    OFF-HIRE BUNKER AND CONDITION SURVEY REPORTM/V “ GENESIS” – IMO 9632947

    HIS IS TO CERTIFY that the undersigned officially appointed marine surveyor did, by the

    request of Messrs. SEAWAY s.a.m., as agents for and on behalf of

    Messrs. UNITED BULK CARRIERS S.A.,  Luxembourg, 

    as charterers, attend on board the Liberia flagship:

    Ship's Name : M/V “GENESIS” 

    Call Sign : D 5 D L 4

    Port of Registry : Monrovia

    Vessel Type : Bulk Carrier

    Length : 229.00 m

    Beam : 32.26 m

    Summer D.W.T : 81,305.4 T

    Gross Tonnage : 44,336 T

    Class / Build : Lloyd’s Register / 2012 

    on the 26th, 28th, 29th and 30th days of October, 2014, the vessel then moored by starboard

    side at Praia Mole Coal Terminal, Berth#1, Vitória, ES, Brazil, for the purpose of carrying out an

    Off-Hire Bunker and Condition Survey to ascertain the

     physical condition of vessel’s weather deck and cargo compartments, etc.and to inspect all fuel oil anddiesel oil tanks and calculate the quantity of bunker remaining on board

    at the time vessel was redelivered from Messrs. UNITED BULK CARRIERS S.A. - Luxembourg,

    as charterers, to Messrs. CARGILL INTERNATIONAL SA, as owners, on DOSLP Praia Mole

    PS, Brazil, on October 30th, 2014 at 16:00 hrs. LT (18:00 UTC), as per terms, conditions,

    provisions and exceptions of the governing Charter-Party.

    http://www.unitedbulkcarriers.com/http://www.unitedbulkcarriers.com/http://www.cargill.com/worldwide/switzerland/http://www.cargill.com/worldwide/switzerland/http://www.cargill.com/worldwide/switzerland/http://www.unitedbulkcarriers.com/http://www.unitedbulkcarriers.com/http://www.unitedbulkcarriers.com/

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    2/22

    6733092/2014

    Page 2/7

    General Notes:

     All shell frames, brackets, railing sections, etc. are counted and named from fore to aft, unlessotherwise specified. The casings, ladder sections, rods of railings, strakes of plating, etc. arecounted and named from bottom to top unless otherwise specified.

    Tank top strakes, corrugations, etc. are counted and named from port to port side, unlessotherwise specified.

    Minor damages such as nicks, cuts and gouges on shell frames / brackets, bulkhead plates, etc.are not enumerated in this report.

    Slight indents: less than ½” deep 

    Moderate indents: more than ½” and less than 1” deep Heavy indents : more than 1” deep 

     ___________________________________________________________________________

    SHIP´S CERTIFICATES

    CERTIFICATE ISSUED DATE DUE DATE

    International Load Line Certificate  14/01/2013 29/05/2017

    Cargo Ship Safety Construction Certificate  17/07/2014 01/03/2015Cargo Ship Safety Radio Certificate 14/01/2013 20/05/2017

    Cargo Ship Safety Equipment Certificate 17/07/2014 01/03/2015

    SOLAS ISM Safety Management Certificate 18/02/2013 29/11/2017

    MARPOL IOPP Certificate (Annex I) 14/01/2013 29/11/2017

    Lnt. Air Pollution Prevention Certificate 17/07/2014 01/03/2015

    Certificate of Class - Class Renewal 11/09/2013 29/05/2017

    Note: A list of main ship´s certificates presented by Mr. Valeriy Zakharko, the Chief Mate inattendance, can be found attached to this survey report.

    See next pages for ascertainments.

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    3/22

    6733092/2014

    Page 3/7

    ASCERTAINMENTS

     After a carefully visual inspection of vessel’s installations, equipment, etc., the following wasascertained:

    WEATHER DECK

    Fore Castle Deck:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.  

    Main Deck to Port Side:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.  

    Main Deck to Starboard Side:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,

    except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.  

    Poop Deck:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.  

    See next pages for cargo compartments.

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    4/22

    6733092/2014

    Page 4/7

    CARGO COMPARTMENTS

    HOLD NO. 01:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

    HOLD NO. 02:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,

    except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

    HOLD NO. 03:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

    HOLD NO. 04:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

    HOLD NO. 05:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

    HOLD NO. 06:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    5/22

    6733092/2014

    Page 5/7

    HOLD NO. 07:

      As per attached master statement, vessel sustained no damage during the charter period, i.e.,except for the bunker ROB, vessel is re-delivered to Cargill International SA, in the samecondition she was found at the time of delivery to United Bulk Carriers S.A.  

    Note:Some damages that can be seen on the attached Photographic Report are old damagessustained by ship prior delivery to Messrs. UNITED BULK CARRIERS S.A.. as informed by Mr.Valeriy Zakharko, the Chief Mate in attendance. Master has stated that NO DAMAGEDOCCURRED TO THE SHIP DURING THIS CHARTER . (See ATTACHMENTS - Letter fromMaster - Master Statement about ship's condition)

    See next page for bunker survey and remaining quantities of bunker on re-delivery.

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    6/22

    6733092/2014

    Page 6/7

    DETERMINATION OF QUANTITIES OF HEAVY FUEL AND DIESEL OIL:

    This bunker survey was carried out, on October 26th, 2014, together with Mr. Nikolay Gurguldaev, Chief Engineer ofM/V "GENESIS", that sign off on October 27th, 2014.

     After having taken temperature and soundings of all bunker tanks, compared same with the tank calibration scales, the followingcalculations were made together with the vessel’s chief engineer in attendance: 

    BUNKER CALCULATIONS: REMAINING QUANTITY OF BUNKER AT THE TIME OF SURVEY:

    Day and time of Bunker Survey: October 26th, 2014, at 14:00 hrs. LT , Praia Mole, Vitória-ES, Brazil.

    Drafts: Fwd: 12.00 m  –  Aft: 12.68 m (Trim 0.68 m by stern). Heel: NIL - Sea water temp: 18.6 oC –  E/R Temp: 30 oC 

    LOW SULPHUR FUEL OIL SOUNDING VOLUM E TEMP. DENSITY VOL. CORREC. QUANTITY

    (Name of Tank) (m) (m3) ( OC) (@ 15OC) FACTOR (MT)

    L.S.H.F.O.T. (P) 4.770 (U) 157.132 51.4 0.9903 0.9749 151.702

    L.S.H.F.O.T. (S) 0.050 (S) 0.700 28.5 0.9404 0.9901 0.652

    L.S.H.F.O. SETT. T. (P) 2.790 (U) 34.375 49.8 0.9404 0.9745 31.502

    L.S.H.F.O. SERV. T. (P) 2.250 (U) 42.585 59.5 0.9404 0.9673 38.737

    TOTAL   222.593

    HIGH SULPHUR FUEL OIL SOUNDING VOLUM E TEMP. DENSITY VOL. CORREC. QUANTITY

    (Name of Tank) (m) (m3) ( OC) (@ 15OC) FACTOR (MT)

    NO. 1 H.F.O.T. (P) 0.970 (U) 357.983 25 0.9890 0.9932 351.638

    NO. 1 H.F.O.T. (S) 0.030 (S) 0.860 22.9 0.9635 0.9943 0.824

    NO. 2 H.F.O.T. (P) 3.600 (U) 52.465 26.1 0.9635 0.9922 50.156

    NO. 2 H.F.O.T. (S) 1.910 (U) 220.370 25 0.9635 0.9929 210.819

    H.F.O. SETT.T. (P) 3.690 (U) 50.910 74.2 0.9671 0.9579 47.162

    H.F.O. SERV. T. (P) 0.695 (U) 76.630 79.4 0.9671 0.9541 70.707

    F.O. OVERFLOW TANK 0.345 (S) 2.301 18.6 0.9840 0.9976 2.259

    TOTAL   733.565

    MARINE DIESEL OIL SOUNDING VOLUME TEMP. DENSITY VOL. CORREC. QUANTITY

    (Name of Tank) (m) (m3) ( OC) (@ 15OC) FACTOR (MT)

    M.D.O. STORAGE T. (S) 6.260 (S) 39.132 27.8 0.8520 0.9894 32.987

    M.D.O. SERV.T. (S) 3.325 (S) 13.649 27.8 0.8690 0.9897 11.739

    TOTAL 44.726

    LOW SULPHUR MGO SOUNDING VOLUME TEMP. DENSITY VOL. CORREC. QUANTITY

    (Name of Tank) (m) (m3) ( OC) (@ 15OC) FACTOR (MT)

    M.G.O. STORAGE T. (S) 7.860 (S) 93.732 27.8 0.8553 0.9895 79.327

    TOTAL 79.327  

    BUNKER R.O.B. AT TIME OF SURVEY, October 26th, 2014, at 14:00 Hrs LT, PRAIA MOLE COAL TERMINAL, VITORIA-ES,BRAZIL. 

    L.S. F.O. : 222.593 MT / H.S.F.O.: 733.565 MT M.D.O. : 44.726 MT / M.G.O.: 79.327 MT 

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    7/22

    6733092/2014

    Page 7/7

    CONSIDERED BUNKER CONSUMPTION FROM SURVEY TIME, OCTOBER 26TH, 2014, AT 14:00 HRS LT, VESSEL BERTHEDAT PRAIA MOLE COAL TERMINAL, UP TO RE-DELIVERY TIME, DLOSP PRAIA MOLE PS, BRAZIL, ON OCTOBER 30TH,

    2014, AT 16:00 HRS LT (18:00 UTC):

    L.S. F.O. : NIL / H.S.F.O.: 14.365 MT M.D.O. : 0.426 MT / M.G.O.: NIL

    BUNKER R.O.B. AT TIME OF RE-DELIVERY, DLOSP PRAIA MOLE PS, ON OCTOBER 30TH, 2014, AT 16:00 HRS LT(18:00 UTC):

    L.S. F.O. : 222.593 MT / H.S.F.O.: 719.200 MTM.D.O. : 44.300 MT / M.G.O.: 79.327 MT

     All concerned parties agreed that the above bunkers quantities were found remaining on board the vessel at the time she wasdelivered from Messrs. UNITED BULK CARRIERS S.A., Luxembourg, as Charterers, to Messrs. CARGILL INTERNATIONAL SA,as Owners, DLOSP Praia Mole PS, on October 30th, 2014, at 16:00 Hrs. LT (18:00 UTC).

    Time log:

    This off hire bunker and condition survey was commenced on October 26th, 2014, at 13:00 hrsLT, and was completed on October 30th, 2014, at 14:00 hrs LT.

    .The contents of this off-hire bunker & condition survey report - the condition of the weather deck and cargo compartments as well asthe quantities of bunkers being on board at time of delivery - are given to the best of our knowledge, true and correct and is issued

    without prejudice to the rights of whom it may concern.

    SurveyorATTACHMENTS:

    - Off-Hire Bunker Survey Result

    - Re-delivery Certificate

    - List of Main Certificates

    - Letter from Master - Master Statement about ship's condition

    - Photographic Report 

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    8/22

    ~ ; ;

    __

     

    ;;:; : 5::

    -   : 5 _   : : : : S : :

     

    i i

    5:::

    E= ==§: -=:a

    §

    ; :

    §

     

    -::;::-;;

     

    services mar itirnos Itda.

    BUNKER SURVEY RESULT

    M /V  GENES IS  

    IM O

    963 947

    This bunker survey was carried out together with Mr. Nikolay Gurguldaev. Chief Engineer of MN  GENESIS 

    After having taken temperature and soundings of all bunker tanks. compared same with the lank calibration scales. the following

    calculations were made together with the vessel's chief engineer in attendance:

    BUNKERCALCULATIONS: REMAI NING OUANTITY OF BUNKER ATTHE TIME OF SURVEy:

    Day and time of Bunker Survey: October 26th, 2014, at 14:00 hrs. LT , Praia Mole, Vitoria-ES, Brazil.

    Drafts : fw d: 12.00 m - Aft : 12.68 m (Trim 0.68 m by stern). Heel: NIL - Sea water temp : 18.6 °C - E/R Temp: 30 °C

    LO W SULPHUR FUB.. OIL SOUNDING VOLUME

    TEJIJI P.

    DENSIT Y VOL. CORREC. QUANTIT Y

    (Nam e o f T an k )

    (

    m)

    (

    m3

    )

      0C)

     @ 15  C)

    FA CTOR

    (MT)

    L

    SHFO

    .T. (

    I')

    4.770  U)

    157

    .132

    51 .4 0.9903 0 .9749 15 1.702

    L SH F O.T. IS) 0 .050

    (5 )

    0.700 28 .5 0.9404 0 .9901 0 .652

    LSH F.O. SETT. T. ( I' ) 2.790 (U) 34.375 49 .8 0.9404 0 .9745

    3 1.50 2

    L S H F.O SERV . T. (I') 2 250  U) 42 .585 59 .5 0 .9404 0 .9673 38 ,737

    T O TA L 222

    .593

    HIGH SULPHUR FUB. OIL SOUNDING VOLUME

    TEMP .

    DENSITY VO L. CORREC. QUANTIT Y

    (Nam e o f Ta n k )

    (

    m)

    (

    m3

    )

    ( OC)

     @ 15°C)

    FACT

    OR

    (MT)

    NO. 1 H.F.O.T.

    (

    I' )

    0 .970  U)

    357.983 25 0 .9890 0 .9932 351 .638

    1\0

    . 1 H.F.O.T. (8) 0 .030 (8)

    0 .

    860

    22 .9 0 .9635

    0.9943 0.824

    NO. 2 HFO.T. (I' ) 3.600 (U) 52.465 26 .1

    0 .9635 0.9922 50 .156

    NO. 2 H.FO.T. (5 ) 1.910 (U) 220 .370 25

    0 ,9635 0 ,9929

    210 .819

    H F.O. SETT.T. ( I')

    3.6 90 (U)

    50 .910

    74 .2

    0.967 1

    0,9579

    47.162

    H.F.O. SERV. T. (I' ) 0.695 (U)

    76.630

    79.4

    0,9671 0.95 41 70 ,707

    F.O .

    O

    VERFL

    OW TA NK 0.345 (5)

    2.30 1 18.6

    0.9840 0.9976

    2

    .259

    T OTAL 733.56

    5

    MA RINE DlESB . OIL SOUNDING V OLUME TEJIJI P. DENSITY V OL. CORREC. QUANTITY

    (Nam e o f Tan k )

    (m ) (

    m3

    )

      0

     

    @  5

    °C)

    FACT OR

    (MT)

    MD.O. STORAGE T.

    (5 )

    6260

    (5 )

    39 .132

    27 ,8

    0.8520

    0

    .989

    4

    32 .987

    M.D.O. SERV .T.

    (5 )

    3

    .325

    (5 )

    13.64 9 27 ,8 0

    ,8690

    0

    .9897

    11

    .739

    T

    OTA

    L

    44

    .726

    LO W SULPHUR

    MG O

    SOUNDI NG VOLUME

    TEJIJI P.

    DENSIT Y

    VOL. CORREC.

    QUANTITY

    (Nam e o f Tan k ) (

    m)

    (m 3)

    ( OC)

     @

    15°C)

    F

    AC

    TO R (M T)

    M.G .O. STORAGE T. (5) 7

    .860

    (5)

    93

    .732

    27 .8 0

    .855

    3 0 .9895 79 .32 7

    TOT A L 79 .327

    BUNKER R.O.B. ATTIME OF SURVEY , Octob er 26 th , 2014 , a t 14 :00 Hrs LT TPM, PRAIA MOLE , VITORIA-ES, BRAZIL.

    L.5 . F.O. :

    M.D.O. :

    222.593 MT

    44 .726 MT

     

    H.5.F.O.:

    M.G.O .:

    733.565 MT

    79.3

    27 MT

     

    Et MARINE SURVEYOR

    Mund i Serv. Maritimos Ltda.

    Roqeno de Atmejda Tristao

    Marine   Cargo Surveyor

    RU .. SEA DE- -rns

     

    rO fJ\,IQ

    AM( e.

     

    EI TR'O ~ l l A

    ESP1RITO SANiO BAA5:L 2

     ) 11

    1E i0:?71 .32.2 fAY.

    l

    r

    ,. ,

    ,l

     

    lJ ., ... ,

    1

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    9/22

    RE DEL IVERY CERTIFIC

    TE

    M V

     GENESIS

    O 963 947

    THIS IS TO CERTIFY THAT THE   BERIAN FLAG SHIP MIV   GENESIS  ,

    I

    . . .

    PORT OF REGISTER,

    MONROV

    IA, 44,336.000 , GROSS TONNAGE,

    WAS

    RE-DELlVERED FROM

    MESSERS. UN

    I1ED

    BULK

    CARR

    IERS S.A. , LUXE BOURG, AS

    CHARTERERS

    , TO MESSRS .

    CARGI

    LL

    INTERNATIONAL SA, AS O

    WNERS

    , DLOSP PRAIA MOLE PS, BRAZIL, ON OCTOBER

    30TH, 2014, AT, AT

     6

    OéJ

    HRS. LOCAL TIME  

    ;,A g :

      é

    UTC) .

    ACCORD

    ING TO OUR BUNKER SURVEY, THE FOLLOWING BUNKER OUANTITIES WERE

    ASCERTAINED TO BE REMAIN ING ON BOARD AT THE TIME OF RE-DE LlVERY:

    L.S. F.O

     

    M D O :

    222

     593

    MT

    44 3 MT

     

    H.S.F.O.:

    11 1·  oo

    MT

    M G O : 79  3  7 MT

    THIS CERTI FICATE IS SUBJECT TO ALL TERMS, CONDITIONS AND EXCEPTIONS OF THE

    RELEVANT CHARTER

    PART

    Y.

    VITÓRIA - ES, BRAZIL, OCTOBER 30TH , 2014 .

    ENGINEER OF MV  GENESIS

    Mr. Oleksanor Trubin

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    10/22

     t

    -

     Pcriod

    IIsslled·

     >

    -

    PreviousCertificare and Survey Status

    -p

    Semto Office 13 m

    30-Sep-14

    -

    ...

    2

    LastClass Su ley Report on board (primou

    frornclass online database)

    13111

    29-Sep-14

     

    3

    ClassSurveyReports• Lastat file

    1---

    130-May-

      _

    4 a.Certificare

    - Class Renewal

    15

    v

      2

    11.09.2013 29.05.2017

    b. ClasslnterrnediateSurvey

    IL

    y

    13

    1

    12

    I

    30.11.2014

      -

    c. ClassAnnual Survey

    I y 17.07.2014

    i

    17.07.2014

    OI-Mar/29-Aug-2015

      _ _

    --

    d.

    Class

    Annual Machinery

    ly

    17072014 117 07 2014 OJ-Mar/29-Aug-2015

    irvey incl

    Class Renewal Iterns(Doe

    19)

    ..-

    c. Banam

    5 Y

    30.05.20J2 29.05.2017

    f Bottom IW Survey iucl Rudder and Propeller

    12

    y

     3

    12

    30.11.20J4

    g. Boiler Intemal Survey (

    I)

    2

    v

    :3 30.11.2014

    I)

    .5 v

    [3052012

     

    Boiler Internai

    (thermal

    29.05.2017

    i. Boiler Externai

    irvey

    1 )

    17.07.2014

    17072014

    OI-Mar/29·Aug·20I 5

    - Flag

     

    5

    a.Flag State• Certificareof

    >1

    01.07.2013

    Permanent

    b. Parallel Ship Registration Cerritícate-

    :ry

    N/A

    FlagState. ContinuousSy

    08.07

    _ • 0   -

    _

    6

    )psi:

    Record

    13

    a.Last CSR on board

     O:

    7

    FlagState - Radio Station License

    ,2:

    2013

    30.01.2017

    .pproved Accouniing

    it y

    (copy)

    .-

    8

    FlagState- Contract with

    OI

    2 3

    9

    FlagState- Minimum Safe Manning Certificare

    14012013

    Flag State- Other Certificates (i.e A&I Liberia,

    ;)

    _ ~ _ N ~ _

    10

    .ypn

     

    a.Antigua and BarbudaTo Whom lt M.f:j SOncern

      STCWstatement)

    I

    N/A

    _._._-_._--

      -

    Ib Marking Note (permanent

    registry

    only) 30.05.2013 Permanent

    lc. Mortgage

      o t i ~ s

    (permanent registry

    o ~ ~ · j

    .. .

    -

      _ ~ . ~ ~ ~ . _ _

    .

    _ _

    0 0

    d. Flag State- Bunker Certificare (Cerrificate of lnsuranceOI Other

    2002.2014

    20.02.2015

    Financiai Securiry in Respect ofcivil Liabilirv for

    131111ker

    Oil Pollution

    Darnage)

     

    -

    e.Other

     

    lnternational TonnageCertificate

      _ ~ _

    - 0 · 0.-

     

    ,

    11

    03072013

    Perrnanent

    iq e Certificare

    0

    ____

    o.

    12 a.lnternational Load

    5 y 14012013

    14.0120J3 29,05.2017

    b. International Load L#1eCertificare - Annua:

    S L ~ ~ _ o

    1

    -

    I

    Y

    17.072014 1707.2014

    ~ M a r 2 9 A u g 2 0 J 5

    a. SOLAS Cargo Ship  aCety Construcuon Certificare

    --   _ . _

    ....

    -

     

    13

    5 y

    14.01.2013 14.012013

    29.05.2017

    +-._-- ,

    b. SOLAS Cargo Ship $.afetyConstruction Ceruficate - Annual Survey

    1

    v

    17.07.2014

    17.07.2014

    O1-Mar/29-Aug·2015

    a. SOLAS Cargo S h í p S ~ r e t y Equipment

    C ~ ~ ~ ~ ~ 5 : ~ ) ~ ~ .

    o

     . _..

    14 5 y 0702.2013 14.0J.2013

    29.05.2017

    .

    b. SOLAS CargoShip Safety Equiprnent Certificate - Annual Survey 1 y 1707.2014

    17072014

    O -Mar/29-Aug-2015

    _.

    15

    a. SOLAS Cargo Ship Safety

    Raclío

    Certificare

    Py

    14012013 14.01.20J3 29.05.2017

      - - - - - ~ -

    :_ _

    b. SOLAS Cargo Ship

    Safety

    Radio

    Certificare -

    Annual Surve, 1 IH17 2014

    17072014

    17.072015

    _............ _ . . ._

    f- .- - . - - - -

    ..

      . - . ~

    16 SOLAS GMDSS Rádio Equipment Shore Baseei Mauuenance Agreernent I

    y

    01012014

    31 122014

    17

    SOLAS Open

    '.;:'

    .

    __. _ _ .

    ..

    Certi ficares:

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    11/22

    18 SOLASISM D o c u m e n t ~ L ~ o r n p l i a n ~ e ( u p d a ~ ~ ) _ ~ ) w i 0 2 . ~ ~ ~ ~ ~ ~ _ a u d l t s )  _.. 15.01.2013 1_2..:...??2013 19.09.2017

    J9 a.SOLASlSMSatety inagern Ceruficare PIRI.3]2041 15y 118.3 29.11.2017

    J . . . . . . : : ~ = ~ .

    --.------

     

    -

    ...

    - - . , , - - . - . - - - - - . - , , - - . - - - ~ - - + - - : - - - - , , - \ - - - ..-----.--f___-.----l-------.--.------1

    b SOLAS ISM lntermediate Audit (betwecn 2nd and 3rd ]ry 2 Y

    20 a. SOLAS ISM Norification Letter

    /ljy

    nage (

    JpICS)

      ]

    122012

    b.

    SOLAS 15M

    Norificanon Letter/ by kg

    (copies)

    21 a.SOLASISPS International Ship Sec rity Cerrificate PIR

    121.3386   5

    y

    121122012

    29112017

    b. SOLAS

    rsps

    IntermediateVeriflcation

    [25 Y

    c.SOLASISPSSS? .pprova Letter

    22 a MARPOL Int. Oil Pollurion Prevention Cert (Annex I)

    \5 y

    ]4.01.2013 29112017

    b.MARPOLlnt. Oil ?ollution PreventionCert .

    Annual

    Survey

    C OMDCalibrationCertificare

    I \

    15y

    23 MARPOLPolI. Prev. Cen.

    t ~ : ~ N o x

    S U _ ~ : . ~ _ ~ 2 : I ~

    ( A n n c · ~   2J:.__

    ~ ~ : A _ _ ~

    f - -

     

    24 MARPOLInt. Sewage Pollutlon

    PreVel1t1011 Cert

    (Annex

    IV) 5 Y

    14012013

    25 MARPOL 'bage Pollution P r e v e ' ; ~ ~ t - ( A n n e x V) 5

    l

    14.01.20]3

    26 MARPOL Int.

    Ai r

    Pollution Prevention Certificate (Annex V]) 5 y 5 72 14

    a.Main Engine EIAPPandTechnical File ...   ScrialNo 2013

    Hynday-MAN B W6S60MC-C8 s/n·· A/\1914

    b. Auxiliary Engine I

    EIAP? / Tec11l1. File ..

    Type   :

    Serial No 13

    STXMANDiesel5L23/30H

    s/n

    5B5L2.'\-12112

    c.Auxiliary Engine2 EIAPP / Techn FuevType   : Serial No

    STXMANDiesel 5L23/30H

    s/n

    SB5L23-12113

    13

    d.Auxiliary Engine3 ElA?? / Techn File - r ipe

    8:.

    SenalNo

    STXMANDiesel 5L23/30H

    s/n

    S85L23-12114

    e.Auxiliary Engine

    4 EIAPP /

    Techn

    -,

    TY JC

      Serial No

    f.

    Harbor/ Ernergency

    Engine/

    Techn

    File-

    Type

      SerialNo

    AD 136TIS s/n EDPYG 113952

    02.072018

      2 42 12

    . IncineratorTypeApproval - Type/Seriai No

    HMMCLtdMAXI

    NGIOOSL

    WS s/n HMR-STA-I

    ---------

    . ..... -- ...

    ---f--.--

    ..

      f t t /

    h.MARPOLlnt. Air Pollution Prevention Certificate-Annual Survey 17072014 17.07.2014 OJ -Mar/29.Aug-20I5

    i I . . . .....

     

    ..- .. -...

      f

    .....-

     

    -- .   ..  = _ .:

    i. MARPOL7 78 ANNEX VI ENERGY EFFICIENCY·

    C f ~ R T I F ] C T E

     

    ----------

    ..- - - - -  -   ----------.- .... ---- - - - - - - - - ----- ---.--------1

    27 IMOBallastWater Managell1ent Certinc,tte

    (convenuon not yet

    In force) 5

    y

    - - - - - - - - - - - - - - - - - - - - . -

    ..---e---------- -----

    ---l

    28 a. Maririme L a b o u r C e n i f i c a t e ~ L C ) ~

    ~ - 5 - y - _ - - ~ ~ o - - - ~ ~ - _ - - _ ~ ~ ~ ~ ~ , ~ - ~ ~ ~ _ ~ ~ ~

    b.MaritimeLatour Certificate (MLC)- Illtennecliate verdication 25y

    - - - - f - - ~ - - - ~ - . . . .

    29 a. IMO G.reen Passport ( R e s A 9 6 ~ ( 2 3 ) . g : _ I . I ~ ~ ~ ~ Ship

    r ~ ~ ~ Y C l i n g ' 1 = __

     

    14. .)

    1.2013 17072014

    b. International Anti-Folllll1g Systern Certificare 14OI 2013

     ------_

     

    -

    _ - - - - . - - - -

      - - - - - - _ . _ . - ~ - - - - - ~ - - - - - I

    30 JLO 'Certificare

    01

    Compliance , 14 OI .2013 20] 3 29.052017

    . . -

    ....

     

    ..

      . . .

    -,, -------..

    --.-.-----f----

      1 1

    3 J Ship S ~ n i t a [ ' Y Control ExernptionYertl fiellle ~ ~ ~ . ~ ~ . o 6 2 ( ) 14 30.12.2014

    .----  ~ ~ . : . : : . : . . . ~ ~ - - - - - ~ t : : L f ~

    D o c l l l ~ e n t

    o f C o m p l i a ~ c e

    for th : Cmriage

    01 D ~ : g e r o l l s

    Goods _..

    .5 Y

    1401.2013 17.07.2014 01-Mar/29-Aug-2015

    GrainCertificate

    I

    2

    . ._ _ . _

    3

    lnt.

    Certo

    ofFitness for theCarriage

    01

    Dang Chemicals in Bulk

    5y

    4

    14.01.2013 117.07.2014 OI-Mar/29-Atlg-2015

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    12/22

    Praia Mole, Vitória, ES, Brazil, October 30th, 2014.

    To

    Messrs. UNITED BULKCARRIERS INTERNATIONAL, Madeira

    C/O Mundi Serviços Marítimos Ltda.

    RuaAlberto Oliveira Santos, 42/ 1309

    Centro - Vitória - ES

    CC:

    Messrs. Carqill   ternational SA

    C/O Orion Rodos Agency - Vitória.

    Re: - M/V  GENESIS  

    - Re-delivery DLOSPPraia Mole, Brazil

    Dear Gcntlemen:

    I , Captain Sergey Koneev, master of the MjV  GENESIS , IMO: 9632947, Port of Registry

    Monrovia, Liberia, declare herein that the mentioned vessel under my command was re

    delivered from Messrs. UNITED BULK

    CARRIERS

    INTERNATIO

    NAL

    Madeira, as Charterers/ to

    Messrs. CargjJj International SA, as Owners, DLOSP

    Pra

    ia Mole, Brazil, on October

     

    2014, at

      tJ:t

    hrs. local time

    : 0 0

    UTC).

    Aboul lhe condition of the cargo notes. hatchcovers, wealher deck, etc, I stale herein tnat the

    vessel was re-delivered lo üwners , Messrs. Cargill International SA, in lhe same condition she

    was delivered lo lhe Charteres, Messrs. UNITED

    BU

    LK

    CARR

    IERS INTERNATIONAL, Madeira.

    except for  a) lhe bunker quantity, that nas lo be ascertained by lhe independenl appoinled

    surveyors. Messrs Mundi Serviços Maritimos LIda., logelher wilh lhe chief engineer in

    attendance and  b) the damages Iisted below, that shall be repaired, ar cornpensated, by

    Messrs. UNITED BULK CARR IERS I

    NTE

    RNATIONAL, Madeira, as per conditions and exceptions

    of the relevant Charter Party:

    List of Damages:

    NO DAMAGE OCCURRED DURING THI 5 CHARTER.

    Yours faithfully

    Receipt

    j

     

    .  ......••..__.._••_ ..

     

    . . t . 7 Ii4tã4

    _ i M RIN U V Y

    OR

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    13/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    14/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    15/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    16/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    17/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    18/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    19/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    20/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    21/22

  • 8/21/2019 GENESIS Off-Hire B&C Pmole

    22/22