Upload
nguyenxuyen
View
216
Download
1
Embed Size (px)
Citation preview
What were your oganisation’s productivity improvement initiative/strategy’s 5 most important focus areas (strategic goals) during the 3 yar period(1 January 2013 to 31 December 2015)
2. PRODUCTIVITY APPROACH: 10
SCORELIST THE 5 MOST IMPORTANT STRATEGIC GOALS OF YOUR ORGANISATIONS’SPRODUCTIVITY IMPROVEMENT PROGRAM (1 January 2013 to 31 December 2015)
TOTAL POINTS = /10
TOTAL POINTS = /20
3.1 RESULTS ACCORDING TO THE 5 MOST IMPORTANT PRODUCTIVITY RATIOS USED IN YOUR ORGANISATION’S PRODUCTIVITYIMPROVEMENT INITIATIVE:20(For eample, but not limited to productivity ratios contained in approaches, entrants may wish too select from, such as: Work Place Challenge Program, 20Keys for continuous improvement, Constraint Analysis, Turn-around Solutions, Critical Thinking Processes, Productivity Oganisational Solutions, Realst[Resource Allocation Strategist], Value Chain Competitiveness Programs and others).
3. RESULTS AND IMPACT (3.1 & 3.2: 40)
CR
ITE
RIA
LIST YOUR ORGANISATIONS 5 MOST IMPORTANTPRODUCTIVITY PERFORMANCE RATIOS BELOW
A
Before &Afterimprovementratio %
BEFORE
(1 JANUARY 2013)
AFTER
(31 DECEMBER 2015)
NO
SCORE
Before and After productivity
performance
B
Ratio formula:Year B - Year A %
Year B
1
2
4
3
5
4
4
4
4
4
EXAMPLE
EX
AM
PLE
EXAMPLE WASTAGE:
WASTAGE: CLUTCH PLATES:PRODUCTION
During year A (beginning of 2013) 20 800 clutch plateswere produced a cost of R22 per unit (20800 x R22= R 475 600).
Cost of the 430 lost units valued at a priceof R58/unit = R24940.
In year B (end of 2015) 32 000 clutch plates wereproduced at a cost of R31 per unit = R992 000.
The cost of 255 lost units valued at a priceof R70/unit = 17 850
BEFORE(YEAR A)
WASTAGE:
Lost aritclesAvailable articles
= 24940 % 476600
= 5.2 %
Cost of Wastage:
= 430 x R 58
= R 24 940
AFTER(YEAR B)
WASTAGE:
Lost aritclesAvailable articles
= 30 100 % 992000
= 3.0 %
Cost of Wastage:
= 255 x R 70
= R 17 850
Year B - Year A %Year B
17850 - 2494017850
= -37.7 %
COST OFWASTAGE ISDOWN BY:
37.7 %
Were there challenges and obstacles? Describe how these were overcome. Include technical, human resources and operational aspects where applicable.
Challenges and Obstacles
• Human resources obstacles 3
• Rising cost of material, capital & labour 2
• Outdated machinery and equipment 2
• Management competencies 3
• Any other challenges 1
TOTAL POINTS = /10CR
ITE
RIA
YES NO
4. IDENTIFY CHALLENGES AND OBSTACLES AND HOW YOU OVERCAME THEM: 10
EVIDENCE/JUSTIFICATIONFOR ALLOCATION
OF POINTS
3.2 ESSENTIAL PRODUCTIVITY MEASUREMENTS REQUIRED FOR ADJUDICATION PURPOSES : 20
CR
ITE
RIA
ESSENTIA PRODUCTIVITY MEASUREMENTSREQUIRED FOR ADJUDICATION PURPOSES
A
Before &Afterimprovementratio %
BEFORE
(1 JANUARY 2013)
AFTER
(31 DECEMBER 2015)
RATIO
SCORE
Before and After productivity
performance
B
Year B - Year A %Year B
1
2
4
3
5
Absenteeism
LOST HOURS %
POSSIBLE HOURS
Number of employees
Customer SatisfactionIndex CSI -Total rating %
Profitability
NETT PROFFIT AFTER TAX %
TOTAL ASSESTS
Total income/total expenditure
RAND TURNOVER %TOTAL OGANISATIONALEXPENDITURE
Sales turn over% year-on-year growth6Net profit as % of sales turnover7Industrial action: People days lost8Annual Labour turnover
NUMBER OF LEAVERS %NUMBER OF HUMANRESOURCES EMPLOYED
9
Total Productivity (Pt)
TOTAL OUTBAND (RAND) %HR (LABOUR) INPUT +CAPITAL INPUT + MATERIALSINPUT (RAND)
10
TOTAL POINTS = /20
Describe the social impact, jobs created, benefits to stakeholders, health and safety practices, employment security, remuneration policy, sharing of benefitsimpact on empowerment.
NO
6. SOCIAL IMPACT: 10
YES
CR
ITE
RIA
EVIDENCE/JUSTIFICATIONFOR ALLOCATION
OF POINTS
List the social impacts (givefigures where possible):• Were additional jobs created? (Permanent vs. Temporary) 3
• Is there a gain sharing scheme? 2
• How did the community benefit from the initiative? Is the 2initiative relevant.
• CSI / Donations / Sponsorships (Total amount spent ondonations made to institutions e.g. NGO’s; schools,universities, hospitals etc.), and sponsorships for sportevent and sport teams as a % of revenue) 3
TOTAL POINTS = /10
Create a work environment that enhances employee health and satisfaction, adherence to safety standards as dictated by the industry.
• Level of safety awareness among workers• Do you have safety rating?• If yes, what rating? If no what initiatives do you have
in placeSafety Measures
• Do you have safety officer/s? 1• Fire drills? 1• Disaster recovery plans and Accident Report? 1• Protective Clothing? 1• Better organised working enviroment (Demarcations,
cleanliness, signage, etc.) 1
YES NO
CR
ITE
RIA
7. SAFETY AND WORKING ENVIRONMENT: 5
EVIDENCE/JUSTIFICATIONFOR ALLOCATION
OF POINTS
TOTAL POINTS = /5
Conformity to set industry standards (eg ISO, SABS), customer satisfaction and improvement
Production to set standards• Any recoginised quality certificate - ISO - Rated? 2
• If you do not have a recognised certification pleaseanswer below questions.
• Show quality improvement (percentages) 1
• Customer satisfaction index (survey) 1
• Quality department (quality measurement and quality 1report)
• Other
YES NO
CR
ITE
RIA
8. QUALITY: 5
EVIDENCE/JUSTIFICATIONFOR ALLOCATION
OF POINTS
TOTAL POINTS = /5
Is the productivity initiative sustainable?• Effective Management and control of productivity initiative. 1• Management commitment and funds to ensure initiative 1
sustainable.• Productive capacity building and skills transfer. 3• Evaluate and improve the strategic planning process. 1
• Will it be possible for other institutions, individuals and 1communties to implement your ideas and achieve thesame or similar results - (is there a mentorship programme)
• Affiliation with professional bodies. 1
• Does the company have a staff member who is its 2productivity champion?
Is the initiative sustainable, has it been institutionalised; what happens if the people in the organization are repositioned? Will it be possible for otherinstitutions, individuals and communities to implement your ideas and achieve the same or similar results? This is not about competitive advantage but aboutlessons, others could learn from your organisation.
CR
ITE
RIA
5. SUSTAINABILITY AND TRANSFERABILITY: 10
YES NO EVIDENCE/JUSTIFICATIONFOR ALLOCATION
OF POINTS
TOTAL POINTS = /10
9. ENVIRONMENTAL IMPACT: 5MEASUREMENT SCORE
Energy Footprint
Water Footprint
DESCRIPTION
Energy efficient methodology, (renewable energy, solar, wind etc.)
Water efficient methodology (Preventing pollution, water treatmentplant, renewable water)
Chemical Footprint (Projects aimed at reducing or even eliminating EDCs (Endocrinedisrupting chemicals) so that you do not pollute
Paper usage methodoly (Recycle, projects aimed at reducing theamount of paper used during production process)
1
1
1
1Reduce the amount of plastics used in production process(Recycle, Reuse)
1
TOTAL POINTS = /5
Paper Footprint
Plastic Footprint
10. GROWTH AND DEVELOPMENT: 5
PeopleInvestment
MEASUREMENTS DESCRIPTIONS %
All costs associated with the provision of Training & Development to specific jobgroupings as % of total Training & Development costs
– Managers
– Supervisors
– Operators / shop floor
– Professionals
– Administrative / support
% Market share Increase / decrease in market share over the previous financial year. Indicate adecrease by a minus.Impact, how have they increased their market shares
Product / serviceinnovation
Revenue generated by newly introduced products / services (products / servicesyounger than 3 years) as a percentage of total revenue.
Business renewal /Diversification /Market Epansion
Total amount of money spent on strategic change interventions (e.g. new technology,restructuring, re-engineering), as % of total revenue over past 3 years.
TOTAL POINTS = /5
1
1
1
2