Generation & Trading
CIST
REGIONAL ENERGY MARKETREGIONAL ENERGY MARKET
IN SOUTH EAST EUROPEIN SOUTH EAST EUROPE
(REM)(REM)
Athens – 27th of October 2004
Generation & Trading
CIST
AGENDAAGENDA
Data Collection Feedback
Grid Code: Organisational Structure
Grid Code: Elements
Workshop Feedback
New Work Plan
Generation & Trading
CIST
Team leader: Frédéric ALBOUY/Nicolas KATCHAROVFrédéric ALBOUY/Nicolas KATCHAROV
Romania:Romania: April/Week 18
Team leader: Philippe RUSSE/ Nicolas KATCHAROV Philippe RUSSE/ Nicolas KATCHAROV Macedonia:Macedonia: May/Week 20 Bulgaria:Bulgaria: May/Week 21 Turkey:Turkey: July/Week 29
Team leader: Jean-Yves BUSSON/Mylène KOLODZIEJEKJean-Yves BUSSON/Mylène KOLODZIEJEK Albania:Albania: May/Week 21 Montenegro:Montenegro: May/Week 22 Kosovo:Kosovo: August/Week 32
Team leader: Laurent TOURRES/Nicolas CHAMOLLETLaurent TOURRES/Nicolas CHAMOLLET Croatia:Croatia: April/Week 18 Bosnia & Herzegovina:Bosnia & Herzegovina: June/Week 25 Serbia:Serbia: July/Week 30
Visits’ datesVisits’ dates
Generation & Trading
CIST
ValidatedValidated In ProgressIn Progress
Bosnia & Herzegovina Albania Croatia BulgariaKosovo Macedonia Serbia Montenegro
RomaniaTurkey
Present state of the reportsPresent state of the reports
Generation & Trading
CIST
PROPOSED FUTUR ORGANISATION:PROPOSED FUTUR ORGANISATION:
1 Steering Committee
3 Working Groups:
PlanningConnectionOperation
Generation & Trading
CIST
1 Steering Committee:
The Steering Committee will be composed of one representative of each country
Every request regarding the Grid Code evolution are submitted to the Steering Committee for evaluation. The Steering Committee approves
the REM Grid Code
The Steering Committee may mandated TSOs or Consultants to perform network studies
(Stability, Short Circuit Power, ..) on the whole region
Generation & Trading
CIST
PLANNING CODE:PLANNING CODE:
REM Systems Development Plan:REM Systems Development Plan: This plan based on each System Reliability Forecast, is an
overview of the regional transmission development. It is done every year for a time horizon up to 10 years
Global REM Generation Adequacy
REM Systems Modelling:REM Systems Modelling:
The UCTE Standard of Data is adopted by the REM members in order to exchange information for performing studies
Generation & Trading
CIST
Protection System:Protection System: The whole protection system must be compatible and the
design protection for boundary substation have to be coordinated within the REM planning Working Group
Defence Plan:Defence Plan:Global REM plan against lost of synchronism: periodically
reviewed
REM under frequency load shedding plan: periodically reviewed
Re-Energizing Plan:Re-Energizing Plan: REM Working Group coordinates black-start capability
Generation & Trading
CIST
Overview to perform Overview to perform studies at the regional studies at the regional level level in order to define in order to define the REM the REM system system development plandevelopment plan
PLANNING CODE:PLANNING CODE:
Generation & Trading
CIST
CONNECTION CONDITIONS:CONNECTION CONDITIONS:
REM TSO shall ensure the regulated access to the transmission network in a non-discriminatory manner
But it is allowed (in case of jeopardizing the system) to interrupt or modify the connection process
Generation & Trading
CIST
Additional requirements for Production:Additional requirements for Production:
Frequency stability: - Primary Control - Secondary Control
- Reserves
Reactive Power Balance
Behaviour in the event of system disturbances (transient stability/steady-state stability)
Restoration of supply: - Tripping onto auxiliary supplies - Black start capability
Generation & Trading
CIST
Harmonisation of the Harmonisation of the criteria criteria for system users in for system users in the whole the whole regional system regional system (equity(equity) )
CONNECTION CONDITIONS:CONNECTION CONDITIONS:
Generation & Trading
CIST
OPERATION CODE:
Frequency Control:Frequency Control: Each TSO must monitor the units response after activation
and must store the data
Level of reserve in accordance with UCTE requirement
Cooperation within the REM TSO:Cooperation within the REM TSO:
Exchange of information Maintenance planning coordination:
- Medium-term planning: 2 meetings/year - Short-term planning: monthly and weekly
confirmation
Special attention for the Power Plans’ planned outage
Generation & Trading
CIST
Voltage and reactive Power Control:Voltage and reactive Power Control: Reactive Energy Exchanges have to be mutually agreed by
the involved TSOs
Exchanges Operation :Exchanges Operation : TSO may object to a transit , which will jeopardize the
security of its network
Generation & Trading
CIST
Emergency Operation:Emergency Operation: In case of emergency: Possibilities for TSOs of actions in
order to avoid collapse (Reduction of Voltage level, Load shedding, ..)
Emergency Operation Plan:Emergency Operation Plan: Coordination between the neighbouring TSO for emergency
assistance
Generation & Trading
CIST
Restoration Plan:Restoration Plan: This Plan shall be coordinated between the REM TSO, it
shall be updated and the restoration procedures shall be tested.
The TSO shall maintain continuously communication between each other and for every case
Back up facilities for communication Maintenance procedure for communication devices
Operation Training: Joint Operators training from different TSOs
Generation & Trading
CIST
Coordination / Exchange Coordination / Exchange of of information between the information between the TTSO’s REM members, in SO’s REM members, in accordance with UCTE accordance with UCTE rulesrules
OPERATION CODE:OPERATION CODE:
Generation & Trading
CIST
WORKSHOP FEEDBACK:WORKSHOP FEEDBACK:
All the entities have attended this first Workshop
Lecturers from EnBW, Powernext, CRE (french Regulatory Authority), Professor Chevalier (Paris University), RTE (French TSO), EKC and EDF
General approach on:
- electricity market
- the balancing market
- and the ancillary services
Generation & Trading
CIST
NEW WORK PLAN:NEW WORK PLAN:
New version of the draft REM Grid Code, taking into account the comments:
End of November
REM National Grid Code draft:End of 2004