GENERAL OBSERVATION REPORT Report Number: M7181304.1610 Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110 Report Date: 08/16/21 Lynnwood, WA 98036-6365 425-742-9360 Client Project Pine Street Group LLC WA State Convention Center Expansion Attn: Webb Miller 1600 9th Ave 1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 8 Permit No.: 6501134-PH GENERAL INFORMATION General Inspection Concrete Placement A concrete placement observation was delayed from 8:00 a.m. to 10:30 a.m. today for the Level 11 slab-on-metal deck at grid lines A.7-D.4/11.4-13.6 and (3) AHU curbs on Level 11 at grid lines D.4/12, E.5/11.8 and G/11.8. The reinforcing steel and final clearances were approved previously. The concrete was placed via line pump and mechanically consolidated into the elements. A total of (80) cubic yards of Stoneway mix 458374c was placed. One set of (5) 4x8” lab-cure cylinders was cast to represent this placement with an expected compressive strength of 4000 psi at (28) days. Reinforcing Steel Inspected Level 2 lower elevator deck between grid lines E.4-F.8/11.6-12.2. Reinforcement was inspected for bar size, grade, lap splice and spacing per RFI 248.12, 4/S514 and 13/S549. Verify the following prior to placement: Install horizontals per detail 4/S514 (#4 at 12”). Correct DBA spacing per RFI 248.12 and detail 13/S549. Complete. Performed a scheduled reinforcing steel inspection of the first lift of Level 1 waler beam from grid lines A-A.2/9-11 and A- A.7/11 and A-A.2/9 for bar size, grade, spacing and splice in accordance with schedule S002, S201C, 11/S239, 10/S624 and S627. Items needed prior to placement: 1. Finish installing (3) #9 bars with hook at line 11 on far west side, of top of A-line wall, per detail 10/S624. Not completed. 2. Clean coated #9 existing bar in top of A-line wall. Not completed. 3. Finish installing #4 at 10” horizontal bars at grid line A.2, per detail 10/S624. Not in this pour. 4. Fix cut perimeter #4 stirrups at grid lines A.5-A.7 along line 11, per detail 12/S627. Not completed. 5. Fix stirrup hook orientation (center of beam) along line 11 per detail 12/S627. Not completed. 6. Correct orientation of 90-degree hooks and complete install of (5) #6 east-west stirrups per detail 8/S627. Not completed. 7. Install north-south #5 bars, 4’ long, perpendicular to stirrup hooks, on west side of A-line wall at line 9, per detail 8/S627. Not completed. 8. Clarify construction joints and reinforcement mentioned in RFI 4249. Not needed. 9. Final clearances. Not completed. Set No. Mix No. S.O. Batch Plant PSI Req. Slump/ Spread Temp. Yards at Sample Yards Total Element Type 1 458374c 1610G 011 4000 24” 85°F 20 80 Level 11 slab-on-metal deck

GENERAL OBSERVATION REPORT

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 1 of 8

Permit No.: 6501134-PH

GENERAL INFORMATION

General Inspection

Concrete PlacementA concrete placement observation was delayed from 8:00 a.m. to 10:30 a.m. today for the Level 11 slab-on-metal deck at grid lines A.7-D.4/11.4-13.6 and (3) AHU curbs on Level 11 at grid lines D.4/12, E.5/11.8 and G/11.8. The reinforcing steel and final clearances were approved previously. The concrete was placed via line pump and mechanically consolidated into the elements. A total of (80) cubic yards of Stoneway mix 458374c was placed. One set of (5) 4x8” lab-cure cylinders was cast to represent this placement with an expected compressive strength of 4000 psi at (28) days.

Reinforcing SteelInspected Level 2 lower elevator deck between grid lines E.4-F.8/11.6-12.2. Reinforcement was inspected for bar size, grade, lap splice and spacing per RFI 248.12, 4/S514 and 13/S549. Verify the following prior to placement:

• Install horizontals per detail 4/S514 (#4 at 12”).• Correct DBA spacing per RFI 248.12 and detail 13/S549. Complete.

Performed a scheduled reinforcing steel inspection of the first lift of Level 1 waler beam from grid lines A-A.2/9-11 and A-A.7/11 and A-A.2/9 for bar size, grade, spacing and splice in accordance with schedule S002, S201C, 11/S239, 10/S624 and S627. Items needed prior to placement:

1. Finish installing (3) #9 bars with hook at line 11 on far west side, of top of A-line wall, per detail 10/S624. Not completed.

2. Clean coated #9 existing bar in top of A-line wall. Not completed.3. Finish installing #4 at 10” horizontal bars at grid line A.2, per detail 10/S624. Not in this pour.4. Fix cut perimeter #4 stirrups at grid lines A.5-A.7 along line 11, per detail 12/S627. Not completed.5. Fix stirrup hook orientation (center of beam) along line 11 per detail 12/S627. Not completed.6. Correct orientation of 90-degree hooks and complete install of (5) #6 east-west stirrups per detail 8/S627. Not

completed.7. Install north-south #5 bars, 4’ long, perpendicular to stirrup hooks, on west side of A-line wall at line 9, per detail

8/S627. Not completed.8. Clarify construction joints and reinforcement mentioned in RFI 4249. Not needed.9. Final clearances. Not completed.

SetNo.

MixNo.

S.O. BatchPlant

PSIReq.

Slump/Spread

Temp. Yards at Sample

Yards Total

Element Type

1 458374c 1610G 011 4000 24” 85°F 20 80 Level 11 slab-on-metal deck

Page 2: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 2 of 8

Performed an unscheduled reinforcing steel inspection of Level 11 AHU curbs at grid lines D.4/12 for bar size, grade, spacing and splice in accordance with schedule S002, S211C and S515. The reinforcing steel was per plan, clearances were verified, and concrete was placed immediately after.

Continued reinforcing steel inspection of the AHU curbs on Level 11 at grid lines E.5/11.8 and G/11.8 for bar size, grade, spacing and splice in accordance with schedule S002, S211C and S515. Items needed prior to placement:

1. Install #5 top horizontal bars in all curbs, per detail 13/S515. Completed.2. Final clearances. Completed.

Continued reinforcing steel inspection of the Level 11 slab-on-metal deck at grid lines A.7-D.4/11.4-13.6 for bar size, grade, spacing and splice in accordance with schedule S002, S211C, S539 and S540. Items needed prior to placement:

1. Install trim reinforcement around any blockouts or penetrations. Completed.2. Clean loose wood and debris off deck. Completed.3. Final clearances. Completed.

Post-Installed Anchors, Level 11An unscheduled epoxy inspection took place at approximately 9:00 a.m., nearly (2) hours before concrete placement started on the Level 11 slab-on-metal deck at grid lines A.7-D.4/11.4-13.6. It was identified that (5) #4 construction joint dowels were missing, and (3) #4 construction joint dowels had been cut to where they only developed 2” to 3” into the slab area that was about to be placed. The construction joint location on Level 11 at grid lines D.4/13-13.6 was where these missing construction joint dowels were identified. Clark Lewis QC was present during the inspection, and the inspection was based on a similar condition in RFI 4222 that was approved by the engineer on 06/25/21 for a horizontal embedment of 7” that was observed.

The Clark Lewis QC authorized a horizontal embedment of 8”, based on the similar condition that was in RFI 4222. The contractor installed #4 candy-cane dowels at 12” on center, with the hooked end of the bar developing into the slab that was being placed. The holes were checked for cleanliness prior to installation. The epoxy used was Hilti HIT-RE 500 (lot no. 1825 17 L3, expiration 02/2022). See photos below for visual observation.

Page 3: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 3 of 8

Looking north along grid line D.4 of construction joint dowels that were cut.

Looking north along grid line D.4 of newly installed construction joint dowels.

Looking east towards grid line D.4 of newly installed construction joint dowels.

Location of construction joint dowels on schedule S211C at grid lines D.4/13.1-13.5.

Page 4: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 4 of 8

Continued reinforcing steel inspection of the Level 7 slab-on-metal deck at grid lines C-E.3/3.7-4. The deck was inspected for bar size, grade, spacing and splice in accordance with schedule S002, S207E, S207, S539, and S540. The following items need to be verified prior to concrete placement:

1. “Chair” reinforcing mat off metal decking. Not completed.2. Final cleanliness check for debris on deck. Not completed.3. Final clearances. Not completed.

Continued reinforcing steel inspection of floor boxes on Level B2 for the slab-on-grade at grid lines A.8-D.8/4-7.4 for bar size, grade, spacing and splice in accordance with schedule S2B2E and S508. The reinforcing steel is per plan.

Continued reinforcing steel inspection on Level B2 for slab-on-grade at grid lines A.7-D.5/4-7.9 for bar size, grade, spacing and splice in accordance with schedule S002, S2B2E, S2B2 and S508. Items needed prior to placement:

1. Clear loose gravel and wrinkles in vapor barrier from floor boxes. Not completed.2. Correct high spot in gravel near SE corner of slab. Not completed.3. Final clearances. Not completed.

Continued reinforcing steel inspection for infills on Level B1 at grid lines A.5-A.7/8.5 for bar size, grade, spacing and splice in accordance with schedule S002, S2B1C, S2B2E, S508, S2B1 and 4-S540. Items needed prior to placement:

1. Clean flutes, install missing reinforcing bars, and secure reinforcement. Not completed.2. Resolve structural steel issues on Level B1 with W27x84 beam at grid lines A.5-A.7/8.5. Not completed.3. Clarify if 90-degree hook replacement bars on Level B1 infill are needed. Not completed.4. Final clearances. Not completed.

Structural Masonry

Level 1J&S Masonry started laying 8” CMU block on Level 1 at grid line D.0-G.0/13.0-13.3 from 0’0” to 2’0”. J&S Masonry mixed Mutual Materials Professional Grade Type S mortar on site per manufacturer’s recommendations, and re-tempered as needed on site and used in laying of 8x8x16” CMU blocks for masonry walls. Mortar joints were per plan and the fins were acceptable; the joints were struck off and within specified tolerances of MSJC ACI 530-13. Reinforcement was inspected for size, grade, lap splice and spacing per schedule S522 and S521.

Page 5: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 5 of 8

Seismic ClipsObserved the installation of 1/2” Hilti KB-TZ wedge anchors horizontally installed in place of missing anchor bolts in masonry wall at Level B2 along grid lines S-U.8/12. Anchors were 6” in length achieving roughly (6) 3” effective embedment couple locations. RFI 3373, reviewed by MKA, instructs the installation of a third 1/2” Hilti KB-TZ with 3-1/4” of embedment. Verified what was installed met RFI and manufacturer’s specification.

• The embedment for (5) anchors ran into reinforcement. Clark is seeking approval for shallow embedment. Shallow embedment approved RFI 4275.

• (2) still need to be installed at grid lines U.5-U.8/12. Complete.

Observed the following conditions concerning seismic clips for top of masonry walls:

• Level B1 along grid lines U-U.9/14, missing seismic clips – (3) appear to meet specifications, and (3) have at least a 1/4” gap between wall and clip with what appears to be shallow embed (no access to see the anchor designation).

Gap and shallow embedment.

Page 6: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 6 of 8

• Level B1 along grid lines U-U.9/13.5, grouted on 03/02/21, are still waiting to have seismic clips installed. Complete.• Level B2 along grid lines U.2-U.8/13.6 have not yet had wedge anchors installed and should be per RFI 3373 with

(3) 1/2” Hilti KB-TZ. Verified anchors were installed per detail 11/S522 RFI 4358 and 3373.• Level B2 along grid line S-U.8/12 has not had the third 1/2” Hilti KB-TZ installed per RFI 3373 See paragraph above.

Complete.

Phase 2

Concrete PlacementA concrete placement observation started at 8:00 a.m. today for the basement wall in Sector A on Level B2 from the top of the footing to the top of wall from grid lines A/17-z.0 and z.0/A-A.3. The reinforcing steel and final clearances were approved previously. The concrete was placed via boom pump and mechanically consolidated into the elements. A total of (96) cubic yards of Stoneway mix 665174 was placed. Five (5) 4x8” lab-cure cylinders were cast to represent this placement with an expected compressive strength of 6000 psi at (28) days.

Reinforcing SteelPerformed a reinforcing steel inspection for the helix truck ramp slab located at grid lines z8.0/y21.5-y23.0 to z2.0-z7.0/y19.0 and Beams B6, B10, B11 and B12. Reinforcing steel for these items is installed per the approved plans and documents with the following exceptions. Verified bar size, grade, spacing, clearances and lap lengths. Items to be verified prior to concrete placement:

1. The reinforcing steel at the construction joint is not complete.2. The west end of the B6 beam still has debris in it.

Performed a scheduled reinforcing steel inspection of (3) columns in Sector A at grid lines y5.8/z9, B.8/18.2 and A.3/19.2. The elements were inspected for bar size, grade, spacing and splice in accordance with schedule S2B2A, S509 and S002. The columns are in conformance with the approved construction documents, and final clearances will be verified prior to placement.

Performed a scheduled reinforcing steel inspection of the Sector A podium shear wall and connected concrete pier at grid lines B.4/17.1-18.2. The element was inspected for bar size, grade, spacing and splice in accordance with schedule S002, S509, S2B2A, S514, 9/S307 and 5/S311. The following items are needed prior to placement:

SetNo.

MixNo.

S.O. BatchPlant

PSIReq.

Slump/Spread

Temp. Yards at Sample

Yards Total

Element Type

1 665174 1610F 014 6000 7-1/2” 83°F 9 96 A-line basement wall

Page 7: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 7 of 8

1. Verify form-savers into existing wall are installed correctly. Not completed.2. Install slab-on-grade form-savers. Not completed.3. Final clearances. Not completed.

Continued reinforcing steel inspection for the following Zone B Level 1 Beams B5, B6, B10, B11 and B12. Reinforcing steel is installed per approved plans and documents. The beams have clearance issues throughout. Beam B6 and B12 have vertical construction joints. Note #6 on detail 7/S513 states that all construction joints in beams need to be authorized by the engineer-of-record prior to placement of forms. These (2) vertical construction joints have not been authorized at this time. This has been brought to the attention of Clark and Lease Crutcher Lewis.

Continued reinforcing steel inspection for the Level 1 type B5, B9 and B17 beams that intersect with the core wall at grid lines y19.3/z7.0, and the type B19 beam that intersects with the core at grid lines y19.3/z12.0. This inspection only includes where these beams connect to the core so Lewis can place some form work. The remaining lengths of these beams still need inspection. The intersections have the correct bar counts, bar size and grade of steel.

Continued reinforcing steel inspection for Level 1 B3 beam at grid lines L.7/17-z.0. Reinforcement was inspected for bar size, grade, lap splice and spacing per schedule S201B, S201BRT, S201BRB, 13/S332, S513 and RFI 3815 and 2810.1. Will continuously verify final clearances.

• Note: MKA Action Items 87.03 and 87.04 are completed on this beam.

Continued reinforcing steel inspection of the south face of the core wall at grid lines z12.0/y19.4-y21.6 to 148’6” for bar size, grade, spacing and splice in accordance with schedule S002, S2B1B, S201B, S306 and S315. Items needed prior to placement:

1. Correct low clearances at grid lines z12/y19.4 pilaster, south side. Not completed.2. Install missing form-savers on south face, per schedule S201BRB and S201BRT. Not in this pour.3. Install missing form-savers/reinforcing steel at grid lines z12.0/y20.3 per detail 15/S316. Not in this pour.4. Final clearances. Not completed.

Continued reinforcing steel inspection of the east face of the core wall at grid lines y21.6/z7.0-z12.0 to 148’6” for bar size, grade, spacing and splice in accordance with schedule S002, S2B1B, S201B, S306 and S315. Items needed prior to placement:

1. Install (3) missing center verticals between grid lines z8.0-z10.0/y21.6 per detail 15/S315. Not completed.2. Remove old concrete and loose debris from core wall reinforcing bars. Completed.3. Final clearances. Not completed.

Page 8: GENERAL OBSERVATION REPORT

GENERAL OBSERVATION REPORTReport Number: M7181304.1610Service Date: 08/11/21 20225 Cedar Valley Rd Ste 110Report Date: 08/16/21 Lynnwood, WA 98036-6365

425-742-9360Client Project

Pine Street Group LLC WA State Convention Center ExpansionAttn: Webb Miller 1600 9th Ave1500 4th Ave Ste 600 Seattle, WA Seattle, WA 98101-1670 Project Number: M7181304

Services: Special Inspections / Materials Testing

Mayes/Terracon Rep.: Samuel Owens Reported To: Clark Construction Contractor: Clark Construction

Report Distribution:See attached distribution list.

Reviewed By: ____________________________________ Barry Tuttle

Project Field ManagerThe tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.

CT0001, 10-16-13, Rev.10 Page 8 of 8

Continued reinforcing steel inspection of the basement wall on Level B2 in Sector A from the top of the footing to the top of wall at grid lines A/17-z.0. The element was inspected for bar size, grade, spacing and splice in accordance with schedule S302, S609, S002, S514, and RFI 3787. The following items are needed prior to placement:

1. Install keyway and form-savers for slab-on-grade. Completed.2. Install pipe sleeves on north end. Completed.3. Lengthen #6 dowel to #9 verticals lap splice. Completed.4. Final clearances. Completed.

COMPLIANCE STATEMENT

Preliminary Observation(s)

Additional Inspectors on site: Craig Williams, Alex Burtis

Page 9: GENERAL OBSERVATION REPORT

Report Date:Service Date:Report Number:

Task:

M7181304.161008/11/2108/16/21

20225 Cedar Valley Rd Ste 110Lynnwood, WA 98036-6365425-742-9360

Distribution List

Distribution Page

(1) Pine Street Group LLC, Webb Miller

(1) American Bridge Company, Ady Velasco

(1) American Bridge Company, Dan Raynor

(1) American Bridge Company, Jason Loebig

(1) American Bridge Company, Jim Thornton

(1) American Bridge Company, Josh Ishibashi

(1) American Bridge Company, Keifer Mosmeier

(1) American Bridge Company, Madeleine Hughan

(1) American Bridge Company, Patrick Ryan

(1) American Bridge Company, Spencer Olson

(1) Clark Construction Group LLC, Amanda Tinoco

(1) Clark Construction Group LLC, Chris Donovan

(1) Clark Construction Group LLC, Colin Reed

(1) Clark Construction Group LLC, Fausto Figueroa

(1) Clark Construction Group LLC, Jeff Shewell

(1) Clark Construction Group LLC, Scott Howland

(1) Clark Construction Group LLC, Zach Travis

(1) Garco Construction Company, Casey Stulc

(1) Garco Construction Company, Dan Fishburn

(1) Garco Construction Company, Jesse Galaviz

(1) Garco Construction Company, Matthew Recknagel

(1) Garco Construction Company, Melissa Meidinger

(1) Garco Construction Company, Mike Herlihy

(1) Lewis Builds, Brian Dougherty

(1) Lewis Builds, Darin Dougherty

(1) Lewis Builds, Dave Hockaday

(1) LMN Architects, Ginnefer Sharpe

(1) LMN Architects, Greg Thompson

(1) Magnusson Klemencic Assoc, Stephen Pool

(1) Magnusson Klemencic Assoc, Thomas Meyer

(1) Mayes Testing Engineers, Inc, Dennis Sanborn

(1) Mayes Testing Engineers, Inc, Melinda Baxter

(1) Mayes Testing Engineers, Inc, Michael Mayes

(1) Pine Street Group LLC, Crystal Ng

(1) Pine Street Group LLC, Heather Glinn

(1) Pine Street Group LLC, Kenneth Wolfe

Page 10: GENERAL OBSERVATION REPORT

Report Date:Service Date:Report Number:

Task:

M7181304.161008/11/2108/16/21

20225 Cedar Valley Rd Ste 110Lynnwood, WA 98036-6365425-742-9360

Distribution List

Distribution Page

(1) Procoretech.com, Doc-Inbound Washington Convention Center

(1) Zemek Construction Company LLC, Dave Zemek

(1) Zemek Construction Company LLC, Preston Dunn

(1) Zemek Construction Company LLC, Roger Hicks