ABBREVIATIONS GENERAL NOTES - MECHANICAL A. COORDINATE THE LOCATION OF THERMOSTATS WITH ALL EQUIPMENT, PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE CONTRACTOR. B. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE COURSE OF THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY EXISTING SERVICE. FOR SAFETY PURPOSES, PAY PARTICULAR ATTENTION TO THIS PRECAUTION RELATIVE TO ELECTRICAL LINES. VERIFY THE LOCATION, SIZE, TYPE, ETC., OF EACH OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN ACCORD WITH ALL FEDERAL, STATE AND/OR LOCAL RULES, REGULATIONS, STANDARD AND SAFETY REQUIREMENTS. C. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM THE WORK OF OTHER TRADES, WHETHER EXISTING OR NEW. D. COORDINATE ALL WORK WITH PROJECT PHASING REQUIREMENTS. E. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR (TO OWNER'S STANDARDS) EXISTING WALLS, CEILINGS, ETC., THAT ARE TO REMAIN IF DAMAGED DURING CONSTRUCTION. REPAIRS SHALL MATCH ADJACENT SURFACES TO THE SATISFACTION OF THE OWNER. F. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL, FEDERAL, MUNICIPALITY, UTILITY COMPANY, COMMONWEALTH OF KENTUCKY, ETC.) G. CONTRACTOR SHALL BE AWARE OF UNSEEN PLUMBING, HVAC AND ELECTRICAL WORK DURING DEMOLITION. IF ITEMS ARE UNCOVERED DURING DEMOLITION THEN FIELD VERIFY THE USE OF THE ITEMS AND PLAN AN ALTERNATE ROUTE TO RUN THESE ITEMS. THEN CONTACT THE ENGINEERS TO REVIEW THE ROUTING. H. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES SHALL BE APPROPRIATELY FIRE STOPPED PER AN APPROVED U.L. LISTED STANDARD. CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO INSULATED PIPING PENETRATIONS. I. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE BUILDING SHALL BE SCHEDULED 2 WEEKS IN ADVANCE, AND SHALL COMPLY WITH INTERIM LIFE SAFETY MEASURES. J. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT SCALE THE DRAWINGS. K. COORDINATE ALL HVAC WORK WITH ELECTRICAL, PLUMBING AND OTHER TRADES TO AVOID INTERFERENCE WITH PIPING, DUCTS, CONDUIT AND OTHER EQUIPMENT. L. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTION. PROVIDE RECOMMENDED ACCESS AND SERVICE CLEARANCES FOR ALL EQUIPMENT. M. SEAL ALL NEW DUCTWORK JOINTS WITH UNITED MCGILL, IRONGRIP 6O1 OR EQUAL WATER BASED SEALANT UNO. N. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING EQUIPMENT APPURTENANCES, ETC., THAT CONFLICT WITH NEW WORK. O. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE INSTALLATION. P. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT USED AS BASIS OF DESIGN SHALL BE THE RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE RESPONSIBILITY OF THE PURCHASER. Q. WORK IN CONFINED AREAS SHALL BE IN ACCORDANCE WITH THE OWNER'S SAFETY POLICY REQUIREMENTS. TAGGED NOTE DESIGNATOR GENERAL SYMBOLS X REVISION TRIANGLE ? ROOM NAME RM # ROOM TAG # AFF ABOVE FINISHED FLOOR AFR ABOVE FINISHED ROOF ADJ ADJUSTABLE AHJ AUTHORITY HAVING JURISDICTION AMP AMPERE (AMP, AMPS) ANSI AMERICAN NATIONAL STANDARD INSTITUTE APD AIR PRESSURE DROP ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR - CONDITIONING ENGINEERS HVAC LEGEND POINT OF CONNECTION / CONNECT TO EXISTING POINT OF DEMOLITION OUTSIDE AIR DIFFUSER MECHANICAL PIPING LEGEND #,### XXX AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER) AIRFLOW TAG EXHAUST AIR DUCT OUTSIDE AIR DUCT EA AIR DUCT TURNING UP EA AIR DUCT TURNING DOWN EXISTING DUCT - (XXX) DENOTES SYSTEM EA OA EA EA E(XXX) RECTANGULAR DUCT ROUND/SPIRAL DUCT ##/## ABBREVIATIONS (CONTINUED) PIPE ELBOW TURNING DOWN PIPE ELBOW TURNING UP PIPE TEE; CONNECTION ON BOTTOM PIPE TEE; CONNECTION ON TOP EXISTING PIPING - (XXX) DENOTES SYSTEM PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEM D(XXX) E(XXX) TWO - WAY CONTROL VALVE BALL VALVE CHECK VALVE FLEXIBLE PIPE CONNECTION PIPING UNION PETE'S PLUG; TEMPERATURE/PRESSURE PORT AUTO - FLOW CONTROL VALVE STRAINER PIPE CAP THERMOSTAT TS T TEMPERATURE SENSOR MOTORIZED DAMPER VERT. HORIZ. MITERED ELBOW WITH TURNING VANES EQUIPMENT TAG INSTANCE TAG XXX - # XXXX BAS BUILDING AUTOMATION SYSTEM CAV CONSTANT AIR VOLUME BTU BRITISH THERMAL UNIT CFM CUBIC FEET PER MINUTE CV VALVE FLOW COEFFICIENT DB DRY BULB CAP CAPACITY FEET PER MINUTE FPM FEET OR FOOT FT FACE VELOCITY FV GALLON ( - S) GAL GENERAL CONTRACTOR GC GALLONS PER MINUTE GPM GRAINS GR HUMIDITY H HEAD HD H ( - ORSEPOWER, - EAT PUMP) HP HEATING, VENTILATING, & AIR - CONDITIONING HVAC LEAVING AIR TEMPERATURE LAT POUNDS LBS LEAVING WATER TEMPERATURE LWT MAXIMUM MAX BTU PER HOUR [THOUSANDS] MBH MINIMUM CIRCUIT AMPS MCA MANUFACTURER MFG MIN ( - IMUM, - UTE) MIN MAXIMUM OVERCURRENT PROTECTION [AMPS] MOCP INCH ( - ES) IN HERTZ Hz NOISE CRITERIA OR NORMALLY CLOSED NC NOT APPLICABLE N/A NOT IN CONTRACT NIC NATIONAL ENVIRONMENTAL BALANCING BUREAU NEBB NORMALLY OPEN OR NUMBER NO NOT TO SCALE NTS PHASE [ELECTRICAL] PH PRESSURE DROP PD POUNDS PER SQUARE INCH PSI RELATIVE HUMIDITY [%] RH REVOLUTIONS PER MINUTE RPM STATIC PRESSURE SP TO BE DETERMINED TBD TESTING AND BALANCING TAB SQUARE FEET OR FOOT SQ FT TYPICAL TYP UNLESS NOTED OTHERWISE UNO TOTAL STATIC PRESSURE TSP TEMPERATURE TEMP VOLT ( - AGE, - S) V VARI ( - ABLE, - IES) VAR VARIABLE AIR VOLUME VAV VELOCITY VEL VARIABLE FEQUENCY DRIVE VFD WATT ( - AGE, - S) W WET BULB WB WATER PRESSURE DROP WPD WEIGHT WT PERCENT % DIFFERENTIAL PRESSURE Δ P TEMPERATURE DIFFERENCE Δ T CENTERLINE NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT DDC DIRECT DIGITAL CONTROLS DEG DEGREE ( - S) DN DOWN DIA DIAMETER ( - S) EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR ELEV ELEVA ( - TION, - TOR) EWT ENTERING WATER TEMPERATURE ESP EXTERNAL STATIC PRESSURE ETR EXISTING TO REMAIN GENERAL NOTES - DEMOLITION A. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT REPRESENTATIVE FOR PROPER COORDINATION. A REQUEST FOR AN OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS IN ADVANCE. B. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE FIRE WATCH OF AREAS WITH OUTAGES. C. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING AND TO A LIKE NEW CONDITION. ALL RATED WALLS AND FLOOR SLABS SHALL BE PATCHED AND REPAIRED TO MAINTAIN RATING. D. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE DEMOLITION PHASE. E. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL UNO AND LIGHT SOLID LINES INDICATE EXISTING ITEMS TO REMAIN. F. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR DEMOLITION) WITH THE OWNER. PHASING NOTES A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION, PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE ALL SAID WORK WITH THE OWNER. HEATING WATER RETURN (HWR) PIPING HEATING WATER SUPPLY (HWS) PIPING NEW PIPING TO BE INSTALLED - XXX DENOTES SYSTEM XXX APPLICABLE BUILDING CODES APPLICABLE BUILDING CODES DOCUMENT YEAR 2013 2015 2013 STATE EDITION FIRE SPRINKLER CODE INTERNATIONAL BUILDING CODE (IBC) INTERNATION PLUMBING CODE (IPC) INTERNATION EXISTING BUILDING CODE (IEBC) NATIONAL FIRE ALARM & SIGNALING CODE NFPA 72 STATE EDITION STATE EDITION NFPA 70 NFPA 13 2015 STATE EDITION INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2015 STATE EDITION INTERNATIONAL FIRE CODE (IFC) 2015 STATE EDITION INTERNATIONAL FUEL GAS CODE (IFGC) 2015 STATE EDITION INTERNATIONAL MECHANICAL CODE (IMC) 2015 2015 NATIONAL ELECTRICAL CODE (NEC) 2014 2015 UNIFORM STATEWIDE BUILDING CODE GAGE/GAUGE GA HWR HWS M M GENERAL NOTES - POWER/SYSTEMS A. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, WITH A MAXIMUM OF THREE (3) BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE PROVIDED WITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME CONDUIT WITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED. B. IDENTIFY THE PANEL AND CICRCUIT NUMBER FOR ALL RECEPTACLES, SWITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELING WITH BLACK LETTERING. MARK INSIDES OF ALL DEVICE BOXES WITH PANEL AND CIRCUIT NUMBER. C. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS SHALL BE COORDINATED WTIH MECHANCIAL CONTRACTOR TO ENSURE ACCESS AND WORKING CLEARANCE IS MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE AREAS. DO NO INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT NAMEPLATES OR ACCESS PANELS OR THROUGH ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER TRADES. CHECKED: DATE: DRAWN: FILENAME: PLOT TIME: CLIENT/CMTA JOB #: C:\Users\dfinn\Documents\VULW21_MECH_R20_dpfinn02.rvt 6/7/2021 10:06:41 AM M100 6/7/2021 DPF TLS CENTER FOR PREDICTIVE MEDICINE BSL3 UNIVERSITY OF LOUISVILLE 950 N Hurstbourne Pkwy, Louisville, KY 40222 MECHANICAL LEGEND AND GENERAL NOTES Bid Set VULW19 REVISIONS

GENERAL NOTES -MECHANICAL ABBREVIATIONS

  • Upload
    others

  • View
    17

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL NOTES -MECHANICAL ABBREVIATIONS

ABBREVIATIONSGENERAL NOTES - MECHANICAL

A. COORDINATE THE LOCATION OF THERMOSTATS WITH ALL EQUIPMENT,

PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED

SHALL BE REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE

CONTRACTOR.

B. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE COURSE OF THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT ANY

EXISTING SERVICE. FOR SAFETY PURPOSES, PAY PARTICULAR ATTENTION

TO THIS PRECAUTION RELATIVE TO ELECTRICAL LINES. VERIFY THE

LOCATION, SIZE, TYPE, ETC., OF EACH OVERHEAD UTILITY. ALL WORK

SHALL BE PERFORMED IN ACCORD WITH ALL FEDERAL, STATE AND/OR

LOCAL RULES, REGULATIONS, STANDARD AND SAFETY REQUIREMENTS.

C. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM THE WORK

OF OTHER TRADES, WHETHER EXISTING OR NEW.D. COORDINATE ALL WORK WITH PROJECT PHASING REQUIREMENTS.

E. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR (TO OWNER'S

STANDARDS) EXISTING WALLS, CEILINGS, ETC., THAT ARE TO REMAIN IF

DAMAGED DURING CONSTRUCTION. REPAIRS SHALL MATCH ADJACENT

SURFACES TO THE SATISFACTION OF THE OWNER.

F. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT MAY

APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY, LOCAL,

FEDERAL, MUNICIPALITY, UTILITY COMPANY, COMMONWEALTH OF KENTUCKY, ETC.)

G. CONTRACTOR SHALL BE AWARE OF UNSEEN PLUMBING, HVAC AND

ELECTRICAL WORK DURING DEMOLITION. IF ITEMS ARE UNCOVERED

DURING DEMOLITION THEN FIELD VERIFY THE USE OF THE ITEMS AND

PLAN AN ALTERNATE ROUTE TO RUN THESE ITEMS. THEN CONTACT THE

ENGINEERS TO REVIEW THE ROUTING.

H. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES SHALL BE

APPROPRIATELY FIRE STOPPED PER AN APPROVED U.L. LISTED STANDARD. CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO INSULATED PIPING

PENETRATIONS.

I. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE BUILDING SHALL

BE SCHEDULED 2 WEEKS IN ADVANCE, AND SHALL COMPLY WITH INTERIM

LIFE SAFETY MEASURES.

J. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE APPROXIMATE AND

SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT SCALE THE

DRAWINGS.

K. COORDINATE ALL HVAC WORK WITH ELECTRICAL, PLUMBING AND OTHER TRADES TO AVOID INTERFERENCE WITH PIPING, DUCTS, CONDUIT AND

OTHER EQUIPMENT.

L. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH MANUFACTURER'S

INSTALLATION INSTRUCTION. PROVIDE RECOMMENDED ACCESS AND

SERVICE CLEARANCES FOR ALL EQUIPMENT.

M. SEAL ALL NEW DUCTWORK JOINTS WITH UNITED MCGILL, IRONGRIP 6O1

OR EQUAL WATER BASED SEALANT UNO.

N. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING EQUIPMENT APPURTENANCES, ETC., THAT CONFLICT WITH NEW WORK.

O. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT

WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE

INSTALLATION.

P. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM

THAT USED AS BASIS OF DESIGN SHALL BE THE RESPONSIBILITY OF THE

PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO

ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE RESPONSIBILITY OF THE PURCHASER.

Q. WORK IN CONFINED AREAS SHALL BE IN ACCORDANCE WITH THE OWNER'S

SAFETY POLICY REQUIREMENTS.

TAGGED NOTE DESIGNATOR

GENERAL SYMBOLS

X REVISION TRIANGLE

?

ROOM NAMERM # ROOM TAG

#

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

ADJ ADJUSTABLE

AHJ AUTHORITY HAVING JURISDICTION

AMP AMPERE (AMP, AMPS)

ANSI AMERICAN NATIONAL STANDARD INSTITUTE

APD AIR PRESSURE DROP

ASHRAEAMERICAN SOCIETY OF HEATING, REFRIGERATION, AND

AIR-CONDITIONING ENGINEERS HVAC LEGEND

POINT OF CONNECTION / CONNECT TO EXISTING

POINT OF DEMOLITION

OUTSIDE AIR DIFFUSER

MECHANICAL PIPING LEGEND

#,###XXX AIR DEVICE TAG (REGISTER, GRILLE, DIFFUSER,LOUVER)

AIRFLOW

TAG

EXHAUST AIR DUCT

OUTSIDE AIR DUCT

EA AIR DUCT TURNING UP

EA AIR DUCT TURNING DOWN

EXISTING DUCT - (XXX) DENOTES SYSTEM

EA

OA

EA

EA

E(XXX)

RECTANGULAR DUCT

ROUND/SPIRAL DUCT#ø

##/##

ABBREVIATIONS (CONTINUED)

PIPE ELBOW TURNING DOWN

PIPE ELBOW TURNING UP

PIPE TEE; CONNECTION ON BOTTOM

PIPE TEE; CONNECTION ON TOP

EXISTING PIPING - (XXX) DENOTES SYSTEM

PIPING TO BE DEMOLISHED - (XXX) DENOTES SYSTEMD(XXX)

E(XXX)

TWO-WAY CONTROL VALVE

BALL VALVE

CHECK VALVE

FLEXIBLE PIPE CONNECTION

PIPING UNION

PETE'S PLUG; TEMPERATURE/PRESSURE PORT

AUTO-FLOW CONTROL VALVE

STRAINER

PIPE CAP

THERMOSTAT

TS

T

TEMPERATURE SENSOR

MOTORIZED DAMPERVERT. HORIZ.

MITERED ELBOW WITH TURNING VANES

EQUIPMENT TAGINSTANCE

TAG XXX-#XXXX

BAS BUILDING AUTOMATION SYSTEM

CAV CONSTANT AIR VOLUME

BTU BRITISH THERMAL UNIT

CFM CUBIC FEET PER MINUTE

CV VALVE FLOW COEFFICIENT

DB DRY BULB

CAP CAPACITY

FEET PER MINUTEFPM

FEET OR FOOTFT

FACE VELOCITYFV

GALLON (-S)GAL

GENERAL CONTRACTORGC

GALLONS PER MINUTEGPM

GRAINSGR

HUMIDITYH

HEADHD

H (-ORSEPOWER, -EAT PUMP)HP

HEATING, VENTILATING, & AIR-CONDITIONINGHVAC

LEAVING AIR TEMPERATURELAT

POUNDSLBS

LEAVING WATER TEMPERATURELWT

MAXIMUMMAX

BTU PER HOUR [THOUSANDS]MBH

MINIMUM CIRCUIT AMPSMCA

MANUFACTURERMFG

MIN (-IMUM, -UTE)MIN

MAXIMUM OVERCURRENT PROTECTION [AMPS]MOCP

INCH (-ES)IN

HERTZHz

NOISE CRITERIA OR NORMALLY CLOSEDNC

NOT APPLICABLEN/A

NOT IN CONTRACTNIC

NATIONAL ENVIRONMENTAL BALANCING BUREAUNEBB

NORMALLY OPEN OR NUMBERNO

NOT TO SCALENTS

PHASE [ELECTRICAL]PH

PRESSURE DROPPD

POUNDS PER SQUARE INCHPSI

RELATIVE HUMIDITY [%]RH

REVOLUTIONS PER MINUTERPM

STATIC PRESSURESP

TO BE DETERMINEDTBD

TESTING AND BALANCINGTAB

SQUARE FEET OR FOOTSQ FT

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

TOTAL STATIC PRESSURETSP

TEMPERATURETEMP

VOLT (-AGE, -S)V

VARI (-ABLE, -IES)VAR

VARIABLE AIR VOLUMEVAV

VELOCITYVEL

VARIABLE FEQUENCY DRIVEVFD

WATT (-AGE, -S)W

WET BULBWB

WATER PRESSURE DROPWPD

WEIGHTWT

PERCENT%

DIFFERENTIAL PRESSUREΔP

TEMPERATURE DIFFERENCEΔT

℄ CENTERLINE

NOTE: NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED ON THIS PROJECT

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE (-S)

DN DOWN

DIA DIAMETER (-S)

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ELEV ELEVA (-TION, -TOR)

EWT ENTERING WATER TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

GENERAL NOTES - DEMOLITION

A. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT

REPRESENTATIVE FOR PROPER COORDINATION. A REQUEST FOR AN

OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS IN

ADVANCE.B. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL PROVIDE

FIRE WATCH OF AREAS WITH OUTAGES.

C. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING

AND TO A LIKE NEW CONDITION. ALL RATED WALLS AND FLOOR SLABS

SHALL BE PATCHED AND REPAIRED TO MAINTAIN RATING.

D. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE

DEMOLITION PHASE.

E. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL UNO AND LIGHT SOLID LINES INDICATE EXISTING ITEMS TO REMAIN.

F. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR

DEMOLITION) WITH THE OWNER.

PHASING NOTES

A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING BUILDING

SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO

COORDINATE AND PHASE ALL TIE-INS AND INTERRUPTIONS OF EXISTING

SERVICES TO MINIMIZE OR ELIMINATE DOWNTIME. IT SHALL BE THE

CONTRACTOR'S RESPONSIBILITY TO BARE ANY AND ALL COSTS ASSOCIATED WITH THIS PHASING, INCLUDING TEMPORARY SERVICES, TEMPORARY

RELOCATION, PREMIUM TIME WORK, ETC. CONTRACTOR SHALL

COORDINATE ALL SAID WORK WITH THE OWNER.

HEATING WATER RETURN (HWR) PIPING

HEATING WATER SUPPLY (HWS) PIPING

NEW PIPING TO BE INSTALLED - XXX DENOTES SYSTEMXXX

APPLICABLE BUILDING CODES

APPLICABLE BUILDING CODES DOCUMENT YEAR

2013

2015

2013

STATE EDITION

FIRE SPRINKLER CODE

INTERNATIONAL BUILDING CODE (IBC)

INTERNATION PLUMBING CODE (IPC)

INTERNATION EXISTING BUILDING CODE (IEBC)

NATIONAL FIRE ALARM & SIGNALING CODE NFPA 72

STATE EDITION

STATE EDITION

NFPA 70

NFPA 13

2015STATE EDITIONINTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2015STATE EDITIONINTERNATIONAL FIRE CODE (IFC)

2015STATE EDITIONINTERNATIONAL FUEL GAS CODE (IFGC)

2015STATE EDITIONINTERNATIONAL MECHANICAL CODE (IMC)

2015

2015

NATIONAL ELECTRICAL CODE (NEC) 2014

2015UNIFORM STATEWIDE BUILDING CODE

GAGE/GAUGEGA

HWR

HWS

M

M

GENERAL NOTES - POWER/SYSTEMS

A. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, WITH A

MAXIMUM OF THREE (3) BRANCH CIRCUITS PER HOMERUN. EACH BRANCH

CIRCUIT SHALL BE PROVIDED WITH A DEDICATED NEUTRAL CONDUCTOR.

DEDICATED NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME CONDUIT

WITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL CURRENT

CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE CONDUIT AS

REQUIRED PER NEC 300.17 AND ANNEX C. MULTIWIRE BRANCH CIRCUITS AS

DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A COMMON NEUTRAL

CONDUCTOR) SHALL NOT BE PERMITTED.

B. IDENTIFY THE PANEL AND CICRCUIT NUMBER FOR ALL RECEPTACLES, SWITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE

LABELING WITH BLACK LETTERING. MARK INSIDES OF ALL DEVICE BOXES

WITH PANEL AND CIRCUIT NUMBER.

C. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS

SHALL BE COORDINATED WTIH MECHANCIAL CONTRACTOR TO ENSURE

ACCESS AND WORKING CLEARANCE IS MAINTAINED PER NEC. NOTIFY

OTHER TRADES OF REQUIRED CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE AREAS. DO NO INSTALL ELECTRICAL EQUIPMENT

OVER EQUIPMENT NAMEPLATES OR ACCESS PANELS OR THROUGH

ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER TRADES.

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:4

1 A

M

M100

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL L

EG

EN

D A

ND

GEN

ER

AL N

OTES

Bid Set

VULW19

REVISIONS

Page 2: GENERAL NOTES -MECHANICAL ABBREVIATIONS

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

T

T T

M8 M8

M7

PHASE IV

PHASE I PHASE II PHASE III

M12

M10

M12

M13 M13 M13 M13 M13

M10

M12

ABSL-3 SIDEBSL-3 SIDE

FIELD APPLIED MOUNTING BRACKETS - SET AGAINST WALL IN CONTINUOUS BEAD OF SEALANT: CONTINUOUS ALL SIDES

EXISTING WALL

MECH. INTERLOCKED GASKETED

PLEXIGLASS DOORS

SLOPED CLOSURE BOTH SIDES

FACTORY WELDED MOUNTING BRACKETS -

SET AGAINST WALL IN CONTINUOUS ALL SIDES

OR AS REQUIRED BY THE MFG TO PROVIDE

AN AIRTIGHT SEAL

CONTROLLER

SLAB

CEILING

SEAL WITH CAULK AIRTIGHT

ROUTE TO ELECTRICAL PANEL LOCATION

SHOWN ON M300A

2'-0"

2'-0"

PROVIDE SQUARE ALUMINUM CONDUIT WITH CAULKING TO

WALL. CONDUIT SHALL BE CLEANABLE AND

PAINTABLE .

THERMOSTAT/TEMPERATURE SENSOR COVER PLATE.

SEAL CONDUIT ENTRANCES WITH EXPANDING FOAM, INSERT STRAW ATTACHMENT TWO INCHES INTO CONDUIT WHEN APPLYING.

SEAL ANY UNUSED KNOCKOUTS WITH CAP AND DUCTSEAL.

FOAM GASKET TO FIT THE THERMOSTAT FACEPLATE STYLE

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:4

5 A

M

M200

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL F

IRST F

LO

OR P

LAN

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN1

KEYNOTES

M7 OUTLINED AREA INDICATES ZONES WITH VALVE CHANGES.

M8 REBALANCE SUPPLY DIFFUSER IN THIS ROOM TO 200 CFM.REFER TO SHEET M300A FOR ADDITIONAL WORK INFORMATION.

M10 PROVIDE NYLON BRUSH DOOR SWEEP, ANODIZED ALUMINUMTO ASSIST WITH PRESSURE CASCADE.

M12 REFER TO THERMOSTAT BACKBOX DETAIL ON THIS SHEET.

M13 PASS-THROUGH BOXES WILL BE OWNER FURNISHED.INSTALLATION WILL BE BY CONTRACTOR. BASIS OF DESIGN ISTO BE PBSC'S "BARRIER HATCH" (PASS-THROUGH BOX)PRODUCT.

SCALE: NONE

PASS THROUGH DETAIL2

SCALE: NONE

THERMOSTAT BACKBOX SEAL DETAIL3

REVISIONS

Page 3: GENERAL NOTES -MECHANICAL ABBREVIATIONS

HV

1&

2 P

LA

N

18

58

18

58

HV

1&

2 P

LA

N

18

58

18

58

M

M

VD

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

RAW

FT

FT

FT

M M M M M M

M1 M1 M2 M2 M2 M2

(TYP)

M3

(TYP)

M3

M4

VVE-148

VVS-124A

VVS-124

VVS-122

VVS-124B

VVE-124B-1

VVE-122

VVE-122A

VVE-124A

VVE-124B-2

VVE-148A

VVE-148C

VVE-148E

VVE-148B VVE-148DVVS-148E

VVS-148C VVS-148A VVS-148D

VVS-148B

VVS-148M M M M M M

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:4

8 A

M

M300A

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL S

ECO

ND

FLO

OR P

LAN

-PH

ASE I

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - PHASE I1

KEYNOTES

M1 REMOVE EXISTING PNEUMATIC OUTSIDE AIR DAMPERACTUATOR INCLUDING ASSOCIATED TUBING AND SUPPORTS.REPLACE WITH NEW ELECTRIC ACTUATOR TO SERVE EXISTING42" X 18" DAMPER.

M2 REMOVE EXISTING PNEUMATIC OUTSIDE AIR DAMPERACTUATOR INCLUDING ASSOCIATED TUBING AND SUPPORTS.REPLACE WITH NEW ELECTRIC ACTUATOR TO SERVE EXISTING60" X 24" DAMPER.

M3 EXISTING SIEMENS CONTROL AND TRANSFORMER PANELS.REMOVE PANELS ASSOCIATED WITH VALVE REPLACEMENT.COMPLETELY REMOVE ASSOCIATED TUBING AND CABLING.CONDUIT SHALL REMAIN.

M4 EXISTING ELECTRICAL PANEL LOCATIONS. COORDINATE NEWVALVE POWER REQUIREMENTS WITH ELECTRICALCONTRACTOR.

GENERAL NOTE: MATERIALS CAN BE BROUGHT UP TO THE INTERSTITIAL LEVEL VIA A CHAIN HOIST AND THROUGH EXTERIOR DOUBLE DOORS IN BACK OF BUILDING. A CONTRACTOR-FABRICATED RAMP SHALL BE USED TO OVERCOME THE CURB BETWEEN THE BUILDING EXPANSION AND THE ORIGINAL BUILDING.

REVISIONS

Page 4: GENERAL NOTES -MECHANICAL ABBREVIATIONS

HV

1&

2 P

LA

N

18

58

18

58

HV

1&

2 P

LA

N

18

58

18

58

M

M

VD

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

RAW

FT

FT

FT

M M M M M M

(TYP)

M3

(TYP)

M3

M4

VVE-145

VVS-121E

VVS-121F

VVS-121 VVS-121A

VVS-121B VVS-121D

VVS-145 VVS-145A VVS-145BVVS-145C

VVS-145D

VVS-145E

VVE-119VVE-118

VVE-119A

VVE-121A-1

VVE-121A-2

VVE-121F

VVE-121E VVE-121B

VVE-121D

VVE-145C

VVE-145E

VVE-145DVVE-145A

VVE-145B

AHU-1 AHU-2 AHU-3 AHU-4

AHU-5 AHU-6

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:4

9 A

M

M300B

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL S

ECO

ND

FLO

OR

PLAN

-PH

ASE I

I

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - PHASE II1

KEYNOTES

M3 EXISTING SIEMENS CONTROL AND TRANSFORMER PANELS.REMOVE PANELS ASSOCIATED WITH VALVE REPLACEMENT.COMPLETELY REMOVE ASSOCIATED TUBING AND CABLING.CONDUIT SHALL REMAIN.

M4 EXISTING ELECTRICAL PANEL LOCATIONS. COORDINATE NEWVALVE POWER REQUIREMENTS WITH ELECTRICALCONTRACTOR.

REVISIONS

GENERAL NOTE: MATERIALS CAN BE BROUGHT UP TO THE INTERSTITIAL LEVEL VIA A CHAIN HOIST AND THROUGH EXTERIOR DOUBLE DOORS IN BACK OF BUILDING. A CONTRACTOR-FABRICATED RAMP SHALL BE USED TO OVERCOME THE CURB BETWEEN THE BUILDING EXPANSION AND THE ORIGINAL BUILDING.

Page 5: GENERAL NOTES -MECHANICAL ABBREVIATIONS

HV

1&

2 P

LA

N

18

58

18

58

HV

1&

2 P

LA

N

18

58

18

58

M

M

VD

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

RAW

FT

FT

FT

M M M M M M

(TYP)

M3

(TYP)

M3

M4

VVE-144

VVS-116A

VVS-116B

VVS-116C

VVS-116

VVS-144VVS-144A

VVS-144B

VVS-144CVVS-144DVVS-144E

VVE-144C

VVE-116A VVE-116B

VVE-116D

VVE-116C

VVE-144A

VVE-144E

VVE-144D

VVE-144B

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

0 A

M

M300C

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL S

ECO

ND

FLO

OR

PLAN

-PH

ASE I

II

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - PHASE III1

KEYNOTES

M3 EXISTING SIEMENS CONTROL AND TRANSFORMER PANELS.REMOVE PANELS ASSOCIATED WITH VALVE REPLACEMENT.COMPLETELY REMOVE ASSOCIATED TUBING AND CABLING.CONDUIT SHALL REMAIN.

M4 EXISTING ELECTRICAL PANEL LOCATIONS. COORDINATE NEWVALVE POWER REQUIREMENTS WITH ELECTRICALCONTRACTOR.

REVISIONS

GENERAL NOTE: MATERIALS CAN BE BROUGHT UP TO THE INTERSTITIAL LEVEL VIA A CHAIN HOIST AND THROUGH EXTERIOR DOUBLE DOORS IN BACK OF BUILDING. A CONTRACTOR-FABRICATED RAMP SHALL BE USED TO OVERCOME THE CURB BETWEEN THE BUILDING EXPANSION AND THE ORIGINAL BUILDING.

Page 6: GENERAL NOTES -MECHANICAL ABBREVIATIONS

HV

1&

2 P

LA

N

18

58

18

58

HV

1&

2 P

LA

N

18

58

18

58

M

M

VD

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

RAW

FT

FT

FT

M M M M M M

(TYP)

M3

(TYP)

M3

M4

VVS-142C

VVS-142A

VVS-142B

VVS-141AVVS-141C

VVS-141B

VVE-142C

VVE-142B

VVE-140

VVE-147A

VVE-147B

VVE-147

VVE-199B

VVE-146

VVE-140A

VVE-141D

VVS-147A

VVE-141C

VVE-141B

VVE-142A

VVE-141A

VVS-140

VVS-147B

VVS-140A VVS-141DVVS-147

VVS-199B

M9

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

1 A

M

M300D

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL S

ECO

ND

FLO

OR

PLAN

-PH

ASE I

V

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - PHASE IV1

KEYNOTES

M3 EXISTING SIEMENS CONTROL AND TRANSFORMER PANELS.REMOVE PANELS ASSOCIATED WITH VALVE REPLACEMENT.COMPLETELY REMOVE ASSOCIATED TUBING AND CABLING.CONDUIT SHALL REMAIN.

M4 EXISTING ELECTRICAL PANEL LOCATIONS. COORDINATE NEWVALVE POWER REQUIREMENTS WITH ELECTRICALCONTRACTOR.

M9 PROPOSED LOCATION FOR NEW TRANSFORMER PANELS.

REVISIONS

GENERAL NOTE: MATERIALS CAN BE BROUGHT UP TO THE INTERSTITIAL LEVEL VIA A CHAIN HOIST AND THROUGH EXTERIOR DOUBLE DOORS IN BACK OF BUILDING. A CONTRACTOR-FABRICATED RAMP SHALL BE USED TO OVERCOME THE CURB BETWEEN THE BUILDING EXPANSION AND THE ORIGINAL BUILDING.

Page 7: GENERAL NOTES -MECHANICAL ABBREVIATIONS

L

21.375∅ 21.375∅

28.5∅

28.63x21.38

38.5∅

28.63x21.38

VD

VD VDVD VD

VD

VD VD

1

1 2 3

4 5

G.1

6 7 8 8.4 9 9.1 9.2

G

F

D.8

2 3

4 5 6 7 8 9

G

F.5

F

E.4

E.3

E.1

E

A

B

C

D

A

B

C

D

23.56x17.69 23.56x17.69

23.75∅23.75∅

M M

M

M

M

M

M M

E(EF-7) E(EF-8) E(EF-1)

E(EF-2) E(EF-3) E(EF-4) E(EF-5) E(EF-6)

(TYP)

M5

(TYP)

M5

M5

M5

PHASE I WORK

M

M

M

MM

M

M M

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

2 A

M

M400

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL R

OO

F P

LAN

Bid Set

VULW19

4' 8' 32'16'0

1/8" = 1'-0"

24'2'

SCALE: 1/8" = 1'-0"

ROOF PLAN - PHASE I1

KEYNOTES

M5 REMOVE EXISTING PNEUMATIC EXHAUST AIR DAMPERACTUATOR INCLUDING ASSOCIATED TUBING AND SUPPORTS.REPLACE WITH NEW ELECTRIC ACTUATOR. PROVIDE NEMA 4HEATED ENCLOSURE.

REVISIONS

Page 8: GENERAL NOTES -MECHANICAL ABBREVIATIONS

EA AIR FLOW TO EF

DRAWBAND CLAMP (TYP.)

NEW EXHAUST VENTURI VALVE

MAINTAIN MANUFACTURER'SRECOMMENDED CLEARANCE OF

14" AROUND VALVE FOR ACCESS

EA AIR FLOW FROM ZONE

EXISTING SOUND TRAP

EXISTING AIRFLOW TEST PORT

DEMOLISH TEMPERATURE SENSOR

EXISTING CURB

EXISTING EA DUCT

WELDED STAINLESS STEEL DUCT EXTENSION. LENGTH AS REQUIRED FOR DRAWBAND CLAMP INSTALLATION

EXISTING EA DUCT

EXISTING FLANGE WITH BUBBLE TIGHT DAMPER

EXISTING DECON PORT WHERE SCHEDULED

NEW TEMPATURE AND HUMIDITY SENSOR LOCATION. DEMOLISH EXISTING HUMIDITY SENSOR.

SA AIR FLOW FROM AHU

DRAWBAND CLAMP (TYP.)

NEW SUPPLY VENTURI VALVE

MAINTAIN MANUFACTURER'SRECOMMENDED CLEARANCE OF

14" AROUND VALVE FOR ACCESS

SA AIR FLOW TO ZONE

EXISTING SOUND TRAP

NEW DUCT MOUNTED HEATING COIL

TRANSITION DUCT TO HEATING COIL.

TRANSITION DUCT TO EXISTING SOUND TRAP

EXISTING STEAM HUMIDIFIER COIL

EXISTING CURB

80"

AF

F M

IN.

HWR

HWS

HAYES AUTO FLOW CONTROL VALVE. AUTOMATIC FLOW CONTROL VALVES UTILIZING CARTRIDGES WITH SEGMENTED PORTS, OR METAL-TO-METAL CONTACT WITH SEAT ARE NOT ALLOWED. FLOW RATES SHALL BE FIELD CHANGEABLE WITHOUT

BREAKING THE PIPING CONNECTIONS.

2-WAY MODULATING CONTROL VALVE

P/T PLUG (TYP)

SUPPORTED 18" SSL BRAIDED FLEXIBLE

HOSE (TYP)

UNION (TYP)

NEW ELECTRIC HUMIDIFER 2-WAY CONTROL VALVE

STM

CR

PROVIDE ACCESS DOOR (MIN. 9" HIGH) PRIOR TO HEATING COIL. PROVIDE ON SIDE WITH LEAST RESTRICTIVE ACCESS.

STRAINER

GENERAL NOTE:

1. DUCTWORK AND DEVICE ASSEMBLIES WILL NEED TO BE FABRICATED PRIOR TO EACH PHASE OF WORK. THE INTENT IS TO SWAP OUT THE NEW ASSEMBLED DUCTWORK SECTIONS.

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

2 A

M

M500

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL D

ETAIL

S

Bid Set

VULW19

SCALE: NONE

PRESSURE INDEPENDENT CONTROLEXHAUST VALVE INSTALLATION DETAIL

2 SCALE: NONE

PRESSURE INDEPENDENT CONTROL SUPPLYVALVE INSTALLATION DETAIL

1

REVISIONS

Page 9: GENERAL NOTES -MECHANICAL ABBREVIATIONS

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

3 A

M

M600

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL S

CH

ED

ULES

Bid Set

VULW19

VENTURI VALVE SCHEDULE

SYMBOL MANUFACTURER MODEL TYPE SYSTEMDUCT CONNECTION

CFMRANGE

INLET STATICPRESSURE(IN. W.C.)

REMARKSINLET OUTLET

VVE08 PHOENIX ACCEL II MEDIUM PRESSURE EXHAUST 8"Ø 8"Ø 35 - 700 0.4 ALL

VVE10 PHOENIX ACCEL II MEDIUM PRESSURE EXHAUST 10"Ø 10"Ø 50 - 1000 0.4 ALL

VVE14 PHOENIX ACCEL II MEDIUM PRESSURE EXHAUST 14"Ø 14"Ø 200 - 2500 0.4 ALL

VVS08 PHOENIX ACCEL II MEDIUM PRESSURE SUPPLY 8"Ø 8"Ø 35 - 700 0.4 ALL

VVS10 PHOENIX ACCEL II MEDIUM PRESSURE SUPPLY 10"Ø 10"Ø 50 - 1000 0.4 ALL

VVS12 PHEONIX ACCEL II MEDIUM PRESSURE SUPPLY 12"Ø 12"Ø 90 - 1500 0.4 ALL

VVS14 PHEONIX ACCEL II MEDIUM PRESSURE SUPPLY 14"Ø 14"Ø 200 - 2500 0.4 ALL

REHEAT COIL SCHEDULE

SYMBOL ZONE SERVEDMANUFACTUR

ER

COIL DIMENSIONS

NO. ROWS AIRFLOWAPD

("WC)EAT / LAT GPM

WPD(FT HEAD)

EWT / LWTHEATING CAP

MBHPIPE SIZELENGTH

(IN.)WIDTH

(IN.)

HC-116 116 AEROFIN 12 12 1 300 0.1 55 / 75 1 0.2 160 / 140 5.5 3/4"

HC-116A 116A AEROFIN 21 12 1 490 0.1 55 / 75 1.5 0.2 160 / 140 10.6 3/4"

HC-116B 116B AEROFIN 21 12 1 300 0.1 55 / 75 1 0.2 160 / 140 5.5 3/4"

HC-116C 116C AEROFIN 12 10 1 90 0.1 55 / 75 0.5 0.2 160 / 140 1.9 3/4"

HC-121 121 AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 2.1 3/4"

HC-121A 121A AEROFIN 24 12 1 1120 0.1 55 / 75 2.5 0.2 160 / 140 2.1 3/4"

HC-121B 121B AEROFIN 12 12 1 240 0.1 55 / 75 0.5 0.2 160 / 140 5.2 3/4"

HC-121D 121D AEROFIN 12 12 1 320 0.1 55 / 75 1 0.2 160 / 140 6.9 3/4"

HC-121E 121E AEROFIN 12 12 1 320 0.1 55 / 75 1 0.2 160 / 140 6.9 3/4"

HC-121F 121F AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 2.1 3/4"

HC-122 122 AEROFIN 12 12 1 140 0.1 55 / 75 0.5 0.2 160 / 140 3.0 3/4"

HC-124 124 AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 2.1 3/4"

HC-124A 124A AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 2.1 3/4"

HC-124B 124B AEROFIN 12 24 1 890 0.1 55 / 75 2 0.2 160 / 140 19.4 3/4"

HC-140 140 AEROFIN 24 36 1 1410 0.1 55 / 75 3.5 0.2 160 / 140 31.7 3/4"

HC-140A 140A AEROFIN 12 11 1 240 0.1 55 / 75 0.5 0.2 160 / 140 4.4 3/4"

HC-141A 141A AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 3.1 3/4"

HC-141B 141B AEROFIN 12 12 1 200 0.1 55 / 75 0.5 0.2 160 / 140 5.3 3/4"

HC-141C 141C AEROFIN 12 10 1 60 0.1 55 / 75 0.5 0.2 160 / 140 2.3 3/4"

HC-141D 141D AEROFIN 12 12 1 240 0.1 55 / 75 0.5 0.2 160 / 140 4.4 3/4"

HC-142A 142A AEROFIN 12 11 1 100 0.1 55 / 75 0.5 0.2 160 / 140 3.1 3/4"

HC-142B 142B AEROFIN 12 12 1 200 0.1 55 / 75 0.5 0.2 160 / 140 5.3 3/4"

HC-142C 142C AEROFIN 12 10 1 60 0.1 55 / 75 0.5 0.2 160 / 140 2.3 3/4"

HC-144 144 AEROFIN 12 12 1 290 0.1 55 / 75 0.5 0.2 160 / 140 5.3 3/4"

HC-144A 144A AEROFIN 24 12 1 470 0.1 55 / 75 0.5 0.2 160 / 140 10.1 3/4"

HC-144B 144B AEROFIN 12 12 1 510 0.1 55 / 75 1.5 0.2 160 / 140 10.1 3/4"

HC-144C 144C AEROFIN 24 12 1 390 0.1 55 / 75 1 0.2 160 / 140 8.5 3/4"

HC-144D 144D AEROFIN 24 12 1 550 0.1 55 / 75 1 0.2 160 / 140 10.1 3/4"

HC-144E 144E AEROFIN 13.5 12 1 300 0.1 55 / 75 1 0.2 160 / 140 5.5 3/4"

HC-145 145 AEROFIN 12 12 1 290 0.1 55 / 75 0.5 0.2 160 / 140 5.3 3/4"

HC-145A 145A AEROFIN 24 12 1 550 0.1 55 / 75 1 0.2 160 / 140 10.1 3/4"

HC-145B 145B AEROFIN 12 12 1 410 0.1 55 / 75 1 0.2 160 / 140 7.5 3/4"

HC-145C 145C AEROFIN 1 570 0.1 55 / 75 1 0.2 160 / 140 10.5 3/4"

HC-145D 145D AEROFIN 24 12 1 550 0.1 55 / 75 1 0.2 160 / 140 10.1 3/4"

HC-145E 145E AEROFIN 12 12 1 300 0.1 55 / 75 1 0.2 160 / 140 5.5 3/4"

HC-147 147 AEROFIN 12 12 1 410 0.1 55 / 75 1 0.2 160 / 140 7.5 3/4"

HC-147A 147A AEROFIN 12 12 1 130 0.1 55 / 75 0.5 0.2 160 / 140 2.4 3/4"

HC-147B 147B AEROFIN 12 12 1 190 0.1 55 / 75 0.5 0.2 160 / 140 3.5 3/4"

HC-148 148 AEROFIN 12 12 1 180 0.1 55 / 75 0.5 0.2 160 / 140 3.3 3/4"

HC-148A 148A AEROFIN 12 12 1 400 0.1 55 / 75 1 0.2 160 / 140 3.8 3/4"

HC-148B 148B AEROFIN 12 12 1 440 0.1 55 / 75 1 0.2 160 / 140 7.5 3/4"

HC-148C 148C AEROFIN 12 12 1 410 0.1 55 / 75 1 0.2 160 / 140 7.5 3/4"

HC-148D 148D AEROFIN 12 12 1 130 0.1 55 / 75 0.5 0.2 160 / 140 2.4 3/4"

HC-148E 148E AEROFIN 12 12 1 210 0.1 55 / 75 0.5 0.2 160 / 140 2.4 3/4"

HC-199B 199B AEROFIN 24 36 1 1890 0.1 55 / 75 3.5 0.2 160 / 140 35 3/4"

REMARKS:

1. APPROVED MANUFACTURERS: PHOENIX CONTROLS AND SIEMENS.2. ALL EQUIPMENT IN ALL PHASES IS TO BE ORDERED AND RECEIVED PRIOR TO COMMENCE OF PHASE I WORK. EQUIPMENT IS TO BE STORED IN AN INSURED

AND BONDED WAREHOUSE. RECEIVED MATERIAL WILL BE INVENTORIED BY THE OWNER, UNIVERSITY OF LOUISVILLE.3. ALL VALVES SHALL BE HIGH-SPEED ELECTRIC.4. PROVIDE WITH DDC PRESSURE INDEPENDENT CONTROLS.5. PROVIDE FACTORY TESTING AND STARTUP.6. PROVIDE FLOW ALARM VIA A PRESSURE SWITCH.7. PROVIDE FLOW FEEDBACK SIGNAL.8. LOW LEAKAGE SHUT OFF. THE LOW LEAKAGE DESIGN ADDS A GASKET THAT PROVIDES NEAR BUBBLE-TIGHT SHUT-OFF PERFORMANCE AT A FRACTION OF

THE COST. LEAKAGE RATES APPROACH 0.02 CFM AT 30 IN. W.C. (0.0092 I/S AT 7,500 PASCALS) AND HAS BEEN TESTED WITH ASME N510S PRESSURE DECAY METHOD AND MEETS THE FOLLOWING LEAKAGE STANDARDS: (EUROPEAN COMMITTEE OF AIR HANDLING AND REFRIGERATION EQUIPMENT MANUFACTURERS (EUROVENT), SECTIONS 2.2 AND 2.3 OF EUROVENT WG 6B), (U.S. DEPARTMENT OF ENERGY (DOE), NUCLEAR AIR CLEANING HANDBOOK), (PUBLIC HEALTH AGENCY OF CANADA, LABORATORY BIOSAFETY GUIDELINES). TYPICAL APPLICATIONS MIGHT BE TO ISOLATE A SPACE FOR DECONTAMINATION AND BIOSAFTEY LEVEL 3 LABORATORIES (BSL3/CSL3) APPLICATIONS WHERE NEAR BUBBLE-TIGHT SHUT-OFF MEETS THE SAFETY AND CONTAINMENT REQUIREMENTS. THE STANDARD SHUT-OFF VALVE PROVIDES SUFFICIENT ISOLATION FOR GASEOUS DECONTAMINATION WHILE THE LOWER LEAKAGE SHUT-OFF VALVE SATISFIES MOST REQUIREMENTS WHERE BUBBLE TIGHT DAMPERS HAVE TYPICALLY BEEN APPLIED.

REMARKS:

1. COIL PERFORMANCE IS MINIMUM ACCEPTABLE; DO NOT PROVIDE COIL WITH LARGER APD.2. PROVIDE STAINLESS STEEL COIL CASING.3. APPROVED MANUFACTURER: AEROFIN, GREENHECK, AND TRANE.

REVISIONS

Page 10: GENERAL NOTES -MECHANICAL ABBREVIATIONS

MECHANICAL CONTROLS LEGEND

ADJ ADJUSTABLEAHU AIR HANDLING UNITAI ANALOG INPUTAO ANALOG OUTPUTAV ANALOG VALUE (READ/WRITE)BAS BUILDING AUTOMATION SYSTEMCAV CONSTANT AIR VOLUMECFM CUBIC FEET PER MINUTECMD COMMANDCV VALVE FLOW COEFFICIENTD DAMPERDAT DISCHARGE AIR TEMPERATUREDDC DIRECT DIGITAL CONTROLDECOM DECOMMISSIONDI DIGITAL INPUTDIFF DIFFERENTIALDO DIGITAL OUTPUTDSP DUCT STATIC PRESSUREDV DIGITAL VALUE (READ/WRITE)EA EXHAUST AIRETR EXISTING TO REMAINGPM GALLONS PER MINUTEH HUMIDITYH/O/A HAND/OFF/AUTOHWR HOT WATER RETURNHWS HOT WATER SUPPLYLACS LABORATORY AIRFLOW CONTROL SYSTEMLAT LEAVING AIR TEMPERATURENC NORMALLY CLOSEDNO NORMALLY OPENOA OUTSIDE AIRPSI POUNDS PER SQUARE INCHRH RELATIVE HUMIDITYSTPT SETPOINTSTS STATUST TEMPERATURETAB TEST AND BALANCETCC TEMPERATURE CONTROL CONTRACTORVAV VARIABLE AIR VOLUMEVEL VELOCITY

INSERTION TEMATURE SENSOR AND HUMIDITY SENSOR

INSERTION TEMPERATURE SENSOR

THERMOSTAT

HUMIDITY SENSOR

PRESSURE SENSOR

MOTORIZED DAMPER

GRAPHICS PAGE POINTSVALUE AND UNIT TO DISPLAYUNITS

BAS POINT

Ts

T

H

P

M

Ts/H

OA

% OPEN

DPR VVS CMD

CFM

CFM STPT

CFM

CFM ACTUAL

CH

SOUND TRAP

TO ZONE

HS

HV-1

% OPEN

HV-1 VALVE

HWS

HWR

SV-1

% OPEN

SV-1 VALVE

STM

CDR

EA

% OPEN

DPR VVE CMD

CFM

CFM STPT

CFM

CFM ACTUAL

SOUND TRAP

FROM ZONE

% RH

H-VVE H

°F

T-VVE T

T-VVSTs

T-VVE

°F

T-VVS T

UNIT MOUNTED CONTROLLER

MEDIUM PRESSURE VENTURI VALVE SEQUENCE OF OPERATION

1. GENERAL:

A. ALL VALVES, CONTROLLERS, AND HEATING COILS SHALL BE FACTORY ASSEMBLED. CONTROLLERS SHALL BE BENCH-PROGRAMMED AND TESTED PRIOR TO SHIPMENT.

B. POWER AND COMMUNICATION TRUNKS SHALL BE INSTALLED UNDER PHASE I, PRIOR TO DECEMBER SITE CHANGEOVER DATE. COORDINATE SCHEDULE AND ACCESS WITH OWNER.

C. COORDINATE WITH OWNER THE TEMPATURE AND HUMIDITY SETPOINTS.

2. THE AIRFLOW CONTROL DEVICES SHALL UTILIZE PEER-TO-PEER, DISTRIBUTED CONTROL ARCHITECTURE TO PERFORM ROOM-LEVEL CONTROL FUNCTIONS. NO CONTROL LOGIC FOR ROOM CONTROL SHALL RESIDE IN THE LACS. CONTROL FUNCTIONS SHALL INCLUDE, AT A MINIMUM, VOLUMETRIC OFFSET PRESSURIZATION, TEMPERATURE, HUMIDITY CONTROL, AS WELL AS RESPOND TO HOOD FLOW DEMANDS, OCCUPANCY, ANDEMERGENCY CONTROL COMMANDS.

3. VOLUMETRIC OFFSET PRESSURIZATION CONTROL

A. THE LABORATORY CONTROL SYSTEM SHALL CONTROL SUPPLY AND AUXILIARYEXHAUST AIRFLOW DEVICES TO MAINTAIN A VOLUMETRIC OFFSET (EITHER POSITIVE OR NEGATIVE). OFFSET SHALL BE MAINTAINED REGARDLESS OF ANY CHANGE IN FLOW OR STATIC PRESSURE (WITHIN SPECIFIED RANGE FOR MEDIUM PRESSURE VALVES). THIS OFFSET SHALL BE FIELD ADJUSTABLE AND REPRESENTS THE VOLUME OF AIR, WHICH WILL ENTER (OR EXIT) THE ROOM FROM THE CORRIDOR OR ADJACENT SPACES. THE GOAL IS TO MAINTAIN 0.05 INH20 MINIMUM PRESSURE DIFFERENTIAL AT EACH DOOR.

4. SPACE TEMPERATURE CONTROL - IF THE SPACE TEMPERATURE DROPS BELOW SETPOINT, THEN THE 2-WAY HOT WATER CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SPACE TEMPERATURE.

5. SPACE HUMIDITY CONTROL - IF THE SPACE HUMIDITY LEVEL DROPS BELOW SETPOINT, THEN THE 2-WAY STEAM VALVE SHALL MODULATE TO MAINTAIN SPACE RELATIVE HUMIDITY.

6. LOSS OF COMMUNICATION/POWER FAIL SAFE - ALL SUPPLY, EXHAUST, REHEAT, AND HUMIDIFIER VALVES SHALL FAIL LAST POSITION.

VVS-DAMPER COMMAND

AIVVS & VVE POINTS LIST AO DI DO TREND

X X

VVS CFM SETPOINT X X

HW VALVE STATUS XX

VVS DISCHARGE AIR TEMPERATURE X X

X

TAG

T-VVS

VVS CFM ACTUAL X

HV-1

STEAM VALVE STATUS XXSV-1

VVE-DAMPER COMMAND X X

VVE CFM SETPOINT X X

VVE ENTERING AIR TEMPERATURE X X

X

T-VVE

VVE CFM ACTUAL X

VVE RELATIVE HUMIDITY XH-VVE X

VALVE FLOW FEEDBACK

VALVE FLOW SETPOINT

JAM ALARM

FLOW ALARM

TOTAL SUPPLY FLOW

TOTAL EXHAUST FLOW

ZONE OFFSET

ZONE OFFSET SETPOINT

OCCUPIED HEATING SETPOINT

OCCUPIED COOLING SETPOINT

UNOCCUPIED HEATING SETPOINT

UNOCCUPIED COOLING SETPOINT

DISCHARGE AIR TEMPERATURE SETPOINT

EXHAUST HUMIDITY

HUMIDITY SETPOINT

DP WARNING SETPOINT

DP ALARM SETPOINT

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SOFTWARE POINTS LIST

Ts/HH-VVE

LACS

EXISTING SIEMENS DISEGO

BACnet IP

ETHERNET

REFER TO PLANS FOR LOCATION

ROOM LEVEL CONTROLLER

VVS-XXX

PROTOCOL- RS-485 OR FTT-10

ROOM LEVEL CONTROLLER

VVS-XXX

ROOM LEVEL CONTROLLER

VVS-XXX

ROOM LEVEL CONTROLLER

VVS-XXX

BAS INTEGRATION NOTES

1. THE CONTRACTOR SHALL REFER TO THE UNIVERSITY OF LOUISVILLE, PHYSICAL PLANT DEPARTMENT FACILITIES AUTOMATION AND CONTROLS OWNER PROJECT REQUIREMENTS (OPR) GUIDELINE, REV 15.

2. EXISTING CONTROLLERS, SENSORS, VALVES, DAMPERS, ACTUATORS, OR OTHER CONTROLS INCLUDING THEIR ASSOCIATED WIRING AND TUBING NOT DESIGNATED FOR REUSE SHALL BE DECOMMISSIONED AND REMOVED BY THE CONTROL SYSTEM CONTRACTOR. DECOMMISSIONING INCLUDES REMOVING AND/OR UPDATING ANY PROGRAMMING, TRENDS, ALARMS, AND GRAPHICS TO REFLECT THE CHANGES.

3. REMOVED CONTROLS SHALL BE OFFERED TO THE UNIVERSITY. UNIVERSITY SHALL BE GIVEN 10 DAYS TO SELECT AND RETAIN ITEMS; CONTROLS SYSTEM CONTRACTOR SHALL PROBABLY DISPOSE OF ANY REMAINING ITEMS.

4. EXISTING CONTROLLERS, SENSORS, VALVES, DAMPERS, ACTUATORS, WIRING AND/OR TUBING DESIGNATED AS ALLOWABLE FOR REUSE, THE CONTROL SYSTEM CONTRACTOR’S MAY CHOOSE TO REUSE OR REPLACE WITH NEW. IF REUSED, THE MATERIALS SHALL BE INSPECTED TO ENSURE THEY ARE FREE OF DEFECTS, CLEANED, CALIBRATED, ADJUSTED, AND BROUGHT UP TO THE LATEST REVISION AS REQUIRED, AND FUNCTIONING ACCORDING TO THE PRODUCT SPECIFICATIONS. CONTROL SYSTEM CONTRACTOR SHALL WARRANTY ANY REUSED AS NEW.

5. HUMIDITY/ TEMPERATURE SENSORS: THESE DEVICES SHALL BE 100% SOLID STATE, LINEAR AND TEMPERATURE COMPENSATED WITH A 0-100% RH RANGE. THE RESPONSE TIME SHALL BE A MINIMUM OF 30 SECONDS FOR A 60% CHANGE. THEY MUST HAVE A 1% ACCURACY BETWEEN 0% - 90% RH. THE OUTPUT OF THE DEVICE MUST UTILIZE A 0-10 VDC OR 4-20MA SIGNAL AS REQUIRED. THE DEVICE MUST USE A POWER SUPPLY OF 24 VAC OR VDC. DUCT MOUNTED SENSORS SHALL HAVE AT LEAST 4" INSERTION PROBE WITH A 16 GAUGE STEEL ENCLOSURE. NIST TRACEABLE CERTIFICATION TO BE PROVIDED TO ENGINEER. APPROVED MANUFACTURER NO SUBSTITUTIONS: VAISALA HMT310 SERIES.

6. THE 2-WAY REHEAT CONTROL VALVES SHALL BE LINEAR GLOBE VALVES. VALVES SHALL PROVIDE THE REQUIRED CAPACITY AND THE CLOSE OFF RATING SHALL BE 150% OF TOTAL SYSTEM (PUMP) HEAD. TWO-WAY VALVES SHALL HAVE REPLACEABLE STEM AND DISC. VALVES WITH SIZE UP TO AND INCLUDING 2" SHALL BE "SCREWED" WITH 250 PSI ANSI PRESSURE BODY RATING;. VALVES SHALL BE SELECTED WITHIN A 3-5 PSIG PRESSURE DROP RANGE AND SHALL FAIL LAST POSITION. ALL ACTUATORS SHALL ALSO UTILIZE THE SAME ANALOG ACTUATION INPUT SIGNAL (2-10 VDC, 4-20 MA) IN ORDER TO MAINTAIN CONSISTENCY IN THE CONTROL APPLICATION. FLOATING POINT CONTROL WITH 2 DIGITAL OUTPUTS IS NOT APPROVED AS ANALOG ACTUATION. POWER REQUIREMENTS: MAXIMUM 15 VA AT 24V AC. TEMPERATURE RATING: -22°F TO 140º. ALL ACTUATORS SHALL HAVE A 5-YEAR FACTORY WARRANTY. FLOATING POINT CONTROL WITH 2 DIGITAL OUTPUTS IS NOT APPROVED AS ANALOG ACTUATION.

7. DAMPER ACTUATORS SHALL BE OF THE SAME MANUFACTURER AND HAVE INTERNAL FEEDBACK CIRCUITRY TO PROVIDE A POSITIVE ACTION TO ENSURE PROPER POSITIONING OF THE DAMPER OR VALVE THROUGH THE ENTIRE SEQUENCE. ACTUATORS SHALL HAVE AN ADJUSTABLE STARTING POINT TO ACCURATELY SET THE RANGE OF TRAVEL TO THE OUTPUT OF THE CONTROLLER. ALL ACTUATORS SHALL ALSO UTILIZE THE SAME ANALOG ACTUATION INPUT SIGNAL (2-10 VDC, 4-20 MA) IN ORDER TO MAINTAIN CONSISTENCY IN THE CONTROL APPLICATION. FLOATING POINT CONTROL WITH 2 DIGITAL OUTPUTS IS NOT APPROVED AS ANALOG ACTUATION. ALL SPRING-RETURN ACTUATORS SHALL HAVE A MANUAL OVERRIDE. POWER REQUIREMENTS: 24V AC OR DC, MAXIMUM 10VA. TEMPERATURE RATING: -22°F TO 140ºF. RUN TIME: DAMPER ACTUATORS SHALL BE FAST ACTING RUNNING TIME (MOTOR) 4S CONSTANT INDEPENDENT OF LOAD. ALL ACTUATORS SHALL HAVE A 5-YEAR FACTORY WARRANTY. SPRING RETURN POSITION SHALL BE.... DAMPER ACTUATOR OUTDOORS SHALL BE NEMA 4 HEATED ENCLOSURE.

8. THE BELOW TABLES INDICATE EXISTING POINTS THAT HAVE BEEN IDENTIFIED. THESE POINTS WILL FALL UNDER NOTES 2, 3, OR 4.

VVS-122

PHASE I - EXISTING VALVES POINTS LIST

VVS-124

DAMPER

ACTUATOR

VVS-124A

XVVS-124B

VVS-148

VVS-148A

VVS-148B

VVS-148C

VS-148D

VVS-148E

UNIT

NUMBER

VELOCITY

PRESSUREHUMIDITY TEMPERATURE

REHEAT

VALVE

HUMIDITY

VALVE

VVE-122

VVE-122A

VVE-124A

VVE-124B-1

VVE-124B-2

VVE-148

VVE-148A

VVE-148B

VVE-148C

VVE-148D

VVE-148E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

122

PHASE I - EXISTING ROOM SPECIFIC POINTS LIST

124

124A

124B

148

148A

148B

148C

148D

148E

ROOM

NUMBER

ROOM DP

ALARMROOM DP

BSC FAN

STATUS

SPACE

SENSOR

EXISTING BAS SYSTEM

TCC

VVS-119

PHASE II - EXISTING VALVES POINTS LIST

VVS-121

DAMPER

ACTUATOR

VVS-121A

VVS-121B

VVS-121D

VVS-121E

VVS-121F

VVS-145

VVS-145A

UNIT

NUMBER

VELOCITY

PRESSUREHUMIDITY TEMPERATURE

REHEAT

VALVE

HUMIDITY

VALVE

VVE-119

VVE-119A

VVE-121A-1

VVE-121A-2

VVE-121B

VVE-121D

VVE-121E

VVE-121F

VVE-145

VVE-145A

VVE-145B

119A

PHASE II - EXISTING ROOM SPECIFIC POINTS LIST

121

121A

124D

124E

124F

145

145A

ROOM

NUMBER

ROOM DP

ALARMROOM DP

BSC FAN

STATUS

SPACE

SENSOR

VVS-116

PHASE III - EXISTING VALVES POINTS LIST

VVS-116A

DAMPER

ACTUATOR

VVS-116B

XVVS-116C

VVS-144

VVS-144A

VVS-144B

VVS-144C

VVS-144D

VVS-144E

UNIT

NUMBER

VELOCITY

PRESSUREHUMIDITY TEMPERATURE

REHEAT

VALVE

HUMIDITY

VALVE

VVE-116A

VVE-116B

VVE-116C

VVE-116D

VVE-144

VVE-144A

VVE-144B

VVE-144C

VVE-144D

VVE-144E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

116

PHASE III - EXISTING ROOM SPECIFIC POINTS LIST

116A

116B

116C

144

144A

144B

144C

144D

144E

ROOM

NUMBER

ROOM DP

ALARMROOM DP

BSC FAN

STATUS

SPACE

SENSOR

VVS-140

PHASE IV - EXISTING VALVES POINTS LIST

VVS-140A

DAMPER

ACTUATOR

VVS-141A

XVVS-141B

VVS-141C

VVS-141D

VVS-142A

VVS-142B

VVS-147

UNIT

NUMBER

VELOCITY

PRESSUREHUMIDITY TEMPERATURE

REHEAT

VALVE

HUMIDITY

VALVE

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

140

PHASE IV - EXISTING ROOM SPECIFIC POINTS LIST

140A

141

141A

141B

141C

141D

142

142A

142B

ROOM

NUMBER

ROOM DP

ALARMROOM DP

BSC FAN

STATUS

SPACE

SENSOR

VVE-118

VVE-145C

VVE-145E

VVE-145D

VVS-147A

VVS-147B

X

X

X

VVS-199B X

VVE-140

VVE-140A

VVE-141A

VVE-141B

VVE-141C

VVE-141D

VVE-142A

VVE-142B

VVE-147

VVE-147A

VVE-147B

VVE-199B

X

X

X

118

142C

X

131

147

147A

199B

131

147B

146

116D

119

145B

145C

145D

145E

122A

PROTOCOL- RS-485 OR FTT-10

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

XXX

XX

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

VVS-145B XX

VVS-145C XX

VVS-145D XX

VVS-145E XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X X

X

XX

X X

X

X

XX X

X X X

X

X

X

X

X

X

CHECKED:

DATE:

DRAWN:

FILENAME:

PLOT TIME:

CLIENT/CMTA JOB #:

C:\

Use

rs\d

finn\D

ocu

ments

\VU

LW

21_M

ECH

_R20_dpfinn02.r

vt

6/7

/2021 1

0:0

6:5

5 A

M

M700

6/7/2021

DPF

TLS

CEN

TER

FO

R P

RED

ICTIV

E M

ED

ICIN

E B

SL3

UN

IVER

SIT

Y O

F L

OU

ISVIL

LE

950 N

Hurs

tbourn

e P

kw

y, Louis

vill

e, KY 4

0222

MECH

AN

ICAL C

ON

TRO

L S

CH

EM

ATIC

S

Bid Set

VULW19

SCALE: NONE

MEDIUM PRESSURE VENTURI VALVECONTROL SCHEMATIC

2

SCALE: NONE

BAS INTEGRATION1

REVISIONS