1
0 - 200' 201' - 400' DPX 2 1.50" 2.00" 0 - 100' 101' - 400' DPX 3 1.50" 2.00" 0 - 150' 151' - 400' DPX 5 2.00" 2.50" 0 - 75' 76' - 250' 251' - 400' DPX 7.5 2.00" 2.50" 3.00" PIPE LENGTH PIPE LENGTH INTAKE PIPE SIZE TABLE (SEE NOTE 8) UNIT SIZE PIPE LENGTH PIPE LENGTH PIPE SIZE (IN) 1.50"NPT 2.00" NPT 2.50" NPT 3.00" NPT EFF. PIPE LENGTH (FT) 3.4 4.9 6.4 7.9 EFFECTIVE PIPE LENGTH FOR ELBOWS 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D 1 of 1 D Sheet Date: Revised: Date: Drawn: DOCUMENT DO NOT SCALE THIS Scale: Description: INST DIA - LL DPX SCROLL AIR SPC 2-7.5Hp NFPA W/ DESC DRYERS MDB 06/26/2019 JDY 10/28/2009 BEACONMEDÆS 4107 8511 86 Part Number: Rev: 02 DN: BM190342 This drawing and the information contained thereon remain the property of BeaconMedaes and may not be used for other than the purpose for which it is loaned without the expressed written permission from BeaconMedaes Engineering. TO HOSPITAL GENERAL NOTES: 1. ALL INTERCONNECTING PIPE AND FITTINGS SHALL BE INSTALLED BY THE CONTRACTOR. 2. ALL PIPING SHALL BE HARD-DRAWN SEAMLESS TYPE "K" OR "L" COPPER TUBING CONFORMING TO ASTM DESIGNATION B-819. 3. ALL PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 99, 2005 EDITION. PIPING LAYOUT IS DIAGRAMMATIC ONLY. FINAL ARRANGEMENT WILL BE SITE SPECIFIC. CONTRACTOR WILL BE RESPONSIBLE FOR FIELD VERIFICATION AND COORDINATING ACTUAL LOCATION WITH ALL OTHER TRADES. 4. CONTRACTOR SHALL VERIFY MOTOR VOLTAGE, PHASE, AND AMP RATINGS BEFORE STARTING ELECTRICAL INSTALLATION; AND MAKE CERTAIN THE VOLTAGE SUPPLIED BY THE HOSPITAL IS THE SAME. 5. THE ROOM REQUIRES DEDICATED MECHANICAL VENTILATION WITH AN ALLOWABLE TEMPERATURE VARIANCE OF 40° TO 105°. (FOR HIGHER AMBIENTS, CONSULT FACTORY). 6. ELECTRICAL POWER SHOULD BE SUPPLIED FROM THE EQUIPMENT SYSTEM BRANCH OF THE ESSENTIAL ELECTRICAL SYSTEM (EMERGENCY POWER). 7. EQUIPMENT, INSTALLATION, AND TESTING OF THE MEDICAL AIR SYSTEM SHALL COMPLY WITH NFPA 99, 2005 EDITION, AND ALL STATE AND LOCAL CODES OR ORDINANCES. 8. WHEN DETERMINING THE TOTAL PIPE LENGTH, ADD ALL THE STRAIGHT LENGTHS OF PIPE TOGETHER IN ADDITION TO THE NUMBER OF ELBOWS TIMES THE EFFECTIVE PIPE LENGTH FOR THE PIPE SIZE. (SEE EQUIVALENT PIPE LENGTH TABLE & EXAMPLE CALCULATION IN THE O&M MANUAL) 9. ALLOW 36 INCHES IN FRONT OF CONTROL PANEL FOR MAINTENANCE AND VENTILATION, ALL OTHER SIDES REQUIRE 24 INCHES OF CLEARNACE. Form F-007 Rev. 01 HIGH-LOW PRESSURE SWITCH MAIN PRESSURE GAUGE SOURCE VALVE - FOR DISCHARGE PIPE SIZING REFER TO STANDARD PRESSURE DROP TABLES. - TOTAL PRESSURE DROP SHOULD BE LESS THAN 5 PSIG. HEAVY-DUTY 4-POINT ISOLATION (SEISMIC OPTIONAL) PIPE INTAKE TO OUTSIDE, TURN DOWN AND SCREEN PER NFPA 99. (REFER TO TABLE ABOVE FOR CORRECT PIPE SIZING). NO VIBRATION PADS ARE NECESSARY AT THIS LOCATION NO FOUNDATION OR INERTIA PAD IS REQUIRED (HOUSEKEEPING PAD IS OPTIONAL) NOTE: ALL ACCESSORIES, PIPE, AND FITTINGS BEYOND INLET AND DISCHARGE PORTS ARE SUPPLIED AND INSTALLED BY OTHERS. (7.5HP WITH 80 GALLON RECEIVER SHOWN) SINGLE POINT POWER WIRING ACCESS ALARM WIRING ACCESS SINGLE POINT DRAIN CONNECTION CONTRACTOR SHALL PIPE TO FLOOR DRAIN ETHERNET WIRING ACCESS DISCHARGE CONNECTION

GENERAL NOTES: INTAKE PIPE SIZE TABLE (SEE NOTE 8) PIPE ... · general notes: 1. all interconnecting pipe and fittings shall be installed by the contractor. 2. all piping shall be

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL NOTES: INTAKE PIPE SIZE TABLE (SEE NOTE 8) PIPE ... · general notes: 1. all interconnecting pipe and fittings shall be installed by the contractor. 2. all piping shall be

0 - 200 ' 201 ' - 400 'DPX 2 1 .50 " 2 .00 "

0 - 100 ' 101 ' - 400 'DPX 3 1 .50 " 2 .00 "

0 - 150 ' 151 ' - 400 'DPX 5 2 .00 " 2 .50 "

0 - 75 ' 76 ' - 250 ' 251 ' - 400 'DPX 7 .5 2 .00 " 2 .50 " 3 .00 "

P IPE LENGT H

PIPE LENGT H

INT A KE P IPE S IZE T A BLE(S EE NO T E 8 )

UNIT S IZE P IPE LENGT H

PIPE LENGT H

PIPE SIZE (IN) 1.50"NPT 2.00" NPT 2.50" NPT 3.00" NPT

EFF. PIPE LENGTH (FT) 3.4 4.9 6.4 7.9

EFFECTIVE PIPE LENGTH FOR ELBOWS

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A A

B B

C C

D D

1 of 1

D

Sheet

Date:Revised: Date: Drawn:

DOCUMENTDO NOT SCALE THIS

Scale:

Description:

INST DIA - LL DPX SCROLL AIRSPC 2-7.5Hp NFPA W/ DESC

DRYERS

MDB 06/26/2019 JDY 10/28/2009

BEACONMEDÆS

4107 8511 86Part Number:

Rev:02

DN:BM190342

This drawing and the information contained thereon remain the property of BeaconMedaes and may not be used for other than the purpose for which it is loaned without the expressed written permission from BeaconMedaes Engineering.

TO HOSPITAL

GENERAL NOTES: 1. ALL INTERCONNECTING PIPE AND FITTINGS SHALL BE INSTALLED BY THE CONTRACTOR. 2. ALL PIPING SHALL BE HARD-DRAWN SEAMLESS TYPE "K" OR "L" COPPER TUBING CONFORMING TO ASTM DESIGNATION B-819. 3. ALL PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 99, 2005 EDITION. PIPING LAYOUT IS DIAGRAMMATIC ONLY. FINAL ARRANGEMENT WILL BE SITE SPECIFIC. CONTRACTOR WILL BE RESPONSIBLE FOR FIELD VERIFICATION AND COORDINATING ACTUAL LOCATION WITH ALL OTHER TRADES. 4. CONTRACTOR SHALL VERIFY MOTOR VOLTAGE, PHASE, AND AMP RATINGS BEFORE STARTING ELECTRICAL INSTALLATION; AND MAKE CERTAIN THE VOLTAGE SUPPLIED BY THE HOSPITAL IS THE SAME. 5. THE ROOM REQUIRES DEDICATED MECHANICAL VENTILATION WITH AN ALLOWABLE TEMPERATURE VARIANCE OF 40° TO 105°. (FOR HIGHER AMBIENTS, CONSULT FACTORY). 6. ELECTRICAL POWER SHOULD BE SUPPLIED FROM THE EQUIPMENT SYSTEM BRANCH OF THE ESSENTIAL ELECTRICAL SYSTEM (EMERGENCY POWER). 7. EQUIPMENT, INSTALLATION, AND TESTING OF THE MEDICAL AIR SYSTEM SHALL COMPLY WITH NFPA 99, 2005 EDITION, AND ALL STATE AND LOCAL CODES OR ORDINANCES. 8. WHEN DETERMINING THE TOTAL PIPE LENGTH, ADD ALL THE STRAIGHT LENGTHS OF PIPE TOGETHER IN ADDITION TO THE NUMBER OF ELBOWS TIMES THE EFFECTIVE PIPE LENGTH FOR THE PIPE SIZE. (SEE EQUIVALENT PIPE LENGTH TABLE & EXAMPLE CALCULATION IN THE O&M MANUAL) 9. ALLOW 36 INCHES IN FRONT OF CONTROL PANEL FOR MAINTENANCE AND VENTILATION, ALL OTHER SIDES REQUIRE 24 INCHES OF CLEARNACE.

Form F-007 Rev. 01

HIGH-LOWPRESSURE SWITCH

MAIN PRESSURE GAUGE

SOURCE VALVE

- FOR DISCHARGE PIPE SIZING REFER TO STANDARD PRESSURE DROP TABLES. - TOTAL PRESSURE DROP SHOULD BE LESS THAN 5 PSIG.

HEAVY-DUTY4-POINT ISOLATION(SEISMIC OPTIONAL)

PIPE INTAKE TO OUTSIDE,TURN DOWN AND

SCREEN PER NFPA 99.(REFER TO TABLE ABOVE

FOR CORRECT PIPE SIZING).

NO VIBRATION PADS ARENECESSARY AT THIS LOCATION

NO FOUNDATION OR INERTIA PAD IS REQUIRED(HOUSEKEEPING PAD IS OPTIONAL)

NOTE: ALL ACCESSORIES, PIPE, AND FITTINGS BEYOND INLET AND DISCHARGE PORTS ARE SUPPLIED AND INSTALLED BY OTHERS.

(7.5HP WITH 80 GALLON RECEIVER SHOWN)

SINGLE POINTPOWER WIRING ACCESS

ALARM WIRING ACCESS

SINGLE POINT DRAINCONNECTION CONTRACTORSHALL PIPE TO FLOOR DRAIN

ETHERNET WIRING ACCESS

DISCHARGECONNECTION