13

GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13
Page 2: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

GENERAL NOTES CONSTRUCTION NOTES

ESTIMATED QUANTITIES

ITEM NO. QUANTITYDESCRIPTION UNIT

MOBILIZATION

TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL

FLAGGER

MAINTENANCE OF TRAFFIC CONTROL DEVICES

CONSTRUCTION SIGN

CONE

DRUM

BARRICADE TYPE III

FIELD OFFICE TYPE B

TRUCK - LARGE (INCLUDING OPERATOR)

ALL PURPORSE EXCAVATOR (INCLUDING OPERATOR)

HAND LABOR - STRAIGHT TIME

EROSION CONTROL GEOTEXTILE

EROSION CONTROL MIX

MULCH

SEEDING METHOD 2

LOAM

WIDEN SHOULDER FOR 350 TERMINAL

GUARDRAIL 350 TERMINAL

PLAIN RIPRAP

GR REMOVE AND DISPOSE

REFLECTORIZED FLEXIBLE GUARDRAIL MARKER

GR TY 3C - OVER 15’ RADIUS

GR TY 3C - SINGLE RAIL

PRECAST CONCRETE BOX CULVERT

COFFERDAM: DOWNSTREAM

COFFERDAM: UPSTREAM

MEMBRANE WATERPROOFING

BITUMINOUS TACK COAT - APPLIED

HOT MIX ASPHALT 12.5 MM BASE

HOT MIX ASPHALT 12.5 MM SURFACE

AGGREGATE SUBBASE COURSE - GRAVEL

STR ROCK EXC - DR & MINOR STR

GRANULAR BORROW

COMMON EXCAVATION

LS

LS

HR

CD/LS

SF

EA

EA

EA

EA

HR

HR

HR

SY

CY

UN

N

CY

EA

EA

CY

LF

EA

LF

LF

LS

LS

LS

SY

G

T

T

CY

CY

CY

CY

1

1

300

60

500

30

15

6

1

10

10

20

100

10

2

2

20

2

2

80

100

6

25

100

1

1

1

80

10

80

40

170

20

90

200

TOTAL: 2 EA

-STA 5+00 LT TO STA. 5+80 LT

-STA. 4+95 RT TO STA. 5+60 RT

606.754 WIDEN SHOULDER FOR 350 FLARED

TOTAL: 2 EA

-STA. 5+00 LT TO STA. 5+37.5 LT

-STA. 4+95 RT TO STA 5+32.5 RT

606.79 GUARDRAIL 350 FLARED TERMINAL

TOTAL: 100 LF

-STA. 4+25 LT TO STA. 5+25 LT

606.363 GR REMOVE AND DISPOSE

TOTAL: 6 EA

-STA. 5+37.5 LT

-STA. 5+00 LT

-STA. 5+32.5 RT

-STA. 4+95 RT

-STA. 4+70 RT

-STA. 4+50 RT

606.353 RELECTORIZED FLEXIBLE GUARDRAIL MARKER

TOTAL: 25 LF

-STA. 4+50 27.1’ RT TO STA. 4+70 15.5’ RT

606.232 GR TY 3C - OVER 15’ RADIUS

TOTAL: 100 LF

-STA. 4+70 15.5’ RT TO STA. 4+95 15.5’ RT (2 PANELS)

-STA. 4+25 13’ LT TO STA. 5+00 13’ LT (6 PANELS)

606.23 GR TY 3C - SINGLE RAIL

-NECESSARY REMOVAL OF UNDERDRAIN

-REMOVAL OF EXISTING TWIN 4’ CMP

-REQUIRED FOOTINGS

ROCK EXCAVATION SHALL BE PAID UNDER ITEM 206.07.

-EXCAVATION BELOW SUBGRADE SHALL BE INCIDENTAL. NECESSARY

-ANY NECESSARY CLEARING

THE FOLLOWING SHALL BE CONSIDERED INCIDENTAL TO THIS ITEM:

AREAS AND STATIONS AS SHOWN ON PLANS.

531.71 PRECAST CONCRETE BOX CULVERT

DOWNSTREAM: 1 LS

UPSTREAM: 1 LS

511.07 COFFERDAM

659.10

656.75

652.38

652.361

652.35

652.34

652.33

652.312

639.19

631.172

631.12

629.05

620.58

619.1401

619.12

618.14

615.07

606.754

606.79

610.08

606.363

606.353

606.232

606.23

534.71

511.07

511.07

508.13

409.15

403.213

403.208

304.10

206.07

203.25

203.20

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

002

_GeneralN

otes.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

GE

NE

RA

L

NO

TE

S/

ES

TI

MA

TE

__

__

_

213

22548.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

022548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

CONTROL, FEBRUARY, 2008.

TRANSPORTATION’S BEST MANAGEMENT PRACTICES FOR EROSION & SEDIMENTATION

25. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MAINE DEPARTMENT OF

ACCEPTABLE TO THE RESIDENT.

FURNISHED BY MAINEDOT. ALL LAYOUT, STAKES, AND GRADES WILL BE CHECKED AND MUST BE

TO DETERMINE NEW CONSTRUCTION FINISH GRADES FROM DIFFERENTIAL ELEVATION SHEETS

THESE STAKES. THESE STAKES AND GRADES WILL BE USED TO LAYOUT CENTERLINE AND

THE CONSTRUCTION LIMITS AND THE EXISTING CENTERLINE GRADES SHALL BE TRANSFERRED TO

AS PER STANDARD SPECIFICATION 105.6.2. SIDE STAKES SHALL BE PLACED SAFELY OUTSIDE OF

24. THE CONTRACTOR IS RESPONSIBLE FOR THE CAREFUL SIDE STAKING OF EXISTING CENTERLINE

WILL BE MADE UNDER ITEM 620.58 EROSION CONTROL GEOTEXTILE.

23. EROSION CONTROL GEOTEXTILE SHALL BE PLACED AT ALL RIPRAP LOCATIONS. PAYMENT

22. STATIONS REFERENCED ARE APPROXIMATE.

ADJACENT TO THE PROJECT SHALL REMAIN ACCESSIBLE AT ALL TIMES.

21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT THE DRIVEWAY IMMEDIATELY

PRECAST CONCRETE BOX CULVERT.

20. REMOVAL OF EXISTING DRAINAGE SHALL BE CONSIDERED INCIDENTAL TO ITEM 531.71

REPLACED AS DETERMINED BY THE RESIDENT AT THE CONTRACTOR’S EXPENSE.

CULVERT. ANY DAMAGE TO THE BOX CULVERT DURING CONSTRUCTION SHALL BE REPAIRED OR

19. RIPRAP ADJACENT TO THE BOX CULVERT SHALL BE PLACED SO AS TO NOT DAMAGE THE

INCIDENTAL TO THE RELATED DRAINAGE ITEMS.

BACKSLOPING REQUIREMENTS WILL NOT BE PAID FOR DIRECTLY BUT WILL BE CONSIDERED

18. ADDITIONAL EXCAVATION FOR THE CONTRACTOR’S CONVENIENCE OR TO COMPLY WITH

EXCAVATION, DITCH & INSLOPE, OR EQUIPMENT RENTAL AREAS.

17. AREAS REQUIRING FILL ON THE PROJECT WILL COME FROM SUITABLE EXCAVATION FROM

EXPENSE.

EQUIPMENT, AND MATERIALS REQUIRED TO MAKE REPAIRS SHALL BE AT THE CONTRACTOR’S

OR OPERATION SHALL BE REPAIRED TO THE SATISFACTION OF THE RESIDENT. ALL WORK,

16. ANY DAMAGE TO THE SLOPES CAUSED BY THE CONTRACTOR’S EQUIPMENT, PERSONNEL,

CONTRACT.

ENSURE THAT THE MAIL WILL BE DELIVERABLE. PAYMENT WILL BE INCIDENTAL TO THE

15. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING MAILBOXES TO

RESIDENT. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO RELATED CONTRACT ITEMS.

BEEN FOUND SHALL BE PLACED IN CONCRETE PER STANDARD DETAIL 606.24, AS DETERMINED BY THE

14. ANY GUARDRAIL POSTS PLACED BETWEEN STA 4+65 AND 4+85 AS WELL AS POSTS WHERE LEDGE HAS

EACH SECTION OF BEAM GUARDRAIL.

13. GUARDRAIL END TREATMENTS SHALL BE INSTALLED CONCURRENTLY WITH THE PLACEMENT OF

APPROVAL OF THE RESIDENT.

12. NO EXISTING DRAINAGE SHALL BE ABANDONED, REMOVED OR PLUGGED WITHOUT PRIOR

TO THE RELATED PAVING ITEMS.

11. ANY NECESSARY CLEANING OF EXISTING PAVEMENT PRIOR TO PAVING SHALL BE INCIDENTAL

INCIDENTAL TO 656 ITEMS.

WASTE AREAS. GRADING, SEEDING, AND MULCHING OF WASTE AREAS TO BE CONSIDERED

10. ALL WASTE MATERIAL NOT USED ON THE PROJECT SHALL BE DISPOSED OF IN ACCEPTABLE

FINAL COMPLETION OF THE PROJECT THERE IS NO DROP-OFF FROM THE EDGE OF SHOULDER.

9. THE CONTRACTOR SHALL PLAN AND CONDUCT THEIR WORK ACCORDINGLY SO THAT UPON

BY HAND.

8. UNLESS OTHERWISE NOTED, SEEDING METHOD NO.2 SHALL BE USED. SEEDING MAY BE DONE

BY THE RESIDENT.

DEPTH OF 2 INCHES. EROSION CONTROL MIX MAY BE USED IN THESE AREAS AS DETERMINED

CONSTRUCTED SIDE SLOPES NOT RECEIVING RIPRAP. LOAM SHALL BE PLACED TO A NOMINAL

7. LOAM, SEED, AND MULCH ARE TO BE PLACED ON DISTURBED LAWN AREAS AND ON NEWLY

FLATTER, OR AS DIRECTED BY THE RESIDENT.

6. ALL INSLOPE AND DITCHES IN CUT AREAS SHALL BE GRADED AS SHOWN ON THE TYPICALS OR

SAW CUT. PAYMENT SHALL BE INCIDENTAL TO THE 403 ITEMS.

5. ALL JOINTS BETWEEN EXISTING AND PROPOSED HOT BITUMINOUS PAVEMENT SHALL BE

RESIDENT.

ACTUAL LIMITS SHALL BE DETERMINED BY THE CONTRACTOR AND APPROVED BY THE

4. CLEARING LIMIT LINES SHOWN ON THE PLANS ARE FOR ESTIMATING PURPOSES ONLY.

RIGHT OF WAY MAP.

3. FOR EASEMENTS, CONSTRUCTION LIMITS AND RIGHT OF WAY LINES, REFER TO THE

SPECIFIED IN THE SPECIAL PROVISIONS

2. DURING CONSTRUCTION, THE ROAD WILL BE CLOSED TO TRAFFIC FOR A TIME PERIOD

OTHERWISE STATED.

1. INVOLVED UTILITIES SHALL BE ADJUSTED BY THEIR RESPECTIVE OWNERS UNLESS

Page 3: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

31.53’ RT

STA. 4+75

REMOVE EXISTING TWIN 4’ CMP

LIMIT OF WORK

STA. 4+18

LIMIT OF WORK

STA. 5+60

AS DIRECTED BY RESIDENT

EXISTING UNDERDRAIN

REMOVE APPROX 10’ OF

DOWNSTREAM COFFERDAM

APPROX. LOCATION OF

UPSTREAM COFFERDAM

APPROX. LOCATION OF

3+00

4+00 5+00

6+00

7+00

7+28

7+28

PO

B

=

ST

A.

3+

00.0

0P

C

=

ST

A.

3+

23.2

6

PC

C

=

ST

A.

4+

16.4

6

PT

=

ST

A.

5+

50.4

2

PC

=

ST

A.

6+

28.5

2

PT =

ST

A.

7+

27.7

0

E = 3.12’

T = 46.87’

L = 93.19’

R = 350.00’

PI = 3+70.14

CURVE DATA #1

E = 7.53’

T = 68.09’

L = 133.97’

R = 303.88’

PI = 4+84.55

CURVE DATA #2

E =

1.23’

T =

49.63

L =

99.18

R =

1000.00

’PI = 6

+78.15

CURVE DATA

#3

IPFIPF

IPF

IPF

IPF

IPF

24.60’ LT

STA. 4+79

4’ C

MP

3/4" D

IA R

OD

1" DIA R

OD

1/2" D

IA REB

AR PLS 2066

18" C

MP

3/4" D

IA R

OD PLS 2006

1" DIA IR

ON PIP

E

18" C

MP

3" P

LASTIC

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

003

_H

DPla

n1.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

OF

PL

AN

S

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

3

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

PROPOSED POLE

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

1/2" D

IA REB

AR PLS 13

23

ARR

OW

ARR

OW

306

55/55

24" P

INE

54/54

56/56 2

98

53/53

Page 4: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

004

_T

ypic

al.dgn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

TY

PIC

AL

SE

CTIO

NSTYPICAL APPROACH SECTION

__

__

_

4

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

VARIES VARIES

5.00 11.00 11.00 3.00 2.00

VARIESVARIES

2:1 2:1

2" HMA SURFACE

4" HMA BASE

24" AGGREGATE SUBBASE COURSE - GRAVEL

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

Page 5: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

005

_P

LA

NP

RO

FIL

E.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

OF

PL

AN

S

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

5

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

Scale in Feet

25 0 25 50

5 0 5 10

PROFILE

Horiz.

Vert.

Scale in Feet

PLAN

25 0 25 50

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

0

5

10

15

20

25

30

35

40

-5

0

5

10

15

20

25

30

35

40

-5

3+50 6+00

3+50 4+50 5+50 6+00

PROFILE

EL. 10.7

3

EL. 11.18

EL. 11.5

4

EL. 11.7

7

EL. 11.8

8

EL. 12.0

6

EL. 12.4

9

EL. 13.17

EL. 14.10

EL. 15.2

8

EL. 16.6

8

EL. 11.8

8

EL. 12.0

6

EL. 12.4

9

EL. 13.1

7

PVI =

ST

A. 4+0

3.3

5

ELE

V. =

11.7

9

PVI =

ST

A. 5+18.4

6

ELE

V. =

12.0

1

PVT =

ST

A. 5+8

7.5

8

ELE

V. =

15.9

7

G = 5.7

2%

V.C.L. = 55’

E = 0.384’

SD = 93’

V.C.L. = 92’

E = -0.212’

SD = 633’

V.C.L. = 138’

E = 0.956’

SD = 154’

GRANULAR BORROW

PAY LIMITS FOR

OPEN BOTTOM PRECASE CONCRETE BOX

PROP. 8’ SPAN BY 3’ RISE

OSHA STANDARDS (TYP.)

BACKSLOPING TO COMPLY WITH

COURSE - GRAVEL

AGGREGATE SUBBASE

25’-3"44’-8�"25’-0�"

BEGIN TRANSITION

MATCH EXISTING

STA 4+30

BEGIN PROJECT

END TRANSITION

STA 4+55

BEGIN TRANSITION

END PROJECT

STA 5+00

MATCH EXISTING

END TRANSITION

STA 5+25

4+00 5+00

4’ CMP

EXISTING TWIN

FOOTER DETAILS

SEE SHEET #7 FOR

4+00

5+00

6+00

PO

B

=

ST

A.

3+

00.0

0P

C

=

ST

A.

3+

23.2

6

PC

C

=

ST

A.

4+

16.4

6

PT

=

ST

A.

5+

50.4

2

PC

=

ST

A.

6+

28.5

2

E = 3.12’

T = 46.87’

L = 93.19’

R = 350.00’

PI = 3+70.14

CURVE DATA #1

E = 7.53’T = 68.09’L = 133.97’R = 303.88’

PI = 4+84.55CURVE DATA #2

E =

1.23’T

= 49.63

’L = 9

9.18’

R =

1000.00

PI =

6+78.15

CURVE DATA

#3

IPFIPF

IPF

IPF

IPF

Page 6: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

BY

DA

TE

SHEET NUMBER

OFNOT TO SCALE

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

006_

Culv

ertDetails.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

613

22548.0

0

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

Flow

TYPICAL LONGITUDINAL SECTION

BO

X

CU

LV

ER

T

DE

TAIL

S

C LC

UL

VE

RT

BOX CULVERT PLAN

Flow

STRUCTURAL CONCRETE, AS APPLICABLE

SPECIFICATIONS AND SPECIAL PROVISION 534, PRECAST

UNITS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER’S

2. CONSTRUCTION, HANDLING, AND ASSEMBLY OF THE PRECAST

PRECAST UNITS.

AND TO AT LEAST 12 INCHES DOWN THE EXTERIOR SIDES OF

1. INSTALL STANDARD MEMBRANE WATERPROOFING OVER THE TOP

CULVERT NOTESCULVERT NOTES

TYPICAL BOX SECTION

WATERPROOFING MEMBRANE

BACKFILL WITH EXCAVATED MATERIAL (TYP.)

IN ACCORDANCE WITH OSHA REQUIREMENTS.

CONTRACTOR’S METHOD OF EXCAVATION

PAY LIMITS

GRANULAR BORROW

31.53’ RT

STA 4+75

24.60’ LT

STA 4+79

022548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

GRADE: 3.77%

3’-0"

8’-0"

56’-0"

3’-0"

1’-0

" MIN.

GRANULAR BORROW

AGGREGATE SUBBASE COURSE - GRAVEL

RIPRAP SLOPE PROTECTION (TYP.)

4’-0"

4’-0"

AGGREGATE SUBBASE COURSE-GRAVELPROP. FINISHED GRADE

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

PRECAST CONCRETE OPEN BOTTEM BOX CULVERT

8’ SPAN BY 3’ RISE

FOOTER DETAILS

SEE SHEET #7 FOR

FOOTER DETAILS

SEE SHEET #7 FOR

CONSTRUCT PER STANDARD DETAIL 606(20)

ELEV. = 5.58

ELEV. = 3.47

Page 7: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

007

_T

ypic

al.dgn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

7

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

OG

K

22548.0

0

022548.0

0

OF 13

WIN

HIG

HW

AY P

LA

NS

5/2

015

CMAENGINEERS

SO

UT

HP

OR

T

RO

UT

E

27

BO

X

CU

LV

ER

T

DE

TAIL

S

S.

SMIT

H

FOOTING NOTES

prior to casting any footing concrete.

4H : 1V it shall be benched to create level steps, as directed by the Resident

8. Bedrock shall not slope more than 4H : 1V. If exposed bedrock slopes more than

7. Footings shall be backfilled with Granular Borrow to the limits shown on plans.

28-day compressive strength of 4000 psi.

6. All footing concrete shall be MaineDOT Class A concrete with a minimum

5. All reinforcing shall be ASTM A615, Grade 60 and shall be epoxy coated.

unless otherwise noted.

4. Reinforcing steel shall have a minimum concrete cover of 2 inches

to the placement of footing.

3. Exposed bedrock shall be cleared of any debris or loose rock prior

Drainage and Minor Structures.

12 inches. Excavation will be paid for under 206.07 Structural Rock Excavation -

2. Excavate bedrock to required elevations for a minimum footing thickness of

1. The maximum factored applied footing pressure is 6.8 ksf.

BY PRECAST CULVERT MANUFACTURER

1" SHIM OR AS RECOMMENDED

FOOTING DETAIL FOOTING REINFORCING DETAIL

2" = 1’-0" 2" = 1’-0"

AT 1’-0" O.C.

#5 BAR

(4)SP. @ 6" – = (5) #4 BARS

TOP CORNERS

ADDITIONAL #4 BARS

BOX LEG

ÉPRECAST

1’-0"1’-6"

4"1’-4"10"

2’-6"

1’-0

" MIN

4"

10"

3"

CLR.

1’-0" MIN FOOTING.

REQUIRED TO INSTALL

REMOVE LEDGE AS

TYPICAL SECTION

�" = 1’-0"

APPROVED GROUT.

GROUT KEY WITH MAINEDOT

CONCRETE RIGID FRAME

PROPOSED PRECAST

1’-0

" min

6"

2’-6"

EL. 3.47 @ OUTLET

EL. 5.58 @ INLET

T.O.F. VARIES

Page 8: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

008

_X

SE

CT

_4

+2

5_

001.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

0

5

10

15

20

25

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+25.00

0

5

10

15

20

25

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+50.00

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 4+25.00 to Sta. 4+50.00

CL

CL

CL

EXIST.

STA. 4+25.00 0.02 RT.

EXIST.

STA. 4+25.0026.32 RT.

EXIST. 24",PINE,,

STA. 4+18.29

EXIST.

STA. 4+50.000.05 RT.

EXIST.

STA. 4+50.0011.88

-2:1 -14.0%

-13.1%

6.4%

13.32 LT.

12.75 LT.

INSTALL GR TYPE 3C (6 PANELS)

STA. 4+25 13’ LT TO STA. 5+00 13’ LT

GRAVEL TAPER DETAILS

SEE PLAN/PROFILE SHEET FOR

(2 PANELS, 40’ RADIUS)

INSTALL GR TY 3C - OVER 15’ RADIUS

STA. 4+50 27.1’ RT TO STA 4+70 15.5’ RT

__

__

_

8

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

Page 9: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

009_

XS

EC

T_

4+7

5_

002.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+75.00

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+79.00

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

0

5

10

15

20

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

5+00.00

0

5

10

15

20

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 4+75.00 to Sta. 5+00.00

CL

CL

CL

CL

CL

CL

EXIST.

STA. 4+75.85

EXIST.

STA. 4+81.28

EXIST.

STA. 4+75.00

-0.05 RT.

EXIST.

STA. 4+75.00

30.09 RT.

EXIST.

STA. 4+72.80

30.20 RT.

EXIST. 4’ CMP

STA. 4+76.32

31.67 RT.

EXIST. 18" CMP

STA. 4+77.92

EXIST.

STA. 4+75.85

EXIST.

STA. 4+81.28

EXIST.

STA. 4+79.00

-0.01 RT.

EXIST.

STA. 4+79.00

30.20 RT.

EXIST. 4’ CMP

STA. 4+76.32

31.67 RT.

EXIST. 18" CMP

STA. 4+77.92

EXIST.

STA. 5+00.00

0.03 RT.

EXIST.

STA. 5+00.00

12.06

-2:1

-14.0%-13.9%

7.3%-4.0%

-2:1

12.11

-2:1

-12.4%-14.0%

7.3%-4.0%

-2:1

12.49

-2:1

-4.0%-14.0%

6.8% -4.0% -2:1

20.28 LT. 19.99 LT.

13.17 LT.

20.28 LT. 19.99 LT.

13.30 LT.

13.11 LT.

REMOVE APPROX. 12’ OF UNDERDRAIN

STA. 4+75 RT. TO STA 4+87 RT.

__

__

_

9

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

INSTALL GUARDRAIL TYPE 3C (2 PANELS)

STA. 4+70 15.5’ RT TO STA. 4+95 15.5’ RT

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

INSTALL GR 350 FLARED TERMINAL

STA. 5+00 TO STA. 5+37.5

WIDEN SHOULDER FOR 350 FLARE

STA. 5+00 TO STA. 5+37.5

CONCRETE OPEN BOTTOM BOX CULVERT

INSTALL 8’ SPAN BY 3’ RISE PRECAST

STA 4+79 24.31’ LT TO STA 4+75 31.53’ RT

Page 10: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

010_

XS

EC

T_

5+2

5_

003.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

OF

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

HIG

HW

AY P

LA

NS

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

CR

OS

S

SE

CTIO

NS

5

10

15

20

25

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

5+25.00

5

10

15

20

25

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 5+25.00 to Sta. 5+25.00

CLCL

0.04 RT.

EXIST.

STA. 5+25.0019.12 RT.

EXIST. 54/54

STA. 5+24.7513.17

-4.0%-13.2%

5.2% -4.0%

GRAVEL TAPER DETAILS

SEE PLAN/PROFILE SHEET FOR

__

__

_

10

022548.0

0

13

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

S

SMIT

H

SHOULDER WIDENING FOR 350 FLARED

STA. 4+95 RT TO STA. 5+60 RT.

INSTALL GUARDRAIL 350 FLARED TERMINAL

STA. 4+95 15.5’ RT TO STA. 5+32.5 RT.

WIN

M.K

IRK

MA

NN

T.W

HIT

EM

AY

2015

Page 11: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

01G

05

01G

04

01G

03

01G

02

01G

01

3+00

4+00 5+00

6+00

7+00

7+28

7+28

PO

B

=

ST

A.

3+

00.0

0P

C

=

ST

A.

3+

23.2

6

PC

C

=

ST

A.

4+

16.4

6

PT

=

ST

A.

5+

50.4

2

PC

=

ST

A.

6+

28.5

2

PT =

ST

A.

7+

27.7

0

ZO

NE

LOVE COVE

WROUGHT PORTION (L.O.W.P.)

HIGHWAY PURPOSES WITHIN LIMITS OF

NOTE: PRESCRIPTIVE EASEMENT FOR

LIMITS O

F

PORTIO

N

WROUGHTPORTION

LIMITS OF

WROUGHT

LIMITS

OF

PORTION

WROUGHT

LIMITS

OF

PORTION

WROUGHTPORTION

OF

RO

UTE 27-H

ENDRIC

K HILL R

OAD

STATE AID

HIG

HW

AY NO. 1

TO

WES

T SO

UTH

PORT

TO SOUTHPORT

P.L.

LOVE’S COVE TRUSTSTEPHEN W. CONANT, TRUSTEEMARGARET CONANT REISER, TRUSTEEPETER A. CONANT, TRUSTEERICHARD W. CONANT, TRUSTEE

LOVE’S COVE TRUSTSTEPHEN W. CONANT, TRUSTEEMARGARET CONANT REISER, TRUSTEEPETER A. CONANT, TRUSTEERICHARD W. CONANT, TRUSTEE

LOVE’S COVE TRUSTSTEPHEN W. CONANT, TRUSTEEMARGARET CONANT REISER, TRUSTEEPETER A. CONANT, TRUSTEERICHARD W. CONANT, TRUSTEE

ROBERT W. BANNISTERKARYL M. BANNISTER

WRO

UG

HT

LIMITS

10’ R/

W

P.L.

35.0

0’

35.0

0’

35.0

0’

35.0

0’

18’*

19’*

P.L.

21’*

35.0

0’

35.0

0’

+75

+20

+67*

+70*

BEGIN B.L.END

B.L.

E = 3.12’

T = 46.87’

L = 93.20’

R = 350.00’

PI = 3+70.14

CURVE DATA #1

E = 7.53’

T = 68.09’

L = 133.96’

R = 303.88’

PI = 4+84.55CURVE DATA #2

P.L.

P.L.

+23*

23.26’

15’*

+18*

+21*+28*

+31*

8’*

35.0

0’

93.20’

133.96’

78.10’

118.53’

5’*

149.39’

89’*

39’*

LIMIT

S

LIMIT

S

CO

NSTRUCTIO

N

+51*160’*

147’*

84’*

64’*

ï »¿930î��

ï »¿0.05î �

ï »¿1200î��

ï »¿1095î��

ï »¿725î��

ï »¿545î��

ï »¿1655î��

ï »¿0.09î �

ï »¿220î��

REM. AREA = 5.33* AC.

TOTAL AREA = 5.4* AC. (DEED + CALC.)

TEMP. CONST. RIGHTS = 1655* S.F. (1)

TOTAL LAND TAKEN = 0.07* AC.

LAND TAKEN = 0.05* AC. (OTHER)

LAND TAKEN = 930* S.F. (PRESC. EASE.)

PARCEL NO. (1)

REM. AREA = 0.51* AC.

TOTAL AREA = 0.56* AC. (CALC.)

TEMP. CONST. RIGHTS = 220* S.F. (1)

TOTAL LAND TAKEN = 0.05* AC.

LAND TAKEN = 1095* S.F. (OTHER)

LAND TAKEN = 1200* S.F. (PRESC. EASE.)

PARCEL NO. (2)

REM. AREA = 4.77* AC.TOTAL AREA = 4.8* AC. (DEEDS)TEMP. CONST. RIGHTS = 0.10* AC. (1)TOTAL LAND TAKEN = 1270* S

.F.LAND TAKEN = 545* S.F. (OTHER)LAND TAKEN = 725* S.F. (PRESC. EASE.)PARCEL NO. (3)

REM. AREA = 0.45* AC.TOTAL AREA = 0.48* AC. (SURVEY)TEMP. CONST. RIGHTS = 0.09* AC. (1)TOTAL LAND TAKEN = 1460* S

.F.LAND TAKEN = 1070* S.F. (OTHER)LAND TAKEN = 390* S.F. (PRESC. EASE.)PARCEL NO. (4)

ï »¿390î��

ï »¿1070î��

13’*

+25

+45

60’*

74’*

TE

MP

OR

AR

Y

CONSTRUCTION

TE

MP

OR

AR

Y ï »¿0.10î �

31’*

6’*

UN

DE

RG

RO

UN

D

PO

WE

R

102.52’

79’*

GRID

2 RODS WIDE

MARCH 3, 1864

SOUTHPORT TOWN RECORDS

ROUTE 27

R/W REFERENCE

P.L.

15’*21’*

PATRICIA JOYCE PAQUETT, TRUSTEE OF PATRICIA JOYCE PAQUETT LIVING TRUST

ARTHUR LEON PAQUETT, TRUSTEE OF ARTHUR LEON PAQUETT LIVING TRUST

PLAN BOOK 50 PAGE 60

LINCOLN COUNTY REGISTRY OF DEEDS

8-10-1992

BY LEIGHTON & ASSOCIATES

RICHARD W. & JOHN A. CONANT

PROPERTY OF

STANDARD BOUNDARY SURVEY

PLAN BOOK 50 PAGE 60

LINCOLN COUNTY REGISTRY OF DEEDS

8-10-1992

BY LEIGHTON & ASSOCIATES

RICHARD W. & JOHN A. CONANT

PROPERTY OF

STANDARD BOUNDARY SURVEY

PLAN BOOK 7 PAGE 39

LINCOLN COUNTY REGISTRY OF DEEDS

5-1958

BY J.B. DOGGETT, SURVEYOR

RICHARD G. CONANT

PLAN OF PROPERTY

DO

WNSTRE

AM COFFERDA

M

APPROX. LO

CATIO

N OF

DO

WNSTRE

AM COFFERDA

M

APPROX. LO

CATIO

N OF

UPSTRE

AM COFFERDA

M

APPROX. LO

CATIO

N OF

2’*

PATRICIA JOYCE PAQUETT, TRUSTEE OF PATRICIA JOYCE PAQUETT LIVING TRUST

ARTHUR LEON PAQUETT, TRUSTEE OF ARTHUR LEON PAQUETT LIVING TRUST

IPFIPF

IPF

IPF

IPF

IPF

4’ C

MP

3/4" D

IA R

OD

1" DIA R

OD

1/2" D

IA REB

AR PLS 2066

18" C

MP

3/4" D

IA R

OD PLS 2006

1" DIA IR

ON PIP

E

18" C

MP

3" P

LASTIC

NO. GRANTOR INSTRUMENT DATE BOOK PAGE

COUNTY RECORDSHEET NUMBER

OFDATE

COMMISSIONER

CHIEF ENGINEER

REVISIONS

NO. DATE DESCRIPTION BY

SY

MB

OLS

(SE

PTIC T

AN

K)

WA

TE

R LIN

E

GA

S LIN

E

ELE

CT

RIC LIN

E

TE

LE

PH

ON

E LIN

E

SE

WE

R LIN

E

PR

OP

ER

TY LIN

E

EXIS

TIN

G RIG

HT O

F W

AY

CO

NT

RO

L O

F A

CC

ES

S

NE

W RIG

HT O

F W

AY

RIG

HT O

F W

AY M

AP

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

16 S

TA

TE H

OU

SE ST

ATIO

N - A

UG

UST

A, M

E 0

4333-0

016

NE

W R

OW W

ITHIN E

XIS

T.

RO

W

BM

GR

ADIN

G LIM

IT LIN

E

CO

NS

TR

UC

TIO

N LIM

IT LIN

E PL

(WE

LL)

(RO

W M

ON

UM

EN

T)

(TR

AV

ER

SE P

OIN

T)

ITE

MT

EC

HC

HE

CK

ED

BA

SE

MA

P

EXIS

T.

R/

W

PR

OP.

LIN

ES

AR

EA

S

RIGHT-OF-WAY MAP

WIN

SCALE 1"= 25’

PLAN FILED IN PLAN BOOK PAGE

HIG

HW

AY

Divisio

n:

Filena

me:...\

HIG

HW

AY\

MS

TA\

011_

RW

PL

AN

1.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

S.T.

WW

GG

EE

TT

WE

LL

(IR

ON PIP

E or PIN F

OU

ND)

IPor

IPF

LIM

ITS O

F W

RO

UG

HT P

OR

TIO

N (

L.O.W.P.)

13

STATE PROJECT NO. 22548.00

SOUTHPORT

SO

UT

HP

OR

T

LINCOLN COUNTY

STATE AID HIGHWAY NO. 1

ROUTE 27\HENDRICK HILL ROAD

D.W.B.

D.W.B.

D.W.B.

DAVID BERNHARDT

JOYCE NOEL TAYLOR

SHEET 1 OF 1

P.N.S.

11

22548.00

OCTOBER 2014

D.O.T. FILE NO. 8-X

1/2" D

IA REB

AR PLS 13

23

ARR

OW

ARR

OW

306

55/55

24" P

INE

54/54

56/56

298

53/53

Page 12: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

MA

G. 19

XX

Scale in Feet

PLAN

25 0 25 50

3+00

4+005+00

6+00

7+00

7+28

7+28

PO

B

=

ST

A.

3+

00.0

0

PC

=

ST

A.

3+

23.2

6

PC

C

=

ST

A.

4+

16.4

6

PT

=

ST

A.

5+

50.4

2

PC

=

ST

A.

6+

28.5

2

PT =

ST

A.

7+

27.7

0

E = 3.12’

T = 46.87’

L = 93.19’

R = 350.00’

PI = 3+70.14

CURVE DATA #1

E = 7.53’

T = 68.09’

L = 133.97’

R = 303.88’

PI = 4+84.55

CURVE DATA #2

E =

1.23’

T =

49.63’

L =

99.18’

R =

1000.00’

PI = 6

+78.15

CURVE DATA

#3

0

0

0

00

0

IPFIPF

IPF

IPF

IPF

IPF

5

5

5

5

55

5

5

10

10

10

10

10

10

10

HB-SCR-101

CASED WASH BORING

LEGEND

HB-SCR-102

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

4+75.00

0

5

10

15

20

-5

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

CL

CL

EXIST.

STA. 4+75.85

EXIST.

STA. 4+81.28

EXIST.

STA. 4+75.00

-0.05 RT.

EXIST.

STA. 4+75.00

30.09 RT.

EXIST.

STA. 4+72.80

30.20 RT.

EXIST. 4’ CMP

STA. 4+76.32

31.67 RT.

EXIST. 18" CMP

STA. 4+77.92

12.06

-2:1

-14.0%

-13.9%7.3%

-4.0%

-2:1

20.28 LT. 19.99 LT.

13.17 LT.

ELEV. = 4.58

31.53 FT.

CONCRETE OPEN BOTTOM BOX CULVERT

INSTALL 8’ SPAN BY 4’ RISE PRECAST

STA 4+79 24.31’ LT TO STA 4+75 31.53’ RT

REMOVE APPROX. 12’ OF UNDERDRAIN

STA. 4+75 RT. TO STA 4+87 RT.

INSTALL GUARDRAIL TYPE 3C (2 PANELS)

STA. 4+70 15.5’ RT TO STA. 4+95 15.5’ RT

BOE

BOE

HB-S

CR-102

HB-S

CR-101

Sta. 4

+91

Sta. 4

+62

0

SCALE

105HORIZ 5

1050VERT 5

CROSS SECTIONBoring No.

Strata Interface

for Rock Core SampleRock Quality Designation

RQD=

Offset, if sh

own

BOE= Bottom Of Exploration

Pavement Thickness if applicable

LEGEND

Boring

Top of Intack Bedrock

Weathered ROCK

Sandy GRAVEL, little silt.

Brown, damp, medium dense,

slightly weathered.

milky white tan, PEGMATITE, fresh to

Both Bedrock R1s: Bedrock: Very hard,RQD=70%

RQD=90%

Note:

trends in subsurface conditions. The boundaries between strata

are approximate and idealized, and have been developed by

interpretations of widely spaced explorations and samples.

Actual soil transitions may vary and are probably more erratic.

For more specific information refer to the exploration logs.

This generalized interpretive soil cross section is intended to convey

SHEET NUMBER

OF

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

D

HIG

HW

AY

Divisio

n:

Filena

me:...\

MS

TA\

012

_Geopla

n

& IS

CS

1.d

gn

Userna

me:

Date:6/1/2

015

nic

holas.w.h

artle

y

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

WIN

HIG

HW

AY P

LA

NS

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

DA

TE

SIG

NA

TU

RE

P.E.

NU

MB

ER

__

__

_

022548.0

0

22548.0

0

SO

UT

HP

OR

T

RO

UT

E

27

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

N

HA

RT

LE

Y_

__

__

__

__

__

_

M.K

IRK

MA

NN

T.W

HIT

E

__

__

__

__

__

__

__

__

__

__

__

__

MA

Y

2015

__

__

__

S

SMIT

H

SU

BS

UR

FA

CE

CR

OS

S

SE

CTIO

N

GE

OP

LA

N

& IN

TE

RP

RE

TIV

E

1213

15

15

15

15

Page 13: GENERAL NOTES CONSTRUCTION NOTES · 2015-06-10 · 629.05 620.58 619.1401 619.12 618.14 615.07 606.754 606.79 610.08 606.363 606.353 606.232 606.23 534.71 511.07 511.07 508.13

Filena

me:

Userna

me:

Date:

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

RE

GIO

N 2

D.M.H

anks

DETOUR

AHEAD

ROAD

CLOSED

July 2

014

ROAD

CLOSED

500 FT.

ROAD

CLOSED

1000 FT.

1

ROAD

CLOSED

ROAD

CLOSED

2

3

4

5

6

7ROAD CLOSED

MILE AHEAD

LOCAL TRAFFIC ONLY

DETOUR

DETOUR

END8

9

10

11

ROAD

CLOSED

MILE21

OUTLET

NO

12

1 MILE

ROAD CLOSED

1 MILE EAST

13

ROAD CLOSED

X

14MILES AHEAD

ROAD CLOSED

3 MILES EAST

15

NOT TO SCALE

SHEET NUMBER

OF

DE

SIG

N-

DE

TAIL

ED

N

HA

RT

LE

Y

PR

OJ.

MA

NA

GE

R

DE

SIG

N2-

DE

TAIL

ED

2

13

°%

23827

1617

16

X

12

3

2

10

10

2

3

ROAD CLOSED

MILE AHEAD

LOCAL TRAFFIC ONLY

DETOUR

X

17

1

1

6

8

11

5

8

22548.0

0

SO

UT

HP

OR

T

RO

UT

E 2

7 D

ET

OU

R

22548.0

0

13

DETOUR

27

DETOUR

27

DETOUR

27

DETOUR

27

DETOUR

27

14

S

SMIT

H

5

1. COVER ALL CONFLICTING ROUTE SIGNS

DETOUR NOTES:

9