GENERAL MOTORS CORPORATION GM POWERTRAIN BEDFORD FACILITY 105 GM DRIVE BEDFORD, INDIANA EPA ID #IND006036099 ADMINISTRATIVE ORDER ON CONSENT U.S. EPA DOCKET NO. V-W-'03-C-747 REMOVAL ACTION MONTHLY PROGRESS REPORT – AUGUST 2004 September 17, 2004 CONESTOGA-ROVERS & ASSOCIATES, INC. 8615 WEST BRYN MAWR AVENUE CHICAGO, ILLINOIS 60631 PHONE: (773) 380-9933 FAX NO.: (773) 380-6421

GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

  • Upload
    vudan

  • View
    219

  • Download
    2

Embed Size (px)

Citation preview

Page 1: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

GENERAL MOTORS CORPORATION

GM POWERTRAIN BEDFORD FACILITY 105 GM DRIVE

BEDFORD, INDIANA EPA ID #IND006036099

ADMINISTRATIVE ORDER ON CONSENT U.S. EPA DOCKET NO. V-W-'03-C-747

REMOVAL ACTION

MONTHLY PROGRESS REPORT – AUGUST 2004

September 17, 2004

CONESTOGA-ROVERS & ASSOCIATES, INC. 8615 WEST BRYN MAWR AVENUE

CHICAGO, ILLINOIS 60631 PHONE: (773) 380-9933 FAX NO.: (773) 380-6421

Page 2: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: I of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

TABLE OF CONTENTS Page

1.0 INTRODUCTION.........................................................................................................................II

2.0 SIGNIFICANT DEVELOPMENTS IN THIS MONTH ............................................................II

3.0 SUMMARIES OF ALL ANTCIPATED PROBLEMS AND PLANNED RESOLUTIONS ........................................................................................... IV

4.0 PROJECTED WORK FOR THE NEXT REPORTING PERIOD ............................................ IV

LIST OF FIGURES FIGURE 1 AIR SAMPLING LOCATIONS (AUGUST 2004) FIGURE 2 PARCEL 3 AND 205 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 3 PARCEL 4 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 4 PARCELS 5 AND 6 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 5 PARCELS 5, 6, AND 7 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 6 PARCELS 8, 10, AND 11 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 7 PARCELS 11 AND 12 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 8 PARCEL 205 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 9 PARCEL 401 - VALIDATED COMPOSITE SAMPLE RESULTS FIGURE 10 AREA NORTH OF AOI 4 – FINAL UNVALIDATED CONFIRMATION

COMPOSITE SAMPLE RESULTS FIGURE 11 NORTH ZIPP LOT EXCAVATION - FINAL UNVALIDATED

CONFIRMATION COMPOSITE SAMPLE RESULTS

LIST OF TABLES TABLE 1.1 VALIDATED AIR MONITORING RESULTS – AUGUST 2004 TABLE 2.1 TRANSPORTATION AND DISPOSAL ACTIVITIES SUMMARY –

AUGUST 2004

LIST OF APPENDICES APPENDIX A DELIVERABLES SUMMARY APPENDIX B CONSTRUCTION MEETING MINUTES APPENDIX C JULY 2004 MONTHLY PROGRESS REPORT U.S. EPA

COMMENTS/QUESTIONS AND GM RESPONSES

Page 3: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: II of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

1.0 INTRODUCTION This Monthly Progress Report is submitted in accordance with the ADMINISTRATIVE ORDER ON CONSENT (AOC) FOR REMOVAL ACTION Proceeding Under Sections 104, 106(a), 107, and 122 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, 42 U.S.C. SS 9604, 9606(a), 9607, and 9622 (U.S. EPA Docket No.: V-W-'03-C-747) effective July 31, 2003. The next monthly Progress Report, for the month of September 2004, will be submitted on or before October 15, 2004.

2.0 SIGNIFICANT DEVELOPMENTS IN THIS MONTH • Air monitoring has continued with the excavation activities. Final validated results of the air

monitoring program for August 2004 can be found in Table 1.1a (polyurethane foam (PUF) samples) and 1.1b (total suspended particulate (TSP) Groups 1, 2, and 3 results). The locations of the air monitoring stations are shown on Figure 1.

• Excavation of soil, sediment, and loose rock within the stream channel and along the stream banks in Parcels 3, 205, 4, 5, 6, 7, 8, 10, 11, and 12 (except for the Quarry area) has been completed. Final validated results from previous confirmation sampling events are presented on Figures 2 through 8. Restoration of these parcels began in August 2004.

• The revised Site Source Control (SSC) Work Plan: Addendum No. 1 was approved by the U.S. EPA on April 21, 2004. The cast-in place concrete foundation and containment walls for the collection system were installed in Trench 1 (Parcel 3) and Trench 3 (Parcel 205). The 6-inch HDPE underdrain system, including cleanouts, was installed. A layer of gravel was placed over the underdrain system and overlain by filter fabric. A geogrid was placed along the rock sidewalls and keyed into the gravel layer. Compacted backfill was placed over the gravel layer between the existing outfall and Containment Wall #2. Construction of the containment inlet structure at Outfall 002, storm water drainage headwalls, and associated piping is complete. Force main and electrical conduit piping from Wet Wells #1 and #2 have been installed from the wet wells to Outfall 002 area.

• The force main and electrical conduit piping from Wet Well #3 (AOI 4) have been installed to Outfall 002 area.

• Components for the two modular million gallon tanks have been received on-Site. The upper (westernmost) modular tank is installed. Construction of the tank pad for the lower (easternmost) modular tank continues.

• Components for the carbon treatment system have been received on-Site.

Page 4: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: III of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

• Consistent with Upstream Parcels Removal Action Work Plan: Addendum No. 3, removal of materials on Parcel 205 is complete. Validated data for Parcel 205 is presented on Figure 8.

• Excavation activities on Parcel 401 are complete. Figure 9 presents the final validated results. Backfill placement, topsoil, and hydroseeding are complete. Garage replacement on Parcel 401 is complete. Restoration of the area around the garage is complete. Fence installation between Parcel 401 and GM property began.

• Upstream Parcel Removal Action Work Plan: Addendum No. 5, regarding the quarry on Parcels 11 and 12, was submitted to the U.S. EPA and IDEM for approval on August 11, 2004.

• Excavation on the area north of AOI 4 is ongoing. During August 2004, a total of 3,757.95 tons of waste material has been removed and disposed both of at Heritage’s Roachdale Facility and Republic’s Sycamore Ridge Facility. Floor soil samples (used for informational purposes) and creek channel sediment samples (used for verification purposes) were collected in the area north of AOI 4 as presented on Figure 10.

• ‘Hot spot’ removal in a section along the northern slope of the Zipp Lot is complete. Figure 11 presents the final unvalidated results. Backfill placement, topsoil, and hydroseeding are complete. A double row of silt fencing remains in place.

• The final RCRA Facility Investigation (RFI) Work Plan: Addendum No. 5 was submitted to the U.S. EPA on July 27, 2004. Twelve groundwater monitoring wells were installed within the bedrock and two wells were installed within the overburden, as part of the implementation of this Work Plan. All newly installed monitoring wells have been developed and ten wells (eight bedrock and two overburden) have been sampled (groundwater samples could not be collected at four bedrock locations due to insufficient volume and parameter stabilization).

• On August 30, 2004, 250-milliliters of Fluorescein dye were injected at monitoring well MW-X233Y087S. The dye injection was followed by approximately nine-gallons of deionized water in order to flush the dye into the rock formation. Dye was visually observed at the location of Wet Well #1 of the SSC system (within the drainage pipe which collects groundwater from immediately down gradient of the pump house) approximately 1.5 hours after injection. Dye was also visually observed at Wet Well #1 within the drainage pipe collecting groundwater from the lateral trench shortly thereafter. Water samples (grab and from the automated sampler) are currently being analyzed for the presence of dye. Dye recovery monitoring was completed at the locations and frequencies indicated in the Work Plan. Visual evidence of the dye was only observed at Wet Well #1 of the SSC system. It is anticipated that this recovery monitoring will extend through the early part of the next reporting period for all locations where dye has not been detected. The results of this dye trace testing will be presented in the form of a RFI Technical Memorandum upon completion of data analysis.

• An on-Site construction meeting was held on August 23, 2004. Meeting minutes are attached in Appendix B.

Page 5: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: IV of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

• A bi-weekly all parties conference call was held on August 3 and 18, 2004 to discuss project progress.

3.0 SUMMARIES OF ALL ANTCIPATED PROBLEMS AND PLANNED RESOLUTIONS

• Access Agreements, as outlined in Appendix 6 of the AOC, have been provided to all

property owners where access was not previously obtained. Access had still not been received from property owners at 2499 Peerless Road as of the end of August 2004. − GM has continued discussions with the property owners of the remaining Parcel where

access has not yet been obtained. GM is clarifying the requirements of restoration of a section of the property currently enrolled in a Conservation Reserve Program with the United States Department of Agriculture (USDA).

− GM has submitted a letter to the Lawrence County Farm Service Agency (August 19, 2004) regarding the cleanup schedule and restoration commitments for this property.

• Three swallets are present within the stream channel downstream of the current cleanup activities; one is located on Parcel 15, and two are located on Parcel 216. − An Addendum No. 3 to the SSC Work Plan will be submitted which summarizes the

investigation and control of the swallets. • The lower quarry located on Parcels 11 and 12 have been separated from the creek channel to

assist in dewatering.. − If work activities in the creek progress beyond the quarry prior to quarry remediation, a

temporary berm will be constructed between the quarry and the creek to isolate the quarry from creek flow until removal activities are completed in the quarry.

− The quarry will be dewatered; accumulated sediment above the cleanup criteria will be removed, characterized and disposed using the same procedures as are being used for the rest of the Upstream Parcels.

• During August 2004, there were several days when TSP concentrations exceeded the action level. The action level for TSP is defined as 67% above the ambient upwind concentration. Cause of the exceedances included disposal truck and Zipp truck traffic in the Zipp lot, grading of fill material in close proximity of the air monitoring stations, inadequate watering of the haul roads, and dust generated during street sweeping activities. Corrective actions included increased watering of the haul roads and Zipp lot, instruction to off-road truckers to drive slower along the haul roads, and procurement of a more efficient street sweeper. In addition, the contractor did a test application of Soiltac, a vinyl acetate copolymer emulsion, along the haul road west of the storm lagoon. Soiltac penetrates the haul road soils, binding the particles. The test application was successful for a few days in keeping dust down, but did not appear to be a good long term solution. The contractor has currently returned to water suppression to control dust.

Page 6: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: V of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

• Soil and sediment excavated from the area north of AOI 4 has been difficult to handle due to saturated nature of the material. GM has proposed to add a non-hazardous material (such as Fly Ash, Lime Kiln Dust (LKD), or Cement Kiln Dust (CKD)) to stabilize the excavated soil and sediment prior to shipment. Information regarding this proposal will be submitted to the U.S. EPA and IDEM for concurrence.

• Comments/questions on the July 2004 Monthly Progress Report was received via email from the U.S. EPA. − The U.S. EPA’s comments/questions and GM’s responses are presented in Appendix C.

4.0 PROJECTED WORK FOR THE NEXT REPORTING PERIOD • The following is a list of anticipated work for the next reporting period:

− Efforts to obtain an Access Agreement from the remaining resident in the downstream area will continue;

− GM is continuing preparation of the Wetland Mitigation Plan for submittal to IDEM and the United States Army Corps of Engineers (ACOE);

− Restoration on Parcels 4, 5, 6, 7, 8, 9, 10, and 11, will continue in September 2004; − Installation of the SSC components will continue in September 2004; − Restoration of Parcel 401 is expected to be completed in September 2004 with the planting

of trees and shrubs; − Excavation will continue in the area north of AOI 4 along the tributary on the north side

of GM property in September 2004; − The Dye Tracer Study, as part of RFI Work Plan: Addendum No. 5, will continue in

September 2004; − The preliminary data, as well as the results for additional sampling conducted for the dye

trace testing, will be forwarded during the next reporting period; − SSC Work Plan: Addendum No. 3 regarding the investigation and control of the swallets

is being drafted and will be submitted to the U.S. EPA and IDEM in the near future; − SSC Work Plan: Addendum No. 4 regarding changes and additions to the seep/spring

monitoring locations is being drafted and will be submitted to the U.S. EPA and IDEM in the near future;

− The Supplemental Stormwater Management Plan is being drafted and will be submitted to the U.S. EPA and IDEM in the near future;

− RFI Work Plan: Addendum No. 6 (swallet investigation) is being drafted and will be submitted to the U.S. EPA and IDEM in September 2004;

− Parcel 22 Removal Action Work Plan: Addendum No. 1 (revised excavation limits based on additional sampling) is being drafted and will be submitted to the U.S. EPA and IDEM in the near future;

Page 7: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT Date: September 17, 2004 AUGUST 2004 Section: Monthly Progress Report Page: VI of VI

13968 (113) CONESTOGA-ROVERS & ASSOCIATES

− The next quarterly meetings with the property owners along the creek and the general public are scheduled for October 27 and 28, 2004, respectively; and

− The next Community Liaison Panel meeting is scheduled for October 29, 2004.

Page 8: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

200

201

203

204

207

210

216

328

329

330

331

332

333

334

335

336

337

338

339

340

3

4

5

7

6

8

9

10

11

12

13

15

417

205

208

209

211

212

213

214

215

402

401

416

415

414

412

413

TYPICAL WORK ZONE

WORK AREA LIMITS

SUPPORT AREA 3WORK AREA LIMITS

SOIL STAGING PAD/LOADOUT AREA

ON-SITE HAUL ROUTE(CLEAN TRUCKS)

202

TYPICAL WORK ZONE

LEGEND

ROADS / PAVED AREAS

RAILROAD TRACKS

FENCE LINE

DIRT ROADS

EXISTING GROUND SURFACEELEVATION CONTOURS (feet AMSL)

EXISTING VEGETATION

EXISTING BUILDINGS

APPROXIMATE PARCEL BOUNDARY

APPROXIMATE GM PROPERTY

APPROXIMATE SURFACE WATER

figure 1

AIR SAMPLING LOCATIONSAUGUST 2004

GM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA001 SEP 09/2004

AIR SAMPLING LOCATION

WORK AREA LIMITS

LOCATION

BOUNDARY

300ft1000

AIR SAMPLING GROUP

Page 9: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

PARCEL 3

50'

50'

1B 1C 2B

2G

1A

1E 1F 1H 2F

1D 2A

2H

2D2C

S-003-011304-CH-5062

S-003-011304-CH-5065S-003-011304-CH-5064

505 4TH STREET

R1 0.28

R1 1.20R1 1.00

R1 S-004-061704-CH-5496 0.08R1

R1R1

S-004-061704-CH-5498 0.05

S-004-061704-CH-5487 0.27 J, BS-004-061704-CH-5489 0.65 J, B

{S-004-061704-CH-5500 0.06}

VERIFICATION AREA 1

VERIFICATION AREA 2

1G2E

S-003-011304-CH-5063R1 8.00SIDEWALL REMOVED TOR2ADJACENT ELEVATION

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

SOIL VERIFICATION SAMPLING GRID

VERIFICATION AREA

LEGEND

ACCESS AGREEMENT:

START WORK DATE:

FINISH WORK DATE:

APPROXIMATE TONNAGE_____>50 ppm

_____< 50 ppm

PARCELS 003 AND 205 WORK SUMMARY

REMOVED:

figure 2

PARCELS 003 AND 205VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA002 SEP 09/2004

60 150ft0

EXCAVATION FLOOR SAMPLE RESULTS

SAMPLE ID

COMPOSITE SAMPLE IN GRID in mg/kg

VERIFICATION RESULTS

SAMPLING ROUND NUMBER

TOTAL PCB CONCENTRATION OF

LIMITS OF EXCAVATION (ACTUAL)

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

S-004-061704-CH-5498

S-205-121303-KB-5037

R1 0.05

R1 2.10

Oct 10/03

Aug 28/03

BCa BIAS-CORRECTED AND ACCELERATED

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

TBS TO BE SAMPLED

R1Result (mg/kg)

Sample IDGrid

B

D

E

GH

Verification Area

2

Sampling Round

IDSample

R2

(mg/kg)Result

IDSample

FINAL

(mg/kg)Result

A

F

S-205-121603-KB-5046

S-205-121603-KB-5048S-205-121603-KB-5049

S-003-121603-KB-5051S-003-121703-KB-5054

S-003-121703-KB-5056S-004-031604-CH-5111

S-004-040204-CH-5144

{S-205-121603-KB-5047

{S-003-121703-KB-5055

0.34 J

0.40 J22.00

5.100.11 J

0.10 J0.03 J

0.73 J

0.11 J}

0.24 J}

BEDROCK

S-003-032304-CH-5138 0.83

BEDROCK

S-205-121603-KB-5046

S-003-121703-KB-5054

S-003-121703-KB-5056S-004-031604-CH-5111

{S-205-121603-KB-5047

{S-003-121703-KB-5055

0.34 J

0.11 J

0.10 J0.03 J

0.11 J}

0.24 J}

S-205-121603-KB-5048 0.40 J

S-004-040204-CH-5144 0.73 JS-003-032304-CH-5138 0.83

R1Result (mg/kg)

Sample IDGrid

B

D

GH

Verification Area

1

Sampling Round

IDSample

R2

(mg/kg)Result

IDSample

FINAL

(mg/kg)Result

A

C

S-205-121303-KB-5037

S-205-121303-KB-5039S-205-121503-KB-5043

S-205-121503-KB-5045S-003-121303-KB-5040

S-003-121303-KB-5042S-003-121603-KB-5050

{S-205-121503-KB-5044

{S-205-121303-KB-5038

S-003-121303-KB-5041

2.10

7.2020.00

34.000.18

0.960.21 J

13.00}

0.08

7.70}

C

EF

BEDROCK

BEDROCK

BEDROCK

UCL Calculations

BEDROCK

BEDROCKS-003-121303-KB-5040

S-003-121303-KB-5042S-003-121603-KB-5050

S-003-121303-KB-50410.18

0.960.21 J

0.08

S-003-062904-CH-5687 4.53 J

UCL Calculations

BEDROCK

BEDROCK

B METHOD BLANK CONTAMINATION

{S-004-061704-CH-5500 0.06}DUPLICATE SAMPLE

Not Required Based on Sample Results

Not Required Based on Sample Results

BEDROCK

IDSample

R3

(mg/kg)Result

Page 10: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

PARCEL 450'

50'

S-003-011304-CH-5065

125 BAILEY SCALES ROAD

R1 1.00

S-004-061704-CH-5489 0.65 J, BS-004-061704-CH-5487 0.27 J, BS-004-061704-CH-5485 0.03 JS-004-061704-CH-5483 0.14

S-004-061704-CH-5481 0.03 J

S-004-061704-CH-5479 0.05

S-004-061704-CH-5496 0.08S-004-061704-CH-5494 0.96

S-004-061704-CH-5492 0.02 JS-004-061704-CH-5490 0.03 J

S-004-061704-CH-5488 0.03 J

S-006-061704-CH-5456 0.52 JS-006-061704-CH-5458 0.40

S-006-061704-CH-5460 0.05S-005-061704-CH-5462 0.09

S-005-061704-CH-5464 0.12S-006-061704-CH-5466 0.13

S-004-061704-CH-5486 0.02 JS-004-061704-CH-5484 ND

S-004-061704-CH-5482 NDS-004-061704-CH-5480 0.06

{S-004-061704-CH-5478 0.10}S-004-061704-CH-5476 0.01 J

S-004-061704-CH-5474 NDS-004-061704-CH-5472 0.10

S-006-061704-CH-5470 ND

S-006-061704-CH-5468 0.06

S-004-061704-CH-5477 0.04 JS-004-061704-CH-5475 0.10 J

S-004-061704-CH-5473 0.03 JS-004-061704-CH-5471 0.15 J

{S-004-061704-CH-5467 0.26}S-004-061704-CH-5465 0.27

S-004-061704-CH-5463 0.09S-004-061704-CH-5461 0.36 J, B

S-004-061704-CH-5459 0.04 JS-005-061704-CH-5457 0.14

S-005-061604-CH-5443 0.18{S-005-061604-CH-5445 0.29 J}

S-005-061704-CH-5449 0.12 JS-005-061604-CH-5447 0.19

S-005-061704-CH-5451 0.86{S-005-061704-CH-5453 2.60}

S-005-061704-CH-5455 0.31

S-004-061704-CH-5469 0.03 J

S-004-061704-CH-5498 0.05R1R1

R1R1

R1R1

R1

R1R1

R1R1

R1R1

R1R1

R1R1

R1

R1R1

R1R1

R1R1

R1

R1

R1R1

R1R1

R1R1

R1

R1

R1R1

R1R1

R1R1

R1R1

{S-004-061704-CH-5500 0.06}

VERIFICATION AREA 4

VERIFICATION AREA 2

VERIFICATION AREA 3

2A 2B

2E2F

2G

2C

2D

2H

3A

3E

3G

3B

3F

3C3D

4A

4B

4F

4D

3H

4E

4G

4C

4H

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

SAMPLE ID

COMPOSITE SAMPLE IN GRID in mg/kg

VERIFICATION RESULTS

SAMPLING ROUND NUMBER

VERIFICATION AREA

LEGEND

ACCESS AGREEMENT:

START WORK DATE:

FINISH WORK DATE:

APPROXIMATE TONNAGE_____>50 ppm

_____< 50 ppm

PARCEL 004 WORK SUMMARY

REMOVED:

Sep 19/03

EXCAVATION FLOOR SAMPLE RESULTS

TOTAL PCB CONCENTRATION OF

LIMITS OF EXCAVATION (ACTUAL)

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

5-POINT COMPOSITE SIDEWALL SAMPLE

Jan 5/04

BCa BIAS-CORRECTED AND ACCELERATED

TBS TO BE SAMPLED

S-004-061704-CH-5498R1 0.05

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

R1Result (mg/kg)

Sample IDGrid

AB

D

C

FGH

Verification Area

4

UCL Calculations

Sampling Round

IDSample

R2

(mg/kg)Result

IDSample

FINAL

(mg/kg)Result Result

(mg/kg)

FINAL

Sample ID

Sampling Round

UCL Calculations

3

Verification Area

HG

E

CD

B

A

Grid IDSample

(mg/kg)Result

R1

R1Result (mg/kg)

Sample IDGrid

B

D

E

GH

Verification Area

2

Sampling Round

IDSample

R2

(mg/kg)Result

IDSample

FINAL

(mg/kg)Result

A

F

S-205-121603-KB-5046

S-205-121603-KB-5048S-205-121603-KB-5049

S-003-121603-KB-5051S-003-121703-KB-5054

S-003-121703-KB-5056S-004-031604-CH-5111

S-004-040204-CH-5144

{S-205-121603-KB-5047

{S-003-121703-KB-5055

0.34 J

0.40 J22.00

5.100.11 J

0.10 J0.03 J

0.73 J

0.11 J}

0.24 J}

BEDROCK

S-003-032304-CH-5138 0.83

BEDROCK

S-205-121603-KB-5046

S-003-121703-KB-5054

S-003-121703-KB-5056S-004-031604-CH-5111

{S-205-121603-KB-5047

{S-003-121703-KB-5055

0.34 J

0.11 J

0.10 J0.03 J

0.11 J}

0.24 J}

S-004-031604-CH-5115S-004-031604-CH-5114S-004-031604-CH-5113S-004-031604-CH-5112S-004-031604-CH-5110S-004-031604-CH-5109

S-004-031604-CH-5107S-004-031604-CH-5106

{S-004-031604-CH-5108

F

0.04 J0.03 J0.01 J0.11 J0.05 J0.11

0.100.05

0.06}

S-004-031604-CH-5115S-004-031604-CH-5114S-004-031604-CH-5113S-004-031604-CH-5112S-004-031604-CH-5110S-004-031604-CH-5109

S-004-031604-CH-5107S-004-031604-CH-5106

{S-004-031604-CH-5108

0.04 J0.03 J0.01 J0.11 J0.05 J0.11

0.100.05

0.06}

S-004-031604-CH-5118

S-004-031604-CH-5116

S-005-031804-CH-5128

S-006-031804-CH-5122

S-006-031804-CH-5120S-006-031804-CH-5119S-004-041304-CH-5160

{S-006-031804-CH-5121

{S-004-031604-CH-5117E

0.01 J

0.07 J

0.51

0.19

0.120.56

0.04 J

0.15}

0.08 J}

S-004-040204-CH-5146S-004-040204-CH-5145

0.170.10 J

S-004-031604-CH-5118

S-004-031604-CH-5116S-006-031804-CH-5122

S-006-031804-CH-5120S-006-031804-CH-5119S-004-041304-CH-5160

{S-006-031804-CH-5121

{S-004-031604-CH-5117

0.01 J

0.07 J0.19

0.120.56

0.04 J

0.15}

0.08 J}

S-004-040204-CH-5146S-004-040204-CH-5145

0.170.10 J

S-205-121603-KB-5048 0.40 J

S-004-040204-CH-5144 0.73 JS-003-032304-CH-5138 0.83

B METHOD BLANK CONTAMINATION

UCL Calculations

SAMPLE RESULT EXCEEDS CLEANUP CRITERIAS-003-121603-KB-5051R1 5.10SOIL VERIFICATION SAMPLING GRID

BCa Bootstrap 95% UCLPercentile Bootstrap 95% UCL

0.51 mg/kg0.42 mg/kg

figure 3

PARCEL 004VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA003 SEP 09/2004

100ft500

DUPLICATE SAMPLE{S-004-061704-CH-5500 0.06}

C

Not Required Based on Sample Results

Not Required Based on Sample Results

Page 11: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

S-007-062104-CH-5507 0.04S-007-062104-CH-5505 0.95

S-007-062104-CH-5503 2.30

S-007-062104-CH-5499 2.00{S-007-062104-CH-5501 2.37 J}

S-005-061804-CH-5493 0.13S-005-061804-CH-5491 0.06 J

S-005-061604-CH-5425 0.14S-005-061604-CH-5427 0.11

S-005-061604-CH-5429 0.07S-005-061604-CH-5431 0.70

S-005-061604-CH-5433 0.73S-005-061604-CH-5435 ND

S-005-061604-CH-5437 NDS-005-061604-CH-5439 ND

S-005-061604-CH-5441 0.01 J

S-005-061604-CH-5443 0.18{S-005-061604-CH-5445 0.29 J}

S-008-062104-CH-5514 0.40 JS-008-062104-CH-5512 0.63 J

S-008-062104-CH-5510 0.06S-008-062104-CH-5506 0.12{S-008-062104-CH-5508 0.10}

S-005-061804-CH-5504 NDS-005-061804-CH-5502 0.31 J

S-006-061604-CH-5430 0.01 J

S-006-061604-CH-5428 0.77 J

S-006-061604-CH-5424 0.27 J{S-006-061604-CH-5426 0.18}

S-006-061604-CH-5434 0.28 J

S-004-061704-CH-5474 NDS-004-061704-CH-5472 0.10

S-006-061604-CH-5436 0.04 J

S-006-061604-CH-5438 0.10

S-006-061604-CH-5440 0.28

S-006-061604-CH-5442 0.53 J

S-006-061604-CH-5444 0.11S-006-061604-CH-5446 0.02 J

S-006-061704-CH-5448 0.07{S-006-061704-CH-5450 0.06}

S-006-061704-CH-5452 0.02 J

S-006-061704-CH-5454 0.22 JS-006-061704-CH-5456 0.52 J

S-006-061704-CH-5458 0.40S-006-061704-CH-5460 0.05

S-005-061704-CH-5462 0.09S-005-061704-CH-5464 0.12

S-006-061704-CH-5466 0.13S-006-061704-CH-5468 0.06

S-006-061704-CH-5470 ND

S-005-061704-CH-5449 0.12 JS-005-061604-CH-5447 0.19

S-005-061704-CH-5451 0.86{S-005-061704-CH-5453 2.60}S-005-061704-CH-5455 0.31

S-005-061704-CH-5457 0.14S-004-061704-CH-5459 0.04 J

S-004-061704-CH-5461 0.36 J, BS-004-061704-CH-5463 0.09

S-004-061704-CH-5465 0.27{S-004-061704-CH-5467 0.26}

S-008-062104-CH-5522 0.76 J

S-008-062104-CH-5520 1.30S-008-062104-CH-5518 0.22

S-008-062104-CH-5516 0.37

R1 S-006-061604-CH-5432 0.15R1

R1R1

R1R1

R1R1

R1

R1

R1R1

R1R1

R1R1

R1

R1

R1

R1R1

R1R1

R1

R1

R1

R1

R1

R1

R1

R1

R1R1

R1R1

R1

R1R1

R1R1

R1R1

R1

R1

R1

R1

R1R1

R1R1

R1

R1

R1R1

R1 R1

R1

R1

R1

S-008-062204-CH-5526 0.05

{S-008-062204-CH-5530 0.04}S-008-062204-CH-5528 0.06

R1R1

R1R1

S-005-061804-CH-5497 0.34 JS-005-061804-CH-5495 0.13 J

S-007-070604-CH-5692 0.34 JR2

S-007-070604-CH-5691 0.51 JR2

S-005-070604-CH-5688 0.02 JR1{S-005-070604-CH-5690 0.04 J}S-005-070604-CH-5689 0.04 JR1

VERIFICATION AREA 5

VERIFICATION AREA 4

VERIFICATION AREA 6

PARCEL 5112 BAILEY SCALES ROAD

4A

4E

4F

4B

4C

4H

4D

4G

5A

5E

5F

5B

5D

5C5H

5G

6H

6F

6E

6A 6G6B

6C

6D

PARCEL 6201 BAILEY

SCALES ROAD

R1Result (mg/kg)

Sample IDGrid

A

B

DC

E

G

H

Verification Area

6S-008-050404-CH-5255 0.29

S-005-031804-CH-5134 0.12

S-007-050504-CH-5262 0.06{S-007-050504-CH-5263 0.06 J}

S-007-050504-CH-5264 0.12

Sampling Round

IDSample

R2

(mg/kg)Result

{S-008-050404-CH-5254

S-006-031804-CH-5127

S-008-050404-CH-5256 0.10

IDSample

FINAL

(mg/kg)Result

0.59}

1.20S-008-050404-CH-5253 0.95

1.79 JS-005-051104-CH-5261S-005-051104-CH-5284 0.86 J

0.95S-008-050404-CH-52531.20

0.59}

0.10S-008-050404-CH-5256

S-006-031804-CH-5127

{S-008-050404-CH-5254

0.29S-008-050404-CH-5255

S-005-051104-CH-5261 1.79 J

0.12S-007-050504-CH-5264

0.06 J}{S-007-050504-CH-52630.06S-007-050504-CH-5262

0.86 JS-005-051104-CH-5284

UCL Calculations

Jan 22/04

Sept 5/03, Parcel 5Sept 4/03, Parcel 6

REMOVED:

PARCEL 005 AND 006 WORK SUMMARY

_____< 50 ppm

_____>50 ppm APPROXIMATE TONNAGE

FINISH WORK DATE:

START WORK DATE:

ACCESS AGREEMENT:

0.490.28

Result (mg/kg)

FINAL

Sample ID

0.15S-006-031804-CH-5126

S-006-031804-CH-5123S-006-031804-CH-5124

Sampling Round

0.13S-005-031804-CH-51331.20S-005-031804-CH-5132

0.12}{S-005-031804-CH-5131

0.73S-005-031804-CH-5129

0.19S-006-031804-CH-5125

UCL Calculations

5

Verification Area

HG

E

C

F

D

BA

Grid IDSample

(mg/kg)Result

R1

S-005-031804-CH-5130 0.08 0.08S-005-031804-CH-5130

S-006-031804-CH-5125 0.19

S-005-031804-CH-5129 0.73

{S-005-031804-CH-5131 0.12}

S-005-031804-CH-5132 1.20S-005-031804-CH-5133 0.13

S-006-031804-CH-5124S-006-031804-CH-5123

S-006-031804-CH-5126 0.15

0.280.49

R1Result (mg/kg)

Sample IDGrid

AB

D

C

GH

Verification Area

4

S-006-031804-CH-5120 0.12

S-004-031604-CH-5116 0.07 J

S-004-031604-CH-5118 0.01 J

S-005-031804-CH-5128 0.51

Sampling Round

S-004-040204-CH-5145S-004-040204-CH-5146

IDSample

R2

(mg/kg)Result

S-006-031804-CH-5119S-004-041304-CH-5160

S-006-031804-CH-5122 0.19

IDSample

FINAL

(mg/kg)Result

0.560.04 J

{S-006-031804-CH-5121 0.15}

{S-004-031604-CH-5117 0.08 J}

0.10 J0.17

S-004-040204-CH-5145S-004-040204-CH-5146

0.10 J0.17

0.08 JS-004-031604-CH-5117

0.15}{S-006-031804-CH-5121

0.04 J0.56

0.19S-006-031804-CH-5122

S-004-041304-CH-5160S-006-031804-CH-5119

0.01 J}{S-004-031604-CH-5118

0.07 JS-004-031604-CH-5116

0.12S-006-031804-CH-5120

EXCAVATION FLOOR SAMPLE RESULTS

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

LEGEND

TOTAL PCB CONCENTRATION OF

SAMPLING ROUND NUMBER

VERIFICATION RESULTS

COMPOSITE SAMPLE IN GRID in mg/kg

SAMPLE ID

SOIL VERIFICATION SAMPLING GRID

LIMITS OF EXCAVATION (ACTUAL)

APPROXIMATE PARCEL BOUNDARY

APPROXIMATE PRE-EXCAVATION

EXISTING BUILDINGS

EXISTING VEGETATION

FENCE LINE

ROADS / UNPAVED AREAS

SURFACE WATER LOCATION

TBS TO BE SAMPLED

ND NOT DETECTED

J ESTIMATE VALUE. RESULT

GRAB SAMPLE LOCATION

VERIFICATION AREA

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

S-008-062204-CH-5528R1 0.06

S-007-062104-CH-5503R1 2.30

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

BCa BIAS-CORRECTED AND ACCELERATED

B METHOD BLANK CONTAMINATION

IS LESS THAN REPORTING LIMIT

figure 4

PARCEL 005 AND 006VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA004 SEP 09/2004

UCL CalculationsBCa Bootstrap 95% UCL

Percentile Bootstrap 95% UCL0.51 mg/kg0.42 mg/kg

F

DUPLICATE SAMPLE{S-008-062204-CH-5530 0.04}

100ft500

Not Required Based on Sample Results

Not Required Based on Sample Results

F

E

Page 12: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

PARCEL 6201 BAILEY

SCALES ROAD

SCALES ROAD

PARCEL 5112 BAILEY

VERIFICATIONAREA 6

VERIFICATIONAREA 7

S-006-061604-CH-5430 0.01 JS-006-061604-CH-5428 0.77 JS-006-061604-CH-5424 0.27 J{S-006-061604-CH-5426 0.18}

S-005-061804-CH-5491 0.06 JS-005-061804-CH-5493 0.13

S-005-061804-CH-5495 0.13 JS-005-061804-CH-5497 0.34 J

{S-007-062104-CH-5501 2.37 J}S-007-062104-CH-5499 2.00

S-007-062104-CH-5503 2.30S-007-062104-CH-5505 0.95

S-007-062104-CH-5507 0.04S-010-062104-CH-5509 0.89

S-010-062104-CH-5511 2.46 JS-010-062104-CH-5513 0.12

S-010-062104-CH-5515 0.07S-010-062104-CH-5517 0.34

{S-010-062104-CH-5521 0.10}S-010-062104-CH-5519 0.59

S-005-061804-CH-5502 0.31 JS-005-061804-CH-5504 ND

S-008-062104-CH-5506 0.12{S-008-062104-CH-5508 0.10}

S-008-062104-CH-5510 0.06S-008-062104-CH-5512 0.63 J

S-008-062104-CH-5524 2.78 J

S-008-062104-CH-5522 0.76 J

S-008-062104-CH-5520 1.30

S-008-062104-CH-5514 0.40 JS-008-062104-CH-5518 0.22

S-008-062104-CH-5516 0.37

S-008-062204-CH-5526 0.05

{S-008-062204-CH-5530 0.04}S-008-062204-CH-5528 0.06

S-008-062204-CH-5532 6.72 J

S-008-062204-CH-5534 0.56 JS-008-062204-CH-5536 1.31 J

S-008-062204-CH-5538 0.46 JS-008-062204-CH-5540 0.71 J

S-008-062204-CH-5542 1.26 JS-008-062204-CH-5544 1.19 J

S-010-062204-CH-5523 5.41 J{S-008-062204-CH-5570 0.90}S-008-062204-CH-5568 0.33 J

S-008-062204-CH-5572 1.64 JS-008-062204-CH-5574 0.55 J

S-008-062204-CH-5576 0.05S-008-062204-CH-5578 ND

R1

R1

R1

R1

R1R1R1

R1

R1R1

R1

R1

R1

R1

R1

R1

R1

R1

R1

R1

R1

R1R1

R1R1

R1R1

R1

R1R1

R1R1

R1R1

R1R1

R1

R1

R1

R1R1

R1

R1

R1 S-010-062504-CH-5681 0.92 B

S-008-070604-CH-5694 2.07 JR2

S-007-070604-CH-5691 0.51 JR2

S-007-070604-CH-5692 0.34 JR2

S-010-070604-CH-5696 0.37 JR2

S-010-070704-CH-5723 NDR2

S-008-070604-CH-5695 0.50R2

S-008-070604-CH-5693 0.48 JR2

PARCEL 71635 I STREET

6E

6A

6B

6F6G

6D

7A

6C

6H

7E

7F

7G

7H7D

7C

7B

50'

50'

figure 5

PARCELS 005, 006, AND 007VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA005 SEP 09/2004

REMOVED:

_____< 50 ppm

_____>50 ppm APPROXIMATE TONNAGE

FINISH WORK DATE:

START WORK DATE:

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

SOIL VERIFICATION SAMPLING GRID6A

VERIFICATION AREA

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN GRID in mg/kg

VERIFICATION RESULTS

SAMPLING ROUND NUMBER

TOTAL PCB CONCENTRATION OF

LIMITS OF EXCAVATION (ACTUAL)

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

S-010-062104-CH-5519

S-007-062104-CH-5499

R1 0.59

R1 2.00

BCa BIAS-CORRECTED AND ACCELERATED

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

EXCAVATION FLOOR SAMPLE RESULTS

TBS TO BE SAMPLED

PARCELS 005, 006, AND 007WORK SUMMARY

Sept 5/03, Parcel 5Sept 4/03, Parcel 6

ACCESS AGREEMENT:

Jan 8/03, Parcel 7

Jan 22/04

R1Result (mg/kg)

Sample IDGrid

AB

D

F

C

E

GH

Verification Area

7

UCL Calculations

S-008-050404-CH-5259 0.18

S-007-050504-CH-5265 0.09S-010-050504-CH-5266 0.02 JS-010-050504-CH-5267 0.02 JS-010-050504-CH-5268 0.06

Sampling Round

S-008-050404-CH-5258S-008-050404-CH-5257

S-008-050404-CH-5260 0.07

IDSample

FINAL

(mg/kg)Result

0.090.25 0.25

0.09

0.07S-008-050404-CH-5260

S-008-050404-CH-5257S-008-050404-CH-5258

0.06S-010-050504-CH-52680.02 JS-010-050504-CH-52670.02 JS-010-050504-CH-52660.09S-007-050504-CH-5265

0.18S-008-050404-CH-5259

R1Result (mg/kg)

Sample IDGrid

A

B

DC

E

G

H

Verification Area

6S-008-050404-CH-5255 0.29

S-005-031804-CH-5134 0.12

S-007-050504-CH-5262 0.06{S-007-050504-CH-5263 0.06 J}

S-007-050504-CH-5264 0.12

Sampling Round

IDSample

R2

(mg/kg)Result

{S-008-050404-CH-5254

S-006-031804-CH-5127

S-008-050404-CH-5256 0.10

IDSample

FINAL

(mg/kg)Result

0.59}

1.20S-008-050404-CH-5253 0.95

1.79 JS-005-051104-CH-5261S-005-051104-CH-5284 0.86 J

0.95S-008-050404-CH-52531.20

0.59}

0.10S-008-050404-CH-5256

S-006-031804-CH-5127

{S-008-050404-CH-5254

0.29S-008-050404-CH-5255

S-005-051104-CH-5261 1.79 J

0.12S-007-050504-CH-5264

0.06 J}{S-007-050504-CH-52630.06S-007-050504-CH-5262

0.86 JS-005-051104-CH-5284

B METHOD BLANK CONTAMINATION

UCL Calculations

100ft500

DUPLICATE SAMPLE{S-010-062104-CH-5521 0.10}

BCa Bootstrap 95% UCLPercentile Bootstrap 95% UCL

0.73 mg/kg0.71 mg/kg

Not Required Based on Sample Results

F

Page 13: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

50'

50'

S-011-070604-CH-5711 0.14R2

S-011-062404-CH-5621 0.08

S-010-062204-CH-5591 0.03 JS-010-062204-CH-5589 0.20 JS-010-062204-CH-5587 0.91 JS-010-062204-CH-5585 0.18 JS-010-062204-CH-5577 43.20 J

S-010-062204-CH-5583 0.22

S-010-062204-CH-5581 0.01 JS-010-062204-CH-5575 0.35 J

S-010-062204-CH-5579 0.35 JS-010-062204-CH-5571 0.18{S-010-062204-CH-5573 0.09}

S-010-062204-CH-5569 3.67 J

S-010-062204-CH-5567 6.31 J

S-010-062204-CH-5535 0.01 J

S-010-062204-CH-5533 0.02 JS-010-062204-CH-5545 0.20 J

S-010-062204-CH-5543 0.08

S-010-062204-CH-5539 0.80 J{S-010-062204-CH-5541 0.75 J}

S-010-062204-CH-5531 0.01

S-010-062204-CH-5529 0.04 J

S-010-062204-CH-5537 1.23 JS-010-062204-CH-5527 1.39 JS-010-062204-CH-5525 8.80

S-008-062204-CH-5574 0.55 J

S-008-062204-CH-5578 ND

S-008-062304-CH-5580 0.45S-008-062304-CH-5584 5.95

S-008-062304-CH-5582 6.72 J

S-008-062304-CH-5586 1.41 JS-008-062304-CH-5588 0.25 J{S-008-062304-CH-5592 0.15 J}S-008-062304-CH-5590 0.06

S-008-062304-CH-5594 0.03 J

S-008-062304-CH-5596 0.01 JS-008-062304-CH-5598 0.22 J

S-008-062304-CH-5602 0.61 J

S-008-062304-CH-5604 0.06

S-008-062304-CH-5616 0.91 JS-008-062304-CH-5606 0.40 J

S-008-062304-CH-5618 3.81

S-008-062304-CH-5608 0.31 J

S-008-062304-CH-5620 NDS-008-062304-CH-5610 1.97 J

{S-008-062304-CH-5624 ND}S-008-062304-CH-5622 0.01 J

{S-008-062304-CH-5614 8.20 J}S-008-062304-CH-5612 1.31 J

S-008-062304-CH-5626 0.02 JS-008-062304-CH-5628 0.55 JS-008-062304-CH-5630 0.47

S-008-062304-CH-5634 3.13 J

S-011-062304-CH-5636 3.80S-011-062304-CH-5640 0.99

S-011-062304-CH-5609 0.88 J

S-011-062304-CH-5607 0.07S-011-062304-CH-5599 0.42 JS-011-062304-CH-5597 2.82 JS-011-062304-CH-5603 0.14{S-011-062304-CH-5605 0.15}S-011-062304-CH-5593 0.18 J

S-011-062304-CH-5601 1.17 J{S-011-062304-CH-5595 0.13 J}

S-011-062304-CH-5646 5.00

S-011-062304-CH-5642 1.30{S-011-062304-CH-5644 1.10}

S-011-062304-CH-5638 0.26 J

S-008-062304-CH-5600 1.64 J

R1

R1R1R1R1R1

R1R1

R1

R1R1

R1

R1

R1R1

R1

R1R1

R1R1

R1R1

R1

R1

R1

R1

R1

R1R1

R1

R1

R1

R1R1

R1

R1

R1

R1R1

R1R1

R1

R1

R1

R1R1

R1

R1R1R1

R1R1

R1

R1R1

R1

R1

R1R1

R1R1

R1

S-011-070604-CH-5708 1.20R2S-011-070604-CH-5710 1.80R2

S-011-070604-CH-5707 1.29R2S-011-070604-CH-5709 3.50R2

S-008-070604-CH-5705 0.51R2S-008-070604-CH-5706 0.23 JR2

S-008-070604-CH-5703 0.12R2S-008-070604-CH-5704 2.86R2

S-008-070604-CH-5700 1.26R2{S-008-070604-CH-5701 0.65}S-008-070604-CH-5702 0.59R2

S-010-070604-CH-5697 4.96R2

S-010-070604-CH-5698 0.01 JR2

S-010-070604-CH-5699 0.38R2

BEDROCKR2

BEDROCKR3

S-008-072004-CH-5751 0.09R3

S-010-072004-CH-5752 1.60R3

S-008-070804-CH-5727 0.44R2

S-008-070804-CH-5728 0.97R2{S-008-070804-CH-5729 0.77}

VERIFICATION AREA 8

VERIFICATION AREA 9

PARCEL 8126 BAILEY SCALES ROAD

659 RILEY BOULEVARDPARCEL 10

PARCEL 11639 RILEY BOULEVARD

8H

8E

9E

9F

9H9D

9C

9B

9G

8D

8G

8C

8B8F

9A

8A

figure 6

PARCELS 008, 010, AND 011VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA006 SEP 09/2004

REMOVED:

_____< 50 ppm

_____>50 ppm APPROXIMATE TONNAGE

FINISH WORK DATE:

START WORK DATE:

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

8A

VERIFICATION AREA

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN GRID in mg/kg

VERIFICATION RESULTS

SAMPLING ROUND NUMBER

TOTAL PCB CONCENTRATION OF

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

S-010-062204-CH-5571

S-010-062204-CH-5525

R1 0.18

R1 8.80

BCa BIAS-CORRECTED AND ACCELERATED

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

EXCAVATION FLOOR SAMPLE RESULTS

TBS TO BE SAMPLED

ACCESS AGREEMENT:

PARCELS 008, 010, AND 011WORK SUMMARY

Feb 11/03, Parcel 8Apr 23/03, Parcel 10Aug 27/02, Parcel 11

R1Result (mg/kg)

Sample IDGrid

AB

D

F

C

E

GH

Verification Area

8

UCL Calculations

S-008-050604-CH-5271 2.14

S-010-051104-CH-5311 0.48

{S-010-051104-CH-5313 0.03 J}

S-010-051104-CH-5314 0.05S-010-051104-CH-5315 0.42

Sampling Round

S-008-050604-CH-5270S-008-050604-CH-5269

S-008-050604-CH-5272 0.53

IDSample

FINAL

(mg/kg)Result

0.260.86 J

R1Result (mg/kg)

Sample IDGrid

A

D

F

C

E

GH

Verification Area

9

UCL Calculations

S-008-050604-CH-5276 0.18 J

S-010-051104-CH-5316 2.40S-010-051104-CH-5317 0.58S-010-051104-CH-5318 0.22 JS-011-051104-CH-5319 0.19 J

{S-008-050604-CH-5275

S-008-050604-CH-5273

S-011-050604-CH-5277 0.18 J

IDSample

FINAL

(mg/kg)Result

10.80}

8.33

0.03 JS-010-051104-CH-5312

S-008-050604-CH-5269S-008-050604-CH-5270 0.26

0.86 J

0.53S-008-050604-CH-5272S-010-051104-CH-5311 0.48

0.03 JS-010-051104-CH-5312{S-010-051104-CH-5313 0.03 J}

0.05S-010-051104-CH-5314S-010-051104-CH-5315 0.42

Sampling Round

S-008-050604-CH-5274 6.95B

0.18 J0.18 J

0.580.22 J0.19 J

R2Result (mg/kg)

Sample ID

S-010-060704-CH-5368 ND S-010-060704-CH-5368 ND

R2Result (mg/kg)

Sample ID

S-010-060704-CH-5372 0.29

S-010-060704-CH-5373 ND

B METHOD BLANK CONTAMINATION

0.29

ND

2.40

S-010-060704-CH-5372

S-010-060704-CH-5373

S-008-050604-CH-5276

S-010-051104-CH-5316S-010-051104-CH-5317S-010-051104-CH-5318S-011-051104-CH-5319

S-011-050604-CH-5277

SOIL VERIFICATION SAMPLING GRID

100ft500

DUPLICATE SAMPLE{S-010-062204-CH-5573 0.09}

BCa Bootstrap 95% UCLPercentile Bootstrap 95% UCL

0.73 mg/kg0.69 mg/kg

Not Required Based on Sample Results

Page 14: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September
Page 15: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

670

650

690

680

660

640

PARCEL 205 (GM)105 GM DRIVE

S-205-061104-CH-5410 0.75 J

S-205-061104-CH-5409 0.13 J

S-205-061104-CH-5408 0.01 J

S-205-061104-CH-5407 ND

S-205-061104-CH-5406 0.21 J

S-205-061104-CH-5403 10.89 J

S-205-061404-CH-5420 0.23S-205-061404-CH-5419 1.90

S-205-061404-CH-5418 1.20

S-205-061404-CH-5421 0.06S-205-061404-CH-5414 0.10

BEDROCK

S-205-061404-CH-5417 1.22

{S-205-061104-CH-5404 18.60 J}

{S-205-061404-CH-5415 0.11}S-205-062104-CH-5547 3.50

S-205-062104-CH-5548 3.18

S-205-062104-CH-5549 1.01 J

S-205-062104-CH-5546 0.87

S-205-062104-CH-5550 4.79

S-205-062104-CH-5551 4.16{S-205-062104-CH-5552 2.16 J}

S-205-062104-CH-5553 2.04 J

S-205-062104-CH-5554 2.55 J

S-205-062104-CH-5555 7.13

S-205-062104-CH-5556 1.68S-205-062104-CH-5557 1.91 J

S-205-062104-CH-5558 0.48

S-205-062104-CH-5559 3.92

S-205-062104-CH-5560 1.26{S-205-062104-CH-5561 1.71}

S-205-062104-CH-5566 0.62

S-205-062104-CH-5565 1.32 JS-205-062104-CH-5564 2.23 J

S-205-062104-CH-5563 3.10

R1 S-205-062104-CH-5562 2.83 JR1

R1

R1

R1R1

R1

R1

R1

R1

R1

R1

R1

R1

R1

R1

R2

R2

R1

R1

R1R1R1

R1R1

R1R1

R1

R2

R1

R1R1

R1 S-205-061404-CH-4386 0.05 S-205-061104-CH-4383 0.45 JR1{S-205-061104-CH-4384 0.30 J}

S-205-062104-CH-4391 0.21R1

S-205-062104-CH-4392 0.30 JR1

S-205-062104-CH-4393 3.28R1

S-205-062104-CH-4394 0.42R1{S-205-062104-CH-4395 0.63}

S-205-061104-CH-5405 9.93 JR1

S-205-062904-CH-5686 12.96 JR2

S-205-061404-CH-5416 6.30R1

S-205-072004-CH-5753 0.13 JR3

figure 8

PARCEL 205VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA011 SEP 09/2004

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN mg/kgTOTAL PCB CONCENTRATION OF

LIMITS OF EXCAVATION (PLANNED)

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

GENERAL NOTES: (1). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.(2). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](3). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(4). All 4000 series samples are for information purposes only; 5000 series samples are for verification.

R1 S-205-062104-CH-4394 0.42

R1 S-205-062104-CH-5555 7.13

5-POINT COMPOSITE FLOOR SAMPLE

0 20 60ft

DUPLICATE SAMPLESAMPLING ROUND NUMBER

{S-205-062104-CH-4395 0.63}

Page 16: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

670

680

680

670

660

650

312 NORTH JACKSON STREET

S-401-050604-CH-5286

S-401-050604-CH-5287

S-401-050604-CH-5290

S-401-050604-CH-5291{S-401-050604-CH-5292

S-401-050604-CH-5285

S-401-050604-CH-5288

S-401-050604-CH-5289

50'

50'

S-401-051204-CH-5326S-401-051204-CH-5327

S-401-051204-CH-5325

S-401-051204-CH-5320

S-401-051204-CH-5321

S-401-051204-CH-5323

S-401-051204-CH-5324

S-401-051904-CH-5351

VERIFICATION AREA 14

S-401-060304-CH-5359

S-401-060304-CH-5360

S-401-060304-CH-5361

PARCEL 401

S-401-060704-CH-5364

S-401-060704-CH-5362

VERIFICATION AREA 13

S-401-060704-CH-5367 {S-401-060704-CH-5363

S-401-060704-CH-5365

S-401-060704-CH-5366

S-401-061404-CH-5413

S-401-061404-CH-5412S-401-061404-CH-5411

S-401-061004-CH-5402

S-401-061004-CH-5401

{S-401-051204-CH-5322

R2 0.17 JR1 4.58

R1 0.03 J

R1R1

R1 4.58 J1.46}0.270.67

R1 0.44R2 0.17

R1 0.19

R2

R2

3.98

0.53

R1 6.60

5.30R1

R1 3.48

11.40

0.611.17R1

R1

R1

R1

R1R1

R1R1 0.04

0.83

31.002.13

9.90}7.20

R1R1

0.66 J0.87

R1

R10.14 J}0.17 J

0.96R1

R2 4.5029.00 J

R3

S-401-061504-CH-5422R3 ND

S-401-061504-CH-5423R2 0.09

R2

R2

R2

VERIFICATION AREA 12

12A 12B

12E 12F

12C 12D

12H12G

13A 13B

13F13E

14A

14E

13C 13D

13H13G

14H

14D14B

14F

14C

14G

SIDEWALLS REMOVED TOELEVATION OF ADJACENT GRID

SIDEWALLS REMOVED TOELEVATION OF ADJACENT GRID

SIDEWALLS REMOVED TOELEVATION OF ADJACENT GRID

SIDEWALLS REMOVED TOELEVATION OF ADJACENT GRID

figure 9

PARCEL 401VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA010 SEP 09/2004

ACCESS AGREEMENT:

START WORK DATE:

FINISH WORK DATE:

APPROXIMATE TONNAGE_____>50 ppm

_____< 50 ppm

PARCEL 401 WORK SUMMARY

REMOVED:

Dec 4/02

Sept 11/03

EXCAVATION FLOOR SAMPLE RESULTS

100ft500

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

SOIL VERIFICATION SAMPLING GRID12A

VERIFICATION AREA

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN GRID in mg/kg

VERIFICATION RESULTS

SAMPLING ROUND NUMBER

TOTAL PCB CONCENTRATION OF

ND NOT DETECTED

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

S-401-051204-CH-5321

S-401-050604-CH-5288

R1 0.27

R1 4.58

BCa BIAS-CORRECTED AND ACCELERATED

GENERAL NOTES:(1). Cleanup Criteria

a.) Soils to < 1.8 mg/kg.- if all results are < 5.0 mg/kg, the cleanup objective can be verified in the Verification Area (approximately 100ft x 200ft) by calculating the Upper Confidence Limit (UCL) of the average concentration using statistics, if the UCL is < 1.8 mg/kg the cleanup objective will be met for the given Verification Area. A value of 0 mg/kg is used in the UCL calculation for sample grids excavated to bedrock.

b.) Sediments to < 1 mg/kg.(2). Composite side wall samples were collected in the location where the sidewall of the excavation exceeded 6 inches in height.(3). The surficial confirmation samples (8 composites per Verification Area except where bedrock is encountered) were collected after the soil/sediment removal was performed.(4). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](5). For UCL calculations, Aroclors 1016, 1221, and 1232 have been assigned a ND value of 0 mg/kg based upon their lack of presence in the data.- UCL calculations are performed on Aroclors 1242, 1248, 1254, and 1260 using the half the quantitation limit where ND results are reported. [ENVIRON]- UCL calculations included both floor and sidewall samples.(6). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(7). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.

R1Result (mg/kg)

Sample IDGrid

AB

D

F

C

E

GH

Verification Area

12

UCL Calculations

S-401-042104-CH-5202 4.42 J

S-401-042104-CH-5208 3.10S-401-042104-CH-5209 10.00 J

5.90S-401-042104-CH-5206

3.38S-401-042104-CH-5212

UCL Calculations

13

Verification Area

HG

E

C

F

D

BA

Grid IDSample

(mg/kg)Result

R1

S-401-042104-CH-5210 3.77 JS-401-042104-CH-5211 33.30 J

Sampling Round

Sampling Round

BEDROCKBEDROCKBEDROCK

IDSample

R2

(mg/kg)Result

S-401-050504-CH-5281

IDSample

R2

(mg/kg)Result

S-401-051004-CH-5308S-401-051004-CH-5307

S-401-042004-CH-5203 0.67

S-401-042004-CH-5204 0.722.54 JS-401-042004-CH-5205

S-401-050504-CH-5283

S-401-050504-CH-5280

0.62

2.15

0.87 J

0.43

BEDROCK

BEDROCK

IDSample

FINAL

(mg/kg)Result

IDSample

R3

(mg/kg)Result

S-401-051904-CH-5350 0.38

0.01 J0.42

BEDROCKBEDROCKBEDROCK

BEDROCK

BEDROCK

IDSample

FINAL

(mg/kg)Result

BEDROCK

S-401-050504-CH-52822.60 J}{S-401-042104-CH-5217

S-401-051204-CH-5329 1.42 0.25S-401-042004-CH-51940.03 JS-401-042004-CH-51930.05 JS-401-042004-CH-5192

4.00S-401-042104-CH-5198

0.11S-401-042004-CH-51960.19S-401-042004-CH-5197

UCL Calculations

14

Verification Area

H

G

E

C

F

D

BA

Grid IDSample

(mg/kg)Result

R1

Sampling Round

IDSample

FINAL

(mg/kg)Result

R3Result (mg/kg)

Sample ID

S-401-051204-CH-5328 10.30 J

R2Result (mg/kg)

Sample ID

S-401-050504-CH-5278 2.55{S-401-050504-CH-5279 3.33 J}

IDSample

(mg/kg)Result

R4

6.60S-401-051304-CH-5331

S-401-051904-CH-5347 0.22{S-401-051904-CH-5348 0.23}

S-401-051904-CH-5349 0.96BEDROCKS-401-052604-SP-5352 3.06S-401-052604-SP-5353 7.40 J

S-401-061004-CH-4381 17.00 BEDROCKBEDROCK

S-401-051004-CH-5308S-401-051004-CH-5307

S-401-042004-CH-5203 0.67

0.01 J0.42

S-401-042004-CH-5204 0.72S-401-050504-CH-5280 0.43S-401-051204-CH-5329 1.42S-401-051904-CH-5350 0.38

0.87 JS-401-050504-CH-5282

S-401-050504-CH-5283 0.62

0.25S-401-042004-CH-51940.03 JS-401-042004-CH-51930.05 JS-401-042004-CH-5192

NDS-401-051304-CH-53300.11S-401-042004-CH-51960.19S-401-042004-CH-5197

S-401-051904-CH-5347 0.22{S-401-051904-CH-5348 0.23}

S-401-051904-CH-5349 0.96

NDS-401-051304-CH-5330

DUPLICATE SAMPLE{S-401-051204-CH-5322 1.46}

BCa Bootstrap 95% UCLPercentile Bootstrap 95% UCL

1.20 mg/kg1.10 mg/kg

Page 17: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

S-NAOI4-070904-CH-4411 0.12 JR1S-NAOI4-071304-CH-4413 0.03 JR1

R1

S-NAOI4-071404-CH-4415 0.30R1S-NAOI4-071404-CH-5738 0.65R1

S-NAOI4-071404-CH-4416 0.46R1

R1

{S-NAOI4-071504-CH-5740 4.50}

{S-NAOI4-071504-CH-4420 0.25}S-NAOI4-071504-CH-4419 0.65R1

R1

R1

R1

S-NAOI4-071604-CH-5743 7.70R1

R1

R1S-NAOI4-071604-CH-4426 0.13 JR1

S-NAOI4-071604-CH-4424 0.99R1

S-NAOI4-071604-CH-4425 0.02 JR1

S-NAOI4-062404-CH-4398 NDR1

S-NAOI4-062404-CH-4399 0.02 J,BR1

S-NAOI4-062404-CH-4400 0.65 BR1

S-NAOI4-062404-CH-4405 0.13 J,BR1

S-NAOI4-071704-CH-4427R1

S-NAOI4-071704-CH-4428

0.02 J

0.10R1

S-NAOI4-071904-CH-5747 0.75R1

S-NAOI4-070804-CH-4409 0.02 JR1{S-NAOI4-070804-CH-4410 0.04}

S-NAOI4-072104-CH-5754 0.05R2

5.70R1

S-NAOI4-072204-CH-5756 NDR2

S-NAOI4-072204-CH-5757 0.02 JR2

S-401-091803-KB-5010 108.00R1

S-401-091803-KB-5009 23.50R1

S-401-091803-KB-5004 528.00R1S-401-091803-KB-5003 3.53R1

S-AOI4A-091703-KB-5000 409.00R1

S-401-091803-KB-5005 11.40R1S-AOI4A-091703-KB-5001 103.00R1

S-401-091803-KB-5006 316.00R1{S-401-091803-KB-5007 479.00}

S-AOI4-091803-KB-5008 10.30R1

S-AOI4-092203-KB-5011 72.00R1

S-401-092203-KB-5012 0.21R1

S-401-042403-KB-5019 0.82R1

S-AOI4-092403-KB-5014 78.10R1

S-AOI4-092403-KB-5015 5.70R1

S-AOI4-092403-KB-5016 26.10R1

S-AOI4-092403-KB-5017 0.51R1

S-AOI4-042903-KB-5026 0.80R1

S-AOI4-042903-KB-5025 0.77R1

S-AOI4-042903-KB-5023 1.59R1

S-AOI4-042903-KB-5021 2.38R1

S-AOI4-042903-KB-5020 20.60R1

R2

{S-NAOI4-062404-CH-4402 2.57 B}S-NAOI4-062404-CH-4401 4.97 BR1

S-NAOI4-062404-CH-4403 1.49 BR1

S-NAOI4-062404-CH-4404 3.91 BR1

S-NAOI4-071504-CH-4421 5.00

S-NAOI4-071504-CH-4422 2.88

S-NAOI4-071504-CH-4423 3.50

S-NAOI4-071904-CH-4429

S-NAOI4-071504-CH-4418 4.39

S-NAOI4-071504-CH-5742 2.86

S-NAOI4-071304-CH-5737 2.61

S-NAOI4-071504-CH-5739 3.70R1

S-NAOI4-071504-CH-5741 1.81

{S-NAOI4-081004-CH-5802 0.47}

S-NAOI4-081004-CH-5803 1.48R1

S-NAOI4-081004-CH-5804 1.28R1

S-NAOI4-081004-CH-5807 0.08R1

S-NAOI4-081004-CH-5810 0.69R1

S-NAOI4-081004-CH-5809 0.44R1

S-NAOI4-081004-CH-5808 0.13 JR1

S-NAOI4-081004-CH-5806 0.43R1

S-NAOI4-081004-CH-5801 1.30R1

S-NAOI4-081304-CH-5811 0.70R2

S-NA0I4-081304-CH-5812 0.74R2{S-NA0I4-081304-CH-5813 0.14 J}

S-NA0I4-081304-CH-5814 0.82 JR2

S-NA0I4-081304-CH-5815 0.27R2

S-NAOI4-072104-CH-5755 0.04 JR2

S-AOI4-042903-KB-5022 4.41R1

S-NAOI4-081904-CH-5817 0.15R3

S-NAOI4-081904-CH-5816 7.50R3

S-NAOI4-082404-CH-4498 0.08 JR1

S-NAOI4-082404-CH-4499 0.50

S-NAOI4-082404-CH-4500 1.67 JR1S-NAOI4-082404-CH-4501 0.81R1

S-NAOI4-082404-CH-4502 0.08 JR1

S-NAOI4-082404-CH-5818 20.80 JR1

S-NAOI4-082404-CH-5820 2.20R1

S-NAOI4-082404-CH-5821 0.09 JR1

{S-NAOI4-082404-CH-5819 19.70 J}

R1

{S-AOI4A-091703-KB-5002 197.00}

{S-AOI4-042903-KB-5024 1.29}

{S-AOI4-092403-KB-5018 0.54}

{S-401-092203-KB-5013 110.00}

105 GM DrivePARCEL 216 (GM)

29.00 BS-NAOI4-062404-CH-4406R1

R1 S-NAOI4-083104-CH-5830 0.06

R1 S-NAOI4-083104-CH-5829 0.18 J

R1 S-NAOI4-083004-CH-5827 4.93 J

R1 S-NAOI4-083004-CH-5828 10.66 J

R1 S-NAOI4-083004-CH-5825 11.30

R1 S-NAOI4-083004-CH-5826 23.00 J

R1 S-NAOI4-082704-CH-5824 0.37 J

S-NAOI4-081004-CH-5805 5.20R1

R1 S-NAOI4-082604-CH-5822 2.93{S-NAOI4-082604-CH-5823 2.93}

R1 S-NAOI4-082704-CH-4505 0.80{S-NAOI4-082704-CH-4506 1.81}

S-NAOI4-082704-CH-4507 4.50

R1 S-NAOI4-082704-CH-4508 1.86 J

R1 S-NAOI4-082704-CH-4511 16.80 J

R1 S-NAOI4-083004-CH-4512 13.88

R1 S-NAOI4-083004-CH-4513 1.84 J

R1 S-NAOI4-083104-CH-4520 0.04 J

R1 S-NAOI4-083104-CH-4517 21.50 JR1 S-NAOI4-083104-CH-4518 0.02 J

{S-NAOI4-083104-CH-4519 0.03 J}

PARCEL 215 (GM)105 GM Drive

R2 S-NAOI4-090204-CH-5831 0.04R2 S-NAOI4-090304-CH-5832 0.13

{S-NAOI4-090304-CH-5833 0.33 J}

PARCEL 216 (GM)105 GM Drive

R4

BEDROCKR2

R2 S-NAOI4-090704-CH-5834 0.15 J

R2 S-NAOI4-090904-CH-5845

R2

R2

R1 S-NAOI4-090804-CH-4525 0.10 J

R1 S-NAOI4-090804-CH-4526 1.50

R1 S-NAOI4-090804-CH-5835 5.47

R1 S-NAOI4-090804-CH-5836 17.83 J

R1 S-NAOI4-090804-CH-5837 53.00 J

R1

0.13

{S-NAOI4-091004-CH-5842 0.01 J}R2 S-NAOI4-091004-CH-5841 0.02 J

{S-NAOI4-091104-CH-5848 3.31 J}R5 S-NAOI4-091104-CH-5847 9.50R4

S-NAOI4-090804-CH-5838 1.60S-NAOI4-090904-CH-5839 22.10 J

R6 RE-SAMPLING PENDING

S-NAOI4-090904-CH-5844 1.08 J

R2 S-NAOI4-091304-CH-5851 11.84

S-NAOI4-091004-CH-5843 0.01 J

R2 S-NAOI4-091304-CH-5850 49.60 J

R2 S-NAOI4-091304-CH-5849 8.29

S-NAOI4-091104-CH-5846 0.17 J

figure 10

AREA NORTH OF AOI 4FINAL UN-VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA012 SEP 17/2004

APPROXIMATE PROPERTY

APPROXIMATE SURFACE

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN mg/kgTOTAL PCB CONCENTRATION OF

ND NOT DETECTED

J ESTIMATE VALUE

SAMPLE RESULT EXCEEDS

5-POINT COMPOSITE CREEK

GENERAL NOTES: (1). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.(2). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](3). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.(4). All 4000 series samples are for information purposes only; 5000 series samples are for verification.

R1R1

5-POINT COMPOSITE FLOOR SAMPLES-NAOI4-071504-CH-4419

S-NAOI5-081004-CH-58030.65

1.48

B METHOD BLANK CONTAMINATION

APPROXIMATE GM PROPERTY

{S-NAOI4-071504-CH-4420 0.25}DUPLICATE SAMPLESAMPLING ROUND NUMBER

CLEANUP CRITERIA

BOUNDARY

BOUNDARY

WATER LOCATION

BED SAMPLE

GRAB SAMPLE LOCATION

60 150ft0

Page 18: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

S-NZIP-072804-CH-5763 90.00 JR1

S-NZIP-072804-CH-5765 0.96R1

S-NZIP-072804-CH-5767 48.80 JR1{S-NZIP-072804-CH-5768 98.00 J}

S-NZIP-072804-CH-5769 25.40 JR1

S-NZIP-072804-CH-5770 28.00R1

S-NZIP-072804-CH-5771 11.50 JR1

S-NZIP-072804-CH-5772 24.40 JR1

S-NZIP-072804-CH-5773 25.00R1

S-NZIP-072804-CH-5774 78.00

S-NZIP-072804-CH-5775 19.90R1

S-NZIP-072804-CH-5776 17.60 JR1

S-NZIP-072804-CH-5777 3.73R1

S-NZIP-072804-CH-5778 0.04 JR1

S-NAOI15-080204-CH-5792 13.70 JR2S-NAOI15-080204-CH-5795 124.00 J

S-NAOI15-080204-CH-5791 54.30 JR2

S-NAOI15-080404-CH-5797 160.00R3

S-NAOI15-080204-CH-5789 91.10 JR2{S-NAOI15-080204-CH-5790 95.00}S-NAOI15-080404-CH-5798 240.00R3

S-NZIP-072804-CH-5764R1 682.00 J

S-NAOI15-080204-CH-5794 98.00REMOVED TO MEET CREEK EXCAVATIONR3

S-NAOI15-080204-CH-5793 27.50R2S-NAOI15-080204-CH-5796 17.50

S-NZIP-072804-CH-5779 0.79R1

R2

R2

R1

R2

S-NAOI15-080704-CH-5800 16.00R4S-NAOI15-080704-CH-5799 36.00R4

{S-NZIP-072804-CH-5780 1.34}

REMOVED TO MEET CREEK EXCAVATIONR4

S-NZIP-072804-CH-5766 11.50 JR1

figure 11

NORTH ZIPP LOT EXCAVATIONFINAL UN-VALIDATED COMPOSITE SAMPLE RESULTS

POST-EXCAVATION SUMMARYGM POWERTRAIN BEDFORD PLANT

13968-00(113)GN-WA013 SEP 09/2004

APPROXIMATE PROPERTY BOUNDARY

APPROXIMATE SURFACE WATER LOCATION

EXISTING BUILDINGS

EXISTING VEGETATION

ELEVATION CONTOURS (feet AMSL)EXISTING GROUND SURFACE

FENCE LINE

ROADS / UNPAVED AREAS

LEGEND

SAMPLE ID

COMPOSITE SAMPLE IN mg/kgTOTAL PCB CONCENTRATION OF

J ESTIMATE VALUE

GRAB SAMPLE LOCATION

SAMPLE RESULT EXCEEDS CLEANUP CRITERIA

5-POINT COMPOSITE SIDEWALL SAMPLE

GENERAL NOTES: (1). Property boundary locations approximated from the Lawrence County survey plats. Locations may not accurately represent the true property boundaries.(2). A value of 0 mg/kg is used for ND in the calculation of Total PCBs. [ENVIRON](3). The sampling round (e.g. R1, R2, etc.) correlates to Verification Area grids or sidewalls where additional rounds of excavation were completed due to exceedances of the cleanup criteria.

R1

R1

S-NZIP-072804-CH-5767

S-NZIP-072804-CH-5774

48.80 J

78.00

APPROXIMATE GM PROPERTY BOUNDARY

80ft400

{S-NZIP-072804-CH-5768 98.00 J}DUPLICATE SAMPLESAMPLING ROUND NUMBER

Page 19: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 1 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Location STATION 1

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 328.00 44 0.1341 13 8/3/2004 301.00 22 0.0731 7 8/4/2004 329.00 19 0.0578 6 8/5/2004 327.00 18 0.055 6 8/6/2004 384.00 17 0.0443 4 8/10/2004 378.00 5 0.0132 1 8/11/2004 386.00 7.1 0.0184 2 8/12/2004 367.00 5.4 0.0147 1 8/13/2004 495.00 11 0.0222 2 8/16/2004 383.00 17 0.0444 4 8/17/2004 371.00 3.9 0.0105 1 8/18/2004 359.00 6.8 0.0189 2

* Results not reported due to machine

Page 20: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 2 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 1A

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/19/2004 322.00 5.4 0.0168 2 8/20/2004 427.00 5.1 0.0119 1 8/23/2004 373.00 10 0.0268 3 8/24/2004 375.00 5.2 0.0139 1 8/25/2004 363.00 4.8 0.0132 1 8/26/2004 394.00 4.4 0.0112 1 8/27/2004 480.00 6 0.0125 1 8/30/2004 383.00 12 0.0313 3 8/31/2004 384.00 18 0.0469 5

* Results not reported due to machine

Page 21: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 3 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 2A

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 200.00 4.8 0.024 2 8/3/2004 201.00 6.8 0.0338 3 8/4/2004 202.00 1.6 0.0079 1 8/5/2004 200.00 0 ND(0.0038) -- 8/6/2004 235.00 1.2 0.0051 1 8/10/2004 205.00 0.54 0.0026 0 8/11/2004 207.00 0.63 0.003 0 8/12/2004 172.00 0 ND(0.0044) -- 8/13/2004 239.00 1.8 0.0075 1 8/16/2004 201.00 4.2 0.0209 2 8/17/2004 186.00 5 0.0269 3 8/18/2004 187.00 2.3 0.0123 1

* Results not reported due to machine

Page 22: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 4 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 2B

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/19/2004 161.00 6.3 0.0391 4 8/20/2004 213.00 3.1 0.0146 1 8/23/2004 194.00 12 0.0619 6 8/24/2004 194.00 11 0.0567 6 8/25/2004 183.00 9.8 0.0536 5 8/26/2004 184.00 5.9 0.0321 3 8/27/2004 183.00 9.8 0.0536 5 8/30/2004 158.00 5.4 0.0342 3 8/31/2004 157.00 7.1 0.0452 5

* Results not reported due to machine

Page 23: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 5 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 3

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 255.00 12 0.0471 5 8/3/2004 261.00 13 0.0498 5 8/4/2004 275.00 4.9 0.0178 2 8/5/2004 273.00 8.4 0.0308 3 8/6/2004 321.00 5.5 0.0171 2 8/10/2004 280.00 16 0.0571 6 8/11/2004 289.00 6.9 0.0239 2 8/12/2004 244.00 4.3 0.0176 2 8/13/2004 401.00 5.1 0.0127 1 8/16/2004 321.00 8.2 0.0255 3 8/17/2004 318.00 10 0.0314 3 8/18/2004 305.00 14 0.0459 5 8/19/2004 315.00 19 0.0603 6 8/20/2004 356.00 6.4 0.018 2 8/23/2004 302.00 17 0.0563 6 8/24/2004 334.00 13 0.0389 4 8/25/2004 305.00 15 0.0492 5 8/26/2004 329.00 13 0.0395 4 8/27/2004 344.00 30 0.0872 9 8/30/2004 323.00 6.2 0.0192 2 8/31/2004 315.00 7.3 0.0232 2

* Results not reported due to machine

Page 24: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 6 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 4

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 252.00 5.3 0.021 2 8/2/2004 280.00 5.2 0.0186 2 8/3/2004 272.00 5.3 0.0195 2 8/3/2004 286.00 5.2 0.0182 2 8/4/2004 288.00 5 0.0174 2 8/4/2004 191.00 5.2 0.0272 3 8/5/2004 280.00 1.5 0.0054 1 8/5/2004 266.00 2.1 0.0079 1 8/6/2004 332.00 2.1 0.0063 1 8/6/2004 348.00 2 0.0057 1 8/10/2004 271.00 5.1 0.0188 2 8/10/2004 285.00 4.5 0.0158 2 8/11/2004 354.00 3.3 0.0093 1 8/11/2004 327.00 3.7 0.0113 1 8/12/2004 313.00 3.1 0.0099 1 8/12/2004 339.00 2.4 0.0071 1 8/13/2004 412.00 2.3 0.0056 1 8/13/2004 446.00 2.2 0.0049 0 8/16/2004 346.00 3 0.0087 1 8/16/2004 375.00 3.2 0.0085 1 8/17/2004 328.00 2.1 0.0064 1 8/17/2004 344.00 2.3 0.0067 1 8/18/2004 348.00 5.6 0.0161 2 8/18/2004 334.00 5 0.015 2 8/19/2004 338.00 6.4 0.0189 2 8/19/2004 352.00 6.6 0.0188 2 8/20/2004 350.00 3 0.0086 1 * Results not reported due to machine

Page 25: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 7 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 4

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/20/2004 365.00 3.1 0.0085 1

8/23/2004 276.00 2 0.0072 1 8/23/2004 346.00 3.2 0.0092 1 8/24/2004 280.00 2 0.0071 1 8/24/2004 342.00 2.4 0.007 1 8/25/2004 327.00 2.9 0.0089 1 8/25/2004 327.00 2.9 0.0089 1 8/26/2004 363.00 3.4 0.0094 1 8/26/2004 363.00 2.7 0.0074 1 8/27/2004 386.00 5.6 0.0145 1 8/27/2004 370.00 4.3 0.0116 1 8/30/2004 347.00 4.7 0.0135 1 8/30/2004 347.00 4.7 0.0135 1 8/31/2004 336.00 2.7 0.008 1 8/31/2004 322.00 2.3 0.0071 1

* Results not reported due to machine

Page 26: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 8 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 6

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 375.00 20 0.0533 5 8/3/2004 348.00 9 0.0259 3 8/4/2004 389.00 5.6 0.0144 1 8/5/2004 369.00 4 0.0108 1 8/18/2004 372.00 3.4 0.0091 1 8/19/2004 395.00 3.6 0.0091 1 8/20/2004 390.00 2.2 0.0056 1 8/24/2004 399.00 2.1 0.0053 1

* Results not reported due to machine

Page 27: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 9 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 9A

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 285.00 3.3 0.0116 1 8/2/2004 352.00 3.4 0.0097 1 8/3/2004 105.00 * * * 8/3/2004 300.00 2.8 0.0093 1 8/4/2004 308.00 4.9 0.0159 2 8/4/2004 328.00 4.5 0.0137 1 8/5/2004 279.00 1.9 0.0068 1 8/5/2004 340.00 2.2 0.0065 1 8/18/2004 361.00 1.6 0.0044 0 8/18/2004 314.00 1.6 0.0051 1 8/19/2004 384.00 3 0.0078 1 8/19/2004 320.00 2.7 0.0084 1 8/20/2004 391.00 1.1 0.0028 0 8/20/2004 343.00 1.5 0.0044 0 8/24/2004 338.00 1.2 0.0036 0 8/24/2004 373.00 1.2 0.0032 0

* Results not reported due to machine

Page 28: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 10 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 10

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 363.00 4.7 0.0129 1 8/3/2004 324.00 5 0.0154 2 8/4/2004 349.00 2.2 0.0063 1 8/5/2004 335.00 1.3 0.0039 0 8/18/2004 347.00 3.7 0.0107 1 8/19/2004 65.00 * * * 8/20/2004 366.00 1.3 0.0036 0 8/24/2004 379.00 2.9 0.0077 1

* Results not reported due to machine

Page 29: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 11 of 11

Table 1.1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Location STATION 11

Date Total Volume Total PCB Mass PCB Concentration Percent Allowable m3 ug ug/m3 %

8/2/2004 331.00 1.3 0.0039 0 8/3/2004 317.00 1.6 0.005 0 8/4/2004 323.00 1.6 0.005 0 8/5/2004 318.00 0 ND(0.0024) -- 8/18/2004 357.00 1.9 0.0053 1 8/19/2004 379.00 1.5 0.004 0 8/20/2004 332.00 1.2 0.0036 0 8/24/2004 367.00 0.61 0.0017 0

* Results not reported due to machine

Page 30: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 1 of 4

Table 1.1B – GROUP 1 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Date 02-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 3 1234.00 0.87 0.095 UPWIND STATION 1 1108.00 0.95 0.1671 105 STATION 2A 1319.00 0.92 0.0531 33 STATION 4 1040.00 0.74 0.0559 35 STATION 4 914.00 0.65 0.0508 32

Sample Date 03-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1 1226.00 0.94 0.3584 UPWIND STATION 2A 1398.00 0.97 0.0963 16 STATION 3 1263.00 0.87 0.1207 20 STATION 4 1119.00 0.78 0.0855 14 STATION 4 961.00 0.67 0.0817 14

Sample Date 04-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 3 1305.00 0.9 0.0564 UPWIND STATION 1 1360.00 0.95 0.146 155 STATION 2A 1401.00 0.97 0.0544 58 STATION 4 1160.00 0.8 0.0236 25 STATION 4 1102.00 0.76 0.0507 54

* Results not reported due to machine

Page 31: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 2 of 4

Table 1.1B – GROUP 1 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 05-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2A 1401.00 0.98 0.0264 UPWIND STATION 1 1340.00 0.94 0.0363 82 STATION 3 1251.00 0.87 0.1973 448 STATION 4 1097.00 0.78 0.0366 83 STATION 4 944.00 0.67 0.0371 84

Sample Date 06-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 3 1573.00 0.93 0.1198 UPWIND STATION 1 1600.00 0.96 0.0806 40 STATION 2A 1592.00 0.95 0.016 8 STATION 4 1096.00 0.66 0.0249 12 STATION 4 1345.00 0.81 0.0274 14

Sample Date 10-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2A 1349.00 0.92 0.0415 UPWIND STATION 1 1342.00 0.92 0.1206 174 STATION 3 1302.00 0.88 0.0685 99 STATION 4 1076.00 0.75 0.044 63 STATION 4 974.00 0.68 0.037 53

* Results not reported due to machine

Page 32: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 3 of 4

Table 1.1B – GROUP 1 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 11-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2A 1451.00 0.98 0.0453 UPWIND STATION 1 1363.00 0.95 0.1147 152 STATION 3 1388.00 0.91 0.0756 100 STATION 4 1358.00 0.95 0.0186 25 STATION 4 1115.00 0.78 0.0128 17

Sample Date 12-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2A 1261.00 0.95 0.031 UPWIND STATION 1 1295.00 0.91 0.1118 216 STATION 3 1240.00 0.91 0.1323 256 STATION 4 1329.00 0.97 0.0242 47 STATION 4 1002.00 0.73 0.0321 62

Sample Date 13-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 3 1552.00 0.85 0.1381 UPWIND STATION 1 1653.00 0.9 0.0753 33 STATION 2A 1753.00 0.95 0.0285 12 STATION 4 1421.00 0.79 0.0246 11 STATION 4 1745.00 0.97 0.026 11

* Results not reported due to machine

Page 33: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 4 of 4

Table 1.1B – GROUP 1 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 16-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1 1253.00 0.88 0.1866 UPWIND STATION 2A 1311.00 0.91 0.0641 21 STATION 3 1155.00 0.79 0.1229 39 STATION 4 989.00 0.68 0.046 15 STATION 4 1336.00 0.92 0.0434 14

Sample Date 17-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1 1259.00 0.88 0.6464 UPWIND STATION 2A 1307.00 0.91 0.1383 13 STATION 3 1335.00 0.92 0.0563 5 STATION 4 1007.00 0.7 0.0517 5 STATION 4 1353.00 0.94 0.0511 5

Sample Date 18-Aug-04 Group 1 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1 1252.00 0.87 0.6291 UPWIND STATION 2A 1331.00 0.92 0.1347 13 STATION 3 1105.00 0.76 0.1148 11 STATION 4 1326.00 0.91 0.0661 6 STATION 4 976.00 0.67 0.0715 7

* Results not reported due to machine

Page 34: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 1 of 3

Table 1.1B – GROUP 1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Date 19-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1A 1003.00 0.81 0.1195 UPWIND STATION 2B 1157.00 0.93 0.0833 42 STATION 3 1188.00 0.79 0.1665 83 STATION 4 1003.00 0.68 0.081 41 STATION 4 1413.00 0.96 0.0717 36

Sample Date 20-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2B 1553.00 0.94 0.0298 UPWIND STATION 1A 1416.00 0.86 0.0249 50 STATION 3 1197.00 0.74 0.0266 53 STATION 4 1436.00 0.9 0.0194 39 STATION 4 1149.00 0.72 0.0203 41

Sample Date 23-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 4 958.00 0.69 0.0462 UPWIND STATION 4 1222.00 0.88 0.044 UPWIND STATION 1A 1150.00 0.83 0.2763 376 STATION 2B 1255.00 0.9 0.0782 106 STATION 3 1074.00 0.78 0.0841 114

* Results not reported due to machine

Page 35: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 2 of 3

Table 1.1B – GROUP 1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 24-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1A 1269.00 0.88 0.0537 UPWIND STATION 2B 1402.00 0.94 0.1317 147 STATION 3 1261.00 0.83 0.0508 57 STATION 4 1163.00 0.81 0.0135 15 STATION 4 1258.00 0.88 0.0266 30

Sample Date 25-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1A 1230.00 0.88 0.0604 UPWIND STATION 2B 1313.00 0.93 0.0593 59 STATION 3 1239.00 0.89 0.0417 41 STATION 4 976.00 0.71 0.0282 28 STATION 4 1149.00 0.84 0.0289 29

Sample Date 26-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1A 1298.00 0.9 0.0344 UPWIND STATION 2B 1336.00 0.94 0.0589 103 STATION 3 1305.00 0.83 0.0715 124 STATION 4 1090.00 0.69 0.0376 65 STATION 4 1316.00 0.83 0.0386 67

* Results not reported due to machine

Page 36: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 3 of 3

Table 1.1B – GROUP 1A SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 27-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 1A 1602.00 0.9 0.0699 UPWIND STATION 2B 1419.00 0.93 0.0426 36 STATION 3 1282.00 0.78 0.0814 70 STATION 4 1356.00 0.84 0.0538 46 STATION 4 1116.00 0.69 0.0418 36

Sample Date 30-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 2B 1326.00 0.92 0.0357 UPWIND STATION 1A 1264.00 0.89 0.2072 348 STATION 3 1222.00 0.83 0.0559 94 STATION 4 1234.00 0.85 0.0331 56 STATION 4 987.00 0.68 0.0349 59

Sample Date 31-Aug-04 Group 1A Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 3 1204.00 0.84 0.0939 UPWIND STATION 1A 1299.00 0.91 0.1956 125 STATION 2B 1320.00 0.92 0.0311 20 STATION 4 1237.00 0.88 0.0325 21 STATION 4 1012.00 0.72 0.0299 19

* Results not reported due to machine

Page 37: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 1 of 4

Table 1.1B – GROUP 2 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Date 02-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 11 1226.00 0.85 0.0605 UPWIND STATION 10 1294.00 0.96 0.0349 35 STATION 6 1372.00 0.95 0.0792 78 STATION 9A 1244.00 0.88 0.03 30 STATION 9A 1089.00 0.76 0.0657 65

Sample Date 03-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1356.00 0.97 0.09 UPWIND STATION 10 1271.00 0.94 0.0723 48 STATION 11 1190.00 0.86 0.0777 52 STATION 9A 1204.00 0.92 0.0257 17 STATION 9A 382.00 * * *

Sample Date 04-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 11 1236.00 0.84 0.0389 UPWIND STATION 10 1369.00 0.94 0.0383 59 STATION 6 1436.00 0.96 0.0418 64 STATION 9A 1230.00 0.86 0.0418 64 STATION 9A 1118.00 0.76 0.0475 73

* Results not reported due to machine

Page 38: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 2 of 4

Table 1.1B – GROUP 2 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 05-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 11 1189.00 0.86 0.0138 UPWIND STATION 10 1315.00 0.94 0.0205 89 STATION 6 1379.00 0.97 0.0492 213 STATION 9A 1095.00 0.78 0.0292 127 STATION 9A 1211.00 0.89 0.0249 108

Sample Date 06-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 11 1363.00 0.85 0.0143 UPWIND STATION 10 1560.00 0.94 0.0142 59 STATION 6 342.00 * * * STATION 9A 1445.00 0.9 0.0131 55 STATION 9A 1295.00 0.79 0.0201 84

Sample Date 09-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1412.00 0.96 0.0714 UPWIND STATION 10 1336.00 0.9 0.0621 52 STATION 11 1194.00 0.85 0.0635 53 STATION 9A 1348.00 0.97 0.0544 46 STATION 9A 1357.00 0.96 0.0365 31

* Results not reported due to machine

Page 39: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 3 of 4

Table 1.1B – GROUP 2 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 10-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 10 1439.00 0.94 0.0412 UPWIND STATION 11 1304.00 0.92 0.0215 31 STATION 6 1420.00 0.93 0.0606 88 STATION 9A 1434.00 0.97 0.0215 31 STATION 9A 1387.00 0.92 0.0308 45

Sample Date 18-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1232.00 0.86 0.074 UPWIND STATION 10 1248.00 0.86 0.0698 56 STATION 11 1280.00 0.89 0.065 53 STATION 9A 1313.00 0.94 0.0641 52 STATION 9A 1354.00 0.94 0.0648 52

Sample Date 19-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1385.00 0.91 0.0815 UPWIND STATION 10 215.00 * * * STATION 11 1366.00 0.9 0.0527 39 STATION 9A 1394.00 0.91 0.0523 38 STATION 9A 1439.00 0.97 0.0608 45

* Results not reported due to machine

Page 40: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 4 of 4

Table 1.1B – GROUP 2 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 20-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 10 1463.00 0.93 0.0137 UPWIND STATION 11 1348.00 0.89 0.0157 69 STATION 6 1423.00 0.91 0.0207 90 STATION 9A 1436.00 0.95 0.0226 99 STATION 9A 1472.00 0.94 0.02 87

Sample Date 24-Aug-04 Group 2 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1276.00 0.92 0.0304 UPWIND STATION 10 1346.00 0.92 0.0181 36 STATION 11 1294.00 0.88 0.0305 60 STATION 9A 1350.00 0.94 0.0178 35 STATION 9A 1268.00 0.86 0.0271 53

* Results not reported due to machine

Page 41: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 1 of 4

Table 1.1B – GROUP 3 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Date 03-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 8A 1877.00 1.35 0.0843 UPWIND STATION 5 943.00 1.04 0.1016 72 STATION 6 1356.00 0.97 0.09 64 STATION 7 1196.00 0.85 0.07 50

Sample Date 04-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1436.00 0.96 0.0418 UPWIND STATION 5 1856.00 1.26 0.0346 50 STATION 7 1315.00 0.87 0.0361 52 STATION 8A 2103.00 1.42 0.0385 55

Sample Date 05-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 5 1529.00 1.09 0.0546 UPWIND STATION 6 1379.00 0.97 0.0492 54 STATION 7 1250.00 0.88 0.0346 38 STATION 8A 1929.00 1.4 0.0271 30

* Results not reported due to machine

Page 42: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 2 of 4

Table 1.1B – GROUP 3 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 06-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 5 1703.00 1.01 0.0553 UPWIND STATION 6 342.00 * * * STATION 7 562.00 * * * STATION 8A 1682.00 1.03 0.0095 10

Sample Date 09-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 8A 2137.00 1.45 0.0663 UPWIND STATION 5 1514.00 1.02 0.1168 105 STATION 6 1412.00 0.96 0.0714 64 STATION 7 1314.00 0.87 0.0559 50

Sample Date 10-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 5 1689.00 1.1 0.0727 UPWIND STATION 6 1420.00 0.93 0.0606 50 STATION 7 1333.00 0.88 0.046 38 STATION 8A 2021.00 1.43 0.0415 34

* Results not reported due to machine

Page 43: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 3 of 4

Table 1.1B – GROUP 3 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA

Sample Date 11-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 5 1527.00 1.11 0.0602 UPWIND STATION 6 1385.00 0.92 0.0378 38 STATION 7 1334.00 0.89 0.0283 28 STATION 8A 1831.00 1.26 0.037 37

Sample Date 20-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 5 1754.00 1.13 0.0251 UPWIND STATION 6 1423.00 0.91 0.0207 49 STATION 7 1024.00 0.65 0.0248 59 STATION 8A 2018.00 1.32 0.0164 39

Sample Date 23-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1197.00 0.88 0.0514 UPWIND STATION 5 1609.00 1.1 0.0579 67 STATION 7 589.00 0.63 0.0606 71 STATION 8A 1944.00 1.3 0.0633 74

* Results not reported due to machine

Page 44: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

Page 4 of 4

Table 1.1B – GROUP 3 SUMMARY OF AIR MONITORING ANALYTICAL RESULTS GM BEDFORD BEDFORD, INDIANA Sample Date 24-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 8A 1920.00 1.31 0.0411 UPWIND STATION 5 1629.00 1.11 0.0335 49 STATION 6 1276.00 0.92 0.0304 44 STATION 7 1044.00 0.7 0.0313 46

Sample Date 31-Aug-04 Group 3 Total Volume Average Flow TSP Concentration Percent Allowable Station# m3 m3/min mg/m3 %

STATION 6 1181.00 0.91 0.0325 UPWIND STATION 5 1402.00 1.11 0.0466 86 STATION 7 252.00 * * * STATION 8A 1738.00 1.31 0.0376 69

* Results not reported due to machine

Page 45: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

TABLE 2.1DISPOSAL LOG

GM BEDFORD POWERTRAIN PLANT

Load Manifest Date Waste Waste Truck Actual LF Actual LF WasteNo. No. Shipped Description Source No. Transporter Weight (lbs) Weight (Kg) Disposal Site Profile No.

20623 20623 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1011 U.S. Bulk Transport, Inc. 48,600 22,091 Republic - Sycamore Ridge LF 30908920624 20624 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1014 U.S. Bulk Transport, Inc. 47,620 21,645 Republic - Sycamore Ridge LF 30908920625 20625 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1017 U.S. Bulk Transport, Inc. 46,060 20,936 Republic - Sycamore Ridge LF 30908920626 20626 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1050-5 U.S. Bulk Transport, Inc. 52,120 23,691 Republic - Sycamore Ridge LF 30908920627 20627 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1013 U.S. Bulk Transport, Inc. 52,180 23,718 Republic - Sycamore Ridge LF 30908920628 20628 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1011 U.S. Bulk Transport, Inc. 53,020 24,100 Republic - Sycamore Ridge LF 30908920629 20629 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1014 U.S. Bulk Transport, Inc. 48,960 22,255 Republic - Sycamore Ridge LF 30908920630 20630 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1017 U.S. Bulk Transport, Inc. 49,460 22,482 Republic - Sycamore Ridge LF 30908920631 20631 8/2/2004 Soil < 50 ppm Area N of AOI4-D 1013 U.S. Bulk Transport, Inc. 47,220 21,464 Republic - Sycamore Ridge LF 309089

Daily Total 445,240 202,382

40805 HER084162 8/3/2004 Soil > 50 ppm Zip Slope 1011 U.S. Bulk Transport, Inc. 51,360 23,345 Heritage Environmental Srvcs. 2195-1240806 HER084163 8/3/2004 Soil > 50 ppm Zip Slope 1014 U.S. Bulk Transport, Inc. 48,220 21,918 Heritage Environmental Srvcs. 2195-1240807 HER084164 8/3/2004 Soil > 50 ppm Zip Slope 1013 U.S. Bulk Transport, Inc. 51,840 23,564 Heritage Environmental Srvcs. 2195-1240808 HER084165 8/3/2004 Soil > 50 ppm Zip Slope 1011 U.S. Bulk Transport, Inc. 49,100 22,318 Heritage Environmental Srvcs. 2195-1240809 HER084166 8/3/2004 Soil > 50 ppm Zip Slope 1014 U.S. Bulk Transport, Inc. 48,520 22,055 Heritage Environmental Srvcs. 2195-1240810 HER084167 8/3/2004 Soil > 50 ppm Zip Slope 1013 U.S. Bulk Transport, Inc. 51,600 23,455 Heritage Environmental Srvcs. 2195-12

Daily Total 300,640 136,655

20632 20632 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1014 U.S. Bulk Transport, Inc. 44,920 20,418 Republic - Sycamore Ridge LF 30908920633 20633 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1011 U.S. Bulk Transport, Inc. 49,840 22,655 Republic - Sycamore Ridge LF 30908920634 20634 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1013 U.S. Bulk Transport, Inc. 49,160 22,345 Republic - Sycamore Ridge LF 30908920635 20635 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1014 U.S. Bulk Transport, Inc. 45,880 20,855 Republic - Sycamore Ridge LF 30908920636 20636 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1011 U.S. Bulk Transport, Inc. 46,540 21,155 Republic - Sycamore Ridge LF 30908920637 20637 8/4/2004 Soil < 50 ppm Area N of AOI4-D 1013 U.S. Bulk Transport, Inc. 51,780 23,536 Republic - Sycamore Ridge LF 309089

Daily Total 288,120 130,964

40811 HER084168 8/5/2004 Soil > 50 ppm Zip Slope 1011 U.S. Bulk Transport, Inc. 51,020 23,191 Heritage Environmental Srvcs. 2195-1240812 HER084169 8/5/2004 Soil > 50 ppm Zip Slope 1014 U.S. Bulk Transport, Inc. 47,480 21,582 Heritage Environmental Srvcs. 2195-1240813 HER084170 8/5/2004 Soil > 50 ppm Zip Slope 1013 U.S. Bulk Transport, Inc. 49,300 22,409 Heritage Environmental Srvcs. 2195-1240814 HER084171 8/5/2004 Soil > 50 ppm Zip Slope 1011 U.S. Bulk Transport, Inc. 46,600 21,182 Heritage Environmental Srvcs. 2195-1240815 HER084172 8/5/2004 Soil > 50 ppm Zip Slope 1014 U.S. Bulk Transport, Inc. 49,640 22,564 Heritage Environmental Srvcs. 2195-1240816 HER084173 8/5/2004 Soil > 50 ppm Zip Slope 1013 U.S. Bulk Transport, Inc. 48,860 22,209 Heritage Environmental Srvcs. 2195-12

Daily Total 292,900 133,136

40817 HER084174 8/6/2004 Soil > 50 ppm Zip Slope 1011 U.S. Bulk Transport, Inc. 51,120 23,236 Heritage Environmental Srvcs. 2195-1240818 HER084175 8/6/2004 Soil > 50 ppm Zip Slope 1014 U.S. Bulk Transport, Inc. 44,100 20,045 Heritage Environmental Srvcs. 2195-1240819 HER084176 8/6/2004 Soil > 50 ppm Zip Slope 1013 U.S. Bulk Transport, Inc. 49,360 22,436 Heritage Environmental Srvcs. 2195-12

Daily Total 144,580 65,718

CRA13968(113) Page 1 of 5

Page 46: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

TABLE 2.1DISPOSAL LOG

GM BEDFORD POWERTRAIN PLANT

Load Manifest Date Waste Waste Truck Actual LF Actual LF WasteNo. No. Shipped Description Source No. Transporter Weight (lbs) Weight (Kg) Disposal Site Profile No.

20638 20638 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1011 U.S. Bulk Transport, Inc. 46,460 21,118 Republic - Sycamore Ridge LF 30908920639 20639 8/20/2004 Soil < 50 ppm Area N of AOI4-E 524 U.S. Bulk Transport, Inc. 51,540 23,427 Republic - Sycamore Ridge LF 30908920640 20640 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-4 U.S. Bulk Transport, Inc. 59,620 27,100 Republic - Sycamore Ridge LF 30908920641 20641 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-5 U.S. Bulk Transport, Inc. 59,860 27,209 Republic - Sycamore Ridge LF 30908920642 20642 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-3 U.S. Bulk Transport, Inc. 44,380 20,173 Republic - Sycamore Ridge LF 30908920643 20643 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-1 U.S. Bulk Transport, Inc. 47,040 21,382 Republic - Sycamore Ridge LF 30908920644 20644 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1008 U.S. Bulk Transport, Inc. 50,040 22,745 Republic - Sycamore Ridge LF 30908920645 20645 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1011 U.S. Bulk Transport, Inc. 49,960 22,709 Republic - Sycamore Ridge LF 30908920646 20646 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-4 U.S. Bulk Transport, Inc. 47,960 21,800 Republic - Sycamore Ridge LF 30908920647 20647 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-5 U.S. Bulk Transport, Inc. 48,780 22,173 Republic - Sycamore Ridge LF 30908920648 20648 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-1 U.S. Bulk Transport, Inc. 48,460 22,027 Republic - Sycamore Ridge LF 30908920649 20649 8/20/2004 Soil < 50 ppm Area N of AOI4-E 1050-3 U.S. Bulk Transport, Inc. 46,740 21,245 Republic - Sycamore Ridge LF 309089

Daily Total 600,840 273,109

20650 20650 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1011 U.S. Bulk Transport, Inc. 46,960 21,345 Republic - Sycamore Ridge LF 30908920651 20651 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1050-4 U.S. Bulk Transport, Inc. 59,020 26,827 Republic - Sycamore Ridge LF 30908920652 20652 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1050-5 U.S. Bulk Transport, Inc. 51,940 23,609 Republic - Sycamore Ridge LF 30908920653 20653 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1050-1 U.S. Bulk Transport, Inc. 45,040 20,473 Republic - Sycamore Ridge LF 30908920654 20654 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1050-3 U.S. Bulk Transport, Inc. 40,860 18,573 Republic - Sycamore Ridge LF 30908920655 20655 8/23/2004 Soil < 50 ppm Area N of AOI4-E 1014 U.S. Bulk Transport, Inc. 47,340 21,518 Republic - Sycamore Ridge LF 30908920656 20656 8/23/2004 Soil < 50 ppm Area N of AOI4-E 521 U.S. Bulk Transport, Inc. 49,900 22,682 Republic - Sycamore Ridge LF 30908920657 20657 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1011 U.S. Bulk Transport, Inc. 51,460 23,391 Republic - Sycamore Ridge LF 30908920658 20658 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1050-4 U.S. Bulk Transport, Inc. 60,660 27,573 Republic - Sycamore Ridge LF 30908920659 20659 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1050-5 U.S. Bulk Transport, Inc. 59,240 26,927 Republic - Sycamore Ridge LF 30908920660 20660 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1050-1 U.S. Bulk Transport, Inc. 60,320 27,418 Republic - Sycamore Ridge LF 30908920661 20661 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1013 U.S. Bulk Transport, Inc. 52,720 23,964 Republic - Sycamore Ridge LF 30908920662 20662 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1014 U.S. Bulk Transport, Inc. 46,600 21,182 Republic - Sycamore Ridge LF 30908920663 20663 8/23/2004 Soil < 50 ppm Area N of AOI4-F 1050-3 U.S. Bulk Transport, Inc. 48,380 21,991 Republic - Sycamore Ridge LF 30908920664 20664 8/23/2004 Soil < 50 ppm Area N of AOI4-F 521 U.S. Bulk Transport, Inc. 47,480 21,582 Republic - Sycamore Ridge LF 309089

Daily Total 767,920 349,055

HER084177 40820 8/24/2004 Soil > 50 ppm Area N of AOI4 1050-5 U.S. Bulk Transport, Inc. 50,800 23,091 Republic - Sycamore Ridge LF 2195-12HER084178 40821 8/24/2004 Soil > 50 ppm Area N of AOI4 1050-4 U.S. Bulk Transport, Inc. 52,520 23,873 Republic - Sycamore Ridge LF 2195-12

20665 20665 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1050-1 U.S. Bulk Transport, Inc. 49,200 22,364 Republic - Sycamore Ridge LF 30908920666 20666 8/24/2004 Soil < 50 ppm Area N of AOI4-F 521 U.S. Bulk Transport, Inc. 51,920 23,600 Republic - Sycamore Ridge LF 30908920667 20667 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1014 U.S. Bulk Transport, Inc. 49,560 22,527 Republic - Sycamore Ridge LF 30908920668 20668 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1013 U.S. Bulk Transport, Inc. 50,300 22,864 Republic - Sycamore Ridge LF 30908920669 20669 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1050-1 U.S. Bulk Transport, Inc. 45,120 20,509 Republic - Sycamore Ridge LF 309089

CRA13968(113) Page 2 of 5

Page 47: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

TABLE 2.1DISPOSAL LOG

GM BEDFORD POWERTRAIN PLANT

Load Manifest Date Waste Waste Truck Actual LF Actual LF WasteNo. No. Shipped Description Source No. Transporter Weight (lbs) Weight (Kg) Disposal Site Profile No.

20670 20670 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1050-5 U.S. Bulk Transport, Inc. 51,960 23,618 Republic - Sycamore Ridge LF 30908920671 20671 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1050-4 U.S. Bulk Transport, Inc. 54,360 24,709 Republic - Sycamore Ridge LF 30908920672 20672 8/24/2004 Soil < 50 ppm Area N of AOI4-F 521 U.S. Bulk Transport, Inc. 44,900 20,409 Republic - Sycamore Ridge LF 30908920673 20673 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1014 U.S. Bulk Transport, Inc. 49,980 22,718 Republic - Sycamore Ridge LF 30908920674 20674 8/24/2004 Soil < 50 ppm Area N of AOI4-F 1013 U.S. Bulk Transport, Inc. 45,300 20,591 Republic - Sycamore Ridge LF 309089

Daily Total 595,920 270,873

20675 20675 8/25/2004 Soil < 50 ppm Area N of AOI4-F 1011 U.S. Bulk Transport, Inc. 49,800 22,636 Republic - Sycamore Ridge LF 30908920676 20676 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-5 U.S. Bulk Transport, Inc. 47,440 21,564 Republic - Sycamore Ridge LF 30908920677 20677 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-4 U.S. Bulk Transport, Inc. 54,120 24,600 Republic - Sycamore Ridge LF 30908920678 20678 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-1 U.S. Bulk Transport, Inc. 47,640 21,655 Republic - Sycamore Ridge LF 30908920679 20679 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1013 U.S. Bulk Transport, Inc. 44,900 20,409 Republic - Sycamore Ridge LF 30908920680 20680 8/25/2004 Soil < 50 ppm Area N of AOI4-G 521 U.S. Bulk Transport, Inc. 47,420 21,555 Republic - Sycamore Ridge LF 30908920681 20681 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1014 U.S. Bulk Transport, Inc. 47,220 21,464 Republic - Sycamore Ridge LF 30908920682 20682 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-4 U.S. Bulk Transport, Inc. 47,600 21,636 Republic - Sycamore Ridge LF 30908920683 20683 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1011 U.S. Bulk Transport, Inc. 49,820 22,645 Republic - Sycamore Ridge LF 30908920684 20684 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-5 U.S. Bulk Transport, Inc. 52,540 23,882 Republic - Sycamore Ridge LF 30908920685 20685 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1050-1 U.S. Bulk Transport, Inc. 45,960 20,891 Republic - Sycamore Ridge LF 30908920686 20686 8/25/2004 Soil < 50 ppm Area N of AOI4-G 1013 U.S. Bulk Transport, Inc. 51,360 23,345 Republic - Sycamore Ridge LF 309089

Daily Total 585,820 266,282

20687 20687 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1011 U.S. Bulk Transport, Inc. 50,560 22,982 Republic - Sycamore Ridge LF 30908920688 20688 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-4 U.S. Bulk Transport, Inc. 58,480 26,582 Republic - Sycamore Ridge LF 30908920689 20689 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-5 U.S. Bulk Transport, Inc. 48,820 22,191 Republic - Sycamore Ridge LF 30908920690 20690 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-1 U.S. Bulk Transport, Inc. 45,900 20,864 Republic - Sycamore Ridge LF 30908920691 20691 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-3 U.S. Bulk Transport, Inc. 48,760 22,164 Republic - Sycamore Ridge LF 30908920692 20692 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1014 U.S. Bulk Transport, Inc. 44,340 20,155 Republic - Sycamore Ridge LF 30908920693 20693 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1007 U.S. Bulk Transport, Inc. 49,600 22,545 Republic - Sycamore Ridge LF 30908920694 20694 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1013 U.S. Bulk Transport, Inc. 47,200 21,455 Republic - Sycamore Ridge LF 30908920695 20695 8/26/2004 Soil < 50 ppm Area N of AOI4-G 521 U.S. Bulk Transport, Inc. 46,420 21,100 Republic - Sycamore Ridge LF 30908920696 20696 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1011 U.S. Bulk Transport, Inc. 53,940 24,518 Republic - Sycamore Ridge LF 30908920697 20697 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-4 U.S. Bulk Transport, Inc. 45,280 20,582 Republic - Sycamore Ridge LF 30908920698 20698 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-1 U.S. Bulk Transport, Inc. 40,980 18,627 Republic - Sycamore Ridge LF 30908920699 20699 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-3 U.S. Bulk Transport, Inc. 44,860 20,391 Republic - Sycamore Ridge LF 30908920700 20700 8/26/2004 Soil < 50 ppm Area N of AOI4-G 1050-5 U.S. Bulk Transport, Inc. 44,540 20,245 Republic - Sycamore Ridge LF 309089

Daily Total 669,680 304,400

20701 20701 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1011 U.S. Bulk Transport, Inc. 50,060 22,755 Republic - Sycamore Ridge LF 30908920702 20702 8/27/2004 Soil < 50 ppm Area N of AOI4-G 204 Buchta Trucking 47,260 21,482 Republic - Sycamore Ridge LF 309089

CRA13968(113) Page 3 of 5

Page 48: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

TABLE 2.1DISPOSAL LOG

GM BEDFORD POWERTRAIN PLANT

Load Manifest Date Waste Waste Truck Actual LF Actual LF WasteNo. No. Shipped Description Source No. Transporter Weight (lbs) Weight (Kg) Disposal Site Profile No.

20703 20703 8/27/2004 Soil < 50 ppm Area N of AOI4-G 226 Buchta Trucking 47,660 21,664 Republic - Sycamore Ridge LF 30908920704 20704 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1050-5 U.S. Bulk Transport, Inc. 47,560 21,618 Republic - Sycamore Ridge LF 30908920705 20705 8/27/2004 Soil < 50 ppm Area N of AOI4-G 259 Buchta Trucking 47,440 21,564 Republic - Sycamore Ridge LF 30908920706 20706 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1050-4 U.S. Bulk Transport, Inc. 56,500 25,682 Republic - Sycamore Ridge LF 30908920707 20707 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1050-1 U.S. Bulk Transport, Inc. 43,480 19,764 Republic - Sycamore Ridge LF 30908920708 20708 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1050-3 U.S. Bulk Transport, Inc. 41,480 18,855 Republic - Sycamore Ridge LF 30908920709 20709 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1050-2 U.S. Bulk Transport, Inc. 54,860 24,936 Republic - Sycamore Ridge LF 30908920710 20710 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1014 U.S. Bulk Transport, Inc. 47,860 21,755 Republic - Sycamore Ridge LF 30908920711 20711 8/27/2004 Soil < 50 ppm Area N of AOI4-G 129 U.S. Bulk Transport, Inc. 49,260 22,391 Republic - Sycamore Ridge LF 30908920712 20712 8/27/2004 Soil < 50 ppm Area N of AOI4-G 227 U.S. Bulk Transport, Inc. 50,740 23,064 Republic - Sycamore Ridge LF 30908920713 20713 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1013 U.S. Bulk Transport, Inc. 47,740 21,700 Republic - Sycamore Ridge LF 30908920714 20714 8/27/2004 Soil < 50 ppm Area N of AOI4-G 521 U.S. Bulk Transport, Inc. 47,720 21,691 Republic - Sycamore Ridge LF 30908920715 20715 8/27/2004 Soil < 50 ppm Area N of AOI4-G 1011 U.S. Bulk Transport, Inc. 51,420 23,373 Republic - Sycamore Ridge LF 30908920716 20716 8/27/2004 Soil < 50 ppm Area N of AOI4-G 204 Buchta Trucking 57,140 25,973 Republic - Sycamore Ridge LF 30908920717 20717 8/27/2004 Soil < 50 ppm Area N of AOI4-G 226 Buchta Trucking 57,160 25,982 Republic - Sycamore Ridge LF 30908920718 20718 8/27/2004 Soil < 50 ppm Area N of AOI4-G 259 Buchta Trucking 57,860 26,300 Republic - Sycamore Ridge LF 30908920719 20719 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1050-1 U.S. Bulk Transport, Inc. 56,440 25,655 Republic - Sycamore Ridge LF 30908920720 20720 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1050-5 U.S. Bulk Transport, Inc. 52,260 23,755 Republic - Sycamore Ridge LF 30908920721 20721 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1050-4 U.S. Bulk Transport, Inc. 49,140 22,336 Republic - Sycamore Ridge LF 30908920722 20722 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1050-3 U.S. Bulk Transport, Inc. 44,240 20,109 Republic - Sycamore Ridge LF 30908920723 20723 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1050-2 U.S. Bulk Transport, Inc. 56,600 25,727 Republic - Sycamore Ridge LF 30908920724 20724 8/27/2004 Soil < 50 ppm Area N of AOI4-H 227 Buchta Trucking 47,440 21,564 Republic - Sycamore Ridge LF 30908920725 20725 8/27/2004 Soil < 50 ppm Area N of AOI4-H 129 Buchta Trucking 46,140 20,973 Republic - Sycamore Ridge LF 30908920726 20726 8/27/2004 Soil < 50 ppm Area N of AOI4-H 1014 U.S. Bulk Transport, Inc. 50,320 22,873 Republic - Sycamore Ridge LF 30908920727 20727 8/27/2004 Soil < 50 ppm Area N of AOI4-H 521 U.S. Bulk Transport, Inc. 52,240 23,745 Republic - Sycamore Ridge LF 309089

Daily Total 1,358,020 617,282

20728 20729 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1011 U.S. Bulk Transport, Inc. 48,220 21,918 Republic - Sycamore Ridge LF 30908920729 20729 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-4 U.S. Bulk Transport, Inc. 45,240 20,564 Republic - Sycamore Ridge LF 30908920730 20730 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-1 U.S. Bulk Transport, Inc. 58,200 26,455 Republic - Sycamore Ridge LF 30908920731 20731 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-2 U.S. Bulk Transport, Inc. 48,200 21,909 Republic - Sycamore Ridge LF 30908920732 20732 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1014 U.S. Bulk Transport, Inc. 46,860 21,300 Republic - Sycamore Ridge LF 30908920733 20733 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1013 U.S. Bulk Transport, Inc. 49,720 22,600 Republic - Sycamore Ridge LF 30908920734 20734 8/30/2004 Soil < 50 ppm Area N of AOI4-H 521 U.S. Bulk Transport, Inc. 54,740 24,882 Republic - Sycamore Ridge LF 30908920735 20735 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1011 U.S. Bulk Transport, Inc. 54,180 24,627 Republic - Sycamore Ridge LF 30908920736 20736 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-4 U.S. Bulk Transport, Inc. 60,000 27,273 Republic - Sycamore Ridge LF 30908920737 20737 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-1 U.S. Bulk Transport, Inc. 55,540 25,245 Republic - Sycamore Ridge LF 30908920738 20738 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1050-2 U.S. Bulk Transport, Inc. 56,680 25,764 Republic - Sycamore Ridge LF 30908920739 20739 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1014 U.S. Bulk Transport, Inc. 47,320 21,509 Republic - Sycamore Ridge LF 309089

CRA13968(113) Page 4 of 5

Page 49: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

TABLE 2.1DISPOSAL LOG

GM BEDFORD POWERTRAIN PLANT

Load Manifest Date Waste Waste Truck Actual LF Actual LF WasteNo. No. Shipped Description Source No. Transporter Weight (lbs) Weight (Kg) Disposal Site Profile No.

20740 20740 8/30/2004 Soil < 50 ppm Area N of AOI4-H 1013 U.S. Bulk Transport, Inc. 50,640 23,018 Republic - Sycamore Ridge LF 30908920741 20741 8/30/2004 Soil < 50 ppm Area N of AOI4-H 521 U.S. Bulk Transport, Inc. 48,400 22,000 Republic - Sycamore Ridge LF 309089

Daily Total 723,940 329,064

20742 20742 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1011 U.S. Bulk Transport, Inc. 49,480 22,491 Republic - Sycamore Ridge LF 30908920743 20743 8/31/2004 Soil < 50 ppm Area N of AOI4-I 226 Buchta Trucking 53,500 24,318 Republic - Sycamore Ridge LF 30908920744 20744 8/31/2004 Soil < 50 ppm Area N of AOI4-I 236 Buchta Trucking 52,860 24,027 Republic - Sycamore Ridge LF 30908920745 20745 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-5 U.S. Bulk Transport, Inc. 57,820 26,282 Republic - Sycamore Ridge LF 30908920746 20746 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-4 U.S. Bulk Transport, Inc. 53,000 24,091 Republic - Sycamore Ridge LF 30908920747 20747 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-1 U.S. Bulk Transport, Inc. 54,860 24,936 Republic - Sycamore Ridge LF 30908920478 20748 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-2 U.S. Bulk Transport, Inc. 49,660 22,573 Republic - Sycamore Ridge LF 30908920749 20749 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-3 U.S. Bulk Transport, Inc. 53,760 24,436 Republic - Sycamore Ridge LF 30908920750 20750 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1008 U.S. Bulk Transport, Inc. 49,820 22,645 Republic - Sycamore Ridge LF 30908920751 20751 8/31/2004 Soil < 50 ppm Area N of AOI4-I 521 U.S. Bulk Transport, Inc. 44,540 20,245 Republic - Sycamore Ridge LF 30908920752 20752 8/31/2004 Soil < 50 ppm Area N of AOI4-I 213 Buchta Trucking 49,140 22,336 Republic - Sycamore Ridge LF 30908920753 20753 8/31/2004 Soil < 50 ppm Area N of AOI4-I 129 Buchta Trucking 56,740 25,791 Republic - Sycamore Ridge LF 30908920754 20754 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1013 U.S. Bulk Transport, Inc. 49,720 22,600 Republic - Sycamore Ridge LF 30908920755 20755 8/31/2004 Soil < 50 ppm Area N of AOI4-I 227 Buchta Trucking 52,640 23,927 Republic - Sycamore Ridge LF 30908920756 20756 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1011 U.S. Bulk Transport, Inc. 50,520 22,964 Republic - Sycamore Ridge LF 30908920757 20757 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1505-5 U.S. Bulk Transport, Inc. 55,340 25,155 Republic - Sycamore Ridge LF 30908920758 20758 8/31/2004 Soil < 50 ppm Area N of AOI4-I 226 Buchta Trucking 52,560 23,891 Republic - Sycamore Ridge LF 30908920759 20759 8/31/2004 Soil < 50 ppm Area N of AOI4-I 236 Buchta Trucking 55,800 25,364 Republic - Sycamore Ridge LF 30908920760 20760 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1505-4 U.S. Bulk Transport, Inc. 65,800 29,909 Republic - Sycamore Ridge LF 30908920761 20761 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1017 U.S. Bulk Transport, Inc. 44,160 20,073 Republic - Sycamore Ridge LF 30908920762 20762 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1008 U.S. Bulk Transport, Inc. 50,080 22,764 Republic - Sycamore Ridge LF 30908920763 20763 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-3 U.S. Bulk Transport, Inc. 50,680 23,036 Republic - Sycamore Ridge LF 30908920764 20764 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-2 U.S. Bulk Transport, Inc. 44,040 20,018 Republic - Sycamore Ridge LF 30908920765 20765 8/31/2004 Soil < 50 ppm Area N of AOI4-I 521 U.S. Bulk Transport, Inc. 49,280 22,400 Republic - Sycamore Ridge LF 30908920766 20766 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1050-1 U.S. Bulk Transport, Inc. 45,060 20,482 Republic - Sycamore Ridge LF 30908920767 20767 8/31/2004 Soil < 50 ppm Area N of AOI4-I 1013 U.S. Bulk Transport, Inc. 47,560 21,618 Republic - Sycamore Ridge LF 30908920768 20768 8/31/2004 Soil < 50 ppm Area N of AOI4-I 533 U.S. Bulk Transport, Inc. 46,620 21,191 Republic - Sycamore Ridge LF 30908920769 20769 8/31/2004 Soil < 50 ppm Area N of AOI4-I 213 U.S. Bulk Transport, Inc. 45,880 20,855 Republic - Sycamore Ridge LF 30908920770 20770 8/31/2004 Soil < 50 ppm Area N of AOI4-I 227 U.S. Bulk Transport, Inc. 49,480 22,491 Republic - Sycamore Ridge LF 309089

Daily Total 1,480,400 672,909

8,254,0204,127.01

Monthly Total (lbs)Monthly Total (Tons)

CRA13968(113) Page 5 of 5

Page 50: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

13968 (113)

APPENDIX A

DELIVERABLES SUMMARY

Page 51: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

MONTHLY PROGRESS REPORT – August 2004 GM Bedford

APPENDIX A

DELIVERABLES SUMMARY

Date: September 17, 2004 Section: Monthly Progress Report

Deliverable Reference DeadlineDeliverable Due Date Status

Final Parcel 22 Workplan AOC IV.23; VIII.34.a Approved July 23, 2003 July 23, 2003 complete

Final Upstream Workplan AOC IV.25; VIII.34.b Approved July 23, 2003 July 23, 2003 completeAOC VII.30; VII.31 CRA & McGuigan – Effective Date of Order July 31, 2003 complete

Other contractors – 5 business days prior to commencement of work

Contractor HASP'U.S. EPA Approval Letter, July 23, 2003' before work is to begins complete

QAPP AOC VIII.34.c; VIII.37.a QAPP – 10 business days AED * August 14, 2003 complete

OMMPAOC VIII.38

OMMP – 30 business days after completion of each portion of Work in Paragraph 34. Final OMMP due with Final Report

Downstream Workplan AOC VIII.34.d; VIII.35.a 90 days AED October 29, 2003 complete

Site Source Control Workplan AOC VIII.34.e; VIII.35.a Approved November 11, 2003 August 21, 2003 completeAOC VIII.39.a 1st 30 days AED August 30, 2003 complete

15th of each month thereafter September 15, 2004 submitted September 17, 2004

Final Report AOC VIII.40Within 90 days after required info is received and work completed

Note:

Designation of Contractors and Project Coordinator

Monthly Progress Reports

AED = After Effective Date of Administrative Order on Consent

CRA 13968 (113)

Page 52: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

13968 (113)

APPENDIX B

CONSTRUCTION MEETING MINUTES

Page 53: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September
Page 54: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September
Page 55: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September
Page 56: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September
Page 57: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

13968 (113)

APPENDIX C

JULY 2004 MONTHLY PROGRESS REPORT U.S. EPA COMMENTS/QUESTIONS AND GM RESPONSES

Page 58: GENERAL MOTORS CORPORATION GM · PDF fileaddition, the contractor did a test application of Soiltac, ... water suppression to control dust. MONTHLY PROGRESS REPORT Date: September

From: Sent: To:

Subject: 13968 Response to Questions on July 2004 Progress Report

This email is being sent to address the Peter Ramanauskas' comments on the July 2004 Monthly Progress Report. We've included Peter's comments, followed by our response. Please let me know if you have any further questions. Comment: A release from the emergency storm water flow discharge. This is noted as being Outfall 002, but isn't the emergency stormwater Outfall 003? Since the sub-bullets talk about clogged pumps north of AOI-4, it leads me to believe this is Outfall 003. I think the NPDES permit has sampling requirements for when Outfall 003 discharges.

Response: This comment is based on an apparent misunderstanding of where the stormwater overflow occurred. The pump station at Outfall 002 has 3 pumps that are used to pump stormwater from the pump station holding tank to the stormwater retention basin. At the time of the rain event on July 20, 2004, two of the pumps were set to be turned on automatically. The third had to be started manually. In our discussions with waste water treatment personnel, the third pump was not immediately started when the rain began. As such, the tank holding capacity for stormwater at the pump station was exceeded and stormwater overflowed at Outfall 002. There was no stormwater overflow at Outfall 003 from the storm water retention basin during the rain event on July 20, 2004. Since July 20, 2004, the plant has made improvements to the system at the pump station. All three pumps are set to be turned on automatically. New floats were installed. These floats were set lower that the previous floats.

Comment: The second sub-bullet here (top of page V) notes that all floor and sidewall sampling from Parcel 3 to the dam at Parcel 12 met the cleanup criteria. Is this an accurate statement as figure 6 notes a "pending" 95% UCL calculation for verification area 9 and figure 7 notes "To Be Sampled" for verification area 11 along with 95% UCLs "pending"?

Response: A more accurate statement would have been "As of July 22, 2004, Verification Areas 1 through 8 met the cleanup criteria. Final UCL calculations are pending on Verification Areas 9 through 11." You are correct that at the time the Progress Report was written, the UCL calculations for Verification Areas 9 and 10 were still pending. Each of these areas had one sample point above 1.8 ppm. Since the time the report was issued, the UCL calculations have been completed for Verification Areas 9 and 10 - the cleanup criteria has been met. We have not completed excavation in Verification Area 11 because the excavation has not extended beyond the dam on Parcel 12. The dam is located at grids 11C and 11G. We have some individual points in Verification Area 11 above the 1.8 ppm criteria. We expect that once we have data from the entire verification area, that the UCL calculations will show we meet the cleanup criteria.