www.nghenvironmental.com.au 0 200 400 100 m A3 @ Ref: SW121 EIS v20190913 Author: TH Date: 25/11/2019 ° GENERAL LAYOUT OF DEVELOPMENT Wellington Solar Farm ! ( # # G O O L M A R O A D BELA VISTA LANE C O B B OR A R O A D TWE LV E MI L E RO AD PI N D A RI G R OVE WU U L U M A N C R E E K Notes: - Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017 Development exclusion zone (excluding rehabilitation undertaken in accordance with the Biodiversity Management Plan) Approved internal road Bench Underground transmission easement Approved infrastructure Project boundary " d Existing substation Local road Highway Existing transmission lines Farm dam / other water body Drainage line Proposed underground transmission line Approved landscaping (5m wide planting) Approved landscaping grove Approved battery storage facility Approved temporary laydown area and parking / turning circle Constraints # # Aboriginal heritage item (isolated find) Aboriginal heritage item (artefact scatter) ! ( Hearth site Potential archaeological deposit (PAD) G F Scarred tree G Historic heritage site (OAM building) " Sensitive receiver Drainage line (40m) Potential rocky outcrops Vegetation exclusion zones Vegetation constraint (CEEC) Vegetation constraint (EEC moderate to good condition) Approved site access with planting Approved OAM building (alternative) Approved OAM building Approved temporary construction compound and parking 1:12,781

GENERAL LAYOUT OF DEVELOPMENT - Amazon S3€¦ · GENERAL LAYOUT OF DEVELOPMENT Wellington Solar Farm!(## G O O L M A R O A D B E L AO VI S T A L A N E C O B B O R A R O A D T W E

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL LAYOUT OF DEVELOPMENT - Amazon S3€¦ · GENERAL LAYOUT OF DEVELOPMENT Wellington Solar Farm!(## G O O L M A R O A D B E L AO VI S T A L A N E C O B B O R A R O A D T W E

www.nghenvironmental.com.au

0 200 400100 m

A3 @Ref: SW121 EIS v20190913Author: TH Date: 25/11/2019 °

GENERAL LAYOUTOF DEVELOPMENTWellington Solar Farm

!(

##

GOOLMA R

OAD

BELA VISTA LANE

COBB

ORA R

OAD

TWELVE MILE ROAD

PINDA

RI GROVE

WUULUMAN CREEK

Notes:- Base map © Esri and its data suppliers. - Base layers from LPI and Geoscience Aust, 2017

Development exclusion zone (excluding rehabilitation undertaken in accordance with the Biodiversity Management Plan)Approved internal roadBenchUnderground transmission easementApproved infrastructureProject boundary

"d Existing substationLocal roadHighwayExisting transmission linesFarm dam / other water bodyDrainage lineProposed underground transmission lineApproved landscaping (5m wide planting)Approved landscaping groveApproved battery storage facilityApproved temporary laydown areaand parking / turning circle

Constraints## Aboriginal heritage item (isolated find)

Aboriginal heritage item (artefact scatter)!( Hearth site

Potential archaeological deposit (PAD)GF Scarred treeG Historic heritage site (OAM building)" Sensitive receiver

Drainage line (40m)Potential rocky outcrops

Vegetation exclusion zonesVegetation constraint (CEEC)Vegetation constraint (EEC moderateto good condition)

Approved site accesswith planting

Approved OAM building (alternative)

Approved OAM building

Approved temporary construction compound and parking

1:12,781

Page 2: GENERAL LAYOUT OF DEVELOPMENT - Amazon S3€¦ · GENERAL LAYOUT OF DEVELOPMENT Wellington Solar Farm!(## G O O L M A R O A D B E L AO VI S T A L A N E C O B B O R A R O A D T W E

www.nghenvironmental.com.au

GENERAL LAYOUT OF DEVELOPMENTSubstation expansionWellington Solar Farm

A4 @ 5,000Ref: SW121 EIS v20190913Author: T.Hastings 25/11/2019

Notes:- Data collected by ngh 2017-19- Client data courtesy of Client, received 2011-19- Base map Copyright © Esri and its data suppliers.

GOOLMA ROAD

TWELVE MILE ROADDevelopment exclusion zone (excluding rehabilitation undertaken in accordance with the Biodiversity Management Plan)Project boundary

"d Existing substationFarm dam / other water bodyApproved infrastructureApproved overhead transmission lineProposed underground transmission lineApproved internal roadApproved landscaping (5m wide planting)Approved landscaping groveApproved substationBenchRefined Cable CorridorVegetation constraint (CEEC)Vegetation constraint (EEC moderateto good condition)