Upload
annette-bayles
View
223
Download
0
Tags:
Embed Size (px)
Citation preview
General IssuesGeneral Issues&&
Reporting GuidanceReporting Guidance
Emissions Inventory Workshop 2014 1
Topics to DiscussTopics to Discuss Recent Rule ChangesRecent Rule Changes
Lower Reporting Guidance Lower Reporting Guidance ChangeChange
Pneumatic DevicesPneumatic Devices
Typical Reporting IssuesTypical Reporting Issues
The Invoicing ProcessThe Invoicing Process
Emissions Inventory Workshop 2014 2
Changes to Subchapter 5Changes to Subchapter 5
OAC 252:100-5OAC 252:100-5
Registration, Emission Inventory Registration, Emission Inventory and Annual Operating Feesand Annual Operating Fees
Emissions Inventory Workshop 2014 3
SC-5 Rule ChangesSC-5 Rule Changes Became effective September 10, 2013Became effective September 10, 2013
Minor rule clarifications:Minor rule clarifications: Eliminated requirement to report “physical state Eliminated requirement to report “physical state
of contaminant” and “moisture content of the of contaminant” and “moisture content of the gas stream”gas stream”
Updated reporting method to emphasize Updated reporting method to emphasize electronic reportingelectronic reporting
Permit number now not requiredPermit number now not required
Confidentiality of proprietary information – Confidentiality of proprietary information – corrected reference to the Oklahoma Statutecorrected reference to the Oklahoma Statute
Emissions Inventory Workshop 2014 4
SC-5 Rule ChangesSC-5 Rule ChangesInventories for Permit by Rule (PBR) Inventories for Permit by Rule (PBR) Facilities – New reporting scheduleFacilities – New reporting schedule
PBR facilities must submit inventory for 2014 or PBR facilities must submit inventory for 2014 or the first calendar year registered under a PBR (if the first calendar year registered under a PBR (if registered after 12/31/2014)registered after 12/31/2014)
After the initial inventory submittal:After the initial inventory submittal: PBR facility > 5 Ton/year of any RAP – every NEI PBR facility > 5 Ton/year of any RAP – every NEI
three year cyclethree year cycle
PBR facility ≤ 5 Ton/year of any RAP – every PBR facility ≤ 5 Ton/year of any RAP – every second NEI three year cyclesecond NEI three year cycle
PBR facilities may elect to also submit an PBR facilities may elect to also submit an emissions inventory for non-NEI reporting years emissions inventory for non-NEI reporting years
Emissions Inventory Workshop 2014 5
SC-5 Rule ChangesSC-5 Rule Changes
What this means for Permit by Rule What this means for Permit by Rule (PBR) facilities for 2013 Reporting:(PBR) facilities for 2013 Reporting:
If a facility applied for a PBR in 2013 then an If a facility applied for a PBR in 2013 then an inventory will NOT be due provided the facility inventory will NOT be due provided the facility would have qualified for a PBR throughout all of would have qualified for a PBR throughout all of 20132013
If there was an equipment change or a decline in If there was an equipment change or a decline in production the facility may still need to report for production the facility may still need to report for 20132013
Emissions Inventory Workshop 2014 6
Lower Emission AmountLower Emission Amount
Reporting GuidanceReporting Guidance
Emissions Inventory Workshop 2014 7
Lower Emission AmountLower Emission AmountReporting GuidanceReporting Guidance
There is no lower reporting limit in SC-5There is no lower reporting limit in SC-5
AQD provides reporting guidance that is “prudent AQD provides reporting guidance that is “prudent and practical”and practical”
For 2010, 2011 and 2012 reporting years guidance For 2010, 2011 and 2012 reporting years guidance was that emissions of 0.001 tons or greater of any was that emissions of 0.001 tons or greater of any regulated air pollutant must be reported from each regulated air pollutant must be reported from each processprocess
Recent data analysis and a review of program Recent data analysis and a review of program needs has allowed us to revise this guidanceneeds has allowed us to revise this guidance
Emissions Inventory Workshop 2014 8
Lower Emission AmountLower Emission AmountReporting GuidanceReporting Guidance
For the 2013 Reporting Year our guidance will be For the 2013 Reporting Year our guidance will be emissions of 0.1 tons or greater of any regulated emissions of 0.1 tons or greater of any regulated air pollutant at a process must be reportedair pollutant at a process must be reported
Key exceptions must still be reported at 0.001 tons Key exceptions must still be reported at 0.001 tons or greater per process:or greater per process:
Lead, mercury & hexavalent chromiumLead, mercury & hexavalent chromium
Any HAP at a TRI facilityAny HAP at a TRI facility
Any HAP from glycol dehydration still ventsAny HAP from glycol dehydration still vents
Any HAP from large storage tanks (>500 BBL)Any HAP from large storage tanks (>500 BBL)
Other situations where deemed necessaryOther situations where deemed necessary
Emissions Inventory Workshop 2014 9
Lower Emission AmountLower Emission AmountReporting GuidanceReporting Guidance
You can still continue to report to 0.001 tons You can still continue to report to 0.001 tons per process if you choose toper process if you choose to
Trace Checkbox is available for <0.001 tons Trace Checkbox is available for <0.001 tons if you wish to use thisif you wish to use this
Contact us to remove unnecessary pollutantsContact us to remove unnecessary pollutants
Emissions Inventory Workshop 2014 10
Pneumatic DevicesPneumatic Devices
Emissions Inventory Workshop 2014 11
Area Oil & Gas Emissions Area Oil & Gas Emissions ToolTool
Emissions Inventory Workshop 2014 12
Source Category VOC (TPY)
Artificial Lift 87
Associated Gas 1,295
Condensate Tanks 20,944
Crude Oil Tanks 25,825
Dehydrators 5,829
Drill Rigs 162
Fugitives 11,206
Gas-Actuated Pumps 15,932
Heaters 577
Hydraulic Fracturing 16
Lateral/Gathering Compressors 511
Liquids Unloading 20,658
Loading Emissions 4,823
Mud Degassing 11,094
Pneumatic Devices 86,614
Produced Water 0
Well Completions 1,917 - Natural Gas well completions
334
Wellhead Compressor Engines 1,044
Total 208,533
Area Oil & Gas Emissions Area Oil & Gas Emissions ToolTool
More information:More information:
CenSARA StudyCenSARA Study
www.deq.state.ok.us/AQDnew/emissions/OilandGasAreaEmissions
EPA National Oil & Gas Emissions Estimation EPA National Oil & Gas Emissions Estimation ToolToolwww.epa.gov/ttn/chief/net/2011inventory.html
Emissions Inventory Workshop 2014 13
Pneumatic DevicesPneumatic Devices Pneumatic Devices account for over 40% of all Pneumatic Devices account for over 40% of all
VOC emissions from wellhead facilitiesVOC emissions from wellhead facilities
Poorly characterized source that is present at Poorly characterized source that is present at many types of Oil & Gas production, processing many types of Oil & Gas production, processing and transmission facilitiesand transmission facilities
Need to start collecting more data to improve Need to start collecting more data to improve both point and area inventoriesboth point and area inventories
2014 will be an important reporting year2014 will be an important reporting year Optional to report for 2013, required for 2014Optional to report for 2013, required for 2014
Work with companies this year to constrain Work with companies this year to constrain uncertainties in counts and bleed ratesuncertainties in counts and bleed rates
Emissions Inventory Workshop 2014 14
Pneumatic DevicesPneumatic Devices
Specific SCC’s are now available in Redbud, Specific SCC’s are now available in Redbud, depending on:depending on:One of three device types (matches Subpart W One of three device types (matches Subpart W GHG reporting):GHG reporting):
Low Bleed (≤ 6 scf/hr)Low Bleed (≤ 6 scf/hr) High Bleed (> 6 scf/hr)High Bleed (> 6 scf/hr) IntermittentIntermittent
One of four sectors:One of four sectors: Gas Production Gas Production (SIC 1311)(SIC 1311) Oil Production Oil Production (SIC 1311)(SIC 1311) Gas Processing Gas Processing (SIC 1321)(SIC 1321) Gas TransmissionGas Transmission (SIC 4922)(SIC 4922)
Emissions Inventory Workshop 2014 15
Emissions Inventory Workshop 2014 16
General ReportingGeneral ReportingIssuesIssues
Emissions Inventory Workshop 2014 17
Change of OwnershipChange of Ownership
Emissions Inventory Workshop 2014 18
Responsibilities of the:
Transferor (Seller)“The transferor shall notify the DEQ using a prescribed form
no later than 30 days following the change in ownership.”
Transferee (Purchaser)“The transfer of ownership of a stationary source or a
facility is an administrative amendment that shall subject the new owner or operator to existing permit conditions and/or compliance schedules.”
Change of OwnershipChange of Ownership
Emissions Inventory Workshop 2014 19
What this means for the new owner:
Responsibilities transfer unless explicitly stated in contract or sale agreement.
New owner is responsible for providing the complete year’s inventory
- Even if sale took place within the reporting year
Changing Facility Changing Facility
InformationInformationForm #100-883Form #100-883
Emissions Inventory Workshop 2014 20
Changing a Responsible Changing a Responsible
OfficialOfficialForm #100-882Form #100-882
Emissions Inventory Workshop 2014 21
Status of Inactive FacilitiesStatus of Inactive Facilities
Reset to Active for New Reporting Reset to Active for New Reporting YearYear
Status Must be Verified YearlyStatus Must be Verified Yearly
If Active at any time, status is If Active at any time, status is Active for that reporting year Active for that reporting year
Emissions Inventory Workshop 2014 22
Facility StatusFacility Status New Classification – “Not yet built”New Classification – “Not yet built”
E.g., permit applied for in 2013 but E.g., permit applied for in 2013 but construction has not yet startedconstruction has not yet started
Add a brief facility note if necessaryAdd a brief facility note if necessary
Exempt or De Minimis facilities must Exempt or De Minimis facilities must be removed completely from Redbudbe removed completely from Redbud
Contact us to do soContact us to do so
Emissions Inventory Workshop 2014 23
Emission Unit and Stack Emission Unit and Stack StatusStatus
OperatingOperating – operated all or part of – operated all or part of the calendar year the calendar year
Temporarily ShutdownTemporarily Shutdown – did not – did not
operate at all during the calendar operate at all during the calendar year, but may restart at sometime in year, but may restart at sometime in the futurethe future
Permanently ShutdownPermanently Shutdown – has been – has been physically removed or is physically removed or is permanently shutdownpermanently shutdown
Emissions Inventory Workshop 2014 24
Emission Unit and Stack Emission Unit and Stack StatusStatus
Operating and Temporarily Shutdown:Operating and Temporarily Shutdown:Remains in your inventoryRemains in your inventory
Permanently Shutdown: Permanently Shutdown: Drops from your inventory the next yearDrops from your inventory the next year
Example: Emission unit operated through June 2013 then physically Example: Emission unit operated through June 2013 then physically removed from the facility in September 2013removed from the facility in September 2013
Status for 2013 – OperatingStatus for 2013 – Operating
Status for 2014 – Permanently ShutdownStatus for 2014 – Permanently Shutdown
Status for 2015 – Not in inventoryStatus for 2015 – Not in inventory
Emissions Inventory Workshop 2014 25
Replacement Replacement EquipmentEquipment
Create a new emission unitCreate a new emission unit
Report data for original and replacement Report data for original and replacement equipment separatelyequipment separately
Preferably include notes explaining the Preferably include notes explaining the situation at both unitssituation at both units
Report original equipment as permanently Report original equipment as permanently shutdown the next year. It will then drop shutdown the next year. It will then drop out of the inventory in the second year.out of the inventory in the second year.
Emissions Inventory Workshop 2014 26
Ensure Data is ConsistentEnsure Data is Consistent
If Emission Unit Status = ActiveIf Emission Unit Status = Active
Operating Hours > 0Operating Hours > 0
Process Rates > 0Process Rates > 0
Emissions > 0Emissions > 0
Emissions Inventory Workshop 2014 27
Storage Tank EmissionsStorage Tank Emissions Emissions released from the bottom of a tank Emissions released from the bottom of a tank
that has no throughput must be reportedthat has no throughput must be reported Tank would be reported as ActiveTank would be reported as Active
Tanks linked together can be reported as a Tanks linked together can be reported as a single emission unitsingle emission unit
Combined SCC 40400311 (working + breathing Combined SCC 40400311 (working + breathing + flashing) may be used for condensate tanks + flashing) may be used for condensate tanks with < 6 ton per year total VOC emissions.with < 6 ton per year total VOC emissions.
Emissions Inventory Workshop 2014 28
Calculating Condensate Tank Calculating Condensate Tank EmissionsEmissions
TANKS Version 4.09D: TANKS Version 4.09D: Estimates VOC and HAP emissions from fixed- and floating-roof storage Estimates VOC and HAP emissions from fixed- and floating-roof storage
tanks. Used for calculating working and breathing loss emissions.tanks. Used for calculating working and breathing loss emissions.www.epa.gov/ttnchie1/software/tanks
Vasquez Beggs equation: Vasquez Beggs equation: Used for calculating flashing lossesUsed for calculating flashing losseswww.deq.state.ok.us/aqdnew/resources/Calculations11.xls
RVP 10:RVP 10: Is the closest default to condensate for the TANKS programIs the closest default to condensate for the TANKS program
Report Working, Breathing and Flashing lossesReport Working, Breathing and Flashing losses
Emissions Inventory Workshop 2014 29
Common Stack ReportingCommon Stack Reporting If you have all tank emissions going to a flare, create an If you have all tank emissions going to a flare, create an
emission unit for the tank emissions with a flare as the emission unit for the tank emissions with a flare as the control and another emission unit for the flare itself to control and another emission unit for the flare itself to show the combustion emissionsshow the combustion emissions
BOTH units will list the same common stackBOTH units will list the same common stack
If you have all emissions going to a thermal oxidizer, If you have all emissions going to a thermal oxidizer, create an emission unit for the process emissions with a create an emission unit for the process emissions with a thermal oxidizer as the control and another emission unit thermal oxidizer as the control and another emission unit for the thermal oxidizer to show the combustion for the thermal oxidizer to show the combustion emissionsemissions
BOTH units will list the same common stackBOTH units will list the same common stack
Emissions Inventory Workshop 2014 30
Emissions Inventory Workshop 2014
Common Stack – Flare as ControlCommon Stack – Flare as Control
31
Common Stack – Flare Common Stack – Flare CombustionCombustion
Emissions Inventory Workshop 2014 32
Inventory CorrectionsInventory Corrections During the reporting season, corrections to the current During the reporting season, corrections to the current
reporting year are accomplished by making changes in Redbud reporting year are accomplished by making changes in Redbud and resubmittingand resubmitting
Last submission overwrites any earlier onesLast submission overwrites any earlier ones
Corrections after the reporting season can not be entered in Corrections after the reporting season can not be entered in RedbudRedbud
Corrections should be marked up in Corrections should be marked up in RedRed on a hardcopy of the on a hardcopy of the Turnaround Document (TAD) from the appropriate yearTurnaround Document (TAD) from the appropriate year
Corrections must be certified by the Responsible Official with an Corrections must be certified by the Responsible Official with an original signature and mailed to our officeoriginal signature and mailed to our office
Redbud TAD has a signature page that can be used in these Redbud TAD has a signature page that can be used in these circumstancescircumstances
Emissions Inventory Workshop 2014 33
34Emissions Inventory Workshop 2014
Certifying CorrectionsCertifying Corrections Submissions made through Redbud during the Submissions made through Redbud during the
reporting season do not need a hardcopy signaturereporting season do not need a hardcopy signature
The statement below is on all Redbud TAD’s in case The statement below is on all Redbud TAD’s in case it is needed for later hardcopy correctionsit is needed for later hardcopy corrections
Redbud Browser Redbud Browser CompatibilityCompatibility
Redbud is best used with Internet Explorer 5.5 or higherRedbud is best used with Internet Explorer 5.5 or higher
To correct compatibility problems with Internet 10 and 11:To correct compatibility problems with Internet 10 and 11: Select Tools in your Menu Bar, then select compatibility viewSelect Tools in your Menu Bar, then select compatibility view Add state.ok.us to the compatibility viewAdd state.ok.us to the compatibility view
Emissions Inventory Workshop 2014 35
Air Quality Operating FeeAir Quality Operating Fee
Invoicing ProcessInvoicing Process
Emissions Inventory Workshop 2014 36
Annual Operating Fee Annual Operating Fee InvoicesInvoices
Invoices are mailed on July 1, normally Invoices are mailed on July 1, normally addressed to the Responsible Officialaddressed to the Responsible Official
Emissions are billed 2 years in arrearsEmissions are billed 2 years in arrears CY 2014 Operating fees will be based on CY 2012 emissions CY 2014 Operating fees will be based on CY 2012 emissions
Payment due 30 days after billingPayment due 30 days after billing
Companies with <5 Tons total are not Companies with <5 Tons total are not invoicedinvoiced
Emissions Inventory Workshop 2014 37
Annual Operating Fee Annual Operating Fee InvoicesInvoices
PBR facilities will be assessed an annual operating PBR facilities will be assessed an annual operating fee each year based on the most recent emissions fee each year based on the most recent emissions inventory submission.inventory submission.
The current facility owner is responsible for The current facility owner is responsible for invoiced fees regardless of facility ownership invoiced fees regardless of facility ownership during the year in which emissions were released.during the year in which emissions were released.
Title V fees are adjusted yearly based on the CPI. Title V fees are adjusted yearly based on the CPI. The 2014 Title V fees will be $36.33 per ton.The 2014 Title V fees will be $36.33 per ton.
Non-Title V fees are fixed at $25.12 per ton.Non-Title V fees are fixed at $25.12 per ton.
Emissions Inventory Workshop 2014 38
Heads Up!Heads Up! 2014 will be an important reporting year2014 will be an important reporting year
Triennial NEI year, likely base year for non-attainment planningTriennial NEI year, likely base year for non-attainment planning
Data quality will be vital for developing effective control Data quality will be vital for developing effective control strategiesstrategies
Get 2013 in best possible shape nowGet 2013 in best possible shape now Comprehensive 2014 inventory of Oil & Gas area and point Comprehensive 2014 inventory of Oil & Gas area and point
sources will be criticalsources will be critical
All PBR facilities will have to report for 2014All PBR facilities will have to report for 2014
We are developing processes for companies with large We are developing processes for companies with large numbers of similar facilities to directly export from their numbers of similar facilities to directly export from their databases to Redbuddatabases to Redbud
Avoids needing to do data entry in RedbudAvoids needing to do data entry in Redbud Not necessarily easy – requires significant technical expertise Not necessarily easy – requires significant technical expertise
Emissions Inventory Workshop 2014 39
Important Proposed ChangeImportant Proposed Changefor Reporting VOC in 2014for Reporting VOC in 2014
Go from reportingGo from reportingSpeciated HAPs plus VOC (non-HAP)Speciated HAPs plus VOC (non-HAP)
totoTotal VOC plus HAPsTotal VOC plus HAPs
Should reduce errors and confusionShould reduce errors and confusion
Consistency with most published emission factorsConsistency with most published emission factors
Oklahoma Clean Air Act does not allow double billing for Oklahoma Clean Air Act does not allow double billing for pollutants that are in multiple categoriespollutants that are in multiple categories
Invoices will continue to charge for HAPs and VOC (non-HAP)Invoices will continue to charge for HAPs and VOC (non-HAP)
Allow industry sufficient lead time to prepare for this Allow industry sufficient lead time to prepare for this changechange
Emissions Inventory Workshop 2014 40
Questions?Questions?
41Emissions Inventory Workshop 2014
Thanks for Coming TodayThanks for Coming Today
Please complete the feedback form before you leavePlease complete the feedback form before you leave
Emissions Inventory Workshop 2014 42