PIC Handling & Classification: Confidential
Document Ref: PICPROP013/09/2019
Owner: PIC
Sunnyside Office Development Pre-qualification Questionnaire for the Procurement of Principal Building Contractor -Tender Addendum No.2 22 October 2019
Tender A
ddendu
m N
o.2
PIC Handling & Classification: Confidential
Document Ref: PICPROP013/09/2019
Owner: PIC
SECTION 1.0
GENERAL INFORMATION
PIC Handling & Classification: Confidential
Document Ref: PICPROP012/8/2019
Owner: PIC
Dear Tenderer
RE: Sunnyside Office Development – Pre-qualification Questionnaire for the Procurement of
Principal Building Contractor -Tender Addendum No.2
In terms of the Tender, issued by Public Investment Corporation on the 30th September 2019, herewith
please find enclosed the addendum for the subject project, which shall be included as part of the tender
document submission when the tender closes.
Except to the extent modified by this Addendum, the original terms of the tender shall remain unchanged
and binding on all the interested parties. The tenderer shall submit a copy of the addendum, including all
tender deliverables specified in the original Tender Document.
The following changes are applicable to Tender Documents dated 30th September 2019
1. Part A: Cover letter, Page 3 and 4
Replace with attached Part A: Cover letter, Page 3 and 4
Changes made: Check list updated
2. Part B: Financial Information, Item 3.12, Page 13
Replace with attached Part B: Financial Information, Item 3.12, Page 13
Changes made:
All items related to insurances under this section (Part B: 3.12 Page 13) to
be excluded as returnables and they will be dealt with at RFP stage.
However, the workmen’s compensation certificate to be submitted.
3.
Part B: Evaluation Criteria, Failure to meet the following minimum criteria will result in automatic disqualification. Page 21
Replace with attached Part B: Evaluation Criteria, Failure to meet the
following minimum criteria will result in automatic disqualification. Page 21
Changes made:
Exclude the following items related to insurances and will be dealt with at
RFP stage.
• Letter of Intent from a Financial Institution to provide a Construction Guarantee.
• Letter of Intent from a registered insurance company to provide ALL insurances in term of this tender.
PIC Handling & Classification: Confidential
Document Ref: PICPROP012/8/2019
Owner: PIC
4 Additional Drawings
Section
Site Development Plan
Area Schedules GBA
Date: 22 October 2019
Project: Sunnyside Office Development
Subject: Pre-qualification questionnaire for the procurement of Principal
Building Contractor -Tender Addendum No.2
Dear Tenderer,
I/We the undersigned hereby confirm that we have received addendum no 2.
Kindly confirm receipt of addendum no 2 by signing and returning this page to
[email protected] no later than Wednesday the 30th of October 2019.
Company Name …………………………………………..
Name & Surname …………………………………………..
Signature …………………………………………..
Designation …………………………………………..
Date …………………………………………..
Page 3
|PICPROP013/09/2019|
Date: 29 September 2019
Dear Sir/Madam,
Public Investment Corporation would like to invite you to pre-qualify for the proposed Sunnyside
Office Development Project in Sunnyside, Pretoria. The project consist of 51000m² super basement
parking, 44000m² above ground parking, 7800 m² podium level and three office towers total area of
46500m².
Potential contractors are required to undergo a pre-qualification process that is designed to provide
PIC with information to assist in the selection of potential contractors to tender for the works. After
this pre-qualification process a full Tender Document will be issued to the shortlisted companies.
As such, please find attached the Pre-Qualification Questionnaire (PQQ) for completion and return in
accordance with the instructions within the document, no later than Wednesday 30 October 2019
at 11:00am.
The process involves the evaluation of the following:
• General Company Information and Organisation Governance
• Financial Information
• Experience and Capability
• Community Development and Management
• Proposed Team, Human Resources and
• B-BBEE
A document checklist has been provided below with all the requirements to be included along with your PQQ response. Please ensure that you pay close attention to this list and provide all required documents, as failure to do so will disqualify you from the process.
Checklist:
1 Pre-Qualification Questionnaire (PQQ) 2 Company Registration Certificate - Section 2.2 (Appendix A) 3 Company Profile (Brochures, etc.) - Section 2.9 (Appendix B) 4 Joint Venture Agreement (if applicable) - Section 2.14 (Appendix C) 5 Quality Management Policy / ISO Accreditation (and certificate where applicable) - Section 2.15
(Appendix D) 6 Health, Safety and Environment Policy - Section 2.16 (Appendix E) 7 Sustainability Policy - Section 2.17 (Appendix F) 8 Latest VAT Certificate - Section 3.2 (Appendix G) 9 Company or Group Structure Chart - Section 3.4 (Appendix H) 10 Audited Financial Records (last 3 years) - Section 3.6 (Appendix I) 11 SARS PIN - Section 3.8 (Appendix J) 12 CSD registration report - Section 3.9 (Appendix K) 13 CIDB registration report or certificate - Section 3.10 (Appendix L)
Page 4
|PICPROP013/09/2019|
14 Applicable insurances and Workmen’s Compensation Certificate - Section 3.12 (Appendix M) 15 Bank Confirmation Letter - Section 3.13 (Appendix N) 16 Experience and Capability - Section 4.2 (Appendix O) 17 Proposed team structure and CV’s of proposed team members - Section 4.3 (Appendix P) 18 Preliminary Construction Programme - Section 4.6 (Appendix Q) 19 Site Establishment Methodology - Section 4.7 (Appendix R) 20 Works Execution Methodology - Section 4.8 (Appendix S) 21 South African National Accreditation System (SANAS) approved Generic construction B-BBEE
Certificate - Section 5.3 (Appendix T) 22 Community development and management methodology Section 6.1 (Appendix U) 23 Green Building Experience and Capability Section 7.1 (Appendix V)
Please complete and respond to the questions as this will assist us in evaluating the information.
Should you have any queries or require any clarifications, please email these to the following
address; [email protected]
We look forward to receiving your pre-qualification responses.
Kind regards,
Public Investment Corporation
Procurement
Page 13
|PICPROP013/09/2019|
3. FINANCIAL INFORMATION (Cont.)
3.12
Please provide a copy of the following, if applicable, including details of the cover.
Include as Appendix M
Workmen’s Compensation Certificate
3.13
Banking Details:
Name of Bank
Name of Branch
Branch Code
Account Holder Name
Account Number
Account Type
Bank Confirmation Letter Include as Appendix N
Page 22
|PICPROP013/09/2019|
The following documents must be included in the proposal:
• A joint venture formal signed agreement (if applicable) indicating the leading company as well
as both companies’ roles and responsibilities.
• Bidders are encouraged to register on the National Treasury’s Central Supplier Database.
• Organogram and CV’s of all personnel who will be working on the project.
• Bidder to provide a SARS PIN in order for PIC to verify Tax Compliance or a CSD Report from
the National Treasury supplier database.
• Name minimum of Three (3) contact numbers and Three (3) reference letters from clients for
similar projects undertaken in the past Five (5) years.
Joint Ventures/ Consortiums
The following information and documentation must be submitted:
• Joint Ventures will score as the Joint Venture throughout the tender as bids cannot be split
between the Joint Venture and individual bids.
• A consolidated Generic construction B-BBEE certificate in case of joint venture.
• All information stipulated under minimum and administrative requirements in the bid must be
submitted by all parties involved in the Joint Ventures/Consortiums, including ownership and
executive management information.
• A percentage breakdown of the work allocation between the parties must be clearly indicated.
• A formal signed agreement indicating the leading company as well as the other company roles
and responsibilities must be submitted.
• A skills transfer plan between the parties must be submitted.
(The PIC Acting on behalf of the Unemployment Insurance Fund (UIF) reserves the right to
disqualify any submissions should they be incomplete or inadequate.)
UP
10269.3 m²GBA - SUPERBASEMENT
10041.9 m²GBA - SUPERBASEMENT
DOUBLE VOLUME
DOUBLE VOLUME
DOUBLE VOLUME
10269.3 m²GBA - SUPERBASEMENT
10269.3 m²GBA - SUPERBASEMENT
10269.3 m²GBA - SUPERBASEMENT
7368.1 m²GBA - SUPERBASEMENT
385.3 m²GBA - SUPERBASEMENT
5818.2 m²GBA - SUPERBASEMENT
53.2 m²GBA - SUPERBASEMENT
DOUBLE VOLUME
DOUBLE VOLUME
7653.9 m²GBA - SUPERBASEMENT
7452.1 m²GBA - SUPERBASEMENT
454.5 m²SHARED FACILITY
7472.0 m²GBA - SUPERBASEMENT
DOUBLE VOLUME
490.3 m²GBA PODIUM
543.
2 m
²G
BA
PO
DIU
M
282.7 m²GBA PODIUM
4996.7 m²GBA PODIUM
1274.3 m²GBA T3
250.7 m²GBA PODIUM
1381.3 m²GBA T2
2689.4 m²GBA T1
169.3 m²GBA T2
1446.6 m²GBA T3
138.2 m²GBA T1
466.2 m²GBA T1
193.5 m²SHARED FACILITY
2135.8 m²GBA T2
2128.5 m²GBA T1
1445.0 m²GBA T3
1848.5 m²GBA T2
2064.2 m²GBA T1
295.5 m²GBA T1
1274.0 m²GBA T3
45.8 m²GBA T2
171.0 m²GBA T3
39.8 m²GBA T2
103.7 m²GBA T2
40.6 m²GBA T2
1655.5 m²GBA T2
2064.1 m²GBA T1
1274.0 m²GBA T3
GBA LEGEND
GBA - FACILITIES
GBA - SUPERBASEMENT
GBA PODIUM
GBA T1
GBA T2
GBA T3
SHARED FACILITY
1610.0 m²GBA T2
2017.0 m²GBA T1
188.3 m²GBA T2
1274.0 m²GBA T3
168.4 m²GBA T1
11.3 m²GBA T2
1610.0 m²GBA T2
1669.1 m²GBA T1
339.7 m²GBA T1
11.3 m²GBA T2
1274.0 m²GBA T3
1610.0 m²GBA T2
1669.1 m²GBA T1
11.3 m²GBA T2
7.7 m²GBA T1
1274.0 m²GBA T3
1610.0 m²GBA T2
1669.1 m²GBA T1
11.3 m²GBA T2
7.7 m²GBA T1
1274.0 m²GBA T3
11.3 m²GBA T2
36.2 m²GBA T1
1610.0 m²GBA T2
1152.7 m²GBA T3
116.2 m²GBA T3
1315.9 m²GBA T211.3 m²
GBA T2
286.2 m²GBA T2
11.3 m²GBA T2
1315.7 m²GBA T2
7.8 m²GBA T2
33.7 m²GBA T2
3784.6 m²GBA - SUPERBASEMENT
4059.5 m²GBA - FACILITIES
FOR INFORMATION
DRAWING DESCRIPTION
PROJECT NUMBER
SCALE
1st. DATE
PRINT SIZE
REVISION
A1
PROJECT NAME & DESCRIPTION
DETAILSDISCIPLINE
COPYRIGHT RESERVED
DRAWING LEGEND
KEY SITE PLAN
IDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTURE
SAIA No. PG 0446 & PI 4669
DRAWN BY
DRAWING NUMBER
GENERAL NOTES[1] This drawing is the copyright of the architect. [2] The contractor is to check and verify the sufficiency of information,levels and dimensions on the drawing before commencing work. [3] Any omissions, discrepancies or errors are to be reported to the architect immediately. [4] Dimensions are not to be scaled from drawing. [5] Should the contractor proceed without the above approval, he does so entirely at his own risk. [6] All materials and building works are to be fixed, applied and carried out in accordance with the SABS 0400 national building regulations, local bylaws and manufacturers’specifications. [7] Each contractor and material supplier is assumed to be experts in their field and is responsible for the product produced by them. Should they believe that site conditions or the use of their product are not conducive to the production of an acceptable product, they are to report same. [8] I.E’s to be at changes in direction on all plumbing pipes. [9] R.E’s to drains to be installed every 25 meters and at the head of every sewer run. [10] Min. Fall for 100mm drains 1:60, and min. Fall for 150mm pipes, 1:250. [11] No backfilling to take place prior to inspection and approval from the relevant consultants and inspectors. [12] All glazing to be in accordance with part ‘N’ of the national building regulations. [13] Where demarcated, specialist shop drawings are required, and are to be approved prior to manufacture and installation. [14] All brickwork to be in accordance with the NHBRC building manuals as well as in accordance with the details and the general notes on the engineers’ drawings. [15] All dimensions to be checked/measured on site prior to manufacture.
CLIENT LOGO DETAILS
JOHANNESBURGSIXTH FLOOR, 7 ANERLEY RD, PARKTOWNPHONE +27 (0) 11 486 2770WEB www.glh.co.za
PRETORIA Office 1, 267b, West Avenue, CenturionPHONE +27 (0) 12 663 1918EMAIL [email protected]
1 : 1000
C
AREA SCHEDULES - GBA
10/22/18
SUNNYSIDE OFFICE DEVELOPMENT
C/O PARK STR & STEVE BIKO STR, SUNNYSIDE, PRETORIA, TSHWANE
16028
PUBLIC INVESTMENT CORPORATION
M Louw
A100
AREA SCHEDULE - GBA
Exterior Area
GBA PODIUM
L12 PODIUM RECEPTION 1566.9 m²
1566.9 m²
GBA T1
L13 OFFICE LEVEL 01 604.4 m²
L15 OFFICE LEVEL 03 295.5 m²
L17 OFFICE LEVEL 05 168.4 m²
L18 OFFICE LEVEL 06 339.7 m²
L19 OFFICE LEVEL 07 7.7 m²
L20 OFFICE LEVEL 08 7.7 m²
1423.3 m²
GBA T2
L13 OFFICE LEVEL 01 169.3 m²
L15 OFFICE LEVEL 03 45.8 m²
L16 OFFICE LEVEL 04 184.1 m²
L17 OFFICE LEVEL 05 188.3 m²
L18 OFFICE LEVEL 06 11.3 m²
L19 OFFICE LEVEL 07 11.3 m²
L20 OFFICE LEVEL 08 11.3 m²
L21 OFFICE LEVEL 09/T1 ROOF 11.3 m²
L22 OFFICE LEVEL 10/ T3 ROOF 297.5 m²
L23 OFFICE LEVEL 11 19.1 m²
949.3 m²
GBA T3
L15 OFFICE LEVEL 03 171.0 m²
L21 OFFICE LEVEL 09/T1 ROOF 116.2 m²
287.2 m²
4226.7 m²
Gross Building Area
GBA - FACILITIES
L11 FACILITIES LVL 4059.5 m²
4059.5 m²
GBA - SUPERBASEMENT
Not Placed 0.0 m²
L01 BASEMENT 05 10269.3 m²
L02 BASEMENT 04 10041.9 m²
L03 BASEMENT 03 10269.3 m²
L04 BASEMENT 02 10269.3 m²
L05 BASEMENT 01 10269.3 m²
L06 GROUND FLOOR LVL 7950.7 m²
L07 PARKADE 01 5871.4 m²
L08 PARKADE 02 7653.9 m²
L09 PARKADE 03 7452.1 m²
L10 PARKADE 04 7472.0 m²
L11 FACILITIES LVL 3784.6 m²
91303.8 m²
GBA PODIUM
L12 PODIUM RECEPTION 4996.7 m²
4996.7 m²
GBA T1
L13 OFFICE LEVEL 01 2689.4 m²
L14 OFFICE LEVEL 02 2128.5 m²
L15 OFFICE LEVEL 03 2064.2 m²
L16 OFFICE LEVEL 04 2064.1 m²
L17 OFFICE LEVEL 05 2017.0 m²
L18 OFFICE LEVEL 06 1669.1 m²
L19 OFFICE LEVEL 07 1669.1 m²
L20 OFFICE LEVEL 08 1669.1 m²
L21 OFFICE LEVEL 09/T1 ROOF 36.2 m²
16006.6 m²
GBA T2
L13 OFFICE LEVEL 01 1381.3 m²
L14 OFFICE LEVEL 02 2135.8 m²
L15 OFFICE LEVEL 03 1848.5 m²
L16 OFFICE LEVEL 04 1655.5 m²
L17 OFFICE LEVEL 05 1621.3 m²
L18 OFFICE LEVEL 06 1610.0 m²
L19 OFFICE LEVEL 07 1610.0 m²
L20 OFFICE LEVEL 08 1610.0 m²
L21 OFFICE LEVEL 09/T1 ROOF 1610.0 m²
L22 OFFICE LEVEL 10/ T3 ROOF 1315.9 m²
L23 OFFICE LEVEL 11 1315.7 m²
L24 T2 ROOF 33.7 m²
17747.9 m²
GBA T3
L12 PODIUM RECEPTION 1274.3 m²
L13 OFFICE LEVEL 01 1446.6 m²
L14 OFFICE LEVEL 02 1445.0 m²
L15 OFFICE LEVEL 03 1274.0 m²
L16 OFFICE LEVEL 04 1274.0 m²
L17 OFFICE LEVEL 05 1274.0 m²
L18 OFFICE LEVEL 06 1274.0 m²
L19 OFFICE LEVEL 07 1274.0 m²
L20 OFFICE LEVEL 08 1274.0 m²
L21 OFFICE LEVEL 09/T1 ROOF 1152.7 m²
12962.3 m²
SHARED FACILITY
L09 PARKADE 03 454.5 m²
L13 OFFICE LEVEL 01 193.5 m²
648.0 m²
147724.8 m²
TOTAL GBA 151951.5 m²
scale 1 : 1000
L01 BASEMENT 05
scale 1 : 1000
L02 BASEMENT 04
scale 1 : 1000
L03 BASEMENT 03
scale 1 : 1000
L04 BASEMENT 02
scale 1 : 1000
L05 BASEMENT 01
scale 1 : 1000
L06 GROUND FLOOR LVL
scale 1 : 1000
L07 PARKADE 01
scale 1 : 1000
L08 PARKADE 02
scale 1 : 1000
L09 PARKADE 03
scale 1 : 1000
L10 PARKADE 04
scale 1 : 1000
L12 PODIUM RECEPTION
scale 1 : 1000
L13 OFFICE LEVEL 01
scale 1 : 1000
L13 OFFICE LEVEL 02
scale 1 : 1000
L15 OFFICE LEVEL 03
scale 1 : 1000
L15 OFFICE LEVEL 04
scale 1 : 1000
L16 OFFICE LEVEL 05
scale 1 : 1000
L17 OFFICE LEVEL 06
scale 1 : 1000
L18 OFFICE LEVEL 07 scale 1 : 1000
L20 OFFICE LEVEL 08
scale 1 : 1000
L21 OFFICE LEVEL 09/T1 ROOF
scale 1 : 1000
L22 OFFICE LEVEL 10/ T3 ROOF
scale 1 : 1000
L23 OFFICE LEVEL 11
scale 1 : 1000
L24 T2 ROOF
PHASE I AREAS
LEVEL AREA
Not Placed 0.0 m²
L01 BASEMENT 05 10269.3 m²
L02 BASEMENT 04 10041.9 m²
L03 BASEMENT 03 10269.3 m²
L04 BASEMENT 02 10269.3 m²
L05 BASEMENT 01 10269.3 m²
L06 GROUND FLOOR LVL 7950.7 m²
L07 PARKADE 01 5871.4 m²
L08 PARKADE 02 7653.9 m²
L09 PARKADE 03 7906.5 m²
L10 PARKADE 04 7472.0 m²
L11 FACILITIES LVL 7844.1 m²
L12 PODIUM RECEPTION 7837.9 m²
L13 OFFICE LEVEL 01 6484.5 m²
L14 OFFICE LEVEL 02 5709.3 m²
L15 OFFICE LEVEL 03 5699.0 m²
L16 OFFICE LEVEL 04 5177.7 m²
L17 OFFICE LEVEL 05 5269.0 m²
L18 OFFICE LEVEL 06 4904.0 m²
L19 OFFICE LEVEL 07 4572.1 m²
L20 OFFICE LEVEL 08 4572.1 m²
L21 OFFICE LEVEL 09/T1 ROOF 2926.3 m²
L22 OFFICE LEVEL 10/ T3 ROOF 1613.4 m²
L23 OFFICE LEVEL 11 1334.9 m²
L24 T2 ROOF 33.7 m²
PHASE I TOTAL 151951.5 m²
scale 1 : 1000
L11 FACILITIES LVL
DIAGRAMS ON THIS PAGE REPRESENT AREAS INCLUDED IN THE CALCULATION OF THE PROJECT FAR.
REV
ISSUE
DATE DESCRIPTION
A 2018-12-03 STAGE 2 DELIVERABLES FORINFORMATION
B 2019-01-16 FAR UPDATED TO EXCLUDESTOREROOMS ANDPLANTROOMS. GBA UPDATED TOLATEST LAYOUTS. LVL 11(SERVICE LVL) ADDED. OMIT 1OFFICE LVL ON ALL TOWERS.
C 2019-10-09 GBA UPDATED TO LATESTLAYOUTS
FDFDFDFDFDFDFDFDFDFDFD
FD
FD
FDFDFDFDFDFDFDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFD
FDFD
FDFDFDFDFDFDFDFDFD
FDFDFDFDFDFDFDFDFDFDFD
FD
T
T
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
V
V
V
V
TA
P
SP
MH
S
S
SF
H
V
V
VM
H
V
MH
MH
MH
V
MH
V
MH
MH
SP
SP
SB
SB
SP
SP
SP
SP
SB
SB
SP
SP
SB
SBSP
SP
SP
SP
SP
CC
MH
LEGENDHARD LANDSCAPE LOADSOFT LANDSCAPE LOAD
EXISTING SERVICES
SW
FH
T
TAP
SP
SB
S
V
PAVING 02 (200mm layerworks incl. paving)
60mm paving@140kg/ m²
30mm sand layer
No fines/ drainage layer (Excluded from load
calculation)
PAVING TYPE 01 (300mm layerworks incl. paving)
60mm paving@140kg/ m²
30mm sand layer
No fines/ drainage layer (Excluded from load
calculation)
PLANTER 01
500mm Planting medium
30mm sand layer
No fines/ drainage layer (Excluded from load
calculation)PLANTER 02 (640mm layerworks )
500mm Planting medium
30mm sand layer
No fines/ drainage layer (Excluded from load
calculation)TREE PLANTER (1.5 tons / tree planter ) FENCE LINE
Existing Manhole
Existing Valve Box
Existing Sewer Manhole
Existing Manhole
Existing Tap Position
Existing Manhole
Existing Street Light Pole
Existing Traffic Light
Existing Telecommunication Manhole
Existing Fire Hydrant
Existing Stormwater Manhole
PA
RK
ST
RE
ET
FR
AN
CIS
BA
AR
D S
TR
EE
T
LANSCAPING TO LANDSCAPE ARCHITECT
LANSC
APIN
G TO LA
NDSCAP
E
ARCHITE
CT
LANSCAPING TO LANDSCAPE ARCHITECT
LANDSCAPING TO LANDSCAPE ARCHITECT
MEC
HAN
ICAL
VEN
TILA
TIO
N /IC
V
CHA
MBE
R /
SIG
NAG
E-PY
LON
(ILLU
MIN
ATED
)
MECHANICAL VENTILATION /
SIGNAGE-PYLON(ILLUMINATED)
SERVITUDE
BOUNDARY WALL80.83M BOUNDARY LINE
SERVITUDE
PARK STREET
PEDESTRIAN
ENTRANCE
PARK STREET
PEDESTRIAN
ENTRANCE
BOUNDARY W
ALL
36.5
8M
BO
UN
DA
RY
LIN
E
BOUNDARY W
ALL
40.4
6M
BO
UN
DA
RY
LIN
E
BOUNDARY WALL
52.42M BOUNDARY LINE
44.2
4M
BO
UN
DA
RY
LIN
E
8.83M BOUNDARY
LINE
115.67M BOUNDARY LINE
28.24M BOUNDARY LINE
95.7
9M
BO
UN
DA
RY
LIN
E
TE
RR
AC
E B
EL
OW
TE
RR
AC
E B
EL
OW
CONCRETE ROOF
CONCRETE ROOF
CONCRETE ROOF
CONCRETE ROOF
CONCRETE ROOF
TE
RR
AC
E B
EL
OW
TERRACE BELOW
TERRACE BELOW
TERRACE BELOW
TERRACE BELOW
TERRACE BELOW
TERRACE BELOW
TE
RR
AC
E B
EL
OW
CONCRETE ROOF
TERRACE BELOW
TE
RR
AC
E
BE
LO
W
CONCRETE ROOF
LIFT
SHA
FT
LIFT
SHA
FT
FE S
TAIR
RIREMANS LIFT
LIFT SHAFT
LIFT SHAFT
FE STAIR
LIFT
SHA
FT
RIR
EMAN
S LI
FT
FE S
TAIR
EXISTING DRO
POFF
exsiting walkway to be demolished &
relocated
ENTRANCE GF
ENTRANCE GF
EXIT GF
ENTRANCE GF
ROAD W
IDENING SERVITUDE
ENTRANCE DRIVEWAY W
IDENING SERVITUDE
exsiting walkway to be demolished & relocated
exsiting walkway to be demolished &
relocated
RAMP & LANDSCAPED STEPS
TE
RR
AC
E B
EL
OW
Stormwater Line
Canopy on Ground Floor
Cano
py o
n G
roun
d Fl
oor
MECHANICAL VENTILATION /ICV
CHAMBER /
SIGNAGE-PYLON
(ILLUMINATED)
corre
ctio
n &
abon
done
men
t to
be c
onfir
med
boun
dary
to d
esig
n
boundary to designboundary to design
2m pedestrian walkway
2m pedestrian walkway
2m pedestrian walkway
2m pedestrian walkway
2m pedestrian walkway
2m p
edes
trian
wal
kway
KERB
LIN
E
EXSITING UNDERG
ROUND PO
WERLINE
exsiting pole
EXISTING POLE TO BE MOVED
NO O
BSTRUCTION IN ENTRANCE/EXIT DRIVEW
AY
2m pedestrian walkway
KERB LINE
2m pedestrian walkway
KERB LINE
CONSOLIDATED BOUNDARY LINE
CO
NS
OL
IDA
TE
D B
OU
ND
AR
Y L
INE
CONSOLIDATED BOUNDARY LINE
CO
NS
OL
IDA
TE
D B
OU
ND
AR
Y L
INE
storm water to Civil Eng
STORMWATER TO CIVIL ENGINEER
stor
m w
ater
to C
ivil E
ng
storm water to Civil Eng
STORMWATER TO CIVIL ENGINEER
GF
FOO
TPRI
NT
GF FOOTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF FO
OTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF FO
OTPRINT
GF FO
OTPRINT
GF FOOTPRINT
GF
FOO
TPR
INT
GF
FOO
TPR
INT
GF FO
OTPRINT
GF FO
OTPRINT
GF FO
OTPRINT
GF FO
OTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF FO
OTPRINT
GF FO
OTPRINT
GF
FOO
TPRI
NT
GF FOOTPRINT
GF FOOTPRINT
GF FOOTPRINT
GF
FOO
TPRI
NT
GF FOOTPRINT
CO
NS
OL
IDA
TE
D B
OU
ND
AR
Y L
INE
CONSOLIDATED BOUNDARY LINE
CO
NS
OL
IDA
TE
D B
OU
ND
AR
Y L
INE
CONSOLIDATED BOUNDARY LINE
CONSOLIDATED BOUNDARY LINE
CONSOLIDATED BOUNDARY LINE
CONSOLIDATED BOUNDARY LINE
CONSOLIDATED BOUNDARY LINE
KERB LINE
SUBJECT TO CONSOLIDATION
SUBJECT TO CONSOLIDATION
SUBJECT TO CONSOLIDATION
SUBJECT TO CONSOLIDATION
SUBJECT TO CONSOLIDATION
SUBJECT TO CONSOLIDATION
SU
BJE
CT
TO
CO
NS
OLID
AT
ION
SU
BJE
CT
TO
CO
NS
OLID
AT
ION
SUBJECT TO CONSOLIDATION
KERB
LIN
E
KERB LINE
KERB LINE
KERB LINE
KERB LINEKERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
KERB LINE
EXSITING UNDERG
ROUND PO
WERLINE
EXIT GF
ENTRANCE GF
CO
NS
OL
IDA
TE
D B
OU
ND
AR
Y L
INE
PA
RK
ST
RE
ET
GF FOOTPRINT
EXIT GF
19 43
28 43
2198
2459
7405
2731
4184
2957
638
6119
7991
9754
3722
2589
1503
2646
19 39
3416
LANSCAPING TO LANDSCAPE ARCHITECT
LANSCAPING TO
LANDSCAPE
ARCHITECT
LANSC
APIN
G TO LA
NDSCAP
E
ARCHITE
CT
LANS
CAPI
NG
TO
LAN
DSC
APE
ARC
HITE
CT
LANSCAPING TO LANDSCAPE ARCHITECT
LANSCAPING TO LANDSCAPE
ARCHITECT
Y 80 000
Y 79 900
Y 79 900
Y 79 800
Y 80 000
Y 79 900
Y 79 800
Y 2
849 3
00
Y 2
849 2
00
Y 2
849 4
00
7810
43622517
ENTRANCE/ EXIT
ENTRANCE/ EXIT
BASEMENT
ENTRANCE/ EXIT
EX
IT
EN
TR
AN
CE
EX
IT
LANSCAPING TO LANDSCAPE ARCHITECT
FOO
TPRINT OF ADJACENT BUILDING
TELECOMMUNICATION POLE TO BE RELOCATED OFF SITE
ERF 82
ERF 79
ERF 83
ADJ. ERF 1
RE
MA
IND
ER
2 O
F E
RF
6
RE
MA
IND
ER
1 O
F E
RF
5
ERF 1431
RE
MA
IND
ER
OF
ER
F 2
RE
MA
IND
ER
OF
ER
F 6
0
REMAINDER OF
PORTION 50 ERF
834
ERF 1432
REMAINDER
OF PORTION
3 OF ERF 3
REMAINDER
OF ERF 1430
REMAINDER OF
PORTION 2 ERF
740
ERF 52
ERF 87
REMAINDER OF
PORTION 39
ERF 834
REMAINDER OF
PORTION 2 ERF
834
REMAINDER OF
PORTION 1 ERF
834REMAINDER OF
PORTION 8 ERF
834
REMAINDER
OF PORTION
39 ERF 834
PORTION 1
ERF 6
REMAINDER
OF SITE 79
REMAINDER OF
PORTION 38
ERF 834
REMAINDER OF
PORTION 3 ERF
834
REMAINDER OF
PORTION 54
ERF 834
REMAINDER OF
PORTION 13
ERF 834
REMAINDER OF
PORTION 22
ERF 834
REMAINDER OF
PORTION 14
ERF 834
ERF 81
ERF 83
SERVITUDE
1315.75m
SERVITUDE
SERVITUDE
SERVITUDE
DEPARTMENT OF TOURISM
TREVENNA COURT
APARTMENTS
EXISTING FOOTPRINT.
NOT SURVEYED
EXISTING FOOTPRINT.
NOT SURVEYED
EXISTING FOOTPRINT.
NOT SURVEYED
LANS
CAPI
NG
TO
LAN
DSC
APE
ARC
HITE
CT
LAND
SCAP
ING
TO L
ANDS
CAPE
ARCH
ITEC
T
DIE
SE
L C
ON
NE
CT
ION
ST
OR
MW
AT
ER
CO
NN
EC
TIO
N
WA
TE
R C
ON
NE
CT
ION
SEWER CONNECTION
DR
IVE
WA
Y
TRAFFIC ENGINEER TO
COM
MENT
FOOTPRINT OF ADJACENT BUILDING
TR
EV
EN
NA
ST
RE
ET
17.6
3m
STEVE BIKO ROAD
PA
RK
ST
RE
ET
STEVE BIKO ROAD
STEVE BIKO ROAD
TR
EV
EN
NA
ST
RE
ET
17.6
3m
PA
RK
ST
RE
ET
SU
NN
YS
IDE
TO
WN
SH
IP
TR
EV
EN
NA
TO
WN
SH
IP
TR
EV
EN
NA
TO
WN
SH
IP
AR
CA
DIA
TO
WN
SH
IP
LAMP POLE & TAP TO BE MOVED
TREE TO BE RELOCATED
SITE FEATURE TO BEREMOVED
SEWER MANHOLE TO BE RELOCATED
NEW DROP OFF
TAXI/ BUS STOP
exsiting poleexsiting pole
exsiting pole
exsiting pole
exsiting pole
exsiting pole
exsiting pole
RAMPTERRACE BELOW
CO
NC
RE
TE
RO
OF
BE
LO
W
TERRACE BELOW
DELIVERY YARD ON GROUND LEVEL
1315.5m
1315.25m
1315m
1315m
1315m
1315.7
5m
1316m
1316.5
m
1316.2
5m
1316.2
5m
1316.2
5m
1316.25m
1316.2
5m
1315.5m
1315.75m
1315.75m
1316.7
5m
1317m
1317.2
5m
1317.5
m
1317.7
5m
1318m
1319m
1319m
1318m
1318m
1317.7
5m
1317.5
m
1317.7
5m
1317.5
m1318m
1317.7
5m
1318m
1318m
1318.25m
1318.5m
1318.75m
1318m
1319.25m
1316.25m
1316.5m
1316.75m
1317m
1317.25m1317.5m
1317.75m
1316m1316.25m
TS06-N
1318.14
TS0-N
1316.28
TS04-N
1316.11
TS03-N
1316.31
TS02-N
1316.07
TS08-N
1317.54
SUB1
1317.95
21029
RAMP & LANDSCAPED STEPS
R 5
000
R 5000
SIGNAGE-
PYLON
(ILLUMINATED)
GENERATO
R EXHAUST &
SIGNAG
E PYLON
BUILDING SIGNAGE ON CANOPY(ILLUMINATED)
5523 250 2420 2305523
REMAINDER
OF ERF 2
REMAINDER
OF PORTION
2 OF ERF 3
REMAINDER
OF PORTION
3 OF ERF 3
PORTION 1
OF ERF 3
REMAINDER OF ERF
1422
REMAINDER OF
PORTION 9 ERF
834
RE
MA
IND
ER
OF
ER
F 6
0
LIFT
SH
AFT
LIFT
SHA
FT
LIFT
SH
AFT
TERRACE BELOW
FE STAIR
N
FOR INFORMATION
DRAWING DESCRIPTION
PROJECT NUMBER
SCALE
1st. DATE
PRINT SIZE
REVISION
A0
PROJECT NAME & DESCRIPTION
DETAILSDISCIPLINE
COPYRIGHT RESERVED
DRAWING LEGEND
IDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTURE
SAIA No. PG 0446 & PI 4669
DRAWN BY
DRAWING NUMBER
GENERAL NOTES[1] This drawing is the copyright of the architect. [2] The contractor is to check and verify the sufficiency of information,levels and dimensions on the drawing before commencing work. [3] Any omissions, discrepancies or errors are to be reported to the architect immediately. [4] Dimensions are not to be scaled from drawing. [5] Should the contractor proceed without the above approval, he does so entirely at his own risk. [6] All materials and building works are to be fixed, applied and carried out in accordance with the SABS 0400 national building regulations, local bylaws and manufacturers’specifications. [7] Each contractor and material supplier is assumed to be experts in their field and is responsible for the product produced by them. Should they believe that site conditions or the use of their product are not conducive to the production of an acceptable product, they are to report same. [8] I.E’s to be at changes in direction on all plumbing pipes. [9] R.E’s to drains to be installed every 25 meters and at the head of every sewer run. [10] Min. Fall for 100mm drains 1:60, and min. Fall for 150mm pipes, 1:250. [11] No backfilling to take place prior to inspection and approval from the relevant consultants and inspectors. [12] All glazing to be in accordance with part ‘N’ of the national building regulations. [13] Where demarcated, specialist shop drawings are required, and are to be approved prior to manufacture and installation. [14] All brickwork to be in accordance with the NHBRC building manuals as well as in accordance with the details and the general notes on the engineers’ drawings. [15] All dimensions to be checked/measured on site prior to manufacture.
CLIENT LOGO DETAILS
JOHANNESBURGSIXTH FLOOR, 7 ANERLEY RD, PARKTOWNPHONE +27 (0) 11 486 2770WEB www.glh.co.za
PRETORIA Office 1, 267b, West Avenue, CenturionPHONE +27 (0) 12 663 1918EMAIL [email protected]
As indicated
B
SITE DEVELOPMENT PLAN
09/26/19
SUNNYSIDE OFFICE DEVELOPMENT
C/O PARK STR & STEVE BIKO STR, SUNNYSIDE,
PRETORIA, TSHWANE
16028
PUBLIC
INVESTMENT
CORPORATION
B.K
16028-000-SDP
scale1 : 250
SITE DEVELOPMENT PLAN
- LANDSCAPING TO LANDSCAPE ARCHITECT
- ELECTRICAL, SECURITY & DATA WORK TO ELECTRICAL ENGINEER
- STORMWATER & ROADS TO CIVIL ENGINEER
- STRUCTURAL WORK TO STRUCTURAL ENGINEER
- MECHANICAL HEATING,COOLING, VENTILATION, EXTRACTION TO
MECHANICAL ENGINEER
REV ISSUE DATE DRAWING REVISION DESCRIPTION
A 2018-12-03 STAGE 2 DELIVERABLES FOR INFORMATION
B 2019-09-26 ISSUED FOR TENDER
L03 BASEMENT 03
1307490
L04 BASEMENT 02
1310210
L05 BASEMENT 01
1312930
L06 GROUND FLOOR LVL
1316500
L07 PARKADE 01
1320070
L08 PARKADE 02
1322790
L09 PARKADE 03
1325510
L10 PARKADE 04
1328230
L12 PODIUM RECEPTION
1334860
L13 OFFICE LEVEL 01
1340980
L14 OFFICE LEVEL 02
1345060
L15 OFFICE LEVEL 03
1349140
L16 OFFICE LEVEL 04
1353220
L17 OFFICE LEVEL 05
1357300
L18 OFFICE LEVEL 06
1361380
L19 OFFICE LEVEL 07
1365460
L20 OFFICE LEVEL 08
1369540
L21 OFFICE LEVEL 09/T1 ROOF
1373620
L22 OFFICE LEVEL 10/ T3 ROOF
1377700
L23 OFFICE LEVEL 11
1381780
L24 T2 ROOF
1385860
L02 BASEMENT 04
1304770
L01 BASEMENT 05
1302050
R Q P N M L K J H G F
4080
4080
4080
4080
4080
4080
4080
4080
4080
4080
4080
6120
6630
2720
2720
2720
3570
3570
2720
2720
2720
2720
L11 FACILITIES LVL
1330950
8381
0
8400 8400 8400 8400 8400 8400 8400 8400 8400 8400
GLASS & STONE FACADE TO SPECIALIST & ENGINEER
GLASS & TILE FACADE TO SPECIALIST & ENGINEER
GLASS & TILE FACADE TO SPECIALIST & ENGINEER
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
NGL
NGL
GLASS & TILE FACADE TO SPECIALIST & ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
RAISED ACCESS FLOOR
100MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
340MM CONCRETE SLAB TO STRUCTURAL ENGINEER
GLASS & TILE FACADE TO SPECIALIST & ENGINEER
GLASS & TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
GLASS AND TILE FACADE TO SPECIALIST & ENGINEER
1.5M HIGH GLASS BALUSTRADE
1.5M HIGH GLASS BALUSTRADE
1.5M HIGH GLASS BALUSTRADE
1.5M HIGH GLASS BALUSTRADE
1.5M HIGH GLASS BALUSTRADE
1.5M HIGH GLASS BALUSTRADE
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
RAISED ACCESS FLOOR
300MM CONCRETE SLAB TO STRUCTURAL ENGINEER
FOR INFORMATION
DRAWING DESCRIPTION
PROJECT NUMBER
SCALE
1st. DATE
PRINT SIZE
REVISION
A3
PROJECT NAME & DESCRIPTION
DETAILSDISCIPLINE
COPYRIGHT RESERVED
/ KEY SITE PLAN
IDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTUREIDW GLH JOINT VENTURE
SAIA No. PG 0446
DRAWN BY
DRAWING NUMBER
CLIENT LOGO DETAILS
JOHANNESBURGSIXTH FLOOR, 7 ANERLEY RD, PARKTOWNPHONE +27 (0) 11 486 2770WEB www.glh.co.za
PRETORIA Office 1, 267b, West Avenue, CenturionPHONE +27 (0) 12 663 1918
DRAWING LEGEND
GENERAL NOTES[1] This drawing is the copyright of the architect. [2] The contractor is to check and verify the sufficiency of information, levels and dimensions on the drawing before commencing work. [3] Any omissions, discrepancies or errors are to be reported to the architect immediately. [4] Dimensions are not to be scaled from drawing. [5] Should the contractor proceed without the above approval, he does so entirely at his own risk. [6] All materials and building works are to be fixed, applied and carried out in accordance with the SABS 0400 national building regulations, local bylaws and manufacturers’ specifications. [7] Each contractor and material supplier is assumed to be experts in their field and is responsible for the product produced by them. Should they believe that site conditions or the use of their product are not conducive to the production of an acceptable product, they are to report same. [8] I.E’s to be at changes in direction on all plumbing pipes. [9] R.E’s to drains to be installed every 25 meters and at the head of every sewer run. [10] Min. Fall for 100mm drains 1:60, and min. Fall for 150mm pipes, 1:250. [11] No backfilling to take place prior to inspection and approval from the relevant consultants and inspectors. [12] All glazing to be in accordance with part ‘N’ of the national building regulations. [13] Where demarcated, specialist shop drawings are required, and are to be approved prior to manufacture and installation. [14] All brickwork to be in accordance with the NHBRC building manuals as well as in accordance with the details and the general notes on the engineers’drawings. [15] All dimensions to be checked/measured on site prior to manufacture.
1 : 500
A
SECTION HH
09/26/19
SUNNYSIDE OFFICE DEVELOPMENT
C/O PARK STR & STEVE BIKO STR, SUNNYSIDE,
PRETORIA, TSHWANE
16028
PUBLIC
INVESTMENT
CORPORATION
B.K
16028-307-SDP
scale 1 : 500
SECTION HH
REV ISSUE DATE DRAWING REVISION DESCRIPTION
A 2019-09-26 ISSUED FOR TENDER