AI SATS SEWAGE TREATMENT PLANT
1
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT
FOR SEWAGE TREATMENT PLANT CAPACITY: 120 KLD
AI SATS SEWAGE TREATMENT PLANT
2
1.0 DOMESTIC SEWAGE TREATMENT PLANT
1.1 Preamble
The Sewage treatment plant has been planned and the plant
capacity is 120 KLD. Technology preferred is SBR (Sequential
Batch Reactor) which should be well compact, clean and
efficient plant.
Technology shall be certified/ accepted based on following
terms,
1. Area occupied( Equalisation tank to final tank and sludge
management)
2. Power Consumption ( from bar screen to final tank)
3. Inlet and Outlet parameters shall be as in clause 1.2
4. Payback period
5. Cost per KL for treatment ( O & M only)
6. Maintenance cost for next 3 years
Tender has been provided with only bill of materials for STP
capacities. Vendor need to confirm the materials availability
quantity need to be confirmed while quoting. Any discrepancy
in qty shall be justified by vendor with proper backup
calculations.
The main source of effluent is waste water resulting from
Toilets, kitchen. The scope of work includes design, drawings,
AI SATS SEWAGE TREATMENT PLANT
3
getting approvals from statutory bodies, coordinating during
construction, erection, commissioning and obtaining best
results of completely below ground domestic sewage
treatment plant with electrical, mechanical and piping. The
treated effluent should be fit to reuse for flushing, gardening
and HVAC application purpose. The work is required to be
carried out on a turnkey basis covering a guarantee of
satisfactory performance as per the standards laid for a
minimum of 2 year.
1.2 Inflow and outflow characteristics
Raw Effluent
PH: 6.5-8.5
TSS : 200-300 mg/l
BOD 5: 250 to 350 mg/l
COD : 500 -800 mg/l
Treated Effluent ( As per PCB norms)
PH: 7-7.5
TSS : < 10 mg/l
BOD 5: < 10 mg/l
COD : < 100 mg/l
AI SATS SEWAGE TREATMENT PLANT
4
1.3 Scope and brief of contract
The Tender is invited on “ Turnkey basis for design, Engg,
Supply and Co-ordinating with construction works, erection
and commissioning “ of sewage treatment plant to produce
treated effluent quality as per contract and State pollution
control board ( SPCB) norms, whichever is superior in
quality.
Following items are within the scope of contract.
a. Drawings ( As per clause 1.5)
b. Data sheets ( As per clause 1.6)
c. Make of material document
d. Site visits before, during and after completion of
installation till contract period validity.
e. Co ordination with civil, electrical, plumbing and other
vendors related to STP works
f. Co-ordination with consultants
g. Equipment testing, transportation, installation, onsite
testing and commissioning
h. Collection samples at inlet and outlet, monthly once and
submitting for analysis and obtaining certificate from
lab for consultants review
i. Operation manual with trouble shooting techniques
j. Pay back calculations based on M & E cost
k. Running cost as per KL.
1.4 Drawings
AI SATS SEWAGE TREATMENT PLANT
5
The drawings provided with tender are preliminary and area
allotted is fixed. However, the successful vendor will be
required to submit the detailed process and structural
drawings incorporating the thickness of various structural
members. These detailed drawings shall be submitted to
consultants for their comments and approval.
Drawings to be submitted by succeeded vendor,
1. Layout plan at various levels
2. Sections at critical places ( min 5 to 6 sections)
3. Hydraulic flow diagram, showing levels of structure and
water flow
4. Piping layout ( showing colour code, valves, levels of pipes
running and supporting details)
5. Panel layout
6. SLD for panel
7. Wiring layout from panel to equipments showing proper
supports
8. Minimum 2 sections need to be submitted showing
equipment and piping layout.
9. Fabricating equipments detail construction drawing with
construction brief.
AI SATS SEWAGE TREATMENT PLANT
6
1.5 Data sheets
Vendor has to submit all the technical details for equipments
used for operation of plant. Vendor need to submit details of
equipments in the form of data sheet attached in annexure
and necessary supporting manufacturing cut sheets need to
be attached. All fabricating equipments need to be submitted
with drawing and technical detail of material used for
construction and IS codes or standards followed to fabricate
the equipments.
1.6 General Details
a) Supply,erection,testing and commissioning of
interconnecting between various units and equipments as per
approved piping layout including all materials like PVC pipes,
fittings, valves, gaskets, flanges, nuts and bolts including all
materials required for necessary pipe supports and associated
civil works etc complete.
b) Supply, erection, testing and commissioning of all the
equipments required for the sewage treatment plant as per
the individual equipment specification and details given
herewith.
c) Supply, erection, testing and commissioning of all
electrical works including all electrical motors for the various
equipment, cabling. LT panel, starters etc. also includes
coordinating all necessary civil works like construction of
panel foundations, cable trenches, cable supports.
AI SATS SEWAGE TREATMENT PLANT
7
1.7 General
All equipment GA drawings shall be submitted to consultant
for approval prior to fabrication/ placing an order. The
fabricated and brought out equipments shall be inspected at
vendor place by consultant and shall be dispatched to site
only after obtaining clear dispatch instructions in writing from
consultant.
It is obligatory on the part of the intending bidder to visit the
site of work prior to submitting the offer and familiarize
himself with local/site/soil conditions, availability of men,
Materials and Machinery for successful and timely execution
of the works. No extra shall be paid in case vendor fails to
ascertain correct site conditions before submitting the offer.
Any other item not specifically mentioned in this tender but is
essential for proper and successful completion,
commissioning and running of the STP for its commercial
utilisation is also to be included in the scope of contract, such
items shall be highlighted before finalizing contract.
“STP vendor has to coordinate with project management/
builder/client and consultant to establish the plant and to run
the plant successfully.
1.8 DETAILS OF CIVIL WORKS
a) The entire existing tanks presently at site shall be cleaned with
water and some cleaner agents as these same existing tanks itself will be utilized for our present STP of 120 KLD.
AI SATS SEWAGE TREATMENT PLANT
8
b) Oil and Grease Chamber- 1no. It is proposed to construct one no. oil and grease trap of size as indicated in the drawing in RCC M-30 construction with necessary CM plaster finishes with WPC & generally as per the details available in the approved shop drawing.
c) Bar Screen Chamber - 1 no.
It is proposed to construct one no. Bar Screen Chamber of size as indicated in the drawing in RCC M-30 construction with necessary CM plaster finishes with WPC & generally as per the details available in the approved shop drawing.
d) Sludge Holding tank of size as mentioned in the BOQ. The tank shall be in RCC M-30 and as in (b) above.
e) Final Treated water tank of size as mentioned in the BOQ. The tank shall be in RCC M-30 and as in (b) above.
f) Working platform, staircase etc., as required. The work shall be in RCC M-30 and as in (c ) above.
g) Miscellaneous works such as pipe / cable trenches, chambers,
equipment foundations, staircase headroom at entry of STP etc.,
h) Plant Room of size as required.
1.9 LIQUID RETAINING STRUCTURES
The contractor shall take special care for concrete for liquid retaining structures, underground structures and those others specifically called for to guarantee the finish and water tightness. The minimum level of the surface finish for liquid retaining structures shall be that of smooth, dense, well compacted concrete showing well marks of well fitted shuttering joints. Contractor shall make good any blemishes all such structures shall be hydro tested.
AI SATS SEWAGE TREATMENT PLANT
9
The contractor shall include in his price of hydro-testing of structure, all arrangements for testing such as temporary bulk heads, pressure gauges, pumps, pipe lines etc.,
Any temporary arrangements that may have to be made to ensure stability of the structures shall also be considered to have been taken into account while quoting the rates. Any leakage that may occur during the hydro-test or subsequently during the defects liability period or the period for which the structure is guaranteed shall be effectively stopped either by cement/epoxy pressure grouting, grunting or such other methods as may be approved by the Engineer. All such rectification shall be done by the contractor to the entire satisfaction of the Engineer at no extra cost to the Employer.
2. SEQUENTIAL BATCH REACTOR
The Treatment plant comprises of following units: PART A: Civil units 1. Oil and Grease Trap 2. Bar screen Chamber 3. Equalization Tank 4. SBR tank 5. Decant 6. Final treated water tank 7. Sludge Holding tank
PART B: Electromechanical Equipments 1. Raw sewage lift pumps 2. Blowers 3. UPVC/ GI pipes 4. Sludge Transfer Pumps 5. Screw Pumps 6. Mechanical Filter press 7. Diffusers
AI SATS SEWAGE TREATMENT PLANT
10
8. Monobloc filter feed pumps 9. Pressure Sand Filters 10. Activated Carbon Filters 11. Chlorine Dosing system 12. UV treatment
PART A: Civil units
Oil and Grease Trap: Oil and Grease is separated in this chamber and only effluent without oil and grease is allowed to flow for further process Bar screen chamber: This removes foreign materials such as plastic, rag or any other solids/ floating matter along with the incoming effluent. Equalisation Tank: In this compartment air is pumped and the liquid is churned to make a uniform suspension of the particles. SBR Tank: The tank is divided into pre-aeration and main aeration tanks by a baffle wall with openings at the bottom. The sewage flows continuously into the pre-aeration tank, which acts as a biological selector enhancing the growth of the most desirable organisms while limiting the growth of filamentous bacteria. Sewage from pre aeration tank flows through openings at the bottom of the baffle wal l and into the main aeration tank where BOD removal and nitrification occur. After aeration phase, sludge separation occurs in the settling phase. Decant Tank: After settling, the clear water from top is removed through a PLC operated decanter. De-nitrification occurs during anoxic periods of settling and decant phases. The excess sludge is wasted during decant phase. Final Treated water Tank: The SBR treated water is disinfected using Sodium Hypochlorite and filtered through a Pressure Sand Filter, activated carbon filter and finally through UV system. The final treated water will be stored in
AI SATS SEWAGE TREATMENT PLANT
11
the final treated water tank for recycling, for Landscape and for flushing purpose. Sludge Holding Tank: The excess sludge is dewatered using sludge filter press.
PART B: Electromechanical Equipments:
Raw Sewage Lift pumps: Pumps the sewage from Equalisation tank to SBR tank Blowers: Blows the air to diffusers provided in both equalisation tank and in SBR tank UPVC/ GI pipes: Pipe materials used for interconnection piping and for blower piping’s. Sludge transfer Pumps: Transfers the sludge from SBR to Sludge holding tank. Screw pumps: Transfers the sludge from Sludge holding tank to filter press. Mechanical Filter Press: Presses the sludge in the form of cakes so that it can be used as manure. Diffusers: Diffuses the air into tank Monobloc/ Submersible filter feed pumps: Pumps the water from Decant tank to Filter units. Pressure Sand Filter: Removes Suspended impurities Activated Carbon Filter: Removes Odour and Colour Chlorine Dosing system: Acts as disinfectant UV Treatment; Acts as 100% disinfectant killing all bacteria’s.
AI SATS SEWAGE TREATMENT PLANT
12
3. 0 Design of Individual units:
3.1 SS Bar screen chamber: Provide a chamber of size 1.5m
length x 0.5m width x 0.7m height to accommodate an
inclined coarse and fine bar screens. Coarse bar screen shall
be MS bar screen with 5mm thick flats at spacing of 10mm
whereas fine MS bar screen is with 5mm spacing.
2. Equalization tanks capacity : 48000 liters considering
average flow of 20 hours.
3. SBR tank capacity: 84000 liters with Pre aeration tank of
capacity 24000 liters.
4. Calculation of air volume
BOD after treatment < 10mg/liter
BOD5 loading = 350 mg/liter
Total BOD5 load = 120 x 1000 x 350/( 1000000) = 42 kgs/
day
Oxygen required = 42 x 2 = 84 Kgs / day
( 2kgs of oxygen is required for every kg of BOD 5 to be
removed)
% of oxygen in air =0.21; density of air =1.2
Air requirement = 84/0.21= 400/1.2 = 333 cum/day
Air requirement = 24 cum/ hr
Diffuser transfer efficiency @6% /m liquid depth
Considering avg 3.0m liquid depth, effective efficiency =
18%
Air requirement shall be 133 cum/hr ( SBR tank alone)
AI SATS SEWAGE TREATMENT PLANT
13
Considering 50% excess assuming air requirement in the
equalization tank/decant tank etc
Total air required = 200 cum/hr
5. Pressure Sand filter : Considering 12cum/sqm/hr loading
and 12 hours operation of filter ; 1000mm dia filter to be
provided
6. Activated Carbon filter : Considering 12cum/sqm/hr loading
and 12 hours operation of filter ; 1000mm dia filter to be
provided
Chlorination:
The filtered water is further chlorinated through an online
automatic chlorination system with electronic dosing pump
for disaffection. Provide 1 no. 100 liter capacity automatic
chlorinator with electronic metering pump to ensure the
residual chlorine level to be less than 2PPM for disinfection
so that it will not affect plantations.
Treated water tank:
One number of treated water tank of 40 kld capacity to hold
filtered water and to use for flushing and gardening shall be
constructed.
Civil Units and its sizes
Sl.No Name of the Unit Size in m
AI SATS SEWAGE TREATMENT PLANT
14
1 Oil and Grease Chamber 1.5m x 1.3m
2 Bar screen chamber 1.5m x 0.5m x
0.75m
3 Equalisation Tank 3.35m x 3.96 x
3.1m
4 SBR 3.65m x 7.34 x 4.3
5 Decant tank 3.96m x 2.75m x
3.1m
6 Sludge Holding tank 2.45m x 2.3m x 3.1
7 Final treated water tank 4.84m x 2.45m x
3.1m
8 Pumproom/ plant room 2.45m x 10.7m
Mechanical equipments Proposed
Sl.No Item Qty
1 Bar screen ( Coarse + fine ) 1 No.
2 Raw sewage transfer pump 2 Nos. ( 1W + 1S)
3 Air blowers 2 Nos. ( 1W + 1S)
4 Sludge transfer pumps 2 No. ( 1w + 1S)
5 Filter feed pumps 2 Nos. ( 1W + 1S)
6 Pressure Sand filter 1 No.
7 Activated carbon filter 1No.
8 Chlorinator 1 No.
9 Treated water pumps 2 No. ( 1w + 1S)
10 UV system 1 No.
AI SATS SEWAGE TREATMENT PLANT
15
4.0 DETAILS OF PIPING WORK
Following piping works including excavation, back filling, masonry / structural pipe supports, puddle flanges, concrete bedding, pipe specials and GM D/F Valves of LEADER (or approved CI valves or approved equivalent make only and or CI D/F Valves of KIRLOSKAR / LEADER make only are all included in the scope of contract. The quantity and sizes of the pipes are indicative, the contractors to quote for the designed sizes of the pipes.
80 dia PVC Pipe recommended make from screen chamber to
equalization tank appx. 100 NB dia PVC pipe recommended make Wherever the necessary piping work should be carried out with
required dia etc complete.
5.0 Equipment Specification
a) MS Bar screen
Type : Manually cleaned with hand rake
Construction : MS flats of 5mm thick with
spacing 10mm c/c for coarse and
5mm c/c for fine.
b) Raw Effluent pumps
Flow and Head : 15 cum/hr at 12 m head
Type : Vertical Submersible type pumps
Motor : Built in Vortex pump
AI SATS SEWAGE TREATMENT PLANT
16
Material of construction : CI Body and impeller
c) Diffusers
Fine pore Diffusers :67mm dia x 1000mm long PVC
10kg/sqcm slotted pipes with
threaded end caps, SS clamps and
earclips, braided PVC air hoses and
nylon hoisting ropes.
Coarse Bubble Diffusers : 80mm dia x 800mm PVC
10kg/sqcm slotted pipes with
threaded end caps, SS clamps and
earclips, braided PVC air hoses and
nylon hoisting ropes.
d) Air blowers
Flow and Head : 200 cum/hr at 0.5 kg/sqcm
Type : Twin lobe compressor
e) Return Sludge pumps
Duty : 10 cum/hr @ 10m head
Type : Horizontal centrifugal non clog
self priming, open impeller
Motor : TEFC motor IP 55 rating,
protection and suitable for 400/
440V, 50 Hz AC supply
MOC : CI body and Impeller
AI SATS SEWAGE TREATMENT PLANT
17
Accessories : Air cock with priming funnel,
flexible coupling with guard, base
frame, foundation bolts etc.
f) Filter feed pumps
Duty : 10 cum/hr @ 30m head
Type : Horizontal centrifugal non clog
self priming, open impeller
Motor : TEFC motor IP 55 rating,
protection and suitable for 400/
440V, 50 Hz AC supply
MOC : CI body and Impeller
Accessories : Air cock with priming funnel,
flexible coupling with guard, base
frame, foundation bolts etc.
g) Pressure Sand Filter
Material : FRP
Under drain : Perforated bottom plate with
plastic strainers or central headers
and laterals
Media : Graded River sand and gravel
h) Activated carbon Filter
AI SATS SEWAGE TREATMENT PLANT
18
Material : FRP
Under drain : Perforated bottom plate with
plastic strainers or central headers
and laterals
Media : Activated carbon with gravel
support
i) Multi stage screw pump
Duty : 1 cum/hr @ 60m head
Motor : TEFC motor IP 55 rating,
protection and suitable for 400/
440V, 50 Hz AC supply
MOC : CI body and Impeller, alloy steel
rotating parts
j) Filter Press
Type : Automatic hydraulic closing
mechanism as per BOQ
6.0 SITE CONDITIONS
Temperature : Maximum 380C Humidity : Minimum …60% at 300C Existing Units : 1 No.
AI SATS SEWAGE TREATMENT PLANT
19
7.0 SITE CLEARANCE AND CLEANUP
The contractor shall, from time to time clear away all the debris and
excess materials accumulated at site.
After the equipment and appliances have been installed and
commissioned, contractor shall clear-up the same and remove all
plaster, paint stains, stickers and other foreign matter of discolouration
leaving the same in a ready to use condition.
On completion of all the works, contractor shall demolish all the
temporary structures, remove all surplus material on written
permission of the Engineer, and leave the site in a room clean
condition.
8.0 EXECUTION OF WORK
The work shall be carried out in conformity with the approved drawings
and within the requirements of architectural, electrical and other
specialized services drawings.
The contractor shall co-operate with all trades and agencies working
on the site. He shall make provision for hangers, sleeves, structural
openings and other requirements well in advance to prevent hold up or
progress of the construction programme. Any work done without
regard (or) consultation with other trades, shall be removed and
rectified by the contractor without additional cost to the Employer.
On award of the work, contractor shall submit a construction
programme in the form of a PERT chart or Bar chart for approval of the
AI SATS SEWAGE TREATMENT PLANT
20
Engineer. All dates and time schedule agreed upon shall be strictly
adhered to, within the stipulated time of completion/commissioning.
The contractor shall be responsible for complete installation of sewage
treatment plant as per approved drawings and as per the latest BIS
codes of practice.
Execution of work by the contractor includes complete installation of
equipments, plant internal & external interconnected piping works,
controllers, valves and power control wiring for controller etc.
It is the responsibility of the contractor to protect all the installed plant
equipments until the time of handing over to the EMPLOYER.
The Contractor shall set out the plant in accordance with the Drawings
and instructions of the Engineer. The contractor shall be responsible
for the correctness of the above and any incorrectness shall be
rectified at his own cost. He will be responsible for taking levels at site
before setting out and putting them on record without extra charge.
The contractor shall provide at all times during the progress of the
works and during maintenance period proper facilities and necessary
attendance for inspection or measurement of the works by the
Engineer or their representatives.
AI SATS SEWAGE TREATMENT PLANT
21
9.0 MANUFACTURERS’ INSTRUCTIONS
Where manufacturers have furnished specific instructions relating to
the materials used in this job and methods of construction that are not
specifically mentioned in these documents, such instructions shall be
followed in all cases. The contractor shall also furnish detailed
instruction and operation manuals in triplicate including detailed
completion drawings on a tracing paper to an approved scale. Further
it is the responsibility of the contractor to train the EMPLOYER's
personnel in the operation and maintenance of the system.
10.0 MATERIALS
Materials shall be of approved make and quality specified. They shall
conform to the respective Bureau of Indian Standards, British
Standards Specifications and supported by Manufacturing Certificate /
test certificate.
Samples of all materials shall be as per the first choice of the list of
approved brand manufacture, the sample of which shall be approved
by the Engineer before placing the order.
In any case of non-availability of materials in metric sizes, the nearest
size of FPS units shall be provided with prior approval of the Engineer
at no extra cost to the Employer.
Colour code shall be used to identify pipe material. The CONTRACTOR
shall be able to identify on request all random piping prior to any field
installation.
As far as possible materials bearing I.S. certification marks shall be
used with the approval of the Engineer.
AI SATS SEWAGE TREATMENT PLANT
22
Unless otherwise specified and expressly approved in writing by the
Engineer, materials of makes and specifications mentioned in this
document/BOQ shall be used.
The CONTRACTOR shall furnish two (2) copies of certificates for –
Sizes of all fittings, G.A. drawings of pumps and equipments and
Hydrostatic test.
Samples of all materials shall be got approved before placing
order and the approved samples shall be deposited with the
Engineer.
If directed, materials shall be tested in an approved testing
laboratory and the contractor shall produce the test certificate in
original to the Engineer and the entire charges for original as
well as repeated tests shall be borne by the Contractor. If
required by the Engineer, the Contractor shall arrange to test
portions of the work at his own cost in order to prove their
soundness and efficiency. If after any such test the work or
portions of work is found in the opinion of the Engineer, to be
defective or unsound, the Contractor shall pull down and re-do
the same at his own cost. Defective materials shall be removed
from site.
It shall be obligatory for the Contractor to furnish certificates if
demanded by the Engineer from manufactures or materials suppliers
that the work has been carried out by using their material and
installed/fixed as Per their recommendations
AI SATS SEWAGE TREATMENT PLANT
23
Cement: Cement required for the plumbing work shall be supplied to
the Contractor through the Civil Contractors. However, the contractor
will have to make his own arrangement to lift the cement from the go-
down to the site. Cost of cement issued will be recovered from
contractor.
Cement shall be stored in weather proof shed with raised wooden
plank flooring to prevent deterioration by dampness or intrusion by
foreign matter.
Sand: Sand shall be clean, free from silt, clay, loam, shells, vegetable
matter and shall be approved by the Engineer.
Coarse Aggregate: Shall be angular, tough, sharp and well graded
stone metal, Basalt from approved source.
Bricks: Bricks shall be local best quality obtainable and shall be table
moulded. Well burnt, but not over burnt and shall be free from cracks,
chips, flaws, and stones. It shall not absorb water more than 20% of
its own weight when dry. The crushing strength of bricks shall not be
less than 35 kg./sq.cm.
Cement Concrete: P.C.C shall be of the proportion specified in the
particular item in the schedule of quantities. Sand and Metal shall be
measured in suitable measuring boxes and correct quantity of cement
shall be added. The materials shall be mixed dry on a clean platform.
Clean water is then added, and mixed thoroughly. It shall be
prepared in such quantity as can be readily used up. P.C.C which has
AI SATS SEWAGE TREATMENT PLANT
24
partially set shall under no circumstances be used and shall be
removed away from the site.
Reinforced Steel: Reinforced steel shall be ribbed torsteel. Steel
required for plumbing work shall be supplied to the Contractor Free of
Cost' through Civil Contractor. However the Contractor shall make his
own arrangements to lift the steel from the go-down to the site.
11.0 PIPE HANGERS, SUPPORTS, CLAMPS, BRACKETS ETC.
GENERAL: Provided proper solid angle iron/channel section, supports for all pipes
complete with clamps. Wherever comes, provided wooden guide to
support pipe on the angle iron hangers/supports. For attachment in
concrete, use Hi-Tech fasteners or anchor plug type inserts of
equipment. Provide hangers with in 900 mm of all changes in direction
of pipes. A minimum of three hangers per expansion band wherever
shown in drawing.
Provided all additional structural steel angles, channels of the members
whether specifically shown or not but are required for proper support.
Where necessary additional hangers to be provided to arrest water
hammers or hydraulic resonance with proper rubber padding.
Space hangers as noted below, except on all soil pipes which shall have
a hanger of multiple fittings.
AI SATS SEWAGE TREATMENT PLANT
25
Sufficient hangers shall be provided to maintain proper slope without
sagging. In case of angle suspended line, the following is suggested.
Standard sizes of Hanger rods
Sl.No Pipe Sizes Hanger Rod Dia.
1 20mm to 50 mm 6 mm
2 65mm to 125 mm 10 mm
3 60mm and above 15 mm
Standard spacing of supports for pipes.
Sl.No Pipe size Spacing of
supports
1 15mm to 40 mm 1.0 m apart
2 50mm and above 1.5 m apart or as per
IS
Provide floor stands, wall brackets of masonry pillars etc. for all lines
running near the floor or near walls for those lines which cannot be
properly supported or suspended from the walls or floors. Pipe lines
near concrete or masonry walls may be hung also by hangers carried
AI SATS SEWAGE TREATMENT PLANT
26
from wall brackets at a higher level than pipes. Hanging of any pipe
from another pipe is prohibited.
Band type hangers shall be provided. Hot water piping is to be
provided with suspended supports as far as possible. Note that
straphangers are not permitted and clamps should be of removable
type.
All vertical pipes shall be fixed by M.S. galvanised Clamps truly
vertical.
Inclined pipes running along ceiling shall be fixed on M.S adjustable
hangers of special design as directed. Pipes shall be laid to uniform
slope and the hangers adjusted to the proper levels so that the pipes
fully rest on them.
Structural clamps shall be fabricated from M.S. structural members
e.g. rods, angles, channels, flats as per detailed drawing or as
directed. Contractor shall provide all nuts, bolts, welding and paint the
clamps with two coats of zinc chromate primer and two coats of
approved enamel paint. Wooden saddles shall be provided free of
cost.
Slotted angle/channel supports on walls shall be provided wherever
shown on drawings or as required. Angles/channels shall be fixed to
brick walls and bolts embedded in cement concrete blocks and to RCC
walls with suitable anchor fasteners. Holes required in RCC walls shall
be neatly drilled by electric drills and no manual chiselling will be
allowed. The spacing of supports horizontally shall not exceed 1.8 M.
Wherever M.S. clamps are required to be anchored directly to brick
walls, concrete slabs, beams or columns, nothing extra shall be
payable for clamping arrangement and for making good with cement
concrete 1:2:4 as directed by the Engineer.
AI SATS SEWAGE TREATMENT PLANT
27
12.0 INSERTS AND SLEEVES Layout work in advance of placing of concrete slabs or construction of
walls, furnish and set inserts and sleeves necessary to complete the
work. Cost of cutting or patching made necessary as a result of this
operation shall be at no expense to the Employer Opening shall be as
per structural Engineers approval.
13.0 SITE FACILITIES An open area shall be made on the plot to enable the contractor to put
up the site office and store at his own cost.
Water supply will be provided by EMPLOYER at one point during the
construction period and the necessary piping shall be done by the
contractor to the required point at his own cost.
Electric power supply will be provided at by the EMPLOYER at one
point. The contractor can use the electricity on chargeable basis by
providing a energy meter at his own cost.
14.0 DETAILS OF ELECTRICAL WORKS
The electrical works for STP is comprising of supply of STP panel with
required incomer and outgoing feeder to drive all the motors of the
system with each type as spare feeder. The starter shall be of Type-2
co-ordination. The STP panel shall be provided with voltmeter,
ammeter and energy meter. The client shall make arrangement for
incoming power supply only. In addition industrial sockets of 63A shall
be provided within the pumproom and one outside the STP ( outdoor
type) for maintenance purpose. Required feeder for the above shall be
provided in the STP panel. Earthing as per IS-3043 for the systems
cable trays and lighting ( outdoor and Indoor) shall be provided. The
AI SATS SEWAGE TREATMENT PLANT
28
STP shall be integrated with level switches of the respective tanks for
auto ON/OFF. Auto/ Manual switch shall also be provided for each
starter. All cables from STP-panel to various pumps, sockets, lighting (
external and internal) are to be covered by STP contractor.
15.0 TEST/TRIAL RUNNING AND COMMISSIONING
The Contractor shall have to test each equipment used for the plant for
atleast 72 hours continuous running with designed load and to the full
satisfaction of Engineers. Any defects found, has to be rectified by the
contractor at his own cost immediately and within reasonable time to
be decided by client.
Necessary Instruments, Gauges, Labour/Supervisory Staff,
Laboratory analysis etc., are to be furnished/provided by the
Contractor free of any cost to client.
16.0 COMMISSIONING/HANDING OVER
During trial runs as described above, the Contractor shall satisfy
Engineer in all respects regarding the satisfactory quality of effluent,
quality of materials, equipments and workmanship used in the plant.
Only after satisfying itself/ himself regarding the above points, client
will takeover the plant and such date of taking over shall be deemed
as date of commissioning for all purposes, guarantees, and payment
terms mentioned elsewhere in this tender. The guarantee period
described elsewhere in the tender shall start from the date of
commissioning.
AI SATS SEWAGE TREATMENT PLANT
29
17.0 (i) GUARANTEE
The under mentioned clauses shall govern in case of any contrary
provisions given elsewhere in the document.
Manufacturer's Guarantees
The manufacturer's guarantee for design, workmanship and
performance for all bought out items shall be made available to the
owner and shall be valid atleast for the entire defects liability period.
In the event of failure of any particular equipment which fails more
than three items during the guarantee period as mentioned in clause
below, the contractor shall replace at his own cost that equipment.
Manufacturer's/Contractor's guarantee, as mentioned in clause
above,for such replaced equipment shall also be made available to
the Owner and should be kept atleast for one year from the date of
last replacement.
(ii) Performance Guarantee
The Contractor shall give guarantee for a period of one year from the
date of successful commissioning of the treatment plant against
design, defective materials, workmanship, performance and
guaranteed effluent quality. In the event the commissioning of the
plant is not possible due to non-availability of effluent, contractor shall
be issued mechanical completion certificate by client/Engineer
provided each equipment is tested satisfactorily as directed by
Engineer. However, the contractor shall have to maintain the plant at
AI SATS SEWAGE TREATMENT PLANT
30
his own cost, in such a case for a period for three months beyond
which period, if he is required to maintain further, he will be paid extra
at mutually agreeable rate. However, testing and commissioning of
the plant shall be carried out by the Contractor during the Defects
Liability Period. Any defects found in the workmanship, materials or
performance of the plant shall be made good by the Contractor at
his own expense within the time specified by client/Engineer.
For this purpose, the retention amount will be as follows:
10% of the total value of Contract shall be retained and also treated as
performance guarantee. The Successful Tenderer as per general
conditions of contract shall be retained till the completion of
satisfactory commissioning as stated above. The contractor at his own
expense shall start and commission, the plant and prove that it is
giving satisfactory service and desired characteristic of the treated
effluent, for two months before handing over the plant to the Owner.
During this, the contractor shall train the Owner’s operational stall
without any extra cost to the Owner. The Contractor shall also have to
guarantee the quality of the treated final effluent to meet the
specification mentioned already. In case the quality of treated effluent
varies from what is required, the contractor shall rectify the plant at no
extra cost so as to achieve the requisite performance guarantee and
satisfactory commissioning of the plant to the client/Engineer. In Case
the contractor fails to achieve any of the aforesaid guarantees he will
be penalised by an amount upto 10% (ten percent) of the total
contract value. For this purpose any money due to the contractor shall
be forfeited and adjusted against such penalty.
AI SATS SEWAGE TREATMENT PLANT
31
The contractor shall furnish the figures for average daily consumption
of nutrients / Chemicals, if any.
All the above guarantees will be based on collection and analysis of
samples as mentioned in clause below.
Oxygenation Capacity of Diffusers.
The contractor, if directed by Engineer, shall at his own cost prove the
Oxygenation capacity guaranteed by him for the diffusers provided by
conducting Oxygenation capacity tests on the unit by any standard and
internationally recognized method to be approved by the Engineers.
18.0 MECHANICAL GUARANTEES
The Contractor shall guarantee for a period of one year for the failure
of any particular part of the equipment. In the event of failure of any
particular part of the equipment more than three times during the
guarantee period, it shall be replaced by the Contractor. In case it is
found that the above mentioned failure is due to some other connected
part of the equipment, that part shall also be rectified or replaced by
the contractor to avoid such failures in the future. The guarantee
for such replaced parts shall be extended by one year from the date
of last replacement.
19.0 COLLECTION AND ANALYSIS OF SAMPLES
The guaranteed effluent shall be based on complete analysis of
samples collected after stabilization of the plant.
AI SATS SEWAGE TREATMENT PLANT
32
20.0 ANNUAL MAINTAINANCE
The contractor shall quote separately for comprehensive Annual
Maintenance Contract (including all consumables and labour) for full
Three (03) years period after the Defect Liability Period (DLP). The
contractor shall bear the full responsibility for all kinds of maintenance
that includes periodic maintenance and all the consumables etc.,
Qualified personnel shall be posted on the site on shift basis, to take
the sampling and carryout the tests. A complete record has to be
maintained for all the tests carried out at regular intervals.
One operator per shift and one supervisor during general shift based
on 2 shifts/day shall be posted. The senior chemist of the contracting
firm shall visit atleast once a week for monitoring plant operation.
Min. 2 nos. Raw Effluent and 2 nos. Treated Effluent samples per
month shall be collected and got analyzed at the Board approved
Laboratory. Also one Senior Mechanical Technician shall visit the plant
for inspection and supervision of maintenance of all equipments.
21.0 DATA SHEET
Filters
Material
Capacity FRP
Design flow 10 cum/hr
Size of inlet/ Outlet
AI SATS SEWAGE TREATMENT PLANT
33
Type of vessel Vertical
Dia of vessel
Design Pressure
Height
Dished end thickness
Shell thickness
Corrosion allowance
Dia of man way
Internal protection Epoxy coating
External protection Epoxy coating
Filtering Media
Material Cum vol Layer Thickness Size Uniformity
Co-
efficient
AI SATS SEWAGE TREATMENT PLANT
34
Valves to be supplied by the filter supplier shall be furnished in the
following table:
Chemical dosing unit with metering pump tank
Capacity in litre : 100 litre
Diameter :
Height :
Sl.No Dia Type Make Number Material Applicable
code
AI SATS SEWAGE TREATMENT PLANT
35
Design flow :
Chemicals required at :
Holding period :
Dia of inlet :
Dia of outlet :
Dia of drain :
Material of construction
Tanks :
Valves :
Piping :
Metering Pump
Make :
Model No :
Construction detail :
Duty conditions :
Accessories included
with pump :
NOTE:
1) All information to be filled by supplier
AI SATS SEWAGE TREATMENT PLANT
36
2) This data sheet to be filled for each unit separately
Raw Pump
Make :
Type :
Flow rate : As per BOQ
Material :
Casing :
Impeller :
Seal :
Motor Electrical Supply : 400/440v, 50 hz, 3 phase
RPM :
Enclosure :
Class of Induction :
Return Sludge pumps
Make :
Type :
Flow rate : As per BOQ
Material :
Casing :
AI SATS SEWAGE TREATMENT PLANT
37
Impeller :
Seal :
Motor Electrical Supply : 400/440v, 50 hz, 3 phase
RPM :
Enclosure :
Class of Induction :
Filter feed pumps
Make :
Type :
Flow rate : As per BOQ
Material :
Casing :
Impeller :
Seal :
Motor Electrical Supply : 400/440v, 50 hz, 3 phase
RPM :
Enclosure :
Class of Induction :
ANNEXURE-A
AI SATS SEWAGE TREATMENT PLANT
38
Project Building Client Contractor NON tendered Iten no: Reference drg. No Issued by Revision no: Dated Location Unit Rate claiming Appx. Quantity
Detailes Specification
Why Non Tendered item
Orally In writing Date
Authorized by
Status of Non Tendered item
a) Executed quantity
b) Work in progress
Quantity executed
AI SATS SEWAGE TREATMENT PLANT
39
Balance Quantity
c) To be executed
Approximate Quantity
Contractors Signature
LIST OF RECOMMENDED MAKES
SEWAGE TREATMENT PLANT
1a I. Galvanised Pipes 1 Tata 2 Jindal
1b ii GI fittings 1 R Brand (ISI) 3 Unik
2 Zoloto
1c CPVC pipes 1 2
Astral Ashirvad
3 Ajay
1d CPVC fittings 1 2
Astral Ashirvad
3 Ajay
2 Gate valves/Non-return
1 Leader 3 Audco
Valves 2 Zoloto
3 Butterfly valves 1 Inter Valve 3 Audco
2 Leader
4 Foot valves 1 Leader 3 Audco
AI SATS SEWAGE TREATMENT PLANT
40
2 Zoloto
5 Pumps 1 As mentioned in technical specification
6 ACB/MCCB/SFU/LBS
1 Merlin Gerin/ 3 Siemens
2 ABB
7 Contactors/ ORLS 1 Tele Mechanique 3 Siemens
2 ABB
8 MCB/ELCB 1 Merlin Gerin 2 MDS
3 Indo Asia
9 MCB DB 1 Merlin Gerin 3 Indo Asia
2 MDS
10 Digital Meters 1 AE 2 MECO
3 ENERCON
11 Kwh/MDM/MDC Meters
1 AE 2 ENERCON
3 L & T
12 LED Indicating Lamps/ PBS
1 TEKNIC 2 VAISHNO
3 Siemens
13 SELECTOR Switches
1 KAYCEE 2 SALZER
14 LIGHT Fixtures & Motion Detectors
1 Philips 2 Wipro
15 Switches/ Sockets( MODULAR) outlets in metal boxes
1 Anchor Roma 2 MDS Mosaic
16 Manhole PVC steps 1 Southern Concrete Industries
2 Approved Equivalent
17 CI manhole frame & 1 Neco 2 Bengal iron castings
AI SATS SEWAGE TREATMENT PLANT
41
Cover
18 PVC pressure pipes 1 Astral
(schedule 40) & fittings
2 Supreme
19 Water meters 1 Dash - Mesh 3 Anand Asahi
2 BHEL 4 Capstan
20 Y Strainer 1 Zoloto 3 Audco
2 Leader
21
Motors
1
NGEF
2 Crompton Greaves 3 Siemens