  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    1/68

     

    Hkkjr ljdkj  Government Of India 

    jsy ea=ky;  Ministry Of Railways 

    ¼jsyos cksMZ½  (Railway Board)

    Indian Railways

    Standard

    General Conditions Of Contract

    July 2014

    New el!i

    Engineering Department 

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    2/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1

    Indian Railways

    STANDARD GENERAL CONDITIONS OF CONTRACT

    JULY 2014

    I N D E X

    PART - I

    REGULATIONS FOR TENDERS AND CONTRACTS

    Para Subjec Pa!e

    I"#e$ 1

    1! %ea"&"! O' Ter() "

    1!1 Inter#retation "

    1!2 $efinition "

    1!3 Sinular And Plural %

    Cre#e"&a*) O' C+"rac+r) %

    2! A##lication &or Reistration %

    3! 'ender &or(s )

    4! O(ission And $iscre#ancies )

    *! +arnest ,oney )

    "! Care In Su-(ission Of 'enders )

    C+")era&+" O' Te"#er) .

    %! Riht Of Railway 'o $eal /ith 'enders .

    %A! 'wo Pacets Syste( of 'enderin .

    C+"rac D+cu(e") .

    )! +ecution Of Contract $ocu(ents .

    .! &or( Of Contract $ocu(ents 10

     A""e$ure) , 11

     AnneureI 'ender &or( 11

    &irst Sheet 11

    Second Sheet 12

    'hird Sheet 1*

     AnneureII Aree(ent &or one Contract 1"

     AnneureIII /or Order 5nder one Contract 1%

     AnneureI6 &or( &or Contract Aree(ent Of /ors 1.

     Anneure6 /or Order &or /ors 7 Contractor8s Aree(ent 20

     Anneure6I /or Order &or /ors 7 Schedule of Rates 22

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    3/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2

    PART - II

    STANDARD GENERAL CONDITIONS OF CONTRACT

    Para Subjec Pa!e

    1! De'&"&&+") A"# I"errea&+" 23

    91: $efinitions 23

    92: Sinular And Plural 24

    93: ;eadins And ,arinal ;eadins 24

    Ge"era* Ob*&!a&+") 24

    2! +ecution< CoRelation And Intent Of Contract $ocu(ents 24

    3! 91: =aw Go>ernin 'he Contract 2*

    92: Co(#liance 'o Reulations And ?ye=aws 2*

    4! Co((unication 'o ?e In /ritin 2*

    *! Ser>ice Of @otices On Contractors 2*

    "! Occu#ation And 5se Of =and 2*

    %! Assin(ent Or Su-=ettin Of Contract 2*

    )!  Assistance ?y 'he Railway &or 'he Stores 'o ?e O-tained ?y 'heContractor

    2*

    .! Railway Passes 2*

    10! Carriae Of ,aterials 2"

    11! 5se Of ?allast 'rain 2"

    12! Re#resentation On /ors 2"

    13 Relics And 'reasures 2"

    14! +ca>ated ,aterial 2"

    1*! Inde(nity ?y Contractors 2"1"! 91: Security $e#osit 2"

    92: Reco>ery Of Security $e#osit 2"

    93: Interest On A(ount 2%

    94: Perfor(ance Guarantee 2%

    1%! &orce ,aeure Clause 2)

    1%A! +tension Of 'i(e In Contracts 2.

    9i: +tension $ue 'o ,odification 2.

    9ii: +tension &or $elay @ot $ue 'o RailwayBContractor 2.

    9iii: +tension Of 'i(e &or $elay $ue 'o Railway 2.

    1%?! +tension Of 'i(e &or $elay $ue 'o Contractor 30

    1)! 91: 92: Illeal Gratification 30

    E$ecu&+" O' .+r/) 30

    1.! 91: ContractorDs 5nderstandin 30

    92: Co((ence(ent Of /ors 31

    93: Acce#ted Prora((e Of /ors 31

    94: Settin Out Of /ors 31

    20! 91: Co(#liance 'o +nineerDs Instructions 31

    92: Alterations 'o ?e Authorised 31

    93: +tra /ors 31

    94: Se#arate Contracts In Connection /ith /ors 31

    21! Instructions Of +nineerDs Re#resentati>e 32

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    4/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 3

    Para Subjec Pa!e

    22! 91: Adherence 'o S#ecification And $rawins 32

    92: $rawins And S#ecifications Of 'he /ors 32

    93: Ownershi# of $rawins And S#ecifications 32

    94: Co(#liance /ith ContractorDs ReEuest &or $etails 329*: ,eanin And Intent Of S#ecifications And $rawins 32

    23! /orin $urin @iht 32

    24! $a(ae 'o Railway Pro#erty Or Pri>ate =ife And Pro#erty 32

    2*! Sheds< Stores;ouses And Fards 33

    2"! Pro>ision Of +fficient And Co(#etent Staff At /or Sites ?y Contractor 33

    2"A! $e#loy(ent Of ualified +nineers At /or Sites ?y Contractor 33

    2%! 91: /or(anshi# And 'estin 33

    92: Re(o>al Of I(#ro#er /or And ,aterials 34

    2)! &acilities &or Ins#ection 34

    2.! +a(ination Of /ors ?efore Co>erin 5# 34

    30! 'e(#orary /ors 34

    31! 91: Contractor 'o Su##ly /ater &or /ors 34

    92: /ater Su##ly &ro( Railway Syste( 34

    93: /ater Su##ly ?y Railway 'rans#ort 3*

    94: 9A: Contractor 'o Arrane Su##ly Of +lectric Power &or /ors 3*

    9?: +lectric Su##ly &ro( 'he Railway Syste( 3*

    32! Pro#erty In ,aterials And Plants 3*

    33! 91: 'ools< Plant And ,aterials Su##lied ?y Railway 3*

    92: ;ire Of Railway Plant 3*

    34! 91: Precautions $urin Proress Of /ors 3*

    92: Roads And /ater Courses 3"

    93: Pro>ision Of Access 'o Pre(ises 3"

    94: Safety Of Pu-lic 3"

    3*! 5se Of +#losi>es 3"

    3"! 91: 92: Sus#ension Of /ors 3"

    93: Sus#ension =astin ,ore 'han 'hree ,onths 3"

    3%! Rates &or Ite(s Of /ors 3%

    3)! $e(urrae And /harfae $ues 3%

    3.! Rates &or +tra Ite(s Of /ors 3%

    40! 91: ;andin O>er Of /ors 3%

    92: Clearance Of Site On Co(#letion 3) ar&a&+") I" E$e" O' C+"rac 3)

    41! ,odification 'o Contract 'o ?e In /ritin 3)

    42! 91: 92: Power Of ,odifications 'o Contract 3)

    93: 6aluation Of 6ariations 3)

    94: 6ariations In uantities $urin +ecution Of /ors Contracts 3.

    43! Clai(s 40

    91: ,onthly State(ent Of Clai(s 40

    92: Sinin Of 8@o Clai( Certificate8 40

    %ea)ure(e" Cer&'&cae) A"# Pa(e") 40

    44! uantities In Schedule Anneed 'o Contract 404*! ,easure(ents Of /ors 40

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    5/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 4

    Para Subjec Pa!e

    4"! 91: HOn Account Pay(ents 41

    92: Roundin Off A(ounts 41

    93: HOn Account Pay(ents @ot Preudicial 'o &inal Settle(ent 41

    94: ,anner Of Pay(ent 414"A! Pr&ce ar&a&+" C*au)e 3PC 41

    1! A##lica-ility 41

    2! ?ase ,onth 41

    3! 6alidity 42

    4! to "! Co(#onents Percentaes 42

    %! to .! &or(ulae etc! 42

    10! Price 6ariation $urin +tended Period Of Contract 4*

    4%! ,aintenance Of /ors 4*

    4)! 91: Certificate Of Co(#letion Of /ors 4"

    92: Contractor @ot A-sol>ed ?y Co(#letion Certificate 4"

    4.! A##ro>al Only ?y ,aintenance Certificate 4"

    *0! 91: ,aintenance Certificate 4"

    92: Cessation Of Railway8s =ia-ility 4"

    93: 5nfulfilled O-liations 4"

    *1! 91: &inal Pay(ent 4%

    92: Post Pay(ent Audit 4%

    *1A! Production Of 6ouchers +tc! ?y 'he Contractor 4%

    *2! /ithholdin And =ien In Res#ect Of Su(s Clai(ed 4%

    *2A! =ien In Res#ect Of Clai(s In Other Contracts 4)*3! Sinature On Recei#ts &or A(ounts 4)

    Lab+ur 4.

    *4! /aes 'o =a-our 4.

    *4A! A##rentices Act 4.

    **! Pro>isions Of Pay(ents Of /aes Act 4.

    **A! Pro>isions Of Contract =a-our 9Reulation And A-olition: Act< 1.%0 4.

    **?! Pro>isions of +(#loyees Pro>ident &und and ,iscellaneous Pro>isions Act< 1.*2

    *0

    **C! Pro>isions of 'he ?uildin and Other Construction /orers 9R+CS: Act<

    1.." and 'he ?uildin and Other Construction /orers8 /elfare Cess Act< 1.."

    *0

    *"! Re#ortin Of Accidents *0

    *%! Pro>ision Of /or(enDs Co(#ensation Act *0

    *%A! Pro>ision Of ,ines Act *1

    *)! Railway @ot 'o Pro>ide uarters &or Contractors *1

    *.! 91: =a-our Ca(#s *1

    92: Co(#liance 'o Rules &or +(#loy(ent Of =a-our *1

    93: Preser>ation Of Peace *1

    94: Sanitary Arrane(ents *1

    9*: Out-rea Of Infectious $iseases *2

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    6/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae *

    Para Subjec Pa!e

    *.! 9": 'reat(ent Of ContractorDs Staff In Railway ;os#itals *2

    9%: ,edical &acilities At Site *2

    9): 5se Of Intoicants *2

    9.: @on+(#loy(ent Of &e(ale =a-our *2910: Restriction On 'he +(#loy(ent Of Retired +nineers Of Go>t!

    Ser>ices /ithin 'wo Fears Of 'heir Retire(ent*2

    "0! 91: @on+(#loy(ent Of =a-ourers ?efore 'he Ae Of 1* Fears *2

    92: ,edical Certificate Of &itness &or =a-our *2

    93: Period Of 6alidity Of ,edical &itness Certificate *3

    94: ,edical Re+a(ination Of =a-ourer *3

    Deer(&"a&+" O' C+"rac *3

    "1! 91: Riht Of Railway 'o $eter(ine Contract *3

    92: Pay(ent On $eter(ination Of Contract *3

    93: @o Clai( On Co(#ensation *3

    "2! 91: $eter(ination Of Contract Owin 'o $efault Of Contractor *3

    92: Riht Of Railway After Rescission Of Contract Owin 'o $efault OfContractor

    **

    Se*e(e" O' D&)ue) **

    "3! ,atters &inally $eter(ined ?y 'he Railway **

    "4! 91: $e(and &or Ar-itration *"

    92: O-liations $urin Pendency Of Ar-itration *"

    93: A##oint(ent Of Ar-itrator *"

    94:< 9*:< 9": 9%: Ar-itral Award General *)

    "*!

    J+&" e"ure 3J F&r() I" .+r/) Te"#er) *)

    Partici#ation Of Joint 6enture 9J6: &ir(s In /ors 'ender *)1! to 4! Identity ,e(-ers of J6 &ir( *)

    *! +arnest ,oney $e#osit 9+,$: *)

    "! =ead ,e(-er *)

    %! to 11! Constitution of J6 and ,O5 -y J6 ,e(-ers *)

    12! J6 Aree(ent *.

    13! 14! Authorised ,e(-ers *.

    1*! $ocu(ents 'o ?e +nclosed Alonwith 'ender *.

    1"! Credentials ualifyin Criteria 'echnical +lii-ility Criteria and&inancial +lii-ility Criteria

    "0

     A""e$ure) , "2

     Anneure6II Profor(a &or 'i(e +tension "2

     Anneure6III Certificate Of &itness "3

     AnneureIK Profor(a Of % $ays8 @otice "4

     AnneureK Profor(a Of 4) ;rs! @otice "*

     AnneureKI Profor(a Of 'er(ination @otice ""

    Reister Of Correction Sli#s "%

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    7/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae "

    PART-I

    REGULATIONS FOR TENDERS AND CONTRACTS

    FOR T5E GUIDANCE OF ENGINEERS 6 CONTRACTORS FOR .OR7S CONTRACTS

    %EANING OF TER%S

    181  I"errea&+" , 'hese Reulations for 'enders and Contracts shall -e read inconunction with the Standard General Conditions of Contract which are referred to herein andshall -e su-ect to (odifications additions or su##ression -y s#ecial conditions of contract andBors#ecial s#ecifications< if any< anneed to the 'ender &or(s!

    182 De'&"&&+" ,  In these Reulations for 'enders and Contracts the followin ter(s shallha>e the (eanins assined hereunder ece#t where the contet otherwise reEuires!

    9a: Railway shall (ean the President of the Re#u-lic of India or the Ad(inistrati>e Officers

    of the Railway or Successor Railway authoriLed to deal with any (atters< which these#resents are concerned on his -ehalf!

    9-: General ,anaer shall (ean the OfficerinChare of the eneral su#erintendence andcontrol of the onal RailwayBProduction 5nits and shall also include the General ,anaer9Construction: and shall (ean and include their successors< of the Successor Railway!

    9c: Chief +nineer shall (ean the Officer in chare of the +nineerin $e#art(ent ofRailway and shall also include the Chief +nineer 9Construction:< Chief +lectrical+nineer< Chief +lectrical +nineer 9Construction:< Chief Sinal 'eleco( +nineer<Chief Sinal 'eleco( +nineer 9Construction: and shall (ean and include theirsuccessors of the Successor Railway!

    9d: $i>isional Railway ,anaer shall (ean the Officer in chare of a $i>ision of the onal

    Railway and shall (ean and include the $i>isional Railway ,anaer of the SuccessorRailway!

    9e: +nineer shall (ean the $i>isional +nineer or the +ecuti>e +nineer< $i>isionalSinal 'eleco( +nineer< $i>isional +lectrical +nineer in eecuti>e chare of thewors and shall include the su#erior officers of O#en =ine and Construction oranisationson the Railway of the +nineerin< Sinal 'eleco( and +lectrical $e#art(ents< i!e! theSenior $i>isional +nineerB$e#uty Chief +nineerBChief +nineer< Senior $i>isional Sinal 'eleco( +nineer B $y!Chief Sinal 'eleco( +nineer< Senior $i>isional +lectrical+nineer B $e#uty Chief +lectrical +nineer and shall (ean include the +nineers ofthe Successors Railway!

    9f: 'enderer shall (ean the #erson B the fir( B coo#erati>e or co(#any whetherincor#orated or not who tenders for the wors with a >iew to eecute the wors oncontract with the Railway and shall include their #ersonal re#resentati>es< successorsand #er(itted assins!

    9: =i(ited 'enders shall (ean tenders in>ited fro( all or so(e Contractors on thea##ro>ed or select list of Contractors with the Railway!

    9h: O#en 'enders shall (ean the tenders in>ited in o#en and #u-lic (anner and withadeEuate notice!

    9i: /ors shall (ean the wors conte(#lated in the drawins and schedules set forth inthe tender for(s and reEuired to -e eecuted accordin to the s#ecifications!

    9: S#ecifications shall (ean the S#ecifications for ,aterials and /ors of the Railway ass#ecified under the authority of the ,inistry of Railways or Chief +nineer or as

    a(#lified< added to or su#erseded -y s#ecial s#ecifications if any< a##ended to the'ender &or(s!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    8/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae %

    9: Schedule of Rates of the Railway shall (ean the Schedule of Rates issued under theauthority of the Chief +nineer fro( ti(e to ti(e!

    9l: $rawins shall (ean the (a#s< drawins< #lans and tracins or #rints thereof anneedto the 'ender &or(s!

    189  /ords i(#ortin the sinular nu(-er shall also include the #lural and >ice >ersa wherethe contet reEuires!

    CREDENTIALS OF CONTRACTORS

    28 A*&ca&+" F+r Re!&)ra&+" , 

    281  /ors of construction and of su##ly of (aterial shall -e entrusted for eecution tocontractors whose ca#a-ilities and financial status ha>e -een in>estiated and a##ro>ed to thesatisfaction of the Railway! &or this #ur#ose< list of a##ro>ed contractors shall -e (aintained inthe Railway! 'he said list -e re>ised #eriodically once in a year or so -y i>in wide #u-licitythrouh ad>ertise(ents etc!

     A Contractor includin a contractor who is already on the a##ro>ed list shall a##ly to the nearestGeneral ,anaer 9Construction:< Chief Ad(inistrati>e Officer 9Construction:< $i>isional Railway,anaer< Chief +nineerBChief +nineer 9Construction:< Chief Sinal 'eleco((unication+nineer B Chief Sinal 'eleco((unication +nineer 9Construction: and Chief +lectrical+nineer B Chief +lectrical +nineer 9Construction:< furnishin #articulars reardin

    9a: his #osition as an inde#endent contractor s#ecifyin +nineerin oraniLation a>aila-lewith details or Partners B Staff B +nineers e(#loyed with Eualifications and e#erienceM

    9-: his ca#acity to undertae and carry out wors satisfactorily as >ouched for -y ares#onsi-le official or fir(< with details a-out the trans#ort eEui#(ents< constructiontools and #lants etc!< reEuired for the wor (aintained -y hi(M

    9c: his #re>ious e#erience of wors si(ilar to that to -e contracted for< in #roof of whichoriinal certificates or testi(onials (ay -e called for and their enuineness >erified< ifneeds -e< -y reference to the sinatories thereofM

    9d: his nowlede fro( actual #ersonal in>estiation of the resources of the areaBLone orLones in which he offers to worM

    9e: his a-ility to su#er>ise the wor #ersonally or -y co(#etent and duly authoriLed aentM

    9f: his financial #ositionM

    9: AuthoriLed co#y of the current Inco(e'a Clearance Certificate!

    282  An a##licant shall clearly state the cateories of wors and the Area B one B $i>ision9s: B $istrict9s: in which he desires reistration in the list of a##ro>ed contractors!

    289 'he selection of contractors for enlist(ent in the a##ro>ed list would -e done -y aco((ittee for different >alue sla-s as notified -y Railway!

    284  An annual fee as #rescri-ed -y the Railway fro( ti(e to ti(e would -e chared fro(such a##ro>ed contractors to co>er the cost of sendin notices to the( and clerae for tendersetc!

    28:  'he list of a##ro>ed contractors would -e treated as confidential office record!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    9/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae )

    TENDERS FOR .OR7S

    98 Te"#er F+r( ,  'ender &or(s shall e(-ody the contents of the contract docu(entseither directly or -y reference and shall -e as #er s#eci(en for(< AnneureI! 'ender &or(sshall -e issued on #ay(ent of the #rescri-ed fee to the a##ro#riate contractors on the list of

    a##ro>ed contractors! Contractors not on the list of a##ro>ed contractors< will on #ay(ent of the#rescri-ed fees< -e furnished with tender for(s and they shall -e reEuired to su-(it e>idencereardin their financial status< #re>ious e#erience and a-ility to eecute the wors!

    48 O(&))&+") 6 D&)crea"c&e) , Should a tenderer find discre#ancies in or o(issionsfro( the drawins or any of the 'ender &or(s or should he -e in dou-t as to their (eanin< heshould at once notify the authority in>itin tenders who (ay send a written instruction to alltenders! It shall -e understood that e>ery endea>our has -een (ade to a>oid any error whichcan (aterially affect the -asis of tender and successful tenderer shall tae u#on hi(self and#ro>ide for the ris of any error which (ay su-seEuently -e disco>ered and shall (ae nosu-seEuent clai( on account thereof!

    :8 Ear"e) %+"e , 

    91: 9a: 'he tenderer shall -e reEuired to de#osit earnest (oney with the tender for the due#erfor(ance with the sti#ulation to ee# the offer o#en till such date as s#ecified in thetender< under the conditions of tender! 'he earnest (oney shall -e as under

     a*ue O' T;e .+r/ Ear"e) %+"e De+)& 3E%D

     A! &or wors esti(ated tocost u# to Rs! 1 crore

    2N of the esti(ated cost of the wor

    ?! &or wors esti(ated tocost (ore than Rs! 1 crore

    Rs! 2 lah #lus N 9half #ercent: of the ecessof the esti(ated cost of wor -eyond Rs!1 croresu-ect to a (ai(u( of Rs! 1 crore

    'he earnest (oney shall -e rounded to the nearest Rs!10! 'his earnest (oney shall -ea##lica-le for all (odes of tenderin!

    9-: It shall -e understood that the tender docu(ents ha>e -een soldBissued to the tendererand the tenderer is #er(itted to tender in consideration of sti#ulation on his #art< thatafter su-(ittin his tender he will not resile fro( his offer or (odify the ter(s andconditions thereof in a (anner not acce#ta-le to the +nineer! Should the tenderer failto o-ser>e or co(#ly with the said sti#ulation< the aforesaid a(ount shall -e lia-le to -eforfeited to the Railway!

    9c: If his tender is acce#ted this earnest (oney (entioned in su- clause 9a: a-o>e will -eretained as #art security for the due and faithful fulfill(ent of the contract in ter(s of

    Clause 1" of the Standard General Conditions of Contract! 'he +arnest ,oney of other'enderers shall< sa>e as herein -efore #ro>ided< -e returned to the(< -ut the Railwayshall not -e res#onsi-le for any loss or de#reciation that (ay ha##en thereto while intheir #ossession< nor -e lia-le to #ay interest thereon!

    92: 'he +arnest ,oney should -e in cash or in the for( of de#osit recei#ts< #ay orders orde(and drafts< eecuted -y State ?an of India or any of the @ationaliLed ?ans or -y aScheduled ?an!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    10/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae .

    Standard General Conditions of Contract for the co(#letion of wors to the entire satisfaction ofthe +nineer!

    9-: /hen wor is tendered for -y a fir( or co(#any of contractors< the tender shall -esined -y the indi>idual leally authoriLed to enter into co((it(ents on their -ehalf!

    9c: 'he Railway will not -e -ound -y any #ower of attorney ranted -y the tenderer or -y

    chanes in the co(#osition of the fir( (ade su-seEuent to the eecution of the contract! It(ay< howe>er< reconiLe such #ower of attorney and chanes after o-tainin #ro#er lealad>ice< the cost of which will -e charea-le to the contractor!

    CONSIDERATION OF TENDERS

    =8 R&!; O' Ra&*>a T+ Dea* .&; Te"#er) ,  'he Railway reser>es the riht of notto in>ite tenders for any of Railway wor or wors or to in>ite o#en or li(ited tenders and whentenders are called to acce#t a tender in whole or in #art or reect any tender or all tenderswithout assinin reasons for any such action!

    =A8 T>+ Pac/e) S2)e( +' Te"#er&"! , 'he #rocedure detailed -elow shall -eado#ted for dealin with 'wo Pocets Syste(8 of 'enderin

    =A81  /ith a >iew to assess the tenders technically without -ein influenced -y the financial-ids< D'wo Pacets Syste( of tenderinD shall -e ado#ted! In this syste(< the tenderersshall su-(it their EuotationsBoffers in two sealed en>elo#esM with one co>er containinthe 'echnical Co((ercial offers and the other co>er containin the &inancial ?ids! 'hefirst #acet shall -e with the o-ecti>e of scrutinisin the ca#a-ility< #ossession ofa##ro#riate (achinery eEui#(ents< financial strenth< e#erience etc! of thetenderers!

    =A82 'he technical details and co((ercial conditions shall -e read out -efore the tenderersor their re#resentati>es at the ti(e of o#enin of tenders and the sa(e shall -ee>aluated -y the 'ender Co((ittee! If the offers are found acce#ta-le -y the

    co(#etent authority 9as #rescri-ed -y Railway ?oard fro( ti(e to ti(e for theesti(ated >alue of tender in>ited:< the second #acet shall -e o#ened and the tendersshall -e #rocessed for finalisation in the nor(al (anner!

    =A89  ;owe>er< if on the -asis of infor(ation contained in the first #acet< the 'enderCo((ittee needs clarification reardin desins< s#ecifications etc!M discussions shall -eheld with each indi>idual #artyB tenderer after o-tainin a##ro>al of the Co(#etent

     Authority!

    =A84  D'wo Pacets Syste(D of tenderin shall -e resorted to for technoco((ercialconsideration in /ors Contract 'enders of >alues as co((unicated -y Railway ?oardfro( ti(e to ti(e on the su-ect!

    QAuthority Railway ?oardDs letter no! .4BC+IBC'B4 Pt!1%< @ew $elhi< $ated 13!0)!2012

    CONTRACT DOCU%ENTS

    ?8 E$ecu&+" +' C+"rac D+cu(e" , 'he 'enderer whose tender is acce#ted shall -ereEuired to a##ear in #erson at the office of General ,anaerBGeneral ,anaer 9Construction:<Chief Ad(inistrati>e Officer 9Construction:< $i>isional Railway ,anaer or concerned +nineer<as the case (ay -e< or if a fir( or cor#oration< a duly authoriLed re#resentati>e shall so a##earand eecute the contract docu(ents within % days after notice that the contract has -eenawarded to hi(! &ailure to do so shall constitute a -reach of the aree(ent affected -y theacce#tance of the tender in which case the full >alue of the earnest (oney acco(#anyin thetender shall stand forfeited without #reudice to any other rihts or re(edies!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    11/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 10

    In the e>ent of any tenderer whose tender is acce#ted shall refuse to eecute thecontract docu(ent as here in -efore #ro>ided< the Railway (ay deter(ine that such tendererhas a-andoned the contract and there u#on his tender and acce#tance thereof shall -e treatedas cancelled and the Railway shall -e entitled to forfeit the full a(ount of the +arnest ,oney andto reco>er the da(aes for such default!

    @8 F+r( O' C+"rac D+cu(e" ,  +>ery contract shall -e co(#lete in res#ect of thedocu(ent it shall so constitute! @ot less than 2 co#ies of the contract docu(ent shall -e sined-y the co(#etent authority and the contractor and one co#y i>en to the contractor!

    9a: &or one contracts< awarded on the -asis of the #ercentae a-o>e or -elow theSchedule of Rates of Railway for the whole or #art of financial year< the contract aree(entreEuired to -e eecuted -y the tenderer whose tender is acce#ted shall -e as #er s#eci(enfor(< AnneureII! $urin the currency of the one Contract< wor orders as #er s#eci(en for(

     AnneuresIII or I6< for wors not eceedin Rs!2e +nineer under the aree(ent for one Contract!

    9-: &or contracts for s#ecific wors< >alued at (ore than Rs!2

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    12/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 11

     ANNEXURE - I

      RAIL.AY

    TENDER FOR% 3F&r) S;ee

    'ender @o!

    @a(e Of /or

    'o

    'he President of India

     Actin throuh the

      Railway

    IB/e ha>e read the >arious conditions to tender attachedhereto and aree to a-ide -y the said conditions! IB/e also aree to ee# this tender o#en foracce#tance for a #eriod of days fro( the date fied for o#enin the sa(e and indefault thereof< IB/e will -e lia-le for forfeiture of (yBour +arnest ,oney! IB/e offer to do thewor for Railway< at the rates Euoted in the attached schedule and here-y -ind(yselfBoursel>es to co(#lete the wor in all res#ects within (onths fro( thedate of issue of letter of acce#tance of the tender!

    28  IB/e also here-y aree to a-ide -y the Indian Railways Standard General Conditions OfContract< with all correction sli#s u#todate and to carry out the wor accordin to the S#ecialConditions of Contract and S#ecifications of (aterials and wors as laid down -y Railway in theanneed S#ecial ConditionsBS#ecifications< Schedule of Rates with all correction sli#s u#todate

    for the #resent contract!98  A su( of Rs! is herewith forwarded as +arnest ,oney! &ull >alue of theearnest ,oney shall stand forfeited without #reudice to any other riht or re(edies in case(yBour 'ender is acce#ted and if

    9a: IB/e do not eecute the contract docu(ents within se>en days after recei#t of noticeissued -y the Railway that such docu(ents are readyM and

    9-: IB/e do not co((ence the wor within fifteen days after recei#t of orders to that effect!

    48  5ntil a for(al aree(ent is #re#ared and eecuted< acce#tance of this tender shallconstitute a -indin contract -etween us su-ect to (odifications< as (ay -e (utually areed to-etween us and indicated in the letter of acce#tance of (yBour offer for this wor!

    Sinature of /itnesses 91:

    92:

     

    Sinature of 'enderer9s:

    $ate

     Address of the 'enderer9s:

     

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    13/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 12

     ANNEXURE - I 9Contd! T:

    TENDER FOR% 3Sec+"# S;ee

    18 I")ruc&+") T+ Te"#er) A"# C+"#&&+") O' Te"#er ,  'he followin docu(ents

    for( #art of 'ender B Contract

    9a: 'ender for(s 7 &irst Sheet and Second Sheet

    9-: S#ecial ConditionsBS#ecifications 9enclosed:

    9c: Schedule of a##roi(ate Euantities 9enclosed:

    9d:  Standard General Conditions of Contract and Standard S#ecifications for ,aterials and/ors of Indian Railway as a(endedBcorrected u#to latest Correction Sli#s< co#ies ofwhich can -e seen in the office of or o-tained fro( the office of theChief +nineer< Railway on #ay(ent of #rescri-ed chares!

    9e:  Schedule of Rates as a(ended B corrected u#to latest Correction Sli#s< co#ies of whichcan -e seen in the office of or o-tained fro( the office of the Chief

    +nineer< Railway on #ay(ent of #rescri-ed chares!

    9f: All eneral and detailed drawins #ertainin to this wor which will -e issued -y the+nineer or his re#resentati>es 9fro( ti(e to ti(e: with all chanes and (odifications!

    28 Dra>&"!) F+r T;e .+r/ , 'he $rawin for the wor can -e seen in the office of the  and B or Chief +nineer< Railway at any ti(e durin the office hours!'he drawins are only for the uidance of 'enderer9s:! $etailed worin drawins 9if reEuired:-ased enerally on the drawin (entioned a-o>e< will -e i>en -y the +nineer or hisre#resentati>e fro( ti(e to ti(e!

    98  'he 'enderer9s: shall Euote his B their rates as a #ercentae a-o>e or -elow the Scheduleof Rates of Railway as a##lica-le to $i>ision ece#t whereheBthey are reEuired to Euote ite( rates and (ust tender for all the ite(s shown in the Scheduleof a##roi(ate Euantities attached! 'he Euantities shown in the attached Schedule are i>en asa uide and are a##roi(ate only and are su-ect to >ariation accordin to the needs of theRailway! 'he Railway does not uarantee wor under each ite( of the Schedule!

    48  'enders containin erasures and B or alterations of tender docu(ents are lia-le to -ereected! Any correction (ade -y tender9s: in hisBtheir entries (ust -e attested -y hi( B the(!

    :8  'he wors are reEuired to -e co(#leted within a #eriod of (onths fro( thedate of issue of acce#tance letter!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    14/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 13

    9c: If the tender is acce#ted< the a(ount of +arnest ,oney will -e retained and adusted asSecurity $e#osit for the due and faithful fulfill(ent of the contract! 'his a(ount of Security$e#osit shall -e forfeited< if the 'enderer9s:BContractor9s: fail to eecute the Aree(ent ?ondwithin % days after recei#t of notice issued -y Railway that such docu(ents are ready or toco((ence the wor within 1* days after recei#t of the order to that effect!

    9d: +arnest ,oney of the unsuccessful tenderer9s: will< sa>e as herein-efore #ro>ided< -ereturned to the unsuccessful tenderer9s: within a reasona-le ti(e< -ut the Railway shall not -eres#onsi-le for any loss or de#reciation that (ay ha##en to the Security for the due#erfor(ance of the sti#ulation to ee# the offer o#en for the #eriod s#ecified in the tenderdocu(ents or to the +arnest ,oney while in their #ossession nor -e lia-le to #ay interestthereon!

    =8 R&!;) O' T;e Ra&*>a T+ Dea* .&; Te"#er , 'he authority for the acce#tance ofthe tender will rest with the Railway! It shall not -e o-liatory on the said authority to acce#tthe lowest tender or any other tender and no tenderers9s: shall de(and any e#lanation for thecause of reection of hisBtheir tender nor the Railway to assin reasons for declinin to consideror reect any #articular tender or tenders!

    ?8  If the tenderer9s: deli-erately i>es B i>e wron infor(ation in his B their tender orcreates B create circu(stances for the acce#tance of his B their tender< the Railway reser>es theriht to reect such tender at any stae!

    @8  If the tenderer9s: e#ire9s: after the su-(ission of his B their tender or after theacce#tance of his B their tender< the Railway shall dee( such tender cancelled! If a #artner of afir( e#ires after the su-(ission of their tender or after the acce#tance of their tender< theRailway shall dee( such tender as cancelled< unless the fir( retains its character!

    108 E*&!&b&*& Cr&er&a ,

    9i: 'he tenderer9s: shall -e elii-le only if he B they fulfill +lii-ility Criteria of ha>inrecei>ed total contract a(ount durin the last three financial years and in the current financialyear with a (ini(u( of 1*0N of the ad>ertised tender >alue!

    9ii: Authentic Certificates shall -e #roduced -y the tenderer9s: to this effect which (ay -ean attested Certificate fro( the e(#loyer B client< Audited ?alance Sheet duly certified -y theChartered Accountant etc!

    QAuthority Railway ?oard8s letter no! .4BC+IBC'B4 9Pt! II:< $ated 0%B14!11!2013

    118 Te"#ererB) Cre#e"&a*) ,  $ocu(ents testifyin tenderer8s #re>ious e#erience andfinancial status should -e #roduced alonwith the tender or when desired -y co(#etentauthority of the Railway!

    'enderer9s: who has B ha>e not carried out any wor so far on Railway and B or whois B are not -orne on the a##ro>ed list of the Contractors of Railway should su-(italonwith his B their tender credentials to esta-lish

    9i: 

    ;is ca#acity to carry out the wors satisfactorily!9ii:  ;is financial status su##orted -y ?an reference and other docu(ents!

    9iii:  Certificates duly attested and testi(onials reardin contractin e#erience for thety#e of o- for which tender is in>ited with list of wors carried out in the #ast!

    128  'ender (ust -e enclosed in a sealed co>er< su#erscri#ted 'ender @o! and (ust-e sent -y reistered #ost to the address of Railway so as to reach hisoffice not later than ;ours on the or de#osited in the s#ecial -oallotted for the #ur#ose in the office of Railway! 'his S#ecial -o will -esealed at hours on ! 'he tender will -e o#ened at hours on thesa(e day! 'he tender #a#ers will not -e sold after hours on !

    198  @onco(#liance with any of the conditions set forth therein a-o>e is lia-le to result inthe tender -ein reected!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    15/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 14

    148 E$ecu&+" O' C+"rac D+cu(e") , 'he successful 'enderer9s: shall -e reEuired toeecute an aree(ent with the President of India actin throuh the <

      Railway for carryin out the wor accordin to Standard General Conditions ofContract< S#ecial Conditions B S#ecifications anneed to the tender and S#ecification for worand (aterials of Railway as a(endedBcorrected u#to latest Correction Sli#s< (entioned in tenderfor( 9&irst Sheet:!

    1:8 Par"er);& Dee#) P+>er O' A+r"e Ec8 , 'he tenderer shall clearly s#ecifywhether the tender is su-(itted on his own or on -ehalf of a #artnershi# concern! If the tenderis su-(itted on -ehalf of a #artnershi# concern< he should su-(it the certified co#y of#artnershi# deed alonwith the tender and authoriLation to sin the tender docu(ents on -ehalfof #artnershi# fir(! If these docu(ents are not enclosed alonwith tender docu(ents< thetender will -e treated as ha>in -een su-(itted -y indi>idual sinin the tender docu(ents! 'heRailway will not -e -ound -y any #ower of attorney ranted -y the tenderer or -y chanes inthe co(#osition of the fir( (ade su-seEuent to the eecution of the contract! It (ay< howe>er<reconiLe such #ower of attorney and chanes after o-tainin #ro#er leal ad>ice< the cost ofwhich will -e charea-le to the contractor!

    1a E(*+ee) ,

    9a: Should a tenderer -e a retired enineer of the GaLetted ran or any other GaLettedofficer worin -efore his retire(ent< whether in the eecuti>e or ad(inistrati>e ca#acity orwhether holdin a #ensiona-le #ost or not< in the +nineerin or any other de#art(ent of any of

    the railways owned and ad(inistered -y the President of India for the ti(e -ein< or should atenderer -ein #artnershi# fir( ha>e as one of its #artners a retired enineer or retired GaLettedOfficer as aforesaid< or should a tenderer -ein an incor#orated co(#any ha>e any such retiredenineer or retired officer as one of its $irectors or should a tenderer ha>e in his e(#loy(entany retired +nineer or retired GaLetted Officer as aforesaid< the full infor(ation as to the dateof retire(ent of such +nineer or GaLetted Officer fro( the said ser>ice and in case where such+nineer or Officer had not retired fro( Go>ern(ent ser>ice at least 2 years #rior to the date ofsu-(ission of the tender as to whether #er(ission for tain such contract< or if the contractor-e a #artnershi# fir( or an incor#orated co(#any< to -eco(e a #artner or $irector as the case(ay -e< or to tae the e(#loy(ent under the contractor< has -een o-tained -y the tenderer orthe +nineer or Officer< as the case (ay -e fro( the President of India or any officer< dulyauthorised -y hi( in this -ehalf< shall -e clearly stated in writin at the ti(e of su-(ittin thetender! 'enders without the infor(ation a-o>e referred to or a state(ent to the effect that no

    such retired +nineer or retired GaLetted Officer is so associated with the tenderer< as the case(ay -e< shall -e reected!

    9-: Should a tenderer or contractor -ein an indi>idual on the list of a##ro>ed Contractors<ha>e a relati>e9s: or in the case of #artnershi# fir( or co(#any of contractors one or (ore of hisshareholder9s: or a relati>e9s: of the shareholder9s: e(#loyed in aLetted ca#acity in the+nineerin or any other de#art(ent of the Railway< the authority in>itintenders shall -e infor(ed of the fact at the ti(e of su-(ission of tender< failin which the tender(ay -e disEualifiedBreected or if such fact su-seEuently co(es to liht< the contract (ay -erescinded in accordance with #ro>ision in Clause "2 of Standard General Conditions of Contract!

    9Sinature:Sinature of 'enderer9s: 9$esination:$ate Railway

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    16/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1*

     ANNEXURE - I 9Contd! T:

    TENDER FOR% 3T;&r# S;ee

    Na(e O' .+r/ , 

     

     

    SC5EDULE OF RATES AND UANTITIES

    S=Ite(@o!

    $escri#tion Of Ite( Of /or A##roi(ate

    uantity5nit

    Rates In &iures And /ords

    9Rs!:

     A(ount

    9Rs!:

    1 2 3 4 * " %

    'he Euantities shown in a-o>e Schedule are a##roi(ate and are as a uide to i>e thetenderer9s: an idea of Euantu( of wor in>ol>ed! 'he Railway reser>es the riht to increaseBdecrease andBor delete or include any of the Euantities i>en a-o>e and no etra rate will -eallowed on this account!

    IB/e undertae to do the wor at N a-o>eB-elow the Schedule of Rates ofthe Railway as a##lica-le to $i>ision or at the ratesEuoted a-o>e for each ite(!

    $ated

    Sinature of the 'enderer9s:

    @ote Colu(ns 1 to * shall -e filled -y the office of the Authority in>itin tender! Colu(ns " % shall -e filled -y the 'enderer9s: only when #ercentae tenders are not in>ited!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    17/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1"

     ANNEXURE II

     AGREE%ENT FOR ONE CONTRACT

    CO@'RAC' AGR++,+@' @o!< $A'+$ ! AR'IC=+S O& AGR++,+@' (ade this day of -etween the President ofIndia actin throuh the < Railway hereinafter called theHRailwayH of the other #art and hereinafter called theHContractorH of the other #art!

    /;+R+AS the Contractor has areed with the Railway durin the #eriod of (onths fro( to for the #erfor(ance of

    9a: @ew /ors< additions and alterations to eistin structures< s#ecial re#air wors andsu##ly of -uildin (aterials su-ect to the contract >alue for such wors not eceedin Rs!

     !

    9-: All ordinary re#air and (aintenance wors at any site -etween ilo(etre andilo(etre as will -e set forth in the wor orders 9which wor orders shall -e dee(edand taen to -e #art of this contract: that will -e issued durin the said #eriod at Na-o>eB-elow the Schedule of Rates of the Railway< corrected u# to the latestCorrection Sli#s and Standard S#ecifications of the Railway corrected u#to latestCorrection Sli#s and the S#ecial Conditions and S#ecial S#ecifications< if any in confor(ity withthe drawins 9if any: that will -e issued with the wor order< aforesaid A@$ /;+R+AS the#erfor(ance of the said wor is an act in which the #u-lic are interested!

    @O/ ';IS I@$+@'5R+ PR+S+@'S /I'@+SS+'; 'hat in consideration of the #ay(entto -e (ade -y the Railway< the Contractor will duly #erfor( the wors set forth in the said /orOrder and shall eecute the sa(e with reat #ro(#tness< care and accuracy< in a wor(an lie(anner to the satisfaction of the Railway and will co(#lete the sa(e on or -efore the res#ecti>e

    dates s#ecified therein in accordance with the said s#ecifications and said drawins 9if any: andsaid conditions of contract and will o-ser>e< fulfill and ee# all the conditions therein (entioned<9which shall -e dee(ed and taen to -e #art of this contract as if the sa(e had -een duly setforth herein:< A@$ the Railway -oth here-y aree that if the Contractor shall duly #erfor( thesaid wor in the (anner aforesaid and o-ser>e and ee# the said ter(s and conditions< theRailway will #ay or cause to -e #aid to the Contractor for the said wors on the co(#letionthereof the a(ount due in res#ect thereof at the rates s#ecified a-o>e!

    Contractor $esination Railway

     Address 9&or President of India:

    $ate

    /itnesses 9to sinature of contractor:

    Sinature of witnesses with address

    $ate

     

    Sinature of witnesses with address

    $ate

     

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    18/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1%

     ANNEXURE - III

    .OR7 ORDER UNDER ONE CONTRACT

    /ORU OR$+R @O!< $A'+$ 5@$+R CO@'RAC' AGR++,+@' @O! < $A'+$ !

    @a(e Of /or 9S I ' +:

    Schedule Of $rawins

     Authority Allocation

    'he Contractor9s: is B are here-y ordered to carry outthe followin wors at N a-o>eB-elow the Schedule Of Rates of Railwaycorrected u#to latest Correction Sli#s of $i>ision under one Contract Aree(ent

    herein-efore referred to

    S=Ite(@o!

    $escri#tion Of Ite( Of /or A##roi(ate

    uantity5nit

    Rates In &iures And /ords

    9Rs!:

     A(ount9Rs!:

    1 2 3 4 * " %

    'otal A##roi(ate 6alue Of /or V Rs!

    W 'his should -e rate of $i>ision concerned!'he wors herein (entioned are reEuired to -e co(#leted on or -efore 9$ate:! 'heEuantities #ro>ided herein are a##roi(ate and su-ect to >ariation under Clause 42 of theStandard General Conditions of Contract corrected u#to latest Correction Sli#s!

    $i>isional Railway ,anaerB$i>isional +nineer

      $i>ision

      Railway

    $ate for President Of India

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    19/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1)

    I aree to co(#lete the wors herein set forth on or -efore the date s#ecified under theone Contract Aree(ent herein -efore referred to in confor(ity with the drawins heretoanneed and in accordance with the General and S#ecial 9if any: Conditions of Contractcorrected u#to latest Correction Sli#s and the Standard S#ecifications of Railway withu#todate Correction Sli#s!

    I also aree to (aintain such wors for the #eriod s#ecified -elow fro( the date ofco(#letion

    9a: Re#air and (aintenance wor includin whiteBcolour washin three calendar(onths fro( date of co(#letion!

    9-: All new wors ece#t earth wor Si calendar (onths fro( date of co(#letion!

    Contractor 9Sinature: Railway $esination

    9&or President of India:

     Address

     

    $ate $ate

    Sinature of .&"e))e)  9to Sinature ofcontractor: with address  

    .&"e))e) 

    1!

     

     

     

     

     

    2!

     

     

     

     

     

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    20/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 1.

     ANNEXURE - I

      RAIL.AY

    CONTRACT AGREE%ENT OF .OR7S

    CO@'RAC' AGR++,+@' @O! $A'+$

     AR'IC=+S O& AGR++,+@' (ade this day of 20 -etweenPresident of India actin throuh the Railway Ad(inistration hereafter called the HRailwayH of theone #art and herein after called the HContractorH of other #art!

    /;+R+AS the Contractor has areed with the Railway for #erfor(ance of the wors  set forth in the Schedule hereto anneed u#on the Standard General

    Conditions of Contract< corrected u#to latest Correction Sli#s and the S#ecifications of  Railway corrected u#to the latest Correction Sli#s and the Schedule of Rates of  Railway< corrected u#to latest Correction Sli#s and the S#ecial Conditions andS#ecial S#ecifications< if any and in confor(ity with the drawins hereinto anneed A@$/;+R+AS the #erfor(ance of the said wors is an act in which the #u-lic are interested!

    @O/ ';IS I@$+@'5R+ /I'@+SS+'; that in consideration to the #ay(ents to -e (ade-y the Railways< the Contractors will duly #erfor( the said wors in the said schedule set forthand shall eecute the sa(e with reat #ro(#tness< care and accuracy in a wor(an lie (annerto the satisfaction of the Railway and will co(#lete the sa(e in accordance with the saids#ecifications and said drawins and said conditions of contract on or -efore the day of

      20 and will (aintain the said wors for a #eriod of Calendar (onthsfro( the certified date of their co(#letion and will o-ser>e< fulfill and ee# all the conditionstherein (entioned 9which shall -e dee(ed and taen to -e #art of this contract< as if the sa(eha>e -een fully set forth herein:< A@$ the Railway< -oth here-y aree that if the Contractor shallduly #erfor( the said wors in the (anner aforesaid and o-ser>e and ee# the said ter(s andconditions< the Railway will #ay or cause to -e #aid to the Contractor for the said wors on thefinal co(#letion thereof the a(ount due in res#ect thereof at the rates s#ecified in the Schedulehereto anneed!

    Contractor 9Sinature: Railway $esination

    9&or President of India:

     Address

     

    $ate $ate

    Sinature of .&"e))e)  9to Sinature ofcontractor: with address  

    .&"e))e) 

     

     

     

     

     

     

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    21/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 20

     ANNEXURE-

    .OR7 ORDER FOR .OR7S

    96alued at o>er Rs! 2in areed withthe Railway isBare here-y ordered to carry out the /ors set forth in the schedule -elow inaccordance with the Standard General Conditions of Contract corrected u#to latest CorrectionSli#s and the Standard S#ecifications of Railway corrected u#to latest CorrectionSli#s< the Schedule of Rates< corrected u#to latest Correction Sli#s and S#ecial Conditions andS#ecial S#ecifications< if any and inconfor(ity with drawins anneed hereto at the ratess#ecified in the said< Schedule and to co(#lete the sa(e on or -efore the day of

      20 and (aintain the said wors for the #eriod of fro( thecertified date of co(#letion! 'he Euantities set forth in the said schedule shall -e considered

    a##roi(ate and su-ect to >ariation under Clause 42 of Standard General Conditions ofContract!

    CONTRACTORS AGREE%ENT 

    I offer to do the wor at the rates entered in the Schedule Of Rates on the re>ersewhich I ha>e sined< and I understand that no fied Euantity of wor is i>en to (e to do that instartin wor! I a( only i>en a #lace to wor in or to de#osit (aterials on and that I ha>e noclai( to (ore than one unit of wor as entered in the Scheduled Rates! I aree that all worsdone and (aterials deli>ered shall -e su-ect to the a##ro>al of the +nineer in Chare< who(ay reect and decline to #ay for whate>er (ay -e< in his o#inion< inferior or defecti>e or eitherand I aree that the Standard S#ecifications corrected u#to latest Correction Sli#s of

    Railway in so far as they are not o>erruled -y ite(s of this aree(ent< shall -e dee(ed #art ofthis aree(ent!

    I aree that no wor under this wor order shall -e assined or su-let without the#re>ious written a##ro>al of the +nineer!

    I aree that (y wor (ay -e sto##ed at any ti(e -y the +nineer on hisi>in (e or (y aent on the wors se>en days8 notice in writin and I aree that the(easure(ent of (y wors shall -e (ade -y the +nineer at any ti(e a##ointed -y hi( inwritin su-seEuent to the e#iry of the said notice and (easure(ent shall -e (ade -y hi( atthe said ti(e whether I a( #resent or not and that on #ay(ent for wor done and a##ro>ed(aterials deli>eredat site of wor as ascertained -y the said (easure(ent< I shall ha>e nofurther clai( aainst the Railway and I aree that any dis#ute arisen on (atters connected withthis aree(ent< the sa(e shall -e referred to a #erson to -e no(inated in this -ehalf -y the

      for the ti(e -ein of the Railway< whose decision in writin shall -e final and-indin on -oth #arties!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    22/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 21

    I aree that any clai( I ha>e to (ae shall -e (ade in writin within se>en days of dateof (easure(ent taen -y the +nineer as aforesaid and that any clai(s in res#ect of such(easure(ent (ade (ore than se>en days after tain of such (easure(ent shall -e dee(ed toha>e wai>ed -y (e!

    I aree to inde(nify the Railway aainst any clai(s which (ay -e (ade under

    /or(enDs Co(#ensation Act< 1.23!

    /itness Contractor

    @a(e @a(e

     Address Address

    @ote If the aree(ent is for a wor for which a S#ecial Act of the =eislature eists< e!! the Indian ,ines Act< thearee(ent shall include a clause inde(nifyin the Railway aainst all clai(s arisin of #ro>ision of such Act!

    I aree to #ay the rates at N a-o>eB-elow Schedule of rates asa##lica-le to $i>ision set forth in the schedule of rates herein forfinished and a##ro>ed wor!

      +nineer

      $i>ision

      Railway

    &or President Of India

    $ate

    IB/e aree to co(#lete the wors herein set forth on or -efore the date s#ecified herein

    and to (aintain the sa(e for a #eriod of Calendar (onths fro( the certifieddate of their co(#letion and in confor(ity with the docu(ent herein referred to< and all thecondition therein (entioned shall -e dee(ed and taen to -e #art of this contract as if the sa(ehad -een fully set forth therein!

    Sinature of witnesses with addresses<to Sinature of Contractor

    Contractor

     Address

     

    $ate

    1!

     

    2!

     

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    23/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 22

     ANNEXURE - I

    .OR7 ORDER FOR .OR7S

      $i>ision

    /ORU OR$+R @o! Oriinal B $u#licate B 'ri#licate @o! < $ated

    IB/e will carry out the followin wor accordin to the aree(ent at -ac!

    SC5EDULE OF RATES

    Par&cu*ar) Rae) 3R)8 Per Re(ar/)

    .ITNESS  CONTRACTOR  

    @a(e @a(e

     Address Address

     

    I aree to #ay the a-o>e (entioned rates for finished and a##ro>ed wor!

    $ated E"!&"eer 

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    24/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 23

    PART II

    STANDARD GENERAL CONDITIONS OF CONTRACT

    FOR USE IN CONNECTION .IT5 .OR7S CONTRACTS

    DEFINITIONS AND INTERPRETATION

    18 31 De'&"&&+") , In these Standard General Conditions of Contract< the followin ter(sshall ha>e the (eanin assined hereunder ece#t where the contet otherwise reEuires

    9a: HRailwayH shall (ean the President of the Re#u-lic of India or the Ad(inistrati>eOfficers of the Railway or of the Successor Railway authorised to deal with any (atterswhich these #resents are concerned on his -ehalf!

    9-: HGeneral ,anaerH shall (ean the Officer inchare of the General Su#erintendenceand Control of the Railway and shall also include the General ,anaer 9Construction:and shall (ean and include their successors< of the successor Railway!

    9c: HChief +nineerH shall (ean the Officer inchare of the +nineerin $e#art(ent ofRailway and shall also include Chief +nineer 9Construction:< Chief Sinal 'eleco((unication +nineer< Chief Sinal 'eleco((unication +nineer9Construction:< Chief +lectrical +nineer< Chief +lectrical +nineer 9Construction: andshall (ean include their successors< of the Successor Railway!

    9d: H$i>isional Railway ,anaerH shall (ean the Officer inchare of a $i>ision of theRailway and shall (ean and include the $i>isional Railway ,anaer of the SuccessorRailway!

    9e: +nineer shall (ean the $i>isional +nineer or the +ecuti>e +nineer< $i>isionalSinal 'eleco( +nineer< $i>isional +lectrical +nineer in eecuti>e chare of thewors and shall include the su#erior officers of O#en =ine and Constructionoranisations on the Railway of the +nineerin< Sinal 'eleco( and +lectrical$e#art(ents< i!e! the Senior $i>isional +nineerB$e#uty Chief +nineerBChief+nineer< Senior $i>isional Sinal 'eleco( +nineer B $y!Chief Sinal 'eleco(+nineer< Senior $i>isional +lectrical +nineer B $e#uty Chief +lectrical +nineer andshall (ean include the +nineers of the Successors Railway!

    9f: H+nineerDs Re#resentati>eH shall (ean the Assistant +nineer< Assistant Sinal 'eleco((unication +nineer and Assistant +lectrical +nineer in direct chare of thewors and shall include any Sr!SectionBJunior +nineer of Ci>il +nineerinBSinal and'eleco((unication +nineerin +lectrical +nineerin $e#art(ents a##ointed -ythe Railway and shall (ean and include the +nineerDs Re#resentati>e of theSuccessor Railway!

    9: HContractorH shall (ean the PersonB&ir(BCoo#erati>e Society or Co(#any whetherincor#orated or not who enters into the contract with the Railway and shall includetheir eecutors< ad(inistrators< successors and #er(itted assins!

    9h: HContractH shall (ean and include the Aree(ent of /or Order< the acce#tedSchedule of Rates or the Schedule or Rates of Railway (odified -y the tender#ercentae for ite(s of wors Euantified< or not Euantified< the Standard GeneralConditions of Contract< the S#ecial Conditions of Contracts< if anyM the $rawin< theS#ecifications< the S#ecial S#ecifications< if any and 'ender &or(s< if any!

    9i: H/orsH shall (ean the wors to -e eecuted in accordance with the contract!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    25/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 24

    9: HS#ecificationsH shall (ean the Standard S#ecifications for ,aterials /ors ofRailway as s#ecified -y Railway under the authority of the Chief +nineer or asa(#lified< added to or su#erseded -y S#ecial S#ecifications< if any!

    9: HSchedule of Rates of RailwayH shall (ean the Schedule of Rates issued under theauthority of the Chief +nineer fro( ti(e to ti(e!

    9l: H$rawinH shall (ean the (a#s< drawins< #lans and tracins or #rints there ofanneed to the contract and shall include any (odifications of such drawins andfurther drawins as (ay -e issued -y the +nineer fro( ti(e to ti(e!

    9(: HConstructional PlantH shall (ean all a##liances or thins of whatsoe>er naturereEuired for the eecution< co(#letion or (aintenance of the wors or te(#orarywors 9as hereinafter defined: -ut does not include (aterials or other thins intendedto for( or for(in #art of the #er(anent wor!

    9n: H'e(#orary /orsH shall (ean all te(#orary wors of e>ery ind reEuired for theeecution co(#letion andBor (aintenance of the wors!

    9o: HSiteH shall (ean the lands and other #laces on< under< in or throuh which the worsare to -e carried out and any other lands or #laces #ro>ided -y the Railway for the#ur#ose of the contract!

    9#: HPeriod of ,aintenanceH shall (ean the s#ecified #eriod of (aintenance fro( the dateof co(#letion of the wors< as certified -y the +nineer!

    1832 S&"!u*ar a"# P*ura* ,  /ords i(#ortin the sinular nu(-er shall also include the#lural and >ice >ersa where the contet reEuires!

    1839 5ea#&"!) A"# %ar!&"a* 5ea#&"!) , 'he headins and (arinal headins in theseStandard General Conditions are solely for the #ur#ose of facilitatin reference and shall not -edee(ed to -e #art thereof or -e taen into consideration in the inter#retation or constructionthereof or the contract!

    GENERAL OHLIGATIONS

    28 31 E$ecu&+" C+-Re*a&+" A"# I"e" O' C+"rac D+cu(e") ,  'he contractdocu(ents shall -e sined in tri#licate -y the Railway and the Contractor! 'he contractdocu(ents are co(#le(entary and what is called for -y anyone shall -e as -indin as if calledfor -y all< the intention of the docu(ents is to include all la-our and (aterials< eEui#(ents andtrans#ortation necessary for #ro#er eecution of wor! ,aterials or wors not co>ered -y or#ro#erly infera-le fro( any headin or class of the s#ecifications shall not -e su##lied -y theRailway to the contractors unless distinctly s#ecified in the contract docu(ents! ,aterials orwors descri-ed in words which so a##lied ha>e a wellnown technical or trade (eanin shall-e held to refer to such reconised standards!

    2832  If a wor is transferred fro( the urisdiction of one Railway to another Railway or to aProect authority or >ice >ersa while contract is in su-sistence< the contract shall -e -indin onthe Contractor and the Successor RailwayBProect in the sa(e (anner tae effect in allres#ects as if the Contractor and the Successor RailwayBProect were #arties thereto fro( theince#tion and the corres#ondin officer or the Co(#etent Authority in the SuccessorRailwayBProect will eercise the sa(e #owers and enoy the sa(e authority as conferred to thePredecessor RailwayBProect under the oriinal contractBaree(ent entered into!

    2839  If for ad(inistrati>e or other reasons the contract is transferred to the SuccessorRailway< the contract shall< notwithstandin any thins contained herein contrary there to< -e-indin on the Contractor and the Successor Railway in the sa(e (anner and tae effect in allres#ects as if the Contractor and the Successor Railway had -een #arties thereto fro( the date

    of this contract!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    26/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2*

    9831 La> G+er"&"! T;e C+"rac , 'he contract shall -e o>erned -y the law for theti(e -ein in force in the Re#u-lic of India!

    9832 C+(*&a"ce T+ Re!u*a&+") A"# He-La>) , 'he Contractor shall confor( to the#ro>ision of any statute relatin to the wors and reulations and -yelaws of any local authorityand of any water and lihtin co(#anies or undertains< with whose syste( the wor is

    #ro#osed to -e connected and shall -efore (ain any >ariation fro( the drawins or thes#ecifications that (ay -e necessitated -y so confir(in i>e to the +nineer notice s#ecifyinthe >ariation #ro#osed to -e (ade and the reason for (ain the >ariation and shall not carryout such >ariation until he has recei>ed instructions fro( the +nineer in res#ect thereof! 'heContractor shall -e -ound to i>e all notices reEuired -y statute< reulations or -yelaws asaforesaid and to #ay all fees and taes #aya-le to any authority in res#ect thereof!

    48 C+((u"&ca&+") T+ He I" .r&&"! ,  All notices< co((unications< reference andco(#laints (ade -y the Railway or the +nineer or the +nineerDs Re#resentati>e or theContractor interse concernin the wors shall -e in writin and no notice< co((unication<reference or co(#laint not in writin shall -e reconiLed!

    :8 Ser&ce O' N+&ce) O" C+"rac+r) , 'he Contractor shall furnish to the +nineerthe na(e< desination and address of his authoriLed aent and all co(#laints< notices<co((unications and references shall -e dee(ed to ha>e -een duly i>en to the Contractor< ifdeli>ered to the Contractor or his authorised aent or left at or #osted to the address so i>enand shall -e dee(ed to ha>e -een so i>en in the case of #ostin on day on which they wouldha>e reached such address in the ordinary course of #ost or on the day on which they were sodeli>ered or left! In the case of contract -y #artners< any chane in the constitution of the fir(shall -e forthwith notified -y the Contractor to the +nineer!

    er nonrailway -odiesB#ersons are #er(itted to use railway

    #re(ises with co(#etent authority8s a##ro>al< conser>ancy chares as a##lica-le fro( ti(e toti(e (ay -e le>ied!

    =8 A))&!"(e" Or Sub*e&"! O' C+"rac , 'he Contractor shall not assin or su-letthe contract or any #art thereof or allow any #erson to -eco(e interested therein any (annerwhatsoe>er without the s#ecial #er(ission in writin of the Railway! Any -reach of this conditionshall entitle the Railway to rescind the contract under Clause "2 of these Conditions and alsorender the contractor lia-le for #ay(ent to the Railway in res#ect of any loss or da(ae arisinor ensuin fro( such cancellationM #ro>ided always that eecution of the details of the wor -y#etty contractor under the direct and #ersonal su#er>ision of the Contractor or his aent shallnot -e dee(ed to -e su-lettin under this clause! 'he #er(itted su-lettin of wor -y theContractor shall not esta-lish any contractual relationshi# -etween the su-contractor and the

    Railway and shall not relie>e the Contractor of any res#onsi-ility under the Contract!

    ?8 A))&)a"ce H Ra&*>a F+r T;e S+re) T+ He Oba&"e# H T;e C+"rac+r ,Owin to difficulty in o-tainin certain (aterials 9includin 'ools Plant: in the (aret< theRailway (ay ha>e areed without any lia-ility therefore to endea>our to o-tain or assist theContractor in o-tainin the reEuired Euantities of such (aterials as (ay -e s#ecified in the'ender! In the e>ent of delay or failure in o-tainin the reEuired Euantities of the aforesaid(aterial< the Contractor shall not -e dee(ed a-sol>ed of his own res#onsi-ility and shall ee# intouch with the day to day #osition reardin their a>aila-ility and accordinly adust #roress ofwors includin e(#loy(ent of la-our and the Railway shall not in any way -e lia-le for thesu##ly of (aterials or for the nonsu##ly thereof for any reasons whatsoe>er nor for any loss orda(ae arisin in conseEuence of such delay or nonsu##ly!

    @8 Ra&*>a Pa))e) , @o free Railway #asses shall -e issued -y the Railway to theContractor or any of his e(#loyeeBworer!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    27/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2"

    108 Carr&a!e O' %aer&a*) , @o forwardin orders shall -e issued -y the Railway for thecon>eyance of ContractorDs (aterials< tools and #lant -y Rail which (ay -e reEuired for use inthe wors and the contractor shall #ay full freiht chares at #u-lic tariff rates therefor!

    118 U)e O' Ha**a) Tra&") , 'he Railway (ay aree to allow the Contractor use of the-allast or (aterial trains under such conditions as shall -e s#ecially #rescri-ed< #ro>ided that the

    Contractor shall #ay for the use thereof chares calculated at #u-lic tariff rates on the (aredcarryin ca#acity of each >ehicle su-ect to s#ecified (ini(u( chare #er day or #art of day and#ro>ided further that the Contractor shall inde(nify the Railway aainst any clai(s or da(aesarisin out of the use or (isuse thereof and aainst any lia-ilities under the /or(enDsCo(#ensation Act< 1.23 or any statutory a(end(ents thereto!

    128 Rere)e"a&+" O" .+r/) , 'he Contractor shall< when he is not #ersonally #resenton the site of the wors #lace< ee# a res#onsi-le aent at the wors durin worin hours whoshall on recei>in reasona-le notice< #resent hi(self to the +nineer and orders i>en -y the+nineer or the +nineerDs re#resentati>e to the aent shall -e dee(ed to ha>e the sa(e forceas if they had -een i>en to the Contractor! ?efore a-sentin hi(self< the Contractor shallfurnish the na(e and address of his aent for the #ur#ose of this clause and failure on the #art

    of the Contractor to co(#ly with this #ro>ision at any ti(e will entitle the Railway to rescind thecontract under Clause "2 of these Conditions!

    198 Re*&c) A"# Trea)ure) , All old< sil>er< oil and other (inerals of any descri#tion andall #recious stones< coins< treasures relics antiEuities and other si(ilar thins which shall -efound in or u#on the site shall -e the #ro#erty of the Railway and the Contractor shall duly#reser>e the sa(e to the satisfaction of the Railway and shall fro( ti(e to ti(e deli>er the sa(eto such #erson or #ersons as the Railway (ay a##oint to recei>e the sa(e!

    148 E$caae# %aer&a* , 'he Contractor shall not sell or otherwise dis#ose of or re(o>eece#t for the #ur#ose of this contract< the sand< stone< clay -allast< earth< roc or othersu-stances or (aterials which (ay -e o-tained fro( any eca>ation (ade for the #ur#ose of

    the wors or any -uildin or #roduced u#on the site at the ti(e of deli>ery of the #ossessionthereof -ut all the su-stances< (aterials< -uildins and #roduce shall -e the #ro#erty of theRailway #ro>ided that the Contractor (ay< with the #er(ission of the +nineer< use the sa(e forthe #ur#ose of the wors either free of cost or #ay the cost of the sa(e at such rates as (ay -edeter(ined -y the +nineer!

    1:8 I"#e("& H C+"rac+r) , 'he Contractor shall inde(nify and sa>e har(less theRailway fro( and aainst all actions< suit #roceedins losses< costs< da(aes< chares< clai(sand de(ands of e>ery nature and descri#tion -rouht or reco>ered aainst the Railways -yreason of any act or o(ission of the Contractor< his aents or e(#loyees< in the eecution of thewors or in his uardin of the sa(e! All su(s #aya-le -y way of co(#ensation under any ofthese conditions shall -e considered as reasona-le co(#ensation to -e a##lied to the actual lossor da(ae sustained< and whether or not any da(ae shall ha>e -een sustained!

    1en -elow< (ay -e de#osited -y the Contractor in cash or (ay -e reco>ered -y #ercentaededuction fro( the ContractorDs Hon accountH -ills! Pro>ided also that in case of defaultincontractor< the Railway (ay retain any a(ount due for #ay(ent to the Contractor on the#endin Hon account -illsH so that the a(ounts so retained (ay not eceed 10N of the total>alue of the contract!

    1

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    28/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2%

    9-:  'he rate of reco>ery should -e at the rate of 10N of the -ill a(ount till the fullSecurity $e#osit is reco>ered<

    9c: 

    Security $e#osits will -e reco>ered only fro( the runnin -ills of the contract and noother (ode of collectin S$ such as S$ in the for( of instru(ents lie ?G 9ece#t@ote 9ii: -elow:M &$ etc! shall -e acce#ted towards Security $e#osit!

    Security $e#osit shall -e returned to the contractor after the e#iry of the(aintenance #eriod in all the cases other than @ote 9i: (entioned -elow and after #assin thefinal -ill -ased on @o Clai( Certificate with the a##ro>al of the Co(#etent Authority! 'heCo(#etent Authority shall nor(ally -e the authority who is co(#etent to sin the contract! Ifthis Co(#etent Authority is of the ran lower than JA Grade< then a JA Grade Officer 9concernedwith the wor: should issue the certificate! 'he certificate< inter alia< should (ention that thewor has -een co(#leted in all res#ects and that all the contractual o-liations ha>e -eenfulfilled -y the contractor and that there is no due fro( the contractor to Railways aainst thecontract concerned! ?efore releasin the S$< an unconditional and uneEui>ocal @o Clai(Certificate8 fro( the contractor concerned should -e o-tained!

    N+e -

    9i: After the wor is #hysically co(#leted< Security $e#osit reco>ered fro( the runnin-ills of a contractor can -e returned to hi(< if he so desires< in lieu of &$RBirre>oca-le?an Guarantee for eEui>alent a(ount to -e su-(itted -y hi(!

    9ii: In case of contracts of >alue Rs! *0 crore and a-o>e< irre>oca-le ?an Guarantee canalso -e acce#ted as a (ode of o-tainin security de#osit!

    1ern(ent Securities de#osited in ter(s ofSu-Clause 91: of this clause will -e #aya-le with interest accrued thereon!

    1: Guarantee ?onds eecuted or $e#osits Recei#ts tendered -y all Scheduled ?ansM

    9>i: A $e#osit in the Post Office Sa>in ?anM

    9>ii: A $e#osit in the @ational Sa>ins CertificatesM

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    29/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2)

    9>iii: 'wel>e years @ational $efence CertificatesM

    9i: 'en years $efence $e#ositsM

    9: @ational $efence ?onds and

    9i: 5nit 'rust Certificates at *N -elow (aret >alue or at the face >alue whiche>er is less!

     Also< &$R in fa>our of &ACAO 9free fro( any encu(-rance: (ay -e acce#ted!N+e - 'he instru(ents as listed a-o>e will also -e acce#ta-le for Guarantees in case of

    ,o-iliLation Ad>ance!

    9c: 'he Perfor(ance Guarantee shall -e su-(itted -y the successful -idder after the=etter Of Acce#tance 9=OA: has -een issued< -ut -efore sinin of the contractaree(ent! 'his P!G! shall -e initially >alid u#to the sti#ulated date of co(#letion #lus"0 days -eyond that! In case< the ti(e for co(#letion of wor ets etended< thecontractor shall et the >alidity of P!G! etended to co>er such etended ti(e forco(#letion of wor #lus "0 days!

    9d: 'he >alue of PG to -e su-(itted -y the< contractor will not chane for >ariation u#to2*N 9either increase or decrease:! In case durin the course of eecution< >alue of

    the contract increases -y (ore than 2*N of the oriinal contract >alue< an additionalPerfor(ance Guarantee a(ountin to *N 9fi>e #ercent: for the ecess >alue o>er theoriinal contract >alue shall -e de#osited -y the contractor!

    9e: 'he Perfor(ance Guarantee 9PG: shall -e released after #hysical co(#letion of thewor -ased on DCo(#letion CertificateD issued -y the co(#etent authority statin thatthe contractor has co(#leted the wor in all res#ects satisfactorily! 'he Security$e#osit shall< howe>er< -e released only after e#iry of the (aintenance #eriod andafter #assin the final -ill -ased on D@o Clai( CertificateD fro( the contractor!

    9f: /hene>er the contract is rescinded< the Security $e#osit shall -e forfeited and thePerfor(ance Guarantee shall -e encashed! 'he -alance wor shall -e ot doneinde#endently without ris cost of the failed contractor! 'he failed contractor shall

    -e de-arred fro( #artici#atin in the tender for eecutin the -alance wor! If thefailed contractor is a J6 or a Partnershi# fir(< then e>ery (e(-erB#artner of such afir( shall -e de-arred fro( #artici#atin in the tender for the -alance wor in hisBherindi>idual ca#acity or as a #artner of any other J6 B#artnershi# fir(!

    9: 'he enineer shall not (ae a clai( under the Perfor(ance Guarantee ece#t fora(ounts to which the President of India is entitled under the contract 9notwithstandin andBor without #reudice to any other #ro>isions in the contractaree(ent: in the e>ent of

    9i: &ailure -y the contractor to etend the >alidity of the Perfor(ance Guarantee asdescri-ed herein a-o>e< in which e>ent the +nineer (ay clai( the full a(ount of thePerfor(ance Guarantee!

    9ii: &ailure -y the contractor to #ay President of India any a(ount due< either as areed-y the contractor or deter(ined under any of the ClausesBConditions of the Aree(ent< within 30 days of the ser>ice of notice to this effect -y +nineer!

    9iii: 'he Contract -ein deter(ined or rescinded under #ro>ision of the GCC< thePerfor(ance Guarantee shall -e forfeited in full and shall -e a-solutely at the dis#osalof the President of India!

    QRef! Ite(l to Railway ?oardDs letter no! 200%BC+!IBC'B1) Pt!KII< dated 31!12!2010

    1=8 F+rce %ajeure C*au)e , If at any ti(e< durin the continuance of this contract< the#erfor(ance in whole or in #art -y either #arty of any o-liation under this contract shall -e#re>ented or delayed -y reason of any war< hostility< acts of #u-lic ene(y< ci>il co((otion<sa-otae< serious loss or da(ae -y fire< e#losions< e#ide(ics< stries< locouts or acts of God9hereinafter< referred to e>ents: #ro>ided< notice of the ha##enin of any such e>ent is i>en -yeither #arty to the other within 30 days fro( the date of occurrence thereof< neither #arty shall

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    30/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 2.

    -y reason of such e>ent< -e entitled to ter(inate this contract nor shall either #arty ha>e anyclai( for da(aes aainst the other in res#ect of such non#erfor(ance of delay in#erfor(ance< and wors under the contract shall -e resu(ed as soon as #ractica-le after suche>ent has co(e to an end or ceased to eist< and the decision of the +nineer as to whether thewors ha>e -een so resu(ed or not shall -e final and conclusi>e< PRO6I$+$ &5R';+R that ifthe #erfor(ance in whole or in #art of any o-liation under this contract is #re>ented or delayed

    -y reason of any such e>ent for a #eriod eceedin 120 days< either #arty (ay at its o#tionter(inate the contract -y i>in notice to the other #arty!

    1=A E$e")&+" O' T&(e I" C+"rac) ,  Su-ect to any reEuire(ent in the contract as toco(#letion of any #ortions or #ortions of the wors -efore co(#letion of the whole< thecontractor shall fully and finally co(#lete the whole of the wors co(#rised in the contract 9withsuch (odifications as (ay -e directed under conditions of this contract: -y the date entered inthe contract or etended date in ter(s of the followin clauses

    9i: E$e")&+" Due T+ %+#&'&ca&+" , If any (odifications ha>e -een ordered which inthe o#inion of the +nineer ha>e (aterially increased the (anitude of the wor< thensuch etension of the contracted date of co(#letion (ay -e ranted as shall a##ear tothe +nineer to -e reasona-le in the circu(stances< #ro>ided (oreo>er that theContractor shall -e res#onsi-le for reEuestin such etension of the date as (ay -econsidered necessary as soon as the cause thereof shall arise and in any case not lessthan one (onth -efore the e#iry of the date fied for co(#letion of the wors!

    9ii: E$e")&+" F+r De*a N+ Due T+ Ra&*>a Or C+"rac+r , If in the o#inion of the+nineer< the #roress of wor has any ti(e -een delayed -y any act or nelect ofRailwayDs e(#loyees or -y other contractor e(#loyed -y the Railway under Su-Clause 94: of Clause 20 of these Conditions or in eecutin the wor not for(in #artof the contract -ut on which contractorDs #erfor(ance necessarily de#ends or -yreason of #roceedin taen or threatened -y or dis#ute with adoinin or toneih-ourin owners or #u-lic authority arisin otherwise throuh the ContractorDsown default etc! or -y the delay authoriLed -y the +nineer #endin ar-itration or in

    conseEuences of the contractor not ha>in recei>ed in due ti(e necessary instructionsfro( the Railway for which he shall ha>e s#ecially a##lied in writin to the +nineer orhis authoriLed re#resentati>e then u#on ha##enin of any such e>ent causin delay<the Contractor shall i((ediately i>e notice thereof in writin to the +nineer within1* days of such ha##enin< -ut shall ne>ertheless (ae constantly his -estendea>ours to -rin down or (ae ood the delay and shall do all that (ay -ereasona-ly reEuired of hi( to the satisfaction of the +nineer to #roceed with thewors! 'he contractor (ay also indicate the #eriod for which the wor is liely to -edelayed and shall -e -ound to as for necessary etension of ti(e! 'he +nineer onrecei#t of such reEuest fro( the contractor shall consider the sa(e and shall rantsuch etension of ti(e as in his o#inion is reasona-le ha>in reard to the nature and#eriod of delay and the ty#e and Euantu( of wor affected there-y! @o otherco(#ensation shall -e #aya-le for wors so carried forward to the etended #eriod of

    ti(e< the sa(e rates< ter(s and conditions of contract -ein a##lica-le as if suchetended #eriod of ti(e was oriinally #ro>ided in the oriinal contract itself!

    9iii: E$e")&+" F+r De*a Due T+ Ra&*>a) , In the e>ent of any failure or delay -y theRailway to hand o>er the Contractor #ossession of the lands necessary for theeecution of the wors or to i>e the necessary notice to co((ence the wors or to#ro>ide the necessary drawins or instructions or any other delay caused -y theRailway due to any other cause whatsoe>er< then such failure or delay shall in no wayaffect or >itiate the contract or alter the character thereof or entitle the contractor toda(aes or co(#ensation therefor< -ut in any such case< the Railway (ay rant suchetension or etensions of the co(#letion date as (ay -e considered reasona-le!

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    31/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 30

    1=-H E$e")&+" O' T&(e F+r De*a Due T+ C+"rac+r , 'he ti(e for the eecution ofthe wor or #art of the wors s#ecified in the contract docu(ents shall -e dee(ed to -e theessence of the contract and the wors (ust -e co(#leted not later than the date9s: as s#ecifiedin the contract! If the contractor fails to co(#lete the wors within the ti(e as s#ecified in thecontract for the reasons other than the reasons s#ecified in Clause 1% and 1%A< the Railway(ay< if satisfied that the wors can -e co(#leted -y the contractor within reasona-le short ti(e

    thereafter< allow the contractor for further etension of ti(e 9Profor(a at Anneure6II: as the+nineer (ay decide! On such etension the Railway will -e entitled without #reudice to anyother riht and re(edy a>aila-le on that -ehalf< to reco>er fro( the contractor as areedda(aes and not -y way of #enalty a su( eEui>alent to of 1N of the contract >alue of thewors for each wee or #art of the wee!

    &or the #ur#ose of this Clause< the contract >alue of the wors shall -e taen as >alueof wor as #er contract aree(ent includin any su##le(entary wor orderBcontract aree(entissued! Pro>ided also< that the total a(ount of liEuidated da(aes under this condition< shall noteceed the under noted #ercentae >alue or of the total >alue of the ite( or rou#s of ite(s ofwor for which a se#arate distinct co(#letion #eriod is s#ecified in the contract!

    9i: &or contract >alue u#to Rs! 2 lah 10N of total >alue of the contract

    9ii: &or contracts >alued a-o>e Rs! 2 lah 10N of first Rs!2 lah and *N of -alance

    &urther< co(#etent authority while rantin etension to the currency of contractunder Clause 1% 9?: of GCC (ay also consider le>y of toen #enalty< as dee(ed fit -ased on the(erit of the case!

    Pro>ided further< that if the Railway is not satisfied that the wors can -e co(#leted -ythe Contractor and in the e>ent of failure on the #art of the contractor to co(#lete the worwithin further etension of ti(e allowed as aforesaid< the Railway shall -e entitled without#reudice to any other riht or re(edy a>aila-le in that -ehalf< to a##ro#riate the contractorDsSecurity $e#osit and rescind the contract under Clause "2 of these Conditions< whether or notactual da(ae is caused -y such default!

    1?831 I**e!a* Gra&'&ca&+" , Any -ri-e< co((ission< ift or ad>antae i>en< #ro(ised oroffered -y or on -ehalf to the Contractor or his #artner< aent or ser>ant or< anyone on his-ehalf< to any officer or e(#loyee of the Railway< or to any #erson on his -ehalf in relation too-tainin or eecution of this or any other contract with the Railway shall< in addition to anycri(inal lia-ility which he (ay incur< su-ect contractor to the rescission of the contract and allother contracts with the Railway and to the #ay(ent of any loss or da(ae resultin fro( suchdecision and the Railway shall -e entitled to deduct the a(ounts so #aya-le fro( any (oneysdue to the Contractor9s: under this contract or any other contracts with the Railway!

    1?832 'he Contractor shall not lend or -orrow fro( or ha>e or enter into any (onitorydealins or transactions either directly or indirectly with any e(#loyee of the Railway and if heshall do so< the Railway shall -e entitled forthwith to rescind the contract and all other contractswith the Railway! Any Euestion or dis#ute as to the co((ission or any such offence orco(#ensation #aya-le to the Railway under this Clause shall -e settled -y the General ,anaerof the Railway< in such a (anner as he shall consider fit sufficient and his decision shall -efinal conclusi>e! In the e>ent of rescission of the contract under this Clause< the Contractor willnot -e #aid any co(#ensation whatsoe>er ece#t #ay(ents for the wor done u#to the date ofrescission!

    EXECUTION OF .OR7S

    1@831 C+"rac+r) U"#er)a"#&"! , It is understood and areed that the Contractor has<-y careful ea(ination< satisfied hi(self as to the nature and location of the wor< theconfor(ation of the round< the character< Euality and Euantity of the (aterials to -e

    encountered< the character of eEui#(ent and facilities needed #reli(inary to and durin the

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    32/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 31

    #roress of the wors< the eneral and local conditions< the la-our conditions #re>ailin thereinand all other (atters which can in any way affect the wors under the contract!

    1@832 C+((e"ce(e" O' .+r/) , 'he Contractor shall co((ence the wors within 1*days after the recei#t -y hi( of an order in writin to this effect fro( the +nineer and shall#roceed with the sa(e with due e#edition and without delay

    1@839 Accee# Pr+!ra((e O' .+r/ , 'he Contractor who has -een awarded the worshall as soon as #ossi-le -ut not later than 30 days after the date of recei#t of the acce#tanceletter in res#ect of contracts with initial co(#letion #eriod of two years or less or not later than.0 days for other contracts ha>e to su-(it the detailed #rora((e of wor indicatin the ti(eschedule of >arious ite(s of wors in the for( of ?ar ChartBP+R'BCP,! ;e shall also su-(it thedetails of oranisation 9in ter(s of la-our and su#er>isors: #lant and (achinery that he intendsto utiliLe 9fro( ti(e to ti(e: for eecution of the wor within sti#ulated date of co(#letion! 'he#rora((e of wor a(ended as necessary -y discussions with the +nineer< shall -e treated asthe areed #rora((e of the wor for the #ur#ose of this contract and the contractor shallendea>our to fulfill this #rora((e of wor! 'he #roress of wor will -e watched accordinlyand the liEuidated da(aes will -e with reference to the o>erall co(#letion date! @othin stated

    herein shall #reclude the contractor in achie>in earlier co(#letion of ite( or whole of the worsthan indicated in the #rora((e!

    1@834 Se&"! Ou O' .+r/) , 'he Contractor shall -e res#onsi-le for the correct settinout of all wors in relation to oriinal #oints< lines and le>els of reference at his cost! 'heContractor shall eecute the wor true to alin(ent< rade< le>els and di(ensions as shown inthe drawin and as directed -y the +nineerDs re#resentati>e and shall chec these at freEuentinter>als! 'he Contractor shall #ro>ide all facilities lie la-our and instru(ents and shall coo#erate with the +nineerDs re#resentati>e to chec all alin(ent< rades< le>els and di(ensions!If< at any ti(e< durin the #roress of the wors any error shall a##ear or arise in any #art of thewor< the Contractor< on -ein reEuired so to do -y the +nineerDs re#resentati>e shall< at hisown cost rectify such errors< to the satisfaction of the +nineerDs re#resentati>e! Such checin

    shall not a-sol>e the Contractor of his own res#onsi-ility of (aintainin accuracy in the wor!'he Contractor shall carefully #rotect and #reser>e all -ench (ars< siht rails< #es and otherthins used in settin out the wor!

    20831 C+(*&a"ce T+ E"!&"eerB) I")ruc&+") ,  'he +nineer shall direct the order inwhich the se>eral #arts of the wors shall -e eecuted and the Contractor shall eecute withoutdelay all orders i>en -y the +nineer fro( ti(e to ti(eM -ut the Contractor shall not -e relie>edthere-y fro( res#onsi-ility for the due #erfor(ance of the wors in all res#ects!

    20832 A*era&+") T+ He Au;+r&e# ,  @o alterations in or additions to or o(issions ora-andon(ent of any #art of the wors shall -e dee(ed authorised< ece#t under instructionsfro( the +nineer< and the Contractor shall -e res#onsi-le to o-tain such instructions in eachand e>ery case in writin fro( the +nineer!

    20839 E$ra .+r/) , Should wors o>er and a-o>e those included in the contract reEuire to-e eecuted at the site< the contractor shall ha>e no riht to -e entrusted with the eecution ofsuch wors which (ay -e carried out -y another contractor or contractors or -y other (eans atthe o#tion of the Railway!

    20834 Searae C+"rac) I" C+""ec&+" .&; .+r/) , 'he Railway shall ha>e the rihtto let other contracts in connection with the wors! 'he Contractor shall afford other contractorsreasona-le o##ortunity for the storae of their (aterials and the eecution of their wors andshall #ro#erly connect and coordinate his wor with theirs! If any #art of the Contractors worde#ends for #ro#er eecution or result u#on the wor of another contractor9s:< the Contractorshall ins#ect and #ro(#tly re#ort to the +nineer any defects in such wors that render it

    unsuita-le for such #ro#er eecution and results! 'he ContractorDs failure soto ins#ect andre#ort shall constitute an acce#tance of the other contractorDs wor as fit and #ro#er for the

  • 8/16/2019 General Conditions of Contract July 2014 22-07-14

    33/68

      Indian Railways Standard General Conditions Of Contract 

     As On 30th June 2014 Pae 32

    rece#tion of his wor< ece#t as to defects which (ay de>elo# in the other contractorDs worafter the eecution of his wor!

    218 I")ruc&+" O' E"!&"eer) Rere)e"a&e , Any instr