The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) General Conditions By : AMIN ABDUL MAJID - ZAID IBRAHIM & CO RAZIB DAWOOD - ENERGY COMMISSION 18 April 2013

General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE)

General Conditions

By :

AMIN ABDUL MAJID - ZAID IBRAHIM & CORAZIB DAWOOD - ENERGY COMMISSION

18 April 2013

Page 2: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 2

Agenda

Industry’s Structure (MESI)

The Book (Table of Contents)

Governance of the Grid Code

Legal Standing of the Grid Code

Page 3: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 3

Suruhanjaya Tenaga

The Grid Code has been adopted and published by ST in the discharge of its function

Page 4: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 4

Parties in The Grid Code

5

TNB Transmission 6

Grid Owner

Directly

Connected

Customer

Grid System

Operator

Interconnected Parties

Page 5: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 5

Power System, Parties & Codes

Users Description e.g.

Generators • TNB Generators• IPPs

• JMJG• TBIN • Kenyir

Directly Connected Customer

Bulk supply customers connected to 132kV and above

KTMB

NetworkOperators

Operates network at any voltage and may import/export to the Grid

NUR

External Parties

OutsideMalaysia

EGAT

Page 6: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 6

“Rules of The Game”

“Work hard & play by the rules”

Page 7: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 7

Run Like Clockwork 24/7/365

Page 8: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 8

THE MALAYSIAN GRID CODE 2010

0 20 40 60 80 100 120

Metering Code

Data Registration

Schedulling & Dispatch

Operating Code

Connection Code

Planning Code

General Conditions

27

35

42

102

63

61

14

Pages

Contents

Page 9: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 9

GC5 Grid Code Committee (GCC)

Governance ST to establish and maintain the GCC to oversee the implementation of the

MGC.

Page 10: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10

GC7 External Audit

“The GCC shall appoint an independent External Auditor to perform, among other functions, to review the GSO and Single Buyer operations and performance in compliance with the provisions of the Grid Code. “

Page 11: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 11

GSO Website

http://www.gso.org.my/Home

“The GSO is entrusted to discharge its duties in a non-discriminatory and transparent manner through the provisions of the Grid Code.”

Page 12: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 12

Applicable Acts, Codes and Standards

LICENCES

Page 13: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 13

Proposed Amendments to the MGC

GC6 General Procedure for GCC

Proposed Amendment to MGC submitted

Chairman and Secretary

informs GCC of Proposed

Amendment

GCC decides or appoints technical experts

Decision / Recommendations

circulated to affected Licensees

GCC deliberates for final

agreement and submission to ST

ST approves Proposed

Amendment

Public Consultation

Page 14: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 14

GC10 Derogations and Exemptions

Derogation Request and Issue Process

Request for Derogation

submitted to ST

ST discusses derogation

request with Grid

Owner, User, GSO and GCC

ST may seek clarification or

expert assistance

ST decides on derogation – Temporary derogation / long term derogation

Page 15: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 15

GC15 Grid Code Disputes

Dispute between the Grid

Owner, Users, Single Buyer, GSO in

relation to the Grid Code

Either party may issue notice and

attempt to resolve by way of negotiation

If not successful, may

refer to ST

ST determines the dispute

ST refers the matter to arbitration

Page 16: General Conditions - Energy Commission · The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE) 10 GC7 External Audit “The GCC shall

The Malaysian Grid Code Awareness Programme Funded by Akaun Amanah Industri Bekalan Elektrik (AAIBE)

THANK YOU