Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
GA
1Scale: 1:20
Unit: inches
Draw
n: S.M.
Date: 28 Sept 2010
Approved: ##
Date: ##
Page: 1 of 2
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SG
ENERA
L ASSEM
BLY / MO
NTA
GE G
ÉNÉRA
L
85.9
0
73.0
0
67.0
0
80.00
74.00
A A
SA1-4-1
SA1-3
SA1-2
SA1-5
SA1-1 2
3
87.00
SECTION A-A / COUPE A-ASCALE 1 : 5 / ÉCHELLE 1:5
SCALE 1 : 20 / ÉCHELLE 1:20
1
TOP VIEW /VUE D’EN HAUT
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
LIFT HERE
page 1
Horizontal Panel Assembly Vertical Panel Assembly
SA1-4-2
SA1-4-3
GA
1Scale: 1:10
Unit: inches
Draw
n: S.M.
Date: 28 Sept 2010
Approved: ##
Date: ##
Page: 2 of 2
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SG
ENERA
L ASSEM
BLY / MO
NTA
GE G
ÉNÉRA
L
A
A SECTION A-A / COUPE A-A
4
P1-1-2
P1-1-1
LIFT HERE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
page 2
NCC logo etched into aluminum.
Art �le supplied by the NCC
SA1-1
Scale: 1:15U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 2
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SFRA
ME A
SSEMBLY / EN
SEMBLE D
’OSSA
TURE
80"
74"
73"
67"
36"
40"
SA1-1-1
P1-1-1-1
P1-1-4
P1-1-5
6"
P1-1-3TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
BOTTOM VIEW / VUE D’EN BAS
page 3
SA1-1
Scale: 1:15U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 2 of 2
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SFRA
ME A
SSEMBLY / EN
SEMBLE D
’OSSA
TURE
DD
DETAIL A / DÉTAIL A SCALE 1 : 3 / ÉCHELLE 1:3
x
x
o�-set holes1/32" betweenbracket and frame les trous de rejeton 1/32 d'un pouce entre la parenthèse et la charpente
P1-1-1
DETAIL B / DÉTAIL B SCALE 1 : 3 / ÉCHELLE 1:3
2
5
P1-1-2
1/16"
1/8"
DETAIL C / DÉTAIL C SCALE 1 : 1 / ÉCHELLE 1:1
1/16"
SECTION D-D / COUPE D-D SCALE 1 : 1 / ÉCHELLE 1:1
page 4
6
7
SA1-1-1
Scale: 1:5U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SPA
NEL M
OU
NTIN
G RA
IL ASSEM
BLY /EN
SEMBLE D
E RAIL D
E MO
NTA
GE D
E PAN
NEA
U
26 1/2"
14"
26 3/8"
13 1/4"A
A
P1-1-1-1
plug weld at 4" O.C. on each aluminum angle/la prise de courant soude à 4 pouces du centre sur chaque angle en aluminium
5 3/
4"
9
SECTION A-A / COUPE A-ASCALE 1 : 1 / ÉCHELLE 1:1
8
TOP VIEW/VUE D’EN HAUT
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
SIDE ELEVATIONSCALE 1:2 / ÉCHELLE 1:2
8 1/2" x 1" x 1/8" Aluminum angle cut to suit /Cornière en aluminum de 1/2 po. sur 1/8 po., à couper en fonction du besoin.
9 1/8" Aluminum end cap - ensure 1/8" gap at bottom of rail assembly for drainage /Capuchon d’extémité en aluminum de 1/8 po.;s’assurer d’avoir un jeu de drainage de 1/8 po. le longde la partie inférieure de l’ensemble du rail.
Notes:
SCALE 1:5/ÉCHELLE 1:5 page 5
/ ÉLÉVATION LATÉRALE
P1-1-1
Scale: 1:2U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
STO
P BRACKET / CRO
CHET SU
PÉRIEURE
6"
6"
45°
A
A
11
10 SECTION A-A / COUPE A-A
1 1/
2"3
1/2"
1 1/2"
3"
5 1/4"
5/16
"
6"
TOP VIEW / VIEW D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
ISOMETRIC VIEW /VUE ISOMÉTRIQUE
SCALE 1:2 / ÉCHELLE 1:2
page 6
P1-1-2
Scale: 1:2U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SBO
TTOM
BRACKET / CRO
CHET SU
PÉRIEURE
5 1/4"
3"
3 1/
2"
1 1/2"
1 1/
2"
6"
6"
6"
5/16
"
45°
A
A
11
10SECTION A-A /COUPE A-A
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
SCALE 1:2 /ÉCHELLE 1:2
ISOMETRIC VIEW /VUE ISOMÉTRIQUE
page 7
P1-1-3
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
STO
P FRAM
E RAIL / RA
IL SUPÉRIEU
R DE BÂ
TI
80"
3"
45°40"
3 1/2"
66 5/8"
33 5/16"
3 1/2" 3"
1 1/
2"
SCALE 1:10 / ÉCHELLE 1:10
SCALE 1:2 /ÉCHELLE 1:2
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
SIDE ELEVATION / ÉLÉVATION LATÉRALE
typ.
page 8
cL
cL
cL
cL
12
Drill through 3/8” c.s. to suit fastenerForer un trou fraisé de 3/8 po., aux �ns de pose d’un dispositif de �xation.
P1-1-4
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SSID
E FRAM
E RAIL / RA
IL DE BÂ
TI LATÉRA
LE
73"
36 1/2"
45°
3 1/2" 3"
1 1/
2"
Drill through 3/8”c.s. to suit fastenerForer un trou fraisé de 3/8 po., aux �ns de pose d’un dispositif de �xation.
3 1/2" 59 5/8"
10 3/4"
36"
typ.
SCALE 1:10 / ÉCHELLE 1:10
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
SIDE ELEVATION / ÉLÉVATION LATÉRALE
page 9
12
P1-1-5
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 201027 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SBO
TTOM
FRAM
E RAIL / RA
IL INFÉRIEU
R DE BÂ
TI
80"
45°
3"3 1/2"
1 1/
2"
40"
3 1/2"
66 5/8"
73 5/8"
20"
33 5/16"A A
11
SECTION A-A / COUPE A-ASCALE 1 : 2 / ÉCHELLE 1 : 2
SCALE 1:10 / ÉCHELLE 1:10
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
typ.
( to suit SA1-3 / devant convenir à l’ensemble SA1-3 )
page 10
12
c.s. to suit fastener /à fraiser en fonction de la grosseur du dispositif de �xation
P1-1-1-1
Scale: 1:8U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SRA
IL BAR / BA
RRE DE RA
IL
0.38
76 3/4"
49 3/4"
16 3/4"
69 3/4"
14 7/8"
1 1/
2"
3/4"
TOP/BOTTOM VIEW / VUE D’EN HAUT ET (OU) D’EN BAS
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION / ÉLÉVATION LATÉRALE
SCALE 1:1 / ÉCHELLE 1:1
SCALE 1:8 / ÉCHELLE 1:8
( or cut to suit / ou couper en fonction du besoin )
( see P1-4-1-1 / voir P1-4-1-1 )
page 11
13
14
SA1-2
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SCO
NCRETE BA
SE ASSEM
BLY / ENSEM
BLE DE SO
CLE EN BÉTO
N
87"
79 1/2"
68"
34"13
14
15
16 SBR rubber leg - recessed into the base and fastened with a minimum of three 1/2” galvanized boltsinto embedded threaded inserts.Patte en caoutchouc SBR, à encastrer dans le socle et à attacher en se servant d’au moins trois boulons galvanisés de ½’’, à noyer dans des pièces rapportées et �letées.
29"
32"
5 11
/16"
9"3/4"
2 1/
2"
° 05. 2
5"2
1/2"
43 1/2"TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION / ÉLÉVATION LATÉRALE
SCALE 1:10 / ÉCHELLE 1:10page 12
SA1-3
Scale: 1:5U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SFRA
ME M
OU
NTIN
G RA
IL / RAIL D
E MO
NTA
GE D
E BÂTI
76 1/2"
2 1/2"
73 1/2"
13/16"
1/4"
3 3/
8"
3/8"
1 1/
2"36 3/4"
1"
68"
34"
2 1/
2"
1" drain hole / Trou de drainage d’un (1 po.) pouce
5"3"
73 5/8"
3"
17/32"
1"
1 1/
2"36 13/16"
22"
A
A
19
20
28
1/8" Depression
4 1/2” x 2 1/2” x 1/4”Sti�ener plate with vinyl text
4 1/2 “ x 2 1/2” x 1/4”plaque de renfort avec le texte de vinyle
for positive contacton ConcreteCreux de 1/8 po., aux �ns de contact positif sur le béton
2 3/4"
SECTION A-A / COUPE A-A SCALE 1 : 5 / ÉCHELLE 1 : 5
21
LIFT HERE
SCALE 1:5 / ÉCHELLE 1 : 5
TOP VIEW / VUE D’EN HAUT
SIDE ELEVATION / ÉLÉVATION LATÉRALE
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
page 13
SA1-4-1
Scale: 1:15U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SH
ORIZO
NTA
L PHO
TO PA
NEL A
SSEMBLY /
ENSEM
BLE DE PA
NN
EAU
DE PH
OTO
S À L’H
ORIZO
NTA
LE
71"
69 1/2"
51"
49 1
/2"
P1-4-1-1
P1-4-1-2
5 1/
8"
12"
52 3/4"
5"
26 3/8"22
Drill 1/8" holes as shown, Typical Panel Installation7/8" Pan Head #8 SS Wood Screw Forer des trous de 1/8’’, selon les indications; il s’agit ici d’un montage typique de panneau. Vis à bois en acier inoxydable, de 7/8’’ et à tête cylindrique et bombée
1 1/4"
A
22TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE BACK ELEVATION / ÉLÉVATION ARRIÈRE
SIDE ELEVATION / ÉLÉVATION LATÉRALE
DETAIL A / DÉTAIL A SCALE 1:2 / ÉCHELLE 1:2
SCALE 1:15 / ÉCHELLE 1:15
page 14
P1-4-1-1
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SH
ORIZO
NTA
L BASE PA
NEL /
PAN
NEA
U D
E BASE, À
L’HO
RIZON
TALE
51"
71"
69 3/4"
36"
2 1/4" 2 1/
4"
8 5/16"
7 3/
4"
23
typ.
SCALE 1:10 / ÉCHELLE 1:10
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION / ÉLÉVATION LATÉRALE
typ.
page 15
P1-4-1-2
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SH
ORIZO
NTA
L PHO
TO PA
NEL /
PAN
NEA
U À
PHO
TOS, À
L’HO
RIZON
TALE
68"
48"
24
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALESIDE ELEVATION /
ÉLÉVATION LATÉRALE
SCALE 1:10 / ÉCHELLE 1:10
page 16
SA1-4-2
Scale: 1:15U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SVERTICA
L PHO
TO PA
NEL A
SSEMBLY /
ENSEM
BLE DE PA
NN
EAU
À PH
OTO
S, À LA
VERTICALE
51"
49 1/2"
64"
62 1
/2"
P1-4-2-1
P1-4-2-2 1 1/4"
A
12"
5 1/
8"
32 3/4"
5"
32"
16 3/8" 22
Drill 1/8" holes as shown, Typical Panel Installation7/8" Pan Head #8 SS Wood ScrewForer des trous de 1/8’’, selon les indications; il s’agit ici d’un montage typique de panneau.
22
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION / ÉLÉVATION LATÉRALE
BACK ELEVATION / ÉLÉVATION ARRIÈRE
SCALE 1:15 / ÉCHELLE 1:15
DETAIL A / DÉTAIL ASCALE 1:2 / ÉCHELLE 1:2
page 17
P1-4-2-1
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SVERTICA
L BASE PA
NEL /
PAN
NEA
U D
E BASE, À
LA VERTICA
LE
51"
64"
49 3/4"
36"
7 5/8"
2 1/4"
2 1/
4"
7 7/
16"
23
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
SCALE 1:10 / ÉCHELLE 1:10
TOP VIEW / VUE D’EN HAUT
typ.page 18
typ.
P1-4-2-2
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SVERTICA
L PHO
TO PA
NEL /
PAN
NEA
U À
PHO
TOS, À
LA VERTICA
LE
48"
61"
24
SCALE 1:10 / ÉCHELLE 1:10
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALESIDE ELEVATION /
ÉLÉVATION LATÉRALE
page 19
SA1-4-3
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SVERTICA
L TEXT PAN
EL ASSEM
BLY /EN
SEMBLE D
E PAN
NEA
U D
E TEXTE, À LA
VERTICALE
18"
51"
16 3/4"
36"
25 1
/2"
18"
8 3/8"
24
A 5 1/
8"
12"
5"
6"
22
22
SCALE 1:10 / ÉCHELLE 1:10
DETAIL A / DÉTAIL A SCALE 1:2 / ÉCHELLE 1:2
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
BACK ELEVATION /ÉLÉVATION ARRIÈRE
page 20
SA1-5
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
27 Oct 2010
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
STEXT PA
NEL A
SSEMBLY /
ENSEM
BLE DE PA
NN
EAU
DE TEXTE
48"
46"
40"
2.25
2 3/
8"
35°
3/8"
3/16" spot weldat 2"Élément de 3/16’’,à souder par poinçonnement, aux 2’’
P1-5-1
P1-5-2
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
SCALE 1:10 / ÉCHELLE 1:10
SCALE 1:2 / ÉCHELLE 1:2
SIDE ELEVATION /ÉLÉVATION LATÉRALE
page 21
fasten to Bottom Frame Rail (P1-1-5)with 3/8” - 16 ss �athead , nut and washerÀ attacher au rail de bâti inférieur (P1-1-5), en se servant de dispositifs de �xation à têtes plates en acier inoxydable, de 3/8’’ et de format 16, avec rondelles et écrous assortis.
SA1-5-1
Scale: 1:4U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 201027 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
STEXT PA
NEL SU
PPORT BRA
CKET /CRO
CHET D
E SUPPO
RT DE PA
NN
EAU
DE TEXTE
3/8"
26
3/8"
5/16
"
45°
9"10"
1 1/8"
25
3"
1/2" 5 1/
4"
6"
3"
2 5/
8"
BOTTOM VIEW /VUE D’EN BAS
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION /ÉLÉVATION PRINCIPALE
LEFT ELEVATION / ÉLÉVATION À GAUCHE RIGHT ELEVATION /ÉLÉVATION À DROITE
ISOMETRIC VIEW /VUE ISOMÉTRIQUE
SCALE 1:2 /ÉCHELLE 1:2
1/4" weldSoudure de 1/4 po.
page 22
4.25
”
SA1-5-2
Scale: 1:10U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 201027 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
STEXT PA
NEL M
OU
NTIN
G BA
SE / SO
CLE DE M
ON
TAG
E DE PA
NN
EAU
DE TEXTE
48"2"
2 1/
8"
2 1/
4"
1 1/
8"
2 3/
8"
1 3/
16"
A
A
14
27
1 1/
2"
9”
46 1/2"
SECTION A-A / COUPE A-A SCALE 1 : 5 / ÉCHELLE 1 : 5
1" TabOnglet de 1 PO.
2" x 2" x 3/8" aluminum block welded to back of gusset
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
BOTTOM VIEW / VUE D’EN BAS
SIDE ELEVATION / ÉLÉVATION LATÉRALE
ISOMETRIC VIEW /VUE ISOMÉTRIQUE
page 23
4.25
"
27
Bloc en aluminium, à souder à la partie arrière de la plaque de gousset.
Drill 1/8" holes as shown, Typical Panel Installation5/8" Pan Head #8 SS Wood Screw.Provide hole spacing as shown,minimum 6” O.C. Forer des trous de 1/8’’, selon les indications (montage typique de panneau);vis à bois en acier inoxydable, de 5/8’’ et à tête cylindrique et bombée, de format n° 8;Fournir distance entre les trous comme indiqué, minimum de 6 pouces de centre à centre
P1-5-1
Scale: 1:5U
nit: inches
Draw
n: S.M.
Date: 25 O
ct 201027 O
ct 2010
Approved: ##
Date: ##
Page: 1 of 1
Draw
ing
Revision:
Date:
PH
OTO
EXH
IBIT STR
UC
TUR
E / STR
UC
TUR
E D’ESP
OSTIO
N D
E PH
OTO
SH
ORIZO
NTA
L TEXT PAN
EL / PA
NN
EAU
DE TEXTE, À
L’HO
RIZON
TALE
12"
50"
24
SCALE 1:5 / ÉCHELLE 1:5
TOP VIEW / VUE D’EN HAUT
FRONT ELEVATION / ÉLÉVATION PRINCIPALE
SIDE ELEVATION /ÉLÉVATION LATÉRALE
page 24