2018 Georgia Department of Transportation • Office of Strategic Communications Based on information available as of December 2017 Georgia Department of Transportation Office of Strategic Communications One Georgia Center 600 West Peachtree Street Atlanta, GA 30308 Phone: 404.631.1990 www.dot.ga.gov Scan this code with your smart phone QR reader for more information about Georgia DOT. 2018 REFERENCE GUIDE www.dot.ga.gov ABOUT GEORGIA DOT GEORGIA DOT’S LEADERSHIP Commissioner, Russell R. McMurry, P.E. ......................... 404-631-1005 Deputy Commissioner, Mike Dover, P.E. ......................... 404-631-1021 Chief Engineer, Meg Pirkle, P.E....................................... 404-631-1004 Treasurer, Angela Whitworth......................................... 404-631-1290 Planning Director, Jay Roberts....................................... 404-631-1802 Government Liaison, Josh Waller................................... 404-631-1007 Strategic Communications Director, Scott Higley........... 404-347-0543 Procurement Office Head, Treasury Young ..................... 404-631-1435 Information Technology CIO, Jeffrey A. Hill .................... 404-631-1590 DISTRICT ENGINEERS District 1/Northeast GA, Brent Cook .............................. 770-531-5723 District 2/East Central GA, Jimmy Smith ........................ 478-552-4600 District 3/West Central GA, Michael Presley................... 706-646-6900 District 4/Southwest GA, Ritchie Swindell ..................... 229-386-3280 District 5/Southeast GA, Brad W. Saxon ......................... 912-427-5711 District 6/Northwest GA, DeWayne Comer .................... 770-387-3602 District 7/Metro Atlanta, Kathy Zahul ............................ 770-216-3811 CUSTOMER SERVICE Customer Service Center ........................................... 404-631-1990 Questions and/or comments ........................................... dot.ga.gov Access & Permits ............................................................... dot.ga.gov Outdoor Advertising Permits .................................... 404-631-1392 Oversize Truck Permits ..................... 404-635-8176 / 888-262-8306 Crash Data & Reports ................................................ 404-635-2823 Roadside Memorials.................................................. 404-631-1933 Call a HERO or CHAMP for roadside assistance ....................... FUNDING, BUDGET & DEBT SERVICE FUND SOURCE (FY 2018) Federal funding ........................................................ $1.6B* Motor fuel ................................................................ $1.798B General funds ........................................................... $217M** *Federal funding reflects multiple years’ obligation authority. The appropriations bill reflects a federal estimate based on annual expenditures. **General funds include HB170 fees of $191M BUDGET (MOTOR FUEL & HB170 FEES) Capital Projects ........................................................ $937M General Operations .................................................. $205M Routine Maintenance ............................................... $448M LMIG ........................................................................ $180M DEBT SERVICE Payments to SRTA .................................................... $111.7M GO Bond Debt Service .............................................. $115.6M 35,000 0 2,500 5,000 10,000 20,000 30,000 40,000 50,000 1972 1992 2012 2016 9,110 Employees Lane Miles * Employee count for 10/2017; lane miles count for 12/2016 43,000 6,121 48,000 4,385 49,008 3,922 2017 *48,675 3,804* ROADWAY STATISTICS ROADS HOW GEORGIA RANKS American Society of Civil Engineers National Roadway rating D Georgia Roadway rating C- CONGESTION TTI (US Rank, Delay) 12 INRIX (World Rank, Hours in Congestion) 9 Tom Tom (World Rank, % Congested) 104 The Reason Foundation (2016) 21 Aggregate measure of overall highway performance, cost effectiveness and pavement condition. BRIDGES ASCE – deficient bridges 16%/ 9th Rankings based on #1 being the worst. ROADWAY MILEAGE Interstate/State Routes Centerline....................................................................... 17,912 Lane Miles ...................................................................... 48,675 Daily Vehicle Miles Traveled ................................... 201,649,271 County Roads Centerline ...................................................................... 87,369 Daily Vehicle Miles Traveled ..................................... 92,217,238 City Streets Centerline ...................................................................... 20,005 DMVT - Daily Vehicle Miles Traveled GDOT EMPLOYEES AND LANE MILES COST OF BUILDING & OPERATING A TRANSPORTATION SYSTEM Construct 1 lane mile (no R/W) Rural................................................................ ...... $1.9M Urban...............................................................$2.4M Construct Diamond Interchange (no R/W) Rural ........................................................................ $25M Urban ...................................................................... $33M Resurface 1 lane mile Interstate.................................................... ......$300,000 State Route .......................................................$125,000 FY 17 Resurfacing (Contracted & GDOT Forces) State Routes – 1,300 miles value .......................... $296M Interstates – 629 lane miles value......................... $106M Mowing................................................................... $40M Ref Guide_1.9.2018.indd 1 1/30/2018 1:38:56 PM

GDOT EMPLOYEES AND LANE MILES ROADWAY … · 2018 • Georgia Department of Transportation • Office of Strategic Communications Based on information available as of December 2017

Embed Size (px)

Citation preview

2018 • Georgia Department of Transportation • Office of Strategic Communications

Based on information available as of December 2017

Georgia Department of TransportationOffice of Strategic CommunicationsOne Georgia Center600 West Peachtree StreetAtlanta, GA 30308Phone: 404.631.1990www.dot.ga.gov

Scan this code with your smart phone QR reader for more information about Georgia DOT.

2018REFERENCE GUIDE

www.dot.ga.gov

ABOUT GEORGIA DOT

GEORGIA DOT’S LEADERSHIP Commissioner, Russell R. McMurry, P.E. ......................... 404-631-1005Deputy Commissioner, Mike Dover, P.E. ......................... 404-631-1021Chief Engineer, Meg Pirkle, P.E....................................... 404-631-1004Treasurer, Angela Whitworth......................................... 404-631-1290Planning Director, Jay Roberts....................................... 404-631-1802Government Liaison, Josh Waller................................... 404-631-1007Strategic Communications Director, Scott Higley ........... 404-347-0543Procurement Office Head, Treasury Young ..................... 404-631-1435Information Technology CIO, Jeffrey A. Hill ....................404-631-1590

DISTRICT ENGINEERSDistrict 1/Northeast GA, Brent Cook ..............................770-531-5723District 2/East Central GA, Jimmy Smith ........................478-552-4600District 3/West Central GA, Michael Presley ...................706-646-6900District 4/Southwest GA, Ritchie Swindell .....................229-386-3280District 5/Southeast GA, Brad W. Saxon .........................912-427-5711District 6/Northwest GA, DeWayne Comer ....................770-387-3602District 7/Metro Atlanta, Kathy Zahul ............................770-216-3811

CUSTOMER SERVICECustomer Service Center ........................................... 404-631-1990Questions and/or comments ...........................................dot.ga.gov Access & Permits ...............................................................dot.ga.govOutdoor Advertising Permits .................................... 404-631-1392Oversize Truck Permits ..................... 404-635-8176 / 888-262-8306Crash Data & Reports ................................................ 404-635-2823Roadside Memorials .................................................. 404-631-1933Call a HERO or CHAMP for roadside assistance .......................

FUNDING, BUDGET & DEBT SERVICE

FUND SOURCE (FY 2018)Federal funding ........................................................ $1.6B*Motor fuel ................................................................ $1.798BGeneral funds ........................................................... $217M***Federal funding reflects multiple years’ obligation authority.

The appropriations bill reflects a federal estimate based on annual expenditures.**General funds include HB170 fees of $191M

BUDGET (MOTOR FUEL & HB170 FEES)Capital Projects ........................................................ $937MGeneral Operations .................................................. $205MRoutine Maintenance ............................................... $448MLMIG ........................................................................ $180M

DEBT SERVICEPayments to SRTA .................................................... $111.7MGO Bond Debt Service .............................................. $115.6M

35,000

02,500

5,000

10,000

20,000

30,000

40,000

50,000

1972199220122016

9,110

EmployeesLane Miles

* Employee count for 10/2017; lane miles count for 12/2016

43,000

6,121

48,000

4,385

49,008

3,922

2017

*48,675

3,804*

ROADWAY STATISTICS ROADSHOW GEORGIA RANKSAmerican Society of Civil EngineersNational Roadway rating DGeorgia Roadway rating C- CONGESTIONTTI (US Rank, Delay) 12INRIX (World Rank, Hours in Congestion) 9 Tom Tom (World Rank, % Congested) 104 The Reason Foundation (2016) 21Aggregate measure of overall highway performance, cost effectiveness and pavement condition.

BRIDGES ASCE – deficient bridges 16%/ 9th

Rankings based on #1 being the worst.

ROADWAY MILEAGE Interstate/State Routes Centerline.......................................................................17,912 Lane Miles ......................................................................48,675 Daily Vehicle Miles Traveled ...................................201,649,271 County Roads Centerline ......................................................................87,369 Daily Vehicle Miles Traveled .....................................92,217,238

City Streets Centerline ......................................................................20,005

DMVT - Daily Vehicle Miles Traveled GDOT EMPLOYEES AND LANE MILES

COST OF BUILDING & OPERATING A TRANSPORTATION SYSTEM Construct 1 lane mile (no R/W)

Rural................................................................ ......$1.9M Urban...............................................................$2.4M

Construct Diamond Interchange (no R/W) Rural ........................................................................$25M Urban ......................................................................$33M

Resurface 1 lane mile Interstate.................................................... ......$300,000 State Route .......................................................$125,000

FY 17 Resurfacing (Contracted & GDOT Forces) State Routes – 1,300 miles value ..........................$296M Interstates – 629 lane miles value.........................$106M Mowing ...................................................................$40M

Ref Guide_1.9.2018.indd 1 1/30/2018 1:38:56 PM

BRIDGESnTotal Number ................................................... 14,740 nState Owned .................................................... 6,729nLocal Owned .................................................... 8,011 99% of state owned bridges are in fair to excellent condition 1% of state owned bridges are structurally deficient 9% of state owned bridges are functionally obsoletenAverage age of bridges: Georgia 43 years; National* 43 years nDesign Life: 50 yearsnASCE report rating: C (Nationally* C+)n8,800 inspections annually (FY 17)*ASCE numbers verified from 2017 report

INTERMODAL (FY 2017)

■Total transit dollars (contracts executed) .............. $ 58.00M • Federal .................................................................. $ 31.06M • State ...................................................................... $ 3.00M • Local ...................................................................... $ 23.40M

OPERATIONS nHighway Emergency Response Operators (HERO): 110 operators cover over 400 centerline miles in metro Atlanta 24 hours daily. 11 minutes average dispatched emergency response.n Coordinated Highway Assistance & Maintenance Program (CHAMP): Assists motorists on interstates statewide, operate 17 routes of appx. 50 miles daily outside metro Atlanta. The program fully launched as of May 2017 with over 45,000 assists.n Wildflower Program: Planted 2,800 acres of wildflowers since 1999. Over 3.6M daffodil bulbs planted since 2007.

TRANSPORTATION INVESTMENT ACT (TIA)

A 10-year one cent sales tax on purchases began Jan.1, 2013Total Projects: 871 n TIA regions: Central Savannah River Area, Heart of Georgia Altamaha and River Valleyn Revenue collections split: 75% to regional projects; 25% to local jurisdictions for discretionary transportation related itemsn Projects let to construction ...................................... 65 (10/2017)n Total projects completed since 2012 ........................ 417 (10/2017)n TIA collections since 2012 ...............................$647.3M (08/2017)n Paid to vendors in ........................................... $290.6M (10/2017)

LOCAL MAINTENANCE IMPROVEMENT GRANT (LMIG) & QUICK RESPONSE (QR) PROJECTS (FY 2017)

The LMIG program offers local governments greater flexibility and quicker project delivery while allowing GDOT to effectively administer the program with a reduced workforce and new funding match requirements. The QR program helps to quickly identify, approve and construct small traffic operations safety projects up to $200,000 on the state system; and is funded by state motor fuel funds. n LMIG funding (budgeted) .............................................. $173.9Mn QR funding (for more than 154 projects) ....................... $ 20.6M

ADDRESSING CONGESTION: Freight Mobility Construction will occur on 20 Freight Network corridors in the next 10 years (2018-2028)n Construction of approximately 528 miles to include but not limited to:

• 19 miles of bridges • 43 miles of interchange work (includes grade separation projects) • 27 miles of managed lanes (includes Northwest Corridor) • 23 miles of new construction (includes bypass projects) • 258 miles of widening • 14 miles of miscellaneous improvements (includes intersection improvement and minor widening and resurfacing projects)

Total of 130 projects Approx. $7.1B investment in construction of the freight network

I-285 Westside Express Lane • One new express lane in each direction between I-20 and I-75 in Fulton County. • Expected 3% reduction in delay • Est. Cost: $655M • Procurement: GEC Advertisement in Jan. 2018 • Est. construction start: 2023

I-285 Eastside Express Lanes • One new express lane in each direction between I-20 and I-85 in DeKalb County. • Est. Cost: $580M • Procurement: GEC selected • Est. construction start: 2022

SR 400 Express Lanes • Two express lanes in each direction from I-285 to McGinnis Ferry Road. • Est. Cost: $1.8B • Procurement: Existing GEC completing work; new GEC selected • Est. construction start: 2021 I-285 Top End Express Lanes • Two new express lanes in each direction between I-75 and I-85. • Expected 6% reduction in delay • Est. Cost: $4.2B • Procurement: GEC advertised in Oct. 2017 • Est. construction start: 2023All information is preliminary and subject to change

I-85 North Widening from Hamilton Mill Road to SR 53 • New general-purpose lane from Hamilton Mill to SR 53. • Expected 56% reduction in delay • Est. Cost: $135M • Procurement: Apparent best proposer selected • Est. construction start: 2018

I-85 North Widening from SR 211 to U.S. 129 • New general-purpose lane from SR 211 to US 129. • Expected 69% reduction in delay • Est. Cost: $305M • Procurement: GEC advertisement in late 2022 • Est. construction start: 2025

I-75 Commercial Vehicle Lanes near I-475 to SR 155 (McDonough) • Two Commercial Vehicle Lanes (CVL). • Est. Cost: $1.8B • Procurement: Scoping underway; GEC advertised in Oct. 2017 • Est. construction start: 2025

I-16/I-95 Interchange Improvement (2 projects) • I-16/I-95 Interchange Reconstruction and I-16 Widening from I-95 to I-516 • Adds new lane miles at the busy gateway to Savannah • Est. Cost: $350M • Est. construction start: 2019All information is preliminary and subject to change

ADDRESSING CONGESTION: People MobilityADDRESSING CONGESTION: People MobilityMajor Mobility Investment Program (MMIP): Initially, 11 transportation projects will create additional capacity; improve the movement of freight; provide operational improvements and efficiencies; enhance safety and decrease travel times.At A Glance: Here are a few of the projects currently underway.

I-285/I-20 East Interchange • Ramp reconstruction and Collector-Distributor lanes construction between Wesley Chapel and I-285 interchange, and a westbound auxiliary lane between Lithonia Industrial Boulevard and Panola Road. • Est. Cost: $475M • Procurement: General Engineering Consultant selected • Est. construction start: 2022

I-285/I-20 West Interchange • Adds increased capacity along I-20 eastbound and a westbound Collector-Distributor lane from I-285 interchange to Fulton Industrial Boulevard. • Est. Cost: $709M • Procurement: GEC Advertisement in Jan. 2018 • Est. construction start: 2023

Additional Mobility Commuter Access (Not MMIP) • 5 miles of movable barriers on Interstate 20All information is preliminary and subject to change

ADDRESSING CONGESTION: People Mobility

ADDRESSING SAFETY Investment Levels (FY 2017) ■ Cable Guardrail Barrier .............................................................. $22.6M Cable Barriers mitigate high-speed median crossover crashes that occur on our rural interstate highways.

■ Off System Safety Improvements (Federal and State) ..... $19.4M Off System Safety Program identifies, develops and delivers safety programs and products to local governments and other stakeholders to improve safety on local and high-risk rural roads. ■State .................................................................................................. $12.8M ■Federal ............................................................................................. $ 6.6M

■ Roundabout Intersection .............................. Traffic Control $29.2M* Most roundabouts REDUCE the types of crashes where people are seriously hurt or killed by 78-82% when compared to conventional stop-controlled and signalized intersections, per the AASHTO Highway Safety Manual. ■ Sidewalk Safety and Access (13 projects) ..................................... $2.1M* Includes pedestrian and bike safety programs and projects. ■ Highway Safety Improvement Program ....................................$103.8M ■ Future Safety Investment (FY 18) ...............................................$126.7M * Total spending on PE and construction to convert conventional intersections to roundabouts

ADDRESSING MAINTENANCE NEEDS Transportation Funding Act (TFA) of 2015 provides an estimated $830 million to $1 billion of annual, sustainable funding that improve and maintain Georgia’s critical infrastructure. . ■ Provides for sustainable 15-year capital maintenance cycle with preventative maintenance in between. ■ Provides flexibility between state and federal funding.

FY 17: ■ Invested $106M for 109 miles of interstate maintenance and resurfacing.■ Invested $296M for 1,300 miles of state route resurfacing.

In FY 18, the TFA will: ■ $447M in routine maintenance, resulting in resurfacing 2,000 miles of roadway. ■ $301M to replace and rehabilitate bridges.

Ref Guide_1.9.2018.indd 2 1/30/2018 1:39:57 PM