Gauteng Freeway Improvement Project and Open Road Tolling Alex van Niekerk

Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

  • Upload
    leduong

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Gauteng Freeway Improvement Project and

Open Road Tolling

Alex van Niekerk

Page 2: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

SANRAL Network

Page 3: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Network Type

Description Non-Toll State Toll PPP(BOT) Total

Dual

Carriageway

610 520 443 1,573

4-Lane

Undivided

11 299 240 550

2-Lane

Single

12,429 1,013 605 14,047

Total 13,050 1,832 1,288 16,170

% of SANRAL Network 81% 11% 8%

Page 4: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Background Gauteng – Economic hub of SA – 38% of GDP

Congestion as a result of traffic growth linked to economic growth

When evaluating feasibility, current situation, as well as future situation considered – “what if not?” 1978

Page 5: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Effect of Congestion on Economic Prosperity of

the Province – Gauteng Province Report (2004)

Potential loss in value added in Gauteng alone could amount to R155 billion over the period 2004 to 2025

Certain development nodes may not reach their full potential as a result of inadequate road access

Every Billion spend – R300m backflow Source: Gautrans Report (Roelof Botha)

Page 6: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Economic Benefit

The Business School of the UCT performed an macro economic impact study for the GFIP

GFIP:

• B/C over 8:1

• IRR: Over 50%

Page 7: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Approval Processes

Approached Minister of Transport 2005 –project proposal

Inter governmental (all spheres) workgroup agreed project principles

EIA approval was obtained

Cabinet approval – mid 2007

Intent to toll process – October 2007

Declared as a toll road – January 2008

Procurement of contracts commenced thereafter

Page 8: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Project Extent:PLANNED LANE ADDITIONS:185 km (2010)

FUTURE UPGRADES:(223 KM)

PLANNED NEW ROUTES:158 km

FINAL SCHEME:561 KM

Page 9: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Road Improvements• In general, freeways are upgraded to 4 lanes per direction

• Some sections, up to 6 lanes per direction

• Interchanges are improved:

7 Systems Interchanges (additional lanes, directional ramps)

27 Access Interchanges (Additional bridges, single points, ramp

Additions, lane additions)

• Auxiliary lanes at on- and off-ramps

• Cross road improvements

• Median lighting is provided

Page 10: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Maraisburg Interchange

Page 11: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: MALIBONGWE INTERCHANGE

Page 12: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: WILLIAM NICOL INTERCHANGE

Page 13: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: RIVONIA ROAD INTERCHANGE :

Page 14: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Allandale Interchange

Page 15: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Rooihuiskraal Interchange

Page 16: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1/R21 Interchange

Page 17: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Rigel Interchange

Page 18: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Garstfontein Interchange

Page 19: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Atterbury Interchange

Page 20: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N1: Lynnwood Interchange

Page 21: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N3: Gilloolys Interchange

Page 22: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N3: Linksfield Interchange

Page 23: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N3/N12 Elands InterchangeN3: Elands Interchange

Page 24: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N3: Grey Ave. InterchangeN3: Grey Ave. Interchange

Page 25: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

N12: Reading Interchange

Page 26: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

R21: Benoni Interchange

Page 27: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Structures – Package D1Incremental launch bridge

Page 28: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Allandale Interchange

Page 29: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Beam Placement Garstfontein

Demolish Atterbury Bridge

Page 30: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Median Works

110 t beam –William Nicol Interchange

Page 31: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

William Nicol Now

Page 32: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Project Progress

Construction commenced: June 08

SANRAL awarded road construction tenders to the amount of R15 b (excl)

ITS for network completed185 km of network under construction – concludes Phase 1 of GFIP

Managed to reach almost all milestones for the 2010 World Cup – in some instances, milestones were exceeded

Page 33: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Project Progress

For World Cup – approximately 80% of road works complete

Road construction commenced –various completion dates from end 2010 to mid 2011

Toll infrastructure under construction – completion end 2010

Toll system under development – toll commencement April/May 2011

Page 34: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Open Road Tolling

Page 35: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Open Road Tolling (ORT)

In urban environment (space constraint), high traffic volumes (100 000 to 200 000 AADT), conventional tolling not an option

ORT:• All transactions recorded electronically

Number plates or tag

• Vehicle linked to an account

• No physical toll plazas – free flow tolling

Page 36: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

SANRAL principles for ORT

One tag standard

One account – may include various vehicles

Central clearing

Full interoperability

Page 37: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT - GeneralSANRAL model:TCH & VPC – National SANRAL initiative:Central clearing with all current and future concessions Clearing with CTROMIntegration of Natis and AARTOUtilising special enforcement unit to do violation processing & enforcement

Page 38: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT Building Blocks Consist of following:Toll tag

Kiosks/Mobile Kiosks

Satelite Centres

Technical Shelters and Gantries (Toll Point)

Communications Backbone

Central Operations Centre (ORT Back Office, TCH, VPC, ITS

Disaster Recovery Centre

Toll Signage

User Services

Page 39: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Electronic tag

•Tag:

• Standard: 5.8 GHz

• Also known as transponder

or On Board Unit (OBU)

• SANRAL pre-qualified 3

suppliers

Page 40: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Kiosks

At shopping centres:

• Account registration

• Tag problems

• Account queries

Page 41: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT – Customer Service

Centres

Page 42: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Assumptions

12 mins at ave of

80km/h = 16km

Turnaround only

possible at next

interchange

Satellite

Centre

Coverage @

12 min

reach

Page 43: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Technical Shelters & Gantries

Page 44: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

TOLLING POINT GANTRIES

Page 45: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Communications Backbone

SANRAL Provides: Fibre Optic Backbone

Combination of existing ITS fibre and fibre to be installed

in median

Coms DBO tender: Two tender options:

Provide infrastructure and services – normal payment

DBO contractor allowed to use it commercially –

SANRAL should share in benefit

Contractor: Backup/emergency coms

Page 46: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT – Central Operations Centre

ORT Back Office

Transaction Clearing House (TCH)

Violations Processing Centre (VPC)

New ITS ops centre

Page 47: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT – Back Office

Receives Transactions from RSS

Apply discounts

Do manual NPR if ANPR failed for non e-Tag transactions

Optimise completeness and compliancy of transaction, before forwarding to the TCH

Page 48: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT - TCH Receive transactions from the ORT

operator

TCH links transaction to an account

Does financial clearing

If not successful – forward to VPC

Do account management – call centre

Manage tag logistics – issues the tag to all ETC projects/Retail outlets

Page 49: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Setting Up an Account

Users required to register or set up account:

• Do it at point of presence (kiosk/customer centre)

• Through the internet

• Contacting a call centre

• Tag in a bag

Page 50: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Account Types

Register a:

• Pre paid account (similar to cell prepaid)

Low balance warning

Automatic top up

• Guaranteed post paid

Linked to credit card

Transactions rolled up on daily basis – single transaction on credit card

Page 51: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Account Types (cont.)

Top up of pre-paid account:

• EFT (internet)

• At POP

• At ATM

• By means of debit order

• Etcetera

Page 52: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

ORT – Violation Processing

Potential violator identified if:No tag or account

Insufficient funds in account

Vehicle not identifiable

Transaction forwarded to VPC:Send invoice

Not successful – Infringement notice – note, must be peace officers and should be appointed by SANRAL

Not paid – Courtesy letter (RTMC)

Not paid – Enforcement order

Page 53: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Violation Enforcement

Enforcement Unit (traffic officers together with ORT contractor) to be set up to do violation enforcement

Not only toll enforcement but also traffic violations & incident response

Page 54: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Enforcement Unit

A dedicated Enforcement Unit of ±260 Traffic

Officers undergoing training (appointed in conjunction with the RTMC)

Two specialised units are envisaged:

Patrolling Unit (toll enforcement / incident response)

“Road Block” Unit

Patrol vehicles (MPV) and Mobile Payment Stations (MPS) are in prototype phase

MPS Midi’s – 3 workstations, MPS Maxi’s – 4 workstations)

Page 55: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Enforcement Unit

Create a safe environment for Road Users

Secure the infrastructure

Assist with incidents on the freeway

Create an awareness and deterrent effect for non-payment of tolls

Enforcing all Traffic Infringements and Offences

Tracking Vehicles of Special Interest (VOSI)

Page 56: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Patrolling Unit Strategy

The Enforcement Unit will patrol the route 24 hours per day

24 MPV are being procured

MPV’s will patrol +/- 20 km stretches of road with 2 vehicles per shift

Page 57: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Patrol Vehicles

Page 58: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Road Block Unit Strategy

The Enforcement Unit will perform road blocks for 2 shifts per day

Road Blocks at on-ramps, X-roads & technical shelters

20 MPS to be procured

Page 59: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Mobile Pay Stations (Midis)

Page 60: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Mobile Pay Stations (Maxis)

Page 61: Gauteng Freeway Improvement Project and Open Road Tolling · Beam Placement Garstfontein Demolish Atterbury Bridge. Median Works 110 t beam – William Nicol Interchange. William

Thank You