11/26/2019
FPID 433880-1-52-01
Gateway Expressway
Program DescriptionTampa Bay Next is a program to modernize Tampa Bay’s transportation infrastructure and a process for engaging the public. Within the majority of the program area, the addition of express lanes is being considered to provide additional capacity, relieve congestion and provide a more reliable travel time option for passenger and transit vehicles. In addition, improvements address safety and traffic operations on the interstates. Interstate modernization projects incorporate additional elements such as opportunities to add bicycle and pedestrian facilities, aesthetic treatments, transit accommodations, and reconnecting streets where possible.
The Gateway ExpresswayThe Gateway Expressway project is made up of two components. • The construction of the Gateway Expressway, two new 4-lane
elevated tolled roadways, will provide express connections from US 19 to I-275 and from the Bayside Bridge to I-275
• The widening of I-275 to add express tolled lanes (one lane in each direction) from south of Gandy Boulevard to 4th Street N.
Overall, the Gateway Expressway project will change the existing roadway system in order to enhance safety, add capacity, and improve mobility. Among the project improvements:• Construct SR 690, a new 4-lane tolled (static) expressway
connection from US 19 to west of I-275• Construct SR 686A, a new 4 lane elevated tolled (static)
expressway from the Bayside Bridge (CR 611) to just west of I-275
• Reconstruct existing Roosevelt Boulevard from the Bayside Bridge to Ulmerton Road as generally two one-way surface roads including new access configurations
• Reconstruct sections of existing US 19 and 118th Avenue N, including new ramps and flyover structures
• Include various improvements to interchanges, intersections, and ramps within the project limits
Work in front of the St. Pete-Clearwater International (PIE) Airport includes:• Construction of a new airport access road parallel to SR 686• Construction of a new signalized intersection at Terminal Boulevard.• Construction of a permanent roadway connection at Fairchild Drive north of the existing signal at Airport Parkway from
Westbound SR 686The project component along I-275 includes the design and construction of one tolled express lane in each direction (one northbound and one southbound) from south of Gandy Boulevard to north of 4th Street North. The new express lanes are in addition to existing general purpose (non-tolled) lanes.
TollingTolling on SR 690 and SR 686A will be static, meaning the cost will remain the same at all hours. Express lanes on I-275 will be dynamically priced, meaning prices increase as the express lanes become more congested and decrease as congestion goes down. Dynamic pricing is designed to provide more reliable travel times, particularly during peak travel periods.For further information about the Gateway Expressway project go to www.fdottampabay.com/project/235/433880-1-52-01
PINELLAS COUNTY
PASCO COUNTY
HILLSBOROUGH COUNTY
PIN
ELL
AS
HIL
LSB
OR
OU
GH
HILLSBOROUGH COUNTY
HIL
LSB
OR
OU
GH
CO
UN
TY
HILLSBOROUGH COUNTY
MANATEE COUNTY
HILLSBOROUGH COUNTY
MANATEE COUNTY
POLK COUNTY
HARDEE COUNTY
PASCO COUNTY POLK COUNTY
PO
LK C
OU
NT
Y
O l d T a m p a B a y
T a m p a B a y
H i l l s b o r o u g h B a y
ClearwaterClearwaterClearwater
St PetersburgSt PetersburgSt Petersburg
TampaTampaTampa
SEIS LIMITSSEIS LIMITS
Howard Frankland Bridge
Downtown Interchange
Vet
eran
s E
xpy
I-4 and C
onnector
Westshore Area Interchange
NW
Exp
y
I-4/I-75Interchange
Project LimitE of Branch Forbes Rd
PD&EStudy Limit
Po
lk Par kway
I-27
5 N
ort
h C
orr
ido
r
I-75
No
rth
Co
rrid
or
I-75
So
uth
Co
rrid
or
I-27
5 P
inel
las
Co
rrid
or
Gateway ExpresswayProject
Bearss Ave
54th Ave S
Moccasin Wallow Rd
Bruce
B. D
owns Blvd
Howard Frankland Bridge
Downtown Interchange
Vet
eran
s E
xpy
I-4 and C
onnector
Westshore Area Interchange
NW
Exp
y
I-4/I-75Interchange
Project LimitE of Branch Forbes Rd
PD&EStudy Limit
Po
lk Par kway
I-27
5 N
ort
h C
orr
ido
r
I-75
No
rth
Co
rrid
or
I-75
So
uth
Co
rrid
or
I-27
5 P
inel
las
Co
rrid
or
Gateway ExpresswayProject
Bearss Ave
54th Ave S
Moccasin Wallow Rd
Bruce
B. D
owns Blvd
618
618
589
60
60
580
580
574574
674
75
4
4
75
75
275
275
275
275
275
275
375
175
19
41
41
41
41
301
301
301
301
92
92
92
19
54
56
TampaInternational
Airport
St. Pete/ClearwaterInternational
Airport
PortTampa Bay
Lakeland Linder Regional AirportLakeland Linder Regional AirportLakeland Linder Regional Airport
MacDillAirforce Base
University ofSouth Florida
TampaInternational
Airport
St. Pete/ClearwaterInternational
Airport
PortTampa Bay
Lakeland Linder Regional Airport
MacDillAirforce Base
University ofSouth Florida
Gateway Expressway
CONSTRUCTION ESTIMATE $596 Million (As of Summer 2019)
CONSTRUCTION SCHEDULE Construction start: August 17, 2018 Anticipated completion late 2022
CONTRACTOR: Archer Western - de Moya Joint Venture
IN CONSTRUCTION
*Present Day Cost
For more project speci� c information and to get involved: TampaBayNext.com | [email protected] | (813) 975-NEXT (6398) | /TampaBayNext | @TampaBayNextPublic participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 1 (800) 955-8770 (Voice).Comuníquese con nosotros: Nos importa mucho la opinión del público sobre el proyecto. Si tiene preguntas o comentarios, o simplemente desea más información, por favor comuníquese con nosotros. Nuestra representante en español es: Manny Flores, 813-975-4248, [email protected].