Information on relevant Oil & Gas activities by Other
Companies on Sakhalin Shelf from 2011 to 2012 and Beyond
Olivier Hasinger, IUCN Global Polar and
Marine ProgrammePhoto taken by: Gazprom Sakhalin Holdings B.V http://gazprom-sh.nl/sakhalin-2/
Economic and Political Context for the Development of Sakhalin’s Energy Potential
• Well positioned geopolitically → Asia and Japan
• The economic value of NG is raising up → Development of the smaller fields
• Sakhalin I and Sakahlin II: additional construction (Piltun-South and ‘Berkut’ platform).
• The trend: use Sakhalin as a platform to further expansion onto the Sea of Okhotsk shelf.
IUCN - Olivier Hasinger 2WGWAP-11
• ENL- Exxon Neftegas Limited, operator of Sakhalin I project
• SEIC/SE - Sakhalin Energy Investment Company, operator of Sakhalin II project
• RN - Rosneft, one of the largest oil companies in Russia: operator of Sakhalin I, III and V project
• RNSFE - Rosneft-Shelf-Far-East - RN branch company operating on the Sea of Okhotsk shelf
Distribution of Oil & Gas activities on Sakhalin Projects – Sakhalin I-V
IUCN - Olivier Hasinger 3WGWAP-11
"
kj"
"
Piltun Bay
Chayvo Bay
Lunsky Bay
Nyiskii Bay
PA-B Platform
Nabilskii Bay
Lun-A Platform
Piltun Lighthouse
PA-A (Molikpaq) Platform
Chayvo (Sakh. 1)
Lunksiy (Sakh. 2)
Veninskiy (Sakh. 3)
Arkutun-Dagi (Sakh. 1)
Lopukhovskaya (Sakh. 5)
Piltun-Astokhskiy (Sakh. 2)
Odoptu Offshore Block (Sakh. 1)
Kaygansko-Vasukanskiy (Sakh. 5)
Vostochno-Schmidtovskiy (Sakh. 5)
Legend
Dev/Production
Explorat/Productio
Surf Expl/Drilling
Gas Pipeline
Oil Pipeline
Oil/Gas/Water Pipeline
Refined Products Pipeline
WGW Feeding Ground
Lebedinskoye
Kaigansky-Vasukanskiy block
North Veninskaya
East Odoptu field
Ayashsky block
Ayashskaya field
Minginskaya structure
East-Smidt block
Kirinsky block
Kirinskoye field
Understanding the concerns
• Main concerns dependon the distance to WGW feeding area and distance from the shore.
• Most dangerous cases: seismic survey planned in transit zones (transit zone - is area with sea depth between 0 to 20 m) close to feeding area.
• Main source of disturbance: pulse noise, continuousnoise, oil spill and gasassociated risks
IUCN - Olivier Hasinger 4WGWAP-11
• Geotechnical survey(s) at Piltun-Astokh field (Sakhalin II) and installation of the second ENL offshore platform (Sakhalin I), are expected to take place in 2012
• The main extraction projects (Sakhalin I, II, III and V) on the Sakhalin shelf are advancing and/or are in production mode
• Increased effort to explore and develop the Okhotsk Sea shelf, with a focus on Magadan and western Kamchatka as the priorities in the near future
Latest updates on Sakhalin Projects – Sakhalin I-V (and the Kamchatka Shelf)
IUCN - Olivier Hasinger 5WGWAP-11
Exxon Neftegas Ltd activities• ENL – installation of 2-d ENL
Berkut platform offshore Chaivo (Arkutun-Dagi field) in 2012, the largest offshore platform in Russia and one of the largest in the world, where impact from ships continuous noise are anticipated
• ENL expect to reach the production phase at Arkutun-Dagi field (roughly offshore Chaivo lagoon) in 2014.
• ENL: Chaivo field is in production for 6 years and Odoptu for 1 year. Both fields have - another 50 years of economic life
• Elvary Neftegaz on Kaygansko-Vasukansky blok likely to conduct geotechnical survey (close to North part of feeding area)
"
kj"
"
Piltun Bay
Chayvo Bay
Lunsky Bay
Nyiskii Bay
PA-B Platform
Nabilskii Bay
Lun-A Platform
Piltun Lighthouse
PA-A (Molikpaq) Platform
Chayvo (Sakh. 1)
Lunksiy (Sakh. 2)
Veninskiy (Sakh. 3)
Arkutun-Dagi (Sakh. 1)
Lopukhovskaya (Sakh. 5)
Piltun-Astokhskiy (Sakh. 2)
Odoptu Offshore Block (Sakh. 1)
Kaygansko-Vasukanskiy (Sakh. 5)
Vostochno-Schmidtovskiy (Sakh. 5)
Legend
Dev/Production
Explorat/Productio
Surf Expl/Drilling
Gas Pipeline
Oil Pipeline
Oil/Gas/Water Pipeline
Refined Products Pipeline
WGW Feeding Ground
IUCN - Olivier Hasinger 6WGWAP-11
"
kj"
"
Piltun Bay
Chayvo Bay
Lunsky Bay
Nyiskii Bay
PA-B Platform
Nabilskii Bay
Lun-A Platform
Piltun Lighthouse
PA-A (Molikpaq) Platform
Chayvo (Sakh. 1)
Lunksiy (Sakh. 2)
Veninskiy (Sakh. 3)
Arkutun-Dagi (Sakh. 1)
Lopukhovskaya (Sakh. 5)
Piltun-Astokhskiy (Sakh. 2)
Odoptu Offshore Block (Sakh. 1)
Kaygansko-Vasukanskiy (Sakh. 5)
Vostochno-Schmidtovskiy (Sakh. 5)
Legend
Dev/Production
Explorat/Productio
Surf Expl/Drilling
Gas Pipeline
Oil Pipeline
Oil/Gas/Water Pipeline
Refined Products Pipeline
WGW Feeding Ground
Lebedinskoye
Kaigansky-Vasukanskiy block
North Veninskaya
East Odoptu field
Ayashsky block
Ayashskaya field
Minginskaya structure
East-Smidt block
Kirinsky block
Kirinskoye field
• Rosneft plans to develop Sakhalin-3 and Kaigan-Vasyukansky blocks in partnership with other companies (i.e. Gazprom)
• New field was discovered within Kaigan-Vasyukanskyblock in 2010, more seismic surveying will be undertaken in 2012 in the block offshore and in the “transit” zone.
• It will operate Lebedinskoyefield and Nekrasovka-Astrakhanskoye (north-west Salkhalin shelf) fields solely.
• Astrakhansky block will be surveyed with 2-d and 3-d seismic surveys in 2012
Rosneft and RNSFE activities
IUCN - Olivier Hasinger 7WGWAP-11
• RNSFE is going to implement its experiences, gained mitigating impacts during Lebedinskoye survey, for the seismic surveys near shore and in transit zone in vicinity of WGW habitats
• Sakhalin-3, Veninskyblock: Seismic surveys at North-Veninskiy field (2010?) showed it is of economic interest; In 2012 RNSFE will conduct exploratory drilling in the area
Rosneft and RNSFE activities
"
kj"
"
Piltun Bay
Chayvo Bay
Lunsky Bay
Nyiskii Bay
PA-B Platform
Nabilskii Bay
Lun-A Platform
Piltun Lighthouse
PA-A (Molikpaq) Platform
Chayvo (Sakh. 1)
Lunksiy (Sakh. 2)
Veninskiy (Sakh. 3)
Arkutun-Dagi (Sakh. 1)
Lopukhovskaya (Sakh. 5)
Piltun-Astokhskiy (Sakh. 2)
Odoptu Offshore Block (Sakh. 1)
Kaygansko-Vasukanskiy (Sakh. 5)
Vostochno-Schmidtovskiy (Sakh. 5)
Legend
Dev/Production
Explorat/Productio
Surf Expl/Drilling
Gas Pipeline
Oil Pipeline
Oil/Gas/Water Pipeline
Refined Products Pipeline
WGW Feeding Ground
IUCN - Olivier Hasinger 8WGWAP-11
Gazprom• Gazprom has plans for gasification
of Sakhalin Island and Kuril Islands. This would require building required infrastructure and pipelines both onshore and offshore.
• There are plans to extend existing pipelines from Sakhalin to Khabarovsk and Vladivostok; potentially to China as well
• Sakhalin 3 and 5 licensed blocks (operators Veni-Neft, Gazpromrespectively) go through active phase of surveying and field evaluation which includes seismic surveying, test drilling etc.
• On Sakhalin-3, Kirinskoye field, 150 km2 of 3-D seismic was completed in 2011; Gazprom is to start production at Kirinskoye in 2012
"
kj"
"
Piltun Bay
Chayvo Bay
Lunsky Bay
Nyiskii Bay
PA-B Platform
Nabilskii Bay
Lun-A Platform
Piltun Lighthouse
PA-A (Molikpaq) Platform
Chayvo (Sakh. 1)
Lunksiy (Sakh. 2)
Veninskiy (Sakh. 3)
Arkutun-Dagi (Sakh. 1)
Lopukhovskaya (Sakh. 5)
Piltun-Astokhskiy (Sakh. 2)
Odoptu Offshore Block (Sakh. 1)
Kaygansko-Vasukanskiy (Sakh. 5)
Vostochno-Schmidtovskiy (Sakh. 5)
Legend
Dev/Production
Explorat/Productio
Surf Expl/Drilling
Gas Pipeline
Oil Pipeline
Oil/Gas/Water Pipeline
Refined Products Pipeline
WGW Feeding Ground
Lebedinskoye
Kaigansky-Vasukanskiy block
North Veninskaya
East Odoptu field
Ayashsky block
Ayashskaya field
Minginskaya structure
East-Smidt block
Kirinsky block
Kirinskoye field
IUCN - Olivier Hasinger 9WGWAP-11