4
‘RESUME’ NAME GARY HORTON ADDRESS: 33 Glasshouse View Court Buderim, Qld. Aust. 4556 D.O.B. 06-07-1962 POSTAL ADDRESS PO Box 1832, Buderim, QLD. 4556 Phone: Mobile: +61429620966 Email: [email protected] Home: +61417192469 Second Contact Mobile:- +61408621282 –Home:–+61 7 54432269 (Friend) Email: [email protected] EMPLOYMENT: Worked Rigs since 1979, both On & Offshore which includes all working operations of drilling for oil & gas wells. Currently employed with SEADRILL since August 2007 to Present day. Working in Angola for the past 6 years in Angola. Currently working as NIGHT TOOLPUSHER. PREVIOUS HISTORY: SEADRILL August 2007 to Present Day Position: NIGHT TOOLPUSHER Operations: SEMI-TENDER Surface BOP’s system with riser tensioners operational system Derrick, Pyramid Quad Make up service tools with a Offline articulated crane system Offline and Online activities and rig operations Totco mud watch panel and systems OEM auto digger and mud pump controller panels. Organize all operations of the 12 hour shift; Pipe Tallies, BHA’s, Casing Tallies. Enforce all Well Control measures are in place and procedures are enforced and adhered to. Ensure Well control drills are perform daily when drilling.

Gary Horton Resume

Embed Size (px)

Citation preview

Page 1: Gary Horton Resume

‘RESUME’

NAME GARY HORTONADDRESS: 33 Glasshouse View Court

Buderim, Qld. Aust. 4556D.O.B. 06-07-1962

POSTAL ADDRESS PO Box 1832, Buderim, QLD. 4556Phone: Mobile: +61429620966 Email: [email protected]

Home: +61417192469Second Contact Mobile:- +61408621282 –Home:–+61 7 54432269

(Friend) Email: [email protected]

EMPLOYMENT:

Worked Rigs since 1979, both On & Offshore which includes all working operations of drilling for oil & gas wells.

Currently employed with SEADRILL since August 2007 to Present day. Working in Angola for the past 6 years in Angola. Currently working as NIGHT TOOLPUSHER.

PREVIOUS HISTORY: SEADRILLAugust 2007 to Present DayPosition: NIGHT TOOLPUSHEROperations: SEMI-TENDER

Surface BOP’s system with riser tensioners operational systemDerrick, Pyramid QuadMake up service tools with a Offline articulated crane systemOffline and Online activities and rig operationsTotco mud watch panel and systemsOEM auto digger and mud pump controller panels.Organize all operations of the 12 hour shift; Pipe Tallies, BHA’s, Casing Tallies.Enforce all Well Control measures are in place and procedures are enforced and adhered to. Ensure Well control drills are perform daily when drilling.

Page 2: Gary Horton Resume

Enforce that all Safe practices and Procedures are adhered to and followed.

FRONTIER DRILLINGJanuary 2007 to August 2007

Position: DRILLEROperations: DRILLSHIP

Running Sub Sea Bop systemDaily Drilling operationsDaily Maintenance routineMaritine Top DriveRoss Hill SCR SystemMulti-National crews

BURGAN CO.February 2006 to January 2007

Position: NIGHT PUSHEROperations: Land Rig Operations

Mobile Land Rig27 Multi National Man CrewsRoss Hill SCR SystemVarco Top Drive

ENSIGN AUSTRALIAAugust 05 to January 06

Position: DRILLER – NIGHT PUSHEROperations: Land Rig Operations

Rotary DrillingMaintaining Rigs Daily OperationsEnsure safety procedures enforcedCrew Management

Mitchell DrillingJuly 2003 to July 2005

Position: DRILLEROperations: Cyber controls

Air Hammer operations and drillingTop drive Supervise Rig relocationBop Nipple up/down

Diamond OffshoreJanuary. 2001 to January.2003

Page 3: Gary Horton Resume

Position: Floorman / Assistant DrillerOperations:- Derrick responsibilities

Mud chemical controlMud pump supervisionMud pump maintenanceHelicopter landing officer

CENTURY DRILLING1984 to 1991

Position: FLOORMAN to DRILLERDRILLED for 5 years

Operations: Man managementFluid trip sheetsKill sheetsRig relocationRig maintenanceDrill line Ton-MilesBop and Choke maintenance

ATCO-APM DRILLING1980 to 1984

Position: FLOORMAN to ASSIT DRILLEROperations: Rig floor preparation

Rotary drilling operationsPreparation of Drilling EquipBha preparation

PETROLEUM DRILLING SERVICES1979 to 1980

Position: LEASEHAND to MOTORMANOperations: Learning Floor operations

Learning Bop operationsLearning mud tank operationsLearning mud pump operations

OPERATIONS: Rig up Rig down of Drilling Equip.Maintenance-Drill Fluid & Equip.Brake Work in Drilling & Tripping Ops.Maintaining crew Duties.Maintaining Rig pumps, Mud tanks, Air-Drilling, Under Balance Operations.General Experience in drilling, Well ServicesRemote & On-site.Working Hydraulics, Plant machinery &Diesel Motors.Maintenance of Rig Floor Equipment

Page 4: Gary Horton Resume

TRAINING OIM CertificateStability and Ballast Control CertificateIWCF: Current Surface BOP (Supervisor)11/14Kelvin Topset InvestigationMajor Emergency Management Initial ResponseOffshore Emergency Response Team LeaderOffshore Emergency Response Team MemberProficiency Fast Rescue craft Survival Training NSCA. Confined Space EntryHelicopter landing Officer Cert.Huet Ticket current international cold certIADC Off & On-Shore Rotary Manuals all unitsDogman TicketFirst Aid St. John’s Pathogen certificate.Forklift TicketFire hazard AwarenessMan-Management Level 2