Ganda ERP Project | 3
The kick-off meeting is the official start for ERP Project
It establishes the priorities, tone, and energy for the project and helps to get a common understanding on:
Project scope
Project approach
Project schedule
Project Team / Organization
Support Required
Ganda ERP Project |
Agenda
1
2
3
Ganda ERP Project Scope & Benefit
Project team
TIPTOP TIM and each milestone approach
Project Plan (with Schedule)4
4
Ganda ERP Project |
Agenda
1
2
3
Ganda ERP Project Scope & Benefit
Project team
TIPTOP TIM and each milestone approach
Project Plan (with Schedule)4
6
Ganda ERP Project |
Why to start the project
1. Need to have integrated system
2. Existing system doesn't support current business operation.
3. Need to have a computerized system / a tool for Financial and
Accounting and other supporting tools to assure company data
consistency, integrity, correctness, real time & transparence to
enable faster and better decision making
4. Concern of future business growing
7
Ganda ERP Project | 8
1. To have Integrated Enterprise Resource Planning (IERP) system which include
application modules to support our business process.
2. To improve the efficiency and co-ordination among business units.
3. To provide management with up-to-date information for better decision making
4. To Improve on the internal control of the company
5. To enhanced computerization of daily work from 40% up to 90%
6. Improved automation and limit the manual data entry
7. Input source data from the H/W devices (weighting scale, fingerprint…) automatically
import for all of process and reports
8. Provide reports at each unit of the business process timely
9. To enable closing of monthly financial accounts on timely manner.
Ganda ERP Project |
Agenda
1
2
3
Ganda ERP Project Scope & Benefit
Project team
TIPTOP TIM and each milestone approach
Project Plan (with Schedule)4
12
Ganda ERP Project |
Chinfon VN Project Leader
T-038 Mr. Alex Hsu TBD – DIGIWIN PROJECT MANAGER
Digiwin Consultant
1. Finance & Acc = Consutant 1 (1 person)2. Mfg and Sales & Dist = Consultant 2 (1 person)3. HRM,= consultant 3 (1 person)4. BI = Consultan 4 (1 person)5. Easyflow = consultant 5 (1 person)6. System Analysis / Trainer = Consultant 6 ( 2 person)Note: Not include programmer who should working on Taiwan)Technical Support
1. V1121 Le Quoc Tuan
2. V1422 Nguyen Thu Hong 3. .Digiwin System Engineer (1 person)
Support Function
1. Change & Communication : Alex Hsu2. Project Supporting: Richard
ERP Project Team
(Full Time)ERP Specialist Engineer 1.Vacant(Suggest recruited from TW)
ERP Technical Lead 1.V1121 Le Quoc Tuan
ERP Programmer 1. V1422 Nguyen Thu Hong
Advance Feature:Business Inteligent; B2B, EasyFlowPLC/Field Instrument IntegrationWeight Scale/Belt Scale/FingerprintTele/Fuel station/SMS/Door access
15
Code Dept. Name Dept. Head Key User - 1 Key User - 2
A0000 Administration Div. T-058 - HSU CHUN LIN
A1100 HRD Dept. V0030 - Lê Thi Thu Hien V0138 - Pham Thi Loan V0064 - Nguyen Thi Thanh
A2100 Purchasing Dept. V0013 - Pham Thanh Hai V0172 - Vu Thi Tuyet Mai V0750 - Ly Thien Hung
A4100 General Affairs Dept. V1562 - Nguyen Van Thien V2077 - Do Thi Ninh V2078 - Luu Thi Minh Hang
E0000 Project Engineering Div. T-059 - LEE YUN CHI V0197 - Tran Đuc Cuong V1526 - Le Đuc Thinh
G0000 G.D. Office V1475 - Tong Duy Tan
G3000 Financial Div. T-060 - CHOU LUNG CHIEN
G3200 Accounting Dept. V0168 - Dang Thi Thanh Huong V1077 - Vu Thi Lan Anh
G3210 Cost Accounting Section V1583 - Nguyen Van Viet V1480 - Pham Thi Yen
G3220 Tax & General Accounting Section V0931 - Ho Thi Thao
G4100 Logistic Dept. V0003 - Nguyen Thuong Hien V0937 - Nguyen Huy Tuong V2088 - Nguyen Ha Phuong
HCMC + HPGP V1096 - Nguyen Trong Tin
H0000 HPGP V1244 - Nguyen Dang Khang V1323 - Ho Huu Nhat Truong
M0000 Marketing Div. V0370 - Nguyen Van Luong
M1100 Hanoi Branch V630 -Nguyen Thi Bich Thuy V0371 - Nguyen Thi Hong Hanh
M1200 Haiphong Branch V1470 - Tran Thi Thu Ha
M1300 HCMC Branch V0915 - Dinh Thi Thanh Quy
Code Dept. Name Dept. Head Key User - 1 Key User - 2
P0000 T.K. Plant T017 - HUANG CHUN YAO V0163 - Hoàng Thế Hải
P1000 Quarry Div. V0071 Nguyen Van Dat V0261 Pham Thi Hong Thai
P2000 Production Div. V0106 - Hoàng Anh Hải
P2100 Raw Mill Dept. V1537 - Nguyễn Mạnh Cường
P2200 Kiln Dept. V1629 - Đinh Triệu Khải
P2300 Cement Mill Dept. V1607 - Nguyễn Văn Điệp
P2400 Production Centre Control Dept. V0161 - Nguyễn Trung Thành
P3100 Packing Department V0134 - Nguyen Trong Thành V0985 - Nguyen Trong Tài
P4100 Finished Goods Dept. V0130 - Bui Hong Chinh
P4110 F/G - Dispatching Centre Section V0068 - Pham Quang May
P4120 F/G - Jetty Section V0537 - Bui Van Hai
P5100 Electrical Department V0076 - Nguyễn Hồng Hải V0195 - Phạm Thành Hưng V0198 - Lê Thành Hưng
P6100 Mechanical Department V0313 - Tran Uyen V0762 - Nguyen Tran Quang V1123 - Nguyen Huu Thang
P7100 Quality Control Department V0823 - Dao Nguyen Huong V0366 - Nguyễn Đức Toàn
P8100 Warehouse Department V1048 - Nguyen Ngoc Viet V0181 - Mr. Le Duy Tan
Ganda ERP Project |
Role Responsibility Qualifications Remark
Project Leader
• Deliver the specified project deliverables on time in good quality and in accordance with the budget
• Achieve milestones on time• Report on project progress to the steering
committee• Identified of potential bottleneck and initiate to
propose the solution• Coordinate & Assign tasks to project members• Keep in touch with Consultant to ensure
successfully the project and for knowledge transfer
• Knowledge of business processes • The ability to work effectively with all levels within
Organization• Project Management Expertise• Have good understanding of project scope &
constraint. • Time management skills and multi-tasking
capabilities • Good on verbal and written communication skills • The ability to make timely decisions • Strong organizational skills • Good leadership and coaching skills
Full time
IT Technical Support
• Providing IT infrastructure for implement ERP System
• To setup system requirement for ERP System• Support user to operate this system
• Have Good skill & experience in Databases, networking, and operating system
• Have good understanding on the current IT System
• Experience and knowledge in current system environment.
Part time but ready if required
Support Function
• To assist project team on Project administration, training, business process development and prepare new infrastructure (if needed)
• To coordinate change program impacted of ERP impl. system
• Project Administration task• Setup and organize documentation control system
and records
• Good knowledge of the company’s organizational structure and business processes
• The ability to work effectively with all members of the organization ranging from executive members to front line / users.
Full Time
16
Project Team Responsibilities
Ganda ERP Project |
Role Responsibility Qualifications Remark
Group Leader/Dept.Lead
• Leader on development defined modules• To manage and coordinate project communication,
training, socialization and prepare new infrastructure (if needed)
• Working together with consultant to determine business process flow that needed to ERP system requirement with consultation to process owner.
• Development of business process documentation (incl design standard form and report) with consultation to process owner.
• Conduct testing, data collection, data validate and data migration for new system configuration.
• To drive, coach and facilitate the implementation of new system
• Issues resolution• Working together with key user to Identify of end
user, training requirements at their particular site.
• Experience in functional business process, • In-depth knowledge of the company’s business
processes & best practices, • Strong analytical skills and problem solving skills• Strong communication skills and coaching skills• Excellence team player skills, with strong verbal
and written communication skills and coaching skills,
• Experience to design and developing System & Procedures.
• Experience in delivery training
Part Time but ready on demand with advance notification
Key User
• Co-ordinate between Project and End User• Represent End Users• Support project team by share data & information• Validate data & Process• Build knowledge of what new system will do• Assist on end user training• “Owner” of new system• Lead in managing the change in their unit areas
• An in-depth knowledge of the business unit functionality business and requirements in their business process area(s),
• Strong analytical skills. • Active and willing• Able to use own initiative• Good at interpersonal communication
Part Time but ready on demand with advance notification
17
Project Team Responsibilities
Ganda ERP Project |
Agenda
1
2
3
Ganda ERP Project Scope & Benefit
Project team
TIPTOP TIM and each milestone approach
Project Plan (with Schedule)4
19
Ganda ERP Project |
1.Form Project Committee1.Form Project Committee
2.Kick-off Meeting2.Kick-off Meeting
TIPTOP Implementation Methodology
P
D
C
A
21
Ganda ERP Project |
1.Form Project Committee1.Form Project Committee
2.Kick-off Meeting2.Kick-off Meeting
TIPTOP Implementation Methodology
P
D
C
A
22
Ganda ERP Project |
1.1. Form Project Committee Form Project Committee Purpose:
Establish an ERP Project Committee & Determine Who is Responsible for What
23
Ganda ERP Project |
2. Kick-off Meeting 2. Kick-off Meeting
Purpose:
- Announce ERP Project Objectives & Direction
- Introduce Project Organization, Key Roles and
Responsibilities
- Overview of Project Schedule
Affirmation of Project Success
Expected Benefits from New System
24
Ganda ERP Project |
1.Form Project Committee1.Form Project Committee
2.Kick-off Meeting2.Kick-off Meeting
TIPTOP Implementation Methodology
P
D
C
A
25
Ganda ERP Project |
3. Survey and Diagnosis 3. Survey and Diagnosis Purpose: Data System Consultants Get Actual Business Model & Data
Process Flow
Participants: All Project Team
Documents Required:
- Current Business Process Flow Chart
- All Currently Used Documents, Forms, Receipts, etc.
- Currently Used Statistical & Management Reports
Deliverables:
- Report of Initial Survey Results
- Initial Variance Analysis Report
- Some Parts of Modules Will Require Assistance from e-Learning Staff
for Set Up (in Coordination with PM)
IFRS
26
Ganda ERP Project |
4. Application Training 4. Application Training Purpose:
- Rapid Training Through e-Learning- Consultant Introduces TIPTOP SOPs & Functions- Focus on Specific Processes as Needed
Provided:- Mapping of Standard Business Processes- User Handbooks for Every Module- e-Learning Online Training Material (According to
Module & Modifications Needed) Deliverables:
- Gap Analysis Report- Participant Training Test Results- Statistics on Participant Online e-Learning Progress
27
Ganda ERP Project |
5. Operation Training 5. Operation Training
Purpose:- System Planner Gets Clear Understanding How
System Actually Works- System Discrepancies in Detail
Participants:- Project Team and KUs
Provided:- Mapping of Standard Business Processes- User Handbooks for Every Module
Deliverables:- Gap Analysis Report- Participant Training Test Results
28
Ganda ERP Project |
6. SOP Modeling 6. SOP Modeling
Purpose:
- Establish the New SOPs for the Company
Participants:
- Project Team, Key Users or Designated Leader for
Each Module
Provided:
- SOPs
- Internal ISO/Key Audit Points
Deliverables
- SOP Flow Chart for Each Module
- Process Owner Sign Off on Completed Modules
29
Ganda ERP Project |
7. GAP Analysis & Customization 7. GAP Analysis & Customization Purpose:
- Process & System Differences Review with Solutions Development
Participants:- Project Team- Consultant
Preparation:- Internal Discussions Conducted about Process Differences
of New System- Consultants Formulate Reports & Variance Analyses to
Adjust Project Direction Deliverables:
- Specifications Confirmation - Gap Analysis Report
30
Ganda ERP Project |
1.Form Project Committee1.Form Project Committee
2.Kick-off Meeting2.Kick-off Meeting
TIPTOP Implementation Methodology
P
D
C
A
31
Ganda ERP Project |
Purpose:
- Preparation of Old System Data Files
- Data Entry of Basic Info into New System
Required:
- Data Migration & Archiving Recommendations Table
Method of Execution:
- Makes Schedule According to Archiving Table to be
Done After Training
- Review Progress of Implementation
8. Basic Data Preparation8. Basic Data Preparation
32
Ganda ERP Project |
9. Process Online Simulation 9. Process Online Simulation
Purpose:
- KMs & KUs Become Familiar with New System
- Further Explore Potential Differences
Participants:
- Project Team & KUs
Provided:
- Current Version of SOPs
Deliverables:
- Participant Online Simulation Scores
33
Ganda ERP Project |
10. Balance of Data Migration 10. Balance of Data Migration
Purpose:
- Migration of Balance of Data for Each Module
- Input of Accurate Accounting Data (or Data Conversion)
Requirements:
- Accounting Opening Balance
- Opening Balance Plan for Each Module
Deliverables:
- Accounts Balance Acceptance Report
- Import of Opening Balances
34
Ganda ERP Project |
1.Form Project Committee1.Form Project Committee
2.Kick-off Meeting2.Kick-off Meeting
TIPTOP Implementation Methodology
P
D
C
A
35
Ganda ERP Project |
11. System Goes-Live 11. System Goes-Live
Purpose:
- Bring System Online
Recommendation:
- New System Completely Replaces Old
System with No Parallel Processing
Method of Execution:
- Consultant & Service Staff Initialize
System On Site
Deliverables:
- Auto Generated System Online
Performance Report
36
Ganda ERP Project |
Purpose:
- Project Costs, Progress Control
- Review the Various Project Implementation Stages &
Objectives
- Resolve All Outstanding Major Issues
- Review Online e-Learning Reports
(Statistics Available for Each System Module
Implemented) Meeting Schedule:
- After Project Kick-Off , at Least Once a Month Participants:
- Process Owner, All Project Participants Deliverables:
- Discussion of Issues & How They were
Resolved
- Subsequent Stages & Plans
12. Monthly Review 12. Monthly Review MeetingMeeting
37
Ganda ERP Project |
13. Settlement of Accounts13. Settlement of Accounts Purpose:
- Initiate Accounts Settlement
- Verify Completion of Project Tasks
- Provide Official Documentation & Management
Reports
Requirements:
- Settlement of Costs, Accounts Settlement SOP
Deliverables:
- Relevant Account Settlement Reports & Management
Reports
Completion Date:
- 10th of the 1st Month Online, with adjustments made in
subsequent months to reduce settlement process
38
Ganda ERP Project |
Agenda
1
2
3
Ganda ERP Project Scope & Benefit
Project team
TIPTOP TIM and each milestone approach
Project Plan (with Schedule)4
39
Ganda ERP Project |
M01 M02 M03 M04 M05 M06
Survey Diagnosis
Survey Diagnosis
Application Training
Application Training
S.O.P. Modeling
S.O.P. Modeling
Gap Analysis Program
Modifying
Gap Analysis Program
Modifying
Simulation Fine-tuning
Simulation Fine-tuning
Data Migration & Data Input Data Migration & Data Input
End Users TrainingEnd Users Training
Balance Check Balance Check
TIPTOP Goes Live
TIPTOP Goes Live
Product
Project
Partner
TIM ,TIPTOP Implementation Methodology
Decision Needs KPI Monitoring
Decision Needs KPI Monitoring
Operation Needs
Operation Needs
Kick-off
Meeting
Close Report Close Report
40
Ganda ERP Project |
Planning1.Signing contract2.Hardware purchase3.System Instalation4.Form Project Team5.Kick Off
Aug Sep DecOct Nov FebJan
23 May, Contract Signing
1 July, Kick Off
May Jun Jul
Action1. System Go-live2. Monthly Review Meeting3. Setlement of account4.Go-live support
Do / Implementing1. Survey & Diagnosis2. Application Training3. Operation Training 4. S.O.P. Modeling5. Gap Analysis &
Customization6. HRM Application Training
/Gap Analysis
Check1. Basic Data Preparation2. Process Online
Simulation3. Balance of data
migration
Phase 2Go-Live
Mar MayApr
ERP Project Milestone
Phase 1 - Project Implementation 6 monthsFinance & Acc; Supply Chain, Sales, Manufacturing, HRM
Phase 2 - Project Implementation 6 monthsGPS/PLC Integration; B2B; BI, Easyflow and other customized programs
1. S&D completed (week 2 July)
2. Application training done (week 2 August)
3. Operational training done (week 4 Sep)
4. SOP Modeling completed (week 1 Oct)
5. Gap Anls & Custm completed (week 3 oct)
1. Basic Data prep done (week 2 Oct)
2. Online Simylation done (week 4 Nov)
3. Data migration completed (week 4 Dec)
Phase 1 Go Live
41
6. HRM Training & Gap Analysis completed (week 5 oct)
Ganda ERP Project |
What next..........Be ready for 1st step survey and diagnosis............
43
4. Purchase requistion Process-GA5. Purchase order Process-GA
09:00-12:00
6. Purchase order Receipt Process-GA 7. Purchase return Process-GA
13:00-15:00
Interview file handle and Check 15:00-17:00
0. Production Planning1. Material Control
09:00-12:00
2. Production Process of Quarry3. Producion Process of Raw Mill 4. Ordinary Report
13:00-15:00
Interview file handle and Check 15:00-17:00
□Production Management (ASF)
SOP Confirm5. Production Process of Clinker6. Ordinary Report
09:00-12:00
□Equipment Management SOP Confirm
0. Equipment Basic Data1. Routine Maintenance2. Repair Request3. Part Management and Issue4. Repair finish report5. Management Report
13:00-16:00
Interview file handle and Check 16:00-17:00
11-Jul□Production Management (ASF)
SOP Confirm7. Production Process of Grinding and Packing8. Ordinary Report
09:00-12:00
□Cost Accounting(AXC) SOP Confirm
0. Cost Calculation Method1. Management Report
13:00-15:00
Summary of interview issues 15:00-17:00
SOP Confirm9-Jul
8-Jul
□PurchaseManagement (APM)
SOP Confirm
10-Jul
□
Production Management (ASF)
1-Jul Item Master SOP Confirm
0. Item Codu Rule discussion1. Item Code Category2. Process of request new item
13:00-14:30
Bill Of Material SOP Confirm0. BOM Structure discussion1. Process of request new BOM2. Process of BOM release
14:30-16:00
Interview file handle and Check 16:00-17:00
SOP Confirm
0. W/H Design1. W/H Transaction2. Stock Opname3. Ordinary Report
09:00-15:00
Interview file handle and Check 15:00-17:00
SOP Confirm0. Customer Master Data 1. Distribution Overview
09:00-12:00
2. Quotation Process 3. Sales contract4. Sales order Process
13:00-16:00
Interview file handle and Check 16:00-17:00
4-JulSales Management (AXM)
5. Shipment Process 6. Truck Scale7. Sales return Process
09:00-15:00
Interview file handle and Check 15:00-17:00
0. Vendor Master Data 1. Purchase requistion Process 2. Purchase order Process
09:00-12:00
3. Purchase order Receipt Process 4. Purchase return Process
13:00-15:00
Interview file handle and Check 15:00-17:00
3-Jul
SOP Confirm
Sales Management (AXM)
1-Jul
2-JulInventory Management
PurchaseManagement (APM)
5-Jul
Ganda ERP Project | 44
Item Month Date Location Participants Objective
1 July 1/07/2013 ~ 5/07/2013 Hai PhongDigiwin 2 Person
JKT team 4 PersonCFC Kick-off meetingCFC Survey & Diagnosis
2
8/07/2013 ~ 12/07/2013 Hai PhongDigiwin 3 Person
JKT team 5 PersonCFC Survey & DiagnosisCFC HW Installation( Mr. Sunu join with HW installation )
3
15/07/2013 ~ 19/09/2013 Both Side
【 Ganda group Internal process 】█ Document Preparation█ Issue Tracking and Discussion
4
22/07/2013 ~ 26/07/2013 Jakarta
Digiwin 2 Person[CFC]
Sales (Mr. Luong + Ms. Thuy) Logistic (Mr. Hien)
MIS (Mr. Tuan)PM Mr. Alex
JKT HW InstallationSOP Discussion█ Sales█ Distribution█ Inter-Company Transaction █ Vehicle Management( Mr. Tuan join with HW installation )
5
29/07/2013 ~ 3/08/20131 day more in Sat
Jakarta
Digiwin 2 Person[CFC]
Pur (Mr. Hai + Mr. Hung) Acc (Ms. Thanh Huong + Ms. Thao)
W/H (Mr. Viet + Mr. Tan)PM Mr. Alex
SOP Discussion █ Purchase █ Account Receivable █ Inventory Management█ Account Payable Discussion█ Warehouse Inventory
Ganda ERP Project | 45
6 Aug 5/08/2013 ~ 9/08/2013 Hai Phong
Digiwin 1 Person[CFC]
HRD (Ms. Hien + Ms. Loan + Ms. Thanh) PM Mr. Alex
SOP Discussion █ Survey and Diagnosis of HRM █ HRM Application Training█ HRM Gap Analysis
7
12/08/2013 ~ 16/08/2013 Jakarta
Digiwin 3 Person[CFC]
Group Lead Mr. Huang P.D Quarry Mr. Dat
Production Mr. HaiPakcing Mr. Thanh
F/G Mr. ChinhQ/C Mr. Huong
W/H Mr. Viet (Spare Parts)ACC Ms. Thanh Huong + Ms. Lan Anh + Mr. Viet
PM Mr. Alex
SOP Discussion █ Production Management█ Notes and Cashing Management█ General Ledger█ Cost Accounting█ Fix Asset(For Accounting)█ Ordinary Report
8
19/08/2013 ~ 23/08/2013 Hai Phong
Digiwin 3 PersonJKT team 4 Person
SOP Gap Analysis & Requirment Confirm█ TIPTOP B2B█ Truck Scale, Belt Scale█ Loca Leagal Report and Tax
9
26/08/2013 ~ 30/08/2013 Both Side
SOP,Basic Data Preparation and DiscussionInternal Key User Training
Ganda ERP Project | 46
10 Sep 2/09/2013 ~ 6/09/2013 Both Side
SOP,Basic Data Preparation and DiscussionInternal Key User Training
11
9/09/2013 ~ 13/09/2013 Hai Phong
Digiwin 2 PersonJKT team 4 Person
Operation Training and SOP Reconfirmation
12
16/09/2013 ~ 20/09/2013 Hai Phong
Digiwin 2 PersonJKT team 4 Person
Operation Training and SOP Reconfirmation
13
23/09/2013 ~ 27/09/2013 Both Side
【 Ganda group Internal Process 】Internal Training to End User and Document Preparation
14
30/09/2013 ~ Hai Phong
MIS Training for Programing, Reporting Modification Skill
Ganda ERP Project |
Three elements of success
The support of The support of Superiors!!Superiors!!
The support of The support of Superiors!!Superiors!!
47