12
Navigation solutions powered by Europe Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day ESA/ESTEC, 22 nd of January 2013

Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Embed Size (px)

DESCRIPTION

Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day. ESA/ESTEC, 22 nd of January 2013. Agenda. TGVF - Industry Day - Meeting Room Einstein Give an overview of the TGVF Tender data package to enable the Tenderer to deliver high quality proposals. - PowerPoint PPT Presentation

Citation preview

Page 1: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

Galileo Full Operational CapabilityTime and Geodetic Validation Facility

Industry DayESA/ESTEC, 22nd of January 2013

Page 2: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 2

TGVF - Industry Day - Meeting Room Einstein

Give an overview of the TGVF Tender data package to enable the Tenderer to deliver high quality proposals.

09:30 Welcome (N. Aouad – TGVF contract responsible)09:45 TGVF presentation (S. Binda – TGVF responsible)10:15 TGVF Core Infrastructure (D. Jimenez – TGVF Core Infrastructure responsible)10:45 OVF (F. Gonzalez – TGVF OVF responsible)11:15 TVF (A. Mudrak – TGVF TVF responsible)

12:00 Lunch

13:00 Visit GPC group A* (D. Jimenez)14:00 Visit GPC group B* (S. Binda)

*Einstein room available from 13:00 to 15:00. For the visits to the GPC: group A should be ready in Einstein at 12:45, group B should be ready in Einstein at 13:45.

Agenda

Page 3: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 3

ESA presentations will be given Visit to the Facilities will be performed

Only clarifications on the presentations text can be provided at the meeting

Complete Applicable Documents and stripped-down TGVF IOV EIDP will be provided tomorrow (to companies having signed the NDA)

It will be possible to send in writing detailed questions to the Contract Officer after the meeting (i.e the usual Clarification process is in place)

A clear distinction will be kept in Presentations and Clarifications distribution between: material referring to the TGVF Tender published on EMITS material referring to the documents subject to NDA (e.g. stripped down TGVF IOV

EIDP)

Presentations/clarifications related to the TGVF Tender Data Package will be published on EMITS

Presentations/clarifications related documents subject to NDA (e.g. stripped down TGVF IOV EIDP) will be distributed only to companies having signed it

Industry Day Organisation

Page 4: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 4

On EMITS:

CT TGVF Open procedure Conditions of Tender.pdf CL TGVF Open procedure Cover Letter.pdf CTR TGVF Open procedure Draft Contract.pdf PSI EUROPEAN-GNSS-PSI_2.0.pdf CISL GAL-CISL-ESA-SYST-X-1475_1.0_CISL.pdf SOW GAL-SOW-ESA-SYST-X-1466_1.0_FOC_TGVF_SOW.pdf SOW GAL-SOW-ESA-SYST-X-1466-A1_1.0_DRL.pdf CU GAL-SOW-ESA-SYST-X-1466-A2_1.0-CU.pdf GLOSSARY GAL-SOW-ESA-SYST-X-1466-

A3_1.0_Glossary.pdf REQSPEC GAL-REQ-ESA-SYST-X-

1477_1.0_FOC_TGVF_REQ.pdf

Clarification no 2 published as well on EMITS

Data Package Composition

Page 5: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 5

SYSTEM EXTERNAL INTERFACES (acting as precursor of future Time Service Provider TSP and Geodetic Reference Service Provider GRSP)

GSS station coordinates (OVF) PTF qualification (TVF) Galileo System Time (GST) Steering to UTC (TVF) Reference clocks and orbits to compute operational GMS Navigation Message

errors (OVF)

IOT/SYSTEM INTEGRATION VERIFICATION (SIV) CAMPAIGNS PERFORMANCE MONITORING

Signal In Space Monitoring by network of Experimental Sensor Stations GMS-external characterisation of orbits and clocks for IOT/SIV purposes User Equivalent Range Error budget estimations (in support of Early Service

validation)

TGVF Use Cases

Page 6: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 6

The TVGF Upgrade shall make use of the TGVF IOV infrastructure, unless the Contractor elects not to do so because he can provide the same functionality and performance within the requested time frame.

Six Work packages have been identified in order to allow the TGVF Upgrade to provide the requested functionality and performance.

The TVF requires some upgrades but needs to be operated immediately as of the KO in a Service Level Agreement (SLA) regime. After the upgrades have been completed, the TVF will be operated in a tightened SLA.

The OVF shall be operated as of the KO in a SLA regime. The Core Infrastructure needs to be updated, but needs as well to be operated

immediately as of the KO. There is no SLA defined for the Core Infrastructure, even though its performance during all phases of Operations shall be monitored routinely and subject to review.

Important activities:

IOV TO FOC CONTRACT HANDOVER OPERATIONS CONTINUITY DURING TGVF UPGRADE

Development logic

Page 7: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 7

Work packages (1/2)

Work Package 1: TGVF Prime. This work package covers the activities to be performed at TGVF System level to ensure a consistent Design, Development, Verification, Validation, Deployment, Operations and Maintenance of the TVF, OVF and Core Infrastructure.

Work Package 2: TVF Service Level Agreement (TVF SLA).

This work package covers the upgrade of TVF to generate timing products as necessary for provision of Galileo OS and PRS SiS. This work package covers also the delivery of these identified products for which the definition of a Service Level Agreement is appropriate. These products are well defined and described in GMS-GTSP. This work package includes finally the Site Hosting and Network Internal and External Services for the TVF. Note that this includes provision of data by UTC laboratories to TVF under similar SLA conditions as the TVF towards Galileo.

Work Package 3: OVF Service Level Agreement (OVF SLA). This work package covers the delivery of well identified products for which the definition of a Service Level Agreement is sufficient for the purposes of the Galileo System. This applies to OVF geodetic products as necessary for provision of Galileo OS and PRS SiS. These products are well defined and described in GMS-GRSP ICD. This work package also includes the Site Hosting and Network Internal and External Services for the OVF.

 

Time and Geodetic Validation Facility (TGVF)

CoreInfrastructure

Off

-lin

e D

ata

An

aly

sis

T

oo

ls

OVF(Geodetic Reference

Service Provider)

RTVF

(Galileo Time Service Provider)

R

GA

LIL

EO

FO

C1

GCCFUC

GCC OBE

GESS NetworkUpgraded Receiver for

FOC1

Ground Mission Segment Interface(SPF)

GTSP I/F GRSP I/F

Galileo Sensor Station Network

DPSTelemetry/

Telecommand History Retrieval

Galileo Telemetry

External Reference Data

Sources(IGS, SLR,…)

DQFG(E)SS Data Quality &

Error Budget

DPAFODTS/ Timing / User / Service Data Analysis

DSFArchive

GALILEO FOC1 &GPS SIS

GALILEO FOC1 SIS

GPS SIS

GALILEO FOC1 S-Band

DMZExternal User Access

R

O

O

Ground Control Segment Interface

(SCCF)

Ext data (BIPM,IERS,…)

LEGEND:

TVF Timing Validation FacilityOVF ODTS Validation FacilityDQF Data Quality assesment FacilityDPAF Data Processing & Analysis FacilityUMF UERE Monitoring FacilityDPS Data Provisioning SystemDSF Data Server FacilityDMZ De-Militarised Zone

R

O

Routine/ Production

Offline/ Campaign based Testing

FOC Upgrades

External Data Sources

(Celestrak, IERS,UMF…)

R

Page 8: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 8

Work packages (2/2)

Work Package 4: Core Infrastructure development, integration and validation. This work package covers the upgrade of the Core Infrastructure, which will be performed based on [AD.2] requirements to upgrade the sensor station to receive Galileo FOC1 signals, ensure review of the algorithms and ensure software development to tailored DAL-E level or equivalent.

Work Package 5: Core Infrastructure Operations. This work package covers: Extension of operations of the Core Infrastructure

part which is hosted at ESA/ESTEC (DSF, DMZ, DQF, DPAF, DPS, ESTEC GESS)

Operations of the set of Galileo Experimental Sensor Stations part of the Core Infrastructure at their current locations

Work Package 6: Security Accreditation. This work package covers all the activities necessary to enable connection of the Upgraded TGVF to the Galileo Control Centres (GCC-I and GCC-D), in accordance with the Local Site Accreditation Plan (AD.7).

Time and Geodetic Validation Facility (TGVF)

CoreInfrastructure

Off

-lin

e D

ata

An

aly

sis

T

oo

ls

OVF(Geodetic Reference

Service Provider)

RTVF

(Galileo Time Service Provider)

R

GA

LIL

EO

FO

C1

GCCFUC

GCC OBE

GESS NetworkUpgraded Receiver for

FOC1

Ground Mission Segment Interface(SPF)

GTSP I/F GRSP I/F

Galileo Sensor Station Network

DPSTelemetry/

Telecommand History Retrieval

Galileo Telemetry

External Reference Data

Sources(IGS, SLR,…)

DQFG(E)SS Data Quality &

Error Budget

DPAFODTS/ Timing / User / Service Data Analysis

DSFArchive

GALILEO FOC1 &GPS SIS

GALILEO FOC1 SIS

GPS SIS

GALILEO FOC1 S-Band

DMZExternal User Access

R

O

O

Ground Control Segment Interface

(SCCF)

Ext data (BIPM,IERS,…)

LEGEND:

TVF Timing Validation FacilityOVF ODTS Validation FacilityDQF Data Quality assesment FacilityDPAF Data Processing & Analysis FacilityUMF UERE Monitoring FacilityDPS Data Provisioning SystemDSF Data Server FacilityDMZ De-Militarised Zone

R

O

Routine/ Production

Offline/ Campaign based Testing

FOC Upgrades

External Data Sources

(Celestrak, IERS,UMF…)

R

Page 9: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 9

Customer Undertakings (1/2)

Page 10: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 10

Deliverables are defined in the SOW/Contract:

HW/SW deliverables

Service Products deliverables

Validation Products deliverables

Documents

Deliverables

Page 11: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 11

The TVF/OVF Service Level Agreement regime consists of:

The provision of services (i.e. signals and reports) with accuracy, frequency, latency and availability in accordance with the Requirement Specification

The delivery of Key Performance Indicators to demonstrate that the accuracy, frequency, latency and availability requirements are routinely met

A provision such that the failure to perform as specified shall result in the application of Service Credits as specified in the SoW and in the Contract

The set of Key Performance Indicators shall be established by the Contractor and agreed by ESA for TVF/OVF at the Kick Off as follows: The list of signals to be delivered is defined in the SOW Measurable performance parameters related the accuracy, frequency, latency and availability to these

signals shall be established according to the Requirement Specification The measurable performance parameters shall be computed routinely and reviewed at each Quarterly

Review

At every Quarterly Review, the Contractor shall be authorised to charge the Agency for the Services delivered in the SLA in accordance to the following: the Normalised KPI (i.e. the unweighted average of the KPIs normalised with respect to their respective

Requirement Specification values) shall be computed ranges for the normalised KPI shall be as defined in the Contract the Service charge per Quarter shall be defined as three times the monthly price of the TVF/OVF SLA

work package related to the provision of the signals defined in the SOW the Agency shall be given a Service Credit (i.e. a reduction on the Service charge) corresponding to the

range achieved by the Normalised KPI as defined in the Contract

The OVF KPIs level are defined at the KOM. The TVF KPIs are defined at the KOM and redefined (tightened) at the AR)

Service Level Agreement (TVF/OVF)

Page 12: Galileo Full Operational Capability Time and Geodetic Validation Facility Industry Day

Navigation solutions powered by Europe

19 April 2023 The European GNSS Programmes 12

Schedule