Crossrail 2 factsheet: Victoria station
Shafts would be required along the tunnelled section of the proposed Crossrail 2 route to connect the tunnels to the surface and provide a safe and comfortable environment for passengers and staff
Crossrail 2 shafts
Why would shafts be needed?Shafts would connect the underground Crossrail 2 tunnels with the surface. During everyday operations, the motion of trains would push air out of the tunnels and pull air into them from the atmosphere. As the air pushed out is usually warmer than the air pulled in, the shafts would help to provide a more comfortable temperature for passengers and staff.
During periods of disturbed service, when trains could be held in Crossrail 2’s tunnels for an extended period of time, the shaft’s ventilation system would deliver cooler air from the atmosphere to the tunnels and to stationary trains.
In the unlikely event of a fire, the shafts would control smoke, provide access for the fire and rescue services and provide a safe evacuation route for passengers.
Where are shafts required?Shafts would be required at both ends of each underground Crossrail 2 station. Where possible, these would be constructed within the overall station structure.
Shafts would also be required at locations between underground Crossrail 2 stations where operational and safety requirements determine they are needed.
What would a shaft look like?Most of the shaft would be underground with an above-ground structure known as a ‘head-house’. This would provide access to the shaft itself, the equipment within it and the tunnels below. A head-house is ideally located directly above the shaft and tunnels, except in some cases where they can be located separately and connected by a short underground passage. A street-level entrance would provide access for the fire and rescue services, for the safe evacuation of passengers in an emergency as well as for maintenance. Direct access to the head-house is required for emergency and maintenance vehicles.
At stations the head-house would typically be integrated with the overall station structure. At locations between stations the head-house would be separate. At this early stage of Crossrail 2 design, we expect a typical head-house to occupy an area of around 25 metres by 25 metres and to be at least two storeys high – although the size of each head-house would be influenced by local factors including the depth of the tunnels and the height of surrounding buildings at each site. Further design work would be required to determine our requirements at each individual location.
As the Crossrail 2 scheme develops further, we would engage with the relevant local authority, interested stakeholders and local communities to inform the designs for each head-house. The examples overleaf illustrate some of the different ways in which head-houses can be integrated into their surroundings.
G2
The locations of station shafts would form part of the overall design for each station.
A separate process is undertaken to inform the locations of shafts in between stations and in doing so a range of factors would be considered. These include:
• Whether a site can provide an area of at least 3,000metres2
• Existing land use and community impacts
• Environmental and heritage impacts
• Site suitability for construction
• Site suitability for operational and safety requirements
• Potential for reinstatement of the site
Crossrail 2 would require shafts in the following proposed locations:
• Downhills Recreation Ground (S2: Seven Sisters to New Southgate Route Options)
• Stamford Hill area (featured within this factsheet)
• Shoreditch Park area (featured within this factsheet)
• Victoria Coach Station (S9: Victoria station)
• Westbridge Road (featured within this factsheet)
• Wandsworth Common (Honeywell Road) (S12: Wimbledon to Clapham Junction)
• Springfield (S12: Wimbledon to Clapham Junction)
• Weir Road (S12: Wimbledon to Clapham Junction)
Selecting shaft locations
Diagram to illustrate how a shaft operates
Minimising our impact
Shenfield
Brentwood
HaroldWood
GideaPark
Romford
ChadwellHeath
Goodmayes
SevenKings
Ilford
ManorPark
ForestGate
Stratford
EbbsfleetCrossrail
Swanscombe
Greenhithe
StoneCrossing
Dartford
SladeGreen
Erith
Belvedere
AbbeyWood
CustomHouse
Isle ofDogs
Whitechapel
LiverpoolStreet
Farringdon
TottenhamCourt Road
Bond Street
Paddington
Ealing BroadwayHayes and HarlingtonHeathrow
Kingston
HamptonWick
Teddington
StrawberryHill
Twickenham
Richmond
KewGardens
Gunnersbury
TurnhamGreen
Crossing the Capital, Connecting the UK TYPICAL VENTILATION SHAFT
1i06
01-c
1v00
-500
01
warm air from tunnels pushed out into atmosphere by fans
ventilation outlet can be incorporated within a building
ventilationshaft
crossrail running tunnel
ventilation outlet can bea freestanding structure
ventilation shaft
crossrail running tunnel
emergency accesspassage to tunnels
emergencyaccess stairs
mechanicalequipmentrooms
grille
air pulled inby shaft
train stationary in tunnel
fresh air pulledinto shaft by fans
mechanicalequipmentrooms
access stair for emergency services
escapewalkways
damper closed
damper open
Crossrailrunning tunnel
attenuator to reduce noiseat tunnel level
attenuatorto reducenoise
fresh air pushed into tunnel smoke pulled out
direction of passenger escape
In the event of a fire emergency affecting a train the fans will be used to control and extract smoke to enable passenger evacuation along the trackside walkway. The tunnel ventilation system will help to ensure that the underground environment remains comfortable and safe for passengers at all times.Method of operation
When 'forced' ventilation is required, two ventilation shafts will work in conjunction with each other. One will push fresh air into the tunnel and the other will pull exhaust air into the atmosphere. In this way a steady airflow can be set up in the tunnels. Fans will either:
- blow cooling air over a stationary train.- extract smoke from the tunnel in the event of a fire.
Detail layout
The layout of each intermediate ventilation shaft will vary to reflect the constraints imposed by different locations but each will contain:
three electric fans - all reversible to enable the fan to push or pull air as required. Two fans will operate at any given time with one on standby.
ventilation control valves (dampers) at tunnel level to direct air into or out of the correct tunnel.
baffles (attenuators) to minimise noise from fan motors.
an access stair to the tunnels for use by the emergency services.
equipment necessary to operate the fans will be housed in a structure (usually underground) attached to the shaft and will be accessed from street level.
Location
Ventilation shafts will be provided at all Crossrail underground stations. Intermediate ventilation shafts will be provided at specific intervals between stations in order to ensure an adequate airflow.
-
-
-
-
-
separatingwall
3 fans(1 standby)
emergency access stairincorporated within all intermediate ventilation shafts
Section ThroughVentilation Shaft
Plan of Shaft
Fans Operating to Control Smoke in theEvent of a Fire Emergency
Bond Street Incorporated into station boxCrossrail Line 1 (post-construction, visualisation)
Mile End ‘Green design’London Borough of Tower HamletsCrossrail Line 1 (post-construction, visualisation)
Gibson Square Heritage designLondon Borough of Islington Victoria line
Kennington Park Conservation Area London Borough of Southwark Northern line extension (post-construction, visualisation)
Crossrail 2 shafts would be designed to avoid any noticeable impact on background noise levels or air quality from their operation.
Proposals for the scheme are still at the early stages of design. Feedback from this and future consultations, together with further design and engineering work, will refine the proposals ahead of seeking permission to build the new railway.
All our contractors would have to adhere to a Code of Construction Practice, which would be developed together with local authorities. This would set out requirements for considerate construction practices that use the latest techniques to reduce noise and disruption both for surface and underground works.
As part of our Environmental Statement, a full assessment of the potential impacts of construction and operation of the scheme will be documented along with proposed methods to minimise impacts where required. These proposals would then form commitments as part of the application for planning consent.
Westbridge Road
Why is a shaft needed in this location?To enable Crossrail 2 to operate safely, we would need a shaft midway between Clapham Junction and King’s Road Chelsea stations. The shaft would provide tunnel ventilation, access for the fire and rescue services and a safe evacuation route for passengers in the event of an emergency.
Our current preferred site is within the Surrey Lane Estate at Westbridge Road. This has been selected to avoid taking residential land, and the site has already been safeguarded for Crossrail 2.
The proposalA single worksite would be required to build the shaft, and a typical shaft would take approximately five years to complete. Activity on site would fluctuate during this period. Once the site has been cleared and prepared, the major construction work to dig out the shaft would usually be complete within two years.
On completion of the works at each site, an above-ground structure known as a ‘head-house’ would remain. The head-house would provide access to the shaft, the equipment within it and the tunnels below. It would also allow air to be drawn into and out of the tunnel ventilation system. At this early stage of Crossrail 2’s design, we expect a typical head-house to be at least two storeys high and to occupy an area of around 25m by 25m. As the scheme develops further, we would engage with the local authority, interested stakeholders and local communities to inform the designs for each head-house.
2
109
2
1
2
1
65
24
39
85
96
52
49
4
H Y D E L A N E
HE
NT
Y C
LOS
E
S U N B U R Y L A N E
B AT T E R S E A CH U R C H R
O A D
BOL INGBROKE WALK
BOL INGBROKE WALK
R A N D A L L C L O S E
OC
TAV
IA S
TREET
BATT ERSEA H
IGH
ST
RE
ET
O R B E L S T R E E T
GR
AN
F I EL D
ST R
E E T PA R K H A M S T R E E T S U R R E Y L A N E
BA
TT
ER
SE
A B
RI
DG
E R
OA
D
W E S T B R I D G E R O A D
WE
ST
BR
ID
GE
R
OA
D
GamesCourt Westbridge
Primary School
Somerset Schooland Nursery
SalesianCollege
The Bridge
Battersea High Street
Surrey LaneEstate
SomersetEstate
Montevetro
Crossrail 2 underground tunnels
Key local buildings
Indicative head-house location
Key
Proposed worksite
Proposed Crossrail 2 stations
© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015
Shoreditch Park area
Why is an intermediate shaft required in this location?To enable Crossrail 2 to operate safely, we would need a shaft midway between Angel and Dalston stations. The shaft would provide tunnel ventilation, access for the fire and rescue services and a safe evacuation route for passengers in the event of an emergency.
We also need to make provision for a junction between Angel and Dalston stations which could allow a future Crossrail 2 ‘Eastern Branch’.
We have adopted the principle that these two requirements should be combined in a single construction site in order to minimise overall disruption.
The proposalA single worksite would be required to build and equip the shaft and the junction.
We are currently considering a number of options for the shaft in the area. Our current options have been selected because they would allow us to position the possible ‘Eastern Branch’ junction under the open space of Shoreditch Park. These comprise:
Option A – Eagle Wharf Road (48 and 48a)
Option B – Eagle Wharf Road (46 and 47)
Option C – Shoreditch Park (north-west corner)
Option D – Britannia Leisure Centre (car park)
Option E – Britannia Leisure Centre (main building)
Construction would take around six years from start to finish. Activity on site would fluctuate over this period. Once the site has been cleared and prepared, the major construction work to dig out the shaft and junction would usually be complete within three years.
On completion of the works, an above-ground structure known as a ‘head-house’ would remain. The head-house would provide access to the shaft, the equipment within it and the tunnels below. It would also allow air to be drawn into and out of the tunnel ventilation system. At this early stage of Crossrail 2’s design, we expect a typical head-house to be at least two storeys high and to occupy an area of around 25m by 25m. As the scheme develops further, we would engage with the local authority, interested stakeholders and local communities to inform the designs for each head-house.
Regent’s Canal
Regent’s Canal
UnionWharf
SturtsLock
ArlingtonSquare
WiltonSquare
Shoreditch Park
Shoreditch Park
BRACK
LYN S
TREE T
F E LT O N S T R E E T
SHUBBERY
C LOSE
B L E T S O E WA L K
GO
DW
IN C
LOS
EN
IAG
AR
A
CLO
SE
NO
RT
HP
OR
TS
TR
EE
T
P H I L L I P P S T R E E T
HA
RV
EY
ST
RE
ET W
HI T
MO
RE
RO
AD
B R A N C H P L A C E
PIT
FIELD
ST
RE
ETC AV E N D I S H S T R E E T
B U C K L A N D S T R E E T
S H A F T E S B U R Y S T R E E T
P U R C E L L S T R E E T
M I N T E R N S T R E E T
BR
IDP
OR
T P
LAC
E
W I M B O U R N E S T R E E T
I V Y S T R E E TR U S H T O N S T R E E T
H E M S W O R T H S T R E E T
PIT
FIE
LD S
TRE E
T
G R A N G E S T R E E T
BR
IDP
OR
T P
LAC
EG O P S A L L S T R E E T
IMB
ER S
TREET
AV
EBU
RY S
TREET
D E V I Z E S
S T R E E T
BR
IDP
OR
T P
LAC
E
W I LT S H I R E R O W
BA
R IN
G S T R E E TB R A N C H P L A C E
W I LT O N S Q U A R E
C A N A L WA L K
S H E P P E R T O N R O A DBIS
HO
P S
TR
EE
T
B A S I R E S T R E E T
RECTOR S TREETCAN
ON S TREET
S T. PA U L S
T R E E T
PACK IN
GTO
N SQ
UA
RE
P R E B E N D ST R E E T
UNION
SQUARE
COLEMAN
F I E LDSB
EVAN
S TREET
L I N T O N ST R E E T
MARY S TREET
COLEMAN
F I E LDS
A R L I N G T O N AV E N U E
ARL INGTON
SQUARES
T. PH
I L I P’ S
WA
Y
S T. PA U L S
T R E E T
ARL INGTON
SQUARE
R Y D O N S T R E E T
L I N T O N ST R E E T
REES S TREET
A R L I N G T O N AV E N U E
W I LT O N
V I L L A S
PA R R S T R E E T
WI LTON
SQUARE
F O R S T O N S T R E E T
S H A F T E S B U R Y S T R E E T
N A P I E R G R O V EC
RO
PLEY S
TREET
H Y D E R O A D
P O O L E S T R E E T
P E N N S T R E E T
BA
RI N
G S
TR
E E T
SO
UT
HG
AT
E
RO
AD
E A GL E W
HA
RF R
OA
D
NE
W N
OR
TH
RO
AD
SH
EP
HE
RD
ES
S
WA
LK
NE
W
NO
RT
H
RO
AD
ShoreditchPlay Park
TennisCourts
IslingtonBusinessCentre
GainsboroughHealth & Fitness
RosemaryBranchTheatre
ShoreditchParkSurgery
The Salvation Army(Hoxton Centre)
WhitmorePrimarySchool
Thomas FairchildCommunity School
Rosemary WorksIndependentPrimary School
Trainingfor LifeWhitmore
Colville EstateCommunity Hall
BritanniaLeisure Centre
Parish Church ofSt. Anne, Hoxtonwith St. ColumbiaShoreditch
Park
CranstonEstate
Colvi l leEstate
Proposed worksite options
Crossrail 2 underground tunnels
Key local buildings
Indicative head-house location
Key
A
B
D
C
E
Proposed Crossrail 2 stations
© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015
Stamford Hill
Why is a shaft required in this location?In order to allow Crossrail 2 trains to serve both of its northern branches via Seven Sisters and Tottenham Hale, an underground junction would be required north of Dalston station. This junction would also have a facility for reversing Crossrail 2 trains so as to ensure a robust and resilient service.
A shaft would be required to construct the junction and reversing facility. To allow Crossrail 2 to operate safely, this shaft would be retained in the long term to provide tunnel ventilation, access for the fire and rescue services and a safe evacuation route for passengers in the event of an emergency.
The proposalA single worksite would be required to construct the shaft, junction and reversing facility. Our current preferred location for this worksite, just north-west of Stoke Newington station, has been selected to minimise the amount of residential land we would need to take.
Construction would take around six years from start to finish. Activity on site would fluctuate over this period. Once the site has been cleared and prepared, the major construction work to dig out the shaft, junction and reversing facility would usually be complete within three years.
On completion of the works, an above-ground structure known as a ‘head-house’ would remain. The head-house would provide access to the shaft, the equipment within it and the tunnels below. It would also allow air to be drawn into and out of the tunnel ventilation system. At this early stage of Crossrail 2 design, we expect a typical head-house to be at least two storeys high and to occupy an area of around 25m by 25m. As the scheme develops further, we would engage with the local authority, interested stakeholders and local communities to inform the designs for each head-house.
56
4
14
43
2
19
90 16
17
21
6
103
54
25
29
6
25
22
6
5
Allen’sGardens
Abney ParkCemetery
L EA
TH
ER
HE
AD
CLO
SE
M A R TA B A N R O A D
B E L F A S T R O A D
W I N D U S R O A D
MA
RG
AR
ET
RO
AD
L A M PA R D G R O V E
R E I Z E L C L O S E
LY N M O U T H R O A D
ROYAL C L OS E
LI ST
RIA
PA
RK
C A Z E N O V E R O A D
MA
NO
R
RO
A D
M A N O R R O A D
ST
AM
FO
RD
H
IL
L
Morrisons
GurSynagogue
CarpetRight
Tollgate LodgePrimary Care Centre
Stamford HillCommunity Centre
StokeNewington
StokeNewingtonStokeNewington
Guinness TrustEstate
Stamford Hil lEstate
Homleigh RoadEstate
S T O K EN E W I N G T O N
S TA M F O R DH I L L
Crossrail 2 underground tunnels
Key local buildings
Indicative head-house location
Key
Proposed worksite
Proposed Crossrail 2 stations
© Crown copyright and database rights 2015 Ordnance Survey 100035971/043© Copyright Transport for London 2015
To find out more Visit www.crossrail2.co.uk where you can view and download a range of factsheets, maps and other information about the scheme.
Come along to one of our drop-in events where you will have an opportunity to view our proposals and speak to members of the Crossrail 2 team. Please visit www.crossrail2.co.uk for details about events in your area.
Please contact us to request a copy of this leaflet and other Crossrail 2 consultation material in hard copy, large print, audio or another language.
Contact us • Email: [email protected]
• Helpline: 0343 222 0055*
• Post: Freepost Crossrail 2 Consultations
• Website: www.crossrail2.co.uk
*Service and network charges may apply. See tfl.gov.uk/terms for details
Have your say This consultation gives you the opportunity to comment on proposals for Crossrail 2. Visit www.crossrail2.co.uk to leave a comment or provide a response to the consultation questions. The consultation will close on Friday 8 January 2016.
Development is still at an early stage. There will be more opportunity to provide feedback on Crossrail 2 as the scheme develops.
G2: Crossrail 2 shafts / Oct-2015