September 10 th ,2021 g 3 : Tomorrow's SF 6 -Free Standard for HV Equipment Bertrand PORTAL – g 3 Product Manager

g : Tomorrow's SF6-Free Standard for HV Equipment

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: g : Tomorrow's SF6-Free Standard for HV Equipment

September 10th ,2021

g3: Tomorrow's SF6-Free Standard for HV EquipmentBertrand PORTAL – g3 Product Manager

Page 2: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

ContentsBACKGROUND

PORTFOLIO

GAS MANAGEMENT

ADOPTION

SUMMARY

REFERENCES

WHAT IS g3 ?

Page 3: g : Tomorrow's SF6-Free Standard for HV Equipment

Background & Context

Page 4: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

SF6 is a Greenhouse Gas

SF6 contributes 23,500

more times to the

greenhouse effect than CO2

SIGNIFICANT ENVIRONMENTAL IMPACT

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

SF6 concentration in the atmosphere goes on increasing

+45% during the last 10 years

Page 5: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

1970’s 1997 1999 2006 2007 2010 2014 2015 2016 2017 2020

EU Target

to cut GHG

Emissions:

20% by 2020

40% by 2030

Carbon

neutral by

2050

COP21 Paris

Agreement

entry into

force

COP21 Paris

Agreement

196 countries

commit to

reduce their

GHG

emissions

New EU

F-gas Regulation

(emissions to be

cut 2/3 by 2030

vs.2014)

2009

COP15 Copenhagen

reduce GHG emissions

by 40 to 70% by 2050

(vs. 2010)

California

Global Warming

Solutions Act

EU F-Gas

Regulation

US EPA

SF₆ Emission

Reduction

Kyoto Protocol

SF6 listed as a

Greenhouse gas

SF6 became the main insulating and switching

medium for High Voltage equipment

US EPA

Mandatory Reporting

of Greenhouse Gases

New gas

launchedGE / 3M

collaboration

First

productsFirst

energizations

SF6 Regulations

Growing number of SF6 regulations in the world

2008

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 6: g : Tomorrow's SF6-Free Standard for HV Equipment

© 2021 General Electric Company. Proprietary. All Rights Reserved.

THE QUESTION IS NO MORE IF THERE WILL BE A SF6 BAN BUT

WHEN WILL COME THE BAN ?

• SF6 ban is scheduled

• Regulation under revision now

• May21, EU proposed options for the new regulation on SF6

• SF6 ban if alternative are available

• Regulation draft scheduled 12/2021

• Transition times could be agreed and have been proposed by DSO,TSO and manufacturers

SF6 Regulations update

Page 7: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

EU welcomes g3

https://ec.europa.eu/clima/sites/clima/files/news/docs/c_2020_6635_en.pdf

EU Commission report on SF6 alternatives – issued Sept. 30th 2020

The report assess whether cost-effective, technically feasible, energy efficient and

reliable alternatives exist.

The report is confirming the availability of alternatives and therefore opening the door

for a future ban of SF6. It is also providing a very positive feedback on g3 technology and

associated products.

Some quotes:

"Gas blends based on fluoronitriles and SF6-based solutions are equivalent in terms of

dimensions and electrical ratings. On the other hand, models with gas blends based on

fluoroketones and natural gases, require larger physical dimensions compared to SF6

models"

420 kV – 63 kA GIS CB

development partially funded

by EU LIFE program

EU selected this project to showcase

Europe’s industrial and

environmental strategy

245 kV – 50 kA LT CB

development partially funded

by EU LIFE program

2019 2021

Page 8: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Existing

IEC and IEEE

standards are

not specific to

SF6 but need

adaptations for

alternative gases

SF6 became the main insulating and

switching medium for High Voltage

equipment

New gas

launchedGE / 3M

collaboration

First

productsFirst

energizations

Standardization is moving forward

Kista meeting – creation of Ad-Hoc

group to review IEC standards

Start revision of IEC

62271-4

Technical report on impact of alternative gases on existing standards

(PES-TR64) + creation of 2 new WG

3 Working Groups (A3.41, B3.45, D1.67)

Technical Brochure TB730 & TB802

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

1970’s 1997 1999 2006 2007 2010 2014 2015 2016 2017 202020092008

Page 9: g : Tomorrow's SF6-Free Standard for HV Equipment

What is g3 ?

Page 10: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

225/45R17.

GE Selection Criteria

CR

IT

ER

IA

225/45R17.

SE

LE

CT

IV

E

Many Candidates, Minimal Success

N2

CO2Dry Air

Low dielectricstrength

Fluro-ketones

High boiling point

Vacuum

Voltage limitations

CF3I

Toxicity

Perfluoro-carbons

High global warming potential

High dielectric strength

No voltage limitation

Low liquefaction temperature

Low global warming potential

Qualified non-toxic like SF6

The long road to an alternative

Page 11: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

225/45R17.

Environmental

• ~99% reduction in Global Warming Potential impact (vs. SF6)

• Same equipment dimension as SF6 switchgear

(lowest lifecycle impact of all available alternatives)

• Same temperature ranges as SF6 (-30 to 55C)

• No voltage or current limitation

Performance

• Classified non-toxic – same toxicity class as SF6

Safety

+

Novec 4710

C4F7N

CO2

+O2

g3: The solution to replace SF6

Page 12: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

225/45R17.v

145 kV GIS Lifecycle Assessment &

Environmental Impact

Substation Carbon Footprint Analysis

1

3

2

4

-70 %

G

A

S

+37%

Vacuum + Dry airSF6 g3

g3 products offers the lowest environmental

footprint over the full product life cycle

The gas GWP is not the criteria to assess the

carbon footprint of a switchgear

1 SF6 is the main contributor to the carbon footprint over 40yrs

2

g3 switchgear has same dimensions ➔ not changing other environmental impacts

3

g3 reduces significantly the gas impact (~ 1 % of the remaining impact)

Dry air insulation requires bigger switchgears→ This increase of size leads to a larger CO2 footprint and therefore a transfer of pollution

4

Page 13: g : Tomorrow's SF6-Free Standard for HV Equipment

g3 Portfolio

Page 14: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

GAS-INSULATED

LINES

420 kV

For -30°C application

-99.3 %CO2 equivalent of

installed gas mass

GAS-INSULATED

SUBSTATIONS

145 kV

For -25°C application

-99.1 %CO2 equivalent of

installed gas mass

-Confidential- . Not to be copied, distributed, or reproduced without prior approval. For internal use only

AIS

CIRCUIT-BREAKERS

145 kV

For -30°C applications

-99.3 %CO2 equivalent of

installed gas mass

g3 Portfolio (as of 2021)

Page 15: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

g3 Product Roadmap

Latest progress in the range:

245 kV 63 kA single break interrupter in development

→ Main breaking performances

demonstrated

T10, T30, L75, T100, LC, OP2

-Confidential- . Not to be copied, distributed, or reproduced without prior approval. For internal use only

Page 16: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.-Confidential- . Not to be copied, distributed, or reproduced without prior approval. For internal use only

Successful technical cooperation with LS Electric Korea

TYPE TESTING FINISHED – END 2019

GAS-INSULATED SUBSTATIONS

170kV – 50kA – 60 Hz

PILOT @ KEPCO STARTED END 2020

Page 17: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.-Confidential- . Not to be copied, distributed, or reproduced without prior approval. For internal use only

Hitachi ABB Power Grids moves to Fluoronitrile

On April 21st, 2021

GE and Hitachi ABB Power Grids announced the signature of an agreement

This will help accelerate the use of

fluoronitrile-based eco-efficient

insulation and switching gas in high-voltage

equipment as an alternative to SF6

Page 18: g : Tomorrow's SF6-Free Standard for HV Equipment

Gas Management Solutions

Page 19: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Gas supply

Gas handlingin factory

Gas handling on site

Operation & maintenance

End of life

g³ – Gas Management

Solutions developed with partners for complete substation life cycle

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 20: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

First filling of equipment big quantities

g3 – Very Simple Gas Handling

Successful gas handling performed on all projects with premixed g³

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Filling - Bottle fluid

Top-up - Bottle gas

Page 21: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

GAS LEAKAGE DETECTION PPEGAS QUALITY CHECK

(HUMIDITY, RATIO)

GAS CARTS FOR GAS

FILLING, RECOVERY AND

TOPPING-UP

Complete set of tools developed to handle and check gas

safely and efficiently

g3 – Gas Handling Tools

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 22: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

3 European factories industrialized to perform routine tests with g³

(1.2 M€ investment)

g3 – Gas Handling (GIS factory)

ROUTINE TESTS IN SWISS GIS FACTORY

WITH g³ ON COMPLETE

145 kV GIS BAYS

ROUTINE TESTS IN GERMAN

AIS FACTORY WITH g³ ON

145 kV AIS CIRCUIT BREAKERS

ROUTINE TESTS IN FRENCH

GIS FACTORY WITH g³ ON

420 kV GIL COMPONENTS

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 23: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

g3 – Gas Handling (on site)

Successful gas handling performed on the first projects with g³

LIQUID TO GAS FILLING

INDOOR APPLICATION

Use of DILO gas cart

110 kV GIS in Switzerland

SMALL VOLUMES OF GAS

Gas to gas filling

145 kV CB in Switzerland

LIQUID TO GAS FILLING

OUTDOOR APPLICATION

Use of Air Liquide gas cart

420 kV GIL in England

LIQUID TO GAS FILLING

OUTDOOR APPLICATION

Use of Air Liquide gas cart

420 kV GIL in Scotland

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 24: g : Tomorrow's SF6-Free Standard for HV Equipment

Adoption

Page 25: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

g3 Adoption

LEADING UTILITIES

Have decided to install

equipment with g3

25

g3 Gas–Insulated Lines

420 kV, -25 °C

10 sites – 5000+ meters

g3 Gas–Insulated Substations

145 kV, -25 °C

18 sites – 120 bays

g3 Gas–Insulated Substations

420 kV, -25 °C

1 sites – 9 bays

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

g3 AIS – Live Tank CB

145 kV, -30 °C

10+ sites – 98 LT

Page 26: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Fluoronitrile users list is growing in HV

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

MANUFACTURERS

- GE (pioneer)

- HITACHI ABB

- LS Electric

- Hyundai

- Pinggao

- …

USERS

- TSO:

- National Grid (UK)

- SPEN (UK)

- SSEN (UK)

- RTE (FR)

- REE (SP)

- Statnett (NOR)

- TenneT (GER, NED)

- TransnetBW (GER)

- 50Hz (GER)

- KEPCO (KOR)

- …

USERS

- Others:

- AXPO(CH)

- Groupe E (CH)

- Eon (GER)

- Cerius (DEN)

- ELVIA (NOR)

- Stedin (DEN)

- Vattenfall (SWE)

- …

Page 27: g : Tomorrow's SF6-Free Standard for HV Equipment

REFERENCES

Page 28: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

GISg3 GIL

g3 GIL

420 kV GIL, National Grid, UK

230m GIL, Sellindge Substation

Year of order: 2016 - Energization: 2017

in tons of CO2e

CO2e reduction

of installed gas masses

35,950

CO2e reduction

of emissions over 40 years

7,190

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 29: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

GIS

GIL

g3

GIL

Year of order: 2017 - Energization: 2018

420 kV GIL, SPEN, UK

177m GIL, Kilmarnock Substation

in tons of CO2e

CO2e reduction

of installed gas masses

31,760

CO2e reduction

of emissions over 40 years

6,350

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 30: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

1020m GIL, New Deer Substation

Year of order: 2018 - Commissioning: 2021

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

in tons of CO2e

CO2e reduction

of installed gas masses

117,000

CO2e reduction

of emissions over 40 years

26,000

420 kV GIL, SSEN, Scotland

“We are delighted to be marking yet another first for SSEN

Transmission in the fight against climate change. Our

substations are vital to enabling the connection of

renewable energy to the grid, they play a key role in the

race to net zero emissions. That is why it is important that

we strive to make our new substations are as green as

possible by using new technology such as GE’s g3

insulated busbars.

“By using these innovations, we are not only reducing the

environmental impact on our own network, we are

demonstrating to the wider energy industry that there

is a viable alternative to SF6 out there, supporting

Government net zero targets, including the recently

announced interim 78% emission reduction target by 2035."

Page 31: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

530m GIL and 7 bays of 145 kV GIS, Fort Augustus Substation

Year of order: 2018 – Commissioning: 2021

in tons of CO2e

CO2e reduction

of installed gas masses

72,000

CO2e reduction

of emissions over 40 years

14,000

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

132 kV GIS + 420 kV GIL, SSEN, Scotland

Page 32: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

2129m GIL and 9 bays of 420 kV GIS, Kintore Substation

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

420 kV GIS + 420 kV GIL, SSEN, Scotland

Year of order: 2020 – Erection: 2025

in tons of CO2e

CO2e reduction

of installed gas masses

>350,000

CO2e reduction

of emissions over 40 years

>70,000

CB development

partially funded

by EU Life

program

Page 33: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

420 kV GIL, STATNETT, Norway

160 m GIL, Hamang Substation (-30°C)

1st g3 in Norway:

Statnett supports Norway’s Decarbonization Goals with

GE’s Green Gas for Grid (g3) Technology:

• Transmission grid operator to install world’s first 420 kV Green Gas for Grid (g3) gas-insulated line

and busbars (GIL/GIB) operating at -30°C

• GE’s g3 technology is a game-changing alternative to sulphur hexafluoride (SF6), an insulating and

switching gas traditionally used in substation equipment and the most potent greenhouse gas in

the world

• GE’s g3 technology to help Statnett meet its goal of reducing its greenhouse gas emissions by 25

percent in 2025

- Ratings: 420 kV / 63 kA / 5000 A, -30°C

Page 34: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

110 kV GIS, AXPO, Switzerland

4 bays of 123 kV g3 + GIB

Year of order: 2017 - Energization: 2018

in tons of CO2e

CO2e reduction

of installed gas masses

8,710

CO2e reduction

of emissions over 40 years

1,740

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 35: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

63 kV GIS, RTE, France

7 bays of 72,5 kV g³ GIS at Grimaud Substation

Year of order: 2017 – Energization: Oct. 2019

in tons of CO2e

CO2e reduction

of installed gas masses

17,750

CO2e reduction

of emissions over 40 years

8,880

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 36: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

50 kV GIS, CERIUS, Haslev, Denmark

6 full 72.5 kV g³-GIS bays

Year of order: 2017 – Energization Sept. 2019

in tons of CO2e

CO2e reduction

of installed gas masses

9,230

CO2e reduction

of emissions over 40 years

1,850

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 37: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

50 kV GIS, STEDIN, Netherlands

7 full bays of 72.5 kV g³-GIS including digital CT&VT (LPIT)

Year of order: 2017 - Energization: Nov. 2019

in tons of CO2e

CO2e reduction

of installed gas masses

13,700

CO2e reduction

of emissions over 40 years

2,740

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 38: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

4 bays of 72.5 kV g³ GIS at Rodovre SS

Year of order: 2018 - Energization: Jan. 2020

in tons of CO2e

CO2e reduction

of installed gas masses

5,860

CO2e reduction

of emissions over 40 years

1,170

50 kV Project, Radius Elnet, Denmark

Page 39: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Year of order: 2018 - Commissioning: Fev. 2020

in tons of CO2e

CO2e reduction

of installed gas masses

1,460

CO2e reduction

of emissions over 40 years

295

1 bay of 72.5 kV g³ GIS, CANARIAS MOBILES, Fuerteventura

66 kV Project, REE, Spain

Page 40: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

110 kV project, EKW OEE, Switzerland6 full bays of 123 kV g³-GIS at UW Zernez

Year of order: 2018 -Energization: July 2019

in tons of CO2e

CO2e reduction

of installed gas masses

8,700

CO2e reduction

of emissions over 40 years

1,760

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 41: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

132 kV Project, SPEN, UK16 bays DBB of 145 kV g³ GIS at Listerdrive SS

Year of order: 2018 - Commissioning: 2021

in tons of CO2e

CO2e reduction

of installed gas masses

23’400

CO2e reduction

of emissions over 40 years

4’680

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Page 42: g : Tomorrow's SF6-Free Standard for HV Equipment

Summary

Page 43: g : Tomorrow's SF6-Free Standard for HV Equipment

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

Summary

• Gas impact: low global warming potential: 99 % reduction versus SF6

• Substation life cycle impact: lowest CO2 footprint of all SF6-free

substations

• Technical performance similar to today’s SF6 products

• Application: -25/-30oC and all voltage levels

• Toxicity: Same toxicity class as SF6 (new and polluted gas)

• Same dimensions and footprint as for SF6 products

• R&D roadmap will keep on evolving thanks to

new projects /regulations/volume of markets

• 25 TSO/DSO decided for g3

-Confidential- . Not to be copied, distributed, or reproduced without prior approval.

g3 is the first technical and economical alternative to SF6 for HV application

Page 44: g : Tomorrow's SF6-Free Standard for HV Equipment