47
McKINLEY ELEMENTARY SCHOOL FINAL DESIGN REPORT | 01.22.2015 RENOVATION AND ADDITION 1

G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

McKINLEY ELEMENTARY SCHOOLFINAL DESIGN REPORT |  01.22.2015 RENOVATION AND ADDITION

1

Page 2: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

Agenda

1. Project Schedule & Costs 

2. Final Building Design

3. Exterior Elevations

4. Interior Views 

McKinley Elementary School Renovation + Addition Final Design School Board Information

January 22nd 2015

Page 3: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

4 McKinley Elementary School Renovation and Addition

Project Schedule & Costs 

3

Page 4: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

Grade  Current  Proposed  Average  Total# of 

Classrooms # of 

Classrooms  Class Size  Capacity Pre‐K 2 2 16.0 32.0Kindergarten 4 4 23.3 93.2Grade 1 5 4 23.3 93.2Grade 2 4 4 23.3 93.2Grade 3 5 4 23.3 93.2Grade 4 4 Relocatables  4 23.3 93.2Grade 5 3 Relocatables  4 23.3 93.2Flex: k‐1 1 2 0.0 0.0Flex 2‐5 1 4 23.3 93.2Total # of classes  29 32 684.4

MORE SEATS FOR MORE STUDENTS :

4

Page 5: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

01SCHEDULE :

PROJECT MILESTONES:

• Concept Design ‐ School Board ‐ Information – Feb 6, 2014• Concept Design  ‐ School Board ‐ Approval – Mar 6, 2014• Schematic Design to APS Board for Information– April 24, 2014 • Schematic Design to APS Board for Action – May 8, 2014 • Environmental Assessment Report – May, 2014• Design Development – July 15, 2014

• Use Permit – September 2014• Construction Documents – November 30, 2014• Building Permit – February / March, 2015• Bidding – February 6, 2015• Construction – June 2015• Occupancy – September 2016

Exhibit: AExhibit: A 5

Page 6: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

01SCHEDULE : PROJECT MILESTONES:

• School Board Information item  January 22nd 2015  

• School Board Action Item February 5th 2015

• Issue Bid Documents February 6th 2015

• Open Bids  March 9th 2015 

• School Board Contract Award  March 19th 2015

• Notice To Proceed  March 26th 2015 

• Building Permits  June / July  2015

• Construction Start  June 22nd 2015

• Occupancy  September 5th 2016

Exhibit: AExhibit: A 6

Page 7: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

54 McKinley Elementary School Renovation and Addition

DEDUCT ALTERNATES• 1 ‐ Leave Existing Lighting In Minor Renovation  ($133,780.44)• 2 ‐ Leave Existing Plumbing In Minor Renovation  ($33,126.92)• 3 ‐ Leave Existing Casework In Minor Renovation  ($111,350.27)• 4 ‐ Leave Existing Flooring In Area E ($44,864.02)• 5 ‐Minimize Scope In Area A ($67,553.29)• 6 ‐Minimize Scope In Area E ($127,837.53)ALTERNATES TOTAL ($518,512.47)

*  Communty Amenities funding to be finalized with County Staff prior to final approval

SUMMARY OF PROJECT COSTS: Cost EstimateSCHEMATIC DESIGN FINAL DESIGN

New Construction $ 8,100,000 $ 8,001,668Renovations $ 3,450,000 $ 5,009,850

SiteWork $ 2,100,000 $ 2,100,352

Contingencies $ 2,000,000 $ 1,101,130

Escalation $ 730,000 $ 300,000

Soft Costs $ 3,720,000 $ 3,587,000

Subtotal $ 20,100,000 $ 20,100,000Community Amenities $ ‐ $ 750,000*TOTAL PROJECT COST $ 20,100,000 $ 20,850,000

7

Page 8: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

*  Communty Amenities funding to be finalized with County Staff prior to final approval

SUMMARY OF PROJECT COSTS: Funding Sources

Funding authorized in 2012 / 2014 Bonds $ 17,600,000

Funding authorized from the 2010/2012 HVAC‐Roofing Bonds $ 1,866,500

Funding authorized from the 2015 MC/MM Fund $ 285,450

Funding authorized from the 2016 MC/MM Fund $ 348,050

TOTAL APS FUNDING PROPOSED FOR THE MCKINLEY PROJECT $ 20,100,000

Joint ACG/APS Fund (Community Amenities) $ 750,000*

TOTAL PROJECT FUNDING $ 20,850,000

8

Page 9: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

*  Communty Amenities funding to be finalized with County Staff prior to final approval

SUMMARY OF PROJECT COSTS: Proposed joint ACG / APS funded Items • New McKinley Road crosswalk: (Safe routes to school)  $35,392 

• New 11th street access ramp: (Safe routes to school)  $53,048 

• Streetscape improvments along McKinley Rd $84,388 

• County emergency repeater system  $156,918 

• Fire access lane  $35,000 • Fire access wet standpipe lane  $15,000 • Utility Undergrounding  $133,000 

• New fire hydrant @ 11th street  $7,500 • ConnectArlington Conduit $68,575 • Construction Contingency  $23,424 • Soft Costs: 22.5%   $137,755 

Subtotal McKinley  $750,000 

9

Page 10: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

01Project Specific Costs Items: BEYOND THE NORM

• Strom Water Management: McKinley Elementary school has some significant storm water drainage issues. These  will be corrected through enhanced storm water management.  

• Steep terrain: The 60 foot grade change across the site,     (5 stories high) results in a high number of retaining walls.  

• Pentagon Wing Replacement: The unanticipated replacement of the pentagon wing results in an increased scope of work.  

• Site Accessibility & Community improvements: The proposed new off campus cross walk on McKinley Road and new accessible ramp from 11th street are scope of work increases. 

• Site Landscaping:  Through creative design of the new storm water management system, several existing trees may be saved. However, additional piping, landscaping and other measures are required. 

10

Page 11: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

01 McKinley           Ashlawn  

Projected new school total area:  95,780                 97,363 Sq. Ft.   

Projected area of new addition;Including pentagon replacement:  34,225  28,010 Sq. Ft.

• Cost per square foot of total building: $209.86  $209.53

• Cost per square foot of new addition only:  $413.24 $468.09

• Cost per total new projected school capacity:  $29,385.96         $29,781.02                                   (684 seats new school capacity)

• Cost per seat new added capacity:  $83,402.49         $90,999.67                               (684 seats projected – 443 seats current)

Unit Project Costs:

11

Page 12: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

01Risk Management: POTENTIAL RISK EXPOSURE ITEMS

• Building Permit Conditions:  Building  Permit requirements causing additional costs

• Challenging Project Schedule:  Occupied renovations necessitating a tight construction schedule controls, a slip the schedule can result in project delays   

• Storm Water Management:  Additional costs and compliance with new MS4 stormwater permit and resulting learning process for APS, County and State stakeholders

• Improved Market Costs: A continued resurgence of the construction sector, translating to potential General Constrictors being more conservative with Bid numbers 

• Off site improvements:  Improvements to McKinley Boulevard cross walk and striping and accessible ramp from 11th Street 

• Unforeseen renovation issues:  Abatement, connections to existing systems, existing construction anomalies and other unforeseen circumstances

12

Page 13: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL BUILDING DESIGN 

13

Page 14: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

SITE AREA:7.54 Acres

PARKING:36 Spaces on site26 Spaces along McKinley Road

STUDENT DROP OFF ZONE:Along McKinley Road (North of Site Driveway)

RELOCATABLE CLASSROOMS:3 Buildings on site

SITE AMENITIES:2 Playgrounds Paved Play Area Outdoor Classroom Rain Garden

SITE GRADE:High Point (South): +346.0’ Low Point (North): +280.0’

SITE OVERVIEWEXISTING SITE PLAN

14

Page 15: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

Concept Design 4Concept Design 3

Concept Design 2Concept Design 1

CONCEPT + SCHEMATIC DESIGNSITE DESIGN PROGRESSION

15

Page 16: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

CONCEPT + SCHEMATIC DESIGNSITE PLAN

EXTERIOR MATERIALS

red brick

colored accent glass

cement panel

3 STORYCLASSROOM ADDITION

1 STORYCLASSROOM ADDITION

1 STORYENTRY ADDITION

16

Page 17: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNSITE PLAN

LANDSCAPE CONCEPT

The site development and landscape improvementsfor McKinley Elementary School focus on creatingnew outdoor activity and learning spaces andpreserving open space.

17

Page 18: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNFLOOR PLAN MAIN LEVEL: 319’-4”

3 STORY CLASSROOM ADDITION

1ST 1ST

1ST 1ST

2ND

FLEX2ND

MEDIA CENTER - MAJOR RENOVATION

2ND

DINING - MAJOR RENOVATION

2ND

1 STORY ENTRY ADDITION

FLEX

PRE-K

K

K

PRE-K

K

K

3RD 3RD

3RD 3RD

FLEX

FLEX

1 STORY CLASSROOM ADDITION

18

Page 19: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN3 STORY CLASSROOM ADDITION, MAIN LEVEL: 319’-4”

ART

VOCAL MUSIC

INSTRUMENTAL MUSIC

SMALL GROUP INSTRUCTION

19

Page 20: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN3 STORY CLASSROOM ADDITION, GYM LEVEL: 307’-2”

GYM STAGE SMALL GROUP INSTRUCTION4TH GRADE CLASSROOM

FLEX CLASSROOM

20

Page 21: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN3 STORY CLASSROOM ADDITION, FIELD LEVEL: 293’-2”

5TH GRADE CLASSROOM

FLEX CLASSROOM

21

Page 22: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNMEDIA CENTER - MAJOR RENOVATION, MAIN LEVEL:

CIRCULATION DESK

STACKSCOMPUTERS

STORY TELLING SMALL

STORY TELLINGMEDIUM

STORY TELLING

LARGE

22

319’-4”

Page 23: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

ARLINGTON PUBLIC SCHOOLS FINAL DESIGN REPORT | 01.22.2015

FINAL DESIGNDINING - MAJOR RENOVATION, MAIN LEVEL: 319’-4”

KITCHEN

BUILT IN SEATS, TYPICAL

QUIET DINING ZONE

DINING

23

Page 24: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN1 STORY ENTRY ADDITION, MAIN LEVEL: 319’-4”

MAIN ENTRY

RECEPTION

ASST. PRINCIPAL

PRINCIPALCOUNSELOR

PSYCHOLOGIST

24

Page 25: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN1 STORY CLASSROOM ADDITION, MAIN LEVEL: 319’-4”

GIFTED RESOURCE TEACHER

3RD GRADE CLASSROOM

SMALL GROUP INSTRUCTION

25

Page 26: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

EXTERIOR VIEWS

26

Page 27: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNNORTHEAST VIEW 3 STORY ADDITION

27

Page 28: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNEAST ELEVATION 3 STORY ADDTITION

28

Page 29: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

North Perspective

CONCEPT + SCHEMATIC DESIGNNORTH ELEVATION OF 3 STORY ADDITION

29

Page 30: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

CONCEPT + SCHEMATIC DESIGNNORTH ELEVATION OF 3 STORY ADDITION

30

Page 31: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

CONCEPT + SCHEMATIC DESIGNNEW 1 STORY MAIN ENTRY

31

Page 32: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNCOMMUNITY ENTRANCE

32

Page 33: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNNEW 1 STORY MAIN ENTRY

33

Page 34: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

INTERIOR VIEWS

34

Page 35: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNINTERIOR DESIGNCONCEPT

MAIN STREET, MAJOR ACCESS

LOCATIONS FOR TEMPORARY ART

LOCATIONS FOR PERMANENT ART

ADDED TRANSPARENCY

COLLABORATIVE BREAKOUT SPACE

35

Page 36: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNMAIN ENTRY / MAIN STREET

36

Page 37: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN3 STORY ADDITION, MAIN LEVEL CORRIDOR - COLLABORATION | ART |PERFORMANCE

37

Page 38: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGN3 STORY ADDITION, GYM LEVEL CORRIDOR - COLLABORATION | ART |

PERFORMANCE

38

Page 39: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNCOMMUNITY ENTRANCE

39

Page 40: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNCOMMUNITY ENTRANCE - SECTION PERSPECTIVE

40

Page 41: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNGYMNASIUM + STAGE

41

Page 42: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNGYMNASIUM LOOKING NORTH

42

Page 43: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNDINING LOOKING EAST

43

Page 44: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNDINING LOOKING WEST

44

Page 45: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

FINAL DESIGNMEDIA CENTER

45

Page 46: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

ARL FINAL DESIGNWAY FINDING, FLOOR MATERIALS + ACCENTS

PRE K + K

1 ST

OR

YC

LAS

SR

OO

M

AD

DIT

ION

3 ST

OR

Y C

LAS

SR

OO

M

AD

DIT

ION

1ST GRADE

2ND GRADE

5TH GRADE

4TH GRADE

3RD GRADE

PTGYM, MUSIC + ART

F TFIELD COLORS

CPTMEDIA CENTER CORRIDOR

WAINSCOTS

F T

F T

CPT

F T

F TF T P T

PT

PT

PT

PT

PT

PT

FT - LINOLEUM FLOOR TILE CPT - CARPET TILEPT - WALL PAINT

46

Page 47: G-1 McKinley Elementary School Final Design Presentation 012215 · 2019. 5. 31. · GYM, MUSIC + ART FT FIELD COLORS CPT MEDIA CENTER CORRIDOR WAINSCOTS FT FT CPT FT FT PT FT PT PT

2000 Duke StreetSuite 105

Alexandria, VA 22314

571.388.7761www.hcm2.com

750 East Pratt Street Suite 1100

Baltimore, MD 21202

410.837.7311www.hcm2.com

McKINLEY ELEMENTARY SCHOOLFINAL DESIGN REPORT |  01.22.2015 RENOVATION AND ADDITION

47