2
-
SCALE: 1/4'' = 1'-0''
1
-
SCALE: 1/4'' = 1'-0''
3
-
SCALE: 1/4'' = 1'-0''
12
KEY NOTES
#
1. EXISTING STANDBY DIESEL GENERATOR TO REMAIN.
2. EXISTING ELECTRICAL EQUIPMENT TO REMAIN.
3. EXISTING HALON FIRE SUPPRESSION CONTROL PANEL TO BE
4. EXISTING HALON TANK TO BE REMOVED ALONG WITH ASSOCIATED
5. EXISTING 500 GAL FUEL TANK TO BE REMOVED. SEE
ISOMETRIC RISER DIAGRAM ON SHEET M-1.
6. EXISTING CONCRETE TANK SUPPORTS TO BE MODIFIED TO ACCOMODATE
8. EXISTING FUEL OIL PIPING TO BE REMOVED.
9. EXTERIOR WALLS MASONRY 8'' x 16'' CONCRETE BLOCK WALL
WITH OUTSIDE STUCCO PAINTED WHITE FINISH.
11. EXISTING FUEL OIL TANK VENT PIPING TO BE REMOVED.
10. EXISTING 4 HOUR RATED CONCRETE BLOCK ALL CORES FILLED WALL.
7. EXISTING METAL GRATING AND SPILL CONTAINMENT AREA TO REMAIN.
12. EXISTING WALL LOUVER TO REMAIN.
REMOVED ALONG WITH ASSOCIATED DEVICES.
13. EXISTING CEILING EXHAUST FAN TO REMAIN.
PIPING AND DEVICES.
NEW TANK. SEE SHEET M-1.
NOTE:
EXISTING HALON FIRE SUPPRESSION SYSTEM SERVES
ONLY THE TANK ROOM.
THE SEPARATION WALLS SHALL BE RECLASSIFIED AS 1 HOUR.
14. PROVIDE 1 HOUR RATED WALL LABEL ON SEPARATION WALL.
21' - 4''
23' -4''
2
-
1
-
3
-
3
13
5
8
11
6
7
10
12
4
14
14
15. EXISTING WATER PRESSURE BOOSTER EQUIPMENT TO REMAIN.
2
1
2
9
PROJECT SCOPE
THE SCOPE OF THIS PROJECT INCLUDES THE FOLLOWING:
1. UNDER A SEPARATE PERMIT , REMOVAL OF THE EXISTING HALON FIRE
SUPPRESSION SYSTEM FROM THE DIESEL FUEL STORAGE TANK ROOM.
SEE SHEET G-2 FOR HALON SYSTEM REMOVAL REQUIREMENTS.
2. UPGRADE OF THE DIESEL FUEL TANK AND PIPING SYSTEM TO BE IN
CONFORMANCE WITH BUILDING AND FIRE CODE REQUIREMENTS AS
WELL AS ENVIRONMENTAL REQUIREMENTS.
THE EXISTING PUMP STATION BUILDING WAS CONSTRUCTED IN 1987.
THE ORIGINAL PERMIT PLANS (A-1 AND S-1) ARE SHOWN ON SHEETS G-3 AND
G-4 FOR INFORMATION ONLY.
ROB GRIFFIN OF THE EAST NAPLES FIRE DEPARTMENT HAS INSPECTED A
SIMILAR MASTER PUMP STATION AND CONCURS THAT FIRE SUPPRESSION IS
NOT REQUIRED FOR THE TANK ROOM.
LIST OF DRAWINGS
G-1 EXISTING FLOOR PLAN AND PARTIAL DEMOLITION PLAN
G-2 REQUIREMENTS AND CORRESPONDENCE
G-3 ORIGINAL ARCHITECTURAL DRAWINGS (FOR REFERENCE ONLY)
G-4 ORIGINAL STRUCTURAL DRAWINGS (FOR REFERENCE ONLY)
M-1 PROPOSED MECHANICAL FLOOR PLAN
M-2 MECHANICAL NOTES AND SPECIFICATIONS
E-1 ELECTRICAL FLOOR PLAN AND ELECTRICAL RISER DIAGRAM
NOTE:
A POLLUTANT STORAGE SYSTEMS CONTRACTOR (PC)
SHALL BE NAMED PRIOR TO PERMIT PICKUP.
NOTE:
PROVIDE FULL TANK OF DIESEL FUEL AT
PROJECT COMPLETION.
DA
TE
: ______________________
RE
GIS
TE
RE
D P
RO
FE
SS
IO
NA
L E
NG
IN
EE
R
G-1
FLO
RID
A R
EG
IS
TR
AT
IO
N N
O. 62767
RIC
HA
RD
M
. S
PA
NG
, P
.E
.
CE
RT
. O
F A
UT
H: 26534
NOT TO SCALE
KEY PLAN
SCALE: 1/4"=1'-0"
FLOOR PLAN & PARTIAL DEMOLITION PLAN
N
APPLICABLE CODES AND STANDARDS
2010 FLORIDA BUILDING CODE
2010 FLORIDA MECHANICAL CODE
2008 NATIONAL ELECTRICAL CODE NFPA 70
2010 FLORIDA FIRE PREVENTION CODE
NFPA 37 (2006) STANDARD FOR THE INSTALLATION OF STATIONARY
COMBUSTION ENGINES AND GAS
NFPA 30 (2008) FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
CODE ANALYSIS
THE EXISTING BUILDING IS OF TYPE II CONSTRUCTION
THE EXISTING OCCUPANCY IS PRESENTLY:
OCCUPANCY S, GENERATOR/SWITCHGEAR ROOM
OCCUPANCY H, FUEL STORAGE ROOM
THE ROOMS ARE SEPARATED BY A 4 HOUR WALL AND THE
CEILING/ROOF STRUCTURE CONSTRUCTION IS A PRECAST
PRESTRESSED CONCRETE SLAB. THE SEPARATION WALL SHALL BE
RECLASSIFIED AS 1 HOUR.
NFPA 37 (2006) STANDARD FOR THE INSTALLATION OF STATIONARY
COMBUSTION ENGINES AND GAS TURBINE SETS THE REQUIREMENTS
FOR DIESEL FUEL (A TYPE II COMBUSTIBLE LIQUID) STORAGE IN A
BUILDING HOUSING A DIESEL GENERATOR WITH A FUEL TANK LOCATED
IN A FUEL STORAGE ROOM.
BASED ON THE ABOVE THE FUEL STORAGE ROOM WAS ERRONEOUSLY
LISTED AS AN H OCCUPANCY IN THE ORIGINAL PLANS AND MEETS THE
REQUIREMENTS OF NFPA 37 (2006) AS AN S OCCUPANCY.
HALON SYSTEM REMOVAL REQUIREMENTS
A FLORIDA LICENSED FIRE SUPPRESSION SYSTEM CONTRACTOR (FIRE
CONTRACTOR III) SHALL:
a) OBTAIN A DEMOLITION PERMIT FOR THE PROPOSED WORK
b) FILE ALL REQUIRED DOCUMENTATION
c) COLLECT HALON GAS FROM THE EXISTING SYSTEM IN
CONFORMANCE WITH ALL APPLICABLE REGULATIONS
d) CREDIT THE OWNER FOR THE SALVAGE VALUE OF THE HALON GAS
e) REMOVE THE ENTIRE HALON SYSTEM INCLUDING CONTROLS AND
ALARMS AND DISPOSE OF IT IN ACCORDANCE WITH
ENVIRONMENTAL REGULATIONS
NARRATIVE
NFPA 37 (2006) SECTION 6.3 PARAGRAPH 6.3.5.1ALLOWS THE INSTALLATION OF
FUEL TANKS CONTAINING LIQUID FUELS OTHER THEN CLASS I FUELS WITH AN
AGGREGATE CAPACITY OF 5000 L (1320 GALLONS) OR LESS IN STORAGE
ROOMS HOUSING IF THE ROOM WALLS, FLOOR AND CEILING HAVE A FIRE
RESISTANCE RATING OF NOT LESS THEN ONE HOUR WITH THE WALLS BONDED
TO THE FLOOR.
THE EXISTING STORAGE ROOM EXCEEDS THESE REQUIREMENTS.
WITH A CHANGE OF THE ROOM FROM H TO S OCCUPANCY FIRE SUPPRESSION
IS NOT REQUIRED FOR THE STORAGE ROOM.
DA
TE
: ______________________
RE
GIS
TE
RE
D P
RO
FE
SS
IO
NA
L E
NG
IN
EE
R
G-2
FLO
RID
A R
EG
IS
TR
AT
IO
N N
O. 62767
RIC
HA
RD
M
. S
PA
NG
, P
.E
.
CE
RT
. O
F A
UT
H: 26534
FIRE RATED WALL PENETRATION DETAIL
E-MAIL CORRESPONDENCE
G-3
CE
RT
. O
F A
UT
H: 26534
NOT TO SCALE
ORIGINAL ARCHITECTURAL DRAWING FOR REFERENCE ONLY
G-4
CE
RT
. O
F A
UT
H: 26534
NOT TO SCALE
ORIGINAL STRUCTURAL DRAWING FOR REFERENCE ONLY
SCALE: 1/4"=1'-0"
PROPOSED MECHANICAL FLOOR PLAN
N
NOT TO SCALE
EXISTING FUEL PIPING ISOMETRIC RISER DIAGRAM & DEMOLITION NOTES
NOT TO SCALE
PROPOSED FUEL PIPING ISOMETRIC RISER DIAGRAM
DIESEL FUEL SYSTEM REVISIONS
SCALE AS NOTED
NOT TO SCALE
VENT PIPE THROUGH ROOF DETAIL
NOTE:
REMOVE FUEL FROM TANK AND DISPOSE OF IN
ACCORDANCE WITH ENVIRONMENTAL REGULATIONS.
1
2
8
17
2
4
13
3
5
7
9
6
10
12
11
14
15
16
KEY NOTES
#
1. EXISTING STANDBY DIESEL GENERATOR.
2. ELECTRICAL EQUIPMENT.
3. EXISTING CEILING EXHAUST FAN.
4. DT-1 - NEW FUEL DAY TANK. SEE SCHEDULE ON SHEET M-2.
5. T-1 - NEW 500 GALLON MAIN DIESEL FUEL TANK.
6. EXISTING MODIFIED CONCRETE TANK SUPPORTS.
8. NEW DIESEL FUEL PIPING SUPPLY AND RETURN LINES.
9. NEW PRIMARY TANK 2" ATMOSPHERIC VENT THROUGH ROOF.
REUSE EXISTING ROOF PENETRATION.
11. NEW MAIN FUEL TANK LEVEL GAUGE.
10. NEW PRIMARY AND SECONDARY TANK 4" EMERGENCY VENTS
7. EXISTING METAL GRATING AND SPILL CONTAINMENT AREA.
12. NEW MAIN FUEL TANK FILL CAP WITH MIN. 3.5 GAL. SPILL CONTAINER.
THROUGH ROOF.
13. DAY TANK AND CONTAINMENT TANK ATMOSPHERIC AND
EMERGENCY VENTS THROUGH ROOF. REFER TO PROPOSED FUEL
PIPING ISOMETRIC RISER DIAGRAM THIS SHEET.
14. 2" FITTING WITH NEW LEVEL TRANSMITTER.
15. 2" FITTING WITH NEW OVERFILL ALARM SENSOR SWITCH.
16. NEW WALL MOUNT OVERFILL ALARM CONTROL PANEL.
17. EXISTING WATER BOOSTER EQUIPMENT.
18. ADD ALTERNATE A: NEW REMOTE FILLPORT. SEE SCHEDULE ON SHEET M-2.
19. ADD ALTERNATE A: NEW 2" FILL PIPE. SLEEVE & SEAL THROUGH WALL.
19
18
DA
TE
: ______________________
RE
GIS
TE
RE
D P
RO
FE
SS
IO
NA
L E
NG
IN
EE
R
M-1
FLO
RID
A R
EG
IS
TR
AT
IO
N N
O. 62767
RIC
HA
RD
M
. S
PA
NG
, P
.E
.
CE
RT
. O
F A
UT
H: 26534
MECHANICAL NOTES AND SPECIFICATIONS
M-2
_________________________
DA
TE
: ____________________
RE
GIS
TE
RE
D P
RO
FE
SS
IO
NA
L E
NG
IN
EE
R
FLO
RID
A C
ER
TIF
IC
AT
IO
N N
O.
RIC
HA
RD
M
. S
PA
NG
, P
.E
.
62
76
7
CE
RT
. O
F A
UT
H: 26534
DIESEL
FUEL
TANK
KEY NOTES#
1. STANDBY DIESEL GENERATOR, 125kW, 480Y277V, 3Ø, 4W.
2. AUTOMATIC TRANSFER SWITCH, CUMMINS OTPC, 600A, 480Y/277V, 3Ø, 4W.
4. PANELBOARD 100A, 208Y/120V, 3Ø, 4W, 60A M.C.B.
5. TELEMETRY CONTROL PANEL.
6. MOTOR CONTROL CENTER.
2RECEPTACLES3602011212/121 EXHAUST FAN 400 20 1 12 12/12
NO.
CIR.
IDENTIFICATION
TRIP
AMPS
WIRE POLEWIREN / G
TRIP
AMPSV.A.
"B"
V.A.
"C"
POLE
V.A.
"A"
IDENTIFICATION
N / G
SUB-TOTAL KVA/ØSUB-TOTAL KVA/Ø
NO.
CIR.
3 BUILDING LIGHTING 400 20 1 12 12/12
5 SPARE (ALARM) - 20 1 - -
V.A.
"B"
V.A.
"C"
V.A.
"A"
7 BIOXIDE TANK 250 20 1 12 12/12
11 DAY TANK MOTOR(S) *** 402 20 1 12 12/12
13 OUTSIDE FLOW METER 100 20 1 12 12/12
15 SPARE - 20 1 - -
17 RECEPTACLES 360 20 1 12 12/12
19 SPARE (FIRE ALARM) - 20 1 - -
21 REMOTE FILL PORT PUMP 1127 20 2 20 12/12
23 - - - - - W/ 120V CONTROLLER 1127 20 20
4DAY TANK TRANSMITTER ***.12011212/12
6TELEMETRY2002011212/12
8GEN BLOCK HEATER10003011010/10
10TO J BOX AT VFD-13003021010/10
12- - - - --30-
14AIR COMPRESSOR7002011212/12
16SPRINKLER **9202011212/12
18SPRINKLER **9202011212/12
20BACK-FED 'MAIN BREAKER'-60366 / 6
22- - - - - (BOLT-IN BREAKER)-606
24- - - - --606
MAIN LUG
10k
100APANELBOARD
NEMA 1
PANEL "A"
SURFACE
120/208V, 3Ø, 4W.VOLTAGE:EQUAL TO: SQ. "D" NQ424L225
MAIN AMPERE/AIR:
TYPE MAINS:
BRANCH AIR:
TYPE:
BOX:
COVER:
* HALON AND FIRE ALARM SYSTEMS TO BE REMOVED FROM THIS BREAKER .
'A'
METER
(EXISTING)
*
CIRCUIT 17 'DAY TANK MOTORS' DUPLEX MOTORS ARE EACH 1/3HP,
(ONLY ONE OPERATES AT ANY ONE TIME)
9 OUTDOOR SUMP PUMP 300 20 1 12 12/12
1
2
3
5
4
6
7. NEW GENERATOR DAY TANK
7
PROVIDE A PORTABLE 125kW, 480Y277V, 3Ø, GENERATOR TO BE
APPROVED BY ENGINEER DURING PERIOD WHEN FUEL TO EXISTING
GENERATOR IS NOT AVAILABLE.
PROVIDE TEMPORARY POWER AND CONTROL WIRING.
FUEL TANK CAPACITY SHALL ALLOW FOR MINIMUM OF 48 HOUR
OPERATION. ELECTRICAL CONTRACTOR TO PROVIDE FULL TANK OF
FUEL.
ADDITIONAL FUEL REQUIRED SHALL BE PROVIDED BY OWNER.
TEMPORARY POWER REQUIREMENTS:
PROVIDE TEMPORARY POWER REQUIREMENTS.
PROVIDE BRANCH CIRCUIT WIRING TO NEW DIESEL FUEL DAY TANK
DISCONNECT POWER AND WIRING TO DELETED FIRE ALARM SYSTEM
AND HALON ALARM WIRING.
THE PANEL 'A' FEEDER NEUTRAL CONDUCTOR ORIGINATES AT THE
10KVA XFMR AND IS IDENTIFIED WHITE, THE OTHER END IN PANEL
'A' IS IDENTIFIED GREEN AND TERMINATED ON THE GROUND BAR.
DE-ENERGIZE XFMR AND RE-IDENTIFY WHITE AND TERMINATE ON
NEUTRAL BAR. INSTALL A #8 AWG MAIN BONDING JUMPER FROM
NEUTRAL BAR TO GROUND BAR.
PROVIDE SEPARATE PRICING FOR ADD ALTERNATE 'A' (REMOTE FILL
PORT PUMP WITH CONTROLLER)
ELECTRICAL SCOPE OF WORK:
*** NEW CIRCUIT, PROVIDE LOCK-ON CIRCUIT BREAKER DEVICE.
DEMAND LOAD PHASE A = 2,810 x 120 = 23 AMPERES
0.75 1.83 1.89 2.06 1.22 1.12
DEMAND LOAD PHASE B = 3,050 x 120 = 25 AMPERES
DEMAND LOAD PHASE C = 3,010 x 120 = 25 AMPERES
PANEL IS FED FROM 10KVA, 3Ø TRANSFORMER LOCATED IN MCC
3.33KVA PER PHASE, 28A PER PHASE MAX.
PROVIDE 3/4" EMT
CONDUIT WITH PULL
STRING FROM DAY TANK
TO TELEMETRY CABINET.
PROVIDE 3/4" EMT CONDUIT
WITH PULL STRING FROM
DIESEL FUEL TANK LEVEL
TRANSMITTER TO
TELEMETRY CABINET
PROVIDE 4" SQ BOX @60"
ABOVE GRATE FLOORING W/
BLANK COVER AND CIRCUIT
A-12 FOR 115V INPUT/ 24VDC
OUTPUT POWER SUPPLY FOR
FLOAT LEVEL TRANSMITTER.
INSTALL BREAKER LOCK ON
DEVICE AND LABEL PANEL.
J
** FIELD VERIFY IF THIS LOAD REQUIRES A 2-POLE DEVICE AND PROVIDE.
PROVIDE 3/4" EMT CONDUIT WITH
(3) #12 AWG THWN CONDUCTORS
FROM PANEL 'A' TO DAY TANK, DAY
TANK CONNECTION IN LIQUIDTITE
NON-METALLIC CONDUIT.
3. SERVICE MAIN DISCONNECT SQ D , 600A, 3-POLE, 42K AIR @ 480V
IN NEMA 1 ENCLOSURE
RAISE EXISTING WALL
SWITCH TO 60" ABOVE
GRATE FLOORING
*
SCOPE OF WORK FOR ALTERNATE 'A' : CIRCUIT BREAKER A-21 & 23, 3/4"
EMT CONDUIT WITH STEEL COMPRESSION FITTINGS, (4) #12 AWG, 75°C,
THWN CONDUCTORS, NEMA 4X, 3-POLE, 4 WIRE, FUSIBLE 250V, SQ D
CATALOG NO. H321DS, NEUTRAL KIT SN03, EQUIPMENT GROUNDING KIT
GTK03. USE 3/4" LIQUIDTITE FLEXIBLE NON-METALLIC CONDUIT TO FUEL
CABINET ENCLOSURE.
(SEE ALTERNATE 'A'
SCOPE OF WORK)
REMOTE FILL PORT ,
SEE MECHANICAL
PLANS
CUTLER HAMMER UNITROL MCC 306
STATION 30600
TELEMETRY
CONTTROL PANEL
EXISTING
ATS
TELEMETRY CONTROL PANEL
EXISTING
600A 3P MAIN
250 KW
GENERATOR
EXISTING
TO PAD MOUNTED
480Y/277V, 3Ø, XFMR
EXISTING 60A M.
BRKR,
208Y/120V,
3Ø, 24CIR.
PANELBOARD 'A'
OUTDOORSINDOORS
EXISTING
CT METER
SPD
EXISTING FEEDER,
1-1/4" RIGID
(3) #6 AWG,
(1) #6 AWG [N]
(SEE SCOPE OF WORK)
TO PAD MOUNTED
480Y/277V, 3Ø, XFMR
(2) 2" PVC CONDUITS W/
(3) 3/0 AWG, (1) 3/0 AWG [N], (1) #3
AWG [EG], THWN, 75°C
CONDUCTORS
(1) 2-1/2" PVC CONDUIT (1) (1)
2-1/2" RIGID NIPPLE W/
(3) 350 KCMIL, (1) 1/0 AWG [N], (1)
#1 AWG [EG], THWN, 75°C
CONDUCTORS
IN EACH
ON
OFF
MIXER 1
10kVA XFMR
XFMR BREAKER
ON
OFF
LAG BACKUP - PUMP 2
ON
OFF
ON
OFF
ODOR CONTROL
AUTOCON
ON
OFF
MIXER 2
ON
OFF
LEAD BACKUP PUMP 3
ON
OFF
DA
TE
: ______________________
RE
GIS
TE
RE
D P
RO
FE
SS
IO
NA
L E
NG
IN
EE
R
E-1
FLO
RID
A C
ER
TIF
IC
AT
IO
N N
O. 62767
RIC
HA
RD
M
. S
PA
NG
, P
.E
.
CE
RT
. O
F A
UT
H: 26534
SCALE: 1/4" = 1'-0"
FLOOR PLAN
NO TO SCALE
EXISTING ELECTRICAL RISER
NO CHANGE IN SCOPE OF WORK