Facility Management Software System Data as of September 30, 2015 NPS Asset Inventory Summary - By Park ABLI Abraham Lincoln Birthplace National Historic Site Number of Asset Locations UM Qty CRV DM CSDM FCI - All Other§ : TOTAL: 51 0.342 $7,609,673 $22,269,302 - 14 2 0 4 2 3 3 0.464 0.005 0.000 0.088 0.494 0.000 0.108 $4,966,200 $1,865 $0 $77,901 $53,963 $0 $22,186 $10,693,903 $394,954 $0 $883,212 $109,295 $603,638 $206,010 20,144 2,856 0 9,435 135 1,360 SF SF AC LF GPD GPD $2,083,055 $1,691,834 0.812 9 14 0.109 $795,725 $7,295,235 - - $461,212 $0 $0 $0 $0 $0 $0 - $10,134 $471,346 Unpaved Roads: Water Systems: Waste Water Systems: Trails: Campgrounds: Housing*: Buildings: Paved Roads: - - - - Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal year. * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support buildings (e.g., detached garages, shower and laundry facilities, storage). † Unpaved Roads includes unpaved parking areas and unpaved roadways. ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways. § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments, fortifications, towers, interpretive media and amphitheaters. FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost of repair of the assets deficiencies divided by the current replacement value for the asset. CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset components. This figure is currently unavailable for the paved roads category. DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and which, therefore, is put off or delayed. CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio. Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard units of measure for each asset type and are consistently used across the federal government. Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP) parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM, CRV and QTY data elements will not match those reported to the FRPP or FASAB Page: 1

FY 2015 NPS Asset Inventory Summary by Park...Jan 11, 2016  · Facility Management Software System Data as of September 30, 2015 NPS Asset Inventory Summary - By Park ABLI Abraham

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ABLI Abraham Lincoln Birthplace National Historic Site

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 51 0.342 $7,609,673 $22,269,302 -

    14

    2

    0

    4

    2

    3

    3

    0.464

    0.005

    0.000

    0.088

    0.494

    0.000

    0.108

    $4,966,200

    $1,865

    $0

    $77,901

    $53,963

    $0

    $22,186

    $10,693,903

    $394,954

    $0

    $883,212

    $109,295

    $603,638

    $206,010

    20,144

    2,856

    0

    9,435

    135

    1,360

    SF

    SF

    AC

    LF

    GPD

    GPD

    $2,083,055$1,691,834 0.812 9

    14 0.109 $795,725 $7,295,235 - -

    $461,212

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $10,134

    $471,346

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 1

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ACAD Acadia National Park

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 715 0.065 $68,250,049 $1,046,956,650 -

    205

    17

    6

    137

    18

    17

    84

    0.091

    0.095

    0.007

    0.272

    0.168

    0.051

    0.018

    $8,766,545

    $1,014,125

    $165,272

    $10,131,389

    $1,937,513

    $858,321

    $11,413,535

    $96,044,960

    $10,707,320

    $23,130,836

    $37,242,129

    $11,561,662

    $16,793,993

    $624,770,995

    307,318

    43,728

    360

    802,752

    136,200

    142,100

    SF

    SF

    AC

    LF

    GPD

    GPD

    $157,753,775$28,973,323 0.184 175

    56 0.072 $4,990,026 $68,950,980 - -

    $2,971,186

    $286,656

    $48,360

    $5,729,238

    $323,583

    $354,038

    $3,366,876

    -

    $3,041,578

    $16,121,515

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 2

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ADAM Adams National Historical Park

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 23 0.006 $273,993 $42,518,497 -

    13

    0

    0

    0

    0

    0

    0

    0.007

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $211,454

    $0

    $0

    $0

    $0

    $0

    $0

    $31,263,428

    $0

    $0

    $0

    $0

    $0

    $0

    51,168

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    10 0.006 $62,539 $11,255,069 - -

    $97,986

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $97,986

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 3

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AFBG African Burial Ground National Monument

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 7 0.000 $205 $21,162,552 -

    2

    0

    0

    0

    0

    1

    0

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $205

    $0

    $0

    $0

    $0

    $0

    $0

    $8,721,937

    $0

    $0

    $0

    $0

    $64,432

    $0

    9,204

    0

    0

    0

    0

    5,000

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    4 0.000 $0 $12,376,183 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $0

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 4

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AGFO Agate Fossil Beds National Monument

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 36 0.090 $2,186,084 $24,308,090 -

    7

    5

    0

    3

    1

    1

    2

    0.012

    0.076

    0.000

    0.000

    0.000

    0.000

    0.000

    $67,062

    $111,773

    $0

    $0

    $0

    $0

    $0

    $5,636,964

    $1,465,046

    $0

    $849,430

    $512,205

    $2,379,079

    $1,628,325

    16,676

    7,326

    0

    10,680

    6,500

    4,000

    SF

    SF

    AC

    LF

    GPD

    GPD

    $6,364,943$1,870,596 0.294 7

    10 0.025 $136,653 $5,472,097 - -

    $0

    $78,720

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $78,720

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 5

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AKRO Alaska Regional Support Office

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 6 0.000 $0 $29,899,340 -

    5

    0

    0

    0

    0

    0

    0

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $29,214,116

    $0

    $0

    $0

    $0

    $0

    $0

    107,984

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    1 0.000 $0 $685,224 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $0

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 6

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ALAG Alagnak Wild River

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 2 0.000 $0 $505,662 -

    1

    0

    0

    0

    0

    0

    0

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $88,035

    $0

    $0

    $0

    $0

    $0

    $0

    224

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    1 0.000 $0 $417,627 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $0

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 7

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ALFL Alibates Flint Quarries National Monument

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 16 0.014 $1,115,598 $81,384,689 -

    4

    0

    0

    1

    1

    1

    4

    0.025

    0.000

    0.000

    0.135

    0.000

    0.010

    0.255

    $46,100

    $0

    $0

    $25,000

    $0

    $8,236

    $151,040

    $1,866,946

    $0

    $0

    $184,592

    $148,071

    $850,327

    $592,254

    5,688

    0

    0

    3,960

    1,000

    25,000

    SF

    SF

    AC

    LF

    GPD

    GPD

    $5,301,334$868,400 0.164 2

    3 0.000 $16,822 $72,441,165 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $67,967

    -

    $0

    $67,967

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 8

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ALKA Ala Kahakai National Historic Trail

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 2 0.025 $106,308 $4,204,216 -

    0

    0

    0

    2

    0

    0

    0

    0.000

    0.000

    0.000

    0.025

    0.000

    0.000

    0.000

    $0

    $0

    $0

    $106,308

    $0

    $0

    $0

    $0

    $0

    $0

    $4,204,216

    $0

    $0

    $0

    0

    0

    0

    14,567

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    0 0.000 $0 $0 - -

    $0

    $0

    $0

    $97,495

    $0

    $0

    $0

    -

    $0

    $97,495

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 9

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ALPO Allegheny Portage Railroad National Historic Site

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 84 0.046 $9,611,084 $209,342,744 -

    12

    1

    0

    7

    1

    0

    2

    0.086

    0.000

    0.000

    0.338

    0.000

    0.000

    1.092

    $3,423,127

    $0

    $0

    $917,428

    $0

    $0

    $136,963

    $39,877,369

    $313,314

    $0

    $2,717,763

    $495,196

    $0

    $125,416

    38,572

    2,275

    0

    72,657

    500

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $8,178,259$3,646,310 0.446 10

    51 0.009 $1,487,256 $157,635,427 - -

    $449,425

    $0

    $0

    $55,000

    $0

    $0

    $136,963

    -

    $33,560

    $674,948

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 10

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AMIS Amistad National Recreation Area

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 175 0.104 $7,894,052 $76,221,926 -

    59

    0

    9

    10

    3

    5

    17

    0.054

    0.000

    0.057

    0.238

    0.005

    0.004

    0.064

    $483,927

    $0

    $118,904

    $239,848

    $13,020

    $17,360

    $113,683

    $8,885,801

    $0

    $2,102,154

    $1,007,657

    $2,621,491

    $4,014,139

    $1,788,026

    42,587

    0

    79

    58,050

    20,400

    195,380

    SF

    SF

    AC

    LF

    GPD

    GPD

    $24,081,774$6,485,922 0.269 31

    41 0.013 $421,390 $31,720,884 - -

    $4,845

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $4,845

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 11

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AMME American Memorial Park

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 46 0.211 $8,888,626 $42,026,820 -

    10

    0

    0

    2

    0

    1

    4

    0.023

    0.000

    0.000

    0.126

    0.000

    0.012

    0.393

    $270,966

    $0

    $0

    $175,491

    $0

    $24,158

    $104,356

    $11,931,809

    $0

    $0

    $1,393,416

    $0

    $2,059,117

    $265,734

    19,865

    0

    0

    12,006

    0

    2,000

    SF

    SF

    AC

    LF

    GPD

    GPD

    $8,233,636$7,701,523 0.935 17

    12 0.034 $612,132 $18,143,109 - -

    $52,000

    $0

    $0

    $90,306

    $0

    $0

    $0

    -

    $17,500

    $159,806

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 12

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ANCH Alaska Public Lands Information Center Anchorage

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 3 0.082 $1,234,863 $15,005,473 -

    2

    0

    0

    0

    0

    0

    0

    0.039

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $274,773

    $0

    $0

    $0

    $0

    $0

    $0

    $7,049,165

    $0

    $0

    $0

    $0

    $0

    $0

    11,099

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    1 0.121 $960,090 $7,956,308 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $482,977

    $482,977

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 13

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ANDE Andersonville National Historic Site

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 110 0.058 $11,514,199 $200,074,741 -

    12

    0

    0

    1

    3

    3

    5

    0.056

    0.000

    0.000

    0.185

    0.000

    0.000

    0.021

    $895,297

    $0

    $0

    $32,841

    $0

    $0

    $8,729

    $15,910,976

    $0

    $0

    $177,879

    $102,022

    $184,147

    $416,930

    23,623

    0

    0

    1,802

    6,900

    3,345

    SF

    SF

    AC

    LF

    GPD

    GPD

    $8,010,332$5,040,353 0.629 22

    64 0.032 $5,536,979 $175,272,454 - -

    $100,929

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $327,329

    $428,258

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 14

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ANIA Aniakchak National Monument and Preserve

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 3 0.197 $51,010 $258,378 -

    2

    0

    0

    0

    0

    0

    0

    0.217

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $47,886

    $0

    $0

    $0

    $0

    $0

    $0

    $220,399

    $0

    $0

    $0

    $0

    $0

    $0

    809

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $0$0 0.000 0

    1 0.082 $3,124 $37,979 - -

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $0

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 15

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ANJO Andrew Johnson National Historic Site

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 32 0.016 $579,277 $35,590,440 -

    10

    0

    0

    0

    0

    0

    0

    0.036

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    $315,929

    $0

    $0

    $0

    $0

    $0

    $0

    $8,827,407

    $0

    $0

    $0

    $0

    $0

    $0

    12,667

    0

    0

    0

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $897,150$0 0.000 7

    15 0.010 $263,348 $25,865,884 - -

    $133,883

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $133,883

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 16

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ANTI Antietam National Battlefield

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 204 0.027 $5,335,094 $196,160,302 -

    68

    1

    0

    11

    0

    0

    9

    0.034

    0.000

    0.000

    0.013

    0.000

    0.000

    0.000

    $2,444,847

    $0

    $0

    $39,646

    $0

    $0

    $0

    $72,494,496

    $324,232

    $0

    $3,012,205

    $0

    $0

    $1,663,517

    166,318

    1,920

    0

    78,479

    0

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $18,281,355$1,147,500 0.063 33

    82 0.017 $1,703,101 $100,384,498 - -

    $1,854,651

    $0

    $0

    $39,646

    $0

    $0

    $0

    -

    $1,449,095

    $3,343,391

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 17

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    APCO Appomattox Court House National Historical Park

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 85 0.040 $1,892,228 $47,430,447 -

    37

    2

    0

    1

    1

    0

    10

    0.036

    0.080

    0.000

    0.035

    0.000

    0.000

    0.040

    $1,076,282

    $91,319

    $0

    $17,877

    $0

    $0

    $30,909

    $30,122,517

    $1,144,981

    $0

    $514,254

    $386,275

    $0

    $769,842

    56,868

    7,077

    0

    24,400

    500

    0

    SF

    SF

    AC

    LF

    GPD

    GPD

    $5,582,898$639,817 0.115 12

    22 0.004 $36,024 $8,909,680 - -

    $203,967

    $0

    $0

    $0

    $0

    $0

    $0

    -

    $0

    $203,967

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 18

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    APIS Apostle Islands National Lakeshore

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 289 0.065 $8,803,453 $135,270,051 -

    117

    15

    17

    13

    8

    10

    4

    0.063

    0.034

    0.136

    0.070

    0.001

    0.129

    0.000

    $2,997,131

    $1,065,965

    $91,058

    $400,974

    $2,343

    $269,953

    $0

    $47,671,822

    $31,149,804

    $668,226

    $5,709,710

    $1,584,341

    $2,086,132

    $231,307

    53,365

    29,321

    4

    307,032

    3,850

    9,500

    SF

    SF

    AC

    LF

    GPD

    GPD

    $3,864,794$1,193,607 0.309 11

    94 0.066 $2,782,423 $42,303,916 - -

    $1,623,627

    $375,092

    $37,785

    $344,674

    $2,343

    $205,056

    $0

    -

    $2,503,447

    $5,092,023

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 19

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    APPA Appalachian National Scenic Trail

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 1,016 0.108 $14,961,149 $138,741,549 -

    635

    0

    13

    82

    0

    4

    184

    0.003

    0.000

    0.000

    0.168

    0.000

    0.000

    0.004

    $86,044

    $0

    $0

    $14,829,584

    $0

    $0

    $28,350

    $28,484,118

    $0

    $180,199

    $88,532,225

    $0

    $202,710

    $6,955,130

    129,865

    0

    6

    11,506,704

    0

    40

    SF

    SF

    AC

    LF

    GPD

    GPD

    $829,957$0 0.000 16

    82 0.001 $17,171 $13,557,211 - -

    $4,500

    $0

    $0

    $163,273

    $0

    $0

    $21,000

    -

    $5,671

    $194,444

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 20

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ARCH Arches National Park

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 156 0.248 $19,886,459 $80,115,216 -

    32

    7

    1

    24

    7

    3

    7

    0.038

    0.082

    0.016

    0.236

    0.005

    0.146

    0.170

    $491,208

    $137,187

    $22,358

    $1,241,961

    $4,537

    $391,439

    $1,041,067

    $13,057,619

    $1,673,683

    $1,409,602

    $5,268,663

    $973,627

    $2,685,160

    $6,137,316

    31,847

    9,979

    52

    123,026

    43,500

    90,800

    SF

    SF

    AC

    LF

    GPD

    GPD

    $46,026,419$16,178,500 0.352 52

    23 0.131 $378,201 $2,883,127 - -

    $80,470

    $0

    $11,378

    $313,289

    $0

    $0

    $710,013

    -

    $249,452

    $1,364,601

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 21

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ARPO Arkansas Post National Memorial

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 50 0.038 $2,730,766 $71,126,367 -

    9

    2

    0

    7

    1

    1

    1

    0.015

    0.041

    0.000

    0.114

    0.155

    0.094

    0.000

    $56,264

    $18,975

    $0

    $130,507

    $494,809

    $176,262

    $0

    $3,847,501

    $465,187

    $0

    $1,146,639

    $3,190,631

    $1,879,683

    $20,256

    10,436

    3,532

    0

    16,528

    755

    881

    SF

    SF

    AC

    LF

    GPD

    GPD

    $3,231,163$862,710 0.267 9

    20 0.017 $991,239 $57,345,306 - -

    $0

    $13,416

    $0

    $120,492

    $493,468

    $0

    $0

    -

    $862,791

    $1,490,166

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 22

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    ASIS Assateague Island NS

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 224 0.104 $24,515,662 $235,266,626 -

    87

    5

    9

    12

    7

    5

    21

    0.075

    0.115

    0.148

    0.167

    0.032

    0.024

    0.065

    $3,087,284

    $189,604

    $626,005

    $667,681

    $52,958

    $291,248

    $797,582

    $40,915,369

    $1,641,641

    $4,229,301

    $3,992,229

    $1,645,537

    $12,296,031

    $12,349,710

    126,068

    14,016

    95

    26,552

    31,500

    92,600

    SF

    SF

    AC

    LF

    GPD

    GPD

    $60,885,083$14,800,486 0.243 43

    35 0.041 $4,002,813 $97,311,725 - -

    $651,308

    $9,987

    $235,802

    $359,005

    $0

    $0

    $564,762

    -

    $1,536,840

    $3,357,704

    Unpaved Roads† :

    Water Systems:

    Waste Water Systems:

    Trails:

    Campgrounds:

    Housing*:

    Buildings:

    Paved Roads‡: - -

    - -

    Figures in the table above represent a snapshot of the NPS Facility Management Software System (FMSS) data as of the end of the fiscal

    year.

    * Housing is defined as buildings that are associated with the NPS Employee Housing Program/DOI Quarters Program, including support

    buildings (e.g., detached garages, shower and laundry facilities, storage).

    † Unpaved Roads includes unpaved parking areas and unpaved roadways.

    ‡ Paved Roads includes bridges, tunnels, paved parking areas and paved roadways.

    § All Other assets include utility systems, dams, constructed waterways, marinas, aviation systems, railroads, ships, monuments,

    fortifications, towers, interpretive media and amphitheaters.

    FCI (Facility Condition Index) - A measure of a facility’s relative condition at a particular point in time. The FCI rating is a ratio of the cost

    of repair of the assets deficiencies divided by the current replacement value for the asset.

    CSDM (Critical Systems Deferred Maintenance) - The cost of critical or serious deferred maintenance located in critical asset

    components. This figure is currently unavailable for the paved roads category.

    DM (Deferred Maintenance) - The cost of maintenance that was not performed when it should have been or was scheduled to be and

    which, therefore, is put off or delayed.

    CRV (Current Replacement Value) - The current replacement value represents the standard industry costs and engineering estimates of

    materials, supplies and labor required to replace a facility at its existing size and functional capability. The CRV is estimated in alignment

    with federal requirements and industry standards and is used in calculating the FCI. However, it is important to note that the results of this

    calculation alone do not suggest that the NPS plans to replace an asset or set of assets within the portfolio.

    Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of measure are used together to describe the quantity. In the unit of

    measure column, SF= square footage, AC= acres, LF= linear feet, GPD= gallons per day, and MI= miles. These are the industry standard

    units of measure for each asset type and are consistently used across the federal government.

    Please note that the parameters used to calculate the data in the report above do not match the Federal Real Property Profile (FRPP)

    parameters or the Federal Accounting Standards Advisory Board (FASAB) parameters. Therefore, the inventory counts, FCI, CSDM, DM,

    CRV and QTY data elements will not match those reported to the FRPP or FASAB

    Page: 23

  • Facility Management Software System Data as of September 30, 2015

    NPS Asset Inventory Summary - By Park

    AZRU Aztec Ruins National Monument

    Number of

    Asset

    Locations

    UM Qty CRV DM CSDMFCI

    -

    All Other§ :

    TOTAL: 76 0.121 $6,606,322 $54,523,724 -

    11

    0

    0

    10

    4

    3

    11

    0.197

    0.000

    0.000

    0.001

    0.253

    0.000

    0.237

    $1,407,503

    $0

    $0

    $971

    $305,537

    $76

    $45,494

    $7,158,631

    $0

    $0

    $691,721

    $1,206,490

    $543,154

    $191,751

    23,541

    0

    0

    15,056

    1,007,000

    1,371,700

    SF

    SF

    AC

    LF

    GPD

    GPD

    $1,546,196$488,909 0.316 10

    27 0.101 $4,357,830 $43,185,781 - -