FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work AL AAL AK TKA Talkeetna GA 4 $ 6,500,000.00 $ 6,500,000.00 $ - Construct Access Road, Construct Apron - 18/36, Rehabilitate Taxiway, Remove Obstructions AL AAL AK CXF Coldfoot CS 2 $ 7,620,430.00 $ 398,527.00 $ 7,221,903.00 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Runway Lighting, Rehabilitate Taxiway AL AAL AK ANC Ted Stevens Anchorage International P 172 $ 26,348,409.00 $ 14,133,845.00 $ 12,214,564.00 Rehabilitate Runway - 07L/25R AL AAL AK *AKV Various Locations in Alaska 100 $ 756,000.00 $ 756,000.00 $ - Conduct Aeronautical Survey for RNAV Approach AL AAL AK *AKV Various Locations in Alaska 103 $ 924,187.00 $ 924,187.00 $ - Install Miscellaneous NAVAIDS AL AAL AK *AKS State of Alaska 21 $ 2,000,000.00 $ 2,000,000.00 $ - Update State System Plan Study AL AAL AK ANC Ted Stevens Anchorage International P 175 $ 3,351,013.00 $ 1,895,272.00 $ 1,455,741.00 Acquire Snow Removal Equipment AL AAL AK +07L Pilot Station 1 $ 24,921,716.00 $ 8,216,631.00 $ 16,705,085.00 Construct New Airport AL AAL AK MRI Merrill Field P 64 $ 1,995,000.00 $ 1,995,000.00 $ - Construct Taxiway AL AAL AK SCC Deadhorse P 16 $ 7,251,310.00 $ 3,945,734.00 $ 3,305,576.00 Construct Sand and Chemical Storage Building, Expand Aircraft Rescue & Fire Fighting Building, Expand Snow Removal Equipment Building AL AAL AK BET Bethel P 22 $ 5,587,042.00 $ 1,000,000.00 $ 4,587,042.00 Rehabilitate Apron AL AAL AK FAI Fairbanks International P 46 $ 1,447,564.00 $ 1,447,564.00 $ - Acquire Snow Removal Equipment AL AAL AK ANC Ted Stevens Anchorage International P 174 $ 476,643.00 $ 476,643.00 $ - Acquire Safety Equipment and/or Fencing AL AAL AK SHH Shishmaref GA 7 $ 7,753,301.00 $ 2,553,301.00 $ 5,200,000.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway AL AAL AK PAQ Palmer Municipal GA 19 $ 235,312.00 $ 235,312.00 $ - Conduct Airport Master Plan Study AL AAL AK SXQ Soldotna GA 14 $ 250,000.00 $ 250,000.00 $ - Conduct Airport Master Plan Study AL AAL AK AFM Ambler GA 6 $ 2,437,899.00 $ 2,437,899.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Runway - 09/27 AL AAL AK JNU Juneau International P 63 $ 234,375.00 $ 234,375.00 $ - Conduct Environmental Study AL AAL AK DUT Unalaska P 15 $ 8,548,356.00 $ 8,548,356.00 $ - Construct Sand and Chemical Storage Building, Construct Snow Removal Equipment Building AL AAL AK BET Bethel P 23 $ 6,500,000.00 $ 3,000,000.00 $ 3,500,000.00 Construct Snow Removal Equipment Building AL AAL AK AWI Wainwright CS 2 $ 3,255,112.00 $ 2,024,737.00 $ 1,230,375.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate Taxiway AL AAL AK +07E Angoon (Proposed GA) 5 $ 250,000.00 $ 250,000.00 $ - Construct New Airport AL AAL AK JNU Juneau International P 61 $ 526,133.00 $ 526,133.00 $ - Acquire Handicap Passenger Lift Device, Rehabilitate Terminal Building AL AAL AK GKN Gulkana GA 5 $ 2,318,248.00 $ 2,318,248.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway AL AAL AK LHD Lake Hood P 21 $ 6,754,014.00 $ 2,044,369.00 $ 4,709,645.00 Rehabilitate Apron Service Level Description: P - Primary CS - Commercial Service R - Reliever GA - General Aviation 1 of 57

FY 2015 Grants Awarded Report Date: 10/6/2015 · FAA-Office of Airports FY 2015 Grants Awarded . Report Date: 10/6/2015 . ... *AKS : State of Alaska : ... FSK : Fort Scott Municipal

Embed Size (px)

Citation preview

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

AL AAL AK TKA Talkeetna GA 4 $ 6,500,000.00 $ 6,500,000.00 $ -Construct Access Road, Construct Apron - 18/36, Rehabilitate

Taxiway, Remove Obstructions

AL AAL AK CXF Coldfoot CS 2 $ 7,620,430.00 $ 398,527.00 $ 7,221,903.00 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate

Runway Lighting, Rehabilitate Taxiway

AL AAL AK ANC Ted Stevens Anchorage International P 172 $ 26,348,409.00 $ 14,133,845.00 $ 12,214,564.00 Rehabilitate Runway - 07L/25R

AL AAL AK *AKV Various Locations in Alaska 100 $ 756,000.00 $ 756,000.00 $ - Conduct Aeronautical Survey for RNAV Approach

AL AAL AK *AKV Various Locations in Alaska 103 $ 924,187.00 $ 924,187.00 $ - Install Miscellaneous NAVAIDS

AL AAL AK *AKS State of Alaska 21 $ 2,000,000.00 $ 2,000,000.00 $ - Update State System Plan Study

AL AAL AK ANC Ted Stevens Anchorage International P 175 $ 3,351,013.00 $ 1,895,272.00 $ 1,455,741.00 Acquire Snow Removal Equipment

AL AAL AK +07L Pilot Station 1 $ 24,921,716.00 $ 8,216,631.00 $ 16,705,085.00 Construct New Airport

AL AAL AK MRI Merrill Field P 64 $ 1,995,000.00 $ 1,995,000.00 $ - Construct Taxiway

AL AAL AK SCC Deadhorse P 16 $ 7,251,310.00 $ 3,945,734.00 $ 3,305,576.00

Construct Sand and Chemical Storage Building, Expand Aircraft

Rescue & Fire Fighting Building, Expand Snow Removal Equipment

Building

AL AAL AK BET Bethel P 22 $ 5,587,042.00 $ 1,000,000.00 $ 4,587,042.00 Rehabilitate Apron

AL AAL AK FAI Fairbanks International P 46 $ 1,447,564.00 $ 1,447,564.00 $ - Acquire Snow Removal Equipment

AL AAL AK ANC Ted Stevens Anchorage International P 174 $ 476,643.00 $ 476,643.00 $ - Acquire Safety Equipment and/or Fencing

AL AAL AK SHH Shishmaref GA 7 $ 7,753,301.00 $ 2,553,301.00 $ 5,200,000.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Runway Lighting - 05/23, Rehabilitate Taxiway

AL AAL AK PAQ Palmer Municipal GA 19 $ 235,312.00 $ 235,312.00 $ - Conduct Airport Master Plan Study

AL AAL AK SXQ Soldotna GA 14 $ 250,000.00 $ 250,000.00 $ - Conduct Airport Master Plan Study

AL AAL AK AFM Ambler GA 6 $ 2,437,899.00 $ 2,437,899.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Runway - 09/27

AL AAL AK JNU Juneau International P 63 $ 234,375.00 $ 234,375.00 $ - Conduct Environmental Study

AL AAL AK DUT Unalaska P 15 $ 8,548,356.00 $ 8,548,356.00 $ -Construct Sand and Chemical Storage Building, Construct Snow

Removal Equipment Building

AL AAL AK BET Bethel P 23 $ 6,500,000.00 $ 3,000,000.00 $ 3,500,000.00 Construct Snow Removal Equipment Building

AL AAL AK AWI Wainwright CS 2 $ 3,255,112.00 $ 2,024,737.00 $ 1,230,375.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway

AL AAL AK +07E Angoon (Proposed GA) 5 $ 250,000.00 $ 250,000.00 $ - Construct New Airport

AL AAL AK JNU Juneau International P 61 $ 526,133.00 $ 526,133.00 $ -Acquire Handicap Passenger Lift Device, Rehabilitate Terminal

Building

AL AAL AK GKN Gulkana GA 5 $ 2,318,248.00 $ 2,318,248.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway

AL AAL AK LHD Lake Hood P 21 $ 6,754,014.00 $ 2,044,369.00 $ 4,709,645.00 Rehabilitate Apron

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 1 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

AL AAL AK WRG Wrangell P 14 $ 2,174,952.00 $ 1,000,000.00 $ 1,174,952.00 Rehabilitate Apron, Rehabilitate Taxiway

AL AAL AK JNU Juneau International P 64 $ 813,773.00 $ 813,773.00 $ - Construct Apron, Install Perimeter Fencing

AL AAL AK ADQ Kodiak P 19 $ 2,584,000.00 $ 2,584,000.00 $ - Improve Airport Drainage

AL AAL AK HPB Hooper Bay CS 7 $ 21,863,032.00 $ 4,478,816.00 $ 17,384,216.00 Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Runway Lighting - 13/31, Rehabilitate Taxiway

AL AAL AK YAK Yakutat P 20 $ 14,604,319.00 $ 3,000,000.00 $ 11,604,319.00 Rehabilitate Runway - 11/29

AL AAL AK MRI Merrill Field P 63 $ 4,577,100.00 $ 1,000,000.00 $ 3,577,100.00 Acquire Safety Equipment and/or Fencing

AL AAL AK 7AK Akutan GA 7 $ 5,000,000.00 $ 5,000,000.00 $ - Construct New Airport

AL AAL AK *AKV Various Locations in Alaska 102 $ 1,301,322.00 $ 1,301,322.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway, Remove

Obstructions

AL AAL AK *AKV Various Locations in Alaska 101 $ 8,235,879.00 $ 8,235,879.00 $ - Acquire Snow Removal Equipment

AL AAL AK MLY Manley Hot Springs GA 3 $ 2,135,220.00 $ 2,135,220.00 $ - Construct Snow Removal Equipment Building

AL AAL AK ANC Ted Stevens Anchorage International P 173 $ 4,000,000.00 $ - $ 4,000,000.00 Widen Runway - 07R/25L, Widen Taxiway, Widen Taxiway

AL AAL AK *AKV Various Locations in Alaska 104 $ 5,508,274.00 $ 5,508,274.00 $ - Rehabilitate Runway, Remove Obstructions

AL AAL AK JNU Juneau International P 62 $ 647,473.00 $ 647,473.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

CE ACE IA MCW Mason City Municipal CS 41 $ 813,813.00 $ 189,761.00 $ 624,052.00 Rehabilitate Apron

CE ACE IA 4C8 Albia Municipal GA 7 $ 440,904.00 $ 440,904.00 $ - Rehabilitate Runway - 13/31

CE ACE IA TNU Newton Municipal GA 14 $ 376,038.00 $ 376,038.00 $ - Construct Snow Removal Equipment Building

CE ACE IA SKI Sac City Municipal GA 11 $ 123,052.00 $ 123,052.00 $ - Update Airport Master Plan Study

CE ACE IA EOK Keokuk Municipal GA 20 $ 51,124.00 $ 51,124.00 $ - Conduct Environmental Study

CE ACE IA IFA Iowa Falls Municipal GA 8 $ 163,299.00 $ 163,299.00 $ - Construct Taxiway

CE ACE IA CKP Cherokee County Regional GA 12 $ 120,940.00 $ 120,940.00 $ - Extend Runway - 18/36

CE ACE IA 0K7 Humboldt Municipal GA 9 $ 89,730.00 $ 89,730.00 $ - Update Airport Master Plan Study

CE ACE IA ALO Waterloo Regional P 44 $ 958,739.00 $ 958,739.00 $ - Rehabilitate Taxiway

CE ACE IA SLB Storm Lake Municipal GA 11 $ 134,753.00 $ 134,753.00 $ - Update Airport Master Plan Study

CE ACE IA +09B New 9 $ 3,151,601.00 $ 150,000.00 $ 3,001,601.00 Construct New Airport

CE ACE IA FOD Fort Dodge Regional CS 30 $ 4,599,138.00 $ 3,035,362.00 $ 1,563,776.00 Rehabilitate Runway - 06/24

CE ACE IA FOD Fort Dodge Regional CS 31 $ 426,976.00 $ - $ 426,976.00 Rehabilitate Taxiway

CE ACE IA SPW Spencer Municipal GA 23 $ 217,945.00 $ 217,945.00 $ - Rehabilitate Access Road, Rehabilitate Taxiway

CE ACE IA IIB Independence Municipal GA 14 $ 377,178.00 $ 377,178.00 $ - Construct Snow Removal Equipment Building

CE ACE IA AXA Algona Municipal GA 10 $ 96,300.00 $ 96,300.00 $ - Conduct Environmental Study

CE ACE IA CID The Eastern Iowa P 48 $ 3,406,468.00 $ 3,406,468.00 $ - Improve Terminal Building

CE ACE IA VTI Vinton Veterans Memorial Airpark GA 9 $ 56,700.00 $ 56,700.00 $ - Rehabilitate Runway - 16/34

CE ACE IA DBQ Dubuque Regional P 58 $ 5,029,230.00 $ 1,000,000.00 $ 4,029,230.00 Construct Terminal Building

CE ACE IA +09B New 8 $ 657,910.00 $ - $ 657,910.00 Construct New Airport

CE ACE IA FFL Fairfield Municipal GA 14 $ 522,560.00 $ 522,560.00 $ - Construct Terminal Building

CE ACE IA OOA Oskaloosa Municipal GA 9 $ 213,489.00 $ 213,489.00 $ - Rehabilitate Taxiway

CE ACE IA ADU Audubon County GA 9 $ 154,485.00 $ 154,485.00 $ - Acquire Snow Removal Equipment

CE ACE IA EST Estherville Municipal GA 10 $ 296,678.00 $ 296,678.00 $ - Construct Fuel Farm

CE ACE IA C25 Waverly Municipal GA 6 $ 1,529,168.00 $ 900,000.00 $ 629,168.00 Rehabilitate Runway - 11/29

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 2 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

CE ACE IA DSM Des Moines International P 63 $ 13,123,148.00 $ 6,745,611.00 $ 6,377,537.00 Rehabilitate Runway - 13/31

CE ACE IA HPT Hampton Municipal GA 8 $ 137,700.00 $ 137,700.00 $ - Rehabilitate Building

CE ACE IA GCT Guthrie County Regional GA 8 $ 301,338.00 $ 301,338.00 $ - Construct Snow Removal Equipment Building

CE ACE IA BRL Southeast Iowa Regional CS 33 $ 73,085.00 $ 73,085.00 $ - Rehabilitate Runway - 12/30

CE ACE IA OXV Knoxville Municipal GA 14 $ 273,951.00 $ 150,000.00 $ 123,951.00 Rehabilitate Taxiway

CE ACE IA IKV Ankeny Regional R 20 $ 647,225.00 $ 150,000.00 $ 497,225.00 Rehabilitate Runway Lighting - 18/36

CE ACE IA LWD Lamoni Municipal GA 8 $ 120,330.00 $ 120,330.00 $ - Extend Runway - 18/36

CE ACE IA OQW Maquoketa Municipal GA 8 $ 95,598.00 $ 95,598.00 $ - Remove Obstructions

CE ACE IA PRO Perry Municipal GA 9 $ 71,955.00 $ 71,955.00 $ - Conduct Environmental Study

CE ACE IA CSQ Creston Municipal GA 11 $ 91,080.00 $ 91,080.00 $ - Acquire Miscellaneous Land

CE ACE IA C25 Waverly Municipal GA 5 $ 712,569.00 $ - $ 712,569.00 Extend Runway - 11/29

CE ACE IA 3Y2 George L Scott Municipal GA 6 $ 209,045.00 $ 209,045.00 $ - Improve Runway Safety Area - 17/35

CE ACE IA DNS Denison Municipal GA 12 $ 45,900.00 $ 45,900.00 $ - Construct Runway - 18/36

CE ACE IA CNC Chariton Municipal GA 9 $ 738,433.00 $ 738,433.00 $ - Construct Taxiway

CE ACE IA DEH Decorah Municipal GA 10 $ 185,400.00 $ 185,400.00 $ - Construct Building

CE ACE IA FXY Forest City Municipal GA 15 $ 275,400.00 $ 275,400.00 $ - Rehabilitate Runway Lighting - 09/27

CE ACE IA AMW Ames Municipal GA 22 $ 450,000.00 $ 450,000.00 $ - Construct Terminal Building

CE ACE IA CIN Arthur N Neu GA 13 $ 284,466.00 $ 284,466.00 $ - Rehabilitate Runway - 13/31

CE ACE IA BNW Boone Municipal GA 15 $ 369,427.00 $ 150,000.00 $ 219,427.00 Rehabilitate Apron

CE ACE IA MUT Muscatine Municipal GA 20 $ 3,747,117.00 $ 150,000.00 $ 3,597,117.00 Rehabilitate Runway - 06/24

CE ACE IA SUX Sioux Gateway/Col Bud Day Field P 49 $ 2,660,840.00 $ 2,284,338.00 $ 376,502.00 Construct Taxiway

CE ACE IA LWD Lamoni Municipal GA 9 $ 75,960.00 $ 75,960.00 $ - Acquire Land For Approaches

CE ACE IA MPZ Mount Pleasant Municipal GA 15 $ 333,515.00 $ 333,515.00 $ - Rehabilitate Runway Lighting - 15/33

CE ACE IA *IAS State of Iowa 22 $ 81,841.00 $ - $ 81,841.00 Conduct State System Plan Study

CE ACE IA 2Y4 Rockwell City Municipal GA 5 $ 72,000.00 $ 72,000.00 $ - Update Airport Master Plan Study

CE ACE IA EFW Jefferson Municipal GA 10 $ 549,765.00 $ 549,765.00 $ - Extend Runway - 14/32

CE ACE IA BRL Southeast Iowa Regional CS 34 $ 88,643.00 $ 88,643.00 $ - Rehabilitate Runway - 12/30

CE ACE IA GCT Guthrie County Regional GA 9 $ 217,262.00 $ 217,262.00 $ - Acquire Snow Removal Equipment

CE ACE KS K68 Garnett Municipal GA 8 $ 138,966.00 $ 138,966.00 $ - Rehabilitate Apron

CE ACE KS HLC Hill City Municipal GA 15 $ 280,732.00 $ 280,732.00 $ - Expand Apron

CE ACE KS MPR McPherson GA 15 $ 153,180.00 $ 153,180.00 $ - Rehabilitate Runway

CE ACE KS GLD Renner Field /Goodland Municipal/ GA 20 $ 236,250.00 $ 236,250.00 $ - Update Airport Master Plan Study

CE ACE KS ICT Wichita Dwight D Eisenhower National P 70 $ 89,730.00 $ 89,730.00 $ - Rehabilitate Apron

CE ACE KS GCK Garden City Regional P 37 $ 1,551,904.00 $ 1,551,904.00 $ - Construct Taxiway

CE ACE KS ICT Wichita Dwight D Eisenhower National P 69 $ 11,004,184.00 $ 3,763,544.00 $ 7,240,640.00 Rehabilitate Apron

CE ACE KS FSK Fort Scott Municipal GA 16 $ 47,603.00 $ 47,603.00 $ - Install Miscellaneous NAVAIDS

CE ACE KS UKL Coffey County GA 10 $ 59,962.00 $ 59,962.00 $ - Rehabilitate Apron

CE ACE KS K34 Gardner Municipal GA 10 $ 65,880.00 $ 65,880.00 $ - Update Airport Master Plan Study

CE ACE KS HUT Hutchinson Municipal GA 30 $ 245,250.00 $ 245,250.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting - 17/35

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 3 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

CE ACE KS K34 Gardner Municipal GA 11 $ 63,439.00 $ 63,439.00 $ - Remove Obstructions

CE ACE KS 3JC Freeman Field GA 11 $ 129,875.00 $ 129,875.00 $ - Install Miscellaneous NAVAIDS, Install Perimeter Fencing

CE ACE KS FOE Forbes Field CS 34 $ 397,795.00 $ 397,795.00 $ - Update Airport Master Plan Study

CE ACE KS 8K8 Cimarron Municipal GA 8 $ 148,815.00 $ 148,815.00 $ - Rehabilitate Runway - 01/19

CE ACE KS 48K Ness City Municipal GA 8 $ 324,223.00 $ 324,223.00 $ - Construct Runway - 17/35

CE ACE KS NRN Norton Municipal GA 7 $ 656,616.00 $ 656,616.00 $ - Construct Taxiway

CE ACE KS PPF Tri-City GA 10 $ 205,686.00 $ 205,686.00 $ - Update Airport Master Plan Study

CE ACE KS K61 Moritz Memorial GA 11 $ 1,979,307.00 $ 1,979,307.00 $ - Extend Runway - 17/35

CE ACE KS GBD Great Bend Municipal GA 24 $ 205,457.00 $ 205,457.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

CE ACE KS HUT Hutchinson Municipal GA 31 $ 117,220.00 $ 117,220.00 $ - Rehabilitate Runway - 17/35

CE ACE KS RSL Russell Municipal GA 11 $ 366,525.00 $ 366,525.00 $ - Rehabilitate Taxiway

CE ACE KS ULS Ulysses GA 15 $ 496,917.00 $ 496,917.00 $ - Construct Taxiway

CE ACE KS PTS Atkinson Municipal GA 15 $ 93,015.00 $ 93,015.00 $ - Rehabilitate Runway - 16/34

CE ACE KS 36K Lakin GA 4 $ 81,000.00 $ 81,000.00 $ - Construct Taxiway

CE ACE KS K51 Medicine Lodge GA 8 $ 117,180.00 $ 117,180.00 $ - Rehabilitate Runway - 16/34

CE ACE KS CYW Clay Center Municipal GA 12 $ 420,288.00 $ 420,288.00 $ -Install Runway Vertical/Visual Guidance System - 17/35,

Rehabilitate Runway - 17/35

CE ACE KS K81 Miami County GA 17 $ 565,308.00 $ 565,308.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway

CE ACE KS K67 Oswego Municipal GA 10 $ 150,000.00 $ 150,000.00 $ - Construct Apron

CE ACE KS CBK Shalz Field GA 15 $ 209,426.00 $ 209,426.00 $ - Extend Runway - 17/35

CE ACE KS *KSS State of Kansas 17 $ 314,590.00 $ 314,590.00 $ - Conduct State System Plan Study

CE ACE KS 5K2 Tribune Municipal GA 8 $ 268,314.00 $ 268,314.00 $ -Install Runway Vertical/Visual Guidance System - 17/35, Install

Taxiway Lighting

CE ACE KS 3K7 Mark Hoard Memorial GA 5 $ 142,650.00 $ 142,650.00 $ - Construct Runway - 17/35

CE ACE KS CNK Blosser Municipal GA 10 $ 158,803.00 $ 158,803.00 $ - Construct Runway - Plan-1

CE ACE KS OEL Oakley Municipal GA 12 $ 117,374.00 $ 117,374.00 $ - Install Runway Vertical/Visual Guidance System - 16/34

CE ACE KS GBD Great Bend Municipal GA 25 $ 460,713.00 $ 460,713.00 $ - Construct Aircraft Rescue & Fire Fighting Building

CE ACE KS OIN Oberlin Municipal GA 10 $ 736,200.00 $ 736,200.00 $ - Extend Runway - 17/35

CE ACE KS RCP Rooks County Regional GA 8 $ 496,305.00 $ 496,305.00 $ - Construct Building, Construct Terminal Building

CE ACE KS 9K7 Ellsworth Municipal GA 10 $ 226,709.00 $ 226,709.00 $ - Rehabilitate Apron

CE ACE KS MYZ Marysville Municipal GA 9 $ 278,110.00 $ 278,110.00 $ - Rehabilitate Runway - 16/34

CE ACE KS LYO Lyons-Rice County Municipal GA 18 $ 1,958,939.00 $ 1,958,939.00 $ - Extend Runway - 17R/35L

CE ACE KS HYS Hays Regional CS 32 $ 785,186.00 $ 785,186.00 $ - Rehabilitate Runway - 04/22

CE ACE MO *MOB Missouri State Block Grant Program 68 $ 6,807,158.00 $ - $ 6,807,158.00 Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 67 $ 2,382,455.00 $ - $ 2,382,455.00 Non primary development projects in state block grant program

CE ACE MO *MOS State of Missouri 11 $ 269,055.00 $ - $ 269,055.00 Update Miscellaneous Study

CE ACE MO *MOB Missouri State Block Grant Program 72 $ 359,459.00 $ - $ 359,459.00 Non primary development projects in state block grant program

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 4 of 57�

Field

Field

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

CE ACE MO JLN Joplin Regional P 36 $ 457,399.00 $ 457,399.00 $ - Construct Taxiway, Construct Taxiway

CE ACE MO *MOB Missouri State Block Grant Program 71 $ 1,481,635.00 $ - $ 1,481,635.00 Non primary development projects in state block grant program

CE ACE MO MCI Kansas City International P 72 $ 20,262,113.00 $ 2,365,199.00 $ 17,896,914.00 Rehabilitate Runway - 01R/19L

CE ACE MO STL Lambert-St Louis International P 147 $ 289,500.00 $ - $ 289,500.00 Acquire Equipment

CE ACE MO STL Lambert-St Louis International P 142 $ 5,706,012.00 $ 2,660,761.00 $ 3,045,251.00 Rehabilitate Taxiway

CE ACE MO SGF Springfield-Branson National P 51 $ 2,868,055.00 $ 2,868,055.00 $ - Construct Apron, Construct Terminal Building

CE ACE MO COU Columbia Regional P 39 $ 4,411,513.00 $ 2,032,190.00 $ 2,379,323.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway

CE ACE MO *MOB Missouri State Block Grant Program 69 $ 824,865.00 $ - $ 824,865.00 Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 65 $ 649,642.00 $ - $ 649,642.00 Non primary development projects in state block grant program

CE ACE MO COU Columbia Regional P 41 $ 1,470,668.00 $ - $ 1,470,668.00 Extend Runway - 13/31

CE ACE MO *MOB Missouri State Block Grant Program 70 $ 3,026,550.00 $ - $ 3,026,550.00 Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 64 $ 11,850,000.00 $ 11,850,000.00 $ - Non primary development projects in state block grant program

CE ACE MO *MOB Missouri State Block Grant Program 66 $ 765,951.00 $ - $ 765,951.00 Non primary development projects in state block grant program

CE ACE MO JLN Joplin Regional P 35 $ 164,832.00 $ 164,832.00 $ - Conduct Environmental Study

CE ACE MO STL Lambert-St Louis International P 146 $ 28,299.00 $ - $ 28,299.00 Zero Emissions Vehicle/Infrastructure

CE ACE MO STL Lambert-St Louis International P 145 $ 762,709.00 $ - $ 762,709.00 Rehabilitate Taxiway

CE ACE MO *MOB Missouri State Block Grant Program 63 $ 4,731,744.00 $ 4,731,744.00 $ - Non primary development projects in state block grant program

CE ACE NE 0G3 Tecumseh Municipal GA 10 $ 343,930.00 $ 343,930.00 $ - Rehabilitate Building

CE ACE NE K01 Farington Field GA 7 $ 2,417,850.00 $ 2,417,850.00 $ - Construct Runway - 16/34

CE ACE NE 93Y David City Municipal GA 10 $ 821,840.00 $ 821,840.00 $ - Construct Building

CE ACE NE RBE Rock County GA 10 $ 205,425.00 $ 205,425.00 $ -Improve Fuel Farm, Install Taxiway Lighting, Rehabilitate Runway

Lighting - 13/31

CE ACE NE BTA Blair Municipal GA 14 $ 1,583,104.00 $ 1,583,104.00 $ - Acquire Land For Approaches

CE ACE NE OFK Norfolk Regional/Karl Stefan Memorial Field GA 19 $ 380,000.00 $ 380,000.00 $ - Construct Taxiway

CE ACE NE BUB Cram Field GA 6 $ 950,561.00 $ 950,561.00 $ - Construct Building

CE ACE NE *NES State of Nebraska 22 $ 57,600.00 $ - $ 57,600.00 Update State System Plan Study

CE ACE NE LBF North Platte Regional Airport Lee Bird Field P 29 $ 483,138.00 $ 483,138.00 $ - Acquire Snow Removal Equipment

CE ACE NE OMA Eppley Airfield P 67 $ 13,358,242.00 $ 5,336,165.00 $ 8,022,077.00 Rehabilitate Apron

CE ACE NE BFF Western Nebraska Regional/William B Heilig P 38 $ 312,000.00 $ 312,000.00 $ - Rehabilitate Building

CE ACE NE BFF Western Nebraska Regional/William B Heilig P 39 $ 419,000.00 $ 419,000.00 $ - Acquire Snow Removal Equipment

CE ACE NE TQE Tekamah Municipal GA 8 $ 1,525,770.00 $ 1,525,770.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

CE ACE NE LBF North Platte Regional Airport Lee Bird Field P 28 $ 47,700.00 $ 47,700.00 $ - Wildlife Hazard Assessments

CE ACE NE 4D9 Alma Municipal GA 7 $ 568,080.00 $ 568,080.00 $ - Construct Terminal Building

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 5 of 57�

ld

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

CE ACE NE ONL The O'Neill Municipal-John L Baker Field GA 10 $ 650,000.00 $ 650,000.00 $ - Construct Building

CE ACE NE OKS Garden County GA 10 $ 195,000.00 $ 195,000.00 $ - Install Runway Vertical/Visual Guidance System - 12/30

CE ACE NE LNK Lincoln P 51 $ 721,800.00 $ 721,800.00 $ - Rehabilitate Runway - 14/32

EA BKW WV 4G7 Fairmont Municipal-Frankman Field GA 16 $ 903,600.00 $ 903,600.00 $ - Construct Apron, Construct Taxiway, Rehabilitate Runway - 05/23

EA BKW WV PKB Mid-Ohio Valley Regional CS 44 $ 2,923,565.00 $ 150,000.00 $ 2,773,565.00 Rehabilitate Apron, Rehabilitate Taxiway

EA BKW WV BKW Raleigh County Memorial CS 34 $ 490,883.00 $ 490,883.00 $ - Acquire Snow Removal Equipment

EA BKW WV CRW Yeager P 57 $ 461,700.00 $ 461,700.00 $ - Acquire Land For Approaches

EA BKW WV 3I2 Mason County GA 21 $ 1,436,167.00 $ 483,421.00 $ 952,746.00 Rehabilitate Apron

EA BKW WV W99 Grant County GA 20 $ 807,942.00 $ 772,903.00 $ 35,039.00 Rehabilitate Runway Lighting - 13/31, Rehabilitate Taxiway Lighting

EA BKW WV CRW Yeager P 56 $ 917,460.00 $ 917,460.00 $ - Improve Airport Drainage, Rehabilitate Taxiway

EA BKW WV W22 Upshur County Regional GA 29 $ 614,051.00 $ 245,632.00 $ 368,419.00 Rehabilitate Apron

EA BKW WV SXL Summersville GA 12 $ 80,763.00 $ 80,763.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

EA BKW WV CKB North Central West Virginia P 40 $ 1,376,131.00 $ 1,376,131.00 $ - Acquire Land For Approaches, Acquire Snow Removal Equipment

EA BKW WV BLF Mercer County GA 28 $ 465,758.00 $ 465,758.00 $ - Construct Taxiway

EA BKW WV MRB Eastern WV Regional/Shepherd Field R 33 $ 74,074.00 $ 74,074.00 $ - Install Airfield Guidance Signs

EA BKW WV MGW Morgantown Municipal-Walter L Bill Hart Fie P 37 $ 1,860,313.00 $ 1,860,313.00 $ - Construct Apron

EA BKW WV LWB Greenbrier Valley CS 34 $ 3,891,672.00 $ 1,345,555.00 $ 2,546,117.00 Construct Taxiway, Rehabilitate Apron

EA BKW WV MPG Marshall County GA 21 $ 73,269.00 $ 73,269.00 $ - Improve Airport Drainage, Rehabilitate Runway - 06/24

EA BKW WV 79D Philippi/Barbour County Regional GA 16 $ 87,989.00 $ 87,989.00 $ - Install Apron Flood Lighting

EA BKW WV HTS Tri-State/Milton J Ferguson Field P 53 $ 1,433,889.00 $ 1,433,889.00 $ -Improve Access Road, Rehabilitate Taxiway, Rehabilitate Terminal

Building

EA HAR DE 33N Delaware Airpark GA 18 $ 5,813,539.00 $ 280,012.00 $ 5,533,527.00 Construct Runway - 09/27

EA HAR DE ILG New Castle P 39 $ 810,000.00 $ - $ 810,000.00 Update Airport Master Plan Study

EA HAR DE ILG New Castle P 38 $ 2,846,864.00 $ 1,000,000.00 $ 1,846,864.00 Rehabilitate Taxiway

EA HAR DE GED Sussex County GA 31 $ 479,182.00 $ 479,182.00 $ - Install Taxiway Lighting

EA HAR DE *DES State of Delaware 11 $ 157,500.00 $ 157,500.00 $ - Conduct State System Plan Study

EA HAR NJ TTN Trenton Mercer P 49 $ 4,515,552.00 $ 1,008,631.00 $ 3,506,921.00 Rehabilitate Taxiway

EA HAR NJ WWD Cape May County GA 36 $ 5,337,902.00 $ 588,690.00 $ 4,749,212.00 Rehabilitate Runway - 01/19

EA HAR NJ CDW Essex County R 38 $ 105,300.00 $ 105,300.00 $ - Rehabilitate Runway - 10/28

EA HAR NJ TTN Trenton Mercer P 48 $ 540,064.00 $ 540,064.00 $ - Rehabilitate Runway - 06/24

EA HAR NJ MMU Morristown Municipal R 49 $ 4,716,900.00 $ 1,402,215.00 $ 3,314,685.00 Improve Runway Safety Area - 05/23, Rehabilitate Runway - 05/23

EA HAR NJ N12 Lakewood GA 19 $ 544,276.00 $ 544,276.00 $ - Construct Taxiway

EA HAR NJ N81 Hammonton Municipal GA 22 $ 149,832.00 $ 149,832.00 $ - Remove Obstructions

EA HAR NJ MIV Millville Municipal GA 38 $ 211,500.00 $ 211,500.00 $ - Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 6 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA HAR NJ MJX Ocean County GA 26 $ 540,440.00 $ 540,440.00 $ - Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24

EA HAR NJ ACY Atlantic City International P 92 $ 7,673,244.00 $ 4,449,804.00 $ 3,223,440.00 Rehabilitate Taxiway

EA HAR NJ VAY South Jersey Regional R 13 $ 384,524.00 $ 384,524.00 $ - Rehabilitate Apron

EA HAR NJ *NJS State of New Jersey 3 $ 264,903.00 $ 264,903.00 $ - Conduct State System Plan Study

EA HAR NJ N07 Lincoln Park R 13 $ 416,449.00 $ 416,449.00 $ - Acquire Land For Approaches

EA HAR NJ SMQ Somerset R 14 $ 29,744.00 $ 29,744.00 $ - Conduct Environmental Study

EA HAR NJ CDW Essex County R 39 $ 768,474.00 $ 768,474.00 $ - Rehabilitate Taxiway Lighting

EA HAR NJ MIV Millville Municipal GA 39 $ 420,610.00 $ 420,610.00 $ - Improve Airport Drainage

EA HAR NJ N12 Lakewood GA 18 $ 222,804.00 $ 222,804.00 $ - Acquire Land For Approaches

EA HAR PA PHL Philadelphia International P 107 $ 8,000,000.00 $ - $ 8,000,000.00 Acquire Land for Development

EA HAR PA PNE Northeast Philadelphia R 19 $ 930,001.00 $ 930,001.00 $ - Improve Airport Miscellaneous Improvements

EA HAR PA AOO Altoona-Blair County CS 43 $ 244,404.00 $ 244,404.00 $ - Acquire Land For Approaches

EA HAR PA *PAB Pennsylvania State Block Grant Program 76 $ 250,000.00 $ 250,000.00 $ - Non primary development projects in state block grant program

EA HAR PA JST John Murtha Johnstown-Cambria County CS 48 $ 455,838.00 $ 455,838.00 $ - Acquire Snow Removal Equipment

EA HAR PA N68 Franklin County Regional GA 15 $ 44,505.00 $ 44,505.00 $ - Construct Taxiway

EA HAR PA ABE Lehigh Valley International P 99 $ 2,350,239.00 $ 2,350,239.00 $ - Acquire Land for Development

EA HAR PA UNV University Park P 61 $ 5,781,500.00 $ 1,458,768.00 $ 4,322,732.00 Rehabilitate Apron

EA HAR PA AGC Allegheny County R 35 $ 1,487,078.00 $ 150,000.00 $ 1,337,078.00 Rehabilitate Taxiway

EA HAR PA PHL Philadelphia International P 106 $ 10,223,286.00 $ 2,223,286.00 $ 8,000,000.00 Extend Runway - 09R/27L

EA HAR PA FWQ Rostraver R 23 $ 242,080.00 $ 242,080.00 $ - Remove Obstructions

EA HAR PA CXY Capital City R 31 $ 135,379.00 $ 135,379.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

EA HAR PA *PAB Pennsylvania State Block Grant Program 75 $ 3,546,665.00 $ 3,546,665.00 $ - Non primary development projects in state block grant program

EA HAR PA CXY Capital City R 32 $ 20,618.00 $ 20,618.00 $ - Improve Airport Drainage

EA HAR PA PHL Philadelphia International P 105 $ 3,756,402.00 $ 3,756,402.00 $ - Extend Runway - 09R/27L

EA HAR PA IPT Williamsport Regional P 47 $ 2,156,081.00 $ 2,156,081.00 $ - Rehabilitate Runway - 09/27

EA HAR PA CXY Capital City R 30 $ 158,924.00 $ 158,924.00 $ - Improve Airport Drainage

EA HAR PA AGC Allegheny County R 36 $ 572,345.00 $ 572,345.00 $ - Remove Obstructions

EA HAR PA ERI Erie International/Tom Ridge Field P 61 $ 537,792.00 $ 537,792.00 $ - Acquire Snow Removal Equipment

EA HAR PA PHL Philadelphia International P 108 $ 16,000.00 $ - $ 16,000.00 Rehabilitate Taxiway

EA HAR PA LNS Lancaster CS 37 $ 530,510.00 $ 530,510.00 $ - Rehabilitate Taxiway

EA HAR PA *PAB Pennsylvania State Block Grant Program 74 $ 4,800,000.00 $ 4,800,000.00 $ - Non primary development projects in state block grant program

EA HAR PA DUJ Dubois Regional CS 41 $ 749,724.00 $ 749,724.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow

Removal Equipment

EA HAR PA ERI Erie International/Tom Ridge Field P 60 $ 34,477.00 $ 34,477.00 $ - Security Enhancements

EA HAR PA UNV University Park P 59 $ 619,661.00 $ 619,661.00 $ - Rehabilitate Apron

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 7 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA HAR PA LBE Arnold Palmer Regional P 49 $ 829,272.00 $ 829,272.00 $ - Acquire Snow Removal Equipment, Improve Building

EA HAR PA @01N Delaware Valley Region 16 $ 68,406.00 $ 68,406.00 $ - Conduct Metropolitan System Plan Study

EA HAR PA LNS Lancaster GA 38 $ 157,551.00 $ - $ 157,551.00 Construct Taxiway

EA HAR PA W05 Gettysburg Regional GA 12 $ 1,039,230.00 $ 205,657.00 $ 833,573.00 Rehabilitate Runway - 06/24

EA HAR PA *PAB Pennsylvania State Block Grant Program 77 $ 3,500,000.00 $ - $ 3,500,000.00 Non primary development projects in state block grant program

EA HAR PA UNV University Park P 60 $ 2,218,569.00 $ 2,218,569.00 $ - Rehabilitate Apron

EA HAR PA PIT Pittsburgh International P 120 $ 5,777,517.00 $ 710,262.00 $ 5,067,255.00 Rehabilitate Runway - 14/32

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 55 $ 2,088,020.00 $ 371,799.00 $ 1,716,221.00 Install Runway Vertical/Visual Guidance System - 13/31,

Rehabilitate Taxiway

EA HAR PA AVP Wilkes-Barre/Scranton International P 61 $ 755,485.00 $ 755,485.00 $ - Update Airport Master Plan Study

EA HAR PA *PAS Commonwealth of Pennsylvania 12 $ 553,335.00 $ 553,335.00 $ - Conduct State System Plan Study

EA HAR PA BFD Bradford Regional GA 44 $ 218,003.00 $ 218,003.00 $ - Rehabilitate Taxiway

EA HAR PA ERI Erie International/Tom Ridge Field P 62 $ 775,575.00 $ 775,575.00 $ - Update Airport Master Plan Study

EA NYC NJ TEB Teterboro R 54 $ 2,410,881.00 $ - $ 2,410,881.00 Conduct Noise Compatibility Plan Study

EA NYC NJ EWR Newark Liberty International P 138 $ 1,250,100.00 $ 1,250,100.00 $ - Rehabilitate Access Road

EA NYC NJ TEB Teterboro R 53 $ 553,573.00 $ 553,573.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

EA NYC NJ EWR Newark Liberty International P 136 $ 2,942,178.00 $ - $ 2,942,178.00 Conduct Noise Compatibility Plan Study

EA NYC NJ EWR Newark Liberty International P 137 $ 3,278,490.00 $ 3,278,490.00 $ - Construct Apron

EA NYC NY LGA Laguardia P 143 $ 2,736,130.00 $ - $ 2,736,130.00 Conduct Noise Compatibility Plan Study

EA NYC NY FOK Francis S Gabreski GA 18 $ 3,291,924.00 $ 805,837.00 $ 2,486,087.00 Rehabilitate Runway - 15/33

EA NYC NY NY0 Fulton County GA 19 $ 224,821.00 $ 224,821.00 $ - Update Airport Master Plan Study

EA NYC NY N23 Sidney Municipal GA 18 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study

EA NYC NY 1B1 Columbia County GA 32 $ 32,940.00 $ 32,940.00 $ - Improve Runway Safety Area - 03/21

EA NYC NY MAL Malone-Dufort GA 31 $ 188,460.00 $ 188,460.00 $ - Install Weather Reporting Equipment

EA NYC NY HPN Westchester County P 119 $ 2,847,954.00 $ 2,847,954.00 $ - Construct Service Road

EA NYC NY HPN Westchester County P 117 $ 119,700.00 $ 119,700.00 $ - Rehabilitate Access Road

EA NYC NY HPN Westchester County P 118 $ 192,793.00 $ 192,793.00 $ - Improve Airport Drainage

EA NYC NY ALB Albany International P 127 $ 450,495.00 $ 450,495.00 $ - Install Airfield Guidance Signs

EA NYC NY 44N Sky Acres R 27 $ 66,734.00 $ 66,734.00 $ - Rehabilitate Runway - 17/35

EA NYC NY PEO Penn Yan GA 34 $ 334,818.00 $ 334,818.00 $ - Install Runway Vertical/Visual Guidance System - 10/28

EA NYC NY 5B2 Saratoga County GA 31 $ 350,219.00 $ 350,219.00 $ - Acquire Easement For Approaches

EA NYC NY POU Dutchess County GA 45 $ 806,837.00 $ 806,837.00 $ - Rehabilitate Taxiway

EA NYC NY GFL Floyd Bennett Memorial GA 57 $ 283,500.00 $ 283,500.00 $ - Conduct Environmental Study

EA NYC NY SLK Adirondack Regional CS 62 $ 48,830.00 $ 48,830.00 $ - Construct Sand and Chemical Storage Building

EA NYC NY SYR Syracuse Hancock International P 139 $ 27,900.00 $ 27,900.00 $ - Construct Taxiway

EA NYC NY JFK John F Kennedy International P 182 $ 7,000,000.00 $ - $ 7,000,000.00 Construct Taxiway

EA NYC NY OGS Ogdensburg International CS 47 $ 7,597,458.00 $ 339,439.00 $ 7,258,019.00 Construct Apron

EA NYC NY RME Griffiss International GA 37 $ 3,582,000.00 $ 150,000.00 $ 3,432,000.00 Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 8 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA NYC NY JHW Chautauqua County/Jamestown CS 42 $ 618,450.00 $ 618,450.00 $ - Acquire Snow Removal Equipment

EA NYC NY 4B7 Schroon Lake GA 11 $ 556,200.00 $ 556,200.00 $ - Improve Runway Safety Area - 16/34, Rehabilitate Runway - 16/34

EA NYC NY JFK John F Kennedy International P 183 $ 8,969,647.00 $ 8,969,647.00 $ -Construct Taxiway, Construct Taxiway, Improve Runway Safety Area

- 04L/22R, Widen Runway - 04L/22R

EA NYC NY ELM Elmira/Corning Regional P 63 $ 1,153,061.00 $ 1,153,061.00 $ - Rehabilitate Taxiway

EA NYC NY MSS Massena International-Richards Field CS 68 $ 67,450.00 $ 67,450.00 $ - Acquire Snow Removal Equipment

EA NYC NY 7N1 Corning-Painted Post GA 20 $ 171,270.00 $ 171,270.00 $ - Update Airport Master Plan Study

EA NYC NY N03 Cortland County-Chase Field GA 24 $ 247,412.00 $ 247,412.00 $ - Conduct Miscellaneous Study

EA NYC NY 5B2 Saratoga County GA 32 $ 36,900.00 $ 36,900.00 $ - Acquire Easement For Approaches

EA NYC NY ELM Elmira/Corning Regional P 65 $ 94,500.00 $ 94,500.00 $ - Construct Taxiway

EA NYC NY GVQ Genesee County R 35 $ 72,455.00 $ 72,455.00 $ - Install Perimeter Fencing

EA NYC NY GFL Floyd Bennett Memorial GA 55 $ 1,008,000.00 $ 226,703.00 $ 781,297.00 Remove Obstructions

EA NYC NY BQR Buffalo-Lancaster Regional R 23 $ 334,855.00 $ 334,855.00 $ -Acquire Land for Development, Install Runway Vertical/Visual

Guidance System, Rehabilitate Runway Lighting - 08/26

EA NYC NY SDC Williamson-Sodus R 30 $ 494,925.00 $ 494,925.00 $ -

Install Airport Beacons, Install Runway Vertical/Visual Guidance

System - 10/28, Rehabilitate Runway Lighting - 10/28, Rehabilitate

Taxiway Lighting

EA NYC NY OLE Cattaraugus County-Olean GA 20 $ 301,293.00 $ 301,293.00 $ - Remove Obstructions

EA NYC NY SYR Syracuse Hancock International P 140 $ 220,500.00 $ 220,500.00 $ - Improve Terminal Building

EA NYC NY ALB Albany International P 128 $ 1,257,571.00 $ 1,257,571.00 $ - Rehabilitate Terminal Building

EA NYC NY LGA Laguardia P 142 $ 1,462,141.00 $ 1,462,141.00 $ - Rehabilitate Runway - 13/31

EA NYC NY DKK Chautauqua County/Dunkirk GA 51 $ 276,496.00 $ 276,496.00 $ - Acquire Snow Removal Equipment

EA NYC NY JFK John F Kennedy International P 184 $ 2,756,957.00 $ 2,756,957.00 $ - Remove Obstructions

EA NYC NY FZY Oswego County GA 44 $ 61,650.00 $ 61,650.00 $ -Install Runway Vertical/Visual Guidance System - 06/24, Light

Obstructions, Rehabilitate Runway Lighting - 06/24

EA NYC NY FRG Republic CS 48 $ 21,851,855.00 $ 61,945.00 $ 21,789,910.00 Improve Runway Safety Area - 01/19

EA NYC NY RME Griffiss International GA 38 $ 1,539,000.00 $ - $ 1,539,000.00 Rehabilitate Building

EA NYC NY N66 Oneonta Municipal GA 17 $ 244,800.00 $ 244,800.00 $ - Update Airport Master Plan Study

EA NYC NY ELZ Wellsville Municipal Airport,Tarantine Field GA 29 $ 45,000.00 $ 45,000.00 $ - Remove Obstructions

EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 31 $ 1,467,953.00 $ 1,467,953.00 $ -

Install Runway Vertical/Visual Guidance System - 06/24,

Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting -

06/24, Remove Obstructions - 06/24

EA NYC NY 9G3 Akron R 22 $ 40,168.00 $ 40,168.00 $ -

Acquire Land for Development, Install Miscellaneous NAVAIDS,

Install Runway Vertical/Visual Guidance System - 07/25,

Rehabilitate Runway Lighting - 07/25

EA NYC NY SWF Stewart International P 72 $ 1,962,512.00 $ 1,962,512.00 $ -Rehabilitate Runway including associated marking - 16/34,

Rehabilitate Runway - 09/27

EA NYC NY ITH Ithaca Tompkins Regional P 73 $ 803,700.00 $ 803,700.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 9 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA NYC NY PBG Plattsburgh International P 52 $ 224,200.00 $ 224,200.00 $ - Remove Obstructions

EA NYC NY MSV Sullivan County International GA 34 $ 730,971.00 $ 730,971.00 $ - Rehabilitate Access Road

EA NYC NY 0G7 Finger Lakes Regional GA 26 $ 188,100.00 $ 188,100.00 $ - Rehabilitate Apron

EA NYC NY MAL Malone-Dufort GA 32 $ 46,260.00 $ 46,260.00 $ - Rehabilitate Apron

EA NYC NY MSS Massena International-Richards Field CS 71 $ 68,400.00 $ 68,400.00 $ - Improve Airport Drainage

EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 68 $ 1,354,208.00 $ 1,354,208.00 $ - Rehabilitate Apron

EA NYC NY 5G0 Le Roy R 26 $ 91,895.00 $ 91,895.00 $ -Acquire Land for Development, Improve Airport Drainage,

Rehabilitate Runway - 10/28, Rehabilitate Runway Lighting - 10/28

EA NYC NY N66 Oneonta Municipal GA 18 $ 1,047,322.00 $ 1,047,322.00 $ - Construct Taxiway, Install Taxiway Lighting

EA NYC NY IAG Niagara Falls International P 44 $ 2,091,390.00 $ 2,091,390.00 $ - Construct Terminal Building

EA NYC NY ROC Greater Rochester International P 90 $ 220,320.00 $ 220,320.00 $ - Conduct Environmental Study

EA NYC NY SLK Adirondack Regional CS 61 $ 205,010.00 $ 205,010.00 $ - Remove Obstructions

EA NYC NY D38 Canandaigua R 36 $ 241,380.00 $ 241,380.00 $ - Update Airport Master Plan Study

EA NYC NY OIC Lt Warren Eaton GA 33 $ 123,930.00 $ 123,930.00 $ - Remove Obstructions

EA NYC NY ISP Long Island MacArthur P 95 $ 892,521.00 $ 892,521.00 $ - Construct Aircraft Rescue & Fire Fighting Building

EA NYC NY SYR Syracuse Hancock International P 138 $ 54,000.00 $ 54,000.00 $ - Improve Airport Drainage

EA NYC NY BUF Buffalo Niagara International P 89 $ 835,308.00 $ 835,308.00 $ -Install Guidance Signs, Install Runway Distance-To-Go Signs - 14/32,

Install Runway Lighting - 14/32, Rehabilitate Runway - 14/32

EA NYC NY ROC Greater Rochester International P 88 $ 2,104,919.00 $ 2,104,919.00 $ - Construct Taxiway, Construct Taxiway

EA NYC NY SLK Adirondack Regional CS 60 $ 176,611.00 $ 176,611.00 $ - Install Runway Lighting - 09/27

EA NYC NY MSS Massena International-Richards Field CS 67 $ 713,385.00 $ 713,385.00 $ - Rehabilitate Access Road

EA NYC NY POU Dutchess County GA 44 $ 609,055.00 $ 609,055.00 $ - Improve Airport Miscellaneous Improvements

EA NYC NY GFL Floyd Bennett Memorial GA 56 $ 72,000.00 $ 72,000.00 $ - Remove Obstructions

EA NYC NY ELM Elmira/Corning Regional P 64 $ 72,000.00 $ 72,000.00 $ - Conduct Miscellaneous Study

EA NYC NY MSS Massena International-Richards Field CS 66 $ 262,870.00 $ 150,000.00 $ 112,870.00 Remove Obstructions

EA NYC NY 1B1 Columbia County GA 31 $ 210,512.00 $ 210,512.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

EA NYC NY 5B2 Saratoga County GA 30 $ 208,331.00 $ 208,331.00 $ - Conduct Environmental Study

EA NYC NY N89 Joseph Y Resnick GA 35 $ 1,145,692.00 $ 1,145,692.00 $ - Rehabilitate Runway - 04/22, Rehabilitate Runway Lighting - 04/22

EA NYC NY ROC Greater Rochester International P 89 $ 1,747,847.00 $ 1,747,847.00 $ - Rehabilitate Access Road

EA NYC NY MSS Massena International-Richards Field CS 69 $ 176,700.00 $ 176,700.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

EA NYC NY HWV Brookhaven R 33 $ 439,041.00 $ 439,041.00 $ - Install Taxiway Lighting

EA NYC NY MSS Massena International-Richards Field CS 70 $ 75,050.00 $ 75,050.00 $ -

Install Runway Vertical/Visual Guidance System - 09/27, Install

Runway Vertical/Visual Guidance System - 09/27, Rehabilitate

Runway Lighting - 05/23, Rehabilitate Taxiway Lighting

EA NYC NY RME Griffiss International GA 39 $ 167,400.00 $ 167,400.00 $ - Construct Deicing Containment Facility

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 10 of 57�

d

od Marshall

od Marshall

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA NYC NY ITH Ithaca Tompkins Regional P 74 $ 3,643,200.00 $ 530,595.00 $ 3,112,605.00 Rehabilitate Runway - 14/32

EA NYC NY ART Watertown International P 44 $ 3,591,188.00 $ 2,003,316.50 $ 1,587,871.50 Extend Runway - 10/28, Extend Taxiway, Improve Runway Safety

Area - 10/28

EA NYC NY JFK John F Kennedy International P 185 $ 2,736,130.00 $ - $ 2,736,130.00 Conduct Noise Compatibility Plan Study

EA NYC NY HTF Hornell Municipal GA 21 $ 50,220.00 $ 50,220.00 $ - Construct Snow Removal Equipment Building

EA NYC NY SYR Syracuse Hancock International P 135 $ 55,800.00 $ 55,800.00 $ - Remove Obstructions

EA NYC NY SYR Syracuse Hancock International P 136 $ 1,066,950.00 $ 1,066,950.00 $ - Improve Terminal Building

EA NYC NY LGA La Guardia P 141 $ 2,638,427.00 $ 2,638,427.00 $ - Improve Airport Drainage

EA NYC NY DKK Chautauqua County/Dunkirk GA 50 $ 286,200.00 $ 286,200.00 $ - Improve Airport Drainage

EA NYC NY POU Dutchess County GA 46 $ 261,000.00 $ 261,000.00 $ - Conduct Environmental Study

EA NYC NY LKP Lake Placid GA 40 $ 122,670.00 $ 122,670.00 $ -Conduct Miscellaneous Study, Install Runway Vertical/Visual

Guidance System - 14/32, Rehabilitate Taxiway Lighting

EA WAS DC DCA Ronald Reagan Washington National P 30 $ 5,641,125.00 $ 5,641,125.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway

EA WAS DC @008 Washington Metropolitan Area 12 $ 225,000.00 $ 225,000.00 $ - Conduct Metropolitan System Plan Study

EA WAS DC IAD Washington Dulles International P 52 $ 3,178,482.00 $ 390,456.00 $ 2,788,026.00 Rehabilitate Taxiway

EA WAS DC IAD Washington Dulles International P 51 $ 14,000,000.00 $ - $ 14,000,000.00 Construct Runway - Plan-1

EA WAS MD FDK Frederick Municipal R 41 $ 2,695,842.00 $ 150,000.00 $ 2,545,842.00 Remove Obstructions

EA WAS MD FDK Frederick Municipal R 40 $ 58,050.00 $ 58,050.00 $ - Wildlife Hazard Assessments

EA WAS MD DMW Carroll County Regional/Jack B Poage Field R 29 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study

EA WAS MD FME Tipton R 19 $ 343,807.00 $ 343,807.00 $ - Rehabilitate Apron

EA WAS MD HGR Hagerstown Regional-Richard A Henson Fiel P 52 $ 1,305,503.00 $ 1,305,503.00 $ - Rehabilitate Taxiway

EA WAS MD ESN Easton/Newnam Field GA 42 $ 527,883.00 $ 527,883.00 $ - Conduct Environmental Study

EA WAS MD 2W6 St Mary's County Regional GA 21 $ 2,765,724.00 $ 2,765,724.00 $ - Extend Runway - 11/29

EA WAS MD FME Tipton R 18 $ 89,921.00 $ 89,921.00 $ - Wildlife Hazard Assessments

EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 50 $ 554,000.00 $ 554,000.00 $ - Rehabilitate Terminal Building

EA WAS MD BWI Baltimore/Washington International Thurgo P 92 $ 16,869,274.00 $ 3,944,274.00 $ 12,925,000.00 Construct Taxiway

EA WAS MD GAI Montgomery County Airpark R 27 $ 405,666.00 $ 405,666.00 $ - Rehabilitate Taxiway

EA WAS MD BWI Baltimore/Washington International Thurgo P 93 $ 2,556,902.00 $ - $ 2,556,902.00 VALE Infrastructure

EA WAS MD GAI Montgomery County Airpark R 25 $ 48,780.00 $ 48,780.00 $ - Wildlife Hazard Assessments

EA WAS MD 2G4 Garrett County GA 13 $ 207,695.00 $ 207,695.00 $ - Conduct Environmental Study

EA WAS MD GAI Montgomery County Airpark R 24 $ 1,406,916.00 $ - $ 1,406,916.00 Remove Obstructions

EA WAS MD CGE Cambridge-Dorchester GA 28 $ 2,790,000.00 $ 602,390.00 $ 2,187,610.00 Extend Runway - 16/34

EA WAS MD GAI Montgomery County Airpark R 26 $ 171,360.00 $ 171,360.00 $ - Remove Obstructions

EA WAS VA BCB Virginia Tech/Montgomery Executive GA 20 $ 8,040,096.00 $ 150,000.00 $ 7,890,096.00 Extend Runway - 12/30

EA WAS VA HSP Ingalls Field GA 13 $ 1,085,978.00 $ 150,000.00 $ 935,978.00 Remove Obstructions

EA WAS VA VJI Virginia Highlands GA 33 $ 1,842,444.00 $ 150,000.00 $ 1,692,444.00 Extend Runway, Supplemental Environmental Assessment &

Runway Extension - 06/24, Extend Runway - 06/24

EA WAS VA LNP Lonesome Pine GA 12 $ 333,009.00 $ 333,009.00 $ - Acquire Land For Approaches

EA WAS VA OKV Winchester Regional GA 33 $ 247,500.00 $ 247,500.00 $ - Construct Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 11 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

EA WAS VA OKV Winchester Regional GA 34 $ 357,771.00 $ 357,771.00 $ - Construct Taxiway

EA WAS VA CHO Charlottesville-Albemarle P 45 $ 532,800.00 $ 532,800.00 $ - Acquire Snow Removal Equipment

EA WAS VA PSK New River Valley GA 16 $ 4,280,688.00 $ 456,347.00 $ 3,824,341.00 Construct Taxiway

EA WAS VA LKU Louisa County/Freeman Field GA 18 $ 576,000.00 $ 576,000.00 $ - Rehabilitate Runway Lighting - 09/27

EA WAS VA EMV Emporia-Greensville Regional GA 11 $ 211,500.00 $ 211,500.00 $ - Extend Taxiway

EA WAS VA HWY Warrenton-Fauquier R 20 $ 1,032,184.00 $ 1,032,184.00 $ - Acquire Land For Approaches

EA WAS VA FRR Front Royal-Warren County GA 16 $ 123,300.00 $ 123,300.00 $ - Remove Obstructions

EA WAS VA MKJ Mountain Empire GA 25 $ 193,473.00 $ 193,473.00 $ - Remove Obstructions

EA WAS VA ROA Roanoke Regional/Woodrum Field P 54 $ 5,600,000.00 $ 5,600,000.00 $ - Improve Terminal Building

EA WAS VA W96 New Kent County GA 14 $ 1,677,675.00 $ 304,612.00 $ 1,373,063.00 Install Taxiway Lighting, Rehabilitate Taxiway

EA WAS VA W78 William M Tuck GA 15 $ 327,145.00 $ 327,145.00 $ - Expand Apron

EA WAS VA MKJ Mountain Empire GA 24 $ 107,820.00 $ 107,820.00 $ - Rehabilitate Runway - 08/26

EA WAS VA DAN Danville Regional GA 27 $ 161,592.00 $ 161,592.00 $ - Rehabilitate Taxiway

EA WAS VA AVC Mecklenburg-Brunswick Regional GA 14 $ 429,615.00 $ 429,615.00 $ -Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate

Taxiway

EA WAS VA SFQ Suffolk Executive GA 24 $ 3,122,658.00 $ 3,122,658.00 $ - Construct Taxiway

EA WAS VA FVX Farmville Regional GA 16 $ 62,010.00 $ 62,010.00 $ - Rehabilitate Apron

EA WAS VA HLX Twin County GA 13 $ 117,900.00 $ 117,900.00 $ - Rehabilitate Apron

EA WAS VA JFZ Tazewell County GA 20 $ 126,000.00 $ 126,000.00 $ - Conduct Environmental Study

EA WAS VA MTV Blue Ridge GA 20 $ 210,833.00 $ 210,833.00 $ - Update Airport Master Plan Study

EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 37 $ 1,132,176.00 $ 1,132,176.00 $ - Construct Building

EA WAS VA SHD Shenandoah Valley Regional P 38 $ 55,028.00 $ 55,028.00 $ - Rehabilitate Runway - 05/23

EA WAS VA JYO Leesburg Executive R 39 $ 360,000.00 $ 360,000.00 $ - Update Airport Master Plan Study

EA WAS VA CPK Chesapeake Regional GA 20 $ 2,070,000.00 $ 315,000.00 $ 1,755,000.00 Expand Apron

EA WAS VA FVX Farmville Regional GA 15 $ 171,063.00 $ 171,063.00 $ - Update Airport Master Plan Study

EA WAS VA 0V4 Brookneal/Campbell County GA 8 $ 441,910.00 $ 441,910.00 $ - Rehabilitate Runway Lighting - 06/24

EA WAS VA OFP Hanover County Municipal GA 27 $ 574,578.00 $ 574,578.00 $ - Construct Apron

EA WAS VA LUA Luray Caverns GA 17 $ 3,560,995.00 $ 129,525.00 $ 3,431,470.00 Remove Obstructions

EA WAS VA SFQ Suffolk Executive GA 22 $ 517,500.00 $ 517,500.00 $ - Remove Obstructions

EA WAS VA OKV Winchester Regional GA 32 $ 122,490.00 $ 122,490.00 $ - Construct Taxiway

GL CHI IL MLI Quad City International P 81 $ 1,751,100.00 $ 1,751,100.00 $ - Security Enhancements

GL CHI IL MDW Chicago Midway International P 87 $ 3,236,412.00 $ 3,236,412.00 $ - Rehabilitate Runway Lighting - 04L/22R, Rehabilitate Taxiway

GL CHI IL ORD Chicago O'Hare International P 147 $ 30,000,000.00 $ - $ 30,000,000.00 Construct Runway - Plan-2

GL CHI IL ORD Chicago O'Hare International P 150 $ 6,500,000.00 $ - $ 6,500,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

GL CHI IL PIA General Downing - Peoria International P 62 $ 4,134,019.00 $ 2,457,710.00 $ 1,676,309.00 Rehabilitate Apron

GL CHI IL CMI University of Illinois-Willard P 30 $ 2,680,340.00 $ 1,142,471.00 $ 1,537,869.00 Rehabilitate Runway - 14L/32R, Rehabilitate Runway - 04/22, Widen

Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 12 of 57�

ormal

ormal

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL CHI IL MDW Chicago Midway International P 88 $ 4,625,292.00 $ - $ 4,625,292.00 Install Runway Incursion Marking, Rehabilitate Runway - 04L/22R

GL CHI IL ORD Chicago O'Hare International P 149 $ 2,000,000.00 $ - $ 2,000,000.00 VALE Infrastructure

GL CHI IL BMI Central IL Regional Airport at Bloomington-N P 64 $ 562,308.00 $ 562,308.00 $ - Acquire Land For Approaches

GL CHI IL MDW Chicago Midway International P 84 $ 2,557,802.00 $ - $ 2,557,802.00 Construct Taxiway

GL CHI IL *ILB Illinois State Block Grant Program 122 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 126 $ 2,307,759.00 $ - $ 2,307,759.00 Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 124 $ 484,200.00 $ - $ 484,200.00 Non primary development projects in state block grant program

GL CHI IL ORD Chicago O'Hare International P 148 $ 2,836,883.00 $ - $ 2,836,883.00 Rehabilitate Runway - 09R/27L

GL CHI IL SPI Abraham Lincoln Capital P 68 $ 2,070,000.00 $ 500,000.00 $ 1,570,000.00 Improve Terminal Building

GL CHI IL RFD Chicago/Rockford International P 75 $ 647,945.00 $ 647,945.00 $ - Construct Apron

GL CHI IL MLI Quad City International P 78 $ 924,022.00 $ 607,968.00 $ 316,054.00 Construct Taxiway

GL CHI IL ORD Chicago O'Hare International P 153 $ 2,500,000.00 $ - $ 2,500,000.00 Conduct Environmental Study

GL CHI IL *ILB Illinois State Block Grant Program 123 $ 100,000.00 $ - $ 100,000.00 Non primary development projects in state block grant program

GL CHI IL MDW Chicago Midway International P 86 $ 12,845,171.00 $ - $ 12,845,171.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

GL CHI IL ORD Chicago O'Hare International P 146 $ 20,000,000.00 $ - $ 20,000,000.00 Construct Runway - Plan-1

GL CHI IL ORD Chicago O'Hare International P 152 $ 9,622,543.00 $ 9,622,543.00 $ - Construct Runway

GL CHI IL UIN Quincy Regional-Baldwin Field P 36 $ 1,484,025.00 $ 1,484,025.00 $ - Construct Taxiway

GL CHI IL *ILB Illinois State Block Grant Program 121 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program

GL CHI IL MWA Williamson County Regional P 32 $ 4,588,521.00 $ 1,000,000.00 $ 3,588,521.00 Construct Terminal Building

GL CHI IL MLI Quad City International P 80 $ 391,844.00 $ 391,844.00 $ - Remove Obstructions

GL CHI IL BMI Central IL Regional Airport at Bloomington-N P 63 $ 1,163,954.00 $ 1,163,954.00 $ - Rehabilitate Service Road

GL CHI IL *ILB Illinois State Block Grant Program 125 $ 4,355,280.00 $ - $ 4,355,280.00 Non primary development projects in state block grant program

GL CHI IL MLI Quad City International P 79 $ 570,984.00 $ 570,984.00 $ - Rehabilitate Taxiway

GL CHI IL *ILS State of Illinois 7 $ 750,000.00 $ - $ 750,000.00 Conduct State System Plan Study

GL CHI IL RFD Chicago/Rockford International P 74 $ 6,698,797.00 $ 1,348,797.00 $ 5,350,000.00 Expand Terminal Building

GL CHI IL MDW Chicago Midway International P 85 $ 210,000.00 $ - $ 210,000.00 Acquire Equipment

GL CHI IL *ILB Illinois State Block Grant Program 127 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program

GL CHI IL *ILB Illinois State Block Grant Program 120 $ 16,630,305.00 $ 16,630,305.00 $ - Non primary development projects in state block grant program

GL CHI IL ORD Chicago O'Hare International P 151 $ 6,325,289.00 $ 6,325,289.00 $ - Rehabilitate Taxiway

GL CHI IN VPZ Porter County Regional GA 27 $ 5,807,807.00 $ - $ 5,807,807.00 Rehabilitate Runway - 09/27

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 13 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL CHI IN LAF Purdue University GA 36 $ 442,969.00 $ 142,969.00 $ 300,000.00 Install Runway Incursion Marking

GL CHI IN RWN Arens Field GA 9 $ 598,320.00 $ 598,320.00 $ - Improve Fuel Farm

GL CHI IN HHG Huntington Municipal GA 13 $ 637,807.00 $ 637,807.00 $ - Expand Apron

GL CHI IN C62 Kendallville Municipal GA 20 $ 387,740.00 $ 387,740.00 $ -

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Install Runway Vertical/Visual Guidance System - 10/28,

Rehabilitate Runway Lighting - 10/28

GL CHI IN FRH French Lick Municipal GA 15 $ 200,935.00 $ 200,935.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 08/26

GL CHI IN GWB De Kalb County GA 22 $ 450,000.00 $ 450,000.00 $ - Acquire Easement For Approaches

GL CHI IN FWA Fort Wayne International P 65 $ 12,883,848.00 $ 4,383,848.00 $ 8,500,000.00 Construct Taxiway, Rehabilitate Runway - 14/32

GL CHI IN MCX White County GA 16 $ 3,167,539.00 $ 150,000.00 $ 3,017,539.00 Extend Runway - 18/36

GL CHI IN GYY Gary/Chicago International CS 32 $ 2,994,597.00 $ 150,000.00 $ 2,844,597.00 Extend Runway - 12/30

GL CHI IN LAF Purdue University GA 38 $ 1,350,000.00 $ - $ 1,350,000.00 Rehabilitate Runway - 10/28

GL CHI IN DCY Daviess County GA 15 $ 74,160.00 $ 74,160.00 $ - Extend Runway - 18/36, Extend Taxiway

GL CHI IN UWL New Castle-Henry Co Municipal GA 15 $ 514,573.00 $ 514,573.00 $ - Construct Runway - Plan-1

GL CHI IN IND Indianapolis International P 140 $ 138,475.00 $ 138,475.00 $ - Conduct Noise Compatibility Plan Study

GL CHI IN MGC Michigan City Municipal-Phillips Field GA 19 $ 256,284.00 $ 256,284.00 $ -Conduct Miscellaneous Study, Extend Runway - 02/20, Remove

Obstructions

GL CHI IN SMD Smith Field GA 16 $ 118,447.00 $ 118,447.00 $ - Install Miscellaneous NAVAIDS, Remove Obstructions

GL CHI IN GYY Gary/Chicago International CS 33 $ 2,411,325.00 $ - $ 2,411,325.00 Rehabilitate Runway - 02/20

GL CHI IN MQJ Indianapolis Regional R 16 $ 514,454.00 $ 514,454.00 $ - Rehabilitate Taxiway

GL CHI IN TYQ Indianapolis Executive R 26 $ 219,275.00 $ 219,275.00 $ -Acquire Easement For Approaches, Extend Runway - 18/36, Extend

Runway - 18/36, Wildlife Hazard Assessments

GL CHI IN MIE Delaware County Regional GA 29 $ 83,016.00 $ 83,016.00 $ - Rehabilitate Runway - 14/32

GL CHI IN OVO North Vernon GA 18 $ 112,670.00 $ 112,670.00 $ - Construct Building

GL CHI IN RZL Jasper County GA 10 $ 450,000.00 $ 450,000.00 $ - Improve Fuel Farm

GL CHI IN SBN South Bend International P 48 $ 3,089,909.00 $ 3,089,909.00 $ - Modify Terminal Building

GL CHI IN OKK Kokomo Municipal GA 23 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 14/32

GL CHI IN CFJ Crawfordsville Municipal GA 14 $ 150,000.00 $ 150,000.00 $ - Construct Terminal Building

GL CHI IN I42 Paoli Municipal GA 12 $ 1,687,072.00 $ 208,695.00 $ 1,478,377.00 Extend Runway - 02/20

GL CHI IN BAK Columbus Municipal GA 27 $ 2,203,630.00 $ 150,000.00 $ 2,053,630.00 Rehabilitate Runway - 14/32

GL CHI IN UMP Indianapolis Metropolitan R 22 $ 2,655,000.00 $ 150,000.00 $ 2,505,000.00 Rehabilitate Runway - 15/33

GL CHI IN RID Richmond Municipal GA 18 $ 171,941.00 $ 171,941.00 $ - Rehabilitate Runway - 15/33

GL CHI IN PPO La Porte Municipal GA 22 $ 525,970.00 $ 525,970.00 $ - Acquire Land for Development

GL CHI IN AID Anderson Municipal-Darlington Field GA 29 $ 496,831.00 $ 496,831.00 $ -Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,

Rehabilitate Runway - 12/30

GL CHI IN EVV Evansville Regional P 58 $ 1,349,474.00 $ 1,349,474.00 $ -Acquire Snow Removal Equipment, Rehabilitate Apron, Security

Enhancements

GL CHI IN SIV Sullivan County GA 17 $ 274,584.00 $ 274,584.00 $ - Improve Fuel Farm

GL CHI IN IND Indianapolis International P 141 $ 3,953,250.00 $ - $ 3,953,250.00 VALE Infrastructure

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 14 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL CHI IN ASW Warsaw Municipal GA 14 $ 543,600.00 $ 543,600.00 $ - Acquire Land For Approaches

GL CHI IN GGP Logansport/Cass County GA 20 $ 352,492.00 $ 352,492.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

GL CHI IN HUF Terre Haute International-Hulman Field GA 43 $ 223,875.00 $ 223,875.00 $ - Construct Runway - 18/36

GL CHI IN 4I7 Putnam County GA 16 $ 854,282.00 $ 854,282.00 $ - Acquire Land For Approaches, Install Perimeter Fencing

GL CHI IN GEZ Shelbyville Municipal GA 25 $ 398,943.00 $ 398,943.00 $ - Install Taxiway Lighting

GL CHI IN ANQ Tri-State Steuben County GA 16 $ 90,241.00 $ 90,241.00 $ - Update Airport Master Plan Study

GL CHI IN FKR Frankfort Municipal GA 18 $ 1,274,083.00 $ 1,274,083.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL CHI IN CEV Mettel Field GA 22 $ 186,756.00 $ 186,756.00 $ - Rehabilitate Taxiway

GL CHI IN 8A4 Indianapolis Downtown GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron

GL CHI IN 50I Kentland Municipal GA 11 $ 150,000.00 $ 150,000.00 $ - Acquire Land For Approaches

GL CHI IN HFY Greenwood Municipal GA 29 $ 150,000.00 $ 150,000.00 $ - Improve Airport Drainage

GL CHI IN BMG Monroe County GA 30 $ 373,130.00 $ 333,350.00 $ 39,780.00 Install Perimeter Fencing

GL CHI IN MZZ Marion Municipal GA 24 $ 735,724.00 $ 300,000.00 $ 435,724.00 Construct Taxiway

GL CHI IN HNB Huntingburg GA 15 $ 505,800.00 $ 505,800.00 $ - Extend Runway - 09/27

GL CHI IN IWH Wabash Municipal GA 15 $ 300,000.00 $ 300,000.00 $ - Construct Fuel Farm

GL CHI IN 2R2 Hendricks County-Gordon Graham Field R 15 $ 221,576.00 $ 221,576.00 $ - Install Perimeter Fencing

GL CHI IN *INS State of Indiana 13 $ 165,600.00 $ 165,600.00 $ - Update State System Plan Study

GL CHI IN EKM Elkhart Municipal GA 29 $ 150,000.00 $ 150,000.00 $ -

Install Airfield Guidance Signs, Install Runway Lighting - 09/27,

Install Runway Vertical/Visual Guidance System - 09/27, Install

Taxiway Lighting

GL CHI IN PLD Portland Municipal GA 12 $ 87,957.00 $ 87,957.00 $ - Update Airport Master Plan Study

GL CHI IN RCR Fulton County GA 14 $ 150,000.00 $ 150,000.00 $ - Improve Airport Drainage

GL CHI IN LAF Purdue University GA 37 $ 898,524.00 $ - $ 898,524.00 Install Airfield Guidance Signs

GL CHI IN IND Indianapolis International P 142 $ 7,357,224.00 $ 6,457,560.00 $ 899,664.00 Rehabilitate Runway - 05L/23R, Rehabilitate Taxiway, Rehabilitate

Taxiway, Rehabilitate Taxiway

GL CHI IN JVY Clark Regional R 28 $ 3,425,000.00 $ 150,000.00 $ 3,275,000.00 Extend Runway - 18/36

GL CHI IN I83 Salem Municipal GA 16 $ 1,004,499.00 $ 150,000.00 $ 854,499.00 Construct Runway - Plan-1

GL CHI IN IND Indianapolis International P 143 $ 187,500.00 $ - $ 187,500.00 Update Miscellaneous Study

GL CHI IN I76 Peru Municipal GA 18 $ 333,360.00 $ 333,360.00 $ - Improve Fuel Farm

GL CHI IN GSH Goshen Municipal GA 15 $ 209,394.00 $ 209,394.00 $ - Update Airport Master Plan Study

GL CHI IN 05C Griffith-Merrillville R 13 $ 140,106.00 $ 140,106.00 $ - Conduct Environmental Study

GL CHI IN I22 Randolph County GA 16 $ 140,737.00 $ 140,737.00 $ - Improve Airport Drainage

GL CHI IN IMS Madison Municipal GA 18 $ 126,397.00 $ 126,397.00 $ -Acquire Land For Approaches, Rehabilitate Runway - 03/21, Wildlife

Hazard Assessments

GL CHI WI LSE La Crosse Regional P 38 $ 2,200,000.00 $ 224,089.00 $ 1,975,911.00 Rehabilitate Terminal Building

GL CHI WI MSN Dane County Regional-Truax Field P 54 $ 432,000.00 $ - $ 432,000.00 Rehabilitate Apron

GL CHI WI CWA Central Wisconsin P 44 $ 541,972.00 $ 541,972.00 $ - Rehabilitate Access Road

GL CHI WI ATW Outagamie County Regional P 49 $ 65,250.00 $ 65,250.00 $ - Conduct Environmental Study, Wildlife Hazard Assessments

GL CHI WI MKE General Mitchell International P 81 $ 150,494.00 $ - $ 150,494.00 Install Perimeter Fencing

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 15 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL CHI WI MSN Dane County Regional-Truax Field P 53 $ 435,600.00 $ - $ 435,600.00 Conduct Environmental Study

GL CHI WI *WIB Wisconsin State Block Grant Program 76 $ 916,894.00 $ - $ 916,894.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 75 $ 698,906.00 $ - $ 698,906.00 Non primary development projects in state block grant program

GL CHI WI MSN Dane County Regional-Truax Field P 51 $ 4,093,727.00 $ 2,350,129.00 $ 1,743,598.00 Construct Runway - 03/21

GL CHI WI MSN Dane County Regional-Truax Field P 52 $ 1,453,284.00 $ 1,453,284.00 $ -Install Runway Lighting - 18/36, Sustainable Management Plan,

Update Airport Master Plan Study

GL CHI WI EAU Chippewa Valley Regional P 38 $ 1,890,848.00 $ 1,257,166.00 $ 633,682.00 Rehabilitate Taxiway

GL CHI WI *WIB Wisconsin State Block Grant Program 71 $ 15,569,731.00 $ 15,569,731.00 $ - Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 77 $ 4,228,200.00 $ - $ 4,228,200.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 74 $ 1,470,000.00 $ - $ 1,470,000.00 Non primary development projects in state block grant program

GL CHI WI *WIB Wisconsin State Block Grant Program 73 $ 504,000.00 $ - $ 504,000.00 Non primary development projects in state block grant program

GL CHI WI MKE General Mitchell International P 83 $ 1,008,714.00 $ 1,008,714.00 $ - Install Guidance Signs, Rehabilitate Runway - 07R/25L

GL CHI WI *WIB Wisconsin State Block Grant Program 72 $ 547,870.00 $ - $ 547,870.00 Non primary development projects in state block grant program

GL CHI WI MKE General Mitchell International P 82 $ 1,668,779.00 $ 949,239.00 $ 719,540.00 Rehabilitate Runway - 13/31

GL CHI WI RHI Rhinelander-Oneida County P 37 $ 1,497,909.00 $ 1,497,909.00 $ - Construct Taxiway, Rehabilitate Runway - 09/27

GL CHI WI GRB Austin Straubel International P 47 $ 2,187,000.00 $ 2,187,000.00 $ -

Install Runway Vertical/Visual Guidance System - 06/24,

Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master

Plan Study

GL DET MI ESC Delta County P 38 $ 442,860.00 $ 442,860.00 $ -

Acquire Handicap Passenger Lift Device, Rehabilitate Runway -

09/27, Rehabilitate Runway - 18/36, Rehabilitate Taxiway,

Rehabilitate Taxiway

GL DET MI CMX Houghton County Memorial P 40 $ 856,203.00 $ 856,203.00 $ - Rehabilitate Apron

GL DET MI APN Alpena County Regional P 21 $ 123,500.00 $ 123,500.00 $ -Rehabilitate Runway - 01/19, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway

GL DET MI *MIB Michigan State Block Grant Program 94 $ 3,500,000.00 $ - $ 3,500,000.00 Non primary development projects in state block grant program

GL DET MI DTW Detroit Metropolitan Wayne County P 94 $ 9,357,639.00 $ 557,639.00 $ 8,800,000.00 Rehabilitate Taxiway

GL DET MI AZO Kalamazoo/Battle Creek International P 42 $ 3,343,654.00 $ 3,343,654.00 $ -

Extend Taxiway, Install Taxiway Lighting, Rehabilitate Apron,

Rehabilitate Runway - 05/23, Rehabilitate Runway - 17/35,

Rehabilitate Taxiway, Rehabilitate Taxiway

GL DET MI *MIB Michigan State Block Grant Program 95 $ 9,500,000.00 $ - $ 9,500,000.00 Non primary development projects in state block grant program

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 16 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DET MI FNT Bishop International P 55 $ 4,387,392.00 $ 4,387,392.00 $ -

Install Runway Incursion Marking (14 CFR Part 139), Rehabilitate

Runway - 18/36, Rehabilitate Runway Lighting - 18/36, Remove

Obstructions

GL DET MI DTW Detroit Metropolitan Wayne County P 111 $ 4,621,620.00 $ 4,621,620.00 $ - Conduct Metropolitan System Plan Study

GL DET MI MKG Muskegon County P 39 $ 1,162,578.00 $ 1,162,578.00 $ - Construct Access Road, Rehabilitate Apron

GL DET MI LAN Capital Region International P 54 $ 652,400.00 $ 652,400.00 $ -Conduct Environmental Study, Rehabilitate Taxiway, Update Airport

Master Plan Study

GL DET MI GRR Gerald R Ford International P 52 $ 3,987,379.00 $ 3,987,379.00 $ - Expand Terminal Building, Rehabilitate Runway - 08L/26R

GL DET MI TVC Cherry Capital P 40 $ 1,474,992.00 $ 1,474,992.00 $ -Construct Taxiway, Install Runway Incursion Marking (14 CFR Part

139), Rehabilitate Runway - 18/36

GL DET MI *MIB Michigan State Block Grant Program 92 $ 17,956,529.00 $ 17,956,529.00 $ - Non primary development projects in state block grant program

GL DET MI MBS MBS International P 50 $ 748,175.00 $ 748,175.00 $ - Rehabilitate Apron

GL DET MI *MIB Michigan State Block Grant Program 93 $ 3,459,900.00 $ - $ 3,459,900.00 Non primary development projects in state block grant program

GL DET MI CVX Charlevoix Municipal P 19 $ 86,400.00 $ 86,400.00 $ -Groove Runway - 09/27, Rehabilitate Runway Lighting - 09/27,

Remove Obstructions

GL DET MI SAW Sawyer International P 39 $ 702,900.00 $ 702,900.00 $ -

Install Perimeter Fencing required by 14 CFR 139, Rehabilitate

Runway - 01/19, Rehabilitate Taxiway, Update Airport Master Plan

Study

GL DET MI CIU Chippewa County International P 36 $ 71,250.00 $ 71,250.00 $ - Acquire Snow Removal Equipment

GL DET OH CMH Port Columbus International P 83 $ 2,696,206.00 $ - $ 2,696,206.00 VALE Infrastructure

GL DET OH MFD Mansfield Lahm Regional GA 29 $ 4,435,334.00 $ 374,110.00 $ 4,061,224.00 Construct Taxiway, Install Runway Distance-To-Go Signs - 05/23,

Rehabilitate Runway - 05/23

GL DET OH 3G3 Wadsworth Municipal GA 17 $ 83,565.00 $ 83,565.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway

GL DET OH AXV Neil Armstrong GA 17 $ 180,000.00 $ 180,000.00 $ - Improve Airport Drainage, Improve Terminal Building

GL DET OH I43 James A Rhodes GA 11 $ 185,116.00 $ 185,116.00 $ - Acquire Land for Development

GL DET OH PMH Greater Portsmouth Regional GA 18 $ 240,106.00 $ 240,106.00 $ - Rehabilitate Apron, Rehabilitate Runway - 18/36

GL DET OH FDY Findlay GA 25 $ 149,514.00 $ 149,514.00 $ - Rehabilitate Runway - 18/36

GL DET OH OWX Putnam County GA 10 $ 34,587.00 $ 34,587.00 $ - Rehabilitate Runway - 09/27, Rehabilitate Taxiway

GL DET OH I74 Grimes Field GA 20 $ 150,076.00 $ 150,076.00 $ - Rehabilitate Taxiway

GL DET OH SCA Sidney Municipal GA 20 $ 148,551.00 $ 148,551.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway - 05/23,

Rehabilitate Taxiway

GL DET OH GAS Gallia-Meigs Regional GA 13 $ 1,082,322.00 $ 1,082,322.00 $ - Rehabilitate Runway - 05/23

GL DET OH CGF Cuyahoga County R 25 $ 9,099,116.00 $ 450,000.00 $ 8,649,116.00 Rehabilitate Runway - 06/24

GL DET OH CMH Port Columbus International P 81 $ 11,523,456.00 $ 1,523,456.00 $ 10,000,000.00 Construct Runway - 10R/28L

GL DET OH CLE Cleveland-Hopkins International P 106 $ 1,125,000.00 $ - $ 1,125,000.00 VALE Infrastructure

GL DET OH POV Portage County GA 27 $ 353,000.00 $ 353,000.00 $ - Rehabilitate Runway - 09/27

GL DET OH 5A1 Norwalk-Huron County GA 8 $ 256,068.00 $ 256,068.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -

10/28, Rehabilitate Taxiway, Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 17 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DET OH 1G3 Kent State University GA 15 $ 188,172.00 $ 188,172.00 $ - Rehabilitate Runway - 01/19

GL DET OH 4G5 Monroe County GA 14 $ 217,246.00 $ 217,246.00 $ - Acquire Land For Approaches, Rehabilitate Taxiway

GL DET OH UYF Madison County GA 18 $ 493,070.00 $ 493,070.00 $ - Construct Building, Construct Taxiway, Wildlife Hazard Assessments

GL DET OH FZI Fostoria Metropolitan GA 15 $ 164,381.00 $ 164,381.00 $ -Improve Airport Drainage, Install Runway Vertical/Visual Guidance

System - 09/27

GL DET OH I19 Greene County-Lewis A Jackson Regional GA 21 $ 1,237,977.00 $ 1,237,977.00 $ -Improve Runway Safety Area, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway

GL DET OH 10G Holmes County GA 13 $ 67,680.00 $ 67,680.00 $ - Conduct Miscellaneous Study, Wildlife Hazard Assessments

GL DET OH LCK Rickenbacker International P 41 $ 839,683.00 $ 839,683.00 $ - Acquire Snow Removal Equipment

GL DET OH CMH Port Columbus International P 82 $ 11,733,833.00 $ - $ 11,733,833.00 Rehabilitate Runway - 10L/28R

GL DET OH VTA Newark-Heath GA 26 $ 216,902.00 $ 216,902.00 $ - Acquire Land For Approaches

GL DET OH CDI Cambridge Municipal GA 14 $ 1,233,202.00 $ 1,233,202.00 $ - Rehabilitate Runway - 04/22

GL DET OH UNI Ohio University GA 20 $ 2,290,897.00 $ 2,290,897.00 $ - Rehabilitate Runway - 07/25

GL DET OH LNN Willoughby Lost Nation Municipal R 12 $ 394,812.00 $ 394,812.00 $ - Rehabilitate Runway - 05/23

GL DET OH MRT Union County GA 22 $ 35,438.00 $ 35,438.00 $ - Install Runway Vertical/Visual Guidance System

GL DET OH MGY Dayton-Wright Brothers R 17 $ 219,341.00 $ 219,341.00 $ - Rehabilitate Runway - 02/20

GL DET OH 1G0 Wood County GA 26 $ 143,235.00 $ 143,235.00 $ - Install Airport Beacons, Rehabilitate Taxiway

GL DET OH TDZ Toledo Executive R 26 $ 99,000.00 $ 99,000.00 $ - Install Runway Vertical/Visual Guidance System - 14/32

GL DET OH YNG Youngstown-Warren Regional P 43 $ 4,757,785.00 $ 3,510,531.00 $ 1,247,254.00 Construct Taxiway, Expand Apron, Install Guidance Signs, Install

Runway Distance-To-Go Signs - 14/32, Runway Incursion Markings

GL DET OH I66 Clinton Field GA 10 $ 470,198.00 $ 470,198.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate

Runway - 03/21

GL DET OH 7G8 Geauga County GA 18 $ 249,660.00 $ 249,660.00 $ - Rehabilitate Apron

GL DET OH LHQ Fairfield County GA 25 $ 176,332.00 $ 176,332.00 $ -Install Runway Vertical/Visual Guidance System, Wildlife Hazard

Assessments

GL DET OH I40 Richard Downing GA 20 $ 141,000.00 $ 141,000.00 $ - Rehabilitate Taxiway

GL DET OH TOL Toledo Express P 76 $ 131,850.00 $ 131,850.00 $ - Conduct Miscellaneous Study, Wildlife Hazard Assessments

GL DET OH CLE Cleveland-Hopkins International P 104 $ 2,332,214.00 $ - $ 2,332,214.00 Construct Taxiway, Construct Taxiway

GL DET OH DLZ Delaware Municipal - Jim Moore Field GA 21 $ 4,250,949.00 $ 17,408.00 $ 4,233,541.00 Extend Runway - 10/28, Rehabilitate Runway - 10/28, Rehabilitate

Taxiway

GL DET OH BJJ Wayne County GA 22 $ 1,719,772.00 $ 1,719,772.00 $ - Rehabilitate Runway - 10/28

GL DET OH AOH Lima Allen County GA 17 $ 404,860.00 $ 404,860.00 $ - Construct Snow Removal Equipment Building

GL DET OH LNN Willoughby Lost Nation Municipal R 11 $ 392,800.00 $ 392,800.00 $ - Update Airport Master Plan Study, Wildlife Hazard Assessments

GL DET OH OSU Ohio State University R 30 $ 452,431.00 $ 452,431.00 $ - Rehabilitate Apron

GL DET OH ZZV Zanesville Municipal GA 14 $ 119,980.00 $ 119,980.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments

GL DET OH I23 Fayette County GA 10 $ 665,875.00 $ 665,875.00 $ - Rehabilitate Runway - 05/23

GL DET OH DAY James M Cox Dayton International P 82 $ 3,957,179.00 $ 3,957,179.00 $ - Environmental Mitigation, Rehabilitate Apron

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 18 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DET OH CLE Cleveland-Hopkins International P 107 $ 2,147,498.00 $ 2,147,498.00 $ - Construct Runway - 06L/24R

GL DET OH 3T7 Middle Bass Island GA 17 $ 76,595.00 $ 76,595.00 $ - Acquire Snow Removal Equipment, Wildlife Hazard Assessments

GL DET OH USE Fulton County GA 13 $ 104,210.00 $ 104,210.00 $ - Install Runway Vertical/Visual Guidance System - 09/27

GL DET OH PCW Erie-Ottawa International GA 33 $ 194,358.00 $ 194,358.00 $ - Construct Taxiway

GL DET OH SGH Springfield-Beckley Municipal GA 23 $ 44,527.00 $ 44,527.00 $ -Rehabilitate Runway - 06/24, Rehabilitate Runway - 15/33,

Rehabilitate Taxiway, Rehabilitate Taxiway

GL DET OH OXD Miami University GA 11 $ 44,110.00 $ 44,110.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments

GL DET OH 1G5 Medina Municipal R 13 $ 90,315.00 $ 90,315.00 $ - Rehabilitate Apron

GL DET OH CAK Akron-Canton Regional P 61 $ 6,506,171.00 $ 6,506,171.00 $ -Construct Sand and Chemical Storage Building, Expand Access Road,

Expand Terminal Building, Rehabilitate Taxiway

GL DET OH VNW Van Wert County GA 17 $ 109,350.00 $ 109,350.00 $ - Construct Apron, Construct Taxiway

GL DET OH I67 Cincinnati West GA 13 $ 179,356.00 $ 179,356.00 $ -Install Runway Vertical/Visual Guidance System - 01/19, Wildlife

Hazard Assessments

GL DET OH PHD Harry Clever Field GA 12 $ 237,794.00 $ 237,794.00 $ - Install Miscellaneous NAVAIDS, Update Airport Master Plan Study

GL DET OH TZR Bolton Field R 23 $ 480,822.00 $ 480,822.00 $ - Rehabilitate Apron, Update Miscellaneous Study

GL DET OH CYO Pickaway County Memorial GA 14 $ 179,550.00 $ 179,550.00 $ - Update Airport Master Plan Study

GL DET OH HZY Northeast Ohio Regional GA 14 $ 903,418.00 $ 447,906.00 $ 455,512.00 Rehabilitate Runway - 09/27

GL DET OH 8G6 Harrison County GA 12 $ 57,031.00 $ 57,031.00 $ -Install Airport Beacons, Rehabilitate Runway - 13/31, Wildlife

Hazard Assessments

GL DET OH 4I3 Knox County GA 16 $ 435,945.00 $ 435,945.00 $ -Improve Airport Drainage, Rehabilitate Parking Lot, Rehabilitate

Taxiway

GL DET OH MNN Marion Municipal GA 23 $ 110,171.00 $ 110,171.00 $ - Rehabilitate Access Road, Wildlife Hazard Assessments

GL DET OH 16G Seneca County GA 11 $ 310,600.00 $ 310,600.00 $ - Acquire Land For Approaches, Wildlife Hazard Assessments

GL DMA MN HIB Range Regional P 36 $ 2,950,659.00 $ 513,120.00 $ 2,437,539.00 Rehabilitate Apron

GL DMA MN OTG Worthington Municipal GA 13 $ 1,001,282.00 $ 604,904.00 $ 396,378.00 Extend Taxiway

GL DMA MN JMR Mora Municipal GA 10 $ 125,086.00 $ 125,086.00 $ - Construct Runway - Plan-1

GL DMA MN MKT Mankato Regional GA 22 $ 417,613.00 $ 417,613.00 $ - Rehabilitate Taxiway

GL DMA MN FFM Fergus Falls Municipal-Einar Mickelson Field GA 12 $ 166,057.00 $ 166,057.00 $ - Rehabilitate Taxiway

GL DMA MN BDE Baudette International GA 14 $ 249,086.00 $ 249,086.00 $ - Conduct Airport Master Plan Study, Rehabilitate Runway - 12/30

GL DMA MN LYV Quentin Aanenson Field GA 12 $ 177,245.00 $ 177,245.00 $ -Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway -

18/36, Rehabilitate Taxiway

GL DMA MN JKJ Moorhead Municipal GA 10 $ 32,040.00 $ 32,040.00 $ - Construct Building

GL DMA MN CFE Buffalo Municipal GA 12 $ 44,150.00 $ 44,150.00 $ -Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate

Taxiway

GL DMA MN ELO Ely Municipal GA 15 $ 58,500.00 $ 58,500.00 $ - Conduct Environmental Study

GL DMA MN FCM Flying Cloud R 18 $ 506,372.00 $ 300,000.00 $ 206,372.00 Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 19 of 57�

an Field

Newstrom Field

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DMA MN CKC Grand Marais/Cook County GA 15 $ 2,607,953.00 $ 150,000.00 $ 2,457,953.00 Extend Runway - 09/27

GL DMA MN STC St. Cloud Regional P 27 $ 3,387,032.00 $ 1,860,000.00 $ 1,527,032.00 Extend Runway - 13/31

GL DMA MN TKC Tracy Municipal GA 8 $ 178,881.00 $ 178,881.00 $ - Rehabilitate Runway Lighting - 11/29

GL DMA MN RWF Redwood Falls Municipal GA 14 $ 162,953.00 $ 162,953.00 $ - Acquire Land For Approaches

GL DMA MN AUM Austin Municipal GA 13 $ 210,651.00 $ 210,651.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DMA MN AIT Aitkin Municipal-Steve Kurtz Field GA 15 $ 426,371.00 $ 426,371.00 $ -Construct Taxiway, Rehabilitate Runway - 16/34, Rehabilitate

Taxiway

GL DMA MN D39 Sauk Centre Municipal GA 6 $ 80,100.00 $ 80,100.00 $ - Conduct Environmental Study

GL DMA MN AXN Chandler Field GA 12 $ 68,273.00 $ 68,273.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -

04/22, Rehabilitate Taxiway

GL DMA MN MML Southwest Minnesota Regional Marshall/Ry GA 14 $ 322,200.00 $ 322,200.00 $ - Update Airport Master Plan Study

GL DMA MN FRM Fairmont Municipal GA 14 $ 52,802.00 $ 52,802.00 $ - Rehabilitate Taxiway

GL DMA MN GPZ Grand Rapids/Itasca County Airport-Gordon GA 19 $ 466,947.00 $ 466,947.00 $ -

Conduct Airport Master Plan Study, Rehabilitate Runway - 16/34,

Rehabilitate Runway - 05/23, Rehabilitate Taxiway, Remove

Obstructions

GL DMA MN 04Y Hawley Municipal GA 9 $ 186,447.00 $ 186,447.00 $ - Rehabilitate Taxiway

GL DMA MN ANE Anoka County-Blaine Airport(Janes Field) R 13 $ 252,178.00 $ 252,178.00 $ - Install Airfield Guidance Signs, Install Taxiway Lighting

GL DMA MN PNM Princeton Municipal GA 11 $ 84,787.00 $ 84,787.00 $ -Construct Taxiway, Rehabilitate Runway - 15/33, Rehabilitate

Taxiway

GL DMA MN ROS Rush City Regional GA 7 $ 1,155,434.00 $ 1,155,434.00 $ -

Acquire Snow Removal Equipment, Acquire Snow Removal

Equipment, Install Miscellaneous NAVAIDS, Rehabilitate Runway -

16/34, Rehabilitate Taxiway

GL DMA MN CKN Crookston Municipal Kirkwood Field GA 11 $ 37,502.00 $ 37,502.00 $ -Construct Fuel Farm, Improve Access Road, Rehabilitate Apron,

Rehabilitate Apron, Rehabilitate Taxiway

GL DMA MN BJI Bemidji Regional P 31 $ 546,535.00 $ 546,535.00 $ -

Construct Snow Removal Equipment Building, Construct Taxiway,

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA MN INL Falls International-Einarson Field P 28 $ 421,519.00 $ 421,519.00 $ -

Install Guidance Signs, Rehabilitate Apron, Rehabilitate Runway -

04/22, Rehabilitate Runway - 13/31, Rehabilitate Taxiway,

Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway,

Rehabilitate Taxiway, Rehabilitate Taxiway, Wildlife Hazard

Assessments

GL DMA MN BRD Brainerd Lakes Regional P 40 $ 599,760.00 $ 599,760.00 $ - Conduct Airport Master Plan Study, Conduct Environmental Study

GL DMA MN OWA Owatonna Degner Regional GA 18 $ 210,707.00 $ 210,707.00 $ - Rehabilitate Taxiway

GL DMA MN ACQ Waseca Municipal GA 11 $ 290,520.00 $ 290,520.00 $ - Conduct Airport Master Plan Study

GL DMA MN PKD Park Rapids Municipal-Konshok Field GA 14 $ 391,500.00 $ 391,500.00 $ - Conduct Airport Master Plan Study, Rehabilitate Taxiway

GL DMA MN HCO Hallock Municipal GA 7 $ 229,210.00 $ 229,210.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA MN LXL Little Falls/Morrison County-Lindbergh Field GA 16 $ 210,773.00 $ 210,773.00 $ - Acquire Land For Approaches

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 20 of 57�

ield

mberlain

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DMA MN TVF Thief River Falls Regional GA 19 $ 110,250.00 $ 110,250.00 $ - Conduct Environmental Study

GL DMA MN CQM Cook Municipal GA 9 $ 25,002.00 $ 25,002.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA MN SGS South St Paul Municipal-Richard E Fleming F R 16 $ 839,862.00 $ 839,862.00 $ -Acquire Land For Approaches, Light Obstructions, Remove

Obstructions, Remove Obstructions

GL DMA MN GYL Glencoe Municipal GA 4 $ 1,832,631.00 $ 1,832,631.00 $ -Acquire Land for Development, Construct Taxiway, Rehabilitate

Apron

GL DMA MN STP St Paul Downtown Holman Field R 23 $ 662,304.00 $ 150,000.00 $ 512,304.00 Rehabilitate Taxiway, Rehabilitate Taxiway

GL DMA MN MZH Moose Lake Carlton County GA 6 $ 250,154.00 $ 250,154.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -

04/22

GL DMA MN ETH Wheaton Municipal GA 7 $ 1,229,671.00 $ 1,229,671.00 $ - Construct Building, Construct Taxiway

GL DMA MN ROX Roseau Municipal/Rudy Billberg Field GA 10 $ 340,921.00 $ 340,921.00 $ - Update Airport Master Plan Study

GL DMA MN FBL Faribault Municipal GA 12 $ 626,698.00 $ 626,698.00 $ - Rehabilitate Taxiway

GL DMA MN ORB Orr Regional GA 9 $ 25,042.00 $ 25,042.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA MN HCD Hutchinson Municipal-Butler Field GA 16 $ 2,154,164.00 $ 2,154,164.00 $ -

Construct Taxiway, Improve Runway Safety Area - 15/33,

Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate

Taxiway

GL DMA MN RST Rochester International P 35 $ 1,475,713.00 $ 1,475,713.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Modify Terminal

Building, Rehabilitate Taxiway

GL DMA MN LJF Litchfield Municipal GA 11 $ 2,343,582.00 $ 1,064,225.00 $ 1,279,357.00 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway -

13/31, Rehabilitate Taxiway

GL DMA MN FKA Fillmore County GA 11 $ 207,603.00 $ 207,603.00 $ - Acquire Snow Removal Equipment, Widen Taxiway

GL DMA MN 3N8 Mahnomen County GA 14 $ 640,721.00 $ 640,721.00 $ - Construct Building

GL DMA MN SBU Blue Earth Municipal GA 12 $ 408,583.00 $ 408,583.00 $ - Rehabilitate Taxiway

GL DMA MN 12Y Le Sueur Municipal GA 11 $ 548,775.00 $ 548,775.00 $ - Acquire Land For Approaches

GL DMA MN Y49 Walker Municipal GA 10 $ 33,345.00 $ 33,345.00 $ -Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate

Taxiway

GL DMA MN VVV Ortonville Municipal-Martinson Field GA 11 $ 51,964.00 $ 51,964.00 $ - Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Taxiway

GL DMA MN 14Y Todd Field GA 9 $ 122,396.00 $ 122,396.00 $ - Conduct Environmental Study

GL DMA MN MSP Minneapolis-St Paul International/Wold-Cha P 112 $ 5,022,119.00 $ 5,022,119.00 $ - Rehabilitate Apron

GL DMA MN CBG Cambridge Municipal GA 10 $ 226,080.00 $ 226,080.00 $ - Update Airport Master Plan Study

GL DMA MN RGK Red Wing Regional GA 13 $ 264,881.00 $ 264,881.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

GL DMA MN DTL Detroit Lakes-Wething Field GA 11 $ 266,268.00 $ 266,268.00 $ - Update Airport Master Plan Study

GL DMA MN DYT Sky Harbor GA 10 $ 111,285.00 $ 111,285.00 $ - Install Perimeter Fencing

GL DMA MN DLH Duluth International P 58 $ 773,992.00 $ 773,992.00 $ -Acquire Snow Removal Equipment, Acquire Snow Removal

Equipment

GL DMA MN RRT Warroad International Memorial GA 15 $ 772,681.00 $ 260,562.00 $ 512,119.00 Install Perimeter Fencing

GL DMA MN DLH Duluth International P 59 $ 11,998,801.00 $ 273,138.00 $ 11,725,663.00 Rehabilitate Runway - 09/27

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 21 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DMA MN JYG St James Municipal GA 13 $ 696,895.00 $ 696,895.00 $ -Rehabilitate Runway Lighting - 15/33, Update Airport Master Plan

Study

GL DMA MN 21D Lake Elmo R 10 $ 448,764.00 $ 448,764.00 $ - Rehabilitate Taxiway

GL DMA MN FSE Fosston Municipal GA 8 $ 55,558.00 $ 55,558.00 $ -Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate

Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway

GL DMA MN XVG Longville Municipal GA 11 $ 179,425.00 $ 179,425.00 $ - Construct Taxiway, Rehabilitate Runway - 13/31

GL DMA MN Y63 Elbow Lake Municipal - Pride of the Prairie GA 7 $ 911,479.00 $ 911,479.00 $ - Construct Building

GL DMA MN AEL Albert Lea Municipal GA 16 $ 90,702.00 $ 90,702.00 $ - Conduct Environmental Study

GL DMA ND D60 Tioga Municipal GA 8 $ 4,582,521.00 $ 523,442.00 $ 4,059,079.00 Construct Apron, Construct Taxiway

GL DMA ND 3H4 Hillsboro Municipal GA 13 $ 734,604.00 $ 734,604.00 $ - Acquire Land for Development

GL DMA ND K74 Robert Odegaard Field GA 15 $ 146,940.00 $ 146,940.00 $ -Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate

Taxiway

GL DMA ND D57 Glen Ullin Regional GA 13 $ 97,200.00 $ 97,200.00 $ - Rehabilitate Runway - 11/29

GL DMA ND JMS Jamestown Regional GA 39 $ 110,700.00 $ 110,700.00 $ - Environmental Mitigation

GL DMA ND MOT Minot International P 50 $ 842,409.00 $ 842,409.00 $ - Update Airport Master Plan Study

GL DMA ND K74 Robert Odegaard Field GA 14 $ 118,688.00 $ 118,688.00 $ - Conduct Environmental Study

GL DMA ND 3P3 Mott Municipal GA 13 $ 360,000.00 $ 360,000.00 $ -Construct Parking Lot, Improve Access Road, Rehabilitate Apron,

Rehabilitate Runway - 10/28, Rehabilitate Taxiway

GL DMA ND 2D5 Oakes Municipal GA 10 $ 53,316.00 $ 53,316.00 $ - Improve Access Road

GL DMA ND DVL Devils Lake Regional CS 33 $ 475,530.00 $ 150,000.00 $ 325,530.00 Construct Runway Safety Area - 13/31

GL DMA ND HZE Mercer County Regional GA 12 $ 419,400.00 $ 419,400.00 $ -Construct Apron, Improve Building, Rehabilitate Apron, Rehabilitate

Runway - 14/32, Rehabilitate Taxiway

GL DMA ND 5C8 Washburn Municipal GA 14 $ 668,995.00 $ 668,995.00 $ - Construct Apron, Widen Taxiway

GL DMA ND ISN Sloulin Field International P 39 $ 944,914.00 $ 944,914.00 $ -Acquire Friction Measuring Equipment, Install Instrument Approach

Aid - Plan-1, Rehabilitate Apron, Rehabilitate Taxiway

GL DMA ND BIS Bismarck Municipal P 56 $ 594,000.00 $ 594,000.00 $ - Rehabilitate Runway - 13/31

GL DMA ND BIS Bismarck Municipal P 55 $ 863,739.00 $ 863,739.00 $ - Update Airport Master Plan Study

GL DMA ND HBC Mohall Municipal GA 11 $ 1,075,019.00 $ 167,785.00 $ 907,234.00 Construct Apron, Extend Taxiway

GL DMA ND D05 Garrison Municipal GA 12 $ 2,311,330.00 $ 567,302.00 $ 1,744,028.00 Rehabilitate Runway - 13/31

GL DMA ND +09N New 1 $ 27,000,000.00 $ 381,686.00 $ 26,618,314.00 Construct New Airport

GL DMA ND Y19 Mandan Municipal GA 20 $ 1,152,000.00 $ 1,152,000.00 $ - Construct Taxiway

GL DMA ND 3H4 Hillsboro Municipal GA 14 $ 433,547.00 $ 433,547.00 $ -

Construct Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate

Runway - 16/34, Rehabilitate Runway Lighting - 16/34, Rehabilitate

Taxiway Lighting

GL DMA ND MOT Minot International P 51 $ 210,150.00 $ 210,150.00 $ - Improve Airport Drainage

GL DMA ND MOT Minot International P 49 $ 828,131.00 $ 828,131.00 $ - Rehabilitate Runway - 13/31

GL DMA ND Y74 Parshall-Hankins GA 10 $ 63,031.00 $ 63,031.00 $ - Construct Building

GL DMA ND BIS Bismarck Municipal P 54 $ 1,890,000.00 $ 564,692.00 $ 1,325,308.00 Environmental Mitigation

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 22 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 35 $ 630,000.00 $ 533,800.00 $ 96,200.00 Rehabilitate Taxiway

GL DMA ND D09 Bottineau Municipal GA 13 $ 317,903.00 $ 317,903.00 $ - Acquire Snow Removal Equipment

GL DMA ND S32 Cooperstown Municipal GA 11 $ 311,364.00 $ 311,364.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

GL DMA ND 5H4 Harvey Municipal GA 12 $ 46,640.00 $ 46,640.00 $ -

Install Airfield Guidance Signs, Install Airport Beacons, Install

Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 11/29,

Rehabilitate Taxiway Lighting

GL DMA ND D50 Crosby Municipal GA 11 $ 59,310.00 $ 59,310.00 $ - Rehabilitate Apron, Rehabilitate Runway - 12/30

GL DMA ND GFK Grand Forks International P 48 $ 970,277.00 $ 970,277.00 $ -Rehabilitate Runway Lighting - 17L/35R, Rehabilitate Taxiway

Lighting

GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 34 $ 563,400.00 $ - $ 563,400.00 Conduct Environmental Study

GL DMA ND 7K5 Kenmare Municipal GA 12 $ 355,997.00 $ 355,997.00 $ -Install Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDS,

Rehabilitate Runway Lighting - 08/26

GL DMA ND HEI Hettinger Municipal GA 13 $ 2,902,500.00 $ 94,927.00 $ 2,807,573.00 Rehabilitate Runway - 12/30

GL DMA ND Y37 Park River - W C Skjerven Field GA 9 $ 55,815.00 $ 55,815.00 $ - Construct Building

GL DMA ND 7L2 Linton Municipal GA 14 $ 1,638,000.00 $ 1,638,000.00 $ - Construct Taxiway, Construct Taxiway, Rehabilitate Runway - 09/27

GL DMA ND 4.00E+07 Ellendale Municipal GA 8 $ 413,100.00 $ 413,100.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 13/31, Rehabilitate Runway Lighting - 13/31

GL DMA ND D55 Robertson Field GA 11 $ 128,687.00 $ 128,687.00 $ -

Install Airfield Guidance Signs, Install Runway Lighting - 14/32,

Install Runway Vertical/Visual Guidance System - 14/32, Install

Taxiway Lighting, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DMA ND 51D Edgeley Municipal GA 14 $ 63,926.00 $ 63,926.00 $ -Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate

Taxiway

GL DMA ND *NDS State of North Dakota 13 $ 441,756.00 $ 441,756.00 $ - Update Miscellaneous Study

GL DMA ND JMS Jamestown Regional GA 40 $ 33,300.00 $ 33,300.00 $ - Rehabilitate Taxiway

GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 33 $ 466,200.00 $ 466,200.00 $ - Extend Runway Safety Area - 14/32

GL DMA ND DVL Devils Lake Regional CS 34 $ 76,508.00 $ - $ 76,508.00 Wildlife Hazard Assessments

GL DMA ND FAR Hector International P 45 $ 7,482,809.00 $ 2,892,907.00 $ 4,589,902.00 Rehabilitate Taxiway

GL DMA ND BWP Harry Stern GA 19 $ 211,173.00 $ 211,173.00 $ - Construct Taxiway, Improve Airport Drainage, Rehabilitate Taxiway

GL DMA ND 20U Beach GA 11 $ 49,571.00 $ 49,571.00 $ -Construct Taxiway, Improve Access Road, Rehabilitate Apron,

Rehabilitate Runway - 12/30

GL DMA ND GFK Grand Forks International P 49 $ 732,452.00 $ 732,452.00 $ - Update Airport Master Plan Study

GL DMA ND 08D Stanley Municipal GA 13 $ 73,357.00 $ 73,357.00 $ - Expand Apron, Extend Taxiway

GL DMA SD HON Huron Regional GA 33 $ 1,407,312.00 $ 1,197,794.00 $ 209,518.00 Construct Runway - 12/30

GL DMA SD MDS Madison Municipal GA 12 $ 196,979.00 $ 196,979.00 $ -Construct Taxiway, Environmental Mitigation, Install Perimeter

Fencing not Required by 14 CFR 139/49 CFR 1542

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 23 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

GL DMA SD 4P3 Flandreau Municipal GA 8 $ 225,000.00 $ 225,000.00 $ - Construct Snow Removal Equipment Building

GL DMA SD 9V9 Chamberlain Municipal GA 8 $ 1,375,390.00 $ 1,375,390.00 $ - Environmental Mitigation

GL DMA SD YKN Chan Gurney Municipal GA 26 $ 63,805.00 $ 63,805.00 $ - Conduct Environmental Study

GL DMA SD FSD Joe Foss Field P 49 $ 6,092,415.00 $ 4,661,426.00 $ 1,430,989.00 Rehabilitate Runway - 03/21, Rehabilitate Taxiway

GL DMA SD MHE Mitchell Municipal GA 26 $ 225,000.00 $ 225,000.00 $ - Rehabilitate Access Road, Rehabilitate Parking Lot

GL DMA SD 9D0 Highmore Municipal GA 7 $ 58,410.00 $ 58,410.00 $ - Construct Taxiway

GL DMA SD HSR Hot Springs Municipal GA 11 $ 67,950.00 $ 67,950.00 $ - Construct Taxiway

GL DMA SD AGZ Wagner Municipal GA 11 $ 33,500.00 $ 33,500.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL DMA SD 3FU Faulkton Municipal GA 9 $ 270,000.00 $ 270,000.00 $ - Extend Taxiway

GL DMA SD ABR Aberdeen Regional P 35 $ 2,268,000.00 $ 602,612.00 $ 1,665,388.00 Environmental Mitigation

GL DMA SD PIR Pierre Regional P 35 $ 1,460,000.00 $ 1,309,393.00 $ 150,607.00 Rehabilitate Apron

GL DMA SD 9D1 Gregory Municipal - Flynn Field GA 12 $ 540,000.00 $ 540,000.00 $ - Expand Apron

GL DMA SD *SDV Various Locations in South Dakota 21 $ 990,000.00 $ 990,000.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway

GL DMA SD 7G9 Canton Municipal GA 5 $ 33,533.00 $ 33,533.00 $ - Wildlife Hazard Assessments

GL DMA SD *SDS State of South Dakota 7 $ 135,000.00 $ 135,000.00 $ - Conduct State System Plan Study

GL DMA SD VMR Harold Davidson Field GA 11 $ 40,000.00 $ 40,000.00 $ - Rehabilitate Apron

GL DMA SD 9F8 Hoven Municipal GA 9 $ 1,570,000.00 $ 1,570,000.00 $ - Rehabilitate Runway - 13/31

GL DMA SD 9V6 Martin Municipal GA 10 $ 35,000.00 $ 35,000.00 $ - Wildlife Hazard Assessments

GL DMA SD BKX Brookings Regional GA 27 $ 135,000.00 $ 135,000.00 $ - Acquire Snow Removal Equipment

GL DMA SD ATY Watertown Regional CS 29 $ 270,000.00 $ 270,000.00 $ - Extend Taxiway

GL DMA SD RAP Rapid City Regional P 47 $ 2,940,000.00 $ 2,940,000.00 $ -

Acquire Snow Removal Equipment, Install Runway Vertical/Visual

Guidance System - 05/23, Install Runway Vertical/Visual Guidance

System - 14/32, Rehabilitate Apron

NE ANE CT BDR Igor I Sikorsky Memorial GA 31 $ 121,140.00 $ 121,140.00 $ - Construct Runway Safety Area - 06/24

NE ANE CT *CTV Various Locations in Connecticut 11 $ 339,726.00 $ 339,726.00 $ - Update State System Plan Study

NE ANE CT GON Groton-New London GA 29 $ 114,979.00 $ 114,979.00 $ - Install Perimeter Fencing

NE ANE CT BDL Bradley International P 61 $ 4,202,352.00 $ 3,233,487.75 $ 968,864.25 Rehabilitate Taxiway, Rehabilitate Taxiway

NE ANE CT DXR Danbury Municipal R 40 $ 90,000.00 $ 90,000.00 $ - Install Runway Vertical/Visual Guidance System - 08/26

NE ANE CT 4B8 Robertson Field R 7 $ 91,350.00 $ 91,350.00 $ - Conduct Miscellaneous Study

NE ANE CT 4B8 Robertson Field R 8 $ 186,120.00 $ 186,120.00 $ - Remove Obstructions

NE ANE CT MMK Meriden Markham Municipal GA 18 $ 108,549.00 $ 108,549.00 $ - Update Airport Master Plan Study

NE ANE CT HFD Hartford-Brainard R 17 $ 99,321.00 $ 99,321.00 $ - Install Perimeter Fencing

NE ANE CT HVN Tweed-New Haven P 44 $ 669,842.00 $ 669,842.00 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

NE ANE CT BDR Igor I Sikorsky Memorial GA 32 $ 10,816,213.00 $ 1,635,833.00 $ 9,180,380.00 Rehabilitate Runway - 06/24

NE ANE CT GON Groton-New London GA 30 $ 181,085.00 $ 181,085.00 $ - Rehabilitate Runway - 15/33

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 24 of 57�

al

eld

al

al

eld

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NE ANE MA PYM Plymouth Municipal GA 43 $ 7,432,200.00 $ 299,466.80 $ 7,132,733.20

Extend Runway [Phase I - Extension Rwy 33 end] - 15/33, Extend

Runway [Phase II - Parallel Taxiway Extension] - 15/33, Extend

Runway [Phase III - Obstruction Removal Rwy 33 end approach] -

15/33, Extend Runway [Phase IV - Mitigation] - 15/33

NE ANE MA BOS General Edward Lawrence Logan Internation P 123 $ 8,122,482.00 $ - $ 8,122,482.00 Rehabilitate Taxiway

NE ANE MA HYA Barnstable Municipal-Boardman/Polando Fi P 62 $ 221,400.00 $ 221,400.00 $ - Remove Obstructions

NE ANE MA FIT Fitchburg Municipal GA 25 $ 675,000.00 $ 150,000.00 $ 525,000.00 Remove Obstructions

NE ANE MA BOS General Edward Lawrence Logan Internation P 121 $ 5,168,493.00 $ 5,168,493.00 $ - Improve Runway Safety Area - 04L/22R

NE ANE MA BVY Beverly Municipal R 34 $ 714,600.00 $ 300,000.00 $ 414,600.00 Install Guidance Signs, Install Runway Vertical/Visual Guidance

System - 09/27, Install Taxiway Lighting

NE ANE MA ORH Worcester Regional CS 49 $ 2,736,305.00 $ - $ 2,736,305.00 Construct Taxiway, Install Instrument Approach Aid - 11/29

NE ANE MA BOS General Edward Lawrence Logan Internation P 122 $ 150,750.00 $ - $ 150,750.00 Acquire Equipment

NE ANE MA LWM Lawrence Municipal R 35 $ 2,092,500.00 $ 2,092,500.00 $ - Construct Runway Safety Area - 14/32, Install Taxiway Lighting

NE ANE MA AQW Harriman-And-West GA 25 $ 2,200,500.00 $ 1,193,324.00 $ 1,007,176.00 Rehabilitate Apron

NE ANE MA 3B0 Southbridge Municipal GA 22 $ 540,939.00 $ 540,939.00 $ - Construct Building

NE ANE MA PVC Provincetown Municipal P 40 $ 63,000.00 $ 63,000.00 $ - Conduct Environmental Study

NE ANE MA BAF Westfield-Barnes Regional GA 48 $ 2,499,999.00 $ - $ 2,499,999.00 Acquire Land for Noise Compatibility within 70 - 74 DNL

NE ANE MA EWB New Bedford Regional P 51 $ 4,176,900.00 $ 1,128,080.00 $ 3,048,820.00 Rehabilitate Taxiway

NE ANE MA FIT Fitchburg Municipal GA 24 $ 2,138,850.00 $ - $ 2,138,850.00 Remove Obstructions

NE ANE MA ACK Nantucket Memorial P 63 $ 723,600.00 $ 723,600.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow

Removal Equipment

NE ANE MA HYA Barnstable Municipal-Boardman/Polando Fi P 61 $ 4,280,675.00 $ 2,414,831.87 $ 1,865,843.13 Rehabilitate Taxiway

NE ANE MA CEF Westover ARB/Metropolitan GA 32 $ 2,500,000.00 $ - $ 2,500,000.00 Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE MA MVY Martha's Vineyard P 42 $ 549,900.00 $ 549,900.00 $ - Acquire Snow Removal Equipment

NE ANE MA 0B5 Turners Falls GA 18 $ 2,286,000.00 $ 217,335.00 $ 2,068,665.00 Rehabilitate Taxiway

NE ANE MA 1B9 Mansfield Municipal GA 30 $ 317,700.00 $ 266,271.00 $ 51,429.00 Remove Obstructions

NE ANE MA OWD Norwood Memorial R 35 $ 369,000.00 $ 369,000.00 $ - Construct Taxiway

NE ANE MA ACK Nantucket Memorial P 62 $ 1,903,500.00 $ 1,903,500.00 $ - Rehabilitate Apron

NE ANE MA BED Laurence G Hanscom Field R 37 $ 1,137,259.00 $ 1,137,259.00 $ - Construct Apron, Improve Runway Safety Area - 05/23

NE ANE ME RKD Knox County Regional P 50 $ 1,762,560.00 $ 1,094,693.00 $ 667,867.00 Rehabilitate Runway - 13/31

NE ANE ME OLD Dewitt Field, Old Town Municipal GA 12 $ 2,045,700.00 $ 2,045,700.00 $ - Rehabilitate Runway - 12/30

NE ANE ME BXM Brunswick Executive GA 21 $ 1,700,000.00 $ - $ 1,700,000.00 Construct Deicing Containment Facility, Rehabilitate Building

NE ANE ME PWM Portland International Jetport P 77 $ 3,107,258.00 $ 3,107,258.00 $ - Rehabilitate Apron

NE ANE ME BHB Hancock County-Bar Harbor P 40 $ 842,680.00 $ 842,680.00 $ -Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Runway - 17/35, Rehabilitate Taxiway, Runway Incursion Markings

NE ANE ME PWM Portland International Jetport P 79 $ 391,455.00 $ 23.00 $ 391,432.00 Environmental Mitigation

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 25 of 57�

Isle

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NE ANE ME BGR Bangor International P 66 $ 2,549,296.00 $ 2,549,296.00 $ -Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Dock 10

Taxielanes], Rehabilitate Taxiway [Taxiway N]

NE ANE ME BGR Bangor International P 67 $ 1,379,966.00 $ 1,379,966.00 $ - Rehabilitate Apron

NE ANE ME 1B0 Dexter Regional GA 10 $ 290,700.00 $ 290,700.00 $ - Rehabilitate Apron

NE ANE ME PWM Portland International Jetport P 76 $ 482,368.00 $ 482,368.00 $ - Acquire Snow Removal Equipment

NE ANE ME PWM Portland International Jetport P 78 $ 825,667.00 $ 825,667.00 $ - Update Airport Master Plan Study

NE ANE ME BXM Brunswick Executive GA 19 $ 1,049,364.00 $ 2,460.00 $ 1,046,904.00 Rehabilitate Building

NE ANE ME B19 Biddeford Municipal GA 10 $ 166,324.00 $ 166,324.00 $ - Conduct Environmental Study

NE ANE ME BGR Bangor International P 68 $ 878,890.00 $ 878,890.00 $ - Modify Terminal Building

NE ANE ME BXM Brunswick Executive GA 20 $ 528,426.00 $ - $ 528,426.00 Rehabilitate Runway Lighting - 01R/19L

NE ANE ME PQI Northern Maine Regional Airport at Presque P 44 $ 511,520.00 $ 511,520.00 $ -Rehabilitate Runway - 10/28, Rehabilitate Runway - 01/19,

Rehabilitate Taxiway

NE ANE ME HUL Houlton International GA 16 $ 121,500.00 $ 121,500.00 $ - Update Airport Master Plan Study

NE ANE ME OLD Dewitt Field, Old Town Municipal GA 14 $ 2,068,020.00 $ 304,672.00 $ 1,763,348.00 Rehabilitate Runway - 04/22

NE ANE ME *MEV Various Locations in Maine 7 $ 399,116.00 $ 399,116.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway

NE ANE ME SFM Sanford Seacoast Regional R 31 $ 211,590.00 $ 211,590.00 $ - Acquire Snow Removal Equipment

NE ANE ME BST Belfast Municipal GA 14 $ 176,850.00 $ 176,850.00 $ - Conduct Environmental Study

NE ANE ME OLD Dewitt Field, Old Town Municipal GA 13 $ 139,500.00 $ 139,500.00 $ - Rehabilitate Runway - 04/22, Rehabilitate Runway - 12/30

NE ANE ME OWK Central Maine Airport of Norridgewock GA 20 $ 84,600.00 $ 84,600.00 $ - Install Airport Beacons

NE ANE ME BXM Brunswick Executive GA 18 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 01R/19L, Rehabilitate Taxiway

NE ANE NH *NHB New Hampshire State Block Grant Program 21 $ 2,022,238.00 $ 2,022,238.00 $ - Non primary development projects in state block grant program

NE ANE NH MHT Manchester P 102 $ 448,545.00 $ 448,545.00 $ - Remove Obstructions

NE ANE NH MHT Manchester P 101 $ 3,546,603.00 $ 3,546,603.00 $ - Remove Obstructions

NE ANE NH LEB Lebanon Municipal P 51 $ 180,504.00 $ 180,504.00 $ - Environmental Mitigation

NE ANE NH MHT Manchester P 104 $ 2,003,917.00 $ 2,003,917.00 $ - Modify Terminal Building

NE ANE NH MHT Manchester P 103 $ 2,845,910.00 $ 2,845,910.00 $ - Modify Terminal Building

NE ANE RI UUU Newport State GA 20 $ 197,831.00 $ 197,831.00 $ - Remove Obstructions

NE ANE RI WST Westerly State P 23 $ 421,280.00 $ 421,280.00 $ - Remove Obstructions

NE ANE RI OQU Quonset State R 22 $ 1,841,113.00 $ 1,841,113.00 $ - Improve Airport Drainage

NE ANE RI PVD Theodore Francis Green State P 114 $ 1,129,028.00 $ - $ 1,129,028.00 Extend Runway - 05/23

NE ANE RI PVD Theodore Francis Green State P 113 $ 8,870,792.00 $ 1,315,695.00 $ 7,555,097.00 Extend Runway - 05/23

NE ANE RI PVD Theodore Francis Green State P 116 $ 7,862,919.00 $ - $ 7,862,919.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

NE ANE RI PVD Theodore Francis Green State P 115 $ 705,143.00 $ 3,681.00 $ 701,462.00 Remove Obstructions, Remove Obstructions

NE ANE VT EFK Newport State GA 17 $ 729,000.00 $ - $ 729,000.00 Construct Snow Removal Equipment Building

NE ANE VT 6B0 Middlebury State GA 10 $ 214,013.00 $ 214,013.00 $ - Remove Obstructions

NE ANE VT BTV Burlington International P 105 $ 1,101,150.00 $ - $ 1,101,150.00 Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE VT BTV Burlington International P 104 $ 2,637,844.00 $ 1,763,108.00 $ 874,736.00 Construct Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 26 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NE ANE VT EFK Newport State GA 16 $ 9,127,018.00 $ 1,503,822.00 $ 7,623,196.00 Construct Taxiway, Extend Runway - 18/36

NE ANE VT BTV Burlington International P 103 $ 1,850,789.00 $ 1,850,789.00 $ - Rehabilitate Apron

NE ANE VT RUT Rutland - Southern Vermont Regional CS 45 $ 150,000.00 $ 150,000.00 $ - Acquire Snow Removal Equipment

NM DEN CO DEN Denver International P 86 $ 20,029,724.00 $ 7,529,724.00 $ 12,500,000.00 Rehabilitate Runway - 17L/35R, Rehabilitate Runway Lighting -

17L/35R, Rehabilitate Taxiway

NM DEN CO ITR Kit Carson County GA 12 $ 140,000.00 $ 140,000.00 $ - Rehabilitate Runway - 15/33

NM DEN CO BJC Rocky Mountain Metropolitan R 58 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 03/21

NM DEN CO ANK Harriet Alexander Field GA 17 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO GJT Grand Junction Regional P 52 $ 2,760,000.00 $ 2,760,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway - 11/29,

Rehabilitate Runway Lighting - 04/22, Rehabilitate Taxiway

NM DEN CO AEJ Central Colorado Regional GA 15 $ 463,215.00 $ 463,215.00 $ - Acquire Land for Development

NM DEN CO GUC Gunnison-Crested Butte Regional P 50 $ 1,040,000.00 $ 1,040,000.00 $ - Rehabilitate Taxiway

NM DEN CO FNL Fort Collins-Loveland Municipal CS 34 $ 760,000.00 $ 760,000.00 $ - Construct Snow Removal Equipment Building

NM DEN CO STK Sterling Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 15/33, Rehabilitate Taxiway

NM DEN CO TEX Telluride Regional CS 33 $ 133,629.00 $ 133,629.00 $ - Improve Runway Safety Area - 09/27

NM DEN CO HEQ Holyoke GA 10 $ 665,730.00 $ 665,730.00 $ - Construct Taxiway

NM DEN CO FLY Meadow Lake R 22 $ 442,663.00 $ 442,663.00 $ - Rehabilitate Runway - 15/33

NM DEN CO FTG Front Range R 40 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO LXV Lake County GA 12 $ 150,000.00 $ 150,000.00 $ - Remove Obstructions

NM DEN CO DRO Durango-La Plata County P 45 $ 5,483,991.00 $ 4,629,760.00 $ 854,231.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting

NM DEN CO AKO Colorado Plains Regional GA 16 $ 374,321.00 $ 374,321.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM DEN CO GJT Grand Junction Regional P 53 $ 167,760.00 $ 167,760.00 $ - Rehabilitate Apron

NM DEN CO TAD Perry Stokes GA 8 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 03/21

NM DEN CO PSO Stevens Field GA 22 $ 4,722,390.00 $ 4,722,390.00 $ - Extend Taxiway

NM DEN CO SBS Steamboat Springs/Bob Adams Field GA 23 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 14/32

NM DEN CO 2V6 Yuma Municipal GA 12 $ 4,823,095.00 $ 2,441,317.00 $ 2,381,778.00 Rehabilitate Runway - 16/34, Rehabilitate Runway Lighting - 16/34

NM DEN CO GXY Greeley-Weld County GA 24 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

NM DEN CO MTJ Montrose Regional P 44 $ 125,871.00 $ 125,871.00 $ - Rehabilitate Taxiway

NM DEN CO APA Centennial R 48 $ 500,000.00 $ - $ 500,000.00 Conduct Noise Compatibility Plan Study

NM DEN CO COS City of Colorado Springs Municipal P 58 $ 11,648,678.00 $ 3,671,615.00 $ 7,977,063.00 Rehabilitate Taxiway

NM DEN CO EGE Eagle County Regional P 55 $ 6,929,263.00 $ 149,263.00 $ 6,780,000.00 Rehabilitate Apron

NM DEN CO ANK Harriet Alexander Field GA 16 $ 321,592.00 $ 321,592.00 $ - Rehabilitate Runway - 06/24

NM DEN CO DRO Durango-La Plata County P 46 $ 951,912.00 $ 951,912.00 $ - Conduct Environmental Study

NM DEN CO LMO Vance Brand GA 14 $ 46,634.00 $ 46,634.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM DEN CO MTJ Montrose Regional P 45 $ 575,000.00 $ 575,000.00 $ - Conduct Airport Master Plan Study

NM DEN CO APA Centennial R 49 $ 3,661,665.00 $ 150,000.00 $ 3,511,665.00 Extend Taxiway

NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 52 $ 235,819.00 $ 140,657.00 $ 95,162.00 Conduct Environmental Study

NM DEN CO LIC Limon Municipal GA 12 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 27 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM DEN CO 4V1 Spanish Peaks Airfield GA 6 $ 936,195.00 $ 936,195.00 $ - Construct Taxiway, Expand Apron, Install Airport Beacons

NM DEN CO MVI Monte Vista Municipal GA 12 $ 724,136.00 $ 724,136.00 $ - Construct Taxiway, Expand Apron

NM DEN CO GNB Granby-Grand County GA 11 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study

NM DEN UT PVU Provo Municipal P 41 $ 500,000.00 $ 500,000.00 $ - Rehabilitate Apron, Rehabilitate Building

NM DEN UT SLC Salt Lake City International P 106 $ 13,938,351.00 $ 3,938,351.00 $ 10,000,000.00 Construct Apron

NM DEN UT PUC Carbon County Regional/Buck Davis Field GA 16 $ 300,000.00 $ 300,000.00 $ - Update Airport Master Plan Study

NM DEN UT CNY Canyonlands Field CS 27 $ 520,000.00 $ 520,000.00 $ - Rehabilitate Taxiway Lighting

NM DEN UT VEL Vernal Regional CS 32 $ 5,765,583.00 $ 1,123,138.00 $ 4,642,445.00 Construct Runway - 16/34

NM DEN UT HVE Hanksville GA 4 $ 2,500,000.00 $ 2,500,000.00 $ -Construct Apron, Construct Taxiway, Install Runway Lighting -

08/26, Rehabilitate Runway - 08/26

NM DEN UT CNY Canyonlands Field CS 28 $ 298,771.00 $ 298,771.00 $ - Conduct Environmental Study

NM DEN UT U14 Nephi Municipal GA 18 $ 929,000.00 $ 929,000.00 $ - Expand Apron

NM DEN UT 38U Wayne Wonderland GA 9 $ 741,000.00 $ 741,000.00 $ -Construct Apron, Construct Building, Construct Taxiway, Remove

Obstructions

NM DEN UT SLC Salt Lake City International P 108 $ 3,100,000.00 $ - $ 3,100,000.00 Rehabilitate Taxiway

NM DEN UT 1L8 General Dick Stout Field GA 5 $ 370,000.00 $ 370,000.00 $ - Install Perimeter Fencing

NM DEN UT 1L7 Escalante Municipal GA 8 $ 299,143.00 $ 299,143.00 $ - Update Airport Master Plan Study

NM DEN UT CDC Cedar City Regional P 29 $ 406,667.00 $ 406,667.00 $ - Update Airport Master Plan Study

NM DEN UT CDC Cedar City Regional P 30 $ 575,000.00 $ 575,000.00 $ - Acquire Snow Removal Equipment

NM DEN UT SLC Salt Lake City International P 107 $ 1,000,000.00 $ - $ 1,000,000.00 Conduct Airport Master Plan Study

NM DEN UT KNB Kanab Municipal GA 13 $ 297,001.00 $ 297,001.00 $ - Update Airport Master Plan Study

NM DEN UT U52 Beaver Municipal GA 13 $ 271,863.00 $ 271,863.00 $ - Construct Taxiway

NM DEN UT SGU St George Municipal P 25 $ 10,000,000.00 $ 1,000,000.00 $ 9,000,000.00 Construct New Airport

NM DEN UT ENV Wendover GA 28 $ 1,609,949.00 $ 1,609,949.00 $ -Install Miscellaneous NAVAIDS, Install Taxiway Lighting, Rehabilitate

Taxiway

NM DEN UT OGD Ogden-Hinckley P 42 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway

NM DEN UT LGU Logan-Cache GA 27 $ 150,000.00 $ 150,000.00 $ - Construct Taxiway

NM DEN WY DWX Dixon GA 15 $ 437,741.00 $ 437,741.00 $ - Expand Apron

NM DEN WY BYG Johnson County GA 17 $ 234,231.00 $ 234,231.00 $ - Update Airport Master Plan Study

NM DEN WY RIW Riverton Regional P 40 $ 730,000.00 $ 730,000.00 $ - Rehabilitate Runway - 10/28

NM DEN WY RWL Rawlins Municipal/Harvey Field GA 16 $ 750,000.00 $ 750,000.00 $ -Rehabilitate Access Road, Rehabilitate Runway - 04/22, Rehabilitate

Taxiway

NM DEN WY SAA Shively Field GA 24 $ 302,481.00 $ 302,481.00 $ - Extend Taxiway, Rehabilitate Taxiway

NM DEN WY LAR Laramie Regional P 32 $ 178,845.00 $ 178,845.00 $ - Rehabilitate Apron

NM DEN WY GCC Gillette-Campbell County P 40 $ 580,000.00 $ 580,000.00 $ - Acquire Snow Removal Equipment

NM DEN WY JAC Jackson Hole P 53 $ 760,000.00 $ 760,000.00 $ - Rehabilitate Apron

NM DEN WY U68 North Big Horn County GA 12 $ 662,542.00 $ 662,542.00 $ - Expand Apron, Rehabilitate Apron

NM DEN WY TOR Torrington Municipal GA 16 $ 1,182,314.00 $ 1,182,314.00 $ - Rehabilitate Runway - 10/28

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 28 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM DEN WY RIW Riverton Regional P 39 $ 12,147,555.00 $ 1,895,680.00 $ 10,251,875.00

Construct Taxiway, Rehabilitate Runway - 10/28, Rehabilitate

Runway Lighting - 10/28, Rehabilitate Taxiway, Rehabilitate Taxiway

Lighting

NM DEN WY RKS Rock Springs-Sweetwater County P 34 $ 700,000.00 $ 700,000.00 $ - Improve Runway Safety Area - 09/27

NM DEN WY COD Yellowstone Regional P 33 $ 100,000.00 $ 100,000.00 $ - Rehabilitate Taxiway

NM DEN WY POY Powell Municipal GA 15 $ 201,000.00 $ 201,000.00 $ - Acquire Snow Removal Equipment

NM DEN WY DGW Converse County GA 21 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Apron

NM DEN WY EMM Kemmerer Municipal GA 19 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Apron

NM DEN WY COD Yellowstone Regional P 34 $ 593,105.00 $ 593,105.00 $ - Acquire Snow Removal Equipment, Improve Terminal Building

NM DEN WY GCC Gillette-Campbell County P 41 $ 458,000.00 $ 458,000.00 $ - Update Airport Master Plan Study

NM DEN WY *WYS State of Wyoming 9 $ 445,864.00 $ 445,864.00 $ - Conduct State System Plan Study

NM DEN WY JAC Jackson Hole P 52 $ 712,710.00 $ 712,710.00 $ - Improve Terminal Building

NM DEN WY JAC Jackson Hole P 54 $ 7,605,333.00 $ - $ 7,605,333.00 Rehabilitate Apron

NM DEN WY +09F New (Replacement Airport) 5 $ 1,962,450.00 $ 1,962,450.00 $ - Construct New Airport

NM DEN WY ECS Mondell Field GA 16 $ 293,443.00 $ 293,443.00 $ - Update Airport Master Plan Study

NM DEN WY AFO Afton Municipal GA 23 $ 250,000.00 $ 250,000.00 $ - Acquire Snow Removal Equipment

NM DEN WY DUB Dubois Municipal GA 17 $ 620,000.00 $ 620,000.00 $ - Construct Runway - 10/28

NM HLN ID MAN Nampa Municipal GA 26 $ 84,862.00 $ - $ 84,862.00 Wildlife Hazard Assessments

NM HLN ID IDA Idaho Falls Regional P 40 $ 2,070,282.00 $ 1,059,521.00 $ 1,010,761.00 Expand Apron

NM HLN ID PIH Pocatello Regional P 38 $ 720,248.00 $ 720,248.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM HLN ID EUL Caldwell Industrial R 28 $ 1,312,200.00 $ 1,312,200.00 $ -Install Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway

Lighting - 12/30

NM HLN ID SUN Friedman Memorial P 41 $ 9,253,125.00 $ 1,000,000.00 $ 8,253,125.00 Construct Runway Safety Area - 13/31

NM HLN ID GIC Idaho County GA 15 $ 4,354,251.00 $ 973,733.00 $ 3,380,518.00

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Install Runway Lighting - 07/25, Install Runway Vertical/Visual

Guidance System - 07/25, Install Taxiway Lighting, Rehabilitate

Runway - 07/25, Rehabilitate Taxiway, Rehabilitate Taxiway

NM HLN ID BOI Boise Air Terminal/Gowen Field P 61 $ 3,744,598.00 $ 3,744,598.00 $ - Acquire Snow Removal Equipment, Security Enhancements

NM HLN ID TWF Joslin Field - Magic Valley Regional P 37 $ 1,665,056.00 $ 1,665,056.00 $ - Expand Terminal Building

NM HLN ID COE Coeur D'Alene - Pappy Boyington Field GA 42 $ 607,303.00 $ 607,303.00 $ -Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,

Rehabilitate Apron

NM HLN ID LWS Lewiston-Nez Perce County P 38 $ 867,952.00 $ 867,952.00 $ - Rehabilitate Apron

NM HLN ID RXE Rexburg-Madison County GA 14 $ 375,230.00 $ 375,230.00 $ - Rehabilitate Apron

NM HLN ID AOC Arco-Butte County GA 13 $ 172,515.00 $ 172,515.00 $ - Conduct Airport Master Plan Study

NM HLN ID GNG Gooding Municipal GA 10 $ 95,400.00 $ 95,400.00 $ - Conduct Environmental Study

NM HLN ID SZT Sandpoint GA 15 $ 209,105.00 $ 209,105.00 $ - Conduct Environmental Study

NM HLN ID U02 McCarley Field GA 12 $ 108,000.00 $ 108,000.00 $ - Update Airport Master Plan Study

NM HLN ID BOI Boise Air Terminal/Gowen Field P 62 $ 660,246.00 $ - $ 660,246.00 VALE Infrastructure

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 29 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM HLN ID U10 Preston GA 4 $ 180,000.00 $ 180,000.00 $ - Conduct Environmental Study

NM HLN ID U03 Buhl Municipal GA 13 $ 150,000.00 $ 150,000.00 $ -Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate

Taxiway

NM HLN ID 65S Boundary County GA 13 $ 800,910.00 $ 800,910.00 $ -

Acquire Land For Approaches, Install Airfield Guidance Signs, Install

Runway Lighting - 02/20, Install Runway Vertical/Visual Guidance

System - 02/20, Rehabilitate Apron, Rehabilitate Runway - 02/20,

Rehabilitate Taxiway

NM HLN ID S83 Shoshone County GA 10 $ 376,267.00 $ 376,267.00 $ -Acquire Snow Removal Equipment, Construct Snow Removal

Equipment Building

NM HLN ID 1U7 Bear Lake County GA 12 $ 150,000.00 $ 150,000.00 $ -

Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Runway - 16/34, Rehabilitate Runway Lighting - 10/28, Rehabilitate

Taxiway

NM HLN ID JER Jerome County GA 17 $ 558,629.00 $ 558,629.00 $ - Rehabilitate Taxiway

NM HLN ID MAN Nampa Municipal GA 25 $ 801,681.00 $ 737,981.00 $ 63,700.00 Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,

Rehabilitate Apron, Rehabilitate Taxiway

NM HLN ID S66 Homedale Municipal GA 3 $ 216,000.00 $ 216,000.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

NM HLN ID DIJ Driggs-Reed Memorial GA 14 $ 744,300.00 $ 744,300.00 $ -

Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS,

Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate

Taxiway

NM HLN ID U70 Cascade GA 13 $ 576,355.00 $ 576,355.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway

NM HLN MT GGW Wokal Field/Glasgow International GA 19 $ 1,417,500.00 $ 343,972.00 $ 1,073,528.00 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate

Runway - 12/30, Rehabilitate Taxiway

NM HLN MT CII Choteau GA 8 $ 136,058.00 $ 136,058.00 $ - Install Weather Reporting Equipment

NM HLN MT LTY Liberty County GA 6 $ 180,000.00 $ 180,000.00 $ -

Conduct Airport Master Plan Study, Rehabilitate Apron, Rehabilitate

Runway - 07/25, Rehabilitate Runway Lighting - 07/25, Rehabilitate

Taxiway

NM HLN MT 79S Fort Benton GA 10 $ 1,108,691.00 $ 1,108,691.00 $ -

Expand Apron, Install Miscellaneous NAVAIDS, Install Runway

Lighting - 05/23, Rehabilitate Apron, Rehabilitate Runway - 05/23,

Rehabilitate Taxiway

NM HLN MT 1S3 Tillitt Field GA 10 $ 2,070,540.00 $ 2,070,540.00 $ -Rehabilitate Runway - 08/26, Rehabilitate Runway Lighting - 08/26,

Rehabilitate Taxiway

NM HLN MT MSO Missoula International P 59 $ 2,194,779.00 $ 2,194,779.00 $ - Extend Taxiway, Improve Airport Drainage, Rehabilitate Apron

NM HLN MT EKS Ennis - Big Sky GA 14 $ 211,500.00 $ 211,500.00 $ - Acquire Land for Development, Update Airport Master Plan Study

NM HLN MT 8S1 Polson GA 6 $ 529,200.00 $ 529,200.00 $ - Acquire Land for Development

NM HLN MT 6S5 Ravalli County GA 13 $ 297,000.00 $ 297,000.00 $ - Conduct Environmental Study

NM HLN MT S71 Edgar G Obie GA 14 $ 173,091.00 $ 173,091.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -

08/26, Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 30 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM HLN MT EKS Ennis - Big Sky GA 15 $ 1,458,384.00 $ 1,458,384.00 $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway

NM HLN MT 9S5 Three Forks GA 10 $ 90,000.00 $ 90,000.00 $ - Conduct Environmental Study

NM HLN MT HWQ Wheatland County at Harlowton GA 6 $ 1,747,000.00 $ 1,747,000.00 $ -

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Install Runway Lighting - 08/26, Rehabilitate Apron, Rehabilitate

Runway - 08/26, Rehabilitate Taxiway

NM HLN MT +00U New 9 $ 329,530.00 $ 329,530.00 $ - Construct Snow Removal Equipment Building

NM HLN MT WYS Yellowstone CS 16 $ 665,588.00 $ 665,588.00 $ -Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate

Taxiway, Remove Obstructions

NM HLN MT BIL Billings Logan International P 49 $ 1,051,485.00 $ 1,051,485.00 $ - Expand Apron, Rehabilitate Apron, Update Miscellaneous Study

NM HLN MT BHK Baker Municipal GA 18 $ 62,820.00 $ 62,820.00 $ - Rehabilitate Apron

NM HLN MT HVR Havre City-County GA 17 $ 3,084,865.00 $ 701,526.00 $ 2,383,339.00 Improve Runway Safety Area - 08/26, Rehabilitate Runway - 03/21,

Rehabilitate Runway - 08/26, Rehabilitate Taxiway

NM HLN MT MLS Frank Wiley Field GA 16 $ 4,046,125.00 $ 826,729.00 $ 3,219,396.00

Install Runway Vertical/Visual Guidance System - 04/22,

Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Runway - 04/22, Rehabilitate Runway - 12/30, Rehabilitate Runway

Lighting - 04/22

NM HLN MT 6S3 Woltermann Memorial GA 12 $ 144,140.00 $ 144,140.00 $ -Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate

Runway Lighting - 10/28, Rehabilitate Taxiway

NM HLN MT 32S Stevensville GA 12 $ 202,500.00 $ 202,500.00 $ -

Construct Taxiway, Install Weather Reporting Equipment,

Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30,

Remove Obstructions, Widen Runway - 12/30

NM HLN MT BIL Billings Logan International P 50 $ 2,080,586.00 $ 2,080,586.00 $ - Extend Taxiway, Improve Airport Drainage

NM HLN MT SDY Sidney-Richland Municipal P 22 $ 2,420,522.00 $ 2,420,522.00 $ -Construct Access Road, Construct Taxiway, Install Airfield Guidance

Signs, Install Taxiway Lighting

NM HLN MT HLN Helena Regional P 47 $ 878,942.00 $ 878,942.00 $ -

Acquire Emergency Generator, Rehabilitate Runway - 05/23,

Rehabilitate Runway - 09/27, Rehabilitate Taxiway, Security

Enhancements

NM HLN MT 8S1 Polson GA 7 $ 245,880.00 $ 245,880.00 $ -Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate

Taxiway

NM HLN MT BZN Bozeman Yellowstone International P 44 $ 3,358,790.00 $ 3,358,790.00 $ - Construct Deicing Containment Facility, Expand Apron

NM HLN MT HLN Helena Regional P 48 $ 405,000.00 $ 405,000.00 $ - Update Airport Master Plan Study

NM HLN MT *MTS State of Montana 13 $ 166,611.00 $ 166,611.00 $ - Conduct State System Plan Study

NM HLN MT GDV Dawson Community GA 15 $ 78,300.00 $ 78,300.00 $ - Install Runway Vertical/Visual Guidance System - 12/30

NM HLN MT GPI Glacier Park International P 49 $ 3,986,340.00 $ 1,584,921.00 $ 2,401,419.00 Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30,

Remove Obstructions

NM HLN MT 3U8 Big Sandy GA 5 $ 1,247,709.00 $ 1,247,709.00 $ -

Construct Building, Construct Taxiway, Rehabilitate Apron,

Rehabilitate Runway - 06/24, Rehabilitate Taxiway, Rehabilitate

Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 31 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM HLN MT PWD Sher-Wood GA 10 $ 829,662.00 $ 829,662.00 $ - Construct Apron, Construct Fuel Farm

NM HLN MT 48S Harlem GA 10 $ 122,329.00 $ 122,329.00 $ -Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate

Taxiway

NM HLN MT 7S6 White Sulphur Springs GA 9 $ 150,277.00 $ 150,277.00 $ -Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate

Taxiway

NM HLN MT PO1 Poplar Municipal GA 10 $ 176,788.00 $ 176,788.00 $ -Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate

Taxiway

NM HLN MT S59 Libby GA 13 $ 321,808.00 $ 321,808.00 $ - Install Taxiway Lighting, Remove Obstructions

NM HLN MT LWT Lewistown Municipal GA 21 $ 428,179.00 $ 428,179.00 $ -Acquire Snow Removal Equipment, Modify Building, Modify Snow

Removal Equipment Building

NM HLN MT M46 Colstrip GA 15 $ 1,082,250.00 $ 1,082,250.00 $ -Construct Taxiway, Expand Apron, Rehabilitate Apron, Rehabilitate

Runway - 06/24, Rehabilitate Taxiway

NM HLN MT 6S8 Laurel Municipal GA 15 $ 762,300.00 $ 762,300.00 $ - Acquire Land For Approaches, Acquire Land for Development

NM HLN MT M75 Malta GA 12 $ 188,600.00 $ 188,600.00 $ -Improve Airport Drainage, Rehabilitate Apron, Rehabilitate Runway -

08/26, Rehabilitate Taxiway

NM HLN MT GTF Great Falls International P 61 $ 2,062,829.00 $ 2,062,829.00 $ -Construct Taxiway, Modify Access Road, Rehabilitate Runway -

16/34

NM SEA OR AST Astoria Regional GA 21 $ 5,140,000.00 $ 334,879.00 $ 4,805,121.00 Rehabilitate Runway - 13/31

NM SEA OR BDN Bend Municipal GA 24 $ 966,670.00 $ 731,756.00 $ 234,914.00 Expand Heliport/Helipad

NM SEA OR *ORV Various Locations in Oregon 31 $ 12,386.00 $ 12,386.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

NM SEA OR 62S Christmas Valley GA 4 $ 1,599,837.00 $ 1,599,837.00 $ - Construct Taxiway, Rehabilitate Apron

NM SEA OR EUG Mahlon Sweet Field P 52 $ 1,547,216.00 $ 1,547,216.00 $ - Update Airport Master Plan Study

NM SEA OR OTH Southwest Oregon Regional P 40 $ 272,930.00 $ 272,930.00 $ - Construct Terminal Building

NM SEA OR HRI Hermiston Municipal GA 9 $ 2,916,000.00 $ 1,211,504.00 $ 1,704,496.00 Construct Fuel Farm, Rehabilitate Taxiway

NM SEA OR 77S Hobby Field GA 11 $ 75,000.00 $ 75,000.00 $ - Install Weather Reporting Equipment

NM SEA OR S30 Lebanon State GA 5 $ 264,628.00 $ 264,628.00 $ - Update Airport Master Plan Study

NM SEA OR GCD Grant County Regional/Ogilvie Field GA 10 $ 155,632.00 $ 155,632.00 $ - Update Airport Master Plan Study

NM SEA OR PDX Portland International P 75 $ 7,293,824.00 $ 3,550,075.00 $ 3,743,749.00 Security Enhancements

NM SEA OR RDM Roberts Field P 39 $ 5,987,960.00 $ 2,008,776.00 $ 3,979,184.00 Rehabilitate Runway - 04/22

NM SEA OR 56S Seaside Municipal GA 5 $ 475,000.00 $ 475,000.00 $ -

Install Airfield Guidance Signs, Install Perimeter Fencing,

Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway, Remove

Obstructions

NM SEA OR MMV McMinnville Municipal GA 16 $ 492,230.00 $ 492,230.00 $ - Rehabilitate Runway - 04/22

NM SEA OR BKE Baker City Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron

NM SEA OR 4S1 Gold Beach Municipal GA 13 $ 217,300.00 $ 217,300.00 $ - Update Airport Master Plan Study

NM SEA OR CVO Corvallis Municipal GA 18 $ 540,000.00 $ 540,000.00 $ - Construct Access Road

NM SEA OR ONO Ontario Municipal GA 12 $ 196,371.00 $ 196,371.00 $ -Install Runway Vertical/Visual Guidance System - 14/32, Install

Taxiway Lighting

NM SEA OR BNO Burns Municipal GA 14 $ 538,435.00 $ 538,435.00 $ - Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 32 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM SEA OR MFR Rogue Valley International - Medford P 41 $ 3,873,540.00 $ 3,873,540.00 $ - Construct Snow Removal Equipment Building

NM SEA OR EUG Mahlon Sweet Field P 51 $ 1,500,000.00 $ 1,500,000.00 $ - Expand Terminal Building

NM SEA OR LKV Lake County GA 8 $ 2,756,123.00 $ 1,744,058.00 $ 1,012,065.00 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 17/35, Rehabilitate Runway - 17/35

NM SEA OR PDX Portland International P 74 $ 8,761,866.00 $ - $ 8,761,866.00 Rehabilitate Taxiway

NM SEA OR UAO Aurora State GA 18 $ 1,289,561.00 $ 1,289,561.00 $ -Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway,

Rehabilitate Taxiway

NM SEA OR SLE McNary Field GA 20 $ 2,301,738.00 $ 950,000.00 $ 1,351,738.00 Rehabilitate Taxiway

NM SEA OR BOK Brookings GA 14 $ 775,413.00 $ 775,413.00 $ - Install Perimeter Fencing

NM SEA OR *ORS State of Oregon 14 $ 148,367.00 $ 148,367.00 $ - Update State System Plan Study

NM SEA OR LMT Klamath Falls P 35 $ 1,216,390.00 $ 1,216,390.00 $ - Construct Taxiway

NM SEA OR *ORV Various Locations in Oregon 30 $ 67,585.00 $ 67,585.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway

NM SEA OR BDN Bend Municipal GA 23 $ 22,741.00 $ 22,741.00 $ - Wildlife Hazard Assessments

NM SEA OR ONP Newport Municipal GA 23 $ 457,200.00 $ 457,200.00 $ - Conduct Airport Master Plan Study

NM SEA WA W04 Ocean Shores Municipal GA 10 $ 691,250.00 $ 691,250.00 $ - Rehabilitate Runway - 15/33

NM SEA WA SEA Seattle-Tacoma International P 137 $ 6,063,306.00 $ 6,063,306.00 $ - Construct Runway - 16R/34L

NM SEA WA MWH Grant County International GA 41 $ 472,500.00 $ 472,500.00 $ - Rehabilitate Access Road

NM SEA WA ALW Walla Walla Regional P 31 $ 519,506.00 $ 519,506.00 $ - Update Airport Master Plan Study

NM SEA WA FHR Friday Harbor P 32 $ 193,500.00 $ 193,500.00 $ - Conduct Environmental Study

NM SEA WA BFI Boeing Field/King County International P 52 $ 1,083,977.00 $ 1,083,977.00 $ - Update Airport Master Plan Study

NM SEA WA PLU Pierce County - Thun Field GA 17 $ 431,566.00 $ 431,566.00 $ -

Install Runway Vertical/Visual Guidance System - 16/34,

Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate

Taxiway

NM SEA WA 43D Odessa Municipal GA 7 $ 300,000.00 $ 300,000.00 $ - Extend Runway - 02/20

NM SEA WA PSC Tri-Cities P 43 $ 1,957,702.00 $ 1,957,702.00 $ - Rehabilitate Apron, Rehabilitate Terminal Building

NM SEA WA TIW Tacoma Narrows GA 18 $ 44,487.00 $ 44,487.00 $ - Wildlife Hazard Assessments

NM SEA WA SEA Seattle-Tacoma International P 136 $ 3,778,402.00 $ - $ 3,778,402.00 Conduct Noise Compatibility Plan Study

NM SEA WA 55S Packwood GA 6 $ 550,000.00 $ 550,000.00 $ -Improve Runway Safety Area - 01/19, Rehabilitate Runway - 01/19,

Rehabilitate Runway Lighting - 01/19

NM SEA WA CLS Chehalis-Centralia GA 16 $ 189,900.00 $ 189,900.00 $ - Construct Taxiway, Rehabilitate Apron

NM SEA WA BLI Bellingham International P 52 $ 4,792,516.00 $ 4,792,516.00 $ - Expand Terminal Building

NM SEA WA S50 Auburn Municipal R 22 $ 220,253.00 $ 220,253.00 $ - Conduct Environmental Study

NM SEA WA SFF Felts Field R 30 $ 4,920,207.00 $ 1,316,738.00 $ 3,603,469.00 Construct Taxiway, Rehabilitate Taxiway

NM SEA WA 2S8 Wilbur GA 13 $ 117,289.00 $ 117,289.00 $ -Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate

Taxiway

NM SEA WA KLS Southwest Washington Regional GA 15 $ 294,777.00 $ 294,777.00 $ -Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Remove

Obstructions

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 33 of 57�

nty

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

NM SEA WA S94 Port of Whitman Business Air Center GA 8 $ 1,875,110.00 $ 1,875,110.00 $ - Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25

NM SEA WA BVS Skagit Regional GA 22 $ 887,000.00 $ 150,000.00 $ 737,000.00 Improve Runway Safety Area - 11/29

NM SEA WA EAT Pangborn Memorial P 37 $ 6,869,283.00 $ 1,000,000.00 $ 5,869,283.00 Extend Runway - 12/30

NM SEA WA S31 Lopez Island GA 12 $ 241,928.00 $ 241,928.00 $ - Update Airport Master Plan Study

NM SEA WA 74S Anacortes GA 19 $ 125,745.00 $ 125,745.00 $ - Install Perimeter Fencing, Remove Obstructions

NM SEA WA HQM Bowerman GA 14 $ 432,218.00 $ 432,218.00 $ - Conduct Environmental Study

NM SEA WA 33S Pru Field GA 8 $ 805,302.00 $ 805,302.00 $ - Rehabilitate Runway - 01/19

NM SEA WA S52 Methow Valley State GA 7 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 13/31

NM SEA WA 0S7 Dorothy Scott GA 3 $ 150,000.00 $ 150,000.00 $ - Conduct Miscellaneous Study

NM SEA WA CLM William R Fairchild International GA 35 $ 853,087.00 $ 853,087.00 $ - Construct Apron

NM SEA WA CLM William R Fairchild International GA 34 $ 596,913.00 $ 596,913.00 $ - Update Airport Master Plan Study

NM SEA WA RLD Richland GA 27 $ 165,368.00 $ 165,368.00 $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway

NM SEA WA PAE Snohomish County (Paine Field) R 56 $ 4,196,768.00 $ 196,768.00 $ 4,000,000.00 Rehabilitate Runway Lighting - 16R/34L, Rehabilitate Taxiway

NM SEA WA SEA Seattle-Tacoma International P 138 $ 9,917,791.00 $ - $ 9,917,791.00 Rehabilitate Runway - 16C/34C

NM SEA WA TDO Ed Carlson Memorial Field - South Lewis Cou GA 8 $ 288,000.00 $ 288,000.00 $ -Install Runway Vertical/Visual Guidance System, Rehabilitate Apron,

Rehabilitate Taxiway

NM SEA WA 1S5 Sunnyside Municipal GA 7 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 07/25, Rehabilitate Taxiway

NM SEA WA EPH Ephrata Municipal GA 16 $ 296,282.00 $ 296,282.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway

NM SEA WA ELN Bowers Field GA 12 $ 287,018.00 $ 287,018.00 $ - Update Airport Master Plan Study

NM SEA WA OLM Olympia Regional GA 26 $ 1,059,917.00 $ 1,059,917.00 $ - Rehabilitate Taxiway

NM SEA WA 68S Davenport GA 6 $ 300,000.00 $ 300,000.00 $ - Conduct Environmental Study

NM SEA WA PUW Pullman/Moscow Regional P 41 $ 16,000,000.00 $ 1,000,000.00 $ 15,000,000.00 Construct Runway - Plan-1

NM SEA WA 2S8 Wilbur GA 12 $ 300,870.00 $ 300,870.00 $ - Update Airport Master Plan Study

NM SEA WA S10 Lake Chelan GA 9 $ 683,775.00 $ 683,775.00 $ - Acquire Land For Approaches

NM SEA WA S23 Ione Municipal GA 6 $ 231,455.00 $ 231,455.00 $ - Construct Taxiway

NM SEA WA GEG Spokane International P 53 $ 459,022.00 $ 459,022.00 $ - Rehabilitate Apron

NM SEA WA S40 Prosser GA 16 $ 266,537.00 $ 266,537.00 $ - Update Airport Master Plan Study

NM SEA WA *WAS State of Washington 14 $ 555,096.00 $ 555,096.00 $ - Conduct Aeronautical Survey for RNAV Approach

NM SEA WA ALW Walla Walla Regional P 30 $ 826,325.00 $ 826,325.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter

Fencing, Rehabilitate Taxiway

SO ATL GA VLD Valdosta Regional P 31 $ 3,285,030.00 $ 2,153,234.00 $ 1,131,796.00 Expand Apron

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 110 $ 10,000,000.00 $ - $ 10,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ATL GA SAV Savannah/Hilton Head International P 56 $ 3,767,889.00 $ 3,767,889.00 $ -Improve Runway Safety Area - 10/28, Improve Runway Safety Area -

01/19, Rehabilitate Taxiway Lighting, Remove Obstructions

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 34 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO ATL GA ABY Southwest Georgia Regional P 44 $ 73,315.00 $ 73,315.00 $ -Conduct Miscellaneous Study, Rehabilitate Runway - 04/22, Wildlife

Hazard Assessments

SO ATL GA AGS Augusta Regional at Bush Field P 38 $ 2,000,000.00 $ 2,000,000.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SO ATL GA *GAB Georgia State Block Grant Program 16 $ 18,281,160.00 $ 18,281,160.00 $ - Non primary development projects in state block grant program

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 115 $ 926,789.00 $ - $ 926,789.00 Zero Emissions Vehicle/Infrastructure

SO ATL GA CSG Columbus P 35 $ 32,238.00 $ 32,238.00 $ - Remove Obstructions

SO ATL GA *GAB Georgia State Block Grant Program 17 $ 23,633,461.00 $ - $ 23,633,461.00 Non primary development projects in state block grant program

SO ATL GA BQK Brunswick Golden Isles P 37 $ 25,000.00 $ 25,000.00 $ - Expand Apron

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 108 $ 8,123,993.00 $ 8,123,993.00 $ - Rehabilitate Runway - 08L/26R

SO ATL PR SJU Luis Munoz Marin International P 52 $ 1,995,000.00 $ 1,995,000.00 $ - Install Perimeter Fencing

SO ATL PR MAZ Eugenio Maria De Hostos CS 14 $ 332,500.00 $ 332,500.00 $ - Remove Obstructions

SO ATL PR SJU Luis Munoz Marin International P 53 $ 1,502,801.00 $ 483,478.00 $ 1,019,323.00 Acquire Aircraft Rescue & Fire Fighting Vehicle

SO ATL PR RVR Jose Aponte De La Torre P 9 $ 1,469,256.00 $ - $ 1,469,256.00 Rehabilitate Apron, Rehabilitate Building

SO ATL PR *PRV Various Locations in Puerto Rico 1 $ 1,496,024.00 $ 1,496,024.00 $ - Rehabilitate Runway

SO ATL PR *PRS Commonwealth of Puerto Rico 5 $ 750,000.00 $ 750,000.00 $ - Conduct State System Plan Study

SO ATL SC GSP Greenville Spartanburg International P 51 $ 915,000.00 $ 221,370.00 $ 693,630.00 Rehabilitate Apron, Rehabilitate Taxiway

SO ATL SC SMS Sumter GA 20 $ 219,117.00 $ 219,117.00 $ - Construct Building, Construct Taxiway

SO ATL SC JZI Charleston Executive GA 21 $ 429,242.00 $ 429,242.00 $ - Rehabilitate Apron

SO ATL SC CEU Oconee County Regional GA 21 $ 655,899.00 $ 655,899.00 $ - Construct Taxiway, Remove Obstructions

SO ATL SC FDW Fairfield County GA 14 $ 146,515.00 $ 146,515.00 $ - Update Airport Master Plan Study

SO ATL SC ARW Beaufort County GA 12 $ 355,048.00 $ 355,048.00 $ - Conduct Environmental Study, Remove Obstructions

SO ATL SC 52J Lee County-Butters Field GA 10 $ 421,038.00 $ 421,038.00 $ - Construct Building

SO ATL SC RBW Lowcountry Regional GA 14 $ 323,927.00 $ 323,927.00 $ -Conduct Miscellaneous Study, Improve Airport Drainage, Update

Airport Master Plan Study

SO ATL SC CQW Cheraw Municipal/Lynch Bellinger Field GA 12 $ 220,724.00 $ 220,724.00 $ - Conduct Environmental Study

SO ATL SC LQK Pickens County GA 21 $ 49,009.00 $ 49,009.00 $ - Expand Apron

SO ATL SC 3J1 Ridgeland GA 9 $ 1,532,727.00 $ 67,873.00 $ 1,464,854.00 Construct Runway - Plan-1

SO ATL SC GGE Georgetown County GA 17 $ 902,201.00 $ 902,201.00 $ - Expand Apron, Remove Obstructions

SO ATL SC CAE Columbia Metropolitan P 45 $ 1,020,010.00 $ 1,020,010.00 $ - Improve Terminal Building, Improve Terminal Building

SO ATL SC AIK Aiken Municipal GA 18 $ 2,261,288.00 $ 481,186.00 $ 1,780,102.00 Expand Apron

SO ATL SC CDN Woodward Field GA 22 $ 2,131,818.00 $ 699,318.00 $ 1,432,500.00 Improve Runway Safety Area - 06/24, Remove Obstructions

SO ATL SC MKS Berkeley County GA 22 $ 2,036,860.00 $ 33,592.00 $ 2,003,268.00 Remove Obstructions

SO ATL SC CHS Charleston AFB/International P 38 $ 17,842,816.00 $ 13,342,816.00 $ 4,500,000.00

Install Apron Edge Lights, Rehabilitate Taxiway [Taxiway A],

Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway Lighting

[Taxiway A], Rehabilitate Taxiway Lighting [Taxiway G]

SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 18 $ 74,817.00 $ 74,817.00 $ - Expand Apron, Rehabilitate Apron, Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 35 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO ATL SC CRE Grand Strand GA 20 $ 360,000.00 $ 360,000.00 $ - Conduct Miscellaneous Study, Conduct Miscellaneous Study

SO ATL SC CEU Oconee County Regional GA 22 $ 211,000.00 $ 211,000.00 $ - Acquire Land For Approaches

SO ATL SC GSP Greenville Spartanburg International P 50 $ 5,220,549.00 $ - $ 5,220,549.00 Rehabilitate Apron

SO ATL SC BBP Marlboro County Jetport - H E Avent Field GA 13 $ 150,000.00 $ 150,000.00 $ - Construct Building, Construct Taxiway

SO ATL SC HYW Conway-Horry County GA 17 $ 180,000.00 $ 180,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -

04/22, Rehabilitate Taxiway Lighting

SO ATL SC CAE Columbia Metropolitan P 44 $ 1,289,900.00 $ 1,289,900.00 $ - Improve Terminal Building, Rehabilitate Taxiway

SO ATL SC HXD Hilton Head P 37 $ 13,032,749.00 $ 2,496,791.00 $ 10,535,958.00

Improve Runway Safety Area [Acquire Land for Taxiways A and F] -

03/21, Improve Runway Safety Area [Expand General Aviation

Apron] - 03/21, Improve Runway Safety Area [Relocate Taxiway A] -

03/21, Remove Obstructions

SO ATL SC *SCV Various Locations in South Carolina 21 $ 553,655.35 $ 553,655.35 $ - Rehabilitate Runway

SO ATL SC UZA Rock Hill/York County/Bryant Field R 26 $ 149,913.00 $ 149,913.00 $ - Update Airport Master Plan Study

SO ATL SC PYG Pageland GA 12 $ 109,800.00 $ 109,800.00 $ - Construct Taxiway

SO ATL SC LKR Lancaster County-Mc Whirter Field GA 18 $ 144,089.00 $ 144,089.00 $ - Construct Apron

SO ATL SC CUB Jim Hamilton L B Owens R 21 $ 150,000.00 $ 150,000.00 $ - Construct Apron

SO ATL SC OGB Orangeburg Municipal GA 20 $ 461,967.00 $ 461,967.00 $ - Construct Fuel Farm

SO ATL SC 5J9 Twin City GA 4 $ 50,500.00 $ 50,500.00 $ - Install Airfield Guidance Signs, Install Perimeter Fencing

SO ATL SC FLO Florence Regional P 33 $ 347,750.00 $ 347,750.00 $ - Construct Aircraft Rescue & Fire Fighting Building

SO ATL SC UDG Darlington County Jetport GA 15 $ 550,525.00 $ 550,525.00 $ - Conduct Miscellaneous Study, Rehabilitate Runway Lighting - 05/23

SO ATL SC MKS Berkeley County GA 21 $ 207,347.00 $ 207,347.00 $ - Remove Obstructions

SO ATL SC 35A Union County, Troy Shelton Field GA 10 $ 324,090.00 $ 324,090.00 $ - Acquire Land For Approaches

SO ATL SC GRD Greenwood County GA 16 $ 151,847.00 $ 151,847.00 $ - Rehabilitate Apron

SO ATL SC SPA Spartanburg Downtown Memorial GA 20 $ 8,150,000.00 $ 150,000.00 $ 8,000,000.00 Extend Runway - 05/23

SO ATL SC GMU Greenville Downtown GA 24 $ 114,075.00 $ 114,075.00 $ - Remove Obstructions

SO ATL VI STX Henry E Rohlsen P 35 $ 6,870,128.00 $ 4,295,044.00 $ 2,575,084.00 Construct Aircraft Rescue & Fire Fighting Building

SO ATL VI STT Cyril E King P 34 $ 765,982.00 $ 765,982.00 $ - Conduct Airport Master Plan Study

SO ATL VI STT Cyril E King P 35 $ 194,287.00 $ 194,287.00 $ - Rehabilitate Runway Lighting - 10/28, Rehabilitate Taxiway

SO JAN AL 7A3 Lanett Municipal GA 12 $ 620,460.00 $ 150,000.00 $ 470,460.00 Construct Runway - 08/26

SO JAN AL 33J Geneva Municipal GA 12 $ 558,006.00 $ 558,006.00 $ - Construct Building

SO JAN AL AIV George Downer GA 13 $ 349,205.00 $ 349,205.00 $ - Construct Fuel Farm, Rehabilitate Runway - 06/24

SO JAN AL 7A5 Roanoke Municipal GA 10 $ 53,851.00 $ 53,851.00 $ - Update Airport Master Plan Study

SO JAN AL 61A Camden Municipal GA 10 $ 41,479.00 $ 41,479.00 $ - Conduct Environmental Study

SO JAN AL JFX Walker County-Bevill Field GA 17 $ 202,500.00 $ 202,500.00 $ - Construct Taxiway, Rehabilitate Runway - 09/27

SO JAN AL 4R3 Jackson Municipal GA 10 $ 64,443.00 $ 64,443.00 $ - Rehabilitate Runway - 01/19

SO JAN AL MOB Mobile Regional P 53 $ 1,992,083.00 $ 1,992,083.00 $ -Acquire Equipment, Conduct Miscellaneous Study, Extend Taxiway,

Rehabilitate Apron, Rehabilitate Building, Security Enhancements

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 36 of 57�

ell Field

l

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO JAN AL CMD Cullman Regional-Folsom Field GA 22 $ 488,149.00 $ 488,149.00 $ - Construct Taxiway

SO JAN AL EDN Enterprise Municipal GA 19 $ 107,635.00 $ 107,635.00 $ - Extend Runway - 05/23, Install Miscellaneous NAVAIDS

SO JAN AL SEM Craig Field GA 16 $ 93,131.00 $ 93,131.00 $ - Update Airport Master Plan Study

SO JAN AL PLR St Clair County R 17 $ 133,200.00 $ 133,200.00 $ -Install Perimeter Fencing, Remove Obstructions, Update Airport

Master Plan Study

SO JAN AL 4A9 Isbell Field GA 21 $ 1,004,840.00 $ 599,085.00 $ 405,755.00 Rehabilitate Runway - 04/22

SO JAN AL M22 Bill Pugh Field GA 12 $ 164,900.00 $ 164,900.00 $ - Rehabilitate Runway - 02/20, Remove Obstructions

SO JAN AL TOI Troy Municipal Airport at N Kenneth Campb GA 16 $ 47,625.00 $ 47,625.00 $ - Conduct Miscellaneous Study

SO JAN AL GAD Northeast Alabama Regional GA 16 $ 174,457.00 $ 174,457.00 $ -Rehabilitate Runway - 06/24, Rehabilitate Runway - 18/36,

Rehabilitate Taxiway

SO JAN AL 20A Robbins Field GA 11 $ 285,931.00 $ 285,931.00 $ - Construct Taxiway

SO JAN AL BHM Birmingham-Shuttlesworth International P 97 $ 482,820.00 $ 206,119.00 $ 276,701.00 Acquire Snow Removal Equipment

SO JAN AL DCU Pryor Field Regional GA 24 $ 646,200.00 $ 646,200.00 $ - Acquire Land for Development

SO JAN AL PRN MacCrenshaw Memorial GA 12 $ 461,445.00 $ 461,445.00 $ - Construct Taxiway

SO JAN AL BHM Birmingham-Shuttlesworth International P 96 $ 3,715,596.00 $ 3,715,596.00 $ - Expand Terminal Building

SO JAN AL 8A0 Albertville Regional-Thomas J Brumlik Field GA 25 $ 142,211.00 $ 142,211.00 $ - Rehabilitate Apron

SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 19 $ 186,006.00 $ 186,006.00 $ - Acquire Land for Development

SO JAN AL MVC Monroe County GA 12 $ 134,257.00 $ 134,257.00 $ - Install Perimeter Fencing, Remove Obstructions

SO JAN AL 79J South Alabama Regional at Bill Benton Field GA 20 $ 106,598.00 $ 106,598.00 $ - Install Perimeter Fencing

SO JAN AL DYA Demopolis Regional GA 13 $ 1,991,891.00 $ 168,600.00 $ 1,823,291.00 Rehabilitate Taxiway

SO JAN AL BFM Mobile Downtown GA 31 $ 5,825,493.00 $ 266,473.00 $ 5,559,020.00 Improve Airport Miscellaneous Improvements

SO JAN AL MGM Montgomery Regional (Dannelly Field) P 46 $ 886,455.00 $ 886,455.00 $ -Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate

Access Road

SO JAN AL MSL Northwest Alabama Regional GA 35 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Terminal Building

SO JAN AL EET Shelby County GA 18 $ 261,448.00 $ 261,448.00 $ - Construct Building

SO JAN AL 14J Carl Folsom GA 10 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway

SO JAN AL HSV Huntsville International-Carl T Jones Field P 75 $ 4,523,215.00 $ 4,523,215.00 $ -Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Terminal

Building

SO JAN AL 1R8 Bay Minette Municipal GA 11 $ 51,837.00 $ 51,837.00 $ - Conduct Environmental Study

SO JAN AL HSV Huntsville International-Carl T Jones Field P 76 $ 7,310,729.00 $ - $ 7,310,729.00 Construct Taxiway, Construct Taxiway

SO JAN AL HAB Marion County-Rankin Fite GA 13 $ 1,881,000.00 $ 247,496.00 $ 1,633,504.00 Rehabilitate Runway - 18/36

SO JAN AL 8A1 Guntersville Municipal - Joe Starnes Field GA 19 $ 2,506,033.00 $ 1,106,033.00 $ 1,400,000.00 Construct Runway - Plan-1

SO JAN AL PYP Centre-Piedmont-Cherokee County Regiona GA 9 $ 563,400.00 $ 563,400.00 $ - Construct Building

SO JAN AL 2R5 St Elmo GA 8 $ 126,583.00 $ 126,583.00 $ - Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24

SO JAN AL 3M8 North Pickens GA 8 $ 568,652.00 $ 568,652.00 $ - Construct Building, Construct Taxiway

SO JAN AL 0J4 Florala Municipal GA 4 $ 247,750.00 $ 247,750.00 $ - Improve Airport Drainage

SO JAN AL 4R9 Dauphin Island GA 12 $ 145,280.00 $ 145,280.00 $ - Conduct Environmental Study

SO JAN AL DHN Dothan Regional P 38 $ 2,810,510.00 $ 2,810,510.00 $ - Rehabilitate Apron

SO JAN AL ASN Talladega Municipal GA 27 $ 231,400.00 $ 231,400.00 $ - Construct Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 37 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO JAN AL 02A Chilton County GA 13 $ 335,668.00 $ 335,668.00 $ - Acquire Land for Development, Install Perimeter Fencing

SO JAN AL 5R4 Foley Municipal GA 13 $ 160,705.00 $ 160,705.00 $ - Improve Airport Drainage

SO JAN AL 0R1 Atmore Municipal GA 12 $ 1,841,856.00 $ 573,641.00 $ 1,268,215.00 Improve Runway Safety Area - 18/36, Rehabilitate Runway - 18/36

SO JAN AL EKY Bessemer R 14 $ 682,500.00 $ 282,500.00 $ 400,000.00 Rehabilitate Apron, Rehabilitate Taxiway

SO JAN AL BHM Birmingham-Shuttlesworth International P 98 $ 2,590,500.00 $ - $ 2,590,500.00 VALE Infrastructure

SO JAN AL 07A Franklin Field GA 5 $ 110,389.00 $ 110,389.00 $ - Install Perimeter Fencing, Update Airport Master Plan Study

SO JAN AL 71J Blackwell Field GA 16 $ 632,434.00 $ 632,434.00 $ - Construct Apron, Construct Taxiway, Install Perimeter Fencing

SO JAN AL 0J6 Headland Municipal GA 14 $ 262,148.00 $ 262,148.00 $ - Construct Fuel Farm

SO JAN AL 08A Wetumpka Municipal GA 16 $ 280,263.00 $ 280,263.00 $ - Improve Airport Drainage, Rehabilitate Runway - 09/27

SO JAN AL MSL Northwest Alabama Regional GA 34 $ 118,750.00 $ 118,750.00 $ - Install Perimeter Fencing

SO JAN AL SEM Craig Field GA 15 $ 97,457.00 $ 97,457.00 $ - Install Perimeter Fencing, Rehabilitate Taxiway

SO JAN AL 1A9 Prattville - Grouby Field GA 17 $ 78,503.00 $ 78,503.00 $ - Acquire Land For Approaches

SO JAN AL ANB Anniston Regional GA 31 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 05/23

SO JAN AL JKA Jack Edwards GA 29 $ 4,554,709.00 $ 150,119.00 $ 4,404,590.00 Construct Apron

SO JAN AL M95 Richard Arthur Field GA 7 $ 120,036.00 $ 120,036.00 $ - Update Airport Master Plan Study

SO JAN AL 12J Brewton Municipal GA 13 $ 271,990.00 $ 271,990.00 $ - Construct Taxiway, Improve Airport Drainage

SO JAN AL SCD Merkel Field Sylacauga Municipal GA 19 $ 423,347.00 $ 423,347.00 $ - Construct Taxiway, Rehabilitate Apron

SO JAN AL ALX Thomas C Russell Field GA 16 $ 1,009,662.00 $ 1,009,662.00 $ - Extend Taxiway

SO JAN AL CQF H. L. (Sonny) Callahan GA 16 $ 618,585.00 $ 618,585.00 $ - Construct Apron, Improve Airport Drainage

SO JAN MS GPT Gulfport-Biloxi International P 85 $ 3,420,000.00 $ - $ 3,420,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO JAN MS 1M2 Belzoni Municipal GA 15 $ 437,069.00 $ 437,069.00 $ - Construct Taxiway

SO JAN MS 2M4 G V Montgomery GA 11 $ 139,820.00 $ 139,820.00 $ - Remove Obstructions

SO JAN MS MJD Picayune Municipal GA 18 $ 75,600.00 $ 75,600.00 $ - Construct Taxiway, Update Airport Master Plan Study

SO JAN MS T36 Paul Pittman Memorial GA 16 $ 273,130.00 $ 273,130.00 $ - Rehabilitate Building

SO JAN MS UBS Columbus-Lowndes County GA 17 $ 119,128.00 $ 119,128.00 $ - Remove Obstructions

SO JAN MS M72 New Albany-Union County GA 17 $ 137,667.00 $ 137,667.00 $ - Install Runway Vertical/Visual Guidance System - 18/36

SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 22 $ 2,257,890.00 $ 166,783.00 $ 2,091,107.00 Rehabilitate Runway - 13/31

SO JAN MS 23M Clarke County GA 15 $ 232,351.00 $ 232,351.00 $ - Construct Apron

SO JAN MS 01M Tishomingo County GA 17 $ 60,993.00 $ 60,993.00 $ - Acquire Land For Approaches, Remove Obstructions

SO JAN MS GNF Grenada Municipal GA 12 $ 204,643.00 $ 204,643.00 $ - Rehabilitate Runway - 13/31

SO JAN MS *MSV Various Locations in Mississippi 6 $ 35,775.00 $ 35,775.00 $ -

Construct Access Road, Construct Apron, Construct Building,

Construct Taxiway, Construct Terminal Building, Improve Runway

Safety Area, Install Airfield Guidance Signs, Rehabilitate Apron,

Rehabilitate Building, Rehabilitate Runway, Rehabilitate Runway

Lighting, Rehabilitate Taxiway, Remove Obstructions to support

RNAV Approach

SO JAN MS CRX Roscoe Turner GA 24 $ 124,611.00 $ 124,611.00 $ - Rehabilitate Apron, Remove Obstructions

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 38 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO JAN MS MEI Key Field CS 34 $ 217,973.00 $ 217,973.00 $ -Rehabilitate Runway - 01/19, Rehabilitate Runway - 04/22,

Rehabilitate Taxiway

SO JAN MS UOX University-Oxford GA 29 $ 6,985,890.00 $ 105,225.00 $ 6,880,665.00 Construct Apron

SO JAN MS 15M Iuka GA 11 $ 257,265.00 $ 257,265.00 $ -Rehabilitate Runway Lighting - 18/36, Update Airport Master Plan

Study

SO JAN MS 14M Hollandale Municipal GA 11 $ 168,535.00 $ 168,535.00 $ - Install Perimeter Fencing

SO JAN MS 1R7 Brookhaven-Lincoln County GA 12 $ 453,830.00 $ 453,830.00 $ -Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions to

support RNAV Approach

SO JAN MS M23 James H Easom Field GA 14 $ 139,306.00 $ 139,306.00 $ - Acquire Land For Approaches

SO JAN MS RNV Cleveland Municipal GA 20 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Taxiway

SO JAN MS 25M Ripley GA 9 $ 297,468.00 $ 297,468.00 $ - Rehabilitate Apron

SO JAN MS 4R1 I H Bass Jr Memorial GA 13 $ 249,975.00 $ 249,975.00 $ - Construct Building

SO JAN MS 06M Eupora GA 9 $ 449,021.00 $ 449,021.00 $ -Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate

Taxiway, Remove Obstructions

SO JAN MS MBO Bruce Campbell Field GA 23 $ 787,050.00 $ 787,050.00 $ - Construct Access Road, Construct Terminal Building

SO JAN MS 19M C A Moore GA 16 $ 156,516.00 $ 156,516.00 $ - Improve Airport Erosion Control

SO JAN MS M24 Dean Griffin Memorial GA 15 $ 212,189.00 $ 212,189.00 $ - Construct Fuel Farm, Remove Obstructions

SO JAN MS PQL Trent Lott International GA 31 $ 423,094.00 $ 423,094.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 17/35,

Rehabilitate Taxiway

SO JAN MS GTR Golden Triangle Regional P 53 $ 860,800.00 $ 860,800.00 $ -Install Perimeter Fencing required by 14 CFR 139, Rehabilitate

Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SO JAN MS OSX Kosciusko-Attala County GA 14 $ 1,016,225.00 $ 255,580.00 $ 760,645.00 Rehabilitate Runway - 14/32

SO JAN MS M43 Prentiss-Jefferson Davis County GA 11 $ 66,161.00 $ 66,161.00 $ - Rehabilitate Apron, Update Airport Master Plan Study

SO JAN MS M37 Ruleville-Drew GA 14 $ 198,220.00 $ 198,220.00 $ - Construct Building

SO JAN MS 5A4 Okolona Municipal-Richard Stovall Field GA 17 $ 151,110.00 $ 151,110.00 $ - Rehabilitate Runway Lighting - 18/36

SO JAN MS GWO Greenwood-Leflore GA 16 $ 880,719.00 $ 880,719.00 $ - Widen Taxiway

SO JAN MS CKM Fletcher Field GA 22 $ 487,589.00 $ 487,589.00 $ - Construct Taxiway, Rehabilitate Runway Lighting - 18/36

SO JAN MS 0R0 Columbia-Marion County GA 12 $ 585,284.00 $ 585,284.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway, Update Airport Master Plan Study

SO JAN MS 5A6 Winona-Montgomery County GA 14 $ 249,883.00 $ 249,883.00 $ - Construct Building, Construct Taxiway

SO JAN MS JVW John Bell Williams GA 20 $ 1,345,769.00 $ 103,165.00 $ 1,242,604.00 Rehabilitate Taxiway

SO JAN MS GPT Gulfport-Biloxi International P 84 $ 3,056,033.00 $ 1,619,947.00 $ 1,436,086.00 Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Terminal

Building, Update Miscellaneous Study, Widen Taxiway

SO JAN MS 33M Water Valley Municipal GA 8 $ 220,608.00 $ 220,608.00 $ - Construct Fuel Farm

SO JAN MS PIB Hattiesburg-Laurel Regional P 36 $ 410,247.00 $ 410,247.00 $ - Construct Taxiway, Update Airport Master Plan Study

SO JAN MS STF George M Bryan GA 20 $ 830,974.00 $ 150,000.00 $ 680,974.00 Improve Runway Safety Area - 18/36

SO JAN MS M41 Holly Springs-Marshall County GA 16 $ 211,712.00 $ 211,712.00 $ - Acquire Land for Development, Remove Obstructions

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 39 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO JAN MS 2R0 Waynesboro Municipal GA 9 $ 210,190.00 $ 210,190.00 $ -Install Perimeter Fencing, Rehabilitate Airport Beacons, Rehabilitate

Runway - 02/20, Update Airport Master Plan Study

SO JAN MS TUP Tupelo Regional CS 40 $ 440,390.00 $ 440,390.00 $ -Install Perimeter Fencing required by 14 CFR 139, Rehabilitate

Runway - 18/36

SO JAN MS HSA Stennis International GA 29 $ 211,140.00 $ 211,140.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 24 $ 242,164.00 $ 242,164.00 $ - Install Perimeter Fencing

SO JAN MS VKS Vicksburg Municipal GA 8 $ 150,280.00 $ 150,280.00 $ -Install Runway Vertical/Visual Guidance System - 01/19, Remove

Obstructions

SO JAN MS HEZ Hardy-Anders Field Natchez-Adams County GA 25 $ 485,100.00 $ 485,100.00 $ - Construct Building

SO JAN MS 8M1 Booneville/Baldwyn GA 16 $ 96,185.00 $ 96,185.00 $ -Improve Runway Safety Area - 15/33, Rehabilitate Apron, Remove

Obstructions

SO JAN MS LMS Louisville Winston County GA 15 $ 67,500.00 $ 67,500.00 $ - Update Airport Master Plan Study

SO MEM KY 2M0 Princeton-Caldwell County GA 13 $ 431,161.00 $ 431,161.00 $ - Construct Taxiway

SO MEM KY 5M9 Marion-Crittenden County GA 12 $ 561,258.00 $ 561,258.00 $ - Construct Building

SO MEM KY AAS Taylor County GA 18 $ 400,870.00 $ 400,870.00 $ -Install Miscellaneous NAVAIDS, Install Runway Lighting - 05/23,

Install Taxiway Lighting

SO MEM KY LEX Blue Grass P 66 $ 3,431,009.00 $ 3,431,009.00 $ -

Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire

Fighting Training Facility, Construct Snow Removal Equipment

Building

SO MEM KY TWT Sturgis Municipal GA 14 $ 113,357.00 $ 113,357.00 $ - Update Airport Master Plan Study

SO MEM KY FFT Capital City GA 16 $ 369,000.00 $ 369,000.00 $ - Install Runway Lighting - 06/24, Remove Obstructions

SO MEM KY DWU Ashland Regional GA 18 $ 353,613.00 $ 353,613.00 $ - Acquire Land for Development

SO MEM KY PAH Barkley Regional P 45 $ 976,116.00 $ 976,116.00 $ -

Acquire Snow Removal Equipment, Improve Airport Drainage,

Install Taxiway Lighting, Rehabilitate Access Road, Rehabilitate

Parking Lot, Security Enhancements

SO MEM KY JQD Ohio County GA 16 $ 150,000.00 $ 150,000.00 $ - Construct Building, Expand Apron

SO MEM KY I35 Tucker-Guthrie Memorial GA 13 $ 42,390.00 $ 42,390.00 $ - Install Perimeter Fencing

SO MEM KY M20 Grayson County GA 11 $ 122,814.00 $ 122,814.00 $ - Acquire Land For Approaches

SO MEM KY M34 Kentucky Dam State Park GA 9 $ 151,351.00 $ 151,351.00 $ - Remove Obstructions

SO MEM KY I93 Breckinridge County GA 9 $ 157,205.00 $ 157,205.00 $ - Construct Fuel Farm

SO MEM KY SME Lake Cumberland Regional GA 22 $ 628,392.00 $ 628,392.00 $ - Construct Building

SO MEM KY KY8 Hancock Co-Ron Lewis Field GA 10 $ 359,100.00 $ 359,100.00 $ - Construct Fuel Farm, Update Airport Master Plan Study

SO MEM KY CEY Kyle-Oakley Field GA 26 $ 351,259.00 $ 351,259.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway - 05/23,

Remove Obstructions

SO MEM KY 0I8 Cynthiana-Harrison County GA 14 $ 760,000.00 $ 760,000.00 $ - Construct Taxiway

SO MEM KY K62 Gene Snyder GA 15 $ 648,931.00 $ 648,931.00 $ - Improve Runway Safety Area - 03/21

SO MEM KY GLW Glasgow Municipal GA 25 $ 101,057.00 $ 101,057.00 $ -Construct Runway Safety Area - 08/26, Improve Airport Drainage,

Install Miscellaneous NAVAIDS

SO MEM KY EKQ Wayne County GA 10 $ 50,000.00 $ 50,000.00 $ - Construct Building

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 40 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO MEM KY 4M7 Russellville-Logan County GA 17 $ 1,961,119.00 $ 1,961,119.00 $ - Extend Runway - 06/24

SO MEM KY 6I2 Lebanon-Springfield GA 15 $ 94,000.00 $ 94,000.00 $ - Conduct Environmental Study

SO MEM KY OWB Owensboro-Daviess County P 50 $ 1,000,000.00 $ 1,000,000.00 $ -

Acquire Snow Removal Equipment, Conduct Environmental Study,

Extend Runway - 18/36, Improve Service Road, Install Airport

Beacons, Install Guidance Signs, Rehabilitate Apron

SO MEM KY 2I3 Rough River State Park GA 2 $ 117,000.00 $ 117,000.00 $ - Remove Obstructions

SO MEM KY *KYS State of Kentucky 2 $ 1,000,000.00 $ 282,478.00 $ 717,522.00 Conduct State System Plan Study

SO MEM KY CPF Wendell H Ford GA 18 $ 269,706.00 $ 269,706.00 $ - Rehabilitate Taxiway

SO MEM KY K24 Russell County GA 16 $ 674,344.00 $ 674,344.00 $ - Construct Building

SO MEM KY 1M7 Fulton GA 13 $ 579,980.00 $ 579,980.00 $ - Construct Building

SO MEM KY JKL Julian Carroll GA 8 $ 361,965.00 $ 361,965.00 $ -Install Runway Vertical/Visual Guidance System - 01/19,

Rehabilitate Runway - 01/19, Rehabilitate Runway Lighting - 01/19

SO MEM KY LOZ London-Corbin Airport-Magee Field GA 23 $ 88,000.00 $ 88,000.00 $ - Construct Building

SO MEM KY FGX Fleming-Mason GA 17 $ 190,000.00 $ 190,000.00 $ - Acquire Land For Approaches, Conduct Environmental Study

SO MEM KY EHR Henderson City-County GA 28 $ 150,000.00 $ 150,000.00 $ - Extend Runway - 09/27

SO MEM KY BWG Bowling Green-Warren County Regional GA 27 $ 750,000.00 $ - $ 750,000.00 Rehabilitate Runway - 03/21

SO MEM KY TZV Tompkinsville-Monroe County GA 12 $ 40,000.00 $ 40,000.00 $ - Remove Obstructions

SO MEM KY 1A6 Middlesboro-Bell County GA 18 $ 122,810.00 $ 122,810.00 $ - Conduct Environmental Study

SO MEM KY LEX Blue Grass P 67 $ 10,676,063.00 $ 176,063.00 $ 10,500,000.00 Construct Taxiway

SO MEM KY 27K Georgetown Scott County - Marshall Field GA 20 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Apron

SO MEM KY CVG Cincinnati/Northern Kentucky International P 85 $ 4,249,391.00 $ 4,249,391.00 $ - Rehabilitate Apron

SO MEM KY M21 Muhlenberg County GA 16 $ 103,500.00 $ 103,500.00 $ - Expand Apron

SO MEM NC PGV Pitt-Greenville P 41 $ 1,024,397.00 $ 1,024,397.00 $ -Acquire Land For Approaches, Conduct Miscellaneous Study,

Remove Obstructions, Security Enhancements

SO MEM NC CLT Charlotte/Douglas International P 74 $ 11,470,826.00 $ 11,470,826.00 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land for

Development, Rehabilitate Runway - 05/23, Rehabilitate Taxiway,

Update Airport Master Plan Study

SO MEM NC FAY Fayetteville Regional/Grannis Field P 43 $ 2,050,594.00 $ 2,050,594.00 $ - Expand Terminal Building, Update Airport Master Plan Study

SO MEM NC *NCB North Carolina State Block Grant Program 50 $ 3,356,295.00 $ - $ 3,356,295.00 Non primary development projects in state block grant program

SO MEM NC ILM Wilmington International P 51 $ 6,836,380.00 $ 2,845,825.00 $ 3,990,555.00 Rehabilitate Apron, Update Airport Master Plan Study

SO MEM NC CLT Charlotte/Douglas International P 73 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment

SO MEM NC OAJ Albert J Ellis P 37 $ 1,508,965.00 $ - $ 1,508,965.00 Rehabilitate Apron

SO MEM NC RDU Raleigh-Durham International P 46 $ 3,607,958.00 $ 3,607,958.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Update Airport

Master Plan Study

SO MEM NC JQF Concord Regional P 1 $ 6,429,612.00 $ 1,000,000.00 $ 5,429,612.00 Construct Terminal Building

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 41 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO MEM NC GSO Piedmont Triad International P 73 $ 1,012,500.00 $ 1,012,500.00 $ - Acquire Snow Removal Equipment, Rehabilitate Runway - 05R/23L

SO MEM NC *NCB North Carolina State Block Grant Program 49 $ 14,882,709.00 $ 14,882,709.00 $ - Non primary development projects in state block grant program

SO MEM NC AVL Asheville Regional P 45 $ 12,560,480.00 $ 2,560,480.00 $ 10,000,000.00 Rehabilitate Runway - 16/34

SO MEM NC GSO Piedmont Triad International P 72 $ 2,700,000.00 $ - $ 2,700,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO MEM NC EWN Coastal Carolina Regional P 38 $ 1,258,202.00 $ 1,258,202.00 $ -Acquire Land for Development, Conduct Environmental Study,

Rehabilitate Taxiway Lighting, Security Enhancements

SO MEM NC GSO Piedmont Triad International P 71 $ 1,298,123.00 $ 1,298,123.00 $ - Construct Runway - 05L/23R

SO MEM TN *TNB Tennessee State Block Grant Program 49 $ 13,150,130.00 $ 13,150,130.00 $ - Non primary development projects in state block grant program

SO MEM TN BNA Nashville International P 99 $ 8,650,367.00 $ 3,046,239.00 $ 5,604,128.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway, Update

Miscellaneous Study

SO MEM TN TYS McGhee Tyson P 67 $ 15,412,563.00 $ 5,412,563.00 $ 10,000,000.00 Rehabilitate Runway - 05L/23R

SO MEM TN JWN John C Tune R 19 $ 5,204,008.00 $ 150,000.00 $ 5,054,008.00 Construct Runway Safety Area - 02/20

SO MEM TN MEM Memphis International P 91 $ 1,383,415.00 $ - $ 1,383,415.00 VALE Infrastructure

SO MEM TN CHA Lovell Field P 61 $ 2,597,670.00 $ 2,597,670.00 $ - Rehabilitate Apron

SO MEM TN TRI Tri-Cities Regional TN/VA P 67 $ 1,842,890.00 $ 1,842,890.00 $ - Improve Terminal Building, Rehabilitate Apron

SO MEM TN TYS McGhee Tyson P 68 $ 7,275,257.00 $ - $ 7,275,257.00 Rehabilitate Runway - 05L/23R

SO ORL FL OMN Ormond Beach Municipal R 18 $ 3,777,825.00 $ 1,077,825.00 $ 2,700,000.00 Construct Taxiway, Install Runway Vertical/Visual Guidance System -

17/35, Install Taxiway Lighting

SO ORL FL AAF Apalachicola Regional-Cleve Randolph Field GA 8 $ 531,766.00 $ 531,766.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway

SO ORL FL FIN Flagler County GA 16 $ 1,435,382.00 $ 1,435,382.00 $ -Construct Taxiway, Install Taxiway Lighting, Wildlife Hazard

Assessments

SO ORL FL 1J0 Tri-County GA 11 $ 74,430.00 $ 74,430.00 $ - Construct Taxiway

SO ORL FL EYW Key West International P 50 $ 525,835.00 $ 525,835.00 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ORL FL EYW Key West International P 49 $ 452,385.00 $ 452,385.00 $ - Improve Airport Drainage, Rehabilitate Apron

SO ORL FL X14 La Belle Municipal GA 8 $ 240,831.00 $ 240,831.00 $ - Construct Terminal Building

SO ORL FL X60 Williston Municipal GA 16 $ 150,000.00 $ 150,000.00 $ - Conduct Airport Master Plan Study

SO ORL FL 54J Defuniak Springs GA 10 $ 162,271.00 $ 162,271.00 $ - Improve Runway Safety Area - 09/27

SO ORL FL RSW Southwest Florida International P 53 $ 1,365,968.00 $ 1,365,968.00 $ - Install Airfield Guidance Signs, Rehabilitate Terminal Building

SO ORL FL MCO Orlando International P 115 $ 1,306,130.00 $ 1,306,130.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate

Taxiway, Rehabilitate Taxiway, Security Enhancements

SO ORL FL TLH Tallahassee Regional P 39 $ 654,711.00 $ 654,711.00 $ - Conduct Airport Master Plan Study

SO ORL FL HEG Herlong Recreational R 18 $ 797,912.00 $ 300,000.00 $ 497,912.00 Rehabilitate Apron

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 42 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO ORL FL FIN Flagler County GA 17 $ 1,054,800.00 $ 237,378.00 $ 817,422.00 Construct Runway - 11/29

SO ORL FL MTH The Florida Keys Marathon GA 32 $ 44,256.00 $ 44,256.00 $ - Install Runway Lighting - 07/25

SO ORL FL 42J Keystone Airpark GA 23 $ 458,823.00 $ 458,823.00 $ - Rehabilitate Apron

SO ORL FL VRB Vero Beach Municipal GA 39 $ 244,140.00 $ 244,140.00 $ - Rehabilitate Taxiway

SO ORL FL EVB New Smyrna Beach Municipal R 19 $ 1,251,000.00 $ 1,251,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway

SO ORL FL CTY Cross City GA 11 $ 150,870.00 $ 150,870.00 $ - Install Weather Reporting Equipment

SO ORL FL PIE St Pete-Clearwater International P 41 $ 5,745,002.00 $ 1,287,002.00 $ 4,458,000.00 Rehabilitate Apron

SO ORL FL FLL Fort Lauderdale/Hollywood International P 76 $ 20,000,000.00 $ - $ 20,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ORL FL SUA Witham Field GA 19 $ 1,490,494.00 $ 150,000.00 $ 1,340,494.00 Rehabilitate Runway - 12/30

SO ORL FL DAB Daytona Beach International P 71 $ 5,900,000.00 $ - $ 5,900,000.00 Construct Aircraft Rescue & Fire Fighting Building

SO ORL FL 54J Defuniak Springs GA 9 $ 210,845.00 $ 210,845.00 $ - Extend Runway - 09/27

SO ORL FL MTH The Florida Keys Marathon GA 33 $ 234,447.00 $ 234,447.00 $ - Update Miscellaneous Study

SO ORL FL GNV Gainesville Regional P 38 $ 2,468,410.00 $ 2,468,410.00 $ -Construct Aircraft Rescue & Fire Fighting Building, Expand Apron,

Rehabilitate Runway Lighting - 11/29

SO ORL FL DAB Daytona Beach International P 70 $ 2,307,984.00 $ 2,307,984.00 $ - Improve Terminal Building

SO ORL FL X35 Marion County GA 3 $ 1,065,072.00 $ 600,000.00 $ 465,072.00 Install Taxiway Lighting, Rehabilitate Taxiway

SO ORL FL SFB Orlando Sanford International P 74 $ 7,584,302.00 $ 210,254.00 $ 7,374,048.00 Install Runway Incursion Marking (14 CFR Part 139), Rehabilitate

Apron

SO ORL FL LAL Lakeland Linder Regional R 37 $ 2,173,500.00 $ 11,035.00 $ 2,162,465.00 Install Airfield Guidance Signs, Rehabilitate Taxiway

SO ORL FL PGD Punta Gorda P 34 $ 2,568,888.00 $ 1,669,829.00 $ 899,059.00 Construct Taxiway

SO ORL FL BKV Brooksville-Tampa Bay Regional GA 18 $ 1,338,254.00 $ 1,338,254.00 $ - Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway Lighting

SO ORL FL MLB Melbourne International P 42 $ 1,102,534.00 $ 1,102,534.00 $ - Widen Taxiway

SO ORL FL FLL Fort Lauderdale/Hollywood International P 75 $ 414,487.00 $ - $ 414,487.00 Acquire Equipment

SO ORL FL BCT Boca Raton R 20 $ 5,103,726.00 $ 150,000.00 $ 4,953,726.00 Improve Runway Safety Area - 05/23

SO ORL FL PNS Pensacola International P 40 $ 7,385,467.00 $ 7,385,467.00 $ - Rehabilitate Apron

SO ORL FL TLH Tallahassee Regional P 38 $ 530,368.00 $ 530,368.00 $ - Rehabilitate Terminal Building

SO ORL FL DED DeLand Municipal-Sidney H Taylor Field R 20 $ 101,700.00 $ 101,700.00 $ -Install Miscellaneous NAVAIDS, Install Weather Reporting

Equipment, Wildlife Hazard Assessments

SO ORL FL BOW Bartow Municipal GA 33 $ 2,253,641.00 $ 203,372.00 $ 2,050,269.00 Construct Taxiway, Install Taxiway Lighting, Wildlife Hazard

Assessments

SO ORL FL VNC Venice Municipal R 14 $ 7,201,487.00 $ 150,000.00 $ 7,051,487.00 Improve Runway Safety Area - 13/31

SO ORL FL F95 Calhoun County GA 6 $ 695,242.00 $ 695,242.00 $ - Construct Taxiway

SO ORL FL PMP Pompano Beach Airpark GA 2 $ 91,130.00 $ 91,130.00 $ - Wildlife Hazard Assessments

SO ORL FL JAX Jacksonville International P 54 $ 1,132,221.00 $ 1,132,221.00 $ - Rehabilitate Taxiway

SO ORL FL TPA Tampa International P 62 $ 5,132,837.00 $ 5,132,837.00 $ - Construct Terminal People Mover

SO ORL FL ORL Executive R 30 $ 350,000.00 $ 350,000.00 $ - Update Airport Master Plan Study

SO ORL FL SGJ Northeast Florida Regional GA 36 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 13/31

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 43 of 57�

d

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SO ORL FL ZPH Zephyrhills Municipal GA 14 $ 150,000.00 $ 150,000.00 $ - Improve Airport Miscellaneous Improvements

SO ORL FL SPG Albert Whitted R 23 $ 2,401,060.00 $ 150,000.00 $ 2,251,060.00 Install Runway Vertical/Visual Guidance System - 07/25,

Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25

SO ORL FL FLL Fort Lauderdale/Hollywood International P 74 $ 24,006,869.00 $ 4,006,869.00 $ 20,000,000.00 Extend Runway - 10R/28L

SO ORL FL SGJ Northeast Florida Regional GA 37 $ 1,146,301.00 $ - $ 1,146,301.00 Install Runway Vertical/Visual Guidance System - 13/31

SO ORL FL OCF Ocala International-Jim Taylor Field GA 24 $ 483,385.00 $ 483,385.00 $ - Construct Parking Lot

SO ORL FL GIF Winter Haven's Gilbert GA 24 $ 65,700.00 $ 65,700.00 $ - Construct Taxiway

SO ORL FL 01J Hilliard Airpark GA 8 $ 177,401.00 $ 177,401.00 $ - Install Perimeter Fencing

SO ORL FL 40J Perry-Foley GA 14 $ 561,546.00 $ 561,546.00 $ - Rehabilitate Apron

SO ORL FL EYW Key West International P 51 $ 772,063.00 $ 772,063.00 $ - Update Airport Master Plan Study

SO ORL FL MIA Miami International P 69 $ 2,790,894.00 $ 2,790,894.00 $ - Conduct Airport Master Plan Study

SO ORL FL LCQ Lake City Gateway GA 21 $ 81,000.00 $ 81,000.00 $ - Rehabilitate Runway Lighting - 10/28

SW AROK AR M73 Almyra Municipal GA 6 $ 586,125.00 $ 586,125.00 $ - Construct Taxiway, Expand Apron

SW AROK AR 7M4 Osceola Municipal GA 8 $ 235,359.00 $ 235,359.00 $ - Update Airport Master Plan Study

SW AROK AR CDH Harrell Field GA 15 $ 77,058.00 $ 77,058.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway

SW AROK AR SGT Stuttgart Municipal GA 22 $ 207,968.00 $ 207,968.00 $ - Rehabilitate Runway - 09/27

SW AROK AR XNA Northwest Arkansas Regional P 50 $ 4,322,029.00 $ 4,322,029.00 $ - Expand Apron

SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 84 $ 1,220,456.00 $ 1,220,456.00 $ - Update Airport Master Plan Study

SW AROK AR VBT Bentonville Municipal/Louise M Thaden Fiel GA 11 $ 91,064.00 $ 91,064.00 $ - Remove Obstructions

SW AROK AR H35 Clarksville Municipal GA 11 $ 386,524.00 $ 386,524.00 $ - Rehabilitate Taxiway

SW AROK AR DEQ J Lynn Helms Sevier County GA 12 $ 863,911.00 $ 863,911.00 $ - Construct Taxiway, Install Taxiway Lighting

SW AROK AR LLQ Monticello Municipal/Ellis Field GA 14 $ 698,634.00 $ 698,634.00 $ - Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway Lighting

SW AROK AR CVK Sharp County Regional GA 9 $ 491,999.00 $ 491,999.00 $ - Rehabilitate Apron, Rehabilitate Runway - 04/22

SW AROK AR MXA Manila Municipal GA 11 $ 279,754.00 $ 279,754.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SW AROK AR 32A Danville Municipal GA 5 $ 388,119.00 $ 388,119.00 $ - Rehabilitate Runway - 11/29

SW AROK AR 9M8 Sheridan Municipal GA 8 $ 242,794.00 $ 242,794.00 $ - Construct Taxiway

SW AROK AR M36 Frank Federer Memorial GA 9 $ 172,662.00 $ 172,662.00 $ - Construct Access Road

SW AROK AR 42A Melbourne Municipal - John E Miller Field GA 15 $ 72,306.00 $ 72,306.00 $ - Construct Taxiway

SW AROK AR HRO Boone County CS 24 $ 125,400.00 $ 125,400.00 $ - Rehabilitate Runway - 18/36

SW AROK AR RUE Russellville Regional GA 14 $ 122,230.00 $ 122,230.00 $ - Acquire Land For Approaches

SW AROK AR 7M7 Piggott Municipal GA 10 $ 90,900.00 $ 90,900.00 $ - Improve Runway Safety Area - 18/36

SW AROK AR M32 Lake Village Municipal GA 11 $ 135,835.00 $ 135,835.00 $ - Rehabilitate Runway Lighting - 01/19

SW AROK AR ELD South Arkansas Regional at Goodwin Field CS 19 $ 1,181,056.00 $ 1,181,056.00 $ - Rehabilitate Apron

SW AROK AR CCA Clinton Municipal GA 13 $ 244,336.00 $ 244,336.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System, Install Taxiway Lighting

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 44 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW AROK AR ORK North Little Rock Municipal R 24 $ 647,146.00 $ 647,146.00 $ -

Install Runway Vertical/Visual Guidance System - 17/35, Install

Runway Vertical/Visual Guidance System - 05/23, Rehabilitate

Runway Lighting - 17/35, Rehabilitate Taxiway Lighting

SW AROK AR FSM Fort Smith Regional P 43 $ 591,785.00 $ - $ 591,785.00 Acquire Aircraft Rescue & Fire Fighting Vehicle

SW AROK AR TXK Texarkana Regional-Webb Field P 40 $ 3,193,359.00 $ - $ 3,193,359.00 Rehabilitate Runway - 04/22

SW AROK AR JBR Jonesboro Municipal CS 20 $ 386,042.00 $ 386,042.00 $ - Rehabilitate Taxiway

SW AROK AR M27 Waldron Municipal GA 9 $ 323,720.00 $ 323,720.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SW AROK AR 6M7 Marianna/Lee County-Steve Edwards Field GA 5 $ 363,612.00 $ 363,612.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate

Runway - 18/36, Rehabilitate Taxiway

SW AROK AR SRC Searcy Municipal GA 22 $ 146,841.00 $ 146,841.00 $ - Rehabilitate Runway - 01/19

SW AROK AR ROG Rogers Municipal-Carter Field GA 34 $ 1,975,201.00 $ 150,211.00 $ 1,824,990.00 Rehabilitate Apron

SW AROK AR 0M0 Billy Free Municipal GA 9 $ 216,689.00 $ 216,689.00 $ - Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway Lighting

SW AROK AR 4M8 Clarendon Municipal GA 9 $ 268,775.00 $ 268,775.00 $ - Extend Taxiway

SW AROK AR 4M1 Carroll County GA 15 $ 594,594.00 $ 594,594.00 $ - Rehabilitate Runway - 07/25

SW AROK AR 4A5 Searcy County GA 13 $ 175,860.00 $ 175,860.00 $ - Rehabilitate Apron

SW AROK AR *ARS State of Arkansas 13 $ 200,000.00 $ 200,000.00 $ - Conduct State System Plan Study

SW AROK AR CRT Z M Jack Stell Field GA 10 $ 187,677.00 $ 187,677.00 $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway

SW AROK AR 5M1 De Witt Municipal GA 9 $ 366,956.00 $ 366,956.00 $ - Expand Apron, Rehabilitate Apron

SW AROK AR ARG Walnut Ridge Regional GA 13 $ 670,207.00 $ 670,207.00 $ - Improve Airport Drainage, Rehabilitate Taxiway

SW AROK AR 7M5 Ozark-Franklin County GA 7 $ 626,134.00 $ 626,134.00 $ - Improve Airport Drainage

SW AROK AR BPK Baxter County GA 16 $ 198,972.00 $ 198,972.00 $ - Rehabilitate Apron

SW AROK AR FLP Marion County Regional GA 11 $ 158,873.00 $ 158,873.00 $ - Rehabilitate Runway - 04/22

SW AROK AR AWM West Memphis Municipal R 26 $ 249,236.00 $ 249,236.00 $ - Update Airport Master Plan Study

SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 83 $ 12,937,527.00 $ 3,091,527.00 $ 9,846,000.00 Improve Runway Safety Area - 04R/22L, Rehabilitate Taxiway

[Taxiway A], Rehabilitate Taxiway [Taxiway B]

SW AROK AR PGR Kirk Field GA 11 $ 155,628.00 $ 155,628.00 $ -Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate

Taxiway

SW AROK AR 4M9 Corning Municipal GA 19 $ 294,660.00 $ 294,660.00 $ - Rehabilitate Apron

SW AROK AR BVX Batesville Regional GA 13 $ 438,971.00 $ 438,971.00 $ - Extend Taxiway [Taxilane], Extend Taxiway [Taxiway G]

SW AROK AR SUZ Saline County Regional GA 9 $ 748,373.00 $ 748,373.00 $ - Expand Apron

SW AROK AR HKA Blytheville Municipal GA 15 $ 127,648.00 $ 127,648.00 $ - Install Perimeter Fencing

SW AROK AR HOT Memorial Field CS 23 $ 46,265.00 $ 46,265.00 $ - Conduct Miscellaneous Study

SW AROK AR M18 Hope Municipal GA 10 $ 162,882.00 $ 162,882.00 $ - Install Taxiway Lighting

SW AROK AR TXK Texarkana Regional-Webb Field P 39 $ 3,403,151.00 $ 3,403,151.00 $ - Rehabilitate Runway - 04/22

SW AROK AR M19 Newport Municipal GA 10 $ 636,875.00 $ 636,875.00 $ -Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,

Rehabilitate Runway Lighting - 18/36

SW AROK AR 7M3 Bearce GA 12 $ 168,071.00 $ 168,071.00 $ - Install Perimeter Fencing, Remove Obstructions

SW AROK AR 4M3 Carlisle Municipal GA 14 $ 85,483.00 $ 85,483.00 $ - Rehabilitate Runway - 09/27

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 45 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW AROK OK F08 Eufaula Municipal GA 9 $ 249,987.00 $ 249,987.00 $ - Expand Apron

SW AROK OK CSM Clinton-Sherman GA 6 $ 450,000.00 $ 450,000.00 $ - Rehabilitate Runway - 17R/35L

SW AROK OK RQO El Reno Regional GA 11 $ 199,800.00 $ 199,800.00 $ - Conduct Airport Master Plan Study

SW AROK OK JWG Watonga Regional GA 9 $ 45,450.00 $ 45,450.00 $ - Construct Taxiway

SW AROK OK 2K4 Scott Field GA 7 $ 190,153.00 $ 190,153.00 $ -Improve Airport Miscellaneous Improvements, Rehabilitate Apron,

Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SW AROK OK OWP William R Pogue Municipal GA 18 $ 380,895.00 $ 380,895.00 $ - Install Miscellaneous NAVAIDS

SW AROK OK 1F4 Madill Municipal GA 5 $ 160,200.00 $ 160,200.00 $ - Improve Runway Safety Area - 18/36

SW AROK OK PVJ Pauls Valley Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 17/35

SW AROK OK GOK Guthrie-Edmond Regional GA 15 $ 175,000.00 $ 175,000.00 $ - Rehabilitate Runway - 16/34

SW AROK OK 1K4 David Jay Perry GA 9 $ 824,626.00 $ 824,626.00 $ - Construct Apron, Construct Building

SW AROK OK 17K Boise City GA 5 $ 70,200.00 $ 70,200.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SW AROK OK FDR Frederick Regional GA 8 $ 436,104.00 $ 436,104.00 $ - Rehabilitate Taxiway

SW AROK OK LAW Lawton-Fort Sill Regional P 33 $ 719,924.00 $ 719,924.00 $ -Construct Aircraft Rescue & Fire Fighting Building, Improve Snow

Removal Equipment Building, Install Perimeter Fencing

SW AROK OK ADH Ada Municipal GA 14 $ 1,758,150.00 $ 1,108,150.00 $ 650,000.00 Improve Runway Safety Area - 17/35, Rehabilitate Runway - 17/35,

Rehabilitate Runway Lighting - 17/35

SW AROK OK HHW Stan Stamper Municipal GA 11 $ 135,398.00 $ 135,398.00 $ - Install Runway Vertical/Visual Guidance System - 17/35

SW AROK OK AQR Atoka Municipal GA 10 $ 59,850.00 $ 59,850.00 $ - Improve Runway Safety Area - 18/36, Widen Runway - 18/36

SW AROK OK 1K2 Lindsay Municipal GA 8 $ 117,675.00 $ 117,675.00 $ - Rehabilitate Runway - 01/19

SW AROK OK 2O8 Hinton Municipal GA 7 $ 346,011.00 $ 346,011.00 $ - Construct Apron, Install Runway Lighting - 17/35

SW AROK OK 2F6 Skiatook Municipal GA 9 $ 131,726.00 $ 131,726.00 $ - Rehabilitate Runway - 18/36

SW AROK OK MKO Davis Field GA 11 $ 840,010.00 $ 840,010.00 $ - Rehabilitate Runway - 04/22

SW AROK OK MLC McAlester Regional GA 13 $ 253,957.00 $ 253,957.00 $ - Improve Airport Drainage, Rehabilitate Taxiway

SW AROK OK H05 Wilburton Municipal GA 6 $ 434,250.00 $ 434,250.00 $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway - 17/35

SW AROK OK HBR Hobart Regional GA 4 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Taxiway

SW AROK OK MDF Mooreland Municipal GA 4 $ 43,200.00 $ 43,200.00 $ - Rehabilitate Apron

SW AROK OK CUH Cushing Municipal GA 15 $ 82,800.00 $ 82,800.00 $ - Install Weather Reporting Equipment

SW AROK OK O45 Hooker Municipal GA 6 $ 117,374.00 $ 117,374.00 $ - Rehabilitate Runway - 17/35

SW AROK OK *OKS State of Oklahoma 15 $ 245,000.00 $ 245,000.00 $ - Update State System Plan Study

SW AROK OK 3F7 Jones Memorial GA 9 $ 175,626.00 $ 175,626.00 $ - Conduct Environmental Study

SW AROK OK RVS Richard Lloyd Jones Jr R 28 $ 1,525,545.00 $ 1,525,545.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 01L/19R,

Rehabilitate Taxiway

SW AROK OK SNL Shawnee Regional GA 16 $ 430,734.00 $ 430,734.00 $ -Construct Taxiway, Install Apron Flood Lighting, Install

Miscellaneous NAVAIDS, Install Weather Reporting Equipment

SW AROK OK 3O3 Purcell Municipal - Steven E Shephard Field GA 8 $ 531,906.00 $ 531,906.00 $ - Construct Taxiway

SW AROK OK CHK Chickasha Municipal GA 13 $ 58,590.00 $ 58,590.00 $ - Rehabilitate Access Road

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 46 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW AROK OK GUY Guymon Municipal GA 15 $ 319,576.00 $ 319,576.00 $ - Rehabilitate Apron, Rehabilitate Runway - 18/36

SW AROK OK RKR Robert S Kerr GA 11 $ 276,796.00 $ 276,796.00 $ - Construct Taxiway

SW AROK OK PVJ Pauls Valley Municipal GA 14 $ 79,067.00 $ 79,067.00 $ - Acquire Snow Removal Equipment

SW AROK OK SWO Stillwater Regional GA 21 $ 300,000.00 $ 300,000.00 $ - Construct Taxiway, Improve Airport Drainage

SW AROK OK ADM Ardmore Municipal GA 15 $ 886,428.00 $ 886,428.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway

SW AROK OK AVK Alva Regional GA 12 $ 569,281.00 $ 569,281.00 $ - Extend Taxiway

SW AROK OK DUC Halliburton Field GA 14 $ 316,445.00 $ 316,445.00 $ - Install Runway Lighting - 17/35

SW AROK OK PWA Wiley Post R 22 $ 3,560,494.00 $ 2,160,494.00 $ 1,400,000.00 Rehabilitate Runway - 17L/35R, Rehabilitate Runway Lighting -

17L/35R

SW AROK OK H71 Mid-America Industrial GA 11 $ 2,050,157.00 $ 1,250,157.00 $ 800,000.00 Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SW AROK OK SWO Stillwater Regional GA 22 $ 300,000.00 $ 300,000.00 $ - Install Perimeter Fencing

SW AROK OK BFK Buffalo Municipal GA 8 $ 573,099.00 $ 573,099.00 $ - Rehabilitate Runway - 17/35

SW AROK OK 1O4 Thomas Municipal GA 11 $ 222,858.00 $ 222,858.00 $ - Install Perimeter Fencing

SW AROK OK OKM Okmulgee Regional GA 21 $ 146,812.00 $ 146,812.00 $ - Install Runway Vertical/Visual Guidance System - 18/36

SW AROK OK JSV Sallisaw Municipal GA 12 $ 388,055.00 $ 388,055.00 $ - Construct Taxiway

SW AROK OK CLK Clinton Regional GA 13 $ 196,104.00 $ 196,104.00 $ - Install Perimeter Fencing

SW AROK OK OKC Will Rogers World P 67 $ 7,100,000.00 $ 7,100,000.00 $ - Rehabilitate Taxiway

SW AROK OK AXS Altus/Quartz Mountain Regional GA 14 $ 259,405.00 $ 259,405.00 $ - Install Perimeter Fencing

SW AROK OK GCM Claremore Regional GA 18 $ 1,095,623.00 $ 795,623.00 $ 300,000.00

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 17/35, Install Taxiway Lighting, Rehabilitate

Runway Lighting - 17/35

SW AROK OK 3O5 Walters Municipal GA 4 $ 346,562.00 $ 346,562.00 $ - Rehabilitate Runway - 16/34

SW AROK OK ELK Elk City Regional Business GA 16 $ 69,255.00 $ 69,255.00 $ - Rehabilitate Taxiway

SW AROK OK BKN Blackwell-Tonkawa Municipal GA 11 $ 124,329.00 $ 124,329.00 $ - Rehabilitate Runway, Rehabilitate Taxiway

SW LANM LA ARA Acadiana Regional GA 18 $ 2,084,283.00 $ 1,015,550.00 $ 1,068,733.00 Rehabilitate Runway - 16/34

SW LANM LA CWF Chennault International GA 15 $ 7,374,982.00 $ 374,982.00 $ 7,000,000.00 Rehabilitate Runway - 15/33

SW LANM LA BQP Morehouse Memorial GA 15 $ 460,719.00 $ 460,719.00 $ - Improve Runway Safety Area - 16/34

SW LANM LA 5F4 Homer Municipal GA 7 $ 1,161,955.00 $ 1,161,955.00 $ -Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate

Taxiway

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 103 $ 1,338,532.00 $ 1,338,532.00 $ - Rehabilitate Apron

SW LANM LA MSY Louis Armstrong New Orleans International P 99 $ 6,680,140.00 $ 50,140.00 $ 6,630,000.00 Construct Apron

SW LANM LA SPH Springhill GA 11 $ 460,295.00 $ 460,295.00 $ -Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway -

18/36, Rehabilitate Taxiway

SW LANM LA ASD Slidell R 20 $ 236,863.00 $ 236,863.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SW LANM LA HUM Houma-Terrebonne GA 27 $ 245,004.00 $ 245,004.00 $ - Construct Taxiway

SW LANM LA RSN Ruston Regional GA 18 $ 220,320.00 $ 220,320.00 $ - Update Airport Master Plan Study

SW LANM LA F87 Union Parish GA 13 $ 67,500.00 $ 67,500.00 $ - Construct Taxiway

SW LANM LA AEX Alexandria International P 64 $ 942,354.00 $ 942,354.00 $ - Rehabilitate Runway - 14/32, Remove Obstructions

SW LANM LA LCH Lake Charles Regional P 45 $ 1,303,204.00 $ 1,303,204.00 $ -Acquire Aircraft Rescue & Fire Fighting Safety Equipment,

Rehabilitate Runway Lighting - 05/23

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 47 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW LANM LA MLU Monroe Regional P 33 $ 870,660.00 $ 870,660.00 $ - Construct Service Road

SW LANM LA AEX Alexandria International P 66 $ 6,593,187.00 $ - $ 6,593,187.00 Rehabilitate Apron

SW LANM LA 4R7 Eunice GA 12 $ 851,846.00 $ 851,846.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

SW LANM LA GAO South Lafourche Leonard Miller Jr GA 14 $ 111,042.00 $ 111,042.00 $ - Conduct Miscellaneous Study

SW LANM LA HDC Hammond Northshore Regional GA 18 $ 365,769.00 $ 365,769.00 $ - Rehabilitate Runway - 13/31

SW LANM LA 3R4 Hart GA 11 $ 148,000.00 $ 148,000.00 $ - Rehabilitate Runway - 12/30

SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 46 $ 6,878,614.00 $ 1,994,190.00 $ 4,884,424.00 Improve Runway Safety Area - 11/29, Wildlife Hazard Assessments

SW LANM LA UXL Southland Field GA 17 $ 143,842.00 $ 143,842.00 $ - Rehabilitate Runway - 15/33

SW LANM LA SHV Shreveport Regional P 60 $ 299,441.00 $ 299,441.00 $ - Rehabilitate Taxiway

SW LANM LA AEX Alexandria International P 67 $ 7,000,000.00 $ - $ 7,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW LANM LA PTN Harry P Williams Memorial GA 16 $ 419,820.00 $ 419,820.00 $ - Rehabilitate Runway - 06/24

SW LANM LA 3F4 Vivian GA 9 $ 1,353,130.00 $ 1,353,130.00 $ - Rehabilitate Runway - 09/27

SW LANM LA HZR False River Regional GA 17 $ 235,270.00 $ 235,270.00 $ - Rehabilitate Apron

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 104 $ 915,453.00 $ 915,453.00 $ - Update Airport Master Plan Study

SW LANM LA IYA Abbeville Chris Crusta Memorial GA 17 $ 600,000.00 $ 600,000.00 $ - Construct Taxiway

SW LANM LA 1L0 St John the Baptist Parish GA 16 $ 467,430.00 $ 467,430.00 $ -Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate

Taxiway

SW LANM LA 0R7 The Red River GA 7 $ 182,994.00 $ 182,994.00 $ - Install Perimeter Fencing, Rehabilitate Runway - 18/36

SW LANM LA TVR Vicksburg Tallulah Regional GA 14 $ 42,621.00 $ 42,621.00 $ - Install Perimeter Fencing

SW LANM LA IER Natchitoches Regional GA 20 $ 1,568,736.00 $ 1,568,736.00 $ - Rehabilitate Runway - 17/35

SW LANM LA 1R1 Jena GA 7 $ 297,560.00 $ 297,560.00 $ -Rehabilitate Runway - 17/35, Rehabilitate Taxiway, Update Airport

Master Plan Study

SW LANM LA BXA George R Carr Memorial Air Field GA 17 $ 150,000.00 $ 150,000.00 $ - Remove Obstructions

SW LANM LA L31 St Tammany Regional GA 8 $ 60,241.00 $ 60,241.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 18/36

SW LANM LA BXA George R Carr Memorial Air Field GA 18 $ 47,370.00 $ 47,370.00 $ - Construct Taxiway

SW LANM LA L38 Louisiana Regional GA 13 $ 132,323.00 $ 132,323.00 $ - Extend Runway - 17/35

SW LANM LA MSY Louis Armstrong New Orleans International P 100 $ 15,000,000.00 $ - $ 15,000,000.00 Construct Apron

SW LANM LA OPL St Landry Parish-Ahart Field GA 12 $ 83,280.00 $ 83,280.00 $ - Rehabilitate Runway - 18/36

SW LANM LA UXL Southland Field GA 18 $ 441,538.00 $ 441,538.00 $ - Rehabilitate Runway Lighting - 15/33

SW LANM LA 0R5 David G Joyce GA 10 $ 139,778.00 $ 139,778.00 $ - Rehabilitate Runway - 09/27

SW LANM LA 5R8 DeQuincy Industrial Airpark GA 16 $ 103,499.00 $ 103,499.00 $ - Update Airport Master Plan Study

SW LANM LA 3R2 Le Gros Memorial GA 11 $ 137,700.00 $ 137,700.00 $ - Rehabilitate Apron, Update Airport Master Plan Study

SW LANM LA DTN Shreveport Downtown R 24 $ 162,919.00 $ 162,919.00 $ - Rehabilitate Taxiway

SW LANM LA L39 Leesville GA 10 $ 106,028.00 $ 106,028.00 $ -Improve Runway Safety Area - 18/36, Update Airport Master Plan

Study

SW LANM LA AEX Alexandria International P 68 $ 1,252,967.00 $ 1,252,967.00 $ -Rehabilitate Runway Lighting - 14/32, Rehabilitate Runway Lighting -

18/36

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 48 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW LANM NM ABQ Albuquerque International Sunport P 48 $ 1,279,576.00 $ - $ 1,279,576.00 VALE Infrastructure

SW LANM NM E14 Ohkay Owingeh GA 11 $ 93,916.00 $ 93,916.00 $ - Conduct Airport Master Plan Study

SW LANM NM S42 Springer Municipal GA 7 $ 102,816.00 $ 102,816.00 $ - Acquire Land for Development, Install Perimeter Fencing

SW LANM NM GNT Grants-Milan Municipal GA 14 $ 62,595.00 $ 62,595.00 $ - Rehabilitate Runway - 13/31

SW LANM NM E14 Ohkay Owingeh GA 12 $ 47,861.00 $ 47,861.00 $ - Construct Snow Removal Equipment Building

SW LANM NM LRU Las Cruces International GA 29 $ 239,221.00 $ 239,221.00 $ - Install Runway Vertical/Visual Guidance System - 08/26

SW LANM NM E06 Lea County-Zip Franklin Memorial GA 7 $ 562,333.00 $ 562,333.00 $ - Rehabilitate Apron

SW LANM NM N17 Vaughn Municipal GA 9 $ 97,324.00 $ 97,324.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

SW LANM NM SVC Grant County GA 16 $ 140,156.00 $ 140,156.00 $ - Rehabilitate Runway - 08/26

SW LANM NM ABQ Albuquerque International Sunport P 47 $ 3,649,805.00 $ 1,840,614.00 $ 1,809,191.00 Rehabilitate Apron

SW LANM NM ALM Alamogordo-White Sands Regional GA 24 $ 2,083,301.00 $ 83,301.00 $ 2,000,000.00 Extend Runway - 03/21

SW LANM NM SKX Taos Regional GA 33 $ 16,162,353.00 $ 1,319,570.00 $ 14,842,783.00 Construct Runway - Plan-1

SW LANM NM CNM Cavern City Air Terminal CS 23 $ 205,658.00 $ 205,658.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

SW LANM NM 83 New Airport 8 $ 3,092,985.00 $ 3,092,985.00 $ - Construct New Airport

SW LANM NM F37 Carrizozo Municipal GA 6 $ 327,463.00 $ 327,463.00 $ - Rehabilitate Taxiway

SW LANM NM SXU Santa Rosa Route 66 GA 13 $ 89,914.00 $ 89,914.00 $ - Conduct Miscellaneous Study

SW LANM NM CNM Cavern City Air Terminal CS 24 $ 62,986.00 $ 62,986.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542

SW LANM NM ATS Artesia Municipal GA 14 $ 2,068,470.00 $ 1,352,421.00 $ 716,049.00 Rehabilitate Runway - 12/30

SW LANM NM E89 Conchas Lake GA 5 $ 853,975.00 $ 853,975.00 $ - Improve Runway Safety Area - 09/27

SW LANM NM E05 Hatch Municipal GA 10 $ 95,622.00 $ 95,622.00 $ - Update Airport Master Plan Study

SW LANM NM SXU Santa Rosa Route 66 GA 14 $ 152,755.00 $ 152,755.00 $ - Install Airport Beacons, Rehabilitate Apron

SW LANM NM ALM Alamogordo-White Sands Regional GA 23 $ 1,400,000.00 $ 1,400,000.00 $ - Extend Runway - 03/21

SW LANM NM CVN Clovis Municipal GA 29 $ 172,800.00 $ 172,800.00 $ - Acquire Equipment

SW LANM NM E80 Alexander Municipal GA 13 $ 600,000.00 $ 600,000.00 $ - Construct Fuel Farm

SW LANM NM SRR Sierra Blanca Regional GA 24 $ 183,510.00 $ 183,510.00 $ - Acquire Equipment

SW LANM NM AXX Angel Fire GA 19 $ 374,599.00 $ 374,599.00 $ - Rehabilitate Taxiway

SW LANM NM N24 Questa Municipal Nr 2 GA 10 $ 299,581.00 $ 299,581.00 $ - Remove Obstructions - 17/35

SW LANM NM TCS Truth Or Consequences Municipal GA 15 $ 392,369.00 $ 392,369.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate

Taxiway

SW LANM NM GUP Gallup Municipal GA 24 $ 214,881.00 $ 214,881.00 $ - Rehabilitate Runway - 06/24

SW LANM NM ROW Roswell International Air Center P 29 $ 9,000,000.00 $ 1,000,000.00 $ 8,000,000.00 Rehabilitate Runway - 03/21

SW LANM NM AEG Double Eagle II R 21 $ 90,000.00 $ - $ 90,000.00 Wildlife Hazard Assessments

SW LANM NM HOB Lea County Regional P 23 $ 269,209.00 $ 269,209.00 $ - Rehabilitate Runway - 03/21

SW LANM NM 0.00E+00 Moriarty GA 14 $ 360,000.00 $ 360,000.00 $ - Rehabilitate Runway Lighting - 08/26

SW LANM NM LSB Lordsburg Municipal GA 15 $ 223,573.00 $ 223,573.00 $ - Rehabilitate Runway

SW LANM NM FMN Four Corners Regional P 39 $ 99,760.00 $ 99,760.00 $ - Acquire Land for Development

SW LANM NM FMN Four Corners Regional P 38 $ 170,149.00 $ 170,149.00 $ - Rehabilitate Taxiway

SW TEX TX DAL Dallas Love Field P 49 $ 863,445.00 $ 863,445.00 $ - Install Airfield Guidance Signs

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 49 of 57�

l

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW TEX TX *TXB Texas State Block Grant Program 91 $ 15,406,017.00 $ 15,406,017.00 $ - Non primary development projects in state block grant program

SW TEX TX IAH George Bush Intercontinental/Houston P 104 $ 2,711,250.00 $ - $ 2,711,250.00 VALE Infrastructure

SW TEX TX AFW Fort Worth Alliance R 56 $ 11,144,001.00 $ - $ 11,144,001.00 Extend Runway - 16L/34R

SW TEX TX *TXB Texas State Block Grant Program 93 $ 720,000.00 $ - $ 720,000.00 Non primary development projects in state block grant program

SW TEX TX HOU William P Hobby P 40 $ 1,575,000.00 $ - $ 1,575,000.00 VALE Infrastructure

SW TEX TX *TXB Texas State Block Grant Program 89 $ 13,640,547.00 $ 13,640,547.00 $ - Non primary development projects in state block grant program

SW TEX TX EFD Ellington R 23 $ 3,000,000.00 $ 3,000,000.00 $ - Rehabilitate Access Road

SW TEX TX ELP El Paso International P 35 $ 4,950,000.00 $ 4,950,000.00 $ - Rehabilitate Runway - 08L/26R

SW TEX TX MAF Midland International P 55 $ 673,545.00 $ 673,545.00 $ - Construct Apron, Construct Taxiway, Rehabilitate Runway - 16L/34R

SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 14 $ 4,482,353.00 $ 482,353.00 $ 4,000,000.00 Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 105 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment

SW TEX TX AMA Rick Husband Amarillo International P 39 $ 2,864,394.00 $ 2,864,394.00 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Equipment,

Conduct Miscellaneous Study, Construct Taxiway, Rehabilitate

Runway Lighting - 04/22, Update Airport Master Plan Study

SW TEX TX HRL Valley International P 57 $ 4,470,425.00 $ 4,470,425.00 $ -

Install Instrument Approach Aid - 13/31, Rehabilitate Runway

Lighting - 13/31, Rehabilitate Runway Lighting - 17R/35L,

Rehabilitate Service Road, Rehabilitate Taxiway, Rehabilitate

Taxiway Lighting

SW TEX TX GRK Robert Gray AAF P 25 $ 400,500.00 $ 400,500.00 $ - Acquire Equipment, Improve Terminal Building

SW TEX TX DRT Del Rio International CS 17 $ 1,218,040.00 $ 1,218,040.00 $ - Construct Wash Rack, Install Apron Lighting, Rehabilitate Apron

SW TEX TX DFW Dallas/Fort Worth International P 111 $ 14,000,000.00 $ - $ 14,000,000.00 Rehabilitate Taxiway

SW TEX TX ABI Abilene Regional P 45 $ 17,602,598.00 $ 1,120,683.00 $ 16,481,915.00 Rehabilitate Runway - 17R/35L

SW TEX TX DFW Dallas/Fort Worth International P 112 $ 9,003,360.00 $ 9,003,360.00 $ -Rehabilitate Runway - 17R/35L, Rehabilitate Runway Lighting -

18L/36R

SW TEX TX IAH George Bush Intercontinental/Houston P 103 $ 13,888,014.00 $ 13,888,014.00 $ - Extend Runway - 15R/33L

SW TEX TX *TXB Texas State Block Grant Program 92 $ 19,652,075.00 $ 19,652,075.00 $ - Non primary development projects in state block grant program

SW TEX TX BRO Brownsville/South Padre Island Internationa P 43 $ 1,200,000.00 $ 1,200,000.00 $ - Construct Terminal Building

SW TEX TX ACT Waco Regional P 37 $ 580,410.00 $ 580,410.00 $ - Update Airport Master Plan Study

SW TEX TX BPT Jack Brooks Regional P 31 $ 3,036,448.00 $ 1,000,000.00 $ 2,036,448.00 Rehabilitate Runway - 12/30

SW TEX TX LBB Lubbock Preston Smith International P 40 $ 16,329,362.00 $ 3,415,407.00 $ 12,913,955.00 Rehabilitate Runway - 17R/35L

SW TEX TX LRD Laredo International P 80 $ 6,000,000.00 $ - $ 6,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW TEX TX GRK Robert Gray AAF P 24 $ 900,000.00 $ 900,000.00 $ - Update Airport Master Plan Study

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 50 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

SW TEX TX MFE McAllen Miller International P 46 $ 1,247,500.00 $ 1,247,500.00 $ -Expand Apron, Improve Airport Drainage, Rehabilitate Terminal

Building, Update Airport Master Plan Study

SW TEX TX GGG East Texas Regional P 41 $ 870,375.00 $ - $ 870,375.00 Rehabilitate Taxiway Lighting

SW TEX TX ACT Waco Regional P 36 $ 6,269,266.00 $ 419,590.00 $ 5,849,676.00 Rehabilitate Taxiway

SW TEX TX AFW Fort Worth Alliance R 55 $ 10,670,629.00 $ 670,629.00 $ 10,000,000.00 Extend Runway - 16L/34R

SW TEX TX SAT San Antonio International P 82 $ 15,000,000.00 $ - $ 15,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

SW TEX TX *TXB Texas State Block Grant Program 90 $ 26,474,547.00 $ 26,474,547.00 $ - Non primary development projects in state block grant program

SW TEX TX CLL Easterwood Field P 37 $ 1,004,172.00 $ 1,004,172.00 $ - Expand Terminal Building

SW TEX TX DAL Dallas Love Field P 48 $ 7,900,000.00 $ 900,000.00 $ 7,000,000.00 Rehabilitate Apron

SW TEX TX SAT San Antonio International P 81 $ 16,361,675.00 $ 2,361,675.00 $ 14,000,000.00 Construct Taxiway, Rehabilitate Runway Lighting, Rehabilitate

Taxiway

SW TEX TX TYR Tyler Pounds Regional P 36 $ 9,841,711.00 $ 1,152,206.00 $ 8,689,505.00 Rehabilitate Runway - 04/22

SW TEX TX *TXB Texas State Block Grant Program 94 $ 75,000.00 $ - $ 75,000.00 Non primary development projects in state block grant program

SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 15 $ 517,647.00 $ 517,647.00 $ - Construct Terminal Building

SW TEX TX LRD Laredo International P 79 $ 7,596,816.00 $ 993,216.00 $ 6,603,600.00 Rehabilitate Taxiway [Taxiway G]

SW TEX TX HOU William P Hobby P 41 $ 210,000.00 $ - $ 210,000.00 Acquire Equipment

WP HNL AS PPG Pago Pago International P 54 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 05/23

WP HNL FM TKK Chuuk International GA 20 $ 32,305,535.00 $ - $ 32,305,535.00 Rehabilitate Runway - 04/22

WP HNL FM TKK Chuuk International GA 19 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan

WP HNL FM T11 Yap International GA 12 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan

WP HNL FM TTK Kosrae GA 14 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan

WP HNL FM PNI Pohnpei International GA 16 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan

WP HNL GU GUM Guam International P 93 $ 2,000,000.00 $ - $ 2,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

WP HNL GU GUM Guam International P 91 $ 1,251,000.00 $ 1,251,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP HNL GU GUM Guam International P 92 $ 3,341,165.00 $ 3,341,165.00 $ - Rehabilitate Runway - 06L/24R

WP HNL HI HNL Honolulu International P 122 $ 16,172,638.00 $ 16,172,638.00 $ - Widen Runway - 08L/26R

WP HNL HI JRF Kalaeloa (John Rodgers Field) R 17 $ 4,000,000.00 $ 3,179,691.00 $ 820,309.00 Construct Building

WP HNL HI HNL Honolulu International P 123 $ 1,995,000.00 $ 1,995,000.00 $ - Update Airport Master Plan Study

WP HNL HI LNY Lanai P 19 $ 819,000.00 $ 819,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP HNL HI HNL Honolulu International P 124 $ 262,000.00 $ - $ 262,000.00 Install Noise Monitoring System

WP HNL HI MKK Molokai P 21 $ 819,000.00 $ 819,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP HNL HI JRF Kalaeloa (John Rodgers Field) R 18 $ 3,073,000.00 $ - $ 3,073,000.00 Rehabilitate Building

WP HNL HI HNL Honolulu International P 121 $ 500,000.00 $ 500,000.00 $ - Rehabilitate Runway Lighting - 04L/22R

WP HNL HI *HIS State of Hawaii 8 $ 1,700,000.00 $ - $ 1,700,000.00 Conduct State System Plan Study

WP HNL HI KOA Kona International at Keahole P 37 $ 269,460.00 $ 269,460.00 $ - Conduct Environmental Study

WP HNL MH MAJ Marshall Islands International GA 16 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 51 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP HNL MP GSN Francisco C Ada/Saipan International P 84 $ 1,052,135.00 $ 1,052,135.00 $ - Construct Aircraft Rescue & Fire Fighting Training Facility

WP HNL MP GSN Francisco C Ada/Saipan International P 86 $ 701,554.00 $ 701,554.00 $ - Improve Terminal Building

WP HNL MP GRO Benjamin Taisacan Manglona International P 25 $ 420,000.00 $ 420,000.00 $ - Update Airport Master Plan Study

WP HNL MP GSN Francisco C Ada/Saipan International P 85 $ 700,000.00 $ 700,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP HNL MP GSN Francisco C Ada/Saipan International P 83 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Taxiway

WP HNL MP TNI Tinian International P 25 $ 360,000.00 $ 360,000.00 $ - Acquire Equipment

WP HNL MP TNI Tinian International P 24 $ 390,348.00 $ 390,348.00 $ - Improve Aircraft Rescue & Fire Fighting Building

WP HNL MP GRO Benjamin Taisacan Manglona International P 24 $ 360,000.00 $ 360,000.00 $ - Acquire Equipment

WP HNL MP TNI Tinian International P 26 $ 420,000.00 $ 420,000.00 $ - Update Airport Master Plan Study

WP HNL PW ROR Babelthuap/Koror GA 21 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan

WP LAX CA LGB Long Beach /Daugherty Field/ P 43 $ 834,072.00 $ - $ 834,072.00 Conduct Airport Master Plan Study

WP LAX CA BIH Eastern Sierra Regional GA 17 $ 1,422,356.00 $ 901,356.00 $ 521,000.00

Install Perimeter Fencing, Install Runway Vertical/Visual Guidance

System - 12/30, Install Runway Vertical/Visual Guidance System -

16/34, Rehabilitate Runway - 16/34

WP LAX CA SBD San Bernardino International R 27 $ 1,333,154.00 $ 281,224.00 $ 1,051,930.00 Rehabilitate Taxiway

WP LAX CA L08 Borrego Valley GA 18 $ 2,650,000.00 $ 2,650,000.00 $ - Rehabilitate Runway - 08/26

WP LAX CA TSP Tehachapi Municipal GA 15 $ 853,933.00 $ 853,933.00 $ - Rehabilitate Taxiway

WP LAX CA EMT El Monte R 16 $ 5,168,838.00 $ 5,168,838.00 $ - Rehabilitate Apron

WP LAX CA CMA Camarillo R 35 $ 241,469.00 $ 241,469.00 $ - Rehabilitate Apron

WP LAX CA O26 Lone Pine GA 11 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway Lighting - 16/34

WP LAX CA PSP Palm Springs International P 53 $ 10,788,409.00 $ 3,838,533.00 $ 6,949,876.00 Rehabilitate Runway - 13R/31L, Rehabilitate Runway Lighting -

13R/31L

WP LAX CA LAX Los Angeles International P 84 $ 8,000,000.00 $ - $ 8,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

WP LAX CA BFL Meadows Field P 42 $ 16,426,728.00 $ 4,668,911.00 $ 11,757,817.00 Rehabilitate Runway - 12L/30R

WP LAX CA MHV Mojave GA 29 $ 432,000.00 $ 432,000.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 08/26,

Rehabilitate Runway Lighting - 08/26

WP LAX CA TNP Twentynine Palms GA 6 $ 54,000.00 $ 54,000.00 $ - Conduct Miscellaneous Study

WP LAX CA IZA Santa Ynez GA 14 $ 1,130,285.00 $ 1,130,285.00 $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual

Guidance System - 08/26, Rehabilitate Runway Lighting - 08/26,

Rehabilitate Taxiway Lighting, Security Enhancements

WP LAX CA RNM Ramona R 16 $ 69,217.00 $ 69,217.00 $ - Wildlife Hazard Assessments

WP LAX CA L71 California City Municipal GA 16 $ 778,865.00 $ 778,865.00 $ - Rehabilitate Taxiway

WP LAX CA BNG Banning Municipal GA 14 $ 127,170.00 $ 127,170.00 $ - Install Airfield Guidance Signs, Remove Obstructions

WP LAX CA HHR Jack Northrop Field/Hawthorne Municipal R 15 $ 54,000.00 $ 54,000.00 $ - Conduct Noise Compatibility Plan Study

WP LAX CA SNA John Wayne Airport-Orange County P 45 $ 2,643,010.00 $ 2,643,010.00 $ -Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate

Taxiway

WP LAX CA MIT Shafter-Minter Field GA 22 $ 830,427.00 $ 830,427.00 $ -Extend Taxiway, Install Runway Vertical/Visual Guidance System -

08/26

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 52 of 57�

ld

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP LAX CA 2O7 Independence GA 7 $ 303,381.00 $ 303,381.00 $ - Rehabilitate Runway - 14/32

WP LAX CA DLO Delano Municipal GA 12 $ 836,179.00 $ 836,179.00 $ -Install Perimeter Fencing, Install Weather Reporting Equipment,

Rehabilitate Apron

WP LAX CA EED Needles GA 8 $ 54,000.00 $ 54,000.00 $ - Conduct Miscellaneous Study

WP LAX CA SAN San Diego International P 74 $ 12,000,000.00 $ - $ 12,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL

WP LAX CA SAN San Diego International P 75 $ 4,461,937.00 $ 3,531,411.00 $ 930,526.00 Rehabilitate Runway - 09/27

WP LAX CA REI Redlands Municipal GA 14 $ 136,350.00 $ 136,350.00 $ - Install Runway Lighting - 08/26

WP LAX CA PSP Palm Springs International P 52 $ 3,114,896.00 $ 3,114,896.00 $ - Security Enhancements

WP LAX CA SBA Santa Barbara Municipal P 49 $ 3,026,481.00 $ 3,026,481.00 $ -

Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway

Lighting - 07/25, Rehabilitate Runway Lighting - 15L/33R,

Rehabilitate Runway Lighting - 15R/33L

WP LAX CA IPL Imperial County CS 32 $ 48,450.00 $ 48,450.00 $ - Rehabilitate Apron

WP LAX CA SMX Santa Maria Public/Capt G Allan Hancock Fie P 34 $ 442,085.00 $ 317,310.00 $ 124,775.00 Update Airport Master Plan Study

WP LAX CA BLH Blythe GA 9 $ 144,000.00 $ 144,000.00 $ - Rehabilitate Apron

WP LAX CA BUR Bob Hope P 59 $ 915,317.00 $ 915,317.00 $ - Rehabilitate Runway - 08/26, Rehabilitate Runway - 15/33

WP LAX CA LGB Long Beach /Daugherty Field/ P 42 $ 7,066,535.00 $ 4,601,906.00 $ 2,464,629.00 Install Perimeter Fencing required by 49 CFR 1542

WP LAX CA VCV Southern California Logistics R 23 $ 6,011,164.00 $ 1,419,825.00 $ 4,591,339.00 Rehabilitate Runway - 17/35

WP LAX CA WJF General Wm J Fox Airfield GA 17 $ 1,321,446.00 $ 150,000.00 $ 1,171,446.00 Construct Taxiway

WP LAX CA IYK Inyokern CS 30 $ 284,944.00 $ 284,944.00 $ - Install Perimeter Fencing required by 14 CFR 139

WP LAX CA L45 Bakersfield Municipal GA 19 $ 360,633.00 $ 360,633.00 $ - Rehabilitate Taxiway

WP LAX CA IPL Imperial County CS 33 $ 236,529.00 $ 236,529.00 $ -Install Runway Vertical/Visual Guidance System - 08/26, Install

Runway Vertical/Visual Guidance System - 14/32

WP LAX CA L35 Big Bear City GA 21 $ 141,750.00 $ 141,750.00 $ - Rehabilitate Runway Lighting - 08/26

WP LAX CA LAX Los Angeles International P 83 $ 10,000,000.00 $ - $ 10,000,000.00 Construct Apron, Construct Taxiway

WP LAX CA LAX Los Angeles International P 85 $ 40,811,250.00 $ 13,181,788.00 $ 27,629,462.00 Improve Runway Safety Area - 06R/24L

WP LAX CA SDM Brown Field Municipal R 17 $ 4,374,638.00 $ 450,000.00 $ 3,924,638.00 Rehabilitate Runway - 08L/26R

WP LAX CA RIV March ARB R 11 $ 2,349,653.00 $ 2,349,653.00 $ - Rehabilitate Apron

WP LAX CA BWC Brawley Municipal GA 17 $ 776,372.00 $ 776,372.00 $ - Improve Runway Safety Area - 08/26

WP PHX AZ 0V7 Kayenta GA 9 $ 382,168.00 $ 382,168.00 $ - Construct Snow Removal Equipment Building

WP PHX AZ P08 Coolidge Municipal GA 10 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Taxiway

WP PHX AZ JTC Springerville Municipal GA 24 $ 689,612.00 $ 689,612.00 $ - Improve Fuel Farm

WP PHX AZ E25 Wickenburg Municipal GA 23 $ 300,000.00 $ 300,000.00 $ - Construct Apron

WP PHX AZ CHD Chandler Municipal R 24 $ 1,262,432.00 $ 1,262,432.00 $ - Improve Airport Drainage

WP PHX AZ 1G4 Grand Canyon West P 18 $ 99,243.00 $ 99,243.00 $ - Conduct Miscellaneous Study

WP PHX AZ FFZ Falcon Field R 25 $ 1,538,231.00 $ 1,538,231.00 $ - Construct Taxiway

WP PHX AZ IFP Laughlin/Bullhead International P 46 $ 6,501,164.00 $ 1,350,164.00 $ 5,151,000.00 Extend Runway - 16/34

WP PHX AZ PRC Ernest A Love Field CS 36 $ 380,000.00 $ 380,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

WP PHX AZ E60 Eloy Municipal GA 13 $ 225,227.00 $ 225,227.00 $ - Conduct Environmental Study

WP PHX AZ IWA Phoenix-Mesa Gateway P 37 $ 3,316,790.00 $ 3,316,790.00 $ - Rehabilitate Runway - 12C/30C

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 53 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP PHX AZ FLG Flagstaff Pulliam P 39 $ 500,000.00 $ 500,000.00 $ - Update Airport Master Plan Study

WP PHX AZ PHX Phoenix Sky Harbor International P 80 $ 1,019,900.00 $ - $ 1,019,900.00 VALE Infrastructure

WP PHX AZ GYR Phoenix Goodyear R 20 $ 4,999,000.00 $ 1,449,000.00 $ 3,550,000.00 Rehabilitate Runway - 03/21

WP PHX AZ INW Winslow-Lindbergh Regional GA 19 $ 2,403,521.00 $ 2,403,521.00 $ - Rehabilitate Runway - 04/22

WP PHX AZ CFT Greenlee County GA 13 $ 450,000.00 $ 450,000.00 $ - Rehabilitate Runway - 07/25

WP PHX AZ OLS Nogales International GA 18 $ 1,529,557.00 $ 1,529,557.00 $ - Rehabilitate Apron

WP PHX AZ FHU Sierra Vista Municipal-Libby AAF GA 29 $ 54,468.00 $ 54,468.00 $ - Strengthen Taxiway

WP PHX AZ E95 Benson Municipal GA 17 $ 247,989.00 $ 247,989.00 $ - Expand Apron, Install Miscellaneous NAVAIDS

WP PHX AZ PRC Ernest A Love Field CS 35 $ 3,539,500.00 $ 220,000.00 $ 3,319,500.00 Install Emergency Generator, Install Taxiway Lighting

WP PHX AZ TUS Tucson International P 72 $ 501,507.00 $ 1.00 $ 501,506.00 Conduct Environmental Study

WP PHX AZ TUS Tucson International P 73 $ 4,730,197.00 $ 4,730,197.00 $ - Energy Efficiency Equipment/Infrastructure

WP PHX AZ FLG Flagstaff Pulliam P 38 $ 293,500.00 $ 293,500.00 $ - Rehabilitate Runway - 03/21

WP PHX AZ SDL Scottsdale R 32 $ 2,282,904.00 $ 161,595.00 $ 2,121,309.00 Rehabilitate Taxiway

WP PHX AZ PHX Phoenix Sky Harbor International P 79 $ 22,699,973.00 $ 6,763,464.00 $ 15,936,509.00 Rehabilitate Apron

WP PHX AZ P13 San Carlos Apache GA 19 $ 519,861.00 $ 519,861.00 $ - Construct Fuel Farm

WP PHX AZ PGA Page Municipal P 29 $ 918,555.00 $ 918,555.00 $ -Construct Taxiway, Install Airfield Guidance Signs, Rehabilitate

Runway Lighting - 15/33, Rehabilitate Taxiway Lighting

WP PHX AZ PHX Phoenix Sky Harbor International P 81 $ 5,000,000.00 $ - $ 5,000,000.00 Conduct Noise Compatibility Plan Study

WP PHX AZ DVT Phoenix Deer Valley R 35 $ 6,714,250.00 $ 490,830.00 $ 6,223,420.00 Rehabilitate Apron

WP PHX AZ IGM Kingman GA 27 $ 2,680,000.00 $ 2,266,809.00 $ 413,191.00 Rehabilitate Apron, Rehabilitate Taxiway

WP PHX AZ AZC Colorado City Municipal GA 19 $ 235,999.00 $ 235,999.00 $ - Conduct Environmental Study

WP PHX AZ P52 Cottonwood GA 16 $ 104,861.00 $ 104,861.00 $ - Rehabilitate Apron

WP PHX AZ SAD Safford Regional GA 24 $ 455,539.00 $ 455,539.00 $ - Rehabilitate Runway - 12/30

WP PHX AZ 1G4 Grand Canyon West P 17 $ 72,848.00 $ 72,848.00 $ - Conduct Miscellaneous Study

WP PHX AZ GCN Grand Canyon National Park P 27 $ 6,468,000.00 $ 6,468,000.00 $ -Construct Taxiway, Install Apron Lighting, Rehabilitate Runway

Lighting, Rehabilitate Taxiway Lighting

WP PHX NV 0L7 Jean GA 4 $ 390,937.00 $ 390,937.00 $ -Rehabilitate Runway - 02R/20L, Rehabilitate Runway - 02L/20R,

Rehabilitate Taxiway, Runway Incursion Markings

WP PHX NV EKO Elko Regional P 45 $ 8,202,190.00 $ 1,000,000.00 $ 7,202,190.00 Rehabilitate Runway - 05/23

WP PHX NV LOL Derby Field GA 14 $ 416,091.00 $ 416,091.00 $ -

Install Runway Vertical/Visual Guidance System - 02/20,

Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate

Runway - 08/26, Rehabilitate Taxiway

WP PHX NV BVU Boulder City Municipal P 23 $ 478,125.00 $ 478,125.00 $ - Update Airport Master Plan Study

WP PHX NV LAS McCarran International P 82 $ 22,407,834.00 $ 6,057,834.00 $ 16,350,000.00 Rehabilitate Runway - 07L/25R, Rehabilitate Taxiway

WP PHX NV 67L Mesquite GA 14 $ 286,226.00 $ 286,226.00 $ - Update Airport Master Plan Study

WP PHX NV 1L1 Lincoln County GA 10 $ 140,254.00 $ 140,254.00 $ - Construct Fuel Farm, Install Perimeter Fencing

WP PHX NV FLX Fallon Municipal GA 17 $ 167,458.00 $ 167,458.00 $ - Rehabilitate Runway - 13/31

WP PHX NV BTY Beatty GA 15 $ 93,750.00 $ 93,750.00 $ - Install Miscellaneous NAVAIDS

WP PHX NV ELY Ely /Yelland Field/ GA 19 $ 2,110,214.00 $ 2,110,214.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 54 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP PHX NV 10U Owyhee GA 9 $ 531,226.00 $ 531,226.00 $ -Acquire Snow Removal Equipment, Construct Snow Removal

Equipment Building

WP PHX NV MEV Minden-Tahoe GA 27 $ 1,380,475.00 $ 1,380,475.00 $ - Rehabilitate Apron, Rehabilitate Taxiway

WP PHX NV SPZ Silver Springs GA 16 $ 164,532.00 $ 164,532.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway

WP PHX NV MEV Minden-Tahoe GA 28 $ 520,132.00 $ 520,132.00 $ - Update Airport Master Plan Study

WP PHX NV CXP Carson R 29 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron

WP PHX NV RNO Reno/Tahoe International P 101 $ 8,553,636.00 $ 8,226,859.00 $ 326,777.00 Rehabilitate Taxiway

WP PHX NV L92 Alamo Landing Field GA 8 $ 90,023.00 $ 90,023.00 $ - Acquire Snow Removal Equipment

WP PHX NV BVU Boulder City Municipal P 22 $ 1,386,613.00 $ 1,386,613.00 $ - Improve Airport Drainage, Rehabilitate Runway - 09L/27R

WP PHX NV 06U Jackpot/Hayden Field GA 12 $ 675,000.00 $ 675,000.00 $ -Install Miscellaneous NAVAIDS, Install Runway Lighting - 15/33,

Install Runway Vertical/Visual Guidance System - 15/33

WP PHX NV RTS Reno/Stead R 34 $ 1,499,517.00 $ 1,499,517.00 $ - Rehabilitate Taxiway

WP PHX NV WMC Winnemucca Municipal GA 22 $ 75,000.00 $ 75,000.00 $ - Construct Taxiway

WP SFO CA OAK Metropolitan Oakland International P 72 $ 2,014,750.00 $ - $ 2,014,750.00 Rehabilitate Runway - 12/30

WP SFO CA D86 Sequoia Field GA 7 $ 90,000.00 $ 90,000.00 $ - Update Airport Master Plan Study

WP SFO CA D86 Sequoia Field GA 8 $ 69,000.00 $ 69,000.00 $ -Install Runway Vertical/Visual Guidance System - 13/31, Install

Weather Reporting Equipment

WP SFO CA PVF Placerville GA 15 $ 271,767.00 $ 271,767.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Taxiway

WP SFO CA O28 Ells Field-Willits Municipal GA 7 $ 26,405.00 $ 26,405.00 $ - Conduct Miscellaneous Study

WP SFO CA JAQ Westover Field Amador County GA 18 $ 50,000.00 $ 50,000.00 $ - Rehabilitate Runway - 01/19

WP SFO CA DVO Gnoss Field R 20 $ 322,524.00 $ 322,524.00 $ - Conduct Environmental Study

WP SFO CA FCH Fresno Chandler Executive R 21 $ 705,000.00 $ 705,000.00 $ - Rehabilitate Taxiway

WP SFO CA O22 Columbia GA 14 $ 181,155.00 $ 181,155.00 $ - Rehabilitate Taxiway

WP SFO CA O08 Colusa County GA 15 $ 226,208.00 $ 226,208.00 $ - Update Airport Master Plan Study

WP SFO CA O16 Garberville GA 9 $ 161,753.00 $ 161,753.00 $ - Rehabilitate Runway - 18/36

WP SFO CA DWA Yolo County GA 17 $ 552,303.00 $ 552,303.00 $ - Install Perimeter Fencing, Update Miscellaneous Study

WP SFO CA TRK Truckee-Tahoe GA 32 $ 1,309,163.00 $ 1,309,163.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway

WP SFO CA MRY Monterey Regional P 62 $ 290,108.00 $ 290,108.00 $ - Conduct Environmental Study

WP SFO CA MMH Mammoth Yosemite P 33 $ 52,800.00 $ 52,800.00 $ - Conduct Miscellaneous Study

WP SFO CA CEC Jack McNamara Field P 31 $ 5,043,438.00 $ 1,000,000.00 $ 4,043,438.00 Improve Runway Safety Area - 11/29

WP SFO CA SJC Norman Y Mineta San Jose International P 87 $ 3,375,620.00 $ 96,960.00 $ 3,278,660.00 Install Perimeter Fencing required by 49 CFR 1542

WP SFO CA O27 Oakdale GA 14 $ 271,000.00 $ 271,000.00 $ - Improve Airport Erosion Control, Wildlife Hazard Assessments

WP SFO CA PAO Palo Alto Airport of Santa Clara County R 10 $ 509,585.00 $ 509,585.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments

WP SFO CA JAQ Westover Field Amador County GA 17 $ 100,000.00 $ 100,000.00 $ - Install Weather Reporting Equipment

WP SFO CA TRK Truckee-Tahoe GA 34 $ 2,157,553.00 $ 2,157,553.00 $ - Rehabilitate Taxiway

WP SFO CA O60 Cloverdale Municipal GA 9 $ 246,335.00 $ 246,335.00 $ - Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 55 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP SFO CA O89 Fall River Mills GA 15 $ 30,150.00 $ 30,150.00 $ - Update Miscellaneous Study

WP SFO CA O22 Columbia GA 15 $ 345,335.00 $ 345,335.00 $ - Update Airport Master Plan Study

WP SFO CA TVL Lake Tahoe GA 37 $ 1,346,535.00 $ 1,346,535.00 $ - Rehabilitate Apron

WP SFO CA TVL Lake Tahoe GA 38 $ 72,000.00 $ 72,000.00 $ - Update Miscellaneous Study

WP SFO CA TRK Truckee-Tahoe GA 31 $ 67,392.00 $ 67,392.00 $ - Rehabilitate Apron

WP SFO CA TVL Lake Tahoe GA 39 $ 128,925.00 $ 128,925.00 $ - Conduct Miscellaneous Study

WP SFO CA O85 Benton Field GA 17 $ 34,779.00 $ 34,779.00 $ - Conduct Miscellaneous Study

WP SFO CA MCE Merced Regional/Macready Field CS 24 $ 124,260.00 $ 124,260.00 $ - Conduct Miscellaneous Study

WP SFO CA SBP San Luis County Regional P 43 $ 15,619,998.00 $ 5,882,212.00 $ 9,737,786.00 Construct Terminal Building

WP SFO CA CVH Hollister Municipal GA 18 $ 5,820,666.00 $ 3,088,474.00 $ 2,732,192.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway

WP SFO CA SJC Norman Y Mineta San Jose International P 86 $ 1,498,141.00 $ - $ 1,498,141.00 Conduct Airport Master Plan Study

WP SFO CA EKA Murray Field GA 12 $ 107,760.00 $ 107,760.00 $ - Update Miscellaneous Study

WP SFO CA MYV Yuba County GA 16 $ 144,000.00 $ 144,000.00 $ - Update Airport Master Plan Study

WP SFO CA DVO Gnoss Field R 19 $ 67,500.00 $ 67,500.00 $ - Update Miscellaneous Study

WP SFO CA PVF Placerville GA 16 $ 37,004.00 $ 37,004.00 $ - Update Miscellaneous Study

WP SFO CA SVE Susanville Municipal GA 15 $ 62,739.00 $ 62,739.00 $ - Install Runway Vertical/Visual Guidance System - 11/29

WP SFO CA CIC Chico Municipal P 35 $ 176,787.00 $ 176,787.00 $ - Update Airport Master Plan Study

WP SFO CA RDD Redding Municipal P 47 $ 545,908.00 $ 545,908.00 $ -

Acquire Handicap Passenger Lift Device, Conduct Miscellaneous

Study, Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate

Apron, Rehabilitate Taxiway

WP SFO CA SMF Sacramento International P 55 $ 7,769,912.00 $ 1,769,912.00 $ 6,000,000.00 Construct Apron

WP SFO CA FAT Fresno Yosemite International P 77 $ 10,228,351.00 $ 5,101,129.00 $ 5,127,222.00 Rehabilitate Apron

WP SFO CA SBP San Luis County Regional P 44 $ 118,266.00 $ 118,266.00 $ - Wildlife Hazard Assessments

WP SFO CA DVO Gnoss Field R 18 $ 83,160.00 $ 83,160.00 $ - Install Weather Reporting Equipment

WP SFO CA SQL San Carlos R 17 $ 250,290.00 $ 250,290.00 $ - Update Airport Master Plan Study

WP SFO CA SBP San Luis County Regional P 45 $ 6,779,405.00 $ - $ 6,779,405.00 Construct Terminal Building

WP SFO CA MMH Mammoth Yosemite P 31 $ 1,607,565.00 $ 1,607,565.00 $ - Rehabilitate Apron

WP SFO CA E36 Georgetown GA 11 $ 32,405.00 $ 32,405.00 $ - Conduct Miscellaneous Study

WP SFO CA SJC Norman Y Mineta San Jose International P 85 $ 2,521,139.00 $ 2,521,139.00 $ - Install Guidance Signs, Rehabilitate Runway - 12L/30R

WP SFO CA AAT Alturas Municipal GA 11 $ 48,600.00 $ 48,600.00 $ - Conduct Miscellaneous Study

WP SFO CA CIC Chico Municipal P 36 $ 98,139.00 $ 98,139.00 $ - Conduct Miscellaneous Study

WP SFO CA STS Charles M Schulz - Sonoma County P 49 $ 1,194,151.00 $ - $ 1,194,151.00 Improve Runway Safety Area - 14/32

WP SFO CA WLW Willows-Glenn County GA 6 $ 591,350.00 $ 591,350.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

WP SFO CA O15 Turlock Municipal GA 10 $ 100,292.00 $ 100,292.00 $ - Conduct Miscellaneous Study

WP SFO CA EKA Murray Field GA 11 $ 41,342.00 $ 41,342.00 $ - Conduct Miscellaneous Study

WP SFO CA HJO Hanford Municipal GA 23 $ 499,127.00 $ 499,127.00 $ - Rehabilitate Taxiway

WP SFO CA OAR Marina Municipal GA 12 $ 1,125,725.00 $ 1,125,725.00 $ - Install Perimeter Fencing

WP SFO CA SCK Stockton Metropolitan P 35 $ 450,000.00 $ 450,000.00 $ - Update Airport Master Plan Study

WP SFO CA OAK Metropolitan Oakland International P 71 $ 9,425,485.00 $ 4,176,635.00 $ 5,248,850.00 Improve Runway Safety Area - 10R/28L

WP SFO CA AUN Auburn Municipal GA 12 $ 225,000.00 $ 225,000.00 $ - Conduct Airport Master Plan Study

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 56 of 57�

FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded

Region ADO State LOCID Airport Service Level Grant Seq

Number AIP Federal Funds Entitlement Discretionary

Brief Description of Work

WP SFO CA GOO Nevada County Air Park GA 17 $ 157,472.00 $ 157,472.00 $ - Update Airport Master Plan Study

WP SFO CA O81 Tulelake Municipal GA 11 $ 275,189.00 $ 275,189.00 $ - Conduct Environmental Study

WP SFO CA O32 Reedley Municipal GA 17 $ 248,913.00 $ 248,913.00 $ - Install Perimeter Fencing

WP SFO CA C83 Byron R 15 $ 834,506.00 $ 834,506.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate

Runway - 12/30, Rehabilitate Taxiway

WP SFO CA AAT Alturas Municipal GA 12 $ 82,440.00 $ 82,440.00 $ - Conduct Miscellaneous Study

WP SFO CA MOD Modesto City County-Harry Sham Field P 39 $ 3,752,183.00 $ 3,752,183.00 $ -Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway -

10L/28R

WP SFO CA ACV Arcata P 44 $ 80,074.00 $ 80,074.00 $ - Conduct Miscellaneous Study

WP SFO CA CPU Calaveras County-Maury Rasmussen Field GA 10 $ 365,100.00 $ 365,100.00 $ - Rehabilitate Runway - 13/31, Rehabilitate Taxiway

WP SFO CA SNS Salinas Municipal GA 24 $ 83,843.00 $ 83,843.00 $ -

Improve Airport Miscellaneous Improvements, Install Airfield

Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway

Vertical/Visual Guidance System - 13/31, Install Runway

Vertical/Visual Guidance System - 08/26, Rehabilitate Taxiway

Lighting

WP SFO CA PRB Paso Robles Municipal GA 24 $ 126,000.00 $ 126,000.00 $ - Rehabilitate Taxiway

Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 57 of 57�