FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
AL AAL AK TKA Talkeetna GA 4 $ 6,500,000.00 $ 6,500,000.00 $ -Construct Access Road, Construct Apron - 18/36, Rehabilitate
Taxiway, Remove Obstructions
AL AAL AK CXF Coldfoot CS 2 $ 7,620,430.00 $ 398,527.00 $ 7,221,903.00 Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate
Runway Lighting, Rehabilitate Taxiway
AL AAL AK ANC Ted Stevens Anchorage International P 172 $ 26,348,409.00 $ 14,133,845.00 $ 12,214,564.00 Rehabilitate Runway - 07L/25R
AL AAL AK *AKV Various Locations in Alaska 100 $ 756,000.00 $ 756,000.00 $ - Conduct Aeronautical Survey for RNAV Approach
AL AAL AK *AKV Various Locations in Alaska 103 $ 924,187.00 $ 924,187.00 $ - Install Miscellaneous NAVAIDS
AL AAL AK *AKS State of Alaska 21 $ 2,000,000.00 $ 2,000,000.00 $ - Update State System Plan Study
AL AAL AK ANC Ted Stevens Anchorage International P 175 $ 3,351,013.00 $ 1,895,272.00 $ 1,455,741.00 Acquire Snow Removal Equipment
AL AAL AK +07L Pilot Station 1 $ 24,921,716.00 $ 8,216,631.00 $ 16,705,085.00 Construct New Airport
AL AAL AK MRI Merrill Field P 64 $ 1,995,000.00 $ 1,995,000.00 $ - Construct Taxiway
AL AAL AK SCC Deadhorse P 16 $ 7,251,310.00 $ 3,945,734.00 $ 3,305,576.00
Construct Sand and Chemical Storage Building, Expand Aircraft
Rescue & Fire Fighting Building, Expand Snow Removal Equipment
Building
AL AAL AK BET Bethel P 22 $ 5,587,042.00 $ 1,000,000.00 $ 4,587,042.00 Rehabilitate Apron
AL AAL AK FAI Fairbanks International P 46 $ 1,447,564.00 $ 1,447,564.00 $ - Acquire Snow Removal Equipment
AL AAL AK ANC Ted Stevens Anchorage International P 174 $ 476,643.00 $ 476,643.00 $ - Acquire Safety Equipment and/or Fencing
AL AAL AK SHH Shishmaref GA 7 $ 7,753,301.00 $ 2,553,301.00 $ 5,200,000.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Runway Lighting - 05/23, Rehabilitate Taxiway
AL AAL AK PAQ Palmer Municipal GA 19 $ 235,312.00 $ 235,312.00 $ - Conduct Airport Master Plan Study
AL AAL AK SXQ Soldotna GA 14 $ 250,000.00 $ 250,000.00 $ - Conduct Airport Master Plan Study
AL AAL AK AFM Ambler GA 6 $ 2,437,899.00 $ 2,437,899.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Runway - 09/27
AL AAL AK JNU Juneau International P 63 $ 234,375.00 $ 234,375.00 $ - Conduct Environmental Study
AL AAL AK DUT Unalaska P 15 $ 8,548,356.00 $ 8,548,356.00 $ -Construct Sand and Chemical Storage Building, Construct Snow
Removal Equipment Building
AL AAL AK BET Bethel P 23 $ 6,500,000.00 $ 3,000,000.00 $ 3,500,000.00 Construct Snow Removal Equipment Building
AL AAL AK AWI Wainwright CS 2 $ 3,255,112.00 $ 2,024,737.00 $ 1,230,375.00 Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Taxiway
AL AAL AK +07E Angoon (Proposed GA) 5 $ 250,000.00 $ 250,000.00 $ - Construct New Airport
AL AAL AK JNU Juneau International P 61 $ 526,133.00 $ 526,133.00 $ -Acquire Handicap Passenger Lift Device, Rehabilitate Terminal
Building
AL AAL AK GKN Gulkana GA 5 $ 2,318,248.00 $ 2,318,248.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway
AL AAL AK LHD Lake Hood P 21 $ 6,754,014.00 $ 2,044,369.00 $ 4,709,645.00 Rehabilitate Apron
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 1 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
AL AAL AK WRG Wrangell P 14 $ 2,174,952.00 $ 1,000,000.00 $ 1,174,952.00 Rehabilitate Apron, Rehabilitate Taxiway
AL AAL AK JNU Juneau International P 64 $ 813,773.00 $ 813,773.00 $ - Construct Apron, Install Perimeter Fencing
AL AAL AK ADQ Kodiak P 19 $ 2,584,000.00 $ 2,584,000.00 $ - Improve Airport Drainage
AL AAL AK HPB Hooper Bay CS 7 $ 21,863,032.00 $ 4,478,816.00 $ 17,384,216.00 Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Runway Lighting - 13/31, Rehabilitate Taxiway
AL AAL AK YAK Yakutat P 20 $ 14,604,319.00 $ 3,000,000.00 $ 11,604,319.00 Rehabilitate Runway - 11/29
AL AAL AK MRI Merrill Field P 63 $ 4,577,100.00 $ 1,000,000.00 $ 3,577,100.00 Acquire Safety Equipment and/or Fencing
AL AAL AK 7AK Akutan GA 7 $ 5,000,000.00 $ 5,000,000.00 $ - Construct New Airport
AL AAL AK *AKV Various Locations in Alaska 102 $ 1,301,322.00 $ 1,301,322.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway, Remove
Obstructions
AL AAL AK *AKV Various Locations in Alaska 101 $ 8,235,879.00 $ 8,235,879.00 $ - Acquire Snow Removal Equipment
AL AAL AK MLY Manley Hot Springs GA 3 $ 2,135,220.00 $ 2,135,220.00 $ - Construct Snow Removal Equipment Building
AL AAL AK ANC Ted Stevens Anchorage International P 173 $ 4,000,000.00 $ - $ 4,000,000.00 Widen Runway - 07R/25L, Widen Taxiway, Widen Taxiway
AL AAL AK *AKV Various Locations in Alaska 104 $ 5,508,274.00 $ 5,508,274.00 $ - Rehabilitate Runway, Remove Obstructions
AL AAL AK JNU Juneau International P 62 $ 647,473.00 $ 647,473.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
CE ACE IA MCW Mason City Municipal CS 41 $ 813,813.00 $ 189,761.00 $ 624,052.00 Rehabilitate Apron
CE ACE IA 4C8 Albia Municipal GA 7 $ 440,904.00 $ 440,904.00 $ - Rehabilitate Runway - 13/31
CE ACE IA TNU Newton Municipal GA 14 $ 376,038.00 $ 376,038.00 $ - Construct Snow Removal Equipment Building
CE ACE IA SKI Sac City Municipal GA 11 $ 123,052.00 $ 123,052.00 $ - Update Airport Master Plan Study
CE ACE IA EOK Keokuk Municipal GA 20 $ 51,124.00 $ 51,124.00 $ - Conduct Environmental Study
CE ACE IA IFA Iowa Falls Municipal GA 8 $ 163,299.00 $ 163,299.00 $ - Construct Taxiway
CE ACE IA CKP Cherokee County Regional GA 12 $ 120,940.00 $ 120,940.00 $ - Extend Runway - 18/36
CE ACE IA 0K7 Humboldt Municipal GA 9 $ 89,730.00 $ 89,730.00 $ - Update Airport Master Plan Study
CE ACE IA ALO Waterloo Regional P 44 $ 958,739.00 $ 958,739.00 $ - Rehabilitate Taxiway
CE ACE IA SLB Storm Lake Municipal GA 11 $ 134,753.00 $ 134,753.00 $ - Update Airport Master Plan Study
CE ACE IA +09B New 9 $ 3,151,601.00 $ 150,000.00 $ 3,001,601.00 Construct New Airport
CE ACE IA FOD Fort Dodge Regional CS 30 $ 4,599,138.00 $ 3,035,362.00 $ 1,563,776.00 Rehabilitate Runway - 06/24
CE ACE IA FOD Fort Dodge Regional CS 31 $ 426,976.00 $ - $ 426,976.00 Rehabilitate Taxiway
CE ACE IA SPW Spencer Municipal GA 23 $ 217,945.00 $ 217,945.00 $ - Rehabilitate Access Road, Rehabilitate Taxiway
CE ACE IA IIB Independence Municipal GA 14 $ 377,178.00 $ 377,178.00 $ - Construct Snow Removal Equipment Building
CE ACE IA AXA Algona Municipal GA 10 $ 96,300.00 $ 96,300.00 $ - Conduct Environmental Study
CE ACE IA CID The Eastern Iowa P 48 $ 3,406,468.00 $ 3,406,468.00 $ - Improve Terminal Building
CE ACE IA VTI Vinton Veterans Memorial Airpark GA 9 $ 56,700.00 $ 56,700.00 $ - Rehabilitate Runway - 16/34
CE ACE IA DBQ Dubuque Regional P 58 $ 5,029,230.00 $ 1,000,000.00 $ 4,029,230.00 Construct Terminal Building
CE ACE IA +09B New 8 $ 657,910.00 $ - $ 657,910.00 Construct New Airport
CE ACE IA FFL Fairfield Municipal GA 14 $ 522,560.00 $ 522,560.00 $ - Construct Terminal Building
CE ACE IA OOA Oskaloosa Municipal GA 9 $ 213,489.00 $ 213,489.00 $ - Rehabilitate Taxiway
CE ACE IA ADU Audubon County GA 9 $ 154,485.00 $ 154,485.00 $ - Acquire Snow Removal Equipment
CE ACE IA EST Estherville Municipal GA 10 $ 296,678.00 $ 296,678.00 $ - Construct Fuel Farm
CE ACE IA C25 Waverly Municipal GA 6 $ 1,529,168.00 $ 900,000.00 $ 629,168.00 Rehabilitate Runway - 11/29
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 2 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
CE ACE IA DSM Des Moines International P 63 $ 13,123,148.00 $ 6,745,611.00 $ 6,377,537.00 Rehabilitate Runway - 13/31
CE ACE IA HPT Hampton Municipal GA 8 $ 137,700.00 $ 137,700.00 $ - Rehabilitate Building
CE ACE IA GCT Guthrie County Regional GA 8 $ 301,338.00 $ 301,338.00 $ - Construct Snow Removal Equipment Building
CE ACE IA BRL Southeast Iowa Regional CS 33 $ 73,085.00 $ 73,085.00 $ - Rehabilitate Runway - 12/30
CE ACE IA OXV Knoxville Municipal GA 14 $ 273,951.00 $ 150,000.00 $ 123,951.00 Rehabilitate Taxiway
CE ACE IA IKV Ankeny Regional R 20 $ 647,225.00 $ 150,000.00 $ 497,225.00 Rehabilitate Runway Lighting - 18/36
CE ACE IA LWD Lamoni Municipal GA 8 $ 120,330.00 $ 120,330.00 $ - Extend Runway - 18/36
CE ACE IA OQW Maquoketa Municipal GA 8 $ 95,598.00 $ 95,598.00 $ - Remove Obstructions
CE ACE IA PRO Perry Municipal GA 9 $ 71,955.00 $ 71,955.00 $ - Conduct Environmental Study
CE ACE IA CSQ Creston Municipal GA 11 $ 91,080.00 $ 91,080.00 $ - Acquire Miscellaneous Land
CE ACE IA C25 Waverly Municipal GA 5 $ 712,569.00 $ - $ 712,569.00 Extend Runway - 11/29
CE ACE IA 3Y2 George L Scott Municipal GA 6 $ 209,045.00 $ 209,045.00 $ - Improve Runway Safety Area - 17/35
CE ACE IA DNS Denison Municipal GA 12 $ 45,900.00 $ 45,900.00 $ - Construct Runway - 18/36
CE ACE IA CNC Chariton Municipal GA 9 $ 738,433.00 $ 738,433.00 $ - Construct Taxiway
CE ACE IA DEH Decorah Municipal GA 10 $ 185,400.00 $ 185,400.00 $ - Construct Building
CE ACE IA FXY Forest City Municipal GA 15 $ 275,400.00 $ 275,400.00 $ - Rehabilitate Runway Lighting - 09/27
CE ACE IA AMW Ames Municipal GA 22 $ 450,000.00 $ 450,000.00 $ - Construct Terminal Building
CE ACE IA CIN Arthur N Neu GA 13 $ 284,466.00 $ 284,466.00 $ - Rehabilitate Runway - 13/31
CE ACE IA BNW Boone Municipal GA 15 $ 369,427.00 $ 150,000.00 $ 219,427.00 Rehabilitate Apron
CE ACE IA MUT Muscatine Municipal GA 20 $ 3,747,117.00 $ 150,000.00 $ 3,597,117.00 Rehabilitate Runway - 06/24
CE ACE IA SUX Sioux Gateway/Col Bud Day Field P 49 $ 2,660,840.00 $ 2,284,338.00 $ 376,502.00 Construct Taxiway
CE ACE IA LWD Lamoni Municipal GA 9 $ 75,960.00 $ 75,960.00 $ - Acquire Land For Approaches
CE ACE IA MPZ Mount Pleasant Municipal GA 15 $ 333,515.00 $ 333,515.00 $ - Rehabilitate Runway Lighting - 15/33
CE ACE IA *IAS State of Iowa 22 $ 81,841.00 $ - $ 81,841.00 Conduct State System Plan Study
CE ACE IA 2Y4 Rockwell City Municipal GA 5 $ 72,000.00 $ 72,000.00 $ - Update Airport Master Plan Study
CE ACE IA EFW Jefferson Municipal GA 10 $ 549,765.00 $ 549,765.00 $ - Extend Runway - 14/32
CE ACE IA BRL Southeast Iowa Regional CS 34 $ 88,643.00 $ 88,643.00 $ - Rehabilitate Runway - 12/30
CE ACE IA GCT Guthrie County Regional GA 9 $ 217,262.00 $ 217,262.00 $ - Acquire Snow Removal Equipment
CE ACE KS K68 Garnett Municipal GA 8 $ 138,966.00 $ 138,966.00 $ - Rehabilitate Apron
CE ACE KS HLC Hill City Municipal GA 15 $ 280,732.00 $ 280,732.00 $ - Expand Apron
CE ACE KS MPR McPherson GA 15 $ 153,180.00 $ 153,180.00 $ - Rehabilitate Runway
CE ACE KS GLD Renner Field /Goodland Municipal/ GA 20 $ 236,250.00 $ 236,250.00 $ - Update Airport Master Plan Study
CE ACE KS ICT Wichita Dwight D Eisenhower National P 70 $ 89,730.00 $ 89,730.00 $ - Rehabilitate Apron
CE ACE KS GCK Garden City Regional P 37 $ 1,551,904.00 $ 1,551,904.00 $ - Construct Taxiway
CE ACE KS ICT Wichita Dwight D Eisenhower National P 69 $ 11,004,184.00 $ 3,763,544.00 $ 7,240,640.00 Rehabilitate Apron
CE ACE KS FSK Fort Scott Municipal GA 16 $ 47,603.00 $ 47,603.00 $ - Install Miscellaneous NAVAIDS
CE ACE KS UKL Coffey County GA 10 $ 59,962.00 $ 59,962.00 $ - Rehabilitate Apron
CE ACE KS K34 Gardner Municipal GA 10 $ 65,880.00 $ 65,880.00 $ - Update Airport Master Plan Study
CE ACE KS HUT Hutchinson Municipal GA 30 $ 245,250.00 $ 245,250.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Runway Lighting - 17/35
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 3 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
CE ACE KS K34 Gardner Municipal GA 11 $ 63,439.00 $ 63,439.00 $ - Remove Obstructions
CE ACE KS 3JC Freeman Field GA 11 $ 129,875.00 $ 129,875.00 $ - Install Miscellaneous NAVAIDS, Install Perimeter Fencing
CE ACE KS FOE Forbes Field CS 34 $ 397,795.00 $ 397,795.00 $ - Update Airport Master Plan Study
CE ACE KS 8K8 Cimarron Municipal GA 8 $ 148,815.00 $ 148,815.00 $ - Rehabilitate Runway - 01/19
CE ACE KS 48K Ness City Municipal GA 8 $ 324,223.00 $ 324,223.00 $ - Construct Runway - 17/35
CE ACE KS NRN Norton Municipal GA 7 $ 656,616.00 $ 656,616.00 $ - Construct Taxiway
CE ACE KS PPF Tri-City GA 10 $ 205,686.00 $ 205,686.00 $ - Update Airport Master Plan Study
CE ACE KS K61 Moritz Memorial GA 11 $ 1,979,307.00 $ 1,979,307.00 $ - Extend Runway - 17/35
CE ACE KS GBD Great Bend Municipal GA 24 $ 205,457.00 $ 205,457.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
CE ACE KS HUT Hutchinson Municipal GA 31 $ 117,220.00 $ 117,220.00 $ - Rehabilitate Runway - 17/35
CE ACE KS RSL Russell Municipal GA 11 $ 366,525.00 $ 366,525.00 $ - Rehabilitate Taxiway
CE ACE KS ULS Ulysses GA 15 $ 496,917.00 $ 496,917.00 $ - Construct Taxiway
CE ACE KS PTS Atkinson Municipal GA 15 $ 93,015.00 $ 93,015.00 $ - Rehabilitate Runway - 16/34
CE ACE KS 36K Lakin GA 4 $ 81,000.00 $ 81,000.00 $ - Construct Taxiway
CE ACE KS K51 Medicine Lodge GA 8 $ 117,180.00 $ 117,180.00 $ - Rehabilitate Runway - 16/34
CE ACE KS CYW Clay Center Municipal GA 12 $ 420,288.00 $ 420,288.00 $ -Install Runway Vertical/Visual Guidance System - 17/35,
Rehabilitate Runway - 17/35
CE ACE KS K81 Miami County GA 17 $ 565,308.00 $ 565,308.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway
CE ACE KS K67 Oswego Municipal GA 10 $ 150,000.00 $ 150,000.00 $ - Construct Apron
CE ACE KS CBK Shalz Field GA 15 $ 209,426.00 $ 209,426.00 $ - Extend Runway - 17/35
CE ACE KS *KSS State of Kansas 17 $ 314,590.00 $ 314,590.00 $ - Conduct State System Plan Study
CE ACE KS 5K2 Tribune Municipal GA 8 $ 268,314.00 $ 268,314.00 $ -Install Runway Vertical/Visual Guidance System - 17/35, Install
Taxiway Lighting
CE ACE KS 3K7 Mark Hoard Memorial GA 5 $ 142,650.00 $ 142,650.00 $ - Construct Runway - 17/35
CE ACE KS CNK Blosser Municipal GA 10 $ 158,803.00 $ 158,803.00 $ - Construct Runway - Plan-1
CE ACE KS OEL Oakley Municipal GA 12 $ 117,374.00 $ 117,374.00 $ - Install Runway Vertical/Visual Guidance System - 16/34
CE ACE KS GBD Great Bend Municipal GA 25 $ 460,713.00 $ 460,713.00 $ - Construct Aircraft Rescue & Fire Fighting Building
CE ACE KS OIN Oberlin Municipal GA 10 $ 736,200.00 $ 736,200.00 $ - Extend Runway - 17/35
CE ACE KS RCP Rooks County Regional GA 8 $ 496,305.00 $ 496,305.00 $ - Construct Building, Construct Terminal Building
CE ACE KS 9K7 Ellsworth Municipal GA 10 $ 226,709.00 $ 226,709.00 $ - Rehabilitate Apron
CE ACE KS MYZ Marysville Municipal GA 9 $ 278,110.00 $ 278,110.00 $ - Rehabilitate Runway - 16/34
CE ACE KS LYO Lyons-Rice County Municipal GA 18 $ 1,958,939.00 $ 1,958,939.00 $ - Extend Runway - 17R/35L
CE ACE KS HYS Hays Regional CS 32 $ 785,186.00 $ 785,186.00 $ - Rehabilitate Runway - 04/22
CE ACE MO *MOB Missouri State Block Grant Program 68 $ 6,807,158.00 $ - $ 6,807,158.00 Non primary development projects in state block grant program
CE ACE MO *MOB Missouri State Block Grant Program 67 $ 2,382,455.00 $ - $ 2,382,455.00 Non primary development projects in state block grant program
CE ACE MO *MOS State of Missouri 11 $ 269,055.00 $ - $ 269,055.00 Update Miscellaneous Study
CE ACE MO *MOB Missouri State Block Grant Program 72 $ 359,459.00 $ - $ 359,459.00 Non primary development projects in state block grant program
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 4 of 57�
Field
Field
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
CE ACE MO JLN Joplin Regional P 36 $ 457,399.00 $ 457,399.00 $ - Construct Taxiway, Construct Taxiway
CE ACE MO *MOB Missouri State Block Grant Program 71 $ 1,481,635.00 $ - $ 1,481,635.00 Non primary development projects in state block grant program
CE ACE MO MCI Kansas City International P 72 $ 20,262,113.00 $ 2,365,199.00 $ 17,896,914.00 Rehabilitate Runway - 01R/19L
CE ACE MO STL Lambert-St Louis International P 147 $ 289,500.00 $ - $ 289,500.00 Acquire Equipment
CE ACE MO STL Lambert-St Louis International P 142 $ 5,706,012.00 $ 2,660,761.00 $ 3,045,251.00 Rehabilitate Taxiway
CE ACE MO SGF Springfield-Branson National P 51 $ 2,868,055.00 $ 2,868,055.00 $ - Construct Apron, Construct Terminal Building
CE ACE MO COU Columbia Regional P 39 $ 4,411,513.00 $ 2,032,190.00 $ 2,379,323.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway
CE ACE MO *MOB Missouri State Block Grant Program 69 $ 824,865.00 $ - $ 824,865.00 Non primary development projects in state block grant program
CE ACE MO *MOB Missouri State Block Grant Program 65 $ 649,642.00 $ - $ 649,642.00 Non primary development projects in state block grant program
CE ACE MO COU Columbia Regional P 41 $ 1,470,668.00 $ - $ 1,470,668.00 Extend Runway - 13/31
CE ACE MO *MOB Missouri State Block Grant Program 70 $ 3,026,550.00 $ - $ 3,026,550.00 Non primary development projects in state block grant program
CE ACE MO *MOB Missouri State Block Grant Program 64 $ 11,850,000.00 $ 11,850,000.00 $ - Non primary development projects in state block grant program
CE ACE MO *MOB Missouri State Block Grant Program 66 $ 765,951.00 $ - $ 765,951.00 Non primary development projects in state block grant program
CE ACE MO JLN Joplin Regional P 35 $ 164,832.00 $ 164,832.00 $ - Conduct Environmental Study
CE ACE MO STL Lambert-St Louis International P 146 $ 28,299.00 $ - $ 28,299.00 Zero Emissions Vehicle/Infrastructure
CE ACE MO STL Lambert-St Louis International P 145 $ 762,709.00 $ - $ 762,709.00 Rehabilitate Taxiway
CE ACE MO *MOB Missouri State Block Grant Program 63 $ 4,731,744.00 $ 4,731,744.00 $ - Non primary development projects in state block grant program
CE ACE NE 0G3 Tecumseh Municipal GA 10 $ 343,930.00 $ 343,930.00 $ - Rehabilitate Building
CE ACE NE K01 Farington Field GA 7 $ 2,417,850.00 $ 2,417,850.00 $ - Construct Runway - 16/34
CE ACE NE 93Y David City Municipal GA 10 $ 821,840.00 $ 821,840.00 $ - Construct Building
CE ACE NE RBE Rock County GA 10 $ 205,425.00 $ 205,425.00 $ -Improve Fuel Farm, Install Taxiway Lighting, Rehabilitate Runway
Lighting - 13/31
CE ACE NE BTA Blair Municipal GA 14 $ 1,583,104.00 $ 1,583,104.00 $ - Acquire Land For Approaches
CE ACE NE OFK Norfolk Regional/Karl Stefan Memorial Field GA 19 $ 380,000.00 $ 380,000.00 $ - Construct Taxiway
CE ACE NE BUB Cram Field GA 6 $ 950,561.00 $ 950,561.00 $ - Construct Building
CE ACE NE *NES State of Nebraska 22 $ 57,600.00 $ - $ 57,600.00 Update State System Plan Study
CE ACE NE LBF North Platte Regional Airport Lee Bird Field P 29 $ 483,138.00 $ 483,138.00 $ - Acquire Snow Removal Equipment
CE ACE NE OMA Eppley Airfield P 67 $ 13,358,242.00 $ 5,336,165.00 $ 8,022,077.00 Rehabilitate Apron
CE ACE NE BFF Western Nebraska Regional/William B Heilig P 38 $ 312,000.00 $ 312,000.00 $ - Rehabilitate Building
CE ACE NE BFF Western Nebraska Regional/William B Heilig P 39 $ 419,000.00 $ 419,000.00 $ - Acquire Snow Removal Equipment
CE ACE NE TQE Tekamah Municipal GA 8 $ 1,525,770.00 $ 1,525,770.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
CE ACE NE LBF North Platte Regional Airport Lee Bird Field P 28 $ 47,700.00 $ 47,700.00 $ - Wildlife Hazard Assessments
CE ACE NE 4D9 Alma Municipal GA 7 $ 568,080.00 $ 568,080.00 $ - Construct Terminal Building
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 5 of 57�
ld
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
CE ACE NE ONL The O'Neill Municipal-John L Baker Field GA 10 $ 650,000.00 $ 650,000.00 $ - Construct Building
CE ACE NE OKS Garden County GA 10 $ 195,000.00 $ 195,000.00 $ - Install Runway Vertical/Visual Guidance System - 12/30
CE ACE NE LNK Lincoln P 51 $ 721,800.00 $ 721,800.00 $ - Rehabilitate Runway - 14/32
EA BKW WV 4G7 Fairmont Municipal-Frankman Field GA 16 $ 903,600.00 $ 903,600.00 $ - Construct Apron, Construct Taxiway, Rehabilitate Runway - 05/23
EA BKW WV PKB Mid-Ohio Valley Regional CS 44 $ 2,923,565.00 $ 150,000.00 $ 2,773,565.00 Rehabilitate Apron, Rehabilitate Taxiway
EA BKW WV BKW Raleigh County Memorial CS 34 $ 490,883.00 $ 490,883.00 $ - Acquire Snow Removal Equipment
EA BKW WV CRW Yeager P 57 $ 461,700.00 $ 461,700.00 $ - Acquire Land For Approaches
EA BKW WV 3I2 Mason County GA 21 $ 1,436,167.00 $ 483,421.00 $ 952,746.00 Rehabilitate Apron
EA BKW WV W99 Grant County GA 20 $ 807,942.00 $ 772,903.00 $ 35,039.00 Rehabilitate Runway Lighting - 13/31, Rehabilitate Taxiway Lighting
EA BKW WV CRW Yeager P 56 $ 917,460.00 $ 917,460.00 $ - Improve Airport Drainage, Rehabilitate Taxiway
EA BKW WV W22 Upshur County Regional GA 29 $ 614,051.00 $ 245,632.00 $ 368,419.00 Rehabilitate Apron
EA BKW WV SXL Summersville GA 12 $ 80,763.00 $ 80,763.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
EA BKW WV CKB North Central West Virginia P 40 $ 1,376,131.00 $ 1,376,131.00 $ - Acquire Land For Approaches, Acquire Snow Removal Equipment
EA BKW WV BLF Mercer County GA 28 $ 465,758.00 $ 465,758.00 $ - Construct Taxiway
EA BKW WV MRB Eastern WV Regional/Shepherd Field R 33 $ 74,074.00 $ 74,074.00 $ - Install Airfield Guidance Signs
EA BKW WV MGW Morgantown Municipal-Walter L Bill Hart Fie P 37 $ 1,860,313.00 $ 1,860,313.00 $ - Construct Apron
EA BKW WV LWB Greenbrier Valley CS 34 $ 3,891,672.00 $ 1,345,555.00 $ 2,546,117.00 Construct Taxiway, Rehabilitate Apron
EA BKW WV MPG Marshall County GA 21 $ 73,269.00 $ 73,269.00 $ - Improve Airport Drainage, Rehabilitate Runway - 06/24
EA BKW WV 79D Philippi/Barbour County Regional GA 16 $ 87,989.00 $ 87,989.00 $ - Install Apron Flood Lighting
EA BKW WV HTS Tri-State/Milton J Ferguson Field P 53 $ 1,433,889.00 $ 1,433,889.00 $ -Improve Access Road, Rehabilitate Taxiway, Rehabilitate Terminal
Building
EA HAR DE 33N Delaware Airpark GA 18 $ 5,813,539.00 $ 280,012.00 $ 5,533,527.00 Construct Runway - 09/27
EA HAR DE ILG New Castle P 39 $ 810,000.00 $ - $ 810,000.00 Update Airport Master Plan Study
EA HAR DE ILG New Castle P 38 $ 2,846,864.00 $ 1,000,000.00 $ 1,846,864.00 Rehabilitate Taxiway
EA HAR DE GED Sussex County GA 31 $ 479,182.00 $ 479,182.00 $ - Install Taxiway Lighting
EA HAR DE *DES State of Delaware 11 $ 157,500.00 $ 157,500.00 $ - Conduct State System Plan Study
EA HAR NJ TTN Trenton Mercer P 49 $ 4,515,552.00 $ 1,008,631.00 $ 3,506,921.00 Rehabilitate Taxiway
EA HAR NJ WWD Cape May County GA 36 $ 5,337,902.00 $ 588,690.00 $ 4,749,212.00 Rehabilitate Runway - 01/19
EA HAR NJ CDW Essex County R 38 $ 105,300.00 $ 105,300.00 $ - Rehabilitate Runway - 10/28
EA HAR NJ TTN Trenton Mercer P 48 $ 540,064.00 $ 540,064.00 $ - Rehabilitate Runway - 06/24
EA HAR NJ MMU Morristown Municipal R 49 $ 4,716,900.00 $ 1,402,215.00 $ 3,314,685.00 Improve Runway Safety Area - 05/23, Rehabilitate Runway - 05/23
EA HAR NJ N12 Lakewood GA 19 $ 544,276.00 $ 544,276.00 $ - Construct Taxiway
EA HAR NJ N81 Hammonton Municipal GA 22 $ 149,832.00 $ 149,832.00 $ - Remove Obstructions
EA HAR NJ MIV Millville Municipal GA 38 $ 211,500.00 $ 211,500.00 $ - Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 6 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA HAR NJ MJX Ocean County GA 26 $ 540,440.00 $ 540,440.00 $ - Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24
EA HAR NJ ACY Atlantic City International P 92 $ 7,673,244.00 $ 4,449,804.00 $ 3,223,440.00 Rehabilitate Taxiway
EA HAR NJ VAY South Jersey Regional R 13 $ 384,524.00 $ 384,524.00 $ - Rehabilitate Apron
EA HAR NJ *NJS State of New Jersey 3 $ 264,903.00 $ 264,903.00 $ - Conduct State System Plan Study
EA HAR NJ N07 Lincoln Park R 13 $ 416,449.00 $ 416,449.00 $ - Acquire Land For Approaches
EA HAR NJ SMQ Somerset R 14 $ 29,744.00 $ 29,744.00 $ - Conduct Environmental Study
EA HAR NJ CDW Essex County R 39 $ 768,474.00 $ 768,474.00 $ - Rehabilitate Taxiway Lighting
EA HAR NJ MIV Millville Municipal GA 39 $ 420,610.00 $ 420,610.00 $ - Improve Airport Drainage
EA HAR NJ N12 Lakewood GA 18 $ 222,804.00 $ 222,804.00 $ - Acquire Land For Approaches
EA HAR PA PHL Philadelphia International P 107 $ 8,000,000.00 $ - $ 8,000,000.00 Acquire Land for Development
EA HAR PA PNE Northeast Philadelphia R 19 $ 930,001.00 $ 930,001.00 $ - Improve Airport Miscellaneous Improvements
EA HAR PA AOO Altoona-Blair County CS 43 $ 244,404.00 $ 244,404.00 $ - Acquire Land For Approaches
EA HAR PA *PAB Pennsylvania State Block Grant Program 76 $ 250,000.00 $ 250,000.00 $ - Non primary development projects in state block grant program
EA HAR PA JST John Murtha Johnstown-Cambria County CS 48 $ 455,838.00 $ 455,838.00 $ - Acquire Snow Removal Equipment
EA HAR PA N68 Franklin County Regional GA 15 $ 44,505.00 $ 44,505.00 $ - Construct Taxiway
EA HAR PA ABE Lehigh Valley International P 99 $ 2,350,239.00 $ 2,350,239.00 $ - Acquire Land for Development
EA HAR PA UNV University Park P 61 $ 5,781,500.00 $ 1,458,768.00 $ 4,322,732.00 Rehabilitate Apron
EA HAR PA AGC Allegheny County R 35 $ 1,487,078.00 $ 150,000.00 $ 1,337,078.00 Rehabilitate Taxiway
EA HAR PA PHL Philadelphia International P 106 $ 10,223,286.00 $ 2,223,286.00 $ 8,000,000.00 Extend Runway - 09R/27L
EA HAR PA FWQ Rostraver R 23 $ 242,080.00 $ 242,080.00 $ - Remove Obstructions
EA HAR PA CXY Capital City R 31 $ 135,379.00 $ 135,379.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
EA HAR PA *PAB Pennsylvania State Block Grant Program 75 $ 3,546,665.00 $ 3,546,665.00 $ - Non primary development projects in state block grant program
EA HAR PA CXY Capital City R 32 $ 20,618.00 $ 20,618.00 $ - Improve Airport Drainage
EA HAR PA PHL Philadelphia International P 105 $ 3,756,402.00 $ 3,756,402.00 $ - Extend Runway - 09R/27L
EA HAR PA IPT Williamsport Regional P 47 $ 2,156,081.00 $ 2,156,081.00 $ - Rehabilitate Runway - 09/27
EA HAR PA CXY Capital City R 30 $ 158,924.00 $ 158,924.00 $ - Improve Airport Drainage
EA HAR PA AGC Allegheny County R 36 $ 572,345.00 $ 572,345.00 $ - Remove Obstructions
EA HAR PA ERI Erie International/Tom Ridge Field P 61 $ 537,792.00 $ 537,792.00 $ - Acquire Snow Removal Equipment
EA HAR PA PHL Philadelphia International P 108 $ 16,000.00 $ - $ 16,000.00 Rehabilitate Taxiway
EA HAR PA LNS Lancaster CS 37 $ 530,510.00 $ 530,510.00 $ - Rehabilitate Taxiway
EA HAR PA *PAB Pennsylvania State Block Grant Program 74 $ 4,800,000.00 $ 4,800,000.00 $ - Non primary development projects in state block grant program
EA HAR PA DUJ Dubois Regional CS 41 $ 749,724.00 $ 749,724.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow
Removal Equipment
EA HAR PA ERI Erie International/Tom Ridge Field P 60 $ 34,477.00 $ 34,477.00 $ - Security Enhancements
EA HAR PA UNV University Park P 59 $ 619,661.00 $ 619,661.00 $ - Rehabilitate Apron
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 7 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA HAR PA LBE Arnold Palmer Regional P 49 $ 829,272.00 $ 829,272.00 $ - Acquire Snow Removal Equipment, Improve Building
EA HAR PA @01N Delaware Valley Region 16 $ 68,406.00 $ 68,406.00 $ - Conduct Metropolitan System Plan Study
EA HAR PA LNS Lancaster GA 38 $ 157,551.00 $ - $ 157,551.00 Construct Taxiway
EA HAR PA W05 Gettysburg Regional GA 12 $ 1,039,230.00 $ 205,657.00 $ 833,573.00 Rehabilitate Runway - 06/24
EA HAR PA *PAB Pennsylvania State Block Grant Program 77 $ 3,500,000.00 $ - $ 3,500,000.00 Non primary development projects in state block grant program
EA HAR PA UNV University Park P 60 $ 2,218,569.00 $ 2,218,569.00 $ - Rehabilitate Apron
EA HAR PA PIT Pittsburgh International P 120 $ 5,777,517.00 $ 710,262.00 $ 5,067,255.00 Rehabilitate Runway - 14/32
EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 55 $ 2,088,020.00 $ 371,799.00 $ 1,716,221.00 Install Runway Vertical/Visual Guidance System - 13/31,
Rehabilitate Taxiway
EA HAR PA AVP Wilkes-Barre/Scranton International P 61 $ 755,485.00 $ 755,485.00 $ - Update Airport Master Plan Study
EA HAR PA *PAS Commonwealth of Pennsylvania 12 $ 553,335.00 $ 553,335.00 $ - Conduct State System Plan Study
EA HAR PA BFD Bradford Regional GA 44 $ 218,003.00 $ 218,003.00 $ - Rehabilitate Taxiway
EA HAR PA ERI Erie International/Tom Ridge Field P 62 $ 775,575.00 $ 775,575.00 $ - Update Airport Master Plan Study
EA NYC NJ TEB Teterboro R 54 $ 2,410,881.00 $ - $ 2,410,881.00 Conduct Noise Compatibility Plan Study
EA NYC NJ EWR Newark Liberty International P 138 $ 1,250,100.00 $ 1,250,100.00 $ - Rehabilitate Access Road
EA NYC NJ TEB Teterboro R 53 $ 553,573.00 $ 553,573.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
EA NYC NJ EWR Newark Liberty International P 136 $ 2,942,178.00 $ - $ 2,942,178.00 Conduct Noise Compatibility Plan Study
EA NYC NJ EWR Newark Liberty International P 137 $ 3,278,490.00 $ 3,278,490.00 $ - Construct Apron
EA NYC NY LGA Laguardia P 143 $ 2,736,130.00 $ - $ 2,736,130.00 Conduct Noise Compatibility Plan Study
EA NYC NY FOK Francis S Gabreski GA 18 $ 3,291,924.00 $ 805,837.00 $ 2,486,087.00 Rehabilitate Runway - 15/33
EA NYC NY NY0 Fulton County GA 19 $ 224,821.00 $ 224,821.00 $ - Update Airport Master Plan Study
EA NYC NY N23 Sidney Municipal GA 18 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study
EA NYC NY 1B1 Columbia County GA 32 $ 32,940.00 $ 32,940.00 $ - Improve Runway Safety Area - 03/21
EA NYC NY MAL Malone-Dufort GA 31 $ 188,460.00 $ 188,460.00 $ - Install Weather Reporting Equipment
EA NYC NY HPN Westchester County P 119 $ 2,847,954.00 $ 2,847,954.00 $ - Construct Service Road
EA NYC NY HPN Westchester County P 117 $ 119,700.00 $ 119,700.00 $ - Rehabilitate Access Road
EA NYC NY HPN Westchester County P 118 $ 192,793.00 $ 192,793.00 $ - Improve Airport Drainage
EA NYC NY ALB Albany International P 127 $ 450,495.00 $ 450,495.00 $ - Install Airfield Guidance Signs
EA NYC NY 44N Sky Acres R 27 $ 66,734.00 $ 66,734.00 $ - Rehabilitate Runway - 17/35
EA NYC NY PEO Penn Yan GA 34 $ 334,818.00 $ 334,818.00 $ - Install Runway Vertical/Visual Guidance System - 10/28
EA NYC NY 5B2 Saratoga County GA 31 $ 350,219.00 $ 350,219.00 $ - Acquire Easement For Approaches
EA NYC NY POU Dutchess County GA 45 $ 806,837.00 $ 806,837.00 $ - Rehabilitate Taxiway
EA NYC NY GFL Floyd Bennett Memorial GA 57 $ 283,500.00 $ 283,500.00 $ - Conduct Environmental Study
EA NYC NY SLK Adirondack Regional CS 62 $ 48,830.00 $ 48,830.00 $ - Construct Sand and Chemical Storage Building
EA NYC NY SYR Syracuse Hancock International P 139 $ 27,900.00 $ 27,900.00 $ - Construct Taxiway
EA NYC NY JFK John F Kennedy International P 182 $ 7,000,000.00 $ - $ 7,000,000.00 Construct Taxiway
EA NYC NY OGS Ogdensburg International CS 47 $ 7,597,458.00 $ 339,439.00 $ 7,258,019.00 Construct Apron
EA NYC NY RME Griffiss International GA 37 $ 3,582,000.00 $ 150,000.00 $ 3,432,000.00 Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 8 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA NYC NY JHW Chautauqua County/Jamestown CS 42 $ 618,450.00 $ 618,450.00 $ - Acquire Snow Removal Equipment
EA NYC NY 4B7 Schroon Lake GA 11 $ 556,200.00 $ 556,200.00 $ - Improve Runway Safety Area - 16/34, Rehabilitate Runway - 16/34
EA NYC NY JFK John F Kennedy International P 183 $ 8,969,647.00 $ 8,969,647.00 $ -Construct Taxiway, Construct Taxiway, Improve Runway Safety Area
- 04L/22R, Widen Runway - 04L/22R
EA NYC NY ELM Elmira/Corning Regional P 63 $ 1,153,061.00 $ 1,153,061.00 $ - Rehabilitate Taxiway
EA NYC NY MSS Massena International-Richards Field CS 68 $ 67,450.00 $ 67,450.00 $ - Acquire Snow Removal Equipment
EA NYC NY 7N1 Corning-Painted Post GA 20 $ 171,270.00 $ 171,270.00 $ - Update Airport Master Plan Study
EA NYC NY N03 Cortland County-Chase Field GA 24 $ 247,412.00 $ 247,412.00 $ - Conduct Miscellaneous Study
EA NYC NY 5B2 Saratoga County GA 32 $ 36,900.00 $ 36,900.00 $ - Acquire Easement For Approaches
EA NYC NY ELM Elmira/Corning Regional P 65 $ 94,500.00 $ 94,500.00 $ - Construct Taxiway
EA NYC NY GVQ Genesee County R 35 $ 72,455.00 $ 72,455.00 $ - Install Perimeter Fencing
EA NYC NY GFL Floyd Bennett Memorial GA 55 $ 1,008,000.00 $ 226,703.00 $ 781,297.00 Remove Obstructions
EA NYC NY BQR Buffalo-Lancaster Regional R 23 $ 334,855.00 $ 334,855.00 $ -Acquire Land for Development, Install Runway Vertical/Visual
Guidance System, Rehabilitate Runway Lighting - 08/26
EA NYC NY SDC Williamson-Sodus R 30 $ 494,925.00 $ 494,925.00 $ -
Install Airport Beacons, Install Runway Vertical/Visual Guidance
System - 10/28, Rehabilitate Runway Lighting - 10/28, Rehabilitate
Taxiway Lighting
EA NYC NY OLE Cattaraugus County-Olean GA 20 $ 301,293.00 $ 301,293.00 $ - Remove Obstructions
EA NYC NY SYR Syracuse Hancock International P 140 $ 220,500.00 $ 220,500.00 $ - Improve Terminal Building
EA NYC NY ALB Albany International P 128 $ 1,257,571.00 $ 1,257,571.00 $ - Rehabilitate Terminal Building
EA NYC NY LGA Laguardia P 142 $ 1,462,141.00 $ 1,462,141.00 $ - Rehabilitate Runway - 13/31
EA NYC NY DKK Chautauqua County/Dunkirk GA 51 $ 276,496.00 $ 276,496.00 $ - Acquire Snow Removal Equipment
EA NYC NY JFK John F Kennedy International P 184 $ 2,756,957.00 $ 2,756,957.00 $ - Remove Obstructions
EA NYC NY FZY Oswego County GA 44 $ 61,650.00 $ 61,650.00 $ -Install Runway Vertical/Visual Guidance System - 06/24, Light
Obstructions, Rehabilitate Runway Lighting - 06/24
EA NYC NY FRG Republic CS 48 $ 21,851,855.00 $ 61,945.00 $ 21,789,910.00 Improve Runway Safety Area - 01/19
EA NYC NY RME Griffiss International GA 38 $ 1,539,000.00 $ - $ 1,539,000.00 Rehabilitate Building
EA NYC NY N66 Oneonta Municipal GA 17 $ 244,800.00 $ 244,800.00 $ - Update Airport Master Plan Study
EA NYC NY ELZ Wellsville Municipal Airport,Tarantine Field GA 29 $ 45,000.00 $ 45,000.00 $ - Remove Obstructions
EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 31 $ 1,467,953.00 $ 1,467,953.00 $ -
Install Runway Vertical/Visual Guidance System - 06/24,
Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting -
06/24, Remove Obstructions - 06/24
EA NYC NY 9G3 Akron R 22 $ 40,168.00 $ 40,168.00 $ -
Acquire Land for Development, Install Miscellaneous NAVAIDS,
Install Runway Vertical/Visual Guidance System - 07/25,
Rehabilitate Runway Lighting - 07/25
EA NYC NY SWF Stewart International P 72 $ 1,962,512.00 $ 1,962,512.00 $ -Rehabilitate Runway including associated marking - 16/34,
Rehabilitate Runway - 09/27
EA NYC NY ITH Ithaca Tompkins Regional P 73 $ 803,700.00 $ 803,700.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 9 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA NYC NY PBG Plattsburgh International P 52 $ 224,200.00 $ 224,200.00 $ - Remove Obstructions
EA NYC NY MSV Sullivan County International GA 34 $ 730,971.00 $ 730,971.00 $ - Rehabilitate Access Road
EA NYC NY 0G7 Finger Lakes Regional GA 26 $ 188,100.00 $ 188,100.00 $ - Rehabilitate Apron
EA NYC NY MAL Malone-Dufort GA 32 $ 46,260.00 $ 46,260.00 $ - Rehabilitate Apron
EA NYC NY MSS Massena International-Richards Field CS 71 $ 68,400.00 $ 68,400.00 $ - Improve Airport Drainage
EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 68 $ 1,354,208.00 $ 1,354,208.00 $ - Rehabilitate Apron
EA NYC NY 5G0 Le Roy R 26 $ 91,895.00 $ 91,895.00 $ -Acquire Land for Development, Improve Airport Drainage,
Rehabilitate Runway - 10/28, Rehabilitate Runway Lighting - 10/28
EA NYC NY N66 Oneonta Municipal GA 18 $ 1,047,322.00 $ 1,047,322.00 $ - Construct Taxiway, Install Taxiway Lighting
EA NYC NY IAG Niagara Falls International P 44 $ 2,091,390.00 $ 2,091,390.00 $ - Construct Terminal Building
EA NYC NY ROC Greater Rochester International P 90 $ 220,320.00 $ 220,320.00 $ - Conduct Environmental Study
EA NYC NY SLK Adirondack Regional CS 61 $ 205,010.00 $ 205,010.00 $ - Remove Obstructions
EA NYC NY D38 Canandaigua R 36 $ 241,380.00 $ 241,380.00 $ - Update Airport Master Plan Study
EA NYC NY OIC Lt Warren Eaton GA 33 $ 123,930.00 $ 123,930.00 $ - Remove Obstructions
EA NYC NY ISP Long Island MacArthur P 95 $ 892,521.00 $ 892,521.00 $ - Construct Aircraft Rescue & Fire Fighting Building
EA NYC NY SYR Syracuse Hancock International P 138 $ 54,000.00 $ 54,000.00 $ - Improve Airport Drainage
EA NYC NY BUF Buffalo Niagara International P 89 $ 835,308.00 $ 835,308.00 $ -Install Guidance Signs, Install Runway Distance-To-Go Signs - 14/32,
Install Runway Lighting - 14/32, Rehabilitate Runway - 14/32
EA NYC NY ROC Greater Rochester International P 88 $ 2,104,919.00 $ 2,104,919.00 $ - Construct Taxiway, Construct Taxiway
EA NYC NY SLK Adirondack Regional CS 60 $ 176,611.00 $ 176,611.00 $ - Install Runway Lighting - 09/27
EA NYC NY MSS Massena International-Richards Field CS 67 $ 713,385.00 $ 713,385.00 $ - Rehabilitate Access Road
EA NYC NY POU Dutchess County GA 44 $ 609,055.00 $ 609,055.00 $ - Improve Airport Miscellaneous Improvements
EA NYC NY GFL Floyd Bennett Memorial GA 56 $ 72,000.00 $ 72,000.00 $ - Remove Obstructions
EA NYC NY ELM Elmira/Corning Regional P 64 $ 72,000.00 $ 72,000.00 $ - Conduct Miscellaneous Study
EA NYC NY MSS Massena International-Richards Field CS 66 $ 262,870.00 $ 150,000.00 $ 112,870.00 Remove Obstructions
EA NYC NY 1B1 Columbia County GA 31 $ 210,512.00 $ 210,512.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
EA NYC NY 5B2 Saratoga County GA 30 $ 208,331.00 $ 208,331.00 $ - Conduct Environmental Study
EA NYC NY N89 Joseph Y Resnick GA 35 $ 1,145,692.00 $ 1,145,692.00 $ - Rehabilitate Runway - 04/22, Rehabilitate Runway Lighting - 04/22
EA NYC NY ROC Greater Rochester International P 89 $ 1,747,847.00 $ 1,747,847.00 $ - Rehabilitate Access Road
EA NYC NY MSS Massena International-Richards Field CS 69 $ 176,700.00 $ 176,700.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
EA NYC NY HWV Brookhaven R 33 $ 439,041.00 $ 439,041.00 $ - Install Taxiway Lighting
EA NYC NY MSS Massena International-Richards Field CS 70 $ 75,050.00 $ 75,050.00 $ -
Install Runway Vertical/Visual Guidance System - 09/27, Install
Runway Vertical/Visual Guidance System - 09/27, Rehabilitate
Runway Lighting - 05/23, Rehabilitate Taxiway Lighting
EA NYC NY RME Griffiss International GA 39 $ 167,400.00 $ 167,400.00 $ - Construct Deicing Containment Facility
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 10 of 57�
d
od Marshall
od Marshall
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA NYC NY ITH Ithaca Tompkins Regional P 74 $ 3,643,200.00 $ 530,595.00 $ 3,112,605.00 Rehabilitate Runway - 14/32
EA NYC NY ART Watertown International P 44 $ 3,591,188.00 $ 2,003,316.50 $ 1,587,871.50 Extend Runway - 10/28, Extend Taxiway, Improve Runway Safety
Area - 10/28
EA NYC NY JFK John F Kennedy International P 185 $ 2,736,130.00 $ - $ 2,736,130.00 Conduct Noise Compatibility Plan Study
EA NYC NY HTF Hornell Municipal GA 21 $ 50,220.00 $ 50,220.00 $ - Construct Snow Removal Equipment Building
EA NYC NY SYR Syracuse Hancock International P 135 $ 55,800.00 $ 55,800.00 $ - Remove Obstructions
EA NYC NY SYR Syracuse Hancock International P 136 $ 1,066,950.00 $ 1,066,950.00 $ - Improve Terminal Building
EA NYC NY LGA La Guardia P 141 $ 2,638,427.00 $ 2,638,427.00 $ - Improve Airport Drainage
EA NYC NY DKK Chautauqua County/Dunkirk GA 50 $ 286,200.00 $ 286,200.00 $ - Improve Airport Drainage
EA NYC NY POU Dutchess County GA 46 $ 261,000.00 $ 261,000.00 $ - Conduct Environmental Study
EA NYC NY LKP Lake Placid GA 40 $ 122,670.00 $ 122,670.00 $ -Conduct Miscellaneous Study, Install Runway Vertical/Visual
Guidance System - 14/32, Rehabilitate Taxiway Lighting
EA WAS DC DCA Ronald Reagan Washington National P 30 $ 5,641,125.00 $ 5,641,125.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway
EA WAS DC @008 Washington Metropolitan Area 12 $ 225,000.00 $ 225,000.00 $ - Conduct Metropolitan System Plan Study
EA WAS DC IAD Washington Dulles International P 52 $ 3,178,482.00 $ 390,456.00 $ 2,788,026.00 Rehabilitate Taxiway
EA WAS DC IAD Washington Dulles International P 51 $ 14,000,000.00 $ - $ 14,000,000.00 Construct Runway - Plan-1
EA WAS MD FDK Frederick Municipal R 41 $ 2,695,842.00 $ 150,000.00 $ 2,545,842.00 Remove Obstructions
EA WAS MD FDK Frederick Municipal R 40 $ 58,050.00 $ 58,050.00 $ - Wildlife Hazard Assessments
EA WAS MD DMW Carroll County Regional/Jack B Poage Field R 29 $ 150,000.00 $ 150,000.00 $ - Conduct Environmental Study
EA WAS MD FME Tipton R 19 $ 343,807.00 $ 343,807.00 $ - Rehabilitate Apron
EA WAS MD HGR Hagerstown Regional-Richard A Henson Fiel P 52 $ 1,305,503.00 $ 1,305,503.00 $ - Rehabilitate Taxiway
EA WAS MD ESN Easton/Newnam Field GA 42 $ 527,883.00 $ 527,883.00 $ - Conduct Environmental Study
EA WAS MD 2W6 St Mary's County Regional GA 21 $ 2,765,724.00 $ 2,765,724.00 $ - Extend Runway - 11/29
EA WAS MD FME Tipton R 18 $ 89,921.00 $ 89,921.00 $ - Wildlife Hazard Assessments
EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 50 $ 554,000.00 $ 554,000.00 $ - Rehabilitate Terminal Building
EA WAS MD BWI Baltimore/Washington International Thurgo P 92 $ 16,869,274.00 $ 3,944,274.00 $ 12,925,000.00 Construct Taxiway
EA WAS MD GAI Montgomery County Airpark R 27 $ 405,666.00 $ 405,666.00 $ - Rehabilitate Taxiway
EA WAS MD BWI Baltimore/Washington International Thurgo P 93 $ 2,556,902.00 $ - $ 2,556,902.00 VALE Infrastructure
EA WAS MD GAI Montgomery County Airpark R 25 $ 48,780.00 $ 48,780.00 $ - Wildlife Hazard Assessments
EA WAS MD 2G4 Garrett County GA 13 $ 207,695.00 $ 207,695.00 $ - Conduct Environmental Study
EA WAS MD GAI Montgomery County Airpark R 24 $ 1,406,916.00 $ - $ 1,406,916.00 Remove Obstructions
EA WAS MD CGE Cambridge-Dorchester GA 28 $ 2,790,000.00 $ 602,390.00 $ 2,187,610.00 Extend Runway - 16/34
EA WAS MD GAI Montgomery County Airpark R 26 $ 171,360.00 $ 171,360.00 $ - Remove Obstructions
EA WAS VA BCB Virginia Tech/Montgomery Executive GA 20 $ 8,040,096.00 $ 150,000.00 $ 7,890,096.00 Extend Runway - 12/30
EA WAS VA HSP Ingalls Field GA 13 $ 1,085,978.00 $ 150,000.00 $ 935,978.00 Remove Obstructions
EA WAS VA VJI Virginia Highlands GA 33 $ 1,842,444.00 $ 150,000.00 $ 1,692,444.00 Extend Runway, Supplemental Environmental Assessment &
Runway Extension - 06/24, Extend Runway - 06/24
EA WAS VA LNP Lonesome Pine GA 12 $ 333,009.00 $ 333,009.00 $ - Acquire Land For Approaches
EA WAS VA OKV Winchester Regional GA 33 $ 247,500.00 $ 247,500.00 $ - Construct Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 11 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
EA WAS VA OKV Winchester Regional GA 34 $ 357,771.00 $ 357,771.00 $ - Construct Taxiway
EA WAS VA CHO Charlottesville-Albemarle P 45 $ 532,800.00 $ 532,800.00 $ - Acquire Snow Removal Equipment
EA WAS VA PSK New River Valley GA 16 $ 4,280,688.00 $ 456,347.00 $ 3,824,341.00 Construct Taxiway
EA WAS VA LKU Louisa County/Freeman Field GA 18 $ 576,000.00 $ 576,000.00 $ - Rehabilitate Runway Lighting - 09/27
EA WAS VA EMV Emporia-Greensville Regional GA 11 $ 211,500.00 $ 211,500.00 $ - Extend Taxiway
EA WAS VA HWY Warrenton-Fauquier R 20 $ 1,032,184.00 $ 1,032,184.00 $ - Acquire Land For Approaches
EA WAS VA FRR Front Royal-Warren County GA 16 $ 123,300.00 $ 123,300.00 $ - Remove Obstructions
EA WAS VA MKJ Mountain Empire GA 25 $ 193,473.00 $ 193,473.00 $ - Remove Obstructions
EA WAS VA ROA Roanoke Regional/Woodrum Field P 54 $ 5,600,000.00 $ 5,600,000.00 $ - Improve Terminal Building
EA WAS VA W96 New Kent County GA 14 $ 1,677,675.00 $ 304,612.00 $ 1,373,063.00 Install Taxiway Lighting, Rehabilitate Taxiway
EA WAS VA W78 William M Tuck GA 15 $ 327,145.00 $ 327,145.00 $ - Expand Apron
EA WAS VA MKJ Mountain Empire GA 24 $ 107,820.00 $ 107,820.00 $ - Rehabilitate Runway - 08/26
EA WAS VA DAN Danville Regional GA 27 $ 161,592.00 $ 161,592.00 $ - Rehabilitate Taxiway
EA WAS VA AVC Mecklenburg-Brunswick Regional GA 14 $ 429,615.00 $ 429,615.00 $ -Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate
Taxiway
EA WAS VA SFQ Suffolk Executive GA 24 $ 3,122,658.00 $ 3,122,658.00 $ - Construct Taxiway
EA WAS VA FVX Farmville Regional GA 16 $ 62,010.00 $ 62,010.00 $ - Rehabilitate Apron
EA WAS VA HLX Twin County GA 13 $ 117,900.00 $ 117,900.00 $ - Rehabilitate Apron
EA WAS VA JFZ Tazewell County GA 20 $ 126,000.00 $ 126,000.00 $ - Conduct Environmental Study
EA WAS VA MTV Blue Ridge GA 20 $ 210,833.00 $ 210,833.00 $ - Update Airport Master Plan Study
EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 37 $ 1,132,176.00 $ 1,132,176.00 $ - Construct Building
EA WAS VA SHD Shenandoah Valley Regional P 38 $ 55,028.00 $ 55,028.00 $ - Rehabilitate Runway - 05/23
EA WAS VA JYO Leesburg Executive R 39 $ 360,000.00 $ 360,000.00 $ - Update Airport Master Plan Study
EA WAS VA CPK Chesapeake Regional GA 20 $ 2,070,000.00 $ 315,000.00 $ 1,755,000.00 Expand Apron
EA WAS VA FVX Farmville Regional GA 15 $ 171,063.00 $ 171,063.00 $ - Update Airport Master Plan Study
EA WAS VA 0V4 Brookneal/Campbell County GA 8 $ 441,910.00 $ 441,910.00 $ - Rehabilitate Runway Lighting - 06/24
EA WAS VA OFP Hanover County Municipal GA 27 $ 574,578.00 $ 574,578.00 $ - Construct Apron
EA WAS VA LUA Luray Caverns GA 17 $ 3,560,995.00 $ 129,525.00 $ 3,431,470.00 Remove Obstructions
EA WAS VA SFQ Suffolk Executive GA 22 $ 517,500.00 $ 517,500.00 $ - Remove Obstructions
EA WAS VA OKV Winchester Regional GA 32 $ 122,490.00 $ 122,490.00 $ - Construct Taxiway
GL CHI IL MLI Quad City International P 81 $ 1,751,100.00 $ 1,751,100.00 $ - Security Enhancements
GL CHI IL MDW Chicago Midway International P 87 $ 3,236,412.00 $ 3,236,412.00 $ - Rehabilitate Runway Lighting - 04L/22R, Rehabilitate Taxiway
GL CHI IL ORD Chicago O'Hare International P 147 $ 30,000,000.00 $ - $ 30,000,000.00 Construct Runway - Plan-2
GL CHI IL ORD Chicago O'Hare International P 150 $ 6,500,000.00 $ - $ 6,500,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL CHI IL PIA General Downing - Peoria International P 62 $ 4,134,019.00 $ 2,457,710.00 $ 1,676,309.00 Rehabilitate Apron
GL CHI IL CMI University of Illinois-Willard P 30 $ 2,680,340.00 $ 1,142,471.00 $ 1,537,869.00 Rehabilitate Runway - 14L/32R, Rehabilitate Runway - 04/22, Widen
Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 12 of 57�
ormal
ormal
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL CHI IL MDW Chicago Midway International P 88 $ 4,625,292.00 $ - $ 4,625,292.00 Install Runway Incursion Marking, Rehabilitate Runway - 04L/22R
GL CHI IL ORD Chicago O'Hare International P 149 $ 2,000,000.00 $ - $ 2,000,000.00 VALE Infrastructure
GL CHI IL BMI Central IL Regional Airport at Bloomington-N P 64 $ 562,308.00 $ 562,308.00 $ - Acquire Land For Approaches
GL CHI IL MDW Chicago Midway International P 84 $ 2,557,802.00 $ - $ 2,557,802.00 Construct Taxiway
GL CHI IL *ILB Illinois State Block Grant Program 122 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 126 $ 2,307,759.00 $ - $ 2,307,759.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 124 $ 484,200.00 $ - $ 484,200.00 Non primary development projects in state block grant program
GL CHI IL ORD Chicago O'Hare International P 148 $ 2,836,883.00 $ - $ 2,836,883.00 Rehabilitate Runway - 09R/27L
GL CHI IL SPI Abraham Lincoln Capital P 68 $ 2,070,000.00 $ 500,000.00 $ 1,570,000.00 Improve Terminal Building
GL CHI IL RFD Chicago/Rockford International P 75 $ 647,945.00 $ 647,945.00 $ - Construct Apron
GL CHI IL MLI Quad City International P 78 $ 924,022.00 $ 607,968.00 $ 316,054.00 Construct Taxiway
GL CHI IL ORD Chicago O'Hare International P 153 $ 2,500,000.00 $ - $ 2,500,000.00 Conduct Environmental Study
GL CHI IL *ILB Illinois State Block Grant Program 123 $ 100,000.00 $ - $ 100,000.00 Non primary development projects in state block grant program
GL CHI IL MDW Chicago Midway International P 86 $ 12,845,171.00 $ - $ 12,845,171.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
GL CHI IL ORD Chicago O'Hare International P 146 $ 20,000,000.00 $ - $ 20,000,000.00 Construct Runway - Plan-1
GL CHI IL ORD Chicago O'Hare International P 152 $ 9,622,543.00 $ 9,622,543.00 $ - Construct Runway
GL CHI IL UIN Quincy Regional-Baldwin Field P 36 $ 1,484,025.00 $ 1,484,025.00 $ - Construct Taxiway
GL CHI IL *ILB Illinois State Block Grant Program 121 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program
GL CHI IL MWA Williamson County Regional P 32 $ 4,588,521.00 $ 1,000,000.00 $ 3,588,521.00 Construct Terminal Building
GL CHI IL MLI Quad City International P 80 $ 391,844.00 $ 391,844.00 $ - Remove Obstructions
GL CHI IL BMI Central IL Regional Airport at Bloomington-N P 63 $ 1,163,954.00 $ 1,163,954.00 $ - Rehabilitate Service Road
GL CHI IL *ILB Illinois State Block Grant Program 125 $ 4,355,280.00 $ - $ 4,355,280.00 Non primary development projects in state block grant program
GL CHI IL MLI Quad City International P 79 $ 570,984.00 $ 570,984.00 $ - Rehabilitate Taxiway
GL CHI IL *ILS State of Illinois 7 $ 750,000.00 $ - $ 750,000.00 Conduct State System Plan Study
GL CHI IL RFD Chicago/Rockford International P 74 $ 6,698,797.00 $ 1,348,797.00 $ 5,350,000.00 Expand Terminal Building
GL CHI IL MDW Chicago Midway International P 85 $ 210,000.00 $ - $ 210,000.00 Acquire Equipment
GL CHI IL *ILB Illinois State Block Grant Program 127 $ 50,000.00 $ - $ 50,000.00 Non primary development projects in state block grant program
GL CHI IL *ILB Illinois State Block Grant Program 120 $ 16,630,305.00 $ 16,630,305.00 $ - Non primary development projects in state block grant program
GL CHI IL ORD Chicago O'Hare International P 151 $ 6,325,289.00 $ 6,325,289.00 $ - Rehabilitate Taxiway
GL CHI IN VPZ Porter County Regional GA 27 $ 5,807,807.00 $ - $ 5,807,807.00 Rehabilitate Runway - 09/27
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 13 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL CHI IN LAF Purdue University GA 36 $ 442,969.00 $ 142,969.00 $ 300,000.00 Install Runway Incursion Marking
GL CHI IN RWN Arens Field GA 9 $ 598,320.00 $ 598,320.00 $ - Improve Fuel Farm
GL CHI IN HHG Huntington Municipal GA 13 $ 637,807.00 $ 637,807.00 $ - Expand Apron
GL CHI IN C62 Kendallville Municipal GA 20 $ 387,740.00 $ 387,740.00 $ -
Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,
Install Runway Vertical/Visual Guidance System - 10/28,
Rehabilitate Runway Lighting - 10/28
GL CHI IN FRH French Lick Municipal GA 15 $ 200,935.00 $ 200,935.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System - 08/26
GL CHI IN GWB De Kalb County GA 22 $ 450,000.00 $ 450,000.00 $ - Acquire Easement For Approaches
GL CHI IN FWA Fort Wayne International P 65 $ 12,883,848.00 $ 4,383,848.00 $ 8,500,000.00 Construct Taxiway, Rehabilitate Runway - 14/32
GL CHI IN MCX White County GA 16 $ 3,167,539.00 $ 150,000.00 $ 3,017,539.00 Extend Runway - 18/36
GL CHI IN GYY Gary/Chicago International CS 32 $ 2,994,597.00 $ 150,000.00 $ 2,844,597.00 Extend Runway - 12/30
GL CHI IN LAF Purdue University GA 38 $ 1,350,000.00 $ - $ 1,350,000.00 Rehabilitate Runway - 10/28
GL CHI IN DCY Daviess County GA 15 $ 74,160.00 $ 74,160.00 $ - Extend Runway - 18/36, Extend Taxiway
GL CHI IN UWL New Castle-Henry Co Municipal GA 15 $ 514,573.00 $ 514,573.00 $ - Construct Runway - Plan-1
GL CHI IN IND Indianapolis International P 140 $ 138,475.00 $ 138,475.00 $ - Conduct Noise Compatibility Plan Study
GL CHI IN MGC Michigan City Municipal-Phillips Field GA 19 $ 256,284.00 $ 256,284.00 $ -Conduct Miscellaneous Study, Extend Runway - 02/20, Remove
Obstructions
GL CHI IN SMD Smith Field GA 16 $ 118,447.00 $ 118,447.00 $ - Install Miscellaneous NAVAIDS, Remove Obstructions
GL CHI IN GYY Gary/Chicago International CS 33 $ 2,411,325.00 $ - $ 2,411,325.00 Rehabilitate Runway - 02/20
GL CHI IN MQJ Indianapolis Regional R 16 $ 514,454.00 $ 514,454.00 $ - Rehabilitate Taxiway
GL CHI IN TYQ Indianapolis Executive R 26 $ 219,275.00 $ 219,275.00 $ -Acquire Easement For Approaches, Extend Runway - 18/36, Extend
Runway - 18/36, Wildlife Hazard Assessments
GL CHI IN MIE Delaware County Regional GA 29 $ 83,016.00 $ 83,016.00 $ - Rehabilitate Runway - 14/32
GL CHI IN OVO North Vernon GA 18 $ 112,670.00 $ 112,670.00 $ - Construct Building
GL CHI IN RZL Jasper County GA 10 $ 450,000.00 $ 450,000.00 $ - Improve Fuel Farm
GL CHI IN SBN South Bend International P 48 $ 3,089,909.00 $ 3,089,909.00 $ - Modify Terminal Building
GL CHI IN OKK Kokomo Municipal GA 23 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 14/32
GL CHI IN CFJ Crawfordsville Municipal GA 14 $ 150,000.00 $ 150,000.00 $ - Construct Terminal Building
GL CHI IN I42 Paoli Municipal GA 12 $ 1,687,072.00 $ 208,695.00 $ 1,478,377.00 Extend Runway - 02/20
GL CHI IN BAK Columbus Municipal GA 27 $ 2,203,630.00 $ 150,000.00 $ 2,053,630.00 Rehabilitate Runway - 14/32
GL CHI IN UMP Indianapolis Metropolitan R 22 $ 2,655,000.00 $ 150,000.00 $ 2,505,000.00 Rehabilitate Runway - 15/33
GL CHI IN RID Richmond Municipal GA 18 $ 171,941.00 $ 171,941.00 $ - Rehabilitate Runway - 15/33
GL CHI IN PPO La Porte Municipal GA 22 $ 525,970.00 $ 525,970.00 $ - Acquire Land for Development
GL CHI IN AID Anderson Municipal-Darlington Field GA 29 $ 496,831.00 $ 496,831.00 $ -Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,
Rehabilitate Runway - 12/30
GL CHI IN EVV Evansville Regional P 58 $ 1,349,474.00 $ 1,349,474.00 $ -Acquire Snow Removal Equipment, Rehabilitate Apron, Security
Enhancements
GL CHI IN SIV Sullivan County GA 17 $ 274,584.00 $ 274,584.00 $ - Improve Fuel Farm
GL CHI IN IND Indianapolis International P 141 $ 3,953,250.00 $ - $ 3,953,250.00 VALE Infrastructure
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 14 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL CHI IN ASW Warsaw Municipal GA 14 $ 543,600.00 $ 543,600.00 $ - Acquire Land For Approaches
GL CHI IN GGP Logansport/Cass County GA 20 $ 352,492.00 $ 352,492.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
GL CHI IN HUF Terre Haute International-Hulman Field GA 43 $ 223,875.00 $ 223,875.00 $ - Construct Runway - 18/36
GL CHI IN 4I7 Putnam County GA 16 $ 854,282.00 $ 854,282.00 $ - Acquire Land For Approaches, Install Perimeter Fencing
GL CHI IN GEZ Shelbyville Municipal GA 25 $ 398,943.00 $ 398,943.00 $ - Install Taxiway Lighting
GL CHI IN ANQ Tri-State Steuben County GA 16 $ 90,241.00 $ 90,241.00 $ - Update Airport Master Plan Study
GL CHI IN FKR Frankfort Municipal GA 18 $ 1,274,083.00 $ 1,274,083.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
GL CHI IN CEV Mettel Field GA 22 $ 186,756.00 $ 186,756.00 $ - Rehabilitate Taxiway
GL CHI IN 8A4 Indianapolis Downtown GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron
GL CHI IN 50I Kentland Municipal GA 11 $ 150,000.00 $ 150,000.00 $ - Acquire Land For Approaches
GL CHI IN HFY Greenwood Municipal GA 29 $ 150,000.00 $ 150,000.00 $ - Improve Airport Drainage
GL CHI IN BMG Monroe County GA 30 $ 373,130.00 $ 333,350.00 $ 39,780.00 Install Perimeter Fencing
GL CHI IN MZZ Marion Municipal GA 24 $ 735,724.00 $ 300,000.00 $ 435,724.00 Construct Taxiway
GL CHI IN HNB Huntingburg GA 15 $ 505,800.00 $ 505,800.00 $ - Extend Runway - 09/27
GL CHI IN IWH Wabash Municipal GA 15 $ 300,000.00 $ 300,000.00 $ - Construct Fuel Farm
GL CHI IN 2R2 Hendricks County-Gordon Graham Field R 15 $ 221,576.00 $ 221,576.00 $ - Install Perimeter Fencing
GL CHI IN *INS State of Indiana 13 $ 165,600.00 $ 165,600.00 $ - Update State System Plan Study
GL CHI IN EKM Elkhart Municipal GA 29 $ 150,000.00 $ 150,000.00 $ -
Install Airfield Guidance Signs, Install Runway Lighting - 09/27,
Install Runway Vertical/Visual Guidance System - 09/27, Install
Taxiway Lighting
GL CHI IN PLD Portland Municipal GA 12 $ 87,957.00 $ 87,957.00 $ - Update Airport Master Plan Study
GL CHI IN RCR Fulton County GA 14 $ 150,000.00 $ 150,000.00 $ - Improve Airport Drainage
GL CHI IN LAF Purdue University GA 37 $ 898,524.00 $ - $ 898,524.00 Install Airfield Guidance Signs
GL CHI IN IND Indianapolis International P 142 $ 7,357,224.00 $ 6,457,560.00 $ 899,664.00 Rehabilitate Runway - 05L/23R, Rehabilitate Taxiway, Rehabilitate
Taxiway, Rehabilitate Taxiway
GL CHI IN JVY Clark Regional R 28 $ 3,425,000.00 $ 150,000.00 $ 3,275,000.00 Extend Runway - 18/36
GL CHI IN I83 Salem Municipal GA 16 $ 1,004,499.00 $ 150,000.00 $ 854,499.00 Construct Runway - Plan-1
GL CHI IN IND Indianapolis International P 143 $ 187,500.00 $ - $ 187,500.00 Update Miscellaneous Study
GL CHI IN I76 Peru Municipal GA 18 $ 333,360.00 $ 333,360.00 $ - Improve Fuel Farm
GL CHI IN GSH Goshen Municipal GA 15 $ 209,394.00 $ 209,394.00 $ - Update Airport Master Plan Study
GL CHI IN 05C Griffith-Merrillville R 13 $ 140,106.00 $ 140,106.00 $ - Conduct Environmental Study
GL CHI IN I22 Randolph County GA 16 $ 140,737.00 $ 140,737.00 $ - Improve Airport Drainage
GL CHI IN IMS Madison Municipal GA 18 $ 126,397.00 $ 126,397.00 $ -Acquire Land For Approaches, Rehabilitate Runway - 03/21, Wildlife
Hazard Assessments
GL CHI WI LSE La Crosse Regional P 38 $ 2,200,000.00 $ 224,089.00 $ 1,975,911.00 Rehabilitate Terminal Building
GL CHI WI MSN Dane County Regional-Truax Field P 54 $ 432,000.00 $ - $ 432,000.00 Rehabilitate Apron
GL CHI WI CWA Central Wisconsin P 44 $ 541,972.00 $ 541,972.00 $ - Rehabilitate Access Road
GL CHI WI ATW Outagamie County Regional P 49 $ 65,250.00 $ 65,250.00 $ - Conduct Environmental Study, Wildlife Hazard Assessments
GL CHI WI MKE General Mitchell International P 81 $ 150,494.00 $ - $ 150,494.00 Install Perimeter Fencing
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 15 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL CHI WI MSN Dane County Regional-Truax Field P 53 $ 435,600.00 $ - $ 435,600.00 Conduct Environmental Study
GL CHI WI *WIB Wisconsin State Block Grant Program 76 $ 916,894.00 $ - $ 916,894.00 Non primary development projects in state block grant program
GL CHI WI *WIB Wisconsin State Block Grant Program 75 $ 698,906.00 $ - $ 698,906.00 Non primary development projects in state block grant program
GL CHI WI MSN Dane County Regional-Truax Field P 51 $ 4,093,727.00 $ 2,350,129.00 $ 1,743,598.00 Construct Runway - 03/21
GL CHI WI MSN Dane County Regional-Truax Field P 52 $ 1,453,284.00 $ 1,453,284.00 $ -Install Runway Lighting - 18/36, Sustainable Management Plan,
Update Airport Master Plan Study
GL CHI WI EAU Chippewa Valley Regional P 38 $ 1,890,848.00 $ 1,257,166.00 $ 633,682.00 Rehabilitate Taxiway
GL CHI WI *WIB Wisconsin State Block Grant Program 71 $ 15,569,731.00 $ 15,569,731.00 $ - Non primary development projects in state block grant program
GL CHI WI *WIB Wisconsin State Block Grant Program 77 $ 4,228,200.00 $ - $ 4,228,200.00 Non primary development projects in state block grant program
GL CHI WI *WIB Wisconsin State Block Grant Program 74 $ 1,470,000.00 $ - $ 1,470,000.00 Non primary development projects in state block grant program
GL CHI WI *WIB Wisconsin State Block Grant Program 73 $ 504,000.00 $ - $ 504,000.00 Non primary development projects in state block grant program
GL CHI WI MKE General Mitchell International P 83 $ 1,008,714.00 $ 1,008,714.00 $ - Install Guidance Signs, Rehabilitate Runway - 07R/25L
GL CHI WI *WIB Wisconsin State Block Grant Program 72 $ 547,870.00 $ - $ 547,870.00 Non primary development projects in state block grant program
GL CHI WI MKE General Mitchell International P 82 $ 1,668,779.00 $ 949,239.00 $ 719,540.00 Rehabilitate Runway - 13/31
GL CHI WI RHI Rhinelander-Oneida County P 37 $ 1,497,909.00 $ 1,497,909.00 $ - Construct Taxiway, Rehabilitate Runway - 09/27
GL CHI WI GRB Austin Straubel International P 47 $ 2,187,000.00 $ 2,187,000.00 $ -
Install Runway Vertical/Visual Guidance System - 06/24,
Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master
Plan Study
GL DET MI ESC Delta County P 38 $ 442,860.00 $ 442,860.00 $ -
Acquire Handicap Passenger Lift Device, Rehabilitate Runway -
09/27, Rehabilitate Runway - 18/36, Rehabilitate Taxiway,
Rehabilitate Taxiway
GL DET MI CMX Houghton County Memorial P 40 $ 856,203.00 $ 856,203.00 $ - Rehabilitate Apron
GL DET MI APN Alpena County Regional P 21 $ 123,500.00 $ 123,500.00 $ -Rehabilitate Runway - 01/19, Rehabilitate Runway - 07/25,
Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway
GL DET MI *MIB Michigan State Block Grant Program 94 $ 3,500,000.00 $ - $ 3,500,000.00 Non primary development projects in state block grant program
GL DET MI DTW Detroit Metropolitan Wayne County P 94 $ 9,357,639.00 $ 557,639.00 $ 8,800,000.00 Rehabilitate Taxiway
GL DET MI AZO Kalamazoo/Battle Creek International P 42 $ 3,343,654.00 $ 3,343,654.00 $ -
Extend Taxiway, Install Taxiway Lighting, Rehabilitate Apron,
Rehabilitate Runway - 05/23, Rehabilitate Runway - 17/35,
Rehabilitate Taxiway, Rehabilitate Taxiway
GL DET MI *MIB Michigan State Block Grant Program 95 $ 9,500,000.00 $ - $ 9,500,000.00 Non primary development projects in state block grant program
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 16 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DET MI FNT Bishop International P 55 $ 4,387,392.00 $ 4,387,392.00 $ -
Install Runway Incursion Marking (14 CFR Part 139), Rehabilitate
Runway - 18/36, Rehabilitate Runway Lighting - 18/36, Remove
Obstructions
GL DET MI DTW Detroit Metropolitan Wayne County P 111 $ 4,621,620.00 $ 4,621,620.00 $ - Conduct Metropolitan System Plan Study
GL DET MI MKG Muskegon County P 39 $ 1,162,578.00 $ 1,162,578.00 $ - Construct Access Road, Rehabilitate Apron
GL DET MI LAN Capital Region International P 54 $ 652,400.00 $ 652,400.00 $ -Conduct Environmental Study, Rehabilitate Taxiway, Update Airport
Master Plan Study
GL DET MI GRR Gerald R Ford International P 52 $ 3,987,379.00 $ 3,987,379.00 $ - Expand Terminal Building, Rehabilitate Runway - 08L/26R
GL DET MI TVC Cherry Capital P 40 $ 1,474,992.00 $ 1,474,992.00 $ -Construct Taxiway, Install Runway Incursion Marking (14 CFR Part
139), Rehabilitate Runway - 18/36
GL DET MI *MIB Michigan State Block Grant Program 92 $ 17,956,529.00 $ 17,956,529.00 $ - Non primary development projects in state block grant program
GL DET MI MBS MBS International P 50 $ 748,175.00 $ 748,175.00 $ - Rehabilitate Apron
GL DET MI *MIB Michigan State Block Grant Program 93 $ 3,459,900.00 $ - $ 3,459,900.00 Non primary development projects in state block grant program
GL DET MI CVX Charlevoix Municipal P 19 $ 86,400.00 $ 86,400.00 $ -Groove Runway - 09/27, Rehabilitate Runway Lighting - 09/27,
Remove Obstructions
GL DET MI SAW Sawyer International P 39 $ 702,900.00 $ 702,900.00 $ -
Install Perimeter Fencing required by 14 CFR 139, Rehabilitate
Runway - 01/19, Rehabilitate Taxiway, Update Airport Master Plan
Study
GL DET MI CIU Chippewa County International P 36 $ 71,250.00 $ 71,250.00 $ - Acquire Snow Removal Equipment
GL DET OH CMH Port Columbus International P 83 $ 2,696,206.00 $ - $ 2,696,206.00 VALE Infrastructure
GL DET OH MFD Mansfield Lahm Regional GA 29 $ 4,435,334.00 $ 374,110.00 $ 4,061,224.00 Construct Taxiway, Install Runway Distance-To-Go Signs - 05/23,
Rehabilitate Runway - 05/23
GL DET OH 3G3 Wadsworth Municipal GA 17 $ 83,565.00 $ 83,565.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway
GL DET OH AXV Neil Armstrong GA 17 $ 180,000.00 $ 180,000.00 $ - Improve Airport Drainage, Improve Terminal Building
GL DET OH I43 James A Rhodes GA 11 $ 185,116.00 $ 185,116.00 $ - Acquire Land for Development
GL DET OH PMH Greater Portsmouth Regional GA 18 $ 240,106.00 $ 240,106.00 $ - Rehabilitate Apron, Rehabilitate Runway - 18/36
GL DET OH FDY Findlay GA 25 $ 149,514.00 $ 149,514.00 $ - Rehabilitate Runway - 18/36
GL DET OH OWX Putnam County GA 10 $ 34,587.00 $ 34,587.00 $ - Rehabilitate Runway - 09/27, Rehabilitate Taxiway
GL DET OH I74 Grimes Field GA 20 $ 150,076.00 $ 150,076.00 $ - Rehabilitate Taxiway
GL DET OH SCA Sidney Municipal GA 20 $ 148,551.00 $ 148,551.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway - 05/23,
Rehabilitate Taxiway
GL DET OH GAS Gallia-Meigs Regional GA 13 $ 1,082,322.00 $ 1,082,322.00 $ - Rehabilitate Runway - 05/23
GL DET OH CGF Cuyahoga County R 25 $ 9,099,116.00 $ 450,000.00 $ 8,649,116.00 Rehabilitate Runway - 06/24
GL DET OH CMH Port Columbus International P 81 $ 11,523,456.00 $ 1,523,456.00 $ 10,000,000.00 Construct Runway - 10R/28L
GL DET OH CLE Cleveland-Hopkins International P 106 $ 1,125,000.00 $ - $ 1,125,000.00 VALE Infrastructure
GL DET OH POV Portage County GA 27 $ 353,000.00 $ 353,000.00 $ - Rehabilitate Runway - 09/27
GL DET OH 5A1 Norwalk-Huron County GA 8 $ 256,068.00 $ 256,068.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -
10/28, Rehabilitate Taxiway, Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 17 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DET OH 1G3 Kent State University GA 15 $ 188,172.00 $ 188,172.00 $ - Rehabilitate Runway - 01/19
GL DET OH 4G5 Monroe County GA 14 $ 217,246.00 $ 217,246.00 $ - Acquire Land For Approaches, Rehabilitate Taxiway
GL DET OH UYF Madison County GA 18 $ 493,070.00 $ 493,070.00 $ - Construct Building, Construct Taxiway, Wildlife Hazard Assessments
GL DET OH FZI Fostoria Metropolitan GA 15 $ 164,381.00 $ 164,381.00 $ -Improve Airport Drainage, Install Runway Vertical/Visual Guidance
System - 09/27
GL DET OH I19 Greene County-Lewis A Jackson Regional GA 21 $ 1,237,977.00 $ 1,237,977.00 $ -Improve Runway Safety Area, Rehabilitate Runway - 07/25,
Rehabilitate Taxiway
GL DET OH 10G Holmes County GA 13 $ 67,680.00 $ 67,680.00 $ - Conduct Miscellaneous Study, Wildlife Hazard Assessments
GL DET OH LCK Rickenbacker International P 41 $ 839,683.00 $ 839,683.00 $ - Acquire Snow Removal Equipment
GL DET OH CMH Port Columbus International P 82 $ 11,733,833.00 $ - $ 11,733,833.00 Rehabilitate Runway - 10L/28R
GL DET OH VTA Newark-Heath GA 26 $ 216,902.00 $ 216,902.00 $ - Acquire Land For Approaches
GL DET OH CDI Cambridge Municipal GA 14 $ 1,233,202.00 $ 1,233,202.00 $ - Rehabilitate Runway - 04/22
GL DET OH UNI Ohio University GA 20 $ 2,290,897.00 $ 2,290,897.00 $ - Rehabilitate Runway - 07/25
GL DET OH LNN Willoughby Lost Nation Municipal R 12 $ 394,812.00 $ 394,812.00 $ - Rehabilitate Runway - 05/23
GL DET OH MRT Union County GA 22 $ 35,438.00 $ 35,438.00 $ - Install Runway Vertical/Visual Guidance System
GL DET OH MGY Dayton-Wright Brothers R 17 $ 219,341.00 $ 219,341.00 $ - Rehabilitate Runway - 02/20
GL DET OH 1G0 Wood County GA 26 $ 143,235.00 $ 143,235.00 $ - Install Airport Beacons, Rehabilitate Taxiway
GL DET OH TDZ Toledo Executive R 26 $ 99,000.00 $ 99,000.00 $ - Install Runway Vertical/Visual Guidance System - 14/32
GL DET OH YNG Youngstown-Warren Regional P 43 $ 4,757,785.00 $ 3,510,531.00 $ 1,247,254.00 Construct Taxiway, Expand Apron, Install Guidance Signs, Install
Runway Distance-To-Go Signs - 14/32, Runway Incursion Markings
GL DET OH I66 Clinton Field GA 10 $ 470,198.00 $ 470,198.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate
Runway - 03/21
GL DET OH 7G8 Geauga County GA 18 $ 249,660.00 $ 249,660.00 $ - Rehabilitate Apron
GL DET OH LHQ Fairfield County GA 25 $ 176,332.00 $ 176,332.00 $ -Install Runway Vertical/Visual Guidance System, Wildlife Hazard
Assessments
GL DET OH I40 Richard Downing GA 20 $ 141,000.00 $ 141,000.00 $ - Rehabilitate Taxiway
GL DET OH TOL Toledo Express P 76 $ 131,850.00 $ 131,850.00 $ - Conduct Miscellaneous Study, Wildlife Hazard Assessments
GL DET OH CLE Cleveland-Hopkins International P 104 $ 2,332,214.00 $ - $ 2,332,214.00 Construct Taxiway, Construct Taxiway
GL DET OH DLZ Delaware Municipal - Jim Moore Field GA 21 $ 4,250,949.00 $ 17,408.00 $ 4,233,541.00 Extend Runway - 10/28, Rehabilitate Runway - 10/28, Rehabilitate
Taxiway
GL DET OH BJJ Wayne County GA 22 $ 1,719,772.00 $ 1,719,772.00 $ - Rehabilitate Runway - 10/28
GL DET OH AOH Lima Allen County GA 17 $ 404,860.00 $ 404,860.00 $ - Construct Snow Removal Equipment Building
GL DET OH LNN Willoughby Lost Nation Municipal R 11 $ 392,800.00 $ 392,800.00 $ - Update Airport Master Plan Study, Wildlife Hazard Assessments
GL DET OH OSU Ohio State University R 30 $ 452,431.00 $ 452,431.00 $ - Rehabilitate Apron
GL DET OH ZZV Zanesville Municipal GA 14 $ 119,980.00 $ 119,980.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments
GL DET OH I23 Fayette County GA 10 $ 665,875.00 $ 665,875.00 $ - Rehabilitate Runway - 05/23
GL DET OH DAY James M Cox Dayton International P 82 $ 3,957,179.00 $ 3,957,179.00 $ - Environmental Mitigation, Rehabilitate Apron
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 18 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DET OH CLE Cleveland-Hopkins International P 107 $ 2,147,498.00 $ 2,147,498.00 $ - Construct Runway - 06L/24R
GL DET OH 3T7 Middle Bass Island GA 17 $ 76,595.00 $ 76,595.00 $ - Acquire Snow Removal Equipment, Wildlife Hazard Assessments
GL DET OH USE Fulton County GA 13 $ 104,210.00 $ 104,210.00 $ - Install Runway Vertical/Visual Guidance System - 09/27
GL DET OH PCW Erie-Ottawa International GA 33 $ 194,358.00 $ 194,358.00 $ - Construct Taxiway
GL DET OH SGH Springfield-Beckley Municipal GA 23 $ 44,527.00 $ 44,527.00 $ -Rehabilitate Runway - 06/24, Rehabilitate Runway - 15/33,
Rehabilitate Taxiway, Rehabilitate Taxiway
GL DET OH OXD Miami University GA 11 $ 44,110.00 $ 44,110.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments
GL DET OH 1G5 Medina Municipal R 13 $ 90,315.00 $ 90,315.00 $ - Rehabilitate Apron
GL DET OH CAK Akron-Canton Regional P 61 $ 6,506,171.00 $ 6,506,171.00 $ -Construct Sand and Chemical Storage Building, Expand Access Road,
Expand Terminal Building, Rehabilitate Taxiway
GL DET OH VNW Van Wert County GA 17 $ 109,350.00 $ 109,350.00 $ - Construct Apron, Construct Taxiway
GL DET OH I67 Cincinnati West GA 13 $ 179,356.00 $ 179,356.00 $ -Install Runway Vertical/Visual Guidance System - 01/19, Wildlife
Hazard Assessments
GL DET OH PHD Harry Clever Field GA 12 $ 237,794.00 $ 237,794.00 $ - Install Miscellaneous NAVAIDS, Update Airport Master Plan Study
GL DET OH TZR Bolton Field R 23 $ 480,822.00 $ 480,822.00 $ - Rehabilitate Apron, Update Miscellaneous Study
GL DET OH CYO Pickaway County Memorial GA 14 $ 179,550.00 $ 179,550.00 $ - Update Airport Master Plan Study
GL DET OH HZY Northeast Ohio Regional GA 14 $ 903,418.00 $ 447,906.00 $ 455,512.00 Rehabilitate Runway - 09/27
GL DET OH 8G6 Harrison County GA 12 $ 57,031.00 $ 57,031.00 $ -Install Airport Beacons, Rehabilitate Runway - 13/31, Wildlife
Hazard Assessments
GL DET OH 4I3 Knox County GA 16 $ 435,945.00 $ 435,945.00 $ -Improve Airport Drainage, Rehabilitate Parking Lot, Rehabilitate
Taxiway
GL DET OH MNN Marion Municipal GA 23 $ 110,171.00 $ 110,171.00 $ - Rehabilitate Access Road, Wildlife Hazard Assessments
GL DET OH 16G Seneca County GA 11 $ 310,600.00 $ 310,600.00 $ - Acquire Land For Approaches, Wildlife Hazard Assessments
GL DMA MN HIB Range Regional P 36 $ 2,950,659.00 $ 513,120.00 $ 2,437,539.00 Rehabilitate Apron
GL DMA MN OTG Worthington Municipal GA 13 $ 1,001,282.00 $ 604,904.00 $ 396,378.00 Extend Taxiway
GL DMA MN JMR Mora Municipal GA 10 $ 125,086.00 $ 125,086.00 $ - Construct Runway - Plan-1
GL DMA MN MKT Mankato Regional GA 22 $ 417,613.00 $ 417,613.00 $ - Rehabilitate Taxiway
GL DMA MN FFM Fergus Falls Municipal-Einar Mickelson Field GA 12 $ 166,057.00 $ 166,057.00 $ - Rehabilitate Taxiway
GL DMA MN BDE Baudette International GA 14 $ 249,086.00 $ 249,086.00 $ - Conduct Airport Master Plan Study, Rehabilitate Runway - 12/30
GL DMA MN LYV Quentin Aanenson Field GA 12 $ 177,245.00 $ 177,245.00 $ -Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway -
18/36, Rehabilitate Taxiway
GL DMA MN JKJ Moorhead Municipal GA 10 $ 32,040.00 $ 32,040.00 $ - Construct Building
GL DMA MN CFE Buffalo Municipal GA 12 $ 44,150.00 $ 44,150.00 $ -Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate
Taxiway
GL DMA MN ELO Ely Municipal GA 15 $ 58,500.00 $ 58,500.00 $ - Conduct Environmental Study
GL DMA MN FCM Flying Cloud R 18 $ 506,372.00 $ 300,000.00 $ 206,372.00 Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 19 of 57�
an Field
Newstrom Field
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DMA MN CKC Grand Marais/Cook County GA 15 $ 2,607,953.00 $ 150,000.00 $ 2,457,953.00 Extend Runway - 09/27
GL DMA MN STC St. Cloud Regional P 27 $ 3,387,032.00 $ 1,860,000.00 $ 1,527,032.00 Extend Runway - 13/31
GL DMA MN TKC Tracy Municipal GA 8 $ 178,881.00 $ 178,881.00 $ - Rehabilitate Runway Lighting - 11/29
GL DMA MN RWF Redwood Falls Municipal GA 14 $ 162,953.00 $ 162,953.00 $ - Acquire Land For Approaches
GL DMA MN AUM Austin Municipal GA 13 $ 210,651.00 $ 210,651.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
GL DMA MN AIT Aitkin Municipal-Steve Kurtz Field GA 15 $ 426,371.00 $ 426,371.00 $ -Construct Taxiway, Rehabilitate Runway - 16/34, Rehabilitate
Taxiway
GL DMA MN D39 Sauk Centre Municipal GA 6 $ 80,100.00 $ 80,100.00 $ - Conduct Environmental Study
GL DMA MN AXN Chandler Field GA 12 $ 68,273.00 $ 68,273.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -
04/22, Rehabilitate Taxiway
GL DMA MN MML Southwest Minnesota Regional Marshall/Ry GA 14 $ 322,200.00 $ 322,200.00 $ - Update Airport Master Plan Study
GL DMA MN FRM Fairmont Municipal GA 14 $ 52,802.00 $ 52,802.00 $ - Rehabilitate Taxiway
GL DMA MN GPZ Grand Rapids/Itasca County Airport-Gordon GA 19 $ 466,947.00 $ 466,947.00 $ -
Conduct Airport Master Plan Study, Rehabilitate Runway - 16/34,
Rehabilitate Runway - 05/23, Rehabilitate Taxiway, Remove
Obstructions
GL DMA MN 04Y Hawley Municipal GA 9 $ 186,447.00 $ 186,447.00 $ - Rehabilitate Taxiway
GL DMA MN ANE Anoka County-Blaine Airport(Janes Field) R 13 $ 252,178.00 $ 252,178.00 $ - Install Airfield Guidance Signs, Install Taxiway Lighting
GL DMA MN PNM Princeton Municipal GA 11 $ 84,787.00 $ 84,787.00 $ -Construct Taxiway, Rehabilitate Runway - 15/33, Rehabilitate
Taxiway
GL DMA MN ROS Rush City Regional GA 7 $ 1,155,434.00 $ 1,155,434.00 $ -
Acquire Snow Removal Equipment, Acquire Snow Removal
Equipment, Install Miscellaneous NAVAIDS, Rehabilitate Runway -
16/34, Rehabilitate Taxiway
GL DMA MN CKN Crookston Municipal Kirkwood Field GA 11 $ 37,502.00 $ 37,502.00 $ -Construct Fuel Farm, Improve Access Road, Rehabilitate Apron,
Rehabilitate Apron, Rehabilitate Taxiway
GL DMA MN BJI Bemidji Regional P 31 $ 546,535.00 $ 546,535.00 $ -
Construct Snow Removal Equipment Building, Construct Taxiway,
Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
GL DMA MN INL Falls International-Einarson Field P 28 $ 421,519.00 $ 421,519.00 $ -
Install Guidance Signs, Rehabilitate Apron, Rehabilitate Runway -
04/22, Rehabilitate Runway - 13/31, Rehabilitate Taxiway,
Rehabilitate Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway,
Rehabilitate Taxiway, Rehabilitate Taxiway, Wildlife Hazard
Assessments
GL DMA MN BRD Brainerd Lakes Regional P 40 $ 599,760.00 $ 599,760.00 $ - Conduct Airport Master Plan Study, Conduct Environmental Study
GL DMA MN OWA Owatonna Degner Regional GA 18 $ 210,707.00 $ 210,707.00 $ - Rehabilitate Taxiway
GL DMA MN ACQ Waseca Municipal GA 11 $ 290,520.00 $ 290,520.00 $ - Conduct Airport Master Plan Study
GL DMA MN PKD Park Rapids Municipal-Konshok Field GA 14 $ 391,500.00 $ 391,500.00 $ - Conduct Airport Master Plan Study, Rehabilitate Taxiway
GL DMA MN HCO Hallock Municipal GA 7 $ 229,210.00 $ 229,210.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
GL DMA MN LXL Little Falls/Morrison County-Lindbergh Field GA 16 $ 210,773.00 $ 210,773.00 $ - Acquire Land For Approaches
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 20 of 57�
ield
mberlain
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DMA MN TVF Thief River Falls Regional GA 19 $ 110,250.00 $ 110,250.00 $ - Conduct Environmental Study
GL DMA MN CQM Cook Municipal GA 9 $ 25,002.00 $ 25,002.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
GL DMA MN SGS South St Paul Municipal-Richard E Fleming F R 16 $ 839,862.00 $ 839,862.00 $ -Acquire Land For Approaches, Light Obstructions, Remove
Obstructions, Remove Obstructions
GL DMA MN GYL Glencoe Municipal GA 4 $ 1,832,631.00 $ 1,832,631.00 $ -Acquire Land for Development, Construct Taxiway, Rehabilitate
Apron
GL DMA MN STP St Paul Downtown Holman Field R 23 $ 662,304.00 $ 150,000.00 $ 512,304.00 Rehabilitate Taxiway, Rehabilitate Taxiway
GL DMA MN MZH Moose Lake Carlton County GA 6 $ 250,154.00 $ 250,154.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -
04/22
GL DMA MN ETH Wheaton Municipal GA 7 $ 1,229,671.00 $ 1,229,671.00 $ - Construct Building, Construct Taxiway
GL DMA MN ROX Roseau Municipal/Rudy Billberg Field GA 10 $ 340,921.00 $ 340,921.00 $ - Update Airport Master Plan Study
GL DMA MN FBL Faribault Municipal GA 12 $ 626,698.00 $ 626,698.00 $ - Rehabilitate Taxiway
GL DMA MN ORB Orr Regional GA 9 $ 25,042.00 $ 25,042.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
GL DMA MN HCD Hutchinson Municipal-Butler Field GA 16 $ 2,154,164.00 $ 2,154,164.00 $ -
Construct Taxiway, Improve Runway Safety Area - 15/33,
Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate
Taxiway
GL DMA MN RST Rochester International P 35 $ 1,475,713.00 $ 1,475,713.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Modify Terminal
Building, Rehabilitate Taxiway
GL DMA MN LJF Litchfield Municipal GA 11 $ 2,343,582.00 $ 1,064,225.00 $ 1,279,357.00 Construct Taxiway, Rehabilitate Apron, Rehabilitate Runway -
13/31, Rehabilitate Taxiway
GL DMA MN FKA Fillmore County GA 11 $ 207,603.00 $ 207,603.00 $ - Acquire Snow Removal Equipment, Widen Taxiway
GL DMA MN 3N8 Mahnomen County GA 14 $ 640,721.00 $ 640,721.00 $ - Construct Building
GL DMA MN SBU Blue Earth Municipal GA 12 $ 408,583.00 $ 408,583.00 $ - Rehabilitate Taxiway
GL DMA MN 12Y Le Sueur Municipal GA 11 $ 548,775.00 $ 548,775.00 $ - Acquire Land For Approaches
GL DMA MN Y49 Walker Municipal GA 10 $ 33,345.00 $ 33,345.00 $ -Rehabilitate Apron, Rehabilitate Runway - 15/33, Rehabilitate
Taxiway
GL DMA MN VVV Ortonville Municipal-Martinson Field GA 11 $ 51,964.00 $ 51,964.00 $ - Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Taxiway
GL DMA MN 14Y Todd Field GA 9 $ 122,396.00 $ 122,396.00 $ - Conduct Environmental Study
GL DMA MN MSP Minneapolis-St Paul International/Wold-Cha P 112 $ 5,022,119.00 $ 5,022,119.00 $ - Rehabilitate Apron
GL DMA MN CBG Cambridge Municipal GA 10 $ 226,080.00 $ 226,080.00 $ - Update Airport Master Plan Study
GL DMA MN RGK Red Wing Regional GA 13 $ 264,881.00 $ 264,881.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
GL DMA MN DTL Detroit Lakes-Wething Field GA 11 $ 266,268.00 $ 266,268.00 $ - Update Airport Master Plan Study
GL DMA MN DYT Sky Harbor GA 10 $ 111,285.00 $ 111,285.00 $ - Install Perimeter Fencing
GL DMA MN DLH Duluth International P 58 $ 773,992.00 $ 773,992.00 $ -Acquire Snow Removal Equipment, Acquire Snow Removal
Equipment
GL DMA MN RRT Warroad International Memorial GA 15 $ 772,681.00 $ 260,562.00 $ 512,119.00 Install Perimeter Fencing
GL DMA MN DLH Duluth International P 59 $ 11,998,801.00 $ 273,138.00 $ 11,725,663.00 Rehabilitate Runway - 09/27
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 21 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DMA MN JYG St James Municipal GA 13 $ 696,895.00 $ 696,895.00 $ -Rehabilitate Runway Lighting - 15/33, Update Airport Master Plan
Study
GL DMA MN 21D Lake Elmo R 10 $ 448,764.00 $ 448,764.00 $ - Rehabilitate Taxiway
GL DMA MN FSE Fosston Municipal GA 8 $ 55,558.00 $ 55,558.00 $ -Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate
Taxiway, Rehabilitate Taxiway, Rehabilitate Taxiway
GL DMA MN XVG Longville Municipal GA 11 $ 179,425.00 $ 179,425.00 $ - Construct Taxiway, Rehabilitate Runway - 13/31
GL DMA MN Y63 Elbow Lake Municipal - Pride of the Prairie GA 7 $ 911,479.00 $ 911,479.00 $ - Construct Building
GL DMA MN AEL Albert Lea Municipal GA 16 $ 90,702.00 $ 90,702.00 $ - Conduct Environmental Study
GL DMA ND D60 Tioga Municipal GA 8 $ 4,582,521.00 $ 523,442.00 $ 4,059,079.00 Construct Apron, Construct Taxiway
GL DMA ND 3H4 Hillsboro Municipal GA 13 $ 734,604.00 $ 734,604.00 $ - Acquire Land for Development
GL DMA ND K74 Robert Odegaard Field GA 15 $ 146,940.00 $ 146,940.00 $ -Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate
Taxiway
GL DMA ND D57 Glen Ullin Regional GA 13 $ 97,200.00 $ 97,200.00 $ - Rehabilitate Runway - 11/29
GL DMA ND JMS Jamestown Regional GA 39 $ 110,700.00 $ 110,700.00 $ - Environmental Mitigation
GL DMA ND MOT Minot International P 50 $ 842,409.00 $ 842,409.00 $ - Update Airport Master Plan Study
GL DMA ND K74 Robert Odegaard Field GA 14 $ 118,688.00 $ 118,688.00 $ - Conduct Environmental Study
GL DMA ND 3P3 Mott Municipal GA 13 $ 360,000.00 $ 360,000.00 $ -Construct Parking Lot, Improve Access Road, Rehabilitate Apron,
Rehabilitate Runway - 10/28, Rehabilitate Taxiway
GL DMA ND 2D5 Oakes Municipal GA 10 $ 53,316.00 $ 53,316.00 $ - Improve Access Road
GL DMA ND DVL Devils Lake Regional CS 33 $ 475,530.00 $ 150,000.00 $ 325,530.00 Construct Runway Safety Area - 13/31
GL DMA ND HZE Mercer County Regional GA 12 $ 419,400.00 $ 419,400.00 $ -Construct Apron, Improve Building, Rehabilitate Apron, Rehabilitate
Runway - 14/32, Rehabilitate Taxiway
GL DMA ND 5C8 Washburn Municipal GA 14 $ 668,995.00 $ 668,995.00 $ - Construct Apron, Widen Taxiway
GL DMA ND ISN Sloulin Field International P 39 $ 944,914.00 $ 944,914.00 $ -Acquire Friction Measuring Equipment, Install Instrument Approach
Aid - Plan-1, Rehabilitate Apron, Rehabilitate Taxiway
GL DMA ND BIS Bismarck Municipal P 56 $ 594,000.00 $ 594,000.00 $ - Rehabilitate Runway - 13/31
GL DMA ND BIS Bismarck Municipal P 55 $ 863,739.00 $ 863,739.00 $ - Update Airport Master Plan Study
GL DMA ND HBC Mohall Municipal GA 11 $ 1,075,019.00 $ 167,785.00 $ 907,234.00 Construct Apron, Extend Taxiway
GL DMA ND D05 Garrison Municipal GA 12 $ 2,311,330.00 $ 567,302.00 $ 1,744,028.00 Rehabilitate Runway - 13/31
GL DMA ND +09N New 1 $ 27,000,000.00 $ 381,686.00 $ 26,618,314.00 Construct New Airport
GL DMA ND Y19 Mandan Municipal GA 20 $ 1,152,000.00 $ 1,152,000.00 $ - Construct Taxiway
GL DMA ND 3H4 Hillsboro Municipal GA 14 $ 433,547.00 $ 433,547.00 $ -
Construct Taxiway, Install Miscellaneous NAVAIDS, Rehabilitate
Runway - 16/34, Rehabilitate Runway Lighting - 16/34, Rehabilitate
Taxiway Lighting
GL DMA ND MOT Minot International P 51 $ 210,150.00 $ 210,150.00 $ - Improve Airport Drainage
GL DMA ND MOT Minot International P 49 $ 828,131.00 $ 828,131.00 $ - Rehabilitate Runway - 13/31
GL DMA ND Y74 Parshall-Hankins GA 10 $ 63,031.00 $ 63,031.00 $ - Construct Building
GL DMA ND BIS Bismarck Municipal P 54 $ 1,890,000.00 $ 564,692.00 $ 1,325,308.00 Environmental Mitigation
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 22 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 35 $ 630,000.00 $ 533,800.00 $ 96,200.00 Rehabilitate Taxiway
GL DMA ND D09 Bottineau Municipal GA 13 $ 317,903.00 $ 317,903.00 $ - Acquire Snow Removal Equipment
GL DMA ND S32 Cooperstown Municipal GA 11 $ 311,364.00 $ 311,364.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
GL DMA ND 5H4 Harvey Municipal GA 12 $ 46,640.00 $ 46,640.00 $ -
Install Airfield Guidance Signs, Install Airport Beacons, Install
Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 11/29,
Rehabilitate Taxiway Lighting
GL DMA ND D50 Crosby Municipal GA 11 $ 59,310.00 $ 59,310.00 $ - Rehabilitate Apron, Rehabilitate Runway - 12/30
GL DMA ND GFK Grand Forks International P 48 $ 970,277.00 $ 970,277.00 $ -Rehabilitate Runway Lighting - 17L/35R, Rehabilitate Taxiway
Lighting
GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 34 $ 563,400.00 $ - $ 563,400.00 Conduct Environmental Study
GL DMA ND 7K5 Kenmare Municipal GA 12 $ 355,997.00 $ 355,997.00 $ -Install Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDS,
Rehabilitate Runway Lighting - 08/26
GL DMA ND HEI Hettinger Municipal GA 13 $ 2,902,500.00 $ 94,927.00 $ 2,807,573.00 Rehabilitate Runway - 12/30
GL DMA ND Y37 Park River - W C Skjerven Field GA 9 $ 55,815.00 $ 55,815.00 $ - Construct Building
GL DMA ND 7L2 Linton Municipal GA 14 $ 1,638,000.00 $ 1,638,000.00 $ - Construct Taxiway, Construct Taxiway, Rehabilitate Runway - 09/27
GL DMA ND 4.00E+07 Ellendale Municipal GA 8 $ 413,100.00 $ 413,100.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System - 13/31, Rehabilitate Runway Lighting - 13/31
GL DMA ND D55 Robertson Field GA 11 $ 128,687.00 $ 128,687.00 $ -
Install Airfield Guidance Signs, Install Runway Lighting - 14/32,
Install Runway Vertical/Visual Guidance System - 14/32, Install
Taxiway Lighting, Rehabilitate Runway - 14/32, Rehabilitate Taxiway
GL DMA ND 51D Edgeley Municipal GA 14 $ 63,926.00 $ 63,926.00 $ -Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate
Taxiway
GL DMA ND *NDS State of North Dakota 13 $ 441,756.00 $ 441,756.00 $ - Update Miscellaneous Study
GL DMA ND JMS Jamestown Regional GA 40 $ 33,300.00 $ 33,300.00 $ - Rehabilitate Taxiway
GL DMA ND DIK Dickinson - Theodore Roosevelt Regional P 33 $ 466,200.00 $ 466,200.00 $ - Extend Runway Safety Area - 14/32
GL DMA ND DVL Devils Lake Regional CS 34 $ 76,508.00 $ - $ 76,508.00 Wildlife Hazard Assessments
GL DMA ND FAR Hector International P 45 $ 7,482,809.00 $ 2,892,907.00 $ 4,589,902.00 Rehabilitate Taxiway
GL DMA ND BWP Harry Stern GA 19 $ 211,173.00 $ 211,173.00 $ - Construct Taxiway, Improve Airport Drainage, Rehabilitate Taxiway
GL DMA ND 20U Beach GA 11 $ 49,571.00 $ 49,571.00 $ -Construct Taxiway, Improve Access Road, Rehabilitate Apron,
Rehabilitate Runway - 12/30
GL DMA ND GFK Grand Forks International P 49 $ 732,452.00 $ 732,452.00 $ - Update Airport Master Plan Study
GL DMA ND 08D Stanley Municipal GA 13 $ 73,357.00 $ 73,357.00 $ - Expand Apron, Extend Taxiway
GL DMA SD HON Huron Regional GA 33 $ 1,407,312.00 $ 1,197,794.00 $ 209,518.00 Construct Runway - 12/30
GL DMA SD MDS Madison Municipal GA 12 $ 196,979.00 $ 196,979.00 $ -Construct Taxiway, Environmental Mitigation, Install Perimeter
Fencing not Required by 14 CFR 139/49 CFR 1542
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 23 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
GL DMA SD 4P3 Flandreau Municipal GA 8 $ 225,000.00 $ 225,000.00 $ - Construct Snow Removal Equipment Building
GL DMA SD 9V9 Chamberlain Municipal GA 8 $ 1,375,390.00 $ 1,375,390.00 $ - Environmental Mitigation
GL DMA SD YKN Chan Gurney Municipal GA 26 $ 63,805.00 $ 63,805.00 $ - Conduct Environmental Study
GL DMA SD FSD Joe Foss Field P 49 $ 6,092,415.00 $ 4,661,426.00 $ 1,430,989.00 Rehabilitate Runway - 03/21, Rehabilitate Taxiway
GL DMA SD MHE Mitchell Municipal GA 26 $ 225,000.00 $ 225,000.00 $ - Rehabilitate Access Road, Rehabilitate Parking Lot
GL DMA SD 9D0 Highmore Municipal GA 7 $ 58,410.00 $ 58,410.00 $ - Construct Taxiway
GL DMA SD HSR Hot Springs Municipal GA 11 $ 67,950.00 $ 67,950.00 $ - Construct Taxiway
GL DMA SD AGZ Wagner Municipal GA 11 $ 33,500.00 $ 33,500.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway
GL DMA SD 3FU Faulkton Municipal GA 9 $ 270,000.00 $ 270,000.00 $ - Extend Taxiway
GL DMA SD ABR Aberdeen Regional P 35 $ 2,268,000.00 $ 602,612.00 $ 1,665,388.00 Environmental Mitigation
GL DMA SD PIR Pierre Regional P 35 $ 1,460,000.00 $ 1,309,393.00 $ 150,607.00 Rehabilitate Apron
GL DMA SD 9D1 Gregory Municipal - Flynn Field GA 12 $ 540,000.00 $ 540,000.00 $ - Expand Apron
GL DMA SD *SDV Various Locations in South Dakota 21 $ 990,000.00 $ 990,000.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway
GL DMA SD 7G9 Canton Municipal GA 5 $ 33,533.00 $ 33,533.00 $ - Wildlife Hazard Assessments
GL DMA SD *SDS State of South Dakota 7 $ 135,000.00 $ 135,000.00 $ - Conduct State System Plan Study
GL DMA SD VMR Harold Davidson Field GA 11 $ 40,000.00 $ 40,000.00 $ - Rehabilitate Apron
GL DMA SD 9F8 Hoven Municipal GA 9 $ 1,570,000.00 $ 1,570,000.00 $ - Rehabilitate Runway - 13/31
GL DMA SD 9V6 Martin Municipal GA 10 $ 35,000.00 $ 35,000.00 $ - Wildlife Hazard Assessments
GL DMA SD BKX Brookings Regional GA 27 $ 135,000.00 $ 135,000.00 $ - Acquire Snow Removal Equipment
GL DMA SD ATY Watertown Regional CS 29 $ 270,000.00 $ 270,000.00 $ - Extend Taxiway
GL DMA SD RAP Rapid City Regional P 47 $ 2,940,000.00 $ 2,940,000.00 $ -
Acquire Snow Removal Equipment, Install Runway Vertical/Visual
Guidance System - 05/23, Install Runway Vertical/Visual Guidance
System - 14/32, Rehabilitate Apron
NE ANE CT BDR Igor I Sikorsky Memorial GA 31 $ 121,140.00 $ 121,140.00 $ - Construct Runway Safety Area - 06/24
NE ANE CT *CTV Various Locations in Connecticut 11 $ 339,726.00 $ 339,726.00 $ - Update State System Plan Study
NE ANE CT GON Groton-New London GA 29 $ 114,979.00 $ 114,979.00 $ - Install Perimeter Fencing
NE ANE CT BDL Bradley International P 61 $ 4,202,352.00 $ 3,233,487.75 $ 968,864.25 Rehabilitate Taxiway, Rehabilitate Taxiway
NE ANE CT DXR Danbury Municipal R 40 $ 90,000.00 $ 90,000.00 $ - Install Runway Vertical/Visual Guidance System - 08/26
NE ANE CT 4B8 Robertson Field R 7 $ 91,350.00 $ 91,350.00 $ - Conduct Miscellaneous Study
NE ANE CT 4B8 Robertson Field R 8 $ 186,120.00 $ 186,120.00 $ - Remove Obstructions
NE ANE CT MMK Meriden Markham Municipal GA 18 $ 108,549.00 $ 108,549.00 $ - Update Airport Master Plan Study
NE ANE CT HFD Hartford-Brainard R 17 $ 99,321.00 $ 99,321.00 $ - Install Perimeter Fencing
NE ANE CT HVN Tweed-New Haven P 44 $ 669,842.00 $ 669,842.00 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL
NE ANE CT BDR Igor I Sikorsky Memorial GA 32 $ 10,816,213.00 $ 1,635,833.00 $ 9,180,380.00 Rehabilitate Runway - 06/24
NE ANE CT GON Groton-New London GA 30 $ 181,085.00 $ 181,085.00 $ - Rehabilitate Runway - 15/33
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 24 of 57�
al
eld
al
al
eld
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NE ANE MA PYM Plymouth Municipal GA 43 $ 7,432,200.00 $ 299,466.80 $ 7,132,733.20
Extend Runway [Phase I - Extension Rwy 33 end] - 15/33, Extend
Runway [Phase II - Parallel Taxiway Extension] - 15/33, Extend
Runway [Phase III - Obstruction Removal Rwy 33 end approach] -
15/33, Extend Runway [Phase IV - Mitigation] - 15/33
NE ANE MA BOS General Edward Lawrence Logan Internation P 123 $ 8,122,482.00 $ - $ 8,122,482.00 Rehabilitate Taxiway
NE ANE MA HYA Barnstable Municipal-Boardman/Polando Fi P 62 $ 221,400.00 $ 221,400.00 $ - Remove Obstructions
NE ANE MA FIT Fitchburg Municipal GA 25 $ 675,000.00 $ 150,000.00 $ 525,000.00 Remove Obstructions
NE ANE MA BOS General Edward Lawrence Logan Internation P 121 $ 5,168,493.00 $ 5,168,493.00 $ - Improve Runway Safety Area - 04L/22R
NE ANE MA BVY Beverly Municipal R 34 $ 714,600.00 $ 300,000.00 $ 414,600.00 Install Guidance Signs, Install Runway Vertical/Visual Guidance
System - 09/27, Install Taxiway Lighting
NE ANE MA ORH Worcester Regional CS 49 $ 2,736,305.00 $ - $ 2,736,305.00 Construct Taxiway, Install Instrument Approach Aid - 11/29
NE ANE MA BOS General Edward Lawrence Logan Internation P 122 $ 150,750.00 $ - $ 150,750.00 Acquire Equipment
NE ANE MA LWM Lawrence Municipal R 35 $ 2,092,500.00 $ 2,092,500.00 $ - Construct Runway Safety Area - 14/32, Install Taxiway Lighting
NE ANE MA AQW Harriman-And-West GA 25 $ 2,200,500.00 $ 1,193,324.00 $ 1,007,176.00 Rehabilitate Apron
NE ANE MA 3B0 Southbridge Municipal GA 22 $ 540,939.00 $ 540,939.00 $ - Construct Building
NE ANE MA PVC Provincetown Municipal P 40 $ 63,000.00 $ 63,000.00 $ - Conduct Environmental Study
NE ANE MA BAF Westfield-Barnes Regional GA 48 $ 2,499,999.00 $ - $ 2,499,999.00 Acquire Land for Noise Compatibility within 70 - 74 DNL
NE ANE MA EWB New Bedford Regional P 51 $ 4,176,900.00 $ 1,128,080.00 $ 3,048,820.00 Rehabilitate Taxiway
NE ANE MA FIT Fitchburg Municipal GA 24 $ 2,138,850.00 $ - $ 2,138,850.00 Remove Obstructions
NE ANE MA ACK Nantucket Memorial P 63 $ 723,600.00 $ 723,600.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow
Removal Equipment
NE ANE MA HYA Barnstable Municipal-Boardman/Polando Fi P 61 $ 4,280,675.00 $ 2,414,831.87 $ 1,865,843.13 Rehabilitate Taxiway
NE ANE MA CEF Westover ARB/Metropolitan GA 32 $ 2,500,000.00 $ - $ 2,500,000.00 Acquire Land for Noise Compatibility within 65 - 69 DNL
NE ANE MA MVY Martha's Vineyard P 42 $ 549,900.00 $ 549,900.00 $ - Acquire Snow Removal Equipment
NE ANE MA 0B5 Turners Falls GA 18 $ 2,286,000.00 $ 217,335.00 $ 2,068,665.00 Rehabilitate Taxiway
NE ANE MA 1B9 Mansfield Municipal GA 30 $ 317,700.00 $ 266,271.00 $ 51,429.00 Remove Obstructions
NE ANE MA OWD Norwood Memorial R 35 $ 369,000.00 $ 369,000.00 $ - Construct Taxiway
NE ANE MA ACK Nantucket Memorial P 62 $ 1,903,500.00 $ 1,903,500.00 $ - Rehabilitate Apron
NE ANE MA BED Laurence G Hanscom Field R 37 $ 1,137,259.00 $ 1,137,259.00 $ - Construct Apron, Improve Runway Safety Area - 05/23
NE ANE ME RKD Knox County Regional P 50 $ 1,762,560.00 $ 1,094,693.00 $ 667,867.00 Rehabilitate Runway - 13/31
NE ANE ME OLD Dewitt Field, Old Town Municipal GA 12 $ 2,045,700.00 $ 2,045,700.00 $ - Rehabilitate Runway - 12/30
NE ANE ME BXM Brunswick Executive GA 21 $ 1,700,000.00 $ - $ 1,700,000.00 Construct Deicing Containment Facility, Rehabilitate Building
NE ANE ME PWM Portland International Jetport P 77 $ 3,107,258.00 $ 3,107,258.00 $ - Rehabilitate Apron
NE ANE ME BHB Hancock County-Bar Harbor P 40 $ 842,680.00 $ 842,680.00 $ -Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate
Runway - 17/35, Rehabilitate Taxiway, Runway Incursion Markings
NE ANE ME PWM Portland International Jetport P 79 $ 391,455.00 $ 23.00 $ 391,432.00 Environmental Mitigation
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 25 of 57�
Isle
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NE ANE ME BGR Bangor International P 66 $ 2,549,296.00 $ 2,549,296.00 $ -Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Dock 10
Taxielanes], Rehabilitate Taxiway [Taxiway N]
NE ANE ME BGR Bangor International P 67 $ 1,379,966.00 $ 1,379,966.00 $ - Rehabilitate Apron
NE ANE ME 1B0 Dexter Regional GA 10 $ 290,700.00 $ 290,700.00 $ - Rehabilitate Apron
NE ANE ME PWM Portland International Jetport P 76 $ 482,368.00 $ 482,368.00 $ - Acquire Snow Removal Equipment
NE ANE ME PWM Portland International Jetport P 78 $ 825,667.00 $ 825,667.00 $ - Update Airport Master Plan Study
NE ANE ME BXM Brunswick Executive GA 19 $ 1,049,364.00 $ 2,460.00 $ 1,046,904.00 Rehabilitate Building
NE ANE ME B19 Biddeford Municipal GA 10 $ 166,324.00 $ 166,324.00 $ - Conduct Environmental Study
NE ANE ME BGR Bangor International P 68 $ 878,890.00 $ 878,890.00 $ - Modify Terminal Building
NE ANE ME BXM Brunswick Executive GA 20 $ 528,426.00 $ - $ 528,426.00 Rehabilitate Runway Lighting - 01R/19L
NE ANE ME PQI Northern Maine Regional Airport at Presque P 44 $ 511,520.00 $ 511,520.00 $ -Rehabilitate Runway - 10/28, Rehabilitate Runway - 01/19,
Rehabilitate Taxiway
NE ANE ME HUL Houlton International GA 16 $ 121,500.00 $ 121,500.00 $ - Update Airport Master Plan Study
NE ANE ME OLD Dewitt Field, Old Town Municipal GA 14 $ 2,068,020.00 $ 304,672.00 $ 1,763,348.00 Rehabilitate Runway - 04/22
NE ANE ME *MEV Various Locations in Maine 7 $ 399,116.00 $ 399,116.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway
NE ANE ME SFM Sanford Seacoast Regional R 31 $ 211,590.00 $ 211,590.00 $ - Acquire Snow Removal Equipment
NE ANE ME BST Belfast Municipal GA 14 $ 176,850.00 $ 176,850.00 $ - Conduct Environmental Study
NE ANE ME OLD Dewitt Field, Old Town Municipal GA 13 $ 139,500.00 $ 139,500.00 $ - Rehabilitate Runway - 04/22, Rehabilitate Runway - 12/30
NE ANE ME OWK Central Maine Airport of Norridgewock GA 20 $ 84,600.00 $ 84,600.00 $ - Install Airport Beacons
NE ANE ME BXM Brunswick Executive GA 18 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 01R/19L, Rehabilitate Taxiway
NE ANE NH *NHB New Hampshire State Block Grant Program 21 $ 2,022,238.00 $ 2,022,238.00 $ - Non primary development projects in state block grant program
NE ANE NH MHT Manchester P 102 $ 448,545.00 $ 448,545.00 $ - Remove Obstructions
NE ANE NH MHT Manchester P 101 $ 3,546,603.00 $ 3,546,603.00 $ - Remove Obstructions
NE ANE NH LEB Lebanon Municipal P 51 $ 180,504.00 $ 180,504.00 $ - Environmental Mitigation
NE ANE NH MHT Manchester P 104 $ 2,003,917.00 $ 2,003,917.00 $ - Modify Terminal Building
NE ANE NH MHT Manchester P 103 $ 2,845,910.00 $ 2,845,910.00 $ - Modify Terminal Building
NE ANE RI UUU Newport State GA 20 $ 197,831.00 $ 197,831.00 $ - Remove Obstructions
NE ANE RI WST Westerly State P 23 $ 421,280.00 $ 421,280.00 $ - Remove Obstructions
NE ANE RI OQU Quonset State R 22 $ 1,841,113.00 $ 1,841,113.00 $ - Improve Airport Drainage
NE ANE RI PVD Theodore Francis Green State P 114 $ 1,129,028.00 $ - $ 1,129,028.00 Extend Runway - 05/23
NE ANE RI PVD Theodore Francis Green State P 113 $ 8,870,792.00 $ 1,315,695.00 $ 7,555,097.00 Extend Runway - 05/23
NE ANE RI PVD Theodore Francis Green State P 116 $ 7,862,919.00 $ - $ 7,862,919.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
NE ANE RI PVD Theodore Francis Green State P 115 $ 705,143.00 $ 3,681.00 $ 701,462.00 Remove Obstructions, Remove Obstructions
NE ANE VT EFK Newport State GA 17 $ 729,000.00 $ - $ 729,000.00 Construct Snow Removal Equipment Building
NE ANE VT 6B0 Middlebury State GA 10 $ 214,013.00 $ 214,013.00 $ - Remove Obstructions
NE ANE VT BTV Burlington International P 105 $ 1,101,150.00 $ - $ 1,101,150.00 Acquire Land for Noise Compatibility within 65 - 69 DNL
NE ANE VT BTV Burlington International P 104 $ 2,637,844.00 $ 1,763,108.00 $ 874,736.00 Construct Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 26 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NE ANE VT EFK Newport State GA 16 $ 9,127,018.00 $ 1,503,822.00 $ 7,623,196.00 Construct Taxiway, Extend Runway - 18/36
NE ANE VT BTV Burlington International P 103 $ 1,850,789.00 $ 1,850,789.00 $ - Rehabilitate Apron
NE ANE VT RUT Rutland - Southern Vermont Regional CS 45 $ 150,000.00 $ 150,000.00 $ - Acquire Snow Removal Equipment
NM DEN CO DEN Denver International P 86 $ 20,029,724.00 $ 7,529,724.00 $ 12,500,000.00 Rehabilitate Runway - 17L/35R, Rehabilitate Runway Lighting -
17L/35R, Rehabilitate Taxiway
NM DEN CO ITR Kit Carson County GA 12 $ 140,000.00 $ 140,000.00 $ - Rehabilitate Runway - 15/33
NM DEN CO BJC Rocky Mountain Metropolitan R 58 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 03/21
NM DEN CO ANK Harriet Alexander Field GA 17 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study
NM DEN CO GJT Grand Junction Regional P 52 $ 2,760,000.00 $ 2,760,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway - 11/29,
Rehabilitate Runway Lighting - 04/22, Rehabilitate Taxiway
NM DEN CO AEJ Central Colorado Regional GA 15 $ 463,215.00 $ 463,215.00 $ - Acquire Land for Development
NM DEN CO GUC Gunnison-Crested Butte Regional P 50 $ 1,040,000.00 $ 1,040,000.00 $ - Rehabilitate Taxiway
NM DEN CO FNL Fort Collins-Loveland Municipal CS 34 $ 760,000.00 $ 760,000.00 $ - Construct Snow Removal Equipment Building
NM DEN CO STK Sterling Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 15/33, Rehabilitate Taxiway
NM DEN CO TEX Telluride Regional CS 33 $ 133,629.00 $ 133,629.00 $ - Improve Runway Safety Area - 09/27
NM DEN CO HEQ Holyoke GA 10 $ 665,730.00 $ 665,730.00 $ - Construct Taxiway
NM DEN CO FLY Meadow Lake R 22 $ 442,663.00 $ 442,663.00 $ - Rehabilitate Runway - 15/33
NM DEN CO FTG Front Range R 40 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study
NM DEN CO LXV Lake County GA 12 $ 150,000.00 $ 150,000.00 $ - Remove Obstructions
NM DEN CO DRO Durango-La Plata County P 45 $ 5,483,991.00 $ 4,629,760.00 $ 854,231.00 Rehabilitate Taxiway, Rehabilitate Taxiway Lighting
NM DEN CO AKO Colorado Plains Regional GA 16 $ 374,321.00 $ 374,321.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
NM DEN CO GJT Grand Junction Regional P 53 $ 167,760.00 $ 167,760.00 $ - Rehabilitate Apron
NM DEN CO TAD Perry Stokes GA 8 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 03/21
NM DEN CO PSO Stevens Field GA 22 $ 4,722,390.00 $ 4,722,390.00 $ - Extend Taxiway
NM DEN CO SBS Steamboat Springs/Bob Adams Field GA 23 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 14/32
NM DEN CO 2V6 Yuma Municipal GA 12 $ 4,823,095.00 $ 2,441,317.00 $ 2,381,778.00 Rehabilitate Runway - 16/34, Rehabilitate Runway Lighting - 16/34
NM DEN CO GXY Greeley-Weld County GA 24 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway
NM DEN CO MTJ Montrose Regional P 44 $ 125,871.00 $ 125,871.00 $ - Rehabilitate Taxiway
NM DEN CO APA Centennial R 48 $ 500,000.00 $ - $ 500,000.00 Conduct Noise Compatibility Plan Study
NM DEN CO COS City of Colorado Springs Municipal P 58 $ 11,648,678.00 $ 3,671,615.00 $ 7,977,063.00 Rehabilitate Taxiway
NM DEN CO EGE Eagle County Regional P 55 $ 6,929,263.00 $ 149,263.00 $ 6,780,000.00 Rehabilitate Apron
NM DEN CO ANK Harriet Alexander Field GA 16 $ 321,592.00 $ 321,592.00 $ - Rehabilitate Runway - 06/24
NM DEN CO DRO Durango-La Plata County P 46 $ 951,912.00 $ 951,912.00 $ - Conduct Environmental Study
NM DEN CO LMO Vance Brand GA 14 $ 46,634.00 $ 46,634.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
NM DEN CO MTJ Montrose Regional P 45 $ 575,000.00 $ 575,000.00 $ - Conduct Airport Master Plan Study
NM DEN CO APA Centennial R 49 $ 3,661,665.00 $ 150,000.00 $ 3,511,665.00 Extend Taxiway
NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 52 $ 235,819.00 $ 140,657.00 $ 95,162.00 Conduct Environmental Study
NM DEN CO LIC Limon Municipal GA 12 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 27 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM DEN CO 4V1 Spanish Peaks Airfield GA 6 $ 936,195.00 $ 936,195.00 $ - Construct Taxiway, Expand Apron, Install Airport Beacons
NM DEN CO MVI Monte Vista Municipal GA 12 $ 724,136.00 $ 724,136.00 $ - Construct Taxiway, Expand Apron
NM DEN CO GNB Granby-Grand County GA 11 $ 300,000.00 $ 300,000.00 $ - Conduct Airport Master Plan Study
NM DEN UT PVU Provo Municipal P 41 $ 500,000.00 $ 500,000.00 $ - Rehabilitate Apron, Rehabilitate Building
NM DEN UT SLC Salt Lake City International P 106 $ 13,938,351.00 $ 3,938,351.00 $ 10,000,000.00 Construct Apron
NM DEN UT PUC Carbon County Regional/Buck Davis Field GA 16 $ 300,000.00 $ 300,000.00 $ - Update Airport Master Plan Study
NM DEN UT CNY Canyonlands Field CS 27 $ 520,000.00 $ 520,000.00 $ - Rehabilitate Taxiway Lighting
NM DEN UT VEL Vernal Regional CS 32 $ 5,765,583.00 $ 1,123,138.00 $ 4,642,445.00 Construct Runway - 16/34
NM DEN UT HVE Hanksville GA 4 $ 2,500,000.00 $ 2,500,000.00 $ -Construct Apron, Construct Taxiway, Install Runway Lighting -
08/26, Rehabilitate Runway - 08/26
NM DEN UT CNY Canyonlands Field CS 28 $ 298,771.00 $ 298,771.00 $ - Conduct Environmental Study
NM DEN UT U14 Nephi Municipal GA 18 $ 929,000.00 $ 929,000.00 $ - Expand Apron
NM DEN UT 38U Wayne Wonderland GA 9 $ 741,000.00 $ 741,000.00 $ -Construct Apron, Construct Building, Construct Taxiway, Remove
Obstructions
NM DEN UT SLC Salt Lake City International P 108 $ 3,100,000.00 $ - $ 3,100,000.00 Rehabilitate Taxiway
NM DEN UT 1L8 General Dick Stout Field GA 5 $ 370,000.00 $ 370,000.00 $ - Install Perimeter Fencing
NM DEN UT 1L7 Escalante Municipal GA 8 $ 299,143.00 $ 299,143.00 $ - Update Airport Master Plan Study
NM DEN UT CDC Cedar City Regional P 29 $ 406,667.00 $ 406,667.00 $ - Update Airport Master Plan Study
NM DEN UT CDC Cedar City Regional P 30 $ 575,000.00 $ 575,000.00 $ - Acquire Snow Removal Equipment
NM DEN UT SLC Salt Lake City International P 107 $ 1,000,000.00 $ - $ 1,000,000.00 Conduct Airport Master Plan Study
NM DEN UT KNB Kanab Municipal GA 13 $ 297,001.00 $ 297,001.00 $ - Update Airport Master Plan Study
NM DEN UT U52 Beaver Municipal GA 13 $ 271,863.00 $ 271,863.00 $ - Construct Taxiway
NM DEN UT SGU St George Municipal P 25 $ 10,000,000.00 $ 1,000,000.00 $ 9,000,000.00 Construct New Airport
NM DEN UT ENV Wendover GA 28 $ 1,609,949.00 $ 1,609,949.00 $ -Install Miscellaneous NAVAIDS, Install Taxiway Lighting, Rehabilitate
Taxiway
NM DEN UT OGD Ogden-Hinckley P 42 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway
NM DEN UT LGU Logan-Cache GA 27 $ 150,000.00 $ 150,000.00 $ - Construct Taxiway
NM DEN WY DWX Dixon GA 15 $ 437,741.00 $ 437,741.00 $ - Expand Apron
NM DEN WY BYG Johnson County GA 17 $ 234,231.00 $ 234,231.00 $ - Update Airport Master Plan Study
NM DEN WY RIW Riverton Regional P 40 $ 730,000.00 $ 730,000.00 $ - Rehabilitate Runway - 10/28
NM DEN WY RWL Rawlins Municipal/Harvey Field GA 16 $ 750,000.00 $ 750,000.00 $ -Rehabilitate Access Road, Rehabilitate Runway - 04/22, Rehabilitate
Taxiway
NM DEN WY SAA Shively Field GA 24 $ 302,481.00 $ 302,481.00 $ - Extend Taxiway, Rehabilitate Taxiway
NM DEN WY LAR Laramie Regional P 32 $ 178,845.00 $ 178,845.00 $ - Rehabilitate Apron
NM DEN WY GCC Gillette-Campbell County P 40 $ 580,000.00 $ 580,000.00 $ - Acquire Snow Removal Equipment
NM DEN WY JAC Jackson Hole P 53 $ 760,000.00 $ 760,000.00 $ - Rehabilitate Apron
NM DEN WY U68 North Big Horn County GA 12 $ 662,542.00 $ 662,542.00 $ - Expand Apron, Rehabilitate Apron
NM DEN WY TOR Torrington Municipal GA 16 $ 1,182,314.00 $ 1,182,314.00 $ - Rehabilitate Runway - 10/28
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 28 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM DEN WY RIW Riverton Regional P 39 $ 12,147,555.00 $ 1,895,680.00 $ 10,251,875.00
Construct Taxiway, Rehabilitate Runway - 10/28, Rehabilitate
Runway Lighting - 10/28, Rehabilitate Taxiway, Rehabilitate Taxiway
Lighting
NM DEN WY RKS Rock Springs-Sweetwater County P 34 $ 700,000.00 $ 700,000.00 $ - Improve Runway Safety Area - 09/27
NM DEN WY COD Yellowstone Regional P 33 $ 100,000.00 $ 100,000.00 $ - Rehabilitate Taxiway
NM DEN WY POY Powell Municipal GA 15 $ 201,000.00 $ 201,000.00 $ - Acquire Snow Removal Equipment
NM DEN WY DGW Converse County GA 21 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Apron
NM DEN WY EMM Kemmerer Municipal GA 19 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Apron
NM DEN WY COD Yellowstone Regional P 34 $ 593,105.00 $ 593,105.00 $ - Acquire Snow Removal Equipment, Improve Terminal Building
NM DEN WY GCC Gillette-Campbell County P 41 $ 458,000.00 $ 458,000.00 $ - Update Airport Master Plan Study
NM DEN WY *WYS State of Wyoming 9 $ 445,864.00 $ 445,864.00 $ - Conduct State System Plan Study
NM DEN WY JAC Jackson Hole P 52 $ 712,710.00 $ 712,710.00 $ - Improve Terminal Building
NM DEN WY JAC Jackson Hole P 54 $ 7,605,333.00 $ - $ 7,605,333.00 Rehabilitate Apron
NM DEN WY +09F New (Replacement Airport) 5 $ 1,962,450.00 $ 1,962,450.00 $ - Construct New Airport
NM DEN WY ECS Mondell Field GA 16 $ 293,443.00 $ 293,443.00 $ - Update Airport Master Plan Study
NM DEN WY AFO Afton Municipal GA 23 $ 250,000.00 $ 250,000.00 $ - Acquire Snow Removal Equipment
NM DEN WY DUB Dubois Municipal GA 17 $ 620,000.00 $ 620,000.00 $ - Construct Runway - 10/28
NM HLN ID MAN Nampa Municipal GA 26 $ 84,862.00 $ - $ 84,862.00 Wildlife Hazard Assessments
NM HLN ID IDA Idaho Falls Regional P 40 $ 2,070,282.00 $ 1,059,521.00 $ 1,010,761.00 Expand Apron
NM HLN ID PIH Pocatello Regional P 38 $ 720,248.00 $ 720,248.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
NM HLN ID EUL Caldwell Industrial R 28 $ 1,312,200.00 $ 1,312,200.00 $ -Install Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway
Lighting - 12/30
NM HLN ID SUN Friedman Memorial P 41 $ 9,253,125.00 $ 1,000,000.00 $ 8,253,125.00 Construct Runway Safety Area - 13/31
NM HLN ID GIC Idaho County GA 15 $ 4,354,251.00 $ 973,733.00 $ 3,380,518.00
Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,
Install Runway Lighting - 07/25, Install Runway Vertical/Visual
Guidance System - 07/25, Install Taxiway Lighting, Rehabilitate
Runway - 07/25, Rehabilitate Taxiway, Rehabilitate Taxiway
NM HLN ID BOI Boise Air Terminal/Gowen Field P 61 $ 3,744,598.00 $ 3,744,598.00 $ - Acquire Snow Removal Equipment, Security Enhancements
NM HLN ID TWF Joslin Field - Magic Valley Regional P 37 $ 1,665,056.00 $ 1,665,056.00 $ - Expand Terminal Building
NM HLN ID COE Coeur D'Alene - Pappy Boyington Field GA 42 $ 607,303.00 $ 607,303.00 $ -Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,
Rehabilitate Apron
NM HLN ID LWS Lewiston-Nez Perce County P 38 $ 867,952.00 $ 867,952.00 $ - Rehabilitate Apron
NM HLN ID RXE Rexburg-Madison County GA 14 $ 375,230.00 $ 375,230.00 $ - Rehabilitate Apron
NM HLN ID AOC Arco-Butte County GA 13 $ 172,515.00 $ 172,515.00 $ - Conduct Airport Master Plan Study
NM HLN ID GNG Gooding Municipal GA 10 $ 95,400.00 $ 95,400.00 $ - Conduct Environmental Study
NM HLN ID SZT Sandpoint GA 15 $ 209,105.00 $ 209,105.00 $ - Conduct Environmental Study
NM HLN ID U02 McCarley Field GA 12 $ 108,000.00 $ 108,000.00 $ - Update Airport Master Plan Study
NM HLN ID BOI Boise Air Terminal/Gowen Field P 62 $ 660,246.00 $ - $ 660,246.00 VALE Infrastructure
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 29 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM HLN ID U10 Preston GA 4 $ 180,000.00 $ 180,000.00 $ - Conduct Environmental Study
NM HLN ID U03 Buhl Municipal GA 13 $ 150,000.00 $ 150,000.00 $ -Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate
Taxiway
NM HLN ID 65S Boundary County GA 13 $ 800,910.00 $ 800,910.00 $ -
Acquire Land For Approaches, Install Airfield Guidance Signs, Install
Runway Lighting - 02/20, Install Runway Vertical/Visual Guidance
System - 02/20, Rehabilitate Apron, Rehabilitate Runway - 02/20,
Rehabilitate Taxiway
NM HLN ID S83 Shoshone County GA 10 $ 376,267.00 $ 376,267.00 $ -Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
NM HLN ID 1U7 Bear Lake County GA 12 $ 150,000.00 $ 150,000.00 $ -
Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate
Runway - 16/34, Rehabilitate Runway Lighting - 10/28, Rehabilitate
Taxiway
NM HLN ID JER Jerome County GA 17 $ 558,629.00 $ 558,629.00 $ - Rehabilitate Taxiway
NM HLN ID MAN Nampa Municipal GA 25 $ 801,681.00 $ 737,981.00 $ 63,700.00 Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542,
Rehabilitate Apron, Rehabilitate Taxiway
NM HLN ID S66 Homedale Municipal GA 3 $ 216,000.00 $ 216,000.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
NM HLN ID DIJ Driggs-Reed Memorial GA 14 $ 744,300.00 $ 744,300.00 $ -
Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS,
Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate
Taxiway
NM HLN ID U70 Cascade GA 13 $ 576,355.00 $ 576,355.00 $ - Rehabilitate Taxiway, Rehabilitate Taxiway
NM HLN MT GGW Wokal Field/Glasgow International GA 19 $ 1,417,500.00 $ 343,972.00 $ 1,073,528.00 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate
Runway - 12/30, Rehabilitate Taxiway
NM HLN MT CII Choteau GA 8 $ 136,058.00 $ 136,058.00 $ - Install Weather Reporting Equipment
NM HLN MT LTY Liberty County GA 6 $ 180,000.00 $ 180,000.00 $ -
Conduct Airport Master Plan Study, Rehabilitate Apron, Rehabilitate
Runway - 07/25, Rehabilitate Runway Lighting - 07/25, Rehabilitate
Taxiway
NM HLN MT 79S Fort Benton GA 10 $ 1,108,691.00 $ 1,108,691.00 $ -
Expand Apron, Install Miscellaneous NAVAIDS, Install Runway
Lighting - 05/23, Rehabilitate Apron, Rehabilitate Runway - 05/23,
Rehabilitate Taxiway
NM HLN MT 1S3 Tillitt Field GA 10 $ 2,070,540.00 $ 2,070,540.00 $ -Rehabilitate Runway - 08/26, Rehabilitate Runway Lighting - 08/26,
Rehabilitate Taxiway
NM HLN MT MSO Missoula International P 59 $ 2,194,779.00 $ 2,194,779.00 $ - Extend Taxiway, Improve Airport Drainage, Rehabilitate Apron
NM HLN MT EKS Ennis - Big Sky GA 14 $ 211,500.00 $ 211,500.00 $ - Acquire Land for Development, Update Airport Master Plan Study
NM HLN MT 8S1 Polson GA 6 $ 529,200.00 $ 529,200.00 $ - Acquire Land for Development
NM HLN MT 6S5 Ravalli County GA 13 $ 297,000.00 $ 297,000.00 $ - Conduct Environmental Study
NM HLN MT S71 Edgar G Obie GA 14 $ 173,091.00 $ 173,091.00 $ -Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway -
08/26, Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 30 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM HLN MT EKS Ennis - Big Sky GA 15 $ 1,458,384.00 $ 1,458,384.00 $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway
NM HLN MT 9S5 Three Forks GA 10 $ 90,000.00 $ 90,000.00 $ - Conduct Environmental Study
NM HLN MT HWQ Wheatland County at Harlowton GA 6 $ 1,747,000.00 $ 1,747,000.00 $ -
Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,
Install Runway Lighting - 08/26, Rehabilitate Apron, Rehabilitate
Runway - 08/26, Rehabilitate Taxiway
NM HLN MT +00U New 9 $ 329,530.00 $ 329,530.00 $ - Construct Snow Removal Equipment Building
NM HLN MT WYS Yellowstone CS 16 $ 665,588.00 $ 665,588.00 $ -Acquire Snow Removal Equipment, Rehabilitate Apron, Rehabilitate
Taxiway, Remove Obstructions
NM HLN MT BIL Billings Logan International P 49 $ 1,051,485.00 $ 1,051,485.00 $ - Expand Apron, Rehabilitate Apron, Update Miscellaneous Study
NM HLN MT BHK Baker Municipal GA 18 $ 62,820.00 $ 62,820.00 $ - Rehabilitate Apron
NM HLN MT HVR Havre City-County GA 17 $ 3,084,865.00 $ 701,526.00 $ 2,383,339.00 Improve Runway Safety Area - 08/26, Rehabilitate Runway - 03/21,
Rehabilitate Runway - 08/26, Rehabilitate Taxiway
NM HLN MT MLS Frank Wiley Field GA 16 $ 4,046,125.00 $ 826,729.00 $ 3,219,396.00
Install Runway Vertical/Visual Guidance System - 04/22,
Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate
Runway - 04/22, Rehabilitate Runway - 12/30, Rehabilitate Runway
Lighting - 04/22
NM HLN MT 6S3 Woltermann Memorial GA 12 $ 144,140.00 $ 144,140.00 $ -Rehabilitate Apron, Rehabilitate Runway - 10/28, Rehabilitate
Runway Lighting - 10/28, Rehabilitate Taxiway
NM HLN MT 32S Stevensville GA 12 $ 202,500.00 $ 202,500.00 $ -
Construct Taxiway, Install Weather Reporting Equipment,
Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30,
Remove Obstructions, Widen Runway - 12/30
NM HLN MT BIL Billings Logan International P 50 $ 2,080,586.00 $ 2,080,586.00 $ - Extend Taxiway, Improve Airport Drainage
NM HLN MT SDY Sidney-Richland Municipal P 22 $ 2,420,522.00 $ 2,420,522.00 $ -Construct Access Road, Construct Taxiway, Install Airfield Guidance
Signs, Install Taxiway Lighting
NM HLN MT HLN Helena Regional P 47 $ 878,942.00 $ 878,942.00 $ -
Acquire Emergency Generator, Rehabilitate Runway - 05/23,
Rehabilitate Runway - 09/27, Rehabilitate Taxiway, Security
Enhancements
NM HLN MT 8S1 Polson GA 7 $ 245,880.00 $ 245,880.00 $ -Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate
Taxiway
NM HLN MT BZN Bozeman Yellowstone International P 44 $ 3,358,790.00 $ 3,358,790.00 $ - Construct Deicing Containment Facility, Expand Apron
NM HLN MT HLN Helena Regional P 48 $ 405,000.00 $ 405,000.00 $ - Update Airport Master Plan Study
NM HLN MT *MTS State of Montana 13 $ 166,611.00 $ 166,611.00 $ - Conduct State System Plan Study
NM HLN MT GDV Dawson Community GA 15 $ 78,300.00 $ 78,300.00 $ - Install Runway Vertical/Visual Guidance System - 12/30
NM HLN MT GPI Glacier Park International P 49 $ 3,986,340.00 $ 1,584,921.00 $ 2,401,419.00 Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30,
Remove Obstructions
NM HLN MT 3U8 Big Sandy GA 5 $ 1,247,709.00 $ 1,247,709.00 $ -
Construct Building, Construct Taxiway, Rehabilitate Apron,
Rehabilitate Runway - 06/24, Rehabilitate Taxiway, Rehabilitate
Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 31 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM HLN MT PWD Sher-Wood GA 10 $ 829,662.00 $ 829,662.00 $ - Construct Apron, Construct Fuel Farm
NM HLN MT 48S Harlem GA 10 $ 122,329.00 $ 122,329.00 $ -Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate
Taxiway
NM HLN MT 7S6 White Sulphur Springs GA 9 $ 150,277.00 $ 150,277.00 $ -Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate
Taxiway
NM HLN MT PO1 Poplar Municipal GA 10 $ 176,788.00 $ 176,788.00 $ -Rehabilitate Apron, Rehabilitate Runway - 09/27, Rehabilitate
Taxiway
NM HLN MT S59 Libby GA 13 $ 321,808.00 $ 321,808.00 $ - Install Taxiway Lighting, Remove Obstructions
NM HLN MT LWT Lewistown Municipal GA 21 $ 428,179.00 $ 428,179.00 $ -Acquire Snow Removal Equipment, Modify Building, Modify Snow
Removal Equipment Building
NM HLN MT M46 Colstrip GA 15 $ 1,082,250.00 $ 1,082,250.00 $ -Construct Taxiway, Expand Apron, Rehabilitate Apron, Rehabilitate
Runway - 06/24, Rehabilitate Taxiway
NM HLN MT 6S8 Laurel Municipal GA 15 $ 762,300.00 $ 762,300.00 $ - Acquire Land For Approaches, Acquire Land for Development
NM HLN MT M75 Malta GA 12 $ 188,600.00 $ 188,600.00 $ -Improve Airport Drainage, Rehabilitate Apron, Rehabilitate Runway -
08/26, Rehabilitate Taxiway
NM HLN MT GTF Great Falls International P 61 $ 2,062,829.00 $ 2,062,829.00 $ -Construct Taxiway, Modify Access Road, Rehabilitate Runway -
16/34
NM SEA OR AST Astoria Regional GA 21 $ 5,140,000.00 $ 334,879.00 $ 4,805,121.00 Rehabilitate Runway - 13/31
NM SEA OR BDN Bend Municipal GA 24 $ 966,670.00 $ 731,756.00 $ 234,914.00 Expand Heliport/Helipad
NM SEA OR *ORV Various Locations in Oregon 31 $ 12,386.00 $ 12,386.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
NM SEA OR 62S Christmas Valley GA 4 $ 1,599,837.00 $ 1,599,837.00 $ - Construct Taxiway, Rehabilitate Apron
NM SEA OR EUG Mahlon Sweet Field P 52 $ 1,547,216.00 $ 1,547,216.00 $ - Update Airport Master Plan Study
NM SEA OR OTH Southwest Oregon Regional P 40 $ 272,930.00 $ 272,930.00 $ - Construct Terminal Building
NM SEA OR HRI Hermiston Municipal GA 9 $ 2,916,000.00 $ 1,211,504.00 $ 1,704,496.00 Construct Fuel Farm, Rehabilitate Taxiway
NM SEA OR 77S Hobby Field GA 11 $ 75,000.00 $ 75,000.00 $ - Install Weather Reporting Equipment
NM SEA OR S30 Lebanon State GA 5 $ 264,628.00 $ 264,628.00 $ - Update Airport Master Plan Study
NM SEA OR GCD Grant County Regional/Ogilvie Field GA 10 $ 155,632.00 $ 155,632.00 $ - Update Airport Master Plan Study
NM SEA OR PDX Portland International P 75 $ 7,293,824.00 $ 3,550,075.00 $ 3,743,749.00 Security Enhancements
NM SEA OR RDM Roberts Field P 39 $ 5,987,960.00 $ 2,008,776.00 $ 3,979,184.00 Rehabilitate Runway - 04/22
NM SEA OR 56S Seaside Municipal GA 5 $ 475,000.00 $ 475,000.00 $ -
Install Airfield Guidance Signs, Install Perimeter Fencing,
Rehabilitate Runway Lighting - 16/34, Rehabilitate Taxiway, Remove
Obstructions
NM SEA OR MMV McMinnville Municipal GA 16 $ 492,230.00 $ 492,230.00 $ - Rehabilitate Runway - 04/22
NM SEA OR BKE Baker City Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron
NM SEA OR 4S1 Gold Beach Municipal GA 13 $ 217,300.00 $ 217,300.00 $ - Update Airport Master Plan Study
NM SEA OR CVO Corvallis Municipal GA 18 $ 540,000.00 $ 540,000.00 $ - Construct Access Road
NM SEA OR ONO Ontario Municipal GA 12 $ 196,371.00 $ 196,371.00 $ -Install Runway Vertical/Visual Guidance System - 14/32, Install
Taxiway Lighting
NM SEA OR BNO Burns Municipal GA 14 $ 538,435.00 $ 538,435.00 $ - Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 32 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM SEA OR MFR Rogue Valley International - Medford P 41 $ 3,873,540.00 $ 3,873,540.00 $ - Construct Snow Removal Equipment Building
NM SEA OR EUG Mahlon Sweet Field P 51 $ 1,500,000.00 $ 1,500,000.00 $ - Expand Terminal Building
NM SEA OR LKV Lake County GA 8 $ 2,756,123.00 $ 1,744,058.00 $ 1,012,065.00 Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System - 17/35, Rehabilitate Runway - 17/35
NM SEA OR PDX Portland International P 74 $ 8,761,866.00 $ - $ 8,761,866.00 Rehabilitate Taxiway
NM SEA OR UAO Aurora State GA 18 $ 1,289,561.00 $ 1,289,561.00 $ -Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway,
Rehabilitate Taxiway
NM SEA OR SLE McNary Field GA 20 $ 2,301,738.00 $ 950,000.00 $ 1,351,738.00 Rehabilitate Taxiway
NM SEA OR BOK Brookings GA 14 $ 775,413.00 $ 775,413.00 $ - Install Perimeter Fencing
NM SEA OR *ORS State of Oregon 14 $ 148,367.00 $ 148,367.00 $ - Update State System Plan Study
NM SEA OR LMT Klamath Falls P 35 $ 1,216,390.00 $ 1,216,390.00 $ - Construct Taxiway
NM SEA OR *ORV Various Locations in Oregon 30 $ 67,585.00 $ 67,585.00 $ - Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway
NM SEA OR BDN Bend Municipal GA 23 $ 22,741.00 $ 22,741.00 $ - Wildlife Hazard Assessments
NM SEA OR ONP Newport Municipal GA 23 $ 457,200.00 $ 457,200.00 $ - Conduct Airport Master Plan Study
NM SEA WA W04 Ocean Shores Municipal GA 10 $ 691,250.00 $ 691,250.00 $ - Rehabilitate Runway - 15/33
NM SEA WA SEA Seattle-Tacoma International P 137 $ 6,063,306.00 $ 6,063,306.00 $ - Construct Runway - 16R/34L
NM SEA WA MWH Grant County International GA 41 $ 472,500.00 $ 472,500.00 $ - Rehabilitate Access Road
NM SEA WA ALW Walla Walla Regional P 31 $ 519,506.00 $ 519,506.00 $ - Update Airport Master Plan Study
NM SEA WA FHR Friday Harbor P 32 $ 193,500.00 $ 193,500.00 $ - Conduct Environmental Study
NM SEA WA BFI Boeing Field/King County International P 52 $ 1,083,977.00 $ 1,083,977.00 $ - Update Airport Master Plan Study
NM SEA WA PLU Pierce County - Thun Field GA 17 $ 431,566.00 $ 431,566.00 $ -
Install Runway Vertical/Visual Guidance System - 16/34,
Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate
Taxiway
NM SEA WA 43D Odessa Municipal GA 7 $ 300,000.00 $ 300,000.00 $ - Extend Runway - 02/20
NM SEA WA PSC Tri-Cities P 43 $ 1,957,702.00 $ 1,957,702.00 $ - Rehabilitate Apron, Rehabilitate Terminal Building
NM SEA WA TIW Tacoma Narrows GA 18 $ 44,487.00 $ 44,487.00 $ - Wildlife Hazard Assessments
NM SEA WA SEA Seattle-Tacoma International P 136 $ 3,778,402.00 $ - $ 3,778,402.00 Conduct Noise Compatibility Plan Study
NM SEA WA 55S Packwood GA 6 $ 550,000.00 $ 550,000.00 $ -Improve Runway Safety Area - 01/19, Rehabilitate Runway - 01/19,
Rehabilitate Runway Lighting - 01/19
NM SEA WA CLS Chehalis-Centralia GA 16 $ 189,900.00 $ 189,900.00 $ - Construct Taxiway, Rehabilitate Apron
NM SEA WA BLI Bellingham International P 52 $ 4,792,516.00 $ 4,792,516.00 $ - Expand Terminal Building
NM SEA WA S50 Auburn Municipal R 22 $ 220,253.00 $ 220,253.00 $ - Conduct Environmental Study
NM SEA WA SFF Felts Field R 30 $ 4,920,207.00 $ 1,316,738.00 $ 3,603,469.00 Construct Taxiway, Rehabilitate Taxiway
NM SEA WA 2S8 Wilbur GA 13 $ 117,289.00 $ 117,289.00 $ -Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate
Taxiway
NM SEA WA KLS Southwest Washington Regional GA 15 $ 294,777.00 $ 294,777.00 $ -Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Remove
Obstructions
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 33 of 57�
nty
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
NM SEA WA S94 Port of Whitman Business Air Center GA 8 $ 1,875,110.00 $ 1,875,110.00 $ - Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25
NM SEA WA BVS Skagit Regional GA 22 $ 887,000.00 $ 150,000.00 $ 737,000.00 Improve Runway Safety Area - 11/29
NM SEA WA EAT Pangborn Memorial P 37 $ 6,869,283.00 $ 1,000,000.00 $ 5,869,283.00 Extend Runway - 12/30
NM SEA WA S31 Lopez Island GA 12 $ 241,928.00 $ 241,928.00 $ - Update Airport Master Plan Study
NM SEA WA 74S Anacortes GA 19 $ 125,745.00 $ 125,745.00 $ - Install Perimeter Fencing, Remove Obstructions
NM SEA WA HQM Bowerman GA 14 $ 432,218.00 $ 432,218.00 $ - Conduct Environmental Study
NM SEA WA 33S Pru Field GA 8 $ 805,302.00 $ 805,302.00 $ - Rehabilitate Runway - 01/19
NM SEA WA S52 Methow Valley State GA 7 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 13/31
NM SEA WA 0S7 Dorothy Scott GA 3 $ 150,000.00 $ 150,000.00 $ - Conduct Miscellaneous Study
NM SEA WA CLM William R Fairchild International GA 35 $ 853,087.00 $ 853,087.00 $ - Construct Apron
NM SEA WA CLM William R Fairchild International GA 34 $ 596,913.00 $ 596,913.00 $ - Update Airport Master Plan Study
NM SEA WA RLD Richland GA 27 $ 165,368.00 $ 165,368.00 $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate Taxiway
NM SEA WA PAE Snohomish County (Paine Field) R 56 $ 4,196,768.00 $ 196,768.00 $ 4,000,000.00 Rehabilitate Runway Lighting - 16R/34L, Rehabilitate Taxiway
NM SEA WA SEA Seattle-Tacoma International P 138 $ 9,917,791.00 $ - $ 9,917,791.00 Rehabilitate Runway - 16C/34C
NM SEA WA TDO Ed Carlson Memorial Field - South Lewis Cou GA 8 $ 288,000.00 $ 288,000.00 $ -Install Runway Vertical/Visual Guidance System, Rehabilitate Apron,
Rehabilitate Taxiway
NM SEA WA 1S5 Sunnyside Municipal GA 7 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 07/25, Rehabilitate Taxiway
NM SEA WA EPH Ephrata Municipal GA 16 $ 296,282.00 $ 296,282.00 $ - Rehabilitate Runway - 03/21, Rehabilitate Taxiway
NM SEA WA ELN Bowers Field GA 12 $ 287,018.00 $ 287,018.00 $ - Update Airport Master Plan Study
NM SEA WA OLM Olympia Regional GA 26 $ 1,059,917.00 $ 1,059,917.00 $ - Rehabilitate Taxiway
NM SEA WA 68S Davenport GA 6 $ 300,000.00 $ 300,000.00 $ - Conduct Environmental Study
NM SEA WA PUW Pullman/Moscow Regional P 41 $ 16,000,000.00 $ 1,000,000.00 $ 15,000,000.00 Construct Runway - Plan-1
NM SEA WA 2S8 Wilbur GA 12 $ 300,870.00 $ 300,870.00 $ - Update Airport Master Plan Study
NM SEA WA S10 Lake Chelan GA 9 $ 683,775.00 $ 683,775.00 $ - Acquire Land For Approaches
NM SEA WA S23 Ione Municipal GA 6 $ 231,455.00 $ 231,455.00 $ - Construct Taxiway
NM SEA WA GEG Spokane International P 53 $ 459,022.00 $ 459,022.00 $ - Rehabilitate Apron
NM SEA WA S40 Prosser GA 16 $ 266,537.00 $ 266,537.00 $ - Update Airport Master Plan Study
NM SEA WA *WAS State of Washington 14 $ 555,096.00 $ 555,096.00 $ - Conduct Aeronautical Survey for RNAV Approach
NM SEA WA ALW Walla Walla Regional P 30 $ 826,325.00 $ 826,325.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter
Fencing, Rehabilitate Taxiway
SO ATL GA VLD Valdosta Regional P 31 $ 3,285,030.00 $ 2,153,234.00 $ 1,131,796.00 Expand Apron
SO ATL GA ATL Hartsfield - Jackson Atlanta International P 110 $ 10,000,000.00 $ - $ 10,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SO ATL GA SAV Savannah/Hilton Head International P 56 $ 3,767,889.00 $ 3,767,889.00 $ -Improve Runway Safety Area - 10/28, Improve Runway Safety Area -
01/19, Rehabilitate Taxiway Lighting, Remove Obstructions
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 34 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO ATL GA ABY Southwest Georgia Regional P 44 $ 73,315.00 $ 73,315.00 $ -Conduct Miscellaneous Study, Rehabilitate Runway - 04/22, Wildlife
Hazard Assessments
SO ATL GA AGS Augusta Regional at Bush Field P 38 $ 2,000,000.00 $ 2,000,000.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
SO ATL GA *GAB Georgia State Block Grant Program 16 $ 18,281,160.00 $ 18,281,160.00 $ - Non primary development projects in state block grant program
SO ATL GA ATL Hartsfield - Jackson Atlanta International P 115 $ 926,789.00 $ - $ 926,789.00 Zero Emissions Vehicle/Infrastructure
SO ATL GA CSG Columbus P 35 $ 32,238.00 $ 32,238.00 $ - Remove Obstructions
SO ATL GA *GAB Georgia State Block Grant Program 17 $ 23,633,461.00 $ - $ 23,633,461.00 Non primary development projects in state block grant program
SO ATL GA BQK Brunswick Golden Isles P 37 $ 25,000.00 $ 25,000.00 $ - Expand Apron
SO ATL GA ATL Hartsfield - Jackson Atlanta International P 108 $ 8,123,993.00 $ 8,123,993.00 $ - Rehabilitate Runway - 08L/26R
SO ATL PR SJU Luis Munoz Marin International P 52 $ 1,995,000.00 $ 1,995,000.00 $ - Install Perimeter Fencing
SO ATL PR MAZ Eugenio Maria De Hostos CS 14 $ 332,500.00 $ 332,500.00 $ - Remove Obstructions
SO ATL PR SJU Luis Munoz Marin International P 53 $ 1,502,801.00 $ 483,478.00 $ 1,019,323.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
SO ATL PR RVR Jose Aponte De La Torre P 9 $ 1,469,256.00 $ - $ 1,469,256.00 Rehabilitate Apron, Rehabilitate Building
SO ATL PR *PRV Various Locations in Puerto Rico 1 $ 1,496,024.00 $ 1,496,024.00 $ - Rehabilitate Runway
SO ATL PR *PRS Commonwealth of Puerto Rico 5 $ 750,000.00 $ 750,000.00 $ - Conduct State System Plan Study
SO ATL SC GSP Greenville Spartanburg International P 51 $ 915,000.00 $ 221,370.00 $ 693,630.00 Rehabilitate Apron, Rehabilitate Taxiway
SO ATL SC SMS Sumter GA 20 $ 219,117.00 $ 219,117.00 $ - Construct Building, Construct Taxiway
SO ATL SC JZI Charleston Executive GA 21 $ 429,242.00 $ 429,242.00 $ - Rehabilitate Apron
SO ATL SC CEU Oconee County Regional GA 21 $ 655,899.00 $ 655,899.00 $ - Construct Taxiway, Remove Obstructions
SO ATL SC FDW Fairfield County GA 14 $ 146,515.00 $ 146,515.00 $ - Update Airport Master Plan Study
SO ATL SC ARW Beaufort County GA 12 $ 355,048.00 $ 355,048.00 $ - Conduct Environmental Study, Remove Obstructions
SO ATL SC 52J Lee County-Butters Field GA 10 $ 421,038.00 $ 421,038.00 $ - Construct Building
SO ATL SC RBW Lowcountry Regional GA 14 $ 323,927.00 $ 323,927.00 $ -Conduct Miscellaneous Study, Improve Airport Drainage, Update
Airport Master Plan Study
SO ATL SC CQW Cheraw Municipal/Lynch Bellinger Field GA 12 $ 220,724.00 $ 220,724.00 $ - Conduct Environmental Study
SO ATL SC LQK Pickens County GA 21 $ 49,009.00 $ 49,009.00 $ - Expand Apron
SO ATL SC 3J1 Ridgeland GA 9 $ 1,532,727.00 $ 67,873.00 $ 1,464,854.00 Construct Runway - Plan-1
SO ATL SC GGE Georgetown County GA 17 $ 902,201.00 $ 902,201.00 $ - Expand Apron, Remove Obstructions
SO ATL SC CAE Columbia Metropolitan P 45 $ 1,020,010.00 $ 1,020,010.00 $ - Improve Terminal Building, Improve Terminal Building
SO ATL SC AIK Aiken Municipal GA 18 $ 2,261,288.00 $ 481,186.00 $ 1,780,102.00 Expand Apron
SO ATL SC CDN Woodward Field GA 22 $ 2,131,818.00 $ 699,318.00 $ 1,432,500.00 Improve Runway Safety Area - 06/24, Remove Obstructions
SO ATL SC MKS Berkeley County GA 22 $ 2,036,860.00 $ 33,592.00 $ 2,003,268.00 Remove Obstructions
SO ATL SC CHS Charleston AFB/International P 38 $ 17,842,816.00 $ 13,342,816.00 $ 4,500,000.00
Install Apron Edge Lights, Rehabilitate Taxiway [Taxiway A],
Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway Lighting
[Taxiway A], Rehabilitate Taxiway Lighting [Taxiway G]
SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 18 $ 74,817.00 $ 74,817.00 $ - Expand Apron, Rehabilitate Apron, Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 35 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO ATL SC CRE Grand Strand GA 20 $ 360,000.00 $ 360,000.00 $ - Conduct Miscellaneous Study, Conduct Miscellaneous Study
SO ATL SC CEU Oconee County Regional GA 22 $ 211,000.00 $ 211,000.00 $ - Acquire Land For Approaches
SO ATL SC GSP Greenville Spartanburg International P 50 $ 5,220,549.00 $ - $ 5,220,549.00 Rehabilitate Apron
SO ATL SC BBP Marlboro County Jetport - H E Avent Field GA 13 $ 150,000.00 $ 150,000.00 $ - Construct Building, Construct Taxiway
SO ATL SC HYW Conway-Horry County GA 17 $ 180,000.00 $ 180,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting -
04/22, Rehabilitate Taxiway Lighting
SO ATL SC CAE Columbia Metropolitan P 44 $ 1,289,900.00 $ 1,289,900.00 $ - Improve Terminal Building, Rehabilitate Taxiway
SO ATL SC HXD Hilton Head P 37 $ 13,032,749.00 $ 2,496,791.00 $ 10,535,958.00
Improve Runway Safety Area [Acquire Land for Taxiways A and F] -
03/21, Improve Runway Safety Area [Expand General Aviation
Apron] - 03/21, Improve Runway Safety Area [Relocate Taxiway A] -
03/21, Remove Obstructions
SO ATL SC *SCV Various Locations in South Carolina 21 $ 553,655.35 $ 553,655.35 $ - Rehabilitate Runway
SO ATL SC UZA Rock Hill/York County/Bryant Field R 26 $ 149,913.00 $ 149,913.00 $ - Update Airport Master Plan Study
SO ATL SC PYG Pageland GA 12 $ 109,800.00 $ 109,800.00 $ - Construct Taxiway
SO ATL SC LKR Lancaster County-Mc Whirter Field GA 18 $ 144,089.00 $ 144,089.00 $ - Construct Apron
SO ATL SC CUB Jim Hamilton L B Owens R 21 $ 150,000.00 $ 150,000.00 $ - Construct Apron
SO ATL SC OGB Orangeburg Municipal GA 20 $ 461,967.00 $ 461,967.00 $ - Construct Fuel Farm
SO ATL SC 5J9 Twin City GA 4 $ 50,500.00 $ 50,500.00 $ - Install Airfield Guidance Signs, Install Perimeter Fencing
SO ATL SC FLO Florence Regional P 33 $ 347,750.00 $ 347,750.00 $ - Construct Aircraft Rescue & Fire Fighting Building
SO ATL SC UDG Darlington County Jetport GA 15 $ 550,525.00 $ 550,525.00 $ - Conduct Miscellaneous Study, Rehabilitate Runway Lighting - 05/23
SO ATL SC MKS Berkeley County GA 21 $ 207,347.00 $ 207,347.00 $ - Remove Obstructions
SO ATL SC 35A Union County, Troy Shelton Field GA 10 $ 324,090.00 $ 324,090.00 $ - Acquire Land For Approaches
SO ATL SC GRD Greenwood County GA 16 $ 151,847.00 $ 151,847.00 $ - Rehabilitate Apron
SO ATL SC SPA Spartanburg Downtown Memorial GA 20 $ 8,150,000.00 $ 150,000.00 $ 8,000,000.00 Extend Runway - 05/23
SO ATL SC GMU Greenville Downtown GA 24 $ 114,075.00 $ 114,075.00 $ - Remove Obstructions
SO ATL VI STX Henry E Rohlsen P 35 $ 6,870,128.00 $ 4,295,044.00 $ 2,575,084.00 Construct Aircraft Rescue & Fire Fighting Building
SO ATL VI STT Cyril E King P 34 $ 765,982.00 $ 765,982.00 $ - Conduct Airport Master Plan Study
SO ATL VI STT Cyril E King P 35 $ 194,287.00 $ 194,287.00 $ - Rehabilitate Runway Lighting - 10/28, Rehabilitate Taxiway
SO JAN AL 7A3 Lanett Municipal GA 12 $ 620,460.00 $ 150,000.00 $ 470,460.00 Construct Runway - 08/26
SO JAN AL 33J Geneva Municipal GA 12 $ 558,006.00 $ 558,006.00 $ - Construct Building
SO JAN AL AIV George Downer GA 13 $ 349,205.00 $ 349,205.00 $ - Construct Fuel Farm, Rehabilitate Runway - 06/24
SO JAN AL 7A5 Roanoke Municipal GA 10 $ 53,851.00 $ 53,851.00 $ - Update Airport Master Plan Study
SO JAN AL 61A Camden Municipal GA 10 $ 41,479.00 $ 41,479.00 $ - Conduct Environmental Study
SO JAN AL JFX Walker County-Bevill Field GA 17 $ 202,500.00 $ 202,500.00 $ - Construct Taxiway, Rehabilitate Runway - 09/27
SO JAN AL 4R3 Jackson Municipal GA 10 $ 64,443.00 $ 64,443.00 $ - Rehabilitate Runway - 01/19
SO JAN AL MOB Mobile Regional P 53 $ 1,992,083.00 $ 1,992,083.00 $ -Acquire Equipment, Conduct Miscellaneous Study, Extend Taxiway,
Rehabilitate Apron, Rehabilitate Building, Security Enhancements
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 36 of 57�
ell Field
l
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO JAN AL CMD Cullman Regional-Folsom Field GA 22 $ 488,149.00 $ 488,149.00 $ - Construct Taxiway
SO JAN AL EDN Enterprise Municipal GA 19 $ 107,635.00 $ 107,635.00 $ - Extend Runway - 05/23, Install Miscellaneous NAVAIDS
SO JAN AL SEM Craig Field GA 16 $ 93,131.00 $ 93,131.00 $ - Update Airport Master Plan Study
SO JAN AL PLR St Clair County R 17 $ 133,200.00 $ 133,200.00 $ -Install Perimeter Fencing, Remove Obstructions, Update Airport
Master Plan Study
SO JAN AL 4A9 Isbell Field GA 21 $ 1,004,840.00 $ 599,085.00 $ 405,755.00 Rehabilitate Runway - 04/22
SO JAN AL M22 Bill Pugh Field GA 12 $ 164,900.00 $ 164,900.00 $ - Rehabilitate Runway - 02/20, Remove Obstructions
SO JAN AL TOI Troy Municipal Airport at N Kenneth Campb GA 16 $ 47,625.00 $ 47,625.00 $ - Conduct Miscellaneous Study
SO JAN AL GAD Northeast Alabama Regional GA 16 $ 174,457.00 $ 174,457.00 $ -Rehabilitate Runway - 06/24, Rehabilitate Runway - 18/36,
Rehabilitate Taxiway
SO JAN AL 20A Robbins Field GA 11 $ 285,931.00 $ 285,931.00 $ - Construct Taxiway
SO JAN AL BHM Birmingham-Shuttlesworth International P 97 $ 482,820.00 $ 206,119.00 $ 276,701.00 Acquire Snow Removal Equipment
SO JAN AL DCU Pryor Field Regional GA 24 $ 646,200.00 $ 646,200.00 $ - Acquire Land for Development
SO JAN AL PRN MacCrenshaw Memorial GA 12 $ 461,445.00 $ 461,445.00 $ - Construct Taxiway
SO JAN AL BHM Birmingham-Shuttlesworth International P 96 $ 3,715,596.00 $ 3,715,596.00 $ - Expand Terminal Building
SO JAN AL 8A0 Albertville Regional-Thomas J Brumlik Field GA 25 $ 142,211.00 $ 142,211.00 $ - Rehabilitate Apron
SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 19 $ 186,006.00 $ 186,006.00 $ - Acquire Land for Development
SO JAN AL MVC Monroe County GA 12 $ 134,257.00 $ 134,257.00 $ - Install Perimeter Fencing, Remove Obstructions
SO JAN AL 79J South Alabama Regional at Bill Benton Field GA 20 $ 106,598.00 $ 106,598.00 $ - Install Perimeter Fencing
SO JAN AL DYA Demopolis Regional GA 13 $ 1,991,891.00 $ 168,600.00 $ 1,823,291.00 Rehabilitate Taxiway
SO JAN AL BFM Mobile Downtown GA 31 $ 5,825,493.00 $ 266,473.00 $ 5,559,020.00 Improve Airport Miscellaneous Improvements
SO JAN AL MGM Montgomery Regional (Dannelly Field) P 46 $ 886,455.00 $ 886,455.00 $ -Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate
Access Road
SO JAN AL MSL Northwest Alabama Regional GA 35 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Terminal Building
SO JAN AL EET Shelby County GA 18 $ 261,448.00 $ 261,448.00 $ - Construct Building
SO JAN AL 14J Carl Folsom GA 10 $ 300,000.00 $ 300,000.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway
SO JAN AL HSV Huntsville International-Carl T Jones Field P 75 $ 4,523,215.00 $ 4,523,215.00 $ -Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Terminal
Building
SO JAN AL 1R8 Bay Minette Municipal GA 11 $ 51,837.00 $ 51,837.00 $ - Conduct Environmental Study
SO JAN AL HSV Huntsville International-Carl T Jones Field P 76 $ 7,310,729.00 $ - $ 7,310,729.00 Construct Taxiway, Construct Taxiway
SO JAN AL HAB Marion County-Rankin Fite GA 13 $ 1,881,000.00 $ 247,496.00 $ 1,633,504.00 Rehabilitate Runway - 18/36
SO JAN AL 8A1 Guntersville Municipal - Joe Starnes Field GA 19 $ 2,506,033.00 $ 1,106,033.00 $ 1,400,000.00 Construct Runway - Plan-1
SO JAN AL PYP Centre-Piedmont-Cherokee County Regiona GA 9 $ 563,400.00 $ 563,400.00 $ - Construct Building
SO JAN AL 2R5 St Elmo GA 8 $ 126,583.00 $ 126,583.00 $ - Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24
SO JAN AL 3M8 North Pickens GA 8 $ 568,652.00 $ 568,652.00 $ - Construct Building, Construct Taxiway
SO JAN AL 0J4 Florala Municipal GA 4 $ 247,750.00 $ 247,750.00 $ - Improve Airport Drainage
SO JAN AL 4R9 Dauphin Island GA 12 $ 145,280.00 $ 145,280.00 $ - Conduct Environmental Study
SO JAN AL DHN Dothan Regional P 38 $ 2,810,510.00 $ 2,810,510.00 $ - Rehabilitate Apron
SO JAN AL ASN Talladega Municipal GA 27 $ 231,400.00 $ 231,400.00 $ - Construct Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 37 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO JAN AL 02A Chilton County GA 13 $ 335,668.00 $ 335,668.00 $ - Acquire Land for Development, Install Perimeter Fencing
SO JAN AL 5R4 Foley Municipal GA 13 $ 160,705.00 $ 160,705.00 $ - Improve Airport Drainage
SO JAN AL 0R1 Atmore Municipal GA 12 $ 1,841,856.00 $ 573,641.00 $ 1,268,215.00 Improve Runway Safety Area - 18/36, Rehabilitate Runway - 18/36
SO JAN AL EKY Bessemer R 14 $ 682,500.00 $ 282,500.00 $ 400,000.00 Rehabilitate Apron, Rehabilitate Taxiway
SO JAN AL BHM Birmingham-Shuttlesworth International P 98 $ 2,590,500.00 $ - $ 2,590,500.00 VALE Infrastructure
SO JAN AL 07A Franklin Field GA 5 $ 110,389.00 $ 110,389.00 $ - Install Perimeter Fencing, Update Airport Master Plan Study
SO JAN AL 71J Blackwell Field GA 16 $ 632,434.00 $ 632,434.00 $ - Construct Apron, Construct Taxiway, Install Perimeter Fencing
SO JAN AL 0J6 Headland Municipal GA 14 $ 262,148.00 $ 262,148.00 $ - Construct Fuel Farm
SO JAN AL 08A Wetumpka Municipal GA 16 $ 280,263.00 $ 280,263.00 $ - Improve Airport Drainage, Rehabilitate Runway - 09/27
SO JAN AL MSL Northwest Alabama Regional GA 34 $ 118,750.00 $ 118,750.00 $ - Install Perimeter Fencing
SO JAN AL SEM Craig Field GA 15 $ 97,457.00 $ 97,457.00 $ - Install Perimeter Fencing, Rehabilitate Taxiway
SO JAN AL 1A9 Prattville - Grouby Field GA 17 $ 78,503.00 $ 78,503.00 $ - Acquire Land For Approaches
SO JAN AL ANB Anniston Regional GA 31 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 05/23
SO JAN AL JKA Jack Edwards GA 29 $ 4,554,709.00 $ 150,119.00 $ 4,404,590.00 Construct Apron
SO JAN AL M95 Richard Arthur Field GA 7 $ 120,036.00 $ 120,036.00 $ - Update Airport Master Plan Study
SO JAN AL 12J Brewton Municipal GA 13 $ 271,990.00 $ 271,990.00 $ - Construct Taxiway, Improve Airport Drainage
SO JAN AL SCD Merkel Field Sylacauga Municipal GA 19 $ 423,347.00 $ 423,347.00 $ - Construct Taxiway, Rehabilitate Apron
SO JAN AL ALX Thomas C Russell Field GA 16 $ 1,009,662.00 $ 1,009,662.00 $ - Extend Taxiway
SO JAN AL CQF H. L. (Sonny) Callahan GA 16 $ 618,585.00 $ 618,585.00 $ - Construct Apron, Improve Airport Drainage
SO JAN MS GPT Gulfport-Biloxi International P 85 $ 3,420,000.00 $ - $ 3,420,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SO JAN MS 1M2 Belzoni Municipal GA 15 $ 437,069.00 $ 437,069.00 $ - Construct Taxiway
SO JAN MS 2M4 G V Montgomery GA 11 $ 139,820.00 $ 139,820.00 $ - Remove Obstructions
SO JAN MS MJD Picayune Municipal GA 18 $ 75,600.00 $ 75,600.00 $ - Construct Taxiway, Update Airport Master Plan Study
SO JAN MS T36 Paul Pittman Memorial GA 16 $ 273,130.00 $ 273,130.00 $ - Rehabilitate Building
SO JAN MS UBS Columbus-Lowndes County GA 17 $ 119,128.00 $ 119,128.00 $ - Remove Obstructions
SO JAN MS M72 New Albany-Union County GA 17 $ 137,667.00 $ 137,667.00 $ - Install Runway Vertical/Visual Guidance System - 18/36
SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 22 $ 2,257,890.00 $ 166,783.00 $ 2,091,107.00 Rehabilitate Runway - 13/31
SO JAN MS 23M Clarke County GA 15 $ 232,351.00 $ 232,351.00 $ - Construct Apron
SO JAN MS 01M Tishomingo County GA 17 $ 60,993.00 $ 60,993.00 $ - Acquire Land For Approaches, Remove Obstructions
SO JAN MS GNF Grenada Municipal GA 12 $ 204,643.00 $ 204,643.00 $ - Rehabilitate Runway - 13/31
SO JAN MS *MSV Various Locations in Mississippi 6 $ 35,775.00 $ 35,775.00 $ -
Construct Access Road, Construct Apron, Construct Building,
Construct Taxiway, Construct Terminal Building, Improve Runway
Safety Area, Install Airfield Guidance Signs, Rehabilitate Apron,
Rehabilitate Building, Rehabilitate Runway, Rehabilitate Runway
Lighting, Rehabilitate Taxiway, Remove Obstructions to support
RNAV Approach
SO JAN MS CRX Roscoe Turner GA 24 $ 124,611.00 $ 124,611.00 $ - Rehabilitate Apron, Remove Obstructions
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 38 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO JAN MS MEI Key Field CS 34 $ 217,973.00 $ 217,973.00 $ -Rehabilitate Runway - 01/19, Rehabilitate Runway - 04/22,
Rehabilitate Taxiway
SO JAN MS UOX University-Oxford GA 29 $ 6,985,890.00 $ 105,225.00 $ 6,880,665.00 Construct Apron
SO JAN MS 15M Iuka GA 11 $ 257,265.00 $ 257,265.00 $ -Rehabilitate Runway Lighting - 18/36, Update Airport Master Plan
Study
SO JAN MS 14M Hollandale Municipal GA 11 $ 168,535.00 $ 168,535.00 $ - Install Perimeter Fencing
SO JAN MS 1R7 Brookhaven-Lincoln County GA 12 $ 453,830.00 $ 453,830.00 $ -Rehabilitate Apron, Rehabilitate Taxiway, Remove Obstructions to
support RNAV Approach
SO JAN MS M23 James H Easom Field GA 14 $ 139,306.00 $ 139,306.00 $ - Acquire Land For Approaches
SO JAN MS RNV Cleveland Municipal GA 20 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Taxiway
SO JAN MS 25M Ripley GA 9 $ 297,468.00 $ 297,468.00 $ - Rehabilitate Apron
SO JAN MS 4R1 I H Bass Jr Memorial GA 13 $ 249,975.00 $ 249,975.00 $ - Construct Building
SO JAN MS 06M Eupora GA 9 $ 449,021.00 $ 449,021.00 $ -Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate
Taxiway, Remove Obstructions
SO JAN MS MBO Bruce Campbell Field GA 23 $ 787,050.00 $ 787,050.00 $ - Construct Access Road, Construct Terminal Building
SO JAN MS 19M C A Moore GA 16 $ 156,516.00 $ 156,516.00 $ - Improve Airport Erosion Control
SO JAN MS M24 Dean Griffin Memorial GA 15 $ 212,189.00 $ 212,189.00 $ - Construct Fuel Farm, Remove Obstructions
SO JAN MS PQL Trent Lott International GA 31 $ 423,094.00 $ 423,094.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 17/35,
Rehabilitate Taxiway
SO JAN MS GTR Golden Triangle Regional P 53 $ 860,800.00 $ 860,800.00 $ -Install Perimeter Fencing required by 14 CFR 139, Rehabilitate
Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway
SO JAN MS OSX Kosciusko-Attala County GA 14 $ 1,016,225.00 $ 255,580.00 $ 760,645.00 Rehabilitate Runway - 14/32
SO JAN MS M43 Prentiss-Jefferson Davis County GA 11 $ 66,161.00 $ 66,161.00 $ - Rehabilitate Apron, Update Airport Master Plan Study
SO JAN MS M37 Ruleville-Drew GA 14 $ 198,220.00 $ 198,220.00 $ - Construct Building
SO JAN MS 5A4 Okolona Municipal-Richard Stovall Field GA 17 $ 151,110.00 $ 151,110.00 $ - Rehabilitate Runway Lighting - 18/36
SO JAN MS GWO Greenwood-Leflore GA 16 $ 880,719.00 $ 880,719.00 $ - Widen Taxiway
SO JAN MS CKM Fletcher Field GA 22 $ 487,589.00 $ 487,589.00 $ - Construct Taxiway, Rehabilitate Runway Lighting - 18/36
SO JAN MS 0R0 Columbia-Marion County GA 12 $ 585,284.00 $ 585,284.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Taxiway, Update Airport Master Plan Study
SO JAN MS 5A6 Winona-Montgomery County GA 14 $ 249,883.00 $ 249,883.00 $ - Construct Building, Construct Taxiway
SO JAN MS JVW John Bell Williams GA 20 $ 1,345,769.00 $ 103,165.00 $ 1,242,604.00 Rehabilitate Taxiway
SO JAN MS GPT Gulfport-Biloxi International P 84 $ 3,056,033.00 $ 1,619,947.00 $ 1,436,086.00 Rehabilitate Apron, Rehabilitate Taxiway, Rehabilitate Terminal
Building, Update Miscellaneous Study, Widen Taxiway
SO JAN MS 33M Water Valley Municipal GA 8 $ 220,608.00 $ 220,608.00 $ - Construct Fuel Farm
SO JAN MS PIB Hattiesburg-Laurel Regional P 36 $ 410,247.00 $ 410,247.00 $ - Construct Taxiway, Update Airport Master Plan Study
SO JAN MS STF George M Bryan GA 20 $ 830,974.00 $ 150,000.00 $ 680,974.00 Improve Runway Safety Area - 18/36
SO JAN MS M41 Holly Springs-Marshall County GA 16 $ 211,712.00 $ 211,712.00 $ - Acquire Land for Development, Remove Obstructions
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 39 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO JAN MS 2R0 Waynesboro Municipal GA 9 $ 210,190.00 $ 210,190.00 $ -Install Perimeter Fencing, Rehabilitate Airport Beacons, Rehabilitate
Runway - 02/20, Update Airport Master Plan Study
SO JAN MS TUP Tupelo Regional CS 40 $ 440,390.00 $ 440,390.00 $ -Install Perimeter Fencing required by 14 CFR 139, Rehabilitate
Runway - 18/36
SO JAN MS HSA Stennis International GA 29 $ 211,140.00 $ 211,140.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 24 $ 242,164.00 $ 242,164.00 $ - Install Perimeter Fencing
SO JAN MS VKS Vicksburg Municipal GA 8 $ 150,280.00 $ 150,280.00 $ -Install Runway Vertical/Visual Guidance System - 01/19, Remove
Obstructions
SO JAN MS HEZ Hardy-Anders Field Natchez-Adams County GA 25 $ 485,100.00 $ 485,100.00 $ - Construct Building
SO JAN MS 8M1 Booneville/Baldwyn GA 16 $ 96,185.00 $ 96,185.00 $ -Improve Runway Safety Area - 15/33, Rehabilitate Apron, Remove
Obstructions
SO JAN MS LMS Louisville Winston County GA 15 $ 67,500.00 $ 67,500.00 $ - Update Airport Master Plan Study
SO MEM KY 2M0 Princeton-Caldwell County GA 13 $ 431,161.00 $ 431,161.00 $ - Construct Taxiway
SO MEM KY 5M9 Marion-Crittenden County GA 12 $ 561,258.00 $ 561,258.00 $ - Construct Building
SO MEM KY AAS Taylor County GA 18 $ 400,870.00 $ 400,870.00 $ -Install Miscellaneous NAVAIDS, Install Runway Lighting - 05/23,
Install Taxiway Lighting
SO MEM KY LEX Blue Grass P 66 $ 3,431,009.00 $ 3,431,009.00 $ -
Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire
Fighting Training Facility, Construct Snow Removal Equipment
Building
SO MEM KY TWT Sturgis Municipal GA 14 $ 113,357.00 $ 113,357.00 $ - Update Airport Master Plan Study
SO MEM KY FFT Capital City GA 16 $ 369,000.00 $ 369,000.00 $ - Install Runway Lighting - 06/24, Remove Obstructions
SO MEM KY DWU Ashland Regional GA 18 $ 353,613.00 $ 353,613.00 $ - Acquire Land for Development
SO MEM KY PAH Barkley Regional P 45 $ 976,116.00 $ 976,116.00 $ -
Acquire Snow Removal Equipment, Improve Airport Drainage,
Install Taxiway Lighting, Rehabilitate Access Road, Rehabilitate
Parking Lot, Security Enhancements
SO MEM KY JQD Ohio County GA 16 $ 150,000.00 $ 150,000.00 $ - Construct Building, Expand Apron
SO MEM KY I35 Tucker-Guthrie Memorial GA 13 $ 42,390.00 $ 42,390.00 $ - Install Perimeter Fencing
SO MEM KY M20 Grayson County GA 11 $ 122,814.00 $ 122,814.00 $ - Acquire Land For Approaches
SO MEM KY M34 Kentucky Dam State Park GA 9 $ 151,351.00 $ 151,351.00 $ - Remove Obstructions
SO MEM KY I93 Breckinridge County GA 9 $ 157,205.00 $ 157,205.00 $ - Construct Fuel Farm
SO MEM KY SME Lake Cumberland Regional GA 22 $ 628,392.00 $ 628,392.00 $ - Construct Building
SO MEM KY KY8 Hancock Co-Ron Lewis Field GA 10 $ 359,100.00 $ 359,100.00 $ - Construct Fuel Farm, Update Airport Master Plan Study
SO MEM KY CEY Kyle-Oakley Field GA 26 $ 351,259.00 $ 351,259.00 $ -Acquire Snow Removal Equipment, Rehabilitate Runway - 05/23,
Remove Obstructions
SO MEM KY 0I8 Cynthiana-Harrison County GA 14 $ 760,000.00 $ 760,000.00 $ - Construct Taxiway
SO MEM KY K62 Gene Snyder GA 15 $ 648,931.00 $ 648,931.00 $ - Improve Runway Safety Area - 03/21
SO MEM KY GLW Glasgow Municipal GA 25 $ 101,057.00 $ 101,057.00 $ -Construct Runway Safety Area - 08/26, Improve Airport Drainage,
Install Miscellaneous NAVAIDS
SO MEM KY EKQ Wayne County GA 10 $ 50,000.00 $ 50,000.00 $ - Construct Building
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 40 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO MEM KY 4M7 Russellville-Logan County GA 17 $ 1,961,119.00 $ 1,961,119.00 $ - Extend Runway - 06/24
SO MEM KY 6I2 Lebanon-Springfield GA 15 $ 94,000.00 $ 94,000.00 $ - Conduct Environmental Study
SO MEM KY OWB Owensboro-Daviess County P 50 $ 1,000,000.00 $ 1,000,000.00 $ -
Acquire Snow Removal Equipment, Conduct Environmental Study,
Extend Runway - 18/36, Improve Service Road, Install Airport
Beacons, Install Guidance Signs, Rehabilitate Apron
SO MEM KY 2I3 Rough River State Park GA 2 $ 117,000.00 $ 117,000.00 $ - Remove Obstructions
SO MEM KY *KYS State of Kentucky 2 $ 1,000,000.00 $ 282,478.00 $ 717,522.00 Conduct State System Plan Study
SO MEM KY CPF Wendell H Ford GA 18 $ 269,706.00 $ 269,706.00 $ - Rehabilitate Taxiway
SO MEM KY K24 Russell County GA 16 $ 674,344.00 $ 674,344.00 $ - Construct Building
SO MEM KY 1M7 Fulton GA 13 $ 579,980.00 $ 579,980.00 $ - Construct Building
SO MEM KY JKL Julian Carroll GA 8 $ 361,965.00 $ 361,965.00 $ -Install Runway Vertical/Visual Guidance System - 01/19,
Rehabilitate Runway - 01/19, Rehabilitate Runway Lighting - 01/19
SO MEM KY LOZ London-Corbin Airport-Magee Field GA 23 $ 88,000.00 $ 88,000.00 $ - Construct Building
SO MEM KY FGX Fleming-Mason GA 17 $ 190,000.00 $ 190,000.00 $ - Acquire Land For Approaches, Conduct Environmental Study
SO MEM KY EHR Henderson City-County GA 28 $ 150,000.00 $ 150,000.00 $ - Extend Runway - 09/27
SO MEM KY BWG Bowling Green-Warren County Regional GA 27 $ 750,000.00 $ - $ 750,000.00 Rehabilitate Runway - 03/21
SO MEM KY TZV Tompkinsville-Monroe County GA 12 $ 40,000.00 $ 40,000.00 $ - Remove Obstructions
SO MEM KY 1A6 Middlesboro-Bell County GA 18 $ 122,810.00 $ 122,810.00 $ - Conduct Environmental Study
SO MEM KY LEX Blue Grass P 67 $ 10,676,063.00 $ 176,063.00 $ 10,500,000.00 Construct Taxiway
SO MEM KY 27K Georgetown Scott County - Marshall Field GA 20 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Apron
SO MEM KY CVG Cincinnati/Northern Kentucky International P 85 $ 4,249,391.00 $ 4,249,391.00 $ - Rehabilitate Apron
SO MEM KY M21 Muhlenberg County GA 16 $ 103,500.00 $ 103,500.00 $ - Expand Apron
SO MEM NC PGV Pitt-Greenville P 41 $ 1,024,397.00 $ 1,024,397.00 $ -Acquire Land For Approaches, Conduct Miscellaneous Study,
Remove Obstructions, Security Enhancements
SO MEM NC CLT Charlotte/Douglas International P 74 $ 11,470,826.00 $ 11,470,826.00 $ -
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land for
Development, Rehabilitate Runway - 05/23, Rehabilitate Taxiway,
Update Airport Master Plan Study
SO MEM NC FAY Fayetteville Regional/Grannis Field P 43 $ 2,050,594.00 $ 2,050,594.00 $ - Expand Terminal Building, Update Airport Master Plan Study
SO MEM NC *NCB North Carolina State Block Grant Program 50 $ 3,356,295.00 $ - $ 3,356,295.00 Non primary development projects in state block grant program
SO MEM NC ILM Wilmington International P 51 $ 6,836,380.00 $ 2,845,825.00 $ 3,990,555.00 Rehabilitate Apron, Update Airport Master Plan Study
SO MEM NC CLT Charlotte/Douglas International P 73 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment
SO MEM NC OAJ Albert J Ellis P 37 $ 1,508,965.00 $ - $ 1,508,965.00 Rehabilitate Apron
SO MEM NC RDU Raleigh-Durham International P 46 $ 3,607,958.00 $ 3,607,958.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Update Airport
Master Plan Study
SO MEM NC JQF Concord Regional P 1 $ 6,429,612.00 $ 1,000,000.00 $ 5,429,612.00 Construct Terminal Building
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 41 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO MEM NC GSO Piedmont Triad International P 73 $ 1,012,500.00 $ 1,012,500.00 $ - Acquire Snow Removal Equipment, Rehabilitate Runway - 05R/23L
SO MEM NC *NCB North Carolina State Block Grant Program 49 $ 14,882,709.00 $ 14,882,709.00 $ - Non primary development projects in state block grant program
SO MEM NC AVL Asheville Regional P 45 $ 12,560,480.00 $ 2,560,480.00 $ 10,000,000.00 Rehabilitate Runway - 16/34
SO MEM NC GSO Piedmont Triad International P 72 $ 2,700,000.00 $ - $ 2,700,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SO MEM NC EWN Coastal Carolina Regional P 38 $ 1,258,202.00 $ 1,258,202.00 $ -Acquire Land for Development, Conduct Environmental Study,
Rehabilitate Taxiway Lighting, Security Enhancements
SO MEM NC GSO Piedmont Triad International P 71 $ 1,298,123.00 $ 1,298,123.00 $ - Construct Runway - 05L/23R
SO MEM TN *TNB Tennessee State Block Grant Program 49 $ 13,150,130.00 $ 13,150,130.00 $ - Non primary development projects in state block grant program
SO MEM TN BNA Nashville International P 99 $ 8,650,367.00 $ 3,046,239.00 $ 5,604,128.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway, Update
Miscellaneous Study
SO MEM TN TYS McGhee Tyson P 67 $ 15,412,563.00 $ 5,412,563.00 $ 10,000,000.00 Rehabilitate Runway - 05L/23R
SO MEM TN JWN John C Tune R 19 $ 5,204,008.00 $ 150,000.00 $ 5,054,008.00 Construct Runway Safety Area - 02/20
SO MEM TN MEM Memphis International P 91 $ 1,383,415.00 $ - $ 1,383,415.00 VALE Infrastructure
SO MEM TN CHA Lovell Field P 61 $ 2,597,670.00 $ 2,597,670.00 $ - Rehabilitate Apron
SO MEM TN TRI Tri-Cities Regional TN/VA P 67 $ 1,842,890.00 $ 1,842,890.00 $ - Improve Terminal Building, Rehabilitate Apron
SO MEM TN TYS McGhee Tyson P 68 $ 7,275,257.00 $ - $ 7,275,257.00 Rehabilitate Runway - 05L/23R
SO ORL FL OMN Ormond Beach Municipal R 18 $ 3,777,825.00 $ 1,077,825.00 $ 2,700,000.00 Construct Taxiway, Install Runway Vertical/Visual Guidance System -
17/35, Install Taxiway Lighting
SO ORL FL AAF Apalachicola Regional-Cleve Randolph Field GA 8 $ 531,766.00 $ 531,766.00 $ - Rehabilitate Runway - 14/32, Rehabilitate Taxiway
SO ORL FL FIN Flagler County GA 16 $ 1,435,382.00 $ 1,435,382.00 $ -Construct Taxiway, Install Taxiway Lighting, Wildlife Hazard
Assessments
SO ORL FL 1J0 Tri-County GA 11 $ 74,430.00 $ 74,430.00 $ - Construct Taxiway
SO ORL FL EYW Key West International P 50 $ 525,835.00 $ 525,835.00 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL
SO ORL FL EYW Key West International P 49 $ 452,385.00 $ 452,385.00 $ - Improve Airport Drainage, Rehabilitate Apron
SO ORL FL X14 La Belle Municipal GA 8 $ 240,831.00 $ 240,831.00 $ - Construct Terminal Building
SO ORL FL X60 Williston Municipal GA 16 $ 150,000.00 $ 150,000.00 $ - Conduct Airport Master Plan Study
SO ORL FL 54J Defuniak Springs GA 10 $ 162,271.00 $ 162,271.00 $ - Improve Runway Safety Area - 09/27
SO ORL FL RSW Southwest Florida International P 53 $ 1,365,968.00 $ 1,365,968.00 $ - Install Airfield Guidance Signs, Rehabilitate Terminal Building
SO ORL FL MCO Orlando International P 115 $ 1,306,130.00 $ 1,306,130.00 $ -Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate
Taxiway, Rehabilitate Taxiway, Security Enhancements
SO ORL FL TLH Tallahassee Regional P 39 $ 654,711.00 $ 654,711.00 $ - Conduct Airport Master Plan Study
SO ORL FL HEG Herlong Recreational R 18 $ 797,912.00 $ 300,000.00 $ 497,912.00 Rehabilitate Apron
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 42 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO ORL FL FIN Flagler County GA 17 $ 1,054,800.00 $ 237,378.00 $ 817,422.00 Construct Runway - 11/29
SO ORL FL MTH The Florida Keys Marathon GA 32 $ 44,256.00 $ 44,256.00 $ - Install Runway Lighting - 07/25
SO ORL FL 42J Keystone Airpark GA 23 $ 458,823.00 $ 458,823.00 $ - Rehabilitate Apron
SO ORL FL VRB Vero Beach Municipal GA 39 $ 244,140.00 $ 244,140.00 $ - Rehabilitate Taxiway
SO ORL FL EVB New Smyrna Beach Municipal R 19 $ 1,251,000.00 $ 1,251,000.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Runway - 07/25,
Rehabilitate Taxiway
SO ORL FL CTY Cross City GA 11 $ 150,870.00 $ 150,870.00 $ - Install Weather Reporting Equipment
SO ORL FL PIE St Pete-Clearwater International P 41 $ 5,745,002.00 $ 1,287,002.00 $ 4,458,000.00 Rehabilitate Apron
SO ORL FL FLL Fort Lauderdale/Hollywood International P 76 $ 20,000,000.00 $ - $ 20,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SO ORL FL SUA Witham Field GA 19 $ 1,490,494.00 $ 150,000.00 $ 1,340,494.00 Rehabilitate Runway - 12/30
SO ORL FL DAB Daytona Beach International P 71 $ 5,900,000.00 $ - $ 5,900,000.00 Construct Aircraft Rescue & Fire Fighting Building
SO ORL FL 54J Defuniak Springs GA 9 $ 210,845.00 $ 210,845.00 $ - Extend Runway - 09/27
SO ORL FL MTH The Florida Keys Marathon GA 33 $ 234,447.00 $ 234,447.00 $ - Update Miscellaneous Study
SO ORL FL GNV Gainesville Regional P 38 $ 2,468,410.00 $ 2,468,410.00 $ -Construct Aircraft Rescue & Fire Fighting Building, Expand Apron,
Rehabilitate Runway Lighting - 11/29
SO ORL FL DAB Daytona Beach International P 70 $ 2,307,984.00 $ 2,307,984.00 $ - Improve Terminal Building
SO ORL FL X35 Marion County GA 3 $ 1,065,072.00 $ 600,000.00 $ 465,072.00 Install Taxiway Lighting, Rehabilitate Taxiway
SO ORL FL SFB Orlando Sanford International P 74 $ 7,584,302.00 $ 210,254.00 $ 7,374,048.00 Install Runway Incursion Marking (14 CFR Part 139), Rehabilitate
Apron
SO ORL FL LAL Lakeland Linder Regional R 37 $ 2,173,500.00 $ 11,035.00 $ 2,162,465.00 Install Airfield Guidance Signs, Rehabilitate Taxiway
SO ORL FL PGD Punta Gorda P 34 $ 2,568,888.00 $ 1,669,829.00 $ 899,059.00 Construct Taxiway
SO ORL FL BKV Brooksville-Tampa Bay Regional GA 18 $ 1,338,254.00 $ 1,338,254.00 $ - Rehabilitate Runway Lighting - 09/27, Rehabilitate Taxiway Lighting
SO ORL FL MLB Melbourne International P 42 $ 1,102,534.00 $ 1,102,534.00 $ - Widen Taxiway
SO ORL FL FLL Fort Lauderdale/Hollywood International P 75 $ 414,487.00 $ - $ 414,487.00 Acquire Equipment
SO ORL FL BCT Boca Raton R 20 $ 5,103,726.00 $ 150,000.00 $ 4,953,726.00 Improve Runway Safety Area - 05/23
SO ORL FL PNS Pensacola International P 40 $ 7,385,467.00 $ 7,385,467.00 $ - Rehabilitate Apron
SO ORL FL TLH Tallahassee Regional P 38 $ 530,368.00 $ 530,368.00 $ - Rehabilitate Terminal Building
SO ORL FL DED DeLand Municipal-Sidney H Taylor Field R 20 $ 101,700.00 $ 101,700.00 $ -Install Miscellaneous NAVAIDS, Install Weather Reporting
Equipment, Wildlife Hazard Assessments
SO ORL FL BOW Bartow Municipal GA 33 $ 2,253,641.00 $ 203,372.00 $ 2,050,269.00 Construct Taxiway, Install Taxiway Lighting, Wildlife Hazard
Assessments
SO ORL FL VNC Venice Municipal R 14 $ 7,201,487.00 $ 150,000.00 $ 7,051,487.00 Improve Runway Safety Area - 13/31
SO ORL FL F95 Calhoun County GA 6 $ 695,242.00 $ 695,242.00 $ - Construct Taxiway
SO ORL FL PMP Pompano Beach Airpark GA 2 $ 91,130.00 $ 91,130.00 $ - Wildlife Hazard Assessments
SO ORL FL JAX Jacksonville International P 54 $ 1,132,221.00 $ 1,132,221.00 $ - Rehabilitate Taxiway
SO ORL FL TPA Tampa International P 62 $ 5,132,837.00 $ 5,132,837.00 $ - Construct Terminal People Mover
SO ORL FL ORL Executive R 30 $ 350,000.00 $ 350,000.00 $ - Update Airport Master Plan Study
SO ORL FL SGJ Northeast Florida Regional GA 36 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 13/31
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 43 of 57�
d
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SO ORL FL ZPH Zephyrhills Municipal GA 14 $ 150,000.00 $ 150,000.00 $ - Improve Airport Miscellaneous Improvements
SO ORL FL SPG Albert Whitted R 23 $ 2,401,060.00 $ 150,000.00 $ 2,251,060.00 Install Runway Vertical/Visual Guidance System - 07/25,
Rehabilitate Runway - 07/25, Rehabilitate Runway Lighting - 07/25
SO ORL FL FLL Fort Lauderdale/Hollywood International P 74 $ 24,006,869.00 $ 4,006,869.00 $ 20,000,000.00 Extend Runway - 10R/28L
SO ORL FL SGJ Northeast Florida Regional GA 37 $ 1,146,301.00 $ - $ 1,146,301.00 Install Runway Vertical/Visual Guidance System - 13/31
SO ORL FL OCF Ocala International-Jim Taylor Field GA 24 $ 483,385.00 $ 483,385.00 $ - Construct Parking Lot
SO ORL FL GIF Winter Haven's Gilbert GA 24 $ 65,700.00 $ 65,700.00 $ - Construct Taxiway
SO ORL FL 01J Hilliard Airpark GA 8 $ 177,401.00 $ 177,401.00 $ - Install Perimeter Fencing
SO ORL FL 40J Perry-Foley GA 14 $ 561,546.00 $ 561,546.00 $ - Rehabilitate Apron
SO ORL FL EYW Key West International P 51 $ 772,063.00 $ 772,063.00 $ - Update Airport Master Plan Study
SO ORL FL MIA Miami International P 69 $ 2,790,894.00 $ 2,790,894.00 $ - Conduct Airport Master Plan Study
SO ORL FL LCQ Lake City Gateway GA 21 $ 81,000.00 $ 81,000.00 $ - Rehabilitate Runway Lighting - 10/28
SW AROK AR M73 Almyra Municipal GA 6 $ 586,125.00 $ 586,125.00 $ - Construct Taxiway, Expand Apron
SW AROK AR 7M4 Osceola Municipal GA 8 $ 235,359.00 $ 235,359.00 $ - Update Airport Master Plan Study
SW AROK AR CDH Harrell Field GA 15 $ 77,058.00 $ 77,058.00 $ - Rehabilitate Runway - 01/19, Rehabilitate Taxiway
SW AROK AR SGT Stuttgart Municipal GA 22 $ 207,968.00 $ 207,968.00 $ - Rehabilitate Runway - 09/27
SW AROK AR XNA Northwest Arkansas Regional P 50 $ 4,322,029.00 $ 4,322,029.00 $ - Expand Apron
SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 84 $ 1,220,456.00 $ 1,220,456.00 $ - Update Airport Master Plan Study
SW AROK AR VBT Bentonville Municipal/Louise M Thaden Fiel GA 11 $ 91,064.00 $ 91,064.00 $ - Remove Obstructions
SW AROK AR H35 Clarksville Municipal GA 11 $ 386,524.00 $ 386,524.00 $ - Rehabilitate Taxiway
SW AROK AR DEQ J Lynn Helms Sevier County GA 12 $ 863,911.00 $ 863,911.00 $ - Construct Taxiway, Install Taxiway Lighting
SW AROK AR LLQ Monticello Municipal/Ellis Field GA 14 $ 698,634.00 $ 698,634.00 $ - Rehabilitate Runway Lighting - 03/21, Rehabilitate Taxiway Lighting
SW AROK AR CVK Sharp County Regional GA 9 $ 491,999.00 $ 491,999.00 $ - Rehabilitate Apron, Rehabilitate Runway - 04/22
SW AROK AR MXA Manila Municipal GA 11 $ 279,754.00 $ 279,754.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
SW AROK AR 32A Danville Municipal GA 5 $ 388,119.00 $ 388,119.00 $ - Rehabilitate Runway - 11/29
SW AROK AR 9M8 Sheridan Municipal GA 8 $ 242,794.00 $ 242,794.00 $ - Construct Taxiway
SW AROK AR M36 Frank Federer Memorial GA 9 $ 172,662.00 $ 172,662.00 $ - Construct Access Road
SW AROK AR 42A Melbourne Municipal - John E Miller Field GA 15 $ 72,306.00 $ 72,306.00 $ - Construct Taxiway
SW AROK AR HRO Boone County CS 24 $ 125,400.00 $ 125,400.00 $ - Rehabilitate Runway - 18/36
SW AROK AR RUE Russellville Regional GA 14 $ 122,230.00 $ 122,230.00 $ - Acquire Land For Approaches
SW AROK AR 7M7 Piggott Municipal GA 10 $ 90,900.00 $ 90,900.00 $ - Improve Runway Safety Area - 18/36
SW AROK AR M32 Lake Village Municipal GA 11 $ 135,835.00 $ 135,835.00 $ - Rehabilitate Runway Lighting - 01/19
SW AROK AR ELD South Arkansas Regional at Goodwin Field CS 19 $ 1,181,056.00 $ 1,181,056.00 $ - Rehabilitate Apron
SW AROK AR CCA Clinton Municipal GA 13 $ 244,336.00 $ 244,336.00 $ -Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System, Install Taxiway Lighting
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 44 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW AROK AR ORK North Little Rock Municipal R 24 $ 647,146.00 $ 647,146.00 $ -
Install Runway Vertical/Visual Guidance System - 17/35, Install
Runway Vertical/Visual Guidance System - 05/23, Rehabilitate
Runway Lighting - 17/35, Rehabilitate Taxiway Lighting
SW AROK AR FSM Fort Smith Regional P 43 $ 591,785.00 $ - $ 591,785.00 Acquire Aircraft Rescue & Fire Fighting Vehicle
SW AROK AR TXK Texarkana Regional-Webb Field P 40 $ 3,193,359.00 $ - $ 3,193,359.00 Rehabilitate Runway - 04/22
SW AROK AR JBR Jonesboro Municipal CS 20 $ 386,042.00 $ 386,042.00 $ - Rehabilitate Taxiway
SW AROK AR M27 Waldron Municipal GA 9 $ 323,720.00 $ 323,720.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
SW AROK AR 6M7 Marianna/Lee County-Steve Edwards Field GA 5 $ 363,612.00 $ 363,612.00 $ -Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate
Runway - 18/36, Rehabilitate Taxiway
SW AROK AR SRC Searcy Municipal GA 22 $ 146,841.00 $ 146,841.00 $ - Rehabilitate Runway - 01/19
SW AROK AR ROG Rogers Municipal-Carter Field GA 34 $ 1,975,201.00 $ 150,211.00 $ 1,824,990.00 Rehabilitate Apron
SW AROK AR 0M0 Billy Free Municipal GA 9 $ 216,689.00 $ 216,689.00 $ - Rehabilitate Runway Lighting - 18/36, Rehabilitate Taxiway Lighting
SW AROK AR 4M8 Clarendon Municipal GA 9 $ 268,775.00 $ 268,775.00 $ - Extend Taxiway
SW AROK AR 4M1 Carroll County GA 15 $ 594,594.00 $ 594,594.00 $ - Rehabilitate Runway - 07/25
SW AROK AR 4A5 Searcy County GA 13 $ 175,860.00 $ 175,860.00 $ - Rehabilitate Apron
SW AROK AR *ARS State of Arkansas 13 $ 200,000.00 $ 200,000.00 $ - Conduct State System Plan Study
SW AROK AR CRT Z M Jack Stell Field GA 10 $ 187,677.00 $ 187,677.00 $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway
SW AROK AR 5M1 De Witt Municipal GA 9 $ 366,956.00 $ 366,956.00 $ - Expand Apron, Rehabilitate Apron
SW AROK AR ARG Walnut Ridge Regional GA 13 $ 670,207.00 $ 670,207.00 $ - Improve Airport Drainage, Rehabilitate Taxiway
SW AROK AR 7M5 Ozark-Franklin County GA 7 $ 626,134.00 $ 626,134.00 $ - Improve Airport Drainage
SW AROK AR BPK Baxter County GA 16 $ 198,972.00 $ 198,972.00 $ - Rehabilitate Apron
SW AROK AR FLP Marion County Regional GA 11 $ 158,873.00 $ 158,873.00 $ - Rehabilitate Runway - 04/22
SW AROK AR AWM West Memphis Municipal R 26 $ 249,236.00 $ 249,236.00 $ - Update Airport Master Plan Study
SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 83 $ 12,937,527.00 $ 3,091,527.00 $ 9,846,000.00 Improve Runway Safety Area - 04R/22L, Rehabilitate Taxiway
[Taxiway A], Rehabilitate Taxiway [Taxiway B]
SW AROK AR PGR Kirk Field GA 11 $ 155,628.00 $ 155,628.00 $ -Rehabilitate Apron, Rehabilitate Runway - 04/22, Rehabilitate
Taxiway
SW AROK AR 4M9 Corning Municipal GA 19 $ 294,660.00 $ 294,660.00 $ - Rehabilitate Apron
SW AROK AR BVX Batesville Regional GA 13 $ 438,971.00 $ 438,971.00 $ - Extend Taxiway [Taxilane], Extend Taxiway [Taxiway G]
SW AROK AR SUZ Saline County Regional GA 9 $ 748,373.00 $ 748,373.00 $ - Expand Apron
SW AROK AR HKA Blytheville Municipal GA 15 $ 127,648.00 $ 127,648.00 $ - Install Perimeter Fencing
SW AROK AR HOT Memorial Field CS 23 $ 46,265.00 $ 46,265.00 $ - Conduct Miscellaneous Study
SW AROK AR M18 Hope Municipal GA 10 $ 162,882.00 $ 162,882.00 $ - Install Taxiway Lighting
SW AROK AR TXK Texarkana Regional-Webb Field P 39 $ 3,403,151.00 $ 3,403,151.00 $ - Rehabilitate Runway - 04/22
SW AROK AR M19 Newport Municipal GA 10 $ 636,875.00 $ 636,875.00 $ -Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS,
Rehabilitate Runway Lighting - 18/36
SW AROK AR 7M3 Bearce GA 12 $ 168,071.00 $ 168,071.00 $ - Install Perimeter Fencing, Remove Obstructions
SW AROK AR 4M3 Carlisle Municipal GA 14 $ 85,483.00 $ 85,483.00 $ - Rehabilitate Runway - 09/27
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 45 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW AROK OK F08 Eufaula Municipal GA 9 $ 249,987.00 $ 249,987.00 $ - Expand Apron
SW AROK OK CSM Clinton-Sherman GA 6 $ 450,000.00 $ 450,000.00 $ - Rehabilitate Runway - 17R/35L
SW AROK OK RQO El Reno Regional GA 11 $ 199,800.00 $ 199,800.00 $ - Conduct Airport Master Plan Study
SW AROK OK JWG Watonga Regional GA 9 $ 45,450.00 $ 45,450.00 $ - Construct Taxiway
SW AROK OK 2K4 Scott Field GA 7 $ 190,153.00 $ 190,153.00 $ -Improve Airport Miscellaneous Improvements, Rehabilitate Apron,
Rehabilitate Runway - 17/35, Rehabilitate Taxiway
SW AROK OK OWP William R Pogue Municipal GA 18 $ 380,895.00 $ 380,895.00 $ - Install Miscellaneous NAVAIDS
SW AROK OK 1F4 Madill Municipal GA 5 $ 160,200.00 $ 160,200.00 $ - Improve Runway Safety Area - 18/36
SW AROK OK PVJ Pauls Valley Municipal GA 13 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway - 17/35
SW AROK OK GOK Guthrie-Edmond Regional GA 15 $ 175,000.00 $ 175,000.00 $ - Rehabilitate Runway - 16/34
SW AROK OK 1K4 David Jay Perry GA 9 $ 824,626.00 $ 824,626.00 $ - Construct Apron, Construct Building
SW AROK OK 17K Boise City GA 5 $ 70,200.00 $ 70,200.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
SW AROK OK FDR Frederick Regional GA 8 $ 436,104.00 $ 436,104.00 $ - Rehabilitate Taxiway
SW AROK OK LAW Lawton-Fort Sill Regional P 33 $ 719,924.00 $ 719,924.00 $ -Construct Aircraft Rescue & Fire Fighting Building, Improve Snow
Removal Equipment Building, Install Perimeter Fencing
SW AROK OK ADH Ada Municipal GA 14 $ 1,758,150.00 $ 1,108,150.00 $ 650,000.00 Improve Runway Safety Area - 17/35, Rehabilitate Runway - 17/35,
Rehabilitate Runway Lighting - 17/35
SW AROK OK HHW Stan Stamper Municipal GA 11 $ 135,398.00 $ 135,398.00 $ - Install Runway Vertical/Visual Guidance System - 17/35
SW AROK OK AQR Atoka Municipal GA 10 $ 59,850.00 $ 59,850.00 $ - Improve Runway Safety Area - 18/36, Widen Runway - 18/36
SW AROK OK 1K2 Lindsay Municipal GA 8 $ 117,675.00 $ 117,675.00 $ - Rehabilitate Runway - 01/19
SW AROK OK 2O8 Hinton Municipal GA 7 $ 346,011.00 $ 346,011.00 $ - Construct Apron, Install Runway Lighting - 17/35
SW AROK OK 2F6 Skiatook Municipal GA 9 $ 131,726.00 $ 131,726.00 $ - Rehabilitate Runway - 18/36
SW AROK OK MKO Davis Field GA 11 $ 840,010.00 $ 840,010.00 $ - Rehabilitate Runway - 04/22
SW AROK OK MLC McAlester Regional GA 13 $ 253,957.00 $ 253,957.00 $ - Improve Airport Drainage, Rehabilitate Taxiway
SW AROK OK H05 Wilburton Municipal GA 6 $ 434,250.00 $ 434,250.00 $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway - 17/35
SW AROK OK HBR Hobart Regional GA 4 $ 600,000.00 $ 600,000.00 $ - Rehabilitate Taxiway
SW AROK OK MDF Mooreland Municipal GA 4 $ 43,200.00 $ 43,200.00 $ - Rehabilitate Apron
SW AROK OK CUH Cushing Municipal GA 15 $ 82,800.00 $ 82,800.00 $ - Install Weather Reporting Equipment
SW AROK OK O45 Hooker Municipal GA 6 $ 117,374.00 $ 117,374.00 $ - Rehabilitate Runway - 17/35
SW AROK OK *OKS State of Oklahoma 15 $ 245,000.00 $ 245,000.00 $ - Update State System Plan Study
SW AROK OK 3F7 Jones Memorial GA 9 $ 175,626.00 $ 175,626.00 $ - Conduct Environmental Study
SW AROK OK RVS Richard Lloyd Jones Jr R 28 $ 1,525,545.00 $ 1,525,545.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 01L/19R,
Rehabilitate Taxiway
SW AROK OK SNL Shawnee Regional GA 16 $ 430,734.00 $ 430,734.00 $ -Construct Taxiway, Install Apron Flood Lighting, Install
Miscellaneous NAVAIDS, Install Weather Reporting Equipment
SW AROK OK 3O3 Purcell Municipal - Steven E Shephard Field GA 8 $ 531,906.00 $ 531,906.00 $ - Construct Taxiway
SW AROK OK CHK Chickasha Municipal GA 13 $ 58,590.00 $ 58,590.00 $ - Rehabilitate Access Road
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 46 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW AROK OK GUY Guymon Municipal GA 15 $ 319,576.00 $ 319,576.00 $ - Rehabilitate Apron, Rehabilitate Runway - 18/36
SW AROK OK RKR Robert S Kerr GA 11 $ 276,796.00 $ 276,796.00 $ - Construct Taxiway
SW AROK OK PVJ Pauls Valley Municipal GA 14 $ 79,067.00 $ 79,067.00 $ - Acquire Snow Removal Equipment
SW AROK OK SWO Stillwater Regional GA 21 $ 300,000.00 $ 300,000.00 $ - Construct Taxiway, Improve Airport Drainage
SW AROK OK ADM Ardmore Municipal GA 15 $ 886,428.00 $ 886,428.00 $ - Rehabilitate Runway - 17/35, Rehabilitate Taxiway
SW AROK OK AVK Alva Regional GA 12 $ 569,281.00 $ 569,281.00 $ - Extend Taxiway
SW AROK OK DUC Halliburton Field GA 14 $ 316,445.00 $ 316,445.00 $ - Install Runway Lighting - 17/35
SW AROK OK PWA Wiley Post R 22 $ 3,560,494.00 $ 2,160,494.00 $ 1,400,000.00 Rehabilitate Runway - 17L/35R, Rehabilitate Runway Lighting -
17L/35R
SW AROK OK H71 Mid-America Industrial GA 11 $ 2,050,157.00 $ 1,250,157.00 $ 800,000.00 Rehabilitate Runway - 18/36, Rehabilitate Taxiway
SW AROK OK SWO Stillwater Regional GA 22 $ 300,000.00 $ 300,000.00 $ - Install Perimeter Fencing
SW AROK OK BFK Buffalo Municipal GA 8 $ 573,099.00 $ 573,099.00 $ - Rehabilitate Runway - 17/35
SW AROK OK 1O4 Thomas Municipal GA 11 $ 222,858.00 $ 222,858.00 $ - Install Perimeter Fencing
SW AROK OK OKM Okmulgee Regional GA 21 $ 146,812.00 $ 146,812.00 $ - Install Runway Vertical/Visual Guidance System - 18/36
SW AROK OK JSV Sallisaw Municipal GA 12 $ 388,055.00 $ 388,055.00 $ - Construct Taxiway
SW AROK OK CLK Clinton Regional GA 13 $ 196,104.00 $ 196,104.00 $ - Install Perimeter Fencing
SW AROK OK OKC Will Rogers World P 67 $ 7,100,000.00 $ 7,100,000.00 $ - Rehabilitate Taxiway
SW AROK OK AXS Altus/Quartz Mountain Regional GA 14 $ 259,405.00 $ 259,405.00 $ - Install Perimeter Fencing
SW AROK OK GCM Claremore Regional GA 18 $ 1,095,623.00 $ 795,623.00 $ 300,000.00
Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System - 17/35, Install Taxiway Lighting, Rehabilitate
Runway Lighting - 17/35
SW AROK OK 3O5 Walters Municipal GA 4 $ 346,562.00 $ 346,562.00 $ - Rehabilitate Runway - 16/34
SW AROK OK ELK Elk City Regional Business GA 16 $ 69,255.00 $ 69,255.00 $ - Rehabilitate Taxiway
SW AROK OK BKN Blackwell-Tonkawa Municipal GA 11 $ 124,329.00 $ 124,329.00 $ - Rehabilitate Runway, Rehabilitate Taxiway
SW LANM LA ARA Acadiana Regional GA 18 $ 2,084,283.00 $ 1,015,550.00 $ 1,068,733.00 Rehabilitate Runway - 16/34
SW LANM LA CWF Chennault International GA 15 $ 7,374,982.00 $ 374,982.00 $ 7,000,000.00 Rehabilitate Runway - 15/33
SW LANM LA BQP Morehouse Memorial GA 15 $ 460,719.00 $ 460,719.00 $ - Improve Runway Safety Area - 16/34
SW LANM LA 5F4 Homer Municipal GA 7 $ 1,161,955.00 $ 1,161,955.00 $ -Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate
Taxiway
SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 103 $ 1,338,532.00 $ 1,338,532.00 $ - Rehabilitate Apron
SW LANM LA MSY Louis Armstrong New Orleans International P 99 $ 6,680,140.00 $ 50,140.00 $ 6,630,000.00 Construct Apron
SW LANM LA SPH Springhill GA 11 $ 460,295.00 $ 460,295.00 $ -Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway -
18/36, Rehabilitate Taxiway
SW LANM LA ASD Slidell R 20 $ 236,863.00 $ 236,863.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway
SW LANM LA HUM Houma-Terrebonne GA 27 $ 245,004.00 $ 245,004.00 $ - Construct Taxiway
SW LANM LA RSN Ruston Regional GA 18 $ 220,320.00 $ 220,320.00 $ - Update Airport Master Plan Study
SW LANM LA F87 Union Parish GA 13 $ 67,500.00 $ 67,500.00 $ - Construct Taxiway
SW LANM LA AEX Alexandria International P 64 $ 942,354.00 $ 942,354.00 $ - Rehabilitate Runway - 14/32, Remove Obstructions
SW LANM LA LCH Lake Charles Regional P 45 $ 1,303,204.00 $ 1,303,204.00 $ -Acquire Aircraft Rescue & Fire Fighting Safety Equipment,
Rehabilitate Runway Lighting - 05/23
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 47 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW LANM LA MLU Monroe Regional P 33 $ 870,660.00 $ 870,660.00 $ - Construct Service Road
SW LANM LA AEX Alexandria International P 66 $ 6,593,187.00 $ - $ 6,593,187.00 Rehabilitate Apron
SW LANM LA 4R7 Eunice GA 12 $ 851,846.00 $ 851,846.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway
SW LANM LA GAO South Lafourche Leonard Miller Jr GA 14 $ 111,042.00 $ 111,042.00 $ - Conduct Miscellaneous Study
SW LANM LA HDC Hammond Northshore Regional GA 18 $ 365,769.00 $ 365,769.00 $ - Rehabilitate Runway - 13/31
SW LANM LA 3R4 Hart GA 11 $ 148,000.00 $ 148,000.00 $ - Rehabilitate Runway - 12/30
SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 46 $ 6,878,614.00 $ 1,994,190.00 $ 4,884,424.00 Improve Runway Safety Area - 11/29, Wildlife Hazard Assessments
SW LANM LA UXL Southland Field GA 17 $ 143,842.00 $ 143,842.00 $ - Rehabilitate Runway - 15/33
SW LANM LA SHV Shreveport Regional P 60 $ 299,441.00 $ 299,441.00 $ - Rehabilitate Taxiway
SW LANM LA AEX Alexandria International P 67 $ 7,000,000.00 $ - $ 7,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SW LANM LA PTN Harry P Williams Memorial GA 16 $ 419,820.00 $ 419,820.00 $ - Rehabilitate Runway - 06/24
SW LANM LA 3F4 Vivian GA 9 $ 1,353,130.00 $ 1,353,130.00 $ - Rehabilitate Runway - 09/27
SW LANM LA HZR False River Regional GA 17 $ 235,270.00 $ 235,270.00 $ - Rehabilitate Apron
SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 104 $ 915,453.00 $ 915,453.00 $ - Update Airport Master Plan Study
SW LANM LA IYA Abbeville Chris Crusta Memorial GA 17 $ 600,000.00 $ 600,000.00 $ - Construct Taxiway
SW LANM LA 1L0 St John the Baptist Parish GA 16 $ 467,430.00 $ 467,430.00 $ -Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate
Taxiway
SW LANM LA 0R7 The Red River GA 7 $ 182,994.00 $ 182,994.00 $ - Install Perimeter Fencing, Rehabilitate Runway - 18/36
SW LANM LA TVR Vicksburg Tallulah Regional GA 14 $ 42,621.00 $ 42,621.00 $ - Install Perimeter Fencing
SW LANM LA IER Natchitoches Regional GA 20 $ 1,568,736.00 $ 1,568,736.00 $ - Rehabilitate Runway - 17/35
SW LANM LA 1R1 Jena GA 7 $ 297,560.00 $ 297,560.00 $ -Rehabilitate Runway - 17/35, Rehabilitate Taxiway, Update Airport
Master Plan Study
SW LANM LA BXA George R Carr Memorial Air Field GA 17 $ 150,000.00 $ 150,000.00 $ - Remove Obstructions
SW LANM LA L31 St Tammany Regional GA 8 $ 60,241.00 $ 60,241.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Runway Lighting - 18/36
SW LANM LA BXA George R Carr Memorial Air Field GA 18 $ 47,370.00 $ 47,370.00 $ - Construct Taxiway
SW LANM LA L38 Louisiana Regional GA 13 $ 132,323.00 $ 132,323.00 $ - Extend Runway - 17/35
SW LANM LA MSY Louis Armstrong New Orleans International P 100 $ 15,000,000.00 $ - $ 15,000,000.00 Construct Apron
SW LANM LA OPL St Landry Parish-Ahart Field GA 12 $ 83,280.00 $ 83,280.00 $ - Rehabilitate Runway - 18/36
SW LANM LA UXL Southland Field GA 18 $ 441,538.00 $ 441,538.00 $ - Rehabilitate Runway Lighting - 15/33
SW LANM LA 0R5 David G Joyce GA 10 $ 139,778.00 $ 139,778.00 $ - Rehabilitate Runway - 09/27
SW LANM LA 5R8 DeQuincy Industrial Airpark GA 16 $ 103,499.00 $ 103,499.00 $ - Update Airport Master Plan Study
SW LANM LA 3R2 Le Gros Memorial GA 11 $ 137,700.00 $ 137,700.00 $ - Rehabilitate Apron, Update Airport Master Plan Study
SW LANM LA DTN Shreveport Downtown R 24 $ 162,919.00 $ 162,919.00 $ - Rehabilitate Taxiway
SW LANM LA L39 Leesville GA 10 $ 106,028.00 $ 106,028.00 $ -Improve Runway Safety Area - 18/36, Update Airport Master Plan
Study
SW LANM LA AEX Alexandria International P 68 $ 1,252,967.00 $ 1,252,967.00 $ -Rehabilitate Runway Lighting - 14/32, Rehabilitate Runway Lighting -
18/36
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 48 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW LANM NM ABQ Albuquerque International Sunport P 48 $ 1,279,576.00 $ - $ 1,279,576.00 VALE Infrastructure
SW LANM NM E14 Ohkay Owingeh GA 11 $ 93,916.00 $ 93,916.00 $ - Conduct Airport Master Plan Study
SW LANM NM S42 Springer Municipal GA 7 $ 102,816.00 $ 102,816.00 $ - Acquire Land for Development, Install Perimeter Fencing
SW LANM NM GNT Grants-Milan Municipal GA 14 $ 62,595.00 $ 62,595.00 $ - Rehabilitate Runway - 13/31
SW LANM NM E14 Ohkay Owingeh GA 12 $ 47,861.00 $ 47,861.00 $ - Construct Snow Removal Equipment Building
SW LANM NM LRU Las Cruces International GA 29 $ 239,221.00 $ 239,221.00 $ - Install Runway Vertical/Visual Guidance System - 08/26
SW LANM NM E06 Lea County-Zip Franklin Memorial GA 7 $ 562,333.00 $ 562,333.00 $ - Rehabilitate Apron
SW LANM NM N17 Vaughn Municipal GA 9 $ 97,324.00 $ 97,324.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
SW LANM NM SVC Grant County GA 16 $ 140,156.00 $ 140,156.00 $ - Rehabilitate Runway - 08/26
SW LANM NM ABQ Albuquerque International Sunport P 47 $ 3,649,805.00 $ 1,840,614.00 $ 1,809,191.00 Rehabilitate Apron
SW LANM NM ALM Alamogordo-White Sands Regional GA 24 $ 2,083,301.00 $ 83,301.00 $ 2,000,000.00 Extend Runway - 03/21
SW LANM NM SKX Taos Regional GA 33 $ 16,162,353.00 $ 1,319,570.00 $ 14,842,783.00 Construct Runway - Plan-1
SW LANM NM CNM Cavern City Air Terminal CS 23 $ 205,658.00 $ 205,658.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
SW LANM NM 83 New Airport 8 $ 3,092,985.00 $ 3,092,985.00 $ - Construct New Airport
SW LANM NM F37 Carrizozo Municipal GA 6 $ 327,463.00 $ 327,463.00 $ - Rehabilitate Taxiway
SW LANM NM SXU Santa Rosa Route 66 GA 13 $ 89,914.00 $ 89,914.00 $ - Conduct Miscellaneous Study
SW LANM NM CNM Cavern City Air Terminal CS 24 $ 62,986.00 $ 62,986.00 $ - Install Perimeter Fencing not Required by 14 CFR 139/49 CFR 1542
SW LANM NM ATS Artesia Municipal GA 14 $ 2,068,470.00 $ 1,352,421.00 $ 716,049.00 Rehabilitate Runway - 12/30
SW LANM NM E89 Conchas Lake GA 5 $ 853,975.00 $ 853,975.00 $ - Improve Runway Safety Area - 09/27
SW LANM NM E05 Hatch Municipal GA 10 $ 95,622.00 $ 95,622.00 $ - Update Airport Master Plan Study
SW LANM NM SXU Santa Rosa Route 66 GA 14 $ 152,755.00 $ 152,755.00 $ - Install Airport Beacons, Rehabilitate Apron
SW LANM NM ALM Alamogordo-White Sands Regional GA 23 $ 1,400,000.00 $ 1,400,000.00 $ - Extend Runway - 03/21
SW LANM NM CVN Clovis Municipal GA 29 $ 172,800.00 $ 172,800.00 $ - Acquire Equipment
SW LANM NM E80 Alexander Municipal GA 13 $ 600,000.00 $ 600,000.00 $ - Construct Fuel Farm
SW LANM NM SRR Sierra Blanca Regional GA 24 $ 183,510.00 $ 183,510.00 $ - Acquire Equipment
SW LANM NM AXX Angel Fire GA 19 $ 374,599.00 $ 374,599.00 $ - Rehabilitate Taxiway
SW LANM NM N24 Questa Municipal Nr 2 GA 10 $ 299,581.00 $ 299,581.00 $ - Remove Obstructions - 17/35
SW LANM NM TCS Truth Or Consequences Municipal GA 15 $ 392,369.00 $ 392,369.00 $ -Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate
Taxiway
SW LANM NM GUP Gallup Municipal GA 24 $ 214,881.00 $ 214,881.00 $ - Rehabilitate Runway - 06/24
SW LANM NM ROW Roswell International Air Center P 29 $ 9,000,000.00 $ 1,000,000.00 $ 8,000,000.00 Rehabilitate Runway - 03/21
SW LANM NM AEG Double Eagle II R 21 $ 90,000.00 $ - $ 90,000.00 Wildlife Hazard Assessments
SW LANM NM HOB Lea County Regional P 23 $ 269,209.00 $ 269,209.00 $ - Rehabilitate Runway - 03/21
SW LANM NM 0.00E+00 Moriarty GA 14 $ 360,000.00 $ 360,000.00 $ - Rehabilitate Runway Lighting - 08/26
SW LANM NM LSB Lordsburg Municipal GA 15 $ 223,573.00 $ 223,573.00 $ - Rehabilitate Runway
SW LANM NM FMN Four Corners Regional P 39 $ 99,760.00 $ 99,760.00 $ - Acquire Land for Development
SW LANM NM FMN Four Corners Regional P 38 $ 170,149.00 $ 170,149.00 $ - Rehabilitate Taxiway
SW TEX TX DAL Dallas Love Field P 49 $ 863,445.00 $ 863,445.00 $ - Install Airfield Guidance Signs
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 49 of 57�
l
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW TEX TX *TXB Texas State Block Grant Program 91 $ 15,406,017.00 $ 15,406,017.00 $ - Non primary development projects in state block grant program
SW TEX TX IAH George Bush Intercontinental/Houston P 104 $ 2,711,250.00 $ - $ 2,711,250.00 VALE Infrastructure
SW TEX TX AFW Fort Worth Alliance R 56 $ 11,144,001.00 $ - $ 11,144,001.00 Extend Runway - 16L/34R
SW TEX TX *TXB Texas State Block Grant Program 93 $ 720,000.00 $ - $ 720,000.00 Non primary development projects in state block grant program
SW TEX TX HOU William P Hobby P 40 $ 1,575,000.00 $ - $ 1,575,000.00 VALE Infrastructure
SW TEX TX *TXB Texas State Block Grant Program 89 $ 13,640,547.00 $ 13,640,547.00 $ - Non primary development projects in state block grant program
SW TEX TX EFD Ellington R 23 $ 3,000,000.00 $ 3,000,000.00 $ - Rehabilitate Access Road
SW TEX TX ELP El Paso International P 35 $ 4,950,000.00 $ 4,950,000.00 $ - Rehabilitate Runway - 08L/26R
SW TEX TX MAF Midland International P 55 $ 673,545.00 $ 673,545.00 $ - Construct Apron, Construct Taxiway, Rehabilitate Runway - 16L/34R
SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 14 $ 4,482,353.00 $ 482,353.00 $ 4,000,000.00 Rehabilitate Taxiway
SW TEX TX IAH George Bush Intercontinental/Houston P 105 $ 450,000.00 $ - $ 450,000.00 Acquire Equipment
SW TEX TX AMA Rick Husband Amarillo International P 39 $ 2,864,394.00 $ 2,864,394.00 $ -
Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Equipment,
Conduct Miscellaneous Study, Construct Taxiway, Rehabilitate
Runway Lighting - 04/22, Update Airport Master Plan Study
SW TEX TX HRL Valley International P 57 $ 4,470,425.00 $ 4,470,425.00 $ -
Install Instrument Approach Aid - 13/31, Rehabilitate Runway
Lighting - 13/31, Rehabilitate Runway Lighting - 17R/35L,
Rehabilitate Service Road, Rehabilitate Taxiway, Rehabilitate
Taxiway Lighting
SW TEX TX GRK Robert Gray AAF P 25 $ 400,500.00 $ 400,500.00 $ - Acquire Equipment, Improve Terminal Building
SW TEX TX DRT Del Rio International CS 17 $ 1,218,040.00 $ 1,218,040.00 $ - Construct Wash Rack, Install Apron Lighting, Rehabilitate Apron
SW TEX TX DFW Dallas/Fort Worth International P 111 $ 14,000,000.00 $ - $ 14,000,000.00 Rehabilitate Taxiway
SW TEX TX ABI Abilene Regional P 45 $ 17,602,598.00 $ 1,120,683.00 $ 16,481,915.00 Rehabilitate Runway - 17R/35L
SW TEX TX DFW Dallas/Fort Worth International P 112 $ 9,003,360.00 $ 9,003,360.00 $ -Rehabilitate Runway - 17R/35L, Rehabilitate Runway Lighting -
18L/36R
SW TEX TX IAH George Bush Intercontinental/Houston P 103 $ 13,888,014.00 $ 13,888,014.00 $ - Extend Runway - 15R/33L
SW TEX TX *TXB Texas State Block Grant Program 92 $ 19,652,075.00 $ 19,652,075.00 $ - Non primary development projects in state block grant program
SW TEX TX BRO Brownsville/South Padre Island Internationa P 43 $ 1,200,000.00 $ 1,200,000.00 $ - Construct Terminal Building
SW TEX TX ACT Waco Regional P 37 $ 580,410.00 $ 580,410.00 $ - Update Airport Master Plan Study
SW TEX TX BPT Jack Brooks Regional P 31 $ 3,036,448.00 $ 1,000,000.00 $ 2,036,448.00 Rehabilitate Runway - 12/30
SW TEX TX LBB Lubbock Preston Smith International P 40 $ 16,329,362.00 $ 3,415,407.00 $ 12,913,955.00 Rehabilitate Runway - 17R/35L
SW TEX TX LRD Laredo International P 80 $ 6,000,000.00 $ - $ 6,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SW TEX TX GRK Robert Gray AAF P 24 $ 900,000.00 $ 900,000.00 $ - Update Airport Master Plan Study
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 50 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
SW TEX TX MFE McAllen Miller International P 46 $ 1,247,500.00 $ 1,247,500.00 $ -Expand Apron, Improve Airport Drainage, Rehabilitate Terminal
Building, Update Airport Master Plan Study
SW TEX TX GGG East Texas Regional P 41 $ 870,375.00 $ - $ 870,375.00 Rehabilitate Taxiway Lighting
SW TEX TX ACT Waco Regional P 36 $ 6,269,266.00 $ 419,590.00 $ 5,849,676.00 Rehabilitate Taxiway
SW TEX TX AFW Fort Worth Alliance R 55 $ 10,670,629.00 $ 670,629.00 $ 10,000,000.00 Extend Runway - 16L/34R
SW TEX TX SAT San Antonio International P 82 $ 15,000,000.00 $ - $ 15,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
SW TEX TX *TXB Texas State Block Grant Program 90 $ 26,474,547.00 $ 26,474,547.00 $ - Non primary development projects in state block grant program
SW TEX TX CLL Easterwood Field P 37 $ 1,004,172.00 $ 1,004,172.00 $ - Expand Terminal Building
SW TEX TX DAL Dallas Love Field P 48 $ 7,900,000.00 $ 900,000.00 $ 7,000,000.00 Rehabilitate Apron
SW TEX TX SAT San Antonio International P 81 $ 16,361,675.00 $ 2,361,675.00 $ 14,000,000.00 Construct Taxiway, Rehabilitate Runway Lighting, Rehabilitate
Taxiway
SW TEX TX TYR Tyler Pounds Regional P 36 $ 9,841,711.00 $ 1,152,206.00 $ 8,689,505.00 Rehabilitate Runway - 04/22
SW TEX TX *TXB Texas State Block Grant Program 94 $ 75,000.00 $ - $ 75,000.00 Non primary development projects in state block grant program
SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 15 $ 517,647.00 $ 517,647.00 $ - Construct Terminal Building
SW TEX TX LRD Laredo International P 79 $ 7,596,816.00 $ 993,216.00 $ 6,603,600.00 Rehabilitate Taxiway [Taxiway G]
SW TEX TX HOU William P Hobby P 41 $ 210,000.00 $ - $ 210,000.00 Acquire Equipment
WP HNL AS PPG Pago Pago International P 54 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Apron, Rehabilitate Runway - 05/23
WP HNL FM TKK Chuuk International GA 20 $ 32,305,535.00 $ - $ 32,305,535.00 Rehabilitate Runway - 04/22
WP HNL FM TKK Chuuk International GA 19 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan
WP HNL FM T11 Yap International GA 12 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan
WP HNL FM TTK Kosrae GA 14 $ 100,000.00 $ - $ 100,000.00 Prepare SMS Manual and Implementation Plan
WP HNL FM PNI Pohnpei International GA 16 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan
WP HNL GU GUM Guam International P 93 $ 2,000,000.00 $ - $ 2,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
WP HNL GU GUM Guam International P 91 $ 1,251,000.00 $ 1,251,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL GU GUM Guam International P 92 $ 3,341,165.00 $ 3,341,165.00 $ - Rehabilitate Runway - 06L/24R
WP HNL HI HNL Honolulu International P 122 $ 16,172,638.00 $ 16,172,638.00 $ - Widen Runway - 08L/26R
WP HNL HI JRF Kalaeloa (John Rodgers Field) R 17 $ 4,000,000.00 $ 3,179,691.00 $ 820,309.00 Construct Building
WP HNL HI HNL Honolulu International P 123 $ 1,995,000.00 $ 1,995,000.00 $ - Update Airport Master Plan Study
WP HNL HI LNY Lanai P 19 $ 819,000.00 $ 819,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL HI HNL Honolulu International P 124 $ 262,000.00 $ - $ 262,000.00 Install Noise Monitoring System
WP HNL HI MKK Molokai P 21 $ 819,000.00 $ 819,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL HI JRF Kalaeloa (John Rodgers Field) R 18 $ 3,073,000.00 $ - $ 3,073,000.00 Rehabilitate Building
WP HNL HI HNL Honolulu International P 121 $ 500,000.00 $ 500,000.00 $ - Rehabilitate Runway Lighting - 04L/22R
WP HNL HI *HIS State of Hawaii 8 $ 1,700,000.00 $ - $ 1,700,000.00 Conduct State System Plan Study
WP HNL HI KOA Kona International at Keahole P 37 $ 269,460.00 $ 269,460.00 $ - Conduct Environmental Study
WP HNL MH MAJ Marshall Islands International GA 16 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 51 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP HNL MP GSN Francisco C Ada/Saipan International P 84 $ 1,052,135.00 $ 1,052,135.00 $ - Construct Aircraft Rescue & Fire Fighting Training Facility
WP HNL MP GSN Francisco C Ada/Saipan International P 86 $ 701,554.00 $ 701,554.00 $ - Improve Terminal Building
WP HNL MP GRO Benjamin Taisacan Manglona International P 25 $ 420,000.00 $ 420,000.00 $ - Update Airport Master Plan Study
WP HNL MP GSN Francisco C Ada/Saipan International P 85 $ 700,000.00 $ 700,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
WP HNL MP GSN Francisco C Ada/Saipan International P 83 $ 1,000,000.00 $ 1,000,000.00 $ - Rehabilitate Taxiway
WP HNL MP TNI Tinian International P 25 $ 360,000.00 $ 360,000.00 $ - Acquire Equipment
WP HNL MP TNI Tinian International P 24 $ 390,348.00 $ 390,348.00 $ - Improve Aircraft Rescue & Fire Fighting Building
WP HNL MP GRO Benjamin Taisacan Manglona International P 24 $ 360,000.00 $ 360,000.00 $ - Acquire Equipment
WP HNL MP TNI Tinian International P 26 $ 420,000.00 $ 420,000.00 $ - Update Airport Master Plan Study
WP HNL PW ROR Babelthuap/Koror GA 21 $ 150,000.00 $ - $ 150,000.00 Prepare SMS Manual and Implementation Plan
WP LAX CA LGB Long Beach /Daugherty Field/ P 43 $ 834,072.00 $ - $ 834,072.00 Conduct Airport Master Plan Study
WP LAX CA BIH Eastern Sierra Regional GA 17 $ 1,422,356.00 $ 901,356.00 $ 521,000.00
Install Perimeter Fencing, Install Runway Vertical/Visual Guidance
System - 12/30, Install Runway Vertical/Visual Guidance System -
16/34, Rehabilitate Runway - 16/34
WP LAX CA SBD San Bernardino International R 27 $ 1,333,154.00 $ 281,224.00 $ 1,051,930.00 Rehabilitate Taxiway
WP LAX CA L08 Borrego Valley GA 18 $ 2,650,000.00 $ 2,650,000.00 $ - Rehabilitate Runway - 08/26
WP LAX CA TSP Tehachapi Municipal GA 15 $ 853,933.00 $ 853,933.00 $ - Rehabilitate Taxiway
WP LAX CA EMT El Monte R 16 $ 5,168,838.00 $ 5,168,838.00 $ - Rehabilitate Apron
WP LAX CA CMA Camarillo R 35 $ 241,469.00 $ 241,469.00 $ - Rehabilitate Apron
WP LAX CA O26 Lone Pine GA 11 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Runway Lighting - 16/34
WP LAX CA PSP Palm Springs International P 53 $ 10,788,409.00 $ 3,838,533.00 $ 6,949,876.00 Rehabilitate Runway - 13R/31L, Rehabilitate Runway Lighting -
13R/31L
WP LAX CA LAX Los Angeles International P 84 $ 8,000,000.00 $ - $ 8,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
WP LAX CA BFL Meadows Field P 42 $ 16,426,728.00 $ 4,668,911.00 $ 11,757,817.00 Rehabilitate Runway - 12L/30R
WP LAX CA MHV Mojave GA 29 $ 432,000.00 $ 432,000.00 $ -Install Airfield Guidance Signs, Rehabilitate Runway - 08/26,
Rehabilitate Runway Lighting - 08/26
WP LAX CA TNP Twentynine Palms GA 6 $ 54,000.00 $ 54,000.00 $ - Conduct Miscellaneous Study
WP LAX CA IZA Santa Ynez GA 14 $ 1,130,285.00 $ 1,130,285.00 $ -
Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual
Guidance System - 08/26, Rehabilitate Runway Lighting - 08/26,
Rehabilitate Taxiway Lighting, Security Enhancements
WP LAX CA RNM Ramona R 16 $ 69,217.00 $ 69,217.00 $ - Wildlife Hazard Assessments
WP LAX CA L71 California City Municipal GA 16 $ 778,865.00 $ 778,865.00 $ - Rehabilitate Taxiway
WP LAX CA BNG Banning Municipal GA 14 $ 127,170.00 $ 127,170.00 $ - Install Airfield Guidance Signs, Remove Obstructions
WP LAX CA HHR Jack Northrop Field/Hawthorne Municipal R 15 $ 54,000.00 $ 54,000.00 $ - Conduct Noise Compatibility Plan Study
WP LAX CA SNA John Wayne Airport-Orange County P 45 $ 2,643,010.00 $ 2,643,010.00 $ -Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate
Taxiway
WP LAX CA MIT Shafter-Minter Field GA 22 $ 830,427.00 $ 830,427.00 $ -Extend Taxiway, Install Runway Vertical/Visual Guidance System -
08/26
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 52 of 57�
ld
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP LAX CA 2O7 Independence GA 7 $ 303,381.00 $ 303,381.00 $ - Rehabilitate Runway - 14/32
WP LAX CA DLO Delano Municipal GA 12 $ 836,179.00 $ 836,179.00 $ -Install Perimeter Fencing, Install Weather Reporting Equipment,
Rehabilitate Apron
WP LAX CA EED Needles GA 8 $ 54,000.00 $ 54,000.00 $ - Conduct Miscellaneous Study
WP LAX CA SAN San Diego International P 74 $ 12,000,000.00 $ - $ 12,000,000.00 Noise Mitigation Measures for Residences within 65 - 69 DNL
WP LAX CA SAN San Diego International P 75 $ 4,461,937.00 $ 3,531,411.00 $ 930,526.00 Rehabilitate Runway - 09/27
WP LAX CA REI Redlands Municipal GA 14 $ 136,350.00 $ 136,350.00 $ - Install Runway Lighting - 08/26
WP LAX CA PSP Palm Springs International P 52 $ 3,114,896.00 $ 3,114,896.00 $ - Security Enhancements
WP LAX CA SBA Santa Barbara Municipal P 49 $ 3,026,481.00 $ 3,026,481.00 $ -
Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway
Lighting - 07/25, Rehabilitate Runway Lighting - 15L/33R,
Rehabilitate Runway Lighting - 15R/33L
WP LAX CA IPL Imperial County CS 32 $ 48,450.00 $ 48,450.00 $ - Rehabilitate Apron
WP LAX CA SMX Santa Maria Public/Capt G Allan Hancock Fie P 34 $ 442,085.00 $ 317,310.00 $ 124,775.00 Update Airport Master Plan Study
WP LAX CA BLH Blythe GA 9 $ 144,000.00 $ 144,000.00 $ - Rehabilitate Apron
WP LAX CA BUR Bob Hope P 59 $ 915,317.00 $ 915,317.00 $ - Rehabilitate Runway - 08/26, Rehabilitate Runway - 15/33
WP LAX CA LGB Long Beach /Daugherty Field/ P 42 $ 7,066,535.00 $ 4,601,906.00 $ 2,464,629.00 Install Perimeter Fencing required by 49 CFR 1542
WP LAX CA VCV Southern California Logistics R 23 $ 6,011,164.00 $ 1,419,825.00 $ 4,591,339.00 Rehabilitate Runway - 17/35
WP LAX CA WJF General Wm J Fox Airfield GA 17 $ 1,321,446.00 $ 150,000.00 $ 1,171,446.00 Construct Taxiway
WP LAX CA IYK Inyokern CS 30 $ 284,944.00 $ 284,944.00 $ - Install Perimeter Fencing required by 14 CFR 139
WP LAX CA L45 Bakersfield Municipal GA 19 $ 360,633.00 $ 360,633.00 $ - Rehabilitate Taxiway
WP LAX CA IPL Imperial County CS 33 $ 236,529.00 $ 236,529.00 $ -Install Runway Vertical/Visual Guidance System - 08/26, Install
Runway Vertical/Visual Guidance System - 14/32
WP LAX CA L35 Big Bear City GA 21 $ 141,750.00 $ 141,750.00 $ - Rehabilitate Runway Lighting - 08/26
WP LAX CA LAX Los Angeles International P 83 $ 10,000,000.00 $ - $ 10,000,000.00 Construct Apron, Construct Taxiway
WP LAX CA LAX Los Angeles International P 85 $ 40,811,250.00 $ 13,181,788.00 $ 27,629,462.00 Improve Runway Safety Area - 06R/24L
WP LAX CA SDM Brown Field Municipal R 17 $ 4,374,638.00 $ 450,000.00 $ 3,924,638.00 Rehabilitate Runway - 08L/26R
WP LAX CA RIV March ARB R 11 $ 2,349,653.00 $ 2,349,653.00 $ - Rehabilitate Apron
WP LAX CA BWC Brawley Municipal GA 17 $ 776,372.00 $ 776,372.00 $ - Improve Runway Safety Area - 08/26
WP PHX AZ 0V7 Kayenta GA 9 $ 382,168.00 $ 382,168.00 $ - Construct Snow Removal Equipment Building
WP PHX AZ P08 Coolidge Municipal GA 10 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Taxiway
WP PHX AZ JTC Springerville Municipal GA 24 $ 689,612.00 $ 689,612.00 $ - Improve Fuel Farm
WP PHX AZ E25 Wickenburg Municipal GA 23 $ 300,000.00 $ 300,000.00 $ - Construct Apron
WP PHX AZ CHD Chandler Municipal R 24 $ 1,262,432.00 $ 1,262,432.00 $ - Improve Airport Drainage
WP PHX AZ 1G4 Grand Canyon West P 18 $ 99,243.00 $ 99,243.00 $ - Conduct Miscellaneous Study
WP PHX AZ FFZ Falcon Field R 25 $ 1,538,231.00 $ 1,538,231.00 $ - Construct Taxiway
WP PHX AZ IFP Laughlin/Bullhead International P 46 $ 6,501,164.00 $ 1,350,164.00 $ 5,151,000.00 Extend Runway - 16/34
WP PHX AZ PRC Ernest A Love Field CS 36 $ 380,000.00 $ 380,000.00 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle
WP PHX AZ E60 Eloy Municipal GA 13 $ 225,227.00 $ 225,227.00 $ - Conduct Environmental Study
WP PHX AZ IWA Phoenix-Mesa Gateway P 37 $ 3,316,790.00 $ 3,316,790.00 $ - Rehabilitate Runway - 12C/30C
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 53 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP PHX AZ FLG Flagstaff Pulliam P 39 $ 500,000.00 $ 500,000.00 $ - Update Airport Master Plan Study
WP PHX AZ PHX Phoenix Sky Harbor International P 80 $ 1,019,900.00 $ - $ 1,019,900.00 VALE Infrastructure
WP PHX AZ GYR Phoenix Goodyear R 20 $ 4,999,000.00 $ 1,449,000.00 $ 3,550,000.00 Rehabilitate Runway - 03/21
WP PHX AZ INW Winslow-Lindbergh Regional GA 19 $ 2,403,521.00 $ 2,403,521.00 $ - Rehabilitate Runway - 04/22
WP PHX AZ CFT Greenlee County GA 13 $ 450,000.00 $ 450,000.00 $ - Rehabilitate Runway - 07/25
WP PHX AZ OLS Nogales International GA 18 $ 1,529,557.00 $ 1,529,557.00 $ - Rehabilitate Apron
WP PHX AZ FHU Sierra Vista Municipal-Libby AAF GA 29 $ 54,468.00 $ 54,468.00 $ - Strengthen Taxiway
WP PHX AZ E95 Benson Municipal GA 17 $ 247,989.00 $ 247,989.00 $ - Expand Apron, Install Miscellaneous NAVAIDS
WP PHX AZ PRC Ernest A Love Field CS 35 $ 3,539,500.00 $ 220,000.00 $ 3,319,500.00 Install Emergency Generator, Install Taxiway Lighting
WP PHX AZ TUS Tucson International P 72 $ 501,507.00 $ 1.00 $ 501,506.00 Conduct Environmental Study
WP PHX AZ TUS Tucson International P 73 $ 4,730,197.00 $ 4,730,197.00 $ - Energy Efficiency Equipment/Infrastructure
WP PHX AZ FLG Flagstaff Pulliam P 38 $ 293,500.00 $ 293,500.00 $ - Rehabilitate Runway - 03/21
WP PHX AZ SDL Scottsdale R 32 $ 2,282,904.00 $ 161,595.00 $ 2,121,309.00 Rehabilitate Taxiway
WP PHX AZ PHX Phoenix Sky Harbor International P 79 $ 22,699,973.00 $ 6,763,464.00 $ 15,936,509.00 Rehabilitate Apron
WP PHX AZ P13 San Carlos Apache GA 19 $ 519,861.00 $ 519,861.00 $ - Construct Fuel Farm
WP PHX AZ PGA Page Municipal P 29 $ 918,555.00 $ 918,555.00 $ -Construct Taxiway, Install Airfield Guidance Signs, Rehabilitate
Runway Lighting - 15/33, Rehabilitate Taxiway Lighting
WP PHX AZ PHX Phoenix Sky Harbor International P 81 $ 5,000,000.00 $ - $ 5,000,000.00 Conduct Noise Compatibility Plan Study
WP PHX AZ DVT Phoenix Deer Valley R 35 $ 6,714,250.00 $ 490,830.00 $ 6,223,420.00 Rehabilitate Apron
WP PHX AZ IGM Kingman GA 27 $ 2,680,000.00 $ 2,266,809.00 $ 413,191.00 Rehabilitate Apron, Rehabilitate Taxiway
WP PHX AZ AZC Colorado City Municipal GA 19 $ 235,999.00 $ 235,999.00 $ - Conduct Environmental Study
WP PHX AZ P52 Cottonwood GA 16 $ 104,861.00 $ 104,861.00 $ - Rehabilitate Apron
WP PHX AZ SAD Safford Regional GA 24 $ 455,539.00 $ 455,539.00 $ - Rehabilitate Runway - 12/30
WP PHX AZ 1G4 Grand Canyon West P 17 $ 72,848.00 $ 72,848.00 $ - Conduct Miscellaneous Study
WP PHX AZ GCN Grand Canyon National Park P 27 $ 6,468,000.00 $ 6,468,000.00 $ -Construct Taxiway, Install Apron Lighting, Rehabilitate Runway
Lighting, Rehabilitate Taxiway Lighting
WP PHX NV 0L7 Jean GA 4 $ 390,937.00 $ 390,937.00 $ -Rehabilitate Runway - 02R/20L, Rehabilitate Runway - 02L/20R,
Rehabilitate Taxiway, Runway Incursion Markings
WP PHX NV EKO Elko Regional P 45 $ 8,202,190.00 $ 1,000,000.00 $ 7,202,190.00 Rehabilitate Runway - 05/23
WP PHX NV LOL Derby Field GA 14 $ 416,091.00 $ 416,091.00 $ -
Install Runway Vertical/Visual Guidance System - 02/20,
Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate
Runway - 08/26, Rehabilitate Taxiway
WP PHX NV BVU Boulder City Municipal P 23 $ 478,125.00 $ 478,125.00 $ - Update Airport Master Plan Study
WP PHX NV LAS McCarran International P 82 $ 22,407,834.00 $ 6,057,834.00 $ 16,350,000.00 Rehabilitate Runway - 07L/25R, Rehabilitate Taxiway
WP PHX NV 67L Mesquite GA 14 $ 286,226.00 $ 286,226.00 $ - Update Airport Master Plan Study
WP PHX NV 1L1 Lincoln County GA 10 $ 140,254.00 $ 140,254.00 $ - Construct Fuel Farm, Install Perimeter Fencing
WP PHX NV FLX Fallon Municipal GA 17 $ 167,458.00 $ 167,458.00 $ - Rehabilitate Runway - 13/31
WP PHX NV BTY Beatty GA 15 $ 93,750.00 $ 93,750.00 $ - Install Miscellaneous NAVAIDS
WP PHX NV ELY Ely /Yelland Field/ GA 19 $ 2,110,214.00 $ 2,110,214.00 $ - Rehabilitate Runway - 18/36, Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 54 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP PHX NV 10U Owyhee GA 9 $ 531,226.00 $ 531,226.00 $ -Acquire Snow Removal Equipment, Construct Snow Removal
Equipment Building
WP PHX NV MEV Minden-Tahoe GA 27 $ 1,380,475.00 $ 1,380,475.00 $ - Rehabilitate Apron, Rehabilitate Taxiway
WP PHX NV SPZ Silver Springs GA 16 $ 164,532.00 $ 164,532.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Taxiway
WP PHX NV MEV Minden-Tahoe GA 28 $ 520,132.00 $ 520,132.00 $ - Update Airport Master Plan Study
WP PHX NV CXP Carson R 29 $ 150,000.00 $ 150,000.00 $ - Rehabilitate Apron
WP PHX NV RNO Reno/Tahoe International P 101 $ 8,553,636.00 $ 8,226,859.00 $ 326,777.00 Rehabilitate Taxiway
WP PHX NV L92 Alamo Landing Field GA 8 $ 90,023.00 $ 90,023.00 $ - Acquire Snow Removal Equipment
WP PHX NV BVU Boulder City Municipal P 22 $ 1,386,613.00 $ 1,386,613.00 $ - Improve Airport Drainage, Rehabilitate Runway - 09L/27R
WP PHX NV 06U Jackpot/Hayden Field GA 12 $ 675,000.00 $ 675,000.00 $ -Install Miscellaneous NAVAIDS, Install Runway Lighting - 15/33,
Install Runway Vertical/Visual Guidance System - 15/33
WP PHX NV RTS Reno/Stead R 34 $ 1,499,517.00 $ 1,499,517.00 $ - Rehabilitate Taxiway
WP PHX NV WMC Winnemucca Municipal GA 22 $ 75,000.00 $ 75,000.00 $ - Construct Taxiway
WP SFO CA OAK Metropolitan Oakland International P 72 $ 2,014,750.00 $ - $ 2,014,750.00 Rehabilitate Runway - 12/30
WP SFO CA D86 Sequoia Field GA 7 $ 90,000.00 $ 90,000.00 $ - Update Airport Master Plan Study
WP SFO CA D86 Sequoia Field GA 8 $ 69,000.00 $ 69,000.00 $ -Install Runway Vertical/Visual Guidance System - 13/31, Install
Weather Reporting Equipment
WP SFO CA PVF Placerville GA 15 $ 271,767.00 $ 271,767.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Taxiway
WP SFO CA O28 Ells Field-Willits Municipal GA 7 $ 26,405.00 $ 26,405.00 $ - Conduct Miscellaneous Study
WP SFO CA JAQ Westover Field Amador County GA 18 $ 50,000.00 $ 50,000.00 $ - Rehabilitate Runway - 01/19
WP SFO CA DVO Gnoss Field R 20 $ 322,524.00 $ 322,524.00 $ - Conduct Environmental Study
WP SFO CA FCH Fresno Chandler Executive R 21 $ 705,000.00 $ 705,000.00 $ - Rehabilitate Taxiway
WP SFO CA O22 Columbia GA 14 $ 181,155.00 $ 181,155.00 $ - Rehabilitate Taxiway
WP SFO CA O08 Colusa County GA 15 $ 226,208.00 $ 226,208.00 $ - Update Airport Master Plan Study
WP SFO CA O16 Garberville GA 9 $ 161,753.00 $ 161,753.00 $ - Rehabilitate Runway - 18/36
WP SFO CA DWA Yolo County GA 17 $ 552,303.00 $ 552,303.00 $ - Install Perimeter Fencing, Update Miscellaneous Study
WP SFO CA TRK Truckee-Tahoe GA 32 $ 1,309,163.00 $ 1,309,163.00 $ - Rehabilitate Runway - 02/20, Rehabilitate Taxiway
WP SFO CA MRY Monterey Regional P 62 $ 290,108.00 $ 290,108.00 $ - Conduct Environmental Study
WP SFO CA MMH Mammoth Yosemite P 33 $ 52,800.00 $ 52,800.00 $ - Conduct Miscellaneous Study
WP SFO CA CEC Jack McNamara Field P 31 $ 5,043,438.00 $ 1,000,000.00 $ 4,043,438.00 Improve Runway Safety Area - 11/29
WP SFO CA SJC Norman Y Mineta San Jose International P 87 $ 3,375,620.00 $ 96,960.00 $ 3,278,660.00 Install Perimeter Fencing required by 49 CFR 1542
WP SFO CA O27 Oakdale GA 14 $ 271,000.00 $ 271,000.00 $ - Improve Airport Erosion Control, Wildlife Hazard Assessments
WP SFO CA PAO Palo Alto Airport of Santa Clara County R 10 $ 509,585.00 $ 509,585.00 $ - Rehabilitate Apron, Wildlife Hazard Assessments
WP SFO CA JAQ Westover Field Amador County GA 17 $ 100,000.00 $ 100,000.00 $ - Install Weather Reporting Equipment
WP SFO CA TRK Truckee-Tahoe GA 34 $ 2,157,553.00 $ 2,157,553.00 $ - Rehabilitate Taxiway
WP SFO CA O60 Cloverdale Municipal GA 9 $ 246,335.00 $ 246,335.00 $ - Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 55 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP SFO CA O89 Fall River Mills GA 15 $ 30,150.00 $ 30,150.00 $ - Update Miscellaneous Study
WP SFO CA O22 Columbia GA 15 $ 345,335.00 $ 345,335.00 $ - Update Airport Master Plan Study
WP SFO CA TVL Lake Tahoe GA 37 $ 1,346,535.00 $ 1,346,535.00 $ - Rehabilitate Apron
WP SFO CA TVL Lake Tahoe GA 38 $ 72,000.00 $ 72,000.00 $ - Update Miscellaneous Study
WP SFO CA TRK Truckee-Tahoe GA 31 $ 67,392.00 $ 67,392.00 $ - Rehabilitate Apron
WP SFO CA TVL Lake Tahoe GA 39 $ 128,925.00 $ 128,925.00 $ - Conduct Miscellaneous Study
WP SFO CA O85 Benton Field GA 17 $ 34,779.00 $ 34,779.00 $ - Conduct Miscellaneous Study
WP SFO CA MCE Merced Regional/Macready Field CS 24 $ 124,260.00 $ 124,260.00 $ - Conduct Miscellaneous Study
WP SFO CA SBP San Luis County Regional P 43 $ 15,619,998.00 $ 5,882,212.00 $ 9,737,786.00 Construct Terminal Building
WP SFO CA CVH Hollister Municipal GA 18 $ 5,820,666.00 $ 3,088,474.00 $ 2,732,192.00 Rehabilitate Runway - 13/31, Rehabilitate Taxiway
WP SFO CA SJC Norman Y Mineta San Jose International P 86 $ 1,498,141.00 $ - $ 1,498,141.00 Conduct Airport Master Plan Study
WP SFO CA EKA Murray Field GA 12 $ 107,760.00 $ 107,760.00 $ - Update Miscellaneous Study
WP SFO CA MYV Yuba County GA 16 $ 144,000.00 $ 144,000.00 $ - Update Airport Master Plan Study
WP SFO CA DVO Gnoss Field R 19 $ 67,500.00 $ 67,500.00 $ - Update Miscellaneous Study
WP SFO CA PVF Placerville GA 16 $ 37,004.00 $ 37,004.00 $ - Update Miscellaneous Study
WP SFO CA SVE Susanville Municipal GA 15 $ 62,739.00 $ 62,739.00 $ - Install Runway Vertical/Visual Guidance System - 11/29
WP SFO CA CIC Chico Municipal P 35 $ 176,787.00 $ 176,787.00 $ - Update Airport Master Plan Study
WP SFO CA RDD Redding Municipal P 47 $ 545,908.00 $ 545,908.00 $ -
Acquire Handicap Passenger Lift Device, Conduct Miscellaneous
Study, Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate
Apron, Rehabilitate Taxiway
WP SFO CA SMF Sacramento International P 55 $ 7,769,912.00 $ 1,769,912.00 $ 6,000,000.00 Construct Apron
WP SFO CA FAT Fresno Yosemite International P 77 $ 10,228,351.00 $ 5,101,129.00 $ 5,127,222.00 Rehabilitate Apron
WP SFO CA SBP San Luis County Regional P 44 $ 118,266.00 $ 118,266.00 $ - Wildlife Hazard Assessments
WP SFO CA DVO Gnoss Field R 18 $ 83,160.00 $ 83,160.00 $ - Install Weather Reporting Equipment
WP SFO CA SQL San Carlos R 17 $ 250,290.00 $ 250,290.00 $ - Update Airport Master Plan Study
WP SFO CA SBP San Luis County Regional P 45 $ 6,779,405.00 $ - $ 6,779,405.00 Construct Terminal Building
WP SFO CA MMH Mammoth Yosemite P 31 $ 1,607,565.00 $ 1,607,565.00 $ - Rehabilitate Apron
WP SFO CA E36 Georgetown GA 11 $ 32,405.00 $ 32,405.00 $ - Conduct Miscellaneous Study
WP SFO CA SJC Norman Y Mineta San Jose International P 85 $ 2,521,139.00 $ 2,521,139.00 $ - Install Guidance Signs, Rehabilitate Runway - 12L/30R
WP SFO CA AAT Alturas Municipal GA 11 $ 48,600.00 $ 48,600.00 $ - Conduct Miscellaneous Study
WP SFO CA CIC Chico Municipal P 36 $ 98,139.00 $ 98,139.00 $ - Conduct Miscellaneous Study
WP SFO CA STS Charles M Schulz - Sonoma County P 49 $ 1,194,151.00 $ - $ 1,194,151.00 Improve Runway Safety Area - 14/32
WP SFO CA WLW Willows-Glenn County GA 6 $ 591,350.00 $ 591,350.00 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway
WP SFO CA O15 Turlock Municipal GA 10 $ 100,292.00 $ 100,292.00 $ - Conduct Miscellaneous Study
WP SFO CA EKA Murray Field GA 11 $ 41,342.00 $ 41,342.00 $ - Conduct Miscellaneous Study
WP SFO CA HJO Hanford Municipal GA 23 $ 499,127.00 $ 499,127.00 $ - Rehabilitate Taxiway
WP SFO CA OAR Marina Municipal GA 12 $ 1,125,725.00 $ 1,125,725.00 $ - Install Perimeter Fencing
WP SFO CA SCK Stockton Metropolitan P 35 $ 450,000.00 $ 450,000.00 $ - Update Airport Master Plan Study
WP SFO CA OAK Metropolitan Oakland International P 71 $ 9,425,485.00 $ 4,176,635.00 $ 5,248,850.00 Improve Runway Safety Area - 10R/28L
WP SFO CA AUN Auburn Municipal GA 12 $ 225,000.00 $ 225,000.00 $ - Conduct Airport Master Plan Study
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 56 of 57�
FAA- Office of Airports Report Date: 10/6/2015 FY 2015 Grants Awarded
Region ADO State LOCID Airport Service Level Grant Seq
Number AIP Federal Funds Entitlement Discretionary
Brief Description of Work
WP SFO CA GOO Nevada County Air Park GA 17 $ 157,472.00 $ 157,472.00 $ - Update Airport Master Plan Study
WP SFO CA O81 Tulelake Municipal GA 11 $ 275,189.00 $ 275,189.00 $ - Conduct Environmental Study
WP SFO CA O32 Reedley Municipal GA 17 $ 248,913.00 $ 248,913.00 $ - Install Perimeter Fencing
WP SFO CA C83 Byron R 15 $ 834,506.00 $ 834,506.00 $ -Rehabilitate Apron, Rehabilitate Runway - 05/23, Rehabilitate
Runway - 12/30, Rehabilitate Taxiway
WP SFO CA AAT Alturas Municipal GA 12 $ 82,440.00 $ 82,440.00 $ - Conduct Miscellaneous Study
WP SFO CA MOD Modesto City County-Harry Sham Field P 39 $ 3,752,183.00 $ 3,752,183.00 $ -Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Runway -
10L/28R
WP SFO CA ACV Arcata P 44 $ 80,074.00 $ 80,074.00 $ - Conduct Miscellaneous Study
WP SFO CA CPU Calaveras County-Maury Rasmussen Field GA 10 $ 365,100.00 $ 365,100.00 $ - Rehabilitate Runway - 13/31, Rehabilitate Taxiway
WP SFO CA SNS Salinas Municipal GA 24 $ 83,843.00 $ 83,843.00 $ -
Improve Airport Miscellaneous Improvements, Install Airfield
Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway
Vertical/Visual Guidance System - 13/31, Install Runway
Vertical/Visual Guidance System - 08/26, Rehabilitate Taxiway
Lighting
WP SFO CA PRB Paso Robles Municipal GA 24 $ 126,000.00 $ 126,000.00 $ - Rehabilitate Taxiway
Service Level Description:�P - Primary CS - Commercial Service R - Reliever GA - General Aviation 57 of 57�