Presentation to the Committee on AppropriationsHouse of Representatives August 6, 2014
1
I. IntroductionII. Key Features & ReformsIII. Budget DimensionsIV. Priority Programs
OUTLINE
2
Php 2.6 Trillion
Proposed National BudgetFiscal Year 2015
3
I. Introduction
4
Comparative GDP growth shows Philippines performing better in recent years
7.2
5
2.9
Credit Rating Upgrades
Baa3in October 2013
BBB-in March 2014
BBBin May 2014
Ba3in July 2009
BBin May 2009
BB-in July 2009
BBBin May 2014
BBB-in Mar 2009
6
Poverty and EmploymentThe countrys poverty incidence in terms of population has registered a decrease falling to 24.9%in first semester of 2013 from 27.9% and 28.6% in the first semesters of 2012 and 2009, respectively;
The unemployment rate declined to 7.0% in April 2014 from 7.6% in April 2013*
7
It would seem that our poverty reduction interventions are taking effect. This only shows that we need to intensify and sharpen the focus of such interventions to substantially reduce poverty.*Note: unemployment rate excludes Leyte
II. A Budget for Inclusive Development:Features & Key Reforms
8
1. Expanding with the Economy
9
1. Expanding with the Economy
10
Key Budgetary Sectors(as percent of GDP)
2. Consistent with the Fiscal Consolidation Strategy
Deficit at 2.0 % of GDP
Enabling Environment for Inclusive Development
Climate Change Adaptation and
Mitigation
3. Budget Strategy: Focus on Social Protection and Job Creation
Social Protection and Social Services
Economic Expansionand Job Creation
12
4. Focus on poverty areas and tailor-fit interventions
13
5. Increases citizensvoice on how their taxes are spent
Grassroots Participatory Budgeting From P20 B in 2014 to P22.4 B in 2015
14
6. Increases accountability for results
New feature: Outcome-basedPerformance Informed Budget
15
Construction of 31,728 classrooms Hiring of additional 39,066 teachersProvide GASTPE to 1,082,798 grantees
15,148,560 learners ages 5-11 years old are enrolled in kindergarten and elementary education 5,904,740 learners ages 12-15 years old are enrolled in kindergarten and elementary education
Cohort survival rate increased:81 % - Elementary 83 % - Secondary
7. Supports the rapid and effective delivery of public services
One-year validity of appropriations
GAA-as-release-document Procurement innovations Performance-Based Bonus (PBB)
and Performance Enhancement Incentive (PEI)
Absorptive capacity of agencies
16
III. Budget DimensionsBudget Level
By SectorTop Departments
17
2015Expenditure Program
P2,606.0 billion18.4 % of GDP
15.1% Growth from Last Year
Overhead ExpensesP80.6 billion3.1 %
Debt BurdenP399.4 billion15.3 %
Internal Revenue AllotmentP389.9 billion15.0 %
Personnel ServicesP761.7 billion29.2 %
Developmental Expenditures*P974.5 billion
37.4 %
Operations programs of the following sectors:
Economic Services P490.4 BSocial Services P328.6 BGeneral Public Services P114.2 BDefense P 41.3 B
Budget Level
*The PS requirements and overhead costs of developmental expenditures are as follows:Economic Services P32.7 billion PS and P40.7 billion overhead cost; Social Services P475.0 billion PS and P20.0 billion overhead costDefense P70.3 billion PS and P3.9 billion overhead cost; General Public Services P183.7 billion PS and P16.0 billion overhead cost
19
Top Ten Departments (2014 vs 2015)(in Billion Pesos)
20
Level Rank Level Rank
Education 1 309.5 1 365.1 1 17.9
Public Works and Highways 2 219.9 2 300.5 2 36.7
National Defense 3 123.2 4 144.0 3 16.9
Interior and Local Government 3 136.1 3 141.4 4 3.9
Social Welfare and Development 4 83.4 6 109.0 5 30.7
Health 2, 4 90.8 5 102.2 6 12.6
Agriculture 5 80.0 7 88.8 7 11.1
Transportation and Communications 2, 4 48.8 8 59.0 8 20.9
Environment and Natural Resources 3 23.9 9 21.3 9 (11.0) 6
Science and Technology 4 13.1 19.4 10 47.7
Notes:
1 Inclusive of School Building Program and transfers from MPBF2 Inclusive of budgetary support to attached corporations3 Inclusive of transfers from MPBF and PGF4 Inclusive of transfers from MPBF5 Inclusive of budgetary support to attached corporations and budgetary support to NFA, PCA and NIA
2015 Proposed Growth Rate
6 The reduction is due to DENR's lower PS requirements because of completed rationalization program, and lower requirements for cadastral survey and geo-hazard mapping activities
Particulars2014 Program
Figures indicated here are the "all in" budgets of these agencies: their agency-specific budgets plus allocations from the following special purpose funds:
Programmed Special Purpose Funds,2014-2015
21
(in Billions of Pesos)2014 2015 2014 2015I. NEW GAA 282.6 378.6 12.5 14.5
A. Lump-Sum SPFs 51.3 48.1 2.3 1.8 National Disaster Risk Reduction and Management Fund 13.0 14.0 0.6 0.5 Contingent Fund 1.0 2.0 0.0 0.1 Rehabilitation and Reconstruction Program 20.0 1.0 0.9 0.0 Allocations to LGUs (Special Shares, etc.) 17.3 31.1 0.8 1.2
B. Determined Implementing Agency/Nature ExepensesB. Disaggregated SPFs 231.3 330.5 10.2 12.7 Budgetary Support to Government Corporations 46.3 61.3 2.0 2.4 Allocations to LGUs (MMDA) 2.3 2.0 0.1 0.1 E-Government Fund 2.5 1.0 0.1 0.0 International Commitments Fund 4.8 7.4 0.2 0.3 Miscellaneous Personnel Benefits Fund 53.5 118.1 2.4 4.5 Pension and Gratuity Fund 120.5 140.6 5.3 5.4
II. Automatic Appropriations 747.0 816.0 33.0 31.3 Budgetary Support to Government Corporations 1.0 1.3 0.0 0.1 Internal Revenue Allotment (IRA) 341.5 389.9 15.1 15.0 Net Lending 25.0 26.5 1.1 1.0 Tax Expenditure Fund 26.9 25.5 1.2 1.0 Debt Service Fund-Interest Payment 352.7 372.9 15.6 14.3
Total Special Purpose Funds 1,029.6 1,194.6 45.5 45.8
PARTICULARSLevels % Share to Budget
Enabling Environment for Inclusive Development
Social Protection and Social Services
Job Generationand Economic Expansion
Climate Change Adaptation and Mitigation
IV. Priority Expenditures
22
1. Social Protection2. Universal Healthcare3. Basic Education 4. Socialized Housing
SOCIAL PROTECTIONAND SOCIAL SERVICES
23
1. Social Protection Programs
24
1. Social Protection Programs(Pantawid Pamilyang Pilipino Program)
25
Particulars 2014 2015
Total CCT Php 62,614 M Php 64,738 M
Regular CCT Php 60,611 M Php 59,788 MNo. of beneficiaries1/ 4,329,769 HHs 2/ 4,309,769 families 3/
of which: Children Aged 15 -18 (extended age) 509,366 509,366Modified CCT 4/ Php 2,003 M Php 4,950 MNo. of beneficiaries 131,963 families 126,963 families Itinerant 3,956 families 3,956 families Homeless Street Families 7,007 families 7,007 families Indigenous People 116,000 families 116,000 families
4/ Increase in budget for 2015 is due to inclusion of additional assistance package.
3/ An expected 25,000 families w ill be exiting from the program in 2015 since they no longer have children aged 0-18 years old
2/ Includes 20,000 families affected by typhoon Yolanda w ho are not covered under the existing CCT program of the DSWD
1/ Conversion of household to family as unit of measurement w ill happen in 2015 Included in Regular CCT in 2015 based on the results of the 2nd round of household assessment under the NHTS. Based on the NHT Off ice calculation, there is an estimated 1.117 family/ies per household.
1. Social Protection Programs
26
2014 2015Kalahi-CIDSS National Community-Driven Development - Php 17,513 M
Project (DSWD)No. of sub-projects covered - 6,735 No. of regions covered 14 No. of provinces covered 58 No. of municipalities covered - 826 No. of barangays covered 19,352 No. of households covered - 1,515,375
Sustainable Livelihood Program (DSWD) Php 2,439 M Php 4,943 MNo. of families served through Micro-enterprise Development
Pantawid Pamilya 77,912 265,175No. of families facilitated for employment 33,402 113,647
Social Pension for Indigent Senior Citizens (DSWD) Php 3,109 M Php 4,763 MNo. of indigent senior citizens provided with social pension* 479,080 739,609
Particulars
*The senior citizens to benefit from the social pension was expanded to cover 71 years old and above in 2015 from itsprevious year's coverage of 77 years old and above.
2. Universal Healthcare
27
2. Universal Healthcare2014 2015
National Health Insurance Program Php 35,338 M Php 37,189 MNo. of NHTS-PR Indigents covered 14.7 M 15.4 M
Health Facilities Enhancement Program* Php 13,541 M Php 13,098 M No. of Barangay Health Stations upgraded 1,365 1,242 Rural Health Units/ City Health Centers 1,028 587
LGU Hospitals 389 128
DOH Hospitals 59 19
Treatment and Rehabilitation Centers - 11
Preventive and Promotive Health ProgramHealth and Human Resource Php 2,970 M Php 4,256 M
Doctors 319 398
Nurses 11,000 12,540
Midwives 2,700 5,749
Dentists 480
National Immunization Program Php 2,970 M Php 3,336 MNo. of children fully immunized 2.7 M 2.2M
No. of pneumococcal vaccines provided
infants 333,000 429,000
senior citizens 1.2 M 1.4 M*For FYs 2010-2014, a total of P29.6 billion has been allocated by the National Government for the
construction/upgrading/rehabilitation of BHS, RHUs, LGU Hospitals and DOH Hospitals. Of the said amount,
P23.8 B or 80.2 percent has already been obligated. In terms of physical accomplishment, 2,715 health facilities
have already been completed; 1,139 health facilities are currently being constructed/upgraded/rehabilitated; and
744 and 2,316 health facilities are still under the procurement and pre-procurement stage, respectively.
Particulars
28
2. Universal Healthcare2014 2015
Family Health and Responsible Parenting Php 2,539 M Php 3,274 MOf which:
Micronutrient Supplementation Php 900 M
No. of children below 5years old provided with vitamin A supplement. 5.9M 4.4M
Family Planning Php 1,036 M
No. of women provided w/ FP commodities & services to LGUs 2.2M 2.7M
No. of women provided with sub-dermal implant for contraception 1.0M
Community Health Teams Php 250 M
No. of Community Health Teams deployed to visit 5.2M households 26,376 30,407
TB Control Program Php 1,062 M Php 1,094 MNo. of cases treated 257,972 252,913
Treatment of Public Health Diseases Php 827 M Php 788 MNo. of persons treated:
Malaria (No. of D&T cases treated) 6,962 5,978
Schistosomiasis (No. of mass drug treatment) 2.07 M 2.03M
Filariasis (No. of mass drug treatment plus ICT and disability kit) 20M 17M
Particulars
29
3. Basic Education
30
3. Basic Education2014 2015
Php 44,626 M Php 52,874 MNo. of classrooms constructed 30,000 31,728
No. of classrooms repaired 9,500 9,500
No. of water and sanitation facilities
Constructed 13,586 13,586
No. of seats procured 1.4M 1.3M
No. of technical vocational laboratories
Constructed - 455
Php 8,564 M Php 9,965 M
No. of teaching positions created 33,194 39,066
No. of non-teaching positions created 1,500 1,500
Particulars
Creation of Teaching & Non-Teaching Positions
Provision of Basic Educational Facilities
30
3. Basic Education2014 2015
Php 4,019 M Php 8,531 MNo. of information communications tech packages 15,966 24,028
Php 7,447 M Php 8,437 M
No. of grantees 995,010 1,082,798
Php 1,700 M Php 3,462 MNo. of textbooks delivered and procured 42.3M 70.5M
Php 1,968 M Php 1,968 MNo. of out-of-school youth benefited 1,000,000 1,000,000
Abot-Alam Program
Government Assistance to Students and Teachers in Private Education (GASTPE)
DepEd Computerization Program
Provision of Textbooks & Instructional Materials
Particulars
32
4. Socialized Housing
33
34
4. Socialized Housing2014 2015
Total Socialized Housing Php 17,161 M Php 10,987 M
I. Projects Php 15,862 M Php 8,674 M
1.
SHFC Php 3,665 M Php 3,743 MNo. of beneficiaries 6,400 7,754
NHA Php 5,494 M Php 3,586 MNo. of beneficiaries 16,807 8,108
2. Micro-Medium Rise Building Php 770 M* Php 770 M*
No. of Housing Units 472 472
3. Interim Shelter Fund Php 475 M Php 475 M No. of Beneficiaries of Rental Assistance 26,367 26,367
4.Php 5,458 M Php 100 M
No. of beneficiaries 20,000 341
* Includes administrative cost/social preparation
AFP/PNP/BFP/BJMP/BuCor Housing Project (NHA)
Particulars
Housing Program for ISFs Residing in Danger Areas in Metro Manila
35
4. Socialized Housing
2014 2015Php 1,300 M Php 2,313 M
1 Community Mortgage Program (SHFC) Php 1,000 M Php 1,000 MNo. of beneficiaries 16,200 16,500
2 Emergency Housing Assistance for Calamity Victims Program (NHA) Php 100 M Php 736 M
No. of beneficiaries 3,000 26,426
3 Resettlement Program (NHA) Php 200 M Php 577 MNo. of beneficiaries 3,089 7,215
ParticularsII. Programs
ECONOMIC EXPANSION AND JOB GENERATION
1. Transport Infrastructure2. Agriculture Development3. Manufacturing Resurgence4. Tourism Development5. Tech-Voc & Tertiary Education
36
1. Transport Infrastructure Program
37
Road TransportNational Roads and Bridges (DPWH) Php 130,449 M Php 174,550 M
Percentage of National Road Network
paved (Total length - 31, 242 km)
Percentage of bridge along national roads
made permanent (Total length - 345,978 lm)
Road Transport (DOTC) Php 3,765 M Php 7,019 Mof which:
Road Transport IT Infrastructure Project Php 1,298 M Php 2,098 M
Integrated Transport Systems:
South Coastal Php 2,467 M Php 800 M
South Php 1,180 M
North Php 750 M
20152014
91.2%
(28,483 km)
98.9%
(342,172 lm)
97.0%
(30,316 km)
100.0%
(345,978 lm)
Particulars
1. Transport Infrastructure Program
38
Air Transport (DOTC) Php 9,114 M Php 13,282 Mof which:
Bicol International Airport Dev't Project Php 150 M Php 1,554 M
Puerto Princesa Airport Dev't Project Php 1,700 M Php 1,552 M
Clark Airport Php 270 M Php 1,200 M
Busuanga Airport Php 16 M Php 1,022 M
General Santos Airport Php 959 M
Kalibo Airport Php 388 M Php 950 M
Iloilo International Airport Php 275 M Php 791 M
Ozamis Airport Php 695 M
Calbayog Airport Php 33 M Php 678 M
Camarines Sur (Naga) Airport Php 670 M
NAIA Capacity Expansion and
Maximization*
- Php 592 M
*Funding of 2014 requirements came from 2013 carry over
20152014Particulars
1.Transport Infrastructure Program
39
1. Transport Infrastructure Program
Php 15,003 M Php 16,853 Mof which
LRT Line 1 South (Cavite) Extension Php 5,172 M Php 4,774 M
Subsidy for Mass Transport (MRT 3) Php 4,091 M Php 4,658 M
Rehabilitation of LRT 1 and 2 - Php 2,820 M
LRT Line 2 East Extension (to Masinag) Php 265 M Php 2,400 M
MRT 3 Infrastructure Outlay - Php 804 M
LRT Line 2 West Extension Project - Php 200 M
Maritime Transport (DOTC) Php 3,167 M Php 5,142 Mof which
Philippine Ports and Coast Guard
Capability Development Project
- Php 1,944 M
Maritime Safety Capability Improvement
Project
Php 2,087 M Php 1,603 M
ParticularsRail Transport (DOTC, LRTA, PNR)
2014 2015
40
2. Agriculture Development
41
2. Agriculture Development
Rice Program (DA)Volume of Production:
Palay 19.07 M mt. 20.09 M mt.Corn Program (DA)Volume of Production:
White Corn 2.54 M mt. 2.75 M mt.
Yellow Corn 5.83 M mt. 6.27 M mt.
Cassava 2.77 M mt. 3.28 M mt.
Php 1,797 M Php 2,297 M
Particulars 2014 2015
Php 6,900 M Php 7,004 MAgricultural Commodity Programs
42
2. Agriculture DevelopmentCoconut Program (PCA)Coconut (copra)
Volume of Production 2.78 M mt. 2.81 M mt.Yield 0.87 mt./ha. 0.88 mt./ha.
Interventions:
No. of seednuts sownNo. of seedlings distributed
Coconut FertilizationNo. of salt fertilizers distributed
Coconut Agro-Industrial HubsNo. of agro-industrial hubs established
Integrated Pest Management
No. of laboratories upgraded/maintained
No. of quarantine chackpoints maintained/improved
No. of trees fertilized
No. of trees treated
Accelerated Coconut Planting and Replanting
ProjectPhp 704 M Php 838 M
39,298,400 kg. 39,754,600 kg.
6,642,400 16,477,100 Php 416 M Php 424 M
Php 4,086 M*
9,963,600 24,565,000
Php 50 M Php 250 M
Php 305 M Php 308 M5 major hubs 2 major; 12 small hubs
27
121,790
2,465,361
Particulars 2014 2015
8
Php 2,384 M
43* Includes Farm-to-Market Roads amounting to Php 1.5 billion.
Banana 8,905,120 mt. 9,172,280 mt.Cacao 6,500 mt. 7,790 mt.Coffee 81,370 mt. 84,380 mt.Mango 840,680 mt. 865,910 mt.Pineapple 2,532,170 mt. 2,608,140 mt.Rubber 476,530 mt. 496,550 mt.
Livestock and Poultry Program (DA)
Volume of production
Hog 2.05 M mt. 2.10 M mt.
Chicken 1.64 M mt. 1.72 M mt.
Php 1,350 M Php 1,526 M
Volume of Production:
2014 2015Particulars
Php 1,673 M Php 2,200 M
High Value Crops Development
Program (DA)
44
2. Agriculture Development
Fisheries Program (DA/BFAR)Volume of production:
Bangus 0.424 M mt. 0.443 M mt.
Tilapia 0.334 M mt. 0.350 M mt.Seaweeds 1.64 M mt. 1.72 M mt.
Fishery InfrastructureFish Landing (DA - BFAR)
No. of fish landing constructed
Municipal Fishports (DA - PFDA)No. of fishports constructed
No. of fisherfolk provided with technical advisory
No. of fiherfolk provided with production support/supply
No. of fisherfolk provided with fishery equipment and facilities
Php 1,290 M No allocation Php 756 M
ParticularsPhp 4,194 M Php 4,599 M
206,354
- 252
Php 480 M Php 534 M
Php 480 M
2014 2015
2621
15,064
72,471
219,387
20,404
74,848
45
2. Agriculture Development
Irrigation (NIA)41,158 has. 20,650 has.
5,999 has. 23,200 has.
Canals 184 kms. 586 kms.
Canal lining and other facilities 90 kms. 512 kms.
Service Area Restored
Repair and Maintenance
2014 2015
Service Area Generated
Php 21,112 M Php 25,983 M
Particulars
46
Notes:
Service Area Generated the area of an irrigation project wherein the facilities have already been completed and which could already be provided with irrigation and drainage system.
Service Area Restored the work being done on damaged irrigation facilities to restore water flow.
2. Agriculture Development
Farm-to-Market Roadsof which:
DA (Regular)Roads constructed 1,000 kms.
Philippine Rural Dev't Project (DA)
Roads constructed 419 kms.
Philippine Coconut Authority -- *Roads constructed
PAMANA (DA)Roads constructed 147.73 kms.
Particulars
Php 4,191 M
Php 14,497 MPhp 18,361 M
Php 4,899 M
625 kms.
Php 12,150 M Php 6,400 M
Php 1,500 M
166.71 kms.
Php 1,477 M
2014 2015
Php 1,417 M
644.9 kms.
150 kms.
47
* Funds intended for FMRs in Coconut areas are included in the FY 2014 budget of the DA for FMRs.
2. Agriculture Development
3. ManufacturingResurgence
48
3. Manufacturing Resurgence
2014 2015Php 739 M Php 874 M
No. of MSMEs assisted 90,570 100,084
Php 173 M Php 194 MNo. of plans and policies updated,
issued and disseminated50 31
Number of industry
roadmaps/feasibility studies conducted17 24
ParticularsPromotion and Development of MSMEs
Design and Development of Plans, Programs and Policies for Industry Development
49
3. Manufacturing Resurgence2014 2015Php 662 M Php 662 M
No. of jobs 12,681 14,710
No. of firms provided with S&T assistance 1,841 1,984
No. of technology intervention 3,746 4,392Research and Development Projects (DOST, PCIEERD) Php 121 M Php 132 MOf which:
Php 33 M
Small Enterprise Technology Upgrading Program (DOST)
Establishment of the Advanced Device and Materials Testing Laboratory
National R&D Program for Natural Rubber Processing and Rubber Products Manufacturing
Php 10 M Php 24 M
Establishment and Operation of the Philippine Electronics Product Development Hub
Php 22 M Php 18 M
Particulars
Php 30 M Php 30 M
Establishment and Operation of the Philippine Institute for Integrated Circuits
Php 35 M
50
4. TourismDevelopment
51
4. Tourism Development
* Amounts are also included in the Transport Infrastructure Program
Php 14,732 M Php 16,254 M
No. of road kms. 450 km 784 km
Air Transport (DOTC) * Php 6,743 M Php 9,939 M
Maritime Transport (DOTC) * Php 534 M Php 275 M
Php 3,065 M Php 3,638 M
International Arrivals 6.8 M 8.2 M
Domestic Travellers 47.7 M 51.7 M
Construction/improvement of access roads leading to declared tourism destinations (DPWH) *
Tourism Infrastructure Dev't
Tourism Promotion (DOT-OSEC & TPB)
2014 2015Particulars
52
5. Tertiary and Tech-Voc Education
53
5. Tech-Voc Education2014 2015
Training of WorkersTraining for Work Scholarship Program (TWSP) Php 1,404 M Php 2,000 M
No. of TWSP Enrollees 163,300 210,526
No. of TWSP Graduates 146,970 189,473
Special Training for Employment Program (STEP) Php 1,022 M Php 543 MNo. of beneficiaries 74,947 40,248
Private Education Student Financial Assistance (PESFA) Php 200 M Php 200 MNo. of PESFA enrollees 26,667 26,667
Particulars
54
5. Tertiary Education
55
2014 2015
Total Php 9,046 M Php 7,876 M
Expanded Students' Grants-in-Aid Program for Php 2,500 M Php 2,500 MPoverty Alleviation (SUCs)
No. of beneficiaries 40,453 40,453
Tulong Dunong Scholarship Program Php 4,124 M Php 2,459 MCHED Php 4,124 M Php 1,471 M No. of beneficiaries 340,280 121,372 SUCs - Php 988 M No. of beneficiaries - 81,540
DOST Scholarship Program (Science Education Php 1,675 M Php 2,155 M Institute)No. of beneficiaries 14,389 18,479
Students Financial Assistance Programs (CHED) Php 742 M Php 762 MNo. of beneficiaries 51,537 54,208
Particulars
CLIMATE CHANGE ADAPTATION AND
MITIGATION
1. Build Back Better2. Risk Resiliency Program
56
1. Build Back Better
57
1. Build Back BetterPhp 13,000 M Php 14,000 M *
Php 4,850 M Php 6,508 M
DA-OSEC 500 M 500 MDepEd 655 M 1000 MDOH 500 M 500 MDND-OSEC 353 M 353 MDND-OCD 530 M 530 MDPWH 650 M 800 MDSWD 663 M 1,325 MDOTC 1000 M 1,000 MNIA 500 M
Php 20,000 M Php 1,000 M
2015Particulars
Quick Response Fund
Calamity Fund
Rehabilitation and Reconstruction
Program
2014
*of which P1 B is for Peoples Survival Fund
58
2. Risk Resiliency Program
59
2. Risk Resiliency ProgramFlood Control and Drainage Projects (DPWH)
Php 33,620 M Php 44,841 M
National Greening Program (DENR-OSEC)
Php 6,205 M Php 7,022 M
Area planted (has.) 300,000 300,000
No. of seedlings produced 165 mil 222 mil
No. of extension officers hired 1,600 2,396
Unified Mapping Project (DENR-NAMRIA)
- Php 398 M
No. of topographic base maps at scale
1:10,000 produced
Nationwide Operational Assessment of Hazards (NOAH) (DOST-OSEC)
Php 921 M Php 1,153 M
2014 2015
1,500 large scale
image maps;
1,500 large scale
topographic base maps
Particulars
60
2. Risk Resiliency ProgramHazard Assessments
National Geohazards Assessment Php 431 M Php 89 Ma. Land Php 412 M Php 63 M
b. Coastal Php 19 M Php 26 MNo. of coastal municipalities assessed and
mapped (1:10,000 scale)Enhancement of Earthquake and Volcano Monitoring and Effective Utilization of Disaster Mitigation Information in the Philippines (DOST-PHILVOLCS)
Php 8 M Php 8 M
Enhancement of Volcano, Earthquake and Tsunami Warning Systems (DOST-PHILVOLCS)
Php 10 M Php 9 M
Particulars
166 coastal cities/
municpalities
122 coastal cities/
municpalities
20152014
61
ENABLING ENVIRONMENT FOR INCLUSIVE DEVELOPMENT1. Good Governance and Anti-Corruption2. Just and Lasting Peace and the Rule of Law
62
1. Good Governance and Anti-Corruption
63
1. Good Governance and Anti-Corruption2014 2015
Php 1,794 M Php 1,732 M
Personnel Services Php 1,492 M Php 1,492 M
MOOEMaintenance & Other Operating Expenditures Php 199 M Php 199 M
Capital Outlays Php 103 M Php 40 M
Of which:
Corruption Deterrence Services Php 575 M Php 543 M*Investigation Services
No. of complaints and grievances resolved acted upon 18,378 18,913
No. of fact-finding investigation completed 4,038 4,155
No. of preliminary investigations conducted 3,470 3,571
16% 16%
15% 15%
Enforcement
No. of administrative cases adjudicated 3,537 3,866
No. of criminal/civil cases prosecuted in court 2,584 2,659
85% 85%
88% 89%
15% 15%
Percentage of decided cases not resulting in quashal, outright
dismissal, or demurrer to evidence
Percentage of administrative cases adjudicated within one year
Particulars
Percentage of investigations conducted resulting in the institution of
the criminal and/or administrative cases
Percentage of investigations completed or conducted within one year
Percentage of decisions in appealed administrative decisions that have
been affirmed by the appellate courts
Ombudsman
64* Net of completed non-recurring ISSP
1. Good Governance and Anti-Corruption
2014 2015SANDIGANBAYAN
Php 405 M Php 410 MPersonnel Services Php 195 M Php 210 MMaintenance & Other Operating Expenditures Php 121 M Php 124 MCapital Outlays Php 89 M Php 85 M
Of which:
Php 290 M Php 295 M
No. of cases received/handled 3,300 3,796
No. of cases disposed 408 418
Disposition rate 12% 12%
Particulars
Adjudication of cases involving graft and corrupt practices
committed by public officials, employees and accomplices
Resolution of Graft and Corruption Cases (SANDIGANBAYAN)
Total Budget
65
1. Good Governance and Anti-Corruption
Php 12,643 M
Acquisition of additional machines * Php 11,436 M
Other expenses related to preparatory NLE Php 1,207 M
Registration Php 147 M Php 155 M
Php 1,175 M Php 936 M
Preparation for FY 2016 National and
Local Elections (NLE)
Election
20152013Particulars
2015 Sangguniang Kabataan (SK)
66
* Additional 41,800 new units at Php 90,000 each will be acquired to augment the existing 80,000 units of PCOS machines
2. Just and Lasting Peace & the Rule of Law
67
2015Total Php 2,690 M
Php 2,462 MDSWD Immediate Assistance Php 950 M
Auxillary Social Services for PWD Combatants
Sustainable Livelihood Program
Cash for Work and Cash for Training
DA Agri-enterprise support program 31 municipalities Php 880 M6 acknowledged camps
TESDA Technical Vocational Training Identified areas in Regions IX, X, XI and Php 335 Mand XII
DEPED Literacy Program (Alternative Learning System) Php 231 M
PHIC Philhealth Insurance Cards Php 50 M
CHED Php 16 M
II. Annex on Normalization Php 228 MOPAPP Implementation of Annex on Normalization Php 228 MIdentified areas in Regions IX, X, XI and
XII
Agricultural Development Support Program: SWIP, FMRs,
Farm inputs and machineries, Seeds
Identified areas in Regions IX, X, XI and
XII
Identified areas in Regions IX, X, XI and
XII
Construction and renovation of Community Based
Infrastructure: (access roads, level 2 water system)
Particulars
Identified in areas in Regions IX, X, XI
and XII.
Transformatioin of MILF Camps: CHED Scholarship Program Total of 1,550 beneficiaries in 31
municipalities
I. Socio-Economic
Support for Bangsamoro Development
68
2014 2015Php 7,215 M Php 7,301 M
Php 1,547 M Php 3,143 MCommunity-Driven Development (DA) Php 1,735 M Php 1,800 MCommunity Support (DSWD) Php 922 M Php 760 M
Community-Driven Development (ARMM) Php 2,660 M Php 655 M
Road Construction (DPWH) Php 519 M
Reforestation (DENR) Php 200 MPhp 57 M Php 100 M
Support to Indigenous Peoples (NCIP) Php 57 M Php 62 M
Health Insurance Premiums (PHIC) Php 15 M Php 48 M
Study Grant (CHED) Php 4 M Php 9 M
Solar Electrification (DOE) Php 19 M Php 3 M
Sitio Electrification and Brgy. Line Enhancement
Projects (NEA)
Particulars
Community Infrastructure and Support (DILG)Total
PAMANA Program