53
FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for 2008-2009 grant applications

FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Embed Size (px)

Citation preview

Page 1: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY:P-16 EDUCATION PARTNERSHIPS

TITLE II, PART A

Friday, September 26, 2008

Technical Assistance Workshop for 2008-2009 grant applications

Page 2: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

NO CHILD LEFT BEHIND

Elementary and Secondary Education Act (ESEA) as amended by the No Child Left Behind Act (NCLB) of 2001, Title II, Part A/Subpart 3 (Public Law 107-110)

Page 3: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

REQUEST FOR PROPOSALS

DEADLINES

Letter of Intent to Apply–use Appendix H

Friday, October 17, 2008

Grant Proposal Due by 4:30 p.m.

Friday, November 21, 2008

Page 4: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

NCLB Priorities (p1)

Increasing teacher content knowledge through partnerships that offer content institutes, workshops, and graduate courses, particularly in mathematics and science.

Increasing teacher knowledge about data-driven decision-making in the classroom.

Page 5: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Assessment and Accountability (pp3-4)ADE Website: http://Arkansas.govACTAAPADE Website – curriculum-frameworks

EPASExplore, Plan, ACT

ACSIPSchool Improvement Planning

Page 6: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Current Testing Results (p4)

Iowa Test of Basic Skills in grades 3-9 in reading, mathematics and science (07-08)

Arkansas Benchmark Exams in grades 3-8 in mathematics and literacy and grades 5 and 7 in science (07-08)

End-of-Course Examinations in algebra I, geometry, biology and 11th grade literacy (07-09)

Page 7: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

FUNDS AVAILABLE

$680,000

Page 8: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

INTENT OF THE LEGISLATION IS TO SUPPORT PROJECTS THAT:

1. Provide long-term, sustained high-quality professional learning opportunities,

2. Provide access to teachers statewide, including teachers in high-need local school districts, and

3. Result in change of teacher practice in the classroom that increases student performance in content areas.

Page 9: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

PRIORITY FUNDING (p2)

Collaborative professional learning communities that support activities in K-12 science and mathematics to improve teacher quality and student achievement

Professional learning that is sustained, intensive, and long-term

Professional learning that includes graduate course work

Page 10: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

EXAMPLES (p2)

Content workshops, institutes, graduate courses in core academic subjects of mathematics, science, social studies, English/language arts, foreign language, and the arts

Use of instructional technology within a content workshop

Use of research-based curriculum Inclusion of data-driven decision-making

opportunities

Page 11: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

ELIGIBLE APPLICANTS (p2)

FOUR-YEAR INSTITUTIONS WITH TEACHER PREPARATION PROGRAMS THAT ARE ACCREDITED

Page 12: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

ELIGIBLE PARTNERSHIPS (p2)

Eligible partnerships SHALL include:

Institution of higher education College of EducationCollege of Arts and SciencesA high-need local education

agency (LEA)

Page 13: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

HIGH-NEED LEA(a) An LEA that serves not fewer than 10,000

children from families with income below the poverty line, OR for which not less than 20 percent of the children served are from families with incomes below the poverty line; AND

(b) An LEA for which there is a high percentage of teachers not teaching in the academic subjects or grade levels that the teachers were trained to teach, OR for which there is a high percentage of teachers on emergency, provisional, or temporary certification. (8% or more)

Page 14: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

High-need LEA

Exclusively must use U. S. Census data to determine the high-need LEA

http://www.census.gov/hhes/www/saipe/saipe.html

Look for 2005 data which are estimates for census of children 5-17 in poverty for the school districts.

Page 15: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Other partners may include:

University Centers for Mathematics and Science

Community Colleges Education Renewal Zones Education Service Cooperatives Additional local school districts A non-profit organization of demonstrated

effectiveness in improving the quality of teaching

Page 16: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

SCHOOL DISTRICT CHARACTERISTICS

http://www.Arkansas.gov information on characteristics of districts, test scores, teacher quality

http://adhe.edu/nclb.html information on census data

Summarize LEA data in a table

Page 17: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

ELIGIBLE PARTICIPANTS (p3)Eligible participants SHALL include: Core Content teachers who teach in

Arkansas public schools Private school teachers in Arkansas Pre-service senior students if space

available (they pay undergraduate tuition) Out-of-state teachers who pay all

expenses on their own

Page 18: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

SPECIAL CONDITIONS(p3) Results of a current, comprehensive needs

assessment using student and teacher assessment and demographic data

Multiple evaluation components Description of methodology based on

scientifically-based research Pre- and post-testing A minimum of 20 participants 45 content, immersion contact hours and 15

follow-up, implementation hours in learning communities (60 total hours for the same 20 or more teachers)

K-12 faculty, administrators, and other personnel included in the planning

Page 19: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Pre-planning for the proposal

Identify Area of Need-What do the teachers know and what can they do?

Decide from a needs assessment what content area the grant request will support: mathematics, science, social studies, language arts, foreign language, or the arts.

Page 20: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Planning for the proposal

Identify the Desired Results-What do you want the teachers to know and be able to do?

Invite your evaluator to help brainstorm with you and design how you will know when you have the desired results.

Determine acceptable evidence.

Page 21: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Planning for the proposal

Plan Learning Experiences and Instruction-What needs to be done to help teachers learn the required knowledge and skills?

Plan for a minimum of 60 contact hours.

Page 22: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

GOAL

Write a goal that states expectations outcomes, number of teachers and timeframe.

Page 23: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

APPLICATION PROCEDURES (pp 6-9)

1. Cover sheet – Appendix A

2. Abstract – Appendix B (2 pages)-sent to the Governor

3. Table of Contents

4. Memorandum of Agreement – Appendix C

Page 24: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

APPLICATION PROCEDURES cont.

5. Project Narrative – maximum 10 pages, 12-font, double-spaced, numbered pagesa). Document demonstrated need, measurable goals and objectives, demographics of districts and teacher and student datab). Describe the plan of operation scope and sequence

action plan – use Appendix Gadministrative operating proceduresscientifically-based researchfollow-up activities

Page 25: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

APPLICATION PROCEDURES cont.

c). Special populations – teacher recruitment strategies, design description that meets needs of ALL students

d). Evaluation plan - describe proposed methods for identifying outcomes, include pre- and post test instruments, evaluation

questions, and/or surveyse). Resources and Cost effectiveness -

institutional resources, matching resources, administrative support, vitae for project staff, institutionalization of project

Page 26: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

APPLICATION PROCEDURES cont.

6. Attachments/appendices• Budget and budget justification–Appendix D/E• Vitae - MAXimum 2 pages• Current References-bibliography• Action Plan – Appendix G• Written coordination with off-site locations• Copyright/license release• Certificate of Assurances – Appendix F• Audit report (most recent institution’s A-133)

Page 27: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

What Rules Apply to the Use of NCLB funds?

No Child Left Behind Act EDGAR (Education Dept. General

Administrative Regulations) OMB Circulars (Office of

Management & Budget) The FY08-09 Request for

Proposals State financial guidelines

Page 28: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

What are the basic cost criteria?Allowable to the purposes

of the act

Necessary and reasonable

Not for general purposes

Page 29: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

FUNDING GUIDELINES Tuition support up to $600 per teacher for a 3-

hour graduate course and additional $200 in stipends for the 15 hours of follow-up OR

If no tuition support is given, then $800 per teacher can be awarded for the 60 hours (priority is given to those who also award graduate credit at no cost to the grant; faculty costs are allowed)

Teacher pays for all fees and graduate admission costs (the grant should charge a registration fee to cover these)

Tuition may not be used as matching funds

Page 30: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

FUNDING GUIDELINES No major equipment purchases allowed 8% indirect costs allowed on modified

direct costs Maximum $150 for participant materials Maximum consultant fee - $500 per day Project director cost - $2,500 Internal evaluator – at most 8% of the

grant External evaluator - $1,000 for fee and

travel

Page 31: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

What types of costs can generally be considered eligible? Personnel Services Operating Expense (look out for

supplanting) Instructional Materials (watch for

supplanting) Travel-mileage Instructional equipment (ex. calculators) Consultants Tuition and stipends as described

previously

Page 32: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

What types of costs are not eligible? Student Expenses or direct assistance to

K-12 students Entertainment or door prizes Awards and memorabilia Individual memberships Memberships with organizations that

lobby College fees Fines and penalties Insurance/self-insurance Travel out of the United States-48 states

Page 33: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

What types of costs are not eligible? Expenses that supplant Audits except single audit Contributions and donations Contingencies Facilities and furniture General advertising Alcohol Fundraising General administration

Page 34: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

When can funds be obligated? EDGAR says that a sub-grantee of the

state may not obligate funds until the later of:– The date the state may obligate

funds

OR– The date that the sub-grantee

submits its application to the state in substantially approvable form.

Page 35: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

When are funds considered obligated?

Type of Cost Obligation occursEquip. & supplies PO dateWork of employees When work is doneContracted services Date agreement

signedUtilities When usedRental When usedTravel When travel is taken(Time sheets and contracts must be used for

work done by staff or consultants; This includes matching components.)

Page 36: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Questions and Answers

May Federal funds be used to support a program that was supported last year with non-federal funds?

NO. This would be supplanting— Exception:

– Must be evaluated on a case-by-case basis

– If it would be impossible to continue the activity without the federal funds, then it may not be supplanting.

Page 37: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Questions and Answers

Can NCLB funds be co-mingled with other funds to offer professional development programs?

Funds may not be co-mingled so that they lose their identity. Expenditures must be traceable to the source of funding. However, programs can be co-funded to maximize the available funds.

Page 38: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

LOCAL SCHOOL DISTRICTS

Local school districts have over $26,000,000 in No Child Left Behind Funds.

Partnerships must include some monetary support from the local school districts.

(examples-travel, materials, stipends…)

Page 39: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

SPECIAL RULE

“No single partner in an eligible partnership receiving a grant under NCLB may use more than 50% of the grant funds made available to the partnership.”

Page 40: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

EDGAR REGULATIONSJune 23, 2005

HTTP://www.ed.gov/offices/ocfo/grants/edgar.html

Page 41: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

REPORTING REQUIREMENTS

Demographics/project data January 31 and July 31

Expenditure reports February 15 August 15

Final Project Director’s report October 30

Evaluator’s report October 1

Page 42: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

NCLB Non-Regulatory GuidanceTitle II, Part A

Access the Non-Regulatory Guidance at

www.ed.gov/programs/teacherqual/legislation.html

Current as of October 5, 2006

Definitions and explanations (See sections B, C and D)

Page 43: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

SCIENTIFICALLY-BASED RESEARCH

Scientifically-based teacher quality research is research that applies rigorous, systematic, and objective procedures to obtain valid knowledge relevant to improving student academic achievement.

Page 44: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

REVIEW PROCESS Reviewed in the Department of Higher

Education for completion of all application materials (high-need LEA definition)

Reviewed competitively by an expert panel widely representative of state agencies, higher education institutions, K-12 schools, professional organizations, and business

Reviewed using a rubric – Appendix J DO NOT ATTACH THE RUBRIC TO YOUR

PROPOSAL.

Page 45: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

AWARD ANNOUNCEMENT

Awards will be announced around March 15, 2009, subject to availability of federal funds

Page 46: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

Grant Awards

First installment-25% of award amount Additional payments-cost-

reimbursement only-detailed financial report must be submitted as well as ALL narrative, demographic, and evaluator reports

Page 47: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

ADMINISTRATION OF GRANT Each grant must have an internal

evaluator and an evaluation plan Each grant must plan for an external

evaluator provided by ADHE All records must be kept for 5 years No-cost extensions and budget

transfers may be granted with a written request

Page 48: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

POINT OF CONTACT

The point of contact for the grant is the project director. The project director must assume ALL responsibility for program administration, financial details, completion of forms and reports, and following all requirements and guidelines. The project director must attend all meetings called by the funding agency.

Page 49: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

CREDIT AND DISCLAIMER

This phrase must be included on all flyers, brochures, notices, and workshop materials:

“This project is funded in part by a federal grant under Title II of the No Child Left Behind Act (P.L. 107-110) administered by the Arkansas Department of Higher Education. $ ____ (__%) of the cost of the project was financed with federal funds. $____ (__%) was provided by non-federal sources.”

Page 50: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

PROPOSAL CHECKLIST

See Appendix K for proposal checklist.

DO NOT SEND APPENDIX K WITH YOUR PROPOSAL

Page 51: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

ELECTRONIC GRANT SUBMISSION DEADLINE

Written narrative, proposed budget, appendix A, B, and G and attachments

4:30 P.M. FRIDAY, NOVEMBER 21, 2008

Page 52: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

U.S. Mail portion of GRANT SUBMISSION DEADLINE

Appendix C with summary from each partner, Appendix F with signature and A-133 audit.

4:30 P.M. FRIDAY, NOVEMBER 21, 2008

Page 53: FY 09 IMPROVING TEACHER AND PRINCIPAL QUALITY: P-16 EDUCATION PARTNERSHIPS TITLE II, PART A Friday, September 26, 2008 Technical Assistance Workshop for

NCLB Title II, Part A PROGRAM DIRECTOR

Dr. Suzanne Mitchell

114 East Capitol Avenue

Little Rock, AR 72201

501-371-2062

[email protected]