Functional Testing of G60-A Test Results Engro

Embed Size (px)

Citation preview

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    1/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    1

     

    Customer Engro Powergen

    Relay Type Numerical Generator Management Relay

    Panel Identification Generator Protection Panel GPP

    Relay Identification Generator Protection

    Relay Make GENERAL ELECTRIC

    Model G60-G01-HCH-F8F-H67-M8F-P6D-U6D-W6C

    Serial No. AALC07000443

    Firmware Revision 5.4

    Auxiliary Voltage 125V DC

    Test Starting Date 16-04-2015

    Test Set Used Freja 300

    Tested ByMr.Mubasher Ahmed, Testing/Commissioning Engineer.Contact Number: +92 333 408 30 86

    Witnessed By Mr.Ijlal, Engro Powergen

    General Data

    Generator Genout Voltage 11.0 kV

    Connection Type WYE

    CT Ratio Genout Side (CT-6) 8000/1

    CT Ratio Neutral Side (CT-1) 8000/1

    VT Ratio (VT-G) 13.8kV/100V

    Aux. Neutral VT(NET) 13.8kV/200V

    Testing Procedure

    1. 

    Verify that the relay rear connection/wiring is according to referred drawings.2.  Power up relay at its rated voltage mentioned on face plate of relay.

    3. 

    Verify that “ In Service” green LED on face plate is lit up.

    4.  Verify that different protection units inside the relay are configured on desired

    settings.

    5. 

    Isolate the relay from field side wiring as per referred drawing.

    6.  Inject different voltage & current values (according to relay trip settings) to

    relay and check its functionality and behavior.

    7. 

     Note down all test results in tables given below.

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    2/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    2

     

    1.  Measuring / Metering Accuracy

    SourcePhase

    InvolvedRatio

    Applied Analog

    Signals (Secondary)

    Measured Value

    (Primary)

    Source 2,Line Side Ia1 8000/1 1.00 0A 7.994-0

    kA

    Source 2, Line Side Ia2 8000/1 1.00 240A 8.002-119

     kA

    Source 2, Line Side Ia3 8000/1 1.00 120A 7.994-240

    kA

    Source 1, Neutral Side Ib1 8000/1 1.00 0A 7.995-0

    kA

    Source 1, Neutral Side Ib2 8000/1 1.00 240A 8.002-119

     kA

    Source 1, Neutral Side Ib3 8000/1 1.00 120A 7.994-240

    kA

    Main PTs (VTG-P) V1 13.8kV/100V (57.70)100V 13.796-330

     kV

    Main PTs (VTG-P) V2 13.8kV/100V (57.7240)100V 13.794-90

     kV

    Main PTs (VTG-P) V3 13.8kV/100V (57.7120)100V 13.808-210

     kV

     NET VT 13.8kV/220V 1000 V 6.27-0

    kV

    2. 

    Stator Differential Protection (87G)

    Pickup = 0.083 P.U

    Slope 1 = 10 %

    Break 1 = 1.00 P.U

    Break 2 = 3.07 P.U

    Slope 2 = 60 %

    2.1  Pickup Accuracy

    Sr.I Applied at Gen out Side( (Amp) I Applied at Neutral Side (Amp)

    StatusIa1 Φ Ia2 Φ Ia3 Φ Ib1 Φ Ib2 Φ Ib3 Φ

    1 1.00 0 1.00 240 1.00 120 1.00 0 1.00 240 1.00 120 Stable

    2 0.90 0 0.90 240 0.90 120 0.810 0 0.810 240 0.810 120 No Pickup

    3 0.90 0 0.90 240 0.90 120 0.809 0 0.809 240 0.809 120 Pickup

    4 3.50 0 3.50 240 3.50 120 1.41 0 1.41 240 1.41 120 No Pickup5 3.50 0 3.50 240 3.50 120 1.40 0 1.40 240 1.40 120 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    3/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    3

     

    2.2  Operating Time Accuracy

    Sr.I Applied at Genout Side( (Amp) I Applied at Neutral Side (Amp) Measured

    Time

    (msec)

    StatusIa1 Φ Ia2 Φ Ia3 Φ Ib1 Φ Ib2 Φ Ib3 Φ

    1 1.00 0 1.00 240 1.00 120 0.00 0 0.00 240 0.00 120 13.00 Trip

    3.  Negative Phase Sequence (Generator Unbalance Alarm 46A)

    3.1  Pickup Accuracy

    Inom. = 0.830 P.U.

    Stage 2 Pickup = 10.00%

    Time Delay = 6.0 sec

    Sr.Applied Current Gen out Source 2 (Amp)

    StatusIa1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 0.050 0.050 0.050 0 120 240 No Pickup

    2 0.051 0.051 0.051 0 120 240 Pickup

    : Phase T

    OC and Stator Diff. Settings should be switched off to test this function. 

    4.  Negative Phase Sequence ( Generator Unbalance Trip 46T)

    4.1  Pickup Accuracy

    Stage 1 Pickup = 10.00 %

    Stage 1 K Value = 6.40

    Stage 1 min. = 0.250 Sec

    Stage 1 max. = 640.0 Sec

    Stage 1 K Reset = 256.0 Sec

    Sr.Applied Current Gen Out Source 2 (Amp) Status

    Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ31 0.084 0.084 0.084 0 120 240 No Pickup

    2 0.085 0.085 0.085 0 120 240 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    4/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    4

     

    4.2  Operating Time Accuracy

    Sr.Applied Current Neutral Source 2 (Amp) Measured Time

    ( Sec )Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 1.00 1.00 1.00 0 120 240 4.434

    2 1.50 1.50 1.50 0 120 240 1.994

    3 2.50 2.50 2.50 0 120 240 0.733

    5.  Sensitive Directional Power Stage 1(32 N. Stop)

    5.1  Pickup Accuracy

    Directional Power RCA = 180

    Stage 1 SMIN = 0.035 P.U

    Stage 1 Delay = 3.0 Sec

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)

    StatusV1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 0.035 0.035 0.035 180 60 300 No

    Pickup

    2 57.70 57.70 57.70 0 240 120 0.036 0.036 0.036 180 60 300 Pickup

    5.2  Operating Time Accuracy

    Sr.

    Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured

    Time (mSec)

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 0.2 0.2 0.2 180 60 300 3.074

    6.  Sensitive Directional Power Stage 2 (32-2)

    6.1  Pickup Accuracy

    Directional Power RCA = 180

    Stage 2 SMIN = -0.007

    Stage 2 Delay = 0.50 Sec

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)

    StatusV1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 0.007 0.007 0.007 180 60 300 No

    Pickup

    2 57.70 57.70 57.70 0 240 120 0.008 0.008 0.008 180 60 300 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    5/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    5

    6.2 Operating Time Accuracy

    Sr.

    Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured

    Time

    (mSec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 0.005 0.005 0.005 180 60 300 579

    7.  Loss of Field Stage 1 (40):

    7.1  Pickup Accuracy

    Center = 44.14 ohm

    Radius = 34.76 ohm

    Time Delay  = 1.000 sec

    Off Set = 9.38 ohm

    Sr.Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z

    ohmPickup

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 20 20 20 0 240 120 0.254  0.254 0.254 90 330 210 78.74  No

    2 20 20 20 0 240 120 0.255  0.255 0.255 90 330 210 78.41 Yes

    7.2  Operating Time Accuracy

    Sr.

    Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Measured

    Time

    (sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 20 20 20 0 240 120 0.51 0.51 0.51 90 330 210 1.024

    8.  Loss of Field Stage 2 (40):

    8.1  Pickup Accuracy

    Center = 80.98 ohm

    Radius = 71.60 ohm

    Time Delay  = 1.00 sec

    Off Set = 9.38

    Sr.Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z

    ohmStatus

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 20 20 20 0 240 120 0.132 0.132 0.132 90 330 210 151.52 No

    Pickup

    2 20 20 20 0 240 120 0.133 0.133 0.133 90 330 210 150.38  Yes

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    6/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    6

    8.2  Operating Time Accuracy (at 36.0 ohm)

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured

    Time (sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 20 20 20 0 240 120 0.17 0.17 0.17 90 330 210 1.034

    9. 

    Phase Over Voltage Element (59P1):

    9.1 

    Pickup Accuracy

    Pickup = 1.200 P.U.

    Time Delay = 0.50 Sec

    Sr.Applied Voltage (Volts)

    StatusV1 V2 V3 VΦ1 VΦ2 VΦ3

    1 69.18 69.18 69.18 0 240 120 No Pickup

    2 69.19 69.19 69.19 0 240 120 Pickup

    9.2 

    Operating Time Accuracy

    Sr.Applied Voltage (Volts) Measured Time

    (Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3

    1 75.00 75.00 75.00 0 240 120 0.554

    10.  Under Frequency (81-1U):

    10.1  Pickup Accuracy

    Pickup Level = 49.00 Hz

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)Status

    1 63.50 49.01 No Pickup

    2 63.50 49.00 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    7/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    7

    11.  Under Frequency (81-2U):

    11.1 Pickup Accuracy

    Pickup Level = 47.50 Hz

    Time Delay = 3.00 Sec

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)Status

    1 63.50 47.50 No Pickup

    2 63.50 47.49 Pickup

    11.2 Operating Time Accuracy

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)

    Measured Time

    ( Sec)

    1 63.50 47.00 3.10 Sec

    12.  Over-Frequency (81-1O):

    12.1 Pickup Accuracy

    Pickup Level = 51.00 Hz

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)Status

    1 63.50 50.98 No Pickup2 63.50 50.99 Pickup

    13.  Over-Frequency (81-2O):

    13.1 Pickup Accuracy

    Pickup Level = 52.50 Hz

    Time Delay = 3.00Sec

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)Status

    1 63.50 52.49 No Pickup

    2 63.50 52.50 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    8/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    8

    13.2 Operating Time Accuracy 

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)

    Measured Time

    ( Sec)

    1 63.50 53.00 3.10

    14.  Over-Frequency (81-3O):

    14.1 Pickup Accuracy

    Pickup Level = 52.50 Hz

    Time Delay = 30.00 Sec

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)Status

    1 63.50 52.49 No Pickup2 63.50 52.50 Pickup

    14.2 Operating Time Accuracy

    Sr.Voltage Applied

    (Volts)

    Applied Frequency

    (Hz)

    Measured Time

    ( Sec)

    1 63.50 53.00 30.10

     Note: Overfrequency Stage 2 & Stage 3 has same pickups

    15.  Phase Under Voltage (27-U1):

    15.1 Pickup Accuracy

    Pickup = 0.90 P.U (Phase to Ground)

    Curve = Definite Time

    Time Delay = 10.00 Sec

    Sr.Applied Voltage (Volts)

    StatusV1 V2 V3 VΦ1 VΦ2 VΦ3

    1 51.94 51.94 51.94 0 240 120 No Pickup

    2 51.93 51.93 51.93 0 240 120 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    9/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    OF 

    14 

    9

    16.  Phase Under Voltage (27-U2):

    16.1 Pickup Accuracy

    Pickup = 0.90 P.U (Phase to Ground)

    Curve = Definite Time

    Time Delay = 3.00Sec

    Sr.Applied Voltage (Volts)

    StatusV1 V2 V3 VΦ1 VΦ2 VΦ3

    1 40.41 40.41 40.41 0 240 120 No Pickup

    2 40.40 40.40 40.40 0 240 120 Pickup

    16.2 Operating Time Accuracy

    Sr.Applied Voltage (Volts) Measured Time

    (Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3

    1 30.0 30.0 30.0 0 240 120 3.034

    17.  Phase Time Over Current with Voltage Restraint (51V)

    17.1 Pickup Accuracy

    Pickup Level = 0.997 P.U

    Curve = IEEE Mod Inv

    TD Multiplier = 2.00

    Voltage Restrained = Enabled

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)

    Status

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 0.997 0.997 0.997 0 240 120 No

    Pickup

    2 57.70 57.70 57.70 0 240 120 0.998 0.998 0.998 0 240 120 Pickup

    3 0.00 0.00 0.00 0 240 120 0.100 0.100 0.100 0 240 120 No

    Pickup

    4 0.00 0.00 0.00 0 240 120 0.101 0.101 0.101 0 240 120 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    10/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    10 

    OF 

    14 

    10

     

    17.2 Operating Time Accuracy

    Sr. Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured

    Time(Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 57.70 57.70 57.70 0 240 120 2.00 2.00 2.00 0 240 120 7.574

    2 50.00 50.00 50.00 0 240 120 2.00 2.00 2.00 0 240 120 6.334

    3 40.00 40.00 40.00 0 240 120 2.00 2.00 2.00 0 240 120 5.044

    4 30.00 30.00 30.00 0 240 120 2.00 2.00 2.00 0 240 120 4.004

    5 10.00 10.00 10.00 0 240 120 2.00 2.00 2.00 0 240 120 2.294

    6 0.00 0.00 0.00 0 240 120 2.00 2.00 2.00 0 240 120 1.915

    18. Phase Instantaneous Time Over Current-1 for (50 P)

    18.1 Pickup Accuracy

    Pickup Level = 3.076 P.U 

    Time Delay = 0.01Sec

    Sr.Applied Current Source 2 (Amp) Status

    Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ31 3.077 3.077 3.077 0 240 120 No Pickup

    2 3.078 3.078 3.078 0 240 120 Pickup

    18.2 Operating Time Accuracy

    Sr.Applied Current Neutral Source 1 (Amp) Measured Time

    ( Sec )Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 4.00 4.00 4.00 0 240 120 0.041

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    11/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    11 

    OF 

    14 

    11

     

    19.  Phase Instantaneous Time Over Current-1 for (50BF)

    19.1  Operating Time Accuracy

    Pickup Level = 0.200 P.U 

    Time Delay = 0.250 Sec (in logic)

    Sr.Applied Current Source 2 (Amp) Measured Time

    (mSec)Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 1.39 1.39 1.39 0 240 120 268.9

    20. Over Excitation Protection Stage 1(24):

    20.1 Pickup Accuracy

    Pickup = 1.12 P.U.

    Curve = Definite Time

    T.D = 5.00

    Sr.Applied Voltage (Volts) Applied Freq Status

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Hz

    1 64.59 64.59 64.59 0 240 120 50 No Pickup

    2 64.60 64.60 64.60 0 240 120 50 Pickup

    20. Over Excitation Protection Stage 2(24 T):

    20.1 Pickup Accuracy

    Pickup = 1.15 pu

    Curve = Definite Time

    T.D = 3.00

    Sr.Applied Voltage (Volts) Applied Freq Status

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Hz

    1. 66.30 66.30 66.30 0 240 120 50 No Pickup

    2. 66.32 66.32 66.32 0 240 120 50 Pickup

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    12/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    12 

    OF 

    14 

    12

     

    20.2 Operating Time Accuracy

    Sr.Applied Voltage (Volts) Applied Freq Measured Time

    ( Sec )V1 V2 V3  VΦ1 VΦ2 VΦ3 Hz

    1. 72.0 72.0 72.0 0 240 120 50 3.114

    21. 3rd

     Harmonic Neutral Under Voltage Protection (27TN)

    21.1 Pickup Accuracy

    Pickup Level = 0.0087 pu

    Time Delay = 5.00 sec

    Sr. Voltage Applied Neutral Source 1 Aux VT (Volts) Status1 2.00 No Pickup

    2 1.90 Pickup

    23. Accidental Energization(AE)

    23.1 Pickup Accuracy

    AE Armed = UV & OFFLINE

    Under Voltage = 0.7 PUOver Current = 0.3 PU

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)

    Status

    V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 0.00 0.00 0.00 0 240 120 0.301 0.301 0.301 0 240 120 No

    Pickup

    2 0.00 0.00 0.00 0 240 120 0.300 0.300 0.300 0 240 120 Pickup

    3 41.50 41.50 41.50 0 240 120 0.301 0.301 0.301 0 240 120 Normal

    4 41.60 41.60 41.60 0 240 120 0.300 0.300 0.300 0 240 120De-

    latched

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    13/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    Partner GE Energy 

    SHT 

    13 

    OF 

    14 

    13

     

    23.2 Operating Time Accuracy

    Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured

    Time(msec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3

    1 0.00 0.00 0.00 0 240 120 0.80 0.80 0.80 0 240 120 23.50

    hase TOC and Stator Diff.

    Settings should

     be switched off to test this function. 

    24.  Ground Time Over Current-1 (51G)

    24.1  Pickup Accuracy

    Pickup Level = 0.065 P.U 

    Time Delay = 1.00 Sec

    Sr.Applied Ground Current (Amp) Status

    Ig IΦ1

    1 0.066 0 No Pickup

    2 0.067 0 Pickup

    24.2  Operating Time Accuracy

    Sr.Applied Ground Current (Amp) Measured Time

    (Sec)Ig IΦ1

    1 0.100 0 1.02

  • 8/16/2019 Functional Testing of G60-A Test Results Engro

    14/14

    Test Report of Generator Protection Relay (G60-A) for

    Engro Powergen Project

    EPESOL 

    (PVT) 

    LTD 

    14

     

    25. Verification of LED’s

    Sr.  Configuration Remarks

    1 Stator differential Functional

    2 Phase TOC Functional3 Phase IOC Functional

    4 Ground TOC Functional

    5 Generator Unbalance Functional

    6 Phase UV 1 Functional

    7 Phase UV 2 Functional

    8 Phase OV 1 Functional

    9 Volts Per Hz 1 Functional

    10 Volts Per Hz 2 Functional

    11 Loss of excitation Functional

    12 Accidental Energization Functional

    13 3rd

     harmonic under voltage Functional

    14 Sensitive directional Power stage 1 Functional

    15 Sensitive directional Power stage 2 Functional

    Tested By Witnessed By

    Mr.Mubasher Ahmed Mr.Ijlal

    EPESOL PVT LTD Engro Powergen