Functional Program

Embed Size (px)

Citation preview

  • 7/31/2019 Functional Program

    1/585

  • 7/31/2019 Functional Program

    2/585

  • 7/31/2019 Functional Program

    3/585

  • 7/31/2019 Functional Program

    4/585

  • 7/31/2019 Functional Program

    5/585

  • 7/31/2019 Functional Program

    6/585

  • 7/31/2019 Functional Program

    7/585

  • 7/31/2019 Functional Program

    8/585

  • 7/31/2019 Functional Program

    9/585

  • 7/31/2019 Functional Program

    10/585

  • 7/31/2019 Functional Program

    11/585

  • 7/31/2019 Functional Program

    12/585

  • 7/31/2019 Functional Program

    13/585

  • 7/31/2019 Functional Program

    14/585

  • 7/31/2019 Functional Program

    15/585

  • 7/31/2019 Functional Program

    16/585

  • 7/31/2019 Functional Program

    17/585

  • 7/31/2019 Functional Program

    18/585

  • 7/31/2019 Functional Program

    19/585

  • 7/31/2019 Functional Program

    20/585

  • 7/31/2019 Functional Program

    21/585

  • 7/31/2019 Functional Program

    22/585

  • 7/31/2019 Functional Program

    23/585

  • 7/31/2019 Functional Program

    24/585

  • 7/31/2019 Functional Program

    25/585

  • 7/31/2019 Functional Program

    26/585

  • 7/31/2019 Functional Program

    27/585

  • 7/31/2019 Functional Program

    28/585

  • 7/31/2019 Functional Program

    29/585

  • 7/31/2019 Functional Program

    30/585

  • 7/31/2019 Functional Program

    31/585

  • 7/31/2019 Functional Program

    32/585

  • 7/31/2019 Functional Program

    33/585

  • 7/31/2019 Functional Program

    34/585

  • 7/31/2019 Functional Program

    35/585

  • 7/31/2019 Functional Program

    36/585

  • 7/31/2019 Functional Program

    37/585

  • 7/31/2019 Functional Program

    38/585

  • 7/31/2019 Functional Program

    39/585

  • 7/31/2019 Functional Program

    40/585

  • 7/31/2019 Functional Program

    41/585

  • 7/31/2019 Functional Program

    42/585

  • 7/31/2019 Functional Program

    43/585

  • 7/31/2019 Functional Program

    44/585

  • 7/31/2019 Functional Program

    45/585

  • 7/31/2019 Functional Program

    46/585

  • 7/31/2019 Functional Program

    47/585

  • 7/31/2019 Functional Program

    48/585

  • 7/31/2019 Functional Program

    49/585

  • 7/31/2019 Functional Program

    50/585

  • 7/31/2019 Functional Program

    51/585

  • 7/31/2019 Functional Program

    52/585

  • 7/31/2019 Functional Program

    53/585

  • 7/31/2019 Functional Program

    54/585

  • 7/31/2019 Functional Program

    55/585

  • 7/31/2019 Functional Program

    56/585

  • 7/31/2019 Functional Program

    57/585

  • 7/31/2019 Functional Program

    58/585

  • 7/31/2019 Functional Program

    59/585

  • 7/31/2019 Functional Program

    60/585

  • 7/31/2019 Functional Program

    61/585

  • 7/31/2019 Functional Program

    62/585

  • 7/31/2019 Functional Program

    63/585

  • 7/31/2019 Functional Program

    64/585

  • 7/31/2019 Functional Program

    65/585

  • 7/31/2019 Functional Program

    66/585

  • 7/31/2019 Functional Program

    67/585

  • 7/31/2019 Functional Program

    68/585

  • 7/31/2019 Functional Program

    69/585

  • 7/31/2019 Functional Program

    70/585

  • 7/31/2019 Functional Program

    71/585

  • 7/31/2019 Functional Program

    72/585

  • 7/31/2019 Functional Program

    73/585

  • 7/31/2019 Functional Program

    74/585

  • 7/31/2019 Functional Program

    75/585

  • 7/31/2019 Functional Program

    76/585

  • 7/31/2019 Functional Program

    77/585

  • 7/31/2019 Functional Program

    78/585

  • 7/31/2019 Functional Program

    79/585

  • 7/31/2019 Functional Program

    80/585

  • 7/31/2019 Functional Program

    81/585

  • 7/31/2019 Functional Program

    82/585

  • 7/31/2019 Functional Program

    83/585

  • 7/31/2019 Functional Program

    84/585

  • 7/31/2019 Functional Program

    85/585

  • 7/31/2019 Functional Program

    86/585

  • 7/31/2019 Functional Program

    87/585

  • 7/31/2019 Functional Program

    88/585

  • 7/31/2019 Functional Program

    89/585

  • 7/31/2019 Functional Program

    90/585

  • 7/31/2019 Functional Program

    91/585

  • 7/31/2019 Functional Program

    92/585

  • 7/31/2019 Functional Program

    93/585

  • 7/31/2019 Functional Program

    94/585

  • 7/31/2019 Functional Program

    95/585

  • 7/31/2019 Functional Program

    96/585

  • 7/31/2019 Functional Program

    97/585

  • 7/31/2019 Functional Program

    98/585

  • 7/31/2019 Functional Program

    99/585

  • 7/31/2019 Functional Program

    100/585

  • 7/31/2019 Functional Program

    101/585

  • 7/31/2019 Functional Program

    102/585

  • 7/31/2019 Functional Program

    103/585

  • 7/31/2019 Functional Program

    104/585

  • 7/31/2019 Functional Program

    105/585

  • 7/31/2019 Functional Program

    106/585

  • 7/31/2019 Functional Program

    107/585

  • 7/31/2019 Functional Program

    108/585

  • 7/31/2019 Functional Program

    109/585

  • 7/31/2019 Functional Program

    110/585

  • 7/31/2019 Functional Program

    111/585

  • 7/31/2019 Functional Program

    112/585

  • 7/31/2019 Functional Program

    113/585

  • 7/31/2019 Functional Program

    114/585

  • 7/31/2019 Functional Program

    115/585

  • 7/31/2019 Functional Program

    116/585

  • 7/31/2019 Functional Program

    117/585

  • 7/31/2019 Functional Program

    118/585

  • 7/31/2019 Functional Program

    119/585

  • 7/31/2019 Functional Program

    120/585

  • 7/31/2019 Functional Program

    121/585

  • 7/31/2019 Functional Program

    122/585

  • 7/31/2019 Functional Program

    123/585

  • 7/31/2019 Functional Program

    124/585

  • 7/31/2019 Functional Program

    125/585

  • 7/31/2019 Functional Program

    126/585

  • 7/31/2019 Functional Program

    127/585

  • 7/31/2019 Functional Program

    128/585

  • 7/31/2019 Functional Program

    129/585

  • 7/31/2019 Functional Program

    130/585

  • 7/31/2019 Functional Program

    131/585

  • 7/31/2019 Functional Program

    132/585

  • 7/31/2019 Functional Program

    133/585

  • 7/31/2019 Functional Program

    134/585

  • 7/31/2019 Functional Program

    135/585

  • 7/31/2019 Functional Program

    136/585

  • 7/31/2019 Functional Program

    137/585

  • 7/31/2019 Functional Program

    138/585

  • 7/31/2019 Functional Program

    139/585

  • 7/31/2019 Functional Program

    140/585

  • 7/31/2019 Functional Program

    141/585

  • 7/31/2019 Functional Program

    142/585

  • 7/31/2019 Functional Program

    143/585

  • 7/31/2019 Functional Program

    144/585

  • 7/31/2019 Functional Program

    145/585

  • 7/31/2019 Functional Program

    146/585

  • 7/31/2019 Functional Program

    147/585

  • 7/31/2019 Functional Program

    148/585

  • 7/31/2019 Functional Program

    149/585

  • 7/31/2019 Functional Program

    150/585

  • 7/31/2019 Functional Program

    151/585

  • 7/31/2019 Functional Program

    152/585

  • 7/31/2019 Functional Program

    153/585

  • 7/31/2019 Functional Program

    154/585

  • 7/31/2019 Functional Program

    155/585

  • 7/31/2019 Functional Program

    156/585

  • 7/31/2019 Functional Program

    157/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 154

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)

    Emergency call Razor outlet Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit Shower unit

    ROOM NAME: Patient 1-Bed Isolation

    ROOM NO: IP-03.07 NSF: 186

    FUNCTION: To provide a private bedroom for an isolation inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Locate the bathroom on the outside wall.

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Clothes closet Window between corridor and room

    with covering.Privacy curtain and track

    MAJOR EQUIPMENT Electrical bed 8 long

    FURNISHINGS Overbed table Non-tilt step stool Mirror Sharps containerBedside cabinet Television wall mounted Tackboard Soap dispenserPatient lounge chair Paper towel dispenser Waste receptacle Visitors chair

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet Nurse call system Overbed lightEmergency outlets Night light Examination lightExtra receptacles on eachside of bed

    2 computer accessconnections

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)1 oxygen outlet Handwash sink 1 medical gas outlet 1 vacuum outletThis room requiresspecial ventilation

    ROOM NAME: Ensuite Bathroom

    ROOM NO: IP-03.08 NSF: 60

    FUNCTION: Bathroom facility for patient(s)

  • 7/31/2019 Functional Program

    158/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 155

    OCCUPANCY : Patient and nurse TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Privacy lock with emergency

    access

    Grab bars

    Coat hook Storage for extra bedpans Intravenous hook

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Razor outlet Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit Shower unit

    ROOM NAME: Isolation Ante Room

    ROOM NO: IP-03.09 NSF: 80

    FUNCTION: Space for caregivers and visitors to gown/degown

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Counter with sink Window into bedroom Shelving with doors

    FURNISHINGS Soap dispenser Waste receptacle Paper towel dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Intercom to bedroom

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink This room requires

    special ventilation

    ROOM NAME: Day Surgery Stay Extended

    ROOM NO: IP-03.10 NSF: 400

    FUNCTION: This is an extended day surgery recovery room to foster one-day stays for patients whocould be discharged from day surgery in 12 16 hours.

    OCCUPANCY : 4 sites TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)4 clothes lockers 4 cubicle curtain and tracks

  • 7/31/2019 Functional Program

    159/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 156

    MAJOR EQUIPMENT 4 stretchers

    FURNISHINGS

    4 overbed tables Non-tilt step stool Mirror Sharps container4 bedside cabinets 4 wall mounted televisions Tackboard Soap dispenser4 visitors chairs Paper towel dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)4 telephone outlets 4 overbed lights 4 nurse call systems Night light

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)4 oxygen outlets Handwash sink 4 vacuum outlets 4 medical gas outlets

    ROOM NAME: Ensuite Extended Day Bathroom ROOM NO: IP-03.11 NSF: 40

    FUNCTION: Bathroom facility for patient(s)

    OCCUPANCY : Patient and nurse TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Privacy lock with emergency

    accessGrab bars

    Coat hook Storage for extra bedpans Intravenous hook

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Razor outlet Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit Shower unit

    ROOM NAME: Assisted Tub

    ROOM NO: IP-03.12 NSF: 160FUNCTION: Patient bathing

    OCCUPANCY : 1 patient; 1-2 staff TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shelves

    MAJOR EQUIPMENT

  • 7/31/2019 Functional Program

    160/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 157

    Patient lift

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Assist tub Floor drain

    ROOM NAME: Assisted Shower

    ROOM NO: IP-03.13 NSF: 80

    FUNCTION: Shower for inpatients

    OCCUPANCY : 1 patient; 1-2 staff TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Sloped floor for drainage

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Shower

    ROOM NAME: Team Workstation

    ROOM NO: IP-03.14 NSF: 410FUNCTION: Space for care team to chart, prepares requisitions, and makes phone calls

    OCCUPANCY : 1 to 8 People TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Combines visibility of patient bedrooms with confidentiality2 Visible at entrance to unit and into the two observation bedrooms.3 One area segregated for the ward clerk and a shared space for the clinical pharmacist

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)

    Casework Shelving Pneumatic tube station

    MAJOR EQUIPMENT Addressograph

    FURNISHINGS Filing cabinets White board Bulletin board Waste receptacleRecycling bin

  • 7/31/2019 Functional Program

    161/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 158

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Data outlets 6 portable computers

    with docksShredder Fax machine

    4 telephones 1 portable phone Printer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Pneumatic tube station

    ROOM NAME: Medication Preparation

    ROOM NO: IP-03.15 NSF: 120

    FUNCTION: To prepare and control medications for patients

    OCCUPANCY : 1 3 Staff TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with counter Narcotics cabinet Cupboards for storageShelving for storage Security lock and swipe card access

    MAJOR EQUIPMENT 3 medication carts Refrigerator with alarm

    and internal lock box.IV Cart (3x5)

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacleWhiteboard Tackboard

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Electrical receptacles

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink

    ROOM NAME: Dictation Station

    ROOM NO: IP-03.16 NSF: 20

    FUNCTION: Space for dictation and/or input to computer

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Quiet location

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Counter with sidewalls

  • 7/31/2019 Functional Program

    162/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 159

    FURNISHINGS Chair

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)

    Data outlet Computer Telephone Dictation outlet

    ROOM NAME: Conference

    ROOM NO: IP-03.17 NSF: 150

    FUNCTION: To conduct meetings

    OCCUPANCY : 1 to 10 people TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Projector screen

    FURNISHINGS Meeting table White board 10 Chairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Dim lighting Electrical receptacles Telephone Telehealth hookupConference call connection Intercom to nurse call Network connection

    ROOM NAME: Exam / Consult

    ROOM NO: IP-03.18 NSF: 120

    FUNCTION: To examine/consult patientOCCUPANCY : Patient, Nurse, Doctor TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with countertop Storage cupboard above

    MAJOR EQUIPMENT Diagnostic set wall mtd Blood pressure apparatus

    FURNISHINGS

    Exam table Waste receptacle Adjustable stool Soap dispenserPaper towel dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Examination light Electrical receptacles Nurse/emergency call Mobile exam light

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink 1 oxygen outlet 1 vacuum outlet 1 medical air outlet

  • 7/31/2019 Functional Program

    163/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 160

    ROOM NAME: Clean Utility

    ROOM NO: IP-03.19 NSF: 180

    FUNCTION: For storage of clean/sterile supplies and minor equipment

    OCCUPANCY : 1 3 Staff TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with countertopCupboards above

    FURNISHINGS Medical/surgical supplycart (3x5)

    Shelving for disposableitems

    Soap dispenser 4 utility carts (3x2)

    Sterile supply cart (3x5) Dressing cart Paper towel dispenser IV cart (3x5)

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Warming cabinet Electrical receptacles Hot pack machine

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink

    ROOM NAME: Soiled Utility

    ROOM NO: IP-03.20 NSF: 180

    FUNCTION: Room to store soiled linen, garbage and recycling for pickup.

    OCCUPANCY

    :1 to 2 People

    TIME OF

    USE

    :7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 This room will be rectangular in shape to optimize on use of wall space for carts and stands.

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)SS sink unit with countertop

    FURNISHINGS 2 garbage bag stands 3 recyclable containers Shelving dirty supplies Paper towel dispenser6 soiled linen stands Soap dispenser 3 commode chairs 10 IV pumps

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Outlets for IV pumps

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Flushing service sink Sink

  • 7/31/2019 Functional Program

    164/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 161

    ROOM NAME: Linen Storage

    ROOM NO: IP-03.21 NSF: 80

    FUNCTION: To store clean linen exchange carts

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    MAJOR EQUIPMENT 2 linen carts

    FURNISHINGS Shelving

    ROOM NAME: Equipment Storage

    ROOM NO: IP-03.22 NSF: 160

    FUNCTION: To store the medical equipment and furniture used in the department or on the unit

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 This room will be rectangular in shape to optimize on use of wall space for equipment.

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shelving (8)

    MAJOR EQUIPMENT 10 IV pumps 2 rollaway cots 4 floor fans 2 geri chairs

    FURNISHINGS Scale Patient lift 4 folded wheelchairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Extra receptacles 10 outlets for IV pumps

    ROOM NAME: Family Quiet Room

    ROOM NO: IP-03.23 NSF: 120

    FUNCTION: Provide privacy for families in crisis

    OCCUPANCY : Up to 6 people TIME OF USE : 7 Days a Week -0000-2400

    FURNISHINGS 6 comfortable chairs Lamp 2 side tables Coffee table

  • 7/31/2019 Functional Program

    165/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 162

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone Dimmer light

    ROOM NAME: Nourishment Centre ROOM NO: IP-03.25 NSF: 120

    FUNCTION: Place for staff, visitors and patients to prepare light snacks

    OCCUPANCY : 1-2 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 This room will be rectangular in shape to optimize on use of wall space for carts.

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Counter with sink cupboard aboveand below

    MAJOR EQUIPMENT Refrigerator 2 rethermalization carts (2x3) Toaster

    FURNISHINGS Soap dispenser Paper towel dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Ice machine Extra receptacles Microwave

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink Hot water tap

    ROOM NAME: Emergency Cart Alcove

    ROOM NO: IP-03.26 NSF: 20

    FUNCTION: Storage for emergency cart

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    MAJOR EQUIPMENT Emergency cart

    ROOM NAME: Stretcher Alcove

    ROOM NO: IP-03.27 NSF: 50

    FUNCTION: Storage for 2 stretchers

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

  • 7/31/2019 Functional Program

    166/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 163

    MAJOR EQUIPMENT 2 stretchers

    ROOM NAME: Janitor Closet

    ROOM NO: IP-03.28 NSF: 40

    FUNCTION: To hold housekeeping equipment and supplies

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Floor sink and drain Shelf unit for supplies Hanging hooks

    MAJOR EQUIPMENT Housekeeping cart Floor cleaning bucket

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Hot and cold water supplywith hose attachment

    ROOM NAME: Patient Lounge

    ROOM NO: IP-03.29 NSF: 200

    FUNCTION: Space for patients to relax

    OCCUPANCY : 1 to 10 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Home- like atmosphere2 Natural lighting

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Magazine/pamphlet rack

    FURNISHINGS 7 chairs Sofa 2 end tables Coffee table

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Data outlet Telephone Internet access TVNurse call

    ROOM NAME: Staff Bathroom

    ROOM NO: IP-03.30 NSF: 40

    FUNCTION: Bathroom for staff

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

  • 7/31/2019 Functional Program

    167/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 164

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Towel bar Coat hookPrivacy lock

    FURNISHINGS Soap dispenser Waste receptacle Toilet paper dispenser Paper towel dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Electrical receptacle

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit Shower

    ROOM NAME: Staff Shower

    ROOM NO: IP-03.31FUNCTION: Incl. in IP-03.30

    ROOM NAME: Staff Coat / Boot Room

    ROOM NO: IP-03.32 NSF: 135

    FUNCTION: For staff to store personal belongings

    OCCUPANCY : 1 to 5 People TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Keypad access

    FURNISHINGS 40 half-height lockers Coat and shoe racks Bench Waste receptacles

    ROOM NAME: Staff Kitchenette

    ROOM NO: IP-03.33 NSF: 60

    FUNCTION: For use by staff

    OCCUPANCY : 1 to 3 Staff Members TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Kitchenette function with sink,countertop & cupboards

    Keypad access 40 mail slots

    MAJOR EQUIPMENT Refrigerator Microwave Toaster

  • 7/31/2019 Functional Program

    168/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 165

    FURNISHINGS Table Waste receptacle Soap dispenser Whiteboard7 chairs Sofa (for 3) Paper towel dispenser Tackboard

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone Intercom Internet connection Computer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink Hot water tap

    ROOM NAME: Manager Office

    ROOM NO: IP-03.34 NSF: 120

    FUNCTION: Office for manager to perform administrative duties and meet with staff.

    OCCUPANCY : 1 to 4 People TIME OF USE : 5 days a Week - 0800-1800

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Privacy lock on door

    FURNISHINGS Desk Filing cabinet Whiteboard TackboardCredenza Bookcase Table 3 chairsDesk chair Waste receptacle Recycling container

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone Computer Printer

    ROOM NAME: Public Washroom

    ROOM NO: IP-03.35 NSF: 40

    FUNCTION: Washroom for visitors.

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Grab bars Coat hook

    Privacy lock

    FURNISHINGS Soap dispenser Waste receptacle Toilet paper dispenser Paper towel dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call

  • 7/31/2019 Functional Program

    169/585

    Colchester Regional Hospital Surgical Inpatient Unit IP-03Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 166

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit

  • 7/31/2019 Functional Program

    170/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 167

    INTERRELATIONSHIPS

    1. The quiet family room & family lounge should be close to the entrance of the unit.2. Clean & Soiled Utility rooms should be accessible from the outside corridor for stocking of supplies

    & removal of soiled items without staff needing to traverse the unit.3. The staff lounge should be located close to, but possible outside, the unit.4. There must be a direct elevator or corridor to quickly move patients from the ER, surgical suite

    and inpatient units, to the ICU.5. A pneumatic tube station is required to the lab and pharmacy. If located within the unit it should

    not be shared. If located outside the ICU it should be immediately accessible TO ICU.6. Respiratory therapy should be very close to ICU.

    P LANNING CHANGES 1. IP.04.01. The size of the ICU rooms has been increased to 260 NSF to reflect current standards

    & provide adequate space for staff, patient & equipment.

    2. IP.04.08. Bathroom, Ensuite. Reduced from 45 NSF to 40 NSF to be consistent with the other 2piece patient washrooms.

    3. IP.04.09. Shower, Assisted. Intermediate Care. Deleted 1 shower should serve the entire unit.

    4. IP.04.18. Nourishment Centre. Increased to 120 NSF to accommodate dietary food carts.

    5. IP.04.21. Storage, Equipment. Increased to ensure adequate space for equipment.

    6. IP.04.24. Shower, Assisted. Deleted.

    7. IP.04.25. Washroom, staff. Reduced to 25 NSF to be consistent with other staff WCs.

    8. IP.04.29. Lounge, Staff. Reduced from 200 NSF to 160 NSF for 8 people.

    9. IP.04.31. Alcove, Linen Cart. 2 spaces at 15 NSF each added to accommodate linen carts.

    10. IP.04.32. Physician Work. An enclosed area of 50 NSF added for quiet physician work &dictation.

    Summary Master Program 10,080.0 DGSFFunctional Program 10,875.0 DGSFDifference +795.0 DGSF

    ROOM S UMMARY

    ID N0. ROOM NAME CODEROOMAREA

    NSF

    NO. OF

    ROOMS

    TOTALAREA

    NSF

    IP-04 Intensive Care / Intermediate Care (15 Beds)

    IP-04.01 1-Bed room, Combined ICU S,W 260 6 1,560IP-04.02 Isolation, 1-bed Combined ICU S,W 260 2 520IP-04.03 Anteroom, isolation S,W 80 2 160IP-04.04 Shower, assisted Combined ICU (deleted) S,W 0 0 0IP-04.05 1 Bed room, Intermediate Care S,W 220 5 1,100

  • 7/31/2019 Functional Program

    171/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 168

    IP-04.06 Isolation, 1-bed, Intermediate Care S,W 220 2 440IP-04.07 Anteroom, isolation 80 2 160IP-04.08 Bathroom, ensuite, 2 piece W 40 7 280IP-04.09 Shower, assisted, Intermediate Care (deleted) 0 0 0

    IP-04.10 Bedroom, on-call 100 1 100IP-04.11 Bathroom, ensuite 60 1 60IP-04.12 Workstation, nursing (8 people) Combined ICU W 410 1 410IP-04.13 Workstation, nursing (5 people) Intermediate Care 250 1 250IP-04.14 Medication preparation 120 1 120IP-04.15 Conference, report (12 people) W 180 1 180IP-04.16 Quiet room, family (8 people) W 120 1 120IP-04.17 Lounge, family (14 people) 280 1 280IP-04.18 Nourishment centre W 120 1 120IP-04.19 Utility, clean 160 1 160

    IP-04.20 Utility, soiled 150 1 150IP-04.21 Storage, equipment W 400 1 400IP-04.22 Alcove, stretcher / wc (2) S,W 30 2 60IP-04.23 Alcove, emergency cart 20 2 40IP-04.24 Shower, assisted, Combined ICU W 60 1 60IP-04.25 Washroom, staff 25 1 25IP-04.26 Office, research W 100 1 100IP-04.27 Locker room, staff 85 1 85IP-04.28 Shower, staff 30 1 30IP-04.29 Lounge, staff (8 people) 160 1 160

    IP-04.30 Closet, janitor 40 1 40IP-04.31 Alcove, linen cart (new) 15 2 30IP-04.32 Physician workstation (new) 50 1 50

    Sub-total NSF 7,250

    Net-to-gross conversion 1.50

    Total DGSF 10,875.0

    ROOM NAME: Combined ICU 1-Bed Room

    ROOM NO: IP-04.01 NSF: 260FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Glazing and mini blinds to provide visual supervision and privacy2 Clear width and depth from corridor to window of 15ft and 17ft along corridor3 Breakaway doors to room to open to a minimum of 10ft

  • 7/31/2019 Functional Program

    172/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 169

    4 Room to allow 360 degree access to patient

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)IV track, ceiling mounted Interior window with drapes or

    vertical blinds

    Privacy curtain on ceiling mounted

    tracksClothes locker

    MAJOR EQUIPMENT Electrical intensive carebed

    Monitoring equipment Ventilator Ceiling hung TV

    FURNISHINGS Overbed table Mirror Bedside table Paper towel dispenserVisitors chair Tackboard Waste receptacle Soap dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet Computer hookup Emergency call Examination light10 duplex electricalreceptacles on emergencypower (variousheights/locations)

    Nurse call system Overbed light Night light

    ECG data outlet Dimmer switches Wall mounted computer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)4 oxygen outlets Sink Temperature controls Toilet4 vacuum outlets 3 medical air outlets

    ROOM NAME: Combined ICU 1-Bed Room Isolation

    ROOM NO: IP-04.02 NSF: 260

    FUNCTION: To provide a private bedroom for an isolation inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Glazing and mini blinds2 Clear width and depth from corridor and window of 15ft & 17ft & along corridor3 Breakaway doors to room to open to a minimum of 10ft

    4 Room to allow 360 degree access to patient

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Clothes locker Hand wash sink unit Privacy curtain on ceiling mounted

    tracksIV track, ceiling mounted

    MAJOR EQUIPMENT Electrical bed 8 long Ventilator Monitoring equipment Ceiling hunt TV

  • 7/31/2019 Functional Program

    173/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 170

    FURNISHINGS Overbed table Non-tilt step stool Mirror Paper towel dispenserBedside cabinet Television wall mounted Tackboard Soap dispenserPatient lounge chair Visitors chair Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet Computer hookup Emergency call Examination light10 duplex electricalreceptacles on emergencypower (variousheights/locations)

    Nurse call system Overbed light Night light

    ECG data outlet Dimmer switches Wall mounted computer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)4 oxygen outlets Sink Temperature controls Toilet

    4 vacuum outlets 3 medical air outlets

    ROOM NAME: Isolation Ante Room

    ROOM NO: IP-04.03 NSF: 80

    FUNCTION: For staff to change before going into isolation room

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit, base cabinet &cupboards above

    FURNISHINGS Soiled linen hamper Garbage hamper

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 duplex electricalreceptacle

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Negative pressure forisolation

    ROOM NAME: Combined ICU Assisted Shower

    ROOM NO: IP-04.04

    FUNCTION: This room has been deleted.

  • 7/31/2019 Functional Program

    174/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 171

    ROOM NAME: Intermediate Care 1-Bed Room

    ROOM NO: IP-04.05 NSF: 220

    FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Convertible to ICU in future

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Privacy curtain on ceiling mountedtracks

    Hand wash sink unit Interior window with drapes orvertical blinds?

    IV track, ceiling mounted Clothes locker

    MAJOR EQUIPMENT Electrical intensive carebed

    Monitoring equipment Wall or ceiling mountedTV

    FURNISHINGS Overbed table Mirror Paper towel dispenser Waste receptacleVisitors chair Tackboard Soap dispenser Bedside cabinet

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet 1 duplex electrical

    receptacleEmergency call Nurse call system

    6 duplex electrical

    receptacles on emergencypower

    Night light Overbed light Examination light

    Dimmer switch ECG data outlet Wall mounted computer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)4 oxygen outlets 4 vacuum outlets 3 medical gas outlets

    ROOM NAME: Intermediate Care 1-Bed Isolation

    ROOM NO: IP-04.06 NSF: 220

    FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Convertible to ICU in future

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Privacy curtain on ceiling mountedtracks

    Hand wash sink unit Interior window with drapes orvertical blinds

  • 7/31/2019 Functional Program

    175/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 172

    IV track, ceiling mounted

    MAJOR EQUIPMENT Electrical intensive care

    bed

    Monitoring equipment

    FURNISHINGS Overbed table Mirror Paper towel dispenser Waste receptacleVisitors chair Tackboard Soap dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet 1 duplex electrical

    receptacleEmergency call 6 duplex electrical

    receptacles onemergency power

    Nurse call system ECG data outlet Overbed light Night light

    Examination light Wall mounted computer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)4 oxygen outlets 4 vacuum outlets 3 medical gas outlets

    ROOM NAME: Isolation Ante Room

    ROOM NO: IP-04.07 NSF: 80

    FUNCTION: For staff to change before going into isolation room

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit, base cabinet & cupboards above

    FURNISHINGS Soiled linen hamper Garbage hamper

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 duplex electrical receptacle

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

    Negative pressure forisolation

    ROOM NAME: 2 piece Ensuite Bathroom

    ROOM NO: IP-04.08 NSF: 40

    FUNCTION: Bathroom facility for on call physician

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

  • 7/31/2019 Functional Program

    176/585

  • 7/31/2019 Functional Program

    177/585

  • 7/31/2019 Functional Program

    178/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 175

    ROOM NAME: Medication Preparation

    ROOM NO: IP-04.14 NSF: 120

    FUNCTION: To prepare and control medications for patients

    OCCUPANCY : 1 3 Staff TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Accessible to both ICU and Intermediate Care

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Security lock and swipe card access Cupboards for storage Shelving for storageSink unit with counter

    MAJOR EQUIPMENT Full height refrigeratoralarm and interior lock box

    Automated medication dispenser IV cart

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Electrical receptacles

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink

    ROOM NAME: Report Conference

    ROOM NO: IP-04.15 NSF: 180

    FUNCTION: Meeting space

    OCCUPANCY : 12 people TIME OF USE : 7 Days a Week -0000-2400

    FURNISHINGS Meeting table 12 Chairs White board Projector screen

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Dim lighting Electrical receptacles Telephone Network connectionConference call connection

    ROOM NAME: Family Quiet Room

    ROOM NO: IP-04.16 NSF: 120

    FUNCTION: Provide privacy for families in crisis

    OCCUPANCY : Up to 8 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS

  • 7/31/2019 Functional Program

    179/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 176

    1 Home like decor2 Accessible to back ICU & IMCU, close to entrance

    FURNISHINGS

    Chesterfield sofa chair Lamp Coffee table side tables

    ROOM NAME: Family Lounge

    ROOM NO: IP-04.17 NSF: 280

    FUNCTION: Lounge

    OCCUPANCY : 14 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Home like decor

    2 Located inside ICU/CCU near entrance

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework, kitchenette

    MAJOR EQUIPMENT Refrigerator Computer hookup Hot water dispenser PhoneMicrowave TV

    FURNISHINGS Sofas Chairs Coffee Tables Reading Lamps

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink

    ROOM NAME: Nourishment Centre

    ROOM NO: IP-04.18 NSF: 120

    FUNCTION: Space for staff to store and prepare light nourishments for patients as well as forrethermalization or dietary trays on carts

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework, counter with storage

    MAJOR EQUIPMENT Refrigerator Retherm cart Microwave Ice dispenser

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink

  • 7/31/2019 Functional Program

    180/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 177

    ROOM NAME: Clean Utility

    ROOM NO: IP-04.19 NSF: 160

    FUNCTION: For storage of clean/sterile supplies and minor equipmentOCCUPANCY : 1 3 Staff TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 2 entrances

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with countertop Cupboards above

    FURNISHINGS

    Medical/surgical supplycart (7 feet) Dressing cart Sterile supply cart (5 ft.) IV cart (3-4 ft.)

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Warming cabinet Electrical receptacles

    ROOM NAME: Soiled Utility

    ROOM NO: IP-04.20 NSF: 150

    FUNCTION: Space to dispose and/or hold soiled items for pickup

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 2 entrances2 May be subdivided into 2

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)SS sink unit with countertop Shelving

    FURNISHINGS Garbage bag stands orcarts

    Soiled linen stands orcarts

    Carts for soiled trays

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Flushing service sink Hopper

    ROOM NAME: Equipment Storage

    ROOM NO: IP-04.21 NSF: 400

    FUNCTION: To store the medical equipment and furniture used in the department or on the unit

  • 7/31/2019 Functional Program

    181/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 178

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shelving

    MAJOR EQUIPMENT Infusion pumps Transport monitors Blood warmers Pacemaker insertion cartVentilators. Defibrillator carts

    FURNISHINGS Scale

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Duplex receptacles

    ROOM NAME: Stretcher Alcove / WC 2

    ROOM NO: IP-04.22 NSF: 30

    FUNCTION: Storage

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    FURNISHINGS 2 wheelchairs Stretcher

    ROOM NAME: Emergency Cart Alcove

    ROOM NO: IP-04.23 NSF: 20

    FUNCTION: Storage of emergency cart

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Located central to each section of ICU/IMCU

    MAJOR EQUIPMENT Emergency cart

    ROOM NAME: Combined ICU Assisted Shower

    ROOM NO: IP-04.24 NSF: 60

    FUNCTION: Patient shower

    OCCUPANCY : 1 patient 1 staff TIME OF USE : 7 Days a Week -0000-2400

    MAJOR EQUIPMENT Towel bars Boot rack Shower chair

  • 7/31/2019 Functional Program

    182/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 179

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Hand held shower

    ROOM NAME: Staff Washroom

    ROOM NO: IP-04.25 NSF: 25

    FUNCTION: Washroom for staff

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Coat hook Privacy lock

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacle

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Handwash sink unit

    ROOM NAME: Research Office

    ROOM NO: IP-04.26 NSF: 100

    FUNCTION: Office space

    OCCUPANCY : 1-3 TIME OF USE : 5 Days a Week -0800-1800ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)

    Privacy lock on door

    FURNISHINGS Desk Bookcase 2 chairs Filing cabinetDesk chair Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone Computer Printer Electrical receptacles

    ROOM NAME: Staff Locker Room

    ROOM NO: IP-04.27 NSF: 85

    FUNCTION: For staff to store personal belongings

    OCCUPANCY : 1-3 TIME OF USE : 7 Days a Week -0000-2400

    FURNISHINGS

  • 7/31/2019 Functional Program

    183/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 180

    40 f-height lockers Coat and shoe racks Bench Waste receptacles

    ROOM NAME: Staff Shower

    ROOM

    NO

    : IP-04.28 NSF: 30FUNCTION: Shower for staff

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Towel bar Coat hook

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Shower

    ROOM NAME: Staff Lounge ROOM NO: IP-04.29 NSF: 160

    FUNCTION: For use by staff on their breaks

    OCCUPANCY : 8 Staff Members TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Kitchenette function with sink,countertop & cupboards

    MAJOR EQUIPMENT Full height refrigerator Hot water dispenser Microwave Toaster

    FURNISHINGS Table Waste receptacle Bulletin Board ChairsSoap dispenser Paper towel dispenser

    ROOM NAME: Janitor Closet

    ROOM NO: IP-04.30 NSF: 40

    FUNCTION: To hold housekeeping equipment and supplies

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Floor sink and drain Shelf unit for supplies Hanging hooks

    MAJOR EQUIPMENT Housekeeping cart Floor cleaning bucket

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

  • 7/31/2019 Functional Program

    184/585

    Colchester Regional Hospital Intensive Care / Intermediate Care IP-04Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 181

    Hot and cold water supplywith hose attachment

    ROOM NAME: Linen cart alcove

    ROOM NO: IP-04.31 NSF: 15

    FUNCTION: To hold a linen cart

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    MAJOR EQUIPMENT Linen cart

    ROOM NAME: Physician workstation

    ROOM NO: IP-04.32 NSF: 50

    FUNCTION: Space for physician dictation

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shelf

    MAJOR EQUIPMENT Dictating equipment

    FURNISHINGS Chair

  • 7/31/2019 Functional Program

    185/585

  • 7/31/2019 Functional Program

    186/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 183

    IP-05.06 Therapeutic Quiet (TQ) Room (secure) S,W 120 2 240IP-05.07 Washroom, ensuite TQ room W 40 2 80IP-05.08 2-Bedroom, adult mental health (deleted) 0 0 0IP-05.09 Bathroom (deleted) 0 0 0

    IP-05.10 Exam room S,W 80 1 80IP-05.11 Consult room W 0 0 0IP-05.12 Group Therapy (15 people) W 400 1 400IP-05.13 Interview / consult (6 people) W 120 2 240IP-05.14 Conference / multipurpose (25 people) W 0 0 0IP-05.15 Family room (5 people) W 160 1 160IP-05.16 Reading / resource room W 140 1 140IP-05.17 Office, manager W 120 1 120IP-05.18 Office, pharmacy specialist W 100 1 100IP-05.19 Office, psychiatry W 140 2 280

    IP-05.20 Office, nursing / report W 220 1 220IP-05.21 Office, social worker W 140 2 280IP-05.22 Office, OT W 140 1 140IP-05.23 Utility, clean 120 1 120IP-05.24 Utility, soiled 100 1 100IP-05.25 Closet, linen 80 1 80IP-05.26 Laundry, personals 120 1 120IP-05.27 Dining / kitchenette patient (20 people) W 340 1 340IP-05.28 Activity room W 300 1 300IP-05.29 Exercise, client W 300 1 300

    IP-05.30 Kitchen, ADL W 150 1 150IP-05.31 Lounge, patient (12 people) W 270 1 270IP-05.32 Kitchenette / dining (adolescent) W 140 1 140IP-05.33 Smoke room (1 person) 0 0 0IP-05.34 Lounge, staff (reduced to kitchenette) 60 1 60IP-05.35 Locker room, staff W 210 1 210IP-05.36 Washroom, staff 25 2 50IP-05.37 Washroom, Public BF 60 1 60IP-05.38 Storage, client 80 1 80IP-05.39 Closet, janitor 40 1 40IP-05.40 Bedroom, child/adolescent short stay W 140 4 560IP-05.41 Office, Recreation Therapist 140 1 140IP-05.42 Washroom, ensuite W 40 4 160IP-05.43 1 Bedroom, large (new) S,W 186 4 744IP-05.44 Washroom, ensuite (new) W 40 4 160IP-05.45 Shared shower / tub (new) 60 5 300IP-05.46 Shower, assisted (new) W 60 1 60

    Sub-total NSF 10,254

  • 7/31/2019 Functional Program

    187/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 184

    Net-to-gross conversion 1.50

    Total DGSF 15,381.0

    ROOM NAME: Nursing Care Station

    ROOM NO: IP-05.01 NSF: 250

    FUNCTION: Space for staff to chart, make phone calls, etc

    OCCUPANCY : 4 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Central with good visibility of all unit patient care areas2 Lack of physical barriers to patients3 Good sight line to observe patients

    4 Adjacent to the Nursing office5 Visible on entry to the unit

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework with counter Rubber flooring Locked storage cupboardsBuilt in locked file storage Pneumatic tube station

    MAJOR EQUIPMENT Computer terminal 1 fax machine

    FURNISHINGS 4 chairs with wheels

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 land phone 6 electrical outlets 2 cordless phones 3 phone lines2 Video security terminals

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Air ventilation system

    ROOM NAME: Medication Preparation

    ROOM NO: IP-05.02 NSF: 100FUNCTION: To prepare dispense and control medications for patients

    OCCUPANCY : 1 2 Staff TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 lockable2 Adjacent to patient care station and Nursing office3 Adjacent to a small medication education room to meet with the patient and administer medication.

  • 7/31/2019 Functional Program

    188/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 185

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with counter Cupboards for storage Shelving for storageCupboards for unlocked storage Built in under counter refrigerator Security lock and swipe card access

    MAJOR EQUIPMENT Full height refrigerator alarm and interior lock box

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)3 Electrical receptacles 1 Computer hookup 1 phone

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Good air ventilation sink

    ROOM NAME: Medication education

    ROOM NO: IP-05.03FUNCTION: This room has been deleted

    ROOM NAME: Mental Health 1-Bedroom

    ROOM NO: IP-05.04 NSF: 140

    FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 All patient rooms are to be single rooms

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Clothes cupboard Entry doors with double hinges DeskSmall windows in the entry door

    MAJOR EQUIPMENT Stationary bed unit

    FURNISHINGS

    Fold down table Beside cabinet Patient lounge chair Shatter proof mirrorWaste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)2 duplex electrical 1 duplex electrical Wall Night light Light over mirror

    receptacles on Receptacle Computer hookup Wall lightingemergency power Nurse call system No overhead lighting Overbed light

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

  • 7/31/2019 Functional Program

    189/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 186

    sink

    ROOM NAME: Ensuite Washroom

    ROOM NO: IP-05.05 NSF: 40FUNCTION: Washroom facility for patient(s)

    OCCUPANCY : Patient and nurse TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shatter proof mirror with light No locks on doors Collapsible Coat hookBedpan, urinal, wash basin rack Safe grab bars Collapsible Intravenous hook (one

    pod area)

    FURNISHINGS

    Soap dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet with bedpan lugs(only in the one pod)

    Bedpan flusher (only inthe one pod)

    Hand wash sink unit No shower unit

    ROOM NAME: Therapeutic quiet room

    ROOM NO: IP-05.06 NSF: 120

    FUNCTION: Private room for patients at risk for harming themselves or others

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Located away from Patient living areas2 Toilet and Sink located in-between both TQ rooms3 Bathroom needs to have a locked entrance

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Nonbreakable glass window tocorridor

    MAJOR EQUIPMENT Video monitoring system Sound/communication

    monitoring systemKey pad access to room

    FURNISHINGS Floor mattress only Weighted blankets Weighted gowns

  • 7/31/2019 Functional Program

    190/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 187

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)No electrical outlets Lights are always on Protected heating

    systemLight intensity can becontrolled from patientcare station

    Ceiling lighting system

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet and sink in shared Bathroom space

    ROOM NAME: Ensuite Secure Rooms Washroom

    ROOM NO: IP-05.07 NSF: 40

    FUNCTION: Patient washroom.

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Keypad access2 Adjacent to both TQ spaces3 Shared bathroom between both TQ spaces

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink Toilet No mirror

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Ceiling lighting Lights are on when TQ

    room lights are on

    ROOM NAME: Mental Health 2-Bedroom

    ROOM NO: IP-05.08

    FUNCTION: This room has been deleted

    ROOM NAME: Bathroom

    ROOM NO: IP-05.09

    FUNCTION: This room has been deleted

    ROOM NAME: Exam Room

    ROOM NO: IP-05.10 NSF: 80

    FUNCTION: Room to assess and treat patients

    OCCUPANCY : 1-4 TIME OF USE : 7 Days a Week -0000-2400

  • 7/31/2019 Functional Program

    191/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 188

    S PECIAL DESIGN REQUIREMENTS 1 Close to central patient care area

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)

    Casework with sink, counter andstorage

    Built in cupboards Shelves

    MAJOR EQUIPMENT Exam table or stretcher Weight scales BP machine Privacy curtain

    FURNISHINGS 2 chairs Foot stool Desk or counter workspace

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call Exam light 1 Computer hookup 1 phone

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)sink

    ROOM NAME: Consult room

    ROOM NO: IP-05.11

    FUNCTION: This space has been deleted

    ROOM NAME: Group Therapy

    ROOM NO: IP-05.12 NSF: 400

    FUNCTION: Area for patients and staff to participate in group therapy activities

    OCCUPANCY : 15 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Comfortable homelike environment

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in locked cupboards Counter top with double sink area

    MAJOR EQUIPMENT Large white board TV incorporated into

    cupboardsVCR/CD ROM installedin cupboards

    Flip chart

    FURNISHINGS 20 stackable chairs

  • 7/31/2019 Functional Program

    192/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 189

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)No video surveillance

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

    Wall lighting No overhead lighting Dimmer lighting 6 safe electrical outlets

    ROOM NAME: Interview / Consult

    ROOM NO: IP-05.13 NSF: 120

    FUNCTION: For use by care team members including dietary, pharmacy, PT and OT to consult withclients and families

    OCCUPANCY : 6 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS

    1 Comfortable design

    FURNISHINGS Coffee table 4 chairs comfortable 2 side tables

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 Nurse call 1 Computer hookup 1 phone 3 safe electrical outlets

    ROOM NAME: Conference / Multipurpose

    ROOM NO: IP-05.14

    FUNCTION: This room has been deleted

    ROOM NAME: Family Room

    ROOM NO: IP-05.15 NSF: 160

    FUNCTION: Room for family to meet privately with patient

    OCCUPANCY : 5 people TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Home like

    2 Includes play area

    FURNISHINGS 5 Comfortable chairs 1 coffee table 2 side tables

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)3 electrical outlets 1 phone

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

  • 7/31/2019 Functional Program

    193/585

  • 7/31/2019 Functional Program

    194/585

  • 7/31/2019 Functional Program

    195/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 192

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Sink and cupboard area

    ROOM NAME: Office, nursing

    ROOM NO: IP-05.20 NSF: 220

    FUNCTION: Work & meeting space for staff

    OCCUPANCY : 8 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Adjacent to care station

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework, counter and shelving

    MAJOR EQUIPMENT Computer

    FURNISHINGS Chairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call Phone

    ROOM NAME: Social Worker Office ROOM NO: IP-05.21 NSF: 140

    FUNCTION: Office for social worker to meet with patient and support person

    OCCUPANCY : 3 TIME OF USE : 5 Days a Week -0800-1730

    MAJOR EQUIPMENT 1 computer

    FURNISHINGS 4 chairs 1 desk chair 1 desk 1 small meeting table1 bookcase 1 filing cabinet

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 Phone hook up 1 computer hook up Nurse call

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Wall lighting

  • 7/31/2019 Functional Program

    196/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 193

    ROOM NAME: OT Office

    ROOM NO: IP-05.22 NSF: 140

    FUNCTION: Office to meet with patient and support person

    OCCUPANCY : 3 TIME OF USE : 5 Days a Week -0800-1730

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in locked cupboards

    MAJOR EQUIPMENT 1 computer

    FURNISHINGS 4 chairs 1 desk chair 1 desk 1 small meeting table1 bookcase 1 filing cabinet

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call 1 computer hook up 1 phone hook up 3 safe electrical outlets

    ROOM NAME: Clean Utility

    ROOM NO: IP-05.23 NSF: 120

    FUNCTION: For storage of clean/sterile supplies and minor equipment

    OCCUPANCY : 1 3 Staff TIME OF USE : 7 Days a Week 0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Lockable

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Sink unit with countertop Cupboards above Built in shelves

    FURNISHINGS Linen cart

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for sink area

    ROOM NAME: Soiled Utility

    ROOM NO: IP-05.24 NSF: 100

    FUNCTION: Disposal and holding of soiled items awaiting pickup

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week 0000-2400

  • 7/31/2019 Functional Program

    197/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 194

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)SS sink unit with countertop Cupboards above and below sink Built in shelves

    MAJOR EQUIPMENT

    Bed pan flusher

    FURNISHINGS Garbage bag stands or Carts Soiled linen stands or

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)3 electrical outlets

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Flushing service sink

    ROOM NAME: Linen Closet

    ROOM NO: IP-05.25 NSF: 80

    FUNCTION: To store clean linen exchange carts

    OCCUPANCY : 1 Person TIME OF USE : 7 Days a Week 0000-2400

    MAJOR EQUIPMENT Linen carts

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)3 electrical outlets

    ROOM NAME: Personal Laundry

    ROOM NO: IP-05.26 NSF: 120

    FUNCTION: Area for patients to practice doing laundry

    OCCUPANCY : 2 TIME OF USE : 7 Days a Week -0800-1730

    S PECIAL DESIGN REQUIREMENTS 1 Lockable room Key card access

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework-counter and shelves Some lockable cupboards under

    IslandBuilt in island for folding laundry

    MAJOR EQUIPMENT Front load washer 6 collapsible hooks Front load dryer Ironing boardIron

  • 7/31/2019 Functional Program

    198/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 195

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Laundry sink on counteror on island

    ROOM NAME: Patient Kitchenette / Dining ROOM NO: IP-05.27 NSF: 340

    FUNCTION: Patient dining

    OCCUPANCY : 20 TIME OF USE : 7 Days a Week -0800-2200

    S PECIAL DESIGN REQUIREMENTS 1 Visible to staff working on the unit

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)

    Casework- counter with sink andstorage Island Locked cupboards built inunder island Built in recycling bins

    MAJOR EQUIPMENT Refrigerator Spring water dispenser White board DishwasherMicrowave Stove exhaust Hot water dispenser Stove/ovenRetherm cart Heat top unit

    FURNISHINGS 5 tables 20 chairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)8 safe electrical outlets

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for sink anddishwasher area

    Exhaust ventilation overstove top

    ROOM NAME: Activity Room

    ROOM NO: IP-05.28 NSF: 300

    FUNCTION: Space for patients to participate in activities such as crafts and woodworking.

    OCCUPANCY : 8 TIME OF USE : 7 Days a Week -0800-2200

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in shelves Drying racks Built in locked

    cupboardsBuilt in cupboards

    MAJOR EQUIPMENT TV- built in cupboard VCR/CD ROM build in 1 phone 1 computer built into

  • 7/31/2019 Functional Program

    199/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 196

    cupboard cupboard

    FURNISHINGS 3 tables 12 chairs White board

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Wall lighting 1 phone hook up Ceiling lighting

    separate switch from walllighting

    8 safe electrical outlets

    1 computer hook up

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Ventilation re crafts

    ROOM NAME: Client Exercise

    ROOM NO: IP-05.29 NSF: 300

    FUNCTION: Space for patients to exercise and be evaluated/treated by OT and PT

    OCCUPANCY : 8 TIME OF USE : 7 Days a Week -0800-2200

    S PECIAL DESIGN REQUIREMENTS 1 Room must have good visibility i.e.: plexi-glass walls2 Natural light from the outside

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)

    Large built in locked cupboards Built in unlocked cupboards

    MAJOR EQUIPMENT Treadmill Balls Safe weight machine i.e.:

    bio flex machineRowing machine

    Stationary bicycle Mats Rubber bands

    FURNISHINGS Spring water dispenser

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)

    Wall lighting 6 safe electrical outlets

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Excellent airexchange/ventilation

    ROOM NAME: ADL Kitchen

    ROOM NO: IP-05.30 NSF: 150

  • 7/31/2019 Functional Program

    200/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 197

    FUNCTION: Space for patients to work with OT to enhance meal preparation skills

    OCCUPANCY : 2 TIME OF USE : 5 Days a Week -0800-1730

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework- counter with sink andstorage

    Built in cupboards Built in locked cupboards

    Built in self space

    MAJOR EQUIPMENT Domestic stove Dishwasher Built in recycle bins Spring water dispenserFull size refrigerator freezer on the bottom

    Microwave

    FURNISHINGS Table 2 chairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)4 safe electrical outlets

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Stove top ventilation Plumbing for dishwasher Plumbing for double sink Wall lighting

    ROOM NAME: Patient Lounge

    ROOM NO: IP-05.31 NSF: 270

    FUNCTION: Space for patients to relax and socializeOCCUPANCY : 12 people TIME OF USE : 7 Days a Week -0800-2200

    S PECIAL DESIGN REQUIREMENTS 1 Visible to staff of unit2 Home like decor3 This space could be used to accommodate a small sitting/social area in each pod

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in book shelves Built in TV/VCR Center

    MAJOR EQUIPMENT TV VCR/CD ROM Sound system

    FURNISHINGS 3 glider rocking chairs 4 lounge chairs 2 coffee table 4 side tables

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Wall dimmer lighting 4 safe electrical outlets

  • 7/31/2019 Functional Program

    201/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 198

    ROOM NAME: Adolescent Kitchen / Dining

    ROOM NO: IP-05.32 NSF: 140

    FUNCTION: Storage and preparation of snacks for patients

    OCCUPANCY : 6 TIME OF USE : 7 Days a Week -0800-2200

    S PECIAL DESIGN REQUIREMENTS 1 Close to the child / adolescent pod2 Close to outside space for children

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Casework- counter and doublesink with storage

    Shelving Locked cupboards

    Unlocked cupboards

    MAJOR EQUIPMENT Undercounter refrigerator Microwave Ice dispenser

    FURNISHINGS Dining table- seats 6 6 chairs

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call 3 safe electrical outlets Wall lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for the sink area

    ROOM NAME: Smoke Room

    ROOM NO: IP-05.33

    FUNCTION: This room has been deleted

    ROOM NAME: Staff Kitchenette

    ROOM NO: IP-05.34 NSF: 60

    FUNCTION: For use by staff

    OCCUPANCY : 1 to 3 Staff Members TIME OF USE : 7 Days a Week 0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Near the core patient area

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Kitchenette function with doublesink

    Built in recycling bins Built in Microwaves and ventilation

  • 7/31/2019 Functional Program

    202/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 199

    countertop & cupboards

    MAJOR EQUIPMENT Full size refrigerator 1 phone 2 microwaves Kettle

    Toaster

    FURNISHINGS Paper towel dispenser Waste receptacle Recycling bins Soap dispenser

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for the sink area Ventilation for the

    microwave oven

    ROOM NAME: Staff Locker Room

    ROOM NO: IP-05.35 NSF: 210FUNCTION: For staff to store personal belongings

    OCCUPANCY : 60 lockers -30 TIME OF USE : 7 Days a Week 0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Safe storage of personal items2 All lockers are lockable

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in recycling bins Built in benches Built in full size lockers

    Built in double sink area withstorage under sink Built in shoe and boot racks

    FURNISHINGS Full height lockers Bench Coat and shoe racks Recycling bins

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Ceiling lighting 4 safe electrical outlets

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for the sink area

    ROOM NAME: Staff Washroom

    ROOM NO: IP-05.36 NSF: 25

    FUNCTION: Washroom for staff

    OCCUPANCY : 1 Staff TIME OF USE : 7 Days a Week 0000-2400

  • 7/31/2019 Functional Program

    203/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 200

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Non breakable mirror with nonbreakable light fixture over it

    Grab bars Privacy lock

    Collapsible Coat hook Wall cupboards

    MAJOR EQUIPMENT Pedestal sink Toilet

    FURNISHINGS Soap dispenser Paper towel dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)1 safe electrical outlet

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Toilet Plumbing for pedestal

    sink unit

    ROOM NAME: Public Washroom

    ROOM NO: IP-05.37 NSF: 60

    FUNCTION: Washroom for visitors

    OCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    MAJOR EQUIPMENT

    Sink area with no storagecupboards under sink Safe paper toweldispenser Toilet Unbreakable mirror

    Toilet paper dispenser

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Plumbing for sink andtoilet

    ROOM NAME: Client Storage

    ROOM NO: IP-05.38 NSF: 80

    FUNCTION: Storage of patient clothingOCCUPANCY : 1 TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Key card access to room

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Built in lockers

  • 7/31/2019 Functional Program

    204/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 201

    FURNISHINGS 24 lockers

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)

    Ceiling lighting

    ROOM NAME: Janitor Closet

    ROOM NO: IP-05.39 NSF: 40

    FUNCTION: To hold housekeeping equipment and supplies

    OCCUPANCY : 1 Staff TIME OF USE : 7 Days a Week 0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Floor sink and drain Shelf unit for supplies Collapsible hanging hooks

    MAJOR EQUIPMENT Housekeeping cart Floor cleaning bucket

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Hot and cold water supply with hose attachment

    ROOM NAME: Child / Adolescent Short Stay Bedroom

    ROOM NO: IP-05.40 NSF: 140

    FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week 0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Could be smaller as indicated previously

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Clothes closet

    MAJOR EQUIPMENT Bed

    FURNISHINGS Bedside cabinet Waste receptacle Mirror Overbed tablePatient lounge chair Soap dispenser Visitors chair

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Telephone outlet 1 duplex electrical

    receptacleEmergency call 2 duplex electrical

    receptacles onemergency power

  • 7/31/2019 Functional Program

    205/585

  • 7/31/2019 Functional Program

    206/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 203

    ROOM NO: IP-05.43 NSF: 186

    FUNCTION: To provide a private bedroom for an inpatient

    OCCUPANCY : Patient and doctor and nurses TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 All patient rooms are to be single rooms

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Clothes cupboard Entry doors with double hinges DeskSmall windows in the entry door

    MAJOR EQUIPMENT Stationary bed unit

    FURNISHINGS Fold down table Beside cabinet Patient lounge chair Shatter proof mirrorWaste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)2 duplex electrical 1 duplex electrical Wall Night light Light over mirror

    receptacles on Receptacle Computer hookup Wall lightingemergency power Nurse call system No overhead lighting Overbed light

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)sink

    ROOM NAME: Ensuite Washroom

    ROOM NO: IP-05.44 NSF: 40

    FUNCTION: Washroom facility for patient(s)

    OCCUPANCY : Patient and nurse TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shatter proof mirror with light No locks on doors Collapsible Coat hookBedpan, urinal, wash basin rack Safe grab bars Collapsible Intravenous hook (one

    pod area)

    FURNISHINGS Soap dispenser Toilet paper dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)

  • 7/31/2019 Functional Program

    207/585

    Colchester Regional Hospital Inpatient Mental Health IP-05Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 204

    Toilet with bedpan lugs(only in the one pod)

    Bedpan flusher (only inthe one pod)

    Hand wash sink unit No shower unit

    ROOM NAME: Shared Tub / Shower

    ROOM NO: IP-05.45 NSF: 60FUNCTION: Bathroom facility for patient(s)

    OCCUPANCY : Patient TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shatter proof mirror No locks on doors Collapsible Coat hook

    FURNISHINGS Soap dispenser Paper towel dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Tub / shower unit Sink

    ROOM NAME: Shared Assisted Shower

    ROOM NO: IP-05.46 NSF: 60

    FUNCTION: Shower facility for patient(s)

    OCCUPANCY : Patient and nurse TIME OF USE : 7 Days a Week -0000-2400

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Shatter proof mirror No locks on doors Collapsible Coat hook

    FURNISHINGS Soap dispenser Paper towel dispenser Waste receptacle

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Emergency lighting

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Shower unit Sink

  • 7/31/2019 Functional Program

    208/585

    Colchester Regional Hospital Maternal Child Unit IP-06Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 205

    INTERRELATIONSHIPS

    1. LBRP must be adjacent to the surgical suite for caesarian sections.2. The Stabilization Nursery needs to be located close to the nursing station, staff washroom and

    blanket warmer alcove.3. Two single rooms will be located close to the nursing station for observation of ill patients by the

    staff.4. A pediatric medical day unit (IP.06.31) will be located close to entrance to the maternal/child unit

    and nest to the pediatric treatment room.5. Located one staff washroom close to the staff lounge.6. The department needs convenient access to a pneumatic tube station.7. An additional on call room is required somewhere in the building to be shared.

    P LANNING CHANGES

    1. IP-06.03 Pediatric observation converted to pediatric medical day unit (MDU). Observation tooccur in inpatient bed.

    2. IP-06.04. 34, 35, 36. All patient rooms to be identical. Not designated maternity or pediatric.3. Bedrooms changed to all privates.4. A scrub area with 3 sinks has been added for each LBRP. If design allows, these could be

    shared between 2 -3 rooms.5. IP-06-10 Early assessment was changed from one room with three stretchers to two rooms

    increasing area from 350 NSF to 400 NSF and adding a second washroom for the second room.6. IP-06.15. Washroom, fetal assessment. Increased from 30 to 40 NSF per other patient

    washrooms.7. IP-06.19. Storage, linen. Changed from 80 nsf to 3 alcoves x 15 nsf or 45 NSF.8. IP-06.20. Kitchenette, nourishment. Changed to 1 and increased in size to accommodate dietary

    carts.9. IP-06.21. Washroom, staff. Reduced from 30 nsf to 25 nsf per other staff washrooms.10. IP-06.22. Workstation, care team. Increased from 250 NSF to 300 NSF to reflect equipment &

    staff.11. IP-06.23 Medication prep was increased to be 100 NSF.12. IP-06.33. Treatment/exam pediatrics. Increased from 100 to 120 NSF.13. IP-06.39. 40. Delete separate pediatric clean & soiled utility.14. IP-06.44. Changed function from exam room to breastfeeding room.

    15. IP-06.49. Changed to locker room with full lockers for change to scrubs.16. IP-06.51. The staff lounge was reduced from 160 NSF to 120 NSF.17. IP-06.60. A pediatric medication storage room was added.

    Summary Master Program 15,354.0 DGSFFunctional Program 15,267.5 DGSFDifference -87.0 DGSF

  • 7/31/2019 Functional Program

    209/585

    Colchester Regional Hospital Maternal Child Unit IP-06Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 206

    ROOM S UMMARY

    ID N0. ROOM NAME CODEROOMAREA

    NSF

    NO. OFROOMS

    TOTALAREA

    NSF

    IP-06 Maternal Child Unit

    IP-06.01 LBRP S,W 280 7 1,960IP-06.02 Bathroom, patient W 60 7 420IP-06.03 Storage, equipment 30 7 210IP-06.04 1-Bed room (maternal / pediatric swing) S,W 200 6 1,200IP-06.05 Bathroom, patient (maternal / pediatric swing) W 60 6 360IP-06.06 2-Bed room, antepartum / postpartum (deleted) S,W 280 1 280IP-06.07 Bathroom, patient (deleted) W 60 1 60IP-06.08 Alcove, blanket warmer 20 1 20IP-06.09 Alcove, baby scales (2) 25 1 25IP-06.10 Early labour assessment / triage (2 stretchers) S,W 233 1 233IP-06.11 Washroom, patient W 40 1 40IP-06.12 Washroom, public 30 1 30IP-06.13 Early labour lounge / family waiting (8 seats) W 160 1 160IP-06.14 Fetal assessment room S,W 120 1 120IP-06.15 Washroom, ensuite fetal assessment W 40 1 40IP-06.16 Nursery, stabilization (3 sites) S,W 400 1 400IP-06.17 Utility, clean W 120 1 120IP-06.18 Utility, soiled W 150 1 150IP-06.19 Alcove, linen storage 15 3 45IP-06.20 Kitchenette, nourishment 120 1 120IP-06.21 Washroom, staff 25 2 50IP-06.22 Workstation, care team (8 people) W 410 1 410IP-06.23 Medication preparation 100 1 100IP-06.24 Report, conference (10 people) W 150 1 150IP-06.25 Storage, equipment W 350 1 350IP-06.26 Alcove, emergency cart 20 2 40IP-06.27 Alcove, stretcher (1) / wheelchair (2) S,W 40 1 40IP-06.28 1-Bed room, isolation S,W 200 1 200IP-06.29 Ante room, isolation S,W 80 1 80

    IP-06.30 Bathroom, patient W 60 1 60IP-06.31 Pediatric MDU (2 places) S,W 240 1 240IP-06.32 Washroom, patient W 40 1 40IP-06.33 Treatment / exam, pediatrics S,W 120 1 120IP-06.34 1-Bed room, pediatric (deleted) 0 0 0IP-06.35 Bathroom, patient (deleted) 0 0 0IP-06.36 2-Bed room, pediatric (deleted) 0 0 0IP-06.37 Bathroom, pediatric (deleted) 0 0 0

  • 7/31/2019 Functional Program

    210/585

    Colchester Regional Hospital Maternal Child Unit IP-06Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 207

    IP-06.38 Playroom, pediatric (6 people) W 200 1 200IP-06.39 Utility, soiled pediatric (deleted) 0 0 0IP-06.40 Utility, clean pediatric (deleted) 0 0 0IP-06.41 Quiet room (8 people) W 160 1 160

    IP-06.42 Clinic, teaching, prenatal / postnatal W 120 1 120IP-06.43 Office / assessment nurse S,W 120 1 120IP-06.44 Exam / treatment W 120 1 120IP-06.45 Washroom, patient W 40 1 40IP-06.46 Change room, physicians (3 people) 80 1 80IP-06.47 On-call room, staff W 100 1 100IP-06.48 Washroom, on-call staff 50 1 50IP-06.49 Locker / change room, staff (6 staff) 150 1 150IP-06.50 Shower, staff 25 1 25IP-06.51 Lounge, staff (6 people) 180 1 180

    IP-06.52 Closet, janitor 40 2 80IP-06.53 Alcove, recycling 40 1 40IP-06.54 Waiting, family with play area (10 people) W 300 1 300IP-06.55 Washroom, family (with change table) W 60 1 60IP-06.56 Office, nurse manager W 120 1 120IP-06.57 Office, CNS W 120 1 120IP-06.58 Conference, education (12 people) (deleted) 0 0 0IP-06.59 Scrub up (new) 60 3 180IP-06.60 Pediatric medication storage (new) 60 1 60

    Sub-total NSF 10,178

    Net-to-gross conversion 1.50

    Total DGSF 15,267.0

    ROOM NAME: LBRP

    ROOM NO: IP-06.01 NSF: 280

    FUNCTION: Space in which women can be supported during labour, birthing, recovery andpostpartum

    OCCUPANCY : 1 to 4 People TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN REQUIREMENTS 1 Free access to foot of bed2 Separate area for care of infant with gases and electrical outlets separated with sliding wall3 Natural light4 Home-like environment5 Sound deadened

  • 7/31/2019 Functional Program

    211/585

    Colchester Regional Hospital Maternal Child Unit IP-06Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 208

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Counter with cabinetsabove and below and sink

    Sliding wall to hidestaging area

    Storage for medicalequipment

    Ceiling mounted curtaintrack

    Clothes closet Wall clock

    MAJOR EQUIPMENT Birthing bed Garbage can Infant Warmer RefrigeratorBassinet Incubator Neonatal monitor PhoneCase cart Fetal monitor Diagnostic set TVSoiled cart

    FURNISHINGS Bedside table Stool Sleeper / recliner chair Rocking chairPaper towel dispenser Soap dispenser Undercounter refrigerator MicrowaveOverbed table Side chair

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Nurse call Dimmer switch Computer hookup Exam lightTV / DVD / VCR

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)Oxygen-3 Vacuum-3 Medical air-2 Nitrous oxide-1Sink

    ROOM NAME: Patient Bathroom

    ROOM NO: IP-06.02 NSF: 60FUNCTION: Bathroom facility for patient(s)

    OCCUPANCY : 1 to 2 People TIME OF USE : 7 Days a Week -0000-2400

    S PECIAL DESIGN CONSIDERATIONS 1 Adjoins LBRP room

    ARCHITECTURAL ELEMENTS (BUILT-IN ITEMS)Mirror with light over Bedpan holder Grab barsCoat hook Bedpan, wash basin rack Intravenous hook

    MAJOR EQUIPMENT Garbage can

    FURNISHINGS Soap dispenser Towel bar Toilet paper dispenser Waste receptaclePaper towel dispenser Infant change table

  • 7/31/2019 Functional Program

    212/585

    Colchester Regional Hospital Maternal Child Unit IP-06Functional Program Project No. 0400 Room Data Sheet

    William Nycum & Associates Limited September 5, 2005 Page 209

    ELECTRICAL (S PECIAL LIGHTING, DATA, P OWER , C OMMUNICATIONS)Emergency call Emergency lighting Safety outlets for hairdryer

    MECHANICAL (P LUMBING FIXTURES, MEDICAL GASES , S PECIAL VENTILATION)