42
OWEA State Conference June 20, 2012 Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater

Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

OWEA State Conference

June 20, 2012

Full Scale Testing to Demonstrate

Anaerobic Selector Effect for Low

Strength Wastewater

Page 2: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Presenters

• Bill Donohue – NEORSD

• Bob Hrusovsky – MWH

• Don Esping – BC

Page 3: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Easterly Plant Site Plan

Page 4: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

DESIGN

May

15

, 2

01

3

BID & AWARD CONSTRUCTION

Sep

tem

be

r 1

5, 2

01

3

Mar

ch 1

5,

20

16

No

vem

be

r 1

, 20

11

Goal: Provide Sustained 400 MGD Secondary

Treatment by 2016

Page 5: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Preliminary Design Approach

• Investigations

• Testing

• Modeling

• Alternative

Development/Analysis

• Recommendations

– Technical Memorandum

– Preliminary Design Report

Page 6: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Approach to Provide 400 MGD Secondary

Capacity

• Biological Process Pilot Testing

• Clarifier Stress Testing and Modeling

• Plate Settler Pilot Testing

Page 7: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Capacity Limited by Clarifier Capacity and Hydraulics

• Objectives

• Wastewater Characterization for Model Support

• Results of Enhanced Biological Process Pilot

• Process Model Results

– Dry and Wet Weather Response

– Aeration Systems Response

• Operational Modes

– Dry and Wet Weather Options

Process

Page 8: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Objectives

• Incorporate Systems that Enhance and Sustain Biomass

Settleability

• Incorporate Operational Flexibility to Meet Settleability

Objective

• Minimize Operational Decision Points during Extreme Wet

Weather Events

• Optimize and Automate Aeration Delivery Controls

• Investigate Mechanical Alternatives

Page 9: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Wastewater Characterization

Parameter 2005 Ave.

(mg/L)

2012 Ave.

(mg/L)

TSS 46 41

COD 184 117

BOD 80 48

TKN 16.5 9.5

NH3-N 10.3 6.4

TP 2.05 1.45

- 36%

- 40%

- 42%

- 37%

- 29%

- 11%

Wastewater strength has weakened significantly since 2005

Page 10: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Wastewater Characterization

• Characteristics of Wastewater have Changed

General Trend: Decreasing Organic Strength

Page 11: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Wastewater Characterization

Flow Remains Relatively Unchanged

Page 12: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Enhanced Biological Process Pilot

CAS EBP1 EBP2

Page 13: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Enhanced Biological Process Pilot

• Investigate if Enhanced Biological Treatment process

promotes significant improvements in Settleability

Sequence time, hrs

Process

Sequence

Page 14: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Enhanced Biological Process Pilot

• Baseline Results

– All reactors performed “equally” for primary pollutant parameters:

COD, TSS, NH3-N, TP

No P-release

NO3 reduction

Acetate Produced

Consumed in

Denitrification

Page 15: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Enhanced Biological Process

• Biological Phosphorus Removal not observed in pilot

– VFAs consumed by denitrification

• Bench scale phosphorus release testing

– P release under normal flows

– No/limited P release under wet weather flows

• Bio-P/Anaerobic selector would require VFA addition for

reliable operations

Page 16: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Process Model

• Aeration Basin and Clarifier Model

Pass 1a

Pass 2a

Pass 3a

Pass 4a

PE

RAS

MLSS

Aeration Basin & Clarifier Model

Pass 1b

Pass 2b

Pass 3b

Pass 4b

WAS

F E

Page 17: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Process Model

• Conclusions

– Install DO control probes

• 5 DO probes per basin

• Use automated airflow valve control for each aeration pass

• Use airflow meters to monitor airflow and control minimum and maximum

airflow rates

– Maintain RAS rates controlled as percentage of influent flow

Page 18: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Operational Modes

• Objectives

– Maintain operational flexibility during dry and wet weather

– Minimize operator intervention during wet weather

– Optimize opportunity for sustaining optimal SVI

– Minimize solids loadings on clarifiers during wet weather

– Protect biomass from washout during extreme high flow

– Optimize for energy conservation during average conditions

Page 19: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Operational Modes

• Wet Weather: Step Feed Aeration

– Threshold flow = 225 MGD

– Maintain minimum of 800 mg/L during high flow

Pass 1

Pass 2

Pass 3

Pass 4

PERAS

MLSS

Pass 4 Step Feed Mode(threshold flow = 225 MGD)

Page 20: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Operational Modes

• Recommendations

– Maintain 1500 mg/L (14 day SRT) in dry weather (1200 max wet

weather)

– Utilize DO control for balancing air demand with load under all

conditions

– Step-feed aeration to Pass 4 for flows above 225 MGD

– Use RAS chlorination as needed

Page 21: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Plate Settler Demonstration

• Two manufacturers of plate

settlers were tested at

various surface overflow

rates

• Multiple samples were

taken from each and tested

for total suspended solids

(TSS)

• Excessive algae growth

was observed possibly

affecting results

Page 22: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Plate Settler Demonstration

• Results show that plate

settlers can achieve

higher treatment capacity

when compared to

existing settling tanks

• Full scale use of plate

would require covered

tanks to minimize algae

growth.

Average

Plate Settler 1 Plate Settler 2 Existing Tank

SOR TSS SOR TSS SOR TSS

2118 <3 2928 <3 592 <6

Page 23: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Clarifier Numbers and Available Space

Page 24: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Approach

Capacity of existing circular clarifiers

New Clarifier requirements

Circular

Rectangular

Optimization

Page 25: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Existing Circular Clarifiers

Parameter Value

Clarifier Diameter, ft 112

Side Water Depth, ft 11.8

EDI Diameter, ft 12.0

EDI Depth below water surface elevation, ft 4.8

Flocculation Well Diameter (Internal), ft 38.0

Flocculation Well Depth below water surface elevation, ft 7.25

Sludge Collection Scraper

Permitted SOR = 1665 gpd/sf

Page 26: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

0

5

10

15

20

25

30

35

40

45

0

500

1000

1500

2000

2500

3000

3500

0 30 60 90 120 150 180 210 240 270 300 330 360 390

So

lid

s L

oa

din

g R

ate

, lb

/sf-

d

Su

rfa

ce

Ov

erf

low

Ra

rte

, g

pd

/sf

Time, minutes

SOR SLR

Jan 2012 Secondary Clarifier Stress Test

10 clarifiers 8 clarifiers 6 clarifiers 4 clarifiers 8 clarifiers

2

6

Page 27: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Clarifier Modeling for Differing Sludge Quality

MLSS SVI SOR Q/clarifier SLR

mg/L mL/g gal/sf-d mgd lb/sf-d

1400 190 1240 12.2 20.4 15.6

1400 150 1550 15.3 24.0 8.2

1400 120 1800 17.7 26.9 4.0

1200 150 1700 16.7 22.1 5.6

Number of

Additional

Clarifiers @

SOR

Existing Clarifiers

Page 28: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Existing Circular

MLSS 1200 mg/L

SOR 1700 gpd/sf

SVI 150 mL/g

SLR 22 lb/sf-d

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

Double click on text to write a simulation description

720 Minutes

Page 29: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

New Circular Secondary Clarifiers

Center fed mixed liquor

Energy Dissipation inlet

Flocculation Baffle

Hydraulic sludge suction removal with

dedicated pumping

In-board launders

Flat bottom

Clarifier depth > 16 feet

Page 30: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

New Circular Secondary Clarifiers

MLSS 1400 mg/L

SOR 1700 gpd/sf

SVI 150 mL/g

SLR 26.5 lb/sf-d

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

Double click on text to write a simulation description

720 Minutes

Page 31: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

New Circular Secondary Clarifiers

MLSS 1200 mg/L

SOR 1950 gpd/sf

SVI 150 mL/g

SLR 25.3 lb/sf-d

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

Double click on text to write a simulation description

720 Minutes

Page 32: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Rectangular – Type I (Outlet end sludge draw-off)

Page 33: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Rectangular – Type I

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

Double click on text to write a simulation description

540 Minutes

Dimensions 150’x20’x15’ SWD

MLSS 1200 mg/L

SOR 1660 gpd/sf

SVI 150 mL/g

SLR 20.8 lb/sf-d

Page 34: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Rectangular – Type II (Center Sludge Draw-off)

Page 35: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Rectangular – Type II

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

Double click on text to write a simulation description

720 Minutes

Dimensions 265’x20’x15’ SWD

MLSS 1200 mg/L

SOR 1320 gpd/sf

SVI 150 mL/g

SLR 20.3 lb/sf-d

Page 36: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Summary

Type

New (Additional) Clarifier

Dimensions

Number of

Additional

Clarifiers1

Maximum

Number of

Clarifiers in

Space Available

Circular 105ft diameter x 16+ft SWD 6 6

Rectangular

Type I 20ft x 150ft x 15 ft SWD – 22 20

Type II 20ft x 265ft x 15 ft SWD – 16 10

1. Largest clarifier out of service

Page 37: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Optimizing Circular Clarifiers – RAS Capacity

0

5

10

15

20

25

30

0 100 200 300 400 500 600 700 800

Eff

lue

nt

Su

sp

en

de

d S

olid

s,

mg

/L

Time, minutes

Existing Clarifiers, MLSS = 1200 mg/L, SVI = 150 mL/g, SOR=1700

RAS=5 mgd RAS=6 mgd RAS= 7 mgd

Page 38: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Optimizing Existing Clarifiers – RAS Capacity

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

RAS = 5 mgd

720 Minutes

Conc. (mg/L)10000

4329

1874

811

351

152

66

28

12

5

2

1

RAS = 7 mgd

720 Minutes

5 mgd/clarifier

7 mgd/clarifier

Page 39: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Conclusions

• Circular and Type 1 rectangular clarifiers

can provide current permitted capacity of

1665 gpd/sf

• Circular clarifier selected

• Better performance (17 vs 25 mg/L ESS)

• More efficient use of space and less

equipment

• Potential of 20-30% higher capacity than

Type 1 rectangular clarifiers

Page 40: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Clarifier Test / Modeling Results

• Energy Dissipating Inlet and Flocculation Well was a good

investment. Six Circular Clarifiers can be added to provide

400 MGD

• This saved up to $10 million dollars in construction costs

Page 41: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

Proposed Improvements

• Aeration System

• Clarifiers

• Chemical Systems

• Disinfection

• Final Effluent Pumps

• Return Aeration

Sludge (RAS) Pumps

• Flood Pump

Page 42: Full Scale Testing to Demonstrate Anaerobic Selector ... · MLSS SVI SOR Q/clarifier SLR mg/L mL/g gal/sf-d mgd lb/sf-d 1400 190 1240 12.2 20.4 15.6 1400 150 1550 15.3 24.0 8.2 1400

A Special Thanks for Their Assistance

• Bob Bonnett- Easterly WWTP Plant Superintendent

• Plant Staff