US Army Corps of Engineers
BUILDING STRONG®
Freight Advisory Council: Performance of the
Upper Mississippi River Navigation System
Andrew G. Barnes, P.E., P.M.P.
Assistant Chief, Programs & Project
Management Division
Rock Island District
December 2, 2016
BUILDING STRONG®2
• 37 Lock Sites
• 1,200 Miles of River
• Significant Ecosystem (2.7
million acres)
• Constructed 1930-45
Upper Mississippi River System
BUILDING STRONG®3
Commodity Transportation Efficiency
One Tow of 15 Barges + 1 Towboat
216 Rail Cars + 6 Locomotives
1,050 Large Semi Tractor-Trailers
BUILDING STRONG®
UMR Tonnage 1999-2015
4
Tons
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Lock 11
Lock 15
Lock 22
Lagrange
Lock 27
BUILDING STRONG®
Commodity Types UMR
5
BUILDING STRONG®6
0
1000
2000
3000
4000
5000
6000
7000
8000
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Mississippi Scheduled Lock Outages (Nav Notes)
11 12 13 14 15 16 17 18 19 20 21 22
BUILDING STRONG®
FRM Reservoirs
Mississippi River L/D
Saylorville
Red Rock
Coralville
Farmdale
Fondulac
Rock Island District Operations Readiness
LD 12
LD 11
LD 13
LD 14
LD 15
Illinois Waterway L/D
LaGrange
Marseilles
LD 16
Peoria
Starved Rock
Brandon Road
Lockport
T.J. O’Brien
Fully Operational Restricted Operations Out of Operation
Unclassified
FOUO
MVR Top “System”
Issues:
20 JAN 2016
LD 17
LD 18
LD 19
LD 20
LD 21
LD 22
Notes
Gates and Emergency Bulkhead don’t seal, but
does not affect project readiness
Dresden Island
Notes
Dewatering
BH Slots Installation
BH Slots Installation
Dewatering
Issue: Marseilles Dam
Gates under repair from
2013 allision
Diversion dam gate under construction,
Dam gates under repair6/8
Issue: Diversion Dam Gate
under repair, and 2 of 3 fixed
pumps operational at the
Barrier Dam
BUILDING STRONG®
Bulkhead Recess Installation
8
BUILDING STRONG®
Lock Dewatering
BUILDING STRONG®
Miter Gate Install
BUILDING STRONG®
Upcoming Scheduled Closures
Mississippi River► Lock 15 – Bulkhead Recesses 13 Dec 16 – 3 Mar 17
► Lock 16 – Bulkhead Recesses 13 Dec 16 – 3 Mar 17
► Lock 17 – Dewatering 13 Dec 16 – 3 Mar 17
► Lock 21 – Guidewall (Restriction) 15 Dec 16 – 28 Feb 17
► Lock 22 – Tow Haulage (Restriction) 2 Jan 17 – 24 Jan 17
Illinois Waterway► Starved Rock – Guidewall (Restriction) 1 Jun 17 – 7 Jul 17
► LaGrange – Bulkhead Recesses (Restriction) 1 Jun 17 – 29 Aug 17
11
BUILDING STRONG®12
-
1,000
2,000
3,000
4,000
5,000
6,000
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Mississippi Unscheduled Lock Outages (LPMS)
BUILDING STRONG®
High Water Impacts
13
BUILDING STRONG®
High Water Impacts
14
BUILDING STRONG®15
0
1000
2000
3000
4000
5000
6000
7000
8000
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Mississippi Scheduled VS Unscheduled Lock Outages
Unscheduled Scheduled Linear (Unscheduled) Linear (Scheduled)
BUILDING STRONG®
Questions?