1 Freeway Beautification Project (AKA Metro Freeway Crew) April 19, 2012

Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

1

Freeway Beautification

Project (AKA Metro Freeway Crew)

April 19, 2012

Page 2: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Project Definition

MTA initiated a pilot project with Caltrans to improve graffiti abatement, debris removal and landscape improvements along two corridors I-110 from College St to

Exposition Blvd I-710 from SR-60 to I-405

2

Page 3: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Landscape Maintenance

Secured Caltrans authorization to plant deterrent vegetation at a specific location – on 110 S at College St Bridge

Prepared soil for planting, upgraded the irrigation and planted five bougainvillea and four California hopseed plants

Before:

After:

3

Page 4: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

4

Work Has Begun

Mural Replica

Page 5: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Graffiti Removal

Graffiti removal on the I-110 and I-710 corridor has begun 50 locations as of April 19, 2012

Completed initial clean-up of Railroad and Utility crossings along I-710

Secured additional Caltrans support along both corridors – guardrail repairs, ramp crack sealing, additional debris removal, weed herbicide spraying

Conducted a meeting with Caltrans, railroads and utilities to improve vandalism deterrence along I-710

5

Page 6: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

I-110 Graffiti Removal

6

Page 7: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

I-110 Graffiti Removal

7

Page 10: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Railroad Deterrence

10

Page 11: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Railroad Deterrence

11

Page 12: Freeway Beautification Project - Metro...50 locations as of April 19, 2012 Completed initial clean-up of Railroad and Utility crossings along I-710 Secured additional Caltrans support

Next Steps

Continue with the smaller contracts to bridge the gap until the large contracts are awarded

Award large maintenance contract to include graffiti/debris removal

Award large landscaping contract to include plant maintenance and new plantings

Continue discussions with Caltrans, railroads and utilities for graffiti deterrence

12