Prof. Volker Wittwer Fraunhofer Institute for Solar Energy Systems ISE MedSpring Training Event Marrakech, 11-13 June, 2014 www.ise.fraunhofer.de
The Fraunhofer-Gesellschaft Mission Statement
• Promotes and undertakes applied research in an international context, of direct utility to private and public enterprise and of wide benefit to society as a whole.
• Helps reinforce the competitive strength of the economy on the regional level, throughout Germany and in Europe
• Offers a platform that enables its staff to develop professional and personal skills
2
2
The Fraunhofer-Gesellschaft Locations in Germany
• 67 institutes and independent research units
• Staff of over 23,000
Institute/independent research unit
Other research units
Headquarters
3
Dubai
Bangalor
Jakarta
Beijing Seoul Tokyo
Boston Plymouth
East Lansing San José
Newark Maryland Cairo
Ampang
Santiago de Chile
Singapor
Cambridge
Brussels
Porto
Vienna
Bozen Graz Budapest
Wrocław
Göteborg
Thessalonica
Sydney
London
Glasgow
Salvador
Sendai
Paris
São Paulo Campinas
Vancouver
Southampton
Jerusalem
Stellenbosch
Storrs
Dublin
The Fraunhofer Gesellschaft Connected Worldwide
Fraunhofer Subsidiary Center Representative / Marketing Office
Senior Advisor
Project Center
ICON / Strategic Cooperation
4
3
Fraunhofer ISE Performing Research for the Energy Transformation
Director: Prof. Eicke R. Weber Staff: 1300 Budget 2013: € 86.7 million
Established: 1981
5
• Distinguished prize winner: Fraunhofer Institute for Solar Energy Systems ISE
• The Zayed Future Energy Prize is endowed with $1.5 million
Prof. Dr. Eicke Weber accepts the award from His Highness General Sheikh Mohammad Bin Zayed Al Nahyan, crown prince of Abu Dhabi. 20 January 2014
Foto
© R
yan
Car
ter/C
row
n Pr
ince
Cou
r t–
Abu
Dha
bi
6
Fraunhofer ISE Zayed Future Energy Prize 2014
4
"Electricity from Photovoltaic Power Plants without Feed in Tariff"
Project Vallis Solaris "In the Region … for the Region"
Integrated PV Modules Production in Croatia
(Solar silicon/Solar Glass/Ingots/Wafers/Cells/Modules/Inverters)
MedSpring Training Event / Marrakech, 11-13 June, 2014
R & D / System Engineering Leadership
FRAUNHOFER ISE
SOLAR GLASS PRODUCTION
SOLAR SILICON PRODUCTION
(Mg-Si / Umg-Si 4N)
INGOTS / WAFFER / CELLS /
MODULES
PRODUCTION
INVERTER PRODUCTION
PHOTOVOLTAIC POWER PLANTS
STORAGE CAPACITY
VALLIS SOLARIS Initial Capital, Project Development,
Financial Structuring, Market
*) Full Integrated "Eco-industrial Cluster" for Development, Production and Application of PV-Power
ELECTRICITY QUARTZ SAND
Electricity from Photovoltaic (PV) Power Plants without Feed in Tariff
PROJECT VALLIS SOLARIS* - FROM SAND TO ELECTRICTY:
8
5
Why Umg-Silicon (Upgraded metallurgical silicon)? Calisolar Si Purification Process vs. Conventional Siemens
Source: Calisolar Company Overview / January 28, 2011
High Quality, with significant cost advantage
Item Umg-Si (Calisolar)
Conventional-Si (Siemens)
Improvement Factor
Module Reliability/Quality 25 years / 80% Passes all standards
25 Years / 80% =
Cell Performance 16.5% 16.5% =
Environmental Impact Benign, low temp Hazardous Must be remote
++
Energy Requirements < 25kWh/kg 110kWh/kg 1/4th
Construction Time 11 months 2 .5 – 3.5 years 1/4th
Construction Costs $20 million $120 million 1/6th
Plant footprint per 1000MT/yr 5000m2 49,300m2 1/10th
Energie-PayBack <1.0 Jahre 1.5 Jahre 2/3
Advantages are especially relevant when PV market enters next phase: o 2012: 30 GW Market (with overcapacity) o Medium term: 100 GW Market (capacity utilization)
9
Silicon Wafers Solar Cells Modules Systems
Sun Sand Electricity
Ingots
UPGRADED METALLURGICAL SILICON (UMG-Si): Activities at Fraunhofer ISE / Cooperation with Vallis Solaris Company
Since the last 5 years, the institute ISE with support of the Fraunhofer Society and of the Federal Ministry for Environment and Nuclear Security BMU has invested over € 20mio into the realisation of new and unique PV-technologies and production research in the domain of "UMG-Si”.
10
6
Levelized Cost of Electricity (LCOE)**:
Confidential
11
Through further project development the data will be subject to change. Source: Fraunhofer Institute for Solar Energy Systems ISE, Project "Vallis Solaris" – Indicative Business Assessment (500 MW Integrated Ingot/Wafer/Cell/Module Factory in Croatia), 03.09.2013
*) German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (2012), Langfristszenarien und Strategien für den Ausbau der erneuerbaren Energien in Deutschland bei Berücksichtigung der Entwicklung in Europa und global, J. Nitsch et al., 2012.
**) The cost of electricity (typically cents/kWh, Euro/kWh, Euro or $/MWh) generated by different sources is a calculation of the cost of generating electricity at the point of connection to a load or electricity grid. It includes the initial capital, discount rate, as well as the costs of continuous operation, fuel, and maintenance. This type of calculation assists policy makers, researchers and others to guide discussions and decision making.
Solar Park is financed by 100 % Equity, Corporate Tax Rate: 20 %
PROJECT VALLIS SOLARIS: Full integrated - Photovoltaic Industrial Cluster
12
INVESTMENT OVERVIEW
PHASE 1 (2014 / 15, 16*)
PHASE 2 (2017 / 18*)
PHASE 3 (2019 / 20*)
TOTAL
1. PV (Ingots/Wafers/Cells/Modules) Production: a) Investment b) Working places
125 MW 123,363,141 €
371
125 MW 125,005,140 €
345
250 MW 207,085,412 €
579
500 MW 455,453,693 €
1,295
2. Solar Glass (Processing/Coating/Production): a) Investment b) Working places
10,100,000 €
40
15,800,000
35
40,500,000 €***
55
66,400,000 €
130
3. Inverter Production: a) Investment b) Working places
125 MW 5,000,000 €
25
225 MW 15,000,000 €
40
350 MW 20,000,000 €
65
4. PV Power Plants: a) Initial Investment for Development b) Investment – PV Power Plants c) Working places (Control center / maintenance)
113.9 MW 5,000,000 €
119,055,797 € 15
384.2 MW
358,126,166 € 25
663.8 MW**
580,963,559 € 10
1,161.9 MW
1,058,145,522 € 50
5. Research and Development: a) Investment b) Working places
10,000,000 €
5
10,000,000 €
8
10,000,000 €
7
30,000,000 €
20
6. Mg-Sillicon / Umg-Sillicon (4-5 N) Production: a) Investment b) Working places
130,000,000 €***
300
130,000,000 €
300
TOTAL IMVESTMENT 272,518,938 € 523,831,306 € 968,548,971 € 1,764,899,215 €
TOTAL WORKING PLACES 456 453 951 1,860
Through further project development the data will be subject to change.
*) First production year; **) PV Electricity export (100 MW installed capacity); ***) Start depending on market development
7
Job Creation from PV Manufacturing & PV Power Plant Installation
13
Source: ISE Fraunhofer, Solar Summit , Freiburg, 23. October 2013
Learning-curve based predictions of the LCOE of renewable energy technologies and conventional power plants in Germany by 2030 versus Vallis Solaris concept in Croatia
14
Through further project development the data will be subject to change. Source: Fraunhofer ISE
8
*) Joint Venture Company (Vallis Solaris and Local Utilities)
1. Initial Capital and Project development (building and operating permit); 2. Land
3. Power Purchase Agreement with Local Utilities; 4. Sales on Pension Funds, …
PUBLIC PRIVATE PARTNERSHIP – BOOT Model (build-own-operate-transfer)
VALLIS SOLARIS Ltd.* (PV Power Plants - Development)
Republic of Croatia, Municipalities
Local Utilities
PHOTOVOLTIAC – POWER PLANTS (SPV 1, 2, 3, …)
1
PV POWER PLANTS IN CROATIA: Development Structure Draft
2
3
15
Pension Funds, Local Utilities, Other Investors
4
Vallis Solaris PV Power Plants Installations 2016 – 2025: Average PV Power Sales Price
16
7,07 6,71
6,45 6,30 6,19 6,15 6,15 6,15 6,15 6,15 6,15 6,15 6,15
6,15
5,63
5,14
4,70
4,28 3,86
3,63 3,34
2,98
2,51 2,0
3,0
4,0
5,0
6,0
7,0
8,0
Aver
age
PV P
ower
Sal
es P
rice
[€ct
/kW
h]
Average PV Power Sales Price of Vallis Solaris PV Power Plants (for Installations from 2016 - 2025)
Average PV Power Sales Price
Through further project development the data will be subject to change. Source: Fraunhofer ISE, Indicative Business Assessment, Vallis Solaris PV Power Plants in Croatia, June 2014
Ø Electricity Price p.a. (2016-2055)
€ct/kWh 5.22
9
Vallis Solaris PV Power Plant of 2016: Power Production Costs over a PV Power Plant‘s Life (30 years)
17
Through further project development the data will be subject to change. Source: Fraunhofer ISE, Indicative Business Assessment, Vallis Solaris PV Power Plants in Croatia, June 2014
5,66 5,57
4,52 4,43 4,34 4,36 4,53 4,55
1,88 1,90 1,92 1,94 1,96
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
Yr 1 Yr 2 Yr 14 Yr 15 Yr 16 Yr 17 Yr 24 Yr 25 Yr 26 Yr 27 Yr 28 Yr 29 Yr 30
PV p
ower
pro
duct
ion
cost
s [€
ct/k
Wh]
Year of operation of PV park [Year]
PV power production costs of Vallis Solaris PV power plants' life time Interest Reserves for Deconstruction All risk insurance Mainentance Oper./Admin./Monitoring expenses Rent/Lease of Land Contribution to Municipality Depreciation Sum
Vallis Solaris PV Power Plants Installations 2016 – 2025: Annual Energy Production
18
Through further project development the data will be subject to change. Source: Fraunhofer ISE, Indicative Business Assessment, Vallis Solaris PV Power Plants in Croatia, June 2014
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
4,5
Ener
gy P
rodu
ctio
n (A
C) [
TWh/
a]
Energy Production of Vallis Solaris PV Power Plants (for Installations from 2016 - 2025)
Energy Production (AC)
10
19
Monthly production of solar and wind energy in Germany / Year 2012:
Monatliche Produktion Solar und Wind
Jahr 2012
Januar Februar März April Mai Juni Juli August Sept. Oktober Nov. Dez.
5,0
6,0
7,0
4,0
3,0
2,0
1,0
TWh
Legende: Wind Solar
Source: Prof. B. Burger, Fraunhofer ISE, Daten: Leipziger Strombörse EEX
Sun and wind complement each other ideally!
1. SHORT TERM GOALS: • Integrated PV Modules Production
(Ingots / Wafers / Cells / Modules) for Local Markets and Export
• PV-Power Plants (Electricity for Local Market)
• REEE - Technology Center
(Transfer of knowledge, capacity building and initial development of Green Industry, the energy system transformation, flexibilization of production and use of electricity & heat , stationary batteries, optimization of the Croatian future energy system based on hourly modeling, …)
2. MIDDLE TERM GOALS: • Storage capacity (Pumped Storage Hydro Plants, Power-to-Gas, …)
• Physical infrastructures / Grids
• PV-Electricity Export
• Technology Export
PROJECT GOALS:
20
11
21
• Through further development of technology the PV electricity costs will be less than from standard fossil power station in the coming years
• Vallis Solaris as favor company for using of Fraunhofer ISE / UMG-Si technology
development (Fraunhofer has already invested €20.0mio in this technology and is Co-Owner of Vallis Solaris)
• REEE - Technology Center Split (the planning phase of the center is financed by
Fraunhofer Society and the County of Split starting in December 2012 with 100.000 € from each side
• in combination solar energy, wind energy, hydro energy and biomass can deliver 100%
of the needed energy of Croatia. This would save a large amount of money, which is used nowadays for importing fossil fuels and electricity
• Vallis Solaris as possibly Pilot Project of Mediterranean Solar Plan-MSP, great
acceptance by the Secretariat of Union for Mediterranean / letters from 13.12.2012 and 01.10.2013
PROJECT VALLIS SOLARIS: Facts - Summary
MEDITERRANEAN SOLAR PLAN: Summary
Ø Developing renewable energies and improving the energy efficiency in the UfM* member states: Build 20 GW of extra production capacities of RE between now and 2020
Ø 20-20-20 The objectives of the European Energy-Climate package for 2020: - reduction of 20-30 % of the CO2 emissions - reaching 20 % of RE (specific mandatory objectives for every member state).
Ø Renewable energy as an industrial catalyst
Ø Transfer of knowledge and capacity building
Ø Physical infrastructures: Grids
Ø Indicative criterias: regional impact, reproducibility, know-how transfer, demonstration effects, scaling up of potentials, positive impact on host country economy and employment;
Ø UfM label: a political support from 43 UfM countries closely connected to major financial institutions.
*) UfM Member States: Austria , Algeria , Albania , Bosnia and Herzegovina , Belgium , Bulgaria, Croatia ,Cyprus , The Czech Republic , Denmark, Egypt , Estonia, Finland, France, Germany , Greece, Hungary , Italy , Israel , Jordan; Latvia , Lebanon; Lithuania , Luxemburg; Malta , Mauritania , Monaco , Montenegro, Morocco , The Palestinian Authority , The Netherlands , Poland, Portugal , Republic of Ireland , Romania , Slovakia , Slovenia , Spain , Syria , Sweden , Tunisia , The United Kingdom ,Turkey
22
12
Vallis Solaris – Mediterranean Solar Plan: Increasing of Productivity through Cooperation / Structure Draft
Vallis Solaris Productions (Croatia, Morocco, Turkey, …)
Vallis Solaris Services (location / to be defined)
Full Integrated Production:
§ Umg-Si § Solar Glass § Ingots § Wafers § Modules § Inverters § Systems
§ Central Purchasing § Development of New
Technologies (IP) with Industry and Research Institutes
§ International Project Development
VALLIS SOLARIS HOLDING
23
SYNERGIE
RESEARCH AND DEVELOPMENT
PHOTOVOLTAIC
MARKET
PV INGOTS / WAFERS CELLS / MODULES
PRODUCTION
SOLAR GLASS PRODUCTION
SUPPLIERS -
INDUSTRY
SYSTEM ENGINEERING
● Creation and securing of IP and high-tech working places in all supporting countries .
● Regional supply of cost-effective PV modules for solar power generation / electricity from renewables.
● Additional source of income for towns and communities on the basis of the PPP models (PV Roof Installations and Solar Power Plants).
● New Financial Product for Regional Stock-Exchanges (Solar Power Plants- suitable for Institutional Investors / Pension Funds, Local Utilities, …)
● Mutually beneficial partnerships between businesses and R&D institutions from all Vallis Solaris supporting countries.
PROJECT VALLIS SOLARIS: SYNERGIES FOR ALL PROJECT PARTNERS
24