I. INTRODUCTION
Continuous frame analysis is a very important design subject for a
structural engineer, for in this field he is confronted with the conflicting
requirements of achieving sufficient accuracy and at the same time expending a
minimum of effort and calculation. or this purpose there are many analytical
procedures established and evolved by eminent persons like Castigliano,Clapeyron, Maxwell, Poisson Hardy Cross, Grinter, Kani and so on. In the
presence of these the aim of writing this paper is to lay down in a simple form
a procedure for adopting suitable methods, which may be easily understood,
and are also comprehensive enough to so lve the various problems, that arise
in designing complicated framed buildings. Construction of a number of such
buildings are in progress under the charge of the author at Lahore, and he has
the opportunity of structurally designing a number of these. He has, therefore,
ventured to sum up his observations in the form of this paper, so that it may
be of some use to those who are interested in the design of multistoreyed
buildings. While tackling this problem the paper deals with, in the beginning
various properties of a rigid frame and different kinds of loads to which it is
subjected. l t then gives various methods of stress analysis, finishing in the
end with illustrations for stress analysis, which are self explanatory.
The scheme for the construction of Government Institute of Polytechnic
at Lahore was approved by the Government of West Pakistan at the estimated
cost of Rs. 31 lacs. The site selected by the department for this purpose was
the premises occupied by the existing Government Technical Institute at
Railway Road, Lahore.* The site being limited, the new building has been
planned as five-storeyed structure consistent with architectural, structural
and functional requirements, so that it is suitable from the point of view of
accommodation, convenience and comfort. The structure is fully rigid and the
frame that has been adopted consists of two or three panels having long
verandahs with rooms flanking on one side only. The site where the Polytechnic
building is being constructed consisted of made-up soil up to 5 depth. Boring
was carried out at different places up to 100 depth which revealed that the soil
below IS was satisfactory.· · · - -• S uperintending Engineer Constmctio11 Circle Lahore.
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 2/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 3/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 4/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 5/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 6/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 7/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 8/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 9/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 10/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 11/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 12/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 13/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 14/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 15/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 16/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 17/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 18/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 19/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 20/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 21/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 22/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 23/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 24/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 25/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 26/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 27/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 28/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 29/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 30/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 31/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 32/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 33/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 34/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 35/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 36/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 37/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 38/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 39/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 40/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 41/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 42/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 43/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 44/45
8/13/2019 Frame Analysis Engineersdaily
http://slidepdf.com/reader/full/frame-analysis-engineersdaily 45/45