Fpso Hull Integrity

Embed Size (px)

Citation preview

  • 7/23/2019 Fpso Hull Integrity

    1/38

    FPSO HULL INTEGRITY

    MURDJITODepartment of Ocean Engineering ITS, Gedung WA

    Kampu ITS Su!o"i"o, Sura#a$a %&'''

    e(mai") murd*ito+oeitacid

  • 7/23/2019 Fpso Hull Integrity

    2/38

    RULES & REGULATIONS

    Shipbuilding vs. Offshore Stndrds! piping

    ! sele"tion of #terils

    ! ""o##odtions! "ontrol & sfet$ s$ste#s

    Sfet$

    ! I%O %OU s referen"e

    ! SOLAS li#ited to spe"ifi" ite#s not "overed b$%OU

    ! %AR'OL (ith unified interprettion for)'SO*s

  • 7/23/2019 Fpso Hull Integrity

    3/38

    +ULL STRENGT+ ISSUES

  • 7/23/2019 Fpso Hull Integrity

    4/38

    +ULL GIRER ,-ENING %O%ENT

    A'AIT/

  • 7/23/2019 Fpso Hull Integrity

    5/38

    +ULL GIRER ,0A1E S+EAR

  • 7/23/2019 Fpso Hull Integrity

    6/38

    GLO-AL +ULL ESIGN !0A1E -% & S)

    Still (ter loding "onditions often #ore severe for )'SO 0ve loding depends upon site environ#entl "riteri2

    ! hrsh environ#ent (ve -% nd S) re "lose to nd #$ e3"eed ShipRule re4uire#ents

    ! benign environ#ent (ve -% nd S) re less thn Ship Rules 5but notto be t6en less thn 789 of unrestri"ted servi"e Ship Rule

    re4uire#ent: %ulti,site opertion #$ re4uire ssess#ent To(ing; inspe"tion nd te#porr$ "onditions to be "onsidered Rules re4uire ssess#ent of site spe"ifi" (ve loding 5

  • 7/23/2019 Fpso Hull Integrity

    7/38

    E3#ple Trnsit "se 5-ong:

  • 7/23/2019 Fpso Hull Integrity

    8/38

    -U.. STRE/GT- 0 1ATIGUE 1E MODE.S

    rgo > bllst tn6 re

    %ooring stru"ture nd hull integrtion 5turret nd>or"hinstoppers:

    Riser por"hes nd supporting stru"ture

    Topsides support stru"ture nd hull integrtion

    )lre to(er support stru"ture

    Offloding sttion support stru"ture

    %in "rne pedestls nd support stru"ture

    +elide"6 stru"ture

    Additionl lo"tions depending on vessel fun"tion ndo(ners re4uire#ents

  • 7/23/2019 Fpso Hull Integrity

    9/38

    ARGO TAN? %OEL

    Lodings2! +ull girder S) & -%

    ! E3ternl pressure

    ! rgo lods

    ! Topside lods

  • 7/23/2019 Fpso Hull Integrity

    10/38

    %OORING TURRET INTEGRATION

    .oading)! %ooring s$ste# nd

    risers

    ! +ull girder S) & -%

    ! Internl > e3ternlpressure

  • 7/23/2019 Fpso Hull Integrity

    11/38

    TO'SIE SU''ORT STRUTURE

    Grvit$ lodings +ull #otions +ull girder stresses +ull girder defle"tions

  • 7/23/2019 Fpso Hull Integrity

    12/38

    -OTTO% SLA%%ING

  • 7/23/2019 Fpso Hull Integrity

    13/38

    -O0 AREA I%'AT

    Effe"ts for(rd botto# stru"ture )"tors ffe"ting sl# pressure2

    ! bluffness of bo(

    ! pit"h response > (ve length

    ! (ve steepness! (ve height

    ! bre6ing (ves

    ! loding "ondition 5drft:

    %odel testing dvisble Rules "ontin re4uire#ents relting to drft;

    pressure; e3tent nd s"ntlings

  • 7/23/2019 Fpso Hull Integrity

    14/38

    GREEN SEAS !-O0 AN %AIN E?

  • 7/23/2019 Fpso Hull Integrity

    15/38

    GREEN SEAS !%AIN E?

    Tn6er heding off the (ves due to! 0ind! urrent

    0ve "rest trvels long ships (etherside

    Energ$ is "on"entrted 0ve height in"reses 0ter is shipped on the #in de"6 in

    #idship se"tion

    I#p"t on stru"tures nd e4uip#ent

  • 7/23/2019 Fpso Hull Integrity

    16/38

    GREEN SEAS

    )"tors ffe"ting green ses2! pit"h response > (ve length

    ! (ve steepness

    ! (ve height

    ! bre6ing (ves! loding "ondition 5drft:

    ! bo( shpe

    Rules for ships in"orporte llo(n"es (ithin

    design heds for superstru"tures; de"6houses;bul(r6s nd de"6s.

    %odel testing dvisble

  • 7/23/2019 Fpso Hull Integrity

    17/38

    SLOS+ING IN ARGO OIL TAN?S

  • 7/23/2019 Fpso Hull Integrity

    18/38

    SLOS+ING IN ARGO OIL TAN?S

    Sloshing is the d$n#i" #gnifi"tion of pressures(ithin "rgo>bllst tn6s

    'rtil fillings the nor# for )'SOs 5NOT so for trding oiltn6ers:

    Influen"ing )"tors2!

    Tn6 si@e! +ull for#! Environ#ent > 0ethervning! Nturl periods of both vessel nd fluid! Tn6 fill levels

    Sloshing nl$sis re4uired 5e.g. LR )LUIS: Anl$sis #$ result in n in"rese in s"ntlings t tn6

    tops Restri"tions #$ be pl"ed on fill levels in "ertin tn6s

  • 7/23/2019 Fpso Hull Integrity

    19/38

    AIENTAL LOAS

    ollision due to suppl$ bot > shuttle

    tn6er > i"eberg

    ropped obe"t

    E3plosion > blst

    Ulti#te strength "riteri 5

  • 7/23/2019 Fpso Hull Integrity

    20/38

    )ATIGUE !the proble#

    The effe"t on #etl of repeted "$"les of stress. There is no obvious (rning; "r"6 for#s

    (ithout ppre"ible defor#tion of stru"ture#6ing it diffi"ult to dete"t the presen"e ofgro(ing "r"6s.

    )r"tures usull$ strt fro# s#ll ni"6s ors"rt"hes or fillets (hi"h "use lo"li@ed"on"entrtion of stress.

    )ilure "n be influen"ed b$ nu#ber of f"tors

    in"luding si@e; shpe nd design of the"o#ponent; "ondition of the surf"e or opertingenviron#ent.

    )tigue life of stru"turl detils need to bessessed for )'SO

  • 7/23/2019 Fpso Hull Integrity

    21/38

    )ATIGUE LI)E ASSESS%ENT

    Identifi"tion of "riti"l res

    etiled finite ele#ent nl$sis to ssess Stresson"entrtion )"tors

    Site spe"ifi" nl$sis of d$n#i" lods

    'revious servi"e histor$ to be ssessed 5for "onversions:

    Sele"tion of S>N "urves! Other relevnt issues2

    ! thodi" prote"tion > "otings

    ! )bri"tion; tolern"es; (elding

    ! Inspe"tion > Inspe"tbilit$! Repir > stru"turl detil i#prove#ent

    ! )r"ture #e"hni"s ssess#ent

    Note2 ftigue is highl$ sensitive to loding 5stress rnge:

  • 7/23/2019 Fpso Hull Integrity

    22/38

    ECA%'LE )E% %ES+ ARRANGE%ENT TO

    ETER%INE S)S

  • 7/23/2019 Fpso Hull Integrity

    23/38

    )ATIGUE LI)E ,)ATORS O) SA)ET/

  • 7/23/2019 Fpso Hull Integrity

    24/38

    T/'IAL RITIAL AREAS

  • 7/23/2019 Fpso Hull Integrity

    25/38

    )A-RIATION TOLERANES AN 0ELING

    Tolern"es should be in ""ordn"e (ith good

    shipbuilding pr"ti"e; nd greed (ith lss

    So"iet$

    Spe"il ttention given to ftigue sensitive res Enhn"ed NE levels (ill be ne"essr$ for

    identified ftigue sensitive res

    Assu#ptions used in nl$ti"l ftiguessess#ents to be "onsistent (ith "onstru"tion

  • 7/23/2019 Fpso Hull Integrity

    26/38

    )'SO )ATIGUE EN+ANE%ENT ETAILS ON1ERSION

  • 7/23/2019 Fpso Hull Integrity

    27/38

    IN SER1IE SUR1E/ 'ROGRA%

    Sour"e 2! developed b$ the o(ner > opertor ginst list

    of surve$ble ite#s

    ! Surve$ pln to be pproved b$ lss To ddress 2

    ! lss re4uire#ents

    ! Regultor$ re4uire#ents! Overll hull stru"ture "onfigurtion & "riti"l

    res

  • 7/23/2019 Fpso Hull Integrity

    28/38

    STRUTURAL INS'ETION

    rried out on lo"tion

    'rovides dete"tion > #onitoring "p"it$

    Annul; inter#edite & #or surve$s

    %or surve$ 5D $ers or "ontinuous: I0S in lieu of dr$ do"6ing

    Internl surve$ "onsidertions2! "lening & gs freeing

    ! ""ess rrnge#ents>sfet$

    ! Lighting > ventiltion

    ! loding "onditions for strength

  • 7/23/2019 Fpso Hull Integrity

    29/38

    IN 0ATER SUR1E/S

    Re4uire#ents for OI0S* nottion

    ! thodi" prote"tion nd high resistn"e pint

    ! Under(ter #r6ing

    ! Tn6 inspe"tion "onditions in"luded in hull

    girder nl$sis

    ! 1enting>isoltion rrnge#ents for tn6 entr$

    !Arrnge#ents "onsidered for surve$>"hnge,out of thrusters; se "hests; rudder bering

    et".

  • 7/23/2019 Fpso Hull Integrity

    30/38

    'er#nent %ens of A""ess 5'%A:

    SO.AS re2uirement for ne3#ui"d

    4ee"

    !All internl tn6s

    ! Eli#inte need for stging; rfting or rope

    ""ess

    !A""ess for "lose up e3#intion

    ! Utilise tn6s stru"turl #e#bers; or provide

    dedi"ted rrnge#ents! Stndrds for ldders; hndrils; et"

    ! 'ortble e4uip#ent #$ be used for so#e

  • 7/23/2019 Fpso Hull Integrity

    31/38

    SOLAS 'er#nent %ens of A""ess 5'%A:

  • 7/23/2019 Fpso Hull Integrity

    32/38

    GENERAL LI)E O) )IEL ISSUES

    +olisti"* ppro"h for good integrted solution Offshore insted of Ship #intenn"e philosoph$ esign for ""identl lods; in"luding (ve i#p"t o#ptibilit$ of hull stru"turl; s$ste#s nd topsides !

    interf"e design

    )tigue esign 5& life to dte for "onversions: 'rodu"tion e4uip#ent for e3tre#e (ether "onditions %rine e4uip#ent robustness; prti"ulrl$ "rgo>bllst

    s$ste#s OI0S* re4uire#ents nd "orrosion prote"tion A""ess 5operbilit$ > #intinbilit$ > inspe"tbilit$: In,servi"e surve$ !effe"t on do(nti#e 'rovision of spre prts

  • 7/23/2019 Fpso Hull Integrity

    33/38

    )'SO INIENT +ISTOR/

    E3#ples of proble#s

    -u"" Structure

    ! Lo"lised ftigue filure

    ! bo( (ve i#p"t d#ge

    ! shuttle tn6er "ollision

    ! tn6 overpressuristion

    ! se(ter "isson preferentil "orrosion

    ! integrtion of surf"e nd subse "orrosion

    prote"tion

  • 7/23/2019 Fpso Hull Integrity

    34/38

    )'SO INIENT +ISTOR/ ,STATISTIS 5RE'ORTE:

  • 7/23/2019 Fpso Hull Integrity

    35/38

    T/'IAL A%AGE

  • 7/23/2019 Fpso Hull Integrity

    36/38

    ECA%'LES O) INTERNAL 0ELE RE'AIRS

  • 7/23/2019 Fpso Hull Integrity

    37/38

    )'SO -O0 0A1E I%'AT A%AGE

  • 7/23/2019 Fpso Hull Integrity

    38/38

    )'SO RULE A%EN%ENTS )OR )ORE EN

    STRUTURES

    -sis ,Ship Rule re4uire#ents using #in.

    servi"e speed