19
Examples of badly written proposals Examples from FP6 – IST and FP7ICT

FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Examples of badly written proposals

Examples from FP6 – IST and FP7‐ICT

Page 2: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 2

Outline of Module

• A STREP proposal to the second IST call of FP6 2003

• A STREP proposal to the first ICT call of FP7 2007

Page 3: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 3

A STREP proposalto the second IST call of FP6 

2003

Page 4: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 4

Evaluation Criteria

1. Relevance (threshold score 3 out of 5)2. Potential impact (threshold score 3 out of 5)3. S&T excellence (threshold score 4 out of 5)4. Quality of the consortium (threshold score 3 out of 

5)5. Quality of the management (threshold score 3 out 

of 5)6. Mobilisation of resources (threshold score 3 out of 

5)Overall threshold score 21 out of 30.

Page 5: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 5

Criteria 2: Potential Impact

Table of Contents of Proposal

Page 6: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 6

Exploitation Plan

This is everything !+ :

Page 7: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 7

Criteria 3: S&T Excellence

Page 8: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 8

Objectives

Evaluation Result:

Page 9: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 9

State of the Art

Page 10: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 10

Details of Test Cases

Evaluation Result:…”Details of test cases are missing”….

Page 11: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 11

Criteria 4: Quality of the consortium

Page 12: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 12

Roles of Partners

Design and Implementation

Page 13: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 13

Overall Evaluation Result

Page 14: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 14

A STREP proposalto the first ICT call of FP7

2007

Evaluation Results

Page 15: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 15

S&T Excellence

Good and innovative idea, but not well planned in terms of partnership and workplan

Page 16: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 16

Implementation and Management

Page 17: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 17

Impact and Overall Conclusion

Page 18: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 18

Conclusion: What can we learn ?

• Consider carefully the evaluation criteria

• Provide sufficient and concrete detail

• Nothing should remain vague

• The individual parts of the proposal are linked:objectives – work plan – competence and capability of the consortium – state of art

• This is valid not only for the whole proposal, but also for parts of it that are written by different people

Page 19: FP6 FP7 ICT - it.ac.me 5b.pdf · Microsoft PowerPoint - Prezentacija 5b.ppt Author: Korisnik Created Date: 3/9/2010 11:09:02 AM

Roadshow no.1 at IT Conference, Zabljak 19

CONTACT

Thank you for your attention!

Enis KočanUniversity of Montenegro

Faculty of Electrical Engineering

[email protected]