System number Penetration Items UL1479
Materials F T
F-B-8007
Metallic pipe
2 0 FP-02 FM011
Ceramic fiber cotton 8P
Cable bundle
Cable tray
Metallic insulated pipe SSCI-X
Air duct Ceramic fiber cotton 8P
FP-02 Cable Tray Installation Methods FP-02 Standards, Codes Compliances
A2:Concrete floor B4:Cable tray
1:FP-02 firestop sheet 2:FM011 Moldable firestop putty
A2 B4
2
1
Cross-sectional view
Firestop Materials 1:FP-02 Firestop sheet 2:FM011 Moldable firestop putty
International Fireproof Technology Inc. The Ultimate in Firestop Solutions and Fire Protective Coatings
www.painttoprotect.com
949-975-8588
Box Cutter knife Metal Ruler Brush
Jigsaw Power Drill Drill Bit
Measuring Tape
Expansion Bolts
Hexa-Wrench Hammer Self-tapping screws Power Drill (use on the wall)
Installation Equipment
Process of Installation
1. Clean the opening 2. Measure the opening between the
cable tray and substrate.
3. Install FM011 Moldable Firestop Putty onto the cables in the cable tray.
4. FM011 shall be firmly packed into the cable tray and extend beyond the cable tray by 3”.
5. Cut FP-02 firestop sheet and exceed the opening on all sides by 2”
6. Secure FP-02 on the top side of floor ensuring the aluminum foil side of sheet is against the substrate.
8. Any gaps between the FP-02 sheet and cable tray shall be sealed with FM011 such that makes a crown shape
7. Install a 2” wide strip of FP-02 over any joints.
9. Crown shape FM011 shall extend beyond the top of the cable tray by 3”, and by 4” from the bottom
10. Completed Installation