Fourth quarter 2015Bergen 19. February 2016

19.02.2016 GC RIEBER SHIPPING1

Page 2: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Agenda

• Highlights Q4 2015

• Operational review

• Financial review

• Summary and outlook

19.02.2016 GC RIEBER SHIPPING2

“Polar Onyx”

Page 3: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Highlights fourth quarter

• Stable operation in a challenging market

• Fleet utilisation of 73 %

• Bankruptcy of Dolphin Geophysical

• Impairment of fleet of NOK 132.8

• Further reduction of costs

19.02.2016 GC RIEBER SHIPPING3

Page 4: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Dolphin Geophysical

• Bankruptcy of Dolphin Geophysical in December 2015

– Charter agreements for «Polar Marquis», «Polar Duchess» and «Polar Empress» terminated

– NOK 189.7 million in outstanding receivables

– Significant impact on backlog and quarterly results

19.02.2016 GC RIEBER SHIPPING 4

Page 5: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Impairment of vessels

• Impairment of the fleet

– Very challenging offshore market

– Market values reduced significantly

– NOK 132.8 million in impairment charge

• Significant impact on quarterly results

19.02.2016 GC RIEBER SHIPPING 5

Page 6: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Cost programme

• Adapting to a challenging market situation

• Cost reducing measures

– Renegotiation of contracts

– More cost efficient work processes

– Adjustments in organization

• Headcount reduction due to lower activity level

– Onshore with 25 percent with effect from first half of 2016

– Offshore with 28 percent from the end of 2015

19.02.2016 GC RIEBER SHIPPING 6

Page 7: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Post-quarter events

• Extension of bareboat charter for «RRS Ernest Shackleton» with British Antarctic Survey

– One year duration, effective from August 2016

– Remains 2 options of annual extension of the charter

19.02.2016 GC RIEBER SHIPPING7

“RSS Ernest Shackleton”

Page 8: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Key figures

19.02.2016 GC RIEBER SHIPPING8

-201

-36

103

25

-400-450

-350

-250

-150

-50

50

150

250

Q414 Q115 Q215 Q315 Q415

258

224241

337

179

0

50

100

150

200

250

300

350

400

Q414 Q115 Q215 Q315 Q415

130114

134

251

-108-150

-100

-50

0

50

100

150

200

250

Q414 Q115 Q215 Q315 Q415

REVENUESNOK million

EBITDANOK million

NET PROFITNOK million

Page 9: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Operational Review Q4 2015

19.02.2016 GC RIEBER SHIPPING9

Page 10: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Contract backlog of NOK 789 million* per January 2016

43%

36%

22%

0%

20%

40%

60%

80%

100%

From January 2016 2017 2018

239256

119

180

0

100

200

300

400

From January 2016 2017 2018 2019-21

19.02.2016 GC RIEBER SHIPPING10

CONTRACT BACKLOG*NOK million

CONTRACT COVERAGE*Utilisation rate

* Excluding options

Page 11: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

/ Current fleet

GC RIEBER SHIPPING

GC Rieber Shipping has

been involved in

worldwide offshore

exploration and

development with

dynamically positioned

subsea support vessels

since the early 1980s

Polar Onyx Polar King Polar Queen

AVAILABILE

CHARTERER CHARTERERCHARTERER*

Polar EmpressPolar Duke Polar Duchess Polar Marquis

COLD STACKED

CHARTERER CHARTERER CHARTERERCHARTERER

SU

BS

EA

SE

ISM

IC

GC Rieber Shipping has

owned and operated

seismic vessels since

the late 1960s and has

extensive experience

from operations around

the globe, including in

the Canadian High

Arctic and Antarctica.

PiltunPolar Pevek Ernest Shackleton Baikal

CHARTERER CHARTERER CHARTERERCHARTERER

ICE

/ SU

PP

OR

T

Our company is one of

very few specializing in

the Arctic and Antarctic

shipping business,

offering independent

and competitive

services for scientific

expeditions and

logistics in these

demanding regions.

* from January 2016

AVAILABILEShort term

contract AVAILABILE

Page 12: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Subsea

• Fleet utilisation 44 percent

– 100 percent in Q4 2014

– «Polar Onyx» not on charter in the quarter. Charter agreement with MPL from January 2016

– «Polar King» not on charter part of the quarter

• Market

– Uncertain and “on hold”

– Sustained price pressure and time-consuming decision processes

19.02.2016 GC RIEBER SHIPPING12

KEY FIGURESNOK million

151

107 113

213

31

56

3249

155

-23-50

0

50

100

150

200

250

Q4 14 Q1 15 Q2 15 Q3 15 Q415

Operating income EBITDA

Page 13: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Marine Seismic

• Fleet utilisation 75 percent

– 100 percent in Q4 2014

– «Polar Duke» cold stacked in the period

– EBITDA affected by bankruptcy of Dolphin Geophysical

– Fleet impairment

• Market

– Turbulent, price pressure and weak earnings

102112

126 124144

6274

86 81

-103

-150

-100

-50

0

50

100

150

Q4 14 Q1 15 Q2 15 Q3 15 Q415

Operating income EBITDA

19.02.2016 GC RIEBER SHIPPING13

KEY FIGURESNOK million

Page 14: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Ice/ Support

• Fleet utilisation 100 percent

– 100 percent in Q4 2015

– EBITDA contribution of NOK 17.4 million including joint venture companies

• Market

– Generally stable development6

5

2

0

4

12

8

7

15

17

0

5

10

15

20

Q4 14 Q1 15 Q2 15 Q3 15 Q4 15

Operating income EBITDA

19.02.2016 GC RIEBER SHIPPING14

KEY FIGURESNOK million

Page 15: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Financial reviewQ4 2015

19.02.2016 GC RIEBER SHIPPING15

Page 16: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Income statement

19.02.2016 GC RIEBER SHIPPING16

NOK mill Q4 2015 Q4 2014 FY 2015 FY 2014

Operating income 179.0 258.5 980.2 881.5

EBITDA -108.0 130.2 398.2 453.5

EBIT -309.5 78.6 -96.0 280.2

Net financial income and expenses -31.0 -281.0 -150.9 -358.6

Profit before tax -340.5 -202.4 -246.9 -78.5

Net profit in the period -400.1 -201.4 -307.7 -80.1

Normalized profit before tax (1) -51.2 104.2 143.6 253.8

Earnings per share -11.28 -4.61 -7.05 -1.83

(1) Profit bef. tax adjusted for unrealised currency gains/losses, profit from disposals and write-downs.

Page 17: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Balance sheet per 31.12.2015

631 408

47

2882

4994

2381

0

1 000

2 000

3 000

4 000

5 000

6 000

Assets Equity & Liabilities

Fixed assets

Other current

assetsCash & liquid

assets

Equity

Long-

term

liabilities

Current

liabilities

• Total balance NOK 5 672 million

• Equity ratio 42.0 percent

• Cash position NOK 631 million

– Available revolving facility of USD 16 million

• Net debt NOK 2 569 million

• Average duration of loan portfolio is 5 years

19.02.2016 GC RIEBER SHIPPING17

NOK million

Page 18: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Outlook

• Market view short term

– Low oil price, further reductions in the investment activity

– Weak oil sector affects shipping industry, especially subsea and seismic

• Expected trends in segments

– Subsea: Short term focus, price pressure and challenging market

– Marine Seismic: Challenging market and weak results

– Ice/support: Stable and unchanged activity

19.02.2016 GC RIEBER SHIPPING 18

Page 19: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Summary

• Very challenging markets with great uncertainty

• Stable operation

• Continuously focus on reducing costs

• Bankruptcy of Dolphin Geophysical

• Fleet impairment

19.02.2016 GC RIEBER SHIPPING 19

“Polar Marquis”

Page 20: Fourth quarter 2015gcrieberstorage.blob.core.windows.net/gcrieber/1001/ose...MPL from January 2016 – «Polar King»not on charter part of the quarter • Market – Uncertain and

Disclaimer

This quarter presentation includes and is based, inter alia, on forward-looking information andstatements that are subject to risks and uncertainties that could cause actual results to differ.Such forward-looking information and statements are based on current expectations, estimatesand projections about global economic conditions, the economic conditions of the regions andindustries that are major markets for GC Rieber Shipping ASA and its subsidiaries. Theseexpectations, estimates and projections are generally identifiable by statements containingwords such as "expects", "believes", "estimates" or similar expressions. Important factors thatcould cause actual results to differ materially from those expectations include, among others,economic and market conditions in the geographic areas and industries that are or will bemajor markets for GC Rieber Shipping’s businesses, oil prices, market acceptance of newproducts and services, changes in governmental regulations, interest rates, fluctuations incurrency exchange rates and such other factors as may be discussed from time to time.Although GC Rieber Shipping ASA believes that its expectations and the information in thisPresentation were based upon reasonable assumptions at the time when they were made, it cangive no assurance that those expectations will be achieved or that the actual results will be as setout in this Presentation. GC Rieber Shipping ASA nor any other company within the GC RieberShipping Group is making any representation or warranty, expressed or implied, as to theaccuracy, reliability or completeness of the information in the Presentation, and neither GCRieber Shipping ASA, any other company within the GC Rieber Shipping Group nor any of theirdirectors, officers or employees will have any liability to you or any other persons resulting fromyour use of the information in the Presentation. GC Rieber Shipping ASA undertakes noobligation to publicly update or revise any forward-looking information or statements in thePresentation.

19.02.2016 GC RIEBER SHIPPING20