38
PROPOSAL FOR UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS GOVERNMENT POLYTECHNIC, IMMADIHALLI, BANGALORE-560066 KARNATAKA STATE Under the Scheme of Sub-Mission on Polytechnics under the Coordinated Action for Skill Development Submitted to GOVERNMENT OF INDIA

(Foundry, Welding, sheet metal) - Dept of Technical …dte.kar.nic.in/Circulars/DVP/MHRD main.docx · Web viewPhase shift keying modulation and demodulation trainer kit with power

Embed Size (px)

Citation preview

PROPOSAL FOR

UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS

GOVERNMENT POLYTECHNIC, IMMADIHALLI, BANGALORE-560066

KARNATAKA STATE

Under the Scheme of Sub-Mission on Polytechnics under the Coordinated Action for Skill Development

Submitted to

GOVERNMENT OF INDIAMINISTRY OF HUMAN RESOURCE DEVELOPMENT

[DEPARTMENT OF HIGHER EDUCATION]SHASTRI BHAVAN

NEW DELHI

FORMAT FOR UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS – SUB-MISSION ON POLYTECHNICS UNDER THE COORDINATED ACTION FOR SKILL DEVELOPMENT.

PART 1 : BASIC INFORMATION ABOUT THE POLYTECHNIC

1 a] Name of PolytechnicGovernment Polytechnic,

Immadihalli,Bangalore-560066.

b] Location [Road, Street Name, Locality, City, Pin Code]

Immadihalli,Bangalore-560066.

c] Year of Establishment 2009-10

d] Women/Co-educational Co-Educational

e] Government/Government Aided

GOVERNMENT

f] Nature of Institution Affiliated to Board Of Technical Education, Karnataka

2 a] Name of Principal/incharge Sri D.V.Srinivasa murthy

b] Office Address with Pin CodeOffice of the Principal,

Government Polytechnic,Immadihalli,

Bangalore-560066.c] Office Phone No. with STD

Code080-28454040

d] Residential Phone No. with STD Code

080-23626895

e] Telex/Fax No. on which message can be given

-

f] E-mail address [email protected]

3 a] Name of Vice Principal/Deputy in-charge Sri.SureshBabu.R

4 a] Name of Nearest Railway Station

White Field Railway Station

5 a] Name of Nearest Air Port Bangalore International Airport

PART-II::- CURRENT STATUS AND ACADEMIC DIMENSIONS OF THE POLYTECHNIC

1. Courses and sanctioned Intake in various programmesInformation to be filled in Table 1

2. Faculty Positions and Development StatusInformation to be filled in Table 2 & 3

3. Books and Learning Resources Utilization Centre [LRUC]

Information to be filled in Table 4

Rational strengthening LRUCsInformation to be filled in Table 5

4. Existing Laboratories and WorkshopsInformation to be filled in Table 6

5. Rational for Proposed Modernization of Laboratories and Workshops

Information to be filled in Table 7 & 8

6. New Courses/Programmes to be introduced in this Scheme [If

any]. Details thereof and estimates- No -

7. Estimated Cost for Upgradation of Infrastructural facilitiesInformation to be filled in Table 9

TABLE-1COURSES AND SANCTIONED INTAKE IN VARIOUS PROGRAMMES

Sl.No. Name of the Course Year of

StartingDiploma/

Post Diploma

Duration

Semester/Annual

Sanctioned student

intake

Actual enrolment all years [1st +2nd

+3rd year] upto 2010-11

Total

Male Female

01 Civil Engg. 2009-10 Diploma 03 Years Semester 60 50+11 03+0 64

02 Mechanical Engg. 2009-10 Diploma 03 Years Semester 60 59+22 1+0 82

03Electronics & Communication Engg. 2009-10 Diploma 03 Years Semester 60 45+13 15+4 77

04 Computer Sc. Engg. 2009-10 Diploma 03 Years Semester 60 38+5 15+5 63

* The Total enrolment of all course for entire duration to be given

TABLE-2CURRENT FACULTY STATUS

Category Total Posts Sanctioned

Post FilledRegular Adhoc Central Dual

ChargeTotal Grand

Total % filledM F M F M F M F M F

Principal 01 0 0 0 0 0 0 0 0 0 0 0 0Lecturers 24 5 3 5 6 0 0 0 0 0 0 19 79%Instructors including System Analyst

04 0 0 0 0 0 0 0 0 0 0 0 0

Asst. Instructor 05 1 0 0 0 0 0 0 0 1 0 1 20%

Mechanics 06 0 0 0 0 0 0 0 0 0 0 0 0

Helpers 08 0 0 0 0 0 0 0 0 0 0 0 0

TABLE-3CURRENT SUPPORTING STAFF STATUS

Category Total Posts Sanctioned

Post FilledRegular Adhoc Central Dual

ChargeTotal Grand

Total % filledM F M F M F M F M F

Registrar 01 0 0 0 0 0 0 0 0 0 0 0 0

Office Suptds. 02 0 0 1 0 0 0 0 0 0 0 1 50%

F.D.A 04 0 0 0 0 0 0 0 0 0 0 0 0

S.D.A 04 0 0 0 0 0 0 0 0 0 0 0 0

Typist 01 0 0 0 1 0 0 0 0 0 0 1 100%

Office Attenders 01 0 0 0 0 0 0 0 0 0 0 0 0

Group ‘D” 08 0 1 0 0 0 0 0 0 0 0 1 13%

TABLE-4

BOOKS AND LEARNING RESOURCES AVAILABLE CURRENT STATUS [NUMBER]

Sl.No. Type of LRs

TotalNumbers Amount

[In Rupees]1 Text Books 400 80,000/-

TABLE-5

BOOKS AND LEARNING RESOURCES PROPOSED TO BE PROCURED

Sl.No. Type of LRs

Total Quantity Required

Total Cost[Rs. In Million]

Procurement schedule with Approximate cost [Rupees in Lakh] during 11th Plan

Up to 31/03/2010

Year 2010-11

Year 2011-12

1 Text Books 4000 1.2 - 6 Lakhs 6 lakhs

2Educational CD’s 200 0.1 - 0.5 Lakhs 0.5 Lakhs

3Educational

Models200 1.0 - 5 Lakhs 5 Lakhs

4 Educational Charts 200 0.2 - 1 Lakh 1 Lakh

5 Technical Magazine

100 0.1 - 0.5 Lakh 0.5 Lakh

6 E – library(Desktop PC’s /Printers

/Modem/Internet facility

- 1.5 - 7.5 Lakh 7.5 lakh

7 Teaching Aid( LCD Projectors /OHP)

12 1.5 - 7.5 Lakh 7.5 Lakh

TABLE-6LABORATORIES AND EQUIPMENT AVAILABLE

i) DEPARTMENT OF CIVIL ENGINEERING

Sl. No. Laboratory/Workshop List of equipment each costing more than Rs.10,000/-

Availability of

documents manuals

Condition

Yes No In use Obsolete1 Survey Practice i) Electronic Theodolite 2 No’s Yes Yes2 MT lab Nil Yes Yes3 Hydraulics Environmental and

Plumbing LabNil Yes Yes

4 Civil Drawing using Cad 6 Computers Yes Yes

ii) DEPARTMENT OF MECHANICAL ENGINEERING

S.No Laboratory/ Workshop

List of equipment each costing more than Rs 10,000/-

Availability of documents/ manuals

Condition

Yes NO In use Obsolete

1 Carpentry Nil Yes -- -- --2 Fitting Nil Yes -- -- --3 Basic computer

skillscomputers yes

iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

S.No. Laboratory/Workshop List of equipment each costing more than Rs. 10,000/-Quantity available

Availability of documents/Manuals

Condition

Yes No In Use Obsolete

1 Digital Lab Handheld Digital IC Tester Model: HDIT20 01

YES YES

LCR Meter 01 YES YES8-channel Time division multiplexing and de-multiplexing trainer with power supply

01 YES YES

Amplitude Shift keying modulation and demodulation trainer kit with power supply

01 YES YES

Phase shift keying modulation and demodulation trainer kit with power supply

01 YES YES

Frequency shift keying modulation and demodulation trainer kit with power supply

01 YES YES

Frequency modulation and demodulation kit 01 YES YES30MHz dual trace Oscilloscope 02 YES YES1MHz signal generator with frequency counter model: 20140

02 YES YES

Digital IC Trainer 04 YES YES2 Analog Lab 1 MHz Function generator model FG1 MD 02 YES YES

Dual DC Regulated power supply 10 YES YES

iv) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING

Sl. No.

Laboratory/Workshop List of equipment

each costing more than Rs.10,000/-

Availability of

documents manuals

Condition

Yes No In use Obsolete1 BCS Lab 8 Computers

a)5KVA UPSb)Dot Matrix Printerc)Scanner

Yes Yes

2 Networking and Hardware Lab 8 Computersa)Laser Printer

Yes Yes

3 Linux Lab 8 Computersb)Dot matrix printerc)Scanner

Yes Yes

TABLE-7

NAMES OF LABORATORIES AND WORKSHOPSi) DEPARTMENT OF CIVIL ENGINEERING

Name of Existing Additional requirement for current and new courses

Laboratories Workshops Laboratories WorkshopsBasic Computer Skills Plumbing Practice

Surveying Practice Construction work shop

Auto Cad

Material and Soil Testing

HydraulicsEnvironmental Engg

ii) DEPARTMENT OF MECHANICAL ENGINEERING

Name of Existing Additional requirement for current and new courses

Laboratories Workshops Laboratories WorkshopsBasic Computer Skills Basic Work Shop

Practice(carpentry,)CNC

Basic Electrical and Electronics

Basic Work Shop Practice( fitter,)

Mechatronics

Computer Aided Engg Graphics

Basic Work Shop Practice( Forging )

Material Testing and Metrology

Basic Work Shop Practice(Foundry)

Fluid Mechanics and Machines

Basic Work Shop Practice(Sheet Metal)

Pneumatic Basic Work Shop Practice(Welding)

Parametric modeling Machine Shop

(iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

Name of Existing Additional requirement for current and new courses

Laboratories Workshops Laboratories WorkshopsBasic computer skill PC hardware and

networks labBasic electrical and

electronics labDigital Communication

labDigital electronics lab Power Electronics and

PLC labSemiconductor devices

labAnalog Electronics labAnalog communication

labPCB design & Simulation labMicrocontoler

&application lab

v) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING

Name of Existing Additional requirement for current and new courses

Laboratories Workshops Laboratories WorkshopsBasic computer skill JAVA Lab

Basic electrical and electronics lab

ASP.Net Lab

Programming in CDigital Electronics

Advanced Chardware and networks

Web Design LabD.B.M.S Lab

C++ LabLinux LabGUI Lab

vi) DEPARTMENT OF SCINCE AND HUMANITIES

Name of Existing Additional requirement for current and new courses

Laboratories Workshops Laboratories Workshops

Applied Science Language Lab

TABLE-8Tentative Equipment [+Furniture] Requirement

i) DEPARTMENT OF CIVIL ENGINEERING

Sl. No

Name of the Course

Year of Starting

the course

Name of Laborato

ry

Equipment Total Quantit

y

Total Cost (Rs. In million)

Procurement Schedule with Approx. Cost (Rs. In million)

Upto 31.03.2010 Year 2010-11 Year 2011-12 No. Amt. No. Amt. No. Amt.1

Civi

l Eng

inee

ring

2009

Surv

ey P

racti

ce

i) Vernier Transit Theodolite

2 0.018 2 0.018

2)Digital Planimeter 2 0.1 2 0.1

3) Total Station 2 1.6 1 0.8 1 0.8

4) Electronic Theodolite 2 0.12 2 0.12

5)GPS 1 0.08 1 0.08

2

M

T la

b

1) Compression Testing Machine

1 0.1 1 0.1

2) Universal Testing Machine

1 0.25 1 0.25

3)Mechanical Sieve Shaker 1 0.01 1 0.01

4) Electrically Operated Sieve Shaker

1 0.022 1 0.022

5) Electronic Weighing Balance

1 0.01 1 0.01

7) Tables 1 0.05 1 0.05

3

Civi

l Eng

inee

ring

2009 Hy

drau

lics E

nviro

nmen

tal a

nd P

lum

bing

La

b

1) Centrifugal Pump Test Rig

6 0.06 6 0.06

2) Friction Through Pipes Apparatus

1 0.09 1 0.09

3) V notch Apparatus 1 0.09 1 0.09

4)pH Cum Conductivity meter

1 0.09 1 0.09

5) Turbidity Meter 1 0.025 1 0.025

1) Computers 1 0.030 1 0.030

4

Civi

l Dra

win

g us

ing

Cad

2)UPS 24 0.96 12 0.48 12 0.48

4)Plotter 1 0.1 1 0.1

5) Cieling Mounted LCD Projector

1 0.07 1 0.07

ii) DEPARTMENT OF MECHANICAL ENGINEERING

iii) DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

Sl. No.

Nam

e of

the

cour

se

Year

of s

tarti

ng t

he

cour

se

Nam

e of

Labo

rato

ry

Name of the equipmentTotal Qty. required

Total Cost (Rs. In million)

Procurement Schedule with Approx. cost (Rs. In million)

Upto 31.03.2010

Year 2010-11 Year 2011-12

Nos. Cost in Rs Nos. Cost in Rs

1

Elec

tron

ics &

Com

mun

icati

on

2009

-10

Digi

tal C

omm

. Lab

Sampling theorem and Aliasing effect kit 10 0.13 05 0.065 05 0.065Pulse Code modulation and demodulation kit 10 0.14 05 0.07 05 0.07Delta modulation and demodulation kit 10 0.13 05 0.065 05 0.065Adaptive delta modulation and demodulation kit 10 0.15 05 0.075 05 0.075DPSK modulation and demodulation kit 10 0.15 05 0.075 05 0.075Optical fiber omm.. Trainer kit 03 0.24 02 0.16 01 0.08Dual Channel CRO 25MHz 10 0.25 05 0.125 05 0.125Function generator 1MHz 10 0.12 05 0.06 05 0.06Digital IC trainer kit 10 0.1 05 0.05 05 0.05Table 10 0.1 05 0.05 05 0.05Chairs 10 0.05 05 0.025 05 0.025

2

Mi

cro

co

Computer systems : Core 2 duo/dual core, 2 GB RAM, 320GB HDD 10 0.4 05 0.2 05 0.2Laser Printer 02 0.06 01 0.03 01 0.03Computer tables 10 0.1 05 0.05 05 0.05Chairs 10 0.05 05 0.025 05 0.025Sealing mounted LCD Projector 01 0.1 01 0.1 -- ---

3

PCB

Sim

ulati

on

Lab

Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD 20 0.8 10 0.4 10 0.4Computer tables 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05

4

BCS

Lab Computer systems : Core 2 duo/dual core, 1 GB RAM,

150 HDD 20 0.8 10 0.4 10 0.4Computer Table 20 0.2 10 0.1 10 0.1

S.N

o

Nam

e of

the

Labo

rato

ry

Nam

e of

Equ

ipm

ent

Tota

l Qua

ntity

re

quire

d

Tota

l Cos

t (Rs

)

Procurement schedule with Approx. Cost ( Rupees)Up to 1.03.2010

Year 2010-11 Year 2011-12

No

Amou

nt

No

Amou

nt

No

Amou

nt

1 Basic of computer Skills

Computer 20 800000 10 400000 10 4000002 Computer Table 20 200000 10 100000 10 1000003 Computer Chair 20 100000 10 50000 10 500004 5KVA UPS 1 100000 1 1000005 Computer Aided

Engineering GraphicsEngineering Graphics Software 1 20000 1 20000

6 Mechanical Testing & Quality control Laboratory

flash and fire point Apparatus 2 30000 1 15000 1 150007 Universal Testing Machine 1 250000 1 2500008 Izod and Charpy’s tester 1 50000 1 500009 Brinnel &Rockwell

Hardness Tester1 45000 1 45000

10 Vicker hardnessTester

1 45000 1 45000

11 Redwood viscometer 1 30000 1 3000012 Thurston oil tester 1 25000 1 2500013 Dye penetrant tester 1 50000 1 5000014 Ultrasonic equipment. 1 45000 1 4500015 Tables for kit 8 80000 8 8000016 Basic workshop

practice-II

(Foundry, Welding, sheet metal)

Heavy dutyWelding Transformer with Tools

2 50000 1 25000 1 25000

17 Gas welding tools & equipment 2 40000 1 20000 1 2000018 MIG and TIG welding equipment 2 40000 1 20000 1 2000019 Foundry Tools 1set 20000 1 20000

20 Machine shop-I Medium duty Lathe with assoserries

20 3000000 10 1500000 10 1500000

21 Pillar Drillingmachine with assoserries

2 200000 1 100000 1 100000

22 Power hacksaw with assoserries 1 60000 1 6000023 Bench grinder with assoserries 2 40000 1 20000 1 20000

24 Shaping machinewith assoserries

2 200000 1 100000 1 100000

25 slotting machinewith assoserries

1 50000 1 50000

26 Fluid Power LAB Venturimeter Kit 1 25000 1 2500027 Notches Kit 1 25000 1 2500028 Pipe Friction Kit 1 30000 1 30000

Chairs 20 0.1 10 0.05 10 0.055

Anal

og E

lect

roni

cs

Lab

Dual Channel CRO 25 MHz 20 0.5 10 0.25 10 0.25Variable DC regulated power supply (dual) 20 0.3 10 0.15 10 0.15Function generator (0-10MHz) 20 0.2 10 0.1 10 0.1Signal generator (0-1 MHz) 20 0.2 10 0.1 10 0.1Linear /Analog Trainer kits with builtin Power supply and bread board 20 0.2 10 0.1 10 0.1Tables 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05

6 B E E LCR meter 02 0.024 01 0.012 01 0.012

7

Adva

nced

M

icro

proc

esso

r Lab

Microprocessor kits with interfacing units 10 0.1 5 0.05 5 0.05Masm software 10 0.2 5 0.1 5 0.1Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD 20 0.8 10 0.4 10 0.4

Computer Table 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05

8

Pow

er

Elec

tron

ics

and

PLC

Lab Dimmer stat 10 0.15 5 0.075 5 0.075

PLC Trainer kits with interfacing modules 16 0.2 8 0.1 8 0.1Computer Table 20 0.2 10 0.1 10 0.1Chairs 20 0.1 10 0.05 10 0.05

9

Pc

Hard

war

e&

Net

wor

ks Network accessories & Hardware Tools and Software

10 0.3 5 0.15 5 0.15

Total 8.544 4.362 4.182

iv) DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERINGS.

No

Nam

e of

the

Cour

seYe

ar o

f sta

rting

th

e Co

urse

Nam

e of

the

Labo

rato

ry

Nam

e of

Eq

uipm

ent

Tota

l Qua

ntity

re

quire

d

Tota

l Cos

t (Rs

in

mill

ions

)

Procurement schedule with Approx. Cost ( Rupees in Lakh )Up to 31.03.2010

Year 2010-11 Year 2011-12

No

Amou

nt

No

Amou

nt

in R

s.

No

Amou

nt

in R

s.

COM

PUTE

R SC

IEN

CE (

Gen

eral

)

2009

-10

1 Basic computer Skills lab

Computer 10 400000=0.4 05 200000 05 2000002 Computer Table 10 100000=0.1 05 50000 05 500003 Computer Chair 10 50000=0.05 05 25000 05 250004 5KVA UPS 1 100000=0.1 1 100000 -- ---5 Laser Printer 1 13000=0.013 1 13000 - -6 Lcd Projector 1 100000=0.1 1 100000 - -7 AC 2 100000=0.1 1 50000 1 500008 Almarah 2 30000=0.03 1 15000 1 150009 Linux lab Computers 10 400000=0.4 05 200000 05 20000010 Computer table 10 100000=0.1 05 50000 05 5000011 Computer chair 10 50000=0.05 05 25000 05 2500012 5KVA UPS 1 100000=0.1 1 100000 --- ----13 AC 2 50000=0.05 1 25000 1 2500014 Software(CS Related

Syllabus Softwares)1 200000=0.2 1 200000 - -

15 Dot matrix Printer 1 11000=0.011 1 11000 - -16

Hardware & Networking Lab

Computers 10 400000=0.4 05 200000 05 20000017 Computer Table 10 100000=0.1 05 50000 05 5000018 5KVA UPS 1 100000=0.1 01 100000 - -19 Dot matrix printer 1 11000=0.011 - ---20 Digital Multimeters 20 40000=0.04 10 20000 10 2000021 RJ 45 Connectors 100 1000=0.001 50 500 50 50022 Tool Kit 20 10000=0.01 10 5000 10 5000

23 Crimping Tool RJ 45 10 10000=0.01 5 5000 5 5000

24 Wired Switch 1 35000=0.03525 Punching Cat 6

Cable500mts

10000=0.01

26 LAN Tester 5 5000=0.005 3 3000 2 200027 Punching Tool 5 5000=0.005 3 3000 2 200028 ADSL Modem 2 4000=0.004 1 2000 1 200029 I/O Connectors I/O

box +plate20 6000=0.006 10 3000 10 3000

30 NIC card Wired 25 6250=0.00625

15 3750 10 2500

31 NIC Card Wireless IEEE 802.11 Std.

25 50000=0.05 15 30000 10 20000

32 Spike buster 30 9000=0.009 15 4500 15 4500Total 2.60625 1593750 956500

TABLE-9

ESTIMATED COST FOR INFRASTRUCTURAL DEVELOPMENT

Sl.No.

Expenditure Category

Allocations sought [Rupees in Lakh]Upto 31/03/2010 Year 2010-11 Year 2011-12

A] Investment Cost

Books [+Journals] - 6.5 lakhs 6.5 lakhs

LRs. - 21.5 lakhs 21.5 lakhs

Sub-Total [A] - 28 lakhs 28 lakhs

B] RECURRING COSTConsumables - 14 lakhs 10 lakhs

Operation and Maintenance

- 7 lakhs 5 lakhs

Sub-Total [B] - 21 lakhs 15 lakhs

Grand Total [A] + [B] - 49 lakhs 43 lakhs

FINANCIAL RESOURCES

2006-07 2007-08 2008-09

01 Whether the Institution is receiving grants, if so details during last 3 years

a] State

b] Others [Pl. specify]

Recurring Non-Recurring

Recurring Non-Recurring

Recurring Non-Recurring

Whether the Institution received any grants from Central Government/and any other agencies such as Tech. Ed. I, II, & III during the last 15 years, if so given details

Scheme Year Amount Received Amount Spent

Nil 2009-10 NIL NIL

Total NIL NIL NILNote: Govt.Polytechnic, Immadihalli started during Academic Year 2009-10

Brief write up:

Karnataka’s Share in GDP is around 6%. Karnataka’s industrial policy 2009-14 intends to build a

prosperous Karnataka through development of human and natural resources in a systematic scientific and

sustainable manner. It aims to provide additional employment for about 10 lakh persons by 2014 by

attracting Rs 3,00,000Cr of investment and enhance the contribution of manufacturing sector to the states

GDP from current levelof 17% to 20% by 2014 focusing on skill and entrepreneurship development. The

recently concluded GIM has attracted investments to nearly Rs.5,00,000 Cr. with an employment potential

of one million jobs. Govt Polytechnic, Immadihalli will interact with Government of Karnataka and

industries who signed MOU’s to get collaboration and support in IFI and on site skill development of

Students. Availability of skilled human resources including trained technical manpower in Engg and

Technology is major reason for growing investments in the State.

Government Polytechnic, Immadihalli was established in the year 2009-10.The institution is

offering four diploma programmes of three years duration with annual intake of 60 for each programme

for each year. The programmes are.

1. Diploma in Civil Engg.

2. Diploma in Mechanical Engg.

3. Diploma in Electronics & Communication Engg.

4. Diploma in Computer Science Engg.

There are 285 students (academic year 2010-11) studying in the institute (boys 264 & girls 18) the

Institute having it is on threshold of establishing laboratories, workshop and construction of academic and

administrative blocks at an estimated cost of Rs. 800 lakhs, institute has a play ground, own bore well.

Majority of students hail from Bangalore rural and urban districts and very few from other parts of

Karnataka. The students studying in the polytechnic are from low income group family or middle income

group families with Kannada medium study back ground at their matriculation level. The student of the

Institute with their semi urban back up are potential and they are very good at work in the field and also on

shop floor.

Immadihalli is located in the outskirts of Bangalore. The average annual rainfall is 720mm. Immadihalli

is close to ITPL which is IT hub of silicon city Bangalore. In the neighbourhood we have Graphite, TCS,

HCL ,Hindustan Lever, GE, Tisco, HP, Seimens, Accenture, Dell, Secon Surveys, Vimoksha.

The Institution is having the committed and dedicated staff. The institute is fully funded by

Government of Karnataka as per allocation of the annual Budget.

Since the Institute is recently started from the academic year 2009-10 the existing laboratories,

workshop, library, computer lab etc. have to be strengthened, keeping in view of the modernization. By

modernization and strengthening of polytechnic with latest techniques, skills, software up gradation, skill

oriented training can be imparted to student community. Majority of students, in this rural based

polytechnic are poor in English and they scared of their communication in English language.

Though the students are potential and good at work, but the major draw back is lack of

communication skill. It is very important for the institute to develop and improve better communication

skill among the students, so that the can compete with the students of major cities. Keeping this in view,

along with modernization and strengthening of existing laboratories and workshop, it is highly needed to

establish A language and communication skill lab, Which helps the students to improve their English

language, their communication skill, in turn, indirectly personality development aspects.

OBJECTIVES

1. To Strengthen the existing Diploma Courses 2. To Upgrade the Laboratories with state of art equipment 3. To Establish the State of the art Learning Resource Utilization Centre4. To Provide a very safe , neat and tidy academic ambience to the students5. To impart competitive technical skills to the students with modernized Laboratory Setup

The main areas of our thrust are

1. Modernization of laboratories: The existing laboratories are to be

modernized with new Equipment.

2. Modernization of workshops: Improving the present condition and

Environment of teaching learning process for performing better

skills.

3. Furniture : Providing a pleasing and comfort

Environment for listening, writing,

Teaching-learning process in the

Workshop and laboratories

4. Teaching Aids (A-V aids) : Making the students the understand the

Subject and new technological aspect

Through audio-video aids.

5. Models (Machine models : Giving pictorial representation of

Turban pumps models components of a machine or of a

Pneumatics kit models structure of a concerned engineering.

Bridges Models, culvert discipline so those students can visualize

Models, irrigation models and imaging the plan, elevation and

Transmission towers, cross section views of that model .

Satellite signal receiving Models etc.,

6. Non conventional : Being technical students the students Energy aspects

should develop concerned towards Environment and natural

resources. Student must have awareness of solar energy, alternative

eco-Friendly energies

7. E-learning : Sitting at remote district, the student Should get exposures to modern

Technological development in their Concerned programmes by

Internet browsing

8. Language & : To make the student to know themselves

Communication Skills lab Why they are poor in communication?

What makes them to improve their Communication?

How to do effective communication?

How to improve their English Communication language?

Imparting training to boost their Personality development

Keeping all this in view, to impart still better technical know-how, and also for more effective

teaching-learning process in the institute, the project is submitted and justified from Government

Polytechnic, Immadihalli.

PRINCIPAL

(D.V. SRINIVASA MURTHY)