THE BEACONARNAIZ AVE., CHINO ROCES AVE. COR PASAY ROAD, MAKATI CITYCOST PLAN NO. 2
B. ELEMENTAL BREAKDOWN
II. FOUNDATION AND SUBSTRUCTURE
Total Area,(m²)= 45,241 November 2007
ELEMENTS Element Total Elemental Cost %(Peso) (Peso/m²)
1.0 Foundation and Substructure
1.1 Substructure 72,294,100 1,597.97 91.74%72,294,100 1,597.97 91.74%
2.0 Preliminaries 9% 6,506,469 143.82 8.26%
78,800,569 1,741.79 100.00%Total for Foundation and Substructure