FAST FACTS
Race Date 28 September 2008 Milestones Asia’s first F1 street race – located at
Marina Bay in the heart of the CityFirst night-race in F1 history
Circuit Length 5.067 km
Spectators 80,000
FAST FACTS
Race Direction Anti-clockwise*Only one of three in the 2008 calendar, besides Brazil and Turkey
Number of Turns: 24 turns • 14 left • 10 right
Number of Laps 61 (estimated)
Lap Time 1min 30sec (estimated)
Speeds Up to 300km/h - the fastest section of thetrack being RafflesBoulevard
Pit building Scheduled to be completed by July 2008
OVERTAKING
OPPORTUNITIES
• Turn 1: Pit Straight
• Turn 7: Raffles Boulevard
• Turn 15: Esplanade Drive
Overtaking Opportunity
New Road (1.2km)
LEGEND
Slowest Corner,80 – 100kph
Speed in excess of 300kph
Speed: 250-300kph
Race Format
• Friday 26, September 2008: Testing - 8pm onwards
• Saturday 27, September 2008: Qualifying - 8pm onwards
• Sunday 28, September 2008: FORMULA 1™ Singapore Grand Prix, 8pm
PROPOSED
LIGHTING
SYSTEM
• Appointed lighting contractor, Italy-based Valerio Maioli S.p.a
• Lighting tests have been conducted at the Paul Ricard High Tech Test Track in Le Castellet, France, to study the system under real racing conditions
• Upon the fulfilment of satisfactory criteria, the first ever Night Race was approved by the FIA for Singapore on 24 October 2007
PROPOSED
LIGHTING
SYSTEM
Challenges
• It is not a permanent circuit
• Trees along the roads
To prevent the unnecessary uprooting of trees, the height of the lights would have to be lower than the tree canopy lining the circuit
• Impossible to put cables in underground ducts
PROPOSED
LIGHTING
SYSTEM
The Requirements
• Optimal lighting and no glare is required to meet the following requirements:
• Safety
The driver’s, marshal’s and spectator’s safety is critical
• Good Visuals
For spectators, drivers and journalists Able to broadcast High-Definition pictures
PROPOSED
LIGHTING
SYSTEM
Courtesy of Valerio Maioli S.p.a.
Aluminum Truss
Lighting Projectors
Steel Pylon
Pylon Electric Panel
4m
32m
10m
TICKETINGCorporate hospitality suites and packages • On sale from late November to early December 2007
• The deluxe suites, fully equipped with great service and fine food and beverage can cater for 10 to 50 people
General Ticketing
• Sale of three-day passes start in late December 2007
• Single-day passes released for sale just before the Chinese New Year, subject to available inventory