3449
Page 1 Energy Auditing Unit Division Dhaka SL.NO . ID No. Date of Birth Name, Dist, Qualification and Date of Joining Place of Posting Field of Training & Duration Country Inspection Comments 1 1-0777 08.02.63 Mr. Badhan Chandra Basak, Kishoregonj, B.Sc.Engr.(Mech.), 30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) SE (Incharge), Energy Auditing Unit PDB,Dhaka. 1) "Technical Orientation & Quality Test Witness'' on 33KV Current Transformer From 23.11.08 to 30.11.08 in China. 2) 400V, 3x10(60) Amps Three Phase 4-Wire, D-Element, Outdoor Type Double Tariff Electronic Consumer Energy Meter from November/10 for 10 days in China. 3) Inspection against Central Zone Power Distribution Project, Mymensingh 19.07.12 to 24.07.12 for 5 days in Japan. A proposal sent to ministry dated 04.05.16 for Factory acceptance test of energy meter from 20.05.16 to 25.05.16 in India. 2 1-01343 06.04.74 Mr. Md. Jabed Hossain, Jessore, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN) XEN Energy Auditing Unit PDB,Dhaka. 1) Foreign Training from 18.08.08 to 29.08.08 for 10 days South Africa 1) Training on "Foreign Training" Against Energy Meter from 18.08.08 to 29.08.08 for 10 days 2) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3- Element, Double Tariff Programmable Energy Meterfor from 20.06.2011 to 30.06.2011 for 10 (Ten) days or from the date of actual journey (excluding journey time) in Singapore. 3) Inspection of Programmable AMR Meter from 30.09.2012 to 11.10.2012 in Switzerland. 4) "Technical Orientation & Quality Test Witness" on 3- Phase, 4-Wire Double Tariff Fully Programmable Energy Meter from 01.09.13 to 10.09.13 in China. 5) Energy meter testing and sealing program from 8-10 March/2016 in India. A proposal sent to ministry dated 07.04.16 for Testing of CT & CVT from 09.04.16 to 12.04.16 in India.

(Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Embed Size (px)

Citation preview

Page 1: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1

Energy Auditing Unit Division Dhaka

SL.NO.

ID No. Date of Birth Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0777 08.02.63 Mr. Badhan Chandra Basak, Kishoregonj, B.Sc.Engr.(Mech.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

SE (Incharge), Energy Auditing Unit

PDB,Dhaka.

1) "Technical Orientation &Quality Test Witness'' on 33KVCurrent Transformer From23.11.08 to 30.11.08 in China. 2) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from November/10 for10 days in China. 3) Inspection against CentralZone Power DistributionProject, Mymensingh 19.07.12to 24.07.12 for 5 days in Japan.

A proposal sentto ministrydated 04.05.16for Factoryacceptance testof energy meterfrom 20.05.16 to25.05.16 inIndia.

2 1-01343 06.04.74 Mr. Md. Jabed Hossain, Jessore, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)

XEN Energy Auditing Unit

PDB,Dhaka.

1) Foreign Training from 18.08.08to 29.08.08 for 10 days

South Africa 1) Training on "ForeignTraining" Against Energy Meterfrom 18.08.08 to 29.08.08 for 10days 2) Inspection against 110V,3´5(6)A, Three Phase 4-Wire, 3-Element, Double TariffProgrammable Energy Meterforfrom 20.06.2011 to 30.06.2011for 10 (Ten) days or from thedate of actual journey(excluding journey time) inSingapore. 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland. 4) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 5) Energy meter testing andsealing program from 8-10March/2016 in India.

A proposal sentto ministrydated 07.04.16for Testing of CT& CVT from09.04.16 to12.04.16 inIndia.

Page 2: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2

3 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge), Office of SE EnergyAuditing Unit PDB,Dhaka.

1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days 2)Operation & MaintenanceTraining (Factory Training) againstBera 70 MW Peaking Power PlantConstruction Project for 30 (thirty)days (Excluding travel time)

China.

South Korea

1) Factory test witness againstNarayanganj 55 MW Unit-IIPower plant from 12.05.16 to16.05.16 in India.

4 1-01630 17.11.79 Mr.Ajoy Kumar Chakraborti Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Energy Auditing Unit

PDB,Dhaka.

1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days.

China. 1) Inspection against CentralZone Power DistributionProject, Mymensinghfrom thedate of actual journey from05.06.12 to 10.06.12 for 5 days inChina. 2) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 5) Construction DrawingReview Meeting againstBarapukuria 275 MW CoalBased Power Plant from15.01.16 to 21.01.16 in China.

5 1-02002 10.11.1983 Lutfunnahar Khulna B.Sc. Engg. (Comp.) 02.10.11 (AE) 01717366470 [email protected]

AE Energy Auditing Unit

PDB,Dhaka.

OnMetarnityleave

6 1-02025 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)

AE Energy Auditing Unit

PDB, Dhaka.

7 1-02034 27.04.84 Mr. A.H.M. Emdadul Pasha Rajshahi B.Sc. Engg. (Elect.) 12.12.11 (AE)

AE Energy Auditing Unit

PDB, Dhaka.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore 1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.

8 1-02083 28.08.87 Mrs. Afroza Akter Chittagong B.Sc engg. (Elect.) 17.12.13

AE Energy Auditing Unit

PDB, Dhaka.

Page 3: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 3

ChittagongSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01752 07.06.79 Mr. Md.Shahidul Islam, Chittagong B.Sc.Engr (Elec.) 07.04.06 (AE) 16.06.14 (SDE)

XEN(Incharge) Energy Auditing-2,PDB, Chittagong.

1) A training titled "SCADACommunication System" againstGreater Chittagong ElectricityDistribution Project, SCADArehabilitation, PDB, Chittagongfrom 19.07.2012 to 16.08.2012

NewZealand

2 1-01632 25.12.79 Mr.Md.Belal Hossain Pirojpur B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN(Incharge), Energy Auditing UnitDiv-1, PDB, Chittagong.

1) Materials witnessInspection against Enginegenerating set Inspection fromOctober/10 for 07 days in SouthKorea

3 1-01405 22.06.73 Mr. S. M.Kamrul Ahsan, Laxmipur, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge) 0171-4084031

XEN(Incharge), Energy Auditing UnitDiv-3, PDB, Chittagong.

1) Training on 1132/33KV PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design & Maintenance of33KV/11KV Sub-Station'' 10.07.07 to24.08.07 for 42 days

China. 1) Materials witnessInspection against Enginegenerating set Inspection fromfeb/2016 for 07 days in China 2) Quality Test Witness of 11KV pin insulator against Ctg.Power Dist. System dev. Projectfrom 08.01.16 to 14.01.16 inIndia & China.

4 1-01988 26-11-85 Mr. Md. Tanvir Ahmed Laxmipur B.Sc.Engr.(Elec.) 02.10.2011 (AE) 01924543636 [email protected]

AE Energy Auditing UnitDivision-3 PDB, Chittagong.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

5 1-01990 23-03-86 Pinky Dutta B.Sc.Engr.(Elec.) 02.10.2011 (AE)

AE Energy Auditing UnitDivision-2 PDB, Chittagong.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

6 1-02021 28-02-85 Mr. Shahabuddin Ahmed Gazipur B.Sc.Engr.(Elec.) 16.10.2011 (AE) 01714036381

AE Energy Auditing UnitDivision-1 PDB, Chittagong.

1) Technical orientation &quality test witness ofhardware & software of datacentre from 08.05.14 to 09.06.14in Singapore & New Zealand.

Page 4: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 4

7 1-02097 20.09.87 Mr. Md. Taj Uddin Chittagong B.Sc.Engr.(Comp.) 13.04.14 (AE)

AE Energy Auditing UnitDivision-1 PDB, Chittagong.

MymensinghSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01374 01.11.69 Mr. A.K.M. Mustafa Zaman, Mymensingh, B.Sc.Engr.(Elec.), 05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge)

XEN(Incharge), Energy Auditing UnitDivision PDB, Mymenshingh.

1) “Technical Orientation &Quality Test Witness” of EnergyMeter 16.11.09 for 10 days inSingapore. 2) "Policy Planning for EnergyEfficiency & Consevation (A) (J-1200775)" from 13.05.2012 to09.06.2012 in Japan. 3) Technical orientation &quality test witness ofinsulator against Chitt. zonepower dist. system dev. projectfrom 28.08.15 to 03.09.15 inChina.

2 11-0398 01.06.61 Mr. Kamrul Hasan Siddique Mymenshingh Diploma(Elec.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)

SDE, Incharge Energy Auditing UnitDivision PDB, Mymenshingh.

3 1-02022 8.6.1986 Mr. Md. Mahathy HasanSuman Tangail B.Sc. Engg. (Elect.) 16.10.2011 (AE)

AE Energy AuditingUnit, PDB,Mymensingh

4 Mr. Md. Nazrul Islam Diploma engg.

AE (Incharge) Energy AuditingUnit, PDB,Mymensingh

Page 5: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 5

RajshahiSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01622 29.07.79 Mr.Abdullah-Al-Mamun Rajshahi B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Energy Auditing UnitDivision PDB,Rajshahi.

1) Training on Enegry Meteragainst "Foreign Training" from15.10.09 to 29.10.09 for 15 days 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

Singapore

1) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland.

2 1-01883 18.12.85 Mr. Md. Shahnewaz Islam Pabna B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01196082692 [email protected]

SDE, Incharge Energy Auditing UnitDivision PDB,Rajshahi.

1) PSCDP Training on "PerformanceManagement (Batch-1)" from26.08.13 to 06.09.13 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Thailand

Singapore

3 1-02090 30.11.84 Mr. Sohel Ahmed Gaibandha B.Sc.Engr.(Comp.) 17.12.13 (AE)

AE Energy Auditing UnitDivision PDB,Rajshahi.

RangpurSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01332 05.07.70 Mr. Abdullah Al Mahmud, Lalmonirhat, B.Sc.Engr.(Mech.),

20.01.2000(AE) 08.12.09(SDE) 16-10-11 (XEN , Incharge) 18.06.15 (XEN)

XEN Energy Auditing UnitDivision PDB,Rangpur

1) "Work Shop Test" forDohazari 100MW PeakingPower Plant ConstructionProject from 24.02.11 to 02.03.11for 07(Seven) days in China. 2) Technical orientation &quality test witness of 11 KVACR from 25.03.14 to 31.03.14 inChina.

2 1-01972 01.01.88 Mr. Md. Abu Nuaman Thakurgaon B.Sc. Engg (Elect.) 02.10.2011 (AE) 01710474344 [email protected]

AE Energy Auditing UnitDivision PDB,Rangpur

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore 1) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.

Page 6: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 6

BarisalSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01214 31.10.60 Mr. Md. Shakhawot Hossain, Barisal, B.Sc.Engr.(Elec.), 19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)

XEN Energy AuditingUnit, PDB, Barisal.

1) Basic Design" against Sylhet150MW Gas Turbine PowerPlan from 28.07.10 to 11.08.10for 15 days in China 2) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MWCCPP project from 20.10.15 to29.10.15 in China.

2 1-01981 1.1.1984 Mr. Md. Ashraful Islam Sirajganj B.Sc.Engg. (Elec.) 02.10.2011 (AE) 01714950299 [email protected]

AE, Energy Auditing Unit

PDB, Barisal.

3 1-02073 03.12.87 Mr. Abubokar Talukdar Jhalakathi B.Sc.Eng(Elec) 17.12.13 (AE)

AE Energy AuditingUnit, PDB, Barishal.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

4 Mr. Md. Shamsul Alam Diploma 27.01.15 (AE)

AE Energy AuditingUnit, PDB, Barishal.

5 Mr. Anup Kumar Das Diploma Engg.

AE Energy AuditingUnit, PDB, Barishal.

SylhetSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01875 10.10.87 Mr. Nurmohammed Patwary Chandpur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01920944219 [email protected]

AE, Energy AuditingUnit, PDB, Sylhet.

On StudyLeave

Page 7: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 7

2 1-01977 2.1.1986 Mr. Shuvashis Chakraborty Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01817734616 [email protected]

AE, Energy AuditingUnit, PDB, Sylhet.

KhulnaSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01263 06.01.70 Mr. Nishith Kumer Samadder, Magura, B.Sc.Engr.(Mech.),

10.06.99(AE) 18.08.2011 (SDE) 28.05.14 (XEN)

XEN Energy AuditingUnit, PDB, Jessore.

1) " Witnessing ofManufacturing Process andtest of the equipment ofmanufacture's works includingtransfer to technical know -how" from 16.06.12 to 23.06.12for 7 days in Russia.

2 1-01281 30.11.75 Mr. Md. Sohel Hossain Serazi 24.06.99 (AE) 26.07.05 (SDE) 17.11.13 (XEN, Incharge) 18.06.15 (XEN) 01755581391

XEN Energy AuditingUnit, PDB, Khulna.

1) Training on technology transferof CT, PT from 05.05.16 to 11.05.16

China, 1) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China.

3 1-01698 05.01.77 Mr. Md. Kamal Hossain Magura B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)

XEN (Incharge) Energy AuditingUnit, PDB, Jessore.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore 1) Inspection on of 110V, 3X5(6)AMPS, 3-Phase, 4-Wire, 3-Element, Outdoor Type DoubleTariff Programmable ConsumerEnergy Meter with RemoteAutomated Reading System”from 30.11.09 to 14.12.09 inSingapore.

4 1-02028 20-10-86 Mr. Kazi Nawshad Azam Bagerhat B.Sc.Eng(Elec) 16.10.2011 (AE)

AE Energy AuditingUnit, PDB, Khulna.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

5 Mr. Sourav Roy AE Energy AuditingUnit, PDB, Jessore.

Page 8: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 8

ComillaSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01206 21.09.68 Mr. Md. Kamal Uddin Ahmed B-Baria B.Sc Engg (Mech) 19.03.98 (AE) 06.10.04 (SDE) 31.10.13 (XEN) 0176-3480820

XEN,

Energy Auditing Unit

PDB, Comilla.

1) Design, Installation, Testing,Operation & Maintenance onControl & Protection Against G/Ctg.From Aug./02 for 10 days. 2) ''Factory Training" againstDaudkandi 50MW Peaking PowerPlant Construction Project for30(Thirty) days from 30.05.2011 to30.06.2011 (Excluding travel time) (Bond for 5 years)

China,

China

Inspection against metertesting For 3 days in IndiaMarch /2016

BograSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01903 31.12.82 Md. Abdul Majid Joypurhat B.Sc. Engg. (Elect.) 20.04.11 (AE) 01911815901 [email protected]

AE, Energy Auditing UnitDivision, PDB, Bogra.

1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

Singapore

2 1-01967 3/8/1985 Mr. Md. Rabiul Hossain Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01911958040 [email protected]

AE, Energy Auditing UnitDivision, PDB, Bogra.

Page 9: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 9

TrainingGM Training & Dte. of Taining & Career Development

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0489 07.11.57 Mr. Amal Krishna BasuKhulnaB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 29.01.15 (Addl. CE, Incharge) 13.12.15 (CE)

GM (CE) Training, PDB,Dhaka.

1.Improvement of operation ofelec. Power From 10.01.01 to15.02.01 2) Technology Transfer Trainingfrom 07.07.15 to 13.07.15

Japan&Thailand

India

1) “Technical Orientation &Quality Test Witness” onEnergy Meter from 16.11.09 for10 days in Singapore. 2) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China. 3) Site visit from 04.10.15 to15.10.15 in Spain

A proposal sentto ministrydated 25.04.16for witnesing ofmanufacturersprocess againstTongi 80 mWP/S from31.05.16 to06.06.16 inHungery.

2 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 10.02.10 (XEN)

Director (Incharge)

Directorate ofTraining and Career

Development

PDB, Dhaka.

1) PSCDP training Program named"Project Management (Batch-3)"from 15.12.13 to 21.12.13

Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plantfrom 14.12.10 to 22.12.10 for 07days in Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Tehnical orientation &Quality test witness from26.09.15 to 01.10.15 in China. 5)Pre-shipment inspectionagainst Wind Battery PowerPlant, Kutubdia from 20.04.16 to26.04.16 in China.

Page 10: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 10

3 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)

Deputy Director(XEN)

Dte. of Training &CareerDevelpopment PDB,Dhaka.

1)Traning on Gas Turbine AgainstTongi 80 MW From 07.08.04 to TwoMonth 2) PSCDP Training program on"Project Management (Batch-1)"from 12.08.13 to 23.08.13 3) Technology Transfer Trainingagainst 10- town project from13.04.15 to 19.04.15 4) Training on Planning &development from 01.05.16 to15.06.16

France,

Thailand

Germany

India

1) Factrory acceptance testfrom 05.08.14 to 14.08.14 inSingapore.

4 1-01009 12.06.66 Mr. Md Abdur Sattar Miah, B.Sc.Engr.(Mech.),19.07.94(AE) 03.02.03(SDE) 08.02.11 (XEN, Rev.)

Dy. Director(XEN),

Director of Trainingand Career Development

PDB, Dhaka. (Return from lien inDubai for 5 years)

1) PSCDP Training on Procurementand Supply Chain Managementtraining program from 30.09.13 to11.10.13

Thailand 1) Technical orientation &quality test witness from01.04.15 to 07.04.15 in India. 2) Witnessing ofmanufacturing process ofcooling tower gear box againstBarapukuria power stationfrom 16.10.15 to 22.10.15 inChina.

5 1-01010 28.02.68 Mr. Md. Abdul Basid,TangailB.Sc.Engr.(Elec.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)

Dy. Director(XEN),

Director of Trainingand Career Development

PDB, Dhaka.

1)145KV and 36KV Circuit Breaker(RRAGS) From 08.10.03 to 08.01.04for 03 Months

China 1) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07 (seven) days in China. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.

6 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Directorate ofTraining &CareerDevelopment PDB, Dhaka.

Materials witness Inspection(HRSG Inspection)” againstBera 70 MW Peaking PowerPlant Construction Project from14.11.10 to 22.11.10 for 07 daysin South Korea.

Page 11: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 11

7 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)

SDE Directorate ofTraining &CareerDevelopment PDB, Dhaka.

1) Training on ''Operation &Maintenance of HRGS in Koreafrom 20.11.07 to 04.12.07 for 0.5Month & ''Hydraulice DiverterDamper System in China from14.08.07 to 17.10.07 for 03 Monthsagainst 90 MW Sylhet CombinedCycle Power Station (Unit-2) Cons.Project. 2) Training program on "Operation& Maintenance of Generator" from18.03.13 to 29.03.13

Korea &China

India

On Lien

8 1-01710 31.12.77 Miss.Shamima Akhter Gazipur B.Sc.Eng(Elec) 07.04.2006(AE) 28.01.14 (SDE) 24.11.14 (XEN, Incharge)

XEN (Incharge) Directorate ofTraining &CareerDevelopment PDB, Dhaka.

1) Inspection of Gas TurbineGenerating (GTG) Unit againstShikalbaha 150MW PekingPlant Construction Project from13.04.09 to 23.04.09 for 10 daysin Germany. 2) Inspection of Oil burnernozzel against Barapukuriapower station from 19.09.15 to25.09.15 in China

9 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01556559924 [email protected]

SDE (Incharge) Directorate ofTraining &CareerDevelopment, PDB,Dhaka.

1) PSCDP Training program on"Project Management (Batch-1)"from 12.08.13 to 23.08.13

Thailand

10 11-0397 04.02.60 Mrs. Ferdousi Begam Dhaka Diploma engg. (Mech.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)

SDE (Incharge) Directorate ofTraining &CareerDevelopment, PDB,Dhaka.

Training on Planning &development from 01.05.16 to15.06.16

India

11 1-01926 01..11.82 Mr. Abu Naser Md. Abdul Hai Comilla B. Sc. Engg. (Elect.) 24.07.11 (AE)

AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.

Training on Operation &Maintenance from 01.05.16 to15.06.16

India

Page 12: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 12

12 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522

[email protected]

AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.

1) "Implementing Selective ERPApplication & Management"Training Program from 16.04.13 to29.04.13

Thailand On StudyLeave

13 11-0482 01.01.58 Mr. Md. Mahbub Hossain Bagura Diploma (Elect.) 25.08.84 (SAE) 04.11.13 (AE)

AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.

1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.

Chittagong Training Centre, PDB, ChittagongSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0803 01.09.63 Mrs. Dewan Samina Banu, Naogaon,B.Sc.Engr.(Elec.),08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 02.12.09 (XEN)

Director (Incharge) Chittagong TrainingCentre

1) Training On Tower Design, PoleDesign, etc. Operation &Maintenance Against Ctg. P/sDistribution Project From 07.07.04to 22.08.04 (6 Weeks)

2)Training on 132/33KV Sub-Station/ Power Transformer, 33KV11KV Gas Insulated Switchgear,33/11KV Sub-station & ControlPanel & Protection EquipmentAgainst Chittagong PowerDistribution Project ''Design &Maintenance of Control Panel &Protection Equipment'' from10.07.07 to 24.08.07 for 42 days.

China

China.

1) "Factory Acceptance Test(FAT) & Technical OrientationCourse" against GreaterChittagong Power DistributionProject SCADA-Rehabilitation &Extension in Sep./2011 for 07days or from the date of actualjourney (excluding travell time)in New Zealand. 2) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China.

2 1-01629 02.03.72 Mr.Md.Saifur Rahman Chittagong B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

DD, XEN (Incharge) Chittagong TrainingCentre

1) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV LA from 15.09.13 to18.09.13 in India.

Page 13: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 13

3 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN) 01839905723

DD Chittagong TrainingCentre

1) Inspection on H.T.S WireFrom 10.10.02 to 14.10.02 inIndia 2) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. in May/2011for 10(Ten) days in China.

4 11-0194 31.11.57 Mr. Nasir Uddin Chittagong, Diploma(Elec.)

05.07.80.(SAE), 17.09.09(AE) [email protected]

AE, Chittagong TrainingCentre

1) PSCDP training on RelayProtection & Advance trainingprogram from 08.07.13 to 19.07.13

India

Mr. Faridul Islam AE (Incharge), Chittagong TrainingCentre

Tongi Regional Training Centre, PDB, TongiSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01438 16.01.73 Mrs. Nishat Parvin, Khulna, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE) 10.02.14 (XEN, Incharge)

Deputy Director(Incharge), Tongi RegionalTraining Centre,PDB, Tongi

1) “Witnessing ofManufacturing Process andTest of the Equipment atManufacturer's Work includingTransfer of technical Know-How" against Ghorashal powerPlant in Sept./2011 for 07(Seven) days from the date ofactual journey (Excluding traveltime) in India.

A proposal sentto ministrydated 10.05.16for ConstructionDrawing reviewmeetingagainstBarapukuria 275MW projectfrom 28.05.16 to10.06.16 inChina.

2 1-02009 22.12.82 Mrs. Sumita Rani Biswas Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE)

AE, Tongi RegionalTraining Centre,PDB, Tongi

1) Factory Acceptance Test from28.06.14 to 04.07.14 inBangalore, India.

Page 14: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 14

Rajshahi Training Centre, PDB, Tongi, PDB, RajshahiSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0647 12.08.59 Mrs. Hasina Dilruba,

Rajshahi, B.Sc.Engr.(Mech.), 12.08.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)

Director Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi.

1)Seminar On Energy, Power FactorFrom 08.06.87 to 19.06.87

Thailand 1)33KV Capacitor Bank andAssociated Switchger in 2004for 07 days in Germany. 2) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project inAugust/2011 for 07 days inGermany. 3) Construction DrawingReview Meeting againstBarapukuria 275 MW CoalBased Power Plant from15.01.16 to 21.01.16 in China.

2 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, Incharge)

Deputy Director,(XEN) (Incharge) Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi

1) Training program on "Operation& Maintenance of Generator" from18.03.13 to 29.03.13

India 1) Training on Service deadend Clamp, September/05 for07days in India. 2) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina. 3) Special Inspection against"Power Plant Simulator" from16.09.13 to 21.09.13 in USA.

3 11-0417 07.07.57 Mr. Md. Kamrul Alam Rajshahi Diploma Engg. (Elect.) 31.07.83 (SAE) 27.12.11 (AE)

AE Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi

4 Mr. Md. Golam Moftafa AE Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi

Page 15: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 15

5 Mr. Md. Monowar Hossain AE (Incharge) Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi

Ghorashal Training Centre, PDB, GhorashalSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0845 30.11.64 Mr. Md. Rafiqul Islam,Jamalpur,B.Sc.Engr.(Mech.),18.2.88(AE) 21.11.99(SDE) 21.07.11 (XEN) 0176-3915477

Director, Incharge Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

1) PSCDP training program on"Project Management (Batch-1)"from 02.09.13 to 13.09.13

Thailand 1) Breaker Inspection From20.04.02 to 29.04.02 in India 2) Central Zone PowerDistribution Project, aTechnical Orientation andQuality Test Witness Programfor 11KV Drop Out Fuse Link,11KV Lightning Arrester, 200Amps MCCB, 100 Amps MCCB &Transformer Oil in May/2011for 07 days in China. 3)Technical orientation &quality test witness ofDistribution jUNE/2014 in India

2 1-01761 04.01.86 Mr. A. K. M Earshadul Bari Jamalpur B.Sc.Engr(Mech.) 31.05.09 (AE) 24.12.14 (SDE) 25.06.15 (SDE) 01763-791715

XEN, incharge Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

"Witnessing of ManufacturingProcess and Test of theequipment at manufacture'sworks including Transfer ofTechnical-Know How” for 07(Seven) days on June/2011 inNetherlands.

3 11-0436 16.01.62 Mr. Abul Kalam Azad Narayanganj Diploma Engg (Mech.) 03.08.83 (SAE) 27.12.11 (AE)

AE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

4 11-0498 01.01.61 Mr. Md. Moslah Uddin Comilla Diploma Engg (Elect.) 25.08.84 (SAE) 04.11.13 (AE) 01913797735

AE Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

Page 16: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 16

Engineering Academy, PDB, KaptaiSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0747 07.07.58 Mr. Md. Akat Ali,

Comilla, B.Sc.Engr.(Mech.), 30.08.98(AE) 19.03.98(SDE) 10.07.05(XEN)

Joint Director EngineeringAcademy PDB, Kaptai.

1) Training.On 33/11KV 2x10MVA sub station fromApril/2006 for 08 days inThiland. 2)400 Nos.12 Meter Steel Pole(270 DAN) & 100 Nos. 12 MeterSteel Pole (550 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China.

A proposal sentto ministrydated 25.02.15for witnessingofmanufacturingprocess againstShikalbaha P/Sfrom 16.03.15 to22.03.15 inChina & India.

2 1-0974 12.06.60 Mr. Nurul Alam, Chittagong, AMIE (Elect.) 30.08.86 (SAE) 21.04.93 (AE) 03.02.03 (SDE) 18.08.11 (XEN)

XEN EngineeringAcademy PDB, Kaptai.

1) Training on Tower Design &Transmission Line Design &Installation, Testing & Maint.From 2006 for 06 weeks. 2) Factory Training (Operation &Maintenance Training)" againstHathazari 100 MW Peaking PowerPlant Construction Project for 30(Thirty days from15.06.2011 to14.07.2011 (Excluding travel time) (Bond for 5 years)

China

China

3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)

23.10.80(SAE), 17.09.09(AE) 2014 (SDE)

SDE EngineeringAcademy PDB, Kaptai.

Training Academy, PDB, Cox's BazarSL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0864 02.03.60 Mr. Md. Khairul Kabir,Manikgong, B.Sc.Engr.(Elec.),30.8.86(AE) 18.06.2000(SDE) 10.07.05(XEN) 05.04.16 (SE)

Director (SE), Training Academy,PDB, Cox's Bazar

1) Training on 33/11KVTransformers in 2006 for 07days inFinland against 9-Town Project.

1) Orientation/ TechnicalTraining on 33 KV & 11 KV GangIsolator from 20.12.04 for 6days in India. 2) Technical Orientation &Quality Test Witness of 11 KVACR from 21.04.15 to 27.04.15 inChina.

Page 17: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 17

Civil WorksOfficey Under CE, Civil Works

SL.NO.

ID No. Date of Birth Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0549 01.01.61 Mr. Md. Mustafizur Rahman

LaxmipurB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 09.03.03(XEN) 28.01.14 (SE) 01730-705078 [email protected]

Addl. CE (Incharge) Civil Works

1.Electrical Power DistributionSystem From 23.08.90 to 22.06.91

Norway, 1) Training on Technical know-how 33 KV VCB with ControlPanel & 33 KV & 11 KV BusSupport Insulator for 07 days inChina.in Oct/ 2006 2) To attend a course on ProjectBudgeting and Cost Controlfrom 15.12.12 to 27.12.12 orfrom the date of actual journeyin Malaysia. 3) Witnessing ofmanufacturer's process from30.05.14 to 05.06.14 in China. 4) Factory acceptance test of 33KV post insulator againstChitt.zone power dist. system dev.project from 06.11.15 to 12.11.15in China. 5) Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.

2 1-0666 01.05.60 Mr. T.I.M. Noorunnabi,

Barisal, B.Sc.Engr.(Elec.), 03.12.85(AE) 17.06.95(SDE) 21.07.04(XEN) 28.07.15 (SE)

Director Civil Works, PDB,Dhaka

1)'Public & Private Partnership' from 18.11.13 to 29.11.13

Thailand 1) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. from 11.06.11to 19.06.11 for 09 days in China.

2) pre-shipment inspectionagainst Chittaging PC Pole from02.01.15 for 10 days in China.

A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.

3 11-0808 Mr. Muhammad Abul Kashem AE (Incharge) Office of directorcivil works, PDB,Dhaka.

Page 18: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 18

4 11-0114 01.01.58 Mr. Md. Fozlur Rahman Khan Sherpur Diploma(Civil )

28.05.79(SAE), 06.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge) 01715038624

XEN (Incharge), Office of the CE, CivilWorks PDB, Dhaka.

1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal High TensileSteel (HTS) Wire in Nov/2010for 10 days in China. 2) Convention & Seminar from24.07.15 to 04.08.15 in India. 3) Technical orientation &quality test witness from05.01.15 to 11.01.15 in China for10 days+A292 4) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.

A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.

5 1-02061 02.05.88 Ms. Sarfina Tasnim Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)

AE, Office of the CE, CivilWorks PDB, Dhaka.

Civil Construction Division-1SL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),

05.03.2000(AE) 08.12.09(SDE) 17.04.13 (XEN, Incharge)

XEN

Civil ConstructionDivision-1, PDB, Dhaka

1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China.

2) Inspect facilities / towitness test at manufacturersplants" from 06.04.14 to11.04.14 in China. 3) Basic design Approvalmeeting from20.08.15 to03.09.15 in China.

2 11-0443 02.12.57 Mr. Md. Saiful Islam Sirajganj Diploma (Civil) 18.01.84 (SAE) 27.12.11 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

Page 19: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 19

3 11-0499 01.02.63 Mr. Md. Motiur Rahman Jamalpur Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

4 Mr. Md. Asaduzzaman Saad B.Sc. Engg. (Civil) 2014 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

5 11-0494 09.01.63 Mr. Md. Abul Kalam Azadakand Comilla Diploma Engg. (Civil) 25.08.84 (SAE) 04.11.13 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

1) Pre shipmentinspectionagainst ChittagongPC Pole from 20.06.15 to29.06.15 in China.

6 11-0834 Mr. Hachni mojib Diploma engg.

AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka

7 11-0843 Mr.Md. Osman Goni Diploma engg.

AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka

Civil Construction Division-2SL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01694 23.01.76 Mr.M.Arifur Rahman Khan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)

XEN (Incharge) Civil ConstructionDivision-2, PDB, Dhaka

1) Training Programme on SolarEnergy Technologies andApplications from 14-11-2011 to03-12-2011 for 03 (three) weeks 2) PSCDP Training program"Performance Management (Batch-2)" from 21.10.13 to 01.11.13

India

Thailand

1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China. 2) Participate in the "China-Asean EXPO" from 16.09.14 to19.09.14 in China. 3) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China. 4)Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.

Page 20: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 20

2 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE) 25.06.15 (SDE)

SDE Civil ConstructionDivision-2 PDB,Dhaka.

Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina.

3 11-0468 07.02.59 Mr. Shiekh Md. Abdus Salam Sirajganj Diploma(Civil) 25.08.84 (SAE) 27.12.11 (AE) 01819162666

AE, Civil ConstructionDivision-2 PDB,Dhaka.

1) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from20.09.15 to 29.09.15 in China.

Civil Work Division, ChittagongSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01369 20.06.74 Mr. Haradhan Chandra Datta, Comilla, B.Sc.Engr.(Civil.), 05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge) 22.02.2016 (XEN) 01711987216

XEN Zonal CivilConstructionDivision PDB, Chittagong.

1) Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKorea. 2) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China.

2 1-02005 5.12.1983 Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]

AE, Zonal CivilConstructionDivision PDB, Chittagong.

1) Pre-shipment inspectionagainst Chittagong PC PoleConstruction Plant from24.03.13 to 03.04.13 in China.

3 11-0466 01.01.60 Mr. Makhan Lal Debnath Noakhali Diploma (Civil) 25.08.84 (SAE) 27.12.11 (AE)

AE, Zonal CivilConstructionDivision PDB, Chittagong.

1) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China.

4 11-0415 12.02.59 Mr. Anil Chandra Halder Barisal Diploma (Civil) 01.08.83 (SAE) 27.12.11 (AE)

AE, Zonal CivilConstructionDivision PDB, Chittagong.

Page 21: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 21

5 11-0486 20.07.58 Mr. Md. Zakir Hossain Noakhali Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)

AE, Zonal CivilConstructionDivision PDB, Chittagong.

Civil Work Division, RajshahiSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01678 17.11.77 Mr.Shah Khalid MahmudChoudhury Noagaon B.Sc.Eng(Civil) 07.04.2006(AE) 18.08.2011 (SDE) 27.05.14 (XEN, Incharge) 01817148564

XEN (Incharge), Zonal CivilConstructionDivision PDB,Rajshahi

1) Technical Orientation andQuality Witness aganistCentral Zone PowerDistribution Project atApril/2011 for 07 days in China.

A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.PC Pole Construction

ArichaSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01532 15.07.73 Mr. Md. Iktiar Kabir, Comilla, B.Sc.Engr.(Mech.),

29.04.2001(AE) 20.04.09(SDE, Incharge) 01.07.13 (XEN, Incharge)

XEN (Incharge) PC Pole ConstructionPlant PDB, Aricha.

1) Inspection againstChittagong PC PoleConstruction Plant from16.04.2012 to 26.04.2012 inChina. 2) Inspection againstChittagong PC PoleConstruction Plant to inspect 6,7, 8 9 mm 3200 Quintal H.T wirefrom 10.11.13 for 10 days(excluding travel time) inChina. 3)Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.

A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.

2 11-0922 Mr. Abid Hossain Diploma engg 25.08.84 (SAE) 04.02.16 (AE, Incharge)

AE (Incharge), PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.

Page 22: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 22

ChittagongSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 11-0288 01.07.57 Mr. Mir Mohammad Kashem,

Cox'bazar Diploma(Civil) 24.07.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE) 01749346777

SDE PC Pole ConstructionFactory, PDB, Chittagong.

1) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China. 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from20.09.15 to 29.09.15 in China.

2 11-0474 25.09.58 Mr. Swapan Kumar Das Gupta

B-Baria Diploma (Civil) 25.08.84 (SAE) 27.12.11 (AE)

AE, PC Pole ConstructionFactory, PDB, Chittagong.

1) Inspection againstChittagong PC PoleConstruction Plant to inspect 6,7, 8 9 mm 3200 Quintal H.T wirefrom 10.11.13 for 10 days(excluding travel time) inChina.

3 11-0818 Mr. A.B.M. Abu Bakar Siddique AE (Incharge)

PC Pole ConstructionPlant PDB,Halishahar,Chittagong

Page 23: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 23

2

34 ID-No Date of Birth Name, District and Qualification

and Date of joiningDesignation andPresent Posting

Topics of Foreign Training andDuration

Country Inspection Topics and its Duration Comments

5 Mr. Syed Julfiker Ali DD Dte. of Accounts

4) Meeting against Shahjibazar300 MW, Ghorasal 300-450 MW,Barapukuria 275 MW andChapainawabganj 100 MWProject from 23.09.13 to 26.09 13in China.

6 Mr. Kazi Ahsan Ullah Director Dte. of Finance

1) PSCDP training on Public PrivatePartnership (PPP) trainingprogramfrom on 18.11.13 to29.11.13

Thailand

7 Mr. Mazharul Haque Additional Director Dte. of Personnel

1) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13

Thailand

89

10

Page 24: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 24

1 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, Current Charge) 23.04.09 (XEN)

XEN, Civil Works Division

PDB,Chittagong.

(New posting order toChittagong PowerStation)

1) Inspection (EmergencyDiesel Generator) againstGopalgonj 100MW PeakingPower Plant ConstructionProject November/10 for 07days in Singapore.

2 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)

SDE Energy Auditing UnitDivision PDB, Khulna. (New posting orderto Bera 70 MWPeaking PoweerStation, PDB, Pabna)

1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days 2)Operation & MaintenanceTraining (Factory Training) againstBera 70 MW Peaking Power PlantConstruction Project for 30 (thirty)days (Excluding travel time)

China.

South Korea

Page 25: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 25

Foreign Training InformationSL.NO

.ID No. Date of Birth Name, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0955 20.10.65 Mr. S.M.A. Azim ,Chittagong,B.Sc.Engr.(Civil),04.12.91(AE) 12.07.02(SDE) 21.07.11 (XEN)

XEN

PC Pole ConstructionPlant PDB,Halishahar,Chittagong

1) Witnessing the test &Inspection of High tensilesteel (HTS) wire from 23.02.10to 01.03.10 for 07 days in China.

2) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. in May/2011for 10(Ten) days in China. Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.

2 1-01803 18.06.84 Mr. Shamarukh Moutushi Dhaka. B.Sc.Engr(Architect) 31.05.09 (AE)

AE, Dte. Of Design &Inspection-3 PDB, Dhaka.

Training in PIM (PowerManagement Institute) NTPC inFebruary/11.

India A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia.

Page 26: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 26

3 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 01818607385 [email protected]

AE Design & Inspection-3, PDB, Dhaka.

1) A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia. 2) A proposalsent to ministrydated 30.01.13on Pre-shipmentinspectionagainstChittagong PCPoleConstructionPlant for 10days in China.

4 1-02005 5.12.1983 Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]

AE, Zonal CivilConstructionDivision PDB, Chittagong.

A proposal sentto ministrydated 30.01.13on Pre-shipmentinspectionagainstChittagong PCPoleConstructionPlant for 10days in China.

5 1-01938 05.04.87 Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536 [email protected]

AE, Design & Inspection-3, PDB, Dhaka

A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia.

Page 27: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 27

6 1-02015 01.12.88 Mr. Akhond Mahmood Ashek Faridpur B.Sc. Engg. (Civil) 02.10.2011 (AE) [email protected]

AE, Civil ConstructionDivision-1, PDB, Dhaka

2 1-01584 09.02.57 Mr. Md. Ruhul Amin Comilla, Diploma(Civil),

21.08.78(SAE), 27.03.03(AE), 10.02.10(SDE)

SDE, PC Pole ConstructionFactory, PDB, Chittagong.

1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China.

Page 28: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 28

Page 29: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 29

2 1-01599 11.04.58 Mr. Md. Azizul Haque Noyakhali Diploma(Civil),

21.08.78(SAE), 20.11.03(AE), 10.02.10(SDE)

SDE, Zonal CivilConstructionDivision PDB, Chittagong.

1) Basic Design Review againstDohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days inChina.

3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)

23.10.80(SAE), 17.09.09(AE)

AE, EngineeringAcademy PDB, Kaptai.

Page 30: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 30

Page 31: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 31

1 1-0684 12.01.60 Mr. Shahadat Hossain KhanEusufzai, Mymensing, B.Sc.Engr.(Mech.),

30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 01755582461

XEN Energy AuditingUnit, PDB,Mymensingh

1) 7 transmission Project inFrance for 06 weeks,1994 2) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia.

barapukuria

34

5

Page 32: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 32

P&D 23.04.09

Chairman 15.04.08

Page 33: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 33

P&D 24.04.08

P&D 15.04.08

Page 34: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 34

Chittagong D 01.01.10

Foujdarhat D 04.12.08

Pahartoly D 01.01.10

Page 35: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 35

Chairman 10.02.10

Page 36: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 36

P&D 31.07.08

Rangpur D 01.01.10

Page 37: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 37

Baghabari G 2002 01.08.10

Page 38: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 38

Ghorasal G 01.01.10

P&D 04.11.09

Page 39: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 39

Shikalbaha G 22.06.10

Shikalbaha

G 22.06.10

Page 40: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 40

Chairman 2001 02.06.10

PD Dhaka West 108 MW HFO Power PlantConstruction Project, Bosila,Keraniganj.

Siddirgonj G 2004 02.06.10

Page 41: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 41

PD M.Admin 2003 08.02.11

Dhaka West 108 MW HFO Power PlantConstruction Project, Bosila,Keraniganj.

Ghorasal G 2004 08.02.11

M.Admin

Page 42: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 42

M.Admin 14.11.10

Shikalbaha

G

Page 43: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 43

D 2004 09.05.10

Stadium D 16.01.08

Page 44: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 44

P&D 2002 08.02.11

Ghorasal G 25.06.09

Page 45: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 45

M.Adm 23.03.10

Page 46: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 46

Sylhet P G 02.06.10

Horipur G

Page 47: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 47

Chittagong D 02.06.10

M.Am

Page 48: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 48

Siddirgonj G

Page 49: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 49

P&D 16.01.08

Page 50: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 50

P&D 10.11.08

Page 51: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 51

P&D 02.06.10

P&D 10.02.10

Page 52: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 52

BograA proposal sent to ministrydated 24.12.14 for pre-shipmentinspection against Chittaging PC Polefrom 02.01.15 for 10 days in China.

D 2003 02.06.10

P&D 01.01.10

Page 53: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 53

D 02.06.10

Page 54: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 54

D 08.02.11

Page 55: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 55

P&D 22.06.10

P&D 24.04.08

Page 56: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 56

P&D 10.02.10

P&D 02.06.10

Page 57: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 57

Page 58: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 58

P&D Diploma 02.06.10

Page 59: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 59

Page 60: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 60

P&D Diploma 02.06.10

M.Am

Page 61: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 61

Page 62: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 62

F 02.06.10

Page 63: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 63

Page 64: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 64

Page 65: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 65

Page 66: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 66

Page 67: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 67

Page 68: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 68

Page 69: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 69

Page 70: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 70

Page 71: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 71

Page 72: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 72

Page 73: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 73

Page 74: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 74

Page 75: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 75

Page 76: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 76

Page 77: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 77

Page 78: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 78

Page 79: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 79

Page 80: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 80

Page 81: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 81

Page 82: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 82

Page 83: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 83

Page 84: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 84

Page 85: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 85

Page 86: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 86

Page 87: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 87

Page 88: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 88

Page 89: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 89

Page 90: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 90

Page 91: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 91

Page 92: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 92

Page 93: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 93

Page 94: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 94

Page 95: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 95

Page 96: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 96

Page 97: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 97

Page 98: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 98

Page 99: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 99

Page 100: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 100

Page 101: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 101

Page 102: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 102

Page 103: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 103

Page 104: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 104

Page 105: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 105

Page 106: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 106

Page 107: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 107

Page 108: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 108

Page 109: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 109

Page 110: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 110

Page 111: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 111

Page 112: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 112

Page 113: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 113

Page 114: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 114

Page 115: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 115

Page 116: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 116

Page 117: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 117

Page 118: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 118

Page 119: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 119

Page 120: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 120

Page 121: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 121

Page 122: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 122

Page 123: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 123

Page 124: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 124

Page 125: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 125

Page 126: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 126

Page 127: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 127

Page 128: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 128

Page 129: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 129

Page 130: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 130

Page 131: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 131

Page 132: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 132

Page 133: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 133

Page 134: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 134

Page 135: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 135

Page 136: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 136

Page 137: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 137

Page 138: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 138

Page 139: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 139

Page 140: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 140

Page 141: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 141

Page 142: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 142

Page 143: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 143

Page 144: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 144

Page 145: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 145

Page 146: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 146

Page 147: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 147

Page 148: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 148

Page 149: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 149

Page 150: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 150

Page 151: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 151

Page 152: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 152

Page 153: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 153

Page 154: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 154

Page 155: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 155

Page 156: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 156

Page 157: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 157

Page 158: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 158

Page 159: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 159

Page 160: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 160

Page 161: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 161

Page 162: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 162

Page 163: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 163

Page 164: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 164

Page 165: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 165

Page 166: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 166

Page 167: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 167

Page 168: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 168

Page 169: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 169

Page 170: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 170

Page 171: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 171

Page 172: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 172

Page 173: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 173

Page 174: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 174

Page 175: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 175

Page 176: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 176

Page 177: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 177

Page 178: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 178

Page 179: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 179

Page 180: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 180

Page 181: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 181

Page 182: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 182

Page 183: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 183

Page 184: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 184

Page 185: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 185

Page 186: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 186

Page 187: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 187

Page 188: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 188

Page 189: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 189

Page 190: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 190

Page 191: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 191

Page 192: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 192

Page 193: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 193

Page 194: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 194

Page 195: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 195

Page 196: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 196

Page 197: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 197

Page 198: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 198

Page 199: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 199

Page 200: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 200

Page 201: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 201

Page 202: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 202

Page 203: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 203

Page 204: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 204

Page 205: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 205

Page 206: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 206

Page 207: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 207

Page 208: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 208

Page 209: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 209

Page 210: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 210

Page 211: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 211

Page 212: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 212

Page 213: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 213

Page 214: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 214

Page 215: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 215

Page 216: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 216

Page 217: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 217

Page 218: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 218

Page 219: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 219

Page 220: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 220

Page 221: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 221

Page 222: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 222

Page 223: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 223

Page 224: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 224

Page 225: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 225

Page 226: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 226

Page 227: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 227

Page 228: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 228

Page 229: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 229

Page 230: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 230

Page 231: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 231

Page 232: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 232

Page 233: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 233

Page 234: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 234

Page 235: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 235

Page 236: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 236

Page 237: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 237

Page 238: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 238

Page 239: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 239

Page 240: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 240

Page 241: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 241

Page 242: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 242

Page 243: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 243

Page 244: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 244

Page 245: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 245

Page 246: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 246

Page 247: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 247

Page 248: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 248

Page 249: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 249

Page 250: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 250

Page 251: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 251

Page 252: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 252

Page 253: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 253

Page 254: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 254

Page 255: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 255

Page 256: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 256

Page 257: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 257

Page 258: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 258

Page 259: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 259

Page 260: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 260

Page 261: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 261

Page 262: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 262

Page 263: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 263

Page 264: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 264

Page 265: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 265

Page 266: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 266

Page 267: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 267

Page 268: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 268

Page 269: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 269

Page 270: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 270

Page 271: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 271

Page 272: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 272

Page 273: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 273

Page 274: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 274

Page 275: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 275

Page 276: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 276

Page 277: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 277

Page 278: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 278

Page 279: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 279

Page 280: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 280

Page 281: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 281

Page 282: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 282

Page 283: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 283

Page 284: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 284

Page 285: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 285

Page 286: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 286

Page 287: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 287

Page 288: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 288

Page 289: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 289

Page 290: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 290

Page 291: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 291

Page 292: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 292

Page 293: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 293

Page 294: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 294

Page 295: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 295

Page 296: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 296

Page 297: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 297

Page 298: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 298

Page 299: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 299

Page 300: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 300

Page 301: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 301

Page 302: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 302

Page 303: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 303

Page 304: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 304

Page 305: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 305

Page 306: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 306

Page 307: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 307

Page 308: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 308

Page 309: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 309

Page 310: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 310

Page 311: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 311

Page 312: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 312

Page 313: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 313

Page 314: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 314

Page 315: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 315

Page 316: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 316

Page 317: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 317

Page 318: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 318

Page 319: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 319

Page 320: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 320

Page 321: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 321

Page 322: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 322

Page 323: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 323

Page 324: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 324

Page 325: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 325

Page 326: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 326

Page 327: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 327

Page 328: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 328

Page 329: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 329

Page 330: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 330

Page 331: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 331

Page 332: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 332

Page 333: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 333

Page 334: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 334

Page 335: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 335

Page 336: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 336

Page 337: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 337

Page 338: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 338

Page 339: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 339

Page 340: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 340

Page 341: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 341

Page 342: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 342

Page 343: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 343

Page 344: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 344

Page 345: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 345

Page 346: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 346

Page 347: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 347

Page 348: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 348

Page 349: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 349

Page 350: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 350

Page 351: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 351

Page 352: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 352

Page 353: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 353

Page 354: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 354

Page 355: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 355

Page 356: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 356

Page 357: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 357

Page 358: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 358

Page 359: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 359

Page 360: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 360

Page 361: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 361

Page 362: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 362

Page 363: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 363

Page 364: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 364

Page 365: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 365

Page 366: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 366

Page 367: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 367

Page 368: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 368

Page 369: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 369

Page 370: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 370

Page 371: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 371

Page 372: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 372

Page 373: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 373

Page 374: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 374

Page 375: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 375

Page 376: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 376

Page 377: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 377

Page 378: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 378

Page 379: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 379

Page 380: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 380

Page 381: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 381

Page 382: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 382

Page 383: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 383

Page 384: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 384

Page 385: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 385

Page 386: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 386

Page 387: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 387

Page 388: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 388

Page 389: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 389

Page 390: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 390

Page 391: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 391

Page 392: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 392

Page 393: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 393

Page 394: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 394

Page 395: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 395

Page 396: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 396

Page 397: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 397

Page 398: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 398

Page 399: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 399

Page 400: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 400

Page 401: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 401

Page 402: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 402

Page 403: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 403

Page 404: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 404

Page 405: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 405

Page 406: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 406

Page 407: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 407

Page 408: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 408

Page 409: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 409

Page 410: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 410

Page 411: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 411

Page 412: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 412

Page 413: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 413

Page 414: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 414

Page 415: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 415

Page 416: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 416

Page 417: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 417

Page 418: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 418

Page 419: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 419

Page 420: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 420

Page 421: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 421

Page 422: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 422

Page 423: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 423

Page 424: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 424

Page 425: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 425

Page 426: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 426

Page 427: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 427

Page 428: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 428

Page 429: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 429

Page 430: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 430

Page 431: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 431

Page 432: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 432

Page 433: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 433

Page 434: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 434

Page 435: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 435

Page 436: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 436

Page 437: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 437

Page 438: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 438

Page 439: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 439

Page 440: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 440

Page 441: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 441

Page 442: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 442

Page 443: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 443

Page 444: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 444

Page 445: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 445

Page 446: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 446

Page 447: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 447

Page 448: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 448

Page 449: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 449

Page 450: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 450

Page 451: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 451

Page 452: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 452

Page 453: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 453

Page 454: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 454

Page 455: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 455

Page 456: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 456

Page 457: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 457

Page 458: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 458

Page 459: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 459

Page 460: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 460

Page 461: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 461

Page 462: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 462

Page 463: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 463

Page 464: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 464

Page 465: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 465

Page 466: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 466

Page 467: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 467

Page 468: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 468

Page 469: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 469

Page 470: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 470

Page 471: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 471

Page 472: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 472

Page 473: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 473

Page 474: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 474

Page 475: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 475

Page 476: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 476

Page 477: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 477

Page 478: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 478

Page 479: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 479

Page 480: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 480

Page 481: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 481

Page 482: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 482

Page 483: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 483

Page 484: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 484

Page 485: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 485

Page 486: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 486

Page 487: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 487

Page 488: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 488

Page 489: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 489

Page 490: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 490

Page 491: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 491

Page 492: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 492

Page 493: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 493

Page 494: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 494

Page 495: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 495

Page 496: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 496

Page 497: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 497

Page 498: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 498

Page 499: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 499

Page 500: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 500

Page 501: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 501

Page 502: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 502

Page 503: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 503

Page 504: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 504

Page 505: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 505

Page 506: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 506

Page 507: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 507

Page 508: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 508

Page 509: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 509

Page 510: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 510

Page 511: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 511

Page 512: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 512

Page 513: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 513

Page 514: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 514

Page 515: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 515

Page 516: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 516

Page 517: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 517

Page 518: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 518

Page 519: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 519

Page 520: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 520

Page 521: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 521

Page 522: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 522

Page 523: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 523

Page 524: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 524

Page 525: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 525

Page 526: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 526

Page 527: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 527

Page 528: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 528

Diploma

Page 529: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 529

Diploma

Page 530: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 530

Head Offices of BPDBOffice of the Chairman, BPDB

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0373 17.08.57 Mr. Md. Shamsul HassanMiah, Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 28.12.10 (SE) 25.08.14 (Addl. CE) 19.11.14 (CE) 18.01.15 (Member) 19.01.16 (Chairman)

Chairman Bangladesh PowerDevelopment Board.

1) ComputerApplication.09.07.84 for 08(eight) weeks.

2)Project and Financing From01.9.03 to 10.9.03

Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K.,Finland & USA

3) 25.9.2001 to26.9.2001Singapore 4) 330-450MW Combined CyclyPower Station Project from21.04.08 to 23.04.08, 03 days inSingapore. 5) Inspection on Power Plantaganis Desh Energy Ltd. from10.06.10 to 12.06.10 in China. * See N.B.

A proposal sent toministry dated28.04.16 for Visitand inspectionfrom 10-14June/2016 in SouthAfrica

N.B. 6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 02.10.15 to 10.10.15 in UK. 18) Engine & Energy meter test witness against Barisal 110 MW HFO fired Power Station from 27.12.15 to 05.01.16 in Finland & Switzerland 19) Visit Coal Mining for NWPGCL & CPGCL from 11.01.16 to 15.01.16 in Indonesia & Singapore. 20) Citi 13th Annual Asia Pacific Investor Conference 2016 from 17.02.16 to 18.02.16 in Hong Kong. 21) Discussion on the contract of Ruppur Nuclear Power Plant from 23.03.16 to 29.03.16 in Russia.

Page 531: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 531

2 1-0743 01.09.62 Mr. Ashutosh Roy,

Bogra, B.Sc.Engr.(Elec.) , 30.8.86(AE) 19.03.98(SDE) 10.07.05(XEN) 05.04.16 (SE) 01558357200

CSO (SE), Office of Chairman,PDB, Dhaka.

1)System Protection andMetering from 10.12.90 to09.11.91 2) 'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) days from30.05.2011 to30.06.2011(Excluding traveltime) (Bond for 5 years)

UK

China

1) Inspection on 132KV CurrentTransformer & VoltageTransformer against BaghabariPower Station from 13.11.10 to22.11.10 for 07 days in China. 2) "Witnessing ofmanufacturing process & test ofequipment" for Siddhirganj P/Sfrom 10.12.13 to 16.12.13 for 7days in China. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Witnessing of manufacturingagainst Baghabari P/S from10.07.15 to 16.07.15 in USA 5) Factory test witness ofWartsila engine & generatotagainst Chapainawabganj 100MW Project from 08.04.16 to18.08.16 Finland.

Document CentreSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0834 01.01.63 Mr. Sayed Enamul Haque,Dhaka,B.Sc.Engr.(Mech.),18.02.88(AE) 21.11.99(SDE) 03.08.10 (XEN)

XEN,

Document Center PDB, Dhaka.

1)Hydro Plant Design from16.10.95 to 15.1.96 2)Country focused trainingcourse on "Power Sector" from09.01.01 to 08.2.01 3) 18th Energy Program from03.9.98 to 30.2.99

Australia,

Italy,

France

Factory Test Witness Of SinglePhase Step Up TransformerFrom 10.11.2003 to 15.11.2003 InJapan

Offices Under Member Admin

Page 532: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 532

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 5251 Mr. Lokman Hossain Miah

13.02.14 (as member admin.in BPDB)

Member Administration, PDB,Dhaka.

1) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Factory witness test againstKadda 150 MW Duel Fuel PowerPlant Construction Project from30.06.14 to 06.07.14 in China. 4) witnessing of manufacturingprocess against Barishal GasTurbine Power Plant from25.11.14 to 01.12.14 in USA. 5) Factory acceptance test ofGas turbine againstShahjibazar 330 MW CCPPProject from 15.01.15 to 22.01.15in France. See N.B.

1. G.O. issueddated 28.04.16 forManagementmeeting andwitnessing ofmanufacturingprocess againstGhorasal P/S from24-30 May/2016 inRussia. 2. A proposal sentto ministry dated05.05.16 for FactoryAcceptance TestWitness againstJamalpur 94.8 MWproject from01.06.16 to 07.06.16in Sweden.

N.B. 6) Witnessing of manufacturing against Shikalbaha 60 MW Power Station from 20.03.15 to 26.03.15 in Czech Republic 7) Factory Test Witness Against Shahjibazar 330 MW CCPP Project on May/2015 for 7 days in Spain. 8) Witnessing of manufacturing process against Baghabari Power Station from 25.08.15 to 03.09.15 in UK 9) Inspection of Heat recovery steam generator against Shikalbaha 225 project from 02.11.15 to 08.11.15 in South Korea. 10) Deputation for participation inthe Inspection of gas booster against Shikalbaha 225 MW project from 24.02.16 to 01.03.16 in USA.

GM, Training OfficeSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

Page 533: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 533

1 1-0489 07.11.57 Mr. Amal Krishna BasuKhulnaB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 29.01.15 (Addl. CE, Incharge) 13.12.15 (CE)

GM (CE) Training, PDB, Dhaka.

1.Improvement of operationof elec. Power From 10.01.01to 15.02.01 2) Technology TransferTraining from 07.07.15 to13.07.15

Japan &Thailand

India

1) “Technical Orientation &Quality Test Witness” on EnergyMeter from 16.11.09 for 10 daysin Singapore. 2) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China. 3) Site visit from 04.10.15 to15.10.15 in Spain

A proposal sent toministry dated25.04.16 forwitnesing ofmanufacturersprocess againstTongi 80 mW P/Sfrom 31.05.16 to06.06.16 in Hungery.

2 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Directorate of Training&Career Development PDB, Dhaka.

Materials witness Inspection(HRSG Inspection)” againstBera 70 MW Peaking PowerPlant Construction Project from14.11.10 to 22.11.10 for 07 daysin South Korea.

Dte. of Taining & Career DevelopmentSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

2 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 10.02.10 (XEN)

Director (Incharge)

Directorate of Trainingand Career Development

PDB, Dhaka.

1) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13

Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plant from14.12.10 to 22.12.10 for 07 daysin Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Tehnical orientation &Quality test witness from26.09.15 to 01.10.15 in China. 5)Pre-shipment inspectionagainst Wind Battery PowerPlant, Kutubdia from 20.04.16 to26.04.16 in China.

Page 534: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 534

2 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)

Deputy Director (XEN)

Dte. of Training &Career Develpopment PDB,Dhaka.

1)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month 2) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13 3) Technology TransferTraining against 10- townproject from 13.04.15 to19.04.15 4) Training on Planning &development from 01.05.16 to15.06.16

France,

Thailand

Germany

India

1) Factrory acceptance test from05.08.14 to 14.08.14 inSingapore.

3 1-01009 12.06.66 Mr. Md Abdur Sattar Miah, B.Sc.Engr.(Mech.),19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)

Dy. Director(XEN),

Director of Training andCareer Development

PDB, Dhaka. (Return from lien in Dubaifor 5 years)

1) PSCDP Training onProcurement and Supply ChainManagement trainingprogram from 30.09.13 to11.10.13

Thailand 1) Technical orientation &quality test witness from01.04.15 to 07.04.15 in India. 2) Witnessing of manufacturingprocess of cooling tower gearbox against Barapukuria powerstation from 16.10.15 to 22.10.15in China.

4 1-01010 28.02.68 Mr. Md. Abdul Basid,TangailB.Sc.Engr.(Elec.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)

Dy. Director(XEN),

Director of Training andCareer Development

PDB, Dhaka.

1)145KV and 36KV CircuitBreaker (RRAGS) From 08.10.03to 08.01.04 for 03 Months

China 1) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.

5 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)

SDE Directorate of Training&Career Development PDB, Dhaka.

1) Training on ''Operation &Maintenance of HRGS inKorea from 20.11.07 to04.12.07 for 0.5 Month &''Hydraulice Diverter DamperSystem in China from 14.08.07to 17.10.07 for 03 Monthsagainst 90 MW SylhetCombined Cycle Power Station(Unit-2) Cons. Project. 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13

Korea & China

India

On Lien

Page 535: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 535

6 1-01710 31.12.77 Ms. Shamima Akhter Gazipur B.Sc.Eng(Elec) 07.04.2006(AE) 28.01.14 (SDE) 24.11.14 (XEN, Incharge)

XEN (Incharge) Directorate of Training&Career Development PDB, Dhaka.

1) Inspection of Gas TurbineGenerating (GTG) Unit againstShikalbaha 150MW Peking PlantConstruction Project from13.04.09 to 23.04.09 for 10 daysin Germany. 2) Inspection of Oil burnernozzel against Barapukuriapower station from 19.09.15 to25.09.15 in China

7 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01556559924 [email protected]

SDE (Incharge) Directorate of Training&Career Development,PDB, Dhaka.

1) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13

Thailand

8 11-0397 04.02.60 Mrs. Ferdousi Begam Dhaka Diploma engg. (Mech.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)

SDE (Incharge) Directorate of Training&Career Development,PDB, Dhaka.

Training on Planning &development from 01.05.16 to15.06.16

India

9 1-01926 01..11.82 Mr. Abu Naser Md. Abdul Hai Comilla B. Sc. Engg. (Elect.) 24.07.11 (AE)

AE Directorate of Training&Career Development,PDB, Dhaka.

1) Training on Operation &Maintenance from 01.05.16 to15.06.16

India

10 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522

[email protected]

AE Directorate of Training&Career Development,PDB, Dhaka.

1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13

Thailand On StudyLeave

11 11-0482 01.01.58 Mr. Md. Mahbub Hossain Bogra Diploma (Elect.) 25.08.84 (SAE) 27.12.11 (AE)

AE Directorate of Training&Career Development,PDB, Dhaka.

1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.

Page 536: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 536

Dte. of PersonnelSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0578 03.04.58 Mr. Abdul Matin Bhuiyan,

Comilla, B.Sc.Engr.(Elec.), 27.10.84(AE) 28.04.94(SDE) 11.04.04(XEN)

XEN, Dte. of Personnel

1) Training on PerformedTermination for different sizeof Conductors. India for 07days

India 1) Factory Test Witness &Orientation Training on GreaterChittagong Power DistributionProject against ''Switchgear''from 19.03.07 to 03.04.07 for 14days in China.

TemporarilySuspended

Dte. of State & TransportSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01682 15.08.76 Mr.Md.Rezaul Haq Khulna B.Sc.Eng(Mech) 16.10.2006(AE) 27.12.2011(SDE) 02.07.14 (XEN, Incharge) 0171-1274705 [email protected]

DD, XEN (Incharge), Dte. of State &Transport, PDB, Dhaka

1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & Control Division,Operation Division) from10.09.10 to 27.09.10. 2) Shantahar 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12 for 1month

China

China

1) "Witnessing ofManufacturing Process and Testof the Equipment atManufacturer’s works includingtransfer of technical Know-how"against Khulna 110/60MW from02.07.09 to 09.07.09 for 07 daysin India. 2) Quality test witness againstChitt. zone power dist. dev.project from 18-24 March/2016in India & China

Central Pool Repairing Shop, PDB, DhakaSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 11-0276 27.01.59 Mr. Md. Shakhawat Hossain Dhaka Diploma (Mech.) 01.07.80 (SAE) 17.09.09 (AE) 25.06.15 (SDE)

SDE Central Pool RepairingShop, PDB, Dhaka

Page 537: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 537

Offices Under Member FinanceSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 Mr. Md. Azizul Islam Member Finance, BPDB.

1) witnessing of manufacturingprocess and test of equipmentat manufacturer's works inincluding transfer of technicalkhow-how against barapukuriaP/S from 10.05.14 to 16.05.14 inChina. 2) Witnessing of manufacturingprocess against BaghabariPower Plant from 16.10.14 to22.10.14 in France. 3) Site visit from 04.10.15 to15.10.15 in Spain

Dte. of PurchaseSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0679 13.10.60 Mr. Md. Abu Yousuf Noakhali, B.Sc.Engr.(Elec.), 30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 28.07.15 (SE)

Director Dte. of Purchase, PDB,Dhaka.

1)Improvement of Operationof Electric Power From 09.01.01to 11.02.01 2) Orientation & TechnicalTraining on 11KV LightningArrester from 28.11.04 to04.12.04 for 07 days in China. 3) Training Programme onManagement of Wind PowerDevelopment from 28.08.06 to29.09.06 for 33 Days. 4) Economic LoadManagement from 29.04.13 to10.04.13 5) Training on supply,gradation, installation,testing & commissioning workof Mark-II to Mark VIe Controlsystem from 13.05.14 to27.05.14

Japan,

China

Sweden

Vietnam

USA

1)Factory Test Witness From09.10.03 to 12.10.03 in China 2) Inspection on Coal FiredPower Station Construction from19.01.10 to 26.01.10 in China. 3) Power Plant Inspectionagainst Sinha PowerGeneration Company Ltd. from16.06.10 to 19.06.10 in Korea. 4) witnessing of manufacturingprocess against Rangpur PowerStation from 01.09.15 to 07.09.15in Netherland. 5) Quality test witness of GISBreaker from 28.02.16 to 05.03.16in Germany.

Page 538: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 538

2 1-01349 12.05.72 Mr. A.N.M. Tarique Abdullah, Comilla, B.Sc.Engr.(Chemical.),05.03.2000(AE) 18.08.2011 (SDE) 25.10.11 (XEN, Incharge) 18.06.15 (XEN)

Dy. Director (XEN)

Dte. of Purchase, PDB,Dhaka.

1) "Renewable Energy" from01.06.13 to 30.06.13

Thailand 1) 'Developments in RenewableEnergy Technologies'' from07.03.11 to 09.03.11 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 3) conference titled "CarbonForum Asia 2011" organized byADB from 02/11/2011 to03/11/2011 for 2 (two) days(excluding travel time) inSingapore. 4) Seminar on CDM in Indiafrom 23.04.12 to 24.04.12 5) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 6) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China. 7) Technical orientation &quality test witnes of powertransformer from 23.04.16 to29.04.16 in China.

3 1-01968 1.1.1982 Mr. Md. Sarower Murshed Kustia B.Sc. Engg. (Comp.) 02.10.11 (AE) 01713064476 [email protected]

AE Dte. of Purchase, PDB,Dhaka.

1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia. 3) technical orientation &quality test witness againstSCADA Project from Oct/2015 10days in Singapore.

4 1-01838 23.05.85 Mr. H. M. G. sarower Comilla B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01680199093 [email protected]

SDE, Incharge Dte. of Purchase, PDB,Dhaka.

1) Training on Operation &Maintenance from 01.05.16 to15.06.16

India 1) "Technical Orientation &Quality Test Witness for Meter& Meter Enclosure" from16.03.14 to 25.03.14 in China.

Page 539: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 539

Offices Under Member GenerationSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0440 23.12.58 Mr. Khaled Mahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE) 12.01.16 (Member)

Member, Generation, PDB, Dhaka

1) Sub-Station Design From26.02.94 to 25.05.94

2) Training on Power Sectorfrom 09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .

4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13

South Korea &Japan

Japan

France

Italy

Australia

1)China in 1992

2)India in 2002

3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.** N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany.

8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.Inspection against shahjibazar 330 MW project from 25.08.15 to 31.08.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.15 to 01.01.16 in Thailand. 25. Construction Drawing Review Meeting against Barapukuria 275 MW Project from 15.01.16 to 26.01.16 in China 26. Witnessing of manufacturing process against Ghorasal P/S from 21.04.16 to 27.04.16 in Russia.

Page 540: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 540

2 1-01274 01.04.70 Mr. Md. Sawkat Ali Bhuiyan Gagipur, B.Sc.Engr.(Elec.),

10.06.99(AE),

26.07.05(SDE), 21.12.11(XEN Incharge)

XEN(Incharge), Attach to Member,Generation Office, PDB,Dhaka

1) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China

3 1-01298 21.05.74 Mr. Moniruzzaman,Meherpur,B.Sc.Engr.(Elec.) ,13.07.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge) 18.06.15 (XEN)

D.S (XEN)Generation

PDB,Dhaka.

1) Safe, Reliable, &Maintenance of I & C,Circuits/Loops,etc From21.03.2004 for 06 Months. 2) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.

China,

Bahrain

1) Inspection againstBarapukuria Coal Fired ThermalPower Station on in Sept./2011for 07 (Seven) in China. 2)"Coal Power Genaration" from10.06.13 to 14.06.13 in Thailand. +A90 4) Inspection againstBarapukuria Coal Fired ThermalPower Station on Nov./2015 for07 (Seven) in Japan

4 1-01947 21-10-86 Mr. Md. Nazmul Hudda Rangpur B. Sc. engg. (Elect.) 02.10.2011 (AE) 01720334106 [email protected]

Load dispatch Office of MemberGeneration, PDB,dhaka.

1) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13 2) participant in the "Trendsand Developments inGeneration and TransmissionSystem" to be held from27.01.14 to 21.03.14

Thailand

Hydrabad, India.

On Lien

5 1-02076 07.09.89 Mr. Mahbubur Rahman Narayanganj B.Sc.Engr.(Elec.),

17.12.13(AE)

AE Office of MemberGeneration, PDB,dhaka.

A proposal sent toministry dated21.03.16 forWitnessing againstShikalbaha P/Sfrom 19.04.16 to25.04.16 inGermany.

Page 541: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 541

Office of CE, GenerationSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0520 08.02.58 Mr. A.H.M. KamalSirajgonjB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 21.01.03(XEN) 28.01.14 (SE) 08.02.16 (Addl. CE)

Addl. CE Generation, PDB,Dhaka.

1)Transmition line protection,maintenance & protectionfrom 01.08.99 to 31.10.99 2) "Renewable Energy" from01.06.13 to 30.06.13

Germany,Switzerland

India Thailand

1) 33 kv, 1250 Vacuum CircuitBreaker(Out door) From 11.06.01to 17.06.01for 07 days in India. 2) Preshipment Inspection &Testing From 19.09.02 to25.09.02 In India. 3) Orientation & TechnicalTraining on 33 KV Circuit BrakerFrom 27.05.05 to 31.05.05 for 07days in India. 4) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject for 07 days in China. *See N:B:

N:B: 5) Inspection in order to establish Quick Rental Power Plant in Ghorashal or at any suitable place in Bangladesh from 27.08.2010 to 05.09.2010 for 5 (five) days (excluding travell time) in UAE. 6) Solar Preshipment Inspection from 25.06.2011 to 29.06.2011 for 05 days in China. 7) "Wind IPP Summit-2012" from 17.01.2012 to 18.01.2012 for maximum 3 (three) days (excluding travel time) in Mumbai, India 8) Technical orientation & quality test witness from 05.01.15 to 11.01.15 in China 9) technical orientation & quality test witness against SCADA project from 24.08.15 to 02.09.15 in Singapore & Malaysia.for 10 days 10) technical orientation & quality test witness against SCADA project on Aug/2015 in Germany

2 1-01312 16.03.71 Mr. A.K.M. Mohiuddin Azamy, Chandpur, B.Sc.Engr.(Mech.),

07.02.2000(AE) 26.07.05(SDE), 22.12.13 (XEN, Incharge)

Assistant CE, XEN(Incharge), Generation, PDB,Dhaka.

1) Tarif energy Meter FactoryAcceptance Test from 15.09.14 to19.09.14 for 5 days in Singapore.

2) Tariff energy Meter FactoryAcceptance Test from 14.10.15 to17.10.15 for 5 days in UK

3 11-0393 13.08.59 Mr.Shukumer Karmokar Potoakhali Diploma(Power )

21.07.83(SAE), 02.11.10(AE), 06.01.16 (SDE, Incharge)

SDE, Incharge Under CE Generation,PDB, Dhaka.

Chandpur 150 MW CCPP Projectaganist Utility Maintenance (I& C Maint.) GTG Mark VI from30.05.2011 to 12.08.2011 for 75days (bond for 5 years)

China

Page 542: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 542

4 1-01841 10.10.86 Mr. Rahmat Ullah B- Baria B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01717630658 [email protected]

SDE, Incharge Under CE Generation,PDB, Dhaka.

1) Inspection against 2nd unitof Chittagong Power Stationfrom 03.08.2012 to 18.08.2012 inChina. 2) Witnessing of manufacturingprocess of spares withoverhauling against BaghabariP/S from 02.05.16 to 08.05.16 inSwitzerland.

Offices Under Member DistributionSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0490 01.07.58 Mr. Sheikh Md. AlauddinJessoreB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 28.07.15 (Addl. CE) 13.12.15 (CE) 02.03.16 (Member)

Member Distribution BPDB, Dhaka.

1)Operation and maintenanceof sub-station. 09.01.91 to08.04.91 (3 Months) 2)Training of measure testwith the required testEquipment 15.10.01 to 15.11.01(01 Month)

China,

UK (England)

1)from 22.02.02 for 07days inIndia 2) 500 Nos.09 Meter Steel Pole(200 DAN) & 100 Nos. 09 MeterSteel Pole (350 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China. 3) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project in July/2011for 07 days in Germany. 4) Inspection of Step-upTransformer against Santahar50 MW and Katakhali 50 MWPeaking Power PlantConstruction Project inMarch/2012 for 7 days(excluding travel time) from thedate of actual journey in China. 5) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China.

1) A proposal sentto ministry Ref. No.BPDB/Training/TF-3/2016/399 Date-31.03.2016 formanagementmeeting withmanufacturersrepresentative andwitnessing ofmanufacturingprocess againstBheramara PowerStation from24.06.16 to 30.06.16in USA. 2) A proposal sentto ministry dated09.05.16 for Factorywitness test of fueloil system unitagainstChapainawabganj100 MW projectfrom 20.06.16 to26.06.16 in Finland.

Page 543: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 543

2 1-01342 03.02.71 Mr. Sadhan Chandra Dey, Mymensingh, B.Sc.Engr.(Mech.),

05.03.2000(AE) 08.12.09(SDE) 16-10-11 (XEN, Incharge) 18.06.15 (XEN)

DS Distribution BPDB, Dhaka.

3) Technology TransferTraining against 10- townproject from 01.04.15 to30.04.15 Germany.

Germany. 1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form05.01.09 to 14.01.09 for 10 daysin China. 2) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV LA from 15.09.13 to18.09.13 in India.

Office of GM, Commercial OperationSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0540 01.01.58 Mr.Md. Anwarul Islam,

Feni, B.Sc.Engr.(Elec.), 22.02.83(AE) 01.02.92(SDE) 31.12.07(XEN, Revl. Basis) 23.04.09(XEN) 10.09.13 (SE) 13.12.15 (Addl. CE) 14.03.16 (CE)

GM (CE) Commercial Operation

PDB, Dhaka.

1) Improvement of PowerSystem operation, From02.02.2000 to 24.03.2000 2) Installation, testing,operation & maintenance ofprogramming meter and dataanalysis software from15.01.09 to 24.01.09 for 10 days

Japan & Thailand,

USA

1) "Technical Orientation andQuality test Witness" inAugust/2011 for 10 (Ten) days inChina. 2) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland. 3) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from10.11.14 to 25.11.14 in China. 4) Attending a program"Business Customer Summit,2015" from 04.04.15 to 07.04.15in Thailand) 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.

A proposal sent toministry dated10.05.16 forConstructiondrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.

Page 544: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 544

2 1-0840 08.03.59 Mr. Md. Jashim Uddin, Comilla, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 11.10.10 (XEN)

DGM, Incharge Commercial Operation

PDB, Dhaka.

1) Sub-Station Orientation &Technical Training FromFebruary /01 3 Months.

China 1) 500 Nos.09 Meter Steel Pole(200 DAN) & 100 Nos. 09 MeterSteel Pole (350 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China. 2) 3000 Nos.- 11KV PT agaist“Technical Orientation andQuality Test Witness” fromJanuary/10 for 05 days in China. 3) To purchase Two Color Offsetmachine from 07.10.12 to14.10.12 in Germany. See N.B.

N.B. 4) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China. 5) Technical orientation & quality test witness of 11 KV Lightning Arrester from 21.06.14 to 27.06.14 in China. 6) Witnessing of manufacturing process against Baghabari Power Plant from 16.01.15 to 22.01.15 in France. 7) Technical orientation & Quality test witness from 30.04.15 to 06.05.15 in China. 8) Quality test witness from 10-16 March/2016 in China.

3 1-01276 06.10.68 Mr. Nur MohammadShamsuzzoha Kabir, Thakurga, B.Sc.Engr.(Mech.),

10.06.99(AE),

26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN)

XEN , GM, CommercialOperation PDB, Dhaka.

1) Training on Management ofWind Power Developmentfrom 27.08.07 to 28.09.07 for 33days 2) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 3) Training on ct, pt Oct/2015for 7 days

Sweden

Thailand

Germany

1)Factory test witness from27.05.02 to 02.06.02 in India 2)Factory test witness of 33KV1250 Amps Vacuum CircuitBreaker From 16.11.03 to21.11.03 for 07 Days in India 3) Inspection on 132 KV CircuitBreaker against Gopalgonj100MW Peaking Power PlantConstruction Project January/11for 07 days in USA. 4) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 5) Study tour to Nord PoolRegional Electricity Market from12.10.15 to 16.10.15 in Norway &Denmark.

Page 545: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 545

4 1-01339 11.11.76 Mr. Mohammad Abul Hasnat, Chittagong, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE)

SDE, GM, CommercialOperation PDB, Dhaka.

1) Foreign Training from18.08.08 to 29.08.08 for 10 days

2) Training on Enegry Meteragainst "Foreign Training"from 15.10.09 to 29.10.09 for 15days.

South Africa

Singapore.

5 1-01340 14.09.71 Mr. Ashis Kumar Sordar, Khulna, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 16-10-11 (XEN, Incharge) 18.06.15 (XEN)

XEN , GM, CommercialOperation PDB, Dhaka.

1) "The Project onStrengthening Managementand Performance Standards inPower Sector in Bangladeshthrough promotion of TQM"from 22.08.09 to 05.09.09

2) Meter Technology,Installation, testing andoperation & maintenance ofmeter programming and dataanalysis software from15.01.09 to 24.01.09 for 10 days.

(Visit is not done)

Japan

USA.

1) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa. 2) Pre shipment inspection from17.08.14 to 26.08.14 in China.

6 1-01859 20.10.86 Tahsin Karim Chittagong B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01195176841 [email protected]

SDE, Incharge GM, CommercialOperation PDB, Dhaka.

1) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa.

7 1-01958 12.4.1987 Ms. Afrin Anu Gaibandha B.Sc. Engg. (Mech.) 02.10.11 (AE) 01715561482 [email protected]

AE GM, CommercialOperation PDB, Dhaka.

Page 546: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 546

8 1-01994 29.11.83 Mrs. Hasnura Jahan Dinajpur B.Sc. Engg. (Elect.) 02.10.11 (AE)

AE GM, CommercialOperation PDB, Dhaka.

1) PSCDP Training Program onClean DevelopmentMechanism (CDM) from27.01.13 to 01.02.13 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13 3) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13

Indonesia

India

Thailand

Deputed toCBISP Project,Power DivisionUnder Ministry

Energy Auditing Unit, PDB, DhakaSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0777 08.02.63 Mr. Badhan Chandra Basak, Kishoregonj, B.Sc.Engr.(Mech.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge)

SE (Incharge), Energy Auditing Unit PDB,Dhaka.

1) "Technical Orientation &Quality Test Witness'' on 33KVCurrent Transformer From23.11.08 to 30.11.08 in China. 2) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from November/10 for 10days in China. 3) Inspection against CentralZone Power Distribution Project,Mymensingh 19.07.12 to24.07.12 for 5 days in Japan.

A proposal sent toministry dated04.05.16 for Factoryacceptance test ofenergy meter from20.05.16 to 25.05.16in India.

Page 547: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 547

2 1-01343 06.04.74 Mr. Md. Jabed Hossain, Jessore, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)

XEN Energy Auditing Unit PDB,Dhaka.

1) Foreign Training from18.08.08 to 29.08.08 for 10 days

South Africa 1) Training on "ForeignTraining" Against Energy Meterfrom 18.08.08 to 29.08.08 for 10days 2) Inspection against 110V,3´5(6)A, Three Phase 4-Wire, 3-Element, Double TariffProgrammable Energy Meterforfrom 20.06.2011 to 30.06.2011 for10 (Ten) days or from the dateof actual journey (excludingjourney time) in Singapore. 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland. 4) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 5) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MWCCPP project from 20.10.15 to29.10.15 in China. 6) Energy meter testing andsealing program from 09.03.16to 11.03.16 in India.

A proposal sent toministry dated07.04.16 for Testingof CT & CVT from09.04.16 to 12.04.16in India.

3 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge), Office of SE EnergyAuditing Unit PDB,Dhaka.

1) "Foreign Training program"from 07.09.09 to 20.09.09 for 14days 2)Operation & MaintenanceTraining (Factory Training)against Bera 70 MW PeakingPower Plant ConstructionProject for 30 (thirty) days(Excluding travel time)

China.

South Korea

Page 548: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 548

4 1-01630 17.11.79 Mr.Ajoy Kumar Chakraborti Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Energy Auditing Unit PDB,Dhaka.

1) "Foreign Training program"from 07.09.09 to 20.09.09 for 14days.

China. 1) Inspection against CentralZone Power Distribution Project,Mymensinghfrom the date ofactual journey from 05.06.12 to10.06.12 for 5 days in China. 2) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.

5 1-02002 10.11.1983 Lutfunnahar Khulna B.Sc. Engg. (Comp.) 02.10.11 (AE) 01717366470 [email protected]

AE Energy Auditing Unit PDB,Dhaka.

On metarnityLeave

6 1-02025 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)

AE Energy Auditing Unit PDB, Dhaka.

7 1-02034 27.04.84 Mr. A.H.M. Emdadul Pasha Rajshahi B.Sc. Engg. (Elect.) 12.12.11 (AE)

AE Energy Auditing Unit PDB, Dhaka.

1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .

Singapore 1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.

8 1-02083 28.08.87 Mrs. Afroza Akter Chittagong B.Sc engg. (Elect.) 17.12.13

AE Energy Auditing Unit PDB, Dhaka.

On metarnityLeave

Page 549: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 549

Dhaka Computer CentreSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0828 03.08.63 Mr.Ratan Kumar Paul, Jhinaidaha, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 03.08.10 (XEN)

Senior System Analyst Dhaka Computer Centre

PDB, Dhaka.

1) "Renewable Energy" from01.06.13 to 30.06.13

Thailand 1) "Step up Transformer"against Sylhet 150MWCombined Cycle Power StationConstruction Project from 15.01.2011 to 22.01. 2011 for 07(Seven)days in China. 2) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China.

2 9-0005 01.09.1968 Mr. Mrigangko Mohan Pal Magura B.Sc. engg. (Elect.) 21.11.1999 (AssistantProgrammer)

System Analyst Dhaka Computer Centre

PDB, Dhaka.

1) Visit to establishprepayment e meteringthroughout the country inOctober/2011 in South Africaand England. 2) Inspection on Pre-Paid e-metering System SoftwareDevelopment in January/2012for 10 (ten) days in China.

A proposal sent toministry dated10.05.15 for KOICA'sMaster's DegreeProgram from10.08.15 to 23.12.16in South Korea.

3 9-0012 23.05.1979 Mr. Uzzal Miah B-Baria M. Sc. engg. (Comp.) B.Sc. engg. (Comp.) 30.03.2005 (AssistantProgrammer) 01717636020

Assistant Programmer Dhaka Computer Centre

PDB, Dhaka.

1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13

Thailand

4 1-01649 06.05.77 Mr.A.S.M.Foyez Ullah Khulna B.Sc.Eng(Computer) 07.04.2006(AE) 18.08.2011 (SDE) 06.04.14 (XEN, Incharge) 01920753636

XEN (Incharge) Dhaka Computer Centre

PDB, Dhaka.

1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13

Thailand

5 1-01861 25.12.82 Mr. S. M. Niamul Haque B-Baria B.Sc. Engg. (Comp.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01915629769 [email protected]

SDE, Incharge dhaka Computer Centre

PDB, Dhaka.

1) Technical orientation &quality test witness of 11 KVACR from 25.03.14 to 31.03.14 inChina. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia.

A proposal sent toministry dated10.05.15 for KOICA'sMaster's DegreeProgram from10.08.15 to 23.12.16in South Korea.

Page 550: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 550

Offices Under Member P & DSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0476 03.12.58 Mr.Abul Baser Khan Dhaka B.Sc.Engg. (Elec.) 11.01.82 (AE) 20.07.88 (SDE) 15.09.02(XEN) 05-10-11 (SE, Incharge) 28.07.15 (Addl. CE) 12.01.16 (Member)

Member P & D, PDB, Dhaka.

1) Electrical powerdistribution system from05.09.91 to 21.11.91 2) Total Quality Managementfrom 17.02.2004 to 20.03.2004 3) PSCDP Training onProcurement and Supply ChainManagement trainingprogram from 30.09.13 to11.10.13

Japan

Japan

Thailand

1) Approval of Engineering Dataand Detail Design againstHathazari 100 MW PeakingPower Plant Construction Projectfrom OCtober/10 for 07 days inChina. 2) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 3) "Technical Orientation andQuality Test Witness" against33/11 KV, 20/26 MVA PowerTransformer from 05.02.13 to14.02.13 in China. See N.B.

A proposal sent toministry dated05.05.15 forManagementmeeting for GT,SGT, HRSG againstShahjibazar 330MW project from31.05.16 to 07.06.16in Germany.

N.B. 4) Witnessing of manufacturing process against Tongi 80 MW P/S from 03.08.14 to 09.08.14 in USA. 5) Detail Drawing Review & Approval from 26.07.15 to 08.08.15 in China. 6) Seminar on "Transform 2015" from 11.10.15 to 16.10.15 in Germany & Austria. 7) Capacity Building program from 18-20 Jan/2016 in Philippine. 8) Delegation on energy generation and energy efficiency from 13.04.16 to 19.04.16 in Denmark.

Page 551: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 551

Office of CE, P & DSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0558 11.01.59 Mr. Bikash DewanRangamatiB.Sc.Engg. (Elec.)18.03.83(AE) 18.03.93(SDE) 09.03.03(XEN) 31.03.14 (SE)

Addl. CE, Incharge Office of CE P & D,

PDB,Dhaka

1) Meter & Accessories From24.05.2004 to 23.06.04

2) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13

Singapore &Australia

Thailand

1)11KV Capacitor Oil Switch,Automatic Capacitor Controller,Junction Box and Line PostCurrent Sensor for 3x100KVARCapacitor Banks. From Feb/07for 07 days in U.S.A 2) Technical Orientation andQuality Test Witness" against33KV Outdoor Type CurrentTransformer (Diffenent Ratio)from January/11 for 07 days inChina. See N.B.

N.B. 3) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep./2011 for 07 days or fromthe date of actual journey (excluding travell time) in New Zealand. 4) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 5) Factory Full Speed No Load Test of Unit-2 GT against Shahjibazar 330 MW CCPP Project from 08.02.15 for 7 days in Belfort, France. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China. 8)Inspection of Gas turbine and generator from 15.01.16 to 21.01.16 in Germany 9)Basic Design Approval of Ghorasal Repowering Project from 27.03.16 to 05.04.16 in China.

2 1-0970 02.01.59 Mr. Md. Ataur Rahman DewanDhakaAMIE(Elet)26.04.93(AE) 21.04.93( AE) 03.08.10 (XEN Rev) 21.08.11(XEN)

XEN Asst,CE P & D

1) Detail drawing againstKatakhali Power Plant Project23.02.11 to 01.03.11 7 days inChina 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.

Page 552: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 552

Design and Inspection -1SL.No ID-No Date of Birth Name, District and Qualification

and Date of joiningDesignation and Present

PostingTopics of Foreign Training and

DurationCountry Inspection Topics and its Duration Comments

1 1-0656 01.10.62 Mr. Md. Tofazzel Hossain, Rajshahi, B.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)

Director (SE) Design and Inspection -1

PDB,Dhaka

1)GTC in Thermal PowerEngineeringFrom 12.5.97 to 03.7.97

Japan. India 1) Inspection From 19.11.01 to7days in India 2) Inspection againstMeghnaghat 335 MW Duel-fuelCombined Cycle IPP Power Plantto inspect of equipment from24.02.13 to 02.03.13 in China. 3) Inspection against Bibiana400 MW CCPP Project from10.06.15 to 11.06.15 in Singapore

2 1-0758 01.03.61 Mr. Shafiqul Islam,

Barisal, B.Sc.Engr.(Mech.) 30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

Dy. Director (XEN), Design and Inspection -1

PDB,Dhaka & PD (add. Charge) Khulna 40 MW RentalPower Plant, PDB,Khulna.

1) Maintenance of Turbineand Its Auxiliaries, WaterTreatment Plant From21.03.2004 to 6 Months (Bondfor 03 Years from 22.03.04 to21.09.04)

China, 1) "Electricity Markets To MeetTomorrow's Demand: Efficientand Effective Design, Operationand Management" from 28.09.08to 04.10.08 for 07 days in USA. 2) Supply of Spares forGenerator Overhauling of GT-1(Lot-B) against "Witnessing ofManufacturing Process andTests of Concerned Equipmentat Manufacturers' Factory foreach lot including transfer ofTechnical Know-how” for 07days in France 3)Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject from 09.08.10 to 18.08.10for 10 for 07 days in China +H152

On lien to CoalPowerGenerationCompany Ltd.

Page 553: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 553

3 1-01002 01.01.65 Mr. Sayeed Akram UllahComilla ,B.Sc.Engr.(Elec.),19.07.94(AE) 03.02.03(SDE) 18.08.11 (XEN)

Dy. Director (XEN)

Dte. Of Design &Inspection-1, Dhaka.

1) Country Focus Training onPower Sector March/02, for 30days.

Japan 1) Training. 100 Amps - LV MCCB. China,September/05 for 7 days 2) Gas Booster CompressorProgram named "FactoryWitness Test" Against Sylhet150 MW Combined Cycle PowerPlant Construction project from10.05.2011 to 20.05.2011 for 10(ten) days (excluding traveltime ) in USA. 3) Finalizing the report of jointsteering committee from02.09.2012 to 06.09.2012 in India.

See N.B.

A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.

N.B. 4) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 5) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India. 6) ) Meeting with EIB for discussion about RFP preparation for GT conversion projects from 22.04.14 to 26.04.14 in Luxembourg. 7) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 20.06.14 to26.06.14 in China. 8) PDM finalization meeting for Rampal Project from 31.08.14 to 06.09.14 in India. 9) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 10) Basic Design & Drawing against Barapukuria 275 MW Coal Based Power Plant from 10.11.14 to 25.11.14 in China 11) Inspection against Bibiana 400 MW CCPP Project from 10.06.15 to 11.06.15 in Singapore 12)Construction Drawing Review Meeting against Barapukuria 275 MW Coal Based Power Plant from 15.01.16 to 21.01.16 in China. 13)Rotor final balancing test for the gas turbine against Bibiana south 400 MW CCPP project from 25.01.16 to 03.02.16 in Gremany.

4 1-01012 01.03.66 Mr. A.B.M. Ziaul Haque, Patuakhali B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)

Dy. Director (XEN) ,

Dte. of Design &Inspection-1 PDB,Dhaka.

1) Inspection on Power Plantagainst Northern PowerSolution Limited from 17.08.10to 26.08.10 for 10 days inFinland. 2) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China. *N.B.

*N.B. 3) Chandpur 150MW Combined Cycle Power Station Construction Project, a Training Program named "Detailed Design Review Meeting" from 10th of January, 2011 for 12(Twelve) days in China. 4) Approval of "Construction Drawings" aganist Sylhet 150MW Combined Cycle Power Plant Construction Project for 08(Eight) days in China. 5) Chandpur 150MW Combined Cycle Power Station Construction Project, a Training Program named "Detailed Design Review Meeting" from 10th of 20.01.11 to 31.01.11 for 12(Twelve) days in China. 6) Approved Basic design & drawing of Shahjibazar 330 MW Combined Cycle Power Plant Construction Project from 05.08.14 to 18.08.14 in China. 7) Factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 10.12.14 to 16.12.14 in France. 8) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China. 9) Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.

Page 554: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 554

6 1-01616 10.12.82 Mr.Ashiq Imran Barisal B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge), Design & Inspection-1, PDB,Dhaka.

1) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.

2) "Training for 2 Engineers ofBPDB at GE facility" againstRangpur 20 MW Power Plantfrom 26.04.14 to 11.05.14

Bahrain

USA

1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.

2) Engineering review meeting(Basic Design & Drawing)against Shikalbaha 225 MWDuel-Fuel CCPP Project from16.11.14 to 27.11.14 in India. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China. 4) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from Sep/2015 in China. 5)Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina. 6) Detail Design Review andApproval Meeting againstGhorasal 365 MW CCPP projectfrom 08.05.16 to 15.05.16 inChina.

7 1-01644 01.01.77 Mr. Mohammad MahmudurRahman Mahmud B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE) 27.03.14 (XEN, Incharge) 01711607170

XEN (Incharge), Design & Inspection-1, PDB,Dhaka.

1) "Renewable Energy" from01.06.13 to 30.06.13

Thailand 1) Steam turbine generator testwitness from 13.05.14 to19.05.14 in China. 2) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 3) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China. 4)Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 5)Factory test witness ofWartsila Engine and Generatoragainst Chapainawabganj 100MW Project from 09.04.16 to17.04.16 in Finland

Page 555: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 555

8 1-01728 29.10.79 Mr.Md.Ariful Haq Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 27.12.2011(SDE) 24.11.14 (XEN, Incharge)

DD (XEN, Incharge) Design & Inspection-1, PDB,Dhaka.

1) "Orientation &Manufacturing Test Process atManufacturers Works" from02.12.08 for 04(Four) weeks

Czech Republic 1)Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKoria. 2) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. 3) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 4) Witnessing of manufacturingprocess from 18.09.14 to 24.09.14in Netherlands. 5) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based H165Power Plantfrom 10.11.14 to 25.11.14 inChina. 6)Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.

A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.

9 1-01850 05.06.87 Mr. Shahan Shams Alam Jhinaidah B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01748777946 [email protected]

SDE, Incharge Design & Inspection-1,PDB, Dhaka.

1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13

India 1) "witnessing of manufacturingprocess and tests of theequipment at manufacturers'works including transfer oftechnical know-how" againstBheramara Power Plant from15.03.2014 to 21.03.2014 inCroatia. 3) Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.

10 1-01851 22.11.86 Ms. Rhituparna Paul Payel Khulna B.Sc. Engg. (Elect.) 04.11.10 (AE) 017165333262 [email protected]

AE Design & Inspection-1,PDB, Dhaka.

In Norway

Page 556: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 556

11 1-02057 31.12.87 Ekramul Pasha Rajshahi B.Sc.Engr.(Mech.) 17.12.13 (AE)

AE Design & Inspection-1,PDB, Dhaka.

12 1-02096 15.12.84 Mr. Humayun KabirChowdhury Thakurgaon B.Sc. Engg. (Elect.) 13.04.14 (AE)

AE Design & Inspection-1,PDB, Dhaka.

13 Mr. Shamsuddoha AE Design & Inspection-1,PDB, Dhaka.

1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.

Design and Inspection -2 SL.No ID-No Date of Birth Name, District and Qualification

and Date of joiningDesignation and Present

PostingTopics of Foreign Training and

DurationCountry Inspection Topics and its Duration Comments

1 1-0870 15.07.64 Mr. Md. Ahsan Habib,Sirajgonj,B.Sc.Engr.(Mac.),18.2.88(AE) 18.06.2000(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)

Director, Incharge

Design & Inspection-2, PDB,Dhaka

1)Training against Baghabari200 MW P/St. From 16.09.01 to90 days

2)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years) 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .

India,

China,

Singapore

1) Inspection against Sydpur 20MW Power Plant from 06.05.2012to 14.05.2012 for 7 days in China.

2) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 3) Quality acceptance test on 11KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 4) Inspection against BaghariPower Plant on Dec/2015 for 7days in USA.2 1-0846 03.10.64 Mr. Md. Samsul Haque,

Korigram, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 10.02.09 (XEN, In-charge), 11.10.10 (XEN)

XEN,

Design & Inspection-2, PDB,Dhaka.

Maintenance of Generator,Excite, Transformer,Motor,Sub-station From 21.03.2004 to 6Months (Bond for 03 Yearsfrom 22.03.04 to 21.09.04)

China In Canada

Page 557: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 557

3 1-01459 01.05.75 Mrs. Jakia Najnin Panna, Khulna, B.Sc.Engr.(Mech.),

05.03.2000(AE) 25.06.09(SDE) 04-02-14 (XEN, Incharge)

DD(XEN), Incharge

Design & Inspection-2, PDB,Dhaka

1) PSCDP Training programon "Project Management(Batch-1)" from 12.08.13 to23.08.13

Thailand 1) "Technical Know-How" onL.P. Rotor against Khulna PowerStation from 09.06.09 to 15.06.09for 07 days in Czech Republic. 2) “Witnessing ofmanufacturing process againstRepairing / Reconditioning /Replacement of Chimney fromOctob./10 for 07 days in China. 3) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.

4 1-01611 02.12.77 Mr. MohammedHedhayetullah Khan Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)

XEN (Incharge) Dte. of Desigan &Inspection-2 PDB,Dhaka.

1) Training on ''Operation &Maintenance of Gas Turbinein France 01.12.07 to 14.01.08for 1.5 Months & ''Operation &Maintenance of CCPP in Chinafrom 19.07.07 to 17.08.07 for 01Month against 90 MW SylhetCombined cycle Power Station(Unit-2) Cons. Project (Bondfor 03 Years) 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .

France & China

Singapore

1) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) "Technical Orientation andQuality Test Witness" against33/11 KV, 16/20 MVA Power from05.02.13 to 14.02.13 in China. 3) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV GIS from 02.12.13to 05.12.13 in Germany. 4) Technical orientation &quality test witnes of powertransformer from 23.04.16 to29.04.16 in China.

5 1-01189 20.04.66 Mr. Md. Shahidul Islam, Chandpur, B.Sc.Engr.(Mech.),

14.12.97(AE) 27.04.04(SDE). 31.10.13 (XEN)

XEN Design & Inspection-2,PDB, Dhaka.

1) 11KV Load Break Switch (OnLoad) & 11KV Isolator (Off Load)

from 06.11.07 to 12.11.07 for 07days in China. 2) Technical Orientation &Quality Test Witness of 33 KVVCB from 15.02.15 to 21.02.15 inIndia.

6 1-01676 31.12.77 Mr.Mohammad Raihan NabiKhan Sirajgong B.Sc.Eng(Mech) 06.2006(AE) 16.06.14 (SDE)

XEN, Incharge Design & Inspection-2,PDB, Dhaka.

Training on Planning &development from 01.05.16 to15.06.16

India 1) Technical Orientation andQuality Test Witness inDecember/2010 for 07 days inIndia

Page 558: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 558

7 1-01797 05.12.85 Mrs.Tauhida Ahmed Manikgonj B.Sc.Eng(Elec.) 01.06.09(AE)

AE, Dte. Of Design &Inspection-2 PDB, Dhaka.

1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13

India 1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.

In Abroad

8 1-01843 28.10.87 Mr. Md. Zakirul Islam Sarker Netrokona, B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01716420643 [email protected]

SDE, Incharge Dte. Of Design &Inspection-2 PDB, Dhaka.

1) Training course on"Renewable Energy System (25-10)" from 30.01.2012 to24.02.2012 for 4 (four) weeks(excluding travel time) fromthe date of actual journey 2) "Alternative PowerGeneration Technology forLow Carbon Society" organizedby JICA from 08.05.13 to13.06.13 3)Training on Operation &Maintenance from 01.05.16 to15.06.16

India

Japan

India

1) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.

9 1-01845 15.07.87 Mr. Rajesh Mojumder shunamganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01710529383 [email protected]

SDE, Incharge Design & Inspection-2,PDB, Dhaka.

1) Training on Planning &development from 01.05.16 to15.06.16

India 1) "Technical Orientation andQuality Test Witness" against33/11 KV, 20/26 MVA PowerTransformer from 05.02.13 to14.02.13 in China.

10 1-01848 30.09.82 Mr. Md. Ajgar Ali Jhinaidah B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01674433856 [email protected]

SDE, Incharge Design & Inspection-2,PDB, Dhaka.

1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea. 2) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina. 3) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China.

11 1-01885 21.12.86 Mr. Md. Bokul Islam Sirajganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01718412333 [email protected]

SDE, Incharge Design & Inspection-2,PDB, Dhaka.

1) Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial from 01.04.13 to06.04.13 in India.

Page 559: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 559

12 1-01905 16.10.88 Ruhana Ryan Promee Dhaka B.Sc. Engg. (Elect.) 12.07.2011 (AE) 01671160860 [email protected]

AE Design & Inspection-2,PDB, Dhaka.

1) PSCDP training program on"Contract Management (Batch-1)" from 02.09.13 to 13.09.13

Thailand 1) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.

13 1-02094 31.12.89 Mr. Abdullah Al Basid Natore B.Sc.Engr.(Elect.) 13.04.14 (AE)

AE Design & Inspection-2,PDB, Dhaka.

Directorate of ProgramSL.No ID-No Date of

Birth Name, District and

Qualification and Date ofjoining

Designation andPresent Posting

Topics of Foreign Training andDuration

Country Inspection Topics and itsDuration

Comments

1 1-0783 04.10.58 Mr. Nazrul Islam, Jamalpur, B.Sc.Engr.(Elec.),

30.08.86(AE) 21.11.99 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)

Director (Incharge)Dte. of Programme PDB, Dhaka.

1)Training on Total QualityManagement (TQM) & PowerDistribution From 18.03.02 to18.04.02 2) Training on Planning &development from 01.05.16 to15.06.16

Japan(Jica)

India

1) Inspection on DistributionLine 11KV Pin Insulator withPin, 11KV Disc Insulator,etc.October/05 for 07 days inIndia. 2) Inspection of LightningArrester from 02.10.12 to11.10.12 in China. 3) Witnessing of manufacturer'sprocess from 30.05.14 to 05.06.14in China. 4) 9th meeting of solar energyforum from 21-23 March/2016 inChina.

Page 560: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 560

2 1-01201 01.10.65 Mr. Md. Shahidur RahmanKhan, Narsingdhi B.Sc. Engg. (EEE), MBA on HRM (2013)

19.03.98(AE),

27.07.05(SDE), 31.10.13 (XEN)

Dy-Director (XEN) Dte. Of Program PDB, Dhaka.

1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea. 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia 4) Factory Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India.

.A proposal sent toministry dated25.04.16 for FactoryAcceptance Testagainst Chitt. Zonepower dist. Dev.Project from20.05.16 to 26.05.16in China.

3 1-01444 14.11.73 Most. Shafinaj Banu, Rangpur, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Dte. Of Program PDB, Dhaka.

1) "Work Shop Test" forHathazari 100MW PeakingPower Plant Construction Projectfrom 24.02.11 to 02.03.11 for07(Seven) days in China.

In Australia

4 1-01853 11.04.87 Ms. Faeza Hafiz Dhaka B.Sc. Engg. (Elect.) 04.11.10 (AE) 01721611194 [email protected]

AE Dte. of Programme PDB, Dhaka.

In StudyLeave

5 1-01896 07.07.85 Ms. Afsana Yasmin Rajshahi B.Sc. Engg. (Elect.) 20.04.11 (AE) 01817112729 [email protected]

AE Directorate of Program,PDB, Dhaka.

In StudyLeave

6 1-02038 10.11.85 Mr. Omar Faruk Pabna B.Sc engg. (Mech.) 05.01.12 (AE)

AE Dte. of Programme PDB, Dhaka.

In StudyLeave

Page 561: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 561

7 1-02093 27.09.90 Mr. Syed Enam Reza Chapainawabganj B.Sc.Engr.(Elect.) 13.04.14 (AE)

AE Dte. of Programme PDB, Dhaka.

1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .

Singapore

In StudyLeave

Directorate of Project PlanningSL.No ID-No Date of

Birth Name, District and

Qualification and Date ofjoining

Designation andPresent Posting

Topics of Foreign Training andDuration

Country Inspection Topics and itsDuration

Comments

1 1-0883 21.01.64 Mr. Munshi Bashir AhmedGazipur,AMIE(Elec.),25.08.84(SAE) 23.01.89(AE) 18.06.2000 (SDE) 02.07.09 (XEN) (In-charge), 08.02.11 (XEN)

Director (Incharge) Dte. Of Project Planning,

PDB,Dhaka.

1)Prepaid Meter InstallationFrom 25.07.01 to 7 Days/01

2)Training On Tower Design,Pole Design, etc. Operation &Maintenance Against Ctg. P/sDistribution Project From08.07.04 to 6 Weeks 3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days. 4) Chandpur 150 MW CCPPProject aganist Others HRSGfrom 30.05.2011 to 12.08.2011for 75 days (bond for 5 years)

South Africa,Tanzania

China,

China.

China

1)Test on suitable 400 KV Gridinterconnection between WestBengal and Bangladeshnetwork from 26.07.10 to29.07.10 in india. 2) Workshop on Energy: State ofCrisis & Future Outlook from13.05.10 to 14.05.10 in Egypt.

2 1-01280 01.01.73 Mrs. Bithi Islam, Manikgonj, B.Sc.Engr.(Mech.),

24.06.99(AE) 26.07.05(SDE), 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)

Dy.Director Dte. Of Project Planning,

PDB,Dhaka.

1)Training on GIS from15.06.04 for 07 Days

Germany 1)Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial from 01.04.13 to06.04.13 in India.

Page 562: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 562

3 1-01311 23.06.68 Mr. Mohammed Zulfikar Ali

Norail B.Sc.Engr.(Elect.), 20.01.2000(AE) 08.12.09 (SDE) 20.11.13 (XEN,in charge)

Dy.Director (Incharge), Dte. Of Project Planning,

PDB,Dhaka. Return from Lien

1) Winessing of manufacturingprocess from 19.10.14 to 25.10.14in China. 2) “Witnessing ofManufacturing Process and Testof the Equipment atManufacturer's works includingtransfer of technical know-how”from 25.11.14 to 01.12.14 inChina.

4 1-01566 15.05.71 Mrs. Daisy Pervin Dhaka, B.Sc.Engr.(Elec.),

10.06.99(AE),

26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN) 01755582479 [email protected]

Dy.Director Dte. Of Project Planning,

PDB,Dhaka.

1) Training on Selected forOrientation & TechnicalTraining. X-former & Oxilary. X-former from/06 for 06 Weeks 2) Long Term Power SystemPlanning and Preparation ofFuture Project trainingprogram from 29.04.13 to10.05.13

India.

Thailand

5 1-01668 10.06.74 Mr. Mohammad Geasuddin Dhaka B.Sc.Eng(Mech.) 07.04.06 (AE) 18.08.2011 (SDE) 24.11.14 (XEN, Incharge)

XEN (Incharge) Dte. of Project Planning

PDB, Dhaka.

1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project30.03.11 to 06.04.11 for 08(Eight)days in China. 2) Witness of factory test ofconductor (Pkg-18) from 07.05.14to 13.05.14 in China.

6 1-01789 03.10.83 Mr.Zahir Uddin Md. Babur Barisal B.Sc.Eng(Elec.) 28.05.09(AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)

XEN, Incharge Dte. of Project Planning,PDB, Dhaka.

1) Training on Planning &development from 01.05.16 to15.06.16

India. 1) "Developments inRenewable EnergyTechnologies" against "NTPCLimited" from 07.03.11 to09.03.11in India.

7 1-01826 01.01.84 Mrs. Sharmeen Sultana Jessore B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01717086821

[email protected]

SDE, Incharge Dte. of Project Planning

PDB, Dhaka.

1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China.

Page 563: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 563

8 1-01846 10.12.85 Mr. Kamrul Hasan Kafi Shariyatpur B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01827115550 [email protected]

SDE, Incharge Dte. of Project Planning

PDB, Dhaka.

1) "Witness of factory test ofsub-station gantry & hardware"from 10.05.14 to 16.05.14 inIndia. 2) Technical Orientation andQuality Test Witness"from12.10.2015 to 18.10.205 for07 days in Singapore.

9 1-01857 27.10.87 Ms. Kakoli Saha Khulna B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722419764 [email protected]

AE Dte. of Project Planning

PDB, Dhaka.

On lien

10 1-02000 18-06-85 Ms. Rabeya Zaman Narayanganj B.Sc. Engg. (Comp.) 02.10.11 (AE) 01716116328 [email protected]

AE Dte. of Project Planning

PDB, Dhaka.

11 1-02071 04.02.90 Ms. Sanjana Haque Dhaka B.Sc. Engg. (Mech.) 17.12.13 (AE)

AE Dte. of Project Planning

PDB, Dhaka.

Page 564: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 564

Directorate of System PlanningSL.No ID-No Date of

Birth Name, District and

Qualification and Date ofjoining

Designation andPresent Posting

Topics of Foreign Training andDuration

Country Inspection Topics and itsDuration

Comments

1 1-0661 27.02.60 Mr.Mohammed Abul KashemMahmud, Mymensing B.Sc.Engr.(Elec.),

17.10.85(AE) 21.11.99(SDE) 21.07.04(XEN) 26.05.15 (SE)

Director

System Planning, PDB,Dhaka .

1) Training on Instrument &Control from 28.12.87 to27.09.87 2) Training " D-8 WorkingGroup on Clean CoalTechnology" from 11.07.2012to 14.07.2012 .

USSR

Turkey

1) Pre-Shipment InspectionFrom 04.07.01 to10.07.01 InIndia. 2) Expert Group Meeting onSustainable DevelopmentIndicators for the Power Sectorfrom 17.07.07 to 19.07.07, 03days in Thailand. 3) SARI/Energy against "UnionCoordination of Transmissionof Electricity (UCTE) From22.09.08 to 26.09.08 for 05 daysin Belgium. See N.B.

N.B. 4) HRSG factory inspection witness of Shirajganj 150 MW PPP to 225 MW CCPP project from 28.05.13 to 30.05.13 in China. 5) The international seminar on Developing effecient coal based thermal on 14.11.14 in India. 6) Equipment testing witness against Upgradation of Khulna 150 MW to 225 MW CCPP project from 12.12.14 to 18.12.14 in China. 7) Factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in France. 8) Equipment Test Witness on December/2014 in India. 9)Pre-Shipment Inspection Against Shajibajar Power Station Project from 21.12.15 to 27.12.15 In Italy.

2 1-01350 13.02.73 Mrs. Mosammat JarifaKhatun, Jhinaidah, B.Sc.Engr.(Elec.),05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN) 01715000611 [email protected]

Dy.Director Dte. Of systemPlanning, PDB,Dhaka.

1) Masters Degree has beenobtained on "RenewableEnergy" from "Olden BurgeUniversity, Germany" from04.08.08 to 29.08.08 (e¨w³MZ D‡`¨v‡M

wM‡qwQ‡jb) 2) "Policies and Strategies toMitigate Climate Change andEnergy Poverty in Southeastand China from 05.10.09 to09.10.09 for 06 days

Germany

Vietnam

1) Inspection of CopperTerminal Lugs in Kolkata From23.12.04 to 30.12.04 for 07 Days. 2) South Asia Women in Energy(SAWIE) Partnership Program-Participation in the XXIst WorldEnergy Congress from 12.09.10 to16.09.10 in Canada. 3) Asia-Pacific RenewableEnergy Policy againstInternational RenewableEnergy Agency (IRENA)-Koreafrom 14.10.10 to 15.10.10 for 02days in Korea. 4) South and South-West AsiaSubregional PreparatoryConsultation Meeting from06.11.12 to 07.11.12 in India.

Page 565: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 565

3 1-01422 31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN) 01755637647

Dy.Director Dte. of System PlanningPDB, Dhaka.

1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04 for 06Weeks

China 1) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia. 3)Inspection of Gas turbine andgenerator from 15.01.16 to21.01.16 in Germany

4 1-01679 12.11.80 Mr.Muhammad Bellal Hossan

Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE) 01.10.14 (XEN, Incharge)

XEN (Incharge) Dte. Of SystemPlanning, PDB,Dhaka.

1) Training on Pre-paidmetering system from 18.08.08to 29.08.08 for 10 days

2) Renewable Energy andEnergy Efficiency from 04.01.10to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power Plant ConstructionProject, BPDB from 10.07.2011to 09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years) 4) A group training course on"Alternative Power generationTechnology For low Carbonsociety" organized by JICAfrom 31.07.2012 to 30.08.2012 5) PSCDP training programtitled "Tariff Management"from 18.12.12 to 22.12.12 6) Participation in Training onPower System Planning &Design Studies from 09.03.15to 13.03.15 7) JICA Counterpart trainingfrom 06.11.15 to 21.11.15

South Africa.

India.

China

Japan

Thailand

Canada

Japan

1) Attending a program titled"Forum for South East AsianPolicy Makers Fossil-fuelSubsidy Reform: Challengesand Opportunities" from20.11.12 to 21.11.12 inIndonesia.

Page 566: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 566

5 1-01746 03.09.81 Mr. Md. Anowar Hossain, Rajshahi B.Sc.Engr(Mech.) 12.05.08 (AE) 16.06.14 (SDE) 05.11.14 (XEN, Incharge)

DD (Incharge), Dte. Of System Planning

PDB, Dhaka.

1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .

Singapore 1) Workshop on Regional CleanCoal Partnership: Short-termCourse on Coal Preparationfrom 27.07.09 to 01.08.09 inIndia. 2) Pre shipment inspectionagainst renewable basedpower plant constructionproject at haor area from09.03.14 to 15.03.14 in China.

6 1-01764 06.08.84 Mr. Anwarul Maruf Dhaka B.Sc.Engr(Mech.) 31.05.09 (AE) 24.12.14 (SDE) 25.06.15 (SDE)

SDE Dte. of System Planning

PDB, Dhaka.

1) Training Course on BiogasTechnology Facilities andHygiene for DevelopingCountries from 07.06.11 to18.07.11 2) A group training courseorganized by JICA on Nov/2015

China

Japan

1) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China.

8 1-01839 25.06.87 Mr. Sayed Ashraf Mamun Dhaka B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 1911348014 [email protected]

SDE, Incharge System Planning PDB, Dhaka.

1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2)JICA Counterpart trainingfrom 06.11.15 to 21.11.15

NewZealand

Japan

1) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China.

9 1_2039 01.11.87 Mr. Md. Monower Zahid Khan Sirajganj M.Sc. engg. (Elect.) B.Sc. engg. (Elect.) 05.01.2012 (AE) 01718228830 [email protected]

AE, System Planning PDB, Dhaka.

1) Participation in Training onPower System Planning &Design Studies from 09.03.15to 13.03.15 2)1) A group training courseorganized by JICA on Nov/2015

Canada

Japan

1) Witness of factory test ofconductor (Pkg-18) from 20.04.14to 26.04.14 in China.

10 1-02040 08.07.87 Mr. Tanvir Ahmed Dhaka B.Sc. Engg. (Elect.) 05.01.12 (AE) 01714743397 [email protected]

AE, System Planning PDB, Dhaka.

1) "Witness of factory test ofsub-station gantry & hardware"from 10.05.14 to 16.05.14 inIndia.

11 1-02088 01.09.90 Mr. Iqbal Hasan Haboganj B.Sc. engg. (Elect.) 17.12.13 (AE)

AE, System Planning PDB, Dhaka.

1) JICA Counterpart trainingfrom 06.11.15 to 21.11.15

Japan

Dte. Of Renewable Energy and Research and Development

Page 567: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 567

SL.No ID-No Date ofBirth

Name, District andQualification and Date of

joining

Designation andPresent Posting

Topics of Foreign Training andDuration

Country Inspection Topics and itsDuration

Comments

1 1-0832 30.11.63 Mr. Md. Nazmul Haque, Mymensing, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 03.08.10(XEN)

Director (Incharge)Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .

1)System Loss Reduction Studyfrom 11.8.94 to 13.9.94,

2)Training on PowerTransformer from 08.10.03 to08.01.04 for 03 Months .

Kenya,

China

1) Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial on June/2013 for 7days in India. 2) Factory Acceptance test of 11KV Disc Insulator with fittingsfrom 08.11.15 to 14.11.15 inChina. 3) Meeting of Joint WorkingGroup (JWG) from 18-19April/2016 in India.

1) G.O. issueddated 30.03.16 forInspection of 33/11KV x-former from 09-13 May/2016 inGermany. 2) G.O. Issued forGlobal projectplaza 2016 from24.05.16 to 27.05.16in South Korea.

2 1-01177 01.09.68 Mr. Ahmed Jahir Khan, Potuakhali, B.Sc.Engr.(Mech), 14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)

Dy. Director (In charge) Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .

1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 forOne Month 2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13 3) Training on Planning &development from 01.05.16 to15.06.16

Russia

Australia

India

1) Workshop on RegionalCooperation in sedimendmanagement in Hydro powerproject from 16.06.09 to 17.06.09for 02(Two) days in Nepal. 2) Training course on Bio-gastechnology form 22.06.09 to16.08.09 in China. 3) Solar Power Plant "TestWitness" from October/10 for 07days in China. * See N.B.

* N.B. 4) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep/2011 for 07 days orfrom the date of 5) A program named "Carbon Capturing & Destroy" from 26.02.2012 to 29.02.2012 in Singapore. 6) Summit named "Uncover LNG infrastructure, supply chain & trade developments" from 27.03.2012 to 30.03.2012 in Singapore. 7) A program titled "Climate Change and Renewable Energy" from 10.08.2012 to 28.08.2012 in USA. 8) Pre-shipment inspection against Wind Battery Power Plant, Kutubdia from 20.04.16 to 26.04.16 in China.

3 1-01743 01.10.79 Mr. Md. Ahasan Habib Bogra B.Sc.Engr(Mach.) 07.04.06 (AE) 16.06.14 (SDE) 24.11.14 (XEN, Incharge)

XEN (Incharge) Renewable Energy &ResearchDevelopment PDB, Dhaka.

1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China

On Studyleave

Page 568: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 568

4 1-01780 23.03.84 Mr.Farhana Alam Faridpur B.Sc.Eng(Mech 31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)

XEN, Incharge Renewable Energy &ResearchDevelopment PDB, Dhaka.

1)Chandpur 150 MW CCPPProject aganist Others HRSGfrom 30.05.2011 to 12.08.2011for 75 days (bond for 5 years) 2)Training on Planning &development from 01.05.16 to15.06.16

China

India

1) Solar Power Utilization(Bangladesh) against KoreaInternational CooperationAgency (KOICA) from 11.10.10 to28.10.10 for 18 days in Korea.

5 1-01822 18.12.79 Mr. Kamrul Ahmed Khulna B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01678121352 [email protected]

SDE, Incharge Dte. Of RenewableEnergy and Researchand Development, PDB,Dhaka

1) "Alternative PowerGeneration Technology forLow Carbon Society" organizedby JICA from 08.05.13 to13.06.13

Japan DeputationTo SREDA

6 1-01834 28.10.86 Mr. S. M. Sanzad Lumen Natore B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01715139056 [email protected]

SDE, Incharge Dte. Of RenewableEnergy and Researchand Development, PDB,Dhaka

1) "Renewable Energy" from01.06.13 to 30.06.13

2) Training on "Solar EnergyApplication" from 07.08.14 to26.08.14 3) Training on ApplicationTechnology of clean energy fordeveloping countries from14.08.15 to 08.10.15

Thailand

China

China

DeputationTo SREDA

7 1-01897 01.01.88 Ms. Shohana Rahman Deeba Dhaka B.Sc. Engg. (Elect.) 20.04.11 (AE) 01733759275 [email protected]

AE Dte. of RenewableEnergy and Research &Development, PDB,Dhaka.

Study leavefrom june/2013for 2 years inAustralia.

8 1-02078 02.12.91 Ms. Normin Nahar Dhaka B.Sc. Engg (Elect.) 17.12.13 (AE)

AE Dte. of RenewableEnergy and Research &Development, PDB,Dhaka.

1) Training on ApplicationTechnology of clean energy fordeveloping countries from14.08.15 to 08.10.15

China

Page 569: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 569

CE, Power Plant Construction, PDB, DhakaSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0559 01.12.61 Mr. Mustaque Muhammad,

Comilla, B.Sc.Engr.(Elec.), 23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)

Addl. CE, Incharge Power PlantConstruction, PDB,Dhaka

1) Advance Protection PowerSystem(APPS), from 21.03.94 to22.04.94 2) Energy Management from19.05.13 to 01.06.13

UK,

Thailand

1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 inBanglalore, India.

2) Conceptual Design Approvalof Sylhet 90MW CCPP Project(2nd Unit) 27.04.06 to 02.05.06,in China. 3)''Conceptual DesignApproval'' Sylhet 90MW CCPP(2nd Unit) 28.01.07 to 08.02.07in China 4) Approval of Engineering Data& Drawing from 08.06.09 to17.06.09 in China. 5) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. See N.B.

G.O. isued dated05.04.16 for Seconddetail designreview andapproval meetingagainst Ghorasal365 MW CCPPproject from 08-15May/2016 in China.

N.B. 6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China. 7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India. 9) Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.

2 1-01407 25.08.75 Mosammat Imroz Azim, Gaibandha, B.Sc.Engr.(Elec.),

09.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge)

Asst. CE (XEN) InchargeOffice of CE, PowerStation Construction,PDB, Dhaka.

1) Improved Maintenance ofThermal Power Plant From17.03.03 To 21.03.03 2)"Air Pollution SourceMonitoring Management"From 16.08.04 to 10.12.04(Bond for 03 Years 16.08.04 to10.12.04)+F268

Malaysia,

Japan,

1) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China. 2)Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China.

Page 570: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 570

Office of CE, Civil WorksSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0549 01.01.61 Mr. Md. Mustafizur Rahman

LaxmipurB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 09.03.03(XEN) 28.01.14 (SE) 01730-705078 [email protected]

Addl. CE (Incharge) Civil Works

1.Electrical Power DistributionSystem From 23.08.90 to22.06.91

Norway, 1) Training on Technical know-how 33 KV VCB with ControlPanel & 33 KV & 11 KV BusSupport Insulator for 07 days inChina.in Oct/ 2006 2) To attend a course on ProjectBudgeting and Cost Controlfrom 15.12.12 to 27.12.12 or fromthe date of actual journey inMalaysia. 3) Witnessing of manufacturer'sprocess from 30.05.14 to 05.06.14in China. 4) Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.

2 11-0114 01.01.58 Mr. Md. Fozlur Rahman Khan Sherpur Diploma(Civil )

28.05.79(SAE), 06.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge) 01715038624

XEN (Incharge), Office of the CE, CivilWorks PDB, Dhaka.

1) Tests and/or Inspectionagainst 8 mm dia and 9 mm dia3500 Quintal High Tensile Steel(HTS) Wire in Nov/2010 for 10days in China. 2) Convention & Seminar from24.07.15 to 04.08.15 in India. 3) Technical orientation &quality test witness from05.01.16 to 11.01.16 in China for10 days+A292 4) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.

A proposal sent toministry dated28.04.16 for Pre-ShipmentInspection of steelpole mould againstPC Pole , Arichafrom 11.05.16 to20.05.16 in China.

3 1-02061 02.05.88 Ms. Sarfina Tasnim Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)

AE, Office of the CE, CivilWorks PDB, Dhaka.

Page 571: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 571

Directorate of Civil WorksSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0666 01.05.60 Mr. T.I.M. Noorunnabi,

Barisal, B.Sc.Engr.(Elec.), 03.12.85(AE) 17.06.95(SDE) 21.07.04(XEN) 28.07.15 (SE)

Director Civil Works, PDB, Dhaka

1)'Public & PrivatePartnership' from 18.11.13 to 29.11.13

Thailand 1) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. from 11.06.11to 19.06.11 for 09 days in China. 2) pre-shipment inspectionagainst Chittaging PC Pole from02.01.15 for 10 days in China.

A proposal sent toministry dated28.04.16 for Pre-ShipmentInspection of steelpole mould againstPC Pole , Arichafrom 11.05.16 to20.05.16 in China.

2 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),

05.03.2000(AE) 08.12.09(SDE) 17.04.13 (XEN, Incharge)

XEN

Civil ConstructionDivision-1, PDB, Dhaka

1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China. 2) Inspect facilities / to witnesstest at manufacturers plants"from 06.04.14 to 11.04.14 inChina. 3) Basic design Approvalmeeting from20.08.15 to 03.09.15in China.

3 1-01694 23.01.76 Mr.M.Arifur Rahman Khan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)

XEN (Incharge) Civil ConstructionDivision-2, PDB, Dhaka

1) Training Programme onSolar Energy Technologiesand Applications from 14-11-2011 to 03-12-2011 for 03(three) weeks 2) PSCDP Training program"Performance Management(Batch-2)" from 21.10.13 to01.11.13

India

Thailand

1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China. 2) Participate in the "China-Asean EXPO" from 16.09.14 to19.09.14 in China. 3) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China. 4) Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.

4 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE) 25.06.15 (SDE)

SDE Civil ConstructionDivision-2 PDB,Dhaka.

1)Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina. 2)nspection against PC Poleconstruction plant, Aricha inJan/2016 for 10 days in China.

Page 572: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 572

5 11-0443 02.12.57 Mr. Md. Saiful Islam Sirajganj Diploma (Civil) 18.01.84 (SAE) 27.12.11 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

6 11-0468 07.02.59 Mr. Shiekh Md. Abdus Salam Sirajganj Diploma(Civil) 25.08.84 (SAE) 27.12.11 (AE) 01819162666

AE, Civil ConstructionDivision-2 PDB,Dhaka.

1) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.

7 11-0499 01.02.63 Mr. Md. Motiur Rahman Jamalpur Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

8 Mr. Md. Asaduzzaman Saad B.Sc. Engg. (Civil) 2014 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

9 11-0494 09.01.63 Mr. Md. Abul Kalam Azadakand Comilla Diploma Engg. (Civil) 25.08.84 (SAE) 04.11.13 (AE)

AE, Civil ConstructionDivision-1, PDB, Dhaka

1) Pre shipmentinspectionagainst ChittagongPC Pole from 20.06.15 to 29.06.15in China.

10 11-0808 Mr. Muhammad Abul Kashem AE (Incharge) Office of director civilworks, PDB, Dhaka.

11 Mr. Ezazul Karim AE, Pc Pole Chitg.. 25-10-1984 SAE

1) Pre shipmentinspectionagainst ChittagongPC Pole Jan/2016 in China.

12 11-0834 Mr. Hachni mojib Diploma engg.

AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka

13 11-0843 Mr.Md. Osman Goni Diploma engg.

AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka

Page 573: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 573

Design & Inspection-3SL.No ID-No Date of Birth Name, District and Qualification

and Date of joiningDesignation and Present

PostingTopics of Foreign Training and

DurationCountry Inspection Topics and its Duration Comments

1 1-0790 02.01.62 Mr. Abdullah Noman,Comilla,B.Sc.Engr.(Civil.),

30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, Current Charge) 23.04.09 (XEN)

Director (Incharge), Design and Inspection -3

PDB,Dhaka

1) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China. 2) Pre-shipment Inspection of6,7,8 & 9 mm dia 3200 QuintalH.T.S Wire to be held from 20-29June/2014 in China. 3) Participation in the GlobalInfrastructure CooperationConference (GICC) from 17.09.14to 19.09.14 in South Korea. 4) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from10.11.14 to 25.11.14 inChina.H277 5) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea. 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.

A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.

Page 574: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 574

2 1-0999 18.12.66 Mr. Dewan Md. Fazlul Karim, Gazipur,B.Sc.Engr.(Civil.),19.07.94(AE) 03-02-2003 (SDE) 18.08.11 (XEN)

Dy. Director (XEN), Design and Inspection -3

PDB,Dhaka

Generator (Electrical) againstKarnaphuly Hydro Power Plant(Unit-3) Rehabilitation Projectfor 30 days

Italy 1) H T S (High Tensile SteelWire) from 06.09.06 to 15.09.06 for 10days in India. 2) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China. 4) Preliminary Design approvalagainst Barapukuria 275 MWproject on Aug/2015 for 10 daysin China. 5) Pre-shipment Inspectionagainst PC Pole Oct/2015 in S.Korea.Korea. 6) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.

3 1-01529 16.12.74 Mr. Noore Alam Siddiqui, Pabna, B.Sc.Engr.(Civil.),

29.04.2001(AE) 13.06.11 (SDE) 15.11.13 (XEN, Incharge)

Deputy Director (XEN)Incharge, Design and Inspection-3 PDB, Dhaka.

1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Examine & Discussion onbasic design of Kadda 150 MWDuel Fuel Power PlantConstruction Project from22.06.14 to28.06.14 in China. See N.B.

G.O. isued dated05.04.16 for Seconddetail designreview andapproval meetingagainst Ghorasal365 MW CCPPproject from 08-15May/2016 in China.

N.B. 4) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 5) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India. 6) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China.

Page 575: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 575

4 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01818607385 [email protected]

SDE, Incharge Design & Inspection-3,PDB, Dhaka.

1) Inspection program on"Energy Efficient Buildings"from 12.03.13 to 18.03.13 inIndia. 2) Pre-shipment inspectionagainst Chittagong PC PoleConstruction Plant from 24.03.13to 03.04.13 in China.

5 1-01938 05.04.87 Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536 [email protected]

AE, Design & Inspection-3, PDB, Dhaka

1) Inspection program on"Energy Efficient Buildings"from 12.03.13 to 18.03.13 inIndia. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 4)Basic design engineeringreview meeting against Bibiana-3 CCPP project from 27.01.16 to05.02.16 in India.

6 1-02049 13.11.86 Mr. Md. Ikram Uddin Sunny Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)

AE, Design & Inspection-3, PDB, Dhaka

1)Basic design Approvalmeeting from20.08.15 to 03.09.15in China.

7 1-02047 09.09.87 Mr. S.M. Irfan Ullah Dhaka B.Sc. Engg. (Civil) 09.09.2013 (AE)

AE, Design & Inspection-3, PDB, Dhaka

8 1-02149 Nusrat Afrin Prova Chandpur B.Sc. Engg. (Civil) 25.06.15 (AE)

AE, Design & Inspection-3, PDB, Dhaka

Page 576: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 576

Office of CE ServicesSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN) 31.03.14 (SE)

Addl. CE, Incharge Services, PDB, Dhaka.

1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Designplanning on PowerConstruction 01(one) month in2004 3) Training on O & M of Pre-payment Metering from09.11.07 to 15.11.07 for 07 days.

Newzeland

Russia

South Africa

1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland. 4) Factory acceptance Test of 33KV guy insulator against Ctg.Power Distribution dev. Projectfrom 10.11.15 to 17.11.15 inChina

Page 577: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 577

System Protection & Testing Commisioning cell, Office of CE ServicesSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0854 01.01.66 Mr. Kh. Mokammel Hossain, Tangile,B.Sc.Engr.(Elec.),13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)

SE, Incharge System Protection &Testing Commisioningcell,PDB, Dhaka.

1) Training on Measwing andControl Equipment ofSiddergong P/St. from03(Three) Weeks in 1994 2) Training on MEGAC-VControl System Gas TurbineControl From 17.05.2004 to28.05.04 for 07 Days 3) Training on Liasys NetratimSystem from 11.06.07 to20.07.07 for 40 days. 3)"Orientation &Manufacturers Test Process atManufacturers Works" from05.02.09 for (Four) weeks 4) O & M Training on GTaganist Siddirgonj 210 MWPeaking Powe PlantConstruction Project May 26 toJuly 08,2009 5) Operation & maintenanceof steam turbine from 28.10.13to 08.11.13

Singapore,

Japan

Japan

Czech Republic

India

India

1) Inspection on Alternatoragainst Gopalgonj 100MWPeaking Power PlantConstruction Project from10.02.11 to 16.02.11 for 07 daysin Germany. 2)"Witnessing of manufacturingprocess & test of equipmentincluding transfer of technicalknow-how with training on KP-500 control system" from20.06.13 to 29.06.13 for 10 daysin Russia. 3) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina. 4)"Witnessing of manufacturingprocess & test of equipmentincluding transfer of technicalknow-" from 20.06.13 to 29.06.13for 10 days in Russia. 4)Inspection of HGPI Spareparts for GT against FencugangCCPP FROM 07.12.15 TO 13.12.15in Hungery.

2 1-01024 15.05.68 Mr. Sheikh Wahiduzzaman, Munshigong, B.Sc.Engr.(Elec.)19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)

XEN

System protection &Testing CommissioningCell, PDB, Dhaka.

1) Operation & Maintenanceof Protection System & RelayCoordination training programfrom 14.01.13 to 25.01.13

Thailand 1) Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 3)Design approval of Bibiyana400 mw ccpp project Feb/2016for 5 days in Spain

Page 578: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 578

3 1-01273 10.07.69 Mr. Md. Saiful Islam Narayangonj, B.Sc.Engr.(Elec.),

10.06.99(AE),

26.07.05(SDE), 25.10.2011 (XEN , Incharge) 28.05.14 (XEN)

XEN, System Protection &Testing Commisioningcell,PDB, Dhaka.

1) Training on Tower Design,Pole Design, TransmissionLien Design, TransmissionLien etc. Operation &Maintenance Against OPGWfrom 09.07.04 to 21.08.04 2) Training on PowerTransformer O & M, MediumVoltage Switchgear O & M,High Voltage Testing from20.03.06 to 29.03.06 3) Training On 33/11KV 2x10MVA sub station from April/06for 08 days.

China

Thiland

Thiland.

On lien

4 1-01933 18.11.85 Mr.Md.Imdadul Hoque Zhinaidaha B.Sc.Eng(Mech) 02.10.2011 (AE) 01716175611 [email protected]

AE System Protection, CEServices, PDB,Dhaka.

1) PSCDP training program on"Operation and Maintenanceof Steam Turbine" from28.10.13 to 08.11.13

India

5 1-01983 01.01.87 Mr.Md. Jannatul Naim Khulna B.Sc.Eng(Elect.) 02.10.2011 (AE) 01717883303 [email protected]

AE System Protection, CEServices, PDB,Dhaka.

1) Factory Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India.

6 1-01987 27.12.87 Mr. Tanvir Hassan Bhuiyan Norshindi B.Sc.Eng(Elect.) 02.10.2011 (AE) 01715842900 [email protected]

AE System Protection, CEServices, PDB,Dhaka.

Training on Operation &Maintenance from 01.05.16 to15.06.16

India

Page 579: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 579

Dte. of Electrical EquipmentSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0782 25.08.60 Mr. Jitendra Chandra Acharjya,

Jamalpur, B.Sc.Engr.(Mech.),

30.08.86(AE) 21.11.99 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)

Director (Incharge) Electrical Equipment PDB,Dhaka.

1) From 19.8.01 to 11 Days inIndia 2)500 Nos.12 Meter Steel Pole(270 DAN) & 150 Nos. 12 MeterSteel Pole (550 DAN) From14.22.07 to 22.04.07 for 07(SevenDays) in China. 3) Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina. 4) "Technical orientation andquality test witness" of Buckettruck against central Zone from10.03.13 to 16.03.13 in China . 5) CT, VT Test witness from24.08.14 to 25.08.14 in India. 6) Factozzry Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India. 7) Factory Test Witness AgainstShahjibazar 330 MW CCPPProject from 02.09.15 to 08.09.15in Spain. 8) "Technical orientation andquality test witness" of againstBaghabari power station onOct/2015 in USA for 7 days.

2 1-01338 16.08.76 Mr. Md. Zakirul Kabir Khan, Kishoregonj, B.Sc.Engr.(Elec.), 05.03.2000 (AE) 18.08.2011 (SDE) 28.06.12 (XEN) 18.06.15 (XEN)

Deputy Director (XEN), Dte. Of ElectricalEquipment, PDB,Dhaka.

1) Economic LoadManagement from 29.04.13 to10.05.13

Vietnam

Page 580: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 580

3 1-01408 25.05.74 Mr. Md. Golam Gaws, Rajshahi, B.Sc.Engr.(Mechanical)

05.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge)

XEN (Incharge), Dte. Of ElectricalEquipment, PDB,Dhaka.

1) Orientation & TechnicalTraining on Power transformer& auxiliary Transformer fromOctober/06 for 06 Weeks

India 1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 2) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa. 3) Technical orientation &quality test witness againstCentral zone power distributionproject from 03.12.14 to 19.12.14in China. 4) Manufacturer factory test &Inspection against Shahjibazar330MW CCPP project from05.04.16 to 11.04.16 in China.

4 11-0400 30.04.59 Mr. Jafor Ahmed Faridpur, Diploma(Elec.),

31.7.83 (SAE) 02.11.10(AE) 06.01.16 (SDE, Incharge)

SDE, Incharge Dte. Of ElectricalEquipment PDB,Dhaka.

5 1-01980 20.09.89 Mohd. Sadeed Al Hossain Dhaka B.Sc. engg. (Elect.) 02.10.2011 (AE) 01722090908 [email protected]

AE, Dte. Of ElectricalEquipment PDB,Dhaka.

A proposal sent toministry dated09.05.16 for Pre-delivery inspectionof Disc Insulatoragainst Rajshahizone power dist.Dev. Project from15.05.16 to 21.05.16in India & China

Page 581: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 581

Diesel Generation, PDB, DhakaSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 11-0403 01.07.58 Mr. Md. Zahir Alam, Bagura Diploma (Mech.),

31.07.83.(SAE), 02.11.10(AE), 06.01.16 (SDE, Incharge)

SDE, Incharge Diesel Generation,PDB, Dhaka

CERS, Tongi, GazipurSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0773 15.06.63 Mr. Howlader Md.ShirajulIslam, Barisal,B.Sc.Engr.(Elec.),30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge) 01777743219

SE (Incharge), CERS, PDB, Tongi.

1)Power Distribution throughpromotion of TQM from 18.3.02to 18.4.02

Japan 1) Orientation & TechnicalTraining on 33 KV Circuit BrakerFrom 13.03.05 for 7 days inIndia. 2) Inspection against CentralZone Distribution Project from19.04.2012 to 25.04.2012 inChina. 3) Technical orientation &quality test witness from05.01.15 to 11.01.15 in China. 4) Project development meetingfrom 15.07.15 to 20.07.15 inAustria.

Page 582: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 582

2 1-01446 28.02.76 Mr. Mohammad AbdullahBhuiyan, Dhaka, B.Sc.Engr.(Metallurgi.),

05.03.2000(AE) 25.06.09(SDE) 01.01.14 (XEN,in charge) 01715791177

XEN (Incharge), CERS, PDB, Tongi. (Return from lien in Dubaifrom 2003-2005)

1) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” againsttongi power station from08.11.09 to 13.11.09 fro 07 daysin USA. 2) “Witnessing ofmanufacturing process & testsof the equipment atmanufacturer's works includingtransfer of technical know-howon Blade Kit, Turbine RotorStage-3 with Hardware kits GesShroud Assembly of TurbineNozzle Stage-3 with hard warekits Complete Set” againstBheramara Power Station from10.01.11 to 17.01.11 in USA.

2 1-01759 08.05.79 Mr.Mohammad Jahirul Islam Kishorgonj B.Sc.Eng(Mech.) 07.04.2006(AE) 16.06.14 (SDE)

XEN (Incharge), CERS, PDB, Tongi.

1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012

NewZealand 1) Technical Orientation &Quality Test Witness from25.04.14 to 01.05.14 in China.

3 1-01989 14-11-85 Mr. Md. Emam Hasan Gaibandha B.Sc. Engg (Elect.) 02-10-11 (AE) 01716977875

AE, CERS, PDB, Tongi.

1) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina.

Page 583: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 583

Offices Under Member Company AffairsSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0391 01.01.58 Mr. Minhajuddin Ahmed,Comilla,B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE) 20.09.12 (Add. CE, Incharge) 01.10.14 (Addl. CE) 13.07.15 (Member)

Member Company Affairs

PDB, Dhaka.

I) Span Type P.C. PoolManufacturing Plant.22.12.85 to 21.03.86 2) 9th Meter & 12th MeterSteel Poll and feting fromApril, 05 for 07 days in China.

China

China.

1) 8.05.02 to 17.05.02 , India 2) Orientation & TechnicalTraining on Meter Steel PoleFrom 28.03.05 for 07 days inChina. 2) "Witnessing Manufacturer'sProcess and test of 6mm, 7mmand 9mm dia High Tensile Steel(HTS) Wire'' from 12.07.08 to21.07.08 for 10 days in China. 3) Inspection on Coal ThermalPower Station construction from18.11.09 to 24.11.09 for 07 daysin India. 4) See N.B.

A proposal sent toministry dated25.04.16 forManagementmeeting andWitnessing againstTongi 80 MW P/Sfrom 31.05.16 to06.06.16 in USA

*N.B.- 1) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding travel time) to attend Coaltrans Conference in India. 2) Supplying of 6mm dia 1000 Quintal, 7mm dia 1000 Quintal, 8mm dia 600 Quintal & 9mm Dia 1400 Quintal High Tensile Steel(HTS) Wire, ''Pre-shipment inspection (Foreign)” against Chittagong PC Pole Construction Plant, BPDB, Halishahar, Chittagong from in June/2011 for 10 (Ten) working days from the date of actual journey in China. 3) To travel Indonesia, Singapur and Australia in April/2012 for 10 days. 4) Pre-shipment Inspection of 6,7,8 & 9 mm dia 3200 Quintal H.T.S Wire to be held from 20-29 June/2014 in China. 5) Factory Full Speed No Load Test of Unit-2 GT against Shahjibazar 330 MW CCPP Project from 08.02.15 for 7 days in Belfort, France. 6) Management meeting on HGPI spare parts supply against Sylhet 20 MW GT power station from 16.12.15 to 22.12.15 in USA. 7) Witnessing of manufacturing process of overhauling work against Ghorasal 210 MW power plant from 25.01.16 to 31.01.16 in Ukraine & Russia. 8) Factory acceptance test of energy meter from 10-16 March/2016 in Sweden.

Page 584: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 584

2 1-01104 12.02.69 Mr. Md. Mofijul Islam, Nawbabgong, B.Sc.Engr.(Elec.),

19.07.94 (AE) 01.07.03 (SDE) 31.07.12 (XEN) 0171-2197777

DS (XEN), Company Affairs

PDB, Dhaka.

1)Distribution Control From19.05.99 to 02.07.99 2)Traning On Planning &Design Against 210 MW.Siddhirgong from 02.09.04 fortwo Months 3) Operation & MaintenanceTraining (Factory Training)against Bera 70 MW PeakingPower Plant ConstructionProject for 30 (thirty) days(Excluding travel time)

China,

Russia,

South Korea

1) "Practical Dermonostration toImpart Technical know-how &Manufacturing Process" onBoiler Main Safety Valve.Impulse savety Valve againstGhorasal Power Plant from16.04.07 to 20.04.07 for 07 daysin Russia. 2) CT, VT Test witness from24.08.14 to 25.08.14 in India. 3) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France. A proposal sent to ministrydated 27.07.15 for witnessing ofmanufacturing process againstChittagong P/S from 12.08.15 to18.08.15 in China.

Office of CE, Company AffairsSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0580 06.01.60 Mrs. Dilruba BegumBoguraB.Sc.Engg. (Elec.)09.10.84(AE) 28.04.94(SDE) 25.06.03(XEN) 2.1.2012(SE, Incharge) 25.08.14 (SE)

Addl. CE, Incharge Company Affairs, PDB,Dhaka.

1) Power Sector Restructuringand private participation from09.12.01 to 12.12.01 2) Rehabilitation, Renovationand Augmentation on gridsystem Phase-2 145 KV & 36 KVCT & PT from 03sep 2003 toThree Months,

Napal

China.

1) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China. 2) A program titled "Green HubKorea-2013" from 29.04.13 to30.04.13 from South Korea.

2 1-0881 01.01.59 Mr. Md. Omar Faruque,Noakhili,B.Sc.Engr.(Elec.),

03.07.80(SAE) 23.01.89(AE) 18.06.2000 (SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)

Asstt. CE (XEN)

Company Affairs, PDB,Dhaka.

1)Traning on Gas TurbinePower Station Against Tongi

80 MW From 25.07.04 To ThreeMonth (Bond for 03 Years from

01.07.04 )

China, 1)From 20.6.02 to 26.6.02 inIndia 2) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China.

Page 585: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 585

Office of CE, Private Power GenerationSL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0555 01.02.61 Mr. Sayeed AhmedRangpurB.Sc.Engg. (Elec.)28.12.83(AE) 18.03.93(SDE) 09.03.03(XEN) 28.01.14 (SE)

Addl.CE( Incharge)Private PowerGeneration

1)Maintenance of Generator,

Exciter, Transformers, Motors,Sub-station, Station Batteries,Rectifier & Converter from15.03.2004 to 6 Month 2) JICA Counterpart trainingfrom 06.11.15 to 21.11.15

China,

Japan

1) Witnessing of manufacturingprocess against Barapukuria2*125 MW Power Plant from24.10.14 to 30.10.14 in China. 2) SASEC Trade Facilitation andEnergy Working group from04.11.14 to 05.11.14 in Nepal. 3) Particiating in the JointSurvey in Bhutan-JICA datacollection on electricityinterconnectivity from 18.05.15to 22.05.15 in Bhutan. 4) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina.

2 1-01337 31.12.69 Mr. Md. Ziaur Rahman, Shirajgong, B.Sc.Engr.(Mech.),

05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN , Incharge) 18.06.15 (XEN)

Asst. CE (XEN), Private PowerGeneration (IPP/PPP),PDB, Dhaka.

1)Safe Reliable and EfficientOperation of the Power PlantFrom 15.03.2004 to 06 Month.(Bond for 03 Years from22.03.04 to 22.09.04)

China, 1)Factory Test Witness From20.01.04 to 26.01.04 In CzechRepublic 2) 11KV Switchgear againstDudkhandi 50MW PeakingPower Plant Construction Projectfrom 14.12.2010 to 21.12.2010 for07 days in Germany . 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia

Page 586: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 586

IPP Cell-1SL.NO

.ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0658 01.04.61 Mr. Golam Kibria, Barisal,

B.Sc.Engr.(Elec.),

17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)

Director IPP Cell-1 PDB,Dhaka

1)Power Transformer From12.07.04 for 07 Days 2)The Improvement ForElectrical Power ManagementBy Benchmarking From06.09.04 to 15.10.04 3) Training. On 33/11KV 2x10MVA sub station from April/06for 08 days. 4) Training on 132/33KV -44MVA Power TransformerAgainst GhorasalPower Plant132KV Sub-Station. April./07for 07 days. 5) "Professional ServicesDevelopment CorporationSdn. Bhd. (PSDC)" From27.07.09 to 07.08.09 for 12 days.

China,

Japan

Thiland

Turkey

Malaysia.

1) Bangla Trac Ltd GesJointVenture of BangladeshDiesel Plant from 14.06.10 to17.06.10 for 04 days in German. 2) Inspection againstMeghnaghat 335 MW Duel-fuelCombined Cycle IPP Power Plantto inspect of equipment from24.02.13 to 02.03.13 in China. 3) Coal conference with coaltrader / producer / terminaloperator in Indonesia &Australia from 03.06.13 to09.06.13. See N.B.

N.B. 4) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 5) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India. 6) Factory Acceptance test against ashuganj 200 MW Power Plant from 25.06.14 to 28.06.14 in Finland. 7) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 8) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 9) Quarterly Reconciliation from 08.01.15 to 10.01.15 in India. 10) Attend Power Tech Korea 2015 Program by KOTRA from 14.05.15 to 15.05.15 in South Korea. 11) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 12) Electricity Market Operations & Design Executive Exchange from 30.08.15 to 08.09.15 in Norway. 13) Meeting on commercial aggrement from 26.10.15 to 28.10.15 in India.

2 1-0941 10.10.63 Mr. Md. Fazlul Hoque Noakhali B.Sc.Engr.(Elec),14.08.91(AE) 11.11.2001(SDE) 21.07.11 (XEN)

XEN IPP Cell-1, PDB, Dhaka.

1) Testing of Energy CT & PT ofJangalia 33MW Power Plantfrom 20.08.08 to 27.08.08 for 07days in China. 2) Power Plant Inspectionagainst Sinha PowerGeneration Company Ltd. from16.06.10 to 19.06.10 in Korea. See N.B.

Page 587: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 587

N.B. 3) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 4) Inspection against 335 MW dual fuel combined cycle power plant in order to inspect "Meter, Current Transformer, Inductive Voltage Transformer" from 25.02.13 to 05.03.13 in USA 5) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 6) "Meeting to discuss the operational issues related to cross border connection between India and Bangladesh through Baharampur-Bheramara 400 KV D/C Line" Program in New Delhi, India from 08-09 January, 2014 7) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 8) Factory Acceptance test of 11 KV SF Circuit Breaker against Ashuganj 200 MW Power Plant from 04.08.14 to 07.08.14 in Italy. 9)A proposal sent to ministry dated 27.07.15 for witnessing of manufacturing process against Chittagong P/S from 12.08.15 to 18.08.15 in China. 10) Meeting on commercial aggrement from 26.10.15 to 28.10.15 in India.

3 1-01181 21.10.69 Mr. Md. Rezaul Karim Khan, Pabna, B.Sc.Engr.(Elec.), 14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)

XEN( Incharge) IPP Cell-1, PDB,Dhaka.

1) Power Plant Inspection from16.06.10 to 19.06.10 in Koria. 2) Inspection on Power Plantagainst Northern PowerSolution Limited from 17.08.10to 22.08.10 for 5 days (excludingtravel time) in Finland. 3) A meeting against 1320 MWCoal based Power PlantContruction Project, Khulna from11.07.2012 to 12.07.2012 in India.

4) Inspection against 52.2 MWHFO Based Power Plant,Rajshahi from 26.01.14 to01.02.14 in Finland.

3 1-01276 06.10.68 Mr. Nur MohammadShamsuzzoha Kabir, Thakurga, B.Sc.Engr.(Mech.),

10.06.99(AE),

26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN)

XEN , IPP Cell-1, PDB, Dhaka.

1) Training on Management ofWind Power Developmentfrom 27.08.07 to 28.09.07 for 33days 2) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 3) Training on ct, pt Oct/2015for 7 days

Sweden

Thailand

Germany

1)Factory test witness from27.05.02 to 02.06.02 in India 2)Factory test witness of 33KV1250 Amps Vacuum CircuitBreaker From 16.11.03 to21.11.03 for 07 Days in India 3) Inspection on 132 KV CircuitBreaker against Gopalgonj100MW Peaking Power PlantConstruction Project January/11for 07 days in USA. 4) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China.

Page 588: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 588

4 1-01739 29.04.77 Mr. Md. Akefur Rahman Kustia B.Sc.Engr(Mach.) 27.12.06 (AE) 27.12.2011(SDE) 13.08.14 (XEN,in charge)

XEN , Incharge IPP Cell-1, PDB, Dhaka.

1) Operation & Maintenanceof Generator from 18.03.13 to29.03.13

India 1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project forOctober/10 for 07 days inSingapore. 2) Inspection of HGPI Spareparts for GT against FencugangCCPP FROM 07.12.15 TO 13.12.15in Hungery. 3) Workshop on Technical &Regulatory Challenges in crossborder electricity transmissioninterconnections from 24.04.16to 25.04.16 in India.

5 1-01810 21.12.86 Mr. Muhammad Faisal Hasan Dhaka B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01716399371 [email protected]

SDE, Incharge IPP Cell-1, PDB, Dhaka.

1) Inspection against Ghorasal108 MW Gas Fired Power Plantfrom 07.04.13 to 11.04.13 inIndia. 2) Quarterly Reconciliation(October/13 to December/13)from 18.03.14 to 21.03.14 inIndia.

6 1-01828 15.09.86 Mr. Md. Nazmul Hoque Mymensingh B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01675936637 [email protected]

SDE, Incharge IPP Cell-1, PDB, Dhaka.

1) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13

Thailand

7 1-01854 01.05.81 Mrs. Farahnaz Begum Potuakhali B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01199268271 [email protected]

SDE, Incharge IPP Cell-1, PDB, Dhaka.

8 1-01887 25.12.87 Mr. H. M. Imran Hassan Kishoreganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01921352592 [email protected]

SDE, Incharge IPP Cell-1, PDB, Dhaka.

Page 589: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 589

9 1-02046 15.12.88 Mr. Mehedi Hasan Joypurhat 26.06.13 (AE)

AE IPP Cell-1, PDB, Dhaka.

1) Visit of manufacturing facilityof CT and CT testing from10.12.14 to 14.12.14 in China.

10 1-02183 Sadia Sharmin Rajshahi 25.06.15 (AE)

AE IPP Cell-1, PDB, Dhaka.

IPP Cell-2

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0751 23.09.63 Mr. Mohammad AshrafulIslam, Naogaon, B.Sc.Engr.(Mech.),

30.08.86 (AE) 019.03.98(SDE) 23.04.09(XEN) 29.01.15 (SE, Incharge)

Director (Incharge) IPP Cell-2, PDB, Dhaka.

1) Techinal Orientation onSplit Bolt Line Tape ConnectorG-452. 07 Days, January/06,

India. 1) Inspection against CentralZone Power Distribution Project,Mymensingh from 14.06.2012 to24.06.2012 for 7 daysin China 2) Quality acceptance test on 11KV ACR from 20.06.14 to 26.06.14for 7 days in Australia.

2 1-01101 11.02.69 Mr. Sk. Moin Uddin, Jessore, B.Sc.Engr.(Elec.),

19.07.94 (AE) 01.07.03 (SDE) 31.07.12 (XEN) 0171-2709929

XEN IPP Cell-2, PDB, Dhaka.

1)Design,Installation,Testing,Operation & Maintenance onCircuit Breaker Against G/Ctg.From Aug./04 to 10 days. 2) 11KV Gas InsulatedSwitchgear, 33/11Sub-station& Control Panel & ProtectionEquipment atainst ChittagongPower Distribtion Project“Design & Maintenance of33KV, 11 KV gas InsulatedSwitchgear Sub-Station” from10.07.07 to 24.08.07 for 42Days. 3) Training On 05 Nos.-33KVHigh Voltage Tester from20.02.07 to 26.02.07 for 07 Days

4) "Factory Training" againstFaridpur 50MW Peaking PowerPlant Construction Projectfrom 12/09/2011 to 11/10/2011for 30 days (Bond for 5 years)

China

China.

UK

Norway

1) Inspection on Enginegenerating Set Lot-1 againstGopalgonj 100MW PeakingPower Plant Construction Projectfor 07 days in Norway. 2) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China.

Page 590: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 590

3 1-01194 03.06.71 Mr. Md. Abdul Mannan, Jamalpur, B.Sc.Engr.(Mech.),

30.03.98(AE) 06.10.04 (SDE) 31.10.13 (XEN)

XEN IPP Cell-2, PDB, Dhaka.

1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 fortwo Months 2) Training on Siddirgonj 210MW Peaking Powe PlantConstruction Project from28.01.09 for 44 days.

Russia,

India

1) Inspection of Power Plant(Boiler) valves of Siddhirganj210 MW Power Station from02.08.2010 to 09.08.2010 inRussia. 2) Inspection on the PowerPlants equipment andmachineries of JV of FujianLongking Co. Ltd. & Dhaka WestPower Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued,but visit not yet done) 3) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea. 4) Inspection againstShahjibazar 330 MW CCPPProject from 20.07.15 to 26.07.15in China.

4 1-01882 26.05.84 Mr. Mohammad arafat Kishoreganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01716894457 [email protected]

SDE, Incharge IPP Cell,-2 PDB,Dhaka,

5 1-01894 30.12.87 Mr. Prince Reza Tangail B.Sc. Engg. (Comp.) 01.12.10 (AE) 01911192137 [email protected]

AE IPP Cell,-2 PDB,Dhaka,

On Lien

6 1-01964 16.11.87 Mr. Waliur Rahman Jamalpur B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01675536039 [email protected]

AE IPP Cell,-2 PDB,Dhaka,

1) Witness of factory test of 33& 11 KV POwer Cable from15.04.14 to 21.04.14 in China.

Page 591: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 591

7 1-02048 25.10.85 Mr. Md. Faisal Ahamed Barisal B.Sc. Engg. (Comp.) 18.09.13 (AE)

AE IPP Cell,-2 PDB,Dhaka,

8 1-01942 25.03.88 Mr. Md. Sanuwar Rahman Jamalpur B.Sc. Engg. (Mrch.) 02.10.11 (AE) 0119-5405856 [email protected]

AE IPP Cell,-2 PDB,Dhaka,

1) Witness of factory test of 33& 11 KV POwer Cable from15.04.14 to 21.04.14 in China.

IPP Cell-3

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0742 01.09.63 Mr. Md. Mahbubur Rahman, Shariatpur, B.Sc.Engr.(Civil.), 30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN) 14.03.16 (SE)

Director IPP Cell-3 PDB,Dhaka,

1) Completed M.sc.Engineering (Hydro PowerDevelopment ) From 23.08.93 to 30.06.95 2)Traning On Planning &Design of PS Against 210 MW.Siddhirgong from 01.09.04 to29.09.04 in Russia 3) Training on ContractAdministration from 20.07.10to 08.08.10 in Japan 4) Training course from24.02.16 to 08.03.16

Norway

Russia,

Japan

Australia

1) Finalization of conceptDesign of Haripur 360MW CCPPfrom 11.11.09 to 28.11.09 inNewzealand. 2) To travel India from25.09.2011 to 29.09.2011 for 05(five) days (excluding traveltime) to review ConceptualDrawing of Feasibility Report inorder to build 2*660 MW PowerPlant in Khulna. * See N.B.

2. A proposal sentto ministry dated05.05.16 for FactoryAcceptance TestWitness againstJamalpur 94.8 MWproject from01.06.16 to 07.06.16in Sweden.

Page 592: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 592

* N.B. 3)In order to attend a discussion meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. 4) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 5) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 6) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 7) Coal conference with coal trader / producer / terminal operator in Indonesia & Australia from 03.06.13 to 09.06.13. 8) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 9) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 10) Meeting with Vendor including Vendor inspection of Vendor facilities for Vacum Conductors and Protection Relay from 14.07.14 to 19.07.14 in France. 11) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 12) Inspection of Coal based Power Plant from 26.08.14 to 30.08.14 in South Korea. 13) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 14) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.02.15 to 13.02.15 in Germany & France 15) Inspection of Power, Oil, Gas & Petro-Chemical Hub of Jurong Island from 01.09.15 to 06.09.15 in Singapore. 16)TestTest witness of energy meter against Chittagong 108 MW HFO Fired P/S from 02.10.15 to 10.10.15 in UK. 17) To attend 8th National Hydro-power Convention-2015 from 18.11.15 to 21.11.15 in Assam, India. 18) Hydro-power development Study tour from 30.01.16 to 05.02.16 in Bhutan

2 1-01196 18.01.71 Mrs. Rubina Haque, Jessor, B.Sc.Engr.(Mech.),

19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)

XEN IPP Cell-3 PDB,Dhaka,

1) Supply, Installation,Testing & Commissioning ofVHF Tower from 18.05.2002 to17.06.2002

2) Meter technology,Installation, testing andoperation & maintenance ofmeter programming and dataanalysis software from15.01.09 to 24.01.09 for 10days

3) Technical Training of CT,PT, Lightning Arrester,Isolator, Battery and BatteryCharger from 30.03.05 to06.04.05 against Khulna P/S 4) Training program on TNBPower Plant-Selections,Design and Construction from11.08.14 to 20.08.14 5) Training course from16.02.16 to 08.03.16

Newzeland

USA

China

Malaysia

Australia

1) Technical Orientation &Quality Test Witness at theManufacurer's Premisesagainst 11kv, 3x100KVAR AutoControlled Switched TypeCapacitor Bank complete withall Equipment & Accessoriesfrom 07.02.07 to 15.02.07 inIndia. 2) Visit to establishprepayment e meteringthroughout the country inOctober/2011 in South Africaand England. 3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland. 4) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China. 5) Technical orientation &quality test witness againstBheramera p/stn Nov/2015 inJapan for 7 days.

Page 593: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 593

3 1-01306 30.11.69 Mr. Md. Jahangir AlamMollah, Narshingdi, B.Sc.Engr.(Elec.), 17.08.99(AE) 18.08.2011 (SDE) 21.05.13 (XEN, Incharge) 18.06.15 (XEN)

XEN IPP Cell-3, PDB, Dhaka.

1)Traning On Planning &Design Against 210 MW.Siddhirgonj From 31.10.04 fortwo Month (Bond for 03 Years)

Russia, 1) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 2) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France. 3) Energy meter testing andsealing program from 8-10March/2016 in India.

4 1-01658 07.07.74 Mr. Mohammed SherajulIslam Munshigonj B.Sc.Eng(Mech) 07.04.2006(AE) 18.08.2011 (SDE) 06.04.14 (XEN, Incharge)

XEN (Incharge), IPP Cell-3, PDB, Dhaka.

1) O & M Training on GTaganist 210 M. W. SiddirgonjPeaking Power PlantConstruction from 26.05.09 to08.07.09

India 1) Inspection on "Witnessingof manufacturingProcess/Factory test witness" atJune/2011 for 07 days(excludingtravell time) in Germany. 2) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 3) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 2) Tariff energy Meter FactoryAcceptance Test from 14.10.15 to17.10.15 for 5 days in UK

5 1-01727 01.01.80 Mrs. Arifa Parveen Dhaka B.Sc.Eng(Metallurgy) 07.06.2006(AE)

AE, IPP Cell-3, PDB, Dhaka.

1) Testing & Inspection on 33KVCapacitor Bank and at theManufacturer Premises from09.04.07 to 16.04.07 for 07 daysin India.

Absent

6 1-01772 07.03.85 Mr. Konika Sarker Kustia B.Sc.Engr(Mech.) 01.06.09 (AE) 24.12.14 (SDE)

SDE IPP Cell,-3 PDB,Dhaka,

Chandpur 150 MW CCPP Projectaganist Others HRSG from30.05.2011 to 12.08.2011 for 75days

China 1) Inspection (For DiverterDamper) against Gopalgonj100MW Peaking Power PlantConstruction Project from31.01.11 to 06.02.11 for 07 daysin Indonesia.

Page 594: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 594

7 1-01893 24.01.84 Mr. Shahed MohammadMehedi Iqbal Jessore B.Sc. Engg. (Comp.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01716295868 [email protected]

SDE, Incharge IPP Cell,-3 PDB,Dhaka,

1) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia

8 1-02044 30.01.91 Mr. S.M. Mahmud Hasan Shirajganj B.Sc. Engg. (Elect.) 26.06.13 (AE)

AE IPP Cell,-3 PDB,Dhaka,

9 1-02043 30.07.86 Mr. Md. Saleh B-Baria B.Sc. Engg. (Elect.) 05.01.12 (AE) 01837148060 [email protected]

AE IPP Cell,-3 PDB,Dhaka,

1) Basic design engineeringreview meeting against Bibiana-3 CCPP project from 27.01.16 to05.02.16 in India.

Page 595: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 595

Information on Foreign Training

1 1-0568 23.02.59 Mr. Sontosh KumarSadhukhan SatkhiraB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN) 31-03-14 (SE)

Director (Power) Bangladesh EnergyRegulatoryCommission, Dhaka

1)for Technology TransferTraining against 10- townproject from 01.04.15 to14.04.15 in India.

India. 1)Training & Witnessing therutting test of 145KV SF-6 CircuitBreaker from 19.06.06 to 25.06.06for 07 days in India. 2) Factory witness test(Engineering Inspection) StemTurbine & Generator for SteamTurbine aganist Chandpur150MW Combined Cycle PowerStation Construction ProjectNovember/10 for 10 days inJinan, China & Hangzhou, China.

3)for Technology TransferTraining against 10- townproject from 01.04.15 to 14.04.15in India.

1 1-01306 30.11.69 Mr. Md. Jahangir AlamMollah, Narshingdi, B.Sc.Engr.(Elec.), 17.08.99(AE) 18.08.2011 (SDE) 21.05.13 (XEN, Incharge) 18.06.15 (XEN)

XEN IPP Cell-3, PDB, Dhaka.

1)Traning On Planning &Design Against 210 MW.Siddhirgonj From 31.10.04 fortwo Month (Bond for 03 Years)

Russia, 1) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 2) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France.

2 1-01337 31.12.69 Mr. Md. Ziaur Rahman, Shirajgong, B.Sc.Engr.(Mech.),

05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN , Incharge) 18.06.15 (XEN)

Asst. CE (XEN), Private PowerGeneration (IPP/PPP),PDB, Dhaka.

1)Safe Reliable and EfficientOperation of the Power PlantFrom 15.03.2004 to 06 Month.(Bond for 03 Years from22.03.04 to 22.09.04)

China, 1)Factory Test Witness From20.01.04 to 26.01.04 In CzechRepublic 2) 11KV Switchgear againstDudkhandi 50MW PeakingPower Plant Construction Projectfrom 14.12.2010 to 21.12.2010 for07 days in Germany . 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia

Page 596: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 596

2 1-0780 01.01.64 Mr. C.F.K. Musaddeq Ahmed, Sylhet, B.Sc.Engr.(Mech.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)

Dy. Director(XEN),

GM, Training PDB, Dhaka.

1) Electric Power ManagementBy Benchmarking from 08.09.03to 17.10.03 2) Managing Training Functionfrom July/09 to November/90

Japan,

UK

Deputed topower cellas director

Page 597: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 597

Page 598: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 598

2 1-0574 01.01.58 Mr. Mohammed KhurshedAlam NoakhiliB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN)

DGM Commercial Operation

PDB, Dhaka. New posting order toConversion ofShahjibazar 70 MWPower PlantConstruction Project.

1) 133/33/11KV Sub StationEquipment From 25.12.91 to31.3.922)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004

China,

Japan,

1) Inspection against “132KVTransformer from October/10 for07 days in China.

1 1-0618 30.01.55 Mr. Debobroto Ukil,

Dhaka , B.Sc.Engr.(Mech.), 24.01.85(AE) 07.01.85(AE) 09.01.95(SDE) 09.03.04(XEN) 2012 (SE, Incharge) 01730069681

Director(SE, Incharge),

Dte. of Project Planning,

PDB, Dhaka.

1) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.

2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13

Bahrain

Australia

1)11 KV. Capacitor Bank FactoryTest Witness From 04.04.04 to12.04.04, 12 Days In India. 2) A program named "CarbonCapturing & Destroy" from26.02.2012 to 29.02.2012 inSingapore. 2) To attend a course on ProjectBudgeting and Cost Controlfrom 09.12.12 to 22.12.12 or fromthe date of actual journey inMalaysia.

Coal PowerGeneration

1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN)

Director Dte. of Project Planning,

PDB, Dhaka

1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Designplanning on PowerConstruction 01(one) month in2004 3) Training on O & M of Pre-payment Metering from09.11.07 to 15.11.07 for 07 days.

Newzeland

Russia

South Africa

"Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China

A proposal sent toministry dated30.10.2013 againsttechnicalorientation &quality testwitness on 50 Nos.-ACR from 15.11.13for 7 days in Korea.2 1-0589 29.11.61 Mrs. Nurun Nahar Begum

Dhaka,

B.Sc.Engg. (Elec.)

09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)

XEN,

Dte. Of Training &Career Develpopment PDB, Dhaka.

1)Training on Powertransformer from 10.10.03 to08.01.04 for 03 Months 2) PSCDP Training program on"Strategic Human ResourceManagement" from 12.08.13 to23.08.13

China

Thailand

Page 599: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 599

2 1-0653 20.02.56 Mr. Quazi Md. Moinul Alam

khulna, M.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN)

XEN, IPP Cell-3, PDB, Dhaka.

1)Relay Protection, From25.09.87 to 24.06.88 2)Power Transformer UnderRRAGS Project from 11.10.03 to06.0104 3) Orientation /TechnicalTraining on 11 KV. PinInsulator, 11 KV Guy Insulatorfrom 05.02.05 to 09.02.05 for 5days in India

Russia,

China

India

1) Technical Orientation andQuality Test Witness against 05-set Oil Centrifuging Machine &08 Nos. Current Injection setfrom 03.01.2011 to 12.01.2011 for07 days in China & Malyasia.

1 1-0347 22.06.56 Mr. Mustak Ahmed,Bagerhat,B.Sc.Engg. (Elec.)18.03.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 03-08-10 (SE) 28.06.12 (Addl. CE, Incharge) 30.06.14 (CE)

GM Commercial Operation,PDB, Dhaka

1) A Program named "Renewable Energy Korea 2011"organized by KOTRA, Dhakafrom 19.10.2011 to 22.10.2011 inSouth Korea. 2) "Technical Orientation &Quality Test Witness" onPortable Meter Testing Set from25.05.13 to 31.05.13 in Bulgeria. 3) Quarterly Reconciliation(October/13 to December/13)from 18.03.14 to 21.03.14 inIndia.

Deputation to EnergyRegulatoryCommission asDirector (Power)

9 1-01737 03.09.77 Mr. Mohammad ErfanulHaque Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE)

AE Directorate of Training&Career Development,PDB, Dhaka.

1) ''Inspection of Heat RecoverySteam Generator againstDudkhandi 50MW PeakingPower Plant Construction Projectfor 07 days in China. 2) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 06.22.13 to28.05.13 in China

2 1-0562 23.11.61 Mr. Kazi Abdul BariJoypurhatB.Sc.Engg. (Elec.)09.02.84(AE) 18.03.93(SDE) 17.05.03(XEN)

XEN, System Protection &Testing Commisioningcell,PDB, Dhaka.

1)Switch Gear & Transformer 6weeks in 2000 2) Design, Planning 4 weeksDec 2000

3) Power Distribution ProjectFrom 17.02.2004 to 20.03.2004

India,

India,

Japan

1) Pre-Shipment Inspection Dec1999 for 07 days in India, Resigned

Page 600: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 600

2 1-0584 12.03.61 Mr. Md. Kausar Ameer Ali

Bogra

B.Sc.Engg. (Elec.)

09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)

DGM Commercial Operation

PDB, Dhaka.

1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000

2) Trouble shootingprograming energy meter from21.08.04 to 10.09.04

3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)

India,

U.S.A

USA

1) FAT on Pre-Payment Metering.05 days in South Africa.Jan/07 2) Inspection June/08 for 06days in India. 3) Energy Meter on “TechnicalOrientation & Quality TestWitness” 16.11.09 for 10 days inSingapore. 4) See N.B.

4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actual journey (excluding journey time) in Singapore. 7) Inspection of Programmable AMR Meter from 30.09.2012 to 11.10.2012 in Switzerland. 8) Factory Test Witness of Gas Turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in Austria.

Page 601: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 601

1 1-0402 30.10.56 Mr. Saiful Islam Khan,Satkhira,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE, Revel.) 12.04.2011 (SE) [email protected]

Director (SE) IPP Cell-2 PDB, Dhaka.

I) Electric Power DistributionEngineering From 07.09.87 to20.11.87 2) Training. Double TariffSocket Type Programmableconsumer meter with socket,(9 Town Project) May/2006 for10 days

Japan

USA

1)Factory Test Witness FromJuly, 2001 for 03 days, In Indiaon Load Break Switch. 2) Factory Test Witness fromFeb, 2004 for 05 Days InSwitzerland 3)Training on Technical know-how in 400 Sets 11KV LoadBreak Switch from Oct/2006 for07 days in China. 4) Inspection on the PowerPlants equipment andmachineries of JV of FujianLongking Co. Ltd. & Dhaka WestPower Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued,but visit not yet done) 5) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea.

?

Page 602: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 602

3 1-0554 30.12.60 Mr. Sayed Abdul Hakim Shah

NilphamiryB.Sc.Engg. (Mech.)28.12.83(AE) 18.03.93(SDE) 09.03.03(XEN)

Asstt. CE(XEN)

CE, Power StationConstruction, PDB,Dhaka. (New posting order as PDincharge in Conversationof Shajibazar 70 MW,Baghabari 71 MW, &Sylhet 150 MW Powerplant Construction Project,PDB, Dhaka.)

1)Advanced Training On PowerGeneration Operation From06.10.89 to 11.11.89

West Germany Practical Demonstration &Factory Test Witness Of DieselGenerating Set From 10.10.04 to18.10.04, 9 Days in USA.

3 1-0354 10.11.55 Mr. Md. Abul Kalam Azad,Chittagong,B.Sc.Engg. (Elec.)26.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 19.05.09 (SE, Reve. Basis) 07.01.10 (SE)

SE Attach to Office ofMember (Distribution),PDB, Dhaka. (PD, Meghnaghatproject)

1) Operation & MechanicalMaint. of GTPS.11.05.87 to 10.08.87 2)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month (Bondfor 03 Years from 08.08.04 to07.10.04)

Japan,

France,

1) 33KV Pin Insulator & DiskFittings May/2001 - 05 days,India

2 9-0002 17.05.1961 Mr. Afsar Ali Dinajpur B.Sc. engg. (Mech.) 07.03.1988 (AssistantProgrammer)

Senior System Analyst Dhaka Computer Centre

PDB, Dhaka.

In Abroad

1 1-0391 01.01.58 Mr. Minhaj Uddin Ahmed,Comilla,B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE)

Director (SE) Civil Works, PDB,Dhaka.

New posting order as PD(Addl. CE), Incharge toBibiana-3 Power PlantConstruction Project, PDB,Sylhet.

I) Span Type P.C. PoolManufacturing Plant.22.12.85 to 21.03.86 2) 9th Meter & 12th MeterSteel Poll and feting fromApril, 05 for 07 days in China.

China

China.

1) 8.05.02 to 17.05.02 , India 2) Orientation & TechnicalTraining on Meter Steel PoleFrom 28.03.05 for 07 days inChina. 2) "Witnessing Manufacturer'sProcess and test of 6mm, 7mmand 9mm dia High Tensile Steel(HTS) Wire'' from 12.07.08 to21.07.08 for 10 days in China. 3) Inspection on Coal ThermalPower Station construction from18.11.09 to 24.11.09 for 07 daysin India. 4) See N.B.

*N.B.- 1) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding travel time) to attend Coaltrans Conference in India. 2) Supplying of 6mm dia 1000 Quintal, 7mm dia 1000 Quintal, 8mm dia 600 Quintal & 9mm Dia 1400 Quintal High Tensile Steel(HTS) Wire, ''Pre-shipment inspection (Foreign)” against Chittagong PC Pole Construction Plant, BPDB, Halishahar, Chittagong from in June/2011 for 10 (Ten) working days from the date of actual journey in China. 3) To travel Indonesia, Singapur and Australia in April/2012 for 10 days.

Page 603: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 603

1 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)

Director(SE) IPP Cell-3, PDB, Dhaka.

New posting order to 820MW power plantconstruction project, PDB,Dhaka.

I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)

2)Training on PowerEngineering and Managementfrom 09.05.04 to 22.05.04

U.K.

Korea

1)Pre-Payment Meter & VendingEquipment From 25.11.06 to01.12.06 for 07 (days) inEngland 2) “Technical Orientation andQuality Test Witness” on FourLevel Security Seal &Accessories from 18.02.10 to23.02.10 for 05 days in India. 3) Inspection on machineries ofHundai Heavy Industries Co. Ltdfor establishing IPP Power Plantat Gaptali, Mirpur, Dhaka from24 July/2011 for 05 (five) days(excluding travel time) in SouthKorea. 4) Inspection againstPlant/Factory in "MidlandPower Co. Ltd" from 25.06.2012to 02.07.2012 in Norway. 5) Technical orientation andquality test witness from18.05.13 to 23.05.13 in USA.

4 1-0458 01.01.56 Mr. Mir Md. Rezaul Kabir, Kustia, B.Sc.Engg.(Mech.)24.07.81 (AE) 24.07.81 (AE) 06.08.86(SDE) 16.08.01(XEN) 18-8-2011 (SE)

SE Attach to Member P & D,PDB, Dhaka. (New posting as PD (SE), Shirajgonj 300 - 400 MWPower Plant ConstructionProject, PDB, Dhaka.)

1) Planning & Design,Operation & Maintenance ofHigh Voltage Transformer andSwitchgear From 26.01.87 to24.04.87 2) Update of Power SystemStudies through WASPsoftware from 15.04.98 to01.05.98 3)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 for ThreeMonth (Bond for 03 Yearsfrom 17.07.04 to 16.10.04)

U.K.

U.S.A.

China,

1) Hydrabad, India For Re-Chargeable Battery InspectionFrom 02.05.01 to 06.05.01 2) "Developments inRenewable EnergyTechnologies" against "NTPCLimited" from 07.03.11 to09.03.11 in India. 3) Regulatory Policy andFramework for Marketdevelopment for RenewableEnergy from 14.06.10 to 17.06.10in Chennai, India

Page 604: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 604

2 1-01127 15.09.66 Mr. Md. Fariduzzaman, Rangpur, B.Sc.Engr.(Elec.), 19.07.94(AE) 27.04.04 (SDE) 06.05.10 (XEN, Incharge) 18.08.2011 (XEN)

XEN Attested to Office ofMember Generation.

(New posting order toCoal Power GenerationCompany BangladeshLtd.)

1)Orientation & TechnicalTraining on Power Transformerfrom 14.03.05 for 7 days inIndia.(G.O Issued)

15 30.07.86 Mr. Md. Saleh B-Baria B.Sc. Engg. (Elect.) 05.01.12 (AE) 01837148060 [email protected]

AE Dte. of Project Planning

PDB, Dhaka.

2 1-0429 23.04.56 Mr. Nurul Karim,Chittagong,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN)

XEN,

System Protection &Testing Commisioningcell, Office of CE,Services PDB, Dhaka.

(SE Coal Project, Khulna)

1) Scada System Soft &Hardware from 28.11.88 for14.03.89

2) 33/11KV Power TransformerFrom May/03 for 14 Days 3) GIS From 15.06.04 for 11Days

4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India &Malaysia.

U.K.

Iran

Germany,

India & Malaysia

1) 14.4.2001 to 19.4.2001 for 06days in India.

2)Factory Test Witness &Orientation Training on GreaterChittagong Power DistributionProject, ''Power Transformer''from July/06 for 14 days inChina.

25 1-01649 06.05.77 Mr.A.S.M.Foyez Ullah Khulna B.Sc.Eng(Computer) 07.04.2006(AE) 18.08.2011 (SDE)

SDE Dhaka Computer Centre

PDB, Dhaka.

82 1-01672 20.09.78 Mr.Subrata Roy Netrokona B.Sc.Eng(Computer) 06.2006(AE)

AE O & M Circle (MymensighComputer Centre) PDB, Mymensigh .

1) G.O. Issued dt.12.05.11on “Technical Orientationand Quality test witness''Supply of TransformerAccessories (CopperCables)" against Central zonepower distribution Project,PDB, Mymensingh for 07(Seven) days from the dateof actual journey(Excludingtravel time) in China.

234 1-01806 01.06.09 Mr. Shyamol Chandro Sarker Sunamgonj B.Sc.Engr(Computer) 01.06.09 (AE)

AE, Chittagong Computer Centre PDB, Chittagong.

235 1-01807 01.05.83 Mr. Shek Kashruzamman Noralil B.Sc.Engr(Computer) 31.05.09 (AE)

AE, Comilla Computer Centre PDB, Comilla.

Page 605: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 605

361 1-01861 25.12.82 Mr. S. M. Niamul Haque B-Baria B.Sc. Engg. (Comp.) 04.11.10 (AE) 01915629769 [email protected]

AE dhaka Computer Centre PDB, Dhaka.

A proposal sent toministry dated11.04.13 in order toinspect PC serverother equipmentfor AMR from02.05.13 to 08.05.13in Malaysia.

393 1-01893 24.01.84 Mr. Shahed Mohammad Mehedi Iqbal Jessore B.Sc. Engg. (Comp.) 01.12.10 (AE) 01716295868 [email protected]

AE Computer Centre PDB, Comilla..

1 1-0275 10.09.55 Mr. Md. Shahjahan Miah,

Munshiganj,

B.Sc.Engg. (Elec.)

08.12.78 (AE) 23.01.94(XEN) 28.12.10(SE, Revl.) 08.02.11 (SE) 01-12-11 (Addl. CE)

Addl. CE Services, PDB, Dhaka.

1) System Planning & SystemStudies. From 07.01.86 for 08Weeks

Thailand

1 1-0372 05.03.55 Mr. Md. Abdur Razzaque, Mymensingh,

B.Sc.Engg. (Mech.) 21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE, Rev.)

Director (SE),

Directorate of Program.

France 1) 25.03.2001 to 28.3.2001India 2)Factory test witness of 33KVXLPE Power cable & BatteryFrom 05.12.03 to 5 Days inChina 3) 132KV Transformer against“Inspection'' from October/10for 07 days in China.

A proposal sent toministry dated19.09.13 againstroad show on"German-BangladeshInvestors Meet forEmergingBangladesh" on22.10.13 inGermany.

* N.B.- 1) G.O. issued dated 23.01.2012 against the contact between BPDB & Consortium of Ideal Enterprise, Dhaka, Bangladesh in order to Attend a pre shipment inspection on single phase smart card meters for 11 days (excluding travel time) from the date of actual journey in Malaysia.

2 1-0752 15.02.63 Mr. Kazi Absaruddin Ahmed, Dhaka, B.Sc.Engr.(Mech.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

Dy. Director(XEN) Project Planning PDB, Dhaka.

1)Training on Tower &Transmission Line Designfrom 01.08.99 to 31.10.99

2) "Approval of EngineeringData & Drawing" from 07.06.09to 16.06.09 for 07 days

3) Training on Rehabilitationof GT of Shahijibazar PowerStation from 29.11.07 to 05.12.07 for 07 Days 4) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13

Germany

China.

Abu Dhabi.

Australia

1)33 KV & 11 KV Pin InsulatorFactory Test From 01.09.98 to10.09.98 in India

2) Factory Test of 33 KV SF6 &Vacuum CB from 28.05.01 to06.06.01in India 3) Design Test of Lattice StreetTower From 02.07.02 to 06.06.02in China * See N.B.

lien

Page 606: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 606

* N.B. 4) Factory Test of Cable Accessories 11 KV & below Line Construction From 03.11.03 to 14.11.03 in Indonesia, 5) Factory Test Witness With Orientation & Technical Training For Barrel Transformer Oil From 26.06.2004 to 05.07.04 in India. 6) Orientation & Technical Training on 9 Meter Steel Pole From 28.03.05 for 07 days in China. 7) Basic Engineering Drawing against Chandpur 150MW Combined Cycle Power Station Construction Project from 28.07.10 to 11.08.10 for 15 days in China. 8) Inspection against Santahar 50 MW and Katakhali 50 MW Peaking Power Plant Construction Project from 14.03.2012 to 19.03.2012 in China.

3 1-0896 10.08.53 Mr. Kazi Abu Bakar,Barisal,Diploma(Elec).29.03.76(SAE) 16.05.90(AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN)

XEN,Diesel Generation,PDB, Dhaka.

(freedomfighter)

1) Training on Gas TurbinePower GenerationMaintenance & Operationfrom 16.09.01 to 13.12.01

India 1) Factory Test Witness from30.06.97 to 11.07.97 in Itali 2) "Practical Demonstration toImport Technical know how"against PPRP on Gus Turbinefrom 04.11.04 to 12 days In USA

LPR

1 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,

Rajshahi,

B.Sc.Engg. (Elec.)

14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE, Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member, currentcharge) 24-07-12 (member) 04.11.13 (Chairman)

Chairman, PDB, Dhaka.

1)Transformer operation andMaintenance from 07.08.94 to17.09.94 2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07, 14days. 3) Training on Design, Supply,Installation, Testing andCommissioning of 1000KWCapacity Wind Mill PowerPlant (WBHPP) on turnkeybasis at Kutubdia Island,cox's Bazar ``TechnicalOrientation and Quality TestWitness from 18.12.07 to31.12.07 for 14 days.

Belgium

Germany

China.

1)11 KV. Pre- Paid Metering(Sylhet) From 20.08.04 to30.08.04 for 07 Days in SouthAfrica 2) Workshop Program titled"Low Carbon Power SectorDevelopment Workshop" whichwill be held on 10/12/2011 to17/12/2011 for maximum 08(eight) days (excluding travelperiod) in Washington DC, USA. 3) Inspection against CentralZone Power Distribution Project,Mymensingh from 03.07.12 to14.07.12 in USA. See N.B.

2) A proposal sentto ministry dated14.05.14 to attend15 the annualAsian Utility WeekConference &Exhibition from10.06.14 to 11.06.14in Thailand. (G.O.issued but vist notyet done) 3) A proposal Sentto ministry dated28.05.14 to AttentCommonwealthGames BusinessConference from23.07.14 to 25.07.14in UK.

N.B. 4) A meeting with Nepal Govt. regarding import/construction of hydropower from 24-27 July/2012 in Nepal. 5) To attend a meeting with Soudi Fund against Shikalbaha 225 MW Dual Fuel CCPP from 10.09.12 to 13.09.12 in Saudi Arab. 6) "Quality acceptance Test" of 11 KV Auto Circuit Reclosure from 03.06.13 to 12.06.13 in Australia. 7) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 8) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 9) Management Meeting & Visit of Coal & Renewable Energy Based Power Plant from 18.01.14 to 23.01.14 in China. 10) seminar on Coal Based Power Plant Inspection & Investment from 20.04.14 to 26.04.14 in Japan.

2 1-0682 05.07.59 Mr. Md. Delshad Hossain

Feni, B.Sc.Engr.(Civil.),

30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN)

Deputy Director(XEN), Dte. Of Design &Inspection-3, PDB, Dhaka.

1) 14 Meter Steel Pole (450daN: 130 Nos. & 550 daN: 70Nos) "Proof Test" from 22.04.08to 28.04.08 for 07 days.

China 1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.

Resigned

Central Secretariat

Page 607: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 607

SL.NO.

ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01916 30.10.88 Mr. Md. Ali Baker Joypurhat B. Sc. Engg. (Elect.) 24.07.11 (AE) 0171-1081796 [email protected]

AE, Central Secretariate,BPDB, Dhaka.

1) PSCDP Training Program onOperation & Maintenance ofBoiler from 27.05.13 to 07.06.13

2) PSCDP Training Program onContract Management (Batch-1) from 02.09.13 to 13.09.13

Indonesia

Thailand

Ghorasal P/Snew posting

4 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),

05.03.2000(AE) 08.12.09(SDE)

SDE, Civil ConstructionDivision-1 PDB, Dhaka.

Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China.

Page 608: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 608

A proposal Sent to ministry forTest witness of energy meter

against Summit Barisal PowerLit. 6 days in Switzerland,

Norway, Finland

2004 01.07.10

Page 609: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 609

P&D 1991 11.10.10

P&D 2003 03.08.10

Page 610: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 610

7) for Factory Test WitnessAgainst Shahjibazar 330 MWCCPP Project from 30.04.15 to01.05.15 in Spain. 8) witnessing of manufacturingprocess against BaghabariPower Station from 30.11.15 to6.12.15 in UK 9) witnessing of manufacturingprocess against 225 Shikalbahai PowerPlant Project Feb/2016 inUSA

Page 611: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 611

Chairman 2001 02.06.10

M.Admin

G& PD

Dhaka West 108 MW HFO PowerPlant Construction Project,

Bosila, Keraniganj.

2004 02.06.10

Page 612: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 612

M.Admin 10.02.10

M.Admin 2003 08.02.11

M.Adm 11.05.08

Page 613: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 613

M.Admin 14.11.10

Page 614: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 614

D

G 11.11.08

Page 615: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 615

5)Witnessing of manufacturingprocess against Ctg.Distribution Project fromDec/2015 in china & India.

G 2004 02.06.10

Page 616: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 616

P&D7) Technical Orientation &Quality Test Witness In Chinafor 7 days in China March/2016

04.08.10

D 01.01.10

Page 617: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 617

P&D 2005 13.01.11

25. Basic Design & DrawingApproval against Barapukuria275 MW Aug/2015 for 10 days

in China 26.Basic Design & Drawing

Approval against GPS 365 MWDec/2015 for 8 days in

China+A65 A68

Page 618: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 618

G

G 2004 01.01.10

Page 619: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 619

P&D 2005 12.01.11

P&D

1) Detail drawing againstKatakhali Power Plant Project23.02.11 to 01.03.11 7 days inChina 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.

Page 620: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 620

D 1991 02.06.10

Page 621: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 621

Chairman 15.04.08

Page 622: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 622

Chairman 11.10.10

P&D 2003 01.01.10

Page 623: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 623

D 25.06.09

D 25.06.09

Page 624: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 624

P&D 23.04.09

Page 625: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 625

Chairman 15.04.08

P&D 24.04.08

Page 626: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 626

P&D 15.04.08

Page 627: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 627

G 2004 02.06.10

P&D

Page 628: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 628

3) training on capacity building program from 18.01.16 to 20.10.15 in ManilaM.Admin 2004 21.01.10

Page 629: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 629

P&D 2003 30.03.10

D 23.03.10

Page 630: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 630

D

P&D

Page 631: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 631

P&D 2004 11.10.10

Inspection of gas turbineagainst Bibiana-3 CCPP project

from 28.09.15 to 01.10.15 inJapan & Thailand.

13)Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from

Nov/2015 in China

P&D 2004 18.01.11

Page 632: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 632

P&D

P&D 20.04.08

Page 633: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 633

P&D7) Basic Design & Drawingagainst GPS 275 MW Power

Plant from Nov/2015 in ChinaFor 12 days

30.12.09

Page 634: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 634

P&D 2004 08.02.11

Chairman 2004 12.01.11

Page 635: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 635

G 2004 08.02.11

P&D 04.10.10

D 02.06.10

D 02.06.10

Page 636: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 636

D 02.06.10

Page 637: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 637

D 2000 04.12.08

Page 638: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 638

P&D Diploma

06.05.10

P&D 25.06.09

Page 639: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 639

P&D 2004 08.02.11

P&D 2004

Page 640: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 640

D 18.03.08

P&D 01.01.10

P&D 07.06.10

D 02.06.10

Page 641: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 641

Page 642: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 642

P&D 2001 28.07.08

P&D 2004 25.06.09

Page 643: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 643

P&D 2004 25.06.09

P&D 20.04.08

Page 644: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 644

G

G 24.08.10

Page 645: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 645

P&D 2003 18.01.11

P&D 2004 06.05.10

P&D 01.01.10

Page 646: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 646

G 24.08.10

Page 647: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 647

D 02.06.10

G 2004 25.06.09

Page 648: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 648

P&D 16.01.08

Page 649: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 649

G

P&D 10.11.08

P&D 02.06.10

Page 650: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 650

Page 651: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 651

P&D 17.09.09

Page 652: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 652

P&D 11.10.10

F 15.05.08

Page 653: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 653

Page 654: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 654

D 2002 24.01.11

Page 655: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 655

G 2004 08.02.11

D 10.03.11

Page 656: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 656

P&D 01.01.10

Page 657: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 657

M.Admin 2001 24.01.11

Page 658: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 658

G 01.01.10

P&D 2003 01.01.10

Page 659: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 659

D 01.01.10

Page 660: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 660

G 25.06.09

Page 661: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 661

D 1997 30.03.10

Page 662: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 662

G 2004 21.01.10

P&D 2003 02.06.10

Page 663: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 663

G 2004 01.01.10

Page 664: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 664

1)From 20.6.02 to 26.6.02 in India

2) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China.

2004

G 10.02.10

Page 665: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 665

10+A350)Conferece, Srilanka,Feb/2016

G 06.05.10

Page 666: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 666

G

Page 667: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 667

G 2004 22.04.10

Page 668: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 668

G 2004 09.06.10

D 01.01.10

Page 669: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 669

& PD (Addl. Charge) 1320 MW Coal Based PowerPlant Construction Project,Moheshkhali, Coxs'Bazar

2004 05.06.10

Page 670: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 670

P&D 2002 06.05.10

Page 671: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 671

G 2004 01.01.10

G

M.Admin

P&D 02.06.10

Page 672: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 672

Page 673: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 673

G 11.01.11

Page 674: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 674

Page 675: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 675

Page 676: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 676

G 2004 02.06.10

M.Admin 2003 06.05.10

P&D 2005 01.01.10

Page 677: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 677

G 2004 02.07.09

M.Admin 02.03.07

2004 18.07.07

Chairman 2000 01.01.10

Page 678: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 678

G 2004 13.01.11

Page 679: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 679

P&D 2004 12.04.11

Page 680: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 680

P&D 14.08.08

P&D 2005 13.01.11

M.Admin 2004 05.10.11

Page 681: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 681

D 2001 23.01.11

M.Admin 2005 06.05.10

Page 682: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 682

P&D 2005 02.06.10

P&D

D 16.01.08

D 02.06.10

D 02.06.10

Page 683: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 683

1985 05.03.08

P&D 2003 11.10.10

P&D

Page 684: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 684

G Diploma 2004 06.05.10

P&D

Page 685: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 685

P&D 16.07.09

Page 686: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 686

Page 687: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 687

Page 688: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 688

Page 689: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 689

Page 690: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 690

Page 691: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 691

Page 692: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 692

Page 693: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 693

Page 694: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 694

Page 695: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 695

Page 696: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 696

Page 697: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 697

Page 698: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 698

Page 699: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 699

Page 700: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 700

Page 701: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 701

Page 702: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 702

Page 703: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 703

Page 704: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 704

Page 705: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 705

Page 706: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 706

Page 707: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 707

Page 708: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 708

Page 709: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 709

Page 710: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 710

Page 711: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 711

Page 712: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 712

Page 713: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 713

Page 714: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 714

Page 715: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 715

Page 716: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 716

Page 717: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 717

Page 718: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 718

Page 719: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 719

Page 720: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 720

Page 721: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 721

Page 722: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 722

Page 723: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 723

Page 724: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 724

Page 725: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 725

Page 726: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 726

Page 727: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 727

Page 728: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 728

Page 729: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 729

Page 730: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 730

Page 731: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 731

Page 732: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 732

Page 733: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 733

Page 734: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 734

Page 735: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 735

Page 736: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 736

Page 737: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 737

Page 738: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 738

Page 739: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 739

Page 740: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 740

Page 741: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 741

Page 742: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 742

Page 743: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 743

Page 744: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 744

Page 745: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 745

Page 746: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 746

Page 747: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 747

Page 748: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 748

Page 749: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 749

Page 750: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 750

Page 751: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 751

Page 752: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 752

Page 753: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 753

Page 754: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 754

Page 755: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 755

Page 756: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 756

Page 757: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 757

Page 758: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 758

Page 759: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 759

Page 760: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 760

Page 761: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 761

Page 762: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 762

Page 763: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 763

Page 764: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 764

Page 765: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 765

Page 766: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 766

Page 767: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 767

Page 768: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 768

Page 769: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 769

Page 770: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 770

Page 771: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 771

Page 772: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 772

Page 773: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 773

Page 774: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 774

Page 775: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 775

Page 776: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 776

Page 777: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 777

Page 778: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 778

Page 779: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 779

Page 780: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 780

Page 781: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 781

Page 782: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 782

Page 783: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 783

Page 784: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 784

Page 785: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 785

Page 786: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 786

Page 787: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 787

Page 788: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 788

Page 789: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 789

Page 790: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 790

Page 791: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 791

Page 792: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 792

Page 793: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 793

Page 794: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 794

Page 795: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 795

Page 796: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 796

Page 797: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 797

Page 798: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 798

Page 799: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 799

Page 800: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 800

Page 801: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 801

Page 802: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 802

Page 803: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 803

Page 804: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 804

Page 805: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 805

Page 806: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 806

Page 807: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 807

Page 808: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 808

Page 809: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 809

Page 810: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 810

Page 811: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 811

Page 812: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 812

Page 813: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 813

Page 814: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 814

Page 815: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 815

Page 816: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 816

Page 817: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 817

Page 818: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 818

Page 819: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 819

Page 820: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 820

Page 821: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 821

Page 822: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 822

Page 823: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 823

Page 824: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 824

Page 825: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 825

Page 826: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 826

Page 827: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 827

Page 828: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 828

Page 829: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 829

Page 830: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 830

Page 831: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 831

Page 832: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 832

Page 833: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 833

Page 834: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 834

Page 835: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 835

Page 836: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 836

Page 837: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 837

Page 838: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 838

Page 839: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 839

Page 840: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 840

Page 841: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 841

Page 842: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 842

Page 843: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 843

Page 844: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 844

Page 845: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 845

Page 846: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 846

Page 847: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 847

Page 848: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 848

Page 849: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 849

Page 850: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 850

Page 851: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 851

Page 852: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 852

Page 853: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 853

Page 854: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 854

Page 855: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 855

Page 856: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 856

Page 857: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 857

Page 858: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 858

Page 859: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 859

Page 860: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 860

Page 861: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 861

Page 862: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 862

Page 863: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 863

Page 864: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 864

Page 865: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 865

Page 866: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 866

Page 867: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 867

Page 868: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 868

Page 869: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 869

Page 870: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 870

Page 871: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 871

Page 872: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 872

Page 873: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 873

Page 874: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 874

Page 875: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 875

Page 876: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 876

Page 877: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 877

Page 878: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 878

Page 879: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 879

Page 880: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 880

Page 881: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 881

Page 882: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 882

Page 883: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 883

Page 884: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 884

Page 885: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 885

Page 886: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 886

Page 887: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 887

Page 888: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 888

Page 889: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 889

Page 890: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 890

Page 891: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 891

Page 892: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 892

Page 893: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 893

Page 894: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 894

Page 895: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 895

Page 896: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 896

Page 897: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 897

Page 898: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 898

Page 899: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 899

Page 900: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 900

Page 901: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 901

Page 902: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 902

Page 903: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 903

Page 904: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 904

Page 905: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 905

Page 906: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 906

Page 907: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 907

Page 908: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 908

Page 909: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 909

Page 910: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 910

Page 911: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 911

Page 912: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 912

Page 913: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 913

Page 914: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 914

Page 915: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 915

Page 916: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 916

Page 917: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 917

Page 918: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 918

Page 919: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 919

Page 920: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 920

Page 921: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 921

Page 922: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 922

Page 923: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 923

Page 924: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 924

Page 925: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 925

Page 926: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 926

Page 927: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 927

Page 928: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 928

Page 929: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 929

Page 930: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 930

Page 931: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 931

Page 932: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 932

Page 933: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 933

Page 934: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 934

Page 935: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 935

Page 936: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 936

Page 937: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 937

Page 938: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 938

Page 939: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 939

Page 940: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 940

Page 941: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 941

Page 942: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 942

Page 943: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 943

Page 944: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 944

Page 945: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 945

Page 946: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 946

Page 947: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 947

Page 948: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 948

Page 949: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 949

Page 950: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 950

Page 951: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 951

Page 952: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 952

Page 953: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 953

Page 954: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 954

Page 955: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 955

Page 956: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 956

Page 957: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 957

Page 958: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 958

Page 959: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 959

Page 960: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 960

Page 961: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 961

Page 962: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 962

Page 963: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 963

Page 964: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 964

Page 965: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 965

Page 966: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 966

Page 967: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 967

Page 968: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 968

Page 969: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 969

Page 970: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 970

Page 971: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 971

Page 972: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 972

Page 973: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 973

Page 974: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 974

Page 975: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 975

Page 976: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 976

Page 977: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 977

Page 978: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 978

Page 979: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 979

Page 980: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 980

Page 981: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 981

Page 982: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 982

Page 983: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 983

Page 984: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 984

Page 985: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 985

Page 986: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 986

Page 987: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 987

Page 988: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 988

Page 989: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 989

Page 990: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 990

Page 991: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 991

Page 992: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 992

Page 993: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 993

Page 994: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 994

Page 995: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 995

Page 996: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 996

Page 997: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 997

Page 998: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 998

Page 999: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 999

Page 1000: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1000

Page 1001: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1001

Page 1002: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1002

Page 1003: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1003

Page 1004: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1004

Page 1005: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1005

Page 1006: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1006

Page 1007: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1007

Page 1008: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1008

Page 1009: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1009

Page 1010: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1010

Page 1011: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1011

Page 1012: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1012

Page 1013: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1013

Page 1014: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1014

Page 1015: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1015

Page 1016: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1016

Page 1017: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1017

Page 1018: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1018

Page 1019: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1019

Page 1020: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1020

Page 1021: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1021

Page 1022: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1022

Page 1023: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1023

Page 1024: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1024

Page 1025: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1025

Page 1026: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1026

Page 1027: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1027

Page 1028: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1028

Page 1029: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1029

Page 1030: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1030

Page 1031: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1031

Page 1032: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1032

Page 1033: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1033

Page 1034: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1034

Page 1035: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1035

Page 1036: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1036

Page 1037: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1037

Page 1038: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1038

Page 1039: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1039

Page 1040: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1040

Page 1041: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1041

Page 1042: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1042

Page 1043: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1043

Page 1044: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1044

Page 1045: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1045

Page 1046: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1046

Page 1047: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1047

Page 1048: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1048

Page 1049: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1049

Page 1050: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1050

Page 1051: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1051

Page 1052: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1052

Page 1053: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1053

Page 1054: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1054

Page 1055: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1055

Page 1056: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1056

Page 1057: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1057

Page 1058: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1058

Page 1059: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1059

Page 1060: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1060

Page 1061: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1061

Page 1062: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1062

Page 1063: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1063

Page 1064: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1064

Page 1065: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1065

Page 1066: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1066

Page 1067: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1067

Page 1068: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1068

Page 1069: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1069

Page 1070: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1070

Page 1071: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1071

Page 1072: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1072

Page 1073: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1073

Page 1074: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1074

Page 1075: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1075

Page 1076: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1076

Page 1077: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1077

Page 1078: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1078

Page 1079: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1079

Page 1080: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1080

Page 1081: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1081

Page 1082: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1082

Page 1083: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1083

Page 1084: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1084

Page 1085: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1085

Page 1086: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1086

Page 1087: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1087

Page 1088: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1088

Page 1089: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1089

Page 1090: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1090

Page 1091: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1091

Page 1092: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1092

Page 1093: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1093

Page 1094: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1094

Page 1095: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1095

Page 1096: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1096

Page 1097: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1097

Page 1098: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1098

Page 1099: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1099

Page 1100: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1100

Page 1101: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1101

Page 1102: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1102

Page 1103: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1103

Page 1104: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1104

Page 1105: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1105

Page 1106: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1106

Page 1107: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1107

Page 1108: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1108

Page 1109: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1109

Page 1110: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1110

Page 1111: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1111

Page 1112: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1112

Page 1113: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1113

Page 1114: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1114

Page 1115: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1115

Page 1116: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1116

Page 1117: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1117

Page 1118: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1118

Page 1119: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1119

Page 1120: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1120

Page 1121: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1121

Page 1122: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1122

Page 1123: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1123

Page 1124: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1124

Page 1125: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1125

Page 1126: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1126

Page 1127: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1127

Page 1128: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1128

Page 1129: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1129

Page 1130: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1130

Page 1131: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1131

Page 1132: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1132

Page 1133: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1133

Page 1134: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1134

Page 1135: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1135

Page 1136: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1136

Page 1137: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1137

Page 1138: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1138

Page 1139: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1139

Page 1140: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1140

Page 1141: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1141

Page 1142: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1142

Page 1143: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1143

Page 1144: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1144

Page 1145: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1145

Page 1146: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1146

Page 1147: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1147

Page 1148: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1148

Page 1149: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1149

Page 1150: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1150

Page 1151: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1151

Page 1152: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1152

Page 1153: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1153

Page 1154: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1154

Page 1155: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1155

Page 1156: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1156

Page 1157: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1157

Page 1158: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1158

Page 1159: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1159

Page 1160: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1160

Page 1161: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1161

Page 1162: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1162

Page 1163: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1163

Page 1164: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1164

Page 1165: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1165

Page 1166: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1166

Page 1167: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1167

Page 1168: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1168

Page 1169: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1169

Page 1170: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1170

Page 1171: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1171

Page 1172: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1172

Page 1173: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1173

Page 1174: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1174

Page 1175: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1175

Page 1176: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1176

Page 1177: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1177

Page 1178: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1178

Page 1179: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1179

Page 1180: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1180

Page 1181: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1181

Page 1182: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1182

Page 1183: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1183

Page 1184: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1184

Page 1185: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1185

Page 1186: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1186

Page 1187: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1187

Page 1188: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1188

Page 1189: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1189

Page 1190: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1190

Page 1191: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1191

Page 1192: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1192

Page 1193: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1193

Page 1194: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1194

Page 1195: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1195

Page 1196: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1196

Page 1197: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1197

Page 1198: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1198

Page 1199: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1199

Page 1200: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1200

Page 1201: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1201

Page 1202: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1202

Page 1203: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1203

Page 1204: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1204

Page 1205: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1205

Page 1206: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1206

Page 1207: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1207

Page 1208: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1208

Page 1209: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1209

Page 1210: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1210

Page 1211: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1211

Page 1212: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1212

Page 1213: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1213

Page 1214: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1214

Page 1215: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1215

Page 1216: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1216

Page 1217: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1217

Page 1218: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1218

Page 1219: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1219

Page 1220: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1220

Page 1221: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1221

Page 1222: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1222

Page 1223: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1223

Page 1224: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1224

Page 1225: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1225

Page 1226: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1226

Page 1227: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1227

Page 1228: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1228

Page 1229: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1229

Page 1230: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1230

Page 1231: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1231

Page 1232: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1232

Page 1233: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1233

Page 1234: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1234

Page 1235: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1235

Page 1236: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1236

Page 1237: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1237

Page 1238: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1238

Page 1239: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1239

Page 1240: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1240

Page 1241: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1241

Page 1242: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1242

Page 1243: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1243

Page 1244: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1244

Page 1245: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1245

Page 1246: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1246

Page 1247: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1247

Page 1248: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1248

Page 1249: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1249

Page 1250: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1250

Page 1251: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1251

Page 1252: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1252

Page 1253: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1253

Page 1254: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1254

Page 1255: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1255

Page 1256: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1256

Page 1257: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1257

Page 1258: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1258

Page 1259: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1259

Page 1260: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1260

Page 1261: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1261

Page 1262: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1262

Page 1263: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1263

Page 1264: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1264

Page 1265: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1265

Page 1266: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1266

Page 1267: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1267

Page 1268: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1268

Page 1269: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1269

Page 1270: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1270

Page 1271: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1271

Page 1272: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1272

Page 1273: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1273

Page 1274: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1274

Page 1275: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1275

Page 1276: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1276

Page 1277: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1277

Page 1278: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1278

Page 1279: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1279

Page 1280: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1280

Page 1281: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1281

Page 1282: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1282

Page 1283: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1283

Page 1284: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1284

Page 1285: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1285

Page 1286: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1286

Page 1287: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1287

Page 1288: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1288

Page 1289: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1289

Page 1290: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1290

Page 1291: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1291

Page 1292: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1292

Page 1293: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1293

Page 1294: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1294

Page 1295: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1295

Page 1296: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1296

Page 1297: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1297

Page 1298: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1298

Page 1299: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1299

Page 1300: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1300

Page 1301: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1301

Page 1302: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1302

Page 1303: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1303

Page 1304: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1304

Page 1305: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1305

Page 1306: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1306

Page 1307: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1307

Page 1308: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1308

Page 1309: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1309

Page 1310: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1310

Page 1311: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1311

Page 1312: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1312

Page 1313: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1313

Page 1314: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1314

Page 1315: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1315

Page 1316: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1316

Page 1317: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1317

Page 1318: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1318

Page 1319: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1319

Page 1320: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1320

Page 1321: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1321

Page 1322: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1322

Page 1323: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1323

Page 1324: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1324

Page 1325: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1325

Page 1326: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1326

Page 1327: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1327

Page 1328: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1328

Page 1329: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1329

Page 1330: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1330

Page 1331: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1331

Page 1332: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1332

Page 1333: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1333

Page 1334: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1334

Page 1335: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1335

Page 1336: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1336

Page 1337: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1337

Page 1338: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1338

Page 1339: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1339

Page 1340: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1340

Page 1341: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1341

Page 1342: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1342

Page 1343: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1343

Page 1344: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1344

Page 1345: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1345

Page 1346: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1346

Page 1347: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1347

Page 1348: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1348

Page 1349: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1349

Page 1350: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1350

Page 1351: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1351

Page 1352: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1352

Page 1353: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1353

Page 1354: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1354

Page 1355: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1355

Page 1356: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1356

Page 1357: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1357

Page 1358: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1358

Page 1359: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1359

Page 1360: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1360

Page 1361: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1361

Page 1362: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1362

Page 1363: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1363

Page 1364: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1364

Page 1365: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1365

Page 1366: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1366

Page 1367: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1367

Page 1368: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1368

Page 1369: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1369

Page 1370: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1370

Page 1371: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1371

Page 1372: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1372

Page 1373: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1373

Page 1374: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1374

Page 1375: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1375

Page 1376: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1376

Page 1377: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1377

Page 1378: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1378

Page 1379: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1379

Page 1380: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1380

Page 1381: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1381

Page 1382: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1382

Page 1383: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1383

Page 1384: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1384

Page 1385: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1385

Page 1386: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1386

Page 1387: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1387

Page 1388: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1388

Page 1389: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1389

Page 1390: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1390

Page 1391: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1391

Page 1392: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1392

Page 1393: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1393

Page 1394: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1394

Page 1395: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1395

Page 1396: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1396

Page 1397: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1397

Page 1398: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1398

Page 1399: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1399

Page 1400: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1400

Page 1401: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1401

Page 1402: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1402

Page 1403: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1403

Page 1404: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1404

Page 1405: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1405

Page 1406: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1406

Page 1407: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1407

Page 1408: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1408

Page 1409: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1409

Page 1410: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1410

Page 1411: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1411

Page 1412: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1412

Page 1413: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1413

Page 1414: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1414

Page 1415: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1415

Page 1416: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1416

Page 1417: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1417

Page 1418: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1418

Page 1419: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1419

Page 1420: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1420

Page 1421: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1421

Page 1422: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1422

Page 1423: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1423

Page 1424: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1424

Page 1425: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1425

Page 1426: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1426

Page 1427: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1427

Page 1428: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1428

Page 1429: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1429

Page 1430: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1430

Page 1431: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1431

Page 1432: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1432

Page 1433: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1433

Page 1434: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1434

Page 1435: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1435

Page 1436: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1436

Page 1437: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1437

Page 1438: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1438

Page 1439: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1439

Page 1440: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1440

Page 1441: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1441

Page 1442: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1442

Page 1443: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1443

Page 1444: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1444

Page 1445: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1445

Page 1446: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1446

Page 1447: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1447

Page 1448: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1448

Page 1449: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1449

Page 1450: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1450

Page 1451: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1451

Page 1452: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1452

Page 1453: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1453

Page 1454: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1454

Page 1455: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1455

Page 1456: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1456

Page 1457: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1457

Page 1458: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1458

Page 1459: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1459

Page 1460: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1460

Page 1461: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1461

Page 1462: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1462

Page 1463: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1463

Page 1464: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1464

Page 1465: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1465

Page 1466: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1466

Page 1467: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1467

Page 1468: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1468

Page 1469: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1469

Page 1470: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1470

Page 1471: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1471

Page 1472: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1472

Page 1473: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1473

Page 1474: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1474

Page 1475: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1475

Page 1476: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1476

Page 1477: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1477

Page 1478: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1478

Page 1479: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1479

Page 1480: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1480

Page 1481: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1481

Page 1482: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1482

Page 1483: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1483

Page 1484: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1484

Page 1485: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1485

Page 1486: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1486

Page 1487: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1487

Page 1488: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1488

Page 1489: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1489

Page 1490: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1490

Page 1491: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1491

Page 1492: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1492

Page 1493: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1493

Page 1494: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1494

Page 1495: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1495

Page 1496: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1496

Page 1497: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1497

Page 1498: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1498

Page 1499: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1499

Page 1500: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1500

Page 1501: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1501

Page 1502: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1502

Page 1503: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1503

Page 1504: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1504

Page 1505: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1505

Page 1506: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1506

Page 1507: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1507

Page 1508: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1508

Page 1509: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1509

Page 1510: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1510

Page 1511: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1511

Page 1512: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1512

Page 1513: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1513

Page 1514: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1514

Page 1515: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1515

Page 1516: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1516

Page 1517: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1517

Page 1518: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1518

Page 1519: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1519

Page 1520: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1520

Page 1521: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1521

Page 1522: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1522

Page 1523: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1523

Page 1524: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1524

Page 1525: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1525

Page 1526: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1526

Page 1527: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1527

Page 1528: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1528

Page 1529: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1529

Page 1530: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1530

Page 1531: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1531

Page 1532: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1532

Page 1533: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1533

Page 1534: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1534

Page 1535: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1535

Page 1536: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1536

Page 1537: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1537

Page 1538: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1538

Page 1539: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1539

Page 1540: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1540

Page 1541: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1541

Page 1542: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1542

Page 1543: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1543

Page 1544: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1544

Page 1545: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1545

Page 1546: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1546

Page 1547: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1547

Page 1548: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1548

Page 1549: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1549

Page 1550: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1550

Page 1551: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1551

Page 1552: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1552

Page 1553: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1553

Page 1554: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1554

Page 1555: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1555

Page 1556: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1556

Page 1557: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1557

Page 1558: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1558

Page 1559: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1559

Page 1560: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1560

Page 1561: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1561

Page 1562: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1562

Page 1563: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1563

Page 1564: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1564

Page 1565: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1565

Page 1566: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1566

Page 1567: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1567

Page 1568: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1568

Page 1569: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1569

Page 1570: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1570

Page 1571: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1571

Page 1572: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1572

Page 1573: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1573

Page 1574: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1574

Page 1575: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1575

Page 1576: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1576

Page 1577: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1577

Page 1578: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1578

Page 1579: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1579

Page 1580: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1580

Page 1581: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1581

Page 1582: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1582

Page 1583: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1583

Page 1584: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1584

Page 1585: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1585

Page 1586: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1586

Page 1587: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1587

Page 1588: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1588

Page 1589: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1589

Page 1590: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1590

Page 1591: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1591

Page 1592: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1592

Page 1593: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1593

Page 1594: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1594

Page 1595: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1595

Page 1596: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1596

Page 1597: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1597

Page 1598: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1598

Page 1599: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1599

Page 1600: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1600

Page 1601: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1601

Page 1602: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1602

Page 1603: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1603

Page 1604: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1604

Page 1605: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1605

Page 1606: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1606

Page 1607: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1607

Page 1608: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1608

Page 1609: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1609

Page 1610: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1610

Page 1611: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1611

Page 1612: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1612

Page 1613: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1613

Page 1614: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1614

Page 1615: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1615

Page 1616: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1616

Page 1617: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1617

Page 1618: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1618

Page 1619: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1619

Page 1620: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1620

Page 1621: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1621

Page 1622: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1622

Page 1623: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1623

Page 1624: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1624

Page 1625: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1625

Page 1626: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1626

Page 1627: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1627

Page 1628: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1628

Page 1629: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1629

Page 1630: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1630

Page 1631: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1631

Page 1632: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1632

Page 1633: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1633

Page 1634: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1634

Page 1635: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1635

Page 1636: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1636

Page 1637: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1637

Page 1638: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1638

Page 1639: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1639

Page 1640: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1640

Page 1641: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1641

Page 1642: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1642

Page 1643: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1643

Page 1644: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1644

Page 1645: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1645

Page 1646: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1646

Page 1647: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1647

Page 1648: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1648

Page 1649: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1649

Page 1650: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1650

Page 1651: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1651

Page 1652: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1652

Page 1653: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1653

Page 1654: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1654

Page 1655: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1655

Page 1656: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1656

Page 1657: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1657

Page 1658: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1658

Page 1659: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1659

Page 1660: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1660

Page 1661: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1661

Page 1662: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1662

Page 1663: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1663

Page 1664: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1664

Page 1665: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1665

Page 1666: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1666

Page 1667: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1667

Page 1668: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1668

Page 1669: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1669

Page 1670: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1670

Page 1671: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1671

Page 1672: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1672

Page 1673: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1673

Page 1674: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1674

Page 1675: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1675

Page 1676: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1676

Page 1677: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1677

Page 1678: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1678

Page 1679: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1679

Page 1680: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1680

Page 1681: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1681

Page 1682: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1682

Page 1683: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1683

Page 1684: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1684

Page 1685: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1685

Page 1686: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1686

Page 1687: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1687

Page 1688: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1688

Page 1689: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1689

Page 1690: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1690

Page 1691: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1691

Page 1692: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1692

Page 1693: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1693

Page 1694: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1694

Page 1695: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1695

Page 1696: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1696

Page 1697: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1697

Page 1698: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1698

Page 1699: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1699

Page 1700: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1700

Page 1701: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1701

Page 1702: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1702

Page 1703: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1703

Page 1704: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1704

Page 1705: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1705

Page 1706: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1706

Page 1707: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1707

Page 1708: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1708

Page 1709: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1709

Page 1710: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1710

Page 1711: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1711

Page 1712: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1712

Page 1713: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1713

Page 1714: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1714

Page 1715: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1715

Page 1716: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1716

Page 1717: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1717

Page 1718: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1718

Page 1719: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1719

Page 1720: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1720

Page 1721: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1721

Page 1722: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1722

Page 1723: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1723

Page 1724: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1724

Page 1725: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1725

Page 1726: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1726

Page 1727: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1727

Page 1728: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1728

Page 1729: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1729

Page 1730: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1730

Page 1731: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1731

Page 1732: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1732

Page 1733: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1733

Page 1734: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1734

Page 1735: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1735

Page 1736: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1736

Page 1737: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1737

Page 1738: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1738

Page 1739: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1739

Page 1740: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1740

Page 1741: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1741

Page 1742: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1742

Page 1743: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1743

Page 1744: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1744

Page 1745: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1745

Page 1746: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1746

Page 1747: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1747

Page 1748: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1748

Page 1749: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1749

Page 1750: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1750

Page 1751: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1751

Page 1752: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1752

Page 1753: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1753

Page 1754: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1754

Page 1755: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1755

Page 1756: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1756

Page 1757: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1757

Page 1758: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1758

Page 1759: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1759

Page 1760: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1760

Page 1761: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1761

Page 1762: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1762

Page 1763: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1763

Page 1764: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1764

Page 1765: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1765

Page 1766: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1766

Page 1767: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1767

Page 1768: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1768

Page 1769: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1769

Page 1770: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1770

Page 1771: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1771

Page 1772: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1772

Page 1773: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1773

Page 1774: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1774

Page 1775: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1775

Page 1776: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1776

Page 1777: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1777

Page 1778: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1778

Page 1779: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1779

Page 1780: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1780

Page 1781: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1781

Page 1782: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1782

Page 1783: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1783

Page 1784: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1784

Page 1785: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1785

Page 1786: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1786

Page 1787: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1787

Page 1788: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1788

Page 1789: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1789

Page 1790: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1790

Page 1791: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1791

Page 1792: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1792

Page 1793: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1793

Page 1794: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1794

Page 1795: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1795

Page 1796: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1796

Page 1797: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1797

Page 1798: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1798

Page 1799: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1799

Page 1800: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1800

Page 1801: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1801

Page 1802: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1802

Diploma

Page 1803: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1803

Page 1804: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1804

Page 1805: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1805

Page 1806: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1806

Page 1807: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1807

Page 1808: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1808

Page 1809: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1809

Page 1810: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1810

Page 1811: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1811

Page 1812: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1812

Page 1813: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1813

Page 1814: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1814

Page 1815: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1815

Page 1816: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1816

Page 1817: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1817

Page 1818: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1818

Page 1819: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1819

Page 1820: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1820

Page 1821: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1821

Page 1822: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1822

Page 1823: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1823

Page 1824: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1824

Page 1825: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1825

Page 1826: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1826

Page 1827: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1827

Page 1828: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1828

Page 1829: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1829

Page 1830: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1830

Page 1831: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1831

Page 1832: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1832

Page 1833: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1833

Page 1834: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1834

Page 1835: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1835

Page 1836: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1836

Page 1837: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1837

Page 1838: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1838

Page 1839: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1839

Page 1840: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1840

Page 1841: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1841

Page 1842: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1842

Page 1843: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1843

Page 1844: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1844

Page 1845: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1845

Page 1846: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1846

Page 1847: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1847

Page 1848: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1848

Page 1849: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1849

Page 1850: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1850

Page 1851: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1851

Page 1852: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1852

Page 1853: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1853

Page 1854: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1854

Page 1855: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1855

Page 1856: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1856

GM Training Dte. of Taining & Career Development

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0248 01.01.56 Mr. A.K.M. Abdur Rouf,

Bogra,

B.Sc.Engg. (Elec.)

14.09.78 (AE) 17.02.93(XEN) 09.01.06 (SE) 10.01.10 Addl.CE (Incharge) 15.02.10 Addl.CE (Rev.) 13.01.11 (CE) 2.1.2012 (CE)

GM (CE) Training, PDB, Dhaka.

1) Eclectic Power DistributionEngineering From 03.09.88 to17.11.88 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 to two Month (Bondfor 03 Years from 01.09.04 to31.10.04.) 3) Electricity Markets To MeetTomorrow's Demand: Efficientand Effective Design,Operation and Managementfrom 30.09.07 to 06.10.07, 07days.

Japan,

Russia,

USA

1)''Conceptual DesignApproval'' of Sylhet 90MWCCPP (2nd Unit) from28.01.07 to 06.02.07 for 10days in China

1 1-0537 02.02.55 Mr. Motahar RahmanChowdhury NaogaonB.Sc.Engg. (Elec.)18.3.82(AE) 01.02.92(SDE) 17.05.03(XEN)

Director Dte. of Training andCareer Development,PDB, Dhaka. & PD (Addl. Charge) Training AcademyComplex, PDB,Keraniganj.

1. Training

2. A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012

Thailand &Bangkok

Newzealand

1) Inspection Battery &Battery Charger fromJanuary/2000 for 07 days inIndia. 2) “Witnessing ofManufacturing processand tests of the Matarialsand Spare at Manufactur’sworks including transferof technical know how” for15.09.09 to 22.09.09 inJapan. * See N.B.

*N.B. 3) “Witnessing of manufacturing process and test of the equipment of manufacturer's works including transfer of technical know-how” against Mechanical Security Spares from October/10 for 07 days in Netherland. 4) "Witnessing of manufacturing Process and test of the equipment of manufacturer;s works including transfer of technical Know-How" from 16.08.11 to 22.08.11 for 07 days in USA. 5) Inspection program on "Energy Efficient Buildings" from 12.03.13 to 18.03.13 in India. 6) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 7) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China.

Page 1857: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1857

2 1-0589 29.11.61 Mrs. Nurun Nahar Begum

Dhaka,

B.Sc.Engg. (Elec.)

09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)

XEN,

Dte. Of Training &Career Develpopment PDB, Dhaka.

1)Training on Powertransformer from 10.10.03 to08.01.04 for 03 Months 2) PSCDP Training program on"Strategic Human ResourceManagement" from 12.08.13to 23.08.13

China

Thailand

3 1-0592 01.02.56 Mr. Khan Monjur Morshed,

Barisal,

B.Sc.Engg. (Elec.)

09.10.84(AE) 09.10.84(SDE) 17.09.03(XEN)

Dy. Director Training & CareerDevelpopment PDB,Dhaka.

1)Electrical Maintanance/LTEEquipment From 30.12.86 to29.04.872)Maintanance Of Sub-Station,MV SwitchgearInstallation andMaintenance of Power X-Former From 18.08.2003 to29.08.2003 3) Training On 33/11KV 2x10MVA sub station June/ 2006for 10 Days

4) PSCDP tarining program on"Project Management (Batch-2)" from 02.09.13 to 13.09.13

USSR

Thailand

Norway

Thailand

1)Pre-Paiyment Metaringfrom 17.02.07 to 22.02.07for 07 days in SouthAfrica. 2) Orientation & TechnicalTraining mn Factory TestWitness in 05 for 07 daysin India. 3) "Factory Inspection onElectronic Governor" From19.02.09 to 26.02.09 for 07days in Italy.

5 1-0780 01.01.64 Mr. C.F.K. Musaddeq Ahmed, Sylhet, B.Sc.Engr.(Mech.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)

Dy. Director(XEN),

GM, Training PDB, Dhaka.

1) Electric Power ManagementBy Benchmarking from08.09.03 to 17.10.03 2) Managing TrainingFunction from July/09 toNovember/90

Japan,

UK

6 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 23.04.09 (XEN)

Dy. Director(XEN),

Director of Training andCareer Development

PDB, Dhaka.

1) Factory Test Witness26.03.04 to 31.03.04, 06days in India. 2) Inspection of Engine &Generator againstDaudkhandi 50MWPeaking Power Plant for 07days in Finland 3) PIM (PowerManagement Institute)NTPC for 03 days atFebruary/11.

Page 1858: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1858

5 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 08.02.11 (XEN, Rev.)

XEN,

Dte. of Training &Career Develpopment PDB,Dhaka.

1)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month 2) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13

France,

Thailand

6 1-01459 01.05.75 Mrs. Jakia Naznin Panna, Khulna, B.Sc.Engr.(Mech.),

05.03.2000(AE) 25.06.09(SDE)

SDE Directorate of Training&Career Development PDB,Dhaka.

1) PSCDP Training programon "Project Management(Batch-1)" from 12.08.13 to23.08.13

Thailand 1) "Technical Know-How"on L.P. Rotor againstKhulna Power Station from09.06.09 to 15.06.09 for 07days in Czech Republic. 2) “Witnessing ofmanufacturing processand tests of the materialsand spares atmanufacturers' worksincluding transfer oftechnical know-how”against Repairing /Reconditioning /Replacement of Chimneyfrom Octob./10 for 07 daysin China.

9 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE)

SDE Directorate of Training&Career Development PDB,Dhaka

Materials witnessInspection (HRSGInspection)” against Bera70 MW Peaking PowerPlant Construction Projectfrom 14.11.10 to 22.11.10for 07 days in South Korea.

Page 1859: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1859

10 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)

SDE Directorate of Training&Career Development PDB, Dhaka.

1) Training on ''Operation &Maintenance of HRGS inKorea from 20.11.07 to04.12.07 for 0.5 Month &''Hydraulice Diverter DamperSystem in China from 14.08.07to 17.10.07 for 03 Monthsagainst 90 MW SylhetCombined Cycle Power Station(Unit-2) Cons. Project. 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13

Korea & China

India

9 1-01737 03.09.77 Mr. Mohammad ErfanulHaque Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE)

AE Directorate of Training&Career Development,PDB, Dhaka.

1) ''Inspection of HeatRecovery Steam Generatoragainst Dudkhandi 50MWPeaking Power PlantConstruction Project for 07days in China. 2) "Technical Orientation& Quality Test Witness"against ACSR Grosbeak,ACSR MERLIN, GUY WIREfrom 06.22.13 to 28.05.13 inChina

10 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01556559924 [email protected]

AE Directorate of Training&Career Development,PDB, Dhaka.

1) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13

Thailand

11 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522

[email protected]

AE Directorate of Training&Career Development,PDB, Dhaka.

1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13

Thailand

Page 1860: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1860

Chittagong RTC, PDB, Chittagong

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 11-0194 31.11.57 Mr. Nasir Uddin Chittagong, Diploma(Elec.)

05.07.80.(SAE), 17.09.09(AE)

AE, RTC PDB, Chittagong.

1) PSCDP training on RelayProtection & Advance trainingprogram from 08.07.13 to19.07.13

India

Tongi RTC, PDB, Tongi

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0916 25.02.56 Mr. Shah Alam,Dhaka,B.Sc.Engr.(Mech.),08.2.87(AE) 13.12.2000 (SDE) 08.02.11 (XEN)

Dy, Director (XEN)

RTC, Tongi, Gazipur

Pre-Shipment ofTransformer From 13.09.01to 24.09.01 in China

2 11-0007 09.01.57 Mr.Shukumer Lal Sarker, Kustia Diploma(Power )

21.08.78(SAE), 06.04.06 (AE), 10.02.10(SDE)

SDE, RTC, PDB, Tongi,Gazipur.

1) Operation & Maintenanceof Distribution Substationtraining program from11.02.13 to 22.02.13

Thailand

3 1-02009 22.12.82 Mrs. Sumita Rani Biswas Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE)

AE, RTC, PDB, Tongi,Gazipur.

Rajshahi RTC, PDB, Rajshahi

Page 1861: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1861

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01428 10.11.71 Mr. Md. Rafiqul Islam, Rajshahi, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

DD (incharge) RTC PDB, Rajshahi.

1) 132KV CurrentTransformer & VoltageTransformer againstDawadkandi 50MWPeaking Power Plant fromOctober/10 for 07 days inChina. 2) "Technical orientation& Quality test witness "from 01.10.13 to 07.10.13 inChina.

G.O. issued dated23.10.13 againstPSCDP training onPublic PrivatePartnership (PPP)trainingprogramfrom18.11.13 to 29.11.13in Thailand.

2 11-0417 07.07.57 Mr. Md. Kamrul Alam Rajshahi Diploma Engg. (Elect.) 31.07.83 (SAE) 27.12.11 (AE)

AE RTC PDB, Rajshahi.

Ghorashal RTC, PDB, GhorashalSL.NO. ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

Deputy Director, (XEN)(Incharge) Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13

India 1) Training on Servicedead end Clamp,September/05 for 07daysin India. 2) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina. 3) Special Inspectionagainst "Power PlantSimulator" from 16.09.13 to21.09.13 in USA.

Page 1862: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1862

9 1-01683 02.03.79 Mr.Mohammad Ali Firoz Sirajgonj B.Sc.Eng(Mech) 07.06.2006(AE) 27.12.2011(SDE)

SDE Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

Factory Training againstBaghabari 50MW PeakingPower Plant ConstructionProject '' from 30.05.2011 to30.06.2011 for 30(Thirty) days(Bond for 5 years)

China 1) Materials witnessInspection against“Control and ProtectionSystem & CT, PT Inspectionfrom October/10 for 07days in South Korea.

2 11-0436 16.01.62 Mr. Abul Kalam Azad Narayanganj Diploma Engg (Mech.) 03.08.83 (SAE) 27.12.11 (AE)

AE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

Engineering Academy, PDB, KaptaiSL.NO. ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

4 1-0429 23.04.56 Mr. Nurul Karim, Chittagong,

B.Sc.Engg. (Elec.) 24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 10.09.13(SE)

Director, Engineering Academy PDB, Kaptai.

1) Scada System Soft &Hardware from 28.11.88 for14.03.89

2) 33/11KV PowerTransformer From May/03for 14 Days 3) GIS From 15.06.04 for 11Days

4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India& Malaysia.

U.K.

Iran

Germany,

India &Malaysia

1) 14.4.2001 to 19.4.2001for 06 days in India.

2)Factory Test Witness &Orientation Training onGreater Chittagong PowerDistribution Project,''Power Transformer''from July/06 for 14 daysin China. 3)"Coal PowerGenaration" from10.06.13 to 14.06.13 inThailand.

Page 1863: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1863

1 1-0558 11.01.59 Mr. Bikash DewanRangamatiB.Sc.Engg. (Elec.)18.03.83(AE) 18.03.93(SDE) 09.03.03(XEN)

Director (Incharge), Engineering Academy PDB, Kaptai.

Meter & Accessories From24.05.2004 to 23.06.04

Singapore &Australia

1)11KV Capacitor OilSwitch, AutomaticCapacitor Controller,Junction Box and Line PostCurrent Sensor for3x100KVAR CapacitorBanks. From Feb/07 for 07days in U.S.A 2) Technical Orientationand Quality Test Witness"against 33KV Outdoor TypeCurrent Transformer(Diffenent Ratio) fromJanuary/11 for 07 days inChina. 3) "Factory AcceptanceTest (FAT) & TechnicalOrientation Course"against GreaterChittagong PowerDistribution Project SCADA-Rehabilitation &Extension in Sep./2011 for07 days or from the date ofactual journey (excludingtravell time) in NewZealand.

1 1-0744 10.02.63 Mr. Probir Kumar Dey,

Chittagong,

B.Sc.Engr.(Elec.),

30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN) 01839905724

DD (XEN), Engineering Academy PDB, Kaptai.

1)Operation andMaintenance of X-former andCkt.Breaker From 09.1.91 to8.4.91 2) Transmission Line DesignFrom 02.8.99 to 2.11.99

China,

Germany& Switzerland

3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)

23.10.80(SAE), 17.09.09(AE)

AE, Engineering Academy PDB, Kaptai.

Page 1864: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1864

Training Academy, PDB, Cox's BazarSL.NO. ID No. Date of

BirthName, Dist, Qualification and

Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0654 15.06.56 Mr. Gan Ranjan Chakma, Rangamaty, B.Sc.Engr.(Elec.), M.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN)

Director (Incharge), Training Academy, PDB,Cox's Bazar

1)Technical Orientationand Quality Test Witnesson Solar Photo Voltaic(PV)System from 21.02.07to 26.02.07 for 07 days inIndia.

5 1-01446 28.02.76 Mr. Mohammad AbdullahBhuiyan, Dhaka, B.Sc.Engr.(Metallurgi.),

05.03.2000(AE) 25.06.09(SDE) 01.01.14 (XEN,in charge) 01715791177

XEN (Incharge), Training Academy, PDB,Cox's Bazar

1) "Witnessing ofManufacturing Process &test of the Equipment atManufacturer’s worksincluding of Technicalknow-how” against tongipower station from08.11.09 to 13.11.09 fro 07days in USA. 2) “Witnessing ofmanufacturing process &tests of the equipment atmanufacturer's worksincluding transfer oftechnical know-how onBlade Kit, Turbine RotorStage-3 with Hardwarekits Ges Shroud Assemblyof Turbine Nozzle Stage-3with hard ware kitsComplete Set” againstBheramara Power Stationfrom 10.01.11 to 17.01.11 inUSA.

newly posted toCoxsBazar Trainingcenter

Page 1865: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1865

2 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN) 01839905723

DD (XEN), Engineering Academy PDB, Kaptai. (new posting order tobarapukuria powerstation)

1) Inspection on H.T.SWire From 10.10.02 to14.10.02 in India 2) ''Pre-shipmentinspection (Foreign)against Chittagong PC PoleConstruction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) daysin China.

Page 1866: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1866

27 1-0370 31.12.56 Mr. Md. Nurul AminChowdhury, Chittagong,B.Sc.Engg. (Mech.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 07.01.10 (SE, Reve. Basis)

Director (SE), Engineering Academy PDB, Kaptai. New posting order as PD(Addl. CE), Incharge to 250MW Barapukuria PowerPlant Construction Project,PDB, Dhaka

1) Design, Manufacture O & Mof Hydro Turbine Governors12.05.87 to 11.08.87 2)Traning on Gas TurbinePower Station Against Tongi80 MW From 24.07.04 To22.08.04 Three Month (Bondfor 03 Years from 24.07.04 to22.08.04)

Japan

China,

1) "Witnessing ofManufacturing Process &test of the Equipment atManufacturer’s worksincluding of Technicalknow-how” aganist Firstshipment for the SecondUnit Equipment (U-5) from09.01.2010 to 18.01.2010 inJapan. 2) Training Hydro Turbine(Mechanical) aganistKaptai Hydro Power Plant(Unit-3) from 01.10.08 to30.10.08 for 30 days in Italy

13 1-01727 01.01.80 Mrs. Arifa Parveen Dhaka B.Sc.Eng(Metallurgy) 07.06.2006(AE)

AE, Dte. of Training &Career Development, PDB,Dhaka

1) Testing & Inspection on33KV Capacitor Bank andat the ManufacturerPremises from 09.04.07 to16.04.07 for 07 days inIndia.

(Study live in Abroad)

7 1-0527 01.06.57 Mr. Samsul Haque, Comilla, B.Sc.Engg. (Elec.)

24.07.81(AE) 20.07.88(SDE) 17.05.03(XEN)

XEN,

Dte. of Training &Career Develpopment PDB,Dhaka.

1) Automation System from22.10.07 to 11.11.07 for03(Weeks)

Russia

Page 1867: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1867

8 1-0734 02.03.60 Mr. Md. Anower Hossain,

Joypurhat, B.Sc.Engr.(Elec.),

19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)

XEN

Dte. of Training &Career Develpopment PDB,Dhaka.

1)MV Switchgear,VD4 and VBFFrom 10.11.03 for 11 Days

India 1)Orientation & TechnicalTraining on 33 KV CircuitBracer & 11 KV Switchgearfrom 14.03.05 for 7 days inIndia.

deputed to Board ofInvestment office of the Primeministry

PDB, Dhaka.

Page 1868: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1868

P&D 2004 13.01.11 1978

G 2003 02.06.10

Page 1869: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1869

M.Admin 2003 06.05.10

M.Admin 2003 02.06.10

M.Admin 2003 08.02.11

M.Admin 10.02.10

Page 1870: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1870

M.Admin 2003 08.02.11

M.Adm 11.05.08

M.Admin

Page 1871: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1871

M.Admin 14.11.10

M.Admin 02.03.07

Page 1872: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1872

M.Admin 2001 08.02.11

P&D 05.06.10

Page 1873: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1873

M.Adm 18.03.10

M.Adm 23.03.10

Page 1874: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1874

Baghabari G 22.10.08

P&D 2005 02.06.10

Page 1875: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1875

Comilla D

1999 18.07.07

M.Am

Page 1876: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1876

Tongi G 25.06.09

Page 1877: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1877

P&D 2002 08.02.11

Page 1878: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1878

M.Admin 2004 21.01.10

M.Admin

M.Admin 02.06.10

Page 1879: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1879

2005 02.06.10

Page 1880: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1880

Page 1881: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1881

Page 1882: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1882

Page 1883: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1883

Page 1884: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1884

Page 1885: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1885

Page 1886: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1886

Page 1887: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1887

Page 1888: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1888

Page 1889: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1889

Page 1890: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1890

Page 1891: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1891

Page 1892: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1892

Page 1893: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1893

Page 1894: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1894

Page 1895: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1895

Page 1896: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1896

Page 1897: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1897

Page 1898: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1898

Page 1899: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1899

Page 1900: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1900

Page 1901: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1901

Page 1902: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1902

Page 1903: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1903

Page 1904: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1904

Page 1905: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1905

Page 1906: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1906

Page 1907: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1907

Page 1908: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1908

Page 1909: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1909

Page 1910: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1910

Page 1911: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1911

Page 1912: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1912

Page 1913: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1913

Page 1914: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1914

Page 1915: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1915

Page 1916: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1916

Page 1917: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1917

Page 1918: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1918

Page 1919: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1919

Page 1920: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1920

Page 1921: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1921

Page 1922: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1922

Page 1923: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1923

Page 1924: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1924

Page 1925: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1925

Page 1926: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1926

Page 1927: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1927

Page 1928: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1928

Page 1929: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1929

Page 1930: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1930

Page 1931: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1931

Page 1932: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1932

Page 1933: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1933

Page 1934: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1934

Page 1935: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1935

Page 1936: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1936

Page 1937: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1937

Page 1938: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1938

Page 1939: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1939

Page 1940: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1940

Page 1941: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1941

Page 1942: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1942

Page 1943: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1943

Page 1944: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1944

Page 1945: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1945

Page 1946: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1946

Page 1947: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1947

Page 1948: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1948

Page 1949: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1949

Page 1950: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1950

Page 1951: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1951

Page 1952: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1952

Page 1953: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1953

Page 1954: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1954

Page 1955: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1955

Page 1956: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1956

Page 1957: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1957

Page 1958: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1958

Page 1959: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1959

Page 1960: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1960

Page 1961: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1961

Page 1962: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1962

Page 1963: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1963

Page 1964: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1964

Page 1965: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1965

Page 1966: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1966

Page 1967: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1967

Page 1968: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1968

Page 1969: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1969

Page 1970: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1970

Page 1971: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1971

Page 1972: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1972

Page 1973: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1973

Page 1974: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1974

Page 1975: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1975

Page 1976: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1976

Page 1977: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1977

Page 1978: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1978

Page 1979: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1979

Page 1980: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1980

Page 1981: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1981

Page 1982: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1982

Page 1983: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1983

Page 1984: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1984

Page 1985: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1985

Page 1986: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1986

Page 1987: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1987

Page 1988: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1988

Page 1989: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1989

Page 1990: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1990

Page 1991: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1991

Page 1992: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1992

Page 1993: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1993

Page 1994: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1994

Page 1995: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1995

Page 1996: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1996

Page 1997: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1997

Page 1998: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1998

Page 1999: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 1999

Page 2000: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2000

Page 2001: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2001

Page 2002: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2002

Page 2003: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2003

Page 2004: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2004

Page 2005: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2005

Page 2006: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2006

Page 2007: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2007

Page 2008: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2008

Page 2009: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2009

Page 2010: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2010

Page 2011: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2011

Page 2012: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2012

Page 2013: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2013

Page 2014: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2014

Page 2015: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2015

Page 2016: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2016

Page 2017: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2017

Page 2018: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2018

Page 2019: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2019

Page 2020: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2020

Page 2021: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2021

Page 2022: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2022

Page 2023: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2023

Page 2024: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2024

Page 2025: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2025

Page 2026: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2026

Page 2027: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2027

Page 2028: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2028

Page 2029: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2029

Page 2030: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2030

Page 2031: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2031

Page 2032: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2032

Page 2033: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2033

Page 2034: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2034

Page 2035: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2035

Page 2036: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2036

Page 2037: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2037

Page 2038: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2038

Page 2039: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2039

Page 2040: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2040

Page 2041: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2041

Page 2042: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2042

Page 2043: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2043

Page 2044: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2044

Page 2045: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2045

Page 2046: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2046

Page 2047: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2047

Page 2048: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2048

Page 2049: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2049

Page 2050: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2050

Page 2051: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2051

Page 2052: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2052

Page 2053: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2053

Page 2054: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2054

Page 2055: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2055

Page 2056: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2056

Page 2057: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2057

Page 2058: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2058

Page 2059: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2059

Page 2060: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2060

Page 2061: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2061

List of Civil Engineers

SL.NO. ID No. Date of Birth Name, Dist,Qualification and Date

of Joining

Place of Posting Field of Training &Duration

Country Inspection Comments

1 1-0335 24.01.54 Mr. Korban Ali,Kushtia,B.Sc.Engg. (Civil)22.11.79 (AE) 04.02.86(SDE) 04.02.98(XEN) 08.04.09 (SE, rev.) 11.08.09 (SE)

Addl CE (Incharge), Civil Works, PDB,Dhaka. (freedomfighter)

1) Training on Span-typeP.C. Pole ManufacturingPlant from 22.12.85 to21.03.86

China 1) Tower Test from30.05.2000 for 07 days China 2) Steel Structure DesignSanction From 07.03.03 for 10Days In China 3) Conceptual DesignApproval Sylhet 90MW CCPP(2nd Unit) for 10 days inChina,2005. 4) Power Station DesignMeetting, 1997 for 07 days i 5) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject for 08(Eight) days inChina. 6)Travel India in Sep./2011for 05 (five) days (excludingtravel time) to reviewConceptual Drawing ofFeasibility Report in orderto build 2*660 MW PowerPlant in Khulna.

Page 2062: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2062

2 1-0392 06.01.57 Mr. A.T.M Zahirul IslamMojumder, Khagrachari

B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE)

SE O & M Circle, PDB,Sylhet. Addl. Charge (CE,Distribution Zone,Sylhet) Project Director(SE)

Faridpur 50 MW &Gopalgonj 100MWPacking PlantConstruction Project PDB, Dhaka.

I) Project ManagementFrom 18.08.97 to 19.09.97 2)International Curse onHydro Power From28.08.2000 to14.09.2000 3)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 To one Month 4) Approval of EngineeringData & Drawing from07.06.09 to 16.06.09 for 07days.

Sweden

Norway

Russia,

China

1)23.09.94 to 28.11.94 inIndia, 2) Inspection on Approvalof Engineering Data &Drawing June/09 for 07 daysin China. 3) Inspection on Coal FiredPower Station fromInspection on Coal FiredPower Station from 19.01.10to 26.01. 10 in China. 4) Factory Witness Test(Engineeing Inspection)against Faridpur 50MWPeaking Power PlantConstruction Project fromOctober/10 for 08 days inNorway. 5) “Factory Test Witness forBalance'' (For Balance ofPlant” in India andIndonesia & For EmergencyDiesel Generator inSingapore) againstGopalgonj 100MW andFaridpur 50 MW PeakingPower Plant ConstructionProject for 07 days in Indiaand Indonesia.

3 1-0396 31.07.54 Mr. Md. Abdul LatifKhan, Dhaka,B.Sc.Engg. (Civil)09.03.81 (AE) 06.08.86(SDE) 28.09.99(XEN) 19.12.10 (SE, Reve.) 08.02.11 (SE)

SE,

Chittagong & Khulna1300x2 MW CoalBased Power PlnatConstruction Project,PDB, Dhaka. (Freedomfighter)

1) 28.8.2001 for 12 days India

Page 2063: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2063

4 1-0569 09.04.59 Mr. ChowdhuryNuruzzamanBograB.Sc.Engg. (Civil.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN)

Director (Incharge),

Dte. of Design &Inspection -3,

PDB, Dhaka.

1) Engineering Data &Drawing Sanction From17.10.03 for 10 Days In China 2) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan from 28.07.10 to11.08.10 for 15 days in China.

3) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11. 4) Technical Orientationagainst Construction ofPower Plant on 16th Floor ofBiddyut Bhaban in July/2011for 07 days in China.

5 1-0581 05.12.60 Mr. Habibur RahmanNatoreB.Sc.Engg. (Civil.)09.10.84(AE) 28.04.94(SDE) 25.06.03(XEN)

Deputy Director(XEN), Dte. of Design &Inspection -3,

PDB, Dhaka.

1) Training on Hydro PowerDevelopmen from 19871988fro 10 Months

Norway 1) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari50MW Peaking PowerConstruction Project from09.08.10 to 18.08.10 for 10 for07 days in China.

6 1-0627 12.11.60 Mr. A.B.M. AnowarulAzim, Dinajpur,

B.Sc.Engr.(Civil.),

26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)

Asstt. CE (XEN) Distribution Project,PDB, Dhaka.

1)Hydro Power and theEnviournment From26.8.02to12.9.02

Norway 1)Training on 60 Nos.-11KVAuto Cerceuit Recloser (ACR)in South Korea in 2006 for07 Days.

On lien inCanada

7 1-0523 31.01.55 Mr. Krishna Kanta Roy, Kishoregonj

B.Sc.Engr.(Civil),

09.3.81(AE) 19.05.86(SDE) 11.04.04(XEN)

XEN, Shirajganj ElectricSupply, PDB,Shirajganj.

Page 2064: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2064

8 1-0682 05.07.59 Mr. Md. DelshadHossain Feni,

B.Sc.Engr.(Civil.),

30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN)

Deputy Director(XEN), Dte. Of Design &Inspection-3, PDB, Dhaka.

1) 14 Meter Steel Pole (450daN: 130 Nos. & 550 daN: 70Nos) "Proof Test" from22.04.08 to 28.04.08 for 07days.

China 1) Basic Design Reviewagainst Thohazari 100MWPower Station ConstructionProject from October/10 for07 days in China.

9 1-0742 01.09.63 Mr. Md. MahbuburRahaman, Shariatpur, B.Sc.Engr.(Civil.),

30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN)

Astt. CE (XEN),

Generation, BPDB,Dhaka.

1) Completed M.sc.Engineering (Hydro PowerDevelopment ) From 23.08.93 to 30.06.95 2)Traning On Planning &Design of PS Against 210MW. Siddhirgong from01.09.04 to 29.09.04 inRussia 3) Training on ContractAdministration from20.07.10 to 08.08.10 inJapan

Norway

Russia,

Japan

1) Finalization of conceptDesign of Haripur 360MWCCPP from 11.11.09 to28.11.09 in Newzealand. 2) To travel India for 05(five) days (excluding traveltime) to review ConceptualDrawing of FeasibilityReport in order to build2*660 MW Power Plant inKhulna. 3)In order to attend adiscussion meeting withPresident, M/s. ChinaHuadian Hongkong Co. Ltd.,China and to inspect Coalbased Power Station ofChina Huadian HongkongCo. Ltd., China from21/11/2011 to 25/11/2011 for5 (five) days (excludingtravel time) in China.

G.O. issueddated22.02.2012against theconvention on"InvestmentOppertunitiesinBangladeshiPower Sector"in India from26.02.2012 to01.03.2012.

10 1-0759 16.01.61 Mr. Md. Abul KalamAzad, Rangpur, B.Sc.Engr.(Civil.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

XEN

PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.

1) Hydro Electric PowerEngineering for Stable &Sustainable Supply , JicaJapan 04.06.06 to 12.07.06for 39 days

Japan. 1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China.

Page 2065: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2065

11 1-0790 02.01.62 Mr. Abdullah Noman,Comilla,B.Sc.Engr.(Civil.),

30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, CurrentCharge) 23.04.09 (XEN)

XEN,

Civil ConstructionDivision-1,PDB,Dhaka.

1) Basic EngineeringDrawing against Chandpur150MW Combined CyclePower Station ConstructionProject from 28.07.10 to11.08.10 for 15 days inChina.

12 1-0810 16.09.54 Mr. Md. Golam MostafaShekh, Bagherhat,B.Sc.Engr.(Civil.)08.02.87(AE) 21.11.99 (SDE) 17.09.09(XEN)

XEN, Civil Maintenance,Khulna Power Station

PDB, Khulna. (freedomfighter)

1)Training on PGD ON HPDSpecialist from 24.08.1989to 23.06.1990

2) Group Hydro ElectricPower Engineering forStable & SustainableSupply , Jica Japan 04.06.06to 12.07.06, 39 days

Norway

Japan

13 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, CurrentCharge) 23.04.09 (XEN)

XEN, Civil Works Division PDB,Chittagong.

1) Inspection (EmergencyDiesel Generator) againstGopalgonj 100MW PeakingPower Plant ConstructionProject November/10 for 07days in Singapore.

14 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN)

XEN, Engineering Academy

PDB, Kaptai.

1) Inspection on H.T.S WireFrom 10.10.02 to 14.10.02 inIndia 2) ''Pre-shipment inspection(Foreign) against ChittagongPC Pole Construction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) days inChina.

Page 2066: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2066

15 1-0955 20.10.65 Mr. S.M.A. Azim ,Chittagong,B.Sc.Engr.(Civil),04.12.91(AE) 12.07.02(SDE) 10.02.10 (Rev. XEN),

XEN

PC Pole ConstructionPlant PDB,Halishahar,Chittagong

1) Witnessing the test &Inspection of High tensilesteel (HTS) wire from23.02.10 to 01.03.10 for 07days in China. 2) ''Pre-shipment inspection(Foreign) against ChittagongPC Pole Construction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) days inChina.

16 1-0994 12.01.66 Mr. Md. Samsul Alam,Dhaka,B.Sc.Engr.(Civil.),19.07.94 (AE) 03-02-2003 (SDE) 24-08-09 (XEN, Incharge)

18-08-11 (XEN)

Dy. Director (XEN),

5-6 Unit, GhorasalPower Plant PDB,Palash,Narsingdhi.

1) Training on Gas TurbineAgainst Tongi 80MW From24.07.04 to 22.08.07 for OneMonth (Bond for 03 Years)

China From 09.05.99 to 15.05.99 InChina 2) 1) Pre-inspection (Factoryvisit at site) againstChittagong Power Station1No Unit (Turbine, Boiler,Electrical, I & C & Operation)from 13.09.10 to 20.09.10 for08 days in China.

17 1-0995 10.11.68 Mr. Md. Kamrul Islam, Noakhali, B.Sc.Engr.(Civil.),

19.07.94(AE) 03.02.03(SDE) 11.10.10 (XEN, Rev.) 18-08-11 (XEN)

XEN,

Gopalgonj 100MWPeaking Power PlantConstruction Project,PDB, Dhaka.

1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04for One Month

Russia, 1) Inspection on Alternatoragainst Gopalgonj 100MWPeaking Power PlantConstruction Project from10.02.11 to 16.02.11 for 07days in Germany. 2) “Factory Test Witness forBalance'' (For Balance ofPlant” in India andIndonesia & For EmergencyDiesel Generator inSingapore) againstGopalgonj 100MW andFaridpur 50 MW PeakingPower Plant ConstructionProject for 07 days in Indiaand Indonesia.

Page 2067: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2067

18 1-0999 18.12.66 Mr. Dewan Md. FazlulKarim, Gazipur,B.Sc.Engr.(Civil.),19.07.94(AE) 03-02-2003 (SDE) 24-08-09 (XEN, Incharge)

Dy. Director (XEN), Design andInspection -3

PDB,Dhaka

Generator (Electrical)against Karnaphuly HydroPower Plant (Unit-3)Rehabilitation Project for30 days

Italy 1) H T S (High Tensile SteelWire) from 06.09.06 to 15.09.06 for10 days in India. 2) Chandpur 150MWCombined Cycle PowerStation Construction Project,a Training Program named"Detailed Design ReviewMeeting" from 20.01.11 to31.01.11 for 12(Twelve) daysin China.

G.O. Issued dt.17.09.09 onGenerator(Electrical)againstKarnaphulyHydro PowerPlant (Unit-3)Rehabilitation Project for 30days in Italy

19 1-01192 01.01.67 Mr. A.T.M. Abduzzaher, Comilla, B.Sc.Engr.(Civil.),

19.03.98(AE) 27.04.04(SDE). 06.05.10 (XEN, Incharge)

Plant Engineer(XEN)(Incharge)Karnaphuly HydroPower Plant PDB, Kaptai,Rangamati.

1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.

20 1-01282 31.12.74 Miss Khaleda YasribaLima, Jhenaidah, B.Sc.Engr.(Civil.),

24.06.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge)

XEN(Incharge), office of the CE,Distribution northernzone, pdb, Rajshahi.

1) Training for TechnicalKnow-how & TechnologyTransfer from 29.06.06 to06.06.06 in India.

postedagainst vacantpost

21 1-01369 20.06.74 Mr. Haradhan ChandraDatta, Comilla, B.Sc.Engr.(Civil.),

05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge)

XEN(Incharge), Civil Chittagong powerstation, PDB, Chittagong.

1) Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKoria.

Page 2068: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2068

22 1-01373 23.08.72 Mr. MohammadShafiqul Islam, Chittagong, B.Sc.Engr.(Civil.),

05.03.2000 (AE) 25.06.09(SDE) 21.12.11(XEN Incharge)

Dy. Director,XEN(Incharge), Directorate of Design& Inspection-3 PDB, Dhaka.

1) International TrainingProgramme on Solar EnergyTechnologies andApplications from14/11/2011 to 03/12/2011for 3 (three) weeks(excluding travel time)

India. 1) 2002 in India 2)Training on 11 Meter SteelPole (350 daN-500 Nos.) from07 days March/08 in China 2) “Technical Orientationand Quality Test Witness of11KV PT ” from January/10 for05 days in China. 3) Solar Power Plant "TestWitness" from October/10for 07 days in China. 4) Travel India inSept./2011for 05 (five) days(excluding travel time) toreview Conceptual Drawingof Feasibility Report inorder to build 2*660 MWPower Plant in Khulna.

23 1-01448 01.01.70 Mr. Hirendra ChandraPaul , Shunamgong, B.Sc.Engr.(Civil.),

05.03.2000(AE) 08.12.09(SDE)

SDE, Civil ConstructionDivision-1 PDB, Dhaka.

Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject for 08(Eight) days inChina.

24 1-01529 16.12.74 Mr. Noore AlamSiddique, Pabna, B.Sc.Engr.(Civil.),

29.04.2001(AE)

SDE, Design andInspection-3 PDB, Dhaka.

Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07(Seven) daysin China.

25 1-01556 01.06.55 Mr. Hazrat Ali Mia, Tangail, Diploma(Civil.),

31.12.77(SAE),

01.09.02(AE), 28.01.10 (SDE, reve.)

SDE, Distribution Division,PDB, Tangail.

Page 2069: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2069

26 1-01588 04.01.57 Mr. S M Nazrul Islam Barisal Diploma(Civil),

21.08.78(SAE),

27.03.03(AE), 10.02.10(SDE)

SDE, Bhola Diesel PowerStation PDB, Bhola.

27 1-01599 11.04.58 Mr. Md. Azizul Haque Noyakhali Diploma(Civil),

21.08.78(SAE),

20.11.03(AE), 10.02.10(SDE)

SDE, Zonal CivilConstruction Division

PDB, Chittagong.

1) Basic Design Reviewagainst Dohazari 100MWPower Station ConstructionProject from October/10 for07 days in China.

28 1-01425 01.01.75 Mrs. Monalisa Akter, Pabna, B.Sc.Engr.(Civil.),

12.03.2000(AE) 25.06.09(SDE)

SDE, Faridpur 50 MWPeaking PowerStation ConstructionProject, Dhaka.

Improved Maintenance ofThermal Power Plants.Fro17.03.2003 to 21.03.2003

Malaysia, 1) Inspection againstFaridpur 50MW PeakingPower Plant ConstructionProject for 07 days inIndonesia. 2) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11.

Page 2070: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2070

29 1-01433 20.10.69 Mr. Ajit Kumer Mondol, Jessore, B.Sc.Engr.(Civil.),

12.03.2000(AE) 25.06.09(SDE

SDE, Unit-2, Khulna PowerStation, PDB, Khulna.

1) G.O. Issueddt. 12.05.11 onSupplying of6mm dia 1000Quintal, 7mmdia 1000Quintal, 8mmdia 600Quintal &9mm Dia 1400Quintal HighTensileSteel(HTS)Wire, ''Pre-shipmentinspection(Foreign)”againstChittagong PCPoleConstructionPlant, BPDB,Halishahar,Chittagongfrom for 10 (Ten)working daysfrom the dateof actualjourney inChina.

30 11-0075 01.10.56 Mr. Md. Nur Alam Dinajpur Diploma(Civil )

21.08.78(SAE),

06.04.06 (AE) 18.08.2011 (SDE)

SDE, Sales andDistribution Division-2, PDB, Dinajpur.

Page 2071: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2071

31 11-0100 10.03.58 Mr.Fazlul HoqueMollah Comilla Diploma(Civil)

15.05.79 (SAE),

06.04.06 (AE) 18.08.2011 (SDE)

SDE, Sylhet 150 MW CCPPProject,Kumargaon,PDB,Sylhet.

1) ''Factory Training"against Sylhet 150 MWCombined Cycle PowerPlant Construction Project,BPDB from 10.07.2011 to09.08.2011 for 30 (thirty)days (Excluding traveltime). (Bond For 5 years)

China 1) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan 28.07.10 to11.08.10 for 15 days in China

32 11-0114 01.01.58 Mr. Md. Fazlur RahmanKhan Sherpur Diploma(Civil )

28.05.79(SAE),

06.04.06 (AE) 18.08.2011 (SDE)

SDE, Office of the CE, CivilWorks PDB, Dhaka.

1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.

33 1-01678 17.11.77 Mr.Shah KhalidMahmud Chowdhury Noagaon B.Sc.Eng(Civil) 06.2006(AE) 18.08.2011 (SDE)

SDE, Sales & DistributionDivision-2, PDB,Rajshahi

1) Technical Orientation andQuality Witness aganistCentral Zone PowerDistribution Project atApril/2011 for 07 days inChina.

34 1-01687 01.01.75 Mr. Md .Monjurul Alam Sirajgong B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)

SDE Deputed to CE Office,Civil works for nextreplacement.

1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.

35 1-01692 01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)

SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.

1) ''Managing Fuel forReliable Power Generation''from 13.12.10 to 15.12.10 inIndia. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07(Seven) daysin China.

Page 2072: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2072

36 1-01694 23.01.76 Mr.M.Arifur RahmanKhan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE)

SDE Deputed to ChiefEngineer office, Civilworks PDB,Dhaka for nextreplacement

1) International TrainingProgramme on Solar EnergyTechnologies andApplications from 14-11-2011 to 03-12-2011 for 03(three) weeks

India 1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China.

37 1-01726 01.01.79 Mr. Joshim Ahamed Netrokona B.Sc.Eng(Civil) 07.04.06 (AE) 27.12.2011(SDE)

SDE, Civil ConstructionDivision-1, PDB, Dhaka

1) "Work Shop Test" forDohazari 100MW PeakingPower Plant ConstructionProject from January/11 for07(Seven) days in China.

38 11-0074 04.08.56 Mr. Md. Abdul LatifSiddiqui Tangail Diploma(Civil )

21.08.78(SAE),

06.04.06(AE),

AE, Distribution Division PDB, Tangail.

39 11-0170 01.10.55 Mr. Sams Uddin Jamalpur, Diploma(Civil),

06.06.79(SAE),

23.04.09(AE)

AE, Central ZoneDistribution Project Division-1, PDB,Mymensing.

40 11-0260 06.03.55 Mr. Md. Golam Rabbani

Bogra, Diploma (Civil)

07.08.80(SAE),

17.09.09(AE)

AE, Chittagong PowerStation PDB, Chittagong.

1) Pre-inspection (Factoryvisit at site) againstChittagong Power Station1No Unit (Turbine, Boiler,Electrical, I & C & Operation)from 13.09.10 to 20.09.10 for08 days in China.

41 11-0261 11.08.59 Mr. Md. Zillur RahmanTalukder Bogra, Diploma (Civil)

07.08.80(SAE),

17.09.09(AE)

AE, Santahar E/S PDB, Bagura.

Page 2073: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2073

42 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)

23.10.80(SAE),

17.09.09(AE)

AE, Engineering Academy

PDB, Kaptai.

43 1-01763 01.11.83 Mr. Md. Hasan Zaman Bogra, B.Sc.Engr(Civil) 31.05.09 (AE)

AE Shantahar 50 MW &Katakhali 50 MWPeaking Power PlantConstruction Project,BPDB, Rajshahi.

G.O. issueddated06.02.2012againstSantahar 50MW andKatakhali 50MW PeakingPower PlantConstructionProject inorder toinspect Step-upTransformerfor 7 days(excludingtravel time)from the dateof actualjourney inChina.

44 11-0288 01.07.57 Mr. Mir Md.Quasem, Cox'bazar Diploma(Civil) 24.07.81(SAE) 22.04.10(AE)

AE, Zonal CivilConstruction Division PDB, Chittagong.

45 11-0294 31.03.56 Mr. Kazi Nazrul Islam, Narsingdhi Diploma(Civil) 12.09.81(SAE) 22.04.10(AE)

AE, Ghorasal PowerStation PDB, Palash,Narsingdhi.

Page 2074: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2074

46 11-0335 01.01.61 Mr.Md. Abul Bashar Sirajgonj, B.Sc.Eng(Civil) 13.08.82 (SAE) 22.04.10(AE)

AE 10-town E/S systemDevelopment Project,PDB, Bagura.

47 11-0349 10.02.59 Mr.Md. Abdul Munaf Comilla. Diploma(Civil) 03.08.82 (SAE) 22.04.10(AE)

AE, Sales & DistributionDivision-2 PDB, Comilla.

48 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE)

AE, Civil Construction-2 PDB,Dhaka.

49 11-0360 25.10.56 Mr. Md. Rafiqual Islam Sirajgonj Diploma(Civil) 09.08.82 (SAE) 22.04.10 (AE)

AE, 210 M. W. SiddirgonjPower Station PDB, Narayangonj.

50 11-0374 24.07.55 Mr. Md. Shahjahan Ali,

Chapainababgonj

Diploma(Civil),

23.08.82(SAE), 22.04.10(AE),

AE, Distribution Division

PDB, Rangpur.

51 11-0375 01.01.59 Mr. Md. Abdur Rab,

Comilla

Diploma(Civil),

10.09.82(SAE), 22.04.10(AE),

AE, Hathazari 100MWPower StationConstruction Project PDB,Chittagong

1) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina.

52 1-01868 25.11.85 Engineering Academy AE, Civil ConstructionDivision-1, PDB, Dhaka

Page 2075: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2075

53 - - PDB, Kaptai. AE, PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.

54 - - Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536

[email protected]

AE, Design & Inspection-3, PDB, Dhaka

List of Architect

SL.NO. ID No. Date of Birth Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2076: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2076

1 1-01803 18.06.84 Mr. ShamarukhMoutushi Dhaka. B.Sc.Engr(Architect) 31.05.09 (AE)

AE, Dte. Of Design &Inspection-3 PDB, Dhaka.

PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11.

2 1-01863 10.09.80 Mrs. Anina Ferdouslinda Mymensingh B.Sc. Engg. (Archi.) 04.11.10 (AE) 01675639727

[email protected]

AE Office of CE civilworks, PDB, Dhaka.

3 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 01818607385

[email protected]

AE Design & Inspection-3, PDB, Dhaka.

4 - - Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]

AE, Civil ConstructionDivision-1, PDB, Dhaka

Page 2077: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2077

P&D 2003 04.05.10

Page 2078: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2078

Dhaka P G 2004 13.01.11

P&D 2001 30.12.10

Page 2079: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2079

P&D 2003 02.06.10

P&D

2002 24.02.08

B-Baria D 01.01.10

Page 2080: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2080

P&D

Siddirgonj G 2004 05.06.10

P&D 13.11.08

Page 2081: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2081

P&D 17.09.09

Khulna G 1990 03.08.10

P&D 22.06.10

P&D 2002 08.02.11

Page 2082: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2082

P&D 10.02.10

Ghorasal G 1999 14.03.10

Faridpur G 2004 22.04.10

Page 2083: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2083

P&D 11.10.10

Kaptai G 06.05.10

Rajshahi D

P&D 10.02.10

Page 2084: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2084

P&D 2002 10.02.10

P&D 16.07.09

F 15.05.08

P&D Diploma 28.01.10

Page 2085: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2085

Barisal G Diploma 10.02.10

P&D Diploma 02.06.10

Project G 25.06.09

Page 2086: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2086

Khulna G 01.01.10

Dinajpur D 02.06.10

Page 2087: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2087

Sylhet P G 02.06.10

P&D 16.01.08

Rajshahi D 18.03.08

P&D 16.06.10

P&D 20.12.10

Page 2088: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2088

P&D 10.11.08

P&D 13.11.08

Tangail D 02.06.10

Mymensingh

D

Chittagong G

Noagoan D

Page 2089: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2089

M.Am

D 02.06.10

Ghorasal D 02.06.10

Page 2090: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2090

P&D 02.06.10

Comilla D 02.06.10

P&D 02.06.10

Siddirgonj G 02.06.10

Rangpur D 02.06.10

G 02.06.10

Page 2091: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2091

Page 2092: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2092

P&D 02.06.10

Page 2093: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2093

Page 2094: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2094

Page 2095: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2095

Page 2096: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2096

Page 2097: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2097

Page 2098: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2098

Page 2099: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2099

Page 2100: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2100

Page 2101: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2101

Page 2102: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2102

Page 2103: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2103

Page 2104: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2104

Page 2105: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2105

Page 2106: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2106

Page 2107: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2107

Page 2108: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2108

Page 2109: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2109

Page 2110: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2110

Page 2111: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2111

Page 2112: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2112

Page 2113: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2113

Page 2114: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2114

Page 2115: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2115

Page 2116: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2116

Page 2117: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2117

Page 2118: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2118

Page 2119: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2119

Page 2120: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2120

Page 2121: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2121

Page 2122: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2122

Page 2123: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2123

Page 2124: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2124

Page 2125: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2125

Page 2126: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2126

Page 2127: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2127

Page 2128: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2128

Page 2129: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2129

Page 2130: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2130

Page 2131: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2131

Page 2132: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2132

Page 2133: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2133

Page 2134: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2134

Page 2135: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2135

Page 2136: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2136

Page 2137: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2137

Page 2138: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2138

Page 2139: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2139

Page 2140: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2140

Page 2141: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2141

Page 2142: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2142

Page 2143: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2143

Page 2144: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2144

Page 2145: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2145

Page 2146: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2146

Page 2147: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2147

Page 2148: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2148

Page 2149: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2149

Page 2150: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2150

Page 2151: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2151

Page 2152: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2152

Page 2153: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2153

Page 2154: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2154

Page 2155: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2155

Page 2156: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2156

Page 2157: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2157

Page 2158: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2158

Page 2159: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2159

Page 2160: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2160

Page 2161: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2161

Page 2162: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2162

Page 2163: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2163

Page 2164: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2164

Page 2165: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2165

Page 2166: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2166

Page 2167: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2167

Page 2168: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2168

Page 2169: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2169

Page 2170: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2170

Page 2171: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2171

Page 2172: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2172

Page 2173: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2173

Page 2174: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2174

Page 2175: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2175

Page 2176: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2176

Page 2177: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2177

Page 2178: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2178

Page 2179: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2179

Page 2180: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2180

Page 2181: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2181

Page 2182: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2182

Page 2183: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2183

Page 2184: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2184

Page 2185: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2185

Page 2186: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2186

Page 2187: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2187

Page 2188: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2188

Page 2189: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2189

Page 2190: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2190

Page 2191: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2191

Page 2192: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2192

Page 2193: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2193

Page 2194: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2194

Page 2195: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2195

Page 2196: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2196

Page 2197: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2197

Page 2198: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2198

Page 2199: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2199

Page 2200: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2200

Page 2201: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2201

Page 2202: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2202

Page 2203: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2203

Page 2204: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2204

Page 2205: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2205

Page 2206: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2206

Page 2207: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2207

Page 2208: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2208

Page 2209: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2209

Page 2210: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2210

Page 2211: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2211

Page 2212: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2212

Page 2213: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2213

Page 2214: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2214

Page 2215: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2215

Page 2216: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2216

Page 2217: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2217

Page 2218: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2218

Page 2219: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2219

Page 2220: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2220

Page 2221: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2221

Page 2222: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2222

Page 2223: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2223

Page 2224: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2224

Page 2225: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2225

Page 2226: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2226

Page 2227: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2227

Page 2228: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2228

Page 2229: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2229

Page 2230: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2230

Page 2231: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2231

Page 2232: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2232

Page 2233: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2233

Page 2234: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2234

Page 2235: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2235

Page 2236: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2236

Page 2237: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2237

Page 2238: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2238

Page 2239: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2239

Page 2240: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2240

Page 2241: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2241

Page 2242: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2242

Page 2243: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2243

Page 2244: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2244

Page 2245: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2245

Page 2246: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2246

Page 2247: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2247

Page 2248: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2248

Page 2249: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2249

Page 2250: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2250

Page 2251: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2251

Page 2252: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2252

Page 2253: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2253

Page 2254: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2254

Page 2255: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2255

Page 2256: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2256

Page 2257: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2257

Page 2258: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2258

Page 2259: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2259

Page 2260: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2260

Page 2261: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2261

Page 2262: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2262

Page 2263: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2263

Page 2264: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2264

Page 2265: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2265

Page 2266: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2266

Page 2267: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2267

Page 2268: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2268

Page 2269: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2269

Page 2270: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2270

Page 2271: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2271

Page 2272: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2272

Page 2273: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2273

Page 2274: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2274

Page 2275: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2275

Page 2276: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2276

Page 2277: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2277

Page 2278: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2278

Page 2279: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2279

Page 2280: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2280

Page 2281: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2281

Page 2282: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2282

Page 2283: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2283

Page 2284: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2284

Page 2285: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2285

Page 2286: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2286

Page 2287: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2287

Page 2288: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2288

Page 2289: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2289

Page 2290: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2290

Page 2291: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2291

Page 2292: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2292

Page 2293: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2293

Page 2294: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2294

Page 2295: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2295

Page 2296: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2296

Page 2297: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2297

Page 2298: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2298

Page 2299: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2299

Page 2300: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2300

Page 2301: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2301

Page 2302: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2302

Page 2303: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2303

Page 2304: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2304

Page 2305: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2305

Page 2306: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2306

Page 2307: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2307

Page 2308: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2308

Page 2309: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2309

Page 2310: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2310

Page 2311: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2311

Page 2312: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2312

Page 2313: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2313

Page 2314: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2314

Page 2315: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2315

Page 2316: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2316

Page 2317: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2317

Page 2318: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2318

Page 2319: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2319

Page 2320: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2320

Page 2321: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2321

Page 2322: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2322

Page 2323: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2323

Page 2324: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2324

Page 2325: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2325

Page 2326: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2326

Page 2327: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2327

Page 2328: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2328

Page 2329: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2329

Page 2330: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2330

Page 2331: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2331

Page 2332: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2332

Page 2333: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2333

Diploma

Page 2334: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Page 2334

Diploma

Diploma

Page 2335: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

LPR2 11-0076 01.06.56 Mr. Md. Abul Hasam

Feni Diploma(Mech. )

21.08.78 (SAE), 06.12.06 (AE) 18.08.2011 (SDE) 02.03.14 (XEN, Incharge)

DD (Incharge), RTC PDB, Chittagong

Chittagong

1 1-0426 09.07.56 Mr. Kajal Kanti Chowdhury,

Chittagong,

B.Sc. Engg. (Mech.)

24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 05-10-11 (SE)

Addl. CE (Incharge) Services, PDB, Dhaka.

1) Operation & Maintenanceof Turbine. 20.11.88 to19.07.89 2) Training Gater 1132/33KVSub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear,33/11KV Sub-station &Control Panel & ProtectionEquipment AgainstChittagong PowerDistribution Project ''Design& Maintenance of 33/33KVSub-Station'' 10.07.07 to24.08.07 for 42 days.

Germany

China

1) from 07.3.2000 for 10 days India 2) on Engine & Generator TestWitness against Thohazari 100MWPower Station Construction Project PDB, Chittagong from November/10for 10 days in Italy & Finland. 3) Factrory acceptance test from05.08.14 to 14.08.14 in Singapore.

A proposalsent toministrydated05.05.15 forfactory testwitnessagainstShahjibazar330 MW CCPPProject from27.05.15 to02.06.15 inSpain.

1 1-0347 22.06.56 Mr. Mustak Ahmed,Bagerhat,B.Sc.Engg. (Elec.)18.03.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 03-08-10 (SE) 28.06.12 (Addl. CE, Incharge) 30.06.14 (CE) .05.2015 (Member)

Member Generation, PDB, Dhaka

1) A Program named " RenewableEnergy Korea 2011" organized byKOTRA, Dhaka from 19.10.2011 to22.10.2011 in South Korea. 2) "Technical Orientation & QualityTest Witness" on Portable MeterTesting Set from 25.05.13 to 31.05.13in Bulgeria. 3) Quarterly Reconciliation(October/13 to December/13) from18.03.14 to 21.03.14 in India.

Page 2336: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0320 18.07.56 Mr. Md. Shahinul IslamKhan, Gazipur,

B.Sc.Engg. (Elec.)

28.06.79 (AE) 19.01.96 (XEN) 08.04.09 (SE) 31-07-12 (Addl. CE) 31.03.14 (CE) 12.06.2014 (Member) 01.01.2015(Chairman)

Chairman, PDB, Dhaka.

1) Electric Power Distributionsystem Management from26.08.96 to 02.11.96 2) "Renewable Energy" from01.06.13 to 30.06.13

Japan

Thailand

1) Inspection and Factory testwitness from 25.07.96 to 02.11.96, 11days In Czech Republic 2) Factory test witness of 33KV 1250Amps Vacuum Circuit Breaker From10.11.03 to 16.11.03, 07 Days in India 3)Training for Technical know-howand Tecnology Transfer aginst HighVacuum Insulating Oil Purifier (2000)Litre/hr Centrifusing Machine)-05Sets. From 20.01.07 to 27.01.07 for 07days in China See. N.B.

1) Aproposalsent toministrydated07.06.15 forwitnessingofmanufacturing processagainstRangpur P/Sfrom25.06.15 to01.07.15 inNetherlands. 2) Aproposalsent toministrydated22.03.15 forwitnessingofmanufacturing processagainstBarishal GTP/S from16.04.15 to22.04.15 inFrance. 3) Aproposalsent toministrydated02.06.15 forInspectionof Power,Oil, Gas &Petro-ChemicalHub &Infrastructure at JurongIsland,Singaporefrom02.07.15 to06.07.15 inSingapore.

N.B. 4) Supply for 11KV Capacitor Bank aganist "Technical Orientation and Quality Test Witness" in April/2011 for 01(One) Week in Turkey & USA. 5) Witnessing of Supply, Installation, Testing & Commissioning of Excitation System against Shiddirganj P/S from 07.12.2014 to 16.12.14 Russia. 6) witnessing of manufacturing process against Bheramara Power Plant from 24.12.2014 for 07 days in USA. 7) Participate in meeting and inspection of Ultra Supercritical Coal Based Power Plant from 21.01.15 to 22.01.15 in China. 8) Seminar on Regional Power Pool Stablishment from 24.01.15 to 26.01.15 in SriLanka

2 1-0916 25.02.56 Mr. Shah Alam,Dhaka,B.Sc.Engr.(Mech.),08.2.87(AE) 13.12.2000 (SDE) 10.02.10 (XEN)

Deputy Director (XEN) Training, PDB, Dhaka.

Pre-Shipment of Transformer From13.09.01 to 24.09.01 in China

Page 2337: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0639 23.03.56 Mr. A.J.M. Lutfe Rabbani,

Pirojpur, B.Sc.Engr.(Elec.),

12.08.85(AE) 17.06.95(SDE) 11.04.04(XEN) 01755582480 [email protected]

Director (Incharge) Electrical Equipment PDB,Dhaka.

i)132Kv and 33KV ControlSignalling and RelayPannel(RRAGS) from 08.10.03to 08.01.04

ii) Training AutomationSystem from 22.10.07 to11.11.07 for (Weeks)

China,

Russia

1)Inspection from 05.09.99 for 07 daysin India. 2)Inspection from 24.4.02 to 3.5.02 inIndia 3) Factory Acceptance Test andTransfer of Technical Know-how ofExcitation System from 13.10.07 to19.10.07, 07 days in India & Germany .

4) "Factory Acceptance Test ofMetering System of 52.2 MW PowerGeneration Facility Rajshahi " on14.10.2013 in India. 5) Technical orientation & Qualitytest witness of 11 KV switchgearCubicles Set from 21.07.14 to 27.07.14in China.

Page 2338: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0588 03.05.56 Mr. Md. Shafique Uddin,

Dhaka, B.Sc.Engr(Mech.), 09.10.84 (AE) 28.04.94(SDE) 30.10.03(XEN) 01.10.14 (SE)

Director (SE), Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .

1)132KV SF6 CircuitBreaker(Live Tank) UnderRRAGS Project,From 04.3.01 to 19.05.01 2) 71MW Gas Turbine PowerStation Against RetrofittingOn-Line Machinery &Management SystemSoftware. From 18.06.07 to23.06.07, 06 (Six Days). 3) "Renewable Energy" from01.06.13 to 30.06.13

China

AbuDhabi

Thailand

1) "Technical Orientation & QualityTest Witness" from 10.11.09 to17.11.09 in China. 2) "Technical Orientation and QualityTest Witness" in order to purchase2000 Nos. 11/0.11KV P.T from25.01.2012 to 31.01.2012 for 7 days(excluding travel time) in China. 3) A workship program "Renewableenergy resource Assesment &Geospatial Analysis" from 04.04.13 to05.04.13 in Thailand. 4) International Solar Energy Expo &Conference from 15.09.14 to 20.09.14in South Korea. 5) Participation in the Seventhmeeting of the Asia Solar Energyfrom 16.10.14 to 17.10.14 in SouthKorea. 6) Participation in the Fifth Sessionof the IRENA Assembly from 17.01.15to 18.01.15 in UAE.

A proposalsent toministrydated18.03.15 forattendingan Event"ClimateChangeProjectPlaza" from08.04.15 to11.04.15 inSouth Korea

A proposalsent toministrydated13.07.14for FactoryAcceptance Test ondesign,supply &installation of 400KW SolarPhotovoltaic Powerplant from15.07.2014for 7 daysin India.

Page 2339: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

21 1-0481 02.02.56 Mr. Khandaker Iftaker Uddin

DhakaB.Sc.Engg. (Mech.)11.01.82 (AE) 17.03.87(SDE) 26.10.02(XEN) 31.07.12 (SE) 0172-9092626

PD (SE), Conversion of 2x35 MWShahjibazar GT PowerPlant to 105 MW CCPPConstruction Project & CE (Additional Charge) Power PlantConstruction, PDB,Dhaka.

1) Tranining on Transformeroperation and maintenance.09.08.94 to 17.09.94

Belgium 1) Inspection in 1994 10 Days inIndia, 2) Inspection from 18.01.98 to 30.01.9813 Days In Italy & Grice 3) Inspection from 05.10.02 to 10.10.02Indonesia. 4) Engineering Data & DrawingSelection from 22.10.03 to 01.11.03 10Days In China 5) Gas Booster Compressor Programnamed "Factory Witness Test"Against Sylhet 150 MW CombinedCycle Power Plant Constructionproject from 10.05.2011 to 20.05.2011for 10 (ten) days (excluding traveltime ) in USA.

A proposalgoes toministrydated08.04.14named"Steamturbinegeneratortest witnessand generalinspectionof steamturbine"againstBhola PPCPfrom13.05.14 to19.05.14 for 7days inChina.

1 1-0120 27.07.52 Mr. A.S.M. Alamgir Kabir

Faridpur

B.Sc.Engg. (Elec.)

10.01.76(AE) 18.06.85 (XEN) 07.10.2002(SE) 05.04.06(CE Addl. CE) 05.12.06 (CE) 05.011.07 MemberDistribution (Incharge) 12.11.07 (MemberDistribution ) 06.04.09(Chairman Addt.Charge) 22.04.09 (Chairman,Incharge) 22.06.09 (Chairman) 19-07-09 (Chairman,Contract) 26-07-10 (Chairman,Contract) 26.07.11 (Chairman,Contract)

Chairman

PDB, Dhaka.

i)Greater Dhaka Power Dist.Project From 05.11.79 to20.2.80

ii)Electricity Tariff From 6.6.92to 10.12.92

iii) Training on ''Publicprivate partnership stratigiesfor 12 days, August/07"

UK

Japan

USA

i) Inspection for 06 days, June/08 inIndia. ii) GTZ & Kfw 05.07.09 to 12.07.09 inU.K & Germany. iii) 3rd Japan-SAARC EnergySymposium on "Promoting EnergyCooperation in South Asia" from06.01.10 to 14.01.10 in India. iiv) NTPC from 28.08.10 to 29.08.10 inIndia. v) Visit to India from 21.12.10 to24.12.10 vi) Visit to USA from 12.10.10 to24.10.10 vii) Visit to Japan from 01.12.10 to07.12.10 viii) Visit to USA from 15.07.11 to29.07.11 iX) * See N.B.

1) A proposalgoes toministry on07.03.2012 toattend ameetingwithdifferentcompaniesof PowerSector from26.03.2012 to31.03.2012 inUK. (G.O. notyet issued)

Page 2340: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

iX) N.B. *Meetings-1) "SAARC Chief Commissioner's Meeting from 17.11.09 to 22.11.09 in India. 2) Meeting of SASEC Energy Working Group organized by ADB from 21/10/2011 to 22/10/2011 for 2 (two) days in Thailand. 3) Meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 4) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 5) Meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. 6) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 7) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. * Road Show- 1) Road Show from 13.12.09 to 18.12.09 for 06 days in UK. 2)Road Show to attract the foreign investors from 24.01.10 to 03.02.10 in Singapore & USA * Seminar/Conference-1) 6th Annual Conference FLNG 2011 from 14.06.11 to 16.06.11 in U.K 2) Investor Seminar on "Joint Steering Committee(JSC)" for 4 days in India from 28.02.2012 to 2.3.2012 * Workshop- 1) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA.

1 1-0241 10.11.54 Mr. Md. Abul Quasem,

Dinajpur,

B.Sc.Engg. (Elec.)

23.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 14.08.11 (member, currentcharge) 25.01.12 (member, contactbasis)

Member Company Affairs PDB, Dhaka.

1)Analysis and Protection ofPower System from 31.03.2003to 09.05.2003

England 1) Factory Test Witness of 11 KV.Capacitor Bank & Accessories From07.04.04 To 11.04.04 in India. 2)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina 3) Training Rehabilitation of GT #8of Shahijibazar Power Station from29.11.07 to 05.12.07 for 07 Days, AbuDhabi 4) See N.B.

1) Aproposalsent toministrydated21.11.2012againstShirajganj150 MWPeakingPower PlantConstructionProject from29.11.12 orfrom thedate ofactualjourney inChina. 2) Aproposalsent toministrydated06.02.13againstGhorasal108 MWPower Plantfor testwitness ofmeteringsystem from18.03.13 to22.03.13 inUSA.

Page 2341: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

* N.B.- 4)Inspection on Power Plant arrange by Khulna Power Company & Summit Power Company from 10.06.10 to 12.06.10 in Italy 5) Participation in Combined Working Commette Group for 22.06.10 in India. 6) NTPC from 28.08.10 to 29.08.10 in India. 7) Zij R¡vjvbxwfwËK we`yy¨r †K›`ªmg~‡n R¡vjvbx mieivn wbiew”Qbœ I wbwe©Nœ ivLvi j‡¶¨ fviZ †_‡K †jv‡Kv‡gvwUf I U¨vsK IqvMY fvov/jxR MÖnY cÖm‡½ AvMvgx †g, 2011gv‡mi wØZxq mßv‡n A_ev hvÎvïiæi ZvwiL n‡Z 07 (mvZ) w`‡bi Rb¨ fviZ| 8) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excluding travel time) in South Korea. 9) Travel India from 25.09.2011 to 29.09.2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plant

in Khulna. 10) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 11) Seminar on "Joint Working Group (JWG)" for 4 days in India from 26.02.2012 to 29.2.2012 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 14) A meeting with NTPC from 23.08.2012 to 26.08.2012 in India. 15) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia.1 Mr.Muhammad Humayan

Kabir Khan Member (Admin) 1) U½x 80†gtIt M¨vmUvievBb we`¨r

†K‡›`ªi Avg`vwbZe¨ Spare Parts forHot Gas path Inspection (HGPI) forLot-A (Capital Spares) Witnessing ofmanufacturing process & test of theequipment at manufacturer's worksincluding transfer of technical know-how 10.02.11 to 18.02.11 in USA &Netherlands. *See N.B.

A proposalsent toministrydated19.05.2013on technicalorientationand qualitytest witnessof 11 KVlightingarresterfrom30.05.13 to05.06.13 inChina.*N.B. 2) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding

travel time) to attend Coaltrans Conference in India. 3) Inspection on 1 (one) set of DLNI Cap & Liner against Tongi 80 MW Power Station from 26.12.12 to 04.01.13 in USA. 4) Technical orientation and quality test witness from 18.05.13 to 23.05.13 in USA.

Page 2342: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0233 23.08.54 Mr. Md. Abdul Wahab Khan,

Mymensingh,

B.Sc.Engg. (Mech.)

01.03.78 (AE) 02.07.90 (XEN) 13.08.05 (SE) 19.05.09(Addl. CE) 22.05.10 (CE) 31-03-11 (Member) 2.08.12 (Chairman, currentcharge)

Chairman (Currentcharge ) PDB, Dhaka.

1) Design, Specification andEquipment Maintenancefrom 01.01.87 to 31.08.87 2)Training on TQM from23.01.05 to 19.02.05 3) A training program "ResultBased ManagementImplementation andPerformance Indicators" from22.09.2012 to 04.10.2012.

U.K.

Japan

Canada

1)Pre-Shipment Inspection Of GasFired Boiler For Aricha PC Pole From22.10.2001 to 8 days In U.K. 2) International Convention onQuality Control Circles (ICQCC) underImplementation of BangladeshPower Sector Reform from 23.10.07 to27.10.07 for 05 days in China. 3) Inspection against Plant/Factory in"Midland Power Co. Ltd" from25.06.2012 to 02.07.2012 in Norway. * See N.B.

* N.B.- 4) SASEC meeting on proposed transmission utility forum (TUF) and sub-regional power generation and transmission master plan from 16-17 Oct/2012 in Srilanka. 5) A program named "2nd Indonesia Coal Investment Forum" in Indonesia from 4.11.12 to 8.11.12. 6) To attend a conference titled "Bangladesh Investment Summit" on 04.12.12 in Singapore. 7) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 8) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 9) Coal conference with coal trader / producer / terminal operator in Indonesia & Australia from 03.06.13 to 09.06.13. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India.

4 1-01513 01.01.54 Mr. Abu Shahid Molla, Faridpur, Diploma(Power),

20.12.77(SAE), 18.06.2000(AE), 08.12.09(SDE)

XEN (Addl. Charge) Dte. Of ElectricalEquipment PDB,Dhaka.

Jamalpur

1 1-0335 24.01.54 Mr. Korban Ali,Kushtia,B.Sc.Engg. (Civil)22.11.79 (AE) 04.02.86(SDE) 04.02.98(XEN) 08.04.09 (SE, rev.) 11.08.09 (SE)

Addl. CE , Civil Works, PDB, Dhaka.

(freedomfighter)

1) Training on Span-type P.C.Pole Manufacturing Plantfrom 22.12.85 to 21.03.86

China 1) Tower Test from 30.05.2000 for 07days China 2) Steel Structure Design SanctionFrom 07.03.03 for 10 Days In China 3) Conceptual Design Approval Sylhet90MW CCPP (2nd Unit) for 10 days inChina,2005. 4) Power Station Design Meetting,1997 for 07 days i * See N.B.

*N.B. 5) Approval of "Construction Drawings" aganist Sylhet 150MW Combined Cycle Power Plant Construction Project for 08(Eight) days in China. 6)Travel India in Sep./2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plant in Khulna.

Page 2343: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0537 02.02.55 Mr. Motahar RahmanChowdhury NaogaonB.Sc.Engg. (Elec.)18.3.82(AE) 01.02.92(SDE) 17.05.03(XEN)

Director Dte. of Training andCareer Development,PDB, Dhaka. & PD (Addl. Charge) Training AcademyComplex, PDB,Keraniganj.

1. Training

2. A training titled "SCADACommunication System"against Greater ChittagongElectricity DistributionProject, SCADA rehabilitation,PDB, Chittagong from19.07.2012 to 16.08.2012

Thailand&

Bangkok

Newzealand

1) Inspection Battery & BatteryCharger from January/2000 for 07 daysin India. 2) “Witnessing of Manufacturingprocess and tests of the Matarialsand Spare at Manufactur’s worksincluding transfer of technical knowhow” for 15.09.09 to 22.09.09 in Japan.

* See N.B.

*N.B. 3) “Witnessing of manufacturing process and test of the equipment of manufacturer's works including transfer of technical know-how” against Mechanical SecuritySpares from October/10 for 07 days in Netherland. 4) "Witnessing of manufacturing Process and test of the equipment of manufacturer;s works including transfer of technical Know-How" from 16.08.11 to 22.08.11 for 07 days inUSA. 5) Inspection program on "Energy Efficient Buildings" from 12.03.13 to 18.03.13 in India. 6) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 7) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China.

1 1-0434 25.02.55 Mr. Md. Zakir Hossain,Chittagong,B.Sc. Engg. (Mech.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01714110545 [email protected]

Director Dte. of Project Planning,

PDB, Dhaka

1) Seminar on PowerDevelopment from 20.01.04 to29.01.04 for 10 days 2)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From07.08.04 for Two Month(Bond for 03 Years from01.07.04)

India ,

France,

1)15 Days 2003 in India, 2)Factory Test Witness From10.01.2004 to 24.01.2004 in India, 2) Basic Design against Bera 70MWPeaking Power Plant ConstructionProject from September/10 for 05days in Korea.

A proposalsent toministrydated29.09.13against"Asiaregionalsustainableenergytrainingevent" from25.11.13 to29.11.13 inThailand.

Page 2344: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0372 05.03.55 Mr. Md. Abdur Razzaque, Mymensingh,

B.Sc.Engg. (Mech.) 21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE) 28.06.12 (Add. CE)

CE (In Charge) Services, PDB,Dhaka.

1) Young professionalTraining in the field ofSCADA System From 06.06.92to 10.12.92

France 1) 25.03.2001 to 28.3.2001 India

2)Factory test witness of 33KV XLPEPower cable & Battery From 05.12.03to 5 Days in China 3) 132KV Transformer against“Inspection'' from October/10 for 07days in China. 4) Conference on "Market Potentialand Cooperation Opportunities inPower Development of South AsianCountries" on 03.06.2013 in China.

A proposalsent toministrydated19.09.13againstroad showon "German-BangladeshInvestorsMeet forEmergingBangladesh"on 22.10.13in Germany.

1 1-0284 08.05.55 Mr. Jalal Uddin AhmedChowdhury Sylhet,

B.Sc.Engg. (Mech.)

18.12.78 (AE) 05.01.95 (XEN) 31.01.07 (SE) 12-04-11 (Addl.CE) 31.07.12 (CE) 22.05.13 (Member)

Member Generation, PDB, Dhaka. & Member P&D, PDB,Dhaka.

1) Training on Boiler From22.02.86 for 06 Months. 2)Traning On Planning &Design Against 210 MW.Siddhirgong P/S From 02.09.04for One Month

Czechoslovakia

1)28.11.94 to 23.12.94 India, 2)16.09.97 to 23.09.97 In China. 3)Seminar 15.03.03 to 29.03.03 InMalaysia, 4) Factory Test Witness on HeatRecovery Steam Generator for 11 daysin South Korea.in 2006 5)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina.

A proposalsent toministrydated27.03.14 fortechnicalorientation& qualitytest witnessof 33 KV ACRfrom07.04.14 to13.04.14 inAustralia.

Page 2345: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0316 30.06.55 Mr. A.T.M. Nannur Rahman,

Khulna,

B.Sc.Engg. (Mech.)

28.06.79 (AE) 11.01.96 (XEN) 18.01.09 (SE, rev.) 24.02.09 (SE) 01-12-11 (Addl. CE) Member (16.04.14) 0171-3019272

Member P & D, PDB, Dhaka.

LPR 29.06.14

1) Power Line Carrier Systemfrom 04.04.84 for 10 Weeks. 2) Training Steam TurbineOperation & MaintenanceFrom 15.09.86 to 14.03.87

Switzerland,

Germany,

1) Pre-shipment Inspection From12.04.98 to 21.04.98 10 days in India 2) Practical Demonstration against210 MW. Chittagong (PRP) From15.07.04 to 22.07.04 for 07 Days InChina. 2) Basic Engineering Drawing againstChandpur 150MW Combined CyclePower Station Construction Projectfrom 28.07.10 to 11.08.10 for 15 daysin China. 3) Chandpur 150MW Combined CyclePower Station Construction Project, aTraining Program named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for 12(Twelve)days in China.

A proposalsent toministrydated05.06.14 forCT, VT testwitnessagainstComilla 52.2MW HFOFired Powerstation from22.06.14 to24.06.14 inIndia. 2) G.O.issueddated15.06.14 forfactoryacceptancetest for 7days/2014 inChina.

1 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)

GM (Incharge) Commercial Operation PDB, Dhaka.

LPR 29.06.14

I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)

2)Training on PowerEngineering andManagement from 09.05.04 to22.05.04

U.K.

Korea

1)Pre-Payment Meter & VendingEquipment From 25.11.06 to 01.12.06for 07 (days) in England 2) “Technical Orientation and QualityTest Witness” on Four Level SecuritySeal & Accessories from 18.02.10 to23.02.10 for 05 days in India. *See N.B.

N.B. 3) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excludingtravel time) in South Korea. 4) Inspection against Plant/Factory in "Midland Power Co. Ltd" from 25.06.2012 to 02.07.2012 in Norway. 5) Technical orientation and quality test witness from 18.05.13 to 23.05.13 in USA. 6) "Change Xchange 2014-2nd Reverse Buyer-Seller Meet (RBSM)" from 08.01.14. to 12.01.14 in India. 7) Technical Orientation & Quality Test Witness of 11KV DOFC with Fuse Linkfrom 15.06.14 to 21.06.14 in China.

1 1-0424 28.11.56 PRL

Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)

CE P & D, PDB, Dhaka

1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011

Japan

USA

China,

UK

Singapore& USA

Russia

England

1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.

1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan

Page 2346: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148

2 1-0425 28.11.56 PRL

Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)

CE P & D, PDB, Dhaka

1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011

Japan

USA

China,

UK

Singapore& USA

Russia

England

1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.

1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan

* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148

3 1-0426 28.11.56 PRL

Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)

CE P & D, PDB, Dhaka

1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011

Japan

USA

China,

UK

Singapore& USA

Russia

England

1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.

1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan

* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148

Dhaka

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01630 17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)

SDE Energy Auditing Unit PDB,Dhaka.

1) "Foreign Training program"from 07.09.09 to 20.09.09 for14 days.

China.

Page 2347: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-01784 01.01.84 Mr. Md. Abu Sayed Sarkar Kurigram, B.Sc.Eng(Elec.)

31.05.09(AE)

AE Energy Auditing Unit PDB, Dhaka.

1) “Technical Orientation and Qualitytest witness'' Supply of TransformerAccessories (Copper Cables)" againstCentral zone power distributionProject, PDB, Mymensingh inJune/2011 for 07 (Seven) days fromthe date of actual journey(Excludingtravel time) in China.

Rajshahi

3 1-01622 29.07.79 Mr.Abdullah-Al-Mamun Rajshahi B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)

SDE Energy Auditing UnitDivision PDB,Rajshahi.

1) Training on Enegry Meteragainst "Foreign Training"from 15.10.09 to 29.10.09 for15 days

Singapore.

Rangpur

4 1-0776 05.01.60 Mr. Md. Khairul Amin,Rangpur,B.Sc.Engr.(Elec.),30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

XEN,

Energy Auditing UnitDivision PDB, Rangpur.

1)Training against I&C andComputerFrom 07.03.96 to 07.03.97 (OneYear)

China 1) Four Level Security Seal &Accessories against “TechnicalOrientation and Quality TestWitness” from 18.02.10 to 23.02.10 inIndia. 2) ''Inspection of Heat RecoverySteam Generator gainst Dudkhandi50MW Peaking Power PlantConstruction Project from 20.01.2011for 07 days in China.

Sylhet

5 1-01332 05.07.70 Mr. Abdulla Al Mahmud, Lalmonirhat, B.Sc.Engr.(Mech.),

20.01.2000(AE) 08.12.09(SDE) 16-10-11 (XEN , Incharge)

XEN (Incharge) Energy Audit, PDB,Sylhet.

1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project from 24.02.11 to02.03.11 for 07(Seven) days in China.

Rangpur

Bogura

Page 2348: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

6 1-0855 08.01.64 Mr. Md. Abdur Rashid,Natore,B.Sc.Engr.(Elec.)13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)

XEN,

Energy Auditing Unit PDB, Bogra.

1)Shahijebazar 60MW GasTurbine P/St.Operation andMaintenance. From 18.04.97to 29.04.97 2) Gas TurbineP/St.Operation andMaintenance. From 10.04.00to 09.04.00, 01 (Month) 3) Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 to 07.08.04 (Bond for03 Years from 01.07.04 to 14days)

WestGermany

France

China

1) "Technical orientation and qualitytest witness" against 400V,3X10(60)Amps Three Phase 4-Wire, D-Element, Outdoor Type Double TariffElectronic Consumer Energy Meterfrom October/10 for 10 days in China.

G.O. Issueddated02.03.09 onMark-II andMark-V -Gi"Inspection& FactoryTestWitness" for10 days inUSA.

Commercial Operation, PDB, Dhaka

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments Dist. Zone

7 1-0566 31.01.61 Mr. Md. Mustafijur Rahman, Bogra, B.Sc.Engr.(Elec.), 09.10.84(AE) 18.03.93(SDE) 02.01.05(XEN)

Dy- General Manager Commercial Operation PDB, Dhaka.

1) Training on Maintenanceof H.T. Switchgear from30.12.86 to 26.04.87 2) Training on VHFEquipment Operation &Maintenance from 15.11.09for 30 days.

Russia

NewZealand

1) Inspection on CFL Bulb againstEfficient Lighting initiative forBangladesh (Phase-1 & Phase-II)from July/10 for 05 days in China.

Bogra

Civil Works

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2349: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

8 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, Current Charge)

23.04.09 (XEN)

XEN, Civil Works Division PDB,Chittagong.

1) Inspection (Emergency DieselGenerator) against Gopalgonj100MW Peaking Power PlantConstruction Project November/10 for07 days in Singapore.

9 1-01687 01.01.75 Mr. Md .Monjurul Alam Sirajgong B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)

SDE Deputed to CE Office,Civil works for nextreplacement.

1) Tests and/or Inspection against 8mm dia and 9 mm dia 3500 QuintalHigh Tensile Steel (HTS) Wire for 10days in China.

10 1-01868 25.11.85 Mr. Md. Shahriar Alam Bagura B.Sc. Engg. (Civil) 01.12.10 (AE) 01712130635 [email protected]

AE, Civil ConstructionDivision-1, PDB, Dhaka

PC Pole Construction

SL.NO. ID No. Date ofBirth

Name, Dist, Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

11 1-0759 16.01.61 Mr. Md. Abul Kalam Azad,

Rangpur, B.Sc.Engr.(Civil.),

30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)

XEN

PC Pole ConstructionFactory, PDB, Aricha, Manikgonj.

1) Hydro Electric PowerEngineering for Stable &Sustainable Supply , JicaJapan 04.06.06 to 12.07.06 for39 days

Japan. 1) Technical Orientation and QualityTest Witness" from 04.12.10 to14.12.10 for 07 days in China.

Page 2350: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 Mr. Md Fazlul Hoque Member Finance, PDB, Dhaka.

1) New Product AppraisingConference from 16.04.10 to 20.04.10in China. 2) Factory Witness test (Natural GasBooster Compressors & Auxiliaries)against Chandpur 150MW CombinedCycle Power Station ConstructionProject from 13.03.11 to 19.03.11 inUSA.

1 1-0240 09.01.55 Mr. Md. Abu Taher,

Chittagong,

B.Sc.Engg. (Elec.)

09.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE, Revr,basis) 15.02.10(Addl.CE) 08.02.11 (CE) 02.09.12 (member, currentcharge)

Member Distribution , PDB,Dhaka. & Menber, P & D (Addl.Charge), PDB, Dhaka.

1) Electrical Maintenancefrom 17.01.92 to 16.01.93

2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13

China

Australia

1) Practical Demonstration OnGenerator Exitation (Shikalbaha )From 05.06.2004 to 07 Days In CzechRepublic 2) "Factory Inspection/Test ofCirculating Water Pump for 110 MW &60 MW Unit of Khulna Power Stationfrom 16.03.09 to 20.03.09 for 05 daysin Czech Republic. 3) Inspection against 335 MW dualfuel combined cycle power plant inorder to inspect "Meter, CurrentTransformer, Inductive VoltageTransformer" from 25.02.13 to 05.03.13in USA

Page 2351: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Proposed Names of Manager (Katakhali 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0514 29.05.57 Mr. Sabbir SultanRajshahiB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN)

XEN, Sales & DistributionDivision-2, PDB, Rajshahi.

1) Power Generation &Distribution from 07.10.89-30.12.90

2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04)

Germany,

France,

Page 2352: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0617 29.07.62 Mr. Md. Mofazzal HossainSarker, Rajshahi

B.Sc.Engr.(Elec.), 03.02.85(SAE) 24.01.85(AE) 09.01.95(SDE) 09.03.04(XEN)

XEN, (shift),

Barapukuria PowerStation PDB, Dinajpur.

i) Gas Turbine Power StationOperation & Maintenancefrom 07.05.1990 to 01.07.90

France 1)Pre-Shipment Inspections ofMetarial of Bheramara Power Stationfrom 19.04.97 to 28.04.97 in Germany 2)Training on Complete NozzleAssembly with hardware, CompleteKit of (92) buckets with hardware,Complete Kit of (36) Shrouds withhardware, Cap & Liner Assembliesetc. 23.06.07 to 30.06.07, 07 days inUSA. 3) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in Sept./2011 for07 days in Germany.

Proposed Names of XEN (Katakhali 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01193 01.12.69 Mr. Md. Enamul Haque, Rajshahi, B.Sc.Engr.(Mech.),

19.03.98(AE) 06.10.04(SDE) 06.05.10 (XEN, Incharge) 0171-2266233

XEN(Incharge) Katakhali 50MWPeaking Power PlantConstruction Project PDB, Bogra.

1) “Alternator Inspection” againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in July/2011 for07 days in South Korea.

Bogra

Page 2353: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-01211 01.08.71 Mr. Md. Mozaharul Islam, Shirajgong, B.Sc.Engr.(Mech.),

19.03.98(AE) 06.10.04(SDE) 06.07.10 (XEN Incharge)

XEN (RE)In charge , Chapainawabganj E/S,PDB, Chapainawabganj. & PD (Addl. Charge) Amnura 50 MW RentalPower Plant Project.

1) Training on Energy Meter,September/05 for 11days.

Australia&

Singapore

3 1-01298 21.05.74 Mr. Moniruzzaman,Meherpur,B.Sc.Engr.(Elec.) ,13.07.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge)

Asstt. CE XEN(Incharge), 300 M.W. BarapukuriaPower Station PDB, Dinajpur.

1) Safe, Reliable, &Maintenance of I & C,Circuits/Loops,etc From21.03.2004 for 06 Months. 2) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days.

China,

Bahrain

1) Inspection against BarapukuriaCoal Fired Thermal Power Station on''Witnessing of ManufacturingProcess and Test of the equipment atmanufacture's works includingTransfer of Technical-Know How” inSept./2011 for 07 (Seven) days fromthe date of actual journey(Excludingtravel time) in China.

4 1-0938 31.12.63 Mr. Md. Zahangir Alam Nawabganj B.Sc.Engr.(Elec),06.09.90(AE) 11.11.2001(SDE) 02.07.19 (Rev. XEN), 10.02.10 (XEN)

XEN Urban Project, PDB,Rajshahi.

1)Factory Test witness,Orientation & TechnicalTraining on 11 KV Singlephase Potential Transformerand 11KV Single phasecurrent transformer from25.07.04 to 29.07.04

China, Chittagong

Proposed Names of SDE (Katakhali 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.

1) Training on Service dead endClamp, September/05 for 07days inIndia. 2) Approval of Engineering Data andDetail Design against Hathazari 100MW Peaking Power PlantConstruction Project from OCtober/10for 07 days in China.

Page 2354: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-01692 01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE) 0171-2561163

SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.

1) ''Managing Fuel for ReliablePower Generation'' from 13.12.10 to15.12.10 in India. 2) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for07(Seven) days in China.

3 1-01678 17.11.77 Mr.Shah Khalid MahmudChowdhury Noagaon B.Sc.Eng(Civil) 07.04.2006(AE) 18.08.2011 (SDE) 01817148564

SDE, Sales & DistributionDivision-2, PDB,Rajshahi

1) Technical Orientation and QualityWitness aganist Central Zone PowerDistribution Project at April/2011 for07 days in China.

Bogra

4 1-01626 31.12.76 Mr.Md.Rabiul Islam Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 0175-1657415

SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.

1) Technical know-how andTechnology Transfer on 1.00 Lac LiterTransformer Oil against fromSept./09 for 07 days in India. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) in China.

Proposed Names of AE (Katakhali 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01787 21.01.85 Mr.Syed Ahmed Chapainababgonj B.Sc.Eng(Elec.) 01.06.09(AE)

AE, Chapainababgonj E/S,PDB, Chapainababgonj

Page 2355: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-01815 07.02.87 Mr. Md. Motiur Rahman Rajshahi B.Sc. Engg. (Mech) 04.11.10 (AE) 01675441000 [email protected]

AE, Directorate of Training& Career Development,PDB, Dhaka.

3 1-01833 15.08.87 Mr. Md. Ahsan Habib Sirajganj B.Sc. Engg (Elect.) 04.11.10 (AE) 01711038155 [email protected]

AE Baghabari 50 MWPeaking Power PlantConstruction Project,PDB,, Pabna.

4 1-01884 04.01.86 Mr. Md. Tariqul Islam Sirajganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 01717442759 0171-8361183 [email protected]

AE Katakhali 50MWPeaking Power PlantConstruction Project,PDB, Rajshahi.

5 1-01809 10.02.85 Mr. Md. Abdul Matin Lalmonirhat B.Sc. Engg. (Mech) 04.11.10 (AE) 01721734233 [email protected]

AE, Sales & DistributionDivision-1, PDB,Rangpur.

6 11-0454 01.01.58 Mr. Abu Hena MostafaKamal Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27.12.2011 (AE)

AE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.

7 1-01869 21.12.87 Mr. Anirnoy Das Naogan B.Sc. Engg. (Elect.) 01.12.10 (AE) 01717517636 [email protected]

AE Distribution Division PDB, B-Baria.

1) Inspection against Santahar 50MW and Katakhali 50 MW PeakingPower Plant Construction Project inorder to Inspect 11 KV switchgearfrom 13.03.2012 to 20.03.2012 for 7days (excluding travel time) in China.

Page 2356: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

8 1-01883 18.12.85 Mr. Md. Shahnewaz Islam Pabna B.Sc. Engg. (Elect.) 01.12.10 (AE) 01196082692 [email protected]

AE S & D-3, PDB, Rajshahi.

9 11-0470 01.01.63 Mr. Md. Ainal Hoque Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)

AE Sales & DistributionDivision, Barabkunda, PDB, Chittagong.

Proposed Names of SAE (Katakhali 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 11-1039 01.09.64 Mr. Md. Firoz Uddin Shirajganj Diploma Engg. (Power) 06.09.86 (SAE) 01918839106

SAE Baghabari PowerStation, PDB, Shirajganj

2 11-1564 01.07.63 Mr. Md. Sultan Mahmud Dhaka Diploma Engg. (Mech.) 17.07.84 (SAE) 01718585422

SAE Bheramara PowerStation, PDB, Kustia.

3 15.05.61 Mr. Md. Abul Kalam Azad Naogan Diploma Engg. (Elect.) 25.08.84 (SAE) 01713726568

SAE S & D-1, PDB, Rajshahi

4 11-1439 16.04.66 Mr. Zamal Uddin Md. KhairulAnam Naogan Diploma Engg. (Electronics) 16.07.94 (SAE) 01712962856

SAE Katakhali 50 MWPeaking Power PlantConstruction Project,PDB, Rajshahi.

Page 2357: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

5 11-0515 01.01.58 Mr. Bizon Kumar Sarker Diploma Engg. (Civil) 25.08.84 (SAE)

SAE S & D-1, PDB, Rajshahi

6 11-0549 31.12.59 Mr. Md. Abul Kalam Azad Shirajganj Diploma Engg. (Elect.) 25.08.84 (SAE)

SAE Bheramara PowerStation, PDB, Kustia.

7 11-0982 01.04.61 Mr. Md. Meser Ali Rajshahi Diploma Engg. (Elect.) 10.09.86 (SAE)

SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.

8 11-1159 01.01.58 Mr. Md. Amzad Hossain Gaibandha Diploma Engg. (Elect.) 25.10.88 (SAE) 01719516870

SAE Barapukuria PowerStation, PDB, Dinajpur.

9 11-1344 15.10.64 Mr. Zulfikar Ali Talukder Bagura Diploma Engg. (Elect.) 27.12.90 (SAE) 01711123724

SAE S & D-1, PDB, Bagura

10 11-1157 14.01.62 Mr. Md. Abdul Hannan Bagura Diploma Engg. (Elect.) 12.10.68 (SAE) 01730711893

SAE Consumer's Affairs,PDB, Dhaka.

1) Training againstBarapukuria Power Station in2004 for 6 months

China

Page 2358: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

11 01.05.75 Mr. Borhan Uddin Ahmed Sylhet Diploma Engg. (Elect.) 30.11.2005 (SAE) 01712121107

SAE Shahjibazar PowerStation, PDB, Habiganj.

1) Training againstBarapukuria Power Station in2004 for 6 months

China

12 11-1589 18.02.64 Mr. Md. Nure Alam Sarker Diploma Engg. (Mech.) 17.07.94 (SAE)

SAE 20 MW Power Station,PDB, Rangpur.

Proposed Names of Manager (Santahar 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2359: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0509 01.04.57 Mr. Moustafa Ishkander Arif

BograB.Sc.Engg. (Elec.)22.02.83(AE) 01.02.92(SDE) 21.01.03(XEN)

PD

Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.

1) Distribution Engineeringfrom 05.12.90 to 07.10.91 2) Trouble Shooting,Programming & dataacquisition from 02.12.2004for 14 days

UK

USA

Orientation & Technical Training on400 Volt Energy Meter against Dte.ofCommercial Operation from 05.03.05to 25.03.05 for 14 days in USA

Bogra

2 1-0628 26.01.60 Mr. S.M. Touhidul Karim,

Khustia, B.Sc.Engr.(Elec.),

26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)

XEN(Mach), Energy Auditing UnitDivision,

PDB, Rajshahi.

1)Operation andMaintenance of GTPS. From06.05.90 to 30.06.90 for08(Weeks)2)Training on Baghabari100MW P/St. From 17.09.01 to15.12.01 for 03 Months 3) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days. 4) Training on Power StationRehbilatation Projec (Phase-2) Bheramara Gas TurbinePower Station Rehbilatation''Lube Oil Cooler, AVR, FireFighting System '' for 07 days.

France,

India

Bahrain

China.

1) "Practical Demonstration to ImportTechnical know how" against PPRPon Gas Turbine in 2006 for 07 days inAmerica

Proposed Names of XEN (Santahar 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2360: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-01197 30.10.70 Mr. Md. Mizanur Rahman, Naoga, B.Sc.Engr.(Elec.),

19.03.98(AE) 06.10.04(SDE) 23.05.10 (XEN Incharge)

XEN (Incharge), (electrical), 300MW BarapukuriaCoal Fired Power PlantProject PDB,Dinajpur.

1) Safe, Reliable & efficientOperation and maintenanceof I & C System, ProtectionCircuits/Loops, Test adjustand setting of I & Cequipment system from21.03.2004 for 06 Months.(Bond for 03 Years)

China 1) “Witnessing of ManufacturingProcess and Tests of the Equipmentat Manufacturer's works includingtransfer of Technical Know-how”from 30.08.10 to 05.09.10 for 07 daysin China. 2) “Witnessing of ManufacturingProcess and Tests of the Equipmentat Manufacturer's works includingtransfer of Technical Know-how”against Barapukuria Coal FiredPower Plant in August/2011 for 03(three) days in China (excludingtravell time).

2 1-01325 09.04.72 Mr. Md. Torul Islam, Naugaon, B.Sc.Engr.(Mech.),

20.01.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge) 0171-1204197

XEN(Incharge), Santhahar 50MWPeaking Power PlantConstruction Project,PDB, Bogra.

1) Smart card Type Pre-payment Metering System(Currency Transfer System).April 05 for 14 days in India &Malaysia.

1) Inspection against Faridpur 50MWPeaking Power Plant ConstructionProject for 07 days in India. 2) “Alternator Inspection” againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in July/2011 for07 days inSouth Korea.

Page 2361: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

3 1-0808 20.11.59 Mr. Md. Nurul Amin,Naogaon,B.Sc.Engr.(Mech.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge)

23.04.09 (XEN) 01733239201

XEN,

90 MW FenchugonjPower Station (Unit-2),PDB, Sylhet.

1)Training on BPDB Specialistfrom 01.12.01 to 21.12.01

2) Group Training Course in"Thermal Power Engineeringfor Gas Turbine and CoalFired Steam Turbine" from15.05.07 to 05.07.07, 52 Days

3) Training on Operation &Maintenance of Balance ofPlant Equipment (BOP) & WTP(Training in China, 3.5months) from 19.07.07 to02.11.07 (Bond for 03 Years)

CzechRepublic

Japan

China

1)Practical Demonestration,TestWitnessing on Different Spare(Mech.) of Sikalbaha Power PlantFrom 20.012004 to 26.01.2004 in CzechRepublic 2) "Witnessing of ManufacturingProcess and test of the Equipment atManufacturer's works includingtransfer of technical Know-how" for07 days in 24.08.09 to 31.08.09 inNetherland.

4 1-01184 21.03.70 Mr. Md. Moklesur Rahman, Rajshahi, B.Sc.Engr.(Mech.),

14.12.97(AE) 27.04.04(SDE) . 06.05.10 (XEN, Incharge)

XEN( Incharge) Urban Project Division PDB, Bogra.

11/10/1999 To 20/10/199910(Ten) Daya On ProcessControl Operation andManagement(PCOM)

China Sylhet

Proposed Names of SDE (Santahar 50 MW Peaking Power Plant Construction Project)

Page 2362: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-01660 09.11.79 Mr. Md. Abdur Rashid Sirajgonj B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 01716518016

SDE (RE), Thanor Electric Supply PDB, Rajshahi

1) Central Zone Power DistributionProject, a Technical Orientation andQuality Test Witness Program for11KV Drop Out Fuse Link, 11KVLightning Arrester, 200 Amps MCCB,100 Amps MCCB & Transformer Oil atJune/2011 for 07 days in China.

2 1-01663 22.07.75 Mr.Md.Ruhul Karim Natore B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE)

SDE Khulna Power Station, PDB,Khulna

1) "Basic Design" against Sylhet150MW Gas Turbine Power Plan from28.07.10 to 11.08.10 for 15 days inChina 2) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project at July/2011 for07 days in Germany.

3 1-01682 15.08.76 Mr.Md.Rezaul Haq Khulna B.Sc.Eng(Mech) 16.10.2006(AE) 27.12.2011(SDE) 0171-1274705 [email protected]

SDE Khulna Power Station PDB,Khulna

1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from 10.09.10 to 27.09.10.

China 1) "Witnessing of ManufacturingProcess and Test of the Equipment atManufacturer’s works includingtransfer of technical Know-how"against Khulna 110/60MW from02.07.09 to 09.07.09 for 07 days inIndia.

4 1-01712 12.09.79 Mr.Md.Hasnath Zaman Dinajpur B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 01712-529880

SDE, shift, Barapukuria ThermalPower station, PDB,Dinajpur

1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project from January/11for 07(Seven) days in China.

Lalmonirhat

Proposed Names of AE (Santahar 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2363: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-01748 15.07.74 Mr. Md.Faridul Hasan, Bogra B.Sc.Engr (Elec.) 12.05.08 (AE)

AE (RE), Shibganj E/S, PDB,Chapainawabganj.

1) "Pre-shipment Inspection" of CoalPulverizer HP 703 Bowl Mill againstfrom 16.09.09 to 21.09.09 for 07 daysin China.

Comilla

2 1-01750 25.12.78 Mr. Md. Azizur Rahman, Kustia B.Sc.Engr (Elec.) 12.05.08 (AE)

AE, Khulna Power Station PDB, Khulna.

1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, OperationDivision) from August/10 for15 days

China

3 1-01763 01.11.83 Mr. Md. Hasan Zaman Bogra, B.Sc.Engr(Civil) 31.05.09 (AE) 0171-8658299

AE Shantahar 50 MWPeaking Power PlantConstruction Project,BPDB, Bogura.

1) Inspection of Step-up Transformeragainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) from the date of actualjourney in China.

4 1-01813 27.12.83 Mr. Md. Sana Ullah Pabna B.Sc. Engg. (Mech) 04.11.10 (AE) 01712937996 [email protected]

AE, S & D-1, PDB, Pabna.

5 1-01819 11.10.85 Mr. Md. Moktar Hossain Chapainawabganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722044335 [email protected]

AE (RE), Doani E/S, PDB,Lalmonirhat.

Nilphamari

6 1-01881 01.01.83 Mr. Md. abu Sohel Nawga B.Sc. Engg. (Mech.) 01.12.10 (AE) 01190311592 [email protected]

AE Santahar 50MW PeakingPower PlantConstruction Project,PDB, Bagura.

Page 2364: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

7 1-01842 21.11.86 Mr. Md.Mohshinul Firoz Nilphamari B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722450004 [email protected]

AE, Barapukuria CoalThermal Power Station,PDB, Dinajpur.

8 1-01821 01.12.86 Mr. Md. Rajoan Hasan Jhinaidaha B.Sc. Engg. (Mech) 04.11.10 (AE) 01712699480 [email protected]

AE, Ghorashal PowerStation, PDB, Polash,Norshindi.

9 11-0455 15.02.59 Mr. Gopal Chandra Saha Tangail Diploma(electrical) 25.08.84(SAE) 27.12.11(AE) 01711378626

AE, opeartion, Bheramara PowerStation, PDB,Kustia.

Proposed Names of SAE (Santahar 50 MW Peaking Power Plant Construction Project)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 11-1205 07.01.63 Mr. Shahaul Kabir Chuadanga Diploma Engg. (Mech.) 10.10.88 (SAE)

SAE, Bheramara PowerStation PDB, Kustia.

2 11-1741 25.04.74 Mr. A.S.M. Rezzakul Haider Thakurgaon Diploma Engg. (Mech.) 12.03.2000 (SAE) 01716555660

SAE Energy Auditing Unit,PDB, Bagura

1) Training in 2004 for 6months

China

3 11-0692 30.04.59 Mr. Bozlur Rahman Bagura Diploma Engg. (Elect.) 25.08.84 (SAE)

SAE Baghabari PowerStation, PDB, Shirajganj.

1) Training in 1994 for 3months

Japan

Page 2365: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 11_2211 01.01.65 Mr. S.M. sohrab Hossain Naogan Diploma Engg. (Mech.) 10.10.88 (SAE)

SAE, 1-4 Unit, GhorasalPower Station PDB, Palash,Narsingdhi.

5 11-0957 01.11.59 Mr. Suranjan Shaha Diploma Engg. (Elect.) 02.09.86(SAE) 01712868298

SAE, Shibganj Electric Supply,PDB, Bagura.

6 11-1809 05.01.84 Mr. Moha. Moshiur Rahman Chapainawabganj Diploma Engg. (Elect.) 15.07.2006 (SAE) 01717983480

SAE, Barapukuria ThermalPower Station, PDB,Dinajpur

7 11-1668 01.01.75 Mr. Md. Abdul Hai Bhuiyan Diploma Engg. (Mech.) 29.02.2000 (SAE)

SAE Operation, ChittagongPower Station, PDB,Raozan, Chittagong.

8 25.08.84 Mr. Md. Ayub Ali Natore Diploma Engg. (Mech.) 02.04.2012 (SAE)

SAE Baghabari PowerStation, PDB, Shirajganj.

9 11-1701 13.03.75 Mr. Md. Sohel Aman Natore Diploma Engg. (Elect.) 04.03.2000(SAE)

SAE, Bheramara PowerStation, PDB, Kustia.

10 11-1604 01.04.69 Subrata Kumar Mohonto Bagura Diploma Engg. (Mech.) 16.07.94 (SAE) 01716027247

SAE, Baghabari PowerStation, PDB, Sirajgonj

Page 2366: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

11 11-1213 31.10.60 Mr. Md. Munir Hossain Jessore Diploma Engg. (Mech.) 10.10.88 (SAE) 01741032122

SAE, Barapukuria ThermalPower Station, PDB,Dinajpur

1) Training againstBarapukuria Power Station in2004 for 6 months

China

12 Mr. Md. shahidul Islam Diploma Engg. (Elect.) July/1994 (SAE)

SAE, Fenchuganj 90 MWpower plant , PDB,Sylhet.

1 1-0275 10.09.55 Mr. Md. Shahjahan Miah,

Munshiganj,

B.Sc.Engg. (Elec.)

08.12.78 (AE) 23.01.94(XEN) 28.12.10(SE, Revl.) 08.02.11 (SE) 01-12-11 (Addl. CE) 28.01.14 (CE)

Member P & D, PDB, Dhaka.

1) System Planning & SystemStudies. From 07.01.86 for 08Weeks

Thailand A proposalsent tominstrydated20.07.14 forwitnessingofmanufacturing processagainstShahjibazarPower Plantfrom15.08.14 to21.08.14 innetherlands.

Page 2367: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-01149 03.10.55 Mr. Mohammad RafiqulIslam, Rangpur, Diploma(Elec),

10.12.77(SAE),

14.09.96(AE), 27.04.04 (SDE) 06.05.10 (XEN, Incharge) 18.08.2011 (XEN)

XEN Diesel Generation, PDB,Dhaka.

1) Operation & Maintenanceof Transmission Linestraining program from04.02.13 to 15.02.13

Thailand

2 1-0396 31.07.54 Mr. Md. Abdul Latif Khan,

Dhaka,B.Sc.Engg. (Civil)09.03.81 (AE) 06.08.86(SDE) 28.09.99(XEN) 19.12.10 (SE, Reve.) 08.02.11 (SE)

Addl. CE (Incharge) Attach to Office ofMember (Distribution),PDB, Dhaka. (Freedomfighter)

1)Inspection from 28.8.2001 for 12days India 2) "Coal Supply Agreemrnts" arrangedby IBC Asia Commodities TrainingAcademy (CTA) from 26.06.12 to30.06.12 in Singapur.

LPR

30.07.14

2 1-0297 01.04.55 Mr. A.N.M. Asadullah,

Rajshahi,

B.Sc.Engg. (Elec.)

20.12.78 (AE) 05.01.95 (XEN) 25.09.07 (SE) 02.03.11 (Addl, CE, Incharge) 18-08-11 (Addl.CE) 31.07.12 (CE)

CE Power PlantConstruction, BPDB,Dhaka.

1) Training onInstrumentation of PowerPlant. 30.09.1985 to 30.01.86for 04(four) Months. 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From01.09.04 to 03.11.04 for 02(two Months) (Bond for 03Years 01.09.04 to 31.10.04)

USSR

Russia,

1) Basic Design Approval MetingFrom 11.11.02 to 04.12.02 in China 2) Conceptual Design Approval ofSylhet 90MW CCPP (2nd Unit) from25.04.06 to 03.05.06 for 10 days inChina. 3)''Conceptual Design Approval''Sylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 in China 4) Inspection on Plant Equipmentfrom 16.1.11 to 22.1.11 in Phillipines.

Page 2368: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0248 01.01.56 Mr. A.K.M. Abdur Rouf,

Bogra,

B.Sc.Engg. (Elec.)

14.09.78 (AE) 17.02.93(XEN) 09.01.06 (SE) 10.01.10 Addl.CE (Incharge) 15.02.10 Addl.CE (Rev.) 13.01.11 (CE) 2.1.2012 (CE)

GM (CE) Training, PDB, Dhaka.

1) Eclectic Power DistributionEngineering From 03.09.88 to17.11.88 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 to two Month (Bondfor 03 Years from 01.09.04 to31.10.04.) 3) Electricity Markets To MeetTomorrow's Demand:Efficient and EffectiveDesign, Operation andManagement from 30.09.07 to06.10.07, 07 days.

Japan,

Russia,

USA

1)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina

1 1-0356 01.01.56 Mr.Zafar Ullah Bhuiya,Narsingdhi,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 07.01.10 (SE) 25.08.14 (CE) 07.09.14 (Member, P &D)

Member P & D, BPDB, Dhaka.

1) Training on ElectricalDistribution From 24.05.88 to23.06.89

2) Electrical Design From1.03.96 to 30.05.96 3)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 for two Month 4) Training on ‘‘ControlSystem” aganist Kaptai HydroPower Plsnt (Unit-3) from23.03.2009 to 30-03-2009

Norway

Italy

Russia

Italy.

1) 'Basic Design & Drawing ' againstShahjibazar P/S from 5.8.14 to 18.8.14for 14 days in China.

A proposalsent tominstrydated30.10.14 forfactoryacceptancetest of GasturbineagainstShahjibazar330 MW CCPPProject from10.12.14 to16.12.14 inFrance.4 11-0211 01.01.56 Mr. Miher Boron Shaha Roy

Chittagong, Diploma(Elec.)

26.06.80.(SAE), 23.04.09(AE)

AE Energy Auditing UnitDivision-3 PDB, Chittagong.

1) Inspection against 110V, 3´5(6)A,Three Phase 4-Wire, 3-Element,Double Tariff Programmable EnergyMeterfor from May/11 for 10 (Ten)days or from the date of actualjourney (excluding journey time) inSingapore.

2 1-0344 01.01.56 Mr. Md. Enayet Karim,Bogura,B.Sc.Engg. (Elec.)19.01.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 2.1.2012(SE)

SE Consumer Affair's, PDB,Dhaka.

1)Power Distribution ProjectFrom 17.02.2004 to 20.03.2004

2) Smart card Type Pre-payment Metering System(Currency Transfer System).April 05, 14 days in India &Malaysia.

Japan

India &Malaysia

1) 8.4.02 to 10 days Australia.

Page 2369: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 11-0276

13.12.55 Mr. Md. Sakwat Hossain Dhaka, Diploma (Mech.)

01.07.80(SAE), 17.09.09(AE) 21.12.14 (SDE)

SDE (Incharge), Central Workshop State & Transport PDB, Dhaka.

1 1-0354 10.11.55 Mr. Md. Abul Kalam ,Chittagong,B.Sc.Engg. (Elec.)26.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 19.05.09 (SE, Reve. Basis) 07.01.10 (SE) 25.08.14 (CE)

CE Power PlantConstruction, BPDB,Dhaka. & PC Solar Street LightingProgramin CityCorporation Project

1) Operation & MechanicalMaint. of GTPS.11.05.87 to 10.08.87 2)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month (Bondfor 03 Years from 08.08.04 to07.10.04)

Japan,

France,

1) 33KV Pin Insulator & Disk FittingsMay/2001 - 05 days, India 2) Pre-shipment Inspection of 6,7,8 &9 mm dia 3200 Quintal H.T.S Wire tobe held from 20-29 June/2014 inChina.

1 1-0237 01.01.56 Mr. Tamal Chakraborty, Sherpur, B.Sc. Engg. (Elec.)

09.09.78 (AE) 02.07.90(XEN) 28.11.05(SE) 09.12.09 (Addl.CE, rev.) 15.02.10(Addl.CE) 30.03.10(CE, Reve. Basis) 28.06.11 (Member, currentcharge) 24-07-12 (member)

Member Company Affairs, PDB, Dhaka.

1)Training against East ZonePower System Energyreplacement programme.

SouthKorea

1) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. See N.B.

N.B. 2) A program named "Witnessing of manufacturing process and tests of the equipment at manufacturer's works including tranfsfer of technical know-how" against Shahjibazar Power Plant (unit- 8 & 9) from12.05.2012 to 21.05.2012 in USA. 3) "Witnessing of manufacturing process & test of the equipment at manufacturers work including transfer of technical know-how" from 24.07.13 to 01.08.13 for 7 days in Amsterdam, Netherland. 4) Gas Booster Compressor Inspection against Bhola 225 MW CCPP from 24.04.14 to 02.05.14 in USA. 5) Technical orientation & Quality test witness of 11 KV switchgear Cubicles Set from 21.07.14 to 27.07.14 in China. 6) 9th Board Meeting of Bangladesh-India Friendship Power Company Limited (BIFPCL) on 26.07.14 in India. 7) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 8) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 9) factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 18.12.14 to 24.12.14 in France.

Page 2370: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,

Rajshahi,

B.Sc.Engg. (Elec.)

14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member, currentcharge) 24-07-12 (member) 04.11.13 (Chairman)

Chairman, PDB, Dhaka.

1)Transformer operation andMaintenance from 07.08.94 to17.09.94 2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07, 14days. 3) Training on Design,Supply, Installation, Testingand Commissioning of1000KW Capacity Wind MillPower Plant (WBHPP) onturnkey basis at KutubdiaIsland, cox's Bazar``Technical Orientation andQuality Test Witness from18.12.07 to 31.12.07 for 14days.

Belgium

Germany

China.

1)11 KV. Pre- Paid Metering (Sylhet)From 20.08.04 to 30.08.04 for 07 Daysin South Africa 2) Workshop Program titled "LowCarbon Power Sector DevelopmentWorkshop" which will be held on10/12/2011 to 17/12/2011 formaximum 08 (eight) days (excludingtravel period) in Washington DC,USA. 3) Inspection against Central ZonePower Distribution Project,Mymensingh from 03.07.12 to 14.07.12in USA. See N.B.

1) AproposalSent toministrydated28.05.14 toAttentCommonwealth GamesBusinessConferencefrom23.07.14 to25.07.14 inUK.

N.B. 4) A meeting with Nepal Govt. regarding import/construction of hydropower from 24-27 July/2012 in Nepal. 5) To attend a meeting with Soudi Fund against Shikalbaha 225 MW Dual Fuel CCPP from 10.09.12 to 13.09.12 in Saudi Arab. 6) "Quality acceptance Test" of 11 KV Auto Circuit Reclosure from 03.06.13 to 12.06.13 in Australia. 7) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 8) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 9) Management Meeting & Visit of Coal & Renewable Energy Based Power Plant from 18.01.14 to 23.01.14 in China. 10) seminar on Coal Based Power Plant Inspection & Investment from 20.04.14 to 26.04.14 in Japan. 11) 9th Board Meeting of Bangladesh-India Friendship Power Company Limited (BIFPCL) on 26.07.14 in India. 12) Familiarization Visit from 27.08.14 to 31.08.14 in Saudi Arabia. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Participation in the Triax Turbine Components visit from 01.10.14.14 to 07.10.14 in USA. 15) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India.

Page 2371: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0259 10.09.55 Mr. Swapan Kumar Saha,

Pirojpore,

B.Sc.Engg. (Elec.)

09.09.78 (AE) 02.08.93(XEN) 31.01.07 (SE) 28.12.10 (Addl.CE) 18.08.11 (CE) 2.1.2012 (CE) 08.01.14 (Member)

Member Distribution, PDB,Dhaka. & Member P & D, PDB, Dhaka.

1) Operation andMaintenance From 29.09.86to 07.11.86

U.K. 1) Factory Test Witness & PracticalDemonstration against Bhola DieselPower Station on Diesel GeneratingSet From 10.10.04 to 18.10.04 for 09days in USA. 2) Supply of Spares for GeneratorOverhauling of GT-1 (Lot-A) against"Witnessing of ManufacturingProcess and Tests of ConcernedEquipment at Manufacturers' Factoryfor each lot including transfer ofTechnical Know-how” for 07 days inFrance. 3) "Technical Orientation andQuality Test Witness" against 33/11KV, 16/20 MVA Power from 05.02.13 to14.02.13 in China. 4) Quality acceptance test on 11 KVACR from 20.06.14 to 26.06.14 for 7days in Australia. 5) Inspection against distributioncontrol system from 20.08.14 to26.08.14 in Singapore.

LPR09/09/14

Rajshahi

Proposed Names (Katakhali 50 MW)

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

Page 2372: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

3 1-0514 29.05.57 Mr. Sabbir SultanRajshahiB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN)

XEN, Sales & DistributionDivision-2, PDB, Rajshahi.

1) Power Generation &Distribution from 07.10.89-30.12.90

2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04)

Germany,

France,

Rajshahi

12 1-01663

22.07.75 Mr.Md.Ruhul Karim Natore B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE)

SDE Khulna PowerStation, PDB,Khulna

1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project at July/2011for 07 days in Germany.

12 1-01816

20.10.81 Mr. Md. Shahid Reza Chapainawabganj B.Sc. Engg. 05.03.2011 (AE) Mob.- 01729124506

[email protected]

AE Baghabari 171MWPower Plant, PDB,Shirajganj.

24 11-0470 01.01.63 Mr. Md. Ainal Hoque Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)

AE Sales & DistributionDivision, Barabkunda, PDB, Chittagong.

Page 2373: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

19 1-01787 21.01.85 Mr.Syed Ahmed Chapainababgonj B.Sc.Eng(Elec.) 01.06.09(AE)

AE, Chapainababgonj E/S,PDB, Chapainababgonj

Chapainababgonj

9 - - Mr. Neser Ali Diploma engg. (SAE)

SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.

2 1-01193

01.12.69 Mr. Md. Enamul Haque, Rajshahi, B.Sc.Engr.(Mech.),

19.03.98(AE) 06.10.04(SDE) 06.05.10 (XEN, Incharge) 0171-2266233

XEN(Incharge) Katakhali 50MWPeaking Power PlantConstruction Project PDB, Bogra.

1) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days in SouthKorea.

Bogra

3 1-01626

31.12.76 Mr.Md.Rabiul Islam Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 0175-1657415

SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.

1) Technical know-how andTechnology Transfer on 1.00 LacLiter Transformer Oil againstfrom Sept./09 for 07 days inIndia. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project from13.03.2012 to 20.03.2012 for 7days (excluding travel time) inChina.

Page 2374: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-01692

01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE) 0171-2561163

SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.

1) ''Managing Fuel for ReliablePower Generation'' from13.12.10 to 15.12.10 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for07(Seven) days in China.

2 1-01833

15.08.87 Mr. Md. Ahsan Habib Sirajganj B.Sc. Engg (Elect.) 04.11.10 (AE) 01711038155

[email protected]

AE Baghabari 50 MWPeaking Power PlantConstruction Project,PDB,, Pabna.

3 1-01820

06.02.85 Mr. Abdullah Al Anam Noakhali B.Sc. Engg. (Mech) 04.11.10 (AE) 01818994330 [email protected]

AE, Daudkandi 50 MWPeaking Power PlantConstruction Project,PDB, Comilla.

A proposalgoes toministrynamed"InternationaltrainingProgramon SolarEnergyTechnologies AndApplications from03.12.12 to21.12.12 inIndia.

Page 2375: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-01811

27.12.87 Mr. Nadim Reza Tangail B.Sc. Engg. (Mech) 04.11.10 (AE) 0175-6439346 [email protected]

AE, Bera 70 MW PeakingPower PlantConstruction Project,PDB, Pabna.

A proposalgoes toministrynamed"InternationaltrainingProgramon SolarEnergyTechnologies AndApplications from03.12.12 to21.12.12 inIndia.

Jamal Uddin Md. KhairulAnam Diploma Engg.

SAE Katakhali 50MWPeaking Power PlantConstruction Project PDB, Rajshahi.

Md. Amjad Hossain Diploma Engg.

SAE Barapukuria ThermalPower Plant, PDB,Dinajpur.

Md. Abul Kalam Azad Diploma Engg.

Veramara PowerStation, PDB, Kustia

9 1-01815 07.02.87 Mr. Md. Motiur Rahman Rajshahi B.Sc. Engg. (Mech) 04.11.10 (AE) 01675441000 [email protected]

AE, Directorate of Training& Career Development,PDB, Dhaka.

Page 2376: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

10 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01556559924 [email protected]

AE Directorate of Training&Career Development,PDB, Dhaka.

11 1-02025 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522 [email protected]

AE Directorate of Training&Career Development,PDB, Dhaka.

12 1-01811

27.12.87 Mr. Nadim Reza Tangail B.Sc. Engg. (Mech) 04.11.10 (AE) 01913511790 [email protected]

AE, Bera 70 MW PeakingPower PlantConstruction Project,PDB, Pabna.

13 1-01820

06.02.85 Mr. Abdullah Al Anam Noakhali B.Sc. Engg. (Mech) 04.11.10 (AE) 01818994330 [email protected]

AE, Daudkandi 50 MWPeaking Power PlantConstruction Project,PDB, Comilla.

14 1-02024 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)

AE Energy Auditing Unit PDB, Dhaka.

15 - - Mr. Md. Awlad Hossain Assistant Director Office of Controller ofAccounts & Finance,PDB, Dhaka.

Page 2377: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

16 - - Mr. Mehbub Morshed Assistant Director Directorate of Finance,PDB, Dhaka.

17 - - Mr. Foyez Ahmed Assistant Director Directorate of Finance,PDB, Dhaka.

1 1-01679

12.11.80 Mr.Muhammad BellalHossan Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE)

SDE, Dte. Of SystemPlanning, PDB,Dhaka.

1) Training on Pre-paidmetering system from18.08.08 to 29.08.08 for 10days

2) Renewable Energy andEnergy Efficiency from04.01.10 to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years)

SouthAfrica.

India.

China

2 1-01764

06.08.84 Mr. Anwarul Maruf Dhaka B.Sc.Engr(Mech.) 31.05.09 (AE)

AE, Dte. of System Planning

PDB, Dhaka.

1) Training Course on BiogasTechnology Facilities andHygiene for DevelopingCountries from 07.06.11 to18.07.11

China

Page 2378: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0937 02.01.60 Mr. Md. Shahidul Islam Kuriagram B.Sc.Engr.(Elec),01.07.90(AE) 11.11.2001(SDE) 08.02.11 (XEN)

XEN I & C, Bheramara PowerStation, PDB,Kustia.

1) Combined Cycle/Gas TurbinePower Station against"Implementation of BangladeshPower Sector Reform" from 18.06.07to 22.06.07 in U.K.

Principal

2 1-0870 15.07.64 Mr. Md. Ahsan Habib,Sirajgonj,B.Sc.Engr.(Mac.),18.2.88(AE) 18.06.2000(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)

Dy. Director (XEN),

Dte. Of Program PDB, Dhaka.

1)Training againstBaghabari 200 MW P/St.From 16.09.01 to 90 days

2)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years)

India,

China,

Principal

Page 2379: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

3 1-01334

05.03.72 Mr. Mohammad AbulKalam, Narsindi, B.Sc.Engr.(Elec.),

20.01.2000(AE) 04.08.10(SDE)

SDE, Ghorasal Power Station

PDB, Palash, Norshindi.

1) Factory witness test (EngineeringInspection) Step-up Transformers &66KV Station Switchgear aganistChandpur 150MW Combined CyclePower Station Construction Projectfrom 13.01.11 to 23.01.11 for 10days in China.

Alternate

4 1-01795

30.06.82 Mr.Md. Abu Rayhan Dinajpur B.Sc.Eng(Elec.) 31.05.09(AE)

AE (electrical), Barapukuria ThermalPower Station, PDB,Dinajpur.

“Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, OperationDivision) from August/10 for15 days

China Alternate

Page 2380: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0359 02.01.57 Mr. Khandker MaksudulHassan, Narayangonj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 11.08.09(SE, Reve. Basis) 30.03.10(SE) 2.1.2012 (Addl. CE, Incharge)

CE (Incharge), Services, PDB, Dhaka. & CE (Addl. Charge) P & D, PDB, Dhaka.

1) Electrical Power Dist. Engg.07.09.88 to 16.11.88

2) Training program on the"Design of Sub-station" atFactory of ABB From 04.09.03to 22.09.03 for 15 Days

3) Renewable Energy PolicyOption from 04.01.04 to13.01.04 in India

4) Training on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against GreaterChittagong PowerDistribution Project from25.08.07 for 10 (days)

Japan

SwedenFinlandLudbica,

Vasa.

India

Germany

1)For conducting the pre-deliveryinspection of ''Power Transformer'' in93 for 07 days in India. 2) For conducting the Model Test on''Protection Design" before approvalthe Drawing from 1998 for 07 days inChina. 3) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for 07(seven) days in China.

Principal

2 1-0831 30.12.64 Mr. S.M. Wazed Ali Sarder , Naogaon,B.Sc.Engr.(Elec.),18.2.88(AE) 21.11.99(SDE) 10.02.09 (XEN, In-charge), 20.01.10 (XEN, rev.)

Manager (XEN),

Syedpur 20MW GTPower Station PDB, Syedpur.

1) Power Station Operation& Maintenance from 29,September/94 to 29,December/94

2) Power Station Operation& Maintenance fromApril/2000 to 29, April/2000

Japan

France

1) Basic Engineering Drawingagainst Chandpur 150MW CombinedCycle Power Station ConstructionProject from 28.07.10 to 11.08.10 for15 days in China. 2)Chandpur 150MW Combined CyclePower Station Construction Project,a Training Program named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for 12(Twelve)days in China. 3) Approval of "ConstructionDrawings" aganist Sylhet 150MWCombined Cycle Power PlantConstruction Project March/11 for08(Eight) days in China.

Alternate

Page 2381: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2382: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,

Rajshahi,

B.Sc.Engg. (Elec.)

14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member)

Member, P & D, PDB, Dhaka.

1)Transformer operation andMaintenance from 07.08.94to 17.09.94

2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07,14 days. 3) Training on Design,Supply, Installation, Testingand Commissioning of1000KW Capacity Wind MillPower Plant (WBHPP) onturnkey basis at KutubdiaIsland, cox's Bazar``Technical Orientation andQuality Test Witness from18.12.07 to 31.12.07 for 14days.

Belgium

Germany

China.

1)11 KV. Pre- Paid Metering (Sylhet)From 20.08.04 to 30.08.04 for 07Days in South Africa 2) Workshop Program titled "LowCarbon Power Sector DevelopmentWorkshop" which will be held on10/12/2011 to 17/12/2011 formaximum 08 (eight) days (excludingtravel period) in Washington DC,USA.

Principal

2 1-0511 01.07.55 Mr. Udoy Shakher Datta

ChittagongB.Sc.Engg. (Elec.)31.03.83(AE) 01.02.92(SDE) 21.01.03(XEN) 04.09.2011 (SE, Incharge)

SE (Incharge)

O & M Circle (West) Chottometro, PDB,Chittagong.

1) HV Sub-Station VBL100Batteries andChargerVSE300,Short circuitStrength,Earthing,InternalLighting Protection.

2) Factory Test Witness &Orientation of Gas InsulatedSwitchgear Against 7th132/33KV & 21st 33/11 KVSub-Station Rehabilitationfrom 15-02-07 for 14 daysGermany.

Germany& Hanau,

Germany

1)400 Nos. 12 Meter Steel Pole (270DAN) & 100 Nos. 12 Meter Steel Pole(550 DAN) 14.04.07 to 22.04.07 for07 days In China.

Principal Kalurghat

3 1-01630

17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)

SDE Energy Auditing Unit PDB,Dhaka.

1) "Foreign Trainingprogram" from 07.09.09 to20.09.09 for 14 days.

China. Principal

Page 2383: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-0778 13.09.61 Mr. Md. Motiur Rahman, Kustia, B.Sc.Engr.(Mech.),

30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, Current Charge)

23.04.09(XEN)

XEN,

Sales & Distribution

Potia, PDB, Chittagong.

1)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years)

China, 1)Preshipment Inspection on TwistType Wire Seal From 15.8.02 to 20.8.02in USA.

2) Inspection on 01.09.03 to 10.09.03in Germany.

Alternate Pathoregata

5 1-01422 31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Design & Inspection -2 PDB,Dhaka.

1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04 for06 Weeks

China Alternate

6 1-01423 12.01.73 Mr. S.M. Zahid Hasan, Naugaon, B.Sc.Engr.(Mech.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Design & Inspection -1 PDB,Dhaka.

1) Training on GreaterChittagong PowerDistribution Project Against132/33KV Gas "Control Panel"for 25.11.07 to 10.12.07 for 14days.

2) Administration ofEnvironmental and socialconsideration process forimplementation from18.05.08 to 31.05.08 for 15days 3) DAAD (Scholarship)Humboldt against "ProjectCycle Management" from17.08.09 to 11.09.09.(Selfarranged)

China.

Japan

Germany

1) Factory Witness Test (EngineeingInspection) against Faridpur 50MWPeaking Power Plant ConstructionProject from October/10 for 08 days inNorway.

Alternate

Page 2384: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Proposed Names

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0120 27.07.52 Mr. A.S.M. Alamgir Kabir

Faridpur

B.Sc.Engg. (Elec.)

10.01.76(AE) 18.06.85 (XEN) 07.10.2002(SE) 05.04.06(CE Addl. CE) 05.12.06 (CE) 05.011.07 MemberDistribution (Incharge) 12.11.07 (MemberDistribution ) 06.04.09(Chairman Addt.Charge) 22.04.09 (Chairman,Incharge) 22.06.09 (Chairman) 19-07-09 (Chairman,Contract) 26-07-10 (Chairman,Contract) 26.07.11 (Chairman,Contract)

Chairman

PDB, Dhaka.

i)Greater Dhaka Power Dist.Project From 05.11.79 to20.2.80

ii)Electricity Tariff From 6.6.92to 10.12.92

iii) Training on ''Publicprivate partnership stratigiesfor 12 days, August/07"

UK

Japan

USA

i) Inspection for 06 days, June/08 inIndia. ii) GTZ & Kfw 05.07.09 to 12.07.09 inU.K & Germany. iii) 3rd Japan-SAARC EnergySymposium on "Promoting EnergyCooperation in South Asia" from06.01.10 to 14.01.10 in India. iiv) NTPC from 28.08.10 to 29.08.10 inIndia. v) Visit to India from 21.12.10 to24.12.10 vi) Visit to USA from 12.10.10 to24.10.10 vii) Visit to Japan from 01.12.10 to07.12.10 viii) Visit to USA from 15.07.11 to29.07.11 iX) * See N.B.

Page 2385: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

iX) N.B. *Meetings-1) "SAARC Chief Commissioner's Meeting from 17.11.09 to 22.11.09 in India. 2) Meeting of SASEC Energy Working Group organized by ADB from 21/10/2011 to 22/10/2011 for 2 (two) days in Thailand. 3) Meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 4) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 5) Meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. * Road Show- 1) Road Show from 13.12.09 to 18.12.09 for 06 days in UK. 2)Road Show to attract the foreign investors from 24.01.10 to 03.02.10 in Singapore & USA * Seminar/Conference-1) 6th Annual Conference FLNG 2011 from 14.06.11 to 16.06.11 in U.K 2) Investor Seminar on "Joint Steering Committee(JSC)" for 4 days in India from 28.02.2012 to 2.3.2012 * Workshop- 1) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 13.04.2012 to 27.04.2012 in USA.

2 1-0233 23.08.54 Mr. Md. Abdul Wahab Khan,

Mymensingh,

B.Sc.Engg. (Mech.)

01.03.78 (AE) 02.07.90 (XEN) 13.08.05 (SE) 19.05.09(Addl. CE) 22.05.10 (CE) 31-03-11 (Member)

Member Distribution, PDB,Dhaka.

1) Design, Specification andEquipment Maintenancefrom 01.01.87 to 31.08.87 2)Training on TQM from23.01.05 to 19.02.05

U.K.

Japan

1)Pre-Shipment Inspection Of GasFired Boiler For Aricha PC Pole From22.10.2001 to 8 days In U.K. 2) International Convention onQuality Control Circles (ICQCC) underImplementation of BangladeshPower Sector Reform from 23.10.07 to27.10.07 for 05 days in China.

G.O. issueddated29.01.2012 inorder toattendworkshoptitled"ExecutiveExchange onbestPractices inPower PlantOperations&Maintenance" from14.04.2012 to25.04.2012 inUSA. (Can'tgo)

2 1-0370 31.12.56 prl

Mr. Md. Nurul AminChowdhury, Chittagong,B.Sc.Engg. (Mech.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 07.01.10 (SE, Reve. Basis)

Addl CE (incharge) Attach to Member P & D,PDB, Dhaka.

1) Design, Manufacture O &M of Hydro TurbineGovernors 12.05.87 to 11.08.87

2)Traning on Gas TurbinePower Station Against Tongi80 MW From 24.07.04 To22.08.04 Three Month (Bondfor 03 Years from 24.07.04 to22.08.04)

Japan

China,

1) "Witnessing of ManufacturingProcess & test of the Equipment atManufacturer’s works including ofTechnical know-how” aganist Firstshipment for the Second UnitEquipment (U-5) from 09.01.2010 to18.01.2010 in Japan. 2) Training Hydro Turbine(Mechanical) aganist Kaptai HydroPower Plant (Unit-3) from 01.10.08 to30.10.08 for 30 days in Italy

Page 2386: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0428 09.10.56 Mr. Md. Abdur Rouf Rajshahi,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 29.01.15 (Addl. CE, Incharge) 28.07.15 (CE)

CE Civil Works, PDB, Dhaka.

1) Seminar for Trainers from08.06.87 to 19.06.872) Training Managementfrom 08.01.90 for 24 Weeks. 3) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13

Thailand

U.K.

Thailand

1)Pre-Pament Metering System From20.08.04 for 07 Days in South Africa 2) Technical orientation & qualitytest witness on 25 Nos.- 33 KV ACRfrom 11.12.13 to 19.12.13 in SouthKorea. 3) Quarterly Reconciliation from08.01.15 to 10.01.15 in India.

1 1-0367 11.08.56 Mr. Prahlad Chandra Saha,

Manikganj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 06.12.10 (SE) 30.06.2014(Addll. CE) 01.10.14 (CE)

CE Company Affairs, PDB,Dhaka.

1) Training of Trainers.

July'86 for 03 (three) Months.

France 1) ''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina. 2) Deputation for participation onChina -Asian Clean Energy Forumfrom 26.08.14 to 31.08.14 in China.

1 1-0402 30.10.56 Mr. Saiful Islam Khan,

Satkhira,

B.Sc.Engg. (Elec.)

09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 12.04.2011 (SE) 17.02.15 (Addl. CE) .04.2015 (CE)

CE (PD)

Bibiana-3 Power PlantConstructionProject,PDB,Sylhet. & CE (Addl. Charge) Private PowerGeneration (IPP/PPP),PDB, Dhaka.

I) Electric Power DistributionEngineering From 07.09.87 to20.11.87 2) Training. Double TariffSocket Type Programmableconsumer meter with socket,(9 Town Project) May/2006 for10 days

Japan

USA

1)Factory Test Witness From July,2001 for 03 days, In India on LoadBreak Switch. 2) Factory Test Witness from Feb,2004 for 05 Days In Switzerland 3)Training on Technical know-how in400 Sets 11KV Load Break Switchfrom Oct/2006 for 07 days in China.

4) Inspection on the Power Plantsequipment and machineries of JV ofFujian Longking Co. Ltd. & DhakaWest Power Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued, butvisit not yet done) 5) Visited manufacturer's Factoryagainst 52.5 MW power Plantcontruction project, Katpotti,Munshiganj from 14.10.12 to 21.10.12in South Korea. 6) Technical orientation & qualitytest witness of 11 KV GIS from08.11.14 to 14.11.14 in Germany.

A proposalsent toministrydated27.07.15 forwitnessingofmanufacturing processagainstChittagongPowerStation from12.08.15 to18.08.15 inChina.

Page 2387: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Proposed Names

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0241 10.11.54 Mr. Md. Abul Quasem,

Dinajpur,

B.Sc.Engg. (Elec.)

23.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,)

Member Company Affairs PDB, Dhaka.

1)Analysis and Protection ofPower System from 31.03.2003to 09.05.2003

England 1) Factory Test Witness of 11 KV.Capacitor Bank & Accessories From07.04.04 To 11.04.04 in India. 2)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina 3) Training Rehabilitation of GT #8of Shahijibazar Power Station from29.11.07 to 05.12.07 for 07 Days, AbuDhabi 4) See N.B.

* N.B.- 4)Inspection on Power Plant arrange by Khulna Power Company & Summit Power Company from 10.06.10 to 12.06.10 in Italy 5) Participation in Combined Working Commette Group for 22.06.10 in India. 6) NTPC from 28.08.10 to 29.08.10 in India. 7) Zij R¡vjvbxwfwËK we`yy¨r †K› ª̀mg~‡n R¡vjvbx mieivn wbiew”Qbœ I wbwe©Nœ ivLvi j‡¶¨ fviZ †_‡K †jv‡Kv‡gvwUf I U¨vsK IqvMY fvov/jxR MÖnY cÖm‡½ AvMvgx †g, 2011 gv‡mi wØZxq mßv‡n A_ev hvÎvïiæi ZvwiL n‡Z 07 (mvZ) w`‡bi Rb¨ fviZ| 8) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excluding travel time) in South Korea. 9) Travel India from 25.09.2011 to 29.09.2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plantin Khulna. 10) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 11) Seminar on "Joint Working Group (JWG)" for 4 days in India from 26.02.2012 to 29.2.2012

Page 2388: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)

Director(SE) IPP Cell-3, PDB, Dhaka.

I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)

2)Training on PowerEngineering andManagement from 09.05.04 to22.05.04

U.K.

Korea

1)Pre-Payment Meter & VendingEquipment From 25.11.06 to 01.12.06for 07 (days) in England 2) “Technical Orientation and QualityTest Witness” on Four Level SecuritySeal & Accessories from 18.02.10 to23.02.10 for 05 days in India. 3) Inspection on machineries ofHundai Heavy Industries Co. Ltd forestablishing IPP Power Plant atGaptali, Mirpur, Dhaka from 24July/2011 for 05 (five) days (excludingtravel time) in South Korea.

Proposed NamesSL.NO. ID No. Date of

BirthName, Dist, Qualification

and Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments

1 1-0373 17.08.57 Mr. Shamsul Hasan Miah,Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE, Rev.) 28.12.2010 (SE)

CE (Addl. Charge) Private PowerGeneration (IPP/PPP) & Director (SE),

IPP Cell-1,

PDB, Dhaka.

1) ComputerApplication.09.07.84 for 08(eight) weeks.

2)Project and Financing From01.9.03 to 10.9.03

Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K., Finland& USA 3) 25.9.2001 to 26.9.2001Singapore 4) 330-450MW Combined Cycly PowerStation Project from 21.04.08 to23.04.08, 03 days in Singapore. 5) Inspection on Power Plant aganisDesh Energy Ltd. from 10.06.10 to12.06.10 in China. 6) convention on "InvestmentOppertunities in Bangladeshi PowerSector" in India from 26.02.2012 to01.03.2012.

Page 2389: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0584 12.03.61 Mr. Md. Kausar Ameer Ali

Bogra

B.Sc.Engg. (Elec.)

09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)

CSO SE (Incharge) Office of the Chairman PDB, Dhaka.

1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000

2) Trouble shootingprograming energy meterfrom 21.08.04 to 10.09.04

3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)

India,

U.S.A

USA

1) FAT on Pre-Payment Metering. 05days in South Africa.Jan/07 2) Inspection June/08 for 06 days inIndia. 3) Energy Meter on “TechnicalOrientation & Quality Test Witness”16.11.09 for 10 days in Singapore. 4) See N.B.

4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actualjourney (excluding journey time) in Singapore.

2 1-0511 01.07.55 Mr. Udoy Shakher Datta

ChittagongB.Sc.Engg. (Elec.)31.03.83(AE) 01.02.92(SDE) 21.01.03(XEN) 04.09.2011 (SE, Incharge)

SE (Incharge)

O & M Circle (West) Chottometro, PDB,Chittagong.

1) HV Sub-Station VBL100Batteries andChargerVSE300,Short circuitStrength,Earthing,InternalLighting Protection. 2) Factory Test Witness &Orientation of Gas InsulatedSwitchgear Against 7th132/33KV & 21st 33/11 KVSub-Station Rehabilitationfrom 15-02-07 for 14 daysGermany.

Germany& Hanau,

Germany

1)400 Nos. 12 Meter Steel Pole (270DAN) & 100 Nos. 12 Meter Steel Pole(550 DAN) 14.04.07 to 22.04.07 for07 days In China.

Principal Kalurghat

3 1-0626 03.05.59 Mr. Md. Moazzam HossainDewan, Naogaon, B.Sc.Engr.(Elec.),

26.05.85(AE) 09.01.95(SDE) 09.03.04(XEN)

XEN, Distribution Division-1 10- Town PowerDistribution Project PDB, Rajshahi.

1) 230 KV Grid Sub-stationOperation and MaintenanceFrom April/1993 toSeptember/1993

SouthKorea &Germany

1) Pre-shipment Inspection against33KV ACSR Grossbeak-452.40Km &33KV ACSR Merlin-346.80Km. And33KV ACSR DOG Conductor-2675.60Km form 01.09.08 to10.09.08 for 10 days in China.

Principal Rajshahi P

Page 2390: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-01185

21.11.66 Mr. Md. Tofazzal HossainPramanik, Bogra, B.Sc.Engr.(Mech.),

14.12.97(AE) 27.04.04(SDE) . XEN( Incharge)

XEN (RE) Incharge Sales & DistributionDivision PDB, Natore.

Orientation & Technical Training onCurrency Transfer System From14.03.05 for 7 days in India &Malaysia.

Principal Pabna

5 1-01630

17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)

SDE Energy Auditing Unit PDB,Dhaka.

1) "Foreign Trainingprogram" from 07.09.09 to20.09.09 for 14 days.

China. Principal

6 1-01422

31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Design & Inspection -2 PDB,Dhaka.

1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04for 06 Weeks

China Alternate

7 1-01423

12.01.73 Mr. S.M. Zahid Hasan, Naugaon, B.Sc.Engr.(Mech.),

05.03.2000(AE) 25.06.09(SDE)

SDE, Design & Inspection -1 PDB,Dhaka.

1) Training on GreaterChittagong PowerDistribution Project Against132/33KV Gas "ControlPanel" for 25.11.07 to10.12.07 for 14 days. 2) Administration ofEnvironmental and socialconsideration process forimplementation from18.05.08 to 31.05.08 for 15days 3) DAAD (Scholarship)Humboldt against "ProjectCycle Management" from17.08.09 to 11.09.09.(Selfarranged)

China.

Japan

Germany

1) Factory Witness Test (EngineeingInspection) against Faridpur 50MWPeaking Power Plant ConstructionProject from October/10 for 08 daysin Norway.

Alternate

8 1-0965 01.06.61 Mr. B.M. Jahangir,Shariatpur,AMIE(Elec.),30.8.86(SAE) 02.03.93(AE) 12.07.02(SDE) 03.08.10 (XEN Rev.)

XEN Sales & DistributionDivision, Barabkunda, PDB, Chittagong.

1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 foro One Month 2) "Orientation &Manufacture's Test Prossesat Manufacture's Workshop"from 21.04.08 to 30.04.08for 10 days.

China,

CzechRepublic

Alternate Comilla

Page 2391: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

9 1-01097

10.01.67 Mr. Md. Fafuk Ahmed,

Munshigong, B.Sc.Engr.(Mech),

19.07.94 (AE) 01.07.03 (SDE) 24.09.09 (XEN Incharge) 18.08.2011 (XEN)

XEN Distribution Division, PDB, Tangail.

1) Inspection on 11 Meter Steel Pole(350 daN-500 Nos.) "Type Testinaddition to Factory Test" from24.01.08 to 30.01.08 for 07 days inChina.

Alternate Tangail

10 1-01819

11.10.85 Mr. Md. Moktar Hossain Chapainawabganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722044335 [email protected]

AE, Under CE DistributionZone, PDB, Rangpur.

Alternate

1 1-0428 09.10.56 Mr. Md. Abdur Rouf Rajshahi,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 29.01.15 (Addl. CE, Incharge) 28.07.15 (CE)

CE Civil Works, PDB, Dhaka.

1) Seminar for Trainers from08.06.87 to 19.06.872) Training Managementfrom 08.01.90 for 24 Weeks. 3) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13

Thailand

U.K.

Thailand

1)Pre-Pament Metering System From20.08.04 for 07 Days in South Africa 2) Technical orientation & qualitytest witness on 25 Nos.- 33 KV ACRfrom 11.12.13 to 19.12.13 in SouthKorea. 3) Quarterly Reconciliation from08.01.15 to 10.01.15 in India.

3 11-0053 04.09.56 Mr. Fozal Ahmed Chowdhury

Sylhet Diploma(Power)

21.08.78(SAE), 28.04.04(AE), 10.02.10(SDE) 02.03.14 (XEN, Incharge)

XEN (Incharge) CERS, PDB, Tongi.

1) Technical orientation & qualitytest witness from 13.06.15 to 19.06.15in China.

Page 2392: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0371 14.06.57 Mr. A.B.M. Mizanur Rahman,

Magura,

B.Sc.Engg. (Mech.)

21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 06.12.10(SE) 30.06.14(Add. CE) 01.10.14 (CE) 15.01.15 (Member)

Member Distribution, PDB,Dhaka.

1) Electric Power Engineering.23.05.97 to20.06.97 2) PSCDP Training on"Contract Management(Batch-2)" from 11.11.13 to22.11.13

SouthKorea

Thailand

1) Factory acceptance test of Gasturbine against Shahjibazar 330 MWCCPP Project from 18.12.14 to 24.12.14in France. 2) Witnessing & manufacturingprocess against Syedpur 20 MW P/Sfrom 12.07.15 to 18.07.15 in USA. 3) Quality test witness against Chitt.zone power dist. dev. project from 18-24 March/2016 in India & China

2) Aproposalsent toministrydated29.07.15 forTechnicalOrientation& Qualitytest witnessof PT from20.08.15 to26.08.15 inGermany.

1 1-01350

13.02.73 Mrs. Mosammat JarifaKhatun, Jhinaidah, B.Sc.Engr.(Elec.),05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 01715000611 [email protected]

Dy.Director (Incharge), Dte. Of systemPlanning, PDB,Dhaka.

1) Masters Degree has beenobtained on "RenewableEnergy" from "Olden BurgeUniversity, Germany" from04.08.08 to 29.08.08 (e¨w³MZ

D‡`¨v‡M wM‡qwQ‡jb) 2) "Policies and Strategies toMitigate Climate Change andEnergy Poverty in Southeastand China from 05.10.09 to09.10.09 for 06 days

Germany

Vietnam

1) Inspection of Copper TerminalLugs in Kolkata From 23.12.04 to30.12.04 for 07 Days. 2) South Asia Women in Energy(SAWIE) Partnership Program-Participation in the XXIst WorldEnergy Congress from 12.09.10 to16.09.10 in Canada. 3) Asia-Pacific Renewable EnergyPolicy against InternationalRenewable Energy Agency (IRENA)-Korea from 14.10.10 to 15.10.10 for02 days in Korea.

Principal

Page 2393: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-01679

12.11.80 Mr.Muhammad BellalHossan Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE)

SDE, Dte. Of SystemPlanning, PDB,Dhaka.

1) Training on Pre-paidmetering system from18.08.08 to 29.08.08 for 10days

2) Renewable Energy andEnergy Efficiency from04.01.10 to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years)

SouthAfrica.

India.

China

Alternate

1 1-0751 23.09.63 Mr. Md. Ashraful Islam,

Naogaon, B.Sc.Engr.(Mech.),

30.08.86 (AE) 019.03.98(SDE) 05.01.06 (XEN, CurrentCharge) 09.12.07(XEN, Rev.) 23.04.09(XEN)

XEN,

Sales & DistributionDivision-1 PDB,Rajshahi.

1) Techinal Orientation onSplit Bolt Line TapeConnector G-452. 07 Days,January/06,

India. Principal Rajshahi

2 1-01261

11.03.70 Mr. Shekh Firoz Kabir Satkhira B.Sc.Engr.(Elec.),

10.06.99(AE),

26.07.05(SDE), 10.03.11 (XEN Incharge)

XEN(Incharge), Distribution Division-2(South), PDB,Mymensingh.

1)Orientation & Training againstturbine pump spares for Khulnapower station in Czech Republic for07 days,Dec/06

Principal Bogra

3 1-01673

27.09.77 Mr.Md.Mahbubul AlamChowdhury Naogaon B.Sc.Eng(Computer) 06.2006(AE) 18.08.2011 (SDE)

SDE, Sales & DistributionDivision-1, PDB, Pabna

1) Central Zone Power DistributionProject, a "Technical Orientationand Quality Test Witness" Programnamed of 11KV Capacitor Bank atApril/2011 for 07(Seven) days inChina.

Alternate Sirajgonj

Page 2394: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-01802

07.12.79 Mr. Faozul Islam Shaker Sunamgonj B.Sc.Engr(Elec.) 01.06.09 (AE)

AE, Office of the CE,Distribution Project,PDB, Dhaka.

1) Inspection on Coal Thermal PowerStation construction from 18.11.09to 24.11.09 for 07 days in India. 2) Approval of "ConstructionDrawings" aganist Sylhet 150MWCombined Cycle Power PlantConstruction Project March/11 for08(Eight) days in China.

Alternate

1 1-0359 02.01.57 Mr. Khandker MaksudulHassan, Narayangonj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 11.08.09(SE, Reve. Basis) 30.03.10(SE) 02.01.2012 (Addl. CE,Incharge) 28.06.12 (CE, Incharge) 02.06.14 (Addl. CE) 25.08.14 (CE) 07.09.14 (Member) 20.07.15 (Chairman)

Chairman BPDB, Dhaka.

1) Electrical Power Dist. Engg.07.09.88 to 16.11.88

2) Training program on the"Design of Sub-station" atFactory of ABB From 04.09.03to 22.09.03 for 15 Days

3) Renewable Energy PolicyOption from 04.01.04 to13.01.04 in India

4) Training on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against GreaterChittagong PowerDistribution Project from25.08.07 for 10 (days)

Japan

SwedenFinlandLudbica,

Vasa.

India

Germany

1)For conducting the pre-deliveryinspection of ''Power Transformer'' in93 for 07 days in India. 2) For conducting the Model Test on''Protection Design" before approvalthe Drawing from 1998 for 07 days inChina. 3) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for 07(seven) days in China. See N.B.

N.B.4) A workshop titled "Cross Border Electricity Interconnection" from 23.05.2012 to 24.05.2012 in Bhutan.5) "South Asia Power Forum in India 2013" from 02.12.13 to 03.12.13 in India6) Factory witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 25.06.14 to 01.07.14 in Germany.7) Technical orientation & quality test witness against SCADA Project from 18.01.15 for 10 days in NewZealand, Australia & Singapore.

Page 2395: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0429 23.04.56 Mr. Nurul Karim,Chittagong,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN)

XEN,

System Protection &Testing Commisioningcell, Office of CE,Services PDB, Dhaka.

(SE Coal Project, Khulna)

1) Scada System Soft &Hardware from 28.11.88 for14.03.89

2) 33/11KV Power TransformerFrom May/03 for 14 Days 3) GIS From 15.06.04 for 11Days

4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India& Malaysia.

U.K.

Iran

Germany,

India &Malaysia

1) 14.4.2001 to 19.4.2001 for 06 days inIndia. 2)Factory Test Witness & OrientationTraining on Greater Chittagong PowerDistribution Project, ''PowerTransformer'' from July/06 for 14 daysin China.

SL.NO. ID No. Date ofBirth

Name, Dist, Qualificationand Date of Joining

Place of Posting Field of Training & Duration Country Inspection Comments

1 1-0765 17.11.58 Mr. Md. Arifur Rahman,

Bogra, B.Sc.Engr.(Elec.),

19.05.86(AE) 21.11.99(SDE) 10.07.05(XEN)

PD (Incharge)Chapainawabganj100

MW Power PlantConstruction Project,

PDB, Chapainawabganj.(CAMP office Dhaka)

1)145KV and 36KV CT & PT(RRAGS) from 08.10.03 to

08.01.04 for 90 days

China 1) "Technical Orientation andQuality test Witness" in

August/2011 for 10 (Ten) days inChina.

2) Technical orientation & qualitytest witness on 30 Nos.- oil

Centrifuging Machine from 29.11.13to 07.12.13 in China.

3) Basic design Approval meetingfrom 21.07.15 to 04.08.15 in China.

2 1-0559 01.12.61 Mr. Mustaque Muhammad,

Comilla, B.Sc.Engr.(Elec.), 23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)

SE (addl.char)+E317 System Protection &Testing Commisioningcell,PDB, Dhaka. (Office of CE, services)

1) Advance Protection PowerSystem(APPS), from 21.03.94to 22.04.94 2) Energy Management from19.05.13 to 01.06.13

UK,

Thailand

1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 in Banglalore,India.

2) Conceptual Design Approval ofSylhet 90MW CCPP Project (2nd Unit)27.04.06 to 02.05.06, in China. 3)''Conceptual Design Approval''Sylhet 90MW CCPP (2nd Unit) 28.01.07to 08.02.07 in China 4) Approval of Engineering Data &Drawing from 08.06.09 to 17.06.09 inChina. 5) Basic Engineering review meetingfrom 16.08.13 to 27.08.13 in China. See N.B. N.B.

6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China. 7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India.

Page 2396: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2397: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

7 1-0527 01.06.57 Mr. Samsul Haque, Comilla, B.Sc.Engg. (Elec.)

24.07.81(AE) 20.07.88(SDE) 17.05.03(XEN)

XEN,

Dte. of Training &Career Develpopment PDB,Dhaka.

1) Automation System from22.10.07 to 11.11.07 for03(Weeks)

Russia

8 1-0734 02.03.60 Mr. Md. Anower Hossain,

Joypurhat, B.Sc.Engr.(Elec.),

19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)

XEN

Dte. of Training &Career Develpopment PDB,Dhaka.

1)MV Switchgear,VD4 and VBFFrom 10.11.03 for 11 Days

India 1)Orientation & Technical Trainingon 33 KV Circuit Bracer & 11 KVSwitchgear from 14.03.05 for 7 days inIndia.

deputed toBoard ofInvestment office of thePrimeministry

PDB, Dhaka.

Page 2398: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 01.01.10

Siddirgonj G 2004 02.07.09

Page 2399: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

M.Admin 2001 08.02.11

Page 2400: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2003

Page 2401: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2001 16.11.08

Page 2402: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1976

1976 1976

Page 2403: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

G 1978

Page 2404: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1994 1977

Page 2405: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 02.03.11 1977

D 02.06.10

P&D 2003 04.05.10

Page 2406: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

G 2003 02.06.10

P&D 2004 05.01.11

Page 2407: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2003 11.10.10

G 27.01.10

Page 2408: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Chandpur G 2004 06.05.10

M.Admin 2004 05.10.11

Page 2409: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 15.04.08

Page 2410: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 02.06.10

P&D 31.07.08

Chairman 1997 27.04.08

D 01.01.10

Page 2411: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Chairman 2000 08.02.11

Power St. Type Qualification Last visit Transfer Date

F 04.11.08

Page 2412: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 22.06.10

P&D 16.06.10

P&D 13.11.08

Page 2413: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2414: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2415: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Barapukuria G 24.08.09

D 06.05.10

Page 2416: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Barapukuria

G 2004 01.01.10

D 2004 07.01.10

M.Adm 23.03.10

Page 2417: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 20.12.10

D 2003 02.06.10

M.Admin 12.06.10

M.Admin 2004 09.06.10

Page 2418: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2419: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2420: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2421: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2422: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 2005 21.06.09

P&D 09.03.10

Page 2423: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Barapukuria

G 01.01.10

P&D 2005 20.12.10

Page 2424: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Sylhet G 2007 02.06.10

D 2004 05.11.08

Page 2425: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Khulna G 11.11.08

Khulna G 11.11.08

D 01.01.10

Page 2426: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D Diploma 01.10.10

Khulna G 11.11.08

D 01.01.10

Page 2427: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2428: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2429: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2430: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2001 30.12.10

Chittagong G 2007 02.03.11

Page 2431: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2004 13.01.11 1978

P&D Diploma 01.01.10

Page 2432: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Siddirgonj G

P&D 14.08.08

Ghorasal G 30.03.10 1978

Page 2433: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2434: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D

Page 2435: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 2004 09.11.08

Khulna G 11.11.08

Page 2436: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D

D 06.05.10

M.Admin 12.06.10

Page 2437: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 20.12.10

Page 2438: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2439: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2440: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 20.04.08

G 24.08.10

Page 2441: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Bheramara

G 08.02.11

P&D 2004 08.02.11

Page 2442: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

G 04.08.10

Barapukuria

G 02.06.10

Page 2443: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Chairman 2004 01.07.10

Syedpur G 03.08.10

Page 2444: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2445: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 01.01.10

P&D 15.04.08

Page 2446: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 2004 17.09.09

P&D 2004 25.06.09

P&D

Pathoregata

Page 2447: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1976

1976 1976

Page 2448: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 02.03.11 1977

Page 2449: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2450: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

G 1978

Page 2451: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

M.Admin 2004 05.10.11

IPP G 2003 30.03.10

Page 2452: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Chairman 2000 01.01.10

D 01.01.10

D 1996 14.07.08

Page 2453: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 2005 06.05.10

P&D 15.04.08

P&D 2004 25.06.09

P&D

D 2004 01.04.10

Page 2454: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

D 06.05.10

P&D Diploma 02.06.10

Page 2455: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 2004 25.06.09

Page 2456: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 20.04.08

D 02.06.10

D 01.01.10

D 31.07.08

Page 2457: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 02.06.10

Page 2458: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2459: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2460: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

M.Admin 02.06.10

2005 02.06.10

Page 2461: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2462: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2463: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2464: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2465: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2466: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2467: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2468: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2469: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2470: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2471: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2472: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2473: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2474: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2475: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2476: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2477: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2478: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2479: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2480: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2481: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2482: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2483: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2484: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2485: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2486: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2487: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2488: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2489: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2490: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2491: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2492: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2493: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2494: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2495: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2496: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2497: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2498: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2499: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2500: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2501: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2502: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2503: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2504: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2505: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2506: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2507: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2508: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2509: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2510: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2511: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2512: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2513: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2514: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2515: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2516: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2517: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2518: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2519: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2520: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2521: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2522: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2523: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2524: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2525: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2526: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2527: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2528: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2529: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2530: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2531: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2532: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2533: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2534: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2535: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2536: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2537: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2538: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2539: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2540: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2541: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2542: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2543: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2544: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2545: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2546: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2547: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2548: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2549: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2550: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2551: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2552: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2553: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2554: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2555: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2556: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2557: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2558: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2559: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2560: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2561: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2562: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2563: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2564: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2565: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2566: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2567: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2568: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2569: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2570: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2571: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2572: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2573: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2574: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2575: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2576: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2577: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2578: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2579: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2580: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2581: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2582: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2583: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2584: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2585: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2586: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2587: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2588: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2589: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2590: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2591: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2592: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2593: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2594: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2595: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2596: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2597: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2598: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2599: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2600: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2601: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2602: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2603: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2604: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2605: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2606: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2607: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2608: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2609: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2610: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2611: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2612: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2613: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2614: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2615: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2616: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2617: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2618: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2619: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2620: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2621: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2622: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2623: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2624: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2625: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2626: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2627: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2628: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2629: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2630: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2631: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2632: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2633: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2634: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2635: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2636: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2637: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2638: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2639: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2640: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2641: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2642: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2643: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2644: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2645: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2646: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2647: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2648: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2649: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2650: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2651: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2652: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2653: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2654: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2655: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2656: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2657: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2658: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2659: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2660: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2661: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2662: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2663: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2664: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2665: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2666: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2667: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2668: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2669: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2670: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2671: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2672: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2673: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2674: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2675: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2676: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2677: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2678: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2679: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2680: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2681: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2682: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2683: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2684: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2685: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2686: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2687: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2688: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2689: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2690: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2691: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2692: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2693: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2694: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2695: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2696: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2697: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2698: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2699: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2700: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2701: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2702: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2703: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2704: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2705: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2706: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2707: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2708: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2709: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2710: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2711: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2712: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2713: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2714: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2715: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2716: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2717: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2718: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2719: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2720: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2721: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2722: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2723: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2724: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2725: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2726: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2727: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2728: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2729: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2730: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2731: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2732: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2733: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2734: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2735: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2736: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2737: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2738: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2739: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2740: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2741: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2742: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2743: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2744: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2745: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2746: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2747: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2748: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2749: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2750: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2751: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2752: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2753: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2754: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2755: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2756: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2757: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2758: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2759: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2760: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2761: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2762: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2763: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2764: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2765: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2766: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2767: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2768: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2769: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2770: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2771: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2772: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2773: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2774: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2775: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2776: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2777: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2778: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2779: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2780: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2781: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2782: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2783: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2784: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2785: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2786: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2787: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2788: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2789: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2790: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2791: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2792: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2793: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2794: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2795: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2796: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2797: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2798: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2799: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2800: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2801: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2802: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2803: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2804: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2805: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2806: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2807: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2808: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2809: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2810: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2811: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2812: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2813: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2814: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2815: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2816: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2817: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2818: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2819: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2820: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2821: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2822: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2823: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2824: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2825: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2826: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2827: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2828: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2829: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2830: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2831: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2832: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2833: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2834: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2835: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2836: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2837: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2838: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2839: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2840: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2841: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2842: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2843: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2844: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2845: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2846: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2847: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2848: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2849: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2850: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2851: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2852: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2853: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2854: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2855: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2856: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2857: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2858: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2859: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2860: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2861: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2862: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2863: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2864: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2865: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2866: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2867: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2868: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2869: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2870: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2871: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2872: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2873: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2874: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2875: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2876: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2877: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2878: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2879: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2880: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2881: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2882: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2883: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2884: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2885: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2886: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2887: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2888: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2889: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2890: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2891: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2892: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2893: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2894: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2895: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2896: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2897: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2898: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2899: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2900: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2901: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2902: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2903: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2904: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2905: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2906: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2907: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2908: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2909: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2910: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2911: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2912: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2913: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2914: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2915: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2916: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2917: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2918: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2919: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2920: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2921: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2922: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2923: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2924: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2925: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2926: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2927: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2928: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2929: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2930: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2931: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2932: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2933: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2934: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2935: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2936: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2937: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2938: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2939: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2940: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2941: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2942: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2943: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2944: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2945: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2946: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2947: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2948: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2949: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2950: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2951: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2952: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2953: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2954: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2955: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2956: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2957: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2958: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2959: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2960: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2961: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2962: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2963: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2964: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2965: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2966: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2967: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2968: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2969: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2970: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2971: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2972: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2973: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2974: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2975: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2976: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2977: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2978: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2979: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2980: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2981: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2982: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2983: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2984: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2985: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2986: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2987: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2988: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2989: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2990: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2991: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2992: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2993: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2994: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2995: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2996: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2997: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2998: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 2999: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3000: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3001: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3002: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3003: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3004: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3005: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3006: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3007: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3008: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3009: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3010: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3011: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3012: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3013: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3014: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3015: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3016: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3017: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3018: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3019: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3020: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3021: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3022: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3023: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3024: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3025: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3026: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3027: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3028: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3029: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3030: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3031: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3032: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3033: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3034: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3035: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3036: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3037: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3038: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3039: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3040: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3041: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3042: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3043: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3044: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3045: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3046: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3047: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3048: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3049: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3050: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3051: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3052: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3053: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3054: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3055: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3056: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3057: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3058: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3059: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3060: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3061: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3062: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3063: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3064: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3065: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3066: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3067: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3068: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3069: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3070: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3071: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3072: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3073: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3074: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3075: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3076: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3077: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3078: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3079: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3080: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3081: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3082: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3083: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3084: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3085: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3086: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3087: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3088: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3089: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3090: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3091: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3092: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3093: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3094: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3095: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3096: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3097: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3098: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3099: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3100: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3101: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3102: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3103: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3104: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3105: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3106: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3107: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3108: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3109: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3110: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3111: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3112: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3113: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3114: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3115: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3116: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3117: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3118: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3119: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3120: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3121: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3122: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3123: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3124: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3125: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3126: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3127: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3128: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3129: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3130: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3131: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3132: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3133: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3134: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3135: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3136: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3137: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3138: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3139: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3140: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3141: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3142: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3143: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3144: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3145: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3146: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3147: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3148: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3149: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3150: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3151: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3152: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3153: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3154: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3155: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3156: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3157: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3158: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3159: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3160: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3161: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3162: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3163: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3164: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3165: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3166: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3167: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3168: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3169: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3170: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3171: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3172: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3173: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3174: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3175: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3176: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3177: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3178: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3179: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3180: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3181: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3182: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3183: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3184: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3185: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3186: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3187: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3188: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3189: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3190: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3191: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3192: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3193: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3194: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3195: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3196: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3197: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3198: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3199: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3200: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3201: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3202: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3203: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3204: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3205: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3206: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3207: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3208: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3209: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3210: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3211: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3212: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3213: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3214: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3215: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3216: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3217: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3218: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3219: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3220: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3221: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3222: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3223: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3224: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3225: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3226: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3227: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3228: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3229: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3230: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3231: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3232: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3233: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3234: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3235: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3236: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3237: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3238: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3239: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3240: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3241: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3242: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3243: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3244: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3245: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3246: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3247: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3248: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3249: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3250: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3251: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3252: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3253: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3254: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3255: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3256: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3257: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3258: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3259: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3260: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3261: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3262: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3263: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3264: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3265: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3266: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3267: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3268: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3269: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3270: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3271: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3272: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3273: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3274: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3275: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3276: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3277: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3278: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3279: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3280: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3281: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3282: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3283: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3284: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3285: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3286: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3287: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3288: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3289: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3290: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3291: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3292: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3293: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3294: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3295: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3296: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3297: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3298: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3299: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3300: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3301: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3302: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3303: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3304: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3305: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3306: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3307: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3308: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3309: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3310: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3311: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3312: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3313: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3314: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3315: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3316: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3317: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3318: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3319: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3320: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3321: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3322: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3323: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3324: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3325: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3326: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3327: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3328: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3329: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3330: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3331: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3332: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3333: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3334: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3335: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3336: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3337: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3338: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3339: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3340: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3341: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3342: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3343: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Diploma

Page 3344: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3345: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Diploma

Page 3346: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Diploma

Page 3347: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Diploma

Page 3348: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

SL.NO.

ID No. Date ofBirth

Name, Dist,Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection

1 5251 Mr. Lokman HossainMiah

13.02.14 (as memberadmin. in BPDB)

Member Administration, PDB,Dhaka.

1) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Factory witness test againstKadda 150 MW Duel Fuel PowerPlant Construction Project from30.06.14 to 06.07.14 in China. 4) witnessing of manufacturingprocess against Barishal GasTurbine Power Plant from25.11.14 to 01.12.14 in USA. 5) Factory acceptance test ofGas turbine againstShahjibazar 330 MW CCPPProject from 15.01.15 to 22.01.15in France. 6) Witnessing of manufacturingagainst Shikalbaha 60 MWPower Station from 20.03.15 to26.03.15 in Czech Republic 1) Factory Test Witness AgainstShahjibazar 330 MW CCPPProject from 25.04.15 to 01.05.15in Spain. 2) witnessing of manufacturingprocess against BaghabariPower Station from 30.06.15 to06.07.15 in UK

Page 3349: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

7) for Factory Test WitnessAgainst Shahjibazar 330 MWCCPP Project from 30.04.15 to01.05.15 in Spain. 8) witnessing of manufacturingprocess against BaghabariPower Station from 30.11.15 to6.12.15 in UK2 11-0352 16.10.57 Mr. Md. Nazrul Islam

Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE)

AE, Civil Construction-2 PDB,Dhaka.

3 Mr. Ezaz Karim

AE, PC Pole ,Chittagong PDB,Dhaka.

SL.NO.

ID No. Date ofBirth

Name, Dist,Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection

Page 3350: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0440 23.12.58 Mr. KhaledMahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE)

Member, Generation,PDB, Dhaka

1) Sub-Station Design From26.02.94 to 25.05.94

2) Training on Power Sector from09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .

4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to 23.03.13

South Korea& Japan

Japan

France

Italy

Australia

1)China in 1992

2)India in 2002

3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany.

8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.

10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. 25. 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China

1 1-0392 06.01.57 Mr. A.T.M ZahirulIslam Mojumder,

Khagrachari

B.Sc.Engg. (Civil.),

09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE) 01.10.14 (Addl. CE) 03.02.15 (CE) 13.07.15 (Member)

Member, P & D, PDB,Dhaka Peaking Power

I) Project Management From18.08.97 to 19.09.97 2)International Curse on HydroPower From 28.08.2000to14.09.2000 3)Traning On Boiler EquipmentOperation & MaintenanceAgainst 210 MW. SiddhirgongFrom 02.09.04 To one Month 4) Approval of Engineering Data& Drawing from 07.06.09 to16.06.09 for 07 days.

Sweden

Norway

Russia,

China

1)23.09.94 to 28.11.94 in India, 2) Inspection on Approval ofEngineering Data & DrawingJune/09 for 07 days in China. 3) Inspection on Coal FiredPower Station from Inspectionon Coal Fired Power Stationfrom 19.01.10 to 26.01. 10 inChina. 4) Factory Witness Test(Engineeing Inspection)against Faridpur 50MW PeakingPower Plant ConstructionProject from October/10 for 08days in Norway. See N.B.

N.B. 5) “Factory Test Witness for Balance'' (For Balance of Plant” in India and Indonesia & For Emergency Diesel Generator in Singapore) against Gopalgonj 100MWand Faridpur 50 MW Peaking Power Plant Construction Project for 07 days in India and Indonesia. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Factory Witness Test USA

Page 3351: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

SL.NO.

ID No. Date ofBirth

Name, Dist,Qualification andDate of Joining

Place of Posting Field of Training & Duration Country Inspection

1 1-0559 01.12.61 Mr. MustaqueMuhammad, Comilla,

B.Sc.Engr.(Elec.),

23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)

SE (addl.char)+E317 System Protection &Testing Commisioningcell,PDB, Dhaka. (Office of CE, services)

1) Advance Protection PowerSystem(APPS), from 21.03.94 to22.04.94 2) Energy Management from19.05.13 to 01.06.13

UK,

Thailand

1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 inBanglalore, India.

2) Conceptual Design Approvalof Sylhet 90MW CCPP Project(2nd Unit) 27.04.06 to 02.05.06,in China. 3)''Conceptual DesignApproval'' Sylhet 90MW CCPP(2nd Unit) 28.01.07 to 08.02.07in China 4) Approval of Engineering Data& Drawing from 08.06.09 to17.06.09 in China. 5) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. See N.B.

N.B. 6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China.

7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India.

Page 3352: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

2 1-0683 29.12.60 Mr. Md. Haroon UrRashid, Kishoregonj,

B.Sc.Engr.(Elec.),

30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 28.07.15 (SE) 0171-1624224

Deputy-PD Ghorasal 365 MW CCPPConstruction Project,Dhaka & PD (Addl. Charge) Bhola 225 MW PowerPlant ConstructionProject,Dhaka

1)Improvement of Operation ofElectric Power From 09.01.01 to11.02.01 2) Training on 33/11KV 2x10 MVAsub station equipment 10 days,May/2006. 3) Training on Single Phase &Three Phase Pre-payment MetersFrom 08.11.07 to 15.11.07 07 days.

4) Project Management fron 15-21December. 5) upgrading & retrofitting workfrom 03.03.14 to 16.03.14 6) Oeration & MaintenanceTraining against Bhola 225 MWPower Plant Project from 03.08.14to 09.08.14 7) Operation & MaintenanceTraining on GT & Gas Boosteragainst Bhola 225 MW CCPPProject from 14.04.15 to 28.04.15 .

Japan

Norway.

South Africa

Thailand

USA

China

France & USA

1) Inspection On 33KV insulatorfrom 04.5.02 to 11.05.02 India. 2) Inspection On 11KV HotstickJanuary/2001 for 07 days in USA.

3) "Technical Orientation andQuality Test Witness" of BucketTruck to be supplied for centralztone power distributionproject from 10-16 March, 2013in China. 4) Basic Engineering ReviewMeeting against BHOLA 225 mwccpp Project from 16 - 27August/2013 in China. 5) Detailed engineering designreview meeting on costructionof Bhola 225 MW P/Sconstruction project from10.04.14 to 21.04.14 for 14 daysin China 6) Inspection againstdistribution control systemfrom 20.08.14 to 26.08.14 inSingapore.. +H528) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9)Inspection against Ghorasal 365 MW CCPP

Construction Project Oct/2015 in Germany. 10) Inspection against against Ghorasal 365 MW CCPP Construction Project Jan/2015 4 in Germany.

Page 3353: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

3 1-0727 01.03.60 Mr. MahababurRahman, Dhaka,

B.Sc.Engr.(Elec.),

19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)

Manager (Incharge) Maintenance, 5-6Unit, Ghorasal Power Plant PDB, Palash,Narsingdhi.

1) Power Station Maintenance. December' 1987 for 9 Months

2) Practical Demonstration &Technical Training againstGhorasalPower Station from09.01.05 for 14 days.

Russia

Russia

1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project for 07 daysin Singapore. 2) Meeting on "Power PlantMaintenance Program"organized by USAID from14.11.2011 to 18.11.2011(excluding travel time) inTurkey. 3) " Witnessing ofManufacturing Process and testof the equipment ofmanufacture's works includingtransfer to technical know -how" from 16.06.12 to 23.06.12for 7 days in Russia. 4) Witnessing of manufacturingprocess and test of theequipment at manufacturer'sworks including transfer oftechnical know-how of autocontrol spares' againstGhorasal P/S from 12.03.14 to18.03.14 for 7 days in Russia. 5) Visited China against designapproval of Ghorasal 365 MW.Power Station ConstructionProject.Visited China againstdesign approval of Ghorasal365 MW. Power Station Construction Project.

Visited China against designapproval of Ghorasal 275 MW.Power Station ConstructionProject.

4 1-01083 15.01.70 Mr. Md. ZahurulIslam Bhola, B.Sc.Engr.(Elec.),

19.07.94(AE) 03.02.03(SDE) 18-08-11 (XEN) 0174-8720214

XEN, Ghorasal PowerStation. PDB, Palash,Narsingdhi.

1) Operation & Maintenance ofGenerator from 18.03.13 to29.03.13

India 1) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15to 13.04.15 in China. 2) Visited Chaina on Designapproval against Ghorasal 365MW. Power Station Project. Dec/2015

Page 3354: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

5 1-01529 16.12.74 Mr. Noore AlamSiddiqui, Pabna, B.Sc.Engr.(Civil.),

29.04.2001(AE) 13.06.11 (SDE) 15.11.13 (XEN,Incharge)

Deputy Director (XEN)Incharge, Design andInspection-3 PDB, Dhaka.

1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07(Seven) days in China. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Examine & Discussion onbasic design of Kadda 150 MWDuel Fuel Power PlantConstruction Project from22.06.14 to28.06.14 in China. See N.B.

1 1-0566 31.01.61 Mr. Md. MustafizurRahman, Bogra, B.Sc.Engr.(Elec.),

09.10.84(AE) 18.03.93(SDE) 02.01.05(XEN) 31-03-14 (SE)

Senior System Analyst Dhaka ComputerCentre PDB, Dhaka.

1) Training on Maintenance ofH.T. Switchgear from 30.12.86 to26.04.87 2) Training on VHF EquipmentOperation & Maintenance from15.11.09 for 30 days.

Russia

New Zealand

1) Inspection on CFL Bulbagainst Efficient Lightinginitiative for Bangladesh(Phase-1 & Phase-II) fromJuly/10 for 05 days in China. 2) Attending a program ofPower Division named"Management of PPP" from11.11.12 to 25.11.12 in Malaysia.

3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland 4) technical orientation &quality test witness againstSCADA Project from 2015 10 daysin Singapore..

Page 3355: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN) 31.03.14 (SE)

Director (SE)

Dte. Of Training &Career Develpopment PDB, Dhaka.

1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Design planningon Power Construction 01(one)month in 2004 3) Training on O & M of Pre-payment Metering from 09.11.07to 15.11.07 for 07 days.

Newzeland

Russia

South Africa

1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland. 5) Technical Orientation &Quality Test Witness from10.11.15 to 17.11.15 in China against Ctg. Power DistributionProject

A294

Page 3356: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0440 23.12.58 Mr. KhaledMahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE)

Member, Generation,PDB, Dhaka

1) Sub-Station Design From26.02.94 to 25.05.94

2) Training on Power Sector from09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .

4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to 23.03.13

South Korea& Japan

Japan

France

Italy

Australia

1)China in 1992

2)India in 2002

3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.

* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.

10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. A66 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China

Page 3357: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0373 17.08.57 Mr. Md. ShamsulHassan Miah,Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 28.12.10 (SE) 25.08.14 (Addl. CE) 19.11.14 (CE) 18.01.15 (Member)

Member Company Affairs

PDB, Dhaka.

1) Computer Application.09.07.84for 08 (eight) weeks.

2)Project and Financing From01.9.03 to 10.9.03

Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K.,Finland & USA

3) 25.9.2001 to26.9.2001Singapore 4) 330-450MW Combined CyclyPower Station Project from21.04.08 to 23.04.08, 03 days inSingapore. 5) Inspection on Power Plantaganis Desh Energy Ltd. from10.06.10 to 12.06.10 in China. * See N.B.

N.B. 6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 26.08.15 to 30.08.15 in UK. a

Page 3358: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

6 1-01616 10.12.82 Mr.Ashiq Imran Barisal B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN,Incharge)

XEN (Incharge), Design & Inspection-1, PDB,Dhaka.

1) Supply & Retrofitting on-lineMachinery Protection &Management System from11.10.09 to 05.11.09 for 26 days. 2) "Training for 2 Engineers ofBPDB at GE facility" againstRangpur 20 MW Power Plant from26.04.14 to 11.05.14

Bahrain

USA

1) Basic Design Review againstThohazari 100MW PowerStation Construction Projectfrom October/10 for 07 days inChina. 2) Engineering review meeting(Basic Design & Drawing)against Shikalbaha 225 MWDuel-Fuel CCPP Project from16.11.14 to 27.11.14 in India. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15to 13.04.15 in China. 4) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from Sep/2015 in China. 5)Preliminary Design &Drawing against GhorasalRepowering Project Feb/2016in China

2 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN)

Director (SE)

Dte. Of Training &Career Develpopment PDB, Dhaka.

1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Design planningon Power Construction 01(one)month in 2004 3) Training on O & M of Pre-payment Metering from 09.11.07to 15.11.07 for 07 days.

Newzeland

Russia

South Africa

1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland.

Page 3359: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 1-0887 15.08.61 Mr. Mirza Md.Kamruzzaman, Tangile,AMIE(Elec.),25.8.84(SAE) 10.09.89(AE) 18.06.2000(SDE) 31.10.13 (XEN)

XEN Energy Auditing Unit,PDB, Sylhet.

1) “Technical Orientation andQuality Test Witness” on BarCoded Plastic Seal &Accessories for 05(Five) days inBrazil. 2010

5 1-01975 18.07.83 Mr. Md. Abdullah AlMamun Sardar Rajshahi B.Sc. Engg. (Elect.) 02-10-11 (AE) 01717853702

[email protected]

AE

Sales andDistribution DivisionHathazari, PDB,Chittagong.

6 1-01973 10.06.83 Mr. Faizul Alim Alo Coxs'Bazar B.Sc. Engg. (Elect.) 02-10-11 (AE) 01818143143

[email protected]

AE (RE) Chokoria E/S, PDB,Cox'sBazar.

7 1-02007 03.12.79 Mr. Md.Asaduzzaman Chuadanga B.Sc. Engg. (Elect.) 02-10-11 (AE) 01714443173

[email protected]

AE, Sales & DistributionDivision Mohra, PDB,Chittagong.

8 1-01953 01.07.86 Mr. Shakil Md.Nahid Noakhali B.Sc. Engg. (Elect.) 02-10-11 (AE) 01757019597

[email protected]

AE, Sales & DistributionDivision-3 PDB, Comilla.

ID No. Date ofBirth

Name, Dist,Qualification and

Date of Joining

Place of Posting Field of Training & Duration Country Inspection

Page 3360: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-0816 10.01.62 Mr. Md. KamrulAhsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, CurrentCharge) 10.02.10 (XEN)

Dy. Director(XEN),

Director of Trainingand Career Development

PDB, Dhaka. & PD Dhaka West 108 MWHFO Power PlantConstruction Project,Bosila, Keraniganj.

1) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13

Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plantfrom 14.12.10 to 22.12.10 for 07days in Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Technical orientation &Quality test witness fromNov/15 in China

2 1-01177 01.09.68 Mr. Ahmed JahirKhan, Potuakhali, B.Sc.Engr.(Mech),

14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)

Dy. Director (Incharge) Renewable Energyand Researche &PlanningDevelopment Project,PDB, Dhaka .

Training against Shalna Projectfor 45 days in China Sep/2015

Russia

Australia

India

1) Workshop on RegionalCooperation in sedimendmanagement in Hydro powerproject from 16.06.09 to 17.06.09for 02(Two) days in Nepal. 2) Training course on Bio-gastechnology form 22.06.09 to16.08.09 in China. 3) Solar Power Plant "TestWitness" from October/10 for07 days in China. * See N.B.

* N.B. 4) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep/2011 for 07 days or from the date of in Newziland 5) A program named "Carbon Capturing & Destroy" from 26.02.2012 to 29.02.2012 in Singapore. 6) Summit named "Uncover LNG infrastructure, supply chain & trade developments" from 27.03.2012 to 30.03.2012 in Singapore. 7) A program titled "Climate Change and Renewable Energy" from 10.08.2012 to 28.08.2012 in USA.

SLno

ID No. Date ofBirth

Name, Dist,Qualification and

Date of Joining

Place of Posting Field of Training & Duration Country Inspection

Page 3361: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

1 1-01611 02.12.77 Mr. MohammedHedhayetullah Khan

Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN,Incharge)

XEN (Incharge) Dte. of Desigan &Inspection-2 PDB,Dhaka.

1) Training on ''Operation &Maintenance of Gas Turbine inFrance 01.12.07 to 14.01.08 for 1.5Months & ''Operation &Maintenance of CCPP in Chinafrom 19.07.07 to 17.08.07 for 01Month against 90 MW SylhetCombined cycle Power Station(Unit-2) Cons. Project (Bond for03 Years) 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .

France &China

Singapore

1) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) Test Witness" against 33/11KV, 16/20 MVA Power from05.02.13 to 14.02.13 in China. 3) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV GIS from 02.12.13to 05.12.13 in Germany.

2 1-01349 12.05.72 Mr. A.N.M. TariqueAbdullah, Comilla,

B.Sc.Engr.(Chemical.),05.03.2000(AE) 18.08.2011 (SDE) 25.10.11 (XEN,Incharge) 18.06.15 (XEN)

Dy. Director (XEN)

Dte. of Purchase, PDB,Dhaka.

1) "Renewable Energy" from01.06.13 to 30.06.13

Thailand 1) 'Developments inRenewable EnergyTechnologies'' from 07.03.11 to09.03.11 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07(Seven) days in China. 3) conference titled "CarbonForum Asia 2011" organized byADB from 02/11/2011 to03/11/2011 for 2 (two) days(excluding travel time) inSingapore. 4) Seminar on CDM in Indiafrom 23.04.12 to 24.04.12 5) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 6) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China.

3 1-02022 08.06.86 Mr. Md. MehediHasan sumon Tangail B.Sc. Engg. (Elect.) 16-10-11 (AE)

AE S & D Division-1(North) PDB, mymensingh.

Page 3362: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3363: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3364: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.

10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. 25. 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China

N.B. 5) “Factory Test Witness for Balance'' (For Balance of Plant” in India and Indonesia & For Emergency Diesel Generator in Singapore) against Gopalgonj 100MWand Faridpur 50 MW Peaking Power Plant Construction Project for 07 days in India and Indonesia. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Factory Witness Test USA

Page 3365: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3366: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

8) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9)Inspection against Ghorasal 365 MW CCPPConstruction Project Oct/2015 in Germany.

10) Inspection against against Ghorasal 365 MW CCPP Construction Project Jan/2015 4 in Germany.

Page 3367: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3368: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Bogra F 04.11.08

Page 3369: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

P&D 1986 11.10.10

P&D 2004 08.02.11 A294

Page 3370: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

4 P&D 2004 18.08.09

* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.

10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. A66 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China

Page 3371: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

A proposalSent to

ministry forTest witness

of energymeter

againstSummitBarisal

Power Lit. 6days in

Switzerland,Norway,FinlandN.B.

6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 26.08.15 to 30.08.15 in UK. a

Page 3372: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Siddirgonj G 2004 02.06.10

Page 3373: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Comments

Page 3374: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05

Comments

Page 3375: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3376: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3377: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3378: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3379: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3380: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3381: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3382: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3383: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3384: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3385: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3386: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3387: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3388: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3389: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3390: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3391: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3392: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3393: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3394: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3395: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3396: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3397: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3398: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3399: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3400: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3401: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3402: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3403: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3404: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3405: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3406: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3407: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3408: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3409: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3410: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3411: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3412: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3413: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3414: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3415: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3416: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3417: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3418: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3419: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3420: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3421: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3422: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3423: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3424: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3425: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3426: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3427: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3428: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3429: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3430: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3431: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3432: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3433: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3434: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3435: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3436: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3437: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3438: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3439: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3440: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3441: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3442: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3443: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3444: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3445: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3446: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3447: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3448: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05
Page 3449: (Foreign) of Head Offices And Other Offices of BPDB as on 18.05