Upload
dinhtuong
View
326
Download
17
Embed Size (px)
Citation preview
Page 1
Energy Auditing Unit Division Dhaka
SL.NO.
ID No. Date of Birth Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0777 08.02.63 Mr. Badhan Chandra Basak, Kishoregonj, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
SE (Incharge), Energy Auditing Unit
PDB,Dhaka.
1) "Technical Orientation &Quality Test Witness'' on 33KVCurrent Transformer From23.11.08 to 30.11.08 in China. 2) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from November/10 for10 days in China. 3) Inspection against CentralZone Power DistributionProject, Mymensingh 19.07.12to 24.07.12 for 5 days in Japan.
A proposal sentto ministrydated 04.05.16for Factoryacceptance testof energy meterfrom 20.05.16 to25.05.16 inIndia.
2 1-01343 06.04.74 Mr. Md. Jabed Hossain, Jessore, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)
XEN Energy Auditing Unit
PDB,Dhaka.
1) Foreign Training from 18.08.08to 29.08.08 for 10 days
South Africa 1) Training on "ForeignTraining" Against Energy Meterfrom 18.08.08 to 29.08.08 for 10days 2) Inspection against 110V,3´5(6)A, Three Phase 4-Wire, 3-Element, Double TariffProgrammable Energy Meterforfrom 20.06.2011 to 30.06.2011for 10 (Ten) days or from thedate of actual journey(excluding journey time) inSingapore. 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland. 4) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 5) Energy meter testing andsealing program from 8-10March/2016 in India.
A proposal sentto ministrydated 07.04.16for Testing of CT& CVT from09.04.16 to12.04.16 inIndia.
Page 2
3 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge), Office of SE EnergyAuditing Unit PDB,Dhaka.
1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days 2)Operation & MaintenanceTraining (Factory Training) againstBera 70 MW Peaking Power PlantConstruction Project for 30 (thirty)days (Excluding travel time)
China.
South Korea
1) Factory test witness againstNarayanganj 55 MW Unit-IIPower plant from 12.05.16 to16.05.16 in India.
4 1-01630 17.11.79 Mr.Ajoy Kumar Chakraborti Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Energy Auditing Unit
PDB,Dhaka.
1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days.
China. 1) Inspection against CentralZone Power DistributionProject, Mymensinghfrom thedate of actual journey from05.06.12 to 10.06.12 for 5 days inChina. 2) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 5) Construction DrawingReview Meeting againstBarapukuria 275 MW CoalBased Power Plant from15.01.16 to 21.01.16 in China.
5 1-02002 10.11.1983 Lutfunnahar Khulna B.Sc. Engg. (Comp.) 02.10.11 (AE) 01717366470 [email protected]
AE Energy Auditing Unit
PDB,Dhaka.
OnMetarnityleave
6 1-02025 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)
AE Energy Auditing Unit
PDB, Dhaka.
7 1-02034 27.04.84 Mr. A.H.M. Emdadul Pasha Rajshahi B.Sc. Engg. (Elect.) 12.12.11 (AE)
AE Energy Auditing Unit
PDB, Dhaka.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore 1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
8 1-02083 28.08.87 Mrs. Afroza Akter Chittagong B.Sc engg. (Elect.) 17.12.13
AE Energy Auditing Unit
PDB, Dhaka.
Page 3
ChittagongSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01752 07.06.79 Mr. Md.Shahidul Islam, Chittagong B.Sc.Engr (Elec.) 07.04.06 (AE) 16.06.14 (SDE)
XEN(Incharge) Energy Auditing-2,PDB, Chittagong.
1) A training titled "SCADACommunication System" againstGreater Chittagong ElectricityDistribution Project, SCADArehabilitation, PDB, Chittagongfrom 19.07.2012 to 16.08.2012
NewZealand
2 1-01632 25.12.79 Mr.Md.Belal Hossain Pirojpur B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN(Incharge), Energy Auditing UnitDiv-1, PDB, Chittagong.
1) Materials witnessInspection against Enginegenerating set Inspection fromOctober/10 for 07 days in SouthKorea
3 1-01405 22.06.73 Mr. S. M.Kamrul Ahsan, Laxmipur, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge) 0171-4084031
XEN(Incharge), Energy Auditing UnitDiv-3, PDB, Chittagong.
1) Training on 1132/33KV PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design & Maintenance of33KV/11KV Sub-Station'' 10.07.07 to24.08.07 for 42 days
China. 1) Materials witnessInspection against Enginegenerating set Inspection fromfeb/2016 for 07 days in China 2) Quality Test Witness of 11KV pin insulator against Ctg.Power Dist. System dev. Projectfrom 08.01.16 to 14.01.16 inIndia & China.
4 1-01988 26-11-85 Mr. Md. Tanvir Ahmed Laxmipur B.Sc.Engr.(Elec.) 02.10.2011 (AE) 01924543636 [email protected]
AE Energy Auditing UnitDivision-3 PDB, Chittagong.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
5 1-01990 23-03-86 Pinky Dutta B.Sc.Engr.(Elec.) 02.10.2011 (AE)
AE Energy Auditing UnitDivision-2 PDB, Chittagong.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
6 1-02021 28-02-85 Mr. Shahabuddin Ahmed Gazipur B.Sc.Engr.(Elec.) 16.10.2011 (AE) 01714036381
AE Energy Auditing UnitDivision-1 PDB, Chittagong.
1) Technical orientation &quality test witness ofhardware & software of datacentre from 08.05.14 to 09.06.14in Singapore & New Zealand.
Page 4
7 1-02097 20.09.87 Mr. Md. Taj Uddin Chittagong B.Sc.Engr.(Comp.) 13.04.14 (AE)
AE Energy Auditing UnitDivision-1 PDB, Chittagong.
MymensinghSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01374 01.11.69 Mr. A.K.M. Mustafa Zaman, Mymensingh, B.Sc.Engr.(Elec.), 05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge)
XEN(Incharge), Energy Auditing UnitDivision PDB, Mymenshingh.
1) “Technical Orientation &Quality Test Witness” of EnergyMeter 16.11.09 for 10 days inSingapore. 2) "Policy Planning for EnergyEfficiency & Consevation (A) (J-1200775)" from 13.05.2012 to09.06.2012 in Japan. 3) Technical orientation &quality test witness ofinsulator against Chitt. zonepower dist. system dev. projectfrom 28.08.15 to 03.09.15 inChina.
2 11-0398 01.06.61 Mr. Kamrul Hasan Siddique Mymenshingh Diploma(Elec.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE, Incharge Energy Auditing UnitDivision PDB, Mymenshingh.
3 1-02022 8.6.1986 Mr. Md. Mahathy HasanSuman Tangail B.Sc. Engg. (Elect.) 16.10.2011 (AE)
AE Energy AuditingUnit, PDB,Mymensingh
4 Mr. Md. Nazrul Islam Diploma engg.
AE (Incharge) Energy AuditingUnit, PDB,Mymensingh
Page 5
RajshahiSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01622 29.07.79 Mr.Abdullah-Al-Mamun Rajshahi B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Energy Auditing UnitDivision PDB,Rajshahi.
1) Training on Enegry Meteragainst "Foreign Training" from15.10.09 to 29.10.09 for 15 days 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
Singapore
1) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland.
2 1-01883 18.12.85 Mr. Md. Shahnewaz Islam Pabna B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01196082692 [email protected]
SDE, Incharge Energy Auditing UnitDivision PDB,Rajshahi.
1) PSCDP Training on "PerformanceManagement (Batch-1)" from26.08.13 to 06.09.13 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Thailand
Singapore
3 1-02090 30.11.84 Mr. Sohel Ahmed Gaibandha B.Sc.Engr.(Comp.) 17.12.13 (AE)
AE Energy Auditing UnitDivision PDB,Rajshahi.
RangpurSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01332 05.07.70 Mr. Abdullah Al Mahmud, Lalmonirhat, B.Sc.Engr.(Mech.),
20.01.2000(AE) 08.12.09(SDE) 16-10-11 (XEN , Incharge) 18.06.15 (XEN)
XEN Energy Auditing UnitDivision PDB,Rangpur
1) "Work Shop Test" forDohazari 100MW PeakingPower Plant ConstructionProject from 24.02.11 to 02.03.11for 07(Seven) days in China. 2) Technical orientation &quality test witness of 11 KVACR from 25.03.14 to 31.03.14 inChina.
2 1-01972 01.01.88 Mr. Md. Abu Nuaman Thakurgaon B.Sc. Engg (Elect.) 02.10.2011 (AE) 01710474344 [email protected]
AE Energy Auditing UnitDivision PDB,Rangpur
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore 1) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.
Page 6
BarisalSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01214 31.10.60 Mr. Md. Shakhawot Hossain, Barisal, B.Sc.Engr.(Elec.), 19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN Energy AuditingUnit, PDB, Barisal.
1) Basic Design" against Sylhet150MW Gas Turbine PowerPlan from 28.07.10 to 11.08.10for 15 days in China 2) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MWCCPP project from 20.10.15 to29.10.15 in China.
2 1-01981 1.1.1984 Mr. Md. Ashraful Islam Sirajganj B.Sc.Engg. (Elec.) 02.10.2011 (AE) 01714950299 [email protected]
AE, Energy Auditing Unit
PDB, Barisal.
3 1-02073 03.12.87 Mr. Abubokar Talukdar Jhalakathi B.Sc.Eng(Elec) 17.12.13 (AE)
AE Energy AuditingUnit, PDB, Barishal.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
4 Mr. Md. Shamsul Alam Diploma 27.01.15 (AE)
AE Energy AuditingUnit, PDB, Barishal.
5 Mr. Anup Kumar Das Diploma Engg.
AE Energy AuditingUnit, PDB, Barishal.
SylhetSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01875 10.10.87 Mr. Nurmohammed Patwary Chandpur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01920944219 [email protected]
AE, Energy AuditingUnit, PDB, Sylhet.
On StudyLeave
Page 7
2 1-01977 2.1.1986 Mr. Shuvashis Chakraborty Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01817734616 [email protected]
AE, Energy AuditingUnit, PDB, Sylhet.
KhulnaSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01263 06.01.70 Mr. Nishith Kumer Samadder, Magura, B.Sc.Engr.(Mech.),
10.06.99(AE) 18.08.2011 (SDE) 28.05.14 (XEN)
XEN Energy AuditingUnit, PDB, Jessore.
1) " Witnessing ofManufacturing Process andtest of the equipment ofmanufacture's works includingtransfer to technical know -how" from 16.06.12 to 23.06.12for 7 days in Russia.
2 1-01281 30.11.75 Mr. Md. Sohel Hossain Serazi 24.06.99 (AE) 26.07.05 (SDE) 17.11.13 (XEN, Incharge) 18.06.15 (XEN) 01755581391
XEN Energy AuditingUnit, PDB, Khulna.
1) Training on technology transferof CT, PT from 05.05.16 to 11.05.16
China, 1) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China.
3 1-01698 05.01.77 Mr. Md. Kamal Hossain Magura B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Energy AuditingUnit, PDB, Jessore.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore 1) Inspection on of 110V, 3X5(6)AMPS, 3-Phase, 4-Wire, 3-Element, Outdoor Type DoubleTariff Programmable ConsumerEnergy Meter with RemoteAutomated Reading System”from 30.11.09 to 14.12.09 inSingapore.
4 1-02028 20-10-86 Mr. Kazi Nawshad Azam Bagerhat B.Sc.Eng(Elec) 16.10.2011 (AE)
AE Energy AuditingUnit, PDB, Khulna.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
5 Mr. Sourav Roy AE Energy AuditingUnit, PDB, Jessore.
Page 8
ComillaSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01206 21.09.68 Mr. Md. Kamal Uddin Ahmed B-Baria B.Sc Engg (Mech) 19.03.98 (AE) 06.10.04 (SDE) 31.10.13 (XEN) 0176-3480820
XEN,
Energy Auditing Unit
PDB, Comilla.
1) Design, Installation, Testing,Operation & Maintenance onControl & Protection Against G/Ctg.From Aug./02 for 10 days. 2) ''Factory Training" againstDaudkandi 50MW Peaking PowerPlant Construction Project for30(Thirty) days from 30.05.2011 to30.06.2011 (Excluding travel time) (Bond for 5 years)
China,
China
Inspection against metertesting For 3 days in IndiaMarch /2016
BograSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01903 31.12.82 Md. Abdul Majid Joypurhat B.Sc. Engg. (Elect.) 20.04.11 (AE) 01911815901 [email protected]
AE, Energy Auditing UnitDivision, PDB, Bogra.
1) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
Singapore
2 1-01967 3/8/1985 Mr. Md. Rabiul Hossain Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01911958040 [email protected]
AE, Energy Auditing UnitDivision, PDB, Bogra.
Page 9
TrainingGM Training & Dte. of Taining & Career Development
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0489 07.11.57 Mr. Amal Krishna BasuKhulnaB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 29.01.15 (Addl. CE, Incharge) 13.12.15 (CE)
GM (CE) Training, PDB,Dhaka.
1.Improvement of operation ofelec. Power From 10.01.01 to15.02.01 2) Technology Transfer Trainingfrom 07.07.15 to 13.07.15
Japan&Thailand
India
1) “Technical Orientation &Quality Test Witness” onEnergy Meter from 16.11.09 for10 days in Singapore. 2) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China. 3) Site visit from 04.10.15 to15.10.15 in Spain
A proposal sentto ministrydated 25.04.16for witnesing ofmanufacturersprocess againstTongi 80 mWP/S from31.05.16 to06.06.16 inHungery.
2 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 10.02.10 (XEN)
Director (Incharge)
Directorate ofTraining and Career
Development
PDB, Dhaka.
1) PSCDP training Program named"Project Management (Batch-3)"from 15.12.13 to 21.12.13
Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plantfrom 14.12.10 to 22.12.10 for 07days in Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Tehnical orientation &Quality test witness from26.09.15 to 01.10.15 in China. 5)Pre-shipment inspectionagainst Wind Battery PowerPlant, Kutubdia from 20.04.16 to26.04.16 in China.
Page 10
3 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)
Deputy Director(XEN)
Dte. of Training &CareerDevelpopment PDB,Dhaka.
1)Traning on Gas Turbine AgainstTongi 80 MW From 07.08.04 to TwoMonth 2) PSCDP Training program on"Project Management (Batch-1)"from 12.08.13 to 23.08.13 3) Technology Transfer Trainingagainst 10- town project from13.04.15 to 19.04.15 4) Training on Planning &development from 01.05.16 to15.06.16
France,
Thailand
Germany
India
1) Factrory acceptance testfrom 05.08.14 to 14.08.14 inSingapore.
4 1-01009 12.06.66 Mr. Md Abdur Sattar Miah, B.Sc.Engr.(Mech.),19.07.94(AE) 03.02.03(SDE) 08.02.11 (XEN, Rev.)
Dy. Director(XEN),
Director of Trainingand Career Development
PDB, Dhaka. (Return from lien inDubai for 5 years)
1) PSCDP Training on Procurementand Supply Chain Managementtraining program from 30.09.13 to11.10.13
Thailand 1) Technical orientation &quality test witness from01.04.15 to 07.04.15 in India. 2) Witnessing ofmanufacturing process ofcooling tower gear box againstBarapukuria power stationfrom 16.10.15 to 22.10.15 inChina.
5 1-01010 28.02.68 Mr. Md. Abdul Basid,TangailB.Sc.Engr.(Elec.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)
Dy. Director(XEN),
Director of Trainingand Career Development
PDB, Dhaka.
1)145KV and 36KV Circuit Breaker(RRAGS) From 08.10.03 to 08.01.04for 03 Months
China 1) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07 (seven) days in China. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
6 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Directorate ofTraining &CareerDevelopment PDB, Dhaka.
Materials witness Inspection(HRSG Inspection)” againstBera 70 MW Peaking PowerPlant Construction Project from14.11.10 to 22.11.10 for 07 daysin South Korea.
Page 11
7 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)
SDE Directorate ofTraining &CareerDevelopment PDB, Dhaka.
1) Training on ''Operation &Maintenance of HRGS in Koreafrom 20.11.07 to 04.12.07 for 0.5Month & ''Hydraulice DiverterDamper System in China from14.08.07 to 17.10.07 for 03 Monthsagainst 90 MW Sylhet CombinedCycle Power Station (Unit-2) Cons.Project. 2) Training program on "Operation& Maintenance of Generator" from18.03.13 to 29.03.13
Korea &China
India
On Lien
8 1-01710 31.12.77 Miss.Shamima Akhter Gazipur B.Sc.Eng(Elec) 07.04.2006(AE) 28.01.14 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) Directorate ofTraining &CareerDevelopment PDB, Dhaka.
1) Inspection of Gas TurbineGenerating (GTG) Unit againstShikalbaha 150MW PekingPlant Construction Project from13.04.09 to 23.04.09 for 10 daysin Germany. 2) Inspection of Oil burnernozzel against Barapukuriapower station from 19.09.15 to25.09.15 in China
9 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01556559924 [email protected]
SDE (Incharge) Directorate ofTraining &CareerDevelopment, PDB,Dhaka.
1) PSCDP Training program on"Project Management (Batch-1)"from 12.08.13 to 23.08.13
Thailand
10 11-0397 04.02.60 Mrs. Ferdousi Begam Dhaka Diploma engg. (Mech.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE (Incharge) Directorate ofTraining &CareerDevelopment, PDB,Dhaka.
Training on Planning &development from 01.05.16 to15.06.16
India
11 1-01926 01..11.82 Mr. Abu Naser Md. Abdul Hai Comilla B. Sc. Engg. (Elect.) 24.07.11 (AE)
AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.
Training on Operation &Maintenance from 01.05.16 to15.06.16
India
Page 12
12 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522
AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.
1) "Implementing Selective ERPApplication & Management"Training Program from 16.04.13 to29.04.13
Thailand On StudyLeave
13 11-0482 01.01.58 Mr. Md. Mahbub Hossain Bagura Diploma (Elect.) 25.08.84 (SAE) 04.11.13 (AE)
AE Directorate ofTraining &CareerDevelopment, PDB,Dhaka.
1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
Chittagong Training Centre, PDB, ChittagongSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0803 01.09.63 Mrs. Dewan Samina Banu, Naogaon,B.Sc.Engr.(Elec.),08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 02.12.09 (XEN)
Director (Incharge) Chittagong TrainingCentre
1) Training On Tower Design, PoleDesign, etc. Operation &Maintenance Against Ctg. P/sDistribution Project From 07.07.04to 22.08.04 (6 Weeks)
2)Training on 132/33KV Sub-Station/ Power Transformer, 33KV11KV Gas Insulated Switchgear,33/11KV Sub-station & ControlPanel & Protection EquipmentAgainst Chittagong PowerDistribution Project ''Design &Maintenance of Control Panel &Protection Equipment'' from10.07.07 to 24.08.07 for 42 days.
China
China.
1) "Factory Acceptance Test(FAT) & Technical OrientationCourse" against GreaterChittagong Power DistributionProject SCADA-Rehabilitation &Extension in Sep./2011 for 07days or from the date of actualjourney (excluding travell time)in New Zealand. 2) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China.
2 1-01629 02.03.72 Mr.Md.Saifur Rahman Chittagong B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
DD, XEN (Incharge) Chittagong TrainingCentre
1) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV LA from 15.09.13 to18.09.13 in India.
Page 13
3 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN) 01839905723
DD Chittagong TrainingCentre
1) Inspection on H.T.S WireFrom 10.10.02 to 14.10.02 inIndia 2) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. in May/2011for 10(Ten) days in China.
4 11-0194 31.11.57 Mr. Nasir Uddin Chittagong, Diploma(Elec.)
05.07.80.(SAE), 17.09.09(AE) [email protected]
AE, Chittagong TrainingCentre
1) PSCDP training on RelayProtection & Advance trainingprogram from 08.07.13 to 19.07.13
India
Mr. Faridul Islam AE (Incharge), Chittagong TrainingCentre
Tongi Regional Training Centre, PDB, TongiSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01438 16.01.73 Mrs. Nishat Parvin, Khulna, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 10.02.14 (XEN, Incharge)
Deputy Director(Incharge), Tongi RegionalTraining Centre,PDB, Tongi
1) “Witnessing ofManufacturing Process andTest of the Equipment atManufacturer's Work includingTransfer of technical Know-How" against Ghorashal powerPlant in Sept./2011 for 07(Seven) days from the date ofactual journey (Excluding traveltime) in India.
A proposal sentto ministrydated 10.05.16for ConstructionDrawing reviewmeetingagainstBarapukuria 275MW projectfrom 28.05.16 to10.06.16 inChina.
2 1-02009 22.12.82 Mrs. Sumita Rani Biswas Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE)
AE, Tongi RegionalTraining Centre,PDB, Tongi
1) Factory Acceptance Test from28.06.14 to 04.07.14 inBangalore, India.
Page 14
Rajshahi Training Centre, PDB, Tongi, PDB, RajshahiSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0647 12.08.59 Mrs. Hasina Dilruba,
Rajshahi, B.Sc.Engr.(Mech.), 12.08.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)
Director Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi.
1)Seminar On Energy, Power FactorFrom 08.06.87 to 19.06.87
Thailand 1)33KV Capacitor Bank andAssociated Switchger in 2004for 07 days in Germany. 2) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project inAugust/2011 for 07 days inGermany. 3) Construction DrawingReview Meeting againstBarapukuria 275 MW CoalBased Power Plant from15.01.16 to 21.01.16 in China.
2 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, Incharge)
Deputy Director,(XEN) (Incharge) Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi
1) Training program on "Operation& Maintenance of Generator" from18.03.13 to 29.03.13
India 1) Training on Service deadend Clamp, September/05 for07days in India. 2) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina. 3) Special Inspection against"Power Plant Simulator" from16.09.13 to 21.09.13 in USA.
3 11-0417 07.07.57 Mr. Md. Kamrul Alam Rajshahi Diploma Engg. (Elect.) 31.07.83 (SAE) 27.12.11 (AE)
AE Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi
4 Mr. Md. Golam Moftafa AE Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi
Page 15
5 Mr. Md. Monowar Hossain AE (Incharge) Rajshahi TrainingCentre, PDB, Tongi,PDB, Rajshahi
Ghorashal Training Centre, PDB, GhorashalSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0845 30.11.64 Mr. Md. Rafiqul Islam,Jamalpur,B.Sc.Engr.(Mech.),18.2.88(AE) 21.11.99(SDE) 21.07.11 (XEN) 0176-3915477
Director, Incharge Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
1) PSCDP training program on"Project Management (Batch-1)"from 02.09.13 to 13.09.13
Thailand 1) Breaker Inspection From20.04.02 to 29.04.02 in India 2) Central Zone PowerDistribution Project, aTechnical Orientation andQuality Test Witness Programfor 11KV Drop Out Fuse Link,11KV Lightning Arrester, 200Amps MCCB, 100 Amps MCCB &Transformer Oil in May/2011for 07 days in China. 3)Technical orientation &quality test witness ofDistribution jUNE/2014 in India
2 1-01761 04.01.86 Mr. A. K. M Earshadul Bari Jamalpur B.Sc.Engr(Mech.) 31.05.09 (AE) 24.12.14 (SDE) 25.06.15 (SDE) 01763-791715
XEN, incharge Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
"Witnessing of ManufacturingProcess and Test of theequipment at manufacture'sworks including Transfer ofTechnical-Know How” for 07(Seven) days on June/2011 inNetherlands.
3 11-0436 16.01.62 Mr. Abul Kalam Azad Narayanganj Diploma Engg (Mech.) 03.08.83 (SAE) 27.12.11 (AE)
AE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
4 11-0498 01.01.61 Mr. Md. Moslah Uddin Comilla Diploma Engg (Elect.) 25.08.84 (SAE) 04.11.13 (AE) 01913797735
AE Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
Page 16
Engineering Academy, PDB, KaptaiSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0747 07.07.58 Mr. Md. Akat Ali,
Comilla, B.Sc.Engr.(Mech.), 30.08.98(AE) 19.03.98(SDE) 10.07.05(XEN)
Joint Director EngineeringAcademy PDB, Kaptai.
1) Training.On 33/11KV 2x10MVA sub station fromApril/2006 for 08 days inThiland. 2)400 Nos.12 Meter Steel Pole(270 DAN) & 100 Nos. 12 MeterSteel Pole (550 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China.
A proposal sentto ministrydated 25.02.15for witnessingofmanufacturingprocess againstShikalbaha P/Sfrom 16.03.15 to22.03.15 inChina & India.
2 1-0974 12.06.60 Mr. Nurul Alam, Chittagong, AMIE (Elect.) 30.08.86 (SAE) 21.04.93 (AE) 03.02.03 (SDE) 18.08.11 (XEN)
XEN EngineeringAcademy PDB, Kaptai.
1) Training on Tower Design &Transmission Line Design &Installation, Testing & Maint.From 2006 for 06 weeks. 2) Factory Training (Operation &Maintenance Training)" againstHathazari 100 MW Peaking PowerPlant Construction Project for 30(Thirty days from15.06.2011 to14.07.2011 (Excluding travel time) (Bond for 5 years)
China
China
3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)
23.10.80(SAE), 17.09.09(AE) 2014 (SDE)
SDE EngineeringAcademy PDB, Kaptai.
Training Academy, PDB, Cox's BazarSL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0864 02.03.60 Mr. Md. Khairul Kabir,Manikgong, B.Sc.Engr.(Elec.),30.8.86(AE) 18.06.2000(SDE) 10.07.05(XEN) 05.04.16 (SE)
Director (SE), Training Academy,PDB, Cox's Bazar
1) Training on 33/11KVTransformers in 2006 for 07days inFinland against 9-Town Project.
1) Orientation/ TechnicalTraining on 33 KV & 11 KV GangIsolator from 20.12.04 for 6days in India. 2) Technical Orientation &Quality Test Witness of 11 KVACR from 21.04.15 to 27.04.15 inChina.
Page 17
Civil WorksOfficey Under CE, Civil Works
SL.NO.
ID No. Date of Birth Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0549 01.01.61 Mr. Md. Mustafizur Rahman
LaxmipurB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 09.03.03(XEN) 28.01.14 (SE) 01730-705078 [email protected]
Addl. CE (Incharge) Civil Works
1.Electrical Power DistributionSystem From 23.08.90 to 22.06.91
Norway, 1) Training on Technical know-how 33 KV VCB with ControlPanel & 33 KV & 11 KV BusSupport Insulator for 07 days inChina.in Oct/ 2006 2) To attend a course on ProjectBudgeting and Cost Controlfrom 15.12.12 to 27.12.12 orfrom the date of actual journeyin Malaysia. 3) Witnessing ofmanufacturer's process from30.05.14 to 05.06.14 in China. 4) Factory acceptance test of 33KV post insulator againstChitt.zone power dist. system dev.project from 06.11.15 to 12.11.15in China. 5) Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.
2 1-0666 01.05.60 Mr. T.I.M. Noorunnabi,
Barisal, B.Sc.Engr.(Elec.), 03.12.85(AE) 17.06.95(SDE) 21.07.04(XEN) 28.07.15 (SE)
Director Civil Works, PDB,Dhaka
1)'Public & Private Partnership' from 18.11.13 to 29.11.13
Thailand 1) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. from 11.06.11to 19.06.11 for 09 days in China.
2) pre-shipment inspectionagainst Chittaging PC Pole from02.01.15 for 10 days in China.
A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.
3 11-0808 Mr. Muhammad Abul Kashem AE (Incharge) Office of directorcivil works, PDB,Dhaka.
Page 18
4 11-0114 01.01.58 Mr. Md. Fozlur Rahman Khan Sherpur Diploma(Civil )
28.05.79(SAE), 06.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge) 01715038624
XEN (Incharge), Office of the CE, CivilWorks PDB, Dhaka.
1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal High TensileSteel (HTS) Wire in Nov/2010for 10 days in China. 2) Convention & Seminar from24.07.15 to 04.08.15 in India. 3) Technical orientation &quality test witness from05.01.15 to 11.01.15 in China for10 days+A292 4) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.
A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.
5 1-02061 02.05.88 Ms. Sarfina Tasnim Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)
AE, Office of the CE, CivilWorks PDB, Dhaka.
Civil Construction Division-1SL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),
05.03.2000(AE) 08.12.09(SDE) 17.04.13 (XEN, Incharge)
XEN
Civil ConstructionDivision-1, PDB, Dhaka
1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China.
2) Inspect facilities / towitness test at manufacturersplants" from 06.04.14 to11.04.14 in China. 3) Basic design Approvalmeeting from20.08.15 to03.09.15 in China.
2 11-0443 02.12.57 Mr. Md. Saiful Islam Sirajganj Diploma (Civil) 18.01.84 (SAE) 27.12.11 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
Page 19
3 11-0499 01.02.63 Mr. Md. Motiur Rahman Jamalpur Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
4 Mr. Md. Asaduzzaman Saad B.Sc. Engg. (Civil) 2014 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
5 11-0494 09.01.63 Mr. Md. Abul Kalam Azadakand Comilla Diploma Engg. (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
1) Pre shipmentinspectionagainst ChittagongPC Pole from 20.06.15 to29.06.15 in China.
6 11-0834 Mr. Hachni mojib Diploma engg.
AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka
7 11-0843 Mr.Md. Osman Goni Diploma engg.
AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka
Civil Construction Division-2SL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01694 23.01.76 Mr.M.Arifur Rahman Khan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Civil ConstructionDivision-2, PDB, Dhaka
1) Training Programme on SolarEnergy Technologies andApplications from 14-11-2011 to03-12-2011 for 03 (three) weeks 2) PSCDP Training program"Performance Management (Batch-2)" from 21.10.13 to 01.11.13
India
Thailand
1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China. 2) Participate in the "China-Asean EXPO" from 16.09.14 to19.09.14 in China. 3) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China. 4)Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.
Page 20
2 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE) 25.06.15 (SDE)
SDE Civil ConstructionDivision-2 PDB,Dhaka.
Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina.
3 11-0468 07.02.59 Mr. Shiekh Md. Abdus Salam Sirajganj Diploma(Civil) 25.08.84 (SAE) 27.12.11 (AE) 01819162666
AE, Civil ConstructionDivision-2 PDB,Dhaka.
1) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from20.09.15 to 29.09.15 in China.
Civil Work Division, ChittagongSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01369 20.06.74 Mr. Haradhan Chandra Datta, Comilla, B.Sc.Engr.(Civil.), 05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge) 22.02.2016 (XEN) 01711987216
XEN Zonal CivilConstructionDivision PDB, Chittagong.
1) Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKorea. 2) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China.
2 1-02005 5.12.1983 Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]
AE, Zonal CivilConstructionDivision PDB, Chittagong.
1) Pre-shipment inspectionagainst Chittagong PC PoleConstruction Plant from24.03.13 to 03.04.13 in China.
3 11-0466 01.01.60 Mr. Makhan Lal Debnath Noakhali Diploma (Civil) 25.08.84 (SAE) 27.12.11 (AE)
AE, Zonal CivilConstructionDivision PDB, Chittagong.
1) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China.
4 11-0415 12.02.59 Mr. Anil Chandra Halder Barisal Diploma (Civil) 01.08.83 (SAE) 27.12.11 (AE)
AE, Zonal CivilConstructionDivision PDB, Chittagong.
Page 21
5 11-0486 20.07.58 Mr. Md. Zakir Hossain Noakhali Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE, Zonal CivilConstructionDivision PDB, Chittagong.
Civil Work Division, RajshahiSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01678 17.11.77 Mr.Shah Khalid MahmudChoudhury Noagaon B.Sc.Eng(Civil) 07.04.2006(AE) 18.08.2011 (SDE) 27.05.14 (XEN, Incharge) 01817148564
XEN (Incharge), Zonal CivilConstructionDivision PDB,Rajshahi
1) Technical Orientation andQuality Witness aganistCentral Zone PowerDistribution Project atApril/2011 for 07 days in China.
A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.PC Pole Construction
ArichaSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01532 15.07.73 Mr. Md. Iktiar Kabir, Comilla, B.Sc.Engr.(Mech.),
29.04.2001(AE) 20.04.09(SDE, Incharge) 01.07.13 (XEN, Incharge)
XEN (Incharge) PC Pole ConstructionPlant PDB, Aricha.
1) Inspection againstChittagong PC PoleConstruction Plant from16.04.2012 to 26.04.2012 inChina. 2) Inspection againstChittagong PC PoleConstruction Plant to inspect 6,7, 8 9 mm 3200 Quintal H.T wirefrom 10.11.13 for 10 days(excluding travel time) inChina. 3)Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.
A proposal sentto ministrydated 28.04.16for Pre-ShipmentInspection ofsteel polemould againstPC Pole , Arichafrom 11.05.16 to20.05.16 inChina.
2 11-0922 Mr. Abid Hossain Diploma engg 25.08.84 (SAE) 04.02.16 (AE, Incharge)
AE (Incharge), PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.
Page 22
ChittagongSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 11-0288 01.07.57 Mr. Mir Mohammad Kashem,
Cox'bazar Diploma(Civil) 24.07.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE) 01749346777
SDE PC Pole ConstructionFactory, PDB, Chittagong.
1) Inspection againstChittagong PC PoleConstruction Plant from01.02.14 to 10.02.14 in China. 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from20.09.15 to 29.09.15 in China.
2 11-0474 25.09.58 Mr. Swapan Kumar Das Gupta
B-Baria Diploma (Civil) 25.08.84 (SAE) 27.12.11 (AE)
AE, PC Pole ConstructionFactory, PDB, Chittagong.
1) Inspection againstChittagong PC PoleConstruction Plant to inspect 6,7, 8 9 mm 3200 Quintal H.T wirefrom 10.11.13 for 10 days(excluding travel time) inChina.
3 11-0818 Mr. A.B.M. Abu Bakar Siddique AE (Incharge)
PC Pole ConstructionPlant PDB,Halishahar,Chittagong
Page 23
2
34 ID-No Date of Birth Name, District and Qualification
and Date of joiningDesignation andPresent Posting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
5 Mr. Syed Julfiker Ali DD Dte. of Accounts
4) Meeting against Shahjibazar300 MW, Ghorasal 300-450 MW,Barapukuria 275 MW andChapainawabganj 100 MWProject from 23.09.13 to 26.09 13in China.
6 Mr. Kazi Ahsan Ullah Director Dte. of Finance
1) PSCDP training on Public PrivatePartnership (PPP) trainingprogramfrom on 18.11.13 to29.11.13
Thailand
7 Mr. Mazharul Haque Additional Director Dte. of Personnel
1) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13
Thailand
89
10
Page 24
1 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, Current Charge) 23.04.09 (XEN)
XEN, Civil Works Division
PDB,Chittagong.
(New posting order toChittagong PowerStation)
1) Inspection (EmergencyDiesel Generator) againstGopalgonj 100MW PeakingPower Plant ConstructionProject November/10 for 07days in Singapore.
2 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)
SDE Energy Auditing UnitDivision PDB, Khulna. (New posting orderto Bera 70 MWPeaking PoweerStation, PDB, Pabna)
1) "Foreign Training program" from07.09.09 to 20.09.09 for 14 days 2)Operation & MaintenanceTraining (Factory Training) againstBera 70 MW Peaking Power PlantConstruction Project for 30 (thirty)days (Excluding travel time)
China.
South Korea
Page 25
Foreign Training InformationSL.NO
.ID No. Date of Birth Name, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0955 20.10.65 Mr. S.M.A. Azim ,Chittagong,B.Sc.Engr.(Civil),04.12.91(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN
PC Pole ConstructionPlant PDB,Halishahar,Chittagong
1) Witnessing the test &Inspection of High tensilesteel (HTS) wire from 23.02.10to 01.03.10 for 07 days in China.
2) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. in May/2011for 10(Ten) days in China. Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.
2 1-01803 18.06.84 Mr. Shamarukh Moutushi Dhaka. B.Sc.Engr(Architect) 31.05.09 (AE)
AE, Dte. Of Design &Inspection-3 PDB, Dhaka.
Training in PIM (PowerManagement Institute) NTPC inFebruary/11.
India A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia.
Page 26
3 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 01818607385 [email protected]
AE Design & Inspection-3, PDB, Dhaka.
1) A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia. 2) A proposalsent to ministrydated 30.01.13on Pre-shipmentinspectionagainstChittagong PCPoleConstructionPlant for 10days in China.
4 1-02005 5.12.1983 Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]
AE, Zonal CivilConstructionDivision PDB, Chittagong.
A proposal sentto ministrydated 30.01.13on Pre-shipmentinspectionagainstChittagong PCPoleConstructionPlant for 10days in China.
5 1-01938 05.04.87 Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536 [email protected]
AE, Design & Inspection-3, PDB, Dhaka
A proposalsent to ministrydated 21.11.12to InspectEnergy EfficientBuildingsConstructed inIndia from3rd/4th week ofDecember inIndia.
Page 27
6 1-02015 01.12.88 Mr. Akhond Mahmood Ashek Faridpur B.Sc. Engg. (Civil) 02.10.2011 (AE) [email protected]
AE, Civil ConstructionDivision-1, PDB, Dhaka
2 1-01584 09.02.57 Mr. Md. Ruhul Amin Comilla, Diploma(Civil),
21.08.78(SAE), 27.03.03(AE), 10.02.10(SDE)
SDE, PC Pole ConstructionFactory, PDB, Chittagong.
1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China.
Page 28
Page 29
2 1-01599 11.04.58 Mr. Md. Azizul Haque Noyakhali Diploma(Civil),
21.08.78(SAE), 20.11.03(AE), 10.02.10(SDE)
SDE, Zonal CivilConstructionDivision PDB, Chittagong.
1) Basic Design Review againstDohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days inChina.
3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)
23.10.80(SAE), 17.09.09(AE)
AE, EngineeringAcademy PDB, Kaptai.
Page 30
Page 31
1 1-0684 12.01.60 Mr. Shahadat Hossain KhanEusufzai, Mymensing, B.Sc.Engr.(Mech.),
30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 01755582461
XEN Energy AuditingUnit, PDB,Mymensingh
1) 7 transmission Project inFrance for 06 weeks,1994 2) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia.
barapukuria
34
5
Page 32
P&D 23.04.09
Chairman 15.04.08
Page 33
P&D 24.04.08
P&D 15.04.08
Page 34
Chittagong D 01.01.10
Foujdarhat D 04.12.08
Pahartoly D 01.01.10
Page 35
Chairman 10.02.10
Page 36
P&D 31.07.08
Rangpur D 01.01.10
Page 37
Baghabari G 2002 01.08.10
Page 38
Ghorasal G 01.01.10
P&D 04.11.09
Page 39
Shikalbaha G 22.06.10
Shikalbaha
G 22.06.10
Page 40
Chairman 2001 02.06.10
PD Dhaka West 108 MW HFO Power PlantConstruction Project, Bosila,Keraniganj.
Siddirgonj G 2004 02.06.10
Page 41
PD M.Admin 2003 08.02.11
Dhaka West 108 MW HFO Power PlantConstruction Project, Bosila,Keraniganj.
Ghorasal G 2004 08.02.11
M.Admin
Page 42
M.Admin 14.11.10
Shikalbaha
G
Page 43
D 2004 09.05.10
Stadium D 16.01.08
Page 44
P&D 2002 08.02.11
Ghorasal G 25.06.09
Page 45
M.Adm 23.03.10
Page 46
Sylhet P G 02.06.10
Horipur G
Page 47
Chittagong D 02.06.10
M.Am
Page 48
Siddirgonj G
Page 49
P&D 16.01.08
Page 50
P&D 10.11.08
Page 51
P&D 02.06.10
P&D 10.02.10
Page 52
BograA proposal sent to ministrydated 24.12.14 for pre-shipmentinspection against Chittaging PC Polefrom 02.01.15 for 10 days in China.
D 2003 02.06.10
P&D 01.01.10
Page 53
D 02.06.10
Page 54
D 08.02.11
Page 55
P&D 22.06.10
P&D 24.04.08
Page 56
P&D 10.02.10
P&D 02.06.10
Page 57
Page 58
P&D Diploma 02.06.10
Page 59
Page 60
P&D Diploma 02.06.10
M.Am
Page 61
Page 62
F 02.06.10
Page 63
Page 64
Page 65
Page 66
Page 67
Page 68
Page 69
Page 70
Page 71
Page 72
Page 73
Page 74
Page 75
Page 76
Page 77
Page 78
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Page 101
Page 102
Page 103
Page 104
Page 105
Page 106
Page 107
Page 108
Page 109
Page 110
Page 111
Page 112
Page 113
Page 114
Page 115
Page 116
Page 117
Page 118
Page 119
Page 120
Page 121
Page 122
Page 123
Page 124
Page 125
Page 126
Page 127
Page 128
Page 129
Page 130
Page 131
Page 132
Page 133
Page 134
Page 135
Page 136
Page 137
Page 138
Page 139
Page 140
Page 141
Page 142
Page 143
Page 144
Page 145
Page 146
Page 147
Page 148
Page 149
Page 150
Page 151
Page 152
Page 153
Page 154
Page 155
Page 156
Page 157
Page 158
Page 159
Page 160
Page 161
Page 162
Page 163
Page 164
Page 165
Page 166
Page 167
Page 168
Page 169
Page 170
Page 171
Page 172
Page 173
Page 174
Page 175
Page 176
Page 177
Page 178
Page 179
Page 180
Page 181
Page 182
Page 183
Page 184
Page 185
Page 186
Page 187
Page 188
Page 189
Page 190
Page 191
Page 192
Page 193
Page 194
Page 195
Page 196
Page 197
Page 198
Page 199
Page 200
Page 201
Page 202
Page 203
Page 204
Page 205
Page 206
Page 207
Page 208
Page 209
Page 210
Page 211
Page 212
Page 213
Page 214
Page 215
Page 216
Page 217
Page 218
Page 219
Page 220
Page 221
Page 222
Page 223
Page 224
Page 225
Page 226
Page 227
Page 228
Page 229
Page 230
Page 231
Page 232
Page 233
Page 234
Page 235
Page 236
Page 237
Page 238
Page 239
Page 240
Page 241
Page 242
Page 243
Page 244
Page 245
Page 246
Page 247
Page 248
Page 249
Page 250
Page 251
Page 252
Page 253
Page 254
Page 255
Page 256
Page 257
Page 258
Page 259
Page 260
Page 261
Page 262
Page 263
Page 264
Page 265
Page 266
Page 267
Page 268
Page 269
Page 270
Page 271
Page 272
Page 273
Page 274
Page 275
Page 276
Page 277
Page 278
Page 279
Page 280
Page 281
Page 282
Page 283
Page 284
Page 285
Page 286
Page 287
Page 288
Page 289
Page 290
Page 291
Page 292
Page 293
Page 294
Page 295
Page 296
Page 297
Page 298
Page 299
Page 300
Page 301
Page 302
Page 303
Page 304
Page 305
Page 306
Page 307
Page 308
Page 309
Page 310
Page 311
Page 312
Page 313
Page 314
Page 315
Page 316
Page 317
Page 318
Page 319
Page 320
Page 321
Page 322
Page 323
Page 324
Page 325
Page 326
Page 327
Page 328
Page 329
Page 330
Page 331
Page 332
Page 333
Page 334
Page 335
Page 336
Page 337
Page 338
Page 339
Page 340
Page 341
Page 342
Page 343
Page 344
Page 345
Page 346
Page 347
Page 348
Page 349
Page 350
Page 351
Page 352
Page 353
Page 354
Page 355
Page 356
Page 357
Page 358
Page 359
Page 360
Page 361
Page 362
Page 363
Page 364
Page 365
Page 366
Page 367
Page 368
Page 369
Page 370
Page 371
Page 372
Page 373
Page 374
Page 375
Page 376
Page 377
Page 378
Page 379
Page 380
Page 381
Page 382
Page 383
Page 384
Page 385
Page 386
Page 387
Page 388
Page 389
Page 390
Page 391
Page 392
Page 393
Page 394
Page 395
Page 396
Page 397
Page 398
Page 399
Page 400
Page 401
Page 402
Page 403
Page 404
Page 405
Page 406
Page 407
Page 408
Page 409
Page 410
Page 411
Page 412
Page 413
Page 414
Page 415
Page 416
Page 417
Page 418
Page 419
Page 420
Page 421
Page 422
Page 423
Page 424
Page 425
Page 426
Page 427
Page 428
Page 429
Page 430
Page 431
Page 432
Page 433
Page 434
Page 435
Page 436
Page 437
Page 438
Page 439
Page 440
Page 441
Page 442
Page 443
Page 444
Page 445
Page 446
Page 447
Page 448
Page 449
Page 450
Page 451
Page 452
Page 453
Page 454
Page 455
Page 456
Page 457
Page 458
Page 459
Page 460
Page 461
Page 462
Page 463
Page 464
Page 465
Page 466
Page 467
Page 468
Page 469
Page 470
Page 471
Page 472
Page 473
Page 474
Page 475
Page 476
Page 477
Page 478
Page 479
Page 480
Page 481
Page 482
Page 483
Page 484
Page 485
Page 486
Page 487
Page 488
Page 489
Page 490
Page 491
Page 492
Page 493
Page 494
Page 495
Page 496
Page 497
Page 498
Page 499
Page 500
Page 501
Page 502
Page 503
Page 504
Page 505
Page 506
Page 507
Page 508
Page 509
Page 510
Page 511
Page 512
Page 513
Page 514
Page 515
Page 516
Page 517
Page 518
Page 519
Page 520
Page 521
Page 522
Page 523
Page 524
Page 525
Page 526
Page 527
Page 528
Diploma
Page 529
Diploma
Page 530
Head Offices of BPDBOffice of the Chairman, BPDB
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0373 17.08.57 Mr. Md. Shamsul HassanMiah, Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 28.12.10 (SE) 25.08.14 (Addl. CE) 19.11.14 (CE) 18.01.15 (Member) 19.01.16 (Chairman)
Chairman Bangladesh PowerDevelopment Board.
1) ComputerApplication.09.07.84 for 08(eight) weeks.
2)Project and Financing From01.9.03 to 10.9.03
Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K.,Finland & USA
3) 25.9.2001 to26.9.2001Singapore 4) 330-450MW Combined CyclyPower Station Project from21.04.08 to 23.04.08, 03 days inSingapore. 5) Inspection on Power Plantaganis Desh Energy Ltd. from10.06.10 to 12.06.10 in China. * See N.B.
A proposal sent toministry dated28.04.16 for Visitand inspectionfrom 10-14June/2016 in SouthAfrica
N.B. 6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 02.10.15 to 10.10.15 in UK. 18) Engine & Energy meter test witness against Barisal 110 MW HFO fired Power Station from 27.12.15 to 05.01.16 in Finland & Switzerland 19) Visit Coal Mining for NWPGCL & CPGCL from 11.01.16 to 15.01.16 in Indonesia & Singapore. 20) Citi 13th Annual Asia Pacific Investor Conference 2016 from 17.02.16 to 18.02.16 in Hong Kong. 21) Discussion on the contract of Ruppur Nuclear Power Plant from 23.03.16 to 29.03.16 in Russia.
Page 531
2 1-0743 01.09.62 Mr. Ashutosh Roy,
Bogra, B.Sc.Engr.(Elec.) , 30.8.86(AE) 19.03.98(SDE) 10.07.05(XEN) 05.04.16 (SE) 01558357200
CSO (SE), Office of Chairman,PDB, Dhaka.
1)System Protection andMetering from 10.12.90 to09.11.91 2) 'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) days from30.05.2011 to30.06.2011(Excluding traveltime) (Bond for 5 years)
UK
China
1) Inspection on 132KV CurrentTransformer & VoltageTransformer against BaghabariPower Station from 13.11.10 to22.11.10 for 07 days in China. 2) "Witnessing ofmanufacturing process & test ofequipment" for Siddhirganj P/Sfrom 10.12.13 to 16.12.13 for 7days in China. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Witnessing of manufacturingagainst Baghabari P/S from10.07.15 to 16.07.15 in USA 5) Factory test witness ofWartsila engine & generatotagainst Chapainawabganj 100MW Project from 08.04.16 to18.08.16 Finland.
Document CentreSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0834 01.01.63 Mr. Sayed Enamul Haque,Dhaka,B.Sc.Engr.(Mech.),18.02.88(AE) 21.11.99(SDE) 03.08.10 (XEN)
XEN,
Document Center PDB, Dhaka.
1)Hydro Plant Design from16.10.95 to 15.1.96 2)Country focused trainingcourse on "Power Sector" from09.01.01 to 08.2.01 3) 18th Energy Program from03.9.98 to 30.2.99
Australia,
Italy,
France
Factory Test Witness Of SinglePhase Step Up TransformerFrom 10.11.2003 to 15.11.2003 InJapan
Offices Under Member Admin
Page 532
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 5251 Mr. Lokman Hossain Miah
13.02.14 (as member admin.in BPDB)
Member Administration, PDB,Dhaka.
1) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Factory witness test againstKadda 150 MW Duel Fuel PowerPlant Construction Project from30.06.14 to 06.07.14 in China. 4) witnessing of manufacturingprocess against Barishal GasTurbine Power Plant from25.11.14 to 01.12.14 in USA. 5) Factory acceptance test ofGas turbine againstShahjibazar 330 MW CCPPProject from 15.01.15 to 22.01.15in France. See N.B.
1. G.O. issueddated 28.04.16 forManagementmeeting andwitnessing ofmanufacturingprocess againstGhorasal P/S from24-30 May/2016 inRussia. 2. A proposal sentto ministry dated05.05.16 for FactoryAcceptance TestWitness againstJamalpur 94.8 MWproject from01.06.16 to 07.06.16in Sweden.
N.B. 6) Witnessing of manufacturing against Shikalbaha 60 MW Power Station from 20.03.15 to 26.03.15 in Czech Republic 7) Factory Test Witness Against Shahjibazar 330 MW CCPP Project on May/2015 for 7 days in Spain. 8) Witnessing of manufacturing process against Baghabari Power Station from 25.08.15 to 03.09.15 in UK 9) Inspection of Heat recovery steam generator against Shikalbaha 225 project from 02.11.15 to 08.11.15 in South Korea. 10) Deputation for participation inthe Inspection of gas booster against Shikalbaha 225 MW project from 24.02.16 to 01.03.16 in USA.
GM, Training OfficeSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
Page 533
1 1-0489 07.11.57 Mr. Amal Krishna BasuKhulnaB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 29.01.15 (Addl. CE, Incharge) 13.12.15 (CE)
GM (CE) Training, PDB, Dhaka.
1.Improvement of operationof elec. Power From 10.01.01to 15.02.01 2) Technology TransferTraining from 07.07.15 to13.07.15
Japan &Thailand
India
1) “Technical Orientation &Quality Test Witness” on EnergyMeter from 16.11.09 for 10 daysin Singapore. 2) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China. 3) Site visit from 04.10.15 to15.10.15 in Spain
A proposal sent toministry dated25.04.16 forwitnesing ofmanufacturersprocess againstTongi 80 mW P/Sfrom 31.05.16 to06.06.16 in Hungery.
2 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Directorate of Training&Career Development PDB, Dhaka.
Materials witness Inspection(HRSG Inspection)” againstBera 70 MW Peaking PowerPlant Construction Project from14.11.10 to 22.11.10 for 07 daysin South Korea.
Dte. of Taining & Career DevelopmentSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
2 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 10.02.10 (XEN)
Director (Incharge)
Directorate of Trainingand Career Development
PDB, Dhaka.
1) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13
Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plant from14.12.10 to 22.12.10 for 07 daysin Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Tehnical orientation &Quality test witness from26.09.15 to 01.10.15 in China. 5)Pre-shipment inspectionagainst Wind Battery PowerPlant, Kutubdia from 20.04.16 to26.04.16 in China.
Page 534
2 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)
Deputy Director (XEN)
Dte. of Training &Career Develpopment PDB,Dhaka.
1)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month 2) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13 3) Technology TransferTraining against 10- townproject from 13.04.15 to19.04.15 4) Training on Planning &development from 01.05.16 to15.06.16
France,
Thailand
Germany
India
1) Factrory acceptance test from05.08.14 to 14.08.14 inSingapore.
3 1-01009 12.06.66 Mr. Md Abdur Sattar Miah, B.Sc.Engr.(Mech.),19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)
Dy. Director(XEN),
Director of Training andCareer Development
PDB, Dhaka. (Return from lien in Dubaifor 5 years)
1) PSCDP Training onProcurement and Supply ChainManagement trainingprogram from 30.09.13 to11.10.13
Thailand 1) Technical orientation &quality test witness from01.04.15 to 07.04.15 in India. 2) Witnessing of manufacturingprocess of cooling tower gearbox against Barapukuria powerstation from 16.10.15 to 22.10.15in China.
4 1-01010 28.02.68 Mr. Md. Abdul Basid,TangailB.Sc.Engr.(Elec.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)
Dy. Director(XEN),
Director of Training andCareer Development
PDB, Dhaka.
1)145KV and 36KV CircuitBreaker (RRAGS) From 08.10.03to 08.01.04 for 03 Months
China 1) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
5 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)
SDE Directorate of Training&Career Development PDB, Dhaka.
1) Training on ''Operation &Maintenance of HRGS inKorea from 20.11.07 to04.12.07 for 0.5 Month &''Hydraulice Diverter DamperSystem in China from 14.08.07to 17.10.07 for 03 Monthsagainst 90 MW SylhetCombined Cycle Power Station(Unit-2) Cons. Project. 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13
Korea & China
India
On Lien
Page 535
6 1-01710 31.12.77 Ms. Shamima Akhter Gazipur B.Sc.Eng(Elec) 07.04.2006(AE) 28.01.14 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) Directorate of Training&Career Development PDB, Dhaka.
1) Inspection of Gas TurbineGenerating (GTG) Unit againstShikalbaha 150MW Peking PlantConstruction Project from13.04.09 to 23.04.09 for 10 daysin Germany. 2) Inspection of Oil burnernozzel against Barapukuriapower station from 19.09.15 to25.09.15 in China
7 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01556559924 [email protected]
SDE (Incharge) Directorate of Training&Career Development,PDB, Dhaka.
1) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13
Thailand
8 11-0397 04.02.60 Mrs. Ferdousi Begam Dhaka Diploma engg. (Mech.) 01.08.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE (Incharge) Directorate of Training&Career Development,PDB, Dhaka.
Training on Planning &development from 01.05.16 to15.06.16
India
9 1-01926 01..11.82 Mr. Abu Naser Md. Abdul Hai Comilla B. Sc. Engg. (Elect.) 24.07.11 (AE)
AE Directorate of Training&Career Development,PDB, Dhaka.
1) Training on Operation &Maintenance from 01.05.16 to15.06.16
India
10 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522
AE Directorate of Training&Career Development,PDB, Dhaka.
1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13
Thailand On StudyLeave
11 11-0482 01.01.58 Mr. Md. Mahbub Hossain Bogra Diploma (Elect.) 25.08.84 (SAE) 27.12.11 (AE)
AE Directorate of Training&Career Development,PDB, Dhaka.
1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
Page 536
Dte. of PersonnelSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0578 03.04.58 Mr. Abdul Matin Bhuiyan,
Comilla, B.Sc.Engr.(Elec.), 27.10.84(AE) 28.04.94(SDE) 11.04.04(XEN)
XEN, Dte. of Personnel
1) Training on PerformedTermination for different sizeof Conductors. India for 07days
India 1) Factory Test Witness &Orientation Training on GreaterChittagong Power DistributionProject against ''Switchgear''from 19.03.07 to 03.04.07 for 14days in China.
TemporarilySuspended
Dte. of State & TransportSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01682 15.08.76 Mr.Md.Rezaul Haq Khulna B.Sc.Eng(Mech) 16.10.2006(AE) 27.12.2011(SDE) 02.07.14 (XEN, Incharge) 0171-1274705 [email protected]
DD, XEN (Incharge), Dte. of State &Transport, PDB, Dhaka
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & Control Division,Operation Division) from10.09.10 to 27.09.10. 2) Shantahar 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12 for 1month
China
China
1) "Witnessing ofManufacturing Process and Testof the Equipment atManufacturer’s works includingtransfer of technical Know-how"against Khulna 110/60MW from02.07.09 to 09.07.09 for 07 daysin India. 2) Quality test witness againstChitt. zone power dist. dev.project from 18-24 March/2016in India & China
Central Pool Repairing Shop, PDB, DhakaSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 11-0276 27.01.59 Mr. Md. Shakhawat Hossain Dhaka Diploma (Mech.) 01.07.80 (SAE) 17.09.09 (AE) 25.06.15 (SDE)
SDE Central Pool RepairingShop, PDB, Dhaka
Page 537
Offices Under Member FinanceSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 Mr. Md. Azizul Islam Member Finance, BPDB.
1) witnessing of manufacturingprocess and test of equipmentat manufacturer's works inincluding transfer of technicalkhow-how against barapukuriaP/S from 10.05.14 to 16.05.14 inChina. 2) Witnessing of manufacturingprocess against BaghabariPower Plant from 16.10.14 to22.10.14 in France. 3) Site visit from 04.10.15 to15.10.15 in Spain
Dte. of PurchaseSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0679 13.10.60 Mr. Md. Abu Yousuf Noakhali, B.Sc.Engr.(Elec.), 30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 28.07.15 (SE)
Director Dte. of Purchase, PDB,Dhaka.
1)Improvement of Operationof Electric Power From 09.01.01to 11.02.01 2) Orientation & TechnicalTraining on 11KV LightningArrester from 28.11.04 to04.12.04 for 07 days in China. 3) Training Programme onManagement of Wind PowerDevelopment from 28.08.06 to29.09.06 for 33 Days. 4) Economic LoadManagement from 29.04.13 to10.04.13 5) Training on supply,gradation, installation,testing & commissioning workof Mark-II to Mark VIe Controlsystem from 13.05.14 to27.05.14
Japan,
China
Sweden
Vietnam
USA
1)Factory Test Witness From09.10.03 to 12.10.03 in China 2) Inspection on Coal FiredPower Station Construction from19.01.10 to 26.01.10 in China. 3) Power Plant Inspectionagainst Sinha PowerGeneration Company Ltd. from16.06.10 to 19.06.10 in Korea. 4) witnessing of manufacturingprocess against Rangpur PowerStation from 01.09.15 to 07.09.15in Netherland. 5) Quality test witness of GISBreaker from 28.02.16 to 05.03.16in Germany.
Page 538
2 1-01349 12.05.72 Mr. A.N.M. Tarique Abdullah, Comilla, B.Sc.Engr.(Chemical.),05.03.2000(AE) 18.08.2011 (SDE) 25.10.11 (XEN, Incharge) 18.06.15 (XEN)
Dy. Director (XEN)
Dte. of Purchase, PDB,Dhaka.
1) "Renewable Energy" from01.06.13 to 30.06.13
Thailand 1) 'Developments in RenewableEnergy Technologies'' from07.03.11 to 09.03.11 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 3) conference titled "CarbonForum Asia 2011" organized byADB from 02/11/2011 to03/11/2011 for 2 (two) days(excluding travel time) inSingapore. 4) Seminar on CDM in Indiafrom 23.04.12 to 24.04.12 5) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 6) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China. 7) Technical orientation &quality test witnes of powertransformer from 23.04.16 to29.04.16 in China.
3 1-01968 1.1.1982 Mr. Md. Sarower Murshed Kustia B.Sc. Engg. (Comp.) 02.10.11 (AE) 01713064476 [email protected]
AE Dte. of Purchase, PDB,Dhaka.
1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia. 3) technical orientation &quality test witness againstSCADA Project from Oct/2015 10days in Singapore.
4 1-01838 23.05.85 Mr. H. M. G. sarower Comilla B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01680199093 [email protected]
SDE, Incharge Dte. of Purchase, PDB,Dhaka.
1) Training on Operation &Maintenance from 01.05.16 to15.06.16
India 1) "Technical Orientation &Quality Test Witness for Meter& Meter Enclosure" from16.03.14 to 25.03.14 in China.
Page 539
Offices Under Member GenerationSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0440 23.12.58 Mr. Khaled Mahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE) 12.01.16 (Member)
Member, Generation, PDB, Dhaka
1) Sub-Station Design From26.02.94 to 25.05.94
2) Training on Power Sectorfrom 09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .
4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13
South Korea &Japan
Japan
France
Italy
Australia
1)China in 1992
2)India in 2002
3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.** N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany.
8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.Inspection against shahjibazar 330 MW project from 25.08.15 to 31.08.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.15 to 01.01.16 in Thailand. 25. Construction Drawing Review Meeting against Barapukuria 275 MW Project from 15.01.16 to 26.01.16 in China 26. Witnessing of manufacturing process against Ghorasal P/S from 21.04.16 to 27.04.16 in Russia.
Page 540
2 1-01274 01.04.70 Mr. Md. Sawkat Ali Bhuiyan Gagipur, B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 21.12.11(XEN Incharge)
XEN(Incharge), Attach to Member,Generation Office, PDB,Dhaka
1) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China
3 1-01298 21.05.74 Mr. Moniruzzaman,Meherpur,B.Sc.Engr.(Elec.) ,13.07.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge) 18.06.15 (XEN)
D.S (XEN)Generation
PDB,Dhaka.
1) Safe, Reliable, &Maintenance of I & C,Circuits/Loops,etc From21.03.2004 for 06 Months. 2) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.
China,
Bahrain
1) Inspection againstBarapukuria Coal Fired ThermalPower Station on in Sept./2011for 07 (Seven) in China. 2)"Coal Power Genaration" from10.06.13 to 14.06.13 in Thailand. +A90 4) Inspection againstBarapukuria Coal Fired ThermalPower Station on Nov./2015 for07 (Seven) in Japan
4 1-01947 21-10-86 Mr. Md. Nazmul Hudda Rangpur B. Sc. engg. (Elect.) 02.10.2011 (AE) 01720334106 [email protected]
Load dispatch Office of MemberGeneration, PDB,dhaka.
1) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13 2) participant in the "Trendsand Developments inGeneration and TransmissionSystem" to be held from27.01.14 to 21.03.14
Thailand
Hydrabad, India.
On Lien
5 1-02076 07.09.89 Mr. Mahbubur Rahman Narayanganj B.Sc.Engr.(Elec.),
17.12.13(AE)
AE Office of MemberGeneration, PDB,dhaka.
A proposal sent toministry dated21.03.16 forWitnessing againstShikalbaha P/Sfrom 19.04.16 to25.04.16 inGermany.
Page 541
Office of CE, GenerationSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0520 08.02.58 Mr. A.H.M. KamalSirajgonjB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 21.01.03(XEN) 28.01.14 (SE) 08.02.16 (Addl. CE)
Addl. CE Generation, PDB,Dhaka.
1)Transmition line protection,maintenance & protectionfrom 01.08.99 to 31.10.99 2) "Renewable Energy" from01.06.13 to 30.06.13
Germany,Switzerland
India Thailand
1) 33 kv, 1250 Vacuum CircuitBreaker(Out door) From 11.06.01to 17.06.01for 07 days in India. 2) Preshipment Inspection &Testing From 19.09.02 to25.09.02 In India. 3) Orientation & TechnicalTraining on 33 KV Circuit BrakerFrom 27.05.05 to 31.05.05 for 07days in India. 4) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject for 07 days in China. *See N:B:
N:B: 5) Inspection in order to establish Quick Rental Power Plant in Ghorashal or at any suitable place in Bangladesh from 27.08.2010 to 05.09.2010 for 5 (five) days (excluding travell time) in UAE. 6) Solar Preshipment Inspection from 25.06.2011 to 29.06.2011 for 05 days in China. 7) "Wind IPP Summit-2012" from 17.01.2012 to 18.01.2012 for maximum 3 (three) days (excluding travel time) in Mumbai, India 8) Technical orientation & quality test witness from 05.01.15 to 11.01.15 in China 9) technical orientation & quality test witness against SCADA project from 24.08.15 to 02.09.15 in Singapore & Malaysia.for 10 days 10) technical orientation & quality test witness against SCADA project on Aug/2015 in Germany
2 1-01312 16.03.71 Mr. A.K.M. Mohiuddin Azamy, Chandpur, B.Sc.Engr.(Mech.),
07.02.2000(AE) 26.07.05(SDE), 22.12.13 (XEN, Incharge)
Assistant CE, XEN(Incharge), Generation, PDB,Dhaka.
1) Tarif energy Meter FactoryAcceptance Test from 15.09.14 to19.09.14 for 5 days in Singapore.
2) Tariff energy Meter FactoryAcceptance Test from 14.10.15 to17.10.15 for 5 days in UK
3 11-0393 13.08.59 Mr.Shukumer Karmokar Potoakhali Diploma(Power )
21.07.83(SAE), 02.11.10(AE), 06.01.16 (SDE, Incharge)
SDE, Incharge Under CE Generation,PDB, Dhaka.
Chandpur 150 MW CCPP Projectaganist Utility Maintenance (I& C Maint.) GTG Mark VI from30.05.2011 to 12.08.2011 for 75days (bond for 5 years)
China
Page 542
4 1-01841 10.10.86 Mr. Rahmat Ullah B- Baria B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01717630658 [email protected]
SDE, Incharge Under CE Generation,PDB, Dhaka.
1) Inspection against 2nd unitof Chittagong Power Stationfrom 03.08.2012 to 18.08.2012 inChina. 2) Witnessing of manufacturingprocess of spares withoverhauling against BaghabariP/S from 02.05.16 to 08.05.16 inSwitzerland.
Offices Under Member DistributionSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0490 01.07.58 Mr. Sheikh Md. AlauddinJessoreB.Sc.Engg. (Elec.)18.03.82(AE) 20.07.88(SDE) 26.10.02(XEN) 31.07.12 (SE) 28.07.15 (Addl. CE) 13.12.15 (CE) 02.03.16 (Member)
Member Distribution BPDB, Dhaka.
1)Operation and maintenanceof sub-station. 09.01.91 to08.04.91 (3 Months) 2)Training of measure testwith the required testEquipment 15.10.01 to 15.11.01(01 Month)
China,
UK (England)
1)from 22.02.02 for 07days inIndia 2) 500 Nos.09 Meter Steel Pole(200 DAN) & 100 Nos. 09 MeterSteel Pole (350 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China. 3) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project in July/2011for 07 days in Germany. 4) Inspection of Step-upTransformer against Santahar50 MW and Katakhali 50 MWPeaking Power PlantConstruction Project inMarch/2012 for 7 days(excluding travel time) from thedate of actual journey in China. 5) Inspection againstShahjibazar 330 MW CCPPProject from 17.09.15 to 23.09.15in China.
1) A proposal sentto ministry Ref. No.BPDB/Training/TF-3/2016/399 Date-31.03.2016 formanagementmeeting withmanufacturersrepresentative andwitnessing ofmanufacturingprocess againstBheramara PowerStation from24.06.16 to 30.06.16in USA. 2) A proposal sentto ministry dated09.05.16 for Factorywitness test of fueloil system unitagainstChapainawabganj100 MW projectfrom 20.06.16 to26.06.16 in Finland.
Page 543
2 1-01342 03.02.71 Mr. Sadhan Chandra Dey, Mymensingh, B.Sc.Engr.(Mech.),
05.03.2000(AE) 08.12.09(SDE) 16-10-11 (XEN, Incharge) 18.06.15 (XEN)
DS Distribution BPDB, Dhaka.
3) Technology TransferTraining against 10- townproject from 01.04.15 to30.04.15 Germany.
Germany. 1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form05.01.09 to 14.01.09 for 10 daysin China. 2) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV LA from 15.09.13 to18.09.13 in India.
Office of GM, Commercial OperationSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0540 01.01.58 Mr.Md. Anwarul Islam,
Feni, B.Sc.Engr.(Elec.), 22.02.83(AE) 01.02.92(SDE) 31.12.07(XEN, Revl. Basis) 23.04.09(XEN) 10.09.13 (SE) 13.12.15 (Addl. CE) 14.03.16 (CE)
GM (CE) Commercial Operation
PDB, Dhaka.
1) Improvement of PowerSystem operation, From02.02.2000 to 24.03.2000 2) Installation, testing,operation & maintenance ofprogramming meter and dataanalysis software from15.01.09 to 24.01.09 for 10 days
Japan & Thailand,
USA
1) "Technical Orientation andQuality test Witness" inAugust/2011 for 10 (Ten) days inChina. 2) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland. 3) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from10.11.14 to 25.11.14 in China. 4) Attending a program"Business Customer Summit,2015" from 04.04.15 to 07.04.15in Thailand) 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.
A proposal sent toministry dated10.05.16 forConstructiondrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
Page 544
2 1-0840 08.03.59 Mr. Md. Jashim Uddin, Comilla, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 11.10.10 (XEN)
DGM, Incharge Commercial Operation
PDB, Dhaka.
1) Sub-Station Orientation &Technical Training FromFebruary /01 3 Months.
China 1) 500 Nos.09 Meter Steel Pole(200 DAN) & 100 Nos. 09 MeterSteel Pole (350 DAN) From14.04.07 to 22.04.07 for 07(SevenDays) in China. 2) 3000 Nos.- 11KV PT agaist“Technical Orientation andQuality Test Witness” fromJanuary/10 for 05 days in China. 3) To purchase Two Color Offsetmachine from 07.10.12 to14.10.12 in Germany. See N.B.
N.B. 4) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China. 5) Technical orientation & quality test witness of 11 KV Lightning Arrester from 21.06.14 to 27.06.14 in China. 6) Witnessing of manufacturing process against Baghabari Power Plant from 16.01.15 to 22.01.15 in France. 7) Technical orientation & Quality test witness from 30.04.15 to 06.05.15 in China. 8) Quality test witness from 10-16 March/2016 in China.
3 1-01276 06.10.68 Mr. Nur MohammadShamsuzzoha Kabir, Thakurga, B.Sc.Engr.(Mech.),
10.06.99(AE),
26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN)
XEN , GM, CommercialOperation PDB, Dhaka.
1) Training on Management ofWind Power Developmentfrom 27.08.07 to 28.09.07 for 33days 2) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 3) Training on ct, pt Oct/2015for 7 days
Sweden
Thailand
Germany
1)Factory test witness from27.05.02 to 02.06.02 in India 2)Factory test witness of 33KV1250 Amps Vacuum CircuitBreaker From 16.11.03 to21.11.03 for 07 Days in India 3) Inspection on 132 KV CircuitBreaker against Gopalgonj100MW Peaking Power PlantConstruction Project January/11for 07 days in USA. 4) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 5) Study tour to Nord PoolRegional Electricity Market from12.10.15 to 16.10.15 in Norway &Denmark.
Page 545
4 1-01339 11.11.76 Mr. Mohammad Abul Hasnat, Chittagong, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE)
SDE, GM, CommercialOperation PDB, Dhaka.
1) Foreign Training from18.08.08 to 29.08.08 for 10 days
2) Training on Enegry Meteragainst "Foreign Training"from 15.10.09 to 29.10.09 for 15days.
South Africa
Singapore.
5 1-01340 14.09.71 Mr. Ashis Kumar Sordar, Khulna, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 16-10-11 (XEN, Incharge) 18.06.15 (XEN)
XEN , GM, CommercialOperation PDB, Dhaka.
1) "The Project onStrengthening Managementand Performance Standards inPower Sector in Bangladeshthrough promotion of TQM"from 22.08.09 to 05.09.09
2) Meter Technology,Installation, testing andoperation & maintenance ofmeter programming and dataanalysis software from15.01.09 to 24.01.09 for 10 days.
(Visit is not done)
Japan
USA.
1) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa. 2) Pre shipment inspection from17.08.14 to 26.08.14 in China.
6 1-01859 20.10.86 Tahsin Karim Chittagong B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01195176841 [email protected]
SDE, Incharge GM, CommercialOperation PDB, Dhaka.
1) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa.
7 1-01958 12.4.1987 Ms. Afrin Anu Gaibandha B.Sc. Engg. (Mech.) 02.10.11 (AE) 01715561482 [email protected]
AE GM, CommercialOperation PDB, Dhaka.
Page 546
8 1-01994 29.11.83 Mrs. Hasnura Jahan Dinajpur B.Sc. Engg. (Elect.) 02.10.11 (AE)
AE GM, CommercialOperation PDB, Dhaka.
1) PSCDP Training Program onClean DevelopmentMechanism (CDM) from27.01.13 to 01.02.13 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13 3) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13
Indonesia
India
Thailand
Deputed toCBISP Project,Power DivisionUnder Ministry
Energy Auditing Unit, PDB, DhakaSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0777 08.02.63 Mr. Badhan Chandra Basak, Kishoregonj, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge)
SE (Incharge), Energy Auditing Unit PDB,Dhaka.
1) "Technical Orientation &Quality Test Witness'' on 33KVCurrent Transformer From23.11.08 to 30.11.08 in China. 2) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from November/10 for 10days in China. 3) Inspection against CentralZone Power Distribution Project,Mymensingh 19.07.12 to24.07.12 for 5 days in Japan.
A proposal sent toministry dated04.05.16 for Factoryacceptance test ofenergy meter from20.05.16 to 25.05.16in India.
Page 547
2 1-01343 06.04.74 Mr. Md. Jabed Hossain, Jessore, B.Sc.Engr.(Elec.), 05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)
XEN Energy Auditing Unit PDB,Dhaka.
1) Foreign Training from18.08.08 to 29.08.08 for 10 days
South Africa 1) Training on "ForeignTraining" Against Energy Meterfrom 18.08.08 to 29.08.08 for 10days 2) Inspection against 110V,3´5(6)A, Three Phase 4-Wire, 3-Element, Double TariffProgrammable Energy Meterforfrom 20.06.2011 to 30.06.2011 for10 (Ten) days or from the dateof actual journey (excludingjourney time) in Singapore. 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland. 4) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 5) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MWCCPP project from 20.10.15 to29.10.15 in China. 6) Energy meter testing andsealing program from 09.03.16to 11.03.16 in India.
A proposal sent toministry dated07.04.16 for Testingof CT & CVT from09.04.16 to 12.04.16in India.
3 1-01619 16.01.74 Mr.Md.Muzibor Rahman Jessore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge), Office of SE EnergyAuditing Unit PDB,Dhaka.
1) "Foreign Training program"from 07.09.09 to 20.09.09 for 14days 2)Operation & MaintenanceTraining (Factory Training)against Bera 70 MW PeakingPower Plant ConstructionProject for 30 (thirty) days(Excluding travel time)
China.
South Korea
Page 548
4 1-01630 17.11.79 Mr.Ajoy Kumar Chakraborti Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Energy Auditing Unit PDB,Dhaka.
1) "Foreign Training program"from 07.09.09 to 20.09.09 for 14days.
China. 1) Inspection against CentralZone Power Distribution Project,Mymensinghfrom the date ofactual journey from 05.06.12 to10.06.12 for 5 days in China. 2) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.
5 1-02002 10.11.1983 Lutfunnahar Khulna B.Sc. Engg. (Comp.) 02.10.11 (AE) 01717366470 [email protected]
AE Energy Auditing Unit PDB,Dhaka.
On metarnityLeave
6 1-02025 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)
AE Energy Auditing Unit PDB, Dhaka.
7 1-02034 27.04.84 Mr. A.H.M. Emdadul Pasha Rajshahi B.Sc. Engg. (Elect.) 12.12.11 (AE)
AE Energy Auditing Unit PDB, Dhaka.
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore 1) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
8 1-02083 28.08.87 Mrs. Afroza Akter Chittagong B.Sc engg. (Elect.) 17.12.13
AE Energy Auditing Unit PDB, Dhaka.
On metarnityLeave
Page 549
Dhaka Computer CentreSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0828 03.08.63 Mr.Ratan Kumar Paul, Jhinaidaha, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 03.08.10 (XEN)
Senior System Analyst Dhaka Computer Centre
PDB, Dhaka.
1) "Renewable Energy" from01.06.13 to 30.06.13
Thailand 1) "Step up Transformer"against Sylhet 150MWCombined Cycle Power StationConstruction Project from 15.01.2011 to 22.01. 2011 for 07(Seven)days in China. 2) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China.
2 9-0005 01.09.1968 Mr. Mrigangko Mohan Pal Magura B.Sc. engg. (Elect.) 21.11.1999 (AssistantProgrammer)
System Analyst Dhaka Computer Centre
PDB, Dhaka.
1) Visit to establishprepayment e meteringthroughout the country inOctober/2011 in South Africaand England. 2) Inspection on Pre-Paid e-metering System SoftwareDevelopment in January/2012for 10 (ten) days in China.
A proposal sent toministry dated10.05.15 for KOICA'sMaster's DegreeProgram from10.08.15 to 23.12.16in South Korea.
3 9-0012 23.05.1979 Mr. Uzzal Miah B-Baria M. Sc. engg. (Comp.) B.Sc. engg. (Comp.) 30.03.2005 (AssistantProgrammer) 01717636020
Assistant Programmer Dhaka Computer Centre
PDB, Dhaka.
1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13
Thailand
4 1-01649 06.05.77 Mr.A.S.M.Foyez Ullah Khulna B.Sc.Eng(Computer) 07.04.2006(AE) 18.08.2011 (SDE) 06.04.14 (XEN, Incharge) 01920753636
XEN (Incharge) Dhaka Computer Centre
PDB, Dhaka.
1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13
Thailand
5 1-01861 25.12.82 Mr. S. M. Niamul Haque B-Baria B.Sc. Engg. (Comp.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01915629769 [email protected]
SDE, Incharge dhaka Computer Centre
PDB, Dhaka.
1) Technical orientation &quality test witness of 11 KVACR from 25.03.14 to 31.03.14 inChina. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia.
A proposal sent toministry dated10.05.15 for KOICA'sMaster's DegreeProgram from10.08.15 to 23.12.16in South Korea.
Page 550
Offices Under Member P & DSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0476 03.12.58 Mr.Abul Baser Khan Dhaka B.Sc.Engg. (Elec.) 11.01.82 (AE) 20.07.88 (SDE) 15.09.02(XEN) 05-10-11 (SE, Incharge) 28.07.15 (Addl. CE) 12.01.16 (Member)
Member P & D, PDB, Dhaka.
1) Electrical powerdistribution system from05.09.91 to 21.11.91 2) Total Quality Managementfrom 17.02.2004 to 20.03.2004 3) PSCDP Training onProcurement and Supply ChainManagement trainingprogram from 30.09.13 to11.10.13
Japan
Japan
Thailand
1) Approval of Engineering Dataand Detail Design againstHathazari 100 MW PeakingPower Plant Construction Projectfrom OCtober/10 for 07 days inChina. 2) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 3) "Technical Orientation andQuality Test Witness" against33/11 KV, 20/26 MVA PowerTransformer from 05.02.13 to14.02.13 in China. See N.B.
A proposal sent toministry dated05.05.15 forManagementmeeting for GT,SGT, HRSG againstShahjibazar 330MW project from31.05.16 to 07.06.16in Germany.
N.B. 4) Witnessing of manufacturing process against Tongi 80 MW P/S from 03.08.14 to 09.08.14 in USA. 5) Detail Drawing Review & Approval from 26.07.15 to 08.08.15 in China. 6) Seminar on "Transform 2015" from 11.10.15 to 16.10.15 in Germany & Austria. 7) Capacity Building program from 18-20 Jan/2016 in Philippine. 8) Delegation on energy generation and energy efficiency from 13.04.16 to 19.04.16 in Denmark.
Page 551
Office of CE, P & DSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0558 11.01.59 Mr. Bikash DewanRangamatiB.Sc.Engg. (Elec.)18.03.83(AE) 18.03.93(SDE) 09.03.03(XEN) 31.03.14 (SE)
Addl. CE, Incharge Office of CE P & D,
PDB,Dhaka
1) Meter & Accessories From24.05.2004 to 23.06.04
2) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13
Singapore &Australia
Thailand
1)11KV Capacitor Oil Switch,Automatic Capacitor Controller,Junction Box and Line PostCurrent Sensor for 3x100KVARCapacitor Banks. From Feb/07for 07 days in U.S.A 2) Technical Orientation andQuality Test Witness" against33KV Outdoor Type CurrentTransformer (Diffenent Ratio)from January/11 for 07 days inChina. See N.B.
N.B. 3) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep./2011 for 07 days or fromthe date of actual journey (excluding travell time) in New Zealand. 4) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 5) Factory Full Speed No Load Test of Unit-2 GT against Shahjibazar 330 MW CCPP Project from 08.02.15 for 7 days in Belfort, France. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China. 8)Inspection of Gas turbine and generator from 15.01.16 to 21.01.16 in Germany 9)Basic Design Approval of Ghorasal Repowering Project from 27.03.16 to 05.04.16 in China.
2 1-0970 02.01.59 Mr. Md. Ataur Rahman DewanDhakaAMIE(Elet)26.04.93(AE) 21.04.93( AE) 03.08.10 (XEN Rev) 21.08.11(XEN)
XEN Asst,CE P & D
1) Detail drawing againstKatakhali Power Plant Project23.02.11 to 01.03.11 7 days inChina 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.
Page 552
Design and Inspection -1SL.No ID-No Date of Birth Name, District and Qualification
and Date of joiningDesignation and Present
PostingTopics of Foreign Training and
DurationCountry Inspection Topics and its Duration Comments
1 1-0656 01.10.62 Mr. Md. Tofazzel Hossain, Rajshahi, B.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)
Director (SE) Design and Inspection -1
PDB,Dhaka
1)GTC in Thermal PowerEngineeringFrom 12.5.97 to 03.7.97
Japan. India 1) Inspection From 19.11.01 to7days in India 2) Inspection againstMeghnaghat 335 MW Duel-fuelCombined Cycle IPP Power Plantto inspect of equipment from24.02.13 to 02.03.13 in China. 3) Inspection against Bibiana400 MW CCPP Project from10.06.15 to 11.06.15 in Singapore
2 1-0758 01.03.61 Mr. Shafiqul Islam,
Barisal, B.Sc.Engr.(Mech.) 30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
Dy. Director (XEN), Design and Inspection -1
PDB,Dhaka & PD (add. Charge) Khulna 40 MW RentalPower Plant, PDB,Khulna.
1) Maintenance of Turbineand Its Auxiliaries, WaterTreatment Plant From21.03.2004 to 6 Months (Bondfor 03 Years from 22.03.04 to21.09.04)
China, 1) "Electricity Markets To MeetTomorrow's Demand: Efficientand Effective Design, Operationand Management" from 28.09.08to 04.10.08 for 07 days in USA. 2) Supply of Spares forGenerator Overhauling of GT-1(Lot-B) against "Witnessing ofManufacturing Process andTests of Concerned Equipmentat Manufacturers' Factory foreach lot including transfer ofTechnical Know-how” for 07days in France 3)Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject from 09.08.10 to 18.08.10for 10 for 07 days in China +H152
On lien to CoalPowerGenerationCompany Ltd.
Page 553
3 1-01002 01.01.65 Mr. Sayeed Akram UllahComilla ,B.Sc.Engr.(Elec.),19.07.94(AE) 03.02.03(SDE) 18.08.11 (XEN)
Dy. Director (XEN)
Dte. Of Design &Inspection-1, Dhaka.
1) Country Focus Training onPower Sector March/02, for 30days.
Japan 1) Training. 100 Amps - LV MCCB. China,September/05 for 7 days 2) Gas Booster CompressorProgram named "FactoryWitness Test" Against Sylhet150 MW Combined Cycle PowerPlant Construction project from10.05.2011 to 20.05.2011 for 10(ten) days (excluding traveltime ) in USA. 3) Finalizing the report of jointsteering committee from02.09.2012 to 06.09.2012 in India.
See N.B.
A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
N.B. 4) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 5) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India. 6) ) Meeting with EIB for discussion about RFP preparation for GT conversion projects from 22.04.14 to 26.04.14 in Luxembourg. 7) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 20.06.14 to26.06.14 in China. 8) PDM finalization meeting for Rampal Project from 31.08.14 to 06.09.14 in India. 9) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 10) Basic Design & Drawing against Barapukuria 275 MW Coal Based Power Plant from 10.11.14 to 25.11.14 in China 11) Inspection against Bibiana 400 MW CCPP Project from 10.06.15 to 11.06.15 in Singapore 12)Construction Drawing Review Meeting against Barapukuria 275 MW Coal Based Power Plant from 15.01.16 to 21.01.16 in China. 13)Rotor final balancing test for the gas turbine against Bibiana south 400 MW CCPP project from 25.01.16 to 03.02.16 in Gremany.
4 1-01012 01.03.66 Mr. A.B.M. Ziaul Haque, Patuakhali B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 31.07.12 (XEN)
Dy. Director (XEN) ,
Dte. of Design &Inspection-1 PDB,Dhaka.
1) Inspection on Power Plantagainst Northern PowerSolution Limited from 17.08.10to 26.08.10 for 10 days inFinland. 2) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China. *N.B.
*N.B. 3) Chandpur 150MW Combined Cycle Power Station Construction Project, a Training Program named "Detailed Design Review Meeting" from 10th of January, 2011 for 12(Twelve) days in China. 4) Approval of "Construction Drawings" aganist Sylhet 150MW Combined Cycle Power Plant Construction Project for 08(Eight) days in China. 5) Chandpur 150MW Combined Cycle Power Station Construction Project, a Training Program named "Detailed Design Review Meeting" from 10th of 20.01.11 to 31.01.11 for 12(Twelve) days in China. 6) Approved Basic design & drawing of Shahjibazar 330 MW Combined Cycle Power Plant Construction Project from 05.08.14 to 18.08.14 in China. 7) Factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 10.12.14 to 16.12.14 in France. 8) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China. 9) Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.
Page 554
6 1-01616 10.12.82 Mr.Ashiq Imran Barisal B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge), Design & Inspection-1, PDB,Dhaka.
1) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.
2) "Training for 2 Engineers ofBPDB at GE facility" againstRangpur 20 MW Power Plantfrom 26.04.14 to 11.05.14
Bahrain
USA
1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.
2) Engineering review meeting(Basic Design & Drawing)against Shikalbaha 225 MWDuel-Fuel CCPP Project from16.11.14 to 27.11.14 in India. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China. 4) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from Sep/2015 in China. 5)Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina. 6) Detail Design Review andApproval Meeting againstGhorasal 365 MW CCPP projectfrom 08.05.16 to 15.05.16 inChina.
7 1-01644 01.01.77 Mr. Mohammad MahmudurRahman Mahmud B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE) 27.03.14 (XEN, Incharge) 01711607170
XEN (Incharge), Design & Inspection-1, PDB,Dhaka.
1) "Renewable Energy" from01.06.13 to 30.06.13
Thailand 1) Steam turbine generator testwitness from 13.05.14 to19.05.14 in China. 2) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 3) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China. 4)Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 5)Factory test witness ofWartsila Engine and Generatoragainst Chapainawabganj 100MW Project from 09.04.16 to17.04.16 in Finland
Page 555
8 1-01728 29.10.79 Mr.Md.Ariful Haq Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 27.12.2011(SDE) 24.11.14 (XEN, Incharge)
DD (XEN, Incharge) Design & Inspection-1, PDB,Dhaka.
1) "Orientation &Manufacturing Test Process atManufacturers Works" from02.12.08 for 04(Four) weeks
Czech Republic 1)Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKoria. 2) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. 3) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 4) Witnessing of manufacturingprocess from 18.09.14 to 24.09.14in Netherlands. 5) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based H165Power Plantfrom 10.11.14 to 25.11.14 inChina. 6)Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.
A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
9 1-01850 05.06.87 Mr. Shahan Shams Alam Jhinaidah B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01748777946 [email protected]
SDE, Incharge Design & Inspection-1,PDB, Dhaka.
1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13
India 1) "witnessing of manufacturingprocess and tests of theequipment at manufacturers'works including transfer oftechnical know-how" againstBheramara Power Plant from15.03.2014 to 21.03.2014 inCroatia. 3) Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.
10 1-01851 22.11.86 Ms. Rhituparna Paul Payel Khulna B.Sc. Engg. (Elect.) 04.11.10 (AE) 017165333262 [email protected]
AE Design & Inspection-1,PDB, Dhaka.
In Norway
Page 556
11 1-02057 31.12.87 Ekramul Pasha Rajshahi B.Sc.Engr.(Mech.) 17.12.13 (AE)
AE Design & Inspection-1,PDB, Dhaka.
12 1-02096 15.12.84 Mr. Humayun KabirChowdhury Thakurgaon B.Sc. Engg. (Elect.) 13.04.14 (AE)
AE Design & Inspection-1,PDB, Dhaka.
13 Mr. Shamsuddoha AE Design & Inspection-1,PDB, Dhaka.
1) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
Design and Inspection -2 SL.No ID-No Date of Birth Name, District and Qualification
and Date of joiningDesignation and Present
PostingTopics of Foreign Training and
DurationCountry Inspection Topics and its Duration Comments
1 1-0870 15.07.64 Mr. Md. Ahsan Habib,Sirajgonj,B.Sc.Engr.(Mac.),18.2.88(AE) 18.06.2000(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
Director, Incharge
Design & Inspection-2, PDB,Dhaka
1)Training against Baghabari200 MW P/St. From 16.09.01 to90 days
2)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years) 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
India,
China,
Singapore
1) Inspection against Sydpur 20MW Power Plant from 06.05.2012to 14.05.2012 for 7 days in China.
2) "Technical Orientation &Quality Test Witness" on 3-Phase, 4-Wire Double TariffFully Programmable EnergyMeter from 01.09.13 to 10.09.13in China. 3) Quality acceptance test on 11KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 4) Inspection against BaghariPower Plant on Dec/2015 for 7days in USA.2 1-0846 03.10.64 Mr. Md. Samsul Haque,
Korigram, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 10.02.09 (XEN, In-charge), 11.10.10 (XEN)
XEN,
Design & Inspection-2, PDB,Dhaka.
Maintenance of Generator,Excite, Transformer,Motor,Sub-station From 21.03.2004 to 6Months (Bond for 03 Yearsfrom 22.03.04 to 21.09.04)
China In Canada
Page 557
3 1-01459 01.05.75 Mrs. Jakia Najnin Panna, Khulna, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 04-02-14 (XEN, Incharge)
DD(XEN), Incharge
Design & Inspection-2, PDB,Dhaka
1) PSCDP Training programon "Project Management(Batch-1)" from 12.08.13 to23.08.13
Thailand 1) "Technical Know-How" onL.P. Rotor against Khulna PowerStation from 09.06.09 to 15.06.09for 07 days in Czech Republic. 2) “Witnessing ofmanufacturing process againstRepairing / Reconditioning /Replacement of Chimney fromOctob./10 for 07 days in China. 3) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.
4 1-01611 02.12.77 Mr. MohammedHedhayetullah Khan Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Dte. of Desigan &Inspection-2 PDB,Dhaka.
1) Training on ''Operation &Maintenance of Gas Turbinein France 01.12.07 to 14.01.08for 1.5 Months & ''Operation &Maintenance of CCPP in Chinafrom 19.07.07 to 17.08.07 for 01Month against 90 MW SylhetCombined cycle Power Station(Unit-2) Cons. Project (Bondfor 03 Years) 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
France & China
Singapore
1) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) "Technical Orientation andQuality Test Witness" against33/11 KV, 16/20 MVA Power from05.02.13 to 14.02.13 in China. 3) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV GIS from 02.12.13to 05.12.13 in Germany. 4) Technical orientation &quality test witnes of powertransformer from 23.04.16 to29.04.16 in China.
5 1-01189 20.04.66 Mr. Md. Shahidul Islam, Chandpur, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE). 31.10.13 (XEN)
XEN Design & Inspection-2,PDB, Dhaka.
1) 11KV Load Break Switch (OnLoad) & 11KV Isolator (Off Load)
from 06.11.07 to 12.11.07 for 07days in China. 2) Technical Orientation &Quality Test Witness of 33 KVVCB from 15.02.15 to 21.02.15 inIndia.
6 1-01676 31.12.77 Mr.Mohammad Raihan NabiKhan Sirajgong B.Sc.Eng(Mech) 06.2006(AE) 16.06.14 (SDE)
XEN, Incharge Design & Inspection-2,PDB, Dhaka.
Training on Planning &development from 01.05.16 to15.06.16
India 1) Technical Orientation andQuality Test Witness inDecember/2010 for 07 days inIndia
Page 558
7 1-01797 05.12.85 Mrs.Tauhida Ahmed Manikgonj B.Sc.Eng(Elec.) 01.06.09(AE)
AE, Dte. Of Design &Inspection-2 PDB, Dhaka.
1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13
India 1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.
In Abroad
8 1-01843 28.10.87 Mr. Md. Zakirul Islam Sarker Netrokona, B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01716420643 [email protected]
SDE, Incharge Dte. Of Design &Inspection-2 PDB, Dhaka.
1) Training course on"Renewable Energy System (25-10)" from 30.01.2012 to24.02.2012 for 4 (four) weeks(excluding travel time) fromthe date of actual journey 2) "Alternative PowerGeneration Technology forLow Carbon Society" organizedby JICA from 08.05.13 to13.06.13 3)Training on Operation &Maintenance from 01.05.16 to15.06.16
India
Japan
India
1) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.
9 1-01845 15.07.87 Mr. Rajesh Mojumder shunamganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01710529383 [email protected]
SDE, Incharge Design & Inspection-2,PDB, Dhaka.
1) Training on Planning &development from 01.05.16 to15.06.16
India 1) "Technical Orientation andQuality Test Witness" against33/11 KV, 20/26 MVA PowerTransformer from 05.02.13 to14.02.13 in China.
10 1-01848 30.09.82 Mr. Md. Ajgar Ali Jhinaidah B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01674433856 [email protected]
SDE, Incharge Design & Inspection-2,PDB, Dhaka.
1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea. 2) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina. 3) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China.
11 1-01885 21.12.86 Mr. Md. Bokul Islam Sirajganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01718412333 [email protected]
SDE, Incharge Design & Inspection-2,PDB, Dhaka.
1) Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial from 01.04.13 to06.04.13 in India.
Page 559
12 1-01905 16.10.88 Ruhana Ryan Promee Dhaka B.Sc. Engg. (Elect.) 12.07.2011 (AE) 01671160860 [email protected]
AE Design & Inspection-2,PDB, Dhaka.
1) PSCDP training program on"Contract Management (Batch-1)" from 02.09.13 to 13.09.13
Thailand 1) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina.
13 1-02094 31.12.89 Mr. Abdullah Al Basid Natore B.Sc.Engr.(Elect.) 13.04.14 (AE)
AE Design & Inspection-2,PDB, Dhaka.
Directorate of ProgramSL.No ID-No Date of
Birth Name, District and
Qualification and Date ofjoining
Designation andPresent Posting
Topics of Foreign Training andDuration
Country Inspection Topics and itsDuration
Comments
1 1-0783 04.10.58 Mr. Nazrul Islam, Jamalpur, B.Sc.Engr.(Elec.),
30.08.86(AE) 21.11.99 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)
Director (Incharge)Dte. of Programme PDB, Dhaka.
1)Training on Total QualityManagement (TQM) & PowerDistribution From 18.03.02 to18.04.02 2) Training on Planning &development from 01.05.16 to15.06.16
Japan(Jica)
India
1) Inspection on DistributionLine 11KV Pin Insulator withPin, 11KV Disc Insulator,etc.October/05 for 07 days inIndia. 2) Inspection of LightningArrester from 02.10.12 to11.10.12 in China. 3) Witnessing of manufacturer'sprocess from 30.05.14 to 05.06.14in China. 4) 9th meeting of solar energyforum from 21-23 March/2016 inChina.
Page 560
2 1-01201 01.10.65 Mr. Md. Shahidur RahmanKhan, Narsingdhi B.Sc. Engg. (EEE), MBA on HRM (2013)
19.03.98(AE),
27.07.05(SDE), 31.10.13 (XEN)
Dy-Director (XEN) Dte. Of Program PDB, Dhaka.
1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea. 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia 4) Factory Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India.
.A proposal sent toministry dated25.04.16 for FactoryAcceptance Testagainst Chitt. Zonepower dist. Dev.Project from20.05.16 to 26.05.16in China.
3 1-01444 14.11.73 Most. Shafinaj Banu, Rangpur, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Dte. Of Program PDB, Dhaka.
1) "Work Shop Test" forHathazari 100MW PeakingPower Plant Construction Projectfrom 24.02.11 to 02.03.11 for07(Seven) days in China.
In Australia
4 1-01853 11.04.87 Ms. Faeza Hafiz Dhaka B.Sc. Engg. (Elect.) 04.11.10 (AE) 01721611194 [email protected]
AE Dte. of Programme PDB, Dhaka.
In StudyLeave
5 1-01896 07.07.85 Ms. Afsana Yasmin Rajshahi B.Sc. Engg. (Elect.) 20.04.11 (AE) 01817112729 [email protected]
AE Directorate of Program,PDB, Dhaka.
In StudyLeave
6 1-02038 10.11.85 Mr. Omar Faruk Pabna B.Sc engg. (Mech.) 05.01.12 (AE)
AE Dte. of Programme PDB, Dhaka.
In StudyLeave
Page 561
7 1-02093 27.09.90 Mr. Syed Enam Reza Chapainawabganj B.Sc.Engr.(Elect.) 13.04.14 (AE)
AE Dte. of Programme PDB, Dhaka.
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore
In StudyLeave
Directorate of Project PlanningSL.No ID-No Date of
Birth Name, District and
Qualification and Date ofjoining
Designation andPresent Posting
Topics of Foreign Training andDuration
Country Inspection Topics and itsDuration
Comments
1 1-0883 21.01.64 Mr. Munshi Bashir AhmedGazipur,AMIE(Elec.),25.08.84(SAE) 23.01.89(AE) 18.06.2000 (SDE) 02.07.09 (XEN) (In-charge), 08.02.11 (XEN)
Director (Incharge) Dte. Of Project Planning,
PDB,Dhaka.
1)Prepaid Meter InstallationFrom 25.07.01 to 7 Days/01
2)Training On Tower Design,Pole Design, etc. Operation &Maintenance Against Ctg. P/sDistribution Project From08.07.04 to 6 Weeks 3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days. 4) Chandpur 150 MW CCPPProject aganist Others HRSGfrom 30.05.2011 to 12.08.2011for 75 days (bond for 5 years)
South Africa,Tanzania
China,
China.
China
1)Test on suitable 400 KV Gridinterconnection between WestBengal and Bangladeshnetwork from 26.07.10 to29.07.10 in india. 2) Workshop on Energy: State ofCrisis & Future Outlook from13.05.10 to 14.05.10 in Egypt.
2 1-01280 01.01.73 Mrs. Bithi Islam, Manikgonj, B.Sc.Engr.(Mech.),
24.06.99(AE) 26.07.05(SDE), 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)
Dy.Director Dte. Of Project Planning,
PDB,Dhaka.
1)Training on GIS from15.06.04 for 07 Days
Germany 1)Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial from 01.04.13 to06.04.13 in India.
Page 562
3 1-01311 23.06.68 Mr. Mohammed Zulfikar Ali
Norail B.Sc.Engr.(Elect.), 20.01.2000(AE) 08.12.09 (SDE) 20.11.13 (XEN,in charge)
Dy.Director (Incharge), Dte. Of Project Planning,
PDB,Dhaka. Return from Lien
1) Winessing of manufacturingprocess from 19.10.14 to 25.10.14in China. 2) “Witnessing ofManufacturing Process and Testof the Equipment atManufacturer's works includingtransfer of technical know-how”from 25.11.14 to 01.12.14 inChina.
4 1-01566 15.05.71 Mrs. Daisy Pervin Dhaka, B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN) 01755582479 [email protected]
Dy.Director Dte. Of Project Planning,
PDB,Dhaka.
1) Training on Selected forOrientation & TechnicalTraining. X-former & Oxilary. X-former from/06 for 06 Weeks 2) Long Term Power SystemPlanning and Preparation ofFuture Project trainingprogram from 29.04.13 to10.05.13
India.
Thailand
5 1-01668 10.06.74 Mr. Mohammad Geasuddin Dhaka B.Sc.Eng(Mech.) 07.04.06 (AE) 18.08.2011 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) Dte. of Project Planning
PDB, Dhaka.
1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project30.03.11 to 06.04.11 for 08(Eight)days in China. 2) Witness of factory test ofconductor (Pkg-18) from 07.05.14to 13.05.14 in China.
6 1-01789 03.10.83 Mr.Zahir Uddin Md. Babur Barisal B.Sc.Eng(Elec.) 28.05.09(AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN, Incharge Dte. of Project Planning,PDB, Dhaka.
1) Training on Planning &development from 01.05.16 to15.06.16
India. 1) "Developments inRenewable EnergyTechnologies" against "NTPCLimited" from 07.03.11 to09.03.11in India.
7 1-01826 01.01.84 Mrs. Sharmeen Sultana Jessore B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01717086821
SDE, Incharge Dte. of Project Planning
PDB, Dhaka.
1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China.
Page 563
8 1-01846 10.12.85 Mr. Kamrul Hasan Kafi Shariyatpur B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01827115550 [email protected]
SDE, Incharge Dte. of Project Planning
PDB, Dhaka.
1) "Witness of factory test ofsub-station gantry & hardware"from 10.05.14 to 16.05.14 inIndia. 2) Technical Orientation andQuality Test Witness"from12.10.2015 to 18.10.205 for07 days in Singapore.
9 1-01857 27.10.87 Ms. Kakoli Saha Khulna B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722419764 [email protected]
AE Dte. of Project Planning
PDB, Dhaka.
On lien
10 1-02000 18-06-85 Ms. Rabeya Zaman Narayanganj B.Sc. Engg. (Comp.) 02.10.11 (AE) 01716116328 [email protected]
AE Dte. of Project Planning
PDB, Dhaka.
11 1-02071 04.02.90 Ms. Sanjana Haque Dhaka B.Sc. Engg. (Mech.) 17.12.13 (AE)
AE Dte. of Project Planning
PDB, Dhaka.
Page 564
Directorate of System PlanningSL.No ID-No Date of
Birth Name, District and
Qualification and Date ofjoining
Designation andPresent Posting
Topics of Foreign Training andDuration
Country Inspection Topics and itsDuration
Comments
1 1-0661 27.02.60 Mr.Mohammed Abul KashemMahmud, Mymensing B.Sc.Engr.(Elec.),
17.10.85(AE) 21.11.99(SDE) 21.07.04(XEN) 26.05.15 (SE)
Director
System Planning, PDB,Dhaka .
1) Training on Instrument &Control from 28.12.87 to27.09.87 2) Training " D-8 WorkingGroup on Clean CoalTechnology" from 11.07.2012to 14.07.2012 .
USSR
Turkey
1) Pre-Shipment InspectionFrom 04.07.01 to10.07.01 InIndia. 2) Expert Group Meeting onSustainable DevelopmentIndicators for the Power Sectorfrom 17.07.07 to 19.07.07, 03days in Thailand. 3) SARI/Energy against "UnionCoordination of Transmissionof Electricity (UCTE) From22.09.08 to 26.09.08 for 05 daysin Belgium. See N.B.
N.B. 4) HRSG factory inspection witness of Shirajganj 150 MW PPP to 225 MW CCPP project from 28.05.13 to 30.05.13 in China. 5) The international seminar on Developing effecient coal based thermal on 14.11.14 in India. 6) Equipment testing witness against Upgradation of Khulna 150 MW to 225 MW CCPP project from 12.12.14 to 18.12.14 in China. 7) Factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in France. 8) Equipment Test Witness on December/2014 in India. 9)Pre-Shipment Inspection Against Shajibajar Power Station Project from 21.12.15 to 27.12.15 In Italy.
2 1-01350 13.02.73 Mrs. Mosammat JarifaKhatun, Jhinaidah, B.Sc.Engr.(Elec.),05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 18.06.15 (XEN) 01715000611 [email protected]
Dy.Director Dte. Of systemPlanning, PDB,Dhaka.
1) Masters Degree has beenobtained on "RenewableEnergy" from "Olden BurgeUniversity, Germany" from04.08.08 to 29.08.08 (e¨w³MZ D‡`¨v‡M
wM‡qwQ‡jb) 2) "Policies and Strategies toMitigate Climate Change andEnergy Poverty in Southeastand China from 05.10.09 to09.10.09 for 06 days
Germany
Vietnam
1) Inspection of CopperTerminal Lugs in Kolkata From23.12.04 to 30.12.04 for 07 Days. 2) South Asia Women in Energy(SAWIE) Partnership Program-Participation in the XXIst WorldEnergy Congress from 12.09.10 to16.09.10 in Canada. 3) Asia-Pacific RenewableEnergy Policy againstInternational RenewableEnergy Agency (IRENA)-Koreafrom 14.10.10 to 15.10.10 for 02days in Korea. 4) South and South-West AsiaSubregional PreparatoryConsultation Meeting from06.11.12 to 07.11.12 in India.
Page 565
3 1-01422 31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN) 01755637647
Dy.Director Dte. of System PlanningPDB, Dhaka.
1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04 for 06Weeks
China 1) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 2) Technical orientation from19.12.14 to 27.12.14 in Malaysia. 3)Inspection of Gas turbine andgenerator from 15.01.16 to21.01.16 in Germany
4 1-01679 12.11.80 Mr.Muhammad Bellal Hossan
Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE) 01.10.14 (XEN, Incharge)
XEN (Incharge) Dte. Of SystemPlanning, PDB,Dhaka.
1) Training on Pre-paidmetering system from 18.08.08to 29.08.08 for 10 days
2) Renewable Energy andEnergy Efficiency from 04.01.10to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power Plant ConstructionProject, BPDB from 10.07.2011to 09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years) 4) A group training course on"Alternative Power generationTechnology For low Carbonsociety" organized by JICAfrom 31.07.2012 to 30.08.2012 5) PSCDP training programtitled "Tariff Management"from 18.12.12 to 22.12.12 6) Participation in Training onPower System Planning &Design Studies from 09.03.15to 13.03.15 7) JICA Counterpart trainingfrom 06.11.15 to 21.11.15
South Africa.
India.
China
Japan
Thailand
Canada
Japan
1) Attending a program titled"Forum for South East AsianPolicy Makers Fossil-fuelSubsidy Reform: Challengesand Opportunities" from20.11.12 to 21.11.12 inIndonesia.
Page 566
5 1-01746 03.09.81 Mr. Md. Anowar Hossain, Rajshahi B.Sc.Engr(Mech.) 12.05.08 (AE) 16.06.14 (SDE) 05.11.14 (XEN, Incharge)
DD (Incharge), Dte. Of System Planning
PDB, Dhaka.
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore 1) Workshop on Regional CleanCoal Partnership: Short-termCourse on Coal Preparationfrom 27.07.09 to 01.08.09 inIndia. 2) Pre shipment inspectionagainst renewable basedpower plant constructionproject at haor area from09.03.14 to 15.03.14 in China.
6 1-01764 06.08.84 Mr. Anwarul Maruf Dhaka B.Sc.Engr(Mech.) 31.05.09 (AE) 24.12.14 (SDE) 25.06.15 (SDE)
SDE Dte. of System Planning
PDB, Dhaka.
1) Training Course on BiogasTechnology Facilities andHygiene for DevelopingCountries from 07.06.11 to18.07.11 2) A group training courseorganized by JICA on Nov/2015
China
Japan
1) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China.
8 1-01839 25.06.87 Mr. Sayed Ashraf Mamun Dhaka B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 1911348014 [email protected]
SDE, Incharge System Planning PDB, Dhaka.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2)JICA Counterpart trainingfrom 06.11.15 to 21.11.15
NewZealand
Japan
1) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China.
9 1_2039 01.11.87 Mr. Md. Monower Zahid Khan Sirajganj M.Sc. engg. (Elect.) B.Sc. engg. (Elect.) 05.01.2012 (AE) 01718228830 [email protected]
AE, System Planning PDB, Dhaka.
1) Participation in Training onPower System Planning &Design Studies from 09.03.15to 13.03.15 2)1) A group training courseorganized by JICA on Nov/2015
Canada
Japan
1) Witness of factory test ofconductor (Pkg-18) from 20.04.14to 26.04.14 in China.
10 1-02040 08.07.87 Mr. Tanvir Ahmed Dhaka B.Sc. Engg. (Elect.) 05.01.12 (AE) 01714743397 [email protected]
AE, System Planning PDB, Dhaka.
1) "Witness of factory test ofsub-station gantry & hardware"from 10.05.14 to 16.05.14 inIndia.
11 1-02088 01.09.90 Mr. Iqbal Hasan Haboganj B.Sc. engg. (Elect.) 17.12.13 (AE)
AE, System Planning PDB, Dhaka.
1) JICA Counterpart trainingfrom 06.11.15 to 21.11.15
Japan
Dte. Of Renewable Energy and Research and Development
Page 567
SL.No ID-No Date ofBirth
Name, District andQualification and Date of
joining
Designation andPresent Posting
Topics of Foreign Training andDuration
Country Inspection Topics and itsDuration
Comments
1 1-0832 30.11.63 Mr. Md. Nazmul Haque, Mymensing, B.Sc.Engr.(Elec.),18.02.88(AE) 21.11.99(SDE) 03.08.10(XEN)
Director (Incharge)Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .
1)System Loss Reduction Studyfrom 11.8.94 to 13.9.94,
2)Training on PowerTransformer from 08.10.03 to08.01.04 for 03 Months .
Kenya,
China
1) Inspection against CentralZone Power Distribution Project,Mymensingh to inspectSubstation Equipment &Mateerial on June/2013 for 7days in India. 2) Factory Acceptance test of 11KV Disc Insulator with fittingsfrom 08.11.15 to 14.11.15 inChina. 3) Meeting of Joint WorkingGroup (JWG) from 18-19April/2016 in India.
1) G.O. issueddated 30.03.16 forInspection of 33/11KV x-former from 09-13 May/2016 inGermany. 2) G.O. Issued forGlobal projectplaza 2016 from24.05.16 to 27.05.16in South Korea.
2 1-01177 01.09.68 Mr. Ahmed Jahir Khan, Potuakhali, B.Sc.Engr.(Mech), 14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)
Dy. Director (In charge) Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 forOne Month 2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13 3) Training on Planning &development from 01.05.16 to15.06.16
Russia
Australia
India
1) Workshop on RegionalCooperation in sedimendmanagement in Hydro powerproject from 16.06.09 to 17.06.09for 02(Two) days in Nepal. 2) Training course on Bio-gastechnology form 22.06.09 to16.08.09 in China. 3) Solar Power Plant "TestWitness" from October/10 for 07days in China. * See N.B.
* N.B. 4) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep/2011 for 07 days orfrom the date of 5) A program named "Carbon Capturing & Destroy" from 26.02.2012 to 29.02.2012 in Singapore. 6) Summit named "Uncover LNG infrastructure, supply chain & trade developments" from 27.03.2012 to 30.03.2012 in Singapore. 7) A program titled "Climate Change and Renewable Energy" from 10.08.2012 to 28.08.2012 in USA. 8) Pre-shipment inspection against Wind Battery Power Plant, Kutubdia from 20.04.16 to 26.04.16 in China.
3 1-01743 01.10.79 Mr. Md. Ahasan Habib Bogra B.Sc.Engr(Mach.) 07.04.06 (AE) 16.06.14 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) Renewable Energy &ResearchDevelopment PDB, Dhaka.
1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China
On Studyleave
Page 568
4 1-01780 23.03.84 Mr.Farhana Alam Faridpur B.Sc.Eng(Mech 31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN, Incharge Renewable Energy &ResearchDevelopment PDB, Dhaka.
1)Chandpur 150 MW CCPPProject aganist Others HRSGfrom 30.05.2011 to 12.08.2011for 75 days (bond for 5 years) 2)Training on Planning &development from 01.05.16 to15.06.16
China
India
1) Solar Power Utilization(Bangladesh) against KoreaInternational CooperationAgency (KOICA) from 11.10.10 to28.10.10 for 18 days in Korea.
5 1-01822 18.12.79 Mr. Kamrul Ahmed Khulna B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01678121352 [email protected]
SDE, Incharge Dte. Of RenewableEnergy and Researchand Development, PDB,Dhaka
1) "Alternative PowerGeneration Technology forLow Carbon Society" organizedby JICA from 08.05.13 to13.06.13
Japan DeputationTo SREDA
6 1-01834 28.10.86 Mr. S. M. Sanzad Lumen Natore B.Sc. Engg (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01715139056 [email protected]
SDE, Incharge Dte. Of RenewableEnergy and Researchand Development, PDB,Dhaka
1) "Renewable Energy" from01.06.13 to 30.06.13
2) Training on "Solar EnergyApplication" from 07.08.14 to26.08.14 3) Training on ApplicationTechnology of clean energy fordeveloping countries from14.08.15 to 08.10.15
Thailand
China
China
DeputationTo SREDA
7 1-01897 01.01.88 Ms. Shohana Rahman Deeba Dhaka B.Sc. Engg. (Elect.) 20.04.11 (AE) 01733759275 [email protected]
AE Dte. of RenewableEnergy and Research &Development, PDB,Dhaka.
Study leavefrom june/2013for 2 years inAustralia.
8 1-02078 02.12.91 Ms. Normin Nahar Dhaka B.Sc. Engg (Elect.) 17.12.13 (AE)
AE Dte. of RenewableEnergy and Research &Development, PDB,Dhaka.
1) Training on ApplicationTechnology of clean energy fordeveloping countries from14.08.15 to 08.10.15
China
Page 569
CE, Power Plant Construction, PDB, DhakaSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0559 01.12.61 Mr. Mustaque Muhammad,
Comilla, B.Sc.Engr.(Elec.), 23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)
Addl. CE, Incharge Power PlantConstruction, PDB,Dhaka
1) Advance Protection PowerSystem(APPS), from 21.03.94 to22.04.94 2) Energy Management from19.05.13 to 01.06.13
UK,
Thailand
1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 inBanglalore, India.
2) Conceptual Design Approvalof Sylhet 90MW CCPP Project(2nd Unit) 27.04.06 to 02.05.06,in China. 3)''Conceptual DesignApproval'' Sylhet 90MW CCPP(2nd Unit) 28.01.07 to 08.02.07in China 4) Approval of Engineering Data& Drawing from 08.06.09 to17.06.09 in China. 5) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. See N.B.
G.O. isued dated05.04.16 for Seconddetail designreview andapproval meetingagainst Ghorasal365 MW CCPPproject from 08-15May/2016 in China.
N.B. 6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China. 7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India. 9) Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.
2 1-01407 25.08.75 Mosammat Imroz Azim, Gaibandha, B.Sc.Engr.(Elec.),
09.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge)
Asst. CE (XEN) InchargeOffice of CE, PowerStation Construction,PDB, Dhaka.
1) Improved Maintenance ofThermal Power Plant From17.03.03 To 21.03.03 2)"Air Pollution SourceMonitoring Management"From 16.08.04 to 10.12.04(Bond for 03 Years 16.08.04 to10.12.04)+F268
Malaysia,
Japan,
1) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China. 2)Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China.
Page 570
Office of CE, Civil WorksSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0549 01.01.61 Mr. Md. Mustafizur Rahman
LaxmipurB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 09.03.03(XEN) 28.01.14 (SE) 01730-705078 [email protected]
Addl. CE (Incharge) Civil Works
1.Electrical Power DistributionSystem From 23.08.90 to22.06.91
Norway, 1) Training on Technical know-how 33 KV VCB with ControlPanel & 33 KV & 11 KV BusSupport Insulator for 07 days inChina.in Oct/ 2006 2) To attend a course on ProjectBudgeting and Cost Controlfrom 15.12.12 to 27.12.12 or fromthe date of actual journey inMalaysia. 3) Witnessing of manufacturer'sprocess from 30.05.14 to 05.06.14in China. 4) Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.
2 11-0114 01.01.58 Mr. Md. Fozlur Rahman Khan Sherpur Diploma(Civil )
28.05.79(SAE), 06.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge) 01715038624
XEN (Incharge), Office of the CE, CivilWorks PDB, Dhaka.
1) Tests and/or Inspectionagainst 8 mm dia and 9 mm dia3500 Quintal High Tensile Steel(HTS) Wire in Nov/2010 for 10days in China. 2) Convention & Seminar from24.07.15 to 04.08.15 in India. 3) Technical orientation &quality test witness from05.01.16 to 11.01.16 in China for10 days+A292 4) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea.
A proposal sent toministry dated28.04.16 for Pre-ShipmentInspection of steelpole mould againstPC Pole , Arichafrom 11.05.16 to20.05.16 in China.
3 1-02061 02.05.88 Ms. Sarfina Tasnim Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)
AE, Office of the CE, CivilWorks PDB, Dhaka.
Page 571
Directorate of Civil WorksSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0666 01.05.60 Mr. T.I.M. Noorunnabi,
Barisal, B.Sc.Engr.(Elec.), 03.12.85(AE) 17.06.95(SDE) 21.07.04(XEN) 28.07.15 (SE)
Director Civil Works, PDB, Dhaka
1)'Public & PrivatePartnership' from 18.11.13 to 29.11.13
Thailand 1) ''Pre-shipment inspection(Foreign) against Chittagong PCPole Construction Plant aSupply of 8mm dia & 9mm diaH.T.S Wire at P.C. from 11.06.11to 19.06.11 for 09 days in China. 2) pre-shipment inspectionagainst Chittaging PC Pole from02.01.15 for 10 days in China.
A proposal sent toministry dated28.04.16 for Pre-ShipmentInspection of steelpole mould againstPC Pole , Arichafrom 11.05.16 to20.05.16 in China.
2 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),
05.03.2000(AE) 08.12.09(SDE) 17.04.13 (XEN, Incharge)
XEN
Civil ConstructionDivision-1, PDB, Dhaka
1) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China. 2) Inspect facilities / to witnesstest at manufacturers plants"from 06.04.14 to 11.04.14 inChina. 3) Basic design Approvalmeeting from20.08.15 to 03.09.15in China.
3 1-01694 23.01.76 Mr.M.Arifur Rahman Khan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Civil ConstructionDivision-2, PDB, Dhaka
1) Training Programme onSolar Energy Technologiesand Applications from 14-11-2011 to 03-12-2011 for 03(three) weeks 2) PSCDP Training program"Performance Management(Batch-2)" from 21.10.13 to01.11.13
India
Thailand
1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07 daysin China. 2) Participate in the "China-Asean EXPO" from 16.09.14 to19.09.14 in China. 3) Pre-shipment inspection of2850 Quintal HT wire againstAricha PC pole from 20.09.15 to29.09.15 in China. 4) Design review meetingagainst Bibiana South projectfrom 3-10 April/2016 in Spain.
4 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE) 25.06.15 (SDE)
SDE Civil ConstructionDivision-2 PDB,Dhaka.
1)Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina. 2)nspection against PC Poleconstruction plant, Aricha inJan/2016 for 10 days in China.
Page 572
5 11-0443 02.12.57 Mr. Md. Saiful Islam Sirajganj Diploma (Civil) 18.01.84 (SAE) 27.12.11 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
6 11-0468 07.02.59 Mr. Shiekh Md. Abdus Salam Sirajganj Diploma(Civil) 25.08.84 (SAE) 27.12.11 (AE) 01819162666
AE, Civil ConstructionDivision-2 PDB,Dhaka.
1) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.
7 11-0499 01.02.63 Mr. Md. Motiur Rahman Jamalpur Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
8 Mr. Md. Asaduzzaman Saad B.Sc. Engg. (Civil) 2014 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
9 11-0494 09.01.63 Mr. Md. Abul Kalam Azadakand Comilla Diploma Engg. (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE, Civil ConstructionDivision-1, PDB, Dhaka
1) Pre shipmentinspectionagainst ChittagongPC Pole from 20.06.15 to 29.06.15in China.
10 11-0808 Mr. Muhammad Abul Kashem AE (Incharge) Office of director civilworks, PDB, Dhaka.
11 Mr. Ezazul Karim AE, Pc Pole Chitg.. 25-10-1984 SAE
1) Pre shipmentinspectionagainst ChittagongPC Pole Jan/2016 in China.
12 11-0834 Mr. Hachni mojib Diploma engg.
AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka
13 11-0843 Mr.Md. Osman Goni Diploma engg.
AE (Incharge), Civil ConstructionDivision-1, PDB, Dhaka
Page 573
Design & Inspection-3SL.No ID-No Date of Birth Name, District and Qualification
and Date of joiningDesignation and Present
PostingTopics of Foreign Training and
DurationCountry Inspection Topics and its Duration Comments
1 1-0790 02.01.62 Mr. Abdullah Noman,Comilla,B.Sc.Engr.(Civil.),
30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, Current Charge) 23.04.09 (XEN)
Director (Incharge), Design and Inspection -3
PDB,Dhaka
1) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China. 2) Pre-shipment Inspection of6,7,8 & 9 mm dia 3200 QuintalH.T.S Wire to be held from 20-29June/2014 in China. 3) Participation in the GlobalInfrastructure CooperationConference (GICC) from 17.09.14to 19.09.14 in South Korea. 4) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from10.11.14 to 25.11.14 inChina.H277 5) Pre-shipment Inspection ofpole mold, boiler, tensionmachine against Chittagong PCPole project from 11.12.15 to20.12.15 in south Korea. 5) Construction Drawing ReviewMeeting against Barapukuria275 MW Coal Based Power Plantfrom 15.01.16 to 21.01.16 inChina.
A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
Page 574
2 1-0999 18.12.66 Mr. Dewan Md. Fazlul Karim, Gazipur,B.Sc.Engr.(Civil.),19.07.94(AE) 03-02-2003 (SDE) 18.08.11 (XEN)
Dy. Director (XEN), Design and Inspection -3
PDB,Dhaka
Generator (Electrical) againstKarnaphuly Hydro Power Plant(Unit-3) Rehabilitation Projectfor 30 days
Italy 1) H T S (High Tensile SteelWire) from 06.09.06 to 15.09.06 for 10days in India. 2) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China. 4) Preliminary Design approvalagainst Barapukuria 275 MWproject on Aug/2015 for 10 daysin China. 5) Pre-shipment Inspectionagainst PC Pole Oct/2015 in S.Korea.Korea. 6) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
3 1-01529 16.12.74 Mr. Noore Alam Siddiqui, Pabna, B.Sc.Engr.(Civil.),
29.04.2001(AE) 13.06.11 (SDE) 15.11.13 (XEN, Incharge)
Deputy Director (XEN)Incharge, Design and Inspection-3 PDB, Dhaka.
1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Examine & Discussion onbasic design of Kadda 150 MWDuel Fuel Power PlantConstruction Project from22.06.14 to28.06.14 in China. See N.B.
G.O. isued dated05.04.16 for Seconddetail designreview andapproval meetingagainst Ghorasal365 MW CCPPproject from 08-15May/2016 in China.
N.B. 4) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to 21.11.14 in India 5) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India. 6) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China.
Page 575
4 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01818607385 [email protected]
SDE, Incharge Design & Inspection-3,PDB, Dhaka.
1) Inspection program on"Energy Efficient Buildings"from 12.03.13 to 18.03.13 inIndia. 2) Pre-shipment inspectionagainst Chittagong PC PoleConstruction Plant from 24.03.13to 03.04.13 in China.
5 1-01938 05.04.87 Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536 [email protected]
AE, Design & Inspection-3, PDB, Dhaka
1) Inspection program on"Energy Efficient Buildings"from 12.03.13 to 18.03.13 inIndia. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 4)Basic design engineeringreview meeting against Bibiana-3 CCPP project from 27.01.16 to05.02.16 in India.
6 1-02049 13.11.86 Mr. Md. Ikram Uddin Sunny Dhaka B.Sc. Engg. (Archi.) 17.12.13 (AE)
AE, Design & Inspection-3, PDB, Dhaka
1)Basic design Approvalmeeting from20.08.15 to 03.09.15in China.
7 1-02047 09.09.87 Mr. S.M. Irfan Ullah Dhaka B.Sc. Engg. (Civil) 09.09.2013 (AE)
AE, Design & Inspection-3, PDB, Dhaka
8 1-02149 Nusrat Afrin Prova Chandpur B.Sc. Engg. (Civil) 25.06.15 (AE)
AE, Design & Inspection-3, PDB, Dhaka
Page 576
Office of CE ServicesSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN) 31.03.14 (SE)
Addl. CE, Incharge Services, PDB, Dhaka.
1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Designplanning on PowerConstruction 01(one) month in2004 3) Training on O & M of Pre-payment Metering from09.11.07 to 15.11.07 for 07 days.
Newzeland
Russia
South Africa
1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland. 4) Factory acceptance Test of 33KV guy insulator against Ctg.Power Distribution dev. Projectfrom 10.11.15 to 17.11.15 inChina
Page 577
System Protection & Testing Commisioning cell, Office of CE ServicesSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0854 01.01.66 Mr. Kh. Mokammel Hossain, Tangile,B.Sc.Engr.(Elec.),13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
SE, Incharge System Protection &Testing Commisioningcell,PDB, Dhaka.
1) Training on Measwing andControl Equipment ofSiddergong P/St. from03(Three) Weeks in 1994 2) Training on MEGAC-VControl System Gas TurbineControl From 17.05.2004 to28.05.04 for 07 Days 3) Training on Liasys NetratimSystem from 11.06.07 to20.07.07 for 40 days. 3)"Orientation &Manufacturers Test Process atManufacturers Works" from05.02.09 for (Four) weeks 4) O & M Training on GTaganist Siddirgonj 210 MWPeaking Powe PlantConstruction Project May 26 toJuly 08,2009 5) Operation & maintenanceof steam turbine from 28.10.13to 08.11.13
Singapore,
Japan
Japan
Czech Republic
India
India
1) Inspection on Alternatoragainst Gopalgonj 100MWPeaking Power PlantConstruction Project from10.02.11 to 16.02.11 for 07 daysin Germany. 2)"Witnessing of manufacturingprocess & test of equipmentincluding transfer of technicalknow-how with training on KP-500 control system" from20.06.13 to 29.06.13 for 10 daysin Russia. 3) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina. 4)"Witnessing of manufacturingprocess & test of equipmentincluding transfer of technicalknow-" from 20.06.13 to 29.06.13for 10 days in Russia. 4)Inspection of HGPI Spareparts for GT against FencugangCCPP FROM 07.12.15 TO 13.12.15in Hungery.
2 1-01024 15.05.68 Mr. Sheikh Wahiduzzaman, Munshigong, B.Sc.Engr.(Elec.)19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)
XEN
System protection &Testing CommissioningCell, PDB, Dhaka.
1) Operation & Maintenanceof Protection System & RelayCoordination training programfrom 14.01.13 to 25.01.13
Thailand 1) Basic design Approvalmeeting from20.08.15 to 03.09.15in China. 3)Design approval of Bibiyana400 mw ccpp project Feb/2016for 5 days in Spain
Page 578
3 1-01273 10.07.69 Mr. Md. Saiful Islam Narayangonj, B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 25.10.2011 (XEN , Incharge) 28.05.14 (XEN)
XEN, System Protection &Testing Commisioningcell,PDB, Dhaka.
1) Training on Tower Design,Pole Design, TransmissionLien Design, TransmissionLien etc. Operation &Maintenance Against OPGWfrom 09.07.04 to 21.08.04 2) Training on PowerTransformer O & M, MediumVoltage Switchgear O & M,High Voltage Testing from20.03.06 to 29.03.06 3) Training On 33/11KV 2x10MVA sub station from April/06for 08 days.
China
Thiland
Thiland.
On lien
4 1-01933 18.11.85 Mr.Md.Imdadul Hoque Zhinaidaha B.Sc.Eng(Mech) 02.10.2011 (AE) 01716175611 [email protected]
AE System Protection, CEServices, PDB,Dhaka.
1) PSCDP training program on"Operation and Maintenanceof Steam Turbine" from28.10.13 to 08.11.13
India
5 1-01983 01.01.87 Mr.Md. Jannatul Naim Khulna B.Sc.Eng(Elect.) 02.10.2011 (AE) 01717883303 [email protected]
AE System Protection, CEServices, PDB,Dhaka.
1) Factory Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India.
6 1-01987 27.12.87 Mr. Tanvir Hassan Bhuiyan Norshindi B.Sc.Eng(Elect.) 02.10.2011 (AE) 01715842900 [email protected]
AE System Protection, CEServices, PDB,Dhaka.
Training on Operation &Maintenance from 01.05.16 to15.06.16
India
Page 579
Dte. of Electrical EquipmentSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0782 25.08.60 Mr. Jitendra Chandra Acharjya,
Jamalpur, B.Sc.Engr.(Mech.),
30.08.86(AE) 21.11.99 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)
Director (Incharge) Electrical Equipment PDB,Dhaka.
1) From 19.8.01 to 11 Days inIndia 2)500 Nos.12 Meter Steel Pole(270 DAN) & 150 Nos. 12 MeterSteel Pole (550 DAN) From14.22.07 to 22.04.07 for 07(SevenDays) in China. 3) Inspection against PC Poleconstruction plant, Aricha inaugust/2011 for 10 days inChina. 4) "Technical orientation andquality test witness" of Buckettruck against central Zone from10.03.13 to 16.03.13 in China . 5) CT, VT Test witness from24.08.14 to 25.08.14 in India. 6) Factozzry Acceptance testagainst 108 MW HFO FiredPower Plant ConstructionProject, Bosila from 20.07.15 to23.07.15 in India. 7) Factory Test Witness AgainstShahjibazar 330 MW CCPPProject from 02.09.15 to 08.09.15in Spain. 8) "Technical orientation andquality test witness" of againstBaghabari power station onOct/2015 in USA for 7 days.
2 1-01338 16.08.76 Mr. Md. Zakirul Kabir Khan, Kishoregonj, B.Sc.Engr.(Elec.), 05.03.2000 (AE) 18.08.2011 (SDE) 28.06.12 (XEN) 18.06.15 (XEN)
Deputy Director (XEN), Dte. Of ElectricalEquipment, PDB,Dhaka.
1) Economic LoadManagement from 29.04.13 to10.05.13
Vietnam
Page 580
3 1-01408 25.05.74 Mr. Md. Golam Gaws, Rajshahi, B.Sc.Engr.(Mechanical)
05.03.2000(AE) 25.06.09(SDE) 28.06.12(XEN, in charge)
XEN (Incharge), Dte. Of ElectricalEquipment, PDB,Dhaka.
1) Orientation & TechnicalTraining on Power transformer& auxiliary Transformer fromOctober/06 for 06 Weeks
India 1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(Seven)days in China. 2) "Technical Orientation andQuality Test Witness" forpurchasing 220V, 10 (60)A,Single Phase, STS, PrepaymentMeter & 400V, 20 (100)A, 3-Phase4-wire, STS, Prepayment Meterfrom 06/02/2012 to 13/02/2012for 7 (seven) days (excludingtravel time) in South Africa. 3) Technical orientation &quality test witness againstCentral zone power distributionproject from 03.12.14 to 19.12.14in China. 4) Manufacturer factory test &Inspection against Shahjibazar330MW CCPP project from05.04.16 to 11.04.16 in China.
4 11-0400 30.04.59 Mr. Jafor Ahmed Faridpur, Diploma(Elec.),
31.7.83 (SAE) 02.11.10(AE) 06.01.16 (SDE, Incharge)
SDE, Incharge Dte. Of ElectricalEquipment PDB,Dhaka.
5 1-01980 20.09.89 Mohd. Sadeed Al Hossain Dhaka B.Sc. engg. (Elect.) 02.10.2011 (AE) 01722090908 [email protected]
AE, Dte. Of ElectricalEquipment PDB,Dhaka.
A proposal sent toministry dated09.05.16 for Pre-delivery inspectionof Disc Insulatoragainst Rajshahizone power dist.Dev. Project from15.05.16 to 21.05.16in India & China
Page 581
Diesel Generation, PDB, DhakaSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 11-0403 01.07.58 Mr. Md. Zahir Alam, Bagura Diploma (Mech.),
31.07.83.(SAE), 02.11.10(AE), 06.01.16 (SDE, Incharge)
SDE, Incharge Diesel Generation,PDB, Dhaka
CERS, Tongi, GazipurSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0773 15.06.63 Mr. Howlader Md.ShirajulIslam, Barisal,B.Sc.Engr.(Elec.),30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge) 01777743219
SE (Incharge), CERS, PDB, Tongi.
1)Power Distribution throughpromotion of TQM from 18.3.02to 18.4.02
Japan 1) Orientation & TechnicalTraining on 33 KV Circuit BrakerFrom 13.03.05 for 7 days inIndia. 2) Inspection against CentralZone Distribution Project from19.04.2012 to 25.04.2012 inChina. 3) Technical orientation &quality test witness from05.01.15 to 11.01.15 in China. 4) Project development meetingfrom 15.07.15 to 20.07.15 inAustria.
Page 582
2 1-01446 28.02.76 Mr. Mohammad AbdullahBhuiyan, Dhaka, B.Sc.Engr.(Metallurgi.),
05.03.2000(AE) 25.06.09(SDE) 01.01.14 (XEN,in charge) 01715791177
XEN (Incharge), CERS, PDB, Tongi. (Return from lien in Dubaifrom 2003-2005)
1) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” againsttongi power station from08.11.09 to 13.11.09 fro 07 daysin USA. 2) “Witnessing ofmanufacturing process & testsof the equipment atmanufacturer's works includingtransfer of technical know-howon Blade Kit, Turbine RotorStage-3 with Hardware kits GesShroud Assembly of TurbineNozzle Stage-3 with hard warekits Complete Set” againstBheramara Power Station from10.01.11 to 17.01.11 in USA.
2 1-01759 08.05.79 Mr.Mohammad Jahirul Islam Kishorgonj B.Sc.Eng(Mech.) 07.04.2006(AE) 16.06.14 (SDE)
XEN (Incharge), CERS, PDB, Tongi.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical Orientation &Quality Test Witness from25.04.14 to 01.05.14 in China.
3 1-01989 14-11-85 Mr. Md. Emam Hasan Gaibandha B.Sc. Engg (Elect.) 02-10-11 (AE) 01716977875
AE, CERS, PDB, Tongi.
1) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina.
Page 583
Offices Under Member Company AffairsSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0391 01.01.58 Mr. Minhajuddin Ahmed,Comilla,B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE) 20.09.12 (Add. CE, Incharge) 01.10.14 (Addl. CE) 13.07.15 (Member)
Member Company Affairs
PDB, Dhaka.
I) Span Type P.C. PoolManufacturing Plant.22.12.85 to 21.03.86 2) 9th Meter & 12th MeterSteel Poll and feting fromApril, 05 for 07 days in China.
China
China.
1) 8.05.02 to 17.05.02 , India 2) Orientation & TechnicalTraining on Meter Steel PoleFrom 28.03.05 for 07 days inChina. 2) "Witnessing Manufacturer'sProcess and test of 6mm, 7mmand 9mm dia High Tensile Steel(HTS) Wire'' from 12.07.08 to21.07.08 for 10 days in China. 3) Inspection on Coal ThermalPower Station construction from18.11.09 to 24.11.09 for 07 daysin India. 4) See N.B.
A proposal sent toministry dated25.04.16 forManagementmeeting andWitnessing againstTongi 80 MW P/Sfrom 31.05.16 to06.06.16 in USA
*N.B.- 1) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding travel time) to attend Coaltrans Conference in India. 2) Supplying of 6mm dia 1000 Quintal, 7mm dia 1000 Quintal, 8mm dia 600 Quintal & 9mm Dia 1400 Quintal High Tensile Steel(HTS) Wire, ''Pre-shipment inspection (Foreign)” against Chittagong PC Pole Construction Plant, BPDB, Halishahar, Chittagong from in June/2011 for 10 (Ten) working days from the date of actual journey in China. 3) To travel Indonesia, Singapur and Australia in April/2012 for 10 days. 4) Pre-shipment Inspection of 6,7,8 & 9 mm dia 3200 Quintal H.T.S Wire to be held from 20-29 June/2014 in China. 5) Factory Full Speed No Load Test of Unit-2 GT against Shahjibazar 330 MW CCPP Project from 08.02.15 for 7 days in Belfort, France. 6) Management meeting on HGPI spare parts supply against Sylhet 20 MW GT power station from 16.12.15 to 22.12.15 in USA. 7) Witnessing of manufacturing process of overhauling work against Ghorasal 210 MW power plant from 25.01.16 to 31.01.16 in Ukraine & Russia. 8) Factory acceptance test of energy meter from 10-16 March/2016 in Sweden.
Page 584
2 1-01104 12.02.69 Mr. Md. Mofijul Islam, Nawbabgong, B.Sc.Engr.(Elec.),
19.07.94 (AE) 01.07.03 (SDE) 31.07.12 (XEN) 0171-2197777
DS (XEN), Company Affairs
PDB, Dhaka.
1)Distribution Control From19.05.99 to 02.07.99 2)Traning On Planning &Design Against 210 MW.Siddhirgong from 02.09.04 fortwo Months 3) Operation & MaintenanceTraining (Factory Training)against Bera 70 MW PeakingPower Plant ConstructionProject for 30 (thirty) days(Excluding travel time)
China,
Russia,
South Korea
1) "Practical Dermonostration toImpart Technical know-how &Manufacturing Process" onBoiler Main Safety Valve.Impulse savety Valve againstGhorasal Power Plant from16.04.07 to 20.04.07 for 07 daysin Russia. 2) CT, VT Test witness from24.08.14 to 25.08.14 in India. 3) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France. A proposal sent to ministrydated 27.07.15 for witnessing ofmanufacturing process againstChittagong P/S from 12.08.15 to18.08.15 in China.
Office of CE, Company AffairsSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0580 06.01.60 Mrs. Dilruba BegumBoguraB.Sc.Engg. (Elec.)09.10.84(AE) 28.04.94(SDE) 25.06.03(XEN) 2.1.2012(SE, Incharge) 25.08.14 (SE)
Addl. CE, Incharge Company Affairs, PDB,Dhaka.
1) Power Sector Restructuringand private participation from09.12.01 to 12.12.01 2) Rehabilitation, Renovationand Augmentation on gridsystem Phase-2 145 KV & 36 KVCT & PT from 03sep 2003 toThree Months,
Napal
China.
1) Chandpur 150MW CombinedCycle Power StationConstruction Project, a TrainingProgram named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for12(Twelve) days in China. 2) A program titled "Green HubKorea-2013" from 29.04.13 to30.04.13 from South Korea.
2 1-0881 01.01.59 Mr. Md. Omar Faruque,Noakhili,B.Sc.Engr.(Elec.),
03.07.80(SAE) 23.01.89(AE) 18.06.2000 (SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
Asstt. CE (XEN)
Company Affairs, PDB,Dhaka.
1)Traning on Gas TurbinePower Station Against Tongi
80 MW From 25.07.04 To ThreeMonth (Bond for 03 Years from
01.07.04 )
China, 1)From 20.6.02 to 26.6.02 inIndia 2) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China.
Page 585
Office of CE, Private Power GenerationSL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0555 01.02.61 Mr. Sayeed AhmedRangpurB.Sc.Engg. (Elec.)28.12.83(AE) 18.03.93(SDE) 09.03.03(XEN) 28.01.14 (SE)
Addl.CE( Incharge)Private PowerGeneration
1)Maintenance of Generator,
Exciter, Transformers, Motors,Sub-station, Station Batteries,Rectifier & Converter from15.03.2004 to 6 Month 2) JICA Counterpart trainingfrom 06.11.15 to 21.11.15
China,
Japan
1) Witnessing of manufacturingprocess against Barapukuria2*125 MW Power Plant from24.10.14 to 30.10.14 in China. 2) SASEC Trade Facilitation andEnergy Working group from04.11.14 to 05.11.14 in Nepal. 3) Particiating in the JointSurvey in Bhutan-JICA datacollection on electricityinterconnectivity from 18.05.15to 22.05.15 in Bhutan. 4) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina.
2 1-01337 31.12.69 Mr. Md. Ziaur Rahman, Shirajgong, B.Sc.Engr.(Mech.),
05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN , Incharge) 18.06.15 (XEN)
Asst. CE (XEN), Private PowerGeneration (IPP/PPP),PDB, Dhaka.
1)Safe Reliable and EfficientOperation of the Power PlantFrom 15.03.2004 to 06 Month.(Bond for 03 Years from22.03.04 to 22.09.04)
China, 1)Factory Test Witness From20.01.04 to 26.01.04 In CzechRepublic 2) 11KV Switchgear againstDudkhandi 50MW PeakingPower Plant Construction Projectfrom 14.12.2010 to 21.12.2010 for07 days in Germany . 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia
Page 586
IPP Cell-1SL.NO
.ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0658 01.04.61 Mr. Golam Kibria, Barisal,
B.Sc.Engr.(Elec.),
17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN) 04.05.15 (SE)
Director IPP Cell-1 PDB,Dhaka
1)Power Transformer From12.07.04 for 07 Days 2)The Improvement ForElectrical Power ManagementBy Benchmarking From06.09.04 to 15.10.04 3) Training. On 33/11KV 2x10MVA sub station from April/06for 08 days. 4) Training on 132/33KV -44MVA Power TransformerAgainst GhorasalPower Plant132KV Sub-Station. April./07for 07 days. 5) "Professional ServicesDevelopment CorporationSdn. Bhd. (PSDC)" From27.07.09 to 07.08.09 for 12 days.
China,
Japan
Thiland
Turkey
Malaysia.
1) Bangla Trac Ltd GesJointVenture of BangladeshDiesel Plant from 14.06.10 to17.06.10 for 04 days in German. 2) Inspection againstMeghnaghat 335 MW Duel-fuelCombined Cycle IPP Power Plantto inspect of equipment from24.02.13 to 02.03.13 in China. 3) Coal conference with coaltrader / producer / terminaloperator in Indonesia &Australia from 03.06.13 to09.06.13. See N.B.
N.B. 4) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 5) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India. 6) Factory Acceptance test against ashuganj 200 MW Power Plant from 25.06.14 to 28.06.14 in Finland. 7) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 8) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 9) Quarterly Reconciliation from 08.01.15 to 10.01.15 in India. 10) Attend Power Tech Korea 2015 Program by KOTRA from 14.05.15 to 15.05.15 in South Korea. 11) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 12) Electricity Market Operations & Design Executive Exchange from 30.08.15 to 08.09.15 in Norway. 13) Meeting on commercial aggrement from 26.10.15 to 28.10.15 in India.
2 1-0941 10.10.63 Mr. Md. Fazlul Hoque Noakhali B.Sc.Engr.(Elec),14.08.91(AE) 11.11.2001(SDE) 21.07.11 (XEN)
XEN IPP Cell-1, PDB, Dhaka.
1) Testing of Energy CT & PT ofJangalia 33MW Power Plantfrom 20.08.08 to 27.08.08 for 07days in China. 2) Power Plant Inspectionagainst Sinha PowerGeneration Company Ltd. from16.06.10 to 19.06.10 in Korea. See N.B.
Page 587
N.B. 3) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 4) Inspection against 335 MW dual fuel combined cycle power plant in order to inspect "Meter, Current Transformer, Inductive Voltage Transformer" from 25.02.13 to 05.03.13 in USA 5) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 6) "Meeting to discuss the operational issues related to cross border connection between India and Bangladesh through Baharampur-Bheramara 400 KV D/C Line" Program in New Delhi, India from 08-09 January, 2014 7) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 8) Factory Acceptance test of 11 KV SF Circuit Breaker against Ashuganj 200 MW Power Plant from 04.08.14 to 07.08.14 in Italy. 9)A proposal sent to ministry dated 27.07.15 for witnessing of manufacturing process against Chittagong P/S from 12.08.15 to 18.08.15 in China. 10) Meeting on commercial aggrement from 26.10.15 to 28.10.15 in India.
3 1-01181 21.10.69 Mr. Md. Rezaul Karim Khan, Pabna, B.Sc.Engr.(Elec.), 14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)
XEN( Incharge) IPP Cell-1, PDB,Dhaka.
1) Power Plant Inspection from16.06.10 to 19.06.10 in Koria. 2) Inspection on Power Plantagainst Northern PowerSolution Limited from 17.08.10to 22.08.10 for 5 days (excludingtravel time) in Finland. 3) A meeting against 1320 MWCoal based Power PlantContruction Project, Khulna from11.07.2012 to 12.07.2012 in India.
4) Inspection against 52.2 MWHFO Based Power Plant,Rajshahi from 26.01.14 to01.02.14 in Finland.
3 1-01276 06.10.68 Mr. Nur MohammadShamsuzzoha Kabir, Thakurga, B.Sc.Engr.(Mech.),
10.06.99(AE),
26.07.05(SDE), 25.10.2011 (XEN, Incharge) 28.05.14 (XEN)
XEN , IPP Cell-1, PDB, Dhaka.
1) Training on Management ofWind Power Developmentfrom 27.08.07 to 28.09.07 for 33days 2) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 3) Training on ct, pt Oct/2015for 7 days
Sweden
Thailand
Germany
1)Factory test witness from27.05.02 to 02.06.02 in India 2)Factory test witness of 33KV1250 Amps Vacuum CircuitBreaker From 16.11.03 to21.11.03 for 07 Days in India 3) Inspection on 132 KV CircuitBreaker against Gopalgonj100MW Peaking Power PlantConstruction Project January/11for 07 days in USA. 4) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China.
Page 588
4 1-01739 29.04.77 Mr. Md. Akefur Rahman Kustia B.Sc.Engr(Mach.) 27.12.06 (AE) 27.12.2011(SDE) 13.08.14 (XEN,in charge)
XEN , Incharge IPP Cell-1, PDB, Dhaka.
1) Operation & Maintenanceof Generator from 18.03.13 to29.03.13
India 1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project forOctober/10 for 07 days inSingapore. 2) Inspection of HGPI Spareparts for GT against FencugangCCPP FROM 07.12.15 TO 13.12.15in Hungery. 3) Workshop on Technical &Regulatory Challenges in crossborder electricity transmissioninterconnections from 24.04.16to 25.04.16 in India.
5 1-01810 21.12.86 Mr. Muhammad Faisal Hasan Dhaka B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01716399371 [email protected]
SDE, Incharge IPP Cell-1, PDB, Dhaka.
1) Inspection against Ghorasal108 MW Gas Fired Power Plantfrom 07.04.13 to 11.04.13 inIndia. 2) Quarterly Reconciliation(October/13 to December/13)from 18.03.14 to 21.03.14 inIndia.
6 1-01828 15.09.86 Mr. Md. Nazmul Hoque Mymensingh B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01675936637 [email protected]
SDE, Incharge IPP Cell-1, PDB, Dhaka.
1) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13
Thailand
7 1-01854 01.05.81 Mrs. Farahnaz Begum Potuakhali B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01199268271 [email protected]
SDE, Incharge IPP Cell-1, PDB, Dhaka.
8 1-01887 25.12.87 Mr. H. M. Imran Hassan Kishoreganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01921352592 [email protected]
SDE, Incharge IPP Cell-1, PDB, Dhaka.
Page 589
9 1-02046 15.12.88 Mr. Mehedi Hasan Joypurhat 26.06.13 (AE)
AE IPP Cell-1, PDB, Dhaka.
1) Visit of manufacturing facilityof CT and CT testing from10.12.14 to 14.12.14 in China.
10 1-02183 Sadia Sharmin Rajshahi 25.06.15 (AE)
AE IPP Cell-1, PDB, Dhaka.
IPP Cell-2
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0751 23.09.63 Mr. Mohammad AshrafulIslam, Naogaon, B.Sc.Engr.(Mech.),
30.08.86 (AE) 019.03.98(SDE) 23.04.09(XEN) 29.01.15 (SE, Incharge)
Director (Incharge) IPP Cell-2, PDB, Dhaka.
1) Techinal Orientation onSplit Bolt Line Tape ConnectorG-452. 07 Days, January/06,
India. 1) Inspection against CentralZone Power Distribution Project,Mymensingh from 14.06.2012 to24.06.2012 for 7 daysin China 2) Quality acceptance test on 11KV ACR from 20.06.14 to 26.06.14for 7 days in Australia.
2 1-01101 11.02.69 Mr. Sk. Moin Uddin, Jessore, B.Sc.Engr.(Elec.),
19.07.94 (AE) 01.07.03 (SDE) 31.07.12 (XEN) 0171-2709929
XEN IPP Cell-2, PDB, Dhaka.
1)Design,Installation,Testing,Operation & Maintenance onCircuit Breaker Against G/Ctg.From Aug./04 to 10 days. 2) 11KV Gas InsulatedSwitchgear, 33/11Sub-station& Control Panel & ProtectionEquipment atainst ChittagongPower Distribtion Project“Design & Maintenance of33KV, 11 KV gas InsulatedSwitchgear Sub-Station” from10.07.07 to 24.08.07 for 42Days. 3) Training On 05 Nos.-33KVHigh Voltage Tester from20.02.07 to 26.02.07 for 07 Days
4) "Factory Training" againstFaridpur 50MW Peaking PowerPlant Construction Projectfrom 12/09/2011 to 11/10/2011for 30 days (Bond for 5 years)
China
China.
UK
Norway
1) Inspection on Enginegenerating Set Lot-1 againstGopalgonj 100MW PeakingPower Plant Construction Projectfor 07 days in Norway. 2) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15 to13.04.15 in China.
Page 590
3 1-01194 03.06.71 Mr. Md. Abdul Mannan, Jamalpur, B.Sc.Engr.(Mech.),
30.03.98(AE) 06.10.04 (SDE) 31.10.13 (XEN)
XEN IPP Cell-2, PDB, Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 fortwo Months 2) Training on Siddirgonj 210MW Peaking Powe PlantConstruction Project from28.01.09 for 44 days.
Russia,
India
1) Inspection of Power Plant(Boiler) valves of Siddhirganj210 MW Power Station from02.08.2010 to 09.08.2010 inRussia. 2) Inspection on the PowerPlants equipment andmachineries of JV of FujianLongking Co. Ltd. & Dhaka WestPower Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued,but visit not yet done) 3) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea. 4) Inspection againstShahjibazar 330 MW CCPPProject from 20.07.15 to 26.07.15in China.
4 1-01882 26.05.84 Mr. Mohammad arafat Kishoreganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01716894457 [email protected]
SDE, Incharge IPP Cell,-2 PDB,Dhaka,
5 1-01894 30.12.87 Mr. Prince Reza Tangail B.Sc. Engg. (Comp.) 01.12.10 (AE) 01911192137 [email protected]
AE IPP Cell,-2 PDB,Dhaka,
On Lien
6 1-01964 16.11.87 Mr. Waliur Rahman Jamalpur B.Sc. Engg. (Elect.) 02.10.2011 (AE) 01675536039 [email protected]
AE IPP Cell,-2 PDB,Dhaka,
1) Witness of factory test of 33& 11 KV POwer Cable from15.04.14 to 21.04.14 in China.
Page 591
7 1-02048 25.10.85 Mr. Md. Faisal Ahamed Barisal B.Sc. Engg. (Comp.) 18.09.13 (AE)
AE IPP Cell,-2 PDB,Dhaka,
8 1-01942 25.03.88 Mr. Md. Sanuwar Rahman Jamalpur B.Sc. Engg. (Mrch.) 02.10.11 (AE) 0119-5405856 [email protected]
AE IPP Cell,-2 PDB,Dhaka,
1) Witness of factory test of 33& 11 KV POwer Cable from15.04.14 to 21.04.14 in China.
IPP Cell-3
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0742 01.09.63 Mr. Md. Mahbubur Rahman, Shariatpur, B.Sc.Engr.(Civil.), 30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN) 14.03.16 (SE)
Director IPP Cell-3 PDB,Dhaka,
1) Completed M.sc.Engineering (Hydro PowerDevelopment ) From 23.08.93 to 30.06.95 2)Traning On Planning &Design of PS Against 210 MW.Siddhirgong from 01.09.04 to29.09.04 in Russia 3) Training on ContractAdministration from 20.07.10to 08.08.10 in Japan 4) Training course from24.02.16 to 08.03.16
Norway
Russia,
Japan
Australia
1) Finalization of conceptDesign of Haripur 360MW CCPPfrom 11.11.09 to 28.11.09 inNewzealand. 2) To travel India from25.09.2011 to 29.09.2011 for 05(five) days (excluding traveltime) to review ConceptualDrawing of Feasibility Report inorder to build 2*660 MW PowerPlant in Khulna. * See N.B.
2. A proposal sentto ministry dated05.05.16 for FactoryAcceptance TestWitness againstJamalpur 94.8 MWproject from01.06.16 to 07.06.16in Sweden.
Page 592
* N.B. 3)In order to attend a discussion meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. 4) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 5) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 6) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 7) Coal conference with coal trader / producer / terminal operator in Indonesia & Australia from 03.06.13 to 09.06.13. 8) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 9) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 10) Meeting with Vendor including Vendor inspection of Vendor facilities for Vacum Conductors and Protection Relay from 14.07.14 to 19.07.14 in France. 11) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 12) Inspection of Coal based Power Plant from 26.08.14 to 30.08.14 in South Korea. 13) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 14) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.02.15 to 13.02.15 in Germany & France 15) Inspection of Power, Oil, Gas & Petro-Chemical Hub of Jurong Island from 01.09.15 to 06.09.15 in Singapore. 16)TestTest witness of energy meter against Chittagong 108 MW HFO Fired P/S from 02.10.15 to 10.10.15 in UK. 17) To attend 8th National Hydro-power Convention-2015 from 18.11.15 to 21.11.15 in Assam, India. 18) Hydro-power development Study tour from 30.01.16 to 05.02.16 in Bhutan
2 1-01196 18.01.71 Mrs. Rubina Haque, Jessor, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN IPP Cell-3 PDB,Dhaka,
1) Supply, Installation,Testing & Commissioning ofVHF Tower from 18.05.2002 to17.06.2002
2) Meter technology,Installation, testing andoperation & maintenance ofmeter programming and dataanalysis software from15.01.09 to 24.01.09 for 10days
3) Technical Training of CT,PT, Lightning Arrester,Isolator, Battery and BatteryCharger from 30.03.05 to06.04.05 against Khulna P/S 4) Training program on TNBPower Plant-Selections,Design and Construction from11.08.14 to 20.08.14 5) Training course from16.02.16 to 08.03.16
Newzeland
USA
China
Malaysia
Australia
1) Technical Orientation &Quality Test Witness at theManufacurer's Premisesagainst 11kv, 3x100KVAR AutoControlled Switched TypeCapacitor Bank complete withall Equipment & Accessoriesfrom 07.02.07 to 15.02.07 inIndia. 2) Visit to establishprepayment e meteringthroughout the country inOctober/2011 in South Africaand England. 3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland. 4) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China. 5) Technical orientation &quality test witness againstBheramera p/stn Nov/2015 inJapan for 7 days.
Page 593
3 1-01306 30.11.69 Mr. Md. Jahangir AlamMollah, Narshingdi, B.Sc.Engr.(Elec.), 17.08.99(AE) 18.08.2011 (SDE) 21.05.13 (XEN, Incharge) 18.06.15 (XEN)
XEN IPP Cell-3, PDB, Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgonj From 31.10.04 fortwo Month (Bond for 03 Years)
Russia, 1) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 2) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France. 3) Energy meter testing andsealing program from 8-10March/2016 in India.
4 1-01658 07.07.74 Mr. Mohammed SherajulIslam Munshigonj B.Sc.Eng(Mech) 07.04.2006(AE) 18.08.2011 (SDE) 06.04.14 (XEN, Incharge)
XEN (Incharge), IPP Cell-3, PDB, Dhaka.
1) O & M Training on GTaganist 210 M. W. SiddirgonjPeaking Power PlantConstruction from 26.05.09 to08.07.09
India 1) Inspection on "Witnessingof manufacturingProcess/Factory test witness" atJune/2011 for 07 days(excludingtravell time) in Germany. 2) Detail engineering designreview meeting againstcontruction of Bhola 225 MWCCPP from 30.03.14 to 12.04.14 inChina. 3) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 2) Tariff energy Meter FactoryAcceptance Test from 14.10.15 to17.10.15 for 5 days in UK
5 1-01727 01.01.80 Mrs. Arifa Parveen Dhaka B.Sc.Eng(Metallurgy) 07.06.2006(AE)
AE, IPP Cell-3, PDB, Dhaka.
1) Testing & Inspection on 33KVCapacitor Bank and at theManufacturer Premises from09.04.07 to 16.04.07 for 07 daysin India.
Absent
6 1-01772 07.03.85 Mr. Konika Sarker Kustia B.Sc.Engr(Mech.) 01.06.09 (AE) 24.12.14 (SDE)
SDE IPP Cell,-3 PDB,Dhaka,
Chandpur 150 MW CCPP Projectaganist Others HRSG from30.05.2011 to 12.08.2011 for 75days
China 1) Inspection (For DiverterDamper) against Gopalgonj100MW Peaking Power PlantConstruction Project from31.01.11 to 06.02.11 for 07 daysin Indonesia.
Page 594
7 1-01893 24.01.84 Mr. Shahed MohammadMehedi Iqbal Jessore B.Sc. Engg. (Comp.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01716295868 [email protected]
SDE, Incharge IPP Cell,-3 PDB,Dhaka,
1) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia
8 1-02044 30.01.91 Mr. S.M. Mahmud Hasan Shirajganj B.Sc. Engg. (Elect.) 26.06.13 (AE)
AE IPP Cell,-3 PDB,Dhaka,
9 1-02043 30.07.86 Mr. Md. Saleh B-Baria B.Sc. Engg. (Elect.) 05.01.12 (AE) 01837148060 [email protected]
AE IPP Cell,-3 PDB,Dhaka,
1) Basic design engineeringreview meeting against Bibiana-3 CCPP project from 27.01.16 to05.02.16 in India.
Page 595
Information on Foreign Training
1 1-0568 23.02.59 Mr. Sontosh KumarSadhukhan SatkhiraB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN) 31-03-14 (SE)
Director (Power) Bangladesh EnergyRegulatoryCommission, Dhaka
1)for Technology TransferTraining against 10- townproject from 01.04.15 to14.04.15 in India.
India. 1)Training & Witnessing therutting test of 145KV SF-6 CircuitBreaker from 19.06.06 to 25.06.06for 07 days in India. 2) Factory witness test(Engineering Inspection) StemTurbine & Generator for SteamTurbine aganist Chandpur150MW Combined Cycle PowerStation Construction ProjectNovember/10 for 10 days inJinan, China & Hangzhou, China.
3)for Technology TransferTraining against 10- townproject from 01.04.15 to 14.04.15in India.
1 1-01306 30.11.69 Mr. Md. Jahangir AlamMollah, Narshingdi, B.Sc.Engr.(Elec.), 17.08.99(AE) 18.08.2011 (SDE) 21.05.13 (XEN, Incharge) 18.06.15 (XEN)
XEN IPP Cell-3, PDB, Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgonj From 31.10.04 fortwo Month (Bond for 03 Years)
Russia, 1) Factory Acceptance Test ofMetering System from 08.09.14to 12.09.14 in Singapore. 2) Test Witness of Engineagainst Manukganj 55 MW HFOFired Power Station from09.02.15 to 11.02.15 in France.
2 1-01337 31.12.69 Mr. Md. Ziaur Rahman, Shirajgong, B.Sc.Engr.(Mech.),
05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN , Incharge) 18.06.15 (XEN)
Asst. CE (XEN), Private PowerGeneration (IPP/PPP),PDB, Dhaka.
1)Safe Reliable and EfficientOperation of the Power PlantFrom 15.03.2004 to 06 Month.(Bond for 03 Years from22.03.04 to 22.09.04)
China, 1)Factory Test Witness From20.01.04 to 26.01.04 In CzechRepublic 2) 11KV Switchgear againstDudkhandi 50MW PeakingPower Plant Construction Projectfrom 14.12.2010 to 21.12.2010 for07 days in Germany . 3) CT, PT Factory Acceptance Testfrom 13.10.14 to 16.10.14 inIndia
Page 596
2 1-0780 01.01.64 Mr. C.F.K. Musaddeq Ahmed, Sylhet, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)
Dy. Director(XEN),
GM, Training PDB, Dhaka.
1) Electric Power ManagementBy Benchmarking from 08.09.03to 17.10.03 2) Managing Training Functionfrom July/09 to November/90
Japan,
UK
Deputed topower cellas director
Page 597
Page 598
2 1-0574 01.01.58 Mr. Mohammed KhurshedAlam NoakhiliB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN)
DGM Commercial Operation
PDB, Dhaka. New posting order toConversion ofShahjibazar 70 MWPower PlantConstruction Project.
1) 133/33/11KV Sub StationEquipment From 25.12.91 to31.3.922)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004
China,
Japan,
1) Inspection against “132KVTransformer from October/10 for07 days in China.
1 1-0618 30.01.55 Mr. Debobroto Ukil,
Dhaka , B.Sc.Engr.(Mech.), 24.01.85(AE) 07.01.85(AE) 09.01.95(SDE) 09.03.04(XEN) 2012 (SE, Incharge) 01730069681
Director(SE, Incharge),
Dte. of Project Planning,
PDB, Dhaka.
1) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26 days.
2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13
Bahrain
Australia
1)11 KV. Capacitor Bank FactoryTest Witness From 04.04.04 to12.04.04, 12 Days In India. 2) A program named "CarbonCapturing & Destroy" from26.02.2012 to 29.02.2012 inSingapore. 2) To attend a course on ProjectBudgeting and Cost Controlfrom 09.12.12 to 22.12.12 or fromthe date of actual journey inMalaysia.
Coal PowerGeneration
1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN)
Director Dte. of Project Planning,
PDB, Dhaka
1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Designplanning on PowerConstruction 01(one) month in2004 3) Training on O & M of Pre-payment Metering from09.11.07 to 15.11.07 for 07 days.
Newzeland
Russia
South Africa
"Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China
A proposal sent toministry dated30.10.2013 againsttechnicalorientation &quality testwitness on 50 Nos.-ACR from 15.11.13for 7 days in Korea.2 1-0589 29.11.61 Mrs. Nurun Nahar Begum
Dhaka,
B.Sc.Engg. (Elec.)
09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)
XEN,
Dte. Of Training &Career Develpopment PDB, Dhaka.
1)Training on Powertransformer from 10.10.03 to08.01.04 for 03 Months 2) PSCDP Training program on"Strategic Human ResourceManagement" from 12.08.13 to23.08.13
China
Thailand
Page 599
2 1-0653 20.02.56 Mr. Quazi Md. Moinul Alam
khulna, M.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN)
XEN, IPP Cell-3, PDB, Dhaka.
1)Relay Protection, From25.09.87 to 24.06.88 2)Power Transformer UnderRRAGS Project from 11.10.03 to06.0104 3) Orientation /TechnicalTraining on 11 KV. PinInsulator, 11 KV Guy Insulatorfrom 05.02.05 to 09.02.05 for 5days in India
Russia,
China
India
1) Technical Orientation andQuality Test Witness against 05-set Oil Centrifuging Machine &08 Nos. Current Injection setfrom 03.01.2011 to 12.01.2011 for07 days in China & Malyasia.
1 1-0347 22.06.56 Mr. Mustak Ahmed,Bagerhat,B.Sc.Engg. (Elec.)18.03.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 03-08-10 (SE) 28.06.12 (Addl. CE, Incharge) 30.06.14 (CE)
GM Commercial Operation,PDB, Dhaka
1) A Program named "Renewable Energy Korea 2011"organized by KOTRA, Dhakafrom 19.10.2011 to 22.10.2011 inSouth Korea. 2) "Technical Orientation &Quality Test Witness" onPortable Meter Testing Set from25.05.13 to 31.05.13 in Bulgeria. 3) Quarterly Reconciliation(October/13 to December/13)from 18.03.14 to 21.03.14 inIndia.
Deputation to EnergyRegulatoryCommission asDirector (Power)
9 1-01737 03.09.77 Mr. Mohammad ErfanulHaque Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE)
AE Directorate of Training&Career Development,PDB, Dhaka.
1) ''Inspection of Heat RecoverySteam Generator againstDudkhandi 50MW PeakingPower Plant Construction Projectfor 07 days in China. 2) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 06.22.13 to28.05.13 in China
2 1-0562 23.11.61 Mr. Kazi Abdul BariJoypurhatB.Sc.Engg. (Elec.)09.02.84(AE) 18.03.93(SDE) 17.05.03(XEN)
XEN, System Protection &Testing Commisioningcell,PDB, Dhaka.
1)Switch Gear & Transformer 6weeks in 2000 2) Design, Planning 4 weeksDec 2000
3) Power Distribution ProjectFrom 17.02.2004 to 20.03.2004
India,
India,
Japan
1) Pre-Shipment Inspection Dec1999 for 07 days in India, Resigned
Page 600
2 1-0584 12.03.61 Mr. Md. Kausar Ameer Ali
Bogra
B.Sc.Engg. (Elec.)
09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)
DGM Commercial Operation
PDB, Dhaka.
1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000
2) Trouble shootingprograming energy meter from21.08.04 to 10.09.04
3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)
India,
U.S.A
USA
1) FAT on Pre-Payment Metering.05 days in South Africa.Jan/07 2) Inspection June/08 for 06days in India. 3) Energy Meter on “TechnicalOrientation & Quality TestWitness” 16.11.09 for 10 days inSingapore. 4) See N.B.
4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actual journey (excluding journey time) in Singapore. 7) Inspection of Programmable AMR Meter from 30.09.2012 to 11.10.2012 in Switzerland. 8) Factory Test Witness of Gas Turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in Austria.
Page 601
1 1-0402 30.10.56 Mr. Saiful Islam Khan,Satkhira,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE, Revel.) 12.04.2011 (SE) [email protected]
Director (SE) IPP Cell-2 PDB, Dhaka.
I) Electric Power DistributionEngineering From 07.09.87 to20.11.87 2) Training. Double TariffSocket Type Programmableconsumer meter with socket,(9 Town Project) May/2006 for10 days
Japan
USA
1)Factory Test Witness FromJuly, 2001 for 03 days, In Indiaon Load Break Switch. 2) Factory Test Witness fromFeb, 2004 for 05 Days InSwitzerland 3)Training on Technical know-how in 400 Sets 11KV LoadBreak Switch from Oct/2006 for07 days in China. 4) Inspection on the PowerPlants equipment andmachineries of JV of FujianLongking Co. Ltd. & Dhaka WestPower Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued,but visit not yet done) 5) Visited manufacturer'sFactory against 52.5 MW powerPlant contruction project,Katpotti, Munshiganj from14.10.12 to 21.10.12 in SouthKorea.
?
Page 602
3 1-0554 30.12.60 Mr. Sayed Abdul Hakim Shah
NilphamiryB.Sc.Engg. (Mech.)28.12.83(AE) 18.03.93(SDE) 09.03.03(XEN)
Asstt. CE(XEN)
CE, Power StationConstruction, PDB,Dhaka. (New posting order as PDincharge in Conversationof Shajibazar 70 MW,Baghabari 71 MW, &Sylhet 150 MW Powerplant Construction Project,PDB, Dhaka.)
1)Advanced Training On PowerGeneration Operation From06.10.89 to 11.11.89
West Germany Practical Demonstration &Factory Test Witness Of DieselGenerating Set From 10.10.04 to18.10.04, 9 Days in USA.
3 1-0354 10.11.55 Mr. Md. Abul Kalam Azad,Chittagong,B.Sc.Engg. (Elec.)26.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 19.05.09 (SE, Reve. Basis) 07.01.10 (SE)
SE Attach to Office ofMember (Distribution),PDB, Dhaka. (PD, Meghnaghatproject)
1) Operation & MechanicalMaint. of GTPS.11.05.87 to 10.08.87 2)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month (Bondfor 03 Years from 08.08.04 to07.10.04)
Japan,
France,
1) 33KV Pin Insulator & DiskFittings May/2001 - 05 days,India
2 9-0002 17.05.1961 Mr. Afsar Ali Dinajpur B.Sc. engg. (Mech.) 07.03.1988 (AssistantProgrammer)
Senior System Analyst Dhaka Computer Centre
PDB, Dhaka.
In Abroad
1 1-0391 01.01.58 Mr. Minhaj Uddin Ahmed,Comilla,B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE)
Director (SE) Civil Works, PDB,Dhaka.
New posting order as PD(Addl. CE), Incharge toBibiana-3 Power PlantConstruction Project, PDB,Sylhet.
I) Span Type P.C. PoolManufacturing Plant.22.12.85 to 21.03.86 2) 9th Meter & 12th MeterSteel Poll and feting fromApril, 05 for 07 days in China.
China
China.
1) 8.05.02 to 17.05.02 , India 2) Orientation & TechnicalTraining on Meter Steel PoleFrom 28.03.05 for 07 days inChina. 2) "Witnessing Manufacturer'sProcess and test of 6mm, 7mmand 9mm dia High Tensile Steel(HTS) Wire'' from 12.07.08 to21.07.08 for 10 days in China. 3) Inspection on Coal ThermalPower Station construction from18.11.09 to 24.11.09 for 07 daysin India. 4) See N.B.
*N.B.- 1) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding travel time) to attend Coaltrans Conference in India. 2) Supplying of 6mm dia 1000 Quintal, 7mm dia 1000 Quintal, 8mm dia 600 Quintal & 9mm Dia 1400 Quintal High Tensile Steel(HTS) Wire, ''Pre-shipment inspection (Foreign)” against Chittagong PC Pole Construction Plant, BPDB, Halishahar, Chittagong from in June/2011 for 10 (Ten) working days from the date of actual journey in China. 3) To travel Indonesia, Singapur and Australia in April/2012 for 10 days.
Page 603
1 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)
Director(SE) IPP Cell-3, PDB, Dhaka.
New posting order to 820MW power plantconstruction project, PDB,Dhaka.
I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)
2)Training on PowerEngineering and Managementfrom 09.05.04 to 22.05.04
U.K.
Korea
1)Pre-Payment Meter & VendingEquipment From 25.11.06 to01.12.06 for 07 (days) inEngland 2) “Technical Orientation andQuality Test Witness” on FourLevel Security Seal &Accessories from 18.02.10 to23.02.10 for 05 days in India. 3) Inspection on machineries ofHundai Heavy Industries Co. Ltdfor establishing IPP Power Plantat Gaptali, Mirpur, Dhaka from24 July/2011 for 05 (five) days(excluding travel time) in SouthKorea. 4) Inspection againstPlant/Factory in "MidlandPower Co. Ltd" from 25.06.2012to 02.07.2012 in Norway. 5) Technical orientation andquality test witness from18.05.13 to 23.05.13 in USA.
4 1-0458 01.01.56 Mr. Mir Md. Rezaul Kabir, Kustia, B.Sc.Engg.(Mech.)24.07.81 (AE) 24.07.81 (AE) 06.08.86(SDE) 16.08.01(XEN) 18-8-2011 (SE)
SE Attach to Member P & D,PDB, Dhaka. (New posting as PD (SE), Shirajgonj 300 - 400 MWPower Plant ConstructionProject, PDB, Dhaka.)
1) Planning & Design,Operation & Maintenance ofHigh Voltage Transformer andSwitchgear From 26.01.87 to24.04.87 2) Update of Power SystemStudies through WASPsoftware from 15.04.98 to01.05.98 3)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 for ThreeMonth (Bond for 03 Yearsfrom 17.07.04 to 16.10.04)
U.K.
U.S.A.
China,
1) Hydrabad, India For Re-Chargeable Battery InspectionFrom 02.05.01 to 06.05.01 2) "Developments inRenewable EnergyTechnologies" against "NTPCLimited" from 07.03.11 to09.03.11 in India. 3) Regulatory Policy andFramework for Marketdevelopment for RenewableEnergy from 14.06.10 to 17.06.10in Chennai, India
Page 604
2 1-01127 15.09.66 Mr. Md. Fariduzzaman, Rangpur, B.Sc.Engr.(Elec.), 19.07.94(AE) 27.04.04 (SDE) 06.05.10 (XEN, Incharge) 18.08.2011 (XEN)
XEN Attested to Office ofMember Generation.
(New posting order toCoal Power GenerationCompany BangladeshLtd.)
1)Orientation & TechnicalTraining on Power Transformerfrom 14.03.05 for 7 days inIndia.(G.O Issued)
15 30.07.86 Mr. Md. Saleh B-Baria B.Sc. Engg. (Elect.) 05.01.12 (AE) 01837148060 [email protected]
AE Dte. of Project Planning
PDB, Dhaka.
2 1-0429 23.04.56 Mr. Nurul Karim,Chittagong,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN)
XEN,
System Protection &Testing Commisioningcell, Office of CE,Services PDB, Dhaka.
(SE Coal Project, Khulna)
1) Scada System Soft &Hardware from 28.11.88 for14.03.89
2) 33/11KV Power TransformerFrom May/03 for 14 Days 3) GIS From 15.06.04 for 11Days
4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India &Malaysia.
U.K.
Iran
Germany,
India & Malaysia
1) 14.4.2001 to 19.4.2001 for 06days in India.
2)Factory Test Witness &Orientation Training on GreaterChittagong Power DistributionProject, ''Power Transformer''from July/06 for 14 days inChina.
25 1-01649 06.05.77 Mr.A.S.M.Foyez Ullah Khulna B.Sc.Eng(Computer) 07.04.2006(AE) 18.08.2011 (SDE)
SDE Dhaka Computer Centre
PDB, Dhaka.
82 1-01672 20.09.78 Mr.Subrata Roy Netrokona B.Sc.Eng(Computer) 06.2006(AE)
AE O & M Circle (MymensighComputer Centre) PDB, Mymensigh .
1) G.O. Issued dt.12.05.11on “Technical Orientationand Quality test witness''Supply of TransformerAccessories (CopperCables)" against Central zonepower distribution Project,PDB, Mymensingh for 07(Seven) days from the dateof actual journey(Excludingtravel time) in China.
234 1-01806 01.06.09 Mr. Shyamol Chandro Sarker Sunamgonj B.Sc.Engr(Computer) 01.06.09 (AE)
AE, Chittagong Computer Centre PDB, Chittagong.
235 1-01807 01.05.83 Mr. Shek Kashruzamman Noralil B.Sc.Engr(Computer) 31.05.09 (AE)
AE, Comilla Computer Centre PDB, Comilla.
Page 605
361 1-01861 25.12.82 Mr. S. M. Niamul Haque B-Baria B.Sc. Engg. (Comp.) 04.11.10 (AE) 01915629769 [email protected]
AE dhaka Computer Centre PDB, Dhaka.
A proposal sent toministry dated11.04.13 in order toinspect PC serverother equipmentfor AMR from02.05.13 to 08.05.13in Malaysia.
393 1-01893 24.01.84 Mr. Shahed Mohammad Mehedi Iqbal Jessore B.Sc. Engg. (Comp.) 01.12.10 (AE) 01716295868 [email protected]
AE Computer Centre PDB, Comilla..
1 1-0275 10.09.55 Mr. Md. Shahjahan Miah,
Munshiganj,
B.Sc.Engg. (Elec.)
08.12.78 (AE) 23.01.94(XEN) 28.12.10(SE, Revl.) 08.02.11 (SE) 01-12-11 (Addl. CE)
Addl. CE Services, PDB, Dhaka.
1) System Planning & SystemStudies. From 07.01.86 for 08Weeks
Thailand
1 1-0372 05.03.55 Mr. Md. Abdur Razzaque, Mymensingh,
B.Sc.Engg. (Mech.) 21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE, Rev.)
Director (SE),
Directorate of Program.
France 1) 25.03.2001 to 28.3.2001India 2)Factory test witness of 33KVXLPE Power cable & BatteryFrom 05.12.03 to 5 Days inChina 3) 132KV Transformer against“Inspection'' from October/10for 07 days in China.
A proposal sent toministry dated19.09.13 againstroad show on"German-BangladeshInvestors Meet forEmergingBangladesh" on22.10.13 inGermany.
* N.B.- 1) G.O. issued dated 23.01.2012 against the contact between BPDB & Consortium of Ideal Enterprise, Dhaka, Bangladesh in order to Attend a pre shipment inspection on single phase smart card meters for 11 days (excluding travel time) from the date of actual journey in Malaysia.
2 1-0752 15.02.63 Mr. Kazi Absaruddin Ahmed, Dhaka, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
Dy. Director(XEN) Project Planning PDB, Dhaka.
1)Training on Tower &Transmission Line Designfrom 01.08.99 to 31.10.99
2) "Approval of EngineeringData & Drawing" from 07.06.09to 16.06.09 for 07 days
3) Training on Rehabilitationof GT of Shahijibazar PowerStation from 29.11.07 to 05.12.07 for 07 Days 4) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13
Germany
China.
Abu Dhabi.
Australia
1)33 KV & 11 KV Pin InsulatorFactory Test From 01.09.98 to10.09.98 in India
2) Factory Test of 33 KV SF6 &Vacuum CB from 28.05.01 to06.06.01in India 3) Design Test of Lattice StreetTower From 02.07.02 to 06.06.02in China * See N.B.
lien
Page 606
* N.B. 4) Factory Test of Cable Accessories 11 KV & below Line Construction From 03.11.03 to 14.11.03 in Indonesia, 5) Factory Test Witness With Orientation & Technical Training For Barrel Transformer Oil From 26.06.2004 to 05.07.04 in India. 6) Orientation & Technical Training on 9 Meter Steel Pole From 28.03.05 for 07 days in China. 7) Basic Engineering Drawing against Chandpur 150MW Combined Cycle Power Station Construction Project from 28.07.10 to 11.08.10 for 15 days in China. 8) Inspection against Santahar 50 MW and Katakhali 50 MW Peaking Power Plant Construction Project from 14.03.2012 to 19.03.2012 in China.
3 1-0896 10.08.53 Mr. Kazi Abu Bakar,Barisal,Diploma(Elec).29.03.76(SAE) 16.05.90(AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN)
XEN,Diesel Generation,PDB, Dhaka.
(freedomfighter)
1) Training on Gas TurbinePower GenerationMaintenance & Operationfrom 16.09.01 to 13.12.01
India 1) Factory Test Witness from30.06.97 to 11.07.97 in Itali 2) "Practical Demonstration toImport Technical know how"against PPRP on Gus Turbinefrom 04.11.04 to 12 days In USA
LPR
1 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,
Rajshahi,
B.Sc.Engg. (Elec.)
14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE, Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member, currentcharge) 24-07-12 (member) 04.11.13 (Chairman)
Chairman, PDB, Dhaka.
1)Transformer operation andMaintenance from 07.08.94 to17.09.94 2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07, 14days. 3) Training on Design, Supply,Installation, Testing andCommissioning of 1000KWCapacity Wind Mill PowerPlant (WBHPP) on turnkeybasis at Kutubdia Island,cox's Bazar ``TechnicalOrientation and Quality TestWitness from 18.12.07 to31.12.07 for 14 days.
Belgium
Germany
China.
1)11 KV. Pre- Paid Metering(Sylhet) From 20.08.04 to30.08.04 for 07 Days in SouthAfrica 2) Workshop Program titled"Low Carbon Power SectorDevelopment Workshop" whichwill be held on 10/12/2011 to17/12/2011 for maximum 08(eight) days (excluding travelperiod) in Washington DC, USA. 3) Inspection against CentralZone Power Distribution Project,Mymensingh from 03.07.12 to14.07.12 in USA. See N.B.
2) A proposal sentto ministry dated14.05.14 to attend15 the annualAsian Utility WeekConference &Exhibition from10.06.14 to 11.06.14in Thailand. (G.O.issued but vist notyet done) 3) A proposal Sentto ministry dated28.05.14 to AttentCommonwealthGames BusinessConference from23.07.14 to 25.07.14in UK.
N.B. 4) A meeting with Nepal Govt. regarding import/construction of hydropower from 24-27 July/2012 in Nepal. 5) To attend a meeting with Soudi Fund against Shikalbaha 225 MW Dual Fuel CCPP from 10.09.12 to 13.09.12 in Saudi Arab. 6) "Quality acceptance Test" of 11 KV Auto Circuit Reclosure from 03.06.13 to 12.06.13 in Australia. 7) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 8) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 9) Management Meeting & Visit of Coal & Renewable Energy Based Power Plant from 18.01.14 to 23.01.14 in China. 10) seminar on Coal Based Power Plant Inspection & Investment from 20.04.14 to 26.04.14 in Japan.
2 1-0682 05.07.59 Mr. Md. Delshad Hossain
Feni, B.Sc.Engr.(Civil.),
30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN)
Deputy Director(XEN), Dte. Of Design &Inspection-3, PDB, Dhaka.
1) 14 Meter Steel Pole (450daN: 130 Nos. & 550 daN: 70Nos) "Proof Test" from 22.04.08to 28.04.08 for 07 days.
China 1) Basic Design Review againstThohazari 100MW Power StationConstruction Project fromOctober/10 for 07 days in China.
Resigned
Central Secretariat
Page 607
SL.NO.
ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01916 30.10.88 Mr. Md. Ali Baker Joypurhat B. Sc. Engg. (Elect.) 24.07.11 (AE) 0171-1081796 [email protected]
AE, Central Secretariate,BPDB, Dhaka.
1) PSCDP Training Program onOperation & Maintenance ofBoiler from 27.05.13 to 07.06.13
2) PSCDP Training Program onContract Management (Batch-1) from 02.09.13 to 13.09.13
Indonesia
Thailand
Ghorasal P/Snew posting
4 1-01448 01.01.70 Mr. Hirendra Chandra Paul Shunamgong, B.Sc.Engr.(Civil.),
05.03.2000(AE) 08.12.09(SDE)
SDE, Civil ConstructionDivision-1 PDB, Dhaka.
Approval of "ConstructionDrawings" aganist Sylhet150MW Combined Cycle PowerPlant Construction Project for08(Eight) days in 2011 in China.
Page 608
A proposal Sent to ministry forTest witness of energy meter
against Summit Barisal PowerLit. 6 days in Switzerland,
Norway, Finland
2004 01.07.10
Page 609
P&D 1991 11.10.10
P&D 2003 03.08.10
Page 610
7) for Factory Test WitnessAgainst Shahjibazar 330 MWCCPP Project from 30.04.15 to01.05.15 in Spain. 8) witnessing of manufacturingprocess against BaghabariPower Station from 30.11.15 to6.12.15 in UK 9) witnessing of manufacturingprocess against 225 Shikalbahai PowerPlant Project Feb/2016 inUSA
Page 611
Chairman 2001 02.06.10
M.Admin
G& PD
Dhaka West 108 MW HFO PowerPlant Construction Project,
Bosila, Keraniganj.
2004 02.06.10
Page 612
M.Admin 10.02.10
M.Admin 2003 08.02.11
M.Adm 11.05.08
Page 613
M.Admin 14.11.10
Page 614
D
G 11.11.08
Page 615
5)Witnessing of manufacturingprocess against Ctg.Distribution Project fromDec/2015 in china & India.
G 2004 02.06.10
Page 616
P&D7) Technical Orientation &Quality Test Witness In Chinafor 7 days in China March/2016
04.08.10
D 01.01.10
Page 617
P&D 2005 13.01.11
25. Basic Design & DrawingApproval against Barapukuria275 MW Aug/2015 for 10 days
in China 26.Basic Design & Drawing
Approval against GPS 365 MWDec/2015 for 8 days in
China+A65 A68
Page 618
G
G 2004 01.01.10
Page 619
P&D 2005 12.01.11
P&D
1) Detail drawing againstKatakhali Power Plant Project23.02.11 to 01.03.11 7 days inChina 2) Pre-shipment inspection of2860 Quintal HT wire againstChittagong PC pole from 20.09.15to 29.09.15 in China.
Page 620
D 1991 02.06.10
Page 621
Chairman 15.04.08
Page 622
Chairman 11.10.10
P&D 2003 01.01.10
Page 623
D 25.06.09
D 25.06.09
Page 624
P&D 23.04.09
Page 625
Chairman 15.04.08
P&D 24.04.08
Page 626
P&D 15.04.08
Page 627
G 2004 02.06.10
P&D
Page 628
3) training on capacity building program from 18.01.16 to 20.10.15 in ManilaM.Admin 2004 21.01.10
Page 629
P&D 2003 30.03.10
D 23.03.10
Page 630
D
P&D
Page 631
P&D 2004 11.10.10
Inspection of gas turbineagainst Bibiana-3 CCPP project
from 28.09.15 to 01.10.15 inJapan & Thailand.
13)Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from
Nov/2015 in China
P&D 2004 18.01.11
Page 632
P&D
P&D 20.04.08
Page 633
P&D7) Basic Design & Drawingagainst GPS 275 MW Power
Plant from Nov/2015 in ChinaFor 12 days
30.12.09
Page 634
P&D 2004 08.02.11
Chairman 2004 12.01.11
Page 635
G 2004 08.02.11
P&D 04.10.10
D 02.06.10
D 02.06.10
Page 636
D 02.06.10
Page 637
D 2000 04.12.08
Page 638
P&D Diploma
06.05.10
P&D 25.06.09
Page 639
P&D 2004 08.02.11
P&D 2004
Page 640
D 18.03.08
P&D 01.01.10
P&D 07.06.10
D 02.06.10
Page 641
Page 642
P&D 2001 28.07.08
P&D 2004 25.06.09
Page 643
P&D 2004 25.06.09
P&D 20.04.08
Page 644
G
G 24.08.10
Page 645
P&D 2003 18.01.11
P&D 2004 06.05.10
P&D 01.01.10
Page 646
G 24.08.10
Page 647
D 02.06.10
G 2004 25.06.09
Page 648
P&D 16.01.08
Page 649
G
P&D 10.11.08
P&D 02.06.10
Page 650
Page 651
P&D 17.09.09
Page 652
P&D 11.10.10
F 15.05.08
Page 653
Page 654
D 2002 24.01.11
Page 655
G 2004 08.02.11
D 10.03.11
Page 656
P&D 01.01.10
Page 657
M.Admin 2001 24.01.11
Page 658
G 01.01.10
P&D 2003 01.01.10
Page 659
D 01.01.10
Page 660
G 25.06.09
Page 661
D 1997 30.03.10
Page 662
G 2004 21.01.10
P&D 2003 02.06.10
Page 663
G 2004 01.01.10
Page 664
1)From 20.6.02 to 26.6.02 in India
2) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle Power StationConstruction Project from28.07.10 to 11.08.10 for 15 daysin China.
2004
G 10.02.10
Page 665
10+A350)Conferece, Srilanka,Feb/2016
G 06.05.10
Page 666
G
Page 667
G 2004 22.04.10
Page 668
G 2004 09.06.10
D 01.01.10
Page 669
& PD (Addl. Charge) 1320 MW Coal Based PowerPlant Construction Project,Moheshkhali, Coxs'Bazar
2004 05.06.10
Page 670
P&D 2002 06.05.10
Page 671
G 2004 01.01.10
G
M.Admin
P&D 02.06.10
Page 672
Page 673
G 11.01.11
Page 674
Page 675
Page 676
G 2004 02.06.10
M.Admin 2003 06.05.10
P&D 2005 01.01.10
Page 677
G 2004 02.07.09
M.Admin 02.03.07
2004 18.07.07
Chairman 2000 01.01.10
Page 678
G 2004 13.01.11
Page 679
P&D 2004 12.04.11
Page 680
P&D 14.08.08
P&D 2005 13.01.11
M.Admin 2004 05.10.11
Page 681
D 2001 23.01.11
M.Admin 2005 06.05.10
Page 682
P&D 2005 02.06.10
P&D
D 16.01.08
D 02.06.10
D 02.06.10
Page 683
1985 05.03.08
P&D 2003 11.10.10
P&D
Page 684
G Diploma 2004 06.05.10
P&D
Page 685
P&D 16.07.09
Page 686
Page 687
Page 688
Page 689
Page 690
Page 691
Page 692
Page 693
Page 694
Page 695
Page 696
Page 697
Page 698
Page 699
Page 700
Page 701
Page 702
Page 703
Page 704
Page 705
Page 706
Page 707
Page 708
Page 709
Page 710
Page 711
Page 712
Page 713
Page 714
Page 715
Page 716
Page 717
Page 718
Page 719
Page 720
Page 721
Page 722
Page 723
Page 724
Page 725
Page 726
Page 727
Page 728
Page 729
Page 730
Page 731
Page 732
Page 733
Page 734
Page 735
Page 736
Page 737
Page 738
Page 739
Page 740
Page 741
Page 742
Page 743
Page 744
Page 745
Page 746
Page 747
Page 748
Page 749
Page 750
Page 751
Page 752
Page 753
Page 754
Page 755
Page 756
Page 757
Page 758
Page 759
Page 760
Page 761
Page 762
Page 763
Page 764
Page 765
Page 766
Page 767
Page 768
Page 769
Page 770
Page 771
Page 772
Page 773
Page 774
Page 775
Page 776
Page 777
Page 778
Page 779
Page 780
Page 781
Page 782
Page 783
Page 784
Page 785
Page 786
Page 787
Page 788
Page 789
Page 790
Page 791
Page 792
Page 793
Page 794
Page 795
Page 796
Page 797
Page 798
Page 799
Page 800
Page 801
Page 802
Page 803
Page 804
Page 805
Page 806
Page 807
Page 808
Page 809
Page 810
Page 811
Page 812
Page 813
Page 814
Page 815
Page 816
Page 817
Page 818
Page 819
Page 820
Page 821
Page 822
Page 823
Page 824
Page 825
Page 826
Page 827
Page 828
Page 829
Page 830
Page 831
Page 832
Page 833
Page 834
Page 835
Page 836
Page 837
Page 838
Page 839
Page 840
Page 841
Page 842
Page 843
Page 844
Page 845
Page 846
Page 847
Page 848
Page 849
Page 850
Page 851
Page 852
Page 853
Page 854
Page 855
Page 856
Page 857
Page 858
Page 859
Page 860
Page 861
Page 862
Page 863
Page 864
Page 865
Page 866
Page 867
Page 868
Page 869
Page 870
Page 871
Page 872
Page 873
Page 874
Page 875
Page 876
Page 877
Page 878
Page 879
Page 880
Page 881
Page 882
Page 883
Page 884
Page 885
Page 886
Page 887
Page 888
Page 889
Page 890
Page 891
Page 892
Page 893
Page 894
Page 895
Page 896
Page 897
Page 898
Page 899
Page 900
Page 901
Page 902
Page 903
Page 904
Page 905
Page 906
Page 907
Page 908
Page 909
Page 910
Page 911
Page 912
Page 913
Page 914
Page 915
Page 916
Page 917
Page 918
Page 919
Page 920
Page 921
Page 922
Page 923
Page 924
Page 925
Page 926
Page 927
Page 928
Page 929
Page 930
Page 931
Page 932
Page 933
Page 934
Page 935
Page 936
Page 937
Page 938
Page 939
Page 940
Page 941
Page 942
Page 943
Page 944
Page 945
Page 946
Page 947
Page 948
Page 949
Page 950
Page 951
Page 952
Page 953
Page 954
Page 955
Page 956
Page 957
Page 958
Page 959
Page 960
Page 961
Page 962
Page 963
Page 964
Page 965
Page 966
Page 967
Page 968
Page 969
Page 970
Page 971
Page 972
Page 973
Page 974
Page 975
Page 976
Page 977
Page 978
Page 979
Page 980
Page 981
Page 982
Page 983
Page 984
Page 985
Page 986
Page 987
Page 988
Page 989
Page 990
Page 991
Page 992
Page 993
Page 994
Page 995
Page 996
Page 997
Page 998
Page 999
Page 1000
Page 1001
Page 1002
Page 1003
Page 1004
Page 1005
Page 1006
Page 1007
Page 1008
Page 1009
Page 1010
Page 1011
Page 1012
Page 1013
Page 1014
Page 1015
Page 1016
Page 1017
Page 1018
Page 1019
Page 1020
Page 1021
Page 1022
Page 1023
Page 1024
Page 1025
Page 1026
Page 1027
Page 1028
Page 1029
Page 1030
Page 1031
Page 1032
Page 1033
Page 1034
Page 1035
Page 1036
Page 1037
Page 1038
Page 1039
Page 1040
Page 1041
Page 1042
Page 1043
Page 1044
Page 1045
Page 1046
Page 1047
Page 1048
Page 1049
Page 1050
Page 1051
Page 1052
Page 1053
Page 1054
Page 1055
Page 1056
Page 1057
Page 1058
Page 1059
Page 1060
Page 1061
Page 1062
Page 1063
Page 1064
Page 1065
Page 1066
Page 1067
Page 1068
Page 1069
Page 1070
Page 1071
Page 1072
Page 1073
Page 1074
Page 1075
Page 1076
Page 1077
Page 1078
Page 1079
Page 1080
Page 1081
Page 1082
Page 1083
Page 1084
Page 1085
Page 1086
Page 1087
Page 1088
Page 1089
Page 1090
Page 1091
Page 1092
Page 1093
Page 1094
Page 1095
Page 1096
Page 1097
Page 1098
Page 1099
Page 1100
Page 1101
Page 1102
Page 1103
Page 1104
Page 1105
Page 1106
Page 1107
Page 1108
Page 1109
Page 1110
Page 1111
Page 1112
Page 1113
Page 1114
Page 1115
Page 1116
Page 1117
Page 1118
Page 1119
Page 1120
Page 1121
Page 1122
Page 1123
Page 1124
Page 1125
Page 1126
Page 1127
Page 1128
Page 1129
Page 1130
Page 1131
Page 1132
Page 1133
Page 1134
Page 1135
Page 1136
Page 1137
Page 1138
Page 1139
Page 1140
Page 1141
Page 1142
Page 1143
Page 1144
Page 1145
Page 1146
Page 1147
Page 1148
Page 1149
Page 1150
Page 1151
Page 1152
Page 1153
Page 1154
Page 1155
Page 1156
Page 1157
Page 1158
Page 1159
Page 1160
Page 1161
Page 1162
Page 1163
Page 1164
Page 1165
Page 1166
Page 1167
Page 1168
Page 1169
Page 1170
Page 1171
Page 1172
Page 1173
Page 1174
Page 1175
Page 1176
Page 1177
Page 1178
Page 1179
Page 1180
Page 1181
Page 1182
Page 1183
Page 1184
Page 1185
Page 1186
Page 1187
Page 1188
Page 1189
Page 1190
Page 1191
Page 1192
Page 1193
Page 1194
Page 1195
Page 1196
Page 1197
Page 1198
Page 1199
Page 1200
Page 1201
Page 1202
Page 1203
Page 1204
Page 1205
Page 1206
Page 1207
Page 1208
Page 1209
Page 1210
Page 1211
Page 1212
Page 1213
Page 1214
Page 1215
Page 1216
Page 1217
Page 1218
Page 1219
Page 1220
Page 1221
Page 1222
Page 1223
Page 1224
Page 1225
Page 1226
Page 1227
Page 1228
Page 1229
Page 1230
Page 1231
Page 1232
Page 1233
Page 1234
Page 1235
Page 1236
Page 1237
Page 1238
Page 1239
Page 1240
Page 1241
Page 1242
Page 1243
Page 1244
Page 1245
Page 1246
Page 1247
Page 1248
Page 1249
Page 1250
Page 1251
Page 1252
Page 1253
Page 1254
Page 1255
Page 1256
Page 1257
Page 1258
Page 1259
Page 1260
Page 1261
Page 1262
Page 1263
Page 1264
Page 1265
Page 1266
Page 1267
Page 1268
Page 1269
Page 1270
Page 1271
Page 1272
Page 1273
Page 1274
Page 1275
Page 1276
Page 1277
Page 1278
Page 1279
Page 1280
Page 1281
Page 1282
Page 1283
Page 1284
Page 1285
Page 1286
Page 1287
Page 1288
Page 1289
Page 1290
Page 1291
Page 1292
Page 1293
Page 1294
Page 1295
Page 1296
Page 1297
Page 1298
Page 1299
Page 1300
Page 1301
Page 1302
Page 1303
Page 1304
Page 1305
Page 1306
Page 1307
Page 1308
Page 1309
Page 1310
Page 1311
Page 1312
Page 1313
Page 1314
Page 1315
Page 1316
Page 1317
Page 1318
Page 1319
Page 1320
Page 1321
Page 1322
Page 1323
Page 1324
Page 1325
Page 1326
Page 1327
Page 1328
Page 1329
Page 1330
Page 1331
Page 1332
Page 1333
Page 1334
Page 1335
Page 1336
Page 1337
Page 1338
Page 1339
Page 1340
Page 1341
Page 1342
Page 1343
Page 1344
Page 1345
Page 1346
Page 1347
Page 1348
Page 1349
Page 1350
Page 1351
Page 1352
Page 1353
Page 1354
Page 1355
Page 1356
Page 1357
Page 1358
Page 1359
Page 1360
Page 1361
Page 1362
Page 1363
Page 1364
Page 1365
Page 1366
Page 1367
Page 1368
Page 1369
Page 1370
Page 1371
Page 1372
Page 1373
Page 1374
Page 1375
Page 1376
Page 1377
Page 1378
Page 1379
Page 1380
Page 1381
Page 1382
Page 1383
Page 1384
Page 1385
Page 1386
Page 1387
Page 1388
Page 1389
Page 1390
Page 1391
Page 1392
Page 1393
Page 1394
Page 1395
Page 1396
Page 1397
Page 1398
Page 1399
Page 1400
Page 1401
Page 1402
Page 1403
Page 1404
Page 1405
Page 1406
Page 1407
Page 1408
Page 1409
Page 1410
Page 1411
Page 1412
Page 1413
Page 1414
Page 1415
Page 1416
Page 1417
Page 1418
Page 1419
Page 1420
Page 1421
Page 1422
Page 1423
Page 1424
Page 1425
Page 1426
Page 1427
Page 1428
Page 1429
Page 1430
Page 1431
Page 1432
Page 1433
Page 1434
Page 1435
Page 1436
Page 1437
Page 1438
Page 1439
Page 1440
Page 1441
Page 1442
Page 1443
Page 1444
Page 1445
Page 1446
Page 1447
Page 1448
Page 1449
Page 1450
Page 1451
Page 1452
Page 1453
Page 1454
Page 1455
Page 1456
Page 1457
Page 1458
Page 1459
Page 1460
Page 1461
Page 1462
Page 1463
Page 1464
Page 1465
Page 1466
Page 1467
Page 1468
Page 1469
Page 1470
Page 1471
Page 1472
Page 1473
Page 1474
Page 1475
Page 1476
Page 1477
Page 1478
Page 1479
Page 1480
Page 1481
Page 1482
Page 1483
Page 1484
Page 1485
Page 1486
Page 1487
Page 1488
Page 1489
Page 1490
Page 1491
Page 1492
Page 1493
Page 1494
Page 1495
Page 1496
Page 1497
Page 1498
Page 1499
Page 1500
Page 1501
Page 1502
Page 1503
Page 1504
Page 1505
Page 1506
Page 1507
Page 1508
Page 1509
Page 1510
Page 1511
Page 1512
Page 1513
Page 1514
Page 1515
Page 1516
Page 1517
Page 1518
Page 1519
Page 1520
Page 1521
Page 1522
Page 1523
Page 1524
Page 1525
Page 1526
Page 1527
Page 1528
Page 1529
Page 1530
Page 1531
Page 1532
Page 1533
Page 1534
Page 1535
Page 1536
Page 1537
Page 1538
Page 1539
Page 1540
Page 1541
Page 1542
Page 1543
Page 1544
Page 1545
Page 1546
Page 1547
Page 1548
Page 1549
Page 1550
Page 1551
Page 1552
Page 1553
Page 1554
Page 1555
Page 1556
Page 1557
Page 1558
Page 1559
Page 1560
Page 1561
Page 1562
Page 1563
Page 1564
Page 1565
Page 1566
Page 1567
Page 1568
Page 1569
Page 1570
Page 1571
Page 1572
Page 1573
Page 1574
Page 1575
Page 1576
Page 1577
Page 1578
Page 1579
Page 1580
Page 1581
Page 1582
Page 1583
Page 1584
Page 1585
Page 1586
Page 1587
Page 1588
Page 1589
Page 1590
Page 1591
Page 1592
Page 1593
Page 1594
Page 1595
Page 1596
Page 1597
Page 1598
Page 1599
Page 1600
Page 1601
Page 1602
Page 1603
Page 1604
Page 1605
Page 1606
Page 1607
Page 1608
Page 1609
Page 1610
Page 1611
Page 1612
Page 1613
Page 1614
Page 1615
Page 1616
Page 1617
Page 1618
Page 1619
Page 1620
Page 1621
Page 1622
Page 1623
Page 1624
Page 1625
Page 1626
Page 1627
Page 1628
Page 1629
Page 1630
Page 1631
Page 1632
Page 1633
Page 1634
Page 1635
Page 1636
Page 1637
Page 1638
Page 1639
Page 1640
Page 1641
Page 1642
Page 1643
Page 1644
Page 1645
Page 1646
Page 1647
Page 1648
Page 1649
Page 1650
Page 1651
Page 1652
Page 1653
Page 1654
Page 1655
Page 1656
Page 1657
Page 1658
Page 1659
Page 1660
Page 1661
Page 1662
Page 1663
Page 1664
Page 1665
Page 1666
Page 1667
Page 1668
Page 1669
Page 1670
Page 1671
Page 1672
Page 1673
Page 1674
Page 1675
Page 1676
Page 1677
Page 1678
Page 1679
Page 1680
Page 1681
Page 1682
Page 1683
Page 1684
Page 1685
Page 1686
Page 1687
Page 1688
Page 1689
Page 1690
Page 1691
Page 1692
Page 1693
Page 1694
Page 1695
Page 1696
Page 1697
Page 1698
Page 1699
Page 1700
Page 1701
Page 1702
Page 1703
Page 1704
Page 1705
Page 1706
Page 1707
Page 1708
Page 1709
Page 1710
Page 1711
Page 1712
Page 1713
Page 1714
Page 1715
Page 1716
Page 1717
Page 1718
Page 1719
Page 1720
Page 1721
Page 1722
Page 1723
Page 1724
Page 1725
Page 1726
Page 1727
Page 1728
Page 1729
Page 1730
Page 1731
Page 1732
Page 1733
Page 1734
Page 1735
Page 1736
Page 1737
Page 1738
Page 1739
Page 1740
Page 1741
Page 1742
Page 1743
Page 1744
Page 1745
Page 1746
Page 1747
Page 1748
Page 1749
Page 1750
Page 1751
Page 1752
Page 1753
Page 1754
Page 1755
Page 1756
Page 1757
Page 1758
Page 1759
Page 1760
Page 1761
Page 1762
Page 1763
Page 1764
Page 1765
Page 1766
Page 1767
Page 1768
Page 1769
Page 1770
Page 1771
Page 1772
Page 1773
Page 1774
Page 1775
Page 1776
Page 1777
Page 1778
Page 1779
Page 1780
Page 1781
Page 1782
Page 1783
Page 1784
Page 1785
Page 1786
Page 1787
Page 1788
Page 1789
Page 1790
Page 1791
Page 1792
Page 1793
Page 1794
Page 1795
Page 1796
Page 1797
Page 1798
Page 1799
Page 1800
Page 1801
Page 1802
Diploma
Page 1803
Page 1804
Page 1805
Page 1806
Page 1807
Page 1808
Page 1809
Page 1810
Page 1811
Page 1812
Page 1813
Page 1814
Page 1815
Page 1816
Page 1817
Page 1818
Page 1819
Page 1820
Page 1821
Page 1822
Page 1823
Page 1824
Page 1825
Page 1826
Page 1827
Page 1828
Page 1829
Page 1830
Page 1831
Page 1832
Page 1833
Page 1834
Page 1835
Page 1836
Page 1837
Page 1838
Page 1839
Page 1840
Page 1841
Page 1842
Page 1843
Page 1844
Page 1845
Page 1846
Page 1847
Page 1848
Page 1849
Page 1850
Page 1851
Page 1852
Page 1853
Page 1854
Page 1855
Page 1856
GM Training Dte. of Taining & Career Development
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0248 01.01.56 Mr. A.K.M. Abdur Rouf,
Bogra,
B.Sc.Engg. (Elec.)
14.09.78 (AE) 17.02.93(XEN) 09.01.06 (SE) 10.01.10 Addl.CE (Incharge) 15.02.10 Addl.CE (Rev.) 13.01.11 (CE) 2.1.2012 (CE)
GM (CE) Training, PDB, Dhaka.
1) Eclectic Power DistributionEngineering From 03.09.88 to17.11.88 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 to two Month (Bondfor 03 Years from 01.09.04 to31.10.04.) 3) Electricity Markets To MeetTomorrow's Demand: Efficientand Effective Design,Operation and Managementfrom 30.09.07 to 06.10.07, 07days.
Japan,
Russia,
USA
1)''Conceptual DesignApproval'' of Sylhet 90MWCCPP (2nd Unit) from28.01.07 to 06.02.07 for 10days in China
1 1-0537 02.02.55 Mr. Motahar RahmanChowdhury NaogaonB.Sc.Engg. (Elec.)18.3.82(AE) 01.02.92(SDE) 17.05.03(XEN)
Director Dte. of Training andCareer Development,PDB, Dhaka. & PD (Addl. Charge) Training AcademyComplex, PDB,Keraniganj.
1. Training
2. A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
Thailand &Bangkok
Newzealand
1) Inspection Battery &Battery Charger fromJanuary/2000 for 07 days inIndia. 2) “Witnessing ofManufacturing processand tests of the Matarialsand Spare at Manufactur’sworks including transferof technical know how” for15.09.09 to 22.09.09 inJapan. * See N.B.
*N.B. 3) “Witnessing of manufacturing process and test of the equipment of manufacturer's works including transfer of technical know-how” against Mechanical Security Spares from October/10 for 07 days in Netherland. 4) "Witnessing of manufacturing Process and test of the equipment of manufacturer;s works including transfer of technical Know-How" from 16.08.11 to 22.08.11 for 07 days in USA. 5) Inspection program on "Energy Efficient Buildings" from 12.03.13 to 18.03.13 in India. 6) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 7) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China.
Page 1857
2 1-0589 29.11.61 Mrs. Nurun Nahar Begum
Dhaka,
B.Sc.Engg. (Elec.)
09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)
XEN,
Dte. Of Training &Career Develpopment PDB, Dhaka.
1)Training on Powertransformer from 10.10.03 to08.01.04 for 03 Months 2) PSCDP Training program on"Strategic Human ResourceManagement" from 12.08.13to 23.08.13
China
Thailand
3 1-0592 01.02.56 Mr. Khan Monjur Morshed,
Barisal,
B.Sc.Engg. (Elec.)
09.10.84(AE) 09.10.84(SDE) 17.09.03(XEN)
Dy. Director Training & CareerDevelpopment PDB,Dhaka.
1)Electrical Maintanance/LTEEquipment From 30.12.86 to29.04.872)Maintanance Of Sub-Station,MV SwitchgearInstallation andMaintenance of Power X-Former From 18.08.2003 to29.08.2003 3) Training On 33/11KV 2x10MVA sub station June/ 2006for 10 Days
4) PSCDP tarining program on"Project Management (Batch-2)" from 02.09.13 to 13.09.13
USSR
Thailand
Norway
Thailand
1)Pre-Paiyment Metaringfrom 17.02.07 to 22.02.07for 07 days in SouthAfrica. 2) Orientation & TechnicalTraining mn Factory TestWitness in 05 for 07 daysin India. 3) "Factory Inspection onElectronic Governor" From19.02.09 to 26.02.09 for 07days in Italy.
5 1-0780 01.01.64 Mr. C.F.K. Musaddeq Ahmed, Sylhet, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 08.06.09(XEN)
Dy. Director(XEN),
GM, Training PDB, Dhaka.
1) Electric Power ManagementBy Benchmarking from08.09.03 to 17.10.03 2) Managing TrainingFunction from July/09 toNovember/90
Japan,
UK
6 1-0816 10.01.62 Mr. Md. Kamrul Ahsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge) 23.04.09 (XEN)
Dy. Director(XEN),
Director of Training andCareer Development
PDB, Dhaka.
1) Factory Test Witness26.03.04 to 31.03.04, 06days in India. 2) Inspection of Engine &Generator againstDaudkhandi 50MWPeaking Power Plant for 07days in Finland 3) PIM (PowerManagement Institute)NTPC for 03 days atFebruary/11.
Page 1858
5 1-01008 03.10.68 Mis. Dina Rahman,Dhaka,B.Sc.Engr.(Mech.),19.07.94(AE) 03-02-2003 (SDE) 08.02.11 (XEN, Rev.)
XEN,
Dte. of Training &Career Develpopment PDB,Dhaka.
1)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month 2) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13
France,
Thailand
6 1-01459 01.05.75 Mrs. Jakia Naznin Panna, Khulna, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE)
SDE Directorate of Training&Career Development PDB,Dhaka.
1) PSCDP Training programon "Project Management(Batch-1)" from 12.08.13 to23.08.13
Thailand 1) "Technical Know-How"on L.P. Rotor againstKhulna Power Station from09.06.09 to 15.06.09 for 07days in Czech Republic. 2) “Witnessing ofmanufacturing processand tests of the materialsand spares atmanufacturers' worksincluding transfer oftechnical know-how”against Repairing /Reconditioning /Replacement of Chimneyfrom Octob./10 for 07 daysin China.
9 1-01655 01.01.76 Mr.Md.Muzibul Haque Chuadanga B.Sc.Eng(Mech) 07.06.2006(AE) 18.08.2011 (SDE)
SDE Directorate of Training&Career Development PDB,Dhaka
Materials witnessInspection (HRSGInspection)” against Bera70 MW Peaking PowerPlant Construction Projectfrom 14.11.10 to 22.11.10for 07 days in South Korea.
Page 1859
10 1-01706 03.12.77 Ms.Khundakar NilufarSharmin Narayangonj. B.Sc.Eng(Mech) 07.04.2006(AE) 21.12.11(SDE)
SDE Directorate of Training&Career Development PDB, Dhaka.
1) Training on ''Operation &Maintenance of HRGS inKorea from 20.11.07 to04.12.07 for 0.5 Month &''Hydraulice Diverter DamperSystem in China from 14.08.07to 17.10.07 for 03 Monthsagainst 90 MW SylhetCombined Cycle Power Station(Unit-2) Cons. Project. 2) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13
Korea & China
India
9 1-01737 03.09.77 Mr. Mohammad ErfanulHaque Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE)
AE Directorate of Training&Career Development,PDB, Dhaka.
1) ''Inspection of HeatRecovery Steam Generatoragainst Dudkhandi 50MWPeaking Power PlantConstruction Project for 07days in China. 2) "Technical Orientation& Quality Test Witness"against ACSR Grosbeak,ACSR MERLIN, GUY WIREfrom 06.22.13 to 28.05.13 inChina
10 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01556559924 [email protected]
AE Directorate of Training&Career Development,PDB, Dhaka.
1) PSCDP Training program on"Project Management (Batch-1)" from 12.08.13 to 23.08.13
Thailand
11 1-02026 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522
AE Directorate of Training&Career Development,PDB, Dhaka.
1) "Implementing SelectiveERP Application &Management" TrainingProgram from 16.04.13 to29.04.13
Thailand
Page 1860
Chittagong RTC, PDB, Chittagong
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 11-0194 31.11.57 Mr. Nasir Uddin Chittagong, Diploma(Elec.)
05.07.80.(SAE), 17.09.09(AE)
AE, RTC PDB, Chittagong.
1) PSCDP training on RelayProtection & Advance trainingprogram from 08.07.13 to19.07.13
India
Tongi RTC, PDB, Tongi
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0916 25.02.56 Mr. Shah Alam,Dhaka,B.Sc.Engr.(Mech.),08.2.87(AE) 13.12.2000 (SDE) 08.02.11 (XEN)
Dy, Director (XEN)
RTC, Tongi, Gazipur
Pre-Shipment ofTransformer From 13.09.01to 24.09.01 in China
2 11-0007 09.01.57 Mr.Shukumer Lal Sarker, Kustia Diploma(Power )
21.08.78(SAE), 06.04.06 (AE), 10.02.10(SDE)
SDE, RTC, PDB, Tongi,Gazipur.
1) Operation & Maintenanceof Distribution Substationtraining program from11.02.13 to 22.02.13
Thailand
3 1-02009 22.12.82 Mrs. Sumita Rani Biswas Chittagong B.Sc. Engg. (Elect.) 02.10.2011 (AE)
AE, RTC, PDB, Tongi,Gazipur.
Rajshahi RTC, PDB, Rajshahi
Page 1861
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01428 10.11.71 Mr. Md. Rafiqul Islam, Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
DD (incharge) RTC PDB, Rajshahi.
1) 132KV CurrentTransformer & VoltageTransformer againstDawadkandi 50MWPeaking Power Plant fromOctober/10 for 07 days inChina. 2) "Technical orientation& Quality test witness "from 01.10.13 to 07.10.13 inChina.
G.O. issued dated23.10.13 againstPSCDP training onPublic PrivatePartnership (PPP)trainingprogramfrom18.11.13 to 29.11.13in Thailand.
2 11-0417 07.07.57 Mr. Md. Kamrul Alam Rajshahi Diploma Engg. (Elect.) 31.07.83 (SAE) 27.12.11 (AE)
AE RTC PDB, Rajshahi.
Ghorashal RTC, PDB, GhorashalSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
Deputy Director, (XEN)(Incharge) Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
1) Training program on"Operation & Maintenance ofGenerator" from 18.03.13 to29.03.13
India 1) Training on Servicedead end Clamp,September/05 for 07daysin India. 2) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina. 3) Special Inspectionagainst "Power PlantSimulator" from 16.09.13 to21.09.13 in USA.
Page 1862
9 1-01683 02.03.79 Mr.Mohammad Ali Firoz Sirajgonj B.Sc.Eng(Mech) 07.06.2006(AE) 27.12.2011(SDE)
SDE Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
Factory Training againstBaghabari 50MW PeakingPower Plant ConstructionProject '' from 30.05.2011 to30.06.2011 for 30(Thirty) days(Bond for 5 years)
China 1) Materials witnessInspection against“Control and ProtectionSystem & CT, PT Inspectionfrom October/10 for 07days in South Korea.
2 11-0436 16.01.62 Mr. Abul Kalam Azad Narayanganj Diploma Engg (Mech.) 03.08.83 (SAE) 27.12.11 (AE)
AE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
Engineering Academy, PDB, KaptaiSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
4 1-0429 23.04.56 Mr. Nurul Karim, Chittagong,
B.Sc.Engg. (Elec.) 24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 10.09.13(SE)
Director, Engineering Academy PDB, Kaptai.
1) Scada System Soft &Hardware from 28.11.88 for14.03.89
2) 33/11KV PowerTransformer From May/03for 14 Days 3) GIS From 15.06.04 for 11Days
4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India& Malaysia.
U.K.
Iran
Germany,
India &Malaysia
1) 14.4.2001 to 19.4.2001for 06 days in India.
2)Factory Test Witness &Orientation Training onGreater Chittagong PowerDistribution Project,''Power Transformer''from July/06 for 14 daysin China. 3)"Coal PowerGenaration" from10.06.13 to 14.06.13 inThailand.
Page 1863
1 1-0558 11.01.59 Mr. Bikash DewanRangamatiB.Sc.Engg. (Elec.)18.03.83(AE) 18.03.93(SDE) 09.03.03(XEN)
Director (Incharge), Engineering Academy PDB, Kaptai.
Meter & Accessories From24.05.2004 to 23.06.04
Singapore &Australia
1)11KV Capacitor OilSwitch, AutomaticCapacitor Controller,Junction Box and Line PostCurrent Sensor for3x100KVAR CapacitorBanks. From Feb/07 for 07days in U.S.A 2) Technical Orientationand Quality Test Witness"against 33KV Outdoor TypeCurrent Transformer(Diffenent Ratio) fromJanuary/11 for 07 days inChina. 3) "Factory AcceptanceTest (FAT) & TechnicalOrientation Course"against GreaterChittagong PowerDistribution Project SCADA-Rehabilitation &Extension in Sep./2011 for07 days or from the date ofactual journey (excludingtravell time) in NewZealand.
1 1-0744 10.02.63 Mr. Probir Kumar Dey,
Chittagong,
B.Sc.Engr.(Elec.),
30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN) 01839905724
DD (XEN), Engineering Academy PDB, Kaptai.
1)Operation andMaintenance of X-former andCkt.Breaker From 09.1.91 to8.4.91 2) Transmission Line DesignFrom 02.8.99 to 2.11.99
China,
Germany& Switzerland
3 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)
23.10.80(SAE), 17.09.09(AE)
AE, Engineering Academy PDB, Kaptai.
Page 1864
Training Academy, PDB, Cox's BazarSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0654 15.06.56 Mr. Gan Ranjan Chakma, Rangamaty, B.Sc.Engr.(Elec.), M.Sc.Engr.(Elec.), 17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN)
Director (Incharge), Training Academy, PDB,Cox's Bazar
1)Technical Orientationand Quality Test Witnesson Solar Photo Voltaic(PV)System from 21.02.07to 26.02.07 for 07 days inIndia.
5 1-01446 28.02.76 Mr. Mohammad AbdullahBhuiyan, Dhaka, B.Sc.Engr.(Metallurgi.),
05.03.2000(AE) 25.06.09(SDE) 01.01.14 (XEN,in charge) 01715791177
XEN (Incharge), Training Academy, PDB,Cox's Bazar
1) "Witnessing ofManufacturing Process &test of the Equipment atManufacturer’s worksincluding of Technicalknow-how” against tongipower station from08.11.09 to 13.11.09 fro 07days in USA. 2) “Witnessing ofmanufacturing process &tests of the equipment atmanufacturer's worksincluding transfer oftechnical know-how onBlade Kit, Turbine RotorStage-3 with Hardwarekits Ges Shroud Assemblyof Turbine Nozzle Stage-3with hard ware kitsComplete Set” againstBheramara Power Stationfrom 10.01.11 to 17.01.11 inUSA.
newly posted toCoxsBazar Trainingcenter
Page 1865
2 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN) 01839905723
DD (XEN), Engineering Academy PDB, Kaptai. (new posting order tobarapukuria powerstation)
1) Inspection on H.T.SWire From 10.10.02 to14.10.02 in India 2) ''Pre-shipmentinspection (Foreign)against Chittagong PC PoleConstruction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) daysin China.
Page 1866
27 1-0370 31.12.56 Mr. Md. Nurul AminChowdhury, Chittagong,B.Sc.Engg. (Mech.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 07.01.10 (SE, Reve. Basis)
Director (SE), Engineering Academy PDB, Kaptai. New posting order as PD(Addl. CE), Incharge to 250MW Barapukuria PowerPlant Construction Project,PDB, Dhaka
1) Design, Manufacture O & Mof Hydro Turbine Governors12.05.87 to 11.08.87 2)Traning on Gas TurbinePower Station Against Tongi80 MW From 24.07.04 To22.08.04 Three Month (Bondfor 03 Years from 24.07.04 to22.08.04)
Japan
China,
1) "Witnessing ofManufacturing Process &test of the Equipment atManufacturer’s worksincluding of Technicalknow-how” aganist Firstshipment for the SecondUnit Equipment (U-5) from09.01.2010 to 18.01.2010 inJapan. 2) Training Hydro Turbine(Mechanical) aganistKaptai Hydro Power Plant(Unit-3) from 01.10.08 to30.10.08 for 30 days in Italy
13 1-01727 01.01.80 Mrs. Arifa Parveen Dhaka B.Sc.Eng(Metallurgy) 07.06.2006(AE)
AE, Dte. of Training &Career Development, PDB,Dhaka
1) Testing & Inspection on33KV Capacitor Bank andat the ManufacturerPremises from 09.04.07 to16.04.07 for 07 days inIndia.
(Study live in Abroad)
7 1-0527 01.06.57 Mr. Samsul Haque, Comilla, B.Sc.Engg. (Elec.)
24.07.81(AE) 20.07.88(SDE) 17.05.03(XEN)
XEN,
Dte. of Training &Career Develpopment PDB,Dhaka.
1) Automation System from22.10.07 to 11.11.07 for03(Weeks)
Russia
Page 1867
8 1-0734 02.03.60 Mr. Md. Anower Hossain,
Joypurhat, B.Sc.Engr.(Elec.),
19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)
XEN
Dte. of Training &Career Develpopment PDB,Dhaka.
1)MV Switchgear,VD4 and VBFFrom 10.11.03 for 11 Days
India 1)Orientation & TechnicalTraining on 33 KV CircuitBracer & 11 KV Switchgearfrom 14.03.05 for 7 days inIndia.
deputed to Board ofInvestment office of the Primeministry
PDB, Dhaka.
Page 1868
P&D 2004 13.01.11 1978
G 2003 02.06.10
Page 1869
M.Admin 2003 06.05.10
M.Admin 2003 02.06.10
M.Admin 2003 08.02.11
M.Admin 10.02.10
Page 1870
M.Admin 2003 08.02.11
M.Adm 11.05.08
M.Admin
Page 1871
M.Admin 14.11.10
M.Admin 02.03.07
Page 1872
M.Admin 2001 08.02.11
P&D 05.06.10
Page 1873
M.Adm 18.03.10
M.Adm 23.03.10
Page 1874
Baghabari G 22.10.08
P&D 2005 02.06.10
Page 1875
Comilla D
1999 18.07.07
M.Am
Page 1876
Tongi G 25.06.09
Page 1877
P&D 2002 08.02.11
Page 1878
M.Admin 2004 21.01.10
M.Admin
M.Admin 02.06.10
Page 1879
2005 02.06.10
Page 1880
Page 1881
Page 1882
Page 1883
Page 1884
Page 1885
Page 1886
Page 1887
Page 1888
Page 1889
Page 1890
Page 1891
Page 1892
Page 1893
Page 1894
Page 1895
Page 1896
Page 1897
Page 1898
Page 1899
Page 1900
Page 1901
Page 1902
Page 1903
Page 1904
Page 1905
Page 1906
Page 1907
Page 1908
Page 1909
Page 1910
Page 1911
Page 1912
Page 1913
Page 1914
Page 1915
Page 1916
Page 1917
Page 1918
Page 1919
Page 1920
Page 1921
Page 1922
Page 1923
Page 1924
Page 1925
Page 1926
Page 1927
Page 1928
Page 1929
Page 1930
Page 1931
Page 1932
Page 1933
Page 1934
Page 1935
Page 1936
Page 1937
Page 1938
Page 1939
Page 1940
Page 1941
Page 1942
Page 1943
Page 1944
Page 1945
Page 1946
Page 1947
Page 1948
Page 1949
Page 1950
Page 1951
Page 1952
Page 1953
Page 1954
Page 1955
Page 1956
Page 1957
Page 1958
Page 1959
Page 1960
Page 1961
Page 1962
Page 1963
Page 1964
Page 1965
Page 1966
Page 1967
Page 1968
Page 1969
Page 1970
Page 1971
Page 1972
Page 1973
Page 1974
Page 1975
Page 1976
Page 1977
Page 1978
Page 1979
Page 1980
Page 1981
Page 1982
Page 1983
Page 1984
Page 1985
Page 1986
Page 1987
Page 1988
Page 1989
Page 1990
Page 1991
Page 1992
Page 1993
Page 1994
Page 1995
Page 1996
Page 1997
Page 1998
Page 1999
Page 2000
Page 2001
Page 2002
Page 2003
Page 2004
Page 2005
Page 2006
Page 2007
Page 2008
Page 2009
Page 2010
Page 2011
Page 2012
Page 2013
Page 2014
Page 2015
Page 2016
Page 2017
Page 2018
Page 2019
Page 2020
Page 2021
Page 2022
Page 2023
Page 2024
Page 2025
Page 2026
Page 2027
Page 2028
Page 2029
Page 2030
Page 2031
Page 2032
Page 2033
Page 2034
Page 2035
Page 2036
Page 2037
Page 2038
Page 2039
Page 2040
Page 2041
Page 2042
Page 2043
Page 2044
Page 2045
Page 2046
Page 2047
Page 2048
Page 2049
Page 2050
Page 2051
Page 2052
Page 2053
Page 2054
Page 2055
Page 2056
Page 2057
Page 2058
Page 2059
Page 2060
Page 2061
List of Civil Engineers
SL.NO. ID No. Date of Birth Name, Dist,Qualification and Date
of Joining
Place of Posting Field of Training &Duration
Country Inspection Comments
1 1-0335 24.01.54 Mr. Korban Ali,Kushtia,B.Sc.Engg. (Civil)22.11.79 (AE) 04.02.86(SDE) 04.02.98(XEN) 08.04.09 (SE, rev.) 11.08.09 (SE)
Addl CE (Incharge), Civil Works, PDB,Dhaka. (freedomfighter)
1) Training on Span-typeP.C. Pole ManufacturingPlant from 22.12.85 to21.03.86
China 1) Tower Test from30.05.2000 for 07 days China 2) Steel Structure DesignSanction From 07.03.03 for 10Days In China 3) Conceptual DesignApproval Sylhet 90MW CCPP(2nd Unit) for 10 days inChina,2005. 4) Power Station DesignMeetting, 1997 for 07 days i 5) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject for 08(Eight) days inChina. 6)Travel India in Sep./2011for 05 (five) days (excludingtravel time) to reviewConceptual Drawing ofFeasibility Report in orderto build 2*660 MW PowerPlant in Khulna.
Page 2062
2 1-0392 06.01.57 Mr. A.T.M Zahirul IslamMojumder, Khagrachari
B.Sc.Engg. (Civil.),09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE)
SE O & M Circle, PDB,Sylhet. Addl. Charge (CE,Distribution Zone,Sylhet) Project Director(SE)
Faridpur 50 MW &Gopalgonj 100MWPacking PlantConstruction Project PDB, Dhaka.
I) Project ManagementFrom 18.08.97 to 19.09.97 2)International Curse onHydro Power From28.08.2000 to14.09.2000 3)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 To one Month 4) Approval of EngineeringData & Drawing from07.06.09 to 16.06.09 for 07days.
Sweden
Norway
Russia,
China
1)23.09.94 to 28.11.94 inIndia, 2) Inspection on Approvalof Engineering Data &Drawing June/09 for 07 daysin China. 3) Inspection on Coal FiredPower Station fromInspection on Coal FiredPower Station from 19.01.10to 26.01. 10 in China. 4) Factory Witness Test(Engineeing Inspection)against Faridpur 50MWPeaking Power PlantConstruction Project fromOctober/10 for 08 days inNorway. 5) “Factory Test Witness forBalance'' (For Balance ofPlant” in India andIndonesia & For EmergencyDiesel Generator inSingapore) againstGopalgonj 100MW andFaridpur 50 MW PeakingPower Plant ConstructionProject for 07 days in Indiaand Indonesia.
3 1-0396 31.07.54 Mr. Md. Abdul LatifKhan, Dhaka,B.Sc.Engg. (Civil)09.03.81 (AE) 06.08.86(SDE) 28.09.99(XEN) 19.12.10 (SE, Reve.) 08.02.11 (SE)
SE,
Chittagong & Khulna1300x2 MW CoalBased Power PlnatConstruction Project,PDB, Dhaka. (Freedomfighter)
1) 28.8.2001 for 12 days India
Page 2063
4 1-0569 09.04.59 Mr. ChowdhuryNuruzzamanBograB.Sc.Engg. (Civil.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN)
Director (Incharge),
Dte. of Design &Inspection -3,
PDB, Dhaka.
1) Engineering Data &Drawing Sanction From17.10.03 for 10 Days In China 2) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan from 28.07.10 to11.08.10 for 15 days in China.
3) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11. 4) Technical Orientationagainst Construction ofPower Plant on 16th Floor ofBiddyut Bhaban in July/2011for 07 days in China.
5 1-0581 05.12.60 Mr. Habibur RahmanNatoreB.Sc.Engg. (Civil.)09.10.84(AE) 28.04.94(SDE) 25.06.03(XEN)
Deputy Director(XEN), Dte. of Design &Inspection -3,
PDB, Dhaka.
1) Training on Hydro PowerDevelopmen from 19871988fro 10 Months
Norway 1) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari50MW Peaking PowerConstruction Project from09.08.10 to 18.08.10 for 10 for07 days in China.
6 1-0627 12.11.60 Mr. A.B.M. AnowarulAzim, Dinajpur,
B.Sc.Engr.(Civil.),
26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)
Asstt. CE (XEN) Distribution Project,PDB, Dhaka.
1)Hydro Power and theEnviournment From26.8.02to12.9.02
Norway 1)Training on 60 Nos.-11KVAuto Cerceuit Recloser (ACR)in South Korea in 2006 for07 Days.
On lien inCanada
7 1-0523 31.01.55 Mr. Krishna Kanta Roy, Kishoregonj
B.Sc.Engr.(Civil),
09.3.81(AE) 19.05.86(SDE) 11.04.04(XEN)
XEN, Shirajganj ElectricSupply, PDB,Shirajganj.
Page 2064
8 1-0682 05.07.59 Mr. Md. DelshadHossain Feni,
B.Sc.Engr.(Civil.),
30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN)
Deputy Director(XEN), Dte. Of Design &Inspection-3, PDB, Dhaka.
1) 14 Meter Steel Pole (450daN: 130 Nos. & 550 daN: 70Nos) "Proof Test" from22.04.08 to 28.04.08 for 07days.
China 1) Basic Design Reviewagainst Thohazari 100MWPower Station ConstructionProject from October/10 for07 days in China.
9 1-0742 01.09.63 Mr. Md. MahbuburRahaman, Shariatpur, B.Sc.Engr.(Civil.),
30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN)
Astt. CE (XEN),
Generation, BPDB,Dhaka.
1) Completed M.sc.Engineering (Hydro PowerDevelopment ) From 23.08.93 to 30.06.95 2)Traning On Planning &Design of PS Against 210MW. Siddhirgong from01.09.04 to 29.09.04 inRussia 3) Training on ContractAdministration from20.07.10 to 08.08.10 inJapan
Norway
Russia,
Japan
1) Finalization of conceptDesign of Haripur 360MWCCPP from 11.11.09 to28.11.09 in Newzealand. 2) To travel India for 05(five) days (excluding traveltime) to review ConceptualDrawing of FeasibilityReport in order to build2*660 MW Power Plant inKhulna. 3)In order to attend adiscussion meeting withPresident, M/s. ChinaHuadian Hongkong Co. Ltd.,China and to inspect Coalbased Power Station ofChina Huadian HongkongCo. Ltd., China from21/11/2011 to 25/11/2011 for5 (five) days (excludingtravel time) in China.
G.O. issueddated22.02.2012against theconvention on"InvestmentOppertunitiesinBangladeshiPower Sector"in India from26.02.2012 to01.03.2012.
10 1-0759 16.01.61 Mr. Md. Abul KalamAzad, Rangpur, B.Sc.Engr.(Civil.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
XEN
PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.
1) Hydro Electric PowerEngineering for Stable &Sustainable Supply , JicaJapan 04.06.06 to 12.07.06for 39 days
Japan. 1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China.
Page 2065
11 1-0790 02.01.62 Mr. Abdullah Noman,Comilla,B.Sc.Engr.(Civil.),
30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, CurrentCharge) 23.04.09 (XEN)
XEN,
Civil ConstructionDivision-1,PDB,Dhaka.
1) Basic EngineeringDrawing against Chandpur150MW Combined CyclePower Station ConstructionProject from 28.07.10 to11.08.10 for 15 days inChina.
12 1-0810 16.09.54 Mr. Md. Golam MostafaShekh, Bagherhat,B.Sc.Engr.(Civil.)08.02.87(AE) 21.11.99 (SDE) 17.09.09(XEN)
XEN, Civil Maintenance,Khulna Power Station
PDB, Khulna. (freedomfighter)
1)Training on PGD ON HPDSpecialist from 24.08.1989to 23.06.1990
2) Group Hydro ElectricPower Engineering forStable & SustainableSupply , Jica Japan 04.06.06to 12.07.06, 39 days
Norway
Japan
13 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, CurrentCharge) 23.04.09 (XEN)
XEN, Civil Works Division PDB,Chittagong.
1) Inspection (EmergencyDiesel Generator) againstGopalgonj 100MW PeakingPower Plant ConstructionProject November/10 for 07days in Singapore.
14 1-0889 01.01.60 Mr. Md. Reajul Islam,Rajbari,AMIE(Civil.),30.08.86(SAE) 10.09.89 (AE) 18.06.2000(SDE) 10.02.09 (XEN, In-charge), 08.02.11 (XEN)
XEN, Engineering Academy
PDB, Kaptai.
1) Inspection on H.T.S WireFrom 10.10.02 to 14.10.02 inIndia 2) ''Pre-shipment inspection(Foreign) against ChittagongPC Pole Construction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) days inChina.
Page 2066
15 1-0955 20.10.65 Mr. S.M.A. Azim ,Chittagong,B.Sc.Engr.(Civil),04.12.91(AE) 12.07.02(SDE) 10.02.10 (Rev. XEN),
XEN
PC Pole ConstructionPlant PDB,Halishahar,Chittagong
1) Witnessing the test &Inspection of High tensilesteel (HTS) wire from23.02.10 to 01.03.10 for 07days in China. 2) ''Pre-shipment inspection(Foreign) against ChittagongPC Pole Construction Plant aSupply of 8mm dia & 9mmdia H.T.S Wire at P.C. inMay/2011 for 10(Ten) days inChina.
16 1-0994 12.01.66 Mr. Md. Samsul Alam,Dhaka,B.Sc.Engr.(Civil.),19.07.94 (AE) 03-02-2003 (SDE) 24-08-09 (XEN, Incharge)
18-08-11 (XEN)
Dy. Director (XEN),
5-6 Unit, GhorasalPower Plant PDB,Palash,Narsingdhi.
1) Training on Gas TurbineAgainst Tongi 80MW From24.07.04 to 22.08.07 for OneMonth (Bond for 03 Years)
China From 09.05.99 to 15.05.99 InChina 2) 1) Pre-inspection (Factoryvisit at site) againstChittagong Power Station1No Unit (Turbine, Boiler,Electrical, I & C & Operation)from 13.09.10 to 20.09.10 for08 days in China.
17 1-0995 10.11.68 Mr. Md. Kamrul Islam, Noakhali, B.Sc.Engr.(Civil.),
19.07.94(AE) 03.02.03(SDE) 11.10.10 (XEN, Rev.) 18-08-11 (XEN)
XEN,
Gopalgonj 100MWPeaking Power PlantConstruction Project,PDB, Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04for One Month
Russia, 1) Inspection on Alternatoragainst Gopalgonj 100MWPeaking Power PlantConstruction Project from10.02.11 to 16.02.11 for 07days in Germany. 2) “Factory Test Witness forBalance'' (For Balance ofPlant” in India andIndonesia & For EmergencyDiesel Generator inSingapore) againstGopalgonj 100MW andFaridpur 50 MW PeakingPower Plant ConstructionProject for 07 days in Indiaand Indonesia.
Page 2067
18 1-0999 18.12.66 Mr. Dewan Md. FazlulKarim, Gazipur,B.Sc.Engr.(Civil.),19.07.94(AE) 03-02-2003 (SDE) 24-08-09 (XEN, Incharge)
Dy. Director (XEN), Design andInspection -3
PDB,Dhaka
Generator (Electrical)against Karnaphuly HydroPower Plant (Unit-3)Rehabilitation Project for30 days
Italy 1) H T S (High Tensile SteelWire) from 06.09.06 to 15.09.06 for10 days in India. 2) Chandpur 150MWCombined Cycle PowerStation Construction Project,a Training Program named"Detailed Design ReviewMeeting" from 20.01.11 to31.01.11 for 12(Twelve) daysin China.
G.O. Issued dt.17.09.09 onGenerator(Electrical)againstKarnaphulyHydro PowerPlant (Unit-3)Rehabilitation Project for 30days in Italy
19 1-01192 01.01.67 Mr. A.T.M. Abduzzaher, Comilla, B.Sc.Engr.(Civil.),
19.03.98(AE) 27.04.04(SDE). 06.05.10 (XEN, Incharge)
Plant Engineer(XEN)(Incharge)Karnaphuly HydroPower Plant PDB, Kaptai,Rangamati.
1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.
20 1-01282 31.12.74 Miss Khaleda YasribaLima, Jhenaidah, B.Sc.Engr.(Civil.),
24.06.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge)
XEN(Incharge), office of the CE,Distribution northernzone, pdb, Rajshahi.
1) Training for TechnicalKnow-how & TechnologyTransfer from 29.06.06 to06.06.06 in India.
postedagainst vacantpost
21 1-01369 20.06.74 Mr. Haradhan ChandraDatta, Comilla, B.Sc.Engr.(Civil.),
05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge)
XEN(Incharge), Civil Chittagong powerstation, PDB, Chittagong.
1) Basic Design against Bara70MW Peaking Power PlantConstruction Project fromSeptember/10 for 05 days inKoria.
Page 2068
22 1-01373 23.08.72 Mr. MohammadShafiqul Islam, Chittagong, B.Sc.Engr.(Civil.),
05.03.2000 (AE) 25.06.09(SDE) 21.12.11(XEN Incharge)
Dy. Director,XEN(Incharge), Directorate of Design& Inspection-3 PDB, Dhaka.
1) International TrainingProgramme on Solar EnergyTechnologies andApplications from14/11/2011 to 03/12/2011for 3 (three) weeks(excluding travel time)
India. 1) 2002 in India 2)Training on 11 Meter SteelPole (350 daN-500 Nos.) from07 days March/08 in China 2) “Technical Orientationand Quality Test Witness of11KV PT ” from January/10 for05 days in China. 3) Solar Power Plant "TestWitness" from October/10for 07 days in China. 4) Travel India inSept./2011for 05 (five) days(excluding travel time) toreview Conceptual Drawingof Feasibility Report inorder to build 2*660 MWPower Plant in Khulna.
23 1-01448 01.01.70 Mr. Hirendra ChandraPaul , Shunamgong, B.Sc.Engr.(Civil.),
05.03.2000(AE) 08.12.09(SDE)
SDE, Civil ConstructionDivision-1 PDB, Dhaka.
Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject for 08(Eight) days inChina.
24 1-01529 16.12.74 Mr. Noore AlamSiddique, Pabna, B.Sc.Engr.(Civil.),
29.04.2001(AE)
SDE, Design andInspection-3 PDB, Dhaka.
Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07(Seven) daysin China.
25 1-01556 01.06.55 Mr. Hazrat Ali Mia, Tangail, Diploma(Civil.),
31.12.77(SAE),
01.09.02(AE), 28.01.10 (SDE, reve.)
SDE, Distribution Division,PDB, Tangail.
Page 2069
26 1-01588 04.01.57 Mr. S M Nazrul Islam Barisal Diploma(Civil),
21.08.78(SAE),
27.03.03(AE), 10.02.10(SDE)
SDE, Bhola Diesel PowerStation PDB, Bhola.
27 1-01599 11.04.58 Mr. Md. Azizul Haque Noyakhali Diploma(Civil),
21.08.78(SAE),
20.11.03(AE), 10.02.10(SDE)
SDE, Zonal CivilConstruction Division
PDB, Chittagong.
1) Basic Design Reviewagainst Dohazari 100MWPower Station ConstructionProject from October/10 for07 days in China.
28 1-01425 01.01.75 Mrs. Monalisa Akter, Pabna, B.Sc.Engr.(Civil.),
12.03.2000(AE) 25.06.09(SDE)
SDE, Faridpur 50 MWPeaking PowerStation ConstructionProject, Dhaka.
Improved Maintenance ofThermal Power Plants.Fro17.03.2003 to 21.03.2003
Malaysia, 1) Inspection againstFaridpur 50MW PeakingPower Plant ConstructionProject for 07 days inIndonesia. 2) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11.
Page 2070
29 1-01433 20.10.69 Mr. Ajit Kumer Mondol, Jessore, B.Sc.Engr.(Civil.),
12.03.2000(AE) 25.06.09(SDE
SDE, Unit-2, Khulna PowerStation, PDB, Khulna.
1) G.O. Issueddt. 12.05.11 onSupplying of6mm dia 1000Quintal, 7mmdia 1000Quintal, 8mmdia 600Quintal &9mm Dia 1400Quintal HighTensileSteel(HTS)Wire, ''Pre-shipmentinspection(Foreign)”againstChittagong PCPoleConstructionPlant, BPDB,Halishahar,Chittagongfrom for 10 (Ten)working daysfrom the dateof actualjourney inChina.
30 11-0075 01.10.56 Mr. Md. Nur Alam Dinajpur Diploma(Civil )
21.08.78(SAE),
06.04.06 (AE) 18.08.2011 (SDE)
SDE, Sales andDistribution Division-2, PDB, Dinajpur.
Page 2071
31 11-0100 10.03.58 Mr.Fazlul HoqueMollah Comilla Diploma(Civil)
15.05.79 (SAE),
06.04.06 (AE) 18.08.2011 (SDE)
SDE, Sylhet 150 MW CCPPProject,Kumargaon,PDB,Sylhet.
1) ''Factory Training"against Sylhet 150 MWCombined Cycle PowerPlant Construction Project,BPDB from 10.07.2011 to09.08.2011 for 30 (thirty)days (Excluding traveltime). (Bond For 5 years)
China 1) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan 28.07.10 to11.08.10 for 15 days in China
32 11-0114 01.01.58 Mr. Md. Fazlur RahmanKhan Sherpur Diploma(Civil )
28.05.79(SAE),
06.04.06 (AE) 18.08.2011 (SDE)
SDE, Office of the CE, CivilWorks PDB, Dhaka.
1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.
33 1-01678 17.11.77 Mr.Shah KhalidMahmud Chowdhury Noagaon B.Sc.Eng(Civil) 06.2006(AE) 18.08.2011 (SDE)
SDE, Sales & DistributionDivision-2, PDB,Rajshahi
1) Technical Orientation andQuality Witness aganistCentral Zone PowerDistribution Project atApril/2011 for 07 days inChina.
34 1-01687 01.01.75 Mr. Md .Monjurul Alam Sirajgong B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)
SDE Deputed to CE Office,Civil works for nextreplacement.
1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.
35 1-01692 01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)
SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.
1) ''Managing Fuel forReliable Power Generation''from 13.12.10 to 15.12.10 inIndia. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07(Seven) daysin China.
Page 2072
36 1-01694 23.01.76 Mr.M.Arifur RahmanKhan Manikgonj B.Sc.Eng(Civil) 07.06.2006(AE) 27.12.2011(SDE)
SDE Deputed to ChiefEngineer office, Civilworks PDB,Dhaka for nextreplacement
1) International TrainingProgramme on Solar EnergyTechnologies andApplications from 14-11-2011 to 03-12-2011 for 03(three) weeks
India 1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China.
37 1-01726 01.01.79 Mr. Joshim Ahamed Netrokona B.Sc.Eng(Civil) 07.04.06 (AE) 27.12.2011(SDE)
SDE, Civil ConstructionDivision-1, PDB, Dhaka
1) "Work Shop Test" forDohazari 100MW PeakingPower Plant ConstructionProject from January/11 for07(Seven) days in China.
38 11-0074 04.08.56 Mr. Md. Abdul LatifSiddiqui Tangail Diploma(Civil )
21.08.78(SAE),
06.04.06(AE),
AE, Distribution Division PDB, Tangail.
39 11-0170 01.10.55 Mr. Sams Uddin Jamalpur, Diploma(Civil),
06.06.79(SAE),
23.04.09(AE)
AE, Central ZoneDistribution Project Division-1, PDB,Mymensing.
40 11-0260 06.03.55 Mr. Md. Golam Rabbani
Bogra, Diploma (Civil)
07.08.80(SAE),
17.09.09(AE)
AE, Chittagong PowerStation PDB, Chittagong.
1) Pre-inspection (Factoryvisit at site) againstChittagong Power Station1No Unit (Turbine, Boiler,Electrical, I & C & Operation)from 13.09.10 to 20.09.10 for08 days in China.
41 11-0261 11.08.59 Mr. Md. Zillur RahmanTalukder Bogra, Diploma (Civil)
07.08.80(SAE),
17.09.09(AE)
AE, Santahar E/S PDB, Bagura.
Page 2073
42 11-0264 01.01.59 Mrs. Taybun Nesa Noakhali, Diploma (Civil)
23.10.80(SAE),
17.09.09(AE)
AE, Engineering Academy
PDB, Kaptai.
43 1-01763 01.11.83 Mr. Md. Hasan Zaman Bogra, B.Sc.Engr(Civil) 31.05.09 (AE)
AE Shantahar 50 MW &Katakhali 50 MWPeaking Power PlantConstruction Project,BPDB, Rajshahi.
G.O. issueddated06.02.2012againstSantahar 50MW andKatakhali 50MW PeakingPower PlantConstructionProject inorder toinspect Step-upTransformerfor 7 days(excludingtravel time)from the dateof actualjourney inChina.
44 11-0288 01.07.57 Mr. Mir Md.Quasem, Cox'bazar Diploma(Civil) 24.07.81(SAE) 22.04.10(AE)
AE, Zonal CivilConstruction Division PDB, Chittagong.
45 11-0294 31.03.56 Mr. Kazi Nazrul Islam, Narsingdhi Diploma(Civil) 12.09.81(SAE) 22.04.10(AE)
AE, Ghorasal PowerStation PDB, Palash,Narsingdhi.
Page 2074
46 11-0335 01.01.61 Mr.Md. Abul Bashar Sirajgonj, B.Sc.Eng(Civil) 13.08.82 (SAE) 22.04.10(AE)
AE 10-town E/S systemDevelopment Project,PDB, Bagura.
47 11-0349 10.02.59 Mr.Md. Abdul Munaf Comilla. Diploma(Civil) 03.08.82 (SAE) 22.04.10(AE)
AE, Sales & DistributionDivision-2 PDB, Comilla.
48 11-0352 16.10.57 Mr. Md. Nazrul Islam Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE)
AE, Civil Construction-2 PDB,Dhaka.
49 11-0360 25.10.56 Mr. Md. Rafiqual Islam Sirajgonj Diploma(Civil) 09.08.82 (SAE) 22.04.10 (AE)
AE, 210 M. W. SiddirgonjPower Station PDB, Narayangonj.
50 11-0374 24.07.55 Mr. Md. Shahjahan Ali,
Chapainababgonj
Diploma(Civil),
23.08.82(SAE), 22.04.10(AE),
AE, Distribution Division
PDB, Rangpur.
51 11-0375 01.01.59 Mr. Md. Abdur Rab,
Comilla
Diploma(Civil),
10.09.82(SAE), 22.04.10(AE),
AE, Hathazari 100MWPower StationConstruction Project PDB,Chittagong
1) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina.
52 1-01868 25.11.85 Engineering Academy AE, Civil ConstructionDivision-1, PDB, Dhaka
Page 2075
53 - - PDB, Kaptai. AE, PC Pole ConstructionFactory, PDB, Aricha,Manikgonj.
54 - - Mr. Mohammad HasanMahmood Dhaka B.Sc. Engg. (Civil) 02.10.2011 (AE) 01726188536
AE, Design & Inspection-3, PDB, Dhaka
List of Architect
SL.NO. ID No. Date of Birth Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
Page 2076
1 1-01803 18.06.84 Mr. ShamarukhMoutushi Dhaka. B.Sc.Engr(Architect) 31.05.09 (AE)
AE, Dte. Of Design &Inspection-3 PDB, Dhaka.
PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11.
2 1-01863 10.09.80 Mrs. Anina Ferdouslinda Mymensingh B.Sc. Engg. (Archi.) 04.11.10 (AE) 01675639727
AE Office of CE civilworks, PDB, Dhaka.
3 1-01864 13.02.82 Ms. Farhana Akhter Dhaka B.Sc. Engg. (Archi.) 04.11.10 (AE) 01818607385
AE Design & Inspection-3, PDB, Dhaka.
4 - - Mrs. Pratiti Chakma Rangamati B.Sc. Engg. (Arch.) 02.10.2011 (AE) 01816365856 [email protected]
AE, Civil ConstructionDivision-1, PDB, Dhaka
Page 2077
P&D 2003 04.05.10
Page 2078
Dhaka P G 2004 13.01.11
P&D 2001 30.12.10
Page 2079
P&D 2003 02.06.10
P&D
2002 24.02.08
B-Baria D 01.01.10
Page 2080
P&D
Siddirgonj G 2004 05.06.10
P&D 13.11.08
Page 2081
P&D 17.09.09
Khulna G 1990 03.08.10
P&D 22.06.10
P&D 2002 08.02.11
Page 2082
P&D 10.02.10
Ghorasal G 1999 14.03.10
Faridpur G 2004 22.04.10
Page 2083
P&D 11.10.10
Kaptai G 06.05.10
Rajshahi D
P&D 10.02.10
Page 2084
P&D 2002 10.02.10
P&D 16.07.09
F 15.05.08
P&D Diploma 28.01.10
Page 2085
Barisal G Diploma 10.02.10
P&D Diploma 02.06.10
Project G 25.06.09
Page 2086
Khulna G 01.01.10
Dinajpur D 02.06.10
Page 2087
Sylhet P G 02.06.10
P&D 16.01.08
Rajshahi D 18.03.08
P&D 16.06.10
P&D 20.12.10
Page 2088
P&D 10.11.08
P&D 13.11.08
Tangail D 02.06.10
Mymensingh
D
Chittagong G
Noagoan D
Page 2089
M.Am
D 02.06.10
Ghorasal D 02.06.10
Page 2090
P&D 02.06.10
Comilla D 02.06.10
P&D 02.06.10
Siddirgonj G 02.06.10
Rangpur D 02.06.10
G 02.06.10
Page 2091
Page 2092
P&D 02.06.10
Page 2093
Page 2094
Page 2095
Page 2096
Page 2097
Page 2098
Page 2099
Page 2100
Page 2101
Page 2102
Page 2103
Page 2104
Page 2105
Page 2106
Page 2107
Page 2108
Page 2109
Page 2110
Page 2111
Page 2112
Page 2113
Page 2114
Page 2115
Page 2116
Page 2117
Page 2118
Page 2119
Page 2120
Page 2121
Page 2122
Page 2123
Page 2124
Page 2125
Page 2126
Page 2127
Page 2128
Page 2129
Page 2130
Page 2131
Page 2132
Page 2133
Page 2134
Page 2135
Page 2136
Page 2137
Page 2138
Page 2139
Page 2140
Page 2141
Page 2142
Page 2143
Page 2144
Page 2145
Page 2146
Page 2147
Page 2148
Page 2149
Page 2150
Page 2151
Page 2152
Page 2153
Page 2154
Page 2155
Page 2156
Page 2157
Page 2158
Page 2159
Page 2160
Page 2161
Page 2162
Page 2163
Page 2164
Page 2165
Page 2166
Page 2167
Page 2168
Page 2169
Page 2170
Page 2171
Page 2172
Page 2173
Page 2174
Page 2175
Page 2176
Page 2177
Page 2178
Page 2179
Page 2180
Page 2181
Page 2182
Page 2183
Page 2184
Page 2185
Page 2186
Page 2187
Page 2188
Page 2189
Page 2190
Page 2191
Page 2192
Page 2193
Page 2194
Page 2195
Page 2196
Page 2197
Page 2198
Page 2199
Page 2200
Page 2201
Page 2202
Page 2203
Page 2204
Page 2205
Page 2206
Page 2207
Page 2208
Page 2209
Page 2210
Page 2211
Page 2212
Page 2213
Page 2214
Page 2215
Page 2216
Page 2217
Page 2218
Page 2219
Page 2220
Page 2221
Page 2222
Page 2223
Page 2224
Page 2225
Page 2226
Page 2227
Page 2228
Page 2229
Page 2230
Page 2231
Page 2232
Page 2233
Page 2234
Page 2235
Page 2236
Page 2237
Page 2238
Page 2239
Page 2240
Page 2241
Page 2242
Page 2243
Page 2244
Page 2245
Page 2246
Page 2247
Page 2248
Page 2249
Page 2250
Page 2251
Page 2252
Page 2253
Page 2254
Page 2255
Page 2256
Page 2257
Page 2258
Page 2259
Page 2260
Page 2261
Page 2262
Page 2263
Page 2264
Page 2265
Page 2266
Page 2267
Page 2268
Page 2269
Page 2270
Page 2271
Page 2272
Page 2273
Page 2274
Page 2275
Page 2276
Page 2277
Page 2278
Page 2279
Page 2280
Page 2281
Page 2282
Page 2283
Page 2284
Page 2285
Page 2286
Page 2287
Page 2288
Page 2289
Page 2290
Page 2291
Page 2292
Page 2293
Page 2294
Page 2295
Page 2296
Page 2297
Page 2298
Page 2299
Page 2300
Page 2301
Page 2302
Page 2303
Page 2304
Page 2305
Page 2306
Page 2307
Page 2308
Page 2309
Page 2310
Page 2311
Page 2312
Page 2313
Page 2314
Page 2315
Page 2316
Page 2317
Page 2318
Page 2319
Page 2320
Page 2321
Page 2322
Page 2323
Page 2324
Page 2325
Page 2326
Page 2327
Page 2328
Page 2329
Page 2330
Page 2331
Page 2332
Page 2333
Diploma
Page 2334
Diploma
Diploma
LPR2 11-0076 01.06.56 Mr. Md. Abul Hasam
Feni Diploma(Mech. )
21.08.78 (SAE), 06.12.06 (AE) 18.08.2011 (SDE) 02.03.14 (XEN, Incharge)
DD (Incharge), RTC PDB, Chittagong
Chittagong
1 1-0426 09.07.56 Mr. Kajal Kanti Chowdhury,
Chittagong,
B.Sc. Engg. (Mech.)
24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 05-10-11 (SE)
Addl. CE (Incharge) Services, PDB, Dhaka.
1) Operation & Maintenanceof Turbine. 20.11.88 to19.07.89 2) Training Gater 1132/33KVSub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear,33/11KV Sub-station &Control Panel & ProtectionEquipment AgainstChittagong PowerDistribution Project ''Design& Maintenance of 33/33KVSub-Station'' 10.07.07 to24.08.07 for 42 days.
Germany
China
1) from 07.3.2000 for 10 days India 2) on Engine & Generator TestWitness against Thohazari 100MWPower Station Construction Project PDB, Chittagong from November/10for 10 days in Italy & Finland. 3) Factrory acceptance test from05.08.14 to 14.08.14 in Singapore.
A proposalsent toministrydated05.05.15 forfactory testwitnessagainstShahjibazar330 MW CCPPProject from27.05.15 to02.06.15 inSpain.
1 1-0347 22.06.56 Mr. Mustak Ahmed,Bagerhat,B.Sc.Engg. (Elec.)18.03.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 03-08-10 (SE) 28.06.12 (Addl. CE, Incharge) 30.06.14 (CE) .05.2015 (Member)
Member Generation, PDB, Dhaka
1) A Program named " RenewableEnergy Korea 2011" organized byKOTRA, Dhaka from 19.10.2011 to22.10.2011 in South Korea. 2) "Technical Orientation & QualityTest Witness" on Portable MeterTesting Set from 25.05.13 to 31.05.13in Bulgeria. 3) Quarterly Reconciliation(October/13 to December/13) from18.03.14 to 21.03.14 in India.
1 1-0320 18.07.56 Mr. Md. Shahinul IslamKhan, Gazipur,
B.Sc.Engg. (Elec.)
28.06.79 (AE) 19.01.96 (XEN) 08.04.09 (SE) 31-07-12 (Addl. CE) 31.03.14 (CE) 12.06.2014 (Member) 01.01.2015(Chairman)
Chairman, PDB, Dhaka.
1) Electric Power Distributionsystem Management from26.08.96 to 02.11.96 2) "Renewable Energy" from01.06.13 to 30.06.13
Japan
Thailand
1) Inspection and Factory testwitness from 25.07.96 to 02.11.96, 11days In Czech Republic 2) Factory test witness of 33KV 1250Amps Vacuum Circuit Breaker From10.11.03 to 16.11.03, 07 Days in India 3)Training for Technical know-howand Tecnology Transfer aginst HighVacuum Insulating Oil Purifier (2000)Litre/hr Centrifusing Machine)-05Sets. From 20.01.07 to 27.01.07 for 07days in China See. N.B.
1) Aproposalsent toministrydated07.06.15 forwitnessingofmanufacturing processagainstRangpur P/Sfrom25.06.15 to01.07.15 inNetherlands. 2) Aproposalsent toministrydated22.03.15 forwitnessingofmanufacturing processagainstBarishal GTP/S from16.04.15 to22.04.15 inFrance. 3) Aproposalsent toministrydated02.06.15 forInspectionof Power,Oil, Gas &Petro-ChemicalHub &Infrastructure at JurongIsland,Singaporefrom02.07.15 to06.07.15 inSingapore.
N.B. 4) Supply for 11KV Capacitor Bank aganist "Technical Orientation and Quality Test Witness" in April/2011 for 01(One) Week in Turkey & USA. 5) Witnessing of Supply, Installation, Testing & Commissioning of Excitation System against Shiddirganj P/S from 07.12.2014 to 16.12.14 Russia. 6) witnessing of manufacturing process against Bheramara Power Plant from 24.12.2014 for 07 days in USA. 7) Participate in meeting and inspection of Ultra Supercritical Coal Based Power Plant from 21.01.15 to 22.01.15 in China. 8) Seminar on Regional Power Pool Stablishment from 24.01.15 to 26.01.15 in SriLanka
2 1-0916 25.02.56 Mr. Shah Alam,Dhaka,B.Sc.Engr.(Mech.),08.2.87(AE) 13.12.2000 (SDE) 10.02.10 (XEN)
Deputy Director (XEN) Training, PDB, Dhaka.
Pre-Shipment of Transformer From13.09.01 to 24.09.01 in China
1 1-0639 23.03.56 Mr. A.J.M. Lutfe Rabbani,
Pirojpur, B.Sc.Engr.(Elec.),
12.08.85(AE) 17.06.95(SDE) 11.04.04(XEN) 01755582480 [email protected]
Director (Incharge) Electrical Equipment PDB,Dhaka.
i)132Kv and 33KV ControlSignalling and RelayPannel(RRAGS) from 08.10.03to 08.01.04
ii) Training AutomationSystem from 22.10.07 to11.11.07 for (Weeks)
China,
Russia
1)Inspection from 05.09.99 for 07 daysin India. 2)Inspection from 24.4.02 to 3.5.02 inIndia 3) Factory Acceptance Test andTransfer of Technical Know-how ofExcitation System from 13.10.07 to19.10.07, 07 days in India & Germany .
4) "Factory Acceptance Test ofMetering System of 52.2 MW PowerGeneration Facility Rajshahi " on14.10.2013 in India. 5) Technical orientation & Qualitytest witness of 11 KV switchgearCubicles Set from 21.07.14 to 27.07.14in China.
1 1-0588 03.05.56 Mr. Md. Shafique Uddin,
Dhaka, B.Sc.Engr(Mech.), 09.10.84 (AE) 28.04.94(SDE) 30.10.03(XEN) 01.10.14 (SE)
Director (SE), Renewable Energy andResearche & PlanningDevelopment Project,PDB, Dhaka .
1)132KV SF6 CircuitBreaker(Live Tank) UnderRRAGS Project,From 04.3.01 to 19.05.01 2) 71MW Gas Turbine PowerStation Against RetrofittingOn-Line Machinery &Management SystemSoftware. From 18.06.07 to23.06.07, 06 (Six Days). 3) "Renewable Energy" from01.06.13 to 30.06.13
China
AbuDhabi
Thailand
1) "Technical Orientation & QualityTest Witness" from 10.11.09 to17.11.09 in China. 2) "Technical Orientation and QualityTest Witness" in order to purchase2000 Nos. 11/0.11KV P.T from25.01.2012 to 31.01.2012 for 7 days(excluding travel time) in China. 3) A workship program "Renewableenergy resource Assesment &Geospatial Analysis" from 04.04.13 to05.04.13 in Thailand. 4) International Solar Energy Expo &Conference from 15.09.14 to 20.09.14in South Korea. 5) Participation in the Seventhmeeting of the Asia Solar Energyfrom 16.10.14 to 17.10.14 in SouthKorea. 6) Participation in the Fifth Sessionof the IRENA Assembly from 17.01.15to 18.01.15 in UAE.
A proposalsent toministrydated18.03.15 forattendingan Event"ClimateChangeProjectPlaza" from08.04.15 to11.04.15 inSouth Korea
A proposalsent toministrydated13.07.14for FactoryAcceptance Test ondesign,supply &installation of 400KW SolarPhotovoltaic Powerplant from15.07.2014for 7 daysin India.
21 1-0481 02.02.56 Mr. Khandaker Iftaker Uddin
DhakaB.Sc.Engg. (Mech.)11.01.82 (AE) 17.03.87(SDE) 26.10.02(XEN) 31.07.12 (SE) 0172-9092626
PD (SE), Conversion of 2x35 MWShahjibazar GT PowerPlant to 105 MW CCPPConstruction Project & CE (Additional Charge) Power PlantConstruction, PDB,Dhaka.
1) Tranining on Transformeroperation and maintenance.09.08.94 to 17.09.94
Belgium 1) Inspection in 1994 10 Days inIndia, 2) Inspection from 18.01.98 to 30.01.9813 Days In Italy & Grice 3) Inspection from 05.10.02 to 10.10.02Indonesia. 4) Engineering Data & DrawingSelection from 22.10.03 to 01.11.03 10Days In China 5) Gas Booster Compressor Programnamed "Factory Witness Test"Against Sylhet 150 MW CombinedCycle Power Plant Constructionproject from 10.05.2011 to 20.05.2011for 10 (ten) days (excluding traveltime ) in USA.
A proposalgoes toministrydated08.04.14named"Steamturbinegeneratortest witnessand generalinspectionof steamturbine"againstBhola PPCPfrom13.05.14 to19.05.14 for 7days inChina.
1 1-0120 27.07.52 Mr. A.S.M. Alamgir Kabir
Faridpur
B.Sc.Engg. (Elec.)
10.01.76(AE) 18.06.85 (XEN) 07.10.2002(SE) 05.04.06(CE Addl. CE) 05.12.06 (CE) 05.011.07 MemberDistribution (Incharge) 12.11.07 (MemberDistribution ) 06.04.09(Chairman Addt.Charge) 22.04.09 (Chairman,Incharge) 22.06.09 (Chairman) 19-07-09 (Chairman,Contract) 26-07-10 (Chairman,Contract) 26.07.11 (Chairman,Contract)
Chairman
PDB, Dhaka.
i)Greater Dhaka Power Dist.Project From 05.11.79 to20.2.80
ii)Electricity Tariff From 6.6.92to 10.12.92
iii) Training on ''Publicprivate partnership stratigiesfor 12 days, August/07"
UK
Japan
USA
i) Inspection for 06 days, June/08 inIndia. ii) GTZ & Kfw 05.07.09 to 12.07.09 inU.K & Germany. iii) 3rd Japan-SAARC EnergySymposium on "Promoting EnergyCooperation in South Asia" from06.01.10 to 14.01.10 in India. iiv) NTPC from 28.08.10 to 29.08.10 inIndia. v) Visit to India from 21.12.10 to24.12.10 vi) Visit to USA from 12.10.10 to24.10.10 vii) Visit to Japan from 01.12.10 to07.12.10 viii) Visit to USA from 15.07.11 to29.07.11 iX) * See N.B.
1) A proposalgoes toministry on07.03.2012 toattend ameetingwithdifferentcompaniesof PowerSector from26.03.2012 to31.03.2012 inUK. (G.O. notyet issued)
iX) N.B. *Meetings-1) "SAARC Chief Commissioner's Meeting from 17.11.09 to 22.11.09 in India. 2) Meeting of SASEC Energy Working Group organized by ADB from 21/10/2011 to 22/10/2011 for 2 (two) days in Thailand. 3) Meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 4) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 5) Meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. 6) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 7) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. * Road Show- 1) Road Show from 13.12.09 to 18.12.09 for 06 days in UK. 2)Road Show to attract the foreign investors from 24.01.10 to 03.02.10 in Singapore & USA * Seminar/Conference-1) 6th Annual Conference FLNG 2011 from 14.06.11 to 16.06.11 in U.K 2) Investor Seminar on "Joint Steering Committee(JSC)" for 4 days in India from 28.02.2012 to 2.3.2012 * Workshop- 1) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA.
1 1-0241 10.11.54 Mr. Md. Abul Quasem,
Dinajpur,
B.Sc.Engg. (Elec.)
23.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 14.08.11 (member, currentcharge) 25.01.12 (member, contactbasis)
Member Company Affairs PDB, Dhaka.
1)Analysis and Protection ofPower System from 31.03.2003to 09.05.2003
England 1) Factory Test Witness of 11 KV.Capacitor Bank & Accessories From07.04.04 To 11.04.04 in India. 2)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina 3) Training Rehabilitation of GT #8of Shahijibazar Power Station from29.11.07 to 05.12.07 for 07 Days, AbuDhabi 4) See N.B.
1) Aproposalsent toministrydated21.11.2012againstShirajganj150 MWPeakingPower PlantConstructionProject from29.11.12 orfrom thedate ofactualjourney inChina. 2) Aproposalsent toministrydated06.02.13againstGhorasal108 MWPower Plantfor testwitness ofmeteringsystem from18.03.13 to22.03.13 inUSA.
* N.B.- 4)Inspection on Power Plant arrange by Khulna Power Company & Summit Power Company from 10.06.10 to 12.06.10 in Italy 5) Participation in Combined Working Commette Group for 22.06.10 in India. 6) NTPC from 28.08.10 to 29.08.10 in India. 7) Zij R¡vjvbxwfwËK we`yy¨r †K›`ªmg~‡n R¡vjvbx mieivn wbiew”Qbœ I wbwe©Nœ ivLvi j‡¶¨ fviZ †_‡K †jv‡Kv‡gvwUf I U¨vsK IqvMY fvov/jxR MÖnY cÖm‡½ AvMvgx †g, 2011gv‡mi wØZxq mßv‡n A_ev hvÎvïiæi ZvwiL n‡Z 07 (mvZ) w`‡bi Rb¨ fviZ| 8) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excluding travel time) in South Korea. 9) Travel India from 25.09.2011 to 29.09.2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plant
in Khulna. 10) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 11) Seminar on "Joint Working Group (JWG)" for 4 days in India from 26.02.2012 to 29.2.2012 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 14) A meeting with NTPC from 23.08.2012 to 26.08.2012 in India. 15) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia.1 Mr.Muhammad Humayan
Kabir Khan Member (Admin) 1) U½x 80†gtIt M¨vmUvievBb we`¨r
†K‡›`ªi Avg`vwbZe¨ Spare Parts forHot Gas path Inspection (HGPI) forLot-A (Capital Spares) Witnessing ofmanufacturing process & test of theequipment at manufacturer's worksincluding transfer of technical know-how 10.02.11 to 18.02.11 in USA &Netherlands. *See N.B.
A proposalsent toministrydated19.05.2013on technicalorientationand qualitytest witnessof 11 KVlightingarresterfrom30.05.13 to05.06.13 inChina.*N.B. 2) The Government of the People's Republic of Bangladesh in Copmbination of the delegation of the following officials to visit India from 8-9 March, 2011 (Excluding
travel time) to attend Coaltrans Conference in India. 3) Inspection on 1 (one) set of DLNI Cap & Liner against Tongi 80 MW Power Station from 26.12.12 to 04.01.13 in USA. 4) Technical orientation and quality test witness from 18.05.13 to 23.05.13 in USA.
1 1-0233 23.08.54 Mr. Md. Abdul Wahab Khan,
Mymensingh,
B.Sc.Engg. (Mech.)
01.03.78 (AE) 02.07.90 (XEN) 13.08.05 (SE) 19.05.09(Addl. CE) 22.05.10 (CE) 31-03-11 (Member) 2.08.12 (Chairman, currentcharge)
Chairman (Currentcharge ) PDB, Dhaka.
1) Design, Specification andEquipment Maintenancefrom 01.01.87 to 31.08.87 2)Training on TQM from23.01.05 to 19.02.05 3) A training program "ResultBased ManagementImplementation andPerformance Indicators" from22.09.2012 to 04.10.2012.
U.K.
Japan
Canada
1)Pre-Shipment Inspection Of GasFired Boiler For Aricha PC Pole From22.10.2001 to 8 days In U.K. 2) International Convention onQuality Control Circles (ICQCC) underImplementation of BangladeshPower Sector Reform from 23.10.07 to27.10.07 for 05 days in China. 3) Inspection against Plant/Factory in"Midland Power Co. Ltd" from25.06.2012 to 02.07.2012 in Norway. * See N.B.
* N.B.- 4) SASEC meeting on proposed transmission utility forum (TUF) and sub-regional power generation and transmission master plan from 16-17 Oct/2012 in Srilanka. 5) A program named "2nd Indonesia Coal Investment Forum" in Indonesia from 4.11.12 to 8.11.12. 6) To attend a conference titled "Bangladesh Investment Summit" on 04.12.12 in Singapore. 7) To finalize the draft MOU between Tenaga National Berhad (TNB), Malaysia and BPDB from 10.12.12 to 15.12.12 in Malaysia. 8) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 9) Coal conference with coal trader / producer / terminal operator in Indonesia & Australia from 03.06.13 to 09.06.13. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India.
4 1-01513 01.01.54 Mr. Abu Shahid Molla, Faridpur, Diploma(Power),
20.12.77(SAE), 18.06.2000(AE), 08.12.09(SDE)
XEN (Addl. Charge) Dte. Of ElectricalEquipment PDB,Dhaka.
Jamalpur
1 1-0335 24.01.54 Mr. Korban Ali,Kushtia,B.Sc.Engg. (Civil)22.11.79 (AE) 04.02.86(SDE) 04.02.98(XEN) 08.04.09 (SE, rev.) 11.08.09 (SE)
Addl. CE , Civil Works, PDB, Dhaka.
(freedomfighter)
1) Training on Span-type P.C.Pole Manufacturing Plantfrom 22.12.85 to 21.03.86
China 1) Tower Test from 30.05.2000 for 07days China 2) Steel Structure Design SanctionFrom 07.03.03 for 10 Days In China 3) Conceptual Design Approval Sylhet90MW CCPP (2nd Unit) for 10 days inChina,2005. 4) Power Station Design Meetting,1997 for 07 days i * See N.B.
*N.B. 5) Approval of "Construction Drawings" aganist Sylhet 150MW Combined Cycle Power Plant Construction Project for 08(Eight) days in China. 6)Travel India in Sep./2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plant in Khulna.
1 1-0537 02.02.55 Mr. Motahar RahmanChowdhury NaogaonB.Sc.Engg. (Elec.)18.3.82(AE) 01.02.92(SDE) 17.05.03(XEN)
Director Dte. of Training andCareer Development,PDB, Dhaka. & PD (Addl. Charge) Training AcademyComplex, PDB,Keraniganj.
1. Training
2. A training titled "SCADACommunication System"against Greater ChittagongElectricity DistributionProject, SCADA rehabilitation,PDB, Chittagong from19.07.2012 to 16.08.2012
Thailand&
Bangkok
Newzealand
1) Inspection Battery & BatteryCharger from January/2000 for 07 daysin India. 2) “Witnessing of Manufacturingprocess and tests of the Matarialsand Spare at Manufactur’s worksincluding transfer of technical knowhow” for 15.09.09 to 22.09.09 in Japan.
* See N.B.
*N.B. 3) “Witnessing of manufacturing process and test of the equipment of manufacturer's works including transfer of technical know-how” against Mechanical SecuritySpares from October/10 for 07 days in Netherland. 4) "Witnessing of manufacturing Process and test of the equipment of manufacturer;s works including transfer of technical Know-How" from 16.08.11 to 22.08.11 for 07 days inUSA. 5) Inspection program on "Energy Efficient Buildings" from 12.03.13 to 18.03.13 in India. 6) To Inspect Metering system against 102 MW Power Generation Facility at Gognagor, Narayanganj from 19.05.13 to 25.05.13 in USA. 7) "Technical Orientation & Quality test witness" of 11 KV Single Phase Potential Transformer from 01.10.13 to 07.10.13 in China.
1 1-0434 25.02.55 Mr. Md. Zakir Hossain,Chittagong,B.Sc. Engg. (Mech.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01714110545 [email protected]
Director Dte. of Project Planning,
PDB, Dhaka
1) Seminar on PowerDevelopment from 20.01.04 to29.01.04 for 10 days 2)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From07.08.04 for Two Month(Bond for 03 Years from01.07.04)
India ,
France,
1)15 Days 2003 in India, 2)Factory Test Witness From10.01.2004 to 24.01.2004 in India, 2) Basic Design against Bera 70MWPeaking Power Plant ConstructionProject from September/10 for 05days in Korea.
A proposalsent toministrydated29.09.13against"Asiaregionalsustainableenergytrainingevent" from25.11.13 to29.11.13 inThailand.
1 1-0372 05.03.55 Mr. Md. Abdur Razzaque, Mymensingh,
B.Sc.Engg. (Mech.) 21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE) 28.06.12 (Add. CE)
CE (In Charge) Services, PDB,Dhaka.
1) Young professionalTraining in the field ofSCADA System From 06.06.92to 10.12.92
France 1) 25.03.2001 to 28.3.2001 India
2)Factory test witness of 33KV XLPEPower cable & Battery From 05.12.03to 5 Days in China 3) 132KV Transformer against“Inspection'' from October/10 for 07days in China. 4) Conference on "Market Potentialand Cooperation Opportunities inPower Development of South AsianCountries" on 03.06.2013 in China.
A proposalsent toministrydated19.09.13againstroad showon "German-BangladeshInvestorsMeet forEmergingBangladesh"on 22.10.13in Germany.
1 1-0284 08.05.55 Mr. Jalal Uddin AhmedChowdhury Sylhet,
B.Sc.Engg. (Mech.)
18.12.78 (AE) 05.01.95 (XEN) 31.01.07 (SE) 12-04-11 (Addl.CE) 31.07.12 (CE) 22.05.13 (Member)
Member Generation, PDB, Dhaka. & Member P&D, PDB,Dhaka.
1) Training on Boiler From22.02.86 for 06 Months. 2)Traning On Planning &Design Against 210 MW.Siddhirgong P/S From 02.09.04for One Month
Czechoslovakia
1)28.11.94 to 23.12.94 India, 2)16.09.97 to 23.09.97 In China. 3)Seminar 15.03.03 to 29.03.03 InMalaysia, 4) Factory Test Witness on HeatRecovery Steam Generator for 11 daysin South Korea.in 2006 5)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina.
A proposalsent toministrydated27.03.14 fortechnicalorientation& qualitytest witnessof 33 KV ACRfrom07.04.14 to13.04.14 inAustralia.
1 1-0316 30.06.55 Mr. A.T.M. Nannur Rahman,
Khulna,
B.Sc.Engg. (Mech.)
28.06.79 (AE) 11.01.96 (XEN) 18.01.09 (SE, rev.) 24.02.09 (SE) 01-12-11 (Addl. CE) Member (16.04.14) 0171-3019272
Member P & D, PDB, Dhaka.
LPR 29.06.14
1) Power Line Carrier Systemfrom 04.04.84 for 10 Weeks. 2) Training Steam TurbineOperation & MaintenanceFrom 15.09.86 to 14.03.87
Switzerland,
Germany,
1) Pre-shipment Inspection From12.04.98 to 21.04.98 10 days in India 2) Practical Demonstration against210 MW. Chittagong (PRP) From15.07.04 to 22.07.04 for 07 Days InChina. 2) Basic Engineering Drawing againstChandpur 150MW Combined CyclePower Station Construction Projectfrom 28.07.10 to 11.08.10 for 15 daysin China. 3) Chandpur 150MW Combined CyclePower Station Construction Project, aTraining Program named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for 12(Twelve)days in China.
A proposalsent toministrydated05.06.14 forCT, VT testwitnessagainstComilla 52.2MW HFOFired Powerstation from22.06.14 to24.06.14 inIndia. 2) G.O.issueddated15.06.14 forfactoryacceptancetest for 7days/2014 inChina.
1 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)
GM (Incharge) Commercial Operation PDB, Dhaka.
LPR 29.06.14
I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)
2)Training on PowerEngineering andManagement from 09.05.04 to22.05.04
U.K.
Korea
1)Pre-Payment Meter & VendingEquipment From 25.11.06 to 01.12.06for 07 (days) in England 2) “Technical Orientation and QualityTest Witness” on Four Level SecuritySeal & Accessories from 18.02.10 to23.02.10 for 05 days in India. *See N.B.
N.B. 3) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excludingtravel time) in South Korea. 4) Inspection against Plant/Factory in "Midland Power Co. Ltd" from 25.06.2012 to 02.07.2012 in Norway. 5) Technical orientation and quality test witness from 18.05.13 to 23.05.13 in USA. 6) "Change Xchange 2014-2nd Reverse Buyer-Seller Meet (RBSM)" from 08.01.14. to 12.01.14 in India. 7) Technical Orientation & Quality Test Witness of 11KV DOFC with Fuse Linkfrom 15.06.14 to 21.06.14 in China.
1 1-0424 28.11.56 PRL
Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)
CE P & D, PDB, Dhaka
1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011
Japan
USA
China,
UK
Singapore& USA
Russia
England
1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.
1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan
* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148
2 1-0425 28.11.56 PRL
Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)
CE P & D, PDB, Dhaka
1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011
Japan
USA
China,
UK
Singapore& USA
Russia
England
1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.
1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan
* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148
3 1-0426 28.11.56 PRL
Mr. Md. Mizanur Rahman,Comilla,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN 13.06.11 (SE) 17.02.15 (Addl. CE) 28.07.15 (CE)
CE P & D, PDB, Dhaka
1) Operation & Maintenanceof Electrical Feature ofGenerator. 11.05.87 to10.08.87 2) Update of System Studiesfrom 15.04.98 to 01.05.98 3)1)Planing AndManagement(RRAGS) From08.10.03 to 08.01.04 for 90days. 4) Road Show to attract theforeign investors from14.12.09 to 22.12.09 5) Road Show to attract theforeign investors from25.01.10 to 03.02.10 6) To attend in meeting withRussia In order to BuildNuclear Power Plant atRuppur from 24.01.2011 to28.01.2011. 7) To attend Power Summit2011 from 27.02.2011 to02.03.2011
Japan
USA
China,
UK
Singapore& USA
Russia
England
1) In Order to attend a discussionmeeting with World Bank from18.07.2011 to 27.07.11 for 10 Days(Excluding travel time) in USA.(fromministry) 2) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. * See N.B.
1) Aproposalsent toministrydated26.07.15 forinspectionof Power,Oil, Gas &Petro-ChemicalHub ofA148JurongIsland from29.07.15 to02.08.15 inSingapore. 2) Aproposalsent toministrydated27.04.15 forAttendingDataCollectionsurvey from13.05.15 to20.05.15 inBhutan
* N.B. 3) Convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 4) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 14.04.2012 to 25.04.2012 in USA. 5) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 6) Finalizing the report of joint steering committee from 02.09.2012 to 06.09.2012 in India. 7) To attend "3rd Annual Shale Gas Conference" as a Speaker from 27.11.12 to 30.11.12 in Singapore. 8) A meeting "SASEC Energy Working group (SNWG) meeting" on 09.11.2012 in Bhutan. 9) A workshop program "Equitable Energy Access" from 30.04.13 to 02.05.13 in South Korea. 10) Steering Committee Meeting on Coal from 27.06.13 to 29.06.13 in India. 11) Senior Training program on Result Based Management & Leadership from 15.08.13 to 23.08.13 in Canada. 12) Visit on construction activities and project management system of Belarusian Nuclear Power Plant from 27.11.2013 to 02.12.2013 in Republic of Belarus. 13) 6th international forum ATOMEXPO 2014 from 8.06.14 to 12.06.14 in Moscow, Russia. 14) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 15) Factoy Witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 15.08.14 to 21.08.14 in Germany. 16) Participation in the 8th JSC, 8th JWG meeting from 09.10.14 to 10.10.14 in India. 17) Participation in the Fifth meeting of SAARC energy ministers & its preceding senior officials' meeting from 16.10.14 to 17.10.14 in A150 18) Participation as a member of joint working group on water resource management and hydropower for sub-regional cooperation from 30.01.15 to 31.01.15 in India. +A148
Dhaka
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01630 17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)
SDE Energy Auditing Unit PDB,Dhaka.
1) "Foreign Training program"from 07.09.09 to 20.09.09 for14 days.
China.
2 1-01784 01.01.84 Mr. Md. Abu Sayed Sarkar Kurigram, B.Sc.Eng(Elec.)
31.05.09(AE)
AE Energy Auditing Unit PDB, Dhaka.
1) “Technical Orientation and Qualitytest witness'' Supply of TransformerAccessories (Copper Cables)" againstCentral zone power distributionProject, PDB, Mymensingh inJune/2011 for 07 (Seven) days fromthe date of actual journey(Excludingtravel time) in China.
Rajshahi
3 1-01622 29.07.79 Mr.Abdullah-Al-Mamun Rajshahi B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)
SDE Energy Auditing UnitDivision PDB,Rajshahi.
1) Training on Enegry Meteragainst "Foreign Training"from 15.10.09 to 29.10.09 for15 days
Singapore.
Rangpur
4 1-0776 05.01.60 Mr. Md. Khairul Amin,Rangpur,B.Sc.Engr.(Elec.),30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
XEN,
Energy Auditing UnitDivision PDB, Rangpur.
1)Training against I&C andComputerFrom 07.03.96 to 07.03.97 (OneYear)
China 1) Four Level Security Seal &Accessories against “TechnicalOrientation and Quality TestWitness” from 18.02.10 to 23.02.10 inIndia. 2) ''Inspection of Heat RecoverySteam Generator gainst Dudkhandi50MW Peaking Power PlantConstruction Project from 20.01.2011for 07 days in China.
Sylhet
5 1-01332 05.07.70 Mr. Abdulla Al Mahmud, Lalmonirhat, B.Sc.Engr.(Mech.),
20.01.2000(AE) 08.12.09(SDE) 16-10-11 (XEN , Incharge)
XEN (Incharge) Energy Audit, PDB,Sylhet.
1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project from 24.02.11 to02.03.11 for 07(Seven) days in China.
Rangpur
Bogura
6 1-0855 08.01.64 Mr. Md. Abdur Rashid,Natore,B.Sc.Engr.(Elec.)13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
XEN,
Energy Auditing Unit PDB, Bogra.
1)Shahijebazar 60MW GasTurbine P/St.Operation andMaintenance. From 18.04.97to 29.04.97 2) Gas TurbineP/St.Operation andMaintenance. From 10.04.00to 09.04.00, 01 (Month) 3) Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 to 07.08.04 (Bond for03 Years from 01.07.04 to 14days)
WestGermany
France
China
1) "Technical orientation and qualitytest witness" against 400V,3X10(60)Amps Three Phase 4-Wire, D-Element, Outdoor Type Double TariffElectronic Consumer Energy Meterfrom October/10 for 10 days in China.
G.O. Issueddated02.03.09 onMark-II andMark-V -Gi"Inspection& FactoryTestWitness" for10 days inUSA.
Commercial Operation, PDB, Dhaka
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments Dist. Zone
7 1-0566 31.01.61 Mr. Md. Mustafijur Rahman, Bogra, B.Sc.Engr.(Elec.), 09.10.84(AE) 18.03.93(SDE) 02.01.05(XEN)
Dy- General Manager Commercial Operation PDB, Dhaka.
1) Training on Maintenanceof H.T. Switchgear from30.12.86 to 26.04.87 2) Training on VHFEquipment Operation &Maintenance from 15.11.09for 30 days.
Russia
NewZealand
1) Inspection on CFL Bulb againstEfficient Lighting initiative forBangladesh (Phase-1 & Phase-II)from July/10 for 05 days in China.
Bogra
Civil Works
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
8 1-0820 31.12.61 Md. Miznur Rahman Bogura, AMIE(Civil) 28.04.87(AE) 21.11.99 (SDE) 26.04.06(XEN, Current Charge)
23.04.09 (XEN)
XEN, Civil Works Division PDB,Chittagong.
1) Inspection (Emergency DieselGenerator) against Gopalgonj100MW Peaking Power PlantConstruction Project November/10 for07 days in Singapore.
9 1-01687 01.01.75 Mr. Md .Monjurul Alam Sirajgong B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE)
SDE Deputed to CE Office,Civil works for nextreplacement.
1) Tests and/or Inspection against 8mm dia and 9 mm dia 3500 QuintalHigh Tensile Steel (HTS) Wire for 10days in China.
10 1-01868 25.11.85 Mr. Md. Shahriar Alam Bagura B.Sc. Engg. (Civil) 01.12.10 (AE) 01712130635 [email protected]
AE, Civil ConstructionDivision-1, PDB, Dhaka
PC Pole Construction
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
11 1-0759 16.01.61 Mr. Md. Abul Kalam Azad,
Rangpur, B.Sc.Engr.(Civil.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN)
XEN
PC Pole ConstructionFactory, PDB, Aricha, Manikgonj.
1) Hydro Electric PowerEngineering for Stable &Sustainable Supply , JicaJapan 04.06.06 to 12.07.06 for39 days
Japan. 1) Technical Orientation and QualityTest Witness" from 04.12.10 to14.12.10 for 07 days in China.
1 Mr. Md Fazlul Hoque Member Finance, PDB, Dhaka.
1) New Product AppraisingConference from 16.04.10 to 20.04.10in China. 2) Factory Witness test (Natural GasBooster Compressors & Auxiliaries)against Chandpur 150MW CombinedCycle Power Station ConstructionProject from 13.03.11 to 19.03.11 inUSA.
1 1-0240 09.01.55 Mr. Md. Abu Taher,
Chittagong,
B.Sc.Engg. (Elec.)
09.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE, Revr,basis) 15.02.10(Addl.CE) 08.02.11 (CE) 02.09.12 (member, currentcharge)
Member Distribution , PDB,Dhaka. & Menber, P & D (Addl.Charge), PDB, Dhaka.
1) Electrical Maintenancefrom 17.01.92 to 16.01.93
2) Micro Hydro Power trainingprogram from 15.03.13 to23.03.13
China
Australia
1) Practical Demonstration OnGenerator Exitation (Shikalbaha )From 05.06.2004 to 07 Days In CzechRepublic 2) "Factory Inspection/Test ofCirculating Water Pump for 110 MW &60 MW Unit of Khulna Power Stationfrom 16.03.09 to 20.03.09 for 05 daysin Czech Republic. 3) Inspection against 335 MW dualfuel combined cycle power plant inorder to inspect "Meter, CurrentTransformer, Inductive VoltageTransformer" from 25.02.13 to 05.03.13in USA
Proposed Names of Manager (Katakhali 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0514 29.05.57 Mr. Sabbir SultanRajshahiB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN)
XEN, Sales & DistributionDivision-2, PDB, Rajshahi.
1) Power Generation &Distribution from 07.10.89-30.12.90
2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04)
Germany,
France,
2 1-0617 29.07.62 Mr. Md. Mofazzal HossainSarker, Rajshahi
B.Sc.Engr.(Elec.), 03.02.85(SAE) 24.01.85(AE) 09.01.95(SDE) 09.03.04(XEN)
XEN, (shift),
Barapukuria PowerStation PDB, Dinajpur.
i) Gas Turbine Power StationOperation & Maintenancefrom 07.05.1990 to 01.07.90
France 1)Pre-Shipment Inspections ofMetarial of Bheramara Power Stationfrom 19.04.97 to 28.04.97 in Germany 2)Training on Complete NozzleAssembly with hardware, CompleteKit of (92) buckets with hardware,Complete Kit of (36) Shrouds withhardware, Cap & Liner Assembliesetc. 23.06.07 to 30.06.07, 07 days inUSA. 3) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in Sept./2011 for07 days in Germany.
Proposed Names of XEN (Katakhali 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01193 01.12.69 Mr. Md. Enamul Haque, Rajshahi, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 06.05.10 (XEN, Incharge) 0171-2266233
XEN(Incharge) Katakhali 50MWPeaking Power PlantConstruction Project PDB, Bogra.
1) “Alternator Inspection” againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in July/2011 for07 days in South Korea.
Bogra
2 1-01211 01.08.71 Mr. Md. Mozaharul Islam, Shirajgong, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 06.07.10 (XEN Incharge)
XEN (RE)In charge , Chapainawabganj E/S,PDB, Chapainawabganj. & PD (Addl. Charge) Amnura 50 MW RentalPower Plant Project.
1) Training on Energy Meter,September/05 for 11days.
Australia&
Singapore
3 1-01298 21.05.74 Mr. Moniruzzaman,Meherpur,B.Sc.Engr.(Elec.) ,13.07.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge)
Asstt. CE XEN(Incharge), 300 M.W. BarapukuriaPower Station PDB, Dinajpur.
1) Safe, Reliable, &Maintenance of I & C,Circuits/Loops,etc From21.03.2004 for 06 Months. 2) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days.
China,
Bahrain
1) Inspection against BarapukuriaCoal Fired Thermal Power Station on''Witnessing of ManufacturingProcess and Test of the equipment atmanufacture's works includingTransfer of Technical-Know How” inSept./2011 for 07 (Seven) days fromthe date of actual journey(Excludingtravel time) in China.
4 1-0938 31.12.63 Mr. Md. Zahangir Alam Nawabganj B.Sc.Engr.(Elec),06.09.90(AE) 11.11.2001(SDE) 02.07.19 (Rev. XEN), 10.02.10 (XEN)
XEN Urban Project, PDB,Rajshahi.
1)Factory Test witness,Orientation & TechnicalTraining on 11 KV Singlephase Potential Transformerand 11KV Single phasecurrent transformer from25.07.04 to 29.07.04
China, Chittagong
Proposed Names of SDE (Katakhali 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01410 05.01.73 Mr. Md. Hasibul Huda, Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Ghorasal TrainingCentre PDB, Palash,Narsingdhi.
1) Training on Service dead endClamp, September/05 for 07days inIndia. 2) Approval of Engineering Data andDetail Design against Hathazari 100MW Peaking Power PlantConstruction Project from OCtober/10for 07 days in China.
2 1-01692 01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE) 0171-2561163
SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.
1) ''Managing Fuel for ReliablePower Generation'' from 13.12.10 to15.12.10 in India. 2) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for07(Seven) days in China.
3 1-01678 17.11.77 Mr.Shah Khalid MahmudChowdhury Noagaon B.Sc.Eng(Civil) 07.04.2006(AE) 18.08.2011 (SDE) 01817148564
SDE, Sales & DistributionDivision-2, PDB,Rajshahi
1) Technical Orientation and QualityWitness aganist Central Zone PowerDistribution Project at April/2011 for07 days in China.
Bogra
4 1-01626 31.12.76 Mr.Md.Rabiul Islam Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 0175-1657415
SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.
1) Technical know-how andTechnology Transfer on 1.00 Lac LiterTransformer Oil against fromSept./09 for 07 days in India. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) in China.
Proposed Names of AE (Katakhali 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01787 21.01.85 Mr.Syed Ahmed Chapainababgonj B.Sc.Eng(Elec.) 01.06.09(AE)
AE, Chapainababgonj E/S,PDB, Chapainababgonj
2 1-01815 07.02.87 Mr. Md. Motiur Rahman Rajshahi B.Sc. Engg. (Mech) 04.11.10 (AE) 01675441000 [email protected]
AE, Directorate of Training& Career Development,PDB, Dhaka.
3 1-01833 15.08.87 Mr. Md. Ahsan Habib Sirajganj B.Sc. Engg (Elect.) 04.11.10 (AE) 01711038155 [email protected]
AE Baghabari 50 MWPeaking Power PlantConstruction Project,PDB,, Pabna.
4 1-01884 04.01.86 Mr. Md. Tariqul Islam Sirajganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 01717442759 0171-8361183 [email protected]
AE Katakhali 50MWPeaking Power PlantConstruction Project,PDB, Rajshahi.
5 1-01809 10.02.85 Mr. Md. Abdul Matin Lalmonirhat B.Sc. Engg. (Mech) 04.11.10 (AE) 01721734233 [email protected]
AE, Sales & DistributionDivision-1, PDB,Rangpur.
6 11-0454 01.01.58 Mr. Abu Hena MostafaKamal Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27.12.2011 (AE)
AE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.
7 1-01869 21.12.87 Mr. Anirnoy Das Naogan B.Sc. Engg. (Elect.) 01.12.10 (AE) 01717517636 [email protected]
AE Distribution Division PDB, B-Baria.
1) Inspection against Santahar 50MW and Katakhali 50 MW PeakingPower Plant Construction Project inorder to Inspect 11 KV switchgearfrom 13.03.2012 to 20.03.2012 for 7days (excluding travel time) in China.
8 1-01883 18.12.85 Mr. Md. Shahnewaz Islam Pabna B.Sc. Engg. (Elect.) 01.12.10 (AE) 01196082692 [email protected]
AE S & D-3, PDB, Rajshahi.
9 11-0470 01.01.63 Mr. Md. Ainal Hoque Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE Sales & DistributionDivision, Barabkunda, PDB, Chittagong.
Proposed Names of SAE (Katakhali 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 11-1039 01.09.64 Mr. Md. Firoz Uddin Shirajganj Diploma Engg. (Power) 06.09.86 (SAE) 01918839106
SAE Baghabari PowerStation, PDB, Shirajganj
2 11-1564 01.07.63 Mr. Md. Sultan Mahmud Dhaka Diploma Engg. (Mech.) 17.07.84 (SAE) 01718585422
SAE Bheramara PowerStation, PDB, Kustia.
3 15.05.61 Mr. Md. Abul Kalam Azad Naogan Diploma Engg. (Elect.) 25.08.84 (SAE) 01713726568
SAE S & D-1, PDB, Rajshahi
4 11-1439 16.04.66 Mr. Zamal Uddin Md. KhairulAnam Naogan Diploma Engg. (Electronics) 16.07.94 (SAE) 01712962856
SAE Katakhali 50 MWPeaking Power PlantConstruction Project,PDB, Rajshahi.
5 11-0515 01.01.58 Mr. Bizon Kumar Sarker Diploma Engg. (Civil) 25.08.84 (SAE)
SAE S & D-1, PDB, Rajshahi
6 11-0549 31.12.59 Mr. Md. Abul Kalam Azad Shirajganj Diploma Engg. (Elect.) 25.08.84 (SAE)
SAE Bheramara PowerStation, PDB, Kustia.
7 11-0982 01.04.61 Mr. Md. Meser Ali Rajshahi Diploma Engg. (Elect.) 10.09.86 (SAE)
SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.
8 11-1159 01.01.58 Mr. Md. Amzad Hossain Gaibandha Diploma Engg. (Elect.) 25.10.88 (SAE) 01719516870
SAE Barapukuria PowerStation, PDB, Dinajpur.
9 11-1344 15.10.64 Mr. Zulfikar Ali Talukder Bagura Diploma Engg. (Elect.) 27.12.90 (SAE) 01711123724
SAE S & D-1, PDB, Bagura
10 11-1157 14.01.62 Mr. Md. Abdul Hannan Bagura Diploma Engg. (Elect.) 12.10.68 (SAE) 01730711893
SAE Consumer's Affairs,PDB, Dhaka.
1) Training againstBarapukuria Power Station in2004 for 6 months
China
11 01.05.75 Mr. Borhan Uddin Ahmed Sylhet Diploma Engg. (Elect.) 30.11.2005 (SAE) 01712121107
SAE Shahjibazar PowerStation, PDB, Habiganj.
1) Training againstBarapukuria Power Station in2004 for 6 months
China
12 11-1589 18.02.64 Mr. Md. Nure Alam Sarker Diploma Engg. (Mech.) 17.07.94 (SAE)
SAE 20 MW Power Station,PDB, Rangpur.
Proposed Names of Manager (Santahar 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0509 01.04.57 Mr. Moustafa Ishkander Arif
BograB.Sc.Engg. (Elec.)22.02.83(AE) 01.02.92(SDE) 21.01.03(XEN)
PD
Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.
1) Distribution Engineeringfrom 05.12.90 to 07.10.91 2) Trouble Shooting,Programming & dataacquisition from 02.12.2004for 14 days
UK
USA
Orientation & Technical Training on400 Volt Energy Meter against Dte.ofCommercial Operation from 05.03.05to 25.03.05 for 14 days in USA
Bogra
2 1-0628 26.01.60 Mr. S.M. Touhidul Karim,
Khustia, B.Sc.Engr.(Elec.),
26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)
XEN(Mach), Energy Auditing UnitDivision,
PDB, Rajshahi.
1)Operation andMaintenance of GTPS. From06.05.90 to 30.06.90 for08(Weeks)2)Training on Baghabari100MW P/St. From 17.09.01 to15.12.01 for 03 Months 3) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days. 4) Training on Power StationRehbilatation Projec (Phase-2) Bheramara Gas TurbinePower Station Rehbilatation''Lube Oil Cooler, AVR, FireFighting System '' for 07 days.
France,
India
Bahrain
China.
1) "Practical Demonstration to ImportTechnical know how" against PPRPon Gas Turbine in 2006 for 07 days inAmerica
Proposed Names of XEN (Santahar 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01197 30.10.70 Mr. Md. Mizanur Rahman, Naoga, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 23.05.10 (XEN Incharge)
XEN (Incharge), (electrical), 300MW BarapukuriaCoal Fired Power PlantProject PDB,Dinajpur.
1) Safe, Reliable & efficientOperation and maintenanceof I & C System, ProtectionCircuits/Loops, Test adjustand setting of I & Cequipment system from21.03.2004 for 06 Months.(Bond for 03 Years)
China 1) “Witnessing of ManufacturingProcess and Tests of the Equipmentat Manufacturer's works includingtransfer of Technical Know-how”from 30.08.10 to 05.09.10 for 07 daysin China. 2) “Witnessing of ManufacturingProcess and Tests of the Equipmentat Manufacturer's works includingtransfer of Technical Know-how”against Barapukuria Coal FiredPower Plant in August/2011 for 03(three) days in China (excludingtravell time).
2 1-01325 09.04.72 Mr. Md. Torul Islam, Naugaon, B.Sc.Engr.(Mech.),
20.01.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge) 0171-1204197
XEN(Incharge), Santhahar 50MWPeaking Power PlantConstruction Project,PDB, Bogra.
1) Smart card Type Pre-payment Metering System(Currency Transfer System).April 05 for 14 days in India &Malaysia.
1) Inspection against Faridpur 50MWPeaking Power Plant ConstructionProject for 07 days in India. 2) “Alternator Inspection” againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project in July/2011 for07 days inSouth Korea.
3 1-0808 20.11.59 Mr. Md. Nurul Amin,Naogaon,B.Sc.Engr.(Mech.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, Current Charge)
23.04.09 (XEN) 01733239201
XEN,
90 MW FenchugonjPower Station (Unit-2),PDB, Sylhet.
1)Training on BPDB Specialistfrom 01.12.01 to 21.12.01
2) Group Training Course in"Thermal Power Engineeringfor Gas Turbine and CoalFired Steam Turbine" from15.05.07 to 05.07.07, 52 Days
3) Training on Operation &Maintenance of Balance ofPlant Equipment (BOP) & WTP(Training in China, 3.5months) from 19.07.07 to02.11.07 (Bond for 03 Years)
CzechRepublic
Japan
China
1)Practical Demonestration,TestWitnessing on Different Spare(Mech.) of Sikalbaha Power PlantFrom 20.012004 to 26.01.2004 in CzechRepublic 2) "Witnessing of ManufacturingProcess and test of the Equipment atManufacturer's works includingtransfer of technical Know-how" for07 days in 24.08.09 to 31.08.09 inNetherland.
4 1-01184 21.03.70 Mr. Md. Moklesur Rahman, Rajshahi, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . 06.05.10 (XEN, Incharge)
XEN( Incharge) Urban Project Division PDB, Bogra.
11/10/1999 To 20/10/199910(Ten) Daya On ProcessControl Operation andManagement(PCOM)
China Sylhet
Proposed Names of SDE (Santahar 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01660 09.11.79 Mr. Md. Abdur Rashid Sirajgonj B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 01716518016
SDE (RE), Thanor Electric Supply PDB, Rajshahi
1) Central Zone Power DistributionProject, a Technical Orientation andQuality Test Witness Program for11KV Drop Out Fuse Link, 11KVLightning Arrester, 200 Amps MCCB,100 Amps MCCB & Transformer Oil atJune/2011 for 07 days in China.
2 1-01663 22.07.75 Mr.Md.Ruhul Karim Natore B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE)
SDE Khulna Power Station, PDB,Khulna
1) "Basic Design" against Sylhet150MW Gas Turbine Power Plan from28.07.10 to 11.08.10 for 15 days inChina 2) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project at July/2011 for07 days in Germany.
3 1-01682 15.08.76 Mr.Md.Rezaul Haq Khulna B.Sc.Eng(Mech) 16.10.2006(AE) 27.12.2011(SDE) 0171-1274705 [email protected]
SDE Khulna Power Station PDB,Khulna
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from 10.09.10 to 27.09.10.
China 1) "Witnessing of ManufacturingProcess and Test of the Equipment atManufacturer’s works includingtransfer of technical Know-how"against Khulna 110/60MW from02.07.09 to 09.07.09 for 07 days inIndia.
4 1-01712 12.09.79 Mr.Md.Hasnath Zaman Dinajpur B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 01712-529880
SDE, shift, Barapukuria ThermalPower station, PDB,Dinajpur
1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project from January/11for 07(Seven) days in China.
Lalmonirhat
Proposed Names of AE (Santahar 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01748 15.07.74 Mr. Md.Faridul Hasan, Bogra B.Sc.Engr (Elec.) 12.05.08 (AE)
AE (RE), Shibganj E/S, PDB,Chapainawabganj.
1) "Pre-shipment Inspection" of CoalPulverizer HP 703 Bowl Mill againstfrom 16.09.09 to 21.09.09 for 07 daysin China.
Comilla
2 1-01750 25.12.78 Mr. Md. Azizur Rahman, Kustia B.Sc.Engr (Elec.) 12.05.08 (AE)
AE, Khulna Power Station PDB, Khulna.
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, OperationDivision) from August/10 for15 days
China
3 1-01763 01.11.83 Mr. Md. Hasan Zaman Bogra, B.Sc.Engr(Civil) 31.05.09 (AE) 0171-8658299
AE Shantahar 50 MWPeaking Power PlantConstruction Project,BPDB, Bogura.
1) Inspection of Step-up Transformeragainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) from the date of actualjourney in China.
4 1-01813 27.12.83 Mr. Md. Sana Ullah Pabna B.Sc. Engg. (Mech) 04.11.10 (AE) 01712937996 [email protected]
AE, S & D-1, PDB, Pabna.
5 1-01819 11.10.85 Mr. Md. Moktar Hossain Chapainawabganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722044335 [email protected]
AE (RE), Doani E/S, PDB,Lalmonirhat.
Nilphamari
6 1-01881 01.01.83 Mr. Md. abu Sohel Nawga B.Sc. Engg. (Mech.) 01.12.10 (AE) 01190311592 [email protected]
AE Santahar 50MW PeakingPower PlantConstruction Project,PDB, Bagura.
7 1-01842 21.11.86 Mr. Md.Mohshinul Firoz Nilphamari B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722450004 [email protected]
AE, Barapukuria CoalThermal Power Station,PDB, Dinajpur.
8 1-01821 01.12.86 Mr. Md. Rajoan Hasan Jhinaidaha B.Sc. Engg. (Mech) 04.11.10 (AE) 01712699480 [email protected]
AE, Ghorashal PowerStation, PDB, Polash,Norshindi.
9 11-0455 15.02.59 Mr. Gopal Chandra Saha Tangail Diploma(electrical) 25.08.84(SAE) 27.12.11(AE) 01711378626
AE, opeartion, Bheramara PowerStation, PDB,Kustia.
Proposed Names of SAE (Santahar 50 MW Peaking Power Plant Construction Project)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 11-1205 07.01.63 Mr. Shahaul Kabir Chuadanga Diploma Engg. (Mech.) 10.10.88 (SAE)
SAE, Bheramara PowerStation PDB, Kustia.
2 11-1741 25.04.74 Mr. A.S.M. Rezzakul Haider Thakurgaon Diploma Engg. (Mech.) 12.03.2000 (SAE) 01716555660
SAE Energy Auditing Unit,PDB, Bagura
1) Training in 2004 for 6months
China
3 11-0692 30.04.59 Mr. Bozlur Rahman Bagura Diploma Engg. (Elect.) 25.08.84 (SAE)
SAE Baghabari PowerStation, PDB, Shirajganj.
1) Training in 1994 for 3months
Japan
4 11_2211 01.01.65 Mr. S.M. sohrab Hossain Naogan Diploma Engg. (Mech.) 10.10.88 (SAE)
SAE, 1-4 Unit, GhorasalPower Station PDB, Palash,Narsingdhi.
5 11-0957 01.11.59 Mr. Suranjan Shaha Diploma Engg. (Elect.) 02.09.86(SAE) 01712868298
SAE, Shibganj Electric Supply,PDB, Bagura.
6 11-1809 05.01.84 Mr. Moha. Moshiur Rahman Chapainawabganj Diploma Engg. (Elect.) 15.07.2006 (SAE) 01717983480
SAE, Barapukuria ThermalPower Station, PDB,Dinajpur
7 11-1668 01.01.75 Mr. Md. Abdul Hai Bhuiyan Diploma Engg. (Mech.) 29.02.2000 (SAE)
SAE Operation, ChittagongPower Station, PDB,Raozan, Chittagong.
8 25.08.84 Mr. Md. Ayub Ali Natore Diploma Engg. (Mech.) 02.04.2012 (SAE)
SAE Baghabari PowerStation, PDB, Shirajganj.
9 11-1701 13.03.75 Mr. Md. Sohel Aman Natore Diploma Engg. (Elect.) 04.03.2000(SAE)
SAE, Bheramara PowerStation, PDB, Kustia.
10 11-1604 01.04.69 Subrata Kumar Mohonto Bagura Diploma Engg. (Mech.) 16.07.94 (SAE) 01716027247
SAE, Baghabari PowerStation, PDB, Sirajgonj
11 11-1213 31.10.60 Mr. Md. Munir Hossain Jessore Diploma Engg. (Mech.) 10.10.88 (SAE) 01741032122
SAE, Barapukuria ThermalPower Station, PDB,Dinajpur
1) Training againstBarapukuria Power Station in2004 for 6 months
China
12 Mr. Md. shahidul Islam Diploma Engg. (Elect.) July/1994 (SAE)
SAE, Fenchuganj 90 MWpower plant , PDB,Sylhet.
1 1-0275 10.09.55 Mr. Md. Shahjahan Miah,
Munshiganj,
B.Sc.Engg. (Elec.)
08.12.78 (AE) 23.01.94(XEN) 28.12.10(SE, Revl.) 08.02.11 (SE) 01-12-11 (Addl. CE) 28.01.14 (CE)
Member P & D, PDB, Dhaka.
1) System Planning & SystemStudies. From 07.01.86 for 08Weeks
Thailand A proposalsent tominstrydated20.07.14 forwitnessingofmanufacturing processagainstShahjibazarPower Plantfrom15.08.14 to21.08.14 innetherlands.
1 1-01149 03.10.55 Mr. Mohammad RafiqulIslam, Rangpur, Diploma(Elec),
10.12.77(SAE),
14.09.96(AE), 27.04.04 (SDE) 06.05.10 (XEN, Incharge) 18.08.2011 (XEN)
XEN Diesel Generation, PDB,Dhaka.
1) Operation & Maintenanceof Transmission Linestraining program from04.02.13 to 15.02.13
Thailand
2 1-0396 31.07.54 Mr. Md. Abdul Latif Khan,
Dhaka,B.Sc.Engg. (Civil)09.03.81 (AE) 06.08.86(SDE) 28.09.99(XEN) 19.12.10 (SE, Reve.) 08.02.11 (SE)
Addl. CE (Incharge) Attach to Office ofMember (Distribution),PDB, Dhaka. (Freedomfighter)
1)Inspection from 28.8.2001 for 12days India 2) "Coal Supply Agreemrnts" arrangedby IBC Asia Commodities TrainingAcademy (CTA) from 26.06.12 to30.06.12 in Singapur.
LPR
30.07.14
2 1-0297 01.04.55 Mr. A.N.M. Asadullah,
Rajshahi,
B.Sc.Engg. (Elec.)
20.12.78 (AE) 05.01.95 (XEN) 25.09.07 (SE) 02.03.11 (Addl, CE, Incharge) 18-08-11 (Addl.CE) 31.07.12 (CE)
CE Power PlantConstruction, BPDB,Dhaka.
1) Training onInstrumentation of PowerPlant. 30.09.1985 to 30.01.86for 04(four) Months. 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From01.09.04 to 03.11.04 for 02(two Months) (Bond for 03Years 01.09.04 to 31.10.04)
USSR
Russia,
1) Basic Design Approval MetingFrom 11.11.02 to 04.12.02 in China 2) Conceptual Design Approval ofSylhet 90MW CCPP (2nd Unit) from25.04.06 to 03.05.06 for 10 days inChina. 3)''Conceptual Design Approval''Sylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 in China 4) Inspection on Plant Equipmentfrom 16.1.11 to 22.1.11 in Phillipines.
1 1-0248 01.01.56 Mr. A.K.M. Abdur Rouf,
Bogra,
B.Sc.Engg. (Elec.)
14.09.78 (AE) 17.02.93(XEN) 09.01.06 (SE) 10.01.10 Addl.CE (Incharge) 15.02.10 Addl.CE (Rev.) 13.01.11 (CE) 2.1.2012 (CE)
GM (CE) Training, PDB, Dhaka.
1) Eclectic Power DistributionEngineering From 03.09.88 to17.11.88 2)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 to two Month (Bondfor 03 Years from 01.09.04 to31.10.04.) 3) Electricity Markets To MeetTomorrow's Demand:Efficient and EffectiveDesign, Operation andManagement from 30.09.07 to06.10.07, 07 days.
Japan,
Russia,
USA
1)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina
1 1-0356 01.01.56 Mr.Zafar Ullah Bhuiya,Narsingdhi,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 07.01.10 (SE) 25.08.14 (CE) 07.09.14 (Member, P &D)
Member P & D, BPDB, Dhaka.
1) Training on ElectricalDistribution From 24.05.88 to23.06.89
2) Electrical Design From1.03.96 to 30.05.96 3)Traning On BoilerEquipment Operation &Maintenance Against 210MW. Siddhirgong From02.09.04 for two Month 4) Training on ‘‘ControlSystem” aganist Kaptai HydroPower Plsnt (Unit-3) from23.03.2009 to 30-03-2009
Norway
Italy
Russia
Italy.
1) 'Basic Design & Drawing ' againstShahjibazar P/S from 5.8.14 to 18.8.14for 14 days in China.
A proposalsent tominstrydated30.10.14 forfactoryacceptancetest of GasturbineagainstShahjibazar330 MW CCPPProject from10.12.14 to16.12.14 inFrance.4 11-0211 01.01.56 Mr. Miher Boron Shaha Roy
Chittagong, Diploma(Elec.)
26.06.80.(SAE), 23.04.09(AE)
AE Energy Auditing UnitDivision-3 PDB, Chittagong.
1) Inspection against 110V, 3´5(6)A,Three Phase 4-Wire, 3-Element,Double Tariff Programmable EnergyMeterfor from May/11 for 10 (Ten)days or from the date of actualjourney (excluding journey time) inSingapore.
2 1-0344 01.01.56 Mr. Md. Enayet Karim,Bogura,B.Sc.Engg. (Elec.)19.01.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 2.1.2012(SE)
SE Consumer Affair's, PDB,Dhaka.
1)Power Distribution ProjectFrom 17.02.2004 to 20.03.2004
2) Smart card Type Pre-payment Metering System(Currency Transfer System).April 05, 14 days in India &Malaysia.
Japan
India &Malaysia
1) 8.4.02 to 10 days Australia.
2 11-0276
13.12.55 Mr. Md. Sakwat Hossain Dhaka, Diploma (Mech.)
01.07.80(SAE), 17.09.09(AE) 21.12.14 (SDE)
SDE (Incharge), Central Workshop State & Transport PDB, Dhaka.
1 1-0354 10.11.55 Mr. Md. Abul Kalam ,Chittagong,B.Sc.Engg. (Elec.)26.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 19.05.09 (SE, Reve. Basis) 07.01.10 (SE) 25.08.14 (CE)
CE Power PlantConstruction, BPDB,Dhaka. & PC Solar Street LightingProgramin CityCorporation Project
1) Operation & MechanicalMaint. of GTPS.11.05.87 to 10.08.87 2)Traning on Gas TurbineAgainst Tongi 80 MW From07.08.04 to Two Month (Bondfor 03 Years from 08.08.04 to07.10.04)
Japan,
France,
1) 33KV Pin Insulator & Disk FittingsMay/2001 - 05 days, India 2) Pre-shipment Inspection of 6,7,8 &9 mm dia 3200 Quintal H.T.S Wire tobe held from 20-29 June/2014 inChina.
1 1-0237 01.01.56 Mr. Tamal Chakraborty, Sherpur, B.Sc. Engg. (Elec.)
09.09.78 (AE) 02.07.90(XEN) 28.11.05(SE) 09.12.09 (Addl.CE, rev.) 15.02.10(Addl.CE) 30.03.10(CE, Reve. Basis) 28.06.11 (Member, currentcharge) 24-07-12 (member)
Member Company Affairs, PDB, Dhaka.
1)Training against East ZonePower System Energyreplacement programme.
SouthKorea
1) In order to attend a discussionmeeting with President, M/s. ChinaHuadian Hongkong Co. Ltd., Chinaand to inspect Coal based PowerStation of China Huadian HongkongCo. Ltd., China from 21/11/2011 to25/11/2011 for 5 (five) days (excludingtravel time) in China. See N.B.
N.B. 2) A program named "Witnessing of manufacturing process and tests of the equipment at manufacturer's works including tranfsfer of technical know-how" against Shahjibazar Power Plant (unit- 8 & 9) from12.05.2012 to 21.05.2012 in USA. 3) "Witnessing of manufacturing process & test of the equipment at manufacturers work including transfer of technical know-how" from 24.07.13 to 01.08.13 for 7 days in Amsterdam, Netherland. 4) Gas Booster Compressor Inspection against Bhola 225 MW CCPP from 24.04.14 to 02.05.14 in USA. 5) Technical orientation & Quality test witness of 11 KV switchgear Cubicles Set from 21.07.14 to 27.07.14 in China. 6) 9th Board Meeting of Bangladesh-India Friendship Power Company Limited (BIFPCL) on 26.07.14 in India. 7) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 8) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 9) factory acceptance test of Gas turbine against Shahjibazar 330 MW CCPP Project from 18.12.14 to 24.12.14 in France.
1 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,
Rajshahi,
B.Sc.Engg. (Elec.)
14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member, currentcharge) 24-07-12 (member) 04.11.13 (Chairman)
Chairman, PDB, Dhaka.
1)Transformer operation andMaintenance from 07.08.94 to17.09.94 2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07, 14days. 3) Training on Design,Supply, Installation, Testingand Commissioning of1000KW Capacity Wind MillPower Plant (WBHPP) onturnkey basis at KutubdiaIsland, cox's Bazar``Technical Orientation andQuality Test Witness from18.12.07 to 31.12.07 for 14days.
Belgium
Germany
China.
1)11 KV. Pre- Paid Metering (Sylhet)From 20.08.04 to 30.08.04 for 07 Daysin South Africa 2) Workshop Program titled "LowCarbon Power Sector DevelopmentWorkshop" which will be held on10/12/2011 to 17/12/2011 formaximum 08 (eight) days (excludingtravel period) in Washington DC,USA. 3) Inspection against Central ZonePower Distribution Project,Mymensingh from 03.07.12 to 14.07.12in USA. See N.B.
1) AproposalSent toministrydated28.05.14 toAttentCommonwealth GamesBusinessConferencefrom23.07.14 to25.07.14 inUK.
N.B. 4) A meeting with Nepal Govt. regarding import/construction of hydropower from 24-27 July/2012 in Nepal. 5) To attend a meeting with Soudi Fund against Shikalbaha 225 MW Dual Fuel CCPP from 10.09.12 to 13.09.12 in Saudi Arab. 6) "Quality acceptance Test" of 11 KV Auto Circuit Reclosure from 03.06.13 to 12.06.13 in Australia. 7) Meeting against Shahjibazar 300 MW, Ghorasal 300-450 MW, Barapukuria 275 MW and Chapainawabganj 100 MW Project from 23.09.13 to 26.09 13 in China. 8) Participation in the "G to G Mou Signing Ceremony of Moheshkhali 1320 MW Coal Based Power Plant" from 16.12.13 to 18.12.13 in Malaysia. 9) Management Meeting & Visit of Coal & Renewable Energy Based Power Plant from 18.01.14 to 23.01.14 in China. 10) seminar on Coal Based Power Plant Inspection & Investment from 20.04.14 to 26.04.14 in Japan. 11) 9th Board Meeting of Bangladesh-India Friendship Power Company Limited (BIFPCL) on 26.07.14 in India. 12) Familiarization Visit from 27.08.14 to 31.08.14 in Saudi Arabia. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Participation in the Triax Turbine Components visit from 01.10.14.14 to 07.10.14 in USA. 15) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India.
1 1-0259 10.09.55 Mr. Swapan Kumar Saha,
Pirojpore,
B.Sc.Engg. (Elec.)
09.09.78 (AE) 02.08.93(XEN) 31.01.07 (SE) 28.12.10 (Addl.CE) 18.08.11 (CE) 2.1.2012 (CE) 08.01.14 (Member)
Member Distribution, PDB,Dhaka. & Member P & D, PDB, Dhaka.
1) Operation andMaintenance From 29.09.86to 07.11.86
U.K. 1) Factory Test Witness & PracticalDemonstration against Bhola DieselPower Station on Diesel GeneratingSet From 10.10.04 to 18.10.04 for 09days in USA. 2) Supply of Spares for GeneratorOverhauling of GT-1 (Lot-A) against"Witnessing of ManufacturingProcess and Tests of ConcernedEquipment at Manufacturers' Factoryfor each lot including transfer ofTechnical Know-how” for 07 days inFrance. 3) "Technical Orientation andQuality Test Witness" against 33/11KV, 16/20 MVA Power from 05.02.13 to14.02.13 in China. 4) Quality acceptance test on 11 KVACR from 20.06.14 to 26.06.14 for 7days in Australia. 5) Inspection against distributioncontrol system from 20.08.14 to26.08.14 in Singapore.
LPR09/09/14
Rajshahi
Proposed Names (Katakhali 50 MW)
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
3 1-0514 29.05.57 Mr. Sabbir SultanRajshahiB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN)
XEN, Sales & DistributionDivision-2, PDB, Rajshahi.
1) Power Generation &Distribution from 07.10.89-30.12.90
2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04)
Germany,
France,
Rajshahi
12 1-01663
22.07.75 Mr.Md.Ruhul Karim Natore B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE)
SDE Khulna PowerStation, PDB,Khulna
1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) "Engine Inspection" againstSantahar 50 MW and Katakhali 50MW Peaking Power PlantConstruction Project at July/2011for 07 days in Germany.
12 1-01816
20.10.81 Mr. Md. Shahid Reza Chapainawabganj B.Sc. Engg. 05.03.2011 (AE) Mob.- 01729124506
AE Baghabari 171MWPower Plant, PDB,Shirajganj.
24 11-0470 01.01.63 Mr. Md. Ainal Hoque Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE Sales & DistributionDivision, Barabkunda, PDB, Chittagong.
19 1-01787 21.01.85 Mr.Syed Ahmed Chapainababgonj B.Sc.Eng(Elec.) 01.06.09(AE)
AE, Chapainababgonj E/S,PDB, Chapainababgonj
Chapainababgonj
9 - - Mr. Neser Ali Diploma engg. (SAE)
SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.
2 1-01193
01.12.69 Mr. Md. Enamul Haque, Rajshahi, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 06.05.10 (XEN, Incharge) 0171-2266233
XEN(Incharge) Katakhali 50MWPeaking Power PlantConstruction Project PDB, Bogra.
1) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days in SouthKorea.
Bogra
3 1-01626
31.12.76 Mr.Md.Rabiul Islam Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 0175-1657415
SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.
1) Technical know-how andTechnology Transfer on 1.00 LacLiter Transformer Oil againstfrom Sept./09 for 07 days inIndia. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project from13.03.2012 to 20.03.2012 for 7days (excluding travel time) inChina.
4 1-01692
01.12.78 Mr.Md.Shahriare Islam Naogaon B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE) 0171-2561163
SDE, Katakhali 50MWPeaking Power PlantConstruction Project PDB, Dhaka.
1) ''Managing Fuel for ReliablePower Generation'' from13.12.10 to 15.12.10 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for07(Seven) days in China.
2 1-01833
15.08.87 Mr. Md. Ahsan Habib Sirajganj B.Sc. Engg (Elect.) 04.11.10 (AE) 01711038155
AE Baghabari 50 MWPeaking Power PlantConstruction Project,PDB,, Pabna.
3 1-01820
06.02.85 Mr. Abdullah Al Anam Noakhali B.Sc. Engg. (Mech) 04.11.10 (AE) 01818994330 [email protected]
AE, Daudkandi 50 MWPeaking Power PlantConstruction Project,PDB, Comilla.
A proposalgoes toministrynamed"InternationaltrainingProgramon SolarEnergyTechnologies AndApplications from03.12.12 to21.12.12 inIndia.
4 1-01811
27.12.87 Mr. Nadim Reza Tangail B.Sc. Engg. (Mech) 04.11.10 (AE) 0175-6439346 [email protected]
AE, Bera 70 MW PeakingPower PlantConstruction Project,PDB, Pabna.
A proposalgoes toministrynamed"InternationaltrainingProgramon SolarEnergyTechnologies AndApplications from03.12.12 to21.12.12 inIndia.
Jamal Uddin Md. KhairulAnam Diploma Engg.
SAE Katakhali 50MWPeaking Power PlantConstruction Project PDB, Rajshahi.
Md. Amjad Hossain Diploma Engg.
SAE Barapukuria ThermalPower Plant, PDB,Dinajpur.
Md. Abul Kalam Azad Diploma Engg.
Veramara PowerStation, PDB, Kustia
9 1-01815 07.02.87 Mr. Md. Motiur Rahman Rajshahi B.Sc. Engg. (Mech) 04.11.10 (AE) 01675441000 [email protected]
AE, Directorate of Training& Career Development,PDB, Dhaka.
10 1-01886 12.11.85 Ms. Easmin Ara Mitu Gazipur B.Sc. Engg. (Elect.) 01.12.10 (AE) 01556559924 [email protected]
AE Directorate of Training&Career Development,PDB, Dhaka.
11 1-02025 21.11.87 Mrs. Nehlin Nuraiyah Nicky Patuakhali B.Sc. Engg(Elect.) 16.10.2011 (AE) 01748563522 [email protected]
AE Directorate of Training&Career Development,PDB, Dhaka.
12 1-01811
27.12.87 Mr. Nadim Reza Tangail B.Sc. Engg. (Mech) 04.11.10 (AE) 01913511790 [email protected]
AE, Bera 70 MW PeakingPower PlantConstruction Project,PDB, Pabna.
13 1-01820
06.02.85 Mr. Abdullah Al Anam Noakhali B.Sc. Engg. (Mech) 04.11.10 (AE) 01818994330 [email protected]
AE, Daudkandi 50 MWPeaking Power PlantConstruction Project,PDB, Comilla.
14 1-02024 02.09.86 Ms. Gazi Fatema-Tuz- Zohra Bagerhat B.Sc. Engg. (Elect.) 02.10.2011 (AE)
AE Energy Auditing Unit PDB, Dhaka.
15 - - Mr. Md. Awlad Hossain Assistant Director Office of Controller ofAccounts & Finance,PDB, Dhaka.
16 - - Mr. Mehbub Morshed Assistant Director Directorate of Finance,PDB, Dhaka.
17 - - Mr. Foyez Ahmed Assistant Director Directorate of Finance,PDB, Dhaka.
1 1-01679
12.11.80 Mr.Muhammad BellalHossan Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE)
SDE, Dte. Of SystemPlanning, PDB,Dhaka.
1) Training on Pre-paidmetering system from18.08.08 to 29.08.08 for 10days
2) Renewable Energy andEnergy Efficiency from04.01.10 to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years)
SouthAfrica.
India.
China
2 1-01764
06.08.84 Mr. Anwarul Maruf Dhaka B.Sc.Engr(Mech.) 31.05.09 (AE)
AE, Dte. of System Planning
PDB, Dhaka.
1) Training Course on BiogasTechnology Facilities andHygiene for DevelopingCountries from 07.06.11 to18.07.11
China
1 1-0937 02.01.60 Mr. Md. Shahidul Islam Kuriagram B.Sc.Engr.(Elec),01.07.90(AE) 11.11.2001(SDE) 08.02.11 (XEN)
XEN I & C, Bheramara PowerStation, PDB,Kustia.
1) Combined Cycle/Gas TurbinePower Station against"Implementation of BangladeshPower Sector Reform" from 18.06.07to 22.06.07 in U.K.
Principal
2 1-0870 15.07.64 Mr. Md. Ahsan Habib,Sirajgonj,B.Sc.Engr.(Mac.),18.2.88(AE) 18.06.2000(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
Dy. Director (XEN),
Dte. Of Program PDB, Dhaka.
1)Training againstBaghabari 200 MW P/St.From 16.09.01 to 90 days
2)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years)
India,
China,
Principal
3 1-01334
05.03.72 Mr. Mohammad AbulKalam, Narsindi, B.Sc.Engr.(Elec.),
20.01.2000(AE) 04.08.10(SDE)
SDE, Ghorasal Power Station
PDB, Palash, Norshindi.
1) Factory witness test (EngineeringInspection) Step-up Transformers &66KV Station Switchgear aganistChandpur 150MW Combined CyclePower Station Construction Projectfrom 13.01.11 to 23.01.11 for 10days in China.
Alternate
4 1-01795
30.06.82 Mr.Md. Abu Rayhan Dinajpur B.Sc.Eng(Elec.) 31.05.09(AE)
AE (electrical), Barapukuria ThermalPower Station, PDB,Dinajpur.
“Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1 (Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, OperationDivision) from August/10 for15 days
China Alternate
1 1-0359 02.01.57 Mr. Khandker MaksudulHassan, Narayangonj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 11.08.09(SE, Reve. Basis) 30.03.10(SE) 2.1.2012 (Addl. CE, Incharge)
CE (Incharge), Services, PDB, Dhaka. & CE (Addl. Charge) P & D, PDB, Dhaka.
1) Electrical Power Dist. Engg.07.09.88 to 16.11.88
2) Training program on the"Design of Sub-station" atFactory of ABB From 04.09.03to 22.09.03 for 15 Days
3) Renewable Energy PolicyOption from 04.01.04 to13.01.04 in India
4) Training on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against GreaterChittagong PowerDistribution Project from25.08.07 for 10 (days)
Japan
SwedenFinlandLudbica,
Vasa.
India
Germany
1)For conducting the pre-deliveryinspection of ''Power Transformer'' in93 for 07 days in India. 2) For conducting the Model Test on''Protection Design" before approvalthe Drawing from 1998 for 07 days inChina. 3) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for 07(seven) days in China.
Principal
2 1-0831 30.12.64 Mr. S.M. Wazed Ali Sarder , Naogaon,B.Sc.Engr.(Elec.),18.2.88(AE) 21.11.99(SDE) 10.02.09 (XEN, In-charge), 20.01.10 (XEN, rev.)
Manager (XEN),
Syedpur 20MW GTPower Station PDB, Syedpur.
1) Power Station Operation& Maintenance from 29,September/94 to 29,December/94
2) Power Station Operation& Maintenance fromApril/2000 to 29, April/2000
Japan
France
1) Basic Engineering Drawingagainst Chandpur 150MW CombinedCycle Power Station ConstructionProject from 28.07.10 to 11.08.10 for15 days in China. 2)Chandpur 150MW Combined CyclePower Station Construction Project,a Training Program named "DetailedDesign Review Meeting" from20.01.11 to 31.01.11 for 12(Twelve)days in China. 3) Approval of "ConstructionDrawings" aganist Sylhet 150MWCombined Cycle Power PlantConstruction Project March/11 for08(Eight) days in China.
Alternate
2 1-0243 01.01.56 Mr. Md. Abduhu Ruhullah,
Rajshahi,
B.Sc.Engg. (Elec.)
14.09.78 (AE) 29.03.92 (XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,) 13.01.11(CE, Reve.basis) 05.10.11 (Member)
Member, P & D, PDB, Dhaka.
1)Transformer operation andMaintenance from 07.08.94to 17.09.94
2)Training on "Desigan &Maintenance of 33KVCapacitor Bank and FactoryTest Witness & orientationfrom 19.04.07 to 05.05.07,14 days. 3) Training on Design,Supply, Installation, Testingand Commissioning of1000KW Capacity Wind MillPower Plant (WBHPP) onturnkey basis at KutubdiaIsland, cox's Bazar``Technical Orientation andQuality Test Witness from18.12.07 to 31.12.07 for 14days.
Belgium
Germany
China.
1)11 KV. Pre- Paid Metering (Sylhet)From 20.08.04 to 30.08.04 for 07Days in South Africa 2) Workshop Program titled "LowCarbon Power Sector DevelopmentWorkshop" which will be held on10/12/2011 to 17/12/2011 formaximum 08 (eight) days (excludingtravel period) in Washington DC,USA.
Principal
2 1-0511 01.07.55 Mr. Udoy Shakher Datta
ChittagongB.Sc.Engg. (Elec.)31.03.83(AE) 01.02.92(SDE) 21.01.03(XEN) 04.09.2011 (SE, Incharge)
SE (Incharge)
O & M Circle (West) Chottometro, PDB,Chittagong.
1) HV Sub-Station VBL100Batteries andChargerVSE300,Short circuitStrength,Earthing,InternalLighting Protection.
2) Factory Test Witness &Orientation of Gas InsulatedSwitchgear Against 7th132/33KV & 21st 33/11 KVSub-Station Rehabilitationfrom 15-02-07 for 14 daysGermany.
Germany& Hanau,
Germany
1)400 Nos. 12 Meter Steel Pole (270DAN) & 100 Nos. 12 Meter Steel Pole(550 DAN) 14.04.07 to 22.04.07 for07 days In China.
Principal Kalurghat
3 1-01630
17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)
SDE Energy Auditing Unit PDB,Dhaka.
1) "Foreign Trainingprogram" from 07.09.09 to20.09.09 for 14 days.
China. Principal
4 1-0778 13.09.61 Mr. Md. Motiur Rahman, Kustia, B.Sc.Engr.(Mech.),
30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, Current Charge)
23.04.09(XEN)
XEN,
Sales & Distribution
Potia, PDB, Chittagong.
1)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 forThree Month (Bond for 03Years)
China, 1)Preshipment Inspection on TwistType Wire Seal From 15.8.02 to 20.8.02in USA.
2) Inspection on 01.09.03 to 10.09.03in Germany.
Alternate Pathoregata
5 1-01422 31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Design & Inspection -2 PDB,Dhaka.
1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04 for06 Weeks
China Alternate
6 1-01423 12.01.73 Mr. S.M. Zahid Hasan, Naugaon, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Design & Inspection -1 PDB,Dhaka.
1) Training on GreaterChittagong PowerDistribution Project Against132/33KV Gas "Control Panel"for 25.11.07 to 10.12.07 for 14days.
2) Administration ofEnvironmental and socialconsideration process forimplementation from18.05.08 to 31.05.08 for 15days 3) DAAD (Scholarship)Humboldt against "ProjectCycle Management" from17.08.09 to 11.09.09.(Selfarranged)
China.
Japan
Germany
1) Factory Witness Test (EngineeingInspection) against Faridpur 50MWPeaking Power Plant ConstructionProject from October/10 for 08 days inNorway.
Alternate
Proposed Names
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0120 27.07.52 Mr. A.S.M. Alamgir Kabir
Faridpur
B.Sc.Engg. (Elec.)
10.01.76(AE) 18.06.85 (XEN) 07.10.2002(SE) 05.04.06(CE Addl. CE) 05.12.06 (CE) 05.011.07 MemberDistribution (Incharge) 12.11.07 (MemberDistribution ) 06.04.09(Chairman Addt.Charge) 22.04.09 (Chairman,Incharge) 22.06.09 (Chairman) 19-07-09 (Chairman,Contract) 26-07-10 (Chairman,Contract) 26.07.11 (Chairman,Contract)
Chairman
PDB, Dhaka.
i)Greater Dhaka Power Dist.Project From 05.11.79 to20.2.80
ii)Electricity Tariff From 6.6.92to 10.12.92
iii) Training on ''Publicprivate partnership stratigiesfor 12 days, August/07"
UK
Japan
USA
i) Inspection for 06 days, June/08 inIndia. ii) GTZ & Kfw 05.07.09 to 12.07.09 inU.K & Germany. iii) 3rd Japan-SAARC EnergySymposium on "Promoting EnergyCooperation in South Asia" from06.01.10 to 14.01.10 in India. iiv) NTPC from 28.08.10 to 29.08.10 inIndia. v) Visit to India from 21.12.10 to24.12.10 vi) Visit to USA from 12.10.10 to24.10.10 vii) Visit to Japan from 01.12.10 to07.12.10 viii) Visit to USA from 15.07.11 to29.07.11 iX) * See N.B.
iX) N.B. *Meetings-1) "SAARC Chief Commissioner's Meeting from 17.11.09 to 22.11.09 in India. 2) Meeting of SASEC Energy Working Group organized by ADB from 21/10/2011 to 22/10/2011 for 2 (two) days in Thailand. 3) Meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 4) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 5) Meeting with President, M/s. China Huadian Hongkong Co. Ltd., China and to inspect Coal based Power Station of China Huadian Hongkong Co. Ltd., China from 21/11/2011 to 25/11/2011 for 5 (five) days (excluding travel time) in China. * Road Show- 1) Road Show from 13.12.09 to 18.12.09 for 06 days in UK. 2)Road Show to attract the foreign investors from 24.01.10 to 03.02.10 in Singapore & USA * Seminar/Conference-1) 6th Annual Conference FLNG 2011 from 14.06.11 to 16.06.11 in U.K 2) Investor Seminar on "Joint Steering Committee(JSC)" for 4 days in India from 28.02.2012 to 2.3.2012 * Workshop- 1) workshop titled "Executive Exchange on best Practices in Power Plant Operations & Maintenance" from 13.04.2012 to 27.04.2012 in USA.
2 1-0233 23.08.54 Mr. Md. Abdul Wahab Khan,
Mymensingh,
B.Sc.Engg. (Mech.)
01.03.78 (AE) 02.07.90 (XEN) 13.08.05 (SE) 19.05.09(Addl. CE) 22.05.10 (CE) 31-03-11 (Member)
Member Distribution, PDB,Dhaka.
1) Design, Specification andEquipment Maintenancefrom 01.01.87 to 31.08.87 2)Training on TQM from23.01.05 to 19.02.05
U.K.
Japan
1)Pre-Shipment Inspection Of GasFired Boiler For Aricha PC Pole From22.10.2001 to 8 days In U.K. 2) International Convention onQuality Control Circles (ICQCC) underImplementation of BangladeshPower Sector Reform from 23.10.07 to27.10.07 for 05 days in China.
G.O. issueddated29.01.2012 inorder toattendworkshoptitled"ExecutiveExchange onbestPractices inPower PlantOperations&Maintenance" from14.04.2012 to25.04.2012 inUSA. (Can'tgo)
2 1-0370 31.12.56 prl
Mr. Md. Nurul AminChowdhury, Chittagong,B.Sc.Engg. (Mech.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 07.01.10 (SE, Reve. Basis)
Addl CE (incharge) Attach to Member P & D,PDB, Dhaka.
1) Design, Manufacture O &M of Hydro TurbineGovernors 12.05.87 to 11.08.87
2)Traning on Gas TurbinePower Station Against Tongi80 MW From 24.07.04 To22.08.04 Three Month (Bondfor 03 Years from 24.07.04 to22.08.04)
Japan
China,
1) "Witnessing of ManufacturingProcess & test of the Equipment atManufacturer’s works including ofTechnical know-how” aganist Firstshipment for the Second UnitEquipment (U-5) from 09.01.2010 to18.01.2010 in Japan. 2) Training Hydro Turbine(Mechanical) aganist Kaptai HydroPower Plant (Unit-3) from 01.10.08 to30.10.08 for 30 days in Italy
1 1-0428 09.10.56 Mr. Md. Abdur Rouf Rajshahi,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 29.01.15 (Addl. CE, Incharge) 28.07.15 (CE)
CE Civil Works, PDB, Dhaka.
1) Seminar for Trainers from08.06.87 to 19.06.872) Training Managementfrom 08.01.90 for 24 Weeks. 3) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13
Thailand
U.K.
Thailand
1)Pre-Pament Metering System From20.08.04 for 07 Days in South Africa 2) Technical orientation & qualitytest witness on 25 Nos.- 33 KV ACRfrom 11.12.13 to 19.12.13 in SouthKorea. 3) Quarterly Reconciliation from08.01.15 to 10.01.15 in India.
1 1-0367 11.08.56 Mr. Prahlad Chandra Saha,
Manikganj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 06.12.10 (SE) 30.06.2014(Addll. CE) 01.10.14 (CE)
CE Company Affairs, PDB,Dhaka.
1) Training of Trainers.
July'86 for 03 (three) Months.
France 1) ''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina. 2) Deputation for participation onChina -Asian Clean Energy Forumfrom 26.08.14 to 31.08.14 in China.
1 1-0402 30.10.56 Mr. Saiful Islam Khan,
Satkhira,
B.Sc.Engg. (Elec.)
09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 12.04.2011 (SE) 17.02.15 (Addl. CE) .04.2015 (CE)
CE (PD)
Bibiana-3 Power PlantConstructionProject,PDB,Sylhet. & CE (Addl. Charge) Private PowerGeneration (IPP/PPP),PDB, Dhaka.
I) Electric Power DistributionEngineering From 07.09.87 to20.11.87 2) Training. Double TariffSocket Type Programmableconsumer meter with socket,(9 Town Project) May/2006 for10 days
Japan
USA
1)Factory Test Witness From July,2001 for 03 days, In India on LoadBreak Switch. 2) Factory Test Witness from Feb,2004 for 05 Days In Switzerland 3)Training on Technical know-how in400 Sets 11KV Load Break Switchfrom Oct/2006 for 07 days in China.
4) Inspection on the Power Plantsequipment and machineries of JV ofFujian Longking Co. Ltd. & DhakaWest Power Utility Company from 24October/2011 for 5 (five) days(excluding travel time) in theRepublic of Korea.(G.O. issued, butvisit not yet done) 5) Visited manufacturer's Factoryagainst 52.5 MW power Plantcontruction project, Katpotti,Munshiganj from 14.10.12 to 21.10.12in South Korea. 6) Technical orientation & qualitytest witness of 11 KV GIS from08.11.14 to 14.11.14 in Germany.
A proposalsent toministrydated27.07.15 forwitnessingofmanufacturing processagainstChittagongPowerStation from12.08.15 to18.08.15 inChina.
Proposed Names
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0241 10.11.54 Mr. Md. Abul Quasem,
Dinajpur,
B.Sc.Engg. (Elec.)
23.09.78 (AE) 29.03.92(XEN) 28.11.05 (SE) 07.01.10 (Addl.CE,Reve.basis) 30.03.10 (Addl.CE,)
Member Company Affairs PDB, Dhaka.
1)Analysis and Protection ofPower System from 31.03.2003to 09.05.2003
England 1) Factory Test Witness of 11 KV.Capacitor Bank & Accessories From07.04.04 To 11.04.04 in India. 2)''Conceptual Design Approval'' ofSylhet 90MW CCPP (2nd Unit) from28.01.07 to 06.02.07 for 10 days inChina 3) Training Rehabilitation of GT #8of Shahijibazar Power Station from29.11.07 to 05.12.07 for 07 Days, AbuDhabi 4) See N.B.
* N.B.- 4)Inspection on Power Plant arrange by Khulna Power Company & Summit Power Company from 10.06.10 to 12.06.10 in Italy 5) Participation in Combined Working Commette Group for 22.06.10 in India. 6) NTPC from 28.08.10 to 29.08.10 in India. 7) Zij R¡vjvbxwfwËK we`yy¨r †K› ª̀mg~‡n R¡vjvbx mieivn wbiew”Qbœ I wbwe©Nœ ivLvi j‡¶¨ fviZ †_‡K †jv‡Kv‡gvwUf I U¨vsK IqvMY fvov/jxR MÖnY cÖm‡½ AvMvgx †g, 2011 gv‡mi wØZxq mßv‡n A_ev hvÎvïiæi ZvwiL n‡Z 07 (mvZ) w`‡bi Rb¨ fviZ| 8) Inspection on machineries of Hundai Heavy Industries Co. Ltd for establishing IPP Power Plant at Gaptali, Mirpur, Dhaka from 24 July/2011 for 05 (five) days (excluding travel time) in South Korea. 9) Travel India from 25.09.2011 to 29.09.2011 for 05 (five) days (excluding travel time) to review Conceptual Drawing of Feasibility Report in order to build 2*660 MW Power Plantin Khulna. 10) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant. 11) Seminar on "Joint Working Group (JWG)" for 4 days in India from 26.02.2012 to 29.2.2012
2 1-0393 30.06.55 Mr. G.M. Didarul Islam,Khulna,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 13.01.11 (SE)
Director(SE) IPP Cell-3, PDB, Dhaka.
I) Distribution Engineeringfrom 25.11.92 to 31.08.92(British Council Scholarship)
2)Training on PowerEngineering andManagement from 09.05.04 to22.05.04
U.K.
Korea
1)Pre-Payment Meter & VendingEquipment From 25.11.06 to 01.12.06for 07 (days) in England 2) “Technical Orientation and QualityTest Witness” on Four Level SecuritySeal & Accessories from 18.02.10 to23.02.10 for 05 days in India. 3) Inspection on machineries ofHundai Heavy Industries Co. Ltd forestablishing IPP Power Plant atGaptali, Mirpur, Dhaka from 24July/2011 for 05 (five) days (excludingtravel time) in South Korea.
Proposed NamesSL.NO. ID No. Date of
BirthName, Dist, Qualification
and Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0373 17.08.57 Mr. Shamsul Hasan Miah,Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 30.03.10(SE, Rev.) 28.12.2010 (SE)
CE (Addl. Charge) Private PowerGeneration (IPP/PPP) & Director (SE),
IPP Cell-1,
PDB, Dhaka.
1) ComputerApplication.09.07.84 for 08(eight) weeks.
2)Project and Financing From01.9.03 to 10.9.03
Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K., Finland& USA 3) 25.9.2001 to 26.9.2001Singapore 4) 330-450MW Combined Cycly PowerStation Project from 21.04.08 to23.04.08, 03 days in Singapore. 5) Inspection on Power Plant aganisDesh Energy Ltd. from 10.06.10 to12.06.10 in China. 6) convention on "InvestmentOppertunities in Bangladeshi PowerSector" in India from 26.02.2012 to01.03.2012.
2 1-0584 12.03.61 Mr. Md. Kausar Ameer Ali
Bogra
B.Sc.Engg. (Elec.)
09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN)
CSO SE (Incharge) Office of the Chairman PDB, Dhaka.
1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000
2) Trouble shootingprograming energy meterfrom 21.08.04 to 10.09.04
3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)
India,
U.S.A
USA
1) FAT on Pre-Payment Metering. 05days in South Africa.Jan/07 2) Inspection June/08 for 06 days inIndia. 3) Energy Meter on “TechnicalOrientation & Quality Test Witness”16.11.09 for 10 days in Singapore. 4) See N.B.
4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actualjourney (excluding journey time) in Singapore.
2 1-0511 01.07.55 Mr. Udoy Shakher Datta
ChittagongB.Sc.Engg. (Elec.)31.03.83(AE) 01.02.92(SDE) 21.01.03(XEN) 04.09.2011 (SE, Incharge)
SE (Incharge)
O & M Circle (West) Chottometro, PDB,Chittagong.
1) HV Sub-Station VBL100Batteries andChargerVSE300,Short circuitStrength,Earthing,InternalLighting Protection. 2) Factory Test Witness &Orientation of Gas InsulatedSwitchgear Against 7th132/33KV & 21st 33/11 KVSub-Station Rehabilitationfrom 15-02-07 for 14 daysGermany.
Germany& Hanau,
Germany
1)400 Nos. 12 Meter Steel Pole (270DAN) & 100 Nos. 12 Meter Steel Pole(550 DAN) 14.04.07 to 22.04.07 for07 days In China.
Principal Kalurghat
3 1-0626 03.05.59 Mr. Md. Moazzam HossainDewan, Naogaon, B.Sc.Engr.(Elec.),
26.05.85(AE) 09.01.95(SDE) 09.03.04(XEN)
XEN, Distribution Division-1 10- Town PowerDistribution Project PDB, Rajshahi.
1) 230 KV Grid Sub-stationOperation and MaintenanceFrom April/1993 toSeptember/1993
SouthKorea &Germany
1) Pre-shipment Inspection against33KV ACSR Grossbeak-452.40Km &33KV ACSR Merlin-346.80Km. And33KV ACSR DOG Conductor-2675.60Km form 01.09.08 to10.09.08 for 10 days in China.
Principal Rajshahi P
4 1-01185
21.11.66 Mr. Md. Tofazzal HossainPramanik, Bogra, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . XEN( Incharge)
XEN (RE) Incharge Sales & DistributionDivision PDB, Natore.
Orientation & Technical Training onCurrency Transfer System From14.03.05 for 7 days in India &Malaysia.
Principal Pabna
5 1-01630
17.11.79 Mr.Ajoy Kumar Chakrabarty Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE)
SDE Energy Auditing Unit PDB,Dhaka.
1) "Foreign Trainingprogram" from 07.09.09 to20.09.09 for 14 days.
China. Principal
6 1-01422
31.12.69 Miss Selima Nargis, Bagerhat, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Design & Inspection -2 PDB,Dhaka.
1) Training on Tower Design,Pole Design, etc. Operation &Maintenance Against GCPDPFrom 09.07.04 to 19.08.04for 06 Weeks
China Alternate
7 1-01423
12.01.73 Mr. S.M. Zahid Hasan, Naugaon, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE)
SDE, Design & Inspection -1 PDB,Dhaka.
1) Training on GreaterChittagong PowerDistribution Project Against132/33KV Gas "ControlPanel" for 25.11.07 to10.12.07 for 14 days. 2) Administration ofEnvironmental and socialconsideration process forimplementation from18.05.08 to 31.05.08 for 15days 3) DAAD (Scholarship)Humboldt against "ProjectCycle Management" from17.08.09 to 11.09.09.(Selfarranged)
China.
Japan
Germany
1) Factory Witness Test (EngineeingInspection) against Faridpur 50MWPeaking Power Plant ConstructionProject from October/10 for 08 daysin Norway.
Alternate
8 1-0965 01.06.61 Mr. B.M. Jahangir,Shariatpur,AMIE(Elec.),30.8.86(SAE) 02.03.93(AE) 12.07.02(SDE) 03.08.10 (XEN Rev.)
XEN Sales & DistributionDivision, Barabkunda, PDB, Chittagong.
1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 foro One Month 2) "Orientation &Manufacture's Test Prossesat Manufacture's Workshop"from 21.04.08 to 30.04.08for 10 days.
China,
CzechRepublic
Alternate Comilla
9 1-01097
10.01.67 Mr. Md. Fafuk Ahmed,
Munshigong, B.Sc.Engr.(Mech),
19.07.94 (AE) 01.07.03 (SDE) 24.09.09 (XEN Incharge) 18.08.2011 (XEN)
XEN Distribution Division, PDB, Tangail.
1) Inspection on 11 Meter Steel Pole(350 daN-500 Nos.) "Type Testinaddition to Factory Test" from24.01.08 to 30.01.08 for 07 days inChina.
Alternate Tangail
10 1-01819
11.10.85 Mr. Md. Moktar Hossain Chapainawabganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722044335 [email protected]
AE, Under CE DistributionZone, PDB, Rangpur.
Alternate
1 1-0428 09.10.56 Mr. Md. Abdur Rouf Rajshahi,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 29.01.15 (Addl. CE, Incharge) 28.07.15 (CE)
CE Civil Works, PDB, Dhaka.
1) Seminar for Trainers from08.06.87 to 19.06.872) Training Managementfrom 08.01.90 for 24 Weeks. 3) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13
Thailand
U.K.
Thailand
1)Pre-Pament Metering System From20.08.04 for 07 Days in South Africa 2) Technical orientation & qualitytest witness on 25 Nos.- 33 KV ACRfrom 11.12.13 to 19.12.13 in SouthKorea. 3) Quarterly Reconciliation from08.01.15 to 10.01.15 in India.
3 11-0053 04.09.56 Mr. Fozal Ahmed Chowdhury
Sylhet Diploma(Power)
21.08.78(SAE), 28.04.04(AE), 10.02.10(SDE) 02.03.14 (XEN, Incharge)
XEN (Incharge) CERS, PDB, Tongi.
1) Technical orientation & qualitytest witness from 13.06.15 to 19.06.15in China.
1 1-0371 14.06.57 Mr. A.B.M. Mizanur Rahman,
Magura,
B.Sc.Engg. (Mech.)
21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 06.12.10(SE) 30.06.14(Add. CE) 01.10.14 (CE) 15.01.15 (Member)
Member Distribution, PDB,Dhaka.
1) Electric Power Engineering.23.05.97 to20.06.97 2) PSCDP Training on"Contract Management(Batch-2)" from 11.11.13 to22.11.13
SouthKorea
Thailand
1) Factory acceptance test of Gasturbine against Shahjibazar 330 MWCCPP Project from 18.12.14 to 24.12.14in France. 2) Witnessing & manufacturingprocess against Syedpur 20 MW P/Sfrom 12.07.15 to 18.07.15 in USA. 3) Quality test witness against Chitt.zone power dist. dev. project from 18-24 March/2016 in India & China
2) Aproposalsent toministrydated29.07.15 forTechnicalOrientation& Qualitytest witnessof PT from20.08.15 to26.08.15 inGermany.
1 1-01350
13.02.73 Mrs. Mosammat JarifaKhatun, Jhinaidah, B.Sc.Engr.(Elec.),05.03.2000(AE) 08.12.09(SDE) 25.10.2011 (XEN, Incharge) 01715000611 [email protected]
Dy.Director (Incharge), Dte. Of systemPlanning, PDB,Dhaka.
1) Masters Degree has beenobtained on "RenewableEnergy" from "Olden BurgeUniversity, Germany" from04.08.08 to 29.08.08 (e¨w³MZ
D‡`¨v‡M wM‡qwQ‡jb) 2) "Policies and Strategies toMitigate Climate Change andEnergy Poverty in Southeastand China from 05.10.09 to09.10.09 for 06 days
Germany
Vietnam
1) Inspection of Copper TerminalLugs in Kolkata From 23.12.04 to30.12.04 for 07 Days. 2) South Asia Women in Energy(SAWIE) Partnership Program-Participation in the XXIst WorldEnergy Congress from 12.09.10 to16.09.10 in Canada. 3) Asia-Pacific Renewable EnergyPolicy against InternationalRenewable Energy Agency (IRENA)-Korea from 14.10.10 to 15.10.10 for02 days in Korea.
Principal
2 1-01679
12.11.80 Mr.Muhammad BellalHossan Gazipur B.Sc.Eng(Computer) 07.04.06 (AE) 18.08.2011 (SDE)
SDE, Dte. Of SystemPlanning, PDB,Dhaka.
1) Training on Pre-paidmetering system from18.08.08 to 29.08.08 for 10days
2) Renewable Energy andEnergy Efficiency from04.01.10 to 22.01.10 3) ''Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to09.08.2011 for 30 days(Excluding travel time). (Bond for 5 years)
SouthAfrica.
India.
China
Alternate
1 1-0751 23.09.63 Mr. Md. Ashraful Islam,
Naogaon, B.Sc.Engr.(Mech.),
30.08.86 (AE) 019.03.98(SDE) 05.01.06 (XEN, CurrentCharge) 09.12.07(XEN, Rev.) 23.04.09(XEN)
XEN,
Sales & DistributionDivision-1 PDB,Rajshahi.
1) Techinal Orientation onSplit Bolt Line TapeConnector G-452. 07 Days,January/06,
India. Principal Rajshahi
2 1-01261
11.03.70 Mr. Shekh Firoz Kabir Satkhira B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 10.03.11 (XEN Incharge)
XEN(Incharge), Distribution Division-2(South), PDB,Mymensingh.
1)Orientation & Training againstturbine pump spares for Khulnapower station in Czech Republic for07 days,Dec/06
Principal Bogra
3 1-01673
27.09.77 Mr.Md.Mahbubul AlamChowdhury Naogaon B.Sc.Eng(Computer) 06.2006(AE) 18.08.2011 (SDE)
SDE, Sales & DistributionDivision-1, PDB, Pabna
1) Central Zone Power DistributionProject, a "Technical Orientationand Quality Test Witness" Programnamed of 11KV Capacitor Bank atApril/2011 for 07(Seven) days inChina.
Alternate Sirajgonj
4 1-01802
07.12.79 Mr. Faozul Islam Shaker Sunamgonj B.Sc.Engr(Elec.) 01.06.09 (AE)
AE, Office of the CE,Distribution Project,PDB, Dhaka.
1) Inspection on Coal Thermal PowerStation construction from 18.11.09to 24.11.09 for 07 days in India. 2) Approval of "ConstructionDrawings" aganist Sylhet 150MWCombined Cycle Power PlantConstruction Project March/11 for08(Eight) days in China.
Alternate
1 1-0359 02.01.57 Mr. Khandker MaksudulHassan, Narayangonj,B.Sc.Engg. (Elec.)13.05.80 (AE) 04.02.86(SDE) 04.02.98(XEN) 11.08.09(SE, Reve. Basis) 30.03.10(SE) 02.01.2012 (Addl. CE,Incharge) 28.06.12 (CE, Incharge) 02.06.14 (Addl. CE) 25.08.14 (CE) 07.09.14 (Member) 20.07.15 (Chairman)
Chairman BPDB, Dhaka.
1) Electrical Power Dist. Engg.07.09.88 to 16.11.88
2) Training program on the"Design of Sub-station" atFactory of ABB From 04.09.03to 22.09.03 for 15 Days
3) Renewable Energy PolicyOption from 04.01.04 to13.01.04 in India
4) Training on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against GreaterChittagong PowerDistribution Project from25.08.07 for 10 (days)
Japan
SwedenFinlandLudbica,
Vasa.
India
Germany
1)For conducting the pre-deliveryinspection of ''Power Transformer'' in93 for 07 days in India. 2) For conducting the Model Test on''Protection Design" before approvalthe Drawing from 1998 for 07 days inChina. 3) "Approval of Engineering DrawingDesign & Data" for Katakhali, 50MWPeaking Power Plant ConstructionProject from 23.02.11 to 01.03.11 for 07(seven) days in China. See N.B.
N.B.4) A workshop titled "Cross Border Electricity Interconnection" from 23.05.2012 to 24.05.2012 in Bhutan.5) "South Asia Power Forum in India 2013" from 02.12.13 to 03.12.13 in India6) Factory witness test against Kadda 150 MW Duel Fuel Power Plant Construction Project from 25.06.14 to 01.07.14 in Germany.7) Technical orientation & quality test witness against SCADA Project from 18.01.15 for 10 days in NewZealand, Australia & Singapore.
2 1-0429 23.04.56 Mr. Nurul Karim,Chittagong,B.Sc.Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN)
XEN,
System Protection &Testing Commisioningcell, Office of CE,Services PDB, Dhaka.
(SE Coal Project, Khulna)
1) Scada System Soft &Hardware from 28.11.88 for14.03.89
2) 33/11KV Power TransformerFrom May/03 for 14 Days 3) GIS From 15.06.04 for 11Days
4) Smart card Type Pre-payment Metering System(Currency Transfer System).April/05 for 14 days in India& Malaysia.
U.K.
Iran
Germany,
India &Malaysia
1) 14.4.2001 to 19.4.2001 for 06 days inIndia. 2)Factory Test Witness & OrientationTraining on Greater Chittagong PowerDistribution Project, ''PowerTransformer'' from July/06 for 14 daysin China.
SL.NO. ID No. Date ofBirth
Name, Dist, Qualificationand Date of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0765 17.11.58 Mr. Md. Arifur Rahman,
Bogra, B.Sc.Engr.(Elec.),
19.05.86(AE) 21.11.99(SDE) 10.07.05(XEN)
PD (Incharge)Chapainawabganj100
MW Power PlantConstruction Project,
PDB, Chapainawabganj.(CAMP office Dhaka)
1)145KV and 36KV CT & PT(RRAGS) from 08.10.03 to
08.01.04 for 90 days
China 1) "Technical Orientation andQuality test Witness" in
August/2011 for 10 (Ten) days inChina.
2) Technical orientation & qualitytest witness on 30 Nos.- oil
Centrifuging Machine from 29.11.13to 07.12.13 in China.
3) Basic design Approval meetingfrom 21.07.15 to 04.08.15 in China.
2 1-0559 01.12.61 Mr. Mustaque Muhammad,
Comilla, B.Sc.Engr.(Elec.), 23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)
SE (addl.char)+E317 System Protection &Testing Commisioningcell,PDB, Dhaka. (Office of CE, services)
1) Advance Protection PowerSystem(APPS), from 21.03.94to 22.04.94 2) Energy Management from19.05.13 to 01.06.13
UK,
Thailand
1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 in Banglalore,India.
2) Conceptual Design Approval ofSylhet 90MW CCPP Project (2nd Unit)27.04.06 to 02.05.06, in China. 3)''Conceptual Design Approval''Sylhet 90MW CCPP (2nd Unit) 28.01.07to 08.02.07 in China 4) Approval of Engineering Data &Drawing from 08.06.09 to 17.06.09 inChina. 5) Basic Engineering review meetingfrom 16.08.13 to 27.08.13 in China. See N.B. N.B.
6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China. 7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India.
7 1-0527 01.06.57 Mr. Samsul Haque, Comilla, B.Sc.Engg. (Elec.)
24.07.81(AE) 20.07.88(SDE) 17.05.03(XEN)
XEN,
Dte. of Training &Career Develpopment PDB,Dhaka.
1) Automation System from22.10.07 to 11.11.07 for03(Weeks)
Russia
8 1-0734 02.03.60 Mr. Md. Anower Hossain,
Joypurhat, B.Sc.Engr.(Elec.),
19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)
XEN
Dte. of Training &Career Develpopment PDB,Dhaka.
1)MV Switchgear,VD4 and VBFFrom 10.11.03 for 11 Days
India 1)Orientation & Technical Trainingon 33 KV Circuit Bracer & 11 KVSwitchgear from 14.03.05 for 7 days inIndia.
deputed toBoard ofInvestment office of thePrimeministry
PDB, Dhaka.
D 01.01.10
Siddirgonj G 2004 02.07.09
M.Admin 2001 08.02.11
P&D 2003
P&D 2001 16.11.08
1976
1976 1976
G 1978
1994 1977
D 02.03.11 1977
D 02.06.10
P&D 2003 04.05.10
G 2003 02.06.10
P&D 2004 05.01.11
P&D 2003 11.10.10
G 27.01.10
Chandpur G 2004 06.05.10
M.Admin 2004 05.10.11
P&D 15.04.08
P&D 02.06.10
P&D 31.07.08
Chairman 1997 27.04.08
D 01.01.10
Chairman 2000 08.02.11
Power St. Type Qualification Last visit Transfer Date
F 04.11.08
P&D 22.06.10
P&D 16.06.10
P&D 13.11.08
Barapukuria G 24.08.09
D 06.05.10
Barapukuria
G 2004 01.01.10
D 2004 07.01.10
M.Adm 23.03.10
P&D 20.12.10
D 2003 02.06.10
M.Admin 12.06.10
M.Admin 2004 09.06.10
D 2005 21.06.09
P&D 09.03.10
Barapukuria
G 01.01.10
P&D 2005 20.12.10
Sylhet G 2007 02.06.10
D 2004 05.11.08
Khulna G 11.11.08
Khulna G 11.11.08
D 01.01.10
D Diploma 01.10.10
Khulna G 11.11.08
D 01.01.10
P&D 2001 30.12.10
Chittagong G 2007 02.03.11
P&D 2004 13.01.11 1978
P&D Diploma 01.01.10
Siddirgonj G
P&D 14.08.08
Ghorasal G 30.03.10 1978
D
D 2004 09.11.08
Khulna G 11.11.08
D
D 06.05.10
M.Admin 12.06.10
P&D 20.12.10
P&D 20.04.08
G 24.08.10
Bheramara
G 08.02.11
P&D 2004 08.02.11
G 04.08.10
Barapukuria
G 02.06.10
Chairman 2004 01.07.10
Syedpur G 03.08.10
D 01.01.10
P&D 15.04.08
D 2004 17.09.09
P&D 2004 25.06.09
P&D
Pathoregata
1976
1976 1976
D 02.03.11 1977
G 1978
M.Admin 2004 05.10.11
IPP G 2003 30.03.10
Chairman 2000 01.01.10
D 01.01.10
D 1996 14.07.08
D 2005 06.05.10
P&D 15.04.08
P&D 2004 25.06.09
P&D
D 2004 01.04.10
D 06.05.10
P&D Diploma 02.06.10
P&D 2004 25.06.09
P&D 20.04.08
D 02.06.10
D 01.01.10
D 31.07.08
P&D 02.06.10
M.Admin 02.06.10
2005 02.06.10
Diploma
Diploma
Diploma
Diploma
SL.NO.
ID No. Date ofBirth
Name, Dist,Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection
1 5251 Mr. Lokman HossainMiah
13.02.14 (as memberadmin. in BPDB)
Member Administration, PDB,Dhaka.
1) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Factory witness test againstKadda 150 MW Duel Fuel PowerPlant Construction Project from30.06.14 to 06.07.14 in China. 4) witnessing of manufacturingprocess against Barishal GasTurbine Power Plant from25.11.14 to 01.12.14 in USA. 5) Factory acceptance test ofGas turbine againstShahjibazar 330 MW CCPPProject from 15.01.15 to 22.01.15in France. 6) Witnessing of manufacturingagainst Shikalbaha 60 MWPower Station from 20.03.15 to26.03.15 in Czech Republic 1) Factory Test Witness AgainstShahjibazar 330 MW CCPPProject from 25.04.15 to 01.05.15in Spain. 2) witnessing of manufacturingprocess against BaghabariPower Station from 30.06.15 to06.07.15 in UK
7) for Factory Test WitnessAgainst Shahjibazar 330 MWCCPP Project from 30.04.15 to01.05.15 in Spain. 8) witnessing of manufacturingprocess against BaghabariPower Station from 30.11.15 to6.12.15 in UK2 11-0352 16.10.57 Mr. Md. Nazrul Islam
Magura. Diploma(Civil) 02.08.82 (SAE) 22.04.10(AE)
AE, Civil Construction-2 PDB,Dhaka.
3 Mr. Ezaz Karim
AE, PC Pole ,Chittagong PDB,Dhaka.
SL.NO.
ID No. Date ofBirth
Name, Dist,Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection
1 1-0440 23.12.58 Mr. KhaledMahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE)
Member, Generation,PDB, Dhaka
1) Sub-Station Design From26.02.94 to 25.05.94
2) Training on Power Sector from09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .
4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to 23.03.13
South Korea& Japan
Japan
France
Italy
Australia
1)China in 1992
2)India in 2002
3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany.
8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.
10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. 25. 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China
1 1-0392 06.01.57 Mr. A.T.M ZahirulIslam Mojumder,
Khagrachari
B.Sc.Engg. (Civil.),
09.03.81 (AE) 19.05.86(SDE) 07.09.99(XEN) 13.01.11 (SE) 01.10.14 (Addl. CE) 03.02.15 (CE) 13.07.15 (Member)
Member, P & D, PDB,Dhaka Peaking Power
I) Project Management From18.08.97 to 19.09.97 2)International Curse on HydroPower From 28.08.2000to14.09.2000 3)Traning On Boiler EquipmentOperation & MaintenanceAgainst 210 MW. SiddhirgongFrom 02.09.04 To one Month 4) Approval of Engineering Data& Drawing from 07.06.09 to16.06.09 for 07 days.
Sweden
Norway
Russia,
China
1)23.09.94 to 28.11.94 in India, 2) Inspection on Approval ofEngineering Data & DrawingJune/09 for 07 days in China. 3) Inspection on Coal FiredPower Station from Inspectionon Coal Fired Power Stationfrom 19.01.10 to 26.01. 10 inChina. 4) Factory Witness Test(Engineeing Inspection)against Faridpur 50MW PeakingPower Plant ConstructionProject from October/10 for 08days in Norway. See N.B.
N.B. 5) “Factory Test Witness for Balance'' (For Balance of Plant” in India and Indonesia & For Emergency Diesel Generator in Singapore) against Gopalgonj 100MWand Faridpur 50 MW Peaking Power Plant Construction Project for 07 days in India and Indonesia. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Factory Witness Test USA
SL.NO.
ID No. Date ofBirth
Name, Dist,Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection
1 1-0559 01.12.61 Mr. MustaqueMuhammad, Comilla,
B.Sc.Engr.(Elec.),
23.01.84(AE) 18.03.93(SDE) 30.10.03(XEN) 31.03.14 (SE)
SE (addl.char)+E317 System Protection &Testing Commisioningcell,PDB, Dhaka. (Office of CE, services)
1) Advance Protection PowerSystem(APPS), from 21.03.94 to22.04.94 2) Energy Management from19.05.13 to 01.06.13
UK,
Thailand
1) 230KV CT Defect Rectification,24.06.02 to 28.06.02 inBanglalore, India.
2) Conceptual Design Approvalof Sylhet 90MW CCPP Project(2nd Unit) 27.04.06 to 02.05.06,in China. 3)''Conceptual DesignApproval'' Sylhet 90MW CCPP(2nd Unit) 28.01.07 to 08.02.07in China 4) Approval of Engineering Data& Drawing from 08.06.09 to17.06.09 in China. 5) Basic Engineering reviewmeeting from 16.08.13 to27.08.13 in China. See N.B.
N.B. 6) Inspection of Main Transformer (11/230 Step up X-former) from 15.01.14 to 21.01.14 in China.
7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India.
2 1-0683 29.12.60 Mr. Md. Haroon UrRashid, Kishoregonj,
B.Sc.Engr.(Elec.),
30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 28.07.15 (SE) 0171-1624224
Deputy-PD Ghorasal 365 MW CCPPConstruction Project,Dhaka & PD (Addl. Charge) Bhola 225 MW PowerPlant ConstructionProject,Dhaka
1)Improvement of Operation ofElectric Power From 09.01.01 to11.02.01 2) Training on 33/11KV 2x10 MVAsub station equipment 10 days,May/2006. 3) Training on Single Phase &Three Phase Pre-payment MetersFrom 08.11.07 to 15.11.07 07 days.
4) Project Management fron 15-21December. 5) upgrading & retrofitting workfrom 03.03.14 to 16.03.14 6) Oeration & MaintenanceTraining against Bhola 225 MWPower Plant Project from 03.08.14to 09.08.14 7) Operation & MaintenanceTraining on GT & Gas Boosteragainst Bhola 225 MW CCPPProject from 14.04.15 to 28.04.15 .
Japan
Norway.
South Africa
Thailand
USA
China
France & USA
1) Inspection On 33KV insulatorfrom 04.5.02 to 11.05.02 India. 2) Inspection On 11KV HotstickJanuary/2001 for 07 days in USA.
3) "Technical Orientation andQuality Test Witness" of BucketTruck to be supplied for centralztone power distributionproject from 10-16 March, 2013in China. 4) Basic Engineering ReviewMeeting against BHOLA 225 mwccpp Project from 16 - 27August/2013 in China. 5) Detailed engineering designreview meeting on costructionof Bhola 225 MW P/Sconstruction project from10.04.14 to 21.04.14 for 14 daysin China 6) Inspection againstdistribution control systemfrom 20.08.14 to 26.08.14 inSingapore.. +H528) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9)Inspection against Ghorasal 365 MW CCPP
Construction Project Oct/2015 in Germany. 10) Inspection against against Ghorasal 365 MW CCPP Construction Project Jan/2015 4 in Germany.
3 1-0727 01.03.60 Mr. MahababurRahman, Dhaka,
B.Sc.Engr.(Elec.),
19.05.86(AE) 19.03.98(SDE) 10.07.05(XEN)
Manager (Incharge) Maintenance, 5-6Unit, Ghorasal Power Plant PDB, Palash,Narsingdhi.
1) Power Station Maintenance. December' 1987 for 9 Months
2) Practical Demonstration &Technical Training againstGhorasalPower Station from09.01.05 for 14 days.
Russia
Russia
1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project for 07 daysin Singapore. 2) Meeting on "Power PlantMaintenance Program"organized by USAID from14.11.2011 to 18.11.2011(excluding travel time) inTurkey. 3) " Witnessing ofManufacturing Process and testof the equipment ofmanufacture's works includingtransfer to technical know -how" from 16.06.12 to 23.06.12for 7 days in Russia. 4) Witnessing of manufacturingprocess and test of theequipment at manufacturer'sworks including transfer oftechnical know-how of autocontrol spares' againstGhorasal P/S from 12.03.14 to18.03.14 for 7 days in Russia. 5) Visited China against designapproval of Ghorasal 365 MW.Power Station ConstructionProject.Visited China againstdesign approval of Ghorasal365 MW. Power Station Construction Project.
Visited China against designapproval of Ghorasal 275 MW.Power Station ConstructionProject.
4 1-01083 15.01.70 Mr. Md. ZahurulIslam Bhola, B.Sc.Engr.(Elec.),
19.07.94(AE) 03.02.03(SDE) 18-08-11 (XEN) 0174-8720214
XEN, Ghorasal PowerStation. PDB, Palash,Narsingdhi.
1) Operation & Maintenance ofGenerator from 18.03.13 to29.03.13
India 1) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15to 13.04.15 in China. 2) Visited Chaina on Designapproval against Ghorasal 365MW. Power Station Project. Dec/2015
5 1-01529 16.12.74 Mr. Noore AlamSiddiqui, Pabna, B.Sc.Engr.(Civil.),
29.04.2001(AE) 13.06.11 (SDE) 15.11.13 (XEN,Incharge)
Deputy Director (XEN)Incharge, Design andInspection-3 PDB, Dhaka.
1) Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07(Seven) days in China. 2) Approved Basic design &drawing of Shahjibazar 330 MWCombined Cycle Power PlantConstruction Project from05.08.14 to 18.08.14 in China. 3) Examine & Discussion onbasic design of Kadda 150 MWDuel Fuel Power PlantConstruction Project from22.06.14 to28.06.14 in China. See N.B.
1 1-0566 31.01.61 Mr. Md. MustafizurRahman, Bogra, B.Sc.Engr.(Elec.),
09.10.84(AE) 18.03.93(SDE) 02.01.05(XEN) 31-03-14 (SE)
Senior System Analyst Dhaka ComputerCentre PDB, Dhaka.
1) Training on Maintenance ofH.T. Switchgear from 30.12.86 to26.04.87 2) Training on VHF EquipmentOperation & Maintenance from15.11.09 for 30 days.
Russia
New Zealand
1) Inspection on CFL Bulbagainst Efficient Lightinginitiative for Bangladesh(Phase-1 & Phase-II) fromJuly/10 for 05 days in China. 2) Attending a program ofPower Division named"Management of PPP" from11.11.12 to 25.11.12 in Malaysia.
3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland 4) technical orientation &quality test witness againstSCADA Project from 2015 10 daysin Singapore..
1 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN) 31.03.14 (SE)
Director (SE)
Dte. Of Training &Career Develpopment PDB, Dhaka.
1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Design planningon Power Construction 01(one)month in 2004 3) Training on O & M of Pre-payment Metering from 09.11.07to 15.11.07 for 07 days.
Newzeland
Russia
South Africa
1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland. 5) Technical Orientation &Quality Test Witness from10.11.15 to 17.11.15 in China against Ctg. Power DistributionProject
A294
1 1-0440 23.12.58 Mr. KhaledMahmood,Mymensingh,B.Sc. Engg. (Elec.)24.07.81 (AE) 06.08.86(SDE) 05.04.2000(XEN) 18-8-2011 (SE) 01.06.15 (Addl. CE)
Member, Generation,PDB, Dhaka
1) Sub-Station Design From26.02.94 to 25.05.94
2) Training on Power Sector from09.01.01 to 08.02.01 3) Orientation/ TechnicalTraining on AVR Set againstBarisal Power Station from01.11.04 to 07 days .
4) "Pactrical Demonstratrion &Technology Transfer Program(phase-2) From 06.10.08 to19.10.08 for 14 days. 5) Micro Hydro Power trainingprogram from 15.03.13 to 23.03.13
South Korea& Japan
Japan
France
Italy
Australia
1)China in 1992
2)India in 2002
3)China in 2003 4)Measuring & Testing SetsSupply and Training From10.12.03 to 30.12.03 CzechRepublic, 5) Renewable Source of Energy:Micro Hydro Power for RuralDevelopment . From 07.05.07 to12.05.07 in Indonesia 6) "Witnessing ofManufacturing Process & test ofthe Equipment atManufacturer’s works includingof Technical know-how” from08.11.09 to 11.11.09 fro 07 daysin USA. * See N.B.
* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.
10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. A66 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China
1 1-0373 17.08.57 Mr. Md. ShamsulHassan Miah,Narsingdhi,B.Sc.Engg. (Mech.)21.06.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 28.12.10 (SE) 25.08.14 (Addl. CE) 19.11.14 (CE) 18.01.15 (Member)
Member Company Affairs
PDB, Dhaka.
1) Computer Application.09.07.84for 08 (eight) weeks.
2)Project and Financing From01.9.03 to 10.9.03
Thailand 1) 01.5.98 to 10 days, India2) 22.9.2000 for 10 days U.K.,Finland & USA
3) 25.9.2001 to26.9.2001Singapore 4) 330-450MW Combined CyclyPower Station Project from21.04.08 to 23.04.08, 03 days inSingapore. 5) Inspection on Power Plantaganis Desh Energy Ltd. from10.06.10 to 12.06.10 in China. * See N.B.
N.B. 6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 26.08.15 to 30.08.15 in UK. a
6 1-01616 10.12.82 Mr.Ashiq Imran Barisal B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN,Incharge)
XEN (Incharge), Design & Inspection-1, PDB,Dhaka.
1) Supply & Retrofitting on-lineMachinery Protection &Management System from11.10.09 to 05.11.09 for 26 days. 2) "Training for 2 Engineers ofBPDB at GE facility" againstRangpur 20 MW Power Plant from26.04.14 to 11.05.14
Bahrain
USA
1) Basic Design Review againstThohazari 100MW PowerStation Construction Projectfrom October/10 for 07 days inChina. 2) Engineering review meeting(Basic Design & Drawing)against Shikalbaha 225 MWDuel-Fuel CCPP Project from16.11.14 to 27.11.14 in India. 3) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from 31.03.15to 13.04.15 in China. 4) Preliminary Design &Drawing against Ghorasal 365MW CCPP Project from Sep/2015 in China. 5)Preliminary Design &Drawing against GhorasalRepowering Project Feb/2016in China
2 1-0557 21.09.60 Mr. Md. Abu TaherKishoregonjB.Sc.Engg. (Mech.)28.12.83(AE) 18.04.94(SDE) 09.03.03(XEN)
Director (SE)
Dte. Of Training &Career Develpopment PDB, Dhaka.
1) Training on O & M VHFequipment 01(one) month in2002 2) Training on Design planningon Power Construction 01(one)month in 2004 3) Training on O & M of Pre-payment Metering from 09.11.07to 15.11.07 for 07 days.
Newzeland
Russia
South Africa
1) "Technical Orientation &Quality Test Witness" againstACSR Grosbeak, ACSR MERLIN,GUY WIRE from 22.05.13 to28.05.13 in China. 2) "Technical Orientation &Quality Test Witness" from15.11.13 to 21.11.13 in SouthKorea. 3) Witnessing of Supply,Installation, Testing &Commissioning of ExcitationSystem against Shiddirganj P/Sfrom 07.12.2014 to 16.12.14Russia. 4) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland.
4 1-0887 15.08.61 Mr. Mirza Md.Kamruzzaman, Tangile,AMIE(Elec.),25.8.84(SAE) 10.09.89(AE) 18.06.2000(SDE) 31.10.13 (XEN)
XEN Energy Auditing Unit,PDB, Sylhet.
1) “Technical Orientation andQuality Test Witness” on BarCoded Plastic Seal &Accessories for 05(Five) days inBrazil. 2010
5 1-01975 18.07.83 Mr. Md. Abdullah AlMamun Sardar Rajshahi B.Sc. Engg. (Elect.) 02-10-11 (AE) 01717853702
AE
Sales andDistribution DivisionHathazari, PDB,Chittagong.
6 1-01973 10.06.83 Mr. Faizul Alim Alo Coxs'Bazar B.Sc. Engg. (Elect.) 02-10-11 (AE) 01818143143
AE (RE) Chokoria E/S, PDB,Cox'sBazar.
7 1-02007 03.12.79 Mr. Md.Asaduzzaman Chuadanga B.Sc. Engg. (Elect.) 02-10-11 (AE) 01714443173
AE, Sales & DistributionDivision Mohra, PDB,Chittagong.
8 1-01953 01.07.86 Mr. Shakil Md.Nahid Noakhali B.Sc. Engg. (Elect.) 02-10-11 (AE) 01757019597
AE, Sales & DistributionDivision-3 PDB, Comilla.
ID No. Date ofBirth
Name, Dist,Qualification and
Date of Joining
Place of Posting Field of Training & Duration Country Inspection
1 1-0816 10.01.62 Mr. Md. KamrulAhsan, Barisal B.Sc.Engr.(Elec.)08.02.87(AE) 21.11.99 (SDE) 16.01.06(XEN, CurrentCharge) 10.02.10 (XEN)
Dy. Director(XEN),
Director of Trainingand Career Development
PDB, Dhaka. & PD Dhaka West 108 MWHFO Power PlantConstruction Project,Bosila, Keraniganj.
1) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13
Thailand 1) Factory Test Witness 26.03.04to 31.03.04, 06 days in India. 2) Inspection of Engine &Generator against Daudkhandi50MW Peaking Power Plantfrom 14.12.10 to 22.12.10 for 07days in Finland 3) PIM (Power ManagementInstitute) NTPC from 14.03.11to16.03.11 for 03 days atFebruary/11. 4)Technical orientation &Quality test witness fromNov/15 in China
2 1-01177 01.09.68 Mr. Ahmed JahirKhan, Potuakhali, B.Sc.Engr.(Mech),
14.12.97(AE) 27.04.04(SDE) 31.07.12 (XEN)
Dy. Director (Incharge) Renewable Energyand Researche &PlanningDevelopment Project,PDB, Dhaka .
Training against Shalna Projectfor 45 days in China Sep/2015
Russia
Australia
India
1) Workshop on RegionalCooperation in sedimendmanagement in Hydro powerproject from 16.06.09 to 17.06.09for 02(Two) days in Nepal. 2) Training course on Bio-gastechnology form 22.06.09 to16.08.09 in China. 3) Solar Power Plant "TestWitness" from October/10 for07 days in China. * See N.B.
* N.B. 4) "Factory Acceptance Test (FAT) & Technical Orientation Course" against Greater Chittagong Power Distribution Project SCADA-Rehabilitation & Extension in Sep/2011 for 07 days or from the date of in Newziland 5) A program named "Carbon Capturing & Destroy" from 26.02.2012 to 29.02.2012 in Singapore. 6) Summit named "Uncover LNG infrastructure, supply chain & trade developments" from 27.03.2012 to 30.03.2012 in Singapore. 7) A program titled "Climate Change and Renewable Energy" from 10.08.2012 to 28.08.2012 in USA.
SLno
ID No. Date ofBirth
Name, Dist,Qualification and
Date of Joining
Place of Posting Field of Training & Duration Country Inspection
1 1-01611 02.12.77 Mr. MohammedHedhayetullah Khan
Dhaka B.Sc.Eng(Mech) 07.04.06 (AE) 18.08.2011 (SDE) 24.03.14 (XEN,Incharge)
XEN (Incharge) Dte. of Desigan &Inspection-2 PDB,Dhaka.
1) Training on ''Operation &Maintenance of Gas Turbine inFrance 01.12.07 to 14.01.08 for 1.5Months & ''Operation &Maintenance of CCPP in Chinafrom 19.07.07 to 17.08.07 for 01Month against 90 MW SylhetCombined cycle Power Station(Unit-2) Cons. Project (Bond for03 Years) 2) Training on Meter Technologyagainst SCADA Project from12.03.15 to 28.03.15 .
France &China
Singapore
1) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07(seven) days in China. 2) Test Witness" against 33/11KV, 16/20 MVA Power from05.02.13 to 14.02.13 in China. 3) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV GIS from 02.12.13to 05.12.13 in Germany.
2 1-01349 12.05.72 Mr. A.N.M. TariqueAbdullah, Comilla,
B.Sc.Engr.(Chemical.),05.03.2000(AE) 18.08.2011 (SDE) 25.10.11 (XEN,Incharge) 18.06.15 (XEN)
Dy. Director (XEN)
Dte. of Purchase, PDB,Dhaka.
1) "Renewable Energy" from01.06.13 to 30.06.13
Thailand 1) 'Developments inRenewable EnergyTechnologies'' from 07.03.11 to09.03.11 in India. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to 01.03.11for 07(Seven) days in China. 3) conference titled "CarbonForum Asia 2011" organized byADB from 02/11/2011 to03/11/2011 for 2 (two) days(excluding travel time) inSingapore. 4) Seminar on CDM in Indiafrom 23.04.12 to 24.04.12 5) 9th International LNG Worldfrom 11.08.14 to 13.08.14 inSingapore. 6) Technical orientation &quality test witness from20.04.15 to 26.04.15 in China.
3 1-02022 08.06.86 Mr. Md. MehediHasan sumon Tangail B.Sc. Engg. (Elect.) 16-10-11 (AE)
AE S & D Division-1(North) PDB, mymensingh.
* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.
10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. 25. 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China
N.B. 5) “Factory Test Witness for Balance'' (For Balance of Plant” in India and Indonesia & For Emergency Diesel Generator in Singapore) against Gopalgonj 100MWand Faridpur 50 MW Peaking Power Plant Construction Project for 07 days in India and Indonesia. 6) Preliminary Design & Drawing against Ghorasal 365 MW CCPP Project from 31.03.15 to 13.04.15 in China. 7) Factory Witness Test USA
8) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9)Inspection against Ghorasal 365 MW CCPPConstruction Project Oct/2015 in Germany.
10) Inspection against against Ghorasal 365 MW CCPP Construction Project Jan/2015 4 in Germany.
Bogra F 04.11.08
P&D 1986 11.10.10
P&D 2004 08.02.11 A294
4 P&D 2004 18.08.09
* N.B. 7) Bangla Trac Ltd Ges JointVenture of Bangladesh Diesel Plant from 14.06.10 to 17.06.10 for 04 days in Germany. 8) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USAat January/11. 9) To attend a meeting in India from 01/11/2011 to 05/11/2011 between BPDB and Higher authority of NTPC in order to build 2*660 MW Coal based Thermal Power Plant.
10) Meeting on "Power Plant Maintenance Program" organized by USAID from 14.11.2011 to 18.11.2011 (excluding travel time) in Turkey. 11) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 12) A meeting between BPDB & EGATi from 28.05.2012 to 03.06.2012 in Thailand. 13) To attend meeting, seminer on 2012 Plant Industry Forum and visiting different Industrial Complex from 19.11.12 to 23.11.12 in South Korea. 14) 1) "Technical Orientation & Quality Test Witness" on 11KV Lighting Arrester from 20.07.13 to 26.07.13 in China. 15) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 16) 2* 660 MW Maitree Super Thermal Power Project at Rampal Bagerhat Finalization of RFP Document from 26.12.13 to 29.12.13 in India.. 17) Examine & Discussion on basic design of Kadda 150 MW Duel Fuel Power Plant Construction Project from 22.06.14 to28.06.14 in China. 18) Witnessing of manufacturing process against Tongi 80 MW P/S from 12.06.14 to 18.06.14 in Nedarlands.. 19) Participation in the 8th JSC, 8th JWG and 9th Board meeting of Bangladesh-India Friendship Power Company Limited from 09.10.14 to 11.10.14 in India. 20) Technical specification against Ashiganj 450 MW CCPP (North) Project from 01.11.14 to 08.11.14 in Spain. 21) Meeting with M/S Fichtner, BIFPCL & NTPC Officials to finalize technical specification for 1320 MW Maitree Super Thermal Power Project at Rampal from 12.11.14 to21.11.14 in India 22) LNG Workshop from 09.06.15 to 14.06.15 in Singapore. 23.A85t shahjibazar 330 MW project from 28.04.15 to 04.05.15 in France 24. witnessing of manufacturing process of refurbishment of hot path spares parts against Baghabari Power Station from 26.12.14 to 01.01.14 in Thailand. A66 26. Basic Design & Drawing Approval against Barapukuria 275 MW Aug/2015 for 10 days in China 27.Basic Design & Drawing Approval against GPS 365 MW Dec/2015 for 8 days in China
A proposalSent to
ministry forTest witness
of energymeter
againstSummitBarisal
Power Lit. 6days in
Switzerland,Norway,FinlandN.B.
6) convention on "Investment Oppertunities in Bangladeshi Power Sector" in India from 26.02.2012 to 01.03.2012. 7) A conference named "LNG Regasification Terminals" from 19-22 June/2012 in Singapore. 8) A meeting against 1320 MW Coal based Power Plant Contruction Project, Khulna from 11.07.2012 to 12.07.2012 in India. 9) A meeting with NTPC from 23.08.2102 to 26.08.2012 in India. 10) Inspection against Patenga, Chittagong 50 MW HFO Fired Power Station for test witness of metering system from 19.07.13 to 26.07.13 in Switzerland. 11) Meeting on India-Bangladesh 400 KV Transmission line & Bheramara HVDC Station Commissioning from02.09.13 to 05.09.13 in India. 12) "SAARC Seminar on Role of Private Sector in Regional Power Trade" from 26.09.13 to 27.09.13 in India. 13) Meeting on Joint Venture Agreement against Maheshkhali 1320 MW Coal Based Thermal Power Plant from 12-16 August/2014 in china. 14) Metering manufacturing facility & witnessing meter test against 341 Bibiana (Phase-2) from 05.09.14 to 17.09.14 in USA & China. 15) Discussion, negosiation and finalization of Extension of Term of Power Purchase Agreement from 15.07.14 to 17.07.14 in Malaysia. 16) Engine Test Witness against Nawabganj 55 MW HFO Fired Power Station from 09.03.15 to 13.03.15 in Germany & France 17) Test witness of energy meter against Chittagong 108 MW HFO Fired P/S from 26.08.15 to 30.08.15 in UK. a
Siddirgonj G 2004 02.06.10
Comments
Comments