FORCINA HALL - HVAC AND ROOF REPLACEMENT
THE COLLEGE OF NEW JERSEY
2000 PENNINGTON ROAD
EWING, NJ 08628
PROJECT SPECIFICATIONS
VOLUME 1 OF 3
DIVISION 01 THROUGH DIVISION 22
ISSUED FOR CONSTRUCTION
January 15, 2018
Prepared by:
DLB Associates Consulting Engineers, P.C.
265 Industrial Way West
Eatontown, NJ 07724
(DLB # 47210)
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TABLE OF CONTENTS
SECTION DESCRIPTION
TABLE OF CONTENTS TOC - 1
DIVISION 01 – GENERAL CONDITIONS
010100 SUMMARY OF WORK
010250 MEASUREMENT AND PAYMENT
011000 PROJECT PROCEDURES
013000 SUBMITTALS AND SUBSTITUTIONS
013100 QUALITY CONTROL
013200 TEMPORARY FACILITIES
013220 PHOTOGRAPHIC DOCUMENTATION
013300 CONTRACT CLOSEOUT
013400 PROJECT RECORD DOCUMENTS
015240 CONSTRUCTION WASTE MANAGEMENT
018114 VOC LIMITS FOR ADHESIVES, SEALANTS, AND ARCHITECTURAL
COATINGS
018119 CONSTRUCTION IAQ MANAGEMENT
DIVISION 02 – EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
028213 ABATEMENT OF ASBESTOS CONTAINING MATERIALS USING NON-FRIABLE
METHODS
028214 ABATEMENT OF ASBESTOS CONTAINING MATERIALS IN OCCUPIED
BUILDING IN ACCORDANCE WITH NJAC 5-23:8
028433 REMOVAL AND DISPOSAL OF PCB BULK PRODUCT
DIVISION 03 – CONCRETE
033000 CAST-IN-PLACE CONCRETE
DIVISION 05 – METALS
051200 STRUCTURAL STEEL FRAMING
DIVISION 6 – WOOD, PLASTICS, COMPOSITES
061053 MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
070150 PREPARATION FOR REROOFING
074213 METAL WALL PANELS
075400 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
076200 SHEET METAL FLASHING AND TRIM
079200 JOINT SEALANTS
DIVISION 08 – OPENINGS
081113 HOLLOW METAL WORK
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TABLE OF CONTENTS
SECTION DESCRIPTION
TABLE OF CONTENTS TOC - 2
DIVISION 09 – FINISHES
095113 ACOUSTICAL PANEL CEILINGS
099100 EXTERIOR PAINTING
DIVISION 22 – PLUMBING
221426 ROOF DRAINS
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUMMARY OF WORK 010100 - 1
SECTION 010100 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the specifications,
including General and Supplementary Conditions and other
Division 1 Specification Sections, apply to this Section.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. The Project consists of all work noted on the drawings
and in these specifications for the Forcina Hall HVAC &
Roof Replacement project.
1. Project Location: The College of New Jersey, Ewing
New Jersey
2. Owner: The College of New Jersey, State of New
Jersey
B. Contract Documents, dated January 15, 2018, were prepared
by DLB Associates.
1.3 CONTRACTS
A. The project contract is between The College of New Jersey
and the single prime contractor performing the work
specified.
B. Definition of Extent of Contract Work: The contract
documents, specifications, project drawings,
manufacturer’s installation handbooks, TCNJ form of
agreement, and the contractors’ response to the RFP
represent the extent of the construction contract.
1.4 CONTRACTORS USE OF PREMISES
A. General: During the construction period the Contractor
shall have full use of the premises for construction
operations, including use of the site. The contractor’s
use of the premises is limited only by the Owner’s right
to perform work, retain other contractors on portions of
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUMMARY OF WORK 010100 - 2
associated projects, or to access the building for the
occupants.
1. Contractor is to coordinate their work with the
activities for each work location.
2. Contractor shall provide for and maintain protected
pedestrian access flow through work areas during the
fulfillment of this contract. This work shall
include but is not limited to: temporary walkways,
protection of open trenches and manholes, safety
barriers, overhead protection, and signage for
pedestrian directions.
3. Unhindered and protected egress through all
emergency exit doors shall be maintained at all
times, except with written approval from the New
Jersey State Department of Community Affairs to
close such doors.
B. Use of the Site: Limit use of the premises to areas
required for equipment and material storage and access to
the roof area. Confine operations to areas within
contract limits indicated. Do not disturb portions of
the site beyond the areas immediately adjacent to the
building where the work is being performed.
1. Owner Occupancy: Allow for Owner occupancy and use
by the public.
2. Driveways and Entrances: Keep driveways and
entrances serving the premises clear and available
to the Owner, the Owner’s employees, and emergency
vehicles at all times. Do not use these areas for
parking or storage of materials unless previously
approved by the owner. Schedule deliveries to
minimize space and time requirements or storage of
materials and equipment on -site.
a. This includes traffic lanes on Metzger Dr.
During any full or partial lane closures, for
any duration, the contractor or its
subcontractor(s) shall provide proper traffic
control measures.
3. Burial of Waste Materials: Disposal of organic and
hazardous materials on-site either by burial or
burning, will not be permitted.
4. Owner will provide designated areas near the
construction site for parking for two vehicles, all
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUMMARY OF WORK 010100 - 3
other vehicles must park at the TCNJ Carlton Avenue
parking lot and have the workers shuttled to the
site.
C. Use of the Existing Building: Maintain the existing
building in a weathertight condition throughout the
construction period. Repair damage caused by
construction operations. Take all precautions necessary
to protect campus, buildings, contents, components, and
systems and occupants during the construction period.
D. No Work Permitted On Site During The Following Times:
General Contractor to Schedule Accordingly.
1. TCNJ Commencement: May 17, 2018 – May 18, 2018
2. Special Olympics: June 08, 2018 – June 10, 2018
E. Contractor shall install new or cleaned filters in all
roof drains at the start of each day whenever
construction activities have the potential to generate
debris. The roof shall be thoroughly cleaned, and the
roof drain filters shall be removed at the end of each
day, whether or not rain is forecasted, to ensure the
storm drainage system is fully operable.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01010
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUMMARY OF WORK 010100 - 4
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 1
SECTION 010250 – MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SCHEDULE OF VALUES
A. A. Each Contractor shall prepare a schedule of values in
coordination with the preparation of progress schedule.
Correlate line items with other administrative schedules and
forms required for the work, including progress schedule,
payment request form, listing of subcontractors, schedule of
allowances if any, schedule of alternates if any, listing of
products and principal suppliers and fabricators, and
schedule of submittals. Break down principal subcontract
amounts into multiple line items for each entity of work.
Round off to nearest whole dollar, but with total equal to
Contract Sum. Submit 4 copies of schedule of values to the
Owner and Architect for review and approval.
B. Upon Owner/Architect approval, Owner will return the
Schedule of Values to the Contractor for the Contractor to
submit to the bonding company for their acceptance.
Payments will not be made to the Contractor until the
bonding company has provided a written acceptance to the
Owner.
C. The schedule of values shall be tabulated into subcontracts
and trades with the Quantity, Labor, Material, and Total
Cost indicated. The Schedule of Values shall include such
items as bonds, insurance, allowances and alternates,
punchlist/close out documents and shall enclose copies of
invoices and/or cancelled checks from bonding and insurance
agents.
D. Schedule of values shall be submitted on AIA Form G703 or
similar form approved by the Architect and Owner.
E. Each Contractor's monthly application for payment shall be
in the same schedule form, reflecting the same items from
above. Unit costs shall be realistic for their part of the
Work.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 2
1.2 CHANGES IN THE WORK
A. When a change in the Work includes a category or categories
of Work both added to and deducted from the Contract, the
total quantities of added Work and of deleted Work shall be
determined separately for each category and the appropriate
unit price or net cost of the Work shall be applied to the
difference between the two total quantities.
B. Unit prices shall be inclusive of all costs and shall be
applied to units of measure as defined in the Specifications
for each category of Work.
C. For all extra Work performed by the Contractor, the gross
cost to the Owner shall include the net cost of the Work to
the Contractor plus an allowance for overhead and profit not
to exceed 15% of the net cost.
D. For all extra Work performed by a Subcontractor, the gross
cost to the Owner shall include the net cost of the Work to
the Subcontractor plus an allowance for overhead and profit
not to exceed 15% of the net cost, plus the Prime
Contractor's overhead and profit not to exceed 5% of the
Subcontractor's cost.
E. Net cost of extra Work shall be the actual or pro-rated cost
of:
1. Labor, including foreman, at the prevailing rate of
wages, contributions and taxes.
2. Materials entering permanently into the Work, including
delivery to the site.
3. The ownership or rental cost of construction equipment
and expendable tools, pro-rated for the time necessary
for the Work.
4. Power and consumable supplies for the operation of
power equipment, pro-rated for the time necessary for
the Work.
5. Insurance and Bonds.
F. Gross costs shall be net costs plus the mark up allowances
described above, such allowances being inclusive, of all
cost of superintendence, supervision, engineering, overhead,
profit, administrative and site office expenses and all
other general expenses.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 3
1.3 1.03 APPLICATIONS FOR PAYMENT
A. Except as otherwise indicated, sequence of progress payments
for the Contractor shall be regular, and each shall be
consistent with previous applications and payments. It is
recognized that certain applications involve extra
requirements, including initial applications, applications
at times of substantial completion, and final payment
applications.
B. Payment Application Forms: Use AIA Document G702 and G703
Continuation Sheets; available from Publications Dis-
tribution Div., The American Institute of Architects, 1735
New York Ave., N.W., Washington, D.C. 20006 (also available
at most local AIA chapter offices).
C. Except as otherwise indicated, complete every entry provided
on the form, including notarization and execution by
authorized persons. Incomplete applications will be
returned by Architect and Owner without action. Entries
shall match current data of schedule of values, progress
schedules and reports. Listing shall include amounts of
fully executed change orders issued prior to first day of
the period of construction covered by application.
Applications for payment shall include weekly payroll
report. Contractor shall furnish to the Owner certified
payroll reports for each payroll period with pay request,
indicating name craft, social security number and actual
hourly rate of wages paid to each workman employed on the
project. A certified payroll record is defined as "a
payroll record which is attested to by the employer, or
corporate officer of such company, or an authorized agent of
the employer." A payment request will not be paid until the
Owner receives the certified payrolls.
D. Submit one "pencil" copy of each proposed payment
application to the architect and owner, for review, not less
than seven days prior to formal submissions of application.
E. Submit 4 executed copies of each payment application.
Transmit with a transmittal form listing attachments, and
recording appropriate information related to application.
F. Breakdown may include a line item for General Conditions.
General Conditions shall include the cost of general
supervision, trailers, temporary utilities and other general
expenses directly related to the project and not considered
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 4
overhead. The general conditions item shall be billed on
monthly progress payments on a percentage of work completed.
1.4 INITIAL PAYMENT APPLICATION
A. The principal administrative actions and submittals which
shall precede or coincide with submittal of the Contractor's
first payment application can be summarized as follows, but
not necessarily by way of limitation.
1. Listing of subcontractors and principal suppliers and
fabricators.
2. Schedule of values.
3. Schedule of principal products.
4. Schedule of submittals (preliminary if not final).
5. Copies of acquired building permits and similar
authorizations and licenses from governing authorities
for current performance of the work.
6. Data needed by Owner to secure related insurance
coverages.
7. Performance and Payment Bond.
8. Insurance Certificates.
1.5 PROGRESS PAYMENTS
A. Based upon application for payments submitted to the
Architect and the Owner, by the Contractor, on or about the
25th day of each month for the period ending the last day of
the previous second month, and Certificate of Payment issued
by the Architect and the Owner, the Owner will make progress
payments on account of the Contract Sum to the Contractor as
follows:
1. On or after the 20th day of each month, the Contractor
shall submit to the Architect and Owner a "pencil copy"
indicating the previous payment and the proposed
amounts for each line item for the current period.
After review and approval or changes, the Contractor
shall prepare the final billing for presentation to the
Architect and Owner.
2. a. Whenever any contract, the total price of which
exceeds $100,000, entered into by a State college, for
the construction, reconstruction, alteration or repair
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 5
of any building, structure, facility or other
improvement to real property, requires the withholding
of payment of a percentage of the amount of the
contract, the contractor may agree to the withholding
of payments in the manner prescribed in the contract,
or may deposit with the State college registered book
bonds, entry municipal bonds, State bonds or other
appropriate bonds of the State of New Jersey, or
negotiable bearer bonds or notes of any political
subdivision of the State, the value of which is equal
to the amount necessary to satisfy the amount that
otherwise would be withheld pursuant to the terms of
the contract. The nature and amount of the bonds or
notes to be deposited shall be subject to approval by
the State college. For purposes of this section,
"value" shall mean par value or current market value,
whichever is lower.
If the contractor agrees to the withholding of
payments, the amount withheld shall be deposited, with
a banking institution or savings and loan association
insured by an agency of the Federal government, in an
account bearing interest at the rate currently paid by
such institutions or associations on time or savings
deposits. The amount withheld, or the bonds or notes
deposited, and any interest accruing on such bonds or
notes, shall be returned to the contractor upon
fulfillment of the terms of the contract relating to
such withholding. Any interest accruing on cash
payments withheld shall be credited to the State
college.
b. Any contract, the total price of which exceeds
$100,000, entered into by a State college involving
the construction, reconstruction, alteration, repair
or maintenance of any building, structure, facility or
other improvement to real property, shall provide for
partial payments to be made at least once each month
as the work progresses, unless the contractor shall
agree to deposit bonds with the State college pursuant
to section 1.
c.1. With respect to any contract entered into by a
State college pursuant to section 2 for which the
contractor shall agree to the withholding of payments
pursuant to section 1, 2% of the amount due on each
partial payment shall be withheld by the State college
pending completion of the contract.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 6
c.2. Upon acceptance of the work performed pursuant to
the contract for which the contractor has agreed to
the withholding of payments pursuant to subsection a.
of this section, all amounts being withheld by the
State college shall be released and paid in full to
the contractor within 45 days of the final acceptance
date agreed upon by the contractor and the State
college, without further withholding of any amounts
for any purpose whatsoever, provided that the contract
has been completed as indicated. If the State college
requires maintenance security after acceptance of the
work performed pursuant to the contract, such security
shall be obtained in the form of a maintenance bond.
The maintenance bond shall be no longer than two years
and shall be no more than 100% of the project costs.
d. This act shall take effect immediately. This bill
supplements the “State College Contracts Law,”
P.L.1986, c.43 (C.18A:64-52 et seq.), and applies to
any State college contract for over $100,000 which
involves the construction, reconstruction, alteration
or repair of any building, structure, facility or
other improvement to real property. Under the
provisions of this bill, whenever a contract of this
type requires the withholding of payment of a
percentage of the amount of the contract, the
contractor would have the choice of either agreeing to
a retainage deduction from each monthly progress
payment, or the contractor could choose to deposit
bonds in the amount necessary to satisfy the amount
that otherwise would be withheld under the contract.
If a contractor chooses a retainage deduction from
each monthly payment, then the retainage would be
limited to 2% of the amount due on each partial
payment. Upon acceptance of the work performed
pursuant to the contract for which the contractor has
agreed to a retainage deduction, all amounts being
withheld by the State college must be paid in full to
the contractor within 45 days of the final acceptance
date agreed upon by the contractor and the State
college. The bill provides that if the State college
requires maintenance security after acceptance of the
work performed under the contract, the security must
be obtained in the form of a maintenance bond, which
is required to be no longer than two years and no
more than 100% of the project costs. The provisions
of this bill are similar to provisions in the “Local
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 7
Public Contracts Law,” P.L.1971, c.198 (C.40A:11-1 et
seq.) and the “Public School Contracts Law,” P.L.1977,
c.114 (C.18A:18A-1 47 et seq.).
3. Upon substantial completion, the retainage shall, upon
the Architect/Owner’s approval, remain at 2% of the
value of work completed. Final release of retained
monies will occur only upon the total completion of all
punch list and closeout documentation to the
satisfaction of the Architect and Owner.
4. For each day's delay in the Contractor's submission of
an application for payment acceptable to the Architect
and Owner, the Owner may delay one day in making his
progress payment.
5. Owner shall make payments within 30 days of receipt of said
monthly pay requisition.
1.6 APPLICATION AT TIME OF SUBSTANTIAL COMPLETION
A. Following issuance of certificate of substantial completion
on each Contractor's work, and also in part as applicable to
prior certificates on portions of completed work as
designated, a "special" payment application may be prepared
and submitted by Contractor. The principal administrative
actions and submittals which shall precede or coincide with
such special applications can be summarized as follows, but
not necessarily by way of limitation:
1. Occupancy permits and similar approvals or cer-
tifications by governing authorities and franchised
services, assuring Owner's full access and use of
completed work.
2. Warranties, guarantees, maintenance agreements and
similar provisions of Contract Documents.
3. Test/adjust/balance records, maintenance instructions,
meter readings, start up performance reports, and
similar change over information germane to Owner's
occupancy, use, operation and maintenance of completed
work.
4. Final cleaning of the work.
5. Application for reduction (if any) of retainage, with
consent of surety.
6. Advice to Owner on coordination of shifting insurance
coverages, including proof of extended coverage as
required.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 8
7. Listing of Contractor's incomplete work, recognized as
exceptions to certificate of substantial completion.
1.7 FINAL PAYMENT APPLICATION
A. The administrative actions and submittals which shall
precede or coincide with submittal of the Contractor's final
payment application can be summarized as follows, but not
necessarily by way of limitation.
1. Completion of project closeout requirements.
2. Completion of items specified for completion beyond
time of substantial completion, regardless of whether
special payment application was previously made.
3. Assurance, satisfactory to Owner and Owner, that
unsettled claims will be settled and that work not
actually completed and accepted will be completed
without undue delay.
4. Transmittal of required project construction records to
Owner via the Owner.
5. Proof, satisfactory to Owner and Owner, that taxes,
fees and similar obligations of Contractor have been
paid.
6. Removal of temporary facilities, services, surplus
materials, rubbish and similar elements.
7. Notarized consent of surety for final payment.
1.8 WAIVER OF LIENS
A. Each Contractor, for himself, and for all Subcontractors and
material men, agrees that no mechanic's lien or other claim
shall be filed or maintained by the Contractor or by any
Subcontractor, materialmen, laborer or any other person
whatsoever for, or on account of any work performed or
materials furnished under this Contract. This agreement
shall be an independent contract, and the Contractor shall
execute and deliver a separate Waiver of Liens in form and
substance satisfactory to the Architect and Owner
contemporaneously with the execution of the Owner-Contractor
Agreement and before any work is begun at the site.
B. In every subcontract entered into by each Contractor after
execution of this Contract or in connection herewith, the
Contractor shall incorporate a provision, similar to the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
MEASUREMENT AND PAYMENT 010250 - 9
foregoing paragraph, to the effect that neither the
Subcontractor nor any party acting through or under him
shall file or maintain any mechanic's lien or other claim
against the Architect or Owner in connection with the Work.
END OF SECTION 01025
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 1
SECTION 011000 - PROJECT PROCEDURES
PART 1 - GENERAL
1.1 SPECIAL REQUIREMENTS
A. Schedule:
1. Contractor shall provide a master schedule showing
sequencing of work utilizing the CPM method. The
Contractor shall supply a schedule with all
subcontractor activities, relationships, and durations,
utilizing the CPM method via SureTrak/Primavera,
Version 3.0, or Microsoft scheduling software to the
Owner on a working version CD-ROM and coordinate their
schedule with the Owner.
2. The Contractor is required to update at the end of each
month the CPM Schedule based on the percentage
completed for each activity on the approved schedule
(in concert with the submission of the percentage
completed in the monthly proposed schedule of values).
3. The contractor in their bid includes a cost of $500.00
per month for this schedule submission, for the
duration of construction (per the milestone schedule in
the bidding documents). This only applies to projects
in excess of 2 million dollars in base price. The
contractor’s schedule of values shall include this
cost, and can only be billed for upon TCNJ’s successful
receipt of said schedule. Should any schedule not be
received at the end of any month during construction,
TCNJ will issue a deduct change order in the amount of
$500.00 to the contractor.
B. Each Contractor shall take all necessary precautions to
ensure the safety of all structural elements during all
phases of all work. No materials, cranes, trucks or any
other construction loads shall be placed on any part of the
structure, ground, pavement, concrete, etc. until the
Contractor has determined the adequacy of that structure to
carry the intended load without damage or overstress.
C. Entrance into, or other use of the college buildings will
not be permitted except as may be necessary for the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 2
execution of the Work, and shall be subject to the
restrictions and instructions of the Owner.
D. Routes of ingress and egress to areas where work is being
performed shall be subject to the restrictions and
instructions of the Owner.
E. Materials shall be moved through the campus buildings using
rubber tired vehicles which shall be properly controlled at
all times to avoid damage to existing wall, floor or
ceiling surfaces.
F. Water damage cannot be tolerated and it is incumbent upon
Contractors to take any steps necessary to keep the
existing premises dry at all times.
G. Any damage to the campus buildings from heavy equipment,
striking the Building or any other damage to any part of
the premises shall be repaired at the expense of the
Contractors.
H. All welding and cutting shall be performed by qualified and
certified welders. Certificates shall be on file with the
Contractor prior to commencement of any welding. All hot
work operations shall use the contractor’s, or the
subcontractor’s, hot work permit, that adheres to local,
state, and federal regulations and codes.
I. No work shall start before 8:30am unless agreed to in
advance with the College.
J. All projects that require access to dormitories and
apartments by contractor personnel require that each person
have a state police background check completed and the
contractor is to provide a list of all potential personnel
to work at the site, and provide a copy of the back ground
checks to the TCNJ project manager prior to start of the
work on the project. Should a person not have a back ground
check as required herewith (such as a delivery person),
this unchecked person must be accompanied by a
representative of the contractor who has been checked.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 3
PART 2 - PRODUCTS - NOT APPLICABLE
PART 3 - EXECUTION
3.1 GENERAL
A. A. Contractors shall perform the work on or about the
premises in a careful manner with full consideration to
fire protection as required by OSHA, the National Fire
Protection Association Standards, National Board of Fire
Underwriters and State and Local Departments having
jurisdiction. Fire resistant materials shall be used for
temporary enclosures.
B. Chemical extinguishers approved by the Owner shall be
provided by the General Contractor during the progress of
the work where and as required by the Owner, the Local Fire
Marshal and the National Board of Fire Underwriters.
1. The contractor shall not expect to use TCNJ fire
extinguishers.
2. All fire extinguishers provided by the contractor or
any subcontractors, shall be maintained and inspected
as required by local, state, and federal regulations
and codes.”
C. The Contractor shall maintain an active program of fire
prevention to keep workmen fire conscious during the entire
life of the Contract. Designate one member of the
organization to execute and coordinate fire control
measures of his own organization and that of all
subcontractors under his jurisdiction.
D. All sub-contractors shall cooperate with the Contractor in
carrying out the above program.
E. Storage of flammable materials will not be permitted in the
Building unless written permission is obtained from the
Owner.
1. Storage of all such materials shall be the Contractors'
responsibility and as required by local, state, and
federal regulations and codes.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 4
F. On-site open burning of rubbish, garbage, trade waste,
leaves or plant life is prohibited.
G. Safety Program: The Contractor shall institute a safety
program in accordance with OSHA and any local, state, or
federal regulations and codes.
1. The contractor shall name a safety officer to monitor
this program, have authority to halt and correct unsafe
conditions, and shall submit a safety report at job
meetings.
2. Fall Protection that meets OSHA requirements shall be
utilized and maintained throughout the project, as
required to be in compliance.
3. All workers shall have the authority to halt unsafe
conditions, not just the “Safety Officer.
H. Stockpiling: Stockpiling of materials on site will be
allowed (but limited due to the limited space on this
site). Such materials shall not impair or impede the
functioning of the facility. Materials stored on site shall
be secured to prevent loss from theft, damage, vandalism or
fire. By stockpiling materials on site, the contractor
assumes full responsibility for said materials, and shall
protect them to the fullest extent possible. Specific
locations for stockpiling materials shall be coordinated
with the Architect, Owner and Owner.
I. Safety Barriers: The Contractor shall erect safety
barriers to deter and prohibit unauthorized access to the
construction site; such barriers may take the form of
fences and shall be clearly marked with signage prohibiting
unauthorized access. The Contractor shall be responsible
for safety barriers within the building. The contractor
shall be liable for damages to persons or property due to
the construction process if adequate safety measures are
not undertaken. The Owner and Architect shall review
safety precautions for their adequacy but shall not be held
liable for Contractors failure to maintain or provide
adequate protection.
1. The contractor shall prevent intrusion of dust, debris,
sound, odor, equipment, etc. into the occupied spaces.
2. All entrances to the work area shall have signage
prohibiting unauthorized access and identifying the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 5
minimum personal protective equipment required to
enter.
J. Sequencing: The Contractor will work with the Sub-
Contractors to sequence the work during the submission of
monthly project schedules. Contractors shall endeavor to
coordinate their work efforts with the Owner's
requirements. Interruptions of utility services shall be
coordinated with the Architect, Owner and Owner, but in no
instance shall last longer than 2 hours.
K. Limited staging and onsite parking will be provided by
General Contractor. The Contractor will coordinate parking
areas with all the subcontractors and TCNJ.
1. Parking will be available at Carlton Avenue.
Contractor will provide shuttle service to the site.
2. Contractor will be permitted to have one vehicle on
site.
L. Site Utilities: Electric power and water are available on
site. Toilet facilities will be made available by the
Contractor. These facilities shall remain clean by the
Contractors throughout the course of the project. The
Contractors shall repair and/or replace any damaged
fixtures, partitions, etc. The Electrical Sub-Contractor
shall tie in a temporary power panel (or panels as
required) for all trades to use during construction.
Interruption of building services shall not occur without
prior consent and coordination by the Owner and Owner.
1. The contractor shall provide and maintain portable
toilets for all construction personnel.
M. Construction Lighting: The Electrical Sub-Contractor shall
run sufficient strings and fixtures to maintain a 50 foot-
candle/sq. ft. intensity of light throughout the project
areas.
N. Dumpster Location and Cleanup: The Engineer and Owner
shall coordinate the dumpster location with the
Contractors. The Contractor shall be responsible for
obtaining, maintaining, and disposing of dumpsters, and
shall maintain clean work areas throughout the course of
the project.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 6
O. Ceiling Tile Replacement After Work: In occupied areas,
ceiling tiles must be reset after that portion of work has
finished or at the end of the day, whichever is sooner.
3.2 PROGRESS MEETINGS
A. Progress Meetings shall be held bi-weekly at the job site
at a regular time and day mutually agreed upon. The
frequency may be changed by the Architect or Owner to
reflect current conditions. The Contractors, those of
his/their subcontractors concerned with current progress or
with scheduling of future progress, the Architect, the
Owner, and the Owner shall each be represented at these job
meetings by persons familiar with the details of the work
and authorized to conclude matters relative to work
progress, establishment of progress schedules, etc., as may
be necessary to expedite completion of the work.
B. The Contractors and his/their subcontractors attending
these meetings shall present complete and definite reports
as to the status of their respective work, conditions of
product and equipment manufacturer, labor availability,
productivity and cooperation, shipping data, time of
completion, sequence of the work, safety program, and any
other information bearing upon the execution of the
Contract or subcontract. For the Owner's convenience the
Owner will chair the meetings.
3.3 MONTHLY REPORTS
A. The Contractor is to provide TCNJ a brief monthly status
report on the last working day of each month dividing the
status of the project into the following categories (report
must be complete in all respects, piece meal submissions
will not be accepted):
1. Project overview
2. Financial status
3. Updated project schedule
4. Change order request log
5. Submittal log
6. RFI log
7. Owner/Architect issues that need immediate resolution
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT PROCEDURES 011000 - 7
8. Order/delivery issues
B. The Contractor is to provide TCNJ with this monthly report,
and include in their bid a cost of $500.00 per month for
all projects in excess of 2 million dollars base bid price
for the duration of the construction period as noted in the
bidding milestone schedule. This total cost will be listed
in the contractor’s schedule of values and can be billed
for on a monthly basis only if said report is received in
whole as noted above. Should TCNJ not receive said complete
report a deduct change order will be issued to the
contractor for $500.00 for that month.
END OF SECTION 01100
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-1
SECTION 013000 – SUBMITTALS AND SUBSTITUTIONS
PART 1 - GENERAL
1.1 PROGRESS SCHEDULE / COORDINATION DRAWINGS
A. The Contractor's schedule, shall coordinate with all trades
to produce a coordinated CPM via Suretrak/Primavera version
3.0 or a Microsoft scheduling program schedule indicating
the start and completion dates for each portion of the work
as defined by the schedule of values, with the total time as
defined by the contract time and milestone dates as set
forth in these specifications. The Contractor’s CPM
schedule shall be submitted in electronic format (Suretrak
3.0 or a Microsoft Scheduling program) to and reviewed by
the Owner and Engineer prior to first application for
payment. Any revisions or additional information requested
by the Owner or Engineer shall be provided. (No payment
shall be made to any Contractor not providing a schedule
that reflects their entire work).
1. Also refer to Section 011000 – Project Procedures.
B. The Contractor shall revise the progress schedule on a
monthly basis as the work progresses reflecting therein any
delays, including those not within the Contractor's control,
or accelerations in the progress of the work. The progress
schedule, as revised for any weekly period, shall be
discussed at the bi-weekly job meetings with the, Owner, the
Engineer, and the Contractor and the major trades in order
to insure that the percentage of actual completion of any
portion of the work as called for in the progress schedule
for that bi-weekly period is attained. Monthly updates to
the progress schedule shall be made prior to application for
payment.
C. Should any delay occur in the progress of the work or any
portion thereof, the Contractor shall be required to
implement all necessary measures to accelerate the
construction, to meet the percentages of completion dictated
by the progress schedule on the applicable dates, without
additional cost to the Owner.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-2
1.2 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A. Shop drawings, product data and samples will not be
processed by the Owner and/or Engineer until the list of
subcontractors, material suppliers and fabricators is
submitted as required under Paragraph 3.12 of the General
Conditions.
1. The successful Contractor shall submit their list of
proposed substitutions with in 10 working days of the
Contract Award.
2. The Engineer shall be compensated on an hourly basis
for review of all shop drawings or samples that do not
meet the requirements of the contract documents after
two submissions. The compensation shall be deducted
from the contractors contract via a deduct change
order, or other means that both parties agree to.
B. Coordinate preparation and processing of submittals with
performance of the work so that work will not be delayed by
submittals. Allow two weeks for review/approval by the
Engineer for the approval process. Allow additional time if
processing must be delayed to permit coordination with
subsequent submittals with others.
C. Provide permanent marking on each submittal to identify
Project, date, Contractor, subcontractor, submittal name,
Specification section, drawing reference, and similar
information to distinguish it from other submittals. Show
Contractor's executed review and approval marking and
provide space (5" x 7") for Engineer's Action marking and
space for Owner's review marking. Package each submittal
appropriately for transmittal and handling. Submittals
received, which are lacking the above information, will be
returned without action. Submittals, which are received from
sources other than through Contractor’s office, will be
returned without action.
D. Each submission shall be complete, with all options clearly
marked and with all components required for the assembly
fully described and detailed. Submissions missing important
information will be returned unchecked.
E. Transmittal Form: Submittals shall be accompanied by a
transmittal form. Provide Contractor's certification on
form, ready for execution, stating that information
submitted complies with requirements of contract documents.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-3
1. Transmit all submittals and shop drawings to the
Engineer with a copy of the transmittal to the Owner.
F. Except as otherwise indicated in individual work sections,
comply with requirements specified herein for each indicated
category of submittal. Provide and process intermediate
submittals, where required between initial and final,
similar to initial submittals.
G. Maintain returned final set of samples at project site, in
suitable condition and available for quality control
comparisons by Engineer, and by Owner.
H. Do not proceed with installation of materials, products or
systems until final copy of applicable shop drawings,
product data and samples are in possession of Installer.
I. Provide newly prepared shop drawings, on reproducible
sheets, with graphic information at accurate scale, with
company name of preparer indicated. Show dimensions and
note which are based on field measurement. Identify
materials and products in the work shown. Indicate
compliance with standards, and special coordination
requirements. Do not allow shop drawing copies without
appropriate final Action markings by Engineer to be used in
connection with the work.
1. Initial and Intermediate Submittals: One correctable
translucent reproducible print and 5 blue line or black
line prints; reproducible will be returned.
2. Final Submittal: 6 prints, plus 3 additional prints
where required for maintenance manuals; 4 will be
retained and remainder will be returned, one of which
shall be marked up and maintained by Contractor as
"Record Document".
3. Electronic submittals are acceptable in AutoCAD format
only. Contractor shall be responsible for printing and
distribution of multiple copies as required.
J. Collect required product data into one submittal for each
unit of work or system; and mark each copy to show which
choices and options are applicable to the project. Include
manufacturer's standard printed recommendations for
application and use, compliance with standards, application
of labels and seals, notation of field measurements that
have been checked, and special coordination requirements.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-4
Maintain one set of product data for each submittal at
project site, available for reference by Engineer and
others.
K. Submittals will be accepted from the Contractor only.
Submittals received from other entities will be returned
without review or action.
1. Submittals received without a transmittal form will be
returned without review or action.
2. Transmittal form: Use a form matching the sample form
attached to this section. Include the following:
a. List of deviations.
b. The Contractor's certification signature.
3. Fill out a separate transmittal form for each
submittal; also include the following:
a. Other relevant information.
b. Request for additional information.
L. Do not submit product data, or allow its use on the project,
until compliance with requirements of Contract Documents has
been confirmed by Contractor. Submittal is for information
and record unless otherwise indicated. Initial submittal is
final submittal unless returned promptly by Engineer marked
with an Action that indicates and observed noncompliance.
Submit 6 copies, plus 3 additional copies, which will be
returned, where required for maintenance manuals.
1. Electronic submittals are acceptable in 8 ½” x 11”
format only.
M. Provide three (3) samples identical with final condition of
proposed materials or products for the work. Include range
samples, not less than 3 units, where unavoidable variations
between units of each set. Provide full set of optional
samples where Engineer's selection is required. Prepare
samples to match Engineer's sample where so indicated.
Include information with sample to show generic description,
source or products name and manufacturer, limitations, and
compliance with standards. Samples are submitted for review
and confirmation of color, pattern, texture and kind by
Engineer. Engineer will not test samples, except as
otherwise indicated, for compliance with other requirements,
which are therefore the exclusive responsibility of the
Contractor.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-5
N. Upon receipt of a signed copy of the Engineer’s Waiver form,
electronic copies of CAD drawings of the Contract Documents
will be provided by the Engineer for Contractor's use in
preparing submittals. Copy of Waiver form is attached.
O. Product Selection Procedures: Procedures for product
selection include the following:
1. Product: Where Specification paragraphs or
subparagraphs titled "Product" name a single product
and manufacturer, provide the named product or an
equivalent.
2. Manufacturer/Source: Where Specification paragraphs or
subparagraphs titled "Manufacturer" or "Source" name
single manufacturers or sources, provide a product of
the manufacturer or source that complies with
requirements, or an equivalent.
3. Products: Where Specification paragraphs or
subparagraphs titled "Products" introduce a list of
names of both products and manufacturers, provide one
of the products listed that complies with requirements,
or an equivalent. Comply with provisions of "Product
Options and Substitutions," Section 1.4 of Division
1300 of these specifications when submitting an
equivalent product.
4. Manufacturers: Where specification paragraphs or
subparagraphs titled "Manufacturers" introduce a list
of manufacturers' names, provide a product by one of
the manufacturers listed, or an equivalent, that
complies with requirements. Comply with provisions of
"Product Options and Substitutions," Section 1.4 of
Division 1300 of these specifications when submitting
an equivalent product.
5. Product Options: Where Specification paragraphs or
subparagraphs refer to "Product Options and
Substitutions," indicate that size, profiles, and
dimensional requirements on Drawings are based on a
specific product or system; provide the specific
product or system or an equivalent product or system by
another manufacturer. Comply with provisions of
"Product Options and Substitutions," Section 1.4 of
Division 1300 of these specifications when submitting
an equivalent product.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-6
6. Basis of Design Products: Where Specification
paragraphs or subparagraphs titled "Basis-of-Design
Products" introduce or refer to a list of
manufacturers' names, provide either the specified
product or an equivalent. Drawings and Specifications
indicate sizes, profiles, dimensions and other
characteristics that are based on the product names.
Comply with the provisions of "Product Options and
Substitutions," Section 1.4 of Division 1300 of these
specifications when submitting an equivalent product.
1.3 MISCELLANEOUS SUBMITTALS
A. Miscellaneous submittals related directly to the work
include warranties, maintenance agreements, workmanship
bonds, survey data and reports, physical work records,
quality testing and certifying reports, copies of industry
standards, record drawings, field measurement data,
operating and maintenance materials, overrun stock, and
similar information, devices and materials applicable to the
work and not processed as shop drawings, product data or
samples.
B. Refer to sections for specific general requirements on
warranties, product/workmanship bonds, and maintenance
agreements. In addition to copies desired for Contractor's
use, furnish 2 executed copies, except furnish 3 additional
copies where required for maintenance manuals.
C. For the Owner's records, submit copies of permits, licenses,
certifications, inspection reports, releases, jurisdictional
settlements, notices, receipts for fee payments, judgments,
and similar documents, correspondence and records
established in conjunction with compliance with standards
and regulations bearing upon performance of the work.
1.4 PRODUCT OPTIONS AND SUBSTITUTIONS
A. A. DEFINITIONS
1. Products: Items purchased for incorporating into the
Work, whether purchased for Project or taken from
previously purchased stock. The term "product"
includes the terms "material," "equipment," "system,"
and terms of similar intent.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-7
a. Named Products: Items identified by
manufacturer's product name, including make or
model number or other designation, shown or listed
in manufacturer's published product literature,
that is current as of date of the Contract
Documents.
b. New Products: Items that have not previously been
incorporated into another project or facility,
except that products consisting of recycled-
content materials are allowed, unless explicitly
stated otherwise. Products salvaged or recycled
from other projects are not considered new
products.
c. Equivalent Product: Product that is demonstrated
and approved through submittal process, or where
indicated as a product substitution, to have the
indicated qualities related to type, function,
dimension, in-service performance, physical
properties, appearance, and other characteristics
that equal or exceed those of specified product.
2. Substitutions: Changes in products, materials,
equipment, and methods of construction from those
required by the Contract Documents and proposed by
Contractor.
3. Basis-of-Design Product Specification: Where a
specific manufacturer's product is named and
accompanied by the words "basis of design," including
make or model number or other designation, to establish
the significant qualities related to type, function,
dimension, in-service performance, physical properties,
appearance, and other characteristics for purposes of
evaluating comparable products of other named
manufacturers.
4. Manufacturer's Warranty: Preprinted written warranty
published by individual manufacturer for a particular
product and specifically endorsed by manufacturer to
Owner.
5. Special Warranty: Written warranty required by or
incorporated into the Contract Documents, either to
extend time limit provided by manufacturer's warranty
or to provide more rights for Owner.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-8
B. General Requirements:
1. The requirements for substitutions do not apply to
specified Contractor options on products and
construction methods. Revisions to Contract Documents,
where requested by Owner or Engineer are changes, not
substitutions. Contractor's determination of and
compliance with governing regulations and orders issued
by governing authorities do not constitute
substitutions and do not constitute a basis for change
orders. Otherwise, Contractor's requests for changes in
products, materials, and methods of construction
required by Contract Documents are considered requests
for substitutions, and are subject to requirements
hereto.
2. To the greatest extent possible, provide products,
materials and equipment of a singular generic kind and
from a single source.
3. Where more than one choice is available as options for
Contractor's selection of a product or material, select
an option that is compatible with other products and
materials already selected. Total compatibility among
options is not assured by limitations within Contract
Documents, but shall be provided by Contractor.
Compatibility is a basic general requirement of
product/material selections.
4. Any and all contractor substitutions that require
additional work by other trades not specifically called
for in the documents shall be paid for by the
contractor requesting the substitution if any other
trade increase is required.
5. Requested substitution offers Owner a substantial
advantage in cost, time, energy conservation, or other
considerations, after deducting additional
responsibilities Owner must assume. Owner's additional
responsibilities may include compensation to Engineer
for redesign and evaluation services, increased cost of
other construction by Owner, and similar
considerations.
C. Submittals: Submit 6 copies, utilizing Substitution Request
Form, CSI Form 13.1.A, fully identified for product or
method being requested for substitution, including related
specification section and drawing numbers, and fully
documented to show compliance with requirements for
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-9
substitutions. Include product data/drawings, description
of methods, samples where applicable, Contractor's details
comparison of significant qualities between specified item
and proposed substitution, statement of effect on
construction time and coordination with other affected work
and contractors, cost information or proposal, warranty
information, compatibility with other work, approval of all
authorities having jurisdiction, and Contractor's statement
to the effect that proposed substitution will result in
overall work equal to or better than work originally
indicated.
D. Contractor's options for selecting products are limited by
Contract Documents requirements, and governing regulations.
Required procedures include, but are not necessarily limited
to, the following for various indicated methods or
specifying:
1. Single product/manufacturer name; provide product
indicated or equivalent, except advise Engineer before
proceeding, where known that named product is not a
feasible or acceptable selection.
2. Two or more product/manufacturer names; provide one of
the named products or equivalent, at Contractor's
option; but excluding products which do not comply with
requirements. Advise Engineer before proceeding.
3. Equivalent; where named products in Specifications text
are accompanied by the term "or equivalent", or other
language of similar effect, comply with those Contract
Documents provisions concerning substitutions for
obtaining Engineer's approval of equivalent product.
4. Named, except as otherwise indicated, is defined to
mean manufacturer's name for product, as recorded in
published product literature, of latest issue as of
date of Contract Documents. Refer requests to use
products of a later or earlier model to Engineer for
acceptance before proceeding.
5. Where compliance with an imposed standard, code or
regulation is required, selection from among products
that comply with requirements including those
standards, codes and regulations, is Contractor's
option.
6. Provide products which comply with specific
performances indicated, and which are recommended by
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-10
manufacturer, in published product literature or by
individual certification, for application indicated.
Overall performance of a product is implied where
product is specified for specific performance.
7. Provide products that have been produced in accordance
with prescriptive requirements, using specified
ingredients and components, and complying with
specified requirements for mixing, fabricating, curing,
finishing, testing and similar operations in
manufacturing process.
8. Where matching of an established sample is required,
final judgment of whether a product proposed by
Contractor matches sample satisfactorily is Engineer's
judgment. Where no product within specified cost
category is available, which matches sample
satisfactorily and complies with requirements, comply
with Contract Document provisions concerning
substitutions for selection of a matching product
outside established cost category or not complying with
requirements.
9. Where specified product requirements include "...as
selected from manufacturer's full range of colors,
patterns, textures..." or words of similar effect, the
selection of manufacturer and basic product data is to
comply with requirements of the Contract, and selection
shall be from the full range of products within the
requirements. Where specified product requirements
include "... as the industry...", or words to that
effect, selection of product complying with
requirements, is Engineer's selection, including
designation of manufacturer, where necessary to obtain
desired color, pattern or texture.
E. Substitutions may be permitted by the Engineer, if, in his
opinion, the requirements of the proposed substitution
comply with the requirements specified for the material,
article or piece of equipment; however, the Engineer is not
required to permit substitution pursuant to the case of
Whitten Corporation vs. Paddock, Incorporated, United States
District Court, Massachusetts, April 12, 1974, affirmed by
the Federal First Circuit Court, December 14, 1974.
F. After award of contract, the Contractor may submit
substitutes to the Engineer for review, fully documented and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-11
certified, and accompanied by a proposal for a reduction in
the Contract Sum.
G. Contractor's request for substitution will be received and
considered when extensive revisions to Contract Documents
are not required and changes are in keeping with general
intent of Contract Documents; when timely, fully documented
and properly submitted; and when one or more of following
conditions is satisfied, all as judged by Engineer.
Otherwise, requests will be returned without action except
to record noncompliance with these requirements.
1. Where request is directly related to an "equivalent"
clause or other language of same effect in Contract
Documents.
2. Where required product, material or method cannot be
provided within Contract Time, but not as a result of
Contractor's failure to pursue the work promptly or
coordinate various activities properly.
3. Where required product, material or method cannot be
provided in a manner which is compatible with other
materials of the work, or cannot be properly
coordinated therewith, or cannot be warranted
(guaranteed) as required, or cannot be used without
adversely affecting Owner's insurance coverage on
completed work, or will encounter other substantial
noncompliances which are not possible to otherwise
overcome except by making requested substitution, which
Contractor thereby certifies to overcome such
incompatibility, uncoordination, nonwarranty,
noninsurability or other noncompliance as claimed.
4. Where substantial advantage is offered Owner, in terms
of cost, time or other valuable considerations, after
deducting offsetting responsibilities Owner may be
required to bear, including additional compensation to
Engineer for redesign and evaluation services,
increased cost of other work by Owner or separate
Contractors, and similar considerations.
H. Contractor's submittal of, and Engineer's acceptance of,
shop drawings, product data or samples which indicate work
not complying with requirements of Contract Documents, does
not constitute an acceptable and valid request for, nor
approval of, a substitution.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-12
I. QUALITY ASSURANCE
1. Compatibility of Options: If Contractor is given
option of selecting between two or more products for
use on Project, product selected shall be compatible
with products previously selected, even if previously
selected products were also options.
2. Each contractor is responsible for providing products
and construction methods compatible with products and
construction methods of other contractors.
3. If a dispute arises between contractors over
concurrently selectable but incompatible products,
Engineer will determine which products shall be used.
J. EQUIVALENT PRODUCTS
1. Where products or manufacturers are specified by name,
Contractor must submit the following, in addition to
other required submittals, to obtain approval of an
unnamed product proposed as an equivalent:
a. Evidence that the proposed product does not
require extensive revisions to the Contract
Documents, that it is consistent with the Contract
Documents and will produce the indicated results,
and that it is compatible with other portions of
the Work.
b. Detailed comparison of significant qualities of
proposed product with those named in the
specifications. Significant qualities include
attributes such as performance, weight, size,
durability, visual effect, and specific features
and requirements indicated.
c. Evidence that proposed product provides specified
warranty.
d. List of similar installations for completed
projects with project names and addresses and
names and addresses of Engineers and owners, if
requested.
e. Samples, if requested.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-13
1.5 OPERATION AND MAINTENANCE INSTRUCTIONS AND EQUIPMENT
WARRANTIES
A. The Contractor shall orient and instruct the responsible
maintenance personnel designated by the Owner in the
Operation of all equipment and shall provide the maintenance
personnel with pertinent literature and operational manuals
for all equipment. Date and time of demonstrations shall be
mutually agreed upon with the Owner. Provide qualified
personnel for as long as necessary to fully orient and
instruct the Owner. Contractor shall videotape instruction
session and provide owner with completed video.
B. The manuals shall be submitted in (quadruplicate) 3-ring
loose-leaf type binders to the Engineer for approval with
all additional information that the Engineer may request and
considers necessary for the proper servicing and maintenance
of all equipment. Manuals are to include plain paper copies
of approved shop drawings and catalog cuts. The quality of
the copies may be subject to approval by the Engineer. Upon
completion and approval, 3 copies will be forwarded to the
Owner and one copy retained by the Engineer.
C. Manuals shall include no less than the following:
1. Operating Procedures:
a. Typewritten procedures indicating each mode of
operation of each piece of equipment or system.
Procedures shall indicate the status of each
component of a system in each operating mode.
b. Procedures shall indicate names, symbol numbers,
valve tags, circuit numbers, schematic control and
wiring diagrams, locations of thermostats, manual
starters, control cabinets, and other controls of
each system.
c. Emergency shutdown procedures for each piece of
equipment or system, both automatic and manual as
appropriate.
2. Maintenance Schedule: Typewritten schedule describing
manufacturer's recommended schedule of maintenance and
maintenance procedures.
3. Catalog cuts and shop drawings:
a. Catalog cuts shall clearly indicate the exact
model and type of each piece of equipment
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-14
installed in the Project, including all options
provided.
b. Catalog cuts shall fully describe equipment
including physical, electrical, mechanical and
other characteristics, performance characteristics
and installation or erection diagrams.
c. Catalog cuts shall indicate spare part numbers and
name, address and telephone number of local
representative or service department.
4. Typewritten list of all subcontractors on the Project
including name, address, telephone number and
responsibility on the Project.
5. Manuals shall be indexed with dividers indicating each
system or piece of equipment.
6. Warranties, permits, inspection stickers/approvals and
Certificate of Occupancy are to be included.
D. Required equipment warranties shall be submitted in three
copies to the Engineer.
E. The Contractor shall video tape all instructional sessions
and demonstrations and provide the Owner with a copy of the
videotape at the end of all demonstrations.
PART 2 - PART 2 – PRODUCTS - NOT APPLICABLE
PART 3 - PART 3 - EXECUTION
3.1 ACTION ON SUBMITTALS
A. One copy of all submissions will be returned to the
Contractor for his files. The Contractor shall mark up
other copies so as to conform with the copy returned to him
and forward them to all interested Contractors,
Subcontractors, and Suppliers.
B. The Engineer will review and stamp submitted shop drawings
in one of the following ways (the actual stamp may be
different; below language is shown for an example only)
1. "No Exceptions Taken": Approved.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-15
2. "Make Corrections Noted": Approved, provided the work
complies with corrections marked on the submittal.
3. "Revise and Resubmit": Do not commence work of this
submittal. Revise and resubmit or prepare a new
submittal; comply with notations marked on submittal.
4. "Rejected": Fundamentally not in compliance. Prepare
a new submittal. No notations or comments made.
C. Work shall be executed in accordance with "Approved",
"Approved As Noted", or "Resubmit for Record" stamp only.
D. Engineer's review of shop drawings/submittals will
constitute checking for general arrangement only, and shall
not relieve the Contractor of responsibility for complete
compliance with Drawings and Specifications. Contractor
shall be responsible for quantities and dimensions to assure
a proper fit under field conditions.
3.2 DISTRIBUTION
A. Provide additional distribution of submittals, not included
in foregoing copy submittal requirements, to subcontractors,
suppliers, fabricators, installers, governing authorities
and others as necessary for proper performance of the work.
Include such additional copies in transmittal to Engineer
where required to receive Action marking before final
distribution. Show such distributions on transmittal forms.
3.3 COLOR SELECTIONS
A. All colors for all finished surfaces and materials will be
selected or approved by the Engineer. The color selections
will be made at one time to provide a complete and
coordinated color schedule which, upon acceptance of the
Owner, will be provided to the Contractor. Any and all
specific color selections for materials not noted on
drawings or in specification shall be chosen by Engineer
after submittal of samples.
B. It is imperative that all color information be submitted to
the Engineer by the Contractor before color selections can
be made. If any color selection information is not
available when colors are needed to meet the project
schedule, the Engineer will select colors from one of the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SUBMITTALS AND SUBSTITUTIONS 013000-16
named manufacturers in the Specifications, and the
Contractor will be required to exactly match that color. A
claim for delay will not be accepted if the color schedule
is late due to the failure of the Contractor to provide the
Engineer with all required color information, nor will an
extra be entertained if the selected color is not available
from the manufacturer the Contractor intended to use but
neglected to submit.
C. The Contractors are reminded of the requirement to declare
all substitutions within 20 days of execution of their
Contract as specified.
END OF SECTION 01300
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
QUALITY CONTROL 013100 - 1
SECTION 013100 - QUALITY CONTROL
PART 1 - GENERAL
1.1 1.01 TRADESMEN AND WORKMANSHIP
A. Each Contractor shall ensure that tradesmen performing work
at site are skilled and knowledgeable in methods and
craftsmanship needed to produce required quality levels for
workmanship in completed work. Remove and replace work
which does not comply with workmanship standards as
specified and as recognized in the construction industry for
applications indicated. Remove and replace other work
damaged or deteriorated by faulty workmanship or its
replacement.
B. In certain instances, specification text requires that
specific work be assigned to specialists or expert entities,
who shall be engaged for performance of those units of work.
These shall be recognized as special requirements over which
Contractor has no choice or option. These assignments shall
not be confused with, and are not intended to interfere
with, normal application of regulations, union jurisdictions
and similar conventions. One purpose of such assignments is
to establish which party or entity involved in a specific
unit of work is recognized as "expert" for indicated
construction processes or operations. Nevertheless, final
responsibility for fulfillment of entire set of requirements
remains with Contractor.
1.2 INSPECTION, TESTS AND REPORTS
A. A. Required inspection and testing services are intended to
assist in determination of probable compliances of the work
with requirements, but do not relieve any Contractor of
responsibility for those compliances, or for general
fulfillment of requirements of Contract Documents. Specified
inspections and tests are not intended to limit any
Contractor's quality control program. Afford reasonable
access to agencies performing tests and inspections.
B. Contractors are responsible for all testing associated with
their work (foundations, soils compaction, concrete, steel,
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
QUALITY CONTROL 013100 - 2
roof material testing etc.) and shall submit the name of
their proposed testing agency within 15 days of Notice-to-
Proceed. Each Contractor is responsible to coordinate the
activities of the testing agency to assure that work is
tested prior to being covered up or other activities
associated to the work begin.
PART 2 - PRODUCTS - NOT APPLICABLE
PART 3 - PART 3 - EXECUTION
3.1 REPLACEMENT OF WORK
A. The Contractor shall, within 24 hours after rejection of Work, remove all materials and equipment so rejected and immediately
replace said Work, at his cost, to the satisfaction of the
Architect. Should the Work of the Owner or other Contractors
be damaged by such removal or replacement, the Contractor
shall reimburse the Owner or other Contractors for all cost
incurred for correcting said damage.
3.2 EXAMINATION
A. Existing Conditions: The existence and location of site
improvements, utilities, and other construction indicated as
existing are not guaranteed. Before beginning work,
investigate and verify the existence and location of
mechanical and electrical systems and other construction
affecting the Work.
1. Before construction, verify the location and points of
connection of utility services.
B. Existing Utilities: The existence and location of
underground and other utilities and construction indicated
as existing are not guaranteed. Before beginning sitework,
investigate and verify the existence and location of
underground utilities and other construction affecting the
Work.
1. Before construction, verify the location and invert
elevation at points of connection of sanitary sewer,
storm sewer, and water-service piping; and underground
electrical services.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
QUALITY CONTROL 013100 - 3
2. Furnish location data for work related to Project that
must be performed by public utilities serving Project
site.
3. Contact NJ One-Call prior to ground penetrations.
C. Acceptance of Conditions prior to work starting: Examine
substrates, areas, and conditions, with Installer or
Applicator present where indicated, for compliance with
requirements for installation tolerances and other
conditions affecting performance. Record observations.
1. Written Report: Where a written report listing
conditions detrimental to performance of the Work is
required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including
substrates.
c. List of unacceptable installation tolerances.
d. Recommended corrections.
2. Verify compatibility with and suitability of
substrates, including compatibility with existing
finishes or primers.
3. Examine roughing-in for mechanical and electrical
systems to verify actual locations of connections
before equipment and fixture installation.
4. Examine walls, floors, and roofs for suitable
conditions where products and systems are to be
installed.
5. Proceed with installation only after unsatisfactory
conditions have been corrected. Proceeding with the
Work indicates acceptance of surfaces and conditions.
3.3 PREPARATION
A. Existing Utility Information: Furnish information to local
utility and Owner that is necessary to adjust, move, or
relocate existing utility structures, utility poles, lines,
services, or other utility appurtenances located in or
affected by construction. Coordinate with authorities
having jurisdiction.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
QUALITY CONTROL 013100 - 4
B. Existing Utility Interruptions: Do not interrupt utilities
serving facilities occupied by Owner or others unless
permitted under the following conditions and then only after
arranging to provide temporary utility services according to
requirements indicated:
1. Notify Owner not less than two days in advance of
proposed utility interruptions.
2. Do not proceed with utility interruptions without
Owner's written permission.
C. Field Measurements: Take field measurements as required to
fit the Work properly. Recheck measurements before
installing each product. Where portions of the Work are
indicated to fit to other construction, verify dimensions of
other construction by field measurements before fabrication.
Coordinate fabrication schedule with construction progress
to avoid delaying the Work.
D. Space Requirements: Verify space requirements and
dimensions of items shown diagrammatically on Drawings.
E. Review of Contract Documents and Field Conditions:
Immediately on discovery of the need for clarification of
the Contract Documents, submit a request for information to
Architect. Include a detailed description of problem
encountered, together with recommendations for changing the
Contract Documents.
3.4 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify
layout information shown on Drawings, in relation to
existing conditions and dimensions. If discrepancies are
discovered, notify Architect and Owner promptly.
3.5 INSTALLATION
A. General: Locate the Work and components of the Work
accurately, in correct alignment and elevation, as
indicated.
1. Make vertical work plumb and make horizontal work
level.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
QUALITY CONTROL 013100 - 5
2. Where space is limited, install components to maximize
space available for maintenance and ease of removal for
replacement.
B. Comply with manufacturer's written instructions and
recommendations for installing products in applications
indicated.
C. Install products at the time and under conditions that will
ensure the best possible results. Maintain conditions
required for product performance until Substantial
Completion.
D. Conduct construction operations so no part of the Work is
subjected to damaging operations or loading in excess of
that expected during normal conditions of occupancy.
E. Tools and Equipment: Only use the best quality tools and
equipment with proper attenuations for the latest acceptable
sound levels.
F. Anchors and Fasteners: Provide anchors and fasteners as
required to anchor each component securely in place,
accurately located and aligned with other portions of the
Work.
1. Mounting Heights: Where mounting heights are not
indicated, mount components at heights directed by
Architect.
2. Allow for building movement, including thermal
expansion and contraction.
G. Joints: Make joints of uniform width. Where joint
locations in exposed work are not indicated, arrange joints
for the best visual effect. Fit exposed connections
together to form hairline joints.
H. Hazardous Materials: Use products, cleaners, and
installation materials that are not considered hazardous.
END OF SECTION 01310
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 1
SECTION 013200 - TEMPORARY FACILITIES
PART 1 - GENERAL
1.1 DESCRIPTION OF REQUIREMENTS
A. Specific administrative and procedural minimum actions are
specified in this section, as extensions of provisions in
General Conditions and other Contract Documents. Nothing in
this section is intended to limit types and amounts of
temporary work required, and no omission from this section
will be recognized as an indication that such temporary
activity is not required for successful completion of the
work and compliance with requirements of Contract Documents.
B. Each Contractor is specifically assigned certain
responsibilities for temporary facilities to be used by all
Contractors, other entities at the site, the Owner's work
forces and other personnel including occupants of the
project, the Owner, the Architect, test agencies, personnel
of governing authorities, and similar entities and personnel
authorized to be at the project site during construction.
In general, each Contractor is assigned the responsibilities
for installation, operation and removal of each temporary
facility which is related by recognized trades to its scope
of contract work; and, except as otherwise indicated, each
is responsible for costs and use charges associated there-
with, including fuel, power usage, water usage and similar
usage costs. The Contractor is responsible for temporary
facilities not related to any other Contractor's scope of
contract work and not otherwise specifically assigned, as
designated by the Architect.
C. No costs or usage charges for temporary facilities are
chargeable to the Owner, nor can any Contractor's cost or
usage charges for temporary facilities be accepted as the
basis for a change order extra. The total costs and usage
charges for temporary facilities are included, collectively,
in the Contract Amounts.
1.2 GENERAL REQUIREMENTS
A. Each Contractor shall provide and operate, in a manner that
complies with all local, state, and federal safety
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 2
regulations, all hoists, cranes, helicopters and furnish and
erect all ladders and scaffolding required by him and his
subcontractors, constructed to afford proper protection to
craftsmen, their Work and other Work in progress and
previously executed.
1.3 JOB CONDITIONS
A. Each Contractor shall establish and initiate use of each
temporary facility at time first reasonably required for
proper performance of the total work of project. Terminate
use and remove facilities at earliest reasonable time, when
no longer needed or when permanent facilities have, with
authorized use, replaced the need.
B. Each Contractor shall install, operate, maintain and protect
temporary facilities in a manner and at locations that will
be safe, nonhazardous, sanitary, protective of persons and
property, and free of deleterious effects.
1.4 ENVIRONMENTAL PROTECTION
A. Each Contractor shall provide facilities, establish
procedures, and conduct construction activities in a manner
that will ensure compliance with environmental and other
regulations controlling construction activities at project
site. The Contractor shall designate one person, the
Construction Superintendent or other, to enforce strict
discipline on activities related to generation of wastes,
pollution of air/water/soil, generation of noise, and
similar harmful or deleterious effects which might violate
regulations or reasonably irritate persons at or in vicinity
of project site. Anti-pollution measures required by D.E.P.,
as applicable are to be followed.
1.5 SECURITY
A. The Contractor shall maintain complete security on the site
at all times outside of normal working hours to protect the
Work and all field offices, and to secure the area of
construction by restricting all trespassers.
1. This means locking the doors and gates. A guard is not
required.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 3
2. All areas under construction are to be secured with a
6’ high chain link fence with screening. The fence is
to be maintained on a daily basis, kept straight, plumb
and secure at all times to provide a professional
appearance. Provide gates as necessary for access to
each area.
1.6 TEMPORARY CONSTRUCTION FACILITIES
A. Where mud, snow, ice or other hazardous conditions exist in
the purview (Scope of Work) of any Sub Contractor, the
Contractor shall remove the hazards immediately and replace
with suitable material for the other contractors use. If the
Owner is compelled to remove the hazards with their own
forces due to inaction by the Contractor, then that
Contractor will be back-charged for the work performed by
the Owner.
B. No welding, cutting by torch, or Work utilizing or causing
flammable waste shall be done unless adequate fire
protection is provided and maintained for the duration of
the Work in the area of operations.
1.7 DEBRIS CONTROL (Refer to Section 015240 for further
delineation)
A. The Contractor shall be responsible for daily cleaning up of
spillages and debris resulting from his operations and from
those of his Subcontractors; and shall be responsible for
complete removal and disposition of hazardous and toxic
waste materials. The Contractor shall provide containers at
grade, sufficient for the depositing of
nonhazardous/nontoxic waste materials, and shall remove such
waste materials from project site at least weekly during
cold weather (daily high temperatures below 50oF) and at
least twice weekly during mild and warm weather.
1. Contractor is responsible to provide all dumpsters.
B. The Contractor shall daily clean all mud, dirt and debris
resulting from all trades operations from the adjacent
streets, sidewalks, drives and parking areas and shall
repair all damage caused by the cleaning to the satisfaction
of the Owner.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 4
C. The Contractor is to provide and maintain appropriate means
of safe trash disposal (i.e., chutes) to grade/dumpster.
Multiple units may be required and shall be figured for in
the bid.
D. The contractor shall prevent intrusion of dust, debris,
sound, odor, equipment, etc. into the occupied spaces.
PART 2 - EXECUTION
PART 3 - ENCLOSURES
A. At earliest possible date, the Contractor shall secure
project area against unauthorized entrance at times when
personnel are not working. Provide secure temporary
enclosure at ground floor and other locations of possible
entry, with locked entrances.
B. Where any form of demolition will expose the interior of the
building to weather, demolition shall follow the erection of
weatherproof walls by the Contractor installed inside the
demolition line, sealed and flashed, as required, to keep
all water from the building interior. Keep temporary
weatherproofing in place until new construction has been
completed to the stage where water will not enter the
building.
C. The Contractor shall provide constant protection against
rain, wind, storms, frost or heat to maintain the work,
materials, apparatus and fixtures free from damage. At the
end of each day's work, cover work likely to be damaged.
During cold weather, protect work from damage by freezing
and provide such enclosures and heating apparatus as may be
necessary diligently to prosecute the Work without stoppage
for reason of unfavorable weather.
D. Wherever a Contractor provides openings through walls or
slabs, each location shall be adequately protected at the
end of each working day with temporary enclosures to make
these areas tight. Openings through exterior walls shall be
watertight.
E. Contractor is to maintain the building in a water tight
condition during all construction activities by whatever
means necessary. Contractor is to never do any more removal
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 5
work during any given day than that contractor can replace
in the same day in order to make sure the occupants of the
building will be protected from the possibility of water
leakage into the building. Should any leakage occur, the
contractor is to immediately make the building water tight
(on a 24 hour basis) and repair any damage caused by the
leakage or replace any equipment damaged by the leakage.
3.2 TEMPORARY ELECTRICITY
A. Power is available on site.
3.3 TEMPORARY VENTILATION
A. A trade requiring ventilation for Work shall provide fans to
induce circulation of air provided prior approval has been
obtained from the Owner.
3.4 TEMPORARY TELEPHONES
A. Each Contractor is responsible for their own telephone
service and for payment of all charges relating to that
service.
3.5 TEMPORARY WATER
A. Water is available on site.
3.6 TEMPORARY SANITARY FACILITIES
A. Starting at time of start of work at project site, the
Contractor shall provide and maintain self-contained toilet
units of type acceptable to governing authorities, adequate,
at all stages of construction, for use of personnel at
project site. Provide separate facilities for male and
female personnel when both sexes are working, in any
capacity, at project site. Facilities shall remain in use
until completion of project. Use of permanent facilities
will not be permitted.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TEMPORARY FACILITIES 013200 - 6
3.7 REMOVAL AND RESTORATION
A. Prior to acceptance of the Project, each contractor shall
remove temporary work for which he has been responsible.
3.8 OWNER'S RIGHTS
A. If any Contractor fails to carry out his responsibilities in
providing temporary facilities, as set forth above, the
Owner/Owner shall have the right to take such action as he
deems proper for the protection and conduct of the Work, and
to deduct the cost thereof from the amount due the
Contractor at fault.
B. Extended work days, hours, shifts, weekend work, etc. may be
allowed upon coordination and approval by Architect,
Owner at no additional cost to the Owner.
1. Should the schedule begin to slip, for any reason, each
contractor will be required to work additional shifts
or weekends to recover the lost time. Should there be a
cost to the College for this overtime work, the
contractor will be required to reimburse the owner for
said costs.
END OF SECTION 01320
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PHOTOGRAPHIC DOCUMENTATION 013220 - 1
SECTION 013220 – PHOTOGRAPHIC DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract,
including General and Supplementary Conditions and other
Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural
requirements for the following work by the General
Contractor (other primes are encouraged to document the
site and construction, but not required):
1. Preconstruction video documentation.
B. Related Sections include the following:
1. All of Division 1.
1.3 SUBMITTALS
A. Qualification Data: For photographer.
B. Media: Submit 3 copies of recordings on CD
1. Identification: On each copy, provide an applied
label with the following information:
a. Name of Project.
b. Name and address of photographer.
c. Name of Architect and Construction Manager.
d. Name of Contractor.
e. Date recorded.
f. Description of vantage point, indicating
location, direction (by encompass point), and
elevation or story of construction.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PHOTOGRAPHIC DOCUMENTATION 013220 - 2
1.4 QUALITY ASSURANCE
A. Photographer Qualifications: An individual who has been
regularly engaged as a professional photographer of
construction products for not less than three years.
1.5 COORDINATION
A. Auxiliary Services: Cooperate with photographer and
provide auxiliary services requested, including access to
Project site and use of temporary facilities, including
temporary lighting required to produce clear, well-lit
photographs without obscuring shadows.
1.6 USAGE RIGHTS
A. Obtain and transfer copyright usage rights from
photographer to Owner for unlimited reproduction of
photographic documentation.
PART 2 - PRODUCTS
2.1 PHOTOGRAPHIC MEDIA
A. Format: Provide recordings on CD in mp4 / avi format
PART 3 - EXECUTION
3.1 CONSTRUCTION RECORDINGS
A. Photographer: Engage a qualified commercial videographer
to record construction video.
B. Preconstruction Recording: Before starting demolition or
construction record, record Project site, interior and
exterior.
1. Show protection efforts by Contractor.
END OF SECTION 01322
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 1
SECTION 013300 – CONTRACT CLOSEOUT
PART 1 - GENERAL
1.1 DEFINITION
A. Closeout is hereby defined to include general requirements
near end of Contract Time, in preparation for final
acceptance, final payment, normal termination of Contract,
occupancy by Owner and similar actions evidencing completion
of the work. Specific requirements for individual units of
work are specified in sections of Divisions 2 through 16.
Time of closeout is directly related to Substantial
Completion, and therefore may be either a single time period
for entire work or a series of time periods for individual
parts of the work which have been certified as substantially
complete at different dates. That time variation, if any,
shall be applicable to other provisions of this section.
B. Substantial completion shall be defined that every material
item has been installed. Nothing is missing and therefore,
the punch list can begin.
1.2 PREREQUISITES TO SUBSTANTIAL COMPLETION
A. Prior to requesting the Architect's inspection for cer-
tification of substantial completion, for either entire work
or portions thereof, complete the following and list known
exceptions in request:
1. In progress payment request coincident with or first
following date claimed, show either 100% completion for
portion of work claimed as substantially complete, or
list incomplete items, value of incomplete items, and
reasons for being incomplete.
2. Include supporting documentation for completion as
indicated in these Contract Documents.
a. Prepare a list of items to be completed and
corrected (punch list), the value of items on the
list, and reasons why the Work is not complete.
3. Submit statement showing accounting of changes to the
Contract Sum.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 2
4. Advise Owner of pending insurance change over
requirements.
5. Submit specific warranties, workmanship/maintenance
bonds, maintenance agreements, final certifications and
similar documents.
6. All fire sprinklers, devices, alarm system, roofing
system, doors, insulation, etc. requiring FM Research
approval to submit certification from Factory Mutual.
7. Obtain and submit releases enabling Owner's full and
unrestricted use of the work and access to services and
utilities, including occupancy permits, operating
certificates, and similar releases.
8. Deliver tools, spare parts, extra stocks of materials,
and similar physical items to Owner obtaining a signed
receipt of materials delivered. Refer to individual
work sections for required quantities of spare parts,
extra and overrun stock, maintenance tools and devices,
keys, and similar physical units to be submitted.
9. Complete start up testing of systems, and instructions
of Owner's operating/maintenance personnel.
Discontinue, or change over, and remove from project
site temporary facilities and services, along with
construction tools and facilities, mockups, and similar
elements.
10. Complete final clean up requirements.
11. Touch up and otherwise repair and restore marred
exposed finishes.
12. Inspection: Submit a written request for inspection
for Substantial Completion to Project Manager. On
receipt of request, Architect and Project Manager will
either proceed with inspection or notify Contractor of
unfulfilled requirements. Architect will prepare the
Certificate of Substantial Completion after inspection,
the Project Manager will notify Contractor of items,
either on Contractor's list or additional items
identified by Architect that must be completed or
corrected before certificate will be issued.
13. Reinspection: Request reinspection when the Work
identified in previous inspections as incomplete is
completed or corrected.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 3
14. Results of completed inspection will form the basis of
requirements for Final Completion.
B. Upon receipt of Contractor's request, the Project Manager
and Architect will proceed with substantial completion
inspection. Following inspection, the Architect will either
prepare the certificate of substantial completion, or advise
the Contractor of work which shall be performed prior to
issuance of certificate. The work remaining to be
performed shall be completed prior to the punch list for
final acceptance.
C. Upon receipt of Contractor's notice that work has been
completed, including all punch list items, but excepting
incomplete items delayed because of circumstances acceptable
to the Project Manager and Architect, the Project Manager
and Architect will reinspect the work. Upon completion of
reinspection, the Architect will either prepare the
certificate of final acceptance or advise the Contractor of
work not completed or obligations not fulfilled as required
for final acceptance.
D. In the event that the work is not completed or obligations
are not fulfilled as required for final acceptance and the
Architect/CM is required to reinspect the work more often
than the two inspections described, the Contractor shall
compensate the Architect and/or the Project Manager at the
rate of $500.00 for each additional site visit required for
reinspections. The compensation shall be processed by
change order as a deduction to the Contractor's Contract
Sum, which amount will be paid to the Architect or Project
Manager by the Owner, through a change order as an addition
to the Architect's or Project Manager’s Contract Sum.
E. Substantial Completion shall be defined for this project
that every element of the project/construction and the
contract, based on the contract and amended drawings and
specification sections, is installed and the building / work
is deemed complete, less repairs and/or touch up type work
that would be generally referred to as punchlist work. If
any components of the building, or site work associated with
this contract are not installed, the project cannot be
deemed substantially completed.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 4
1.3 PREREQUISITES TO FINAL ACCEPTANCE
A. Prior to requesting Project Manager and Architect's final
inspection for certification of final acceptance and final
payment, complete the following and list known exceptions,
in request:
1. Submit final payment request with final releases and
supporting documentation not previously submitted and
accepted. Include certificates of insurance for
products and completed operations where required.
2. Submit release of liens for all subcontractors.
3. Submit Contractor's statement that his final
application, as presented, is the final bill and no
other claims will be presented.
4. Submit updated final statement, accounting for
additional changes to Contract Sum including change
orders and allowances.
5. Submit certified copy of Architect's final punch list
of itemized work to be completed or corrected, stating
that each item has been completed or otherwise resolved
for acceptance, endorsed and dated by Architect.
6. Submit one set of record documents, bound copies of
maintenance/operating manuals, final project
photographs, damage or settlement survey, property
survey, and similar final record information.
7. Complete final clean up requirements.
8. Touch up and otherwise repair and restore marred
exposed finishes.
9. Submit notarized consent of surety to final payment.
10. Submit final liquidated damages settlement state-
ment, if required, acceptable to Project Manager and
the Owner.
11. Revise and submit evidence of final, continuing
insurance coverage complying with insurance require-
ments.
12. A letter from the Owner's representative certifying
that he has been properly instructed in the opera-
tion and maintenance of equipment by the Contractor.
13. 10% one year Maintenance Bond.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 5
14. Underwriter's Certificate or Electrical Sub Code
Official's Approval.
15. Fire Alarm Certification and Description - NFPA form
72C including local County of Chester.
16. HVAC Contractor to submit certified balancing
report.
17. Final acceptance by Architect of record documents
B. Except as otherwise indicated or requested by Project
Manager/Architect, remove temporary protection devices
and facilities that were installed during course of the
work to protect previously completed work during
remainder of construction period.
1.4 CLEAN UP
A. Remove waste materials from site and dispose of in a
lawful manner.
PART 2 - PRODUCTS - NOT APPLICABLE
PART 3 - EXECUTION
3.1 CLEANING
A. Where extra materials of value remaining after completion
of associated work have become Owner's property, dispose
of these to Owner's best advantage as directed.
B. After Substantial Completion of the Work, each Contractor
shall do the final cleaning of the surfaces of his
installations as may be required by the various
Specification sections.
C. After each Contractor has cleaned their work, The General
Contractor shall engage a professional cleaning service
to perform final cleaning of the work consisting of
cleaning each surface or unit to normal clean condition.
Comply with manufacturer's instructions for cleaning
operations and chemicals. The following are examples,
but not by way of limitation, of cleaning levels
required:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 6
1. Remove labels that are not required as permanent
labels.
2. Clean transparent materials, including mirrors and
window/door glass, to a polished condition, removing
substances that are noticeable as vision obscuring
materials. Replace broken glass and damaged
transparent materials.
3. Clean exposed exterior and interior hard surfaced
finishes, to a dirt free condition, free of dust,
stains, films and similar noticeable distracting
substances. Except as otherwise indicated, avoid
disturbance of natural weathering of exterior sur-
faces. Restore reflective surfaces to original
reflective conditions.
4. Wipe surfaces of mechanical and electrical equipment
clean, including elevator equipment and similar
equipment; remove excess lubrication and other
substances.
5. Remove debris and surface dust from limited access
spaces including roofs, plenums, shafts, trenches,
equipment vaults, manholes, attics and similar
spaces.
6. Vacuum and clean carpeted surfaces and similar soft
surfaces.
7. Clean light fixtures and lamps to function with full
efficiency.
8. Clean and wax or polish all hard floors following
manufacturer’s instructions.
9. Clean all window surfaces inside and outside.
10. Perform final cleaning in, on and around all
casework, sinks, toilets fixtures, etc.
11. Clean Project site, yard, and grounds, in areas
disturbed by construction activities, including
landscape development areas, of rubbish, waste
material, litter, and other foreign substances.
12. Sweep paved areas broom clean. Remove petrochemical
spills, stains, and other foreign deposits.
13. Rake grounds that are neither planted nor paved to a
smooth, even-textured surface.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 7
14. Remove tools, construction equipment, machinery, and
surplus material from Project site.
15. Remove snow and ice to provide safe access to
building.
16. Clean exposed exterior and interior hard-surfaced
finishes to a dirt-free condition, free of stains,
films, and similar foreign substances. Avoid
disturbing natural weathering of exterior surfaces.
Restore reflective surfaces to their original
condition.
17. Sweep concrete floors broom clean.
18. Replace parts subject to unusual operating
conditions.
19. Clean plumbing fixtures to a sanitary condition,
free of stains, including stains resulting from
water exposure.
20. Replace disposable air filters and clean permanent
air filters. Clean exposed surfaces of diffusers,
registers, and grills.
21. Clean ducts, blowers, and coils if units were
operated without filters during construction.
22. Clean light fixtures, lamps, globes, and reflectors
to function with full efficiency. Replace burned-
out bulbs, and those noticeably dimmed by hours of
use, and defective and noisy starters in fluorescent
and mercury vapor fixtures to comply with
requirements for new fixtures.
23. Leave Project clean and ready for occupancy.
D. Comply with safety standards for cleaning. Do not burn
waste materials. Do not bury debris or excess materials
on Owner's property. Do not discharge volatile, harmful,
or dangerous materials into drainage systems. Remove
waste materials from Project site and dispose of
lawfully.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONTRACT CLOSEOUT 013300 - 8
3.2 RECORD DOCUMENTS (Refer to Section 013400, FOR project
requirements for submitting Record Documents)
3.3 REMOVE TEMPORARY FACILITIES
A. At the completion of the work prior to final payment,
remove all temporary facilities entirely from site,
including, but not limited to, the following: Field
offices, trailers, shanties, sheds, job telephone,
temporary toilets, temporary enclosures, dust barriers
and other temporary protection devices.
END OF SECTION 013300
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT RECORD DOCUMENTS 013400 - 1
SECTION 013400 - PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project record documents consisting of:
a. Record drawings.
b. Record project manual (specifications).
1.2 SUBMITTALS
A. Project Record Documents: Submit after substantial
completion, but prior to final completion.
1. Record drawings: Submit in form of opaque prints.
a. Sets shall include all drawings, whether changed
or not.
2. Other record documents: Submit originals or good
quality photocopies.
3. Each Sub contractor is responsible for their respective
trade, record documents and record drawings. Combine
with General Contractor record drawing documents for a
complete set.
PART 2 - PRODUCTS – (NOT USED)
PART 3 - EXECUTION
3.1 MAINTENANCE OF PROJECT RECORD DOCUMENTS
A. Do not use record documents of any type for construction
purposes.
B. Maintain record documents in a secure location at the site
while providing for access by the contractor and the
engineer during normal working hours; store in a
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT RECORD DOCUMENTS 013400 - 2
fire-resistive room or container outside of normal working
hours.
C. Record information as soon as possible after it is obtained.
D. Assign a person or persons responsible for maintaining
record documents.
E. Record the following types of information on all applicable
record documents:
1. Dimensional changes.
2. New and revised details.
3. Revisions to electrical circuits.
4. Locations of utilities concealed in construction.
5. Particulars on concealed products which will not be
easy to identify later.
6. Changes made by modifications to the contract; note
identification numbers if applicable.
7. New information which may be useful to the owner, but
which was not shown in either the contract documents or
submittals.
3.2 RECORD DRAWINGS
A. Maintain a complete set of opaque prints of the contract
drawings, marked to show changes.
B. Where the actual work differs from that shown on the
drawings, mark this set to show the actual work.
1. Mark location of concealed items before they are
covered by other work.
2. Mark either record contract drawings or shop drawings,
whichever are best suited to show the change.
C. When the contractor is required by a provision of a
modification to prepare a new drawing, rather than to revise
existing drawings, obtain instructions from the engineer as
to the drawing scale and information required.
D. Keep drawings in labeled, bound sets.
1. Mark with red pencil.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT RECORD DOCUMENTS 013400 - 3
2. Mark work of separate contracts with different colors
of pencils.
3. Incorporate new drawings into existing sets, as they
are issued.
E. Where record drawings are also required as part of operation
and maintenance data submittals, copy marks to another
opaque print obtained from the engineer.
3.3 RECORD PROJECT MANUAL
A. Maintain a complete copy of the project manual, marked to
show changes.
B. Where the actual work differs from that shown in the project
manual, mark the record copy to show the actual work.
1. Include a copy of each addendum and modification to the
contract.
2. In addition to the types of information required on all
record documents, record the following types of
information:
a. Product options taken, when the specification
allows more than one.
b. Proprietary name and model number of actual
products furnished, for each product, material,
and item of equipment specified.
c. Name of the supplier and installer, for each
product for which neither a product data submittal
nor a maintenance data submittal was specified.
3.4 TRANSMITTAL TO OWNER (through the Engineer)
A. Collect, organize, label, and package ready for reference.
1. Bind print sets with durable paper covers.
2. Label each document (and each sheet of drawings) with
"PROJECT RECORD DOCUMENTS - This document has been
prepared using information furnished by _____" [insert
the contractor's name], and the date of preparation.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PROJECT RECORD DOCUMENTS 013400 - 4
B. Submit to the Engineer four (4) sets of Operation and
Maintenance Manuals in three-ring binders for approval: All
to be submitted at one time, not piece meal.
1. Include all inspection/approvals/certifications
2. All approved cut sheets as well as manufacturer's
operation and maintenance manuals.
END OF SECTION 01340
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-1
SECTION 015240– CONSTRUCTION WASTE MANAGEMENT
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including
General and Supplementary Conditions and Division 1
Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural
requirements for the following:
1. Salvaging nonhazardous demolition and construction
waste.
2. Recycling nonhazardous demolition and construction
waste.
3. Disposing of nonhazardous demolition and construction
waste.
B. Related Sections include the following:
1. All of Division 1 and attached specifications and
drawings that make a part of this contract.
1.3 DEFINITIONS
A. Construction Waste: Building and site improvement materials
and other solid waste resulting from construction,
remodeling, renovation, or repair operations. Construction
waste includes packaging.
B. Demolition Waste: Building and site improvement materials
resulting from demolition or selective demolition
operations.
C. Disposal: Removal off-site of demolition and construction
waste and subsequent sale, recycling, reuse, or deposit in
landfill or incinerator acceptable to authorities having
jurisdiction.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-2
D. Recycle: Recovery of demolition or construction waste for
subsequent processing in preparation for reuse.
E. Salvage: Recovery of demolition or construction waste and
subsequent sale or reuse in another facility.
1.4 SUBMITTALS
A. Waste Management Plan: Submit 4 copies of plan within 30
days of date established for the Notice to Proceed.
B. Records of Donations: Indicate receipt and acceptance of
salvageable waste donated to individuals and organizations.
Indicate whether organization is tax exempt.
C. Records of Sales: Indicate receipt and acceptance of
salvageable waste sold to individuals and organizations.
Indicate whether organization is tax exempt.
D. Recycling and Processing Facility Records: Indicate receipt
and acceptance of recyclable waste by recycling and
processing facilities licensed to accept them. Include
manifests, weight tickets, receipts, and invoices.
E. Landfill and Incinerator Disposal Records: Indicate receipt
and acceptance of waste by landfills and incinerator
facilities licensed to accept them. Include manifests,
weight tickets, receipts, and invoices.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with hauling and disposal
regulations of authorities having jurisdiction.
B. Waste Management Conference: Conduct conference at Project
site to comply with requirements in Division 1. Review
methods and procedures related to waste management
including, but not limited to, the following:
1. Review and discuss waste management plan.
2. Review requirements for documenting quantities of each
type of waste and its disposition.
3. Review and finalize procedures for materials separation
and verify availability of containers and bins needed
to avoid delays.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-3
4. Review procedures for periodic waste collection and
transportation to recycling and disposal facilities.
5. Review waste management requirements for each trade.
1.6 WASTE MANAGEMENT PLAN
A. General: Develop plan consisting of waste identification,
and waste reduction work plan. Indicate quantities by
weight or volume, but use same units of measure throughout
waste management plan.
B. Waste Identification: Indicate anticipated types and
quantities of demolition, site-clearing, and construction
waste generated by the Work. Include estimated quantities
and assumptions for estimates.
C. Waste Reduction Work Plan: List each type of waste and
whether it will be salvaged, recycled, or disposed of in
landfill or incinerator. Include points of waste
generation, total quantity of each type of waste, quantity
for each means of recovery, and handling and transportation
procedures.
1. Salvaged Materials for Sale: For materials that will
be sold to individuals and organizations, include list
of their names, addresses, and telephone numbers.
2. Salvaged Materials for Donation: For materials that
will be donated to individuals and organizations,
include list of their names, addresses, and telephone
numbers.
3. Recycled Materials: Include list of local receivers
and processors and type of recycled materials each will
accept. Include names, addresses, and telephone
numbers.
4. Disposed Materials: Indicate how and where materials
will be disposed of. Include name, address, and
telephone number of each landfill and incinerator
facility.
5. Handling and Transportation Procedures: Include method
that will be used for separating recyclable waste
including sizes of containers, container labeling, and
designated location on Project site where materials
separation will be located.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-4
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement waste management plan as approved by
Project Manager. Provide handling, containers, storage,
signage, transportation, and other items as required to
implement waste management plan during the entire duration
of the Contract.
1. Comply with Division 1 Section "Temporary Facilities"
for operation, termination, and removal requirements.
B. Training: Train workers, subcontractors, and suppliers on
proper waste management procedures, as appropriate for the
Work occurring at Project site.
1. Distribute waste management plan to entities when they
first begin work on-site. Review plan procedures and
locations established for salvage, recycling, and
disposal.
C. Site Access and Temporary Controls: Conduct waste
management operations to ensure minimum interference with
roads, streets, walks, walkways, and other adjacent occupied
and used facilities.
1. Designate and label specific areas on Project site
necessary for separating materials that are to be
salvaged, recycled, reused, donated, and sold.
2. Comply with Division 1 Section "Temporary Facilities
and Controls" for controlling dust and dirt,
environmental protection, and noise control.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Sale and Donation: Not permitted on
Project site.
3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL
A. General: Recycle beverage containers used by on-site
workers.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-5
B. Recycling Incentives: Revenues, savings, rebates, tax
credits, and other incentives received for recycling waste
materials shall accrue to Contractor.
C. Procedures: Separate recyclable waste from other waste
materials, trash, and debris. Separate recyclable waste by
type at Project site to the maximum extent practical.
1. Provide appropriately marked containers or bins for
controlling recyclable waste until they are removed
from Project site. Include list of acceptable and
unacceptable materials at each container and bin.
a. Inspect containers and bins for contamination and
remove contaminated materials if found.
2. Stockpile processed materials on-site without
intermixing with other materials. Place, grade, and
shape stockpiles to drain surface water. Cover to
present windblown dust.
3. Stockpile materials away from construction area.
4. Store components off the ground and protect from the
weather.
5. Remove recyclable waste off Owner's property and
transport to recycling receiving or processor.
3.4 RECYCLING DEMOLITION WASTE
A. Asphaltic Concrete Paving: Break up and transport paving to
asphalt-recycling facility.
3.5 RECYCLING CONSTRUCTION WASTE
A. Packaging:
1. Cardboard and Boxes: Break down packaging into flat
sheets. Bundle and store in a dry location.
2. Polystyrene Packaging: Separate and bag materials.
3. Pallets: As much as possible, require deliveries using
pallets to remove pallets from Project site. For
pallets that remain on-site, break down pallets into
component wood pieces and comply with requirements for
recycling wood.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION WASTE MANAGEMENT 015240-6
4. Crates: Break down crates into component wood pieces
and comply with requirements for recycling wood.
B. Wood Materials:
1. Clean Cut-Offs of Lumber: Grind or chip into small
pieces.
3.6 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged,
recycled, or otherwise reused, remove waste materials from
Project site and legally dispose of them in a landfill or
incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste
materials that are to be disposed of accumulate on-
site.
2. Remove and transport debris in a manner that will
prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials on site.
C. Burying: Do not bury waste materials on site.
D. Disposal: Transport waste materials off Owner's property
and legally dispose of them.
E. Washing waste materials into sewers or drains is not
permitted.
END OF SECTION 015240
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-1
AND ARCHITECTURAL COATINGS
SECTION 018114 - VOC LIMITS FOR ADHESIVES, SEALANTS, AND
ARCHITECTURAL COATINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for reduced-emission,
reduced-toxicity construction adhesives, sealant and
architectural coatings.
B. RELATED SECTIONS:
1. All sections in the Specifications with interior
adhesive or sealant applications.
2. Painting: Division 9.
1.2 REFERENCE STANDARDS / QUALITY ASSURANCE
A. Adhesives (VOC Content): South Coast Air Quality
Management District Rule #1168 - “Adhesive and Sealant
Applications”, amended 1/7/05: South Coast Air Quality
Management District (SCAQMD), State of California,
www.aqmd.gov.
B. Sealants: (VOC Content): Regulation 8 (Organic
Compounds), Rule 51 (Adhesive and Sealant Products),
amended 5/2/01: Bay Area Air Quality Management District
(BAAQMD), State of California, www.baaqmd.gov.
C. Paints: (VOC Content and Prohibited Compounds): “Green
Seal Standard for Architectural Coating” (GS-11), plus
“Green Seal Standard for Anti-Corrosive Paints” (GC-03).
D. Anticorrosive Paints: “Green Seal Standard for Anti-
Corrosive Paints” (GC-03), Second Edition, 1/7/07.
E. Clear Wood Finishes, Floor Coatings, Stains, Sealers,
Shellacs (VOC Content): South Coast Air Quality
Management District Rule #1113, “Architectural Coatings,”
1/1/04.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-2
AND ARCHITECTURAL COATINGS
1.3 DELIVERY AND STORAGE
A. To the extent feasible, do not store adhesives, sealants,
paints, and other Architectural coatings with materials
that have a high capacity to adsorb VOC emissions (i.e.,
materials which are woven, fibrous or porous in nature,
such as acoustical ceilings, textiles, etc.). Do not store
adhesives, sealants, paints, and other Architectural
coatings in occupied spaces.
PART 2 - PRODUCTS
2.1 MATERIALS
A. VOC Content of Adhesives:
1. The volatile organic compound (VOC) content of
adhesives shall not exceed the limits defined in Rule
#1168, “Adhesive and Sealant Applications” of the South
Coast Air Quality Management District (SCAQMD), of the
State of California. The VOC limits defined by SCAQMD
(based on 1/7/05 amendments) are as follows. All VOC
limits are defined in grams per liter, less water and
less exempt compounds (determined by U. S. EPA
Reference Test Method 24). Unless otherwise specified
below, the VOC content of all adhesives, adhesive
bonding primers, or adhesive primers shall not be in
excess of 250 grams per liter.
2. Architectural Applications:
a. Wood flooring adhesive: 100.
b. Subfloor adhesive: 50.
c. Ceramic tile adhesive: 65.
d. Drywall and panel adhesive: 50.
e. Cove base adhesive: 50.
f. Multipurpose construction adhesive: 70.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-3
AND ARCHITECTURAL COATINGS
g. Glazing adhesives: 100.
3. Specialty applications:
a. PVC welding: 510.
b. CPVC welding: 490.
c. ABS welding: 400.
d. Plastic cement welding: 250.
e. Adhesive primer for plastic: 550.
f. Contact adhesive: 80.
g. Special purpose contact adhesive: 250.
h. Structural wood member adhesive: 140.
i. Sheet applied rubber lining operations: 850.
j. Adhesive Primer for Traffic Marking Tape: 150.
4. Substrate specific applications:
a. Metal to metal: 30.
b. Plastic foams: 50.
c. Porous material (except wood): 50.
d. Wood: 30.
e. Fiberglass: 80.
5. If an adhesive is used to bond dissimilar substrates
together, the adhesive with the highest VOC content
shall be allowed.
B. VOC Content of Sealants and Sealant Primers:
1. The volatile organic compound (VOC) content of sealants
and sealant primers shall not exceed the limits defined
in Rule #1168, “Adhesive and Sealant Applications” of
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-4
AND ARCHITECTURAL COATINGS
the South Coast Air Quality Management District
(SCAQMD), of the State of California. The VOC limits
defined by SCAQMD (based on 1/7/05 amendments) are as
follows. All VOC limits are defined in grams per liter,
less water and less exempt compounds (determined by U.
S. EPA Reference Test Method 24).
2. Sealants:
a. Architectural: 250.
b. Non-membrane Roof: 300.
c. Roadway: 250.
d. Roof Membrane: 450.
e. Other: 420.
3. Sealant Primers:
a. Architectural Non-Porous: 250.
b. Architectural Porous: 775.
c. Other: 750.
C. VOC Content of Aerosol Adhesives:
1. The volatile organic compound (VOC) content of aerosol
adhesives shall not exceed the limits defined in “Green
Seal Standard for Commercial Adhesives” (GS-36),
10/19/00. All VOC limits are defined in grams per
liter, less water and less exempt compounds (determined
by U. S. EPA Reference Test Method 24).
2. Aerosol Adhesives:
a. General Purpose Mist Spray - 65% VOCs by weight.
b. General Purpose Web Spray - 55% VOCs by weight.
c. Special Purpose Aerosol Adhesives, all types - 70%
VOCs by weight.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-5
AND ARCHITECTURAL COATINGS
D. VOC Content of Paints:
1. The Volatile Organic Compound (VOC) content of paints
shall not exceed the limits defined in the “Green Seal
Standard for Architectural Coating” (GS-11) as of
5/20/93. The VOC limits are as follows. All VOC limits
are defined in grams per liter, less water.
2. Paint:
a. Non-flat interior coatings: 150.
b. Flat interior coatings: 50.
E. VOC Content of Anti-Corrosive Paints:
1. The Volatile Organic Compound (VOC) content of paints
shall not exceed the limits defined in the “Green Seal
Standard for Anti-Corrosive Paints” (GC-03), Second
Edition, 1/7/07. All VOC limits are defined in grams per
liter, less water.
2. Anti-Corrosive Paints: 250.
F. VOC Content of Clear Wood Finishes, Floor Coatings,
Stains, Sealers, Shellacs:
1. The Volatile Organic Compound (VOC) content of paints
shall not exceed the limits defined in the South Coast
Air Quality Management District Rule #1113,
“Architectural Coatings,” 1/1/04.
2. Clear Wood Finishes:
a. Varnish: 350.
b. Lacquer: 550.
3. Floor Coatings: 100.
4. Sealers:
a. Waterproofing Sealers: 250.
b. Sanding Sealers: 275.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-6
AND ARCHITECTURAL COATINGS
c. Other Sealers: 200.
d. Stains: 250.
G. Prohibited Compounds in Paints:
1. Paints shall comply with the prohibited compound
requirements of the “Green Seal Standard for
Architectural Coating” (GS-11), Green Seal, Washington
D.C.
2. Prohibited compounds, as defined in the green seal
standard, shall include:
a. Halomethanes: methylene chloride.
b. Chlorinated ethanes: 1,1,1 trichloroethane.
c. Aromatic solvents: benzene, toluene
(methylbenzene), Ethylbenzene.
d. Chlorinated ethylenes: vinyl chloride.
e. Polynuclear aromatics: naphthalene.
f. Chlorobenzenes: 1.2 dichlorobenzene.
g. Phthalate esters: di (2-ethylhexyl) phthalate,
Butyl Benzyl Phthalate, di-n-butyl phthalate, di-n-
octyl phthalate, diethyl phthalate, dimethyl
phthalate.
h. Miscellaneous semi-volatile organics: isophorone.
i. Metals and their compounds: antimony, cadmium,
hexavalent chromium, lead, mercury.
j. Preservatives (antifouling agents): formaldehyde.
k. Ketones: methyl ethyl ketone, methyl isobutyl
ketone.
l. Miscellaneous volatile organics: acrolein,
acrylonitrile.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
VOC LIMITS FOR ADHESIVES, SEALANTS 018114-7
AND ARCHITECTURAL COATINGS
PART 3 - EXECUTION
3.1 INSTALLATION
A. Coordinate installation of all adhesives, sealants,
paints, and coatings with the ventilation and sequencing
criteria defined in Specification section 018119
Construction IAQ Management.
B. When installed over concrete slabs, verify compatibility
of adhesives with curing compounds, leveling agents, or
sealing agents used for slab preparation.
END OF SECTION 018114
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 1
SECTION 018119 - CONSTRUCTION IAQ MANAGEMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for the development of a
Construction Indoor Air Quality Management Plan
(alternatively referred to as the Plan). The Plan shall be
developed by the Contractor, or other qualified party as
approved by the Owner and Architect. The Plan shall be
implemented and documented throughout the duration of the
project construction.
1. The Contractor shall provide, prior to the beginning of
construction, a copy of the IAQ Plan and, upon
completion of the project, the Construction IAQ Summary
Report.
B. Related Sections:
1. Volatile Organic Compound (VOC) Limits for Adhesives,
Sealants and Architectural Coatings: Elsewhere in
Division 1.
2. All sections of the Specifications related to interior
construction, MEP systems, and items affecting indoor
air quality.
3. All sections including adhesives, sealants, and
architectural coatings products.
4. Painting: Division 9.
1.2 CONSTRUCTION IAQ MANAGEMENT GOALS FOR THE PROJECT
A. The Owner has established that this Project shall minimize
the detrimental impacts on Indoor Air Quality (IAQ)
resulting from construction activities. Factors that
contaminate indoor air, such as dust entering HVAC systems
and ductwork, improper storage of materials on-site, poor
housekeeping, shall be minimized.
1.3 REFERENCES, RESOURCES
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 2
A. SMACNA IAQ Guidelines for Occupied Buildings Under
Construction, First ed., Nov. 1995, The Sheet Metal and
Air Conditioner National Contractors Association. (703)
803-2980, http://www.smacna.org.
B. ANSI/ASHRAE 52.2-1999, “Method of Testing General
Ventilation Air-Cleaning Devices for Removal Efficiency by
Particle Size”, www.ashrae.org
1.4 CONSTRUCTION IAQ MANAGEMENT PLAN - OVERVIEW
A. The Contractor shall prepare and submit a Construction IAQ
Management Plan to the Owner and Architect for approval.
The Construction IAQ Management Plan shall meet the
following criteria:
1. Construction activities shall be planned to meet or
exceed the minimum requirements included in Chapter 3 of
the Sheet Metal and Air Conditioning National
Contractors’ Association (SMACNA) “IAQ Guidelines for
Occupied Buildings under Construction”, First Edition,
1995.
2. Absorptive materials shall be protected from moisture
damage when stored on-site and after installation.
3. Filtration media shall be installed to protect ductwork
and/or equipment used during the construction process,
per Item 2.1 (Filtration Media) of this specification.
4. A Sequence of Finish Installation Plan shall be
developed, highlighting measures to reduce the
absorption of VOCs by materials that act as “sinks”.
5. All habitable spaces within the building shall be
subject to an Air Purge (Flush-out) immediately prior to
occupancy.
1.5 IAQ SUBMITTALS REQUIREMENT
A. The Contractor and/or subcontractor shall submit the
following required records and documents:
2. A construction schedule outlining the start-up date and
expected duration of all Construction IAQ Management
Plan control measures.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 3
2. A copy of the Construction IAQ Management Plan and the
Sequence Installation Plan, as defined herein.
3. A list of filtration media used, including manufacturer,
model number, MERV value, location installed, and date
of replacement prior to occupancy.
4. Product cut-sheets for all filtration media used during
construction and installed immediately prior to
occupancy, with MERV values highlighted. Cut sheets
shall be submitted with the Contractor’s or
Subcontractor’s ‘approved’ stamp as confirmation that
the products submitted are the products installed on the
project.
5. 18 photographs - 6 photographs taken on 3 different
occasions during construction, labeled with the SMACNA
approach illustrated - that document the implementation
of the Construction IAQ Management Plan throughout the
course of the project construction. Examples include
photographs of ductwork sealing and protection,
temporary ventilation measures, and conditions of on-
site materials storage (to prevent moisture damage).
Photographs shall include integral date stamping, and
shall be submitted with brief descriptions, or be
referenced to project meeting minutes or similar project
documents.
PART 2 - PRODUCTS
2.1 FILTRATION MEDIA
A. If air handlers are used during construction, filtration
media must be used at each return grill and have a Minimum
Efficiency Reporting Value (MERV) of at least 8, as
determined by ASHRAE 52.2-1999.
B. All filtration media shall be replaced immediately prior
to occupancy and must have a Minimum Efficiency Reporting
Value (MERV) of 13, as determined by ASHRAE 52.2-1999.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 4
PART 3 - EXECUTION
3.1 CONSTRUCTION IAQ MANAGEMENT PLAN - DETAILED
REQUIREMENTS
A. SMACNA Guidelines, as stated in Chapter 3 of the
referenced “IAQ Guidelines for Occupied Buildings Under
Construction”, outline IAQ measures in five categories as
listed below. The Construction IAQ Management Plan shall
be organized in accordance with the SMACNA format, and
shall address measures to be implemented by the Contractor
and/or Subcontractors in each of the five categories
(including subsections). All subsections shall be listed
in the Plan; items that are not applicable for this
project should be listed as such.
1. HVAC Protection: Shall include Return Side, Central
Filtration, Supply Side and Duct Cleaning
a. Contractor shall direct subcontractors to protect air
handling and distribution equipment, and air supply
and return ducting during construction. The
designated person will inspect work and monitor
subcontractor(s) to insure compliance.
b. All ductwork arriving on site shall be sealed with
plastic sheeting and stored on pallets or dunnage
until installed.
c. Contractor shall direct subcontractors to cover and
protect all exposed air inlets and outlets, openings,
grilles, ducts, plenums, etc. to prevent water,
moisture, dust and other contaminate intrusion.
d. Contractor shall direct subcontractors to apply
protection immediately after ducting.
e. Ducting runs shall be protected at the end day’s
work.
f. Contractor shall direct subcontractor to inspect
temporary filtration weekly and replace as required
to maintain the proper ventilation rates in the
building.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 5
2. Source Control:
a. Contractor shall direct subcontractors to protect
stored on-site or installed absorptive or porous
materials such as batt.
b. Contractor shall not allow subcontractors to use wet
damaged porous materials in the building.
c. Contractor shall require subcontractors to use low
emitting paints, sealants, adhesives and carpet.
d. Product Substitution.
e. Modifying Equipment Operation.
f. Changing Work Practices.
g. Local Exhaust.
h. Air Cleaning.
i. Cover or Seal.
3. Pathway Interruption:
a. Depressurize Work Area.
b. Pressurize Occupied Space.
c. Erect Barriers to Contain Construction Areas.
d. Relocate Pollutant Sources.
e. Temporarily Seal the Building.
4. Housekeeping: Protect stored on-site or installed
absorptive materials from moisture damage.
a. Store materials on elevated platforms under cover,
and in a dry location.
b. If materials are not stored in an enclosed location,
cover tops and sides of material with waterproof
sheeting, securely tied.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 6
c. Phase construction such that absorptive materials are
installed only in areas that are weathertight.
5. Scheduling.
B. Protection of Materials from Moisture Damage: As part of
the HOUSEKEEPING section of the Construction IAQ
Management Plan, measures to prevent installed materials
or material stored on-site from moisture damage shall be
provided. This section should also describe measures to
be taken if moisture damage does occur to absorptive
materials during the course of construction.
C. Replacement of Filtration Media: Under the HVAC
PROTECTION section of the Construction IAQ Management
Plan, a description of the filtration media in all
ventilation equipment shall be provided. The description
shall include replacement criteria for filtration media
during construction, and confirmation of filtration media
replacement for all equipment immediately prior to
occupancy. Filtration media shall meet the requirements
of Item 2.1 (Filtration Media) of this specification.
D. Sequence of Finish Installation for Materials: Absorptive
materials should be installed after the installation of
materials or finishes which have high short-term emissions
of VOC’s, formaldehyde, particulates, or other air-borne
compounds. Absorptive materials include, but are not
limited to: insulations (exposed to the air stream);
upholstered furnishings; and other woven, fibrous or
porous materials. Materials with high short-term emissions
include, but are not limited to: adhesives, sealants and
glazing compounds (specifically those with petrochemical
vehicles or carriers); paints, wood preservatives and
finishes; control and/or expansion joint fillers; hard
finishes requiring adhesive installation; gypsum board
(with associated finish processes and products); and
composite or engineered wood products with formaldehyde
binders.
2. The Contractor shall develop a sequencing schedule that
identifies how the sequencing will occur for the
project. The schedule shall be submitted to the Owner
and Architect in accordance with Submittal Requirements
specified elsewhere in Division 1, and in all other
applicable sections.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CONSTRUCTION IAQ REQUIREMENTS 018119 - 7
E. If building HVAC systems are used to supply the
ventilation air, filtration media shall be installed per
the requirements of Item 2.1 (Filtration Media) of this
specification.
F. Air Purging (Flush-out): Purging must be conducted after
construction and immediately prior to initial occupancy,
supplying 14,000 cu.ft. of 100% outdoor air per sq.ft. of
floor area, while maintaining an internal temperature of
at least 60 degrees F relative humidity no higher than
60%.
1. Conduct a minimum two-week building flush-out with MERV
13 filtration media and 100 percent outside air.
2. After flush-out, new MERV 13 filters must replace any
filters that are ready for replacement.
G. Implementation and Coordination:
!. The Contractor shall be responsible for implementation
of the Construction IAQ Management Plan, and for the
coordination of the Plan with all affected trades. The
Contractor shall designate one individual as the
Construction IAQ Representative, who will be responsible
for communicating the progress of the Plan with the
Owner and Architect on a regular basis. The Contractor
shall include provisions in the Construction IAQ
Management Plan for addressing conditions in the field
that do not adhere to the Plan, including provisions to
implement a stop work order, or to rectify non-compliant
conditions.
2. Subcontractors shall be responsible for the
implementation of specific control measures, as
specified in the Construction IAQ Management Plan.
Subcontractors shall coordinate their responsibilities
through the Contractor and their designated Construction
IAQ Representative.
END OF SECTION 018119
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of existing interior walls,
partitions, ceiling and soffit systems, finishes, etc.,
as shown on drawings and/or as required to accommodate
new construction.
2. Removal of existing construction and finishes as
encountered during the course of new construction, as
required to accommodate new work.
3. Cutting of existing construction to accommodate new work
as shown on drawings; such cutting to be performed by
skilled craftsmen.
4. Preparation of surfaces at demolition and removal
locations as required to accept new work.
5. Protection of existing building and spaces to remain,
and shoring of the structure as required to maintain
structural integrity and public safety.
6. Erection of temporary dustproof partitions.
7. Removal of debris.
B. Related Sections:
1. Refer to Plumbing and Electrical drawings for specific
removals of plumbing and electrical items.
1.2 SUBMITTALS
A. Schedule of Demolition Operations: Submit demolition
procedures and operational sequence for Architect's review
prior to start of work. Submit a written request to
Architect well in advance of executing any cutting or
alteration which affects:
1. The work of tying in or connecting to operational
systems of the building, including electrical,
mechanical and security systems.
2. The work of the Owner or any separate Contractor.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 2
3. The structural value or integrity of any element of the
project or of adjacent structures.
B. Notice of Differing Conditions: Submit a written
notification if, during the work of demolition and cutting,
conditions are discovered which significantly vary from
those shown on the drawings. Do not commence work until
approval of Architect.
1.3 QUALITY ASSURANCE
A. Comply with the requirements of all applicable Federal,
State and local safety and health regulations regarding the
demolition of structures including ANSI/NFPD 241-Building
Construction and Demolition Operations.
B. Assume responsibility for any damage to existing building.
1.4 PROJECT CONDITIONS
A. Condition of Structure:
1. Prior to submitting a bid, visit the site to examine the
premises; determine existing conditions, character of
equipment and facilities needed for the performance of
the work; and all matters which may in any way affect
the work.
a. Information regarding existing construction is based
on available record drawings which may or may not
accurately reflect existing conditions. Such
information is included on the assumption that it may
be of interest in carrying out the work, but the
Owner, the Architect, and their consultants assume no
responsibility for its accuracy or completeness.
b. Notify the Architect if, during the course of
demolition and removals, conditions are discovered
which significantly vary from those shown on
drawings. Do not proceed until authorization is
received from the Architect.
2. Accept the condition of the site and structures as
encountered. The Owner and the Architect assume no
responsibility for the condition of the site or
structures nor for the continuation of the conditions
existing at the time of bidding or thereafter.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 3
B. Occupancy: The Owner will vacate areas of demolition but
will continue to occupy the building. Conduct demolition
work so that the Owner's operations will not be
acoustically, environmentally or physically disturbed.
Give not less than 72 hours notice to Owner of activities
that will affect Owner operations. Under no circumstances
shall the Owner's activities be disturbed during demolition
operations.
C. Unforeseen Conditions: Should unforeseen conditions be
encountered that affect design or function of project,
investigate fully and inform the Architect. While awaiting
the Architect's response, reschedule operations if
necessary to avoid delay of overall project.
D. Partial Removal: Items of salvageable value must be
transported from the site as they are removed.
1. Owner retains the right of first refusal on all removed
items; coordinate therewith before disposal.
2. Storage or sale of removed items on the site will not be
permitted.
E. Traffic: Conduct demolition operations and debris removal
to ensure minimum interference with roads, streets, walks,
and other adjacent occupied or used facilities provide in
kind alternate routes to insure sufficient means of are
maintained.
1. Do not close or obstruct streets, walks, or other
occupied or used facilities without permission of the
Owner. Provide alternate routes Signage and traffic
control around closed or obstructed traffic ways if
required by governing regulations.
F. Utilities: Maintain existing utilities required to remain;
keep in service and protect against damage during
demolition operations.
1. Do not interrupt existing utilities serving occupied or
used facilities, except when authorized in writing by
the Owner. Provide temporary services during
interruptions to existing utilities, as acceptable to
governing authorities.
2. Coordinate all work with the Owner and local utility
companies having jurisdiction.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 4
3. Before starting any work relating to existing utilities
(electric, water, fire lines, etc.) that will
temporarily discontinue or disrupt service to remaining
structures, notify the Architect and the Owner 7 days in
advance and obtain the Owner's approval in writing
before proceeding with the work.
G. Examination of Existing Conditions: Inspect existing
masonry bearing walls prior to commencing work, and
determine the necessity for control joints and/or repair
work required. Report any deficiencies to the Architect
and await further instructions.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 PROTECTION
A. Take full precautions to protect workmen, general public,
Owner's personnel, and all other persons from falling
debris and other hazards of demolition operations.
B. Execute demolition work to ensure protection of existing
portions of building against damages which might occur from
falling debris or other causes. Do not interfere with use
of adjacent occupied areas. Maintain free, safe passage to
and from adjacent properties.
C. Do not load structure with weight that will endanger,
overload, or cause excessive deflection of existing
structure, or that will damage finished surfaces adjacent
to and/or supported by existing structure, except portion
being removed.
D. Provide, erect and maintain catch platforms, lights,
barriers, warning signs, and other items as required for
protection of workmen engaged in demolition and removal
operations, occupants of the building, public and adjacent
property.
1. Assume responsibility for any and all damages which may
arise or occur to any party by reason of neglect in
providing proper lights, guards, barriers, or any other
safeguards.
3.2 EXAMINATION
A. Survey existing conditions and correlate with drawings and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 5
specifications to determine extent of demolition required.
B. Insofar as is practicable, arrange operations to reveal
unknown or concealed structural conditions for examination
and verification before removal or demolition.
C. Verify actual conditions to determine in advance whether
removal or demolition of any element will result in
structural deficiency, overloading, failure, or unplanned
collapse.
3.3 PREPARATION
A. Pollution Controls:
1. Use temporary enclosures and other suitable methods to
limit the amount of dust and debris rising and
scattering in the air to the lowest practical level.
Comply with governing regulations pertaining to
environmental protection.
a. Do not use water for dust control.
2. Clean adjacent surfaces and improvements of dust, dirt
and debris caused by demolition operations. Return
adjacent areas to conditions existing prior to start of
the work.
B. Temporary Shoring:
1. Provide and maintain shoring, bracing, and structural
supports as required to preserve stability and prevent
movement, settlement, or collapse of construction and
finishes to remain, and to prevent unexpected or
uncontrolled movement or collapse of construction being
demolished.
a. Strengthen or add new supports when required during
progress of selective demolition.
C. Temporary Partitions:
1. General: Provide substantial construction designed by
the Contractor to provide effective protection as
required.
a. Isolate demolition operations from other areas. Seal
joints and perimeters (including doors) against
passage of dust and dirt. Insulate to provide noise
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 6
protection to occupied areas.
2. Construct temporary partitions in a manner at least
equal to the following (or superior, if necessary to
provide effective protection specified):
a. Wood studs covered with 1/2 inch thick plywood
sheathing.
3. Gypsum board surfaces adjacent to occupied areas, with
joints taped.
a. Equip partitions with doors where access is required.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to
the extent required by new construction and as indicated in
the contract documents. Use methods required to complete
the Work within limitations of governing regulations and as
follows:
1. Proceed with selective demolition systematically, from
higher to lower level. Complete selective demolition
operations above each floor or tier before disturbing
supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to
dimensions required. Use cutting methods least likely
to damage construction to remain or adjoining
construction and that will provide proper surfaces for
patching of finish surfaces and installation of work by
others. Use hand tools or small power tools designed
for sawing or grinding, not hammering and chopping, to
minimize disturbance of adjacent surfaces. Temporarily
cover openings to remain.
3. Cut or drill from the exposed or finished side into
concealed surfaces to avoid marring existing finished
surfaces. Execute cutting and demolition by methods
that will prevent damage to other work and will provide
proper surface to receive installation of work by others
and patching of finish surfaces. Do all cutting and
removal so as to leave neat, true, plumb and square
edges. Use carborundum or diamond saw equipment for
cutting masonry or concrete, where edges are to remain.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 7
4. Do not cut or remove construction which might weaken or
impair the integrity or strength of the structural
framing or support systems which are to remain.
5. Do not use cutting torches until work area is cleared of
flammable materials. At concealed spaces, such as duct
and pipe interiors, verify condition and contents of
hidden space before starting flame-cutting operations.
Maintain fire watch and portable fire-suppression
devices during flame-cutting operations.
6. Maintain adequate ventilation when using cutting
torches.
7. Remove decayed, vermin-infested, or otherwise dangerous
or unsuitable materials and promptly dispose of off-
site.
8. Remove structural framing members and lower to ground by
method suitable to avoid free fall and to prevent ground
impact or dust generation.
9. Locate selective demolition equipment and remove debris
and materials so as not to impose excessive loads on
supporting walls, floors, or framing.
10. Dispose of demolished items and materials
promptly. Remove debris daily.
11. Where portions of the structure are to be removed,
protect remaining portions from damage and prepare
existing surfaces to fit new construction. Repair any
damage caused to remaining portions of the structure at
no cost to the Owner.
B. Concrete: Demolish in small sections. Cut concrete to a
depth of at least 3/4 inch at junctures with construction
to remain, using power-driven saw. Dislodge concrete from
reinforcement at perimeter of areas being demolished, cut
reinforcement, and then remove remainder of concrete
indicated for selective demolition. Neatly trim openings
to dimensions indicated.
C. Masonry: Demolish in small sections. Cut masonry at
junctures with construction to remain, using power-driven
saw, then remove masonry between saw cuts.
3.5 DISPOSAL OF DEMOLISHED MATERIALS
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 8
A. Promptly dispose of materials resulting from demolition
operations. Do not allow materials to accumulate on site.
B. Transport materials resulting from demolition operations
and legally dispose of off-site. Pay any and all fees
associated with disposal work.
C. Do not burn removed materials on project site.
D. Remove decayed, vermin-infested, or otherwise dangerous or
unsuitable materials and promptly dispose of off-site.
3.6 REPAIRS AND PATCHING
A. Repair excess demolition. Employ skilled workmen to
perform repair work.
B. Where installation of similar new work is included, perform
repairs in manner specified for installation of new work.
C. Where similar new work is not included in the project,
perform repairs using approved materials that are
appropriate to the repair and, where practicable, are
identical to the existing materials being repaired.
D. Restore exposed finishes of patched areas in a manner which
eliminates evidence of repairs.
1. Continuous surfaces: Extend refinish to nearest
intersection, with a neat transition to adjacent
surfaces.
2. Assemblies: Refinish entire unit.
3. Painted piping, conduit, and duct: Clean and repaint.
3.7 CLEANING
A. Remove tools and equipment. Dispose of scrap.
B. Broom clean interior areas.
C. Leave exterior areas free of debris.
D. Clean soil, smudges, and dust from surfaces to remain.
E. Return structures and surfaces to remain to condition
existing prior to commencement of demolition.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SELECTIVE DEMOLITION 024119- 9
END OF SECTION 024119
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 1
SECTION 028213 - ABATEMENT OF ASBESTOS CONTAINING MATERIALS USING
NON-FRIABLE METHODS
PART 1 - GENERAL
1.1 SUMMARY
A. Contractor is to provide all labor, materials, equipment,
services, testing, appurtenances, permits and agreements
necessary to perform the work required for the abatement and
proper disposal of all asbestos-containing materials as
required by these contract documents, technical specifications
and all applicable laws and regulations. The work is to be
done in order to facilitate the Forcina Hall HVAC and Roof
Replacement Project. All work shall be performed in
accordance with this Specification, EPA regulations, OSHA
regulations, NIOSH recommendations, and any other applicable
federal, state or local government regulations. Whenever
there is a conflict or overlap of the above references the
most stringent provisions are applicable.
B. It shall be the Contractor’s responsibility to verify the
exact quantities and locations of all asbestos-containing
materials. The College of New Jersey (TCNJ) and/or
Brinkerhoff Environmental Services, Inc. (Brinkerhoff) assume
no responsibility for the accuracy of quantities and/or
descriptions of materials, or the accuracy of descriptions of
existing conditions. The Contractor shall perform the
following work as described herein.
C. Drawings and general provisions of the Contract, including
General and Supplementary Conditions, Drawings and
Specification Sections, apply to work of this section.
1.2 DESCRIPTION OF WORK
A. Asbestos Removal and Disposal Project: The work of this
project includes the removal of designated asbestos-containing
materials. All asbestos-containing material (ACM) shall be
removed using non-friable methods.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 2
ASBESTOS CONTAINING MATERIALS
Location(s) Material Description Est. Quan-
tity
Main Roof Parapet Wall Tar 400 SF
Main Roof Concrete
End Walls Flashing Caulk 425 LF
Main Roof Exhaust Pipe Insulation 6 LF
Penthouse Roof Parapet Wall Tar 225 SF
Penthouse Base on
Main Roof Tar on Fasteners 225 LF
Penthouse Roof Tar on Coping Seams 225 LF
1st Floor Roof Step Flashing Tar 60 LF
1st Floor Roof Coping Seam Caulk 60 LF
Penthouse Mechanical
Room
Tar on Floor and Base
of Wall 35 SF
Penthouse Mechanical
Room
Black Sealant on AHU
Hatch 25 LF
Penthouse Mechanical
Room Gaskets 35 Pieces
Penthouse Mechanical
Room Tar Sealant on Walls 35 SF
Penthouse Mechanical
Room
White Sealant on AHU
Door 15 LF
Ceiling Air Handler
Units Duct Louver Caulk 200 LF
Ceiling Air Handler
Units
Duct Reducer Flange
Caulk 400 LF
SF = Square Feet, LF = Linear Feet, EA = Each
B. Project schedule is as per the Owner. Time is of the essence;
abatement contractor shall conform to the schedule to as
determined by the owner to meet school calendar requirements.
Multiple mobilizations may be required.
C. N.J.A.C.8:60 and 12:120 Asbestos Control and Licensing Act
(NJSA 34:5A-32 et seq.), Occupational Safety and Health
Administration (OSHA) regulations 29 CFR Part 1910. 1001 and
29 CFR 1926.1101, et al, and National Emission Standards for
Hazardous Air Pollutants (NESHAP) 40 CFR Part 61 shall be the
rules for this project.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 3
D. There will be no unauthorized persons allowed in the Building
or structures during this project. Access to the work areas
shall be restricted to the Contractor, Environmental
Consultant, and authorized visitors.
E. All work will occur, during times described in the General
Conditions, Supplementary Conditions and this Specification
unless authorized by the Environmental Consultant responsible
for this project. Building will be occupied throughout the
abatement period.
F. The Contractor shall furnish all labor, materials, services,
insurance and equipment necessary for the complete removal of
all asbestos materials. Refer to the General Conditions of
the Project Manual for specific insurance requirements.
G. The Contractor shall strictly adhere to all precautions
necessary for the safety and health of the workers in
accordance with provisions of OSHA Standards 29 CFR Part
1926.1101.
H. The Contractor shall attend the pre-construction conference.
The Contractor shall present in detail the following
information at the pre-construction conference:
1. A written copy of the Notifications required.
2. A written Progress Schedule.
3. A written plan for preparation of the work site.
4. A written description of the types and quantities of
protective clothing and approved respirators to be used.
5. A written delineation of responsibility of work site
isolation; e.g., barrier construction, signs, security.
6. A written description of all removal methods to be used
including description of types and numbers of negative
air filtration units.
7. A written description of the tools and methods to be used
for clean-up, reconstruction and waste disposal.
8. A written description of emergency procedures to be
followed in case of injury or fire. This section must
include evacuation procedures, source of medical
assistance (name and phone number) and procedures to be
used for access by medical personnel (examples: first aid
squad and physicians).
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 4
9. A written copy of all information presented at this
meeting shall be saved and made available upon request to
Local, State or Federal enforcement officials.
I. Emergencies (such as fire or accidents requiring medical
attention) shall take priority over all other requirements of
these specifications.
1.3 SPECIAL JOB CONDITIONS
A. Asbestos abatement Contractor shall not interfere with daily
activities within the remainder of the building or otherwise
affect daily school operations.
1.4 NOTIFICATIONS
A. The Contractor shall notify the following agencies in writing
10 days prior to the start of the asbestos removal project:
1. United States Environmental Protection Agency Region 2, Division of Enforcement and Compliance
Assistance-Air Compliance Branch (DECA-ACB)
290 Broadway -21st Floor
New York, NY 10007-1866
Phone (212) 637-4080
Fax (212) 637-3998
2. New Jersey Department of Health Indoor Environments Program
Consumer and Environmental Health Services
P. O. Box 369
Trenton, NJ 08625-0369
Phone (609) 826-4950
Fax (609) 826-4975
3. New Jersey Department of Labor Division of Public Safety, Occupational Safety & Health
Asbestos Control & Licensing Section
P.O. Box 949
Trenton, NJ 08625-0949
Phone (609) 633-2159
Fax (609) 633-0664
4. NJ Department of Environmental Protection
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 5
Division of Solid and Hazardous Waste
Solid and Hazardous Waste Management Program
MAIL CODE: 401-02C
P O Box 420
401 East State Street, 2nd Floor
Trenton, New Jersey 08625-0420
Telephone: (609) 984-6985
Fax: (609) 633-9839
With copies to:
Brinkerhoff Environmental Services, Inc.
1805 Atlantic Avenue
Manasquan, NJ 08736
Telephone: (732) 223-2225
Fax: (732) 223-3666
B. Notification to the agencies in Subpart A above shall be
submitted on the required forms and include the following
information:
1. Name and address of Owner of building.
2. Name and address of Contractor.
3. Address and description of the building, including size,
age and prior use of the facility or area. Estimate of
the approximate amount of asbestos material present in
square feet and/or linear feet, as applies. Designate
room numbers or other location information.
4. Scheduled starting and completion dates for removal.
5. Procedures and equipment (including ventilating system)
that will be employed to comply with Title 40 CFR Part
61. National Emission Standard for Asbestos, and with
Title 29 CFR 1926.1101.
6. The name and address of the monitoring firm to perform
air monitoring on behalf of the Contractor's employees.
7. The name and address of the Department of Environmental
Protection registered waste hauler and the landfill where
the waste will be deposited. The landfill should also
comply with 40 CFR Part 61.
C. The Contractor shall notify the Owner and/or the Environmental
Consultant in writing at least 48 hours in advance to perform
of a final clearance inspection and final clearance air
sampling.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 6
1.5 DOCUMENTATION
The Contractor shall provide the following documentation in
writing before the start of the abatement project:
A. His name, address and license number pursuant to the Asbestos
Licenses and Permits under the jurisdiction of the New Jersey
Department of Labor.
B. The name, address and EPA registration certificate of the New
Jersey Department of Environmental Protection registered waste
hauler and of the New Jersey Department of Environmental
Protection registered landfill where the asbestos waste will
be deposited.
C. The name and address of the Contractor's air monitoring firm
successfully participating in the National Institute for
Occupational Safety and Health (NIOSH) PAT program, including
the latest result sheet indicating PAT proficiency.
D. A list of workers with valid New Jersey Asbestos removal
permits which will be involved with this project.
E. Documentation that he is familiar with the Occupational Safety
and Health Administration (OSHA); and the U.S. Environmental
Protection Agency (EPA) relating to the application, removal,
disposal and treatment of asbestos.
1. OSHA Safety and Health Standards, namely Title 29 CFR
1926, Section 1926.1101. Asbestos, Chrysotile,
Crocidolite, Amosite, Tremolite, Anthophyllite and
Actinolite and 29 CFR 1910.134, Respiratory Protection
and 29 CFR 1910.1020, Access to Employee Exposure &
Medical Records.
2. EPA Regulations, namely: Subpart M, Title 40 CFR Part 61,
National Emission Standard for Asbestos, Sections 61.140
through 61.156, Effective April 5, 1984.
F. Documentation that employees have received medical
examinations, which are required by OSHA Title 29 CFR
1926.1101. This documentation shall consist of the name and
address of the physician performing the exam(s); the name(s)
of the employee(s) and the date(s) of the exam(s).
G. Material Safety Data Sheet: Submit the Material Safety Data
Sheet, or equivalent, in accordance with the OSHA Hazard
Communication Standard (29 CFR 1910.1200) for each surfactant
and encapsulation material proposed for use at the work site.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 7
Include a separate attachment for each sheet indicating the
specific worker protection equipment proposed for use with the
material indicated.
H. Deliver materials to the job site in original, new and
unopened packages and containers bearing the manufacturer’s
name and label, and the following information:
1. Name or title of material
2. Manufacturer’s stock number and date of manufacture
3. Manufacturer’s name
4. Thinning instructions
5. Application instructions
1.6 AIR MONITORING AND INSPECTIONS
A. The Contractor shall cooperate fully with the final clean-up
inspection, which verifies that the enclosure is ready for the
collection of the final air clearance samples, which is
conducted by an independent air-monitoring firm responsible to
the Owner.
B. Air monitoring and visual inspections in and adjacent to the
Work Area will be conducted on behalf of the Owner by the
Environmental Consultant.
C. Maximum Airborne Asbestos Concentrations
Asbestos Concentration
Sample Type fibers/cc Method
Contamination sample outside 0.01 PCM
the work site during removal.
Post Abatement – inside <70 structures/mm2 TEM
the work site, after final <0.01 fibers/cc PCM
clean-up. (Small/Minor Projects)
PCM = Phase Contrast Microscopy
TEM = Transmission Electron Microscopy
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 8
1.7 DEFINITIONS
A. The following words, terms, and abbreviations, when used
within this document shall have the following meanings unless
the context clearly indicates otherwise.
1. Abatement: Procedures physically taken to control or elimi-nate fiber release from asbestos-containing building mate-
rials. This includes removal, encapsulation, enclosure, and
repair.
2. Aggressive Sampling: Method of sampling in which the indi-vidual collecting the air sample creates activity by the
use of mechanical equipment during the sampling period to
stir up settled dust and simulate activity in that area of
the building.
3. AIHA: American Industrial Hygiene Association.
4. Airlock: System for permitting entrance and exit while re-stricting air movement between a contaminated area and an
uncontaminated area. It consists of two curtained doorways
separated by a distance of at least three feet such that
one passes through one doorway into the airlock, allowing
the doorway sheeting to overlap and close off the opening
before proceeding through the second doorway, thereby pre-
venting flow-through contamination.
5. Air Sampling: Process of measuring the fiber content of a known volume of air collected during a specific period. The
procedure utilized for asbestos follows the NIOSH Standard
Analytical Method 7400, or the provisional transmission
electron microscopy methods developed by the US EPA, which
are utilized for lower detection levels and specific fiber
identification.
6. Amended Water: Water to which a surfactant has been added.
7. ANSI: American National Standards Institute
8. Area Air Sampling: Any form of air sampling or monitoring where the sampling device is placed at some stationary lo-
cation.
9. Asbestos: Any hydrated mineral silicate separable into com-mercially usable fibers, including but not limited to
chrysotile (serpentine), amosite (cummingtonite-grunerite),
crocidolite (riebeckite), tremolite, anthophyllite and ac-
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 9
tinolite.
10. Asbestos-Containing Material (ACM): Asbestos or any materi-al containing more than one-percent asbestos.
11. Asbestos-Containing Waste Material: ACM or asbes-
tos-contaminated objects requiring disposal.
12. Asbestos Handler: Individual, who disturbs, removes, re-
pairs, or encloses friable asbestos material. This individ-
ual shall have completed approved training course(s) and be
in possession of certification issued by NJDOL.
13. Asbestos Handler Supervisor: Individual who supervises the handlers during an asbestos project and ensures that proper
asbestos abatement procedures as well as individual safety
procedures are being adhered to. This individual shall have
completed approved training course(s) and be in possession
of certification issued by NJDOL.
14. Asbestos Handling Certificate: Certificate(s) issued to in-dividuals who have met the criteria established by NJDOL.
15. Asbestos Inspection Report: A report on the condition of a building or structure in relation to the presence and con-
dition of asbestos therein.
16. Asbestos Project: Any form of work performed in connection with the alteration, innovation, modification, or demoli-
tion of a building or structure which will disturb (e.g.
remove, enclose, encapsulate) more than three linear feet
or more than three square feet of friable ACM.
17. Asbestos Safety Technician (AST): A person certified by the New Jersey Department of Community Affairs and hired by the
ASCM Firm to perform final clearance inspections and final
air testing.
18. Authorized Visitor: Building Owner and his/her representa-tive, and any representative of a regulatory or other agen-
cy having jurisdiction over the project.
19. Barrier: Polyethylene sheeting that completely seals off
the work area to prevent contamination of the surrounding
area.
20. Building Owner: Person in whom legal title to the premises is vested unless the premises are held in land trust, in
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 10
which instance Building Owner means the person in whom ben-
eficial title is vested.
21. Clean Room: An uncontaminated area or room that is part of worker decontamination enclosure system with provisions for
storage of workers’ street clothes and protective equip-
ment.
22. Clearance Air Monitoring: Employment of aggressive sampling techniques with a volume of air collected to determine the
airborne concentration of residual fibers and shall be per-
formed as the final abatement activity.
23. Construction Permit for Asbestos Abatement: A required per-mit provided by the jurisdictional Buildings Department for
the approval to commence any asbestos hazard abatement.
24. Contractor: The hazardous material removal contractor li-censed in the State of New Jersey to Remove Asbestos.
25. Critical Barrier: Two (2) layers of six (6) –mil polyeth-ylene sheeting that completely seals off the work area to
prevent the distribution of fibers to the surrounding area,
such as the opening between the top of non-movable lights,
HVAC systems, windows, doors, ducts, grills, electrical
outlets, floor drains, sinks, etc.
26. Curtained Doorway: Device that consists of at least three overlapping sheets of polyethylene over an existing or tem-
porarily framed doorway. One sheet shall be secured at the
top and left side, the second sheet at the top and right
side, and the third sheet at the top and left side. All
sheets shall have weights attached to the bottom to ensure
that the sheets hang straight and maintain a seal over the
doorway when not in use.
27. Decontamination Enclosure System: Series of connected
rooms, separated from the Work Area and from each other by
air locks, for the decontamination of workers, materials,
waste containers, and equipment.
28. Employee: An asbestos abatement worker having proper train-ing, instruction and licensing.
29. Encapsulant (sealant) or Encapsulating Agent: Liquid mate-rial which can be applied to ACM and which temporarily con-
trols the possible release of asbestos fibers from the ma-
terial either by creating a membrane over the surface
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 11
(bridging encapsulant) or by penetrating into the material
and binding its components together (penetrating encapsul-
ant). This may also be used to seal surfaces from which ACM
has been removed.
30. Encapsulation: Coating or spraying of ACM with a sealant.
31. Enclosure: Construction of airtight walls and/or ceilings between ACM and the facility environment, or around surfac-
es coated with ACM, or any other appropriate procedure as
determined by the Department of Community Affairs, which
prevents the release of asbestos fibers.
32. Environmental Consultant: The firm, hired by the owner, to provide asbestos inspection, sampling, design, and over-
sight services, and to conduct final sample collection and
analysis.
33. EPA or USEPA: United States Environmental Protection Agen-cy.
34. Equipment Decontamination Enclosure System: A three-stage
decontamination enclosure system for materials and equip-
ment, typically consisting of a designated area of the work
area, a washroom, and an uncontaminated area.
35. Equipment Room: Contaminated area or room that is part of the worker decontamination enclosure system with provisions
for the storage of contaminated clothing and equipment.
36. Fixed Object: Unit of equipment or furniture in the Work Area that cannot be removed from the Work Area.
37. Friable Asbestos Material: Asbestos or any ACM that can be crumbled, pulverized, or reduced to powder when dry, by
hand or other mechanical pressure.
38. Glove-Bag Technique: Method for removing friable ACM from heating, ventilation, and air conditioning (HVAC) ducts,
short piping runs, valves, joints, elbows, and other non-
planar surfaces in a non-contained Work Area. The glove-bag
assembly is a manufactured device consisting of a glove-bag
(constructed of at least 6-mil transparent polyethylene),
two inward-projecting long sleeve gloves, one in-
ward-projecting water wand sleeve, an internal tool pouch,
and an attached, labeled receptacle for asbestos waste. The
glove-bag is constructed and installed in such a manner
that it surrounds the object or area to be decontaminated
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 12
and contains all asbestos fibers released during the remov-
al process.
39. HEPA-Filter: High efficiency particulate air filter capable of trapping and retaining 99.97 percent of particles (as-
bestos fibers) greater than 0.3 micrometers mass median
aerodynamic equivalent diameter.
40. HEPA Vacuum: A vacuum cleaner equipped with a HEPA filter.
41. Holding Area: Chamber in the equipment decontamination en-closure located between the washroom and an uncontaminated
area.
42. Movable Object: Unit of equipment or furniture in the Work Area that can be removed from the Work Area.
43. Negative Air Pressure Equipment: Portable local exhaust
system equipped with HEPA filtration. The system shall be
capable of creating a negative pressure differential be-
tween the outside and inside of the Work Area.
44. NESHAPS: National Emission Standards for Hazardous Air Pol-lutants.
45. NIOSH: National Institute for Occupational Safety and
Health.
46. NJDCA: New Jersey Department of Community Affairs
47. NJDOL: New Jersey Department of Labor.
48. NJDEP: New Jersey Department of Environmental Protection
49. Occupied Area: Area of the work site where abatement is not taking place and where personnel or occupants normally
function or where workers are not required to use personal
protective equipment.
50. OSHA: Occupational Safety and Health Administration.
51. Personal Air Monitoring: Method used to determine employ-ees’ exposure to airborne fibers. The sample is collected
outside the respirator in the worker’s breathing zone.
52. Personal Protective Equipment (PPE): Appropriate protective clothing, gloves, eye protection, footwear, and head gear.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 13
53. Plastic Sheeting: Polyethylene sheeting of a certain thick-ness as indicated.
54. Plasticize: Cover floors and walls with polyethylene sheet-ing as herein specified as acceptable to the New Jersey De-
partment of Community Affairs.
55. Qualitative Fit Test: Individual test subject’s responding (either voluntarily or involuntarily) to a chemical chal-
lenge outside the respirator face-piece. Three of the most
popular methods include: 1) irritant smoke test; 2) odorous
vapor test; and 3) taste test.
56. Quantitative Fit Test: Exposing the respiratory wearer to a test atmosphere containing an easily detectable, nontoxic
aerosol, vapor or gas as the test agent. Instrumentation,
which samples the test atmosphere and the air inside the
face-piece of the respirator, is used to measure quantita-
tively the leakage into the respirator. There are a number
of test atmospheres, test agents, and exercises to perform
during the test.
57. Removal: Stripping of any asbestos-containing materials
from surfaces or components of a facility or taking out
structural components in accordance with 40 CFR 61 Subparts
A and M.
58. Repair: Corrective action using recommended work practices to minimize the likelihood of fiber release from small dam-
aged areas of ACM.
59. Separation Barrier: A constructed wall with no door that separates the clean area of the work site from the contami-
nated work area having a fire rating, if applicable, and
does not interfere with the means of egress. Polyethylene
sheeting (minimum 2 layers, 6-mil thick) shall be placed on
the work area side of the barrier so that it completely
seals off the work area to prevent the distribution of fi-
bers to the surrounding area.
60. Shower Room: Room between the clean room and the equipment room in the worker decontamination enclosure with hot and
cold running water controllable at the tap and arranged for
complete showering during decontamination.
61. Surfactant: Chemical wetting agent added to water to im-prove penetration.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 14
62. Visible Emissions: Emissions containing particulate materi-al that are visually detectable without the aid of instru-
ments.
63. Washroom: Room between the Work Area and the holding area in the equipment decontamination enclosure system where
equipment and waste containers are wet cleaned and/or HEPA-
vacuumed prior to disposal.
64. Wet Cleaning: Removal of asbestos fibers from building sur-faces and objects by using cloths, mops, or other cleaning
tools which have been dampened with amended water.
65. Work Area: Designated rooms, spaces, or areas of the build-ing or structure where asbestos abatement activities
take(s) place.
66. Worker Decontamination Enclosure System: Portion of a de-contamination enclosure system designed for controlled pas-
sage of workers and authorized visitors, consisting of a
clean room, a shower room, and an equipment room separated
from each other and from the Work Area by airlocks and cur-
tained doorways.
67. Work Site: Premises where abatement activity is being per-formed. May be composed of one or more Work Areas.
1.8 PERSONNEL REQUIREMENTS AND TRAINING
A. All of the Contractor’s workers must have valid training, a
minimum of one (1) year experience in asbestos abatement, of
which six (6) months must have been performed within the State
of New Jersey. Each worker must possess a valid and current
asbestos worker’s permit as issued by the State of New Jersey,
and shall comply with all applicable requirements of N.J.S.A.
34:5A-32 and 29 CFR 1926.1101 (k)(3), as well as other non-
training requirements of 29 CFR 1926.
B. The Contractor shall furnish proof that all of the Contractors
personnel on site have been given medical examinations as
required by 29 CFR 1910 and 29 CFR 1926. At a minimum, the
examination should include a medical history with specific
reference to respiratory disease and a pulmonary function
test. Additionally a chest roentgenogram shall have been
performed in the last five years. This information should be
provided after Notice of Award and prior to the pre-
construction meeting.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 15
C. The Contractor shall provide a Certified, Licensed Asbestos
Supervisor to the project with a minimum of two (2) years’
experience in asbestos abatement within the State of New
Jersey. The experience should be at a minimum equivalent in
size and scope as to this project. The Contractor shall
submit a copy of the Supervisors qualifications to the Owner.
1.9 ENVIRONMENTAL CONSULTANT
A. General Duties
1. The Environmental Consultant shall perform all final
clearance inspections and collect final air samples and
shall be thoroughly familiar with these Specifications.
B. Authority & Compliance Responsibilities
1. The Environmental Consultant shall have the authority to
direct the actions of the Contractor verbally and in
writing to assure compliance during the final inspection.
In the event of continual noncompliance or serious
violation, the Environmental Consultant shall notify the
Owner, and as necessary, the appropriate governmental
agency.
C. Reporting of Air Sampling & Analysis Data
1. The Testing Laboratory shall conduct all required
analyses within the time frame specified and in
conformance with specified analytical procedures and
shall report the results of such tests to the
Environmental Consultant.
D. Removal Phase
1. Pressure monitoring of the work areas will be performed
by the contractor
a. Pressure differential of greater than or equal to
0.02 inches W.C. shall be monitored by digital
manometers, provided by the Contractor, with
continuous printout or other approved low pressure
monitoring devices. Sensor tubes used for
monitoring shall be placed so that the air
filtration devices shall not cause false readings.
b. One or more separate digital pressure monitoring
systems with continuous printout shall be provided
by the Contractor and installed near the entrance(s)
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 16
to each work area and between the work area and any
interior spaces from which make-up air is drawn.
c. Written documentation of pressure differential shall
be provided by continuous printout from the
installed monitoring device. The contractor
supervisor will ensure, prior to the completion of
the work shift, the integrity of the containment
site before workers depart.
2. Record Keeping: Record in a daily log all on-site
observations and required activities of the removal
specification and quality assurance program (such as
smoke tests and negative air filtration unit pressure
gauge readings).
E. Post Removal Test
Provide monitoring of the Work Area(s) during clean-up, within
48 hours of final cleaning, and before removal of critical
barriers. This test is required to establish safe conditions
for removal of critical barriers and to permit reconstruction
activity to begin. Sufficient time following clean-up
activities shall be allowed so that all surfaces are dry
during monitoring.
1. Sampling Procedure: Filter cassettes and sampling train
shall be assembled as specified in (EPA 560/5-89-001)
Guidelines for Conducting the AHERA TEM Clearance Test to
Determine Completion of an Asbestos Abatement Project.
Pumps shall be calibrated before and after sampling and a
record kept of this calibration.
2. Sampling Frequency & Location: Take at least five
representative samples of Work Area where asbestos-
containing materials have been removed. Five samples
outside the worker area and three field blanks.
3. Analysis:
a. Transmission Electron Microscopy (TEM) for large
projects >160 square or 260 linear feet of asbestos-
containing material.
b. Phase Contrast Microscopy (PCM) for small and minor
projects <160 square or 260 linear feet of asbestos
containing material.
4. Time for Laboratory Analysis: Maximum turnaround time
upon completion of sample is seventy-two (72) hours after
submission of samples to the laboratory.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 17
5. Evaluation Criteria: If test results exceed the
clearance criteria, the Environmental Consultant shall
inform the Contractor and the Owner.
a. The Contractor shall be required to re-clean all
surfaces using wet cleaning methods and provide
negative HEPA filtered exhaust air during the re-
cleaning process. This process of re-cleaning,
allowing surfaces to dry and retesting shall be
repeated until compliance is achieved.
6. Certificate of Completion: When the evaluation criteria
are met, the Owner shall receive a Certificate of
Completion from the Environmental Consultant.
F. Submission of Final Report
1. Upon completion of all asbestos removal work and of all
tests, the Environmental Consultant shall submit a
written Final Report to the Owner, including copies of
all backup records documenting the day-by-day progress of
work and related tests. This report shall be presented
in logical form, neatly bound, and properly titled, dated
and signed. Any deviations from acceptable practice on
the part of the Contractor, and any unsatisfactory test
results reported during the course of the job, shall be
highlighted in the Report for record purposes.
PART 2 - EXECUTION
2.1 STANDARD OPERATING PROCEDURES
A. Develop and implement a written standard procedure for
abatement work to ensure maximum protection and safeguard from
asbestos exposure of the workers, the non-work areas of the
building, visitors, employees, public, and environment.
B. The standard operating procedure shall ensure:
1. Tight security from unauthorized entry into the
workspace.
2. Restriction of Contractor's personnel to the immediate
Work Area and access/egress routes.
3. Donning of proper protective clothing and respiratory
protection prior to entering the Work Area.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 18
4. Safe work practices in the work place, including
provisions for inter-room communication, exclusion of
eating, drinking, smoking, or in any way breaking the
respiratory protection.
5. Proper exit practices from the work space to the outside
through the showering and decontamination facilities.
6. Removing asbestos in ways that minimize release of
fibers.
7. Packing, labeling, loading, transporting, and disposing
of contaminated material in a way that will minimize
exposure and contamination.
8. Emergency evacuation procedures, for medical or safety
situations, to minimize the potential exposure to
airborne asbestos fibers for emergency personnel,
building occupants, and building environment.
9. Safety from accidents in the workspace, especially from
electrical shocks, fall hazards associated with
scaffolding, slippery surfaces, and entanglements in
loose hoses and equipment. The safety procedures
outlined in the General Conditions, Supplementary
Conditions and the requirements of the specifications
must be adhered to as well.
10. Provisions for effective supervision, air monitoring and
personnel monitoring for exposure during the work.
11. Engineering systems that minimize exposure to fibers
within the workspace.
2.2 NOTIFICATIONS, PERMITS, WARNING SIGNS, LABELS AND POSTERS
A. Only licensed contractors may perform work described as
required by this specification. As required by law, the
contractor shall maintain on the project site a valid
Contractors license at all times during the work.
B. The Contractor shall maintain the required number of qualified
personnel on site to complete the project on schedule.
C. ALL CONTRACTOR EMPLOYEES MUST POSSESS A VALID NEW JERSEY
ASBESTOS REMOVAL PERMIT AND MAKE AVAILABLE TO THE OWNER AND
THE ENVIRONMENTAL CONSULTANT, NJ DCA, NJ DOL, AND NJ DOH THESE
PERMITS UPON REQUEST AT THE PROJECT SITE. ALL EMPLOYEES MUST
HAVE A MINIMUM OF AT LEAST SIX (6) MONTHS PRIOR EXPERIENCE IN
ASBESTOS ABATEMENT WITHIN THE STATE OF NEW JERSEY.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 19
D. The Contractor shall also present to the Owner, prior to the
commencement of abatement that a NJ DEP Registered Waste
Hauler has been contracted to haul the waste off site and to
an appropriate landfill. At the completion of the project the
Contractor will submit a copy of all waste manifests with
their invoice:
E. Erect warning signs around the work space and at every point
of potential entry from the outside and at main entrance to
building which can be viewed by the public without
obstruction, in accordance with OSHA 29 CFR 1926.1101 (k)(7)
(Sign Specifications). The warning signs shall be a bright
color so that they will be easily noticeable. The size of the
sign and the size of the lettering shall be no less than OSHA
requirements.
F. Provide the required labels for all polyethylene bags and all
drums utilized to transport contaminated material to the
landfill in accordance with OSHA 29 CFR 1926.1101 (k)(8) and
by 49 CFR Parts 171 and 172 of the Department of
Transportation regulations.
G. Provide any other signs, labels, warnings, and posted
instructions that are necessary to protect, inform and warn
people of the hazard from asbestos exposure. Post in a
prominent and convenient place for the workers a copy of the
latest applicable regulations from OSHA, EPA, NIOSH, New
Jersey and any additional items mandated for posting by the
aforementioned regulations.
2.3 RESPIRATORY PROTECTION AND PROTECTIVE CLOTHING
A. Protective clothing shall consist of disposable full body
coveralls with hoods and booties attached. Separate
disposable head covers and foot covering may be substituted if
disposable coveralls without attached hoods and booties are
used. Additional clothing shall include boots or sneakers and
gloves. Eye protection and hard hats shall be available.
Contractors may choose between two types of respiratory
protection as specified (NOTE: Disposable paper respirators
are unacceptable). In order of increasing effectiveness, they
are:
1. Half-face or full-face tight seal respirators equipped
with dual cartridge HEPA filters and certified by the
National Institute for Occupational Safety and Health
(NIOSH) for use in atmospheres containing asbestos.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 20
2. Powered air purifying respirators certified by NIOSH for
use in atmospheres containing asbestos.
B. The Contractor shall require that each person entering the
Work Area shall wear an approved respirator and protective
clothing. There shall be no exceptions to this rule.
C. The Contractor shall have available sufficient inventory of
protective clothing, respirators, and filter cartridges.
Personal protective equipment inventory shall exceed by a
minimum of 100% the expected daily person-day usage.
D. The Contractor shall provide respirators and disposable
clothing to the Environmental Consultant and any other visitor
authorized by the Owner.
2.4 WORKER EXPOSURE AIR MONITORING
A. In addition to the Environmental Consultant hired by the
Owner, the Contractor shall arrange for air monitoring to be
conducted in all work Areas in accordance with 29 CFR
1926.1101 of OSHA regulations, on behalf of the Contractor’s
employees. The Testing Laboratory employed by the Contractor
shall be accredited by the American Industrial Hygiene
Association for Asbestos or participate and show proficiency
in the NIOSH (National Institute for Occupational Safety
Health) PAT (Proficiency Analytical Testing) program for
airborne asbestos.
B. Personal air sampling for all other waste handling shall also
be conducted as required under any and all applicable OSHA
rules and regulations.
C. Personal samples shall be obtained from employees engaged in
each of the following operations; asbestos and/or
hazardous/universal waste material removal (i.e. spraying,
scraping and brushing), disposal (i.e. bagging) and clean up.
Representative sampling shall be repeated in the event of
major changes in the removal operation. This sampling shall
be done with the sampling media and flow rates specified in
the OSHA Reference (Method 7400 A rules). Samples shall be
taken for the determination of the 8-hour time weighted
average airborne concentration and of the ceiling
concentrations of asbestos fibers.
D. The results of the Contractor’s air monitoring tests (Subpart
B above) shall be returned within 24 hours; copies shall be
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 21
provided to each employee monitored as specified by OSHA
Regulation 29 CFR 1910.20.
E. The Contractor shall examine these results and evaluate the
effectiveness of the controls in use (wet methods, exhaust
units and respiratory protection). Copies of these monitoring
tests shall be provided to the Environmental Consultant.
Copies shall also be made available upon request to
representatives of Local, State, or Federal enforcement
agencies.
2.5 CUT AND WRAP ASBESTOS ABATEMENT METHODS
A. Preparation
1. Install critical barriers, or demarcate a regulated area.
Critical barriers may be established around the abatement
area in the form of a mini enclosure.
2. Place asbestos warning signs at all approaches to the
regulated area.
3. Shut down and lock out all air handling systems supplying
air to, from or through the regulated area.
4. Isolate from the regulated area all air handling
equipment.
5. Decontaminate, using HEPA filtered vacuums and wet
methods, and remove from the regulated area all moveable
items.
6. Pre-clean entire regulated area including all immovable
objects using HEPA filtered vacuums and wet methods.
7. Seal with plastic sheeting and tape all penetrations to
the regulated area, including, but not limited to,
corridors, doorways, windows, ducts, grills, diffusers,
etc. When covering and sealing machinery or other
immovable items that may be damaged by being covered with
plastic sheeting, humidity, or other adverse conditions.
The contractor must take whatever action is necessary to
preserve their original condition.
8. Place one layer of six-mil thick plastic sheeting on the
floor of the work area.
9. Where walls do not exist, construct walls using a minimum
of two layers, 6 mil plastic sheeting. 2 x 4 framework
shall support plastic sheeting.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 22
10. Install a changing cubical adjacent to the regulated area
and a dedicated HEPA filtered vacuum cleaner for worker
decontamination.
11. Place work area under negative air pressure utilizing
HEPA filtration systems. Maintain negative air pressure
in the regulated area continuously from the start of
asbestos removal until successful completion of final
clearance air testing. Maintain and record on a strip
chart recorder a negative pressure of at least 0.02
inches of water column, or four complete air changes in
the regulated area per hour based on the total volume of
the area. When determining the number of negative air
units, assume that the actual efficiency of the machine
is 80% of the rated capacity. The exhausts of all
negative air machines must be discharges to the outside
of the building.
12. Limit access to the regulated area to authorized persons
only.
13. Workers entering the regulated area must be provided with
and wear protective equipment and negative pressure
respirators (as a minimum), before commencing any
abatement activities.
14. Maintain a hardbound project logbook at the entrance to
the regulated area. Record the name, social security
number, employer, date, time-in time-out, and the purpose
of entry into the regulated area. Emergency telephone
numbers must be recorded inside the front cover.
15. The above procedures are for small-scale short duration
activities only. Any other use of glove bags will only
be permitted if the regulated area meets all the
requirements of convention removal practices outlined
elsewhere in this specification. Brinkerhoff
Environmental Services, Inc. reserves the right to amend
these procedures to meet specific project requirements or
locations.
B. Asbestos Removal
1. The surface of the insulation must be kept wet at all
times during removal.
2. Perform glove bag procedure at sections of pipe to be
cut, in accordance with manufacturers written
instructions and Paragraph 3.3 of this Section.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 23
3. Wrap with two layers of six-mil polyethylene the length
of piping. Bags or plastic sheeting must be sealed so as
to provide an air tight seal. All bags or items wrapped
in plastic sheeting must be sealed so as to provide an
air tight seal. All bags or items wrapped in plastic
sheeting must be labeled in accordance with OSHA and EPA
requirements.
C. Clean-up and Clearance Testing
1. Wet clean and HEPA vacuum all surfaces within the
regulated area.
2. Notify Brinkerhoff Environmental Services, Inc. for
visual observation and approval to determine
completeness.
3. Spray plastic sheeting and the immediate area from where
the pipe insulation has been removed with a tinted
sealant.
4. Perform no further work until the sealant has dried.
5. Remove all plastic sheeting.
6. Notify Brinkerhoff Environmental Services, Inc. for
visual observation and approval to determine
completeness.
7. Notify Brinkerhoff Environmental Services, Inc. to
perform Final Clearance Air Testing.
8. Upon receipt of acceptable air sample results remove
warning signs and barricades.
9. Remove all traces of tape adhesive, and staples. Repair
or make good any damaged caused through abatement
activities.
D. Asbestos Removal
1. The surface of the cement panel must be kept wet at all
times during removal.
2. Remove carefully any mounting brackets, fasteners, nails
or screws. Immediately wet any dry areas that become
exposed as brackets or other retaining mounts are
removed.
3. Every effort must be made to remove the panels in whole
sections.
4. Immediately upon removal the panels must be packaged in
plastic bags. Larger items may be wrapped in two layers
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 24
of six mil thick plastic sheeting. Bags or plastic
sheeting must be sealed so as to provide an air tight
seal. All bags or items wrapped in plastic sheeting must
be sealed so as to provide an air tight seal. All bags
or items wrapped in plastic sheeting must be labeled in
accordance with OSHA and EPA requirements.
E. Clean-up and Clearance Testing
1. Wet clean and HEPA vacuum all surfaces within the
regulated area.
2. Notify Brinkerhoff Environmental Services, Inc. for
visual observation and approval to determine
completeness.
3. Spray plastic sheeting and the immediate area from where
the cement panel has been removed with a tinted sealant.
4. Perform no further work until the sealant has dried.
5. Remove all plastic sheeting.
6. Notify Brinkerhoff Environmental Services, Inc. for
visual observation and approval to determine
completeness.
7. Notify Brinkerhoff Environmental Services, Inc. to
perform Final Clearance Air Testing.
8. Upon receipt of acceptable air sample results remove
warning signs and barricades.
9. Remove all traces of tape adhesive, and staples. Repair
or make good any damaged caused through abatement
activities.
2.6 GLOVE BAG REMOVAL METHODS
Note: When performing glove-bag removal of an exterior material
(i.e. pipe insulation on a roof) some of the following steps
(i.e use of AFDs and negative air pressure) may not apply.
A. Preparation
1. Install critical barriers, or demarcate a regulated area.
Critical barriers may be established around the abatement
area in the form of a mini enclosure.
2. Place asbestos warning signs at all approaches to the
regulated area.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 25
3. Shut down and lock out all air handling systems supplying
air to, from or through the regulated area.
4. Isolate from the regulated area all air handling
equipment.
5. Decontaminate, using HEPA filtered vacuums and wet
methods, and remove from the regulated area all moveable
items.
6. Pre-clean entire regulated area including all immovable
objects using HEPA filtered vacuums and wet methods.
7. Seal with plastic sheeting and tape all penetrations to
the regulated area, including, but not limited to,
corridors, doorways, windows, ducts, grills, diffusers,
etc. When covering and sealing machinery or other
immovable items that may be damaged by being covered with
plastic sheeting, humidity, or other adverse conditions.
The contractor must take whatever action is necessary to
preserve their original condition.
8. Place one (1) layer of 6 mil thick plastic sheeting on
the floor of the work area.
9. Where walls do not exist, construct walls using a minimum
of one (1) layers, 6 mil plastic sheeting. Plastic
sheeting shall be supported by 2 x 4 framework where
existing walls are not present.
10. Install a changing cubical adjacent to the regulated area
and a dedicated HEPA filtered vacuum cleaner for worker
decontamination.
11. Place work area under negative air pressure utilizing
HEPA filtration systems. Maintain negative air pressure
in the regulated area continuously from the start of
asbestos removal until successful completion of final
clearance air testing. Maintain and record on a strip
chart recorder a negative pressure of at least 0.02
inches of water column, or four (4) complete air changes
in the regulated area per hour based on the total volume
of the area. When determining the number of negative air
units, assume that the actual efficiency of the machine
is 80% of the rated capacity. The exhausts of all
negative air machines shall be discharged to the outside
of the building.
12. Limit access to the regulated area to authorized persons
only.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 26
13. Workers entering the regulated area must be provided with
and wear protective equipment and half-face negative
pressure respirators (as a minimum), before commencing
any abatement activities.
14. Maintain a hard bound project log book at the entrance to
the regulated area. Record the name, social security
number, employer, date, time-in time-out, and the purpose
of entry into the regulated area. Emergency telephone
numbers must be recorded inside the front cover.
15. The above procedures are for small scale short duration
activities only. Any other use of glove bags will only
be permitted if the regulated area meets all the
requirements of convention removal practices outlined
elsewhere in this specification. The Asbestos Project
Designer reserves the right to amend these procedures to
meet specific project requirements or locations.
B. Asbestos Removal, Clean-Up and Clearance Testing
1. Perform glove bag procedures in accordance with
manufacturers written instructions.
2. Install glove bag onto piping. Completely seal all
penetrations and seams with adhesive and tape.
3. Smoke test each glove bag prior to performing removal.
Reseal any leaks indicated by the testing.
4. Utilize one glove bag per removal location. Do not move
or slide glove bag once installed.
5. Remove and dispose of all asbestos-containing materials
(ACM) in accordance with OSHA regulations.
6. Spray ACM until saturated with amended water using an
airless sprayer. Apply water throughout removal process
to maintain wet condition.
7. Wet clean and HEPA vacuum all surfaces until pipe is free
of all visible debris.
8. Notify the Environmental Consultant for visual
observation and approval to determine completeness.
9. Spray all surfaces inside glove bag with sealant.
10. Any asbestos-containing insulation edges that have been
exposed as a result of the removal or maintenance
activity must be enclosed using a rewettable glass-fiber
cloth. The glove bag operator must ensure that exposed
edges are completely sealed so as not to release asbestos
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 27
fibers to the atmosphere after the glove bag has been
removed.
11. Notify the Environmental Consultant for visual
observation and approval to determine for completeness.
12. Collapse glove bag using HEPA vacuum. Seal bag with tape
and remove from pipe. Place glove bag in a six mil
disposable plastic bag.
13. Notify Testing Laboratory to perform Final Clearance Air
Testing.
14. Re-clean at Contractor's expense, work areas which do not
meet specified final clearance air level.
15. Dismantle and remove remaining plastic sheeting, and any
other materials not previously removed. Thoroughly wet
clean and/or HEPA vacuum work area.
16. Remove all traces of tape adhesive, or similar materials
utilized. Repair or make good any damaged caused through
abatement operations at no additional cost to the Owner.
17. Notify the Environmental Consultant for work area
observation and approval to determine completeness.
2.7 NON-FRIABLE ASBESTOS ABATEMENT METHODS
A. This section applies to the removal of non-friable ACM that
can be removed using methods that do not render the materials
friable.
B. During non-friable abatement of designated exterior non-
friable materials (including caulks and roofing materials)
some of the steps below are not applicable and may be
substituted with the following:
1. Non-friable exterior materials may be abated utilizing
minimal isolation methods.
2. The adjacent ground area must be protected with 6-mil
polyethylene sheeting sufficient to catch all asbestos
material and debris. Polyethylene sheet shall extend
perpendicular to exterior walls and structures a minimum
of 10 feet with an additional 10 feet for each building
story up to a maximum of 50 feet.
3. Adjacent vents, hoods, windows, doors, and other areas of
potential air passage must be sealed with 6-mil plastic
until completion of final visual inspection.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 28
4. The work area must be cordoned off with asbestos caution
tape to a 50 foot radius of the perimeter of the work
area. The tape is to prevent the unknowing entry of non-
asbestos workers into the work area.
C. Sequence Of Work - The following preparation shall be
conducted using approved respirators:
1. Inspection of work areas shall be made by representatives
of the Contractor before any work is initiated to
inventory materials.
2. Caution signs shall be provided and displayed in
accordance with Section 1910.1001(j)(4) of OSHA
regulations, General Conditions, Supplementary Conditions
and this specification.
3. Before the work is begun, the Contractor shall clean with
wet cloths or vacuum cleaner equipped with High
Efficiency Particulate Air (HEPA) filters, all items and
equipment, which can be removed without disrupting the
asbestos material. Cloths and filters used for cleaning
shall be disposed of as contaminated waste.
4. The Contractor shall isolate the Work Area and provide an
approved decontamination facility.
5. The Contractor shall establish emergency procedures for
each area and shall post written plans in areas readily
usable by employees. These plans shall include plans for
medical emergencies, fire evacuation and temporary loss
of electrical power and temporary breach of containment
barriers.
D. The following preparations shall be performed in the stated
order utilizing protective clothing and approved respirators.
These respirators shall be at least half-face or full-face
double cartridge respirators approved by NIOSH for use in
atmospheres containing asbestos.
1. Critical Barriers - completely seal off all openings to
the Work Area, including but not limited to, ducts, floor
drains, doorways, corridors, windows and skylights with
two layers of six-mil plastic sheeting taped securely in
place or fastened by spray-on adhesives, glue beads, or
horizontal wood battens.
2. Detach and clean removable electrical, heating and
ventilating equipment and other items connected to
asbestos surfaces. These items shall be removed from the
work area using decontamination procedures and returned
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 29
to their proper place when the work area has been
decontaminated.
3. Wet clean all non-removable items not designated for
demolition, in the work area and cover with two layers of
six-mil thick plastic sheeting taped securely in place.
4. The Contractor shall install a two (2) flapped, six (6)
mil polyethylene sheeted air lock at the entrance to the
work area. Entrance flaps are to be installed so that the
flaps will close if air flow into the work area is
stopped for any reason.
5. The Contractor shall provide all ladders, scaffolding
and/or other necessary equipment for the installation of
all engineering controls.
6. The Contractor shall provide and install HEPA equipped
air filtration device(s) (AFDs) within the work area to
create a continuous negative pressure (-0.02” W.C.)
within the work area throughout abatement operations, in
addition to the prevention smoke/fumes from exiting the
work area. This may require more than one (1) AFD
depending on conditions. The AFDs shall be exhausted to
the exterior of the building. Additional requirements
specified within this Technical Specification apply.
E. Removal - The work shall proceed in the following sequence:
1. No removal shall take place until notice to do so is
issued by the Environmental Consultant. Approval of the
work area for removal activity shall not, in any way,
relieve the Contractor of his responsibility to ensure
that non-work areas and items/equipment within the work
area are protected from smoke/fumes, physical damage, or
asbestos contamination from this project.
2. The Contractor shall remove floor tiles in a manner such
that the tiles remain non-friable and, to the degree
possible, intact throughout the removal process. Where
present, carpet shall be cut into manageable sections and
disposed of as regular construction debris if tile is not
affixed to the carpet backing. Otherwise, carpet with
tile residue shall be disposed of as asbestos
contaminated waste.
3. No dry removal of asbestos is allowable.
4. The removal of intact asbestos-containing materials shall
be accomplished without the disturbance of asbestos
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 30
materials by removing the component from the non-ACM
substrate as described below.
5. The Contractor shall remove intact asbestos-containing
materials by first wrapping the material with a minimum
of 2-layers of 6-mil polyethylene sheeting. Once the
material is properly wrapped the component may be
dismantled by either cutting, unbolting, unfastening etc.
the un-insulated, non-asbestos containing portion of the
substrate or fasteners such as bolts, non-ACM adhesives
etc.
6. The asbestos-containing material from each section shall
be picked up and then be packed and sealed into labeled
6-mil plastic bags prior to starting the next section to
prevent the material from drying. Metal shovels shall
not be used to pick up or move asbestos waste. Removed
material shall not be left out of bags overnight or for
more than four hours. However, plastic bags will not be
effective when sharp-edged materials are involved in
asbestos removal. Therefore, contaminated material
containing sharp-edged items shall be placed in small
cardboard boxes and double bagged, or singly bagged and
then placed in temporary fiber drums.
7. All waste shall be disposed in accordance with New Jersey
Department of Environmental Protection requirements and
the 40 CFR Part 6, Subpart M of the EPA regulations. The
outside of all containers shall be wet-cleaned or HEPA
vacuumed before leaving the Work Area. All vacuum
cleaners shall be equipped with HEPA filters.
NOTE: Regulations prescribes a leak-tight container, the
integrity of which is the Contractor's responsibility
until after deposition at a sanitary landfill. Therefore,
caution must be used in the choice of container types and
consideration given to the method of unloading at the
landfill. Fragile containers shall be unloaded by hand to
prevent rupture and possible airborne emissions.
F. After completion of this removal phase (stripping), all
surfaces from which asbestos has been removed shall be
scrubbed using a nylon bristle brush and/or wet cleaned to
remove all visible asbestos containing material. During this
work, the surfaces being cleaned shall be kept wet using
amended water. All disposable equipment shall be packaged for
disposal. Containers shall be washed with amended water and
shall have all exterior particulate matter removed prior to
removal from the contaminated area.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 31
G. All free water (in contaminated areas) shall be retrieved and
added to asbestos contaminated waste and then placed in
plastic lined leak-tight container for disposal.
H. Surface Sealing - After completion of cleaning all exposed
surfaces in the Work Area, and after the Contractor has
conducted a satisfactory pre-sealant inspection the Contractor
shall proceed with the following steps:
1. Spray coat all exposed surfaces with a binding agent such
as diluted clear encapsulant or a water-based paint. The
surfaces to be coated shall include surfaces from which
asbestos-containing materials have been removed (such as
ceilings, structural steel, decking, ducting, pipes,
etc.) and polyethylene which has been used to cover
walls, floor and non-removable fixtures, and equipment.
Over spray from ceiling, walls, fixtures and equipment
will usually be sufficient to coat floor coverings.
Plastic used to maintain critical barriers between Work
Areas and Clean Areas such as those in doorways, windows,
light fixtures, clocks, speakers and air vents shall not
be removed until air monitoring is completed and
satisfactory results have been obtained.
2. After spray coating the plastic sheeting used to protect
floors, walls, fixtures and equipment, (Primary
Barriers), the plastic shall be carefully removed and
rolled up with the contaminated portion inside and
packaged for disposal. Wet clean all walls, floors,
woodwork, ceilings, electric light fixtures and other
surfaces.
I. Final Clean-up - The following operation shall be performed
under negative air conditions with respirators and protective
clothing:
1. All walls, floors and other surfaces shall be cleaned
with damp cloths and/or HEPA vacuumed.
2. Cleaning shall continue until all visible residues have
been removed, including dust, grit and other particulate
matter.
3. Cloths, sponges, etc. used in the cleaning operation
shall be disposed of as contaminated waste.
J. After completion of the cleaning operation, the Contractor
shall:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 32
1. Notify the Owner and the Environmental Consultant that a
post removal inspection can be performed to insure all
visible asbestos has been removed and the area is dust
free. The Environmental Consultant will conduct an
aggressive visual inspection of all Work Areas. In
addition to a visual inspection conducted at the floor
level, the Testing Firm to ensure that no visible
asbestos-containing materials have been left above the
ceiling, structural members or other surfaces. All
visible residues must be removed before air monitoring
can be performed.
2. Request air monitoring of the Work Area by the Testing
Firm within 4 hours of a favorable visual inspection in
accordance with these specifications.
3. The Owner and the Testing Firm will then conduct overall
work area clearance testing under simulated conditions of
normal building occupancy known as aggressive sampling as
indicated in the Project Monitoring Specifications. Fans
with a minimum radius of 1' shall be used in each room to
be monitored to stir up any residual invisible fibers
such as would be entrained in the air by the pedestrian
traffic under conditions of normal occupancy. Forced air
equipment, such as a 1 horsepower leaf blower, will be
used to suspend particulate which may be clinging to
walls, ceilings, floors, ledges and other surfaces.
Asbestos fiber concentrations shall not exceed 70
structures / mm2.
4. Air monitoring results shall meet the following:
a. The concentration shall not exceed 0.010 fibers/cc
or 70 structures/mm2.
b. NOTE: This test is required before critical barrier
removal and reconstruction activities may begin. It
shall be sufficient for final air quality monitoring
for building occupancy.
c. If test results show asbestos fiber concentrations
to be greater than allowed, the clean up shall be
repeated until compliance is achieved. Re-clean all
surfaces and operate the HEPA equipped Negative Air
Filtration Units to exhaust air outside the Work
Area to filter the air.
K. Reconstruction
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 33
1. After the Work Area is found to be in compliance with
Part H above, (less than 70 structures/mm2) the following
tasks shall be performed by the Contractor:
a. All critical barriers shall be unsealed.
b. All remaining plastic sheeting, tape and any other
debris shall be disposed of in sealed plastic bags
labeled as asbestos contaminated waste.
c. Clothes or sponges used in the cleaning operation
shall be disposed of as contaminated waste.
2.8 INSPECTIONS
A. It is the Contractor’s responsibility to perform the following
inspections:
1. Pre-commencement inspection, which verifies that all
enclosure protection and engineering controls are in
place before actual gross removal of ACM takes place,
will be conducted prior to each phase of work. The
asbestos sampling technician will observe and check
compliance with the following:
a. Critical/separation barriers are in place;
b. Negative air filtration devices are in place and
operational;
c. Notification, variances, permits, placards and
licenses are posted;
d. Waste container is on site and properly labeled;
e. OSHA signs are posted;
f. Emergency plans and numbers are posted;
g. Decontamination meets all requirements and is in
operation;
h. Plastic sheeting is in place
i. Proper and adequate quantities of supplies, such as
suits, respirators and filters, towels, bags and
other equipment;
j. Locked out and tagged out electrical system;
k. Disconnected HVAC system; and,
l. Ground fault circuit interrupters (GFCI’s) are in
place outside the work area and operational;
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 34
2. Pre-encapsulation (sealant) inspection, which verifies
that all ACM has been removed and the work area is dust
free before the area, is sprayed with a sealant.
B. The Environmental Consultant will perform the following
inspections:
1. Pre-commencement Inspection.
2. Final clean-up inspection, which verifies that the
enclosure is ready for the collection of the final air
clearance samples. The Contractor is required to notify
the Environmental Consultant and the Owner in writing, 24
hours prior, that a final visual inspection is requested.
No final visual inspection will be conducted unless the
work area is dry and free of any standing moisture or wet
surfaces.
3. During the Final clean-up inspection the Contractor must
have a Licensed Supervisor present.
4. The NJDOL is authorized to conduct unannounced
inspections and periodic inspection during the abatement
project to ensure compliance with all applicable
regulation under their authority.
2.9 DECONTAMINATION FACILITIES AND PROCEDURES
A. The Contractor shall provide an adequate remote
decontamination unit, in proximity to the work area, which
shall be staged in a location arranged with the Facility,
consisting of a serial arrangement of rooms or spaces.
1. Each airlock shall be clearly identified and separated
from the other by polyethylene crossover sheet doors
designed to minimize particulates, fibers/particulates
and air transfer as authorized personnel pass between
each chamber.
2. A minimum of two (2) layers of six (6) mil fire-rated
polyethylene sheeting shall be required for floors,
walls, and the ceiling for constructed decontamination
units. Polyethylene crossover sheet doors shall have at
least three (3) layers of polyethylene sheeting and be
weighted so as to fall into place when people pass
through the area.
3. Decontamination chamber doors shall be of sufficient
height and width to enable replacement of equipment that
may fail and to safely stretcher or carry an injured
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 35
worker from the site without destruction of the chamber
or unnecessary risk to the integrity of the work area.
Such doors must be at least four (4) feet wide, and the
distance between sets of doors must be at least four (4)
feet.
4. The decontamination areas shall consist of the following:
a. Clean Room: In this room, authorized personnel
remove and leave all street clothes and put on clean
disposable coveralls. Appropriate NIOSH approved
respiratory protection equipment is also picked up
in this area. No contaminated items are permitted
in this room.
b. Shower Room: This is a separate room used for
transit by cleanly dressed authorized personnel
entering the work area from the clean room and for
showering by them after they have undressed in the
equipment room. This is a contaminated area.
5. Construct airtight walls and ceiling using fire-rated six
(6) mil polyethylene sheeting. Use (2) two layers
(minimum) of six (6) mil polyethylene sheeting to cover
floors in all areas of the Decontamination Units.
6. Fabricate airlock flap doors from three (3) overlapping
sheets with openings a minimum of four (4) feet wide.
Configure so that sheeting overlaps adjacent surfaces.
Weigh sheets at bottoms as required so that they quickly
close after being released. Put arrows on sheets to
indicate direction of overlap and/or travel.
7. Provide a minimum of four (4) feet between entrance and
exit of any room.
B. Decontamination Procedures
1. Where remote decontamination units are utilized, the
Contractor’s personnel shall don two (2) protective
suits.
2. When exiting the work area(s), the first suit shall be
remove and placed in a disposal bag staged at the airlock
entrance to the work area(s). The individuals shall
proceed to the shower room of the decontamination unit,
and remove protective clothing, except respirators.
3. The person then proceeds directly into the shower room.
Respirators shall be taken off last to prevent inhalation
of fibers during removal of contaminated clothing, and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 36
shall not be removed until they have been washed free of
dust.
4. After showering, the person moves to the clean room and
dresses in street clothing prior to exiting. Respirators
are picked up, washed thoroughly, and disinfected as
required, wrapped and stored in the clean room.
5. The Contractor shall ensure that filters in cartridge
type respirators used during the preparation and
abatement phase of the project are removed, wetted, and
discarded as contaminated waste. All new filters shall
be in place in the respirator prior to reuse. For
powered air purifying respirators or supplied air
respirators, the manufacturer's instructions shall be
followed about the proper decontamination sequence.
6. There shall be no smoking, eating, or drinking in any
contaminated areas (shower room, equipment room, and work
area).
7. Respirators shall be worn in all contaminated areas.
8. Non-disposable footwear shall remain inside the
contaminated area until completion of the activity, and
shall be thoroughly cleaned at that time.
9. Decontamination units shall be cleaned on a daily basis,
at the end of each shift.
2.10 EMERGENCY PRECAUTIONS
A. Establish emergency and fire exits from the Work Area. The
clean side of all emergency exits shall be equipped with two
full sets of protective clothing and respirators at all times.
B. Notify local medical emergency personnel, both ambulance crews
and hospital emergency room staff prior to commencement of
abatement operations as to the possibility of having to handle
contaminated or injured workmen, and shall be advised on safe
decontamination.
C. Prepare to administer first aid to injured personnel after
decontamination. Seriously injured personnel shall be treated
immediately or evacuated immediately for decontamination.
When an injury occurs, precautions shall be taken to reduce
airborne fiber concentrations (i.e. misting of the air with
water) until the injured person has been removed from the Work
Area.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 37
D. Notify, before actual removal of the asbestos material, the
local police and fire departments to the danger of entering
the Work Area. Contractor shall make every effort to help
these agencies form plans of action should their personnel
need to enter the contaminated area.
2.11 SUBMITTALS:
A. Before Start of Work submit the following to the Environmental
Consultant for review. Do not begin work until these
submittals are received, reviewed and accepted as is.
1. Material Safety Data Sheet: Submit Material Safety Data
Sheets, or equivalent, in accordance with the OSHA Hazard
Communication Standard (29 CFR 1910.1200) for the
following:
a. Surfactants.
b. Encapsulants.
c. Solvents.
2.12 USE OF BUILDING FACILITIES
A. Temporary Facilities: Refer to General Conditions for an
explanation and breakdown of responsibility.
2.13 USE OF THE PREMISES
A. Contractor shall confine his apparatus, the storage of
materials, and supplies, and the operation of his workmen to
limits established by law, ordinances, and the directions of
the Owner and the Environmental Consultant. All flammable or
combustible materials shall be properly stored to obviate fire
and in areas approved by the Facility.
B. Contractor shall assure that no exits from the building are
obstructed, that appropriate safety barriers are established
to prevent access, and that Work Areas are kept neat, clean,
and safe.
C. All surrounding work, fixtures, soil lines, drains, water
lines, gas pipes, electrical conduit, wires, utilities, duct
work railings, shrubbery, landscaping, etc. which are to
remain in place shall be carefully protected and, if disturbed
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 38
or damaged, shall be repaired or replaced as directed by the
Environmental Consultant or the Owner, at no additional cost.
D. All routes through the building to be used by the Contractor
shall first be approved by the Environmental Consultant and
the Owner.
E. Attention is specifically drawn to the fact that other
Contractors, performing the work of other Contracts, may be
(or are) brought upon any of the work sites of this Contract.
Therefore, the Contractor shall not have exclusive rights to
any site of his work and shall fully cooperate and coordinate
his work with the work of other Contractors who may be on (or
are on) any site of the work of this Contract.
F. Use of toilet facilities will be as designated by the Owner.
2.14 DISPOSAL OF WASTE
A. All asbestos waste materials destined for disposal shall be
wetted and packaged in permanently-sealed, leak-tight
containers (such as six-mil plastic bags) appropriately
labeled in accordance with Title 40 CFR 61.150 before it can
be legally transported and disposed of. Labels must indicate
the name of the generator and the location where the waste was
generated as per the NESHAP revision published November 20,
1990, in the Federal Register.
B. The deposition of all asbestos-containing material must be at
waste disposal sites operated in accordance with the
provisions of Title 40 CFR 61.154.
C. Copies of asbestos waste manifests and/or other receipts
issued by the approved dump site must be provided to the Owner
for each load of asbestos-containing material.
D. A notification of intent to dispose of asbestos shall be sent
to the New Jersey Department of Environmental Protection at
least 10 days prior to actual disposal.
E. All asbestos waste materials destined for disposal in New
Jersey shall be wetted and packaged in permanently sealed,
leak-tight containers (such as 6-mil plastic bags, double
bagged with visible labels) in accordance with 40 CFR 61.150
before it can be legally transported and disposed of in New
Jersey. No haulage of loose asbestos is permitted.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 39
F. The notification of D above shall include the following:
1. Name, address, and telephone number of the removal
project.
2. Quantity and nature of the waste to be disposed.
3. Name, address, and New Jersey Department of Environmental
Protection registration number of the collector-handler.
4. Name and address of the landfill at which disposal will
occur.
5. Date and time of disposal.
6. A copy of any written notification required by 40 CFR
61.150.
G. Asbestos waste, which is properly packaged, shall be disposed
of at a landfill, which is registered, by the New Jersey
Department of Environmental Protection in conformance with the
following:
1. The landfill used must be registered by the New Jersey
Department of Environmental Protection to accept Waste ID
#27A as per N.J.A.C. 7:26-2.13(g).
2. The specific landfill facility chosen must be one
designated by the New Jersey Department of Environmental
Protection as the recipient facility for the community in
which the removal project is located.
3. The waste hauler must possess a valid solid waste
transporter registration issued by the New Jersey
Department of Environmental Protection. A licensed solid
waste transporter shall be a commercial collector/hauler
or shall be the removal company if they are so
registered.
4. Asbestos waste can be hauled in dumpster containers
provided the load is comprised only of asbestos in bags
and does not contain any other wastes or asbestos-
containing wastes which could compromise the integrity of
the permanent containers.
5. If rough surfaces or other materials are present in the
load, which could potentially puncture the permanent
containers, then those containers shall be enclosed in
temporary fiber or steel drums during loading, transport,
and unloading operations. In addition, asbestos wastes
shall not be loaded into or hauled with vehicles
containing compactor devices.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 40
6. To determine which landfill to use for a particular
project, N.J.A.C. 7:26-2.13 and the NJDEP Division of
Solid and Hazardous Waste - Guidance Document for the
Management of Asbestos-containing Material (11/2013)
shall be consulted.
7. A certificate of completion shall not be issued by the
asbestos sampling technician until the waste disposal
unit has been removed from the work site.
8. Locations of waste containers must be coordinated with
the Environmental Consultant prior to being dropped by
the waste hauler.
PART 3 - PRODUCTS
3.1 QUALITY
A. Deliver all materials to the job site in their manufacturer's
original container, with the manufacturer's label intact and
legible.
1. Maintain packaged materials with seals unbroken and
labels intact until time of use.
2. Store all materials on pallets, away from any damp and/or
wet surface. Cover materials in order to prevent damage
and/or contamination.
3. Promptly remove damaged materials and unsuitable items
from the job site, and promptly replace with material
meeting the specified requirements, at no additional cost
to the Client.
B. The asbestos safety technician may reject as non-complying
such material and products that do not bear satisfactory
identification as to manufacturer, grade, quality and other
pertinent information.
3.2 MATERIALS
A. Sealing material shall be both penetrating and bridging and
may be applied by a one or two coat system.
B. Framing Materials and Doors: As required to construct
temporary decontamination facilities and Isolation Barriers.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 41
Lumber shall be high grade, new, finished one side and fire
retardant.
C. Fire Retardant Polyethylene Sheeting: minimum uniform
thickness of 6-mil. Provide largest size possible to minimize
seams.
D. Fire Retardant Reinforced Polyethylene Sheeting: For covering
floor of decontamination units, provide translucent, nylon
reinforced or woven polyethylene laminated, fire retardant
polyethylene sheeting. Provide largest size possible to
minimize seams, minimum uniform thickness 6-mil.
E. Drums: Asbestos transporting drums, sealable and clearly
marked with warning labels as required by OSHA and EPA.
F. Polyethylene Disposal Bags: Asbestos disposal bags, minimum of
6-mil thick. Bags shall be clearly marked with warning labels
as required by OSHA and EPA.
G. Signs: Asbestos warning signs for posting at perimeter of Work
Area, as required by OSHA and EPA.
H. Waste Container Bag Liners and Flexible Trailer Trays: One
piece leak-resistant flexible tray with absorbent pad.
I. Tape: Provide tape, which is of high quality with an adhesive,
which is formulated to aggressively stick to sheet
polyethylene.
J. Spray Adhesive: Provide spray adhesive in aerosol cans which
is specifically formulated to stick tenaciously to sheet
polyethylene.
K. Flexible Duct: Spiral reinforced flex duct for air filtration
devices.
3.3 TOOLS AND EQUIPMENT
A. Air Filtration Device (AFD): AFDs shall be equipped with High
Efficiency Particulate Air (HEPA) filtration systems and shall
be approved by and listed with Underwriter's Laboratory (UL).
B. Scaffolding: All scaffolding shall be designed and constructed
in accordance with OSHA (29 CFR 1926/1910), New Jersey
Building Code, and any other applicable federal, state and
local government regulations. Whenever there is a conflict or
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 42
overlap of the above references the most stringent provisions
are applicable. All scaffolding and components shall be
capable of supporting without failure a minimum of four times
the maximum intended load, plus an allowance for impact.
1. Provide non-skid surface on all scaffold surfaces subject
to foot traffic. Scaffold ends and joints shall be
sealed with tape to prevent penetration of asbestos
fibers.
2. Equip rungs of all metal ladders, etc., with an abrasive,
non-slip surface.
C. Transportation Equipment: Transportation Equipment, as
required, shall be suitable for loading, temporary storage,
transit and unloading of contaminated waste without exposure
to persons or property. Any temporary storage containers
positioned outside the building for temporary storage shall be
metal, closed and locked.
D. Vacuum Equipment: All vacuum equipment utilized in the Work
Area shall utilize HEPA filtration systems.
E. Vacuum Attachments: Soft Brush Attachment, Asbestos Scraper
Tool, Drill Dust Control Kit.
F. Electric Sprayer: An electric airless sprayer suitable for
application of encapsulating material and shall be approved by
and listed with Underwriters Laboratory.
G. Water Sprayer: The water sprayer shall be an airless or other
low-pressure sprayer for amended water application.
H. Water Atomizer: Powered air-misting device equipped with a
ground fault interrupter and equipped to operate continuously.
I. Brushes: All brushes shall have nylon bristles. Wire brushes
are excluded from use due to their potential to shred asbestos
fibers into small, fine fibers.
J. Hand Power Tools: shall be equipped with HEPA-filtered local
exhaust ventilation if used to drill, cut into or otherwise
disturb ACM.
K. Other Tools and Equipment: Contractor shall provide other
suitable tools for the stripping, removal, encapsulation, and
disposal activities including but not limited to: hand-held
scrapers, sponges, rounded-edge shovels, brooms, and carts.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 43
L. Fire Extinguishers: Provide type “A” fire extinguishers for
temporary offices and similar spaces where there is minimal
danger of electrical or grease-oil-flammable liquid fires. In
other areas, provide type “ABC” dry chemical extinguishers of
NFPA recommended types for the exposure in each case. All
fire extinguishers shall comply with the applicable
recommendations of NFPA Standard 10, “Standard for Portable
Extinguishers.” Provide a minimum of four fire extinguishers
in each Work Area; one in the equipment room of the
decontamination unit, one outside the Work Area in the clean
room or directly outside same, and two fire extinguishers
where they are most effective for their intended purpose. Do
not exceed seventy-five feet between fire extinguishers within
the Work Area.
M. First Aid Kits: Contractor shall maintain adequately stocked
first aid kits in the clean rooms of the decontamination units
and within Work Areas. The first aid kit shall be approved by
a licensed physician for the work to be performed under this
Contract.
N. Water Service:
1. Water is available at the facility
2. Temporary Water Service Connection: Valves shall be
temperature and pressure rated for operation of the
temperature and pressures encountered. After completion
of use, connections and fittings shall be removed without
damage or alteration to existing water piping, and
equipment. Leaking or dripping fittings/valves shall be
repaired and or replaced as required.
3. Water Hoses: Employ new heavy-duty abrasion-resistant
hoses with a pressure rating greater than the maximum
pressure of the water distribution system to provide
water into each Work Area and to each Decontamination
Enclosure Unit. Provide fittings as required for
connection to existing wall hydrants or spouts, as well
as temporary water heating equipment, branch piping,
showers shut-off nozzles and equipment.
4. Water Heater: Provide UL rated 40-gallon electric water
heaters to supply hot water for Personal Decontamination
Enclosure System Shower. Activate from 30 Amp Circuit
breakers located within the Decontamination Enclosure
subpanel. Provide relief valve compatible with water
heater operations, pipe relief valve down to drip pan at
floor level with type `L' copper piping. Drip pans shall
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 44
be 6-inch deep and securely fastened to water heater.
Wiring of the water heater shall comply with NEMA, NECA,
and UL standards.
O. Electrical Service:
1. General: Comply with applicable NEMA, NECA and UL
standards and governing regulations for materials and
layout of temporary electric service.
2. Refer to the General Conditions for temporary electric
service requirements.
3. Temporary Power: Provide service to decontamination unit
subpanel with minimum 100 AMP, two pole circuit breaker
or fused disconnect connected to the building's main
distribution panel. Subpanel and disconnect shall be
sized and equipped to accommodate all electrical
equipment required for completion of the work.
4. Voltage Differences: Provide identification warning signs
at power outlets that are other than 110-120 volt power.
Provide polarized outlets for plug-in type outlets, to
prevent insertion of 110-120 volt plugs into higher
voltage outlets. Dry type transformers shall be provided
where required to provide voltages necessary for work
operations.
5. Ground Fault Protection: Equip all circuits for any
purpose entering Work Area with ground fault circuit
interrupters (GFCI). Locate GFCIs exterior to Work Area
so that all circuits are protected prior to entry to Work
Area. Provide circuit breaker type ground fault circuit
interrupters (GFCI) equipped with test button and reset
switch for all circuits to be used for any purpose in
Work Area, decontamination units, exterior, or as
otherwise required by NEC, OSHA or other authority.
Locate in panel exterior to Work Area.
6. Power Distribution System: Provide circuits of adequate
size and proper characteristics for each use. In general
run wiring overhead, and rise vertically where wiring
will be least subject to damage from operations.
7. Temporary Wiring: In the Work Area shall be type UF non-
metallic sheathed cable located overhead and exposed for
surveillance. Provide liquid tight enclosures or boxes
for all wiring devices. Do not wire temporary lighting
with plain, exposed (insulated) electrical conductors.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ABATEMENT OF ASBESTOS CONTAINING MATERIALS
USING NON-FRIABLE METHODS 028213- 45
8. Electrical Power Cords: Use only grounded extension
cords; use hard service cords where exposed to traffic
and abrasion. Use single lengths of cords only.
9. Temporary Lighting: All lighting within the Work Area
shall be liquid and moisture proof and designed for the
use intended.
a. Provide sufficient temporary lighting to ensure
proper workmanship everywhere; by combined use of
daylight, general lighting, and portable plug-in
task lighting.
b. Provide lighting in the Decontamination Unit as
required supplying a minimum 50-foot candle light
level.
END OF SECTION 028213
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 1
SECTION 028214 – ABATEMENT OF ASBESTOS CONTAINING MATERIALS IN
OCCUPIED BUILDING IN ACCORDANCE WITH NJAC 5-23:8
PART 1 - GENERAL
1.1 RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract, including
General and Supplementary Conditions, Architectural Drawings
and Specification Sections, apply to work of this section. An
asbestos inspection report has been prepared and provided to
the Owner for the work identified in this specification.
1.2 REFERENCES
A. The publications listed below form a part of this
specification to the extent referenced. The publications
referred to within the text will be the basic designation
only.
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.146 Confined Spaces
29 CFR 1910.1200 Hazard Communication
29 CFR 1926.1101 OSHA Asbestos
29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists
29 CFR 1926.59 Hazard Communication
29 CFR 1926.62 Lead in Construction
29 CFR 1926.103 Respiratory Protection
40 CFR 763 AHERA
40 CFR 61 Subpart M NESHAP
40 CFR 260 Hazardous Waste Management Systems:
General
40 CFR 261 Identification and Listing of
Hazardous Waste
40 CFR 262 Generators of Hazardous Waste
40 CFR 263 Transporters of Hazardous Waste
40 CFR 264
Owners and Operators of Hazardous
Waste Treatment, Storage, and Disposal
facilities
40 CFR 265
Owners and Operators of Hazardous
Waste Treatment, Storage, and Disposal
facilities
49 CFR 171 Standard for Transportation of
Hazardous Materials.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 2
49 CFR 172 Hazardous Material Tables and
Hazardous Materials Communications
Regulations
49 CFR 173 General Requirements for Shipments and
Packaging
49 CFR 178 Shipping Container Specifications
NEW JERSEY REGULATIONS
N.J.A.C.5:23 - (8.1-
8.22)
Asbestos Hazard Abatement Sub-code
N.J.S.A. 34:5A-32 et
seq.
Asbestos Control and Licensing Act
N.J.A.C. 12:120 Asbestos Licenses and Permits
1.3 NOTIFICATIONS
A. The Contractor shall notify the following agencies in writing
10 days prior to the start of the asbestos removal project:
1. U.S. Environmental Protection Agency-Region II National Emissions Standards for Hazardous
Air Pollutants (NESHAPS) Coordinator
26 Federal Plaza, Room 1033
New York, New York 10278
2. State of New Jersey Department of Environmental Protection Division of Solid Waste Management
P.O. Box 414
Trenton, New Jersey 08625
3. N.J. Department of Health Asbestos Control Service
P.O. Box 369
Trenton, New Jersey 08625
4. NJDOL & Work Force Development Asbestos Control & Licensing
PO Box 949
Trenton, NJ 08625-0949
5. N.J. Department of Community Affairs Bureau of Construction Code Enforcement
Asbestos Safety Unit
CN 816
Trenton, New Jersey 08625
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 3
With copies to:
Brinkerhoff Environmental Services, Inc.
1805 Atlantic Avenue
Manasquan, New Jersey 08736
B. Notification to the agencies in Subpart A above shall be
submitted on the required forms and include the following
information (Title 40 CFR 61.146):
1. Name and address of Owner of building.
2. Name and address of Contractor.
3. Address and description of the building, including size,
age and prior use of the facility or area. Estimate of the
approximate amount of friable asbestos material present in
square feet and/or linear feet, as applies. Designate room
numbers or other location information.
4. Scheduled starting and completion dates for removal.
5. Procedures and equipment (including ventilating system)
that will be employed to comply with Title 40 CFR Part 61.
National Emission Standard for Asbestos, and with Title 29
CFR 1926.58.
6. The name and address of the monitoring firm to perform air monitoring on behalf of the Contractor's employees.
7. The name and address of the Department of Environmental
Protection registered waste hauler and the landfill where
the waste will be deposited. The landfill should also com-
ply with 40 CFR Part 61.
C. The Contractor shall provide the Owner’s Asbestos Safety
Control Monitor (ASCM) with all necessary documents and
information required to obtain a construction permit for
asbestos abatement from the New Jersey Department of Community
Affairs.
D. The building owner shall notify the building occupants in
writing 20 business days prior to the commencement of the
abatement project. The notification shall include precedures
and precautions deemed necessary in order to protect the
health, safety, and welfare of the occupants. The
notification shall include relocation plans, modifications to
emergency egress routs, and contact information for the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 4
appropriate owners representative. This notification shall be
posted seven (7) days prior to the start of work area
preparation in conspicuous locations, and shall remain posted
throughout the project.
E. The Contractor shall notify the Owner’s ASCM in writing at
least 48 hours prior to start of any preparation work.
F. The ASCM shall notify the New Jersey Department of Community
Affairs, Asbestos Unit 10 days prior to the commencement of
the abatement project, 48 hours prior to the start of
preparation for each new work area.
G. The Asbestos Safety Technician shall notify the New Jersey
Department of Community Affairs via telephone notification on
the first day of the project and as required for inspections.
1.4 DOCUMENTATION
A. The Contractor shall provide the following documentation in
writing before the start of the abatement project:
1. His name, address, and license number pursuant to the As-bestos Licenses and Permits under the jurisdiction of the
New Jersey Department of Labor.
2. The name, address, and EPA registration certificate of the New Jersey Department of Environmental Protection regis-
tered waste hauler and of the New Jersey Department of En-
vironmental Protection registered landfill where the asbes-
tos waste will be deposited.
3. The name and address of the Contractor's air monitoring
firm successfully participating in the National Institute
for Occupational Safety and Health (NIOSH) PAT program, in-
cluding the latest result sheet indicating PAT proficiency.
4. A list of workers with valid New Jersey Asbestos Removal Permits which will be involved with this project.
5. A copy of the construction permit for asbestos abatement issued by the Administrative Authority having jurisdiction.
6. Documentation that he is familiar with the Occupational
Safety and Health Administration (OSHA); and the U.S. Envi-
ronmental Protection Agency (EPA) relating to the applica-
tion, removal, disposal and treatment of asbestos.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 5
a. OSHA Safety and Health Standards, namely Title 29 CFR
1926, Section 1926.58. Asbestos, Tremolite, Anthophyl-
lite and Actinolite and 29 CFR 1910.34, Respiratory Pro-
tection and 29 CFR 1910.20, Access to Employee Exposure &
Medical Records.
b. EPA Regulations, namely: Subpart M, Title 40 CFR Part 61, National Emission Standard for Asbestos, Sections 61.140
through 61.156, Effective April 5, 1984.
B. Documentation that employees have received medical
examinations, which are required by OSHA Title 29 CFR 1926.58.
This documentation shall consist of the name and address of
the physician performing the exam(s); the name(s) of the
employee(s) and the date(s) of the exam(s).
C. The Contractor shall submit in writing the following
documentation:
1. A written copy of the Letters of Notification required by Part 1.3, Subpart B, including items 1 through 7.
2. A written plan for preparation of the work site including delineation of all work areas, number and location of nega-
tive air machines, and the location of all decontamination
units.
3. A written description of the types and quantities of pro-tective clothing and approved respirators to be used.
4. A written delineation of work site isolation; e.g., barrier construction, signs, security.
5. A written description of all removal methods to be used in-cluding description of types and numbers of negative air
filtration units.
6. A written description of the tools and methods to be used for clean-up, reconstruction and waste disposal.
D. Safety Data Sheet: Submit the GHS Compliant Safety Data
Sheet, or equivalent, in accordance with the OSHA Hazard
Communication Standard (29 CFR 1910.1200) for each surfactant
and encapsulation material proposed for use at the work site.
Include a separate attachment for each sheet indicating the
specific worker protection equipment proposed for use with the
material indicated.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 6
E. Deliver materials to the job site in original, new and
unopened packages and containers bearing the manufacturer’s
name and label, and the following information:
1. Name or title of material
2. Manufacturer’s stock number and date of manufacture.
3. Manufacturer’s name
4. Thinning instructions
5. Application instructions
1.5 AIR MONITORING AND INSPECTIONS
A. The Contractor shall cooperate fully with all aspects of the
air-monitoring program, which is conducted by an independent
air-monitoring firm (ASCM) responsible to the Owner.
B. In addition to the ASCM hired by the Owner, the Contractor
shall arrange for air monitoring to be conducted in all Work
Areas in accordance with 29 CFR 1926.1101 of OSHA regulations,
on behalf of the Contractor's employees. The Testing
Laboratory employed by the Contractor shall participate and
show proficiency in the NIOSH (National Institute for
Occupational Safety Health) PAT (Proficiency Analytical
Testing) program for airborne asbestos.
C. Personal samples shall be obtained from employees engaged in
each of the following operations; asbestos removal (i.e.
spraying, scraping and brushing), disposal (i.e. bagging) and
clean up. Representative sampling shall be repeated in the
event of major changes in the removal operation. This
sampling shall be done with the sampling media and flow rates
specified in the OSHA Reference (Method 7400 “A” rules).
Samples shall be taken for the determination of the 8-hour
time weighted average airborne concentration and of the
ceiling concentrations of asbestos fibers.
D. The results of the Contractor's air monitoring tests (Subpart
B and C above) shall be returned within 24 hours; copies shall
be provided to each employee monitored as specified by OSHA
Regulation 29 CFR 1910.20. The Contractor shall examine these
results and evaluate the effectiveness of the controls in use
(wet methods, exhaust units and respiratory protection).
Copies of these monitoring tests shall be provided to the
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 7
Owner's Asbestos Safety Technician. Copies shall also be made
available upon request to representatives of Local, State, or
Federal enforcement agencies.
E. The Owner’s Asbestos Safety Technician will conduct air
monitoring and visual inspections in, and adjacent to, the
Work Area on behalf of the Owner throughout the abatement
project.
F. The Testing Laboratory shall conduct all required analyses
expeditiously and in conformance with N.J.A.C. 5:23-8 and
shall report the results of such tests to the Asbestos Safety
Technician. The Asbestos Safety Technician, upon receipt of
testing results indicating that concentrations above 0.01
fibers/cc have occurred outside the containment barriers or
within the clean room of the decontamination chamber during
the abatement action, shall report these results to the
Owner's Contractor and ASCM Firm, so that prompt corrective
action may be taken.
G. If air samples collected outside of the work area during
abatement activities indicate airborne fiber concentrations
greater than original background levels or greater than the
0.01 fibers/cc as determined by Phase Contrast Microscopy,
whichever is larger, work shall stop for inspection, and the
integrity of barriers shall be restored. Clean-up of surfaces
outside of the work area using HEPA vacuums or wet cleaning
techniques shall be done at the direction of the Asbestos
Safety Technician prior to resuming abatement activities and
at the cost of the Contractor.
H. The Asbestos Safety Technician shall keep a daily log of
on-site observations concerning Contractor's compliance with
activities required under these job specifications. This log
shall be made available upon request at all times to the
Owner, ASCM Firm, and appropriate Local, State and Federal
agencies. The Asbestos Safety Technician shall report results
in a comprehensive final report.
I. Maximum Airborne Asbestos Concentrations
Sample Type Asbestos Concentration Method
Progress sample outside the
work area during removal. 0.01 fibers/cc PCM
Post Abatement inside the
work site. <70 structures/mm2 TEM
PCM = Phase Contrast Microscopy
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 8
TEM = Transmission Electron Microscopy
1.6 DEFINITIONS
The following words, terms, and abbreviations, when used within
this document shall have the following meanings unless the
context clearly indicates otherwise.
1. Abatement: Procedures physically taken to control or elimi-
nate fiber release from asbestos-containing building mate-
rials. This includes removal, encapsulation, enclosure, and
repair.
2. Aggressive Sampling: Method of sampling in which the indi-
vidual collecting the air sample creates activity by the
use of mechanical equipment during the sampling period to
stir up settled dust and simulate activity in that area of
the building.
3. AIHA: American Industrial Hygiene Association.
4. Airlock: System for permitting entrance and exit while re-
stricting air movement between a contaminated area and an
uncontaminated area. It consists of two curtained doorways
separated by a distance of at least three feet such that
one passes through one doorway into the airlock, allowing
the doorway sheeting to overlap and close off the opening
before proceeding through the second doorway, thereby pre-
venting flow-through contamination.
5. Air Sampling: Process of measuring the fiber content of a
known volume of air collected during a specific period. The
procedure utilized for asbestos follows the NIOSH Standard
Analytical Method 7400, or the provisional transmission
electron microscopy methods developed by the US EPA, which
are utilized for lower detection levels and specific fiber
identification.
6. Amended Water: Water to which a surfactant has been added.
7. ANSI: American National Standards Institute
8. Area Air Sampling: Any form of air sampling or monitoring
where the sampling device is placed at some stationary lo-
cation.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 9
9. Asbestos: Any hydrated mineral silicate separable into com-
mercially usable fibers, including but not limited to
chrysotile (serpentine), amosite (cumingtonite-grunerite),
crocidolite (riebeckite), tremolite, anthophyllite and ac-
tinolite.
10. Asbestos-Containing Material (ACM): Asbestos or any materi-al containing more than one-percent asbestos.
11. Asbestos-Containing Waste Material: ACM or asbes-
tos-contaminated objects requiring disposal.
12. Asbestos Handler: Individual, who disturbs, removes, re-
pairs, or encloses friable asbestos material. This individ-
ual shall have completed approved training course(s) and be
in possession of certification issued by NJDOL.
13. Asbestos Handler Supervisor: Individual who supervises the handlers during an asbestos project and ensures that proper
asbestos abatement procedures as well as individual safety
procedures are being adhered to. This individual shall have
completed approved training course(s) and be in possession
of certification issued by NJDOL.
14. Asbestos Handling Certificate: Certificate(s) issued to in-dividuals who have met the criteria established by NJDOL.
15. Asbestos Inspection Report: A report on the condition of a building or structure in relation to the presence and con-
dition of asbestos therein.
16. Asbestos Project: Any form of work performed in connection with the alteration, innovation, modification, or demoli-
tion of a building or structure which will disturb (e.g.
remove, enclose, encapsulate) more than three linear feet
or more than three square feet of friable ACM.
17. Asbestos Safety Control Monitoring (ASCM) Firm: The Owners air monitoring firm, certified by the New Jersey Department
of Community Affairs, and hired by the Owner to provide a
certified New Jersey Asbestos Safety Technician, conduct
sample collection and analysis, and personnel to continu-
ously monitor the abatement activities under this contract.
18. Asbestos Safety Technician (AST): A person certified by the New Jersey Department of Community Affairs and hired by the
ASCM Firm to continuously monitor and inspect the asbestos
abatement work pursuant to N.J.A.C. 5:23-8 and these speci-
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 10
fications.
19. Authorized Visitor: Building Owner and his/her representa-tive, and any representative of a regulatory or other agen-
cy having jurisdiction over the project.
20. Barrier: Polyethylene sheeting that completely seals off
the work area to prevent contamination of the surrounding
area.
21. Building Owner: Person in whom legal title to the premises is vested unless the premises are held in land trust, in
which instance Building Owner means the person in whom ben-
eficial title is vested.
22. Clean Room: An uncontaminated area or room that is part of worker decontamination enclosure system with provisions for
storage of workers' street clothes and protective equip-
ment.
23. Clearance Air Monitoring: Employment of aggressive sampling techniques with a volume of air collected to determine the
airborne concentration of residual fibers and shall be per-
formed as the final abatement activity.
24. Construction Permit for Asbestos Abatement: A required per-mit provided by the jurisdictional Buildings Department for
the approval to commence any asbestos hazard abatement.
25. Contractor: The asbestos removal contractor.
26. Critical Barrier: Two (2) layers of six (6) –mil polyeth-ylene sheeting that completely seals off the work area to
prevent the distribution of fibers to the surrounding area,
such as the opening between the top of non-movable lights,
HVAC systems, windows, doors, ducts, grills, electrical
outlets, floor drains, sinks, etc.
27. Curtained Doorway: Device that consists of at least three overlapping sheets of polyethylene over an existing or tem-
porarily framed doorway. One sheet shall be secured at the
top and left side, the second sheet at the top and right
side, and the third sheet at the top and left side. All
sheets shall have weights attached to the bottom to ensure
that the sheets hang straight and maintain a seal over the
doorway when not in use.
28. Decontamination Enclosure System: Series of connected
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 11
rooms, separated from the Work Area and from each other by
air locks, for the decontamination of workers, materials,
waste containers, and equipment.
29. Employee: An asbestos abatement worker having proper train-ing, instruction and licensing.
30. Encapsulant (sealant) or Encapsulating Agent: Liquid mate-rial which can be applied to ACM and which temporarily con-
trols the possible release of asbestos fibers from the ma-
terial either by creating a membrane over the surface
(bridging encapsulant) or by penetrating into the material
and binding its components together (penetrating encapsul-
ant). This may also be used to seal surfaces from which ACM
has been removed.
31. Encapsulation: Coating or spraying of ACM with a sealant.
32. Enclosure: Construction of airtight walls and/or ceilings between ACM and the facility environment, or around surfac-
es coated with ACM, or any other appropriate procedure as
determined by the Department of Community Affairs, which
prevents the release of asbestos fibers.
33. EPA or USEPA: United States Environmental Protection Agen-cy.
34. Equipment Decontamination Enclosure System: A three-stage
decontamination enclosure system for materials and equip-
ment, typically consisting of a designated area of the work
area, a washroom, and an uncontaminated area.
35. Equipment Room: Contaminated area or room that is part of the worker decontamination enclosure system with provisions
for the storage of contaminated clothing and equipment.
36. Fixed Object: Unit of equipment or furniture in the Work Area that cannot be removed from the Work Area.
37. Friable Asbestos Material: Asbestos or any ACM that can be crumbled, pulverized, or reduced to powder when dry, by
hand or other mechanical pressure.
38. Glove-Bag Technique: Method for removing friable ACM from heating, ventilation, and air conditioning (HVAC) ducts,
short piping runs, valves, joints, elbows, and other non-
planar surfaces in a non-contained Work Area. The glove-bag
assembly is a manufactured device consisting of a glove-bag
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 12
(constructed of at least 6-mil transparent polyethylene),
two inward-projecting long sleeve gloves, one in-
ward-projecting water wand sleeve, an internal tool pouch,
and an attached, labeled receptacle for asbestos waste. The
glove-bag is constructed and installed in such a manner
that it surrounds the object or area to be decontaminated
and contains all asbestos fibers released during the remov-
al process.
39. HEPA-Filter: High efficiency particulate air filter capable of trapping and retaining 99.97 percent of particles (as-
bestos fibers) greater than 0.3 micrometers mass median
aerodynamic equivalent diameter.
40. HEPA Vacuum: A vacuum cleaner equipped with a HEPA filter.
41. Holding Area: Chamber in the equipment decontamination en-closure located between the washroom and an uncontaminated
area.
42. Movable Object: Unit of equipment or furniture in the Work Area that can be removed from the Work Area.
43. Negative Air Pressure Equipment: Portable local exhaust
system equipped with HEPA filtration. The system shall be
capable of creating a negative pressure differential be-
tween the outside and inside of the Work Area.
44. NESHAP: National Emission Standards for Hazardous Air Pol-lutants.
45. NIOSH: National Institute for Occupational Safety and
Health.
46. NJDCA: New Jersey Department of Community Affairs
47. NJDOL: New Jersey Department of Labor.
48. NJDEP: New Jersey Department of Environmental Protection
49. Occupied Area: Area of the work site where abatement is not taking place and where personnel or occupants normally
function or where workers are not required to use personal
protective equipment.
50. OSHA: Occupational Safety and Health Administration.
51. PCB Ballast: Polychlorinated biphenyl containing fluores-
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 13
cent light fixture ballast.
52. Personal Air Monitoring: Method used to determine employ-ees' exposure to airborne fibers. The sample is collected
outside the respirator in the worker's breathing zone.
53. Personal Protective Equipment (PPE): Appropriate protective clothing, gloves, eye protection, footwear, and head gear.
54. Plastic Sheeting: Polyethylene sheeting of a certain thick-ness as indicated.
55. Plasticize: Cover floors and walls with polyethylene sheet-ing as herein specified as acceptable to the New Jersey De-
partment of Community Affairs.
56. Qualitative Fit Test: Individual test subject's responding (either voluntarily or involuntarily) to a chemical chal-
lenge outside the respirator face-piece. Three of the most
popular methods include: 1) irritant smoke test; 2) odorous
vapor test; and 3) taste test.
57. Quantitative Fit Test: Exposing the respiratory wearer to a test atmosphere containing an easily detectable, nontoxic
aerosol, vapor or gas as the test agent. Instrumentation,
which samples the test atmosphere and the air inside the
face-piece of the respirator, is used to measure quantita-
tively the leakage into the respirator. There are a number
of test atmospheres, test agents, and exercises to perform
during the test.
58. Removal: Stripping of any asbestos- containing materials
from surfaces or components of a facility or taking out
structural components in accordance with 40 CFR 61 Subparts
A and M.
59. Repair: Corrective action using recommended work practices to minimize the likelihood of fiber release from small dam-
aged areas of ACM.
60. Separation (Isolation) Barrier: A constructed wall (2” x 4” studs, spaced 16” on center, constructed with 1/2” plywood
and caulked seams) that separates the clean area from the
work area having a fire rating, if applicable, and does not
interfere with the means of egress. Polyethylene sheeting
(minimum 2 layers of 6 mil) shall be placed on both sides
of the barrier so that it completely seals off the work ar-
ea to prevent the distribution of fibers to the surrounding
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 14
area.
61. Shower Room: Room between the clean room and the equipment room in the worker decontamination enclosure with hot and
cold running water controllable at the tap and arranged for
complete showering during decontamination.
62. Surfactant: Chemical wetting agent added to water to im-prove penetration.
63. Visible Emissions: Emissions containing particulate materi-al that are visually detectable without the aid of instru-
ments.
64. Washroom: Room between the Work Area and the holding area in the equipment decontamination enclosure system where
equipment and waste containers are wet cleaned and/or HEPA-
vacuumed prior to disposal.
65. Wet Cleaning: Removal of asbestos fibers from building sur-faces and objects by using cloths, mops, or other cleaning
tools which have been dampened with amended water.
66. Work Area: Designated rooms, spaces, or areas of the build-ing or structure where asbestos abatement activities
take(s) place.
67. Worker Decontamination Enclosure System: Portion of a de-contamination enclosure system designed for controlled pas-
sage of workers and authorized visitors, consisting of a
clean room, a shower room, and an equipment room separated
from each other and from the Work Area by airlocks and cur-
tained doorways.
68. Work Site: Premises where abatement activity is being per-formed. May be composed of one or more Work Areas.
1.7 PERSONNEL REQUIREMENTS AND TRAINING
A. All of the Contractor’s workers must have valid training, a
minimum of one (1) years’ experience in asbestos abatement, of
which six (6) months must have been performed within the State
of New Jersey. Each worker must possess a valid and current
asbestos worker’s permit as issued by the State of New Jersey,
and shall comply with all applicable requirements of N.J.S.A.
34:5A-32 and 29 CFR 1926.58 (k)(3), as well as other non-
training requirements of 29 CFR 1926.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 15
B. The Contractor shall furnish proof that all of the Contractors
personnel on site have been given medical examinations as
required by 29 CFR 1910 and 29 CFR 1926. As a minimum, the
examination should include a medical history with specific
reference to respiratory disease and a pulmonary function
test. Additionally a chest roentgenogram shall have been
performed in the last five years. This information should be
provided after Notice to Proceed (NTP) and prior to the pre-
construction meeting.
C. The Contractor shall provide a Certified, New Jersey Asbestos
Supervisor to the project with a minimum of two (2) years of
experience in asbestos abatement within the State of New
Jersey. The experience should be at a minimum equivalent in
size and scope as to this project. The Contractor shall
submit a copy of the Supervisors qualifications to the Owner.
1.8 ASBESTOS CONSULTANT/ASBESTOS SAFETY TECHNICIAN
This section is provided only as information to the Asbestos
Removal Contractor. This work shall be in addition to, and
independent of, the OSHA mandated air monitoring conducted on
behalf of the Contractor's employees. (Note: The word
"Contractor", wherever used herein, refers to the Asbestos
Removal Contractor).
Site supervision, air monitoring, and laboratory analysis will
be conducted by the Owner's ASCM firm. The ASCM’s Asbestos
Safety Technician shall have specific training in asbestos
sampling and analytical techniques as recommended by EPA, OSHA
and any other State or Local requirements.
A. General Duties
1. The Asbestos Safety Technician shall perform all air
sampling specified herein and shall be thoroughly
familiar with the Asbestos Removal Specifications.
Acting on behalf of the Owner, the Asbestos Safety
Technician shall have access to all areas of the Asbestos
Removal Project at all times and shall inspect and
monitor the performance of the Contractor to verify that
said performance meets all Federal, State and City
regulations and is in compliance with the Asbestos
Abatement Specifications. The Asbestos Safety Technician
shall be on site during the entire abatement project.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 16
B. Authority & Compliance Responsibilities
1. The Asbestos Safety Technician shall have the authority
to direct the actions of the Contractor verbally and in
writing to assure compliance. In the event of continual
noncompliance or serious violation, the Asbestos Safety
Technician shall notify the ASCM, Owner, and, as
necessary, the appropriate governmental agency. All
directions to the Contractor shall be legible, dated, and
shall bear the signature of the Asbestos Safety
Technician. Copies shall be forwarded immediately to the
Owner.
C. Reporting of Air Sampling and Analysis Data
1. The Testing Laboratory shall conduct all required
analyses within the time frame specified and in
conformance with specified analytical procedures and
shall report the results of such tests to the Asbestos
Safety Technician. The Asbestos Safety Technician, upon
receipt of testing results indicating that concentrations
above 0.010 fibers per cc have occurred outside the
containment barriers or within the clean room during the
abatement action, shall report these results immediately
verbally or by telephonic communication, if necessary, to
the Contractor and Owner so that prompt corrective action
may be taken. This verbal communication shall be
followed by a written report.
2. The Asbestos Safety Technician shall keep a daily log of
on-site observations concerning Contractor's compliance
with activities required under the job Specifications.
This log shall be made available upon request at all
times to the Owner and to the appropriate Local, State
and Federal agencies. The Asbestos Safety Technician
shall report results in a comprehensive final report,
including daily logs, observations and air monitoring
results simultaneously to the Owner and the Contractor
within 30 working days following final testing for re-
occupancy.
D. Removal Phase
Provide monitoring throughout Removal Operations to ensure
that no outside contamination is occurring and to check fiber
levels within the work area. All work is to be conducted
under occupied conditions as defined by the New Jersey
Department of Community Affairs, Asbestos and Lead Unit.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 17
1. Sampling Procedure: Filter cassettes and sampling train
shall be assembled as specified in NIOSH #7400. The flow
rate shall be sufficient within the method limitations to
capture a minimum volume of 560 liters per sample. Pumps
shall be calibrated before and after sampling and a
record kept of this calibration.
2. Sampling Frequency & Location:
a. Air samples shall be collected at the beginning of
each work shift and every four hours thereafter.
Samples shall encompass the end of the work shift.
b. Air samples shall be collected at a minimum of one
sample in the clean room of each decontamination
unit and a minimum of two (2) samples from adjacent
areas outside each containment, with preference of
location given to rooms adjacent to critical
barriers and/or the work area with a minimum of one
(1) sample for every 10,000 square feet of occupied
space adjacent to the work area.
c. In addition, samples shall be taken outside the
exhaust location, at entrances to the work area, and
from any interior space from which make up air is
drawn, and from areas such as stairwells, elevators,
and plenums which pass through the work area and are
in service.
3. Sample Analysis: The work in progress air samples shall
be analyzed by NIOSH Method 7400 Rules and shall be
analyzed within four hours from the start of the sample
collection by an analyst listed in the Asbestos Analyst
Registry of the American Industrial Hygiene Association.
Ten percent of the abatement samples shall be re-analyzed
for quality control purposes within 24 hours by a
laboratory as defined by NJAC 5-23:8.
4. Daily occupancy shall be allowed when the results of all
the air samples collected are less than or equal to 0.010
fibers/cc by Phase Contrast Microscopy.
5. If air levels exceed 0.010 f/cc outside the work area or
0.020 f/cc in the clean room of the decontamination unit,
the Asbestos Safety Technician shall implement the
Contingency Plan.
6. Pressure monitoring of work area.
a. Pressure differential shall be monitored by digital
manometers, provided by the Contractor, with
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 18
continuous printout. Sensor tubes used for
monitoring shall be placed so that the air
filtration devices shall not cause false readings.
b. One or more separate digital pressure monitoring
systems with continuous printout shall be provided
by the Contractor and installed near the entrance(s)
to each work area and between the work area and any
interior spaces from which make-up air is drawn.
c. The Asbestos Safety Technician shall zero and
calibrate the manometer at a minimum of every 4
hours. The Asbestos Safety Technician shall initial
the manometer tape for all manometer checks.
d. Written documentation of pressure differential shall
be provided to the Asbestos Safety Technician by
continuous printout from the installed monitoring
device. The Asbestos Safety Technician and the
contractor supervisor will ensure, prior to the
completion of the work shift, the integrity of the
containment site before workers depart.
e. The pressure differential shall be greater than or
equal to 0.05 inches w.c. for occupied buildings at
the pre-commencement inspection (at the time of
approval immediately prior to the start abatement
work).
f. In addition to providing a pressure differential
greater than or equal to 0.05 inches w.c. as
required for the pre-commencement inspection, a
smoke test shall be conducted to demonstrate that
the work area has been isolated properly and that
pressure differentials have been established to
prevent fiber migration from the work area.
g. If the air pressure differential drops below 0.05
inches w.c., the Asbestos Safety Technician and the
Contractor Supervisor shall investigate and evaluate
the engineering controls to determine the source of
the pressure loss.
h. If the pressure differential drops below 0.01 inches
w.c. the Asbestos Safety Technician shall implement
the Contingency Plan. The Asbestos Safety
Technician can institute additional requirements, if
necessary, as they see fit for the protection of
building occupants.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 19
7. Record Keeping: Record in a daily log all on-site
observations and required activities of the removal
specification and quality assurance program, (such as
smoke tests and negative air filtration unit pressure
gauge readings.)
E. Post Removal Test
Provide monitoring of the Work Area(s) during clean up, within
48 hours of final cleaning, and before removal of critical
barriers. This test is required to establish safe conditions
for removal of critical barriers and to permit reconstruction
activity to begin. Sufficient time following clean-up
activities shall be allowed so that all surfaces are dry
during monitoring.
1. Sampling Procedure: Filter cassettes and sampling train
shall be assembled as specified in (EPA 560/5-89-001)
Guidelines for Conducting the AHERA TEM Clearance Test to
Determine Completion of an Asbestos Abatement Project.
Pumps shall be calibrated before and after sampling and a
record kept of this calibration.
2. Sampling Frequency & Location: Take at least five
representative samples of each Work Area where asbestos-
containing materials have been removed. Five samples
outside the worker area and three field blanks.
3. Analysis: Transmission Electron Microscopy.
4. Time for Laboratory Analysis: Maximum turnaround time
upon completion of sample is seventy-two (72) hours after
submission of samples to the laboratory.
5. Evaluation Criteria: If test results exceed the
applicable clearance criteria, the Asbestos Safety
Technician shall inform the Contractor and the Owner. The
Contractor shall be required to re-clean all surfaces
using wet cleaning methods and provide negative HEPA
filtered exhaust air during the re-cleaning process.
This process of re-cleaning, allowing surfaces to dry and
retesting shall be repeated until compliance is achieved.
6. Certificate of Completion: When the evaluation criteria
are met, the Owner shall receive a Certificate of
Completion from the Asbestos Safety Technician.
F. Submission of Final Report
1. Upon completion of all asbestos removal work and of all
tests, the Asbestos Safety Technician shall submit a
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 20
written Final Report to the Owner, including copies of
all backup records documenting the day-by-day progress of
work and related tests. This report shall be presented
in logical form, neatly bound, and properly titled, dated
and signed. Any deviations from acceptable practice on
the part of the Contractor, and any unsatisfactory test
results reported during the course of the job, shall be
highlighted in the Report for record purpose
PART 2 - SCOPE OF WORK
2.1 DESCRIPTION OF WORK
A. This asbestos abatement project includes the removal of
asbestos containing generator exhaust pipe insulation and
multiple tank insulation(s). This work is being conducted to
facilitate the Forcina Hall HVAC and Roof Replacement Project.
B. All friable asbestos abatement will be performed in accordance
with New Jersey Administrative Code 5:23-8.
C. Where painted surfaces in the project scope are lead-based
paint, work shall be performed in accordance with OSHA
1926.62.
D. Remove all identified, assumed and/or contaminated asbestos-
containing materials in accordance with the project documents.
This asbestos abatement project will involve the removal of
the materials identified on drawings HZ-1 through HZ-6 and as
identified below. The following lists of materials are to be
abated by the asbestos abatement contractor. All materials
will be abated in accordance with N.J.A.C. 5:23-8.
Note: Non-friable materials are included in this specification
due to their location within the Subchapter 8 Work Area.
Location Material Est. Quantity
Basement Mechanical Room Tank Insulation 300 SF
Basement Mechanical Room Tank Insulation 60 SF
Basement Mechanical Room Tank Insulation 120 SF
Basement Mechanical Room Tank Insulation 60 SF
Basement Mechanical Room Tank Insulation 60 SF
Basement Mechanical Room Exhaust Pipe Wrap 60 LF
Basement Mechanical Room Gaskets 90 Pieces
Basement Mechanical Room Black Pipe Sealant 5 SF
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 21
2.2 OWNER RESPONSIBILITIES
A. The Owner will not occupy any portion of the work area during
the entire asbestos removal project including completion of
the reconstruction.
2.3 CONTRACTOR RESPONSIBILITIES
A. Prospective bidders should bid this project according to what
is observed during the pre-bid walkthrough and enclosed
herein.
B. It shall be the Contractor’s responsibility to verify the
exact quantities and locations of all materials. The
quantities provided herein are for informational purposes
only. The Owner and Brinkerhoff Environmental, Inc. assume no
responsibility for their accuracy, the accuracy of quantities
and /or descriptions of materials, or the accuracy of
descriptions of existing conditions.
C. Contractor is to provide all labor, materials, equipment,
appurtenances, services, testing, insurance, permits, and
agreements necessary to perform the work required for the
abatement of asbestos as required by these contract documents,
technical specifications and all applicable laws and
regulations.
D. Refer to the General Conditions of the Specification for
specific insurance requirements.
E. All work shall be performed in accordance with this
Specification, EPA regulations, OSHA regulations, New Jersey
Administrative Code 5:23-8, N.J.S.A. 34:5A-32 et seq.,
N.J.A.C. 12:120, NIOSH recommendations, and any other
applicable federal, state or local government regulations.
Whenever there is a conflict or overlap of the above
references the most stringent provisions are applicable.
F. During the abatement project, the Contractor shall be
responsible for security in all areas affected by his
operation for:
1. Building security, fire and smoke detection systems.
2. Maintaining the existing building and utility systems
such as plumbing or electrical installations and the
Contractor shall provide security to prevent unauthorized
entry into the work area, and maintenance of
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 22
decontamination chambers, isolation barriers and negative
air filtration devices and systems.
G. Should the failure of any utility occur, the Owner will not be
responsible to the Contractor for loss of time or other
expense incurred.
H. It is the Contractor’s responsibility to remove, treat and
dispose of all asbestos-containing, and/or contaminated,
materials from the areas as indicated within the facility.
I. It is the Contractors responsibility to leave all abated
surfaces, and all exposed remaining adjacent surfaces,
encapsulated.
J. Special Requirements:
1. Waste containers are to be placed as indicated on the
abatement plans or as approved by the Owner’s ASCM.
2. The Contractor shall provide and install digital
manometers required for this project in accordance with
N.J.A.C. 5:23-8, including one (1) spare unit.
3. The contractor shall maintain an off-hours manometer
watch from the issuance of the Notice to Proceed with
asbestos work by the onsite AST, to the successful
completion of final air testing. The manometer watch
must be maintained from the end of the work shift until
the next working day. The manometer watch must be
maintained 24 hours a day during the weekends and
holidays.
4. The contractor is responsible for providing fire watch
during off-hours, 24 hours a day including weekends and
holidays.
5. A licensed electrician is required and shall be trained
on use of a respirator and handling asbestos materials.
6. The contractor shall dismount all fire, electrical, and
mechanical fixtures and appurtenances required for proper
execution of this contract.
7. The Contractor shall have available on site a generator
capable of providing power to the negative air units in
the event of a power failure. In such an event, all work
shall stop until the generator is engaged and negative
air pressure restored.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 23
K. The Contractor shall strictly adhere to all precautions
necessary for the safety and health of the workers in
accordance with provisions of OSHA Standards 29 CFR Parts 1910
and 1926.
2.4 SUBMITTALS
A. Before start of work, submit the following to the Designer for
review.
NOTE: Do not start work until these submittals are returned
with the Designer's approval indicating that the submittal is
returned for unrestricted use.
1. GHS Compliant Safety Data Sheets in accordance with the
OSHA Hazard Communication Standard (29 CFR 1910.1200) for
the following:
a. Surfactants.
b. Encapsulants.
c. Solvents.
2. NESHAP Certification: Submit certification from
manufacturer of surfactant or removal encapsulant that,
to the extent required by this specification, the
material, if used in accordance with manufacturer's
instructions, will wet Asbestos-Containing Materials
(ACM) to which it is applied as required by the National
Emission Standard for Hazardous Pollutants (NESHAP)
Asbestos Regulations (40 CFR 61, Subpart M).
2.5 USE OF BUILDING FACILITIES
A. Temporary Facilities: Refer to General Conditions for an
explanation and breakdown of responsibility.
2.6 USE OF THE PREMISES
A. Contractor shall confine his apparatus, the storage of
materials, and supplies, and the operation of his workmen to
limits established by law, ordinances, and the directions of
the ASCM. All flammable or combustible materials shall be
properly stored to obviate fire and in areas approved by the
Owner.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 24
B. Contractor shall assure that no exits from the building are
obstructed, that appropriate safety barriers are established
to prevent access, and that Work Areas are kept neat, clean,
and safe.
C. All surrounding work, fixtures, soil lines, drains, water
lines, gas pipes, electrical conduit, wires, utilities, duct
work railings, shrubbery, landscaping, etc. which are to
remain in place shall be carefully protected and, if disturbed
or damaged, shall be repaired or replaced as directed by the
Owner, at no additional cost.
D. All routes through the building to be used by the Contractor
shall first be approved by the ASCM and the Owner.
E. Attention is specifically drawn to the fact that other
Contractors, performing the work of other Contracts, may be
(or are) brought upon any of the work sites of this Contract.
Therefore, the Contractor shall not have exclusive rights to
any site of his work and shall fully cooperate and coordinate
his work with the work of other Contractors who may be on (or
are on) any site of the work of this Contract. Regulated area
excepted.
2.7 WORK AREA PREPARATION
NOTE: Prior to initiating any preparation work, verify that the
Owner's Air Monitoring Firm has performed any necessary pre-test(s).
A. Inspection of the work area shall be made by representatives
of the Contractor and Owner before any work is initiated to
inventory any existing equipment. Special requirements
regarding live electric within the work area will be
identified and confirmed.
B. Caution signs shall be provided and displayed in accordance
with Section 1910.1001(g) of OSHA regulations, General
Conditions, Supplementary Conditions and Division 1-General
Requirements section of the specifications.
C. All electric must be shut down and shall be tagged and locked
out in the work area.
D. The following minimum locations for continuous area air
monitoring have been selected for each full containment work
area. The contractor shall ensure that power is available at
the following locations:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 25
1. One sample in the clean room of each decontamination
unit.
2. One sample along worker/waste route outside of the clean
room.
3. One sample outside each critical barrier to each work
area.
4. One sample inside each work area.
5. One sample in the vicinity of the outdoor exhaust
location.
E. The samples shall be collected continuously throughout each
work shift. In the event that unacceptable airborne fiber
concentrations are detected in the building the extent of
contamination shall be determined by area air sampling, an
attempt shall be made to find the cause of the contamination,
the area shall be wet-wiped and HEPA vacuumed, and the area
shall be re-sampled in order to determine if the area can be
reoccupied. The area shall be reoccupied only if airborne
fiber concentrations are less than or equal to 0.01 fibers/cc.
F. Sequence Of Work
1. The following preparations shall be performed in the
stated order utilizing protective clothing and approved
respirators. These respirators shall be at least half-
face or full-face double cartridge respirators approved
by NIOSH for use in atmospheres containing asbestos. If
cartridge respirators are used, fit testing must be
performed. If powered air purifying respirators with
HEPA filters or supplied-air respirators are used, then
fit testing is not required.
a. Isolate the Work Area and provide an approved
decontamination facility. If the decontamination
unit is located outside of the building, it shall be
framed with 2" x 4" studs 16" O.C. and shall be
covered with plywood and a minimum of 2-layers of 6-
mil polyethylene sheeting. All chambers shall be a
minimum size of 4' x 4'.
b. Separation Barriers – construct separation barriers
in accordance with NJAC 5:23-8 to separate the work
area and dedicated contractor egress route from
occupied areas of the building.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 26
c. If make-up air is to be drawn through the separation
barriers, a backflow preventer must be installed at
such openings.
d. Primary Barriers - cover all floor and wall surfaces
in the Work Area with plastic sheeting taped or
fastened securely in place to protect such surfaces
from water damage and to prevent contamination of
those surfaces. Floors shall be covered with a
double thickness of 6 mil polyethylene plastic
before the walls are covered. Plastic used to cover
floors shall run up the bottom of all adjacent walls
and be fastened at least 12 inches and 24 inches up
from the floor. The walls shall then be covered
with 2 layers of 6 mil polyethylene plastic,
supported at the top and of sufficient length to
reach the floor. Wall covering shall be sealed to
the plastic floor covering. This method of overlap
will help to protect the floor surfaces from water
damage and contamination. Floor drains shall be
sealed individually then the floors shall have a
minimum of two thicknesses of six-mil thick
polyethylene sheeting.
NOTE: In the event that the adhesive material used to
secure the plastic sheeting is found to be of
insufficient strength to support the weight of the
plastic barriers, then the Contractor shall use a
suitable stronger method of securing the plastic
sheeting (e.g. spray-on adhesive, glue beads,
horizontal wood battens). All securing procedures
shall be of first class workmanship. The contractor,
at his expense, shall restore any and all damaged
areas prior to completion of projects, which occur as
a result of barrier securing.
e. Critical Barriers - completely seal off all openings
to the Work Area, including but not limited to,
ducts, floor drains, doorways, corridors, windows
and skylights with two layers of six-mil plastic
sheeting taped securely in place or fastened by
spray-on adhesives, glue beads, or horizontal wood
battens.
f. Detach and clean removable electrical, heating and
ventilating equipment and other items connected to
asbestos surfaces if they are to be reused. These
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 27
items shall be removed from the work area using
decontamination procedures.
g. Clean with wet cloth or vacuum cleaner equipped with
High Efficiency Particulate Absolute (HEPA) filters,
all items and equipment, which can be removed
without disrupting the asbestos material. Cloths
and filters used for cleaning shall be disposed of
as contaminated waste.
h. Wet clean all non-removable items including built-in
equipment, in the work area and cover with two (2)
layers of six-mil thick plastic sheeting taped
securely in place.
i. Remove filters from all heat, ventilating, and air
conditioning systems located within the work area
and pack them in sealed 6 mil minimum double
thickness plastic bags, labeled for disposal as
asbestos containing waste. These bags should be
handled in the same manner as removed asbestos. The
filters should be replaced with new filters as a
final step in the decontamination process after the
final visual inspection and re-occupancy air
sampling.
j. Place work area under negative air pressure
utilizing HEPA filtration systems. Maintain
negative air pressure in work area continuously from
the start of asbestos removal until successful
completion of final clearance air testing. The
exhaust of all negative air machines must be
discharged to the outside of the building. Maintain
a minimum of 0.05 inches of water column and
negative air pressure and four (4) complete air
changes per hour of the work area. When determining
the number of negative air units, assume the actual
field measured available capacity.
Volume (ft3) x 4 = CFM Required
60 min
CFM Required = # Unit/s
Available Capacity/s (CFM)
k. In addition to the above requirements, two spare
HEPA filtration air movement machines will be kept
for each work area for use in the event of equipment
failure, filter changes, and other maintenance.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 28
l. The Asbestos Safety Technician on site shall request
that the Contractor replace any negative air unit
that does not appear to be up to the task of
reliable, continuous operation. All negative air
unit exhaust shall be routed to the outside of the
building.
m. The Contractor shall supply at least one (1)
manometers per work area, and shall have one backup
unit available. Manometers shall be equipped to
produce a continuous reading strip chart recording
and shall remain in operation at all times regulated
area is under negative air pressure.
2. Asbestos removal will not begin until the decontamination
chamber and work site preparations are approved by the
Asbestos Safety Technician.
2.8 FULL CONTAINMENT REMOVAL METHODS FOR FRIABLE MATERIALS
A. The asbestos material shall be sprayed with water containing
and additive to enhance penetration (amended water). The
additive, or wetting agent, shall be 50% polyoxyethylene ester
and 50% polyoxyethylene ether at a concentration of 1 oz./5
gal. of water or approved equivalent. A fine low pressure
spray of this solution shall be applied to prevent fiber
disturbance preceding removal. Saturate the material
sufficiently to prevent emission of airborne fibers in excess
of 0.1 fibers/cc. The amended water shall be sprayed on as
many times and as often as necessary to ensure that the
asbestos material is adequately wetted throughout (especially
that asbestos nearest the substrate) to prevent dust emission
as specified in the OSHA regulations. No dry removal of
asbestos is allowable.
B. Removal of the asbestos material shall be done in small
sections by two person teams.
C. Workers shall begin working on the areas nearest to the
decontamination unit and work towards the negative air units.
D. The wet asbestos-containing material from each section shall
be picked up with rubber pans and rubber squeegees and then be
packed and sealed into labeled 6 mil plastic bags prior to
starting the next section to prevent the material from drying.
Metal shovels shall not be used to pick up or move asbestos
waste. Water-soaked fallen material shall not be left out of
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 29
bags overnight or for more than four hours to prevent loss of
its water content due to evaporation.
E. Plastic bags will not be effective when wire or wood lath and
similar sharp-edged materials are involved in asbestos
removal. Therefore, contaminated material containing
sharp-edged items shall be cut to size while adequately wet,
placed in small cardboard boxes and double bagged, or singly
bagged and then placed in temporary fiber drums.
F. All waste shall be disposed in accordance with New Jersey
Department of Environmental Protection requirements and the 40
CFR Part 61, Subpart M. The outside of all containers shall
be wet-cleaned or HEPA vacuumed before leaving the Work Area.
All vacuum cleaners shall be equipped with HEPA filters.
NOTE: Regulations prescribes a leak-tight container, the
integrity of which is the Contractor's responsibility until
after deposition at a sanitary landfill. Therefore, caution
must be used in the choice of container types and
consideration given to the method of unloading at the
landfill. Fragile containers shall be unloaded by hand to
prevent rupture and possible airborne emissions.
G. After completion of this removal phase (stripping), all
surfaces from which asbestos has been removed shall be
scrubbed using a nylon bristle brush and/or wet cleaned to
remove all visible asbestos containing material. During this
work, the surfaces being cleaned shall be kept wet using
amended water. All disposable equipment shall be packaged for
disposal. Containers shall be washed with amended water and
shall have all exterior particulate matter removed prior to
removal from the contaminated area.
H. All equipment and asbestos waste containers shall be
decontaminated and removed from the enclosure as follows:
1. While still in the Work Area, clean all external surfaces
of equipment and containers by wet sponging or HEPA
vacuum.
2. After gross decontamination in Work Area, move equipment
and containers into Equipment Wash Room for complete
decontamination.
3. Periodically, workers dressed in clean disposable
coveralls shall enter the Holding Area from
uncontaminated areas to remove clean equipment and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 30
containers. Do not enter Equipment Wash Room when
removing equipment and containers.
I. All free water (in contaminated areas) shall be retrieved and
added to asbestos contaminated waste and then placed in
plastic lined leak-tight container for disposal.
J. Waste removal (bag out) shall occur at the end of each work
shift. The AST shall be continuously present during waste
removal. Bulk waste and decontaminated non-asbestos materials
shall be removed through the same egress route to the
exterior.
K. Initial Clean-up
The following procedures must be accomplished utilizing
protective clothing and approved respirators and with the work
area under negative pressure:
1. The Contractor shall first clean all surfaces in the Work
Area using disposable cloths wetted with amended water.
These cloths shall be disposed of or rinsed thoroughly on
a frequency sufficient to eliminate visible accumulation
of debris. Then, when these surfaces have been allowed
to dry sufficiently, all surfaces shall be cleaned again
using a HEPA filtered vacuum.
NOTE: A HEPA vacuum will fail if used on wet material.
L. Surface Sealing
After completion of cleaning all exposed surfaces in the Work
Area, and after the Contractor receives a satisfactory pre-
sealant inspection the Contractor shall proceed with the
following steps:
1. Spray coat all exposed surfaces with a binding agent such
as an encapsulant. The surfaces to be coated shall
include surfaces from which asbestos containing materials
have been removed (such as walls, ceilings, floors,
structural steel, decking, ducting, pipes, etc.) and
polyethylene which has been used to cover walls, floor
and non removable fixtures, and equipment. Over spray
from ceiling, walls, fixtures and equipment will usually
be sufficient to coat floor coverings. Plastic used to
maintain critical barriers between Work Areas and Clean
Areas such as those in doorways, windows, light fixtures,
clocks, speakers and air vents shall not be removed until
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 31
air monitoring is completed and satisfactory results have
been obtained.
2. After spray coating the plastic sheeting used to protect
floors, walls, fixtures and equipment, (Primary
Barriers), the plastic shall be carefully removed and
rolled up with the contaminated portion inside and
packaged for disposal. Wet clean all walls, floors,
woodwork, ceilings, electric light fixtures and other
surfaces.
M. Final Clean-up
The following operation shall be performed under negative air
conditions with respirators and protective clothing:
1. All walls, floors and other surfaces shall be cleaned
with damp cloths and/or HEPA vacuumed.
2. After the first cleaning, the Contractor shall wait a
sufficient time to allow the settlement of dust and then
wet clean all surfaces in the Work Area again and allow
to dry. Cleaning shall continue until all visible
residues have been removed, including dust, grit and
other particulate matter.
3. Cleaning shall continue until all visible residues have
been removed, including dust, grit and other particulate
matter.
4. Cloths, sponges, etc. used in the cleaning operation
shall be disposed of as contaminated waste.
N. After completion of the cleaning operation, the Contractor
shall:
1. Notify the Owner's Testing Firm that a post removal
inspection can be performed to insure all visible
asbestos has been removed and the area is dust free. The
Owner's Testing Firm will conduct an aggressive visual
inspection of all Work Areas. In addition to a visual
inspection conducted at the floor level, the Testing Firm
shall inspect all exposed surfaced in the work areas,
including those at the ceiling level (using ladders as
necessary), to ensure that no visible asbestos containing
materials have been left above the ceiling, structural
members or other surfaces. All visible residues must be
removed before air monitoring can be performed.
2. Request air monitoring of the Work Area by the Owner's
Testing Firm within 48 hours of a favorable visual
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 32
inspection in accordance with N.J.A.C. 5:23-8.21 (c) .
The Owner's Testing Firm will then conduct overall work
area clearance testing under simulated conditions of
normal building occupancy known as aggressive sampling as
indicated in the Owner's Project Monitoring
Specifications. Fans with a minimum radius of 1' shall
be used in each room to be monitored to stir up any
residual invisible fibers such as would be entrained in
the air by the pedestrian traffic under conditions of
normal occupancy. Forced air equipment, such as a 1
horsepower leaf blower, will be used to suspend
particulate which may be clinging to walls, ceilings,
floors, ledges and other surfaces. Asbestos fiber
concentrations shall not exceed 70 structures/mm2.
3. Air monitoring results shall meet the following:
a. The concentration shall not exceed 70
structures/mm2.
NOTE: This test is required before critical barrier
removal and reconstruction activities may begin. It
shall be sufficient for final air quality monitoring for
building occupancy.
b. If test results show asbestos fiber concentrations
to be greater than 70 structures/mm2, the cleanup
shall be repeated until compliance is achieved. Re-
clean all surfaces and operate the HEPA equipped
Negative Air Filtration Units to exhaust air outside
the Work Area to filter the air.
O. Reconstruction
After the Work Area is found to be in compliance with Part J
above, (less than 70 structures/mm2) the following tasks shall
be performed by the Contractor:
1. All critical barriers shall be unsealed.
2. All remaining plastic sheeting, tape and any other debris
shall be disposed of in sealed plastic bags labeled as
asbestos contaminated waste.
3. The inside of windows shall be washed.
4. Any walls, floors, trim, doors, furniture or other items
damaged during the work shall be repaired and refinished
to match existing material.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 33
5. Woodwork, trim, floor, furniture, plumbing and electric
light fixtures shall be cleaned.
6. Clothes or sponges used in the cleaning operation shall
be disposed of as contaminated waste.
7. There shall be no residue left on floors, ceilings,
electric light fixtures or any other surfaces.
2.9 STANDARD OPERATING PROCEDURES
A. Develop and implement a written standard procedure for
abatement work to ensure maximum protection and safeguard from
asbestos exposure of the workers, the non-work areas of the
school, visitors, employees, public, and environment.
B. The standard operating procedure shall ensure:
1. Tight security from unauthorized entry into the
workspace.
2. Restriction of Contractor's personnel to the immediate
Work Area and access/egress routes.
3. Donning of proper protective clothing and respiratory
protection prior to entering the Work Area.
4. Safe work practices in the work place, including
provisions for inter-room communication, exclusion of
eating, drinking, smoking, or in any way breaking the
respiratory protection.
5. Proper exit practices from the work space to the outside
through the showering and decontamination facilities.
6. Removing asbestos in ways that minimize release of
fibers.
7. Packing, labeling, loading, transporting, and disposing
of contaminated material in a way that will minimize
exposure and contamination.
8. Emergency evacuation procedures, for medical or safety
situations, to minimize the potential exposure to
airborne asbestos fibers for emergency personnel,
building occupants, and building environment.
9. Safety from accidents in the workspace, especially from
electrical shocks, fall hazards associated with
scaffolding, slippery surfaces, and entanglements in
loose hoses and equipment. The safety procedures outlined
in the General Conditions, Supplementary Conditions and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 34
the Division 1-General requirements section of the
specifications must be adhered to as well.
10. Provisions for effective supervision, air monitoring and
personnel monitoring for exposure during the work.
11. Engineering systems that minimize exposure to fibers
within the workspace.
2.10 NOTIFICATIONS, PERMITS, WARNING SIGNS, LABELS AND POSTERS
A. Erect bilingual (English-Spanish) warning signs around the
work space and at every point of potential entry from the
outside and at main entrance to building which can be viewed
by the public without obstruction, in accordance with OSHA 29
CFR 1926.58 (K) (Sign Specifications) and N.J.A.C. 5:23-8. The
warning signs shall be a bright color so that they will be
easily noticeable. The size of the sign and the size of the
lettering shall be no less than OSHA requirements.
B. Provide the required labels for all polyethylene bags and all
drums utilized to transport contaminated material to the
landfill in accordance with OSHA 29 CFR 1926.58 (K)(2) and by
49 CFR Parts 171 and 172 of the Department of Transportation
regulations.
C. Provide any other signs, labels, warnings, and posted
instructions that are necessary to protect, inform and warn
people of the hazard from asbestos exposure. Post in a
prominent and convenient place for the workers a copy of the
latest applicable regulations from OSHA, EPA, NIOSH, New
Jersey and any additional items mandated for posting by the
aforementioned regulations.
D. The ASCM shall obtain all local permits required to perform
the Work. It is the responsibility of the contractor to
verify that all permits have been acquired.
2.11 EMERGENCY PRECAUTIONS
A. Establish emergency and fire exits from the Work Area. The
clean side of all emergency exits shall be equipped with two
full sets of protective clothing and respirators at all times.
B. Notify local medical emergency personnel, both ambulance crews
and hospital emergency room staff prior to commencement of
abatement operations as to the possibility of having to handle
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 35
contaminated or injured workmen, and shall be advised on safe
decontamination.
C. Prepare to administer first aid to injured personnel after
decontamination. Seriously injured personnel shall be treated
immediately or evacuated immediately for decontamination. When
an injury occurs, precautions shall be taken to reduce
airborne fiber concentrations (i.e. misting of the air with
water) until the injured person has been removed from the Work
Area.
D. Notify, before actual removal of the asbestos material, the
local police and fire departments to the danger of entering
the Work Area. Contractor shall make every effort to help
these agencies form plans of action should their personnel
need to enter the contaminated area.
2.12 PROTECTION AND DAMAGE
A. The Contractor will replace or repair any items damaged, due
to work performed under this contract, equal to their original
construction and/or finish. All repaired or replaced items
will be subject to the Owner’s approval.
B. Use rubber-tire vehicles, which use non-volatile fuels for
conveying material inside the building and provide temporary
covering, as necessary to protect floors.
C. No materials shall be thrown from windows or doors of the
building. Building waste systems shall not be used to remove
refuse.
D. Debris shall be removed from the site daily. Premises shall
be left neat and clean after each work shift, so that work may
proceed the next regular work day without interruption or
delay.
E. Protect all floors from damage, wear and/or staining.
2.13 RESPIRATORY PROTECTION AND PROTECTIVE CLOTHING
A. Protective clothing shall consist of disposable full body
coveralls with hoods and boots attached. Separate disposable
head covers and foot covering may be substituted if disposable
coveralls without attached hoods and booties are used.
Additional clothing shall include rubber boots and gloves as
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 36
per the variance. Eye protection and hard hats shall be
available.
B. Contractors may choose between three types of respiratory
protection as specified. In order of increasing effectiveness
they are:
1. Half-face or full-face, negative pressure respirators
equipped with dual cartridge HEPA filters and certified
by the National Institute for Occupational Safety and
Health (NIOSH) for use in atmospheres containing
asbestos.
2. Powered air-purifying respirators certified by NIOSH for
use in atmospheres containing asbestos.
3. Type "C" supplied-air respirators, either continuous flow
or pressure demand class as certified by NIOSH.
a. (NOTE: Disposable paper respirators are
unacceptable.)
C. The Contractor shall require that each person entering the
Work Area shall wear an approved respirator and protective
clothing. There shall be no exceptions to this rule.
D. The Contractor shall have available sufficient inventory of
protective clothing, respirators, and filter cartridges.
Personal protective equipment inventory shall exceed by a
minimum of 100% the expected daily person-day usage.
E. The Contractor shall provide respirators and disposable
clothing to the Asbestos Safety Technician and any other
visitor authorized by the Client.
2.14 WORKER EXPOSURE AIR MONITORING
A. In addition to the independent air-monitoring firm hired by
the Client, the Contractor shall arrange for air monitoring to
be conducted in all work Areas in accordance with 29 CFR
1926.1101 of OSHA regulations, on behalf of the Contractor's
employees. The Testing Laboratory employed by the Contractor
shall be accredited by the American Industrial Hygiene
Association for Asbestos or participate and show proficiency
in the NIOSH (National Institute for Occupational Safety
Health) PAT (Proficiency Analytical Testing) program for
airborne asbestos.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 37
B. Personal samples shall be obtained from employees engaged in
each of the following operations; asbestos removal (i.e.
spraying, scraping and brushing), disposal (i.e. bagging) and
clean up. Representative sampling shall be repeated in the
event of major changes in the removal operation. This
sampling shall be done with the sampling media and flow rates
specified in the OSHA Reference (Method 7400 A rules).
Samples shall be taken for the determination of the 8-hour
time weighted average airborne concentration and of the
ceiling concentrations of asbestos fibers.
C. The results of the Contractor's air monitoring tests (Subpart
B above) shall be returned within 24 hours; copies shall be
provided to each employee monitored as specified by OSHA
Regulation 29 CFR 1910.20.
D. The Contractor shall examine these results and evaluate the
effectiveness of the controls in use (wet methods, exhaust
units and respiratory protection). Copies of these monitoring
tests shall be provided to the Client's Asbestos Safety
Technician. Copies shall also be made available upon request
to representatives of Local, State, or Federal enforcement
agencies.
2.15 DISPOSAL OF ASBESTOS WASTE
A. All asbestos waste materials destined for disposal shall be
wetted and packaged in permanently-sealed, leak-tight
containers (such as six-mil plastic bags) appropriately
labeled in accordance with Title 40 CFR 61.152 before it can
be legally transported and disposed of. Labels must indicate
the name of the generator and the location where the waste was
generated as per the NESHAP revision published November 20,
1990, in the Federal Register.
B. The deposition of all asbestos-containing material must be at
waste disposal sites operated in accordance with the
provisions of Title 40 CFR 61.156. Copies of asbestos waste
manifests and/or other receipts issued by the approved dump
site must be provided to the Owner for each load of asbestos-
containing material.
C. A notification of intent to dispose of asbestos shall be sent
to the New Jersey Department of Environmental Protection at
least 10 days prior to actual disposal.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 38
D. All asbestos waste materials destined for disposal in New
Jersey shall be wetted and packaged in permanently sealed,
leak-tight containers (such as 6-mil plastic bags, double
bagged with visible labels) in accordance with 40 CFR 61.20-25
before it can be legally transported and disposed of in New
Jersey. No haulage of loose asbestos is permitted.
E. The notification of C above shall include the following:
1. Name, address, and telephone number of the removal
project.
2. Quantity and nature of the waste to be disposed.
3. Name, address, and New Jersey Department of Environmental
Protection registration number of the collector-handler.
4. Name and address of the landfill at which disposal will
occur.
5. Date and time of disposal.
6. A copy of any written notification required by 40 CFR
61.22 to 61.25.
F. Asbestos waste, which is properly packaged, shall be disposed
of at a landfill, which is registered, by the New Jersey
Department of Environmental Protection in conformance with the
following:
1. The landfill used must be registered by the New Jersey
Department of Environmental Protection to accept Waste ID
#27.
2. The specific landfill facility chosen must be one
designated by the New Jersey Department of Environmental
Protection as the recipient facility for the community in
which the removal project is located.
3. The waste hauler must possess a valid solid waste
transporter registration issued by the New Jersey
Department of Environmental Protection. A licensed solid
waste transporter shall be a commercial collector/hauler
or shall be the removal company if they are so
registered.
4. Asbestos waste can be hauled in dumpster containers
provided the load is comprised only of asbestos in bags
and does not contain any other wastes or asbestos-
containing wastes which could compromise the integrity of
the permanent containers.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 39
5. If rough surfaces or other materials are present in the
load, which could potentially puncture the permanent
containers, then those containers shall be enclosed in
temporary fiber or steel drums during loading, transport,
and unloading operations. In addition, asbestos wastes
shall not be loaded into or hauled with vehicles
containing compactor devices.
6. To determine which landfill to use for a particular
project, N.J.A.C. 7:26-6.5 shall be consulted.
7. A certificate of completion shall not be issued by the
AST until the waste disposal unit has been removed from
the work site.
8. Locations of waste containers must be coordinated with
the ASCM Firm prior to being dropped by the waste hauler.
9. The waste container must be a fully enclosed unit with a
lockable door or lid.
2.16 CONTINGENCY PLAN
A. In the event airborne asbestos concentrations in excess of
0.01 fibers per cubic centimeter of air are detected outside
the Work Area or the pressure differential drops below 0.05
inches w.c. this contingency plan must be implemented
immediately by the Asbestos Removal Contractor under the
direction of the Asbestos Safety Technician.
B. In the event the pressure drops below 0.05 inches w.c. the
Asbestos Safety Technician and Contractor Supervisor shall
immediately inspect and evaluate all critical barriers and
make any necessary repairs. Investigate and evaluate all
engineering controls to determine the source of the pressure
loss. The Contractor shall institute corrective action such
as additional sealing, critical barrier maintenance, and
construction, changing exhaust unit filters, adjustment of
make-up air, operation of additional exhaust units and/or
other necessary measures to reestablish an acceptable pressure
differential.
If the pressure drops below 0.01 inches w.c. the following
procedures must be implemented:
1. The Contractor shall cease abatement activity in the work
area.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 40
2. The Asbestos Safety Technician and Contractor Supervisor
shall immediately inspect and evaluate all critical
barriers and make any necessary repairs. Investigate and
evaluate all engineering controls to determine the source
of the pressure loss.
3. The Contractor shall institute corrective action such as
additional sealing, critical barrier maintenance, and
construction, changing exhaust unit filters, adjustment
of make-up air, and operation of additional exhaust units
and/or other necessary measures to reestablish an
acceptable pressure differential.
4. Re-occupancy shall not be permitted in any area unless a
pressure differential of 0.05 inches of w.c. or greater
is re-established.
5. If a pressure differential of 0.05 inches of w.c. or
greater is not reestablished within 24 hours of the first
reading below 0.01 inches of w.c. then the building shall
be evacuated.
C. If air sample results exceed 0.010 f/cc the following
procedures shall be implemented:
1. The Asbestos Safety Technician and Contractor Supervisor
shall immediately inspect and evaluate all critical
barriers and make any necessary repairs. Investigate and
evaluate all engineering controls to determine the source
of the high air level.
2. Collect an additional (second) PCM air sample at each
place where a high air sample result was detected. If
the second result is less than or equal to 0.01 f/cc the
contingency plan is terminated. If the result of the
second air sample still exceeds the 0.01 f/cc the ASCM
has the option to reclean or submit and analyze the
sample by transmission electron microscopy. If the
sample still exceeds the 0.01 f/cc criteria then cleaning
shall be undertaken. Cleaning and resampling shall be
undertaken until the affected area(s) pass the 0.01f/cc
criteria. Reoccupancy in any area that exceeded the 0.01
f/cc criteria cannot occur until each area has passed the
0.01 f/cc criteria.
3. Cleaning shall include but not be limited to wet wiping
and misting the air. Cleaning the affected area shall be
continued outside the containment and PCM sampling shall
also be continued until the result in the area is equal
to or less than 0.01 f/cc by either PCM or TEM analysis.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 41
4. If laboratory analysis of air samples does not yield a
reading of less than or equal to 0.01f/cc within 24 hours
receipt of the first test above 0.010 f/cc. then the
building shall be evacuated.
5. Re-occupancy in any area that exceeded the 0.01 f/cc
criteria cannot occur until each area has passed the 0.01
f/cc criteria.
D. If a power outage occurs when the building is occupied
occupancy will not be permitted until air samples determine
that the spaces to be occupied are safe and power has been
restored.
PART 3 - PRODUCTS
3.1 QUALITY
A. Deliver all materials to the job site in their manufacturer's
original container, with the manufacturer's label intact and
legible.
1. Maintain packaged materials with seals unbroken and
labels intact until time of use.
2. Store all materials on pallets, away from any damp and/or
wet surface. Cover materials in order to prevent damage
and/or contamination.
3. Promptly remove damaged materials and unsuitable items
from the job site, and promptly replace with material
meeting the specified requirements, at no additional cost
to the Owner.
B. The Asbestos Safety Technician may reject as non-complying
such material and products that do not bear satisfactory
identification as to manufacturer, grade, quality and other
pertinent information.
3.2 MATERIALS
A. Wetting agent shall be an approved surfactant specified by the
manufacturer for use in asbestos abatement.
B. Acceptable sealants shall be:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 42
1. Sealing material shall be both penetrating and bridging
and may be applied by a one or two coat system and shall
meet the following criteria:
a. ASTM Standard E84-84
b. Class A Fire Rating Flame Spread: 0-25
Fuel Contribution: 10
Smoke Density: 5
c. Underwriters Laboratory approval for Class 1A.
C. Framing Materials and Doors: As required to construct
temporary decontamination facilities and Isolation Barriers.
Lumber shall be high grade, new, and fire retardant.
D. Fire Retardant Polyethylene Sheeting: minimum uniform
thickness of 6-mil. Provide largest size possible to minimize
seams.
E. Fire Retardant Reinforced Polyethylene Sheeting: For covering
floor of decontamination units, provide translucent, nylon
reinforced or woven polyethylene laminated, fire retardant
polyethylene sheeting. Provide largest size possible to
minimize seams, minimum uniform thickness 6-mil.
F. Drums: Asbestos transporting drums, sealable and clearly
marked with warning labels as required by OSHA and EPA.
G. Polyethylene Disposal Bags: Asbestos disposal bags, minimum of
6-mil thick. Bags shall be clearly marked with warning labels
as required by OSHA and EPA.
H. Signs: Asbestos warning signs for posting at perimeter of Work
Area, as required by OSHA and EPA.
I. Waste Container Bag Liners and Flexible Trailer Trays: One
piece leak-resistant flexible tray with absorbent pad, as
manufactured by Packaging Research and Design Corporation or
approved equivalent.
J. Tape: Provide tape, which is of high quality with an adhesive,
which is formulated to aggressively stick to sheet
polyethylene, as manufactured by Kendall Co., NASHUA Tape
Products; or approved equivalent.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 43
K. Spray Adhesive: Provide spray adhesive in aerosol cans which
is specifically formulated to stick tenaciously to sheet
polyethylene, as manufactured by 3M; NASHUA Tape Products; or
approved equivalent.
L. Flexible Duct: Spiral reinforced flex duct for air filtration
devices.
M. Disposable Coveralls: Dupont “Blockade” as manufactured by
Dupont Company of,” Kleenguard Limited USE Coveralls” or
“Duraguard” coveralls as manufactured by Kimberly Clark
Corporation, or approved equivalent.
3.3 TOOLS AND EQUIPMENT
A. Air Filtration Device (AFD): AFDs shall be equipped with High
Efficiency Particulate Air (HEPA) filtration systems and shall
be approved by and listed with Underwriter's Laboratory. Air
filtration devices shall be “Microtrap” as manufactured by
Asbestos Control Technology, or “RAM AIR 2M” as manufactured
by Aramsco, or “Environmental Ltd., 300” as manufactured by
Torchcross Agency Environmental, or approved equivalent.
B. Scaffolding: All scaffolding shall be designed and constructed
in accordance with OSHA (29 CFR 1926/1910), New Jersey
Building Code, and any other applicable federal, state and
local government regulations. Whenever there is a conflict or
overlap of the above references the most stringent provisions
are applicable. All scaffolding and components shall be
capable of supporting without failure a minimum of four times
the maximum intended load, plus an allowance for impact.
1. Provide non-skid surface on all scaffold surfaces subject
to foot traffic. Scaffold ends and joints shall be
sealed with tape to prevent penetration of asbestos
fibers.
2. Equip rungs of all metal ladders, etc., with an abrasive,
non-slip surface.
C. Transportation Equipment: Transportation Equipment, as
required, shall be suitable for loading, temporary storage,
transit and unloading of contaminated waste without exposure
to persons or property. Any temporary storage containers
positioned outside the building for temporary storage shall be
metal, closed and locked.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 44
D. Vacuum Equipment: All vacuum equipment utilized in the Work
Area shall utilize HEPA filtration systems. Vacuum equipment
shall be as manufactured by Nilfisk of America (Models. GS 81
or GS 83) or approved equivalent.
E. Vacuum Attachments: Soft Brush Attachment, Asbestos Scraper
Tool, Drill Dust Control Kit.
F. Electric Sprayer: An electric airless sprayer suitable for
application of encapsulating material and shall be approved by
and listed with Underwriters Laboratory.
G. Water Sprayer: The water sprayer shall be an airless or other
low-pressure sprayer for amended water application.
H. Portable Shower: For personnel decontamination, Enviro-Clean
by CRSI; Aero-Porta Shower; or approved equivalent.
I. Water Atomizer: Powered air-misting device, equipped with a
ground fault interrupter and equipped to operate continuously.
Water atomizer device shall be the “Tri-Jet DS”, No. 6228, as
manufactured by Fogmaster Corp., or EM 490 Portable
Electrical/Airless Sprayer as manufactured by Graco, Inc., or
approved equivalent.
J. Brushes: All brushes shall have nylon bristles. Wire brushes
are excluded from use due to their potential to shred asbestos
fibers into small, fine fibers. Wire brushes maybe used for
cleaning pipe joints within glove-bags upon written approval
of the Resident Engineer.
K. Hand Power Tools: shall be equipped with HEPA-filtered local
exhaust ventilation if used to drill, cut into or otherwise
disturb ACM.
L. Other Tools and Equipment: Contractor shall provide other
suitable tools for the stripping, removal, encapsulation, and
disposal activities including but not limited to: hand-held
scrapers, sponges, rounded-edge shovels, brooms, and carts.
M. Fans and Leaf Blower: Provide Leaf Blower (one leaf blower per
floor) and one 20-inch diameter fans for each 10,000 cubic
feet of Work Area volume to be used for aggressive sampling
technique for clearance air testing.
N. Fire Extinguishers: Provide type “A” fire extinguishers for
temporary offices and similar spaces where there is minimal
danger of electrical or grease-oil-flammable liquid fires. In
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 45
other areas, provide type “ABC” dry chemical extinguishers of
NFPA recommended types for the exposure in each case. All
fire extinguishers shall comply with the applicable
recommendations of NFPA Standard 10, “Standard for Portable
Extinguishers.” Provide a minimum of four fire extinguishers
in each Work Area; one in the equipment room of the
decontamination unit, one outside the Work Area in the clean
room or directly outside same, and two fire extinguishers
where they are most effective for their intended purpose. Do
not exceed seventy-five feet between fire extinguishers within
the Work Area.
O. First Aid Kits: Contractor shall maintain adequately stocked
first aid kits in the clean rooms of the decontamination units
and within Work Areas. The first aid kit shall be approved by
a licensed physician for the work to be performed under this
Contract.
P. Water Service:
1. Refer to the Division 1-General Requirements for
temporary water service requirements.
2. Temporary Water Service Connection: All connections to
the Facilities water system shall include back flow
protection. Valves shall be temperature and pressure
rated for operation of the temperature and pressures
encountered. After completion of use, connections and
fittings shall be removed without damage or alteration to
existing water piping, and equipment. Leaking or
dripping fittings/valves shall be repaired and or
replaced as required.
3. Water Hoses: Employ new heavy-duty abrasion-resistant
hoses with a pressure rating greater than the maximum
pressure of the water distribution system to provide
water into each Work Area and to each Decontamination
Enclosure Unit. Provide fittings as required for
connection to existing wall hydrants or spouts, as well
as temporary water heating equipment, branch piping,
showers shut-off nozzles and equipment.
4. Water Heater: Provide UL rated 40-gallon electric water
heaters to supply hot water for Personal Decontamination
Enclosure System Shower. Activate from 30 Amp Circuit
breakers located within the Decontamination Enclosure
subpanel. Provide relief valve compatible with water
heater operations, pipe relief valve down to drip pan at
floor level with type `L' copper piping. Drip pans shall
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 46
be 6-inch deep and securely fastened to water heater.
Wiring of the water heater shall comply with NEMA, NECA,
and UL standards.
Q. Electrical Service:
1. General: Comply with applicable NEMA, NECA and UL
standards and governing regulations for materials and
layout of temporary electric service.
2. Refer to the Division 1-General Requirements for
temporary electric service requirements.
3. Temporary Power: Provide service to decontamination unit
subpanel with minimum 60 AMP, two pole circuit breaker or
fused disconnect connected to the building's main
distribution panel. Subpanel and disconnect shall be
sized and equipped to accommodate all electrical
equipment required for completion of the work.
4. Voltage Differences: Provide identification warning signs
at power outlets that are other than 110-120 volt power.
Provide polarized outlets for plug-in type outlets, to
prevent insertion of 110-120 volt plugs into higher
voltage outlets. Dry type transformers shall be provided
where required to provide voltages necessary for work
operations.
5. Ground Fault Protection: Equip all circuits for any
purpose entering Work Area with ground fault circuit
interrupters (GFCI). Locate GFCIs exterior to Work Area
so that all circuits are protected prior to entry to Work
Area. Provide circuit breaker type ground fault circuit
interrupters (GFCI) equipped with test button and reset
switch for all circuits to be used for any purpose in
Work Area, decontamination units, exterior, or as
otherwise required by NEC, OSHA or other authority.
Locate in panel exterior to Work Area.
6. Power Distribution System: Provide circuits of adequate
size and proper characteristics for each use. In general
run wiring overhead, and rise vertically where wiring
will be least subject to damage from operations.
7. Temporary Wiring: In the Work Area shall be type UF non-
metallic sheathed cable located overhead and exposed for
surveillance. Provide liquid tight enclosures or boxes
for all wiring devices. Do not wire temporary lighting
with plain, exposed (insulated) electrical conductors.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 47
8. Electrical Power Cords: Use only grounded extension
cords; use hard service cords where exposed to traffic
and abrasion. Use single lengths of cords only.
9. Temporary Lighting: All lighting within the Work Area
shall be liquid and moisture proof and designed for the
use intended.
a. Provide sufficient temporary lighting to ensure
proper workmanship everywhere; by combined use of
daylight, general lighting, and portable plug-in
task lighting.
b. Provide lighting in the Decontamination Unit as
required supplying a minimum 50-foot candle light
level.
PART 4 - EXECUTION
4.1 PERMITS, NOTIFICATIONS AND LICENSING
A. The Contractor shall present a duplicate copy of his asbestos
contractor’s license issued by the New Jersey Department of
Labor with his bid. Only licensed contractors may perform
work described as required by this specification. As required
by law, the contractor shall maintain on the project site a
valid Contractors license at all times during the work.
B. The Contractor shall apply for the necessary construction
permits and licenses with the jurisdictional authority for
asbestos abatement work.
C. The Contractor shall maintain the required number of qualified
personnel on site to complete the project on schedule.
D. ALL CONTRACTOR EMPLOYEES MUST POSSESS A VALID NEW JERSEY
ASBESTOS REMOVAL PERMIT AND MAKE AVAILABLE TO THE OWNER,
ASBESTOS SAFETY TECHNICIAN, NJ DCA, NJ DOL, AND NJ DOH THESE
PERMITS UPON REQUEST AT THE PROJECT SITE. ALL EMPLOYEES MUST
HAVE A MINIMUM OF AT LEAST SIX (6) MONTHS PRIOR EXPERIENCE IN
ASBESTOS ABATEMENT WITHIN THE STATE OF NEW JERSEY.
E. The Contractor shall also present to the Asbestos Safety
Technician, and Owner, prior to the commencement of abatement
that a NJ DEP Registered Waste Hauler has been contracted to
haul the waste off site and to an appropriate New Jersey
landfill.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 48
NO PRECOMMENCEMENT INSPECTION SHALL TAKE PLACE UNTIL SUCH
PROOF EXISTS AND IS SATISFACTORY TO THE NJ DCA, THE ASCM/AST,
AND THE OWNER.
F. At the completion of the project the Contractor will submit
the following documentation to the owner with their invoice,
with a copy submitted to Brinkerhoff Environmental Services.:
1. The Certificate of Acceptance/Occupancy from the local
construction official.
2. A copy of all waste manifests.
4.2 INSPECTIONS
A. The Asbestos Safety Technician will perform the following
inspections:
1. Pre-commencement inspection, which verifies that all
enclosure protection and engineering controls are in
place before actual gross removal of ACM takes place,
will be conducted prior to each phase of work. The
Asbestos Safety Technician will observe and check
compliance with the following:
a. Critical/separation barriers are in place
b. Negative air filtration devices are in place and
operational
c. Notification, variances, permits, placards and
Contractor’s licenses are posted
d. Waste container is on site and properly labeled
e. OSHA signs are posted
f. Emergency plans and numbers are posted
g. Decontamination meets all requirements and is in
operation
h. Plastic sheeting is in place on walls, floors, and
ceilings
i. Proper and adequate quantities of supplies, such as
suits, respirators and filters, towels, bags and
other equipment
j. Locked out and tagged out electrical system
k. Disconnected HVAC system
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 49
l. Ground fault circuit interrupters (GFCI’s) are in
place outside the work area and operational
2. Periodic unannounced inspections will be made by the
Asbestos Safety Technician to ensure compliance with the
specifications and all applicable rules and regulations,
as per N.J.A.C. 5:23-8.
3. Pre-encapsulation (sealant) inspection, which verifies
that all ACM has been removed and the work area is dust
free before the area, is sprayed with a sealant. The
Contractor is required to notify the in writing, 48
hours prior, that a pre-encapsulation inspection is
requested. The AST shall notify the Contractor in writing
the results of the inspection.
4. Final clean-up inspection, which verifies that the
enclosure is ready for the collection of the final air
clearance samples. The Contractor is required to notify
the Asbestos Safety Technician (AST) in writing, 24 hours
prior, that a final visual inspection is requested. The
AST shall notify the Contractor in writing the results of
the inspection. No final visual inspection will be
conducted unless the work area is dry and free of any
standing moisture or wet surfaces.
5. During each inspection the Contractor must have a
Licensed Supervisor present.
6. The NJ DCA and the NJ DOL are authorized to conduct
unannounced inspections and periodic inspection during
the abatement project to ensure compliance with all
applicable regulation under their authority.
7. The Owner will also conduct unannounced, random
inspections of the AST and the Contractors work
performance, compliance with this specification and the
applicable regulations. All directives will be given to
the AST to be forwarded to the Contractor.
4.3 DECONTAMINATION FACILITIES AND PROCEDURES
A. The Contractor shall provide an adequate decontamination unit
consisting of a serial arrangement of rooms or spaces attached
to the Work Area and meeting the requirements of NJAC 5:23-
8.15 and criteria outlined in Subpart B below. Each airlock
shall be clearly identified and separated from the other by
plastic crossover sheet doors designed to minimize fiber and
air transfer as people pass between areas. A minimum of ½
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 50
inch fire retardant plywood with two layers of six-mil plastic
sheeting shall be required for floors, walls, and the ceiling
for decontamination units. Plastic crossover sheet doors
shall have at least three layers of six-mil plastic sheeting
and be weighted so as to fall into place when people pass
through the area.
B. Decontamination chamber doors shall be of sufficient height
and width to enable replacement of equipment that may fail and
to safely stretcher or carry an injured worker from the site
without destruction of the chamber or unnecessary risk to the
integrity of the work area. Such doors must be at least 4
feet wide, and the distance between sets of flaps must be at
least 4 feet. Lockable doors shall be installed at the clean
room entrance.
C. The Contractor shall have available adequate shower facilities
with hot and cold water adjustable at the tap and sufficient
plumbing for these showers including sufficient hose length
and drain systems or an acceptable alternate such as a
portable decontamination trailer with showers. All shower
facilities and changing areas will be heated to at least 70oF
as required. Waste shower water shall be filtered through
5-um filters or recycled to be used as a wetting agent or
added to asbestos contaminated waste before disposal in an
approved landfill.
D. The decontamination areas are described below:
1. Clean Room: In this room persons remove and leave all
street clothes and put on clean disposable coveralls.
Approved respiratory protection equipment is also picked
up in this area. No asbestos contaminated items are
permitted in this room.
2. Shower Room: This is a separate room used for transit by
cleanly dressed people entering the job site from the
clean room and for showering by them after they have
undressed in the equipment room. This is a contaminated
area.
3. Equipment Room: Work equipment, footwear, and all other
contaminated work clothing shall be stored here. This is
also a change area transit room for people. All areas
between the shower room and work area shall be considered
part of the equipment room. This is a contaminated area.
E. Workers and visitors shall observe the following work area
entry and exit procedures:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 51
1. Worker enters clean room and removes street clothing,
puts on clean overalls and respirator, and passes through
shower room into the equipment room.
2. Any additional required clothing and equipment previously
deposited in the equipment room is put on. When work
area is too cold for coveralls only, the worker will
provide himself with additional warm garments to be worn
over the disposable clothing.
3. These must be treated as contaminated clothing and left
in the decontamination unit. Under no circumstances
shall a worker enter the work area without having a
respirator and protective clothing on.
4. Worker proceeds to work area and performs whatever work
is to be done.
5. Before leaving the work area, the workers shall remove
all gross contamination and debris from the coveralls
using a vacuum with a high efficiency particulate
absolute (HEPA) filter. In practice this is usually
carried out by one worker assisting another.
6. The worker proceeds to equipment room and removes all
clothing except approved respirators. Extra work
clothing and footwear must be stored here. Disposable
coveralls are placed in a bag for disposal as asbestos
material.
7. The worker then proceeds directly into the shower room.
Respirators shall be taken off last to prevent inhalation
of fiber during removal of contaminated clothing and
shall not be removed until they have been washed free of
dust.
8. After showering, the worker moves to the clean room and
dresses in street clothing prior to exiting.
9. Respirators are picked up, washed thoroughly, and
disinfected as required by OSHA Regulations 29 CFR
1910.134, wrapped and stored in the clean room.
F. Filters in dual cartridge type respirators shall be removed,
wetted and discarded as asbestos contaminated waste. A new
filter shall be in place in the respirator prior to reuse.
For powered air purifying respirators or supplied air
respirators, the manufacturer shall be consulted about the
proper decontamination sequence.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
ASBESTOS ABATEMENT IN OCCUPIED BUILDINGS 028214- 52
G. There shall be no smoking, eating, or drinking in any
contaminated areas (Shower Room, Equipment Room and Work Area)
or in the clean room. Respirators shall be worn in all
contaminated areas.
H. Non-disposable work footwear shall remain inside the
contaminated area until completion of the job and shall be
disposed of as asbestos waste or shall be thoroughly
decontaminated before removal.
I. It shall be the Contractor's responsibility to insure that all
employees follow the appropriate procedures, including the
decontamination procedures listed in Subpart C. Employees who
repeatedly violate proper procedures shall be subject to
disciplinary measures by the Contractor, including dismissal
if necessary.
4.4 GUARANTEE
A. The Contractor shall guarantee, in writing, that all asbestos
within this scope of work has been removed, the work area is
free of asbestos and asbestos dust, and disposal of all
asbestos waste was performed to the complete satisfaction of
the requirements of this specification, the Owner, the US EPA,
OSHA, NJ DCA, NJ DOH, NJ DOL, NJ DEP and any other government
agency and/or authority having jurisdiction.
END OF SECTION 028214
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 1
SECTION 02 84 33 – REMOVAL AND DISPOSAL OF PCB BULK PRODUCT
PART 1 - GENERAL
1.1 SUMMARY:
A. Drawings and general provisions of the Contract, including
General and Supplementary Conditions, Architectural Drawings
and Specification Sections, apply to work of this section. A
Hazardous Materials Survey Report has been prepared and
provided to the Owner for the work identified in this
specification.
B. It shall be the Contractor’s responsibility to verify the
exact quantities and locations of all PCBs. The College of
New Jersey (TCNJ) and/or Brinkerhoff Environmental Services,
Inc. (Brinkerhoff) assume no responsibility for the accuracy
of quantities and/or descriptions of materials, or the
accuracy of descriptions of existing conditions. The
Contractor shall perform the following work as described
herein.
C. Drawings and general provisions of the Contract, including
General and Supplementary Conditions, Drawings and
Specification Sections, apply to work of this section.
1.2 SCOPE OF WORK
A. Removal and Disposal of PCB Bulk Product: The work of this
project includes the removal of designated EPA-Regulated PCB
containing materials:
Suspect Material Description Quantity PCB (mg/kg)
Metallic Silver Caulking Associated
with Air Handler Duct Wall Penetration 30 LF 88.2
Legend: mg/kg = milligram/kilogram, LF = linear feet
B. The Contractor shall be aware of all conditions of the Project
and is responsible for verifying quantities and locations of
all PCBs and Work to be performed. Failure to do so shall not
relieve the Contractor of its obligation to furnish all labor
and materials necessary to perform the Work.
C. All Work shall be performed in strict accordance with the
Project Documents and all governing codes, rules, and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 2
regulations. Where conflicts occur between the Project
Documents and applicable codes, rules, and regulations, the
more stringent shall apply.
D. Working hours shall be as required and approved by the Owner.
PCB material removal activities including, but not limited to,
work area preparation, gross removal activities, cleaning
activities, waste removal, etc. may need to be performed
during ‘off-hours’ (including nights and weekends). In
addition, multiple mobilizations may be required to perform
the work identified in this project. The Contractor shall
coordinate and schedule all Work with the Owner.
1.3 SPECIAL JOB CONDITIONS
A. The Contractor shall not interfere with the daily activities
within the remainder of the building or otherwise affect daily
school operations.
1.4 PERMITS AND COMPLIANCE
A. The Contractor shall assume full responsibility and liability
for compliance with all applicable Federal, State, and local
laws, rules, and regulations pertaining to Work practices,
protection of Workers, authorized visitors to the site,
persons, and property adjacent to the Work.
B. Perform PCB related Work in accordance with 40 CFR 761, and 29
CFR 1926, as specified herein. Where more stringent
requirements are specified, adhere to the more stringent
requirements.
C. The Contractor must maintain current licenses or registrations
pursuant to EPA regulations for all Work related to this
Project, including the removal, handling, transport, and
disposal of hazardous and industrial waste.
D. The Contractor shall obtain an EPA Facility ID number if a
number cannot be provided by the Owner.
1.5 SUBMITTALS
A. The Contractor shall submit copies of the documents listed
below to the Owner and Environmental Consultant for review and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 3
approval prior to the commencement of PCB abatement
activities:
1. Progress Schedule:
a. Show the complete sequence of PCB ballast removal
activities and the sequencing of Work within each
building or building section.
b. Show the dates for the beginning and completion of
each major element of Work including substantial
completion dates for each Work Area, building, or
phase.
2. PCB Removal Work Plan: Provide plans that clearly
indicate the following:
a. All Work Areas/containments numbered sequentially.
b. Locations and types of all decontamination
enclosures.
c. Entrances and exits to the Work Areas/containments.
d. Type of abatement activity/technique for each Work
Area/containment.
e. Proposed location and construction of storage
facilities and field office.
f. Location of water and electrical connections to
building services.
g. Waste transport routes through the building to the
waste storage container.
h. Disposal Site/Landfill Permit from applicable
regulatory agency.
i. Letter identifying the presence of PCB bulk product
waste, with Acknowledgement by the landfill. See
section 4.01.A.
j. New Jersey Department of Environmental Protection
Waste Transporter Permit.
B. Project Close-out Submittals: Within 30 days after project
completion, the Contractor shall submit 3 copies of the
documents listed below to the Environmental Consultant for
review and approval prior to the Contractor’s final payment.
1. Originals of all waste disposal manifests, seals, and
disposal logs.
2. Daily progress log, including the entry/exit log.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 4
3. A list of all Workers used in the performance of the
Project, including name and social security number.
4. For each Worker used in the performance of the Project,
submit the Worker’s Acknowledgment Statement.
5. Disposal Site/Landfill Permit from applicable regulatory
agency.
6. Copy of PCB notification with acknowledgement from the
disposal facility/landfill.
1.6 APPLICABLE STANDARDS AND REGULATIONS
A. The Contractor shall comply with the following codes and
standards, except where more stringent requirements are shown
or specified:
B. Federal Regulations:
1. 29 CFR 1910.1200, "Hazard Communication" (OSHA)
2. 29 CFR 1910.134, "Respiratory Protection" (OSHA)
3. 29 CFR 1910.145, "Specification for Accident Prevention
Signs and Tags" (OSHA)
4. 29 CFR 1926, "Construction Industry" (OSHA)
5. 29 CFR 1926.500 "Guardrails, Handrails and Covers" (OSHA)
6. 40 CFR 761, “PART 761—Polychlorinated Biphenyls
7. 49 CFR 171-173, Transportation Standards (DOT)
C. Standards and Guidance Documents:
1. American National Standard Institute (ANSI) Z88.2-80,
Practices for Respiratory Protection
2. ANSI Z9.2-79, Fundamentals Governing the Design and
Operation of Local Exhaust Systems
1.7 PROJECT MONITORING
A. The Environmental Consultant shall serve as Owner’s
representative in regard to the performance of the PCB Removal
Project and provide direction as required throughout the
entire abatement Project period.
B. The Contractor is required to ensure cooperation of its
personnel with the Environmental Consultant Inc for project
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 5
monitoring functions described in this section. The
Contractor shall comply with all direction given by the
Environmental Consultant during the course of the Project.
C. The Environmental Consultant Inc shall provide the following
administrative services:
1. Review and approve or disapprove all submittals, shop
drawings, schedules, and testing.
2. Review and approve the Contractor's compliance testing
laboratory.
3. The Owner may, at its discretion, may elect to conduct
air sampling. If air samples collected during removal
indicate any airborne PCB concentration(s) above the OSHA
PEL of 0.5 mg/m3, work shall be stopped immediately and
Work methods shall be altered to reduce the airborne PCB
concentration(s).
1.8 PROJECT SUPERVISOR
A. The Contractor shall designate a full-time Project Supervisor
and Workers who shall meet the following qualifications:
1. The Project Supervisor shall be trained in PCB removal
and hazardous waste management in accordance with the
Hazardous Waste Operations and Emergency Response
Standard (HAZWOPER), 29 CFR 1910.120 and CFR 1926.65with
29 CFR 1910.120 and CFR 1926.65.
2. The Project Supervisor shall have a minimum of three
years’ experience as a supervisor.
3. The Project Supervisor must be able to read and write
English fluently, as well as communicate in the primary
language of all Workers.
4. If the Project Supervisor is not on-site at any time
whatsoever, all Work shall be stopped. The Project
Supervisor shall remain on-site until the Project is
complete.
5. The Project Supervisor shall be responsible for the
performance of the Work and shall represent the
Contractor in all respects at the Project site.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 6
1.9 TRAINING
A. As required by applicable regulations, prior to assignment to
PCB Work instruct each employee with regard to the hazards of
PCB, safety and health precautions, and the use and
requirements of protective clothing and equipment.
B. Establish a respirator program as required by ANSI Z88.2 and
29 CFR 1910.134. Provide respirator training and fit testing.
C. Workers performing all work described in Section 02-84-00
shall be trained in accordance with the Hazardous Waste
Operations and Emergency Response Standard (HAZWOPER), 29 CFR
1910.120 and CFR 1926.65.
PART 2 - PRODUCTS
2.1 SIGNS AND LABELS, CONTAINERS
A. Provide warning signs and barrier tapes at all approaches to
PCB Work Areas. Locate signs at such distance that personnel
may read the sign and take the necessary protective steps
required before entering the area.
B. Provide the appropriate “Large PCB Marking” or “Small PCB
Marking” (ML or MS per 40 CFR 761) as shown below, of
sufficient size to be clearly legible, for display on waste
containers (bags, boxes, rolloffs or drums) which will be used
to contain or transport PCB contaminated material, in
accordance with 40 CFR 761. In addition, U.S. Department of
Transportation (DOT) 49 CFR Parts 171 and 172 requires the
name and UN number of the material to be on the bags or drums,
and, if shipped in bulk (rolloffs, Gaylord boxes, etc) the
bulk container must also be labeled: Polychlorinated biphenyl,
solid mixture UN 3432.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 7
ML
MS
C. The PCB materials must have a label stating the following on
each container:
HAZARDOUS WASTE--Federal Law Prohibits Improper Disposal. If found,
contact the nearest police or public safety authority, or the U.S.
Environmental Protection Agency.
Generator's Name and Address__________________________________
Generator's EPA Identification Number___________________________
Manifest Tracking Number _____________________________________
D. Provide 6 mil polyethylene disposal bags with PCB caution
labels.
1. The “Small PCB Label” (MS per 40 CFR 761) may be used as
shown above. Bags shall also be labeled with U.S. DOT
required markings per 49 CFR 172, Polychlorinated
biphenyl, solid mixture UN 3432.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 8
2. Labeled PCB waste containers or bags shall not be used
for non-PCB waste or trash. Any material placed in
labeled containers or bags, whether turned inside out or
not shall be handled and disposed of as PCB waste.
2.2 DAILY PROJECT LOG
A. Provide a Daily Project Log. The log shall contain on title
page the Project name, name, address and phone number of
Owner; name, address and phone number of Environmental
Consultant; name, address and phone number of Abatement
Contractor; emergency numbers including, but not limited to
local Fire/Rescue department and all other New York State
Department of Labor requirements.
B. All entries into the log shall be made in non-washable,
permanent ink and such pen shall be strung to or otherwise
attached to the log to prevent removal from the log-in area.
Under no circumstances shall pencil entries be permitted.
C. All persons entering and exiting the Work Area shall sign the
log and include name, social security number, and time.
D. The Project Supervisor shall document all Work performed daily
and note all inspections.
2.3 SHIPPING CONTAINERS AND PACKAGING
A. Provide packaging in accordance with 49 CFR 173 Packaging
Group 9, such as 30 or 55 gallon capacity fiber, plastic, or
metal drums, Gaylord Boxes or other Intermediate Bulk
Containers (IBCs), or non-siftable bulk containers, capable of
being sealed air and water tight if PCB waste has the
potential to damage or puncture disposal bags. Affix PCB
caution labels on lids of drums, and opposite sides of drums
or bulk containers, as well as the ends of bulk containers.
2.4 EQUIPMENT AND MATERIALS
A. All dry vacuuming performed under this contract shall be
performed with High Efficiency Particulate Absolute (HEPA)
filter equipped industrial vacuums conforming to ANSI Z9.2.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 9
B. Any power tools used to drill, cut into, or otherwise disturb
PCB material shall be manufacturer equipped with HEPA filtered
local exhaust ventilation.
C. All polyethylene (plastic) sheeting used on the Project
(including but not limited to sheeting used for critical and
isolation barriers, fixed objects, walls, floors, ceilings,
waste container) shall be at least 6 mil fire retardant
sheeting.
PART 3 - EXECUTION
3.1 REMOVAL OF PCB MATERIALS - GENERAL
A. PCB-containing materials shall be removed in accordance with
the Contract Documents and the approved PCB Work Plan.
B. Non-PCB items such as windows, doors, masonry, and all other
building construction and components from which PCB materials
are removed shall be decontaminated using a double wash-rinse
technique as specified in 40 CFR 761, Subpart S, as follows:
1. First wash. Cover the surface with organic solvent in
which PCBs are soluble to 5% by weight or more. Scrub
rough surfaces with scrubbing pad and solvent such that
the entire surface is very wet for 1 minute. Wipe smooth
surfaces with a solvent-soaked absorbent pad also for 1
minute. Absorb solvent until no visible traces remain.
2. First rinse. Wet the surface with clean rinse solvent
such that the entire surface is very wet for 1 minute.
Drain and contain the solvent from the surface. Wipe the
residual solvent off the drained surface using a clean,
disposable absorbent pad until no liquid is visible on
the surface.
3. Second wash. Repeat the procedures in paragraph (1) of
this section. The rinse solvent from the first rinse
(paragraph (2) of this section) may be used.
4. Second rinse. Repeat the procedures in paragraph (2) of
this section.
C. Mechanical cutting or grinding of PCB materials is not
permitted.
D. All PCB waste must be located at or near the point of
generation, under the control of the Project Supervisor. Up to
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 10
55 gallons may be stored at the point of generation for an
indefinite period, but any more than 55 gallons must be moved
within 3 days to a Container Storage Area (CSA) as specified
in 6 NYCRR Section 372.2 “Standards Applicable to Generators
of Hazardous Waste”, or off site.
E. The CSA and personnel managing it must meet the following
requirements:
1. The containers must be dated when placed in storage, and
accumulation times must be observed
2. A label stating "Hazardous Waste" must identify all areas
and containers used to accumulate hazardous waste
F. Closure of the CSA. If an EPA ID number and CSA were created
specifically for the PCB removal work, the Contractor must
also close out the CSA and notify the Owner and Environmental
Consultant, and all applicable regulatory agencies that the
hazardous waste activity has concluded.
PART 4 - DISPOSAL OF PCB WASTE
4.1 TRANSPORTATION AND DISPOSAL SITE
A. For any permitted out-of-state landfill not specifically
authorized for disposal of PCBs, written notice must be
provided 15 days prior to the first shipment of the same waste
stream that the waste may contain PCBs greater than 50ppm, in
accordance with 40 CFR 761.62. The letter shall be
acknowledged via a disposal facility representative’s
signature, printed name and title.
NOTE: NEW JERSEY STATE LANDFILLS MUST BE SPECIFICALLY
AUTHORIZED TO ACCEPT PCBs.
B. The Contractor shall give twenty-four (24) hour notification
prior to removing any waste from the site. Waste shall be
removed from the site only during normal working hours unless
otherwise specified.
4.2 Hazardous WASTE MANIFESTS
A. A PCB Hazardous Waste Manifest shall be completed by the
Contractor for each PCB Waste Shipment.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION JANUARY 15, 2018
REMOVAL AND DISPOSAL OF PCB BULK PRODUCT 028433- 11
B. The Manifest shall have the appropriate signatures (the
Generator) and the Hauler representative prior to any waste
being removed from the site.
C. Copies of the completed Manifest shall be provided to the
Owner and Environmental Consultant and shall remain on site
for inspection.
D. Upon arrival at the Disposal Site, the Manifest shall be
signed by the Disposal Facility operator to certify receipt of
PCB materials covered by the manifest.
E. Originals of all waste disposal manifests, and disposal logs
shall be submitted by the Contractor to the Owner and
Environmental Consultant with the final close-out
documentation.
END OF SECTION 028433
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including
General and Supplementary Conditions and Division 01
Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes cast-in-place concrete, including formwork,
reinforcement, concrete materials, mixture design, placement
procedures, and finishes.
1.3 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in
combination with one or more of the following: blended
hydraulic cement, fly ash, slag cement, other pozzolans, and
silica fume; materials subject to compliance with
requirements.
B. W/C Ratio: The ratio by weight of water to cementitious
materials.
1.4 SUBMITTALS
A. General: Submit the following according to Conditions of the
Contract and Division 1 Specification Sections.
B. Submit Laboratory test reports for concrete materials and mix
design test.
C. Material certifications in lieu of material laboratory test
reports when permitted by engineer. Material certificates
shall be signed by manufacturer and contractor, certifying
that each material item complies with or exceeds specified
requirements. Provide certification from admixture
manufacturer that chloride content complies with specification
requirements.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 2
D. Copies of Material Safety Data Sheets (MSDS) for any adhesives
and other hazardous materials.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs on
Project personnel qualified as ACI-certified Flatwork
Technician and Finisher and a supervisor who is an ACI-
certified Concrete Flatwork Technician.
B. Manufacturer Qualifications: A firm experienced in
manufacturing ready-mixed concrete products and that complies
with ASTM C 94/C 94M requirements for production facilities
and equipment.
1. Manufacturer certified according to NRMCA's
"Certification of Ready Mixed Concrete Production
Facilities."
C. Testing Agency Qualifications: An independent
agency, acceptable to authorities having jurisdiction,
qualified according to ASTM C 1077 and ASTM E 329 for testing
indicated.
1. Personnel conducting field tests shall be qualified as
ACI Concrete Field Testing Technician, Grade 1, according
to ACI CP-1 or an equivalent certification program.
2. Personnel performing laboratory tests shall be ACI-
certified Concrete Strength Testing Technician and
Concrete Laboratory Testing Technician, Grade I. Testing
agency laboratory supervisor shall be an ACI-certified
Concrete Laboratory Testing Technician, Grade II.
D. Welding Qualifications: Qualify procedures and personnel
according to AWS D1.4/D 1.4M.
E. Mockups: Cast concrete slab-on-grade and formed-surface panels
to demonstrate typical joints, surface finish, texture,
tolerances, floor treatments, and standard of workmanship.
1. Build panel approximately 200 sq. ft. for slab-on-grade
and 100 sq. ft. for formed surface in the location
indicated or, if not indicated, as directed by Owner and
Engineer.
2. Subject to compliance with requirements, approved mockups
may become part of the completed Work if undisturbed at
time of Substantial Completion.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 3
1.6 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing
agency to perform preconstruction testing on concrete
mixtures.
1.7 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 306.1 and as follows.
Protect concrete work from physical damage or reduced strength
that could be caused by frost, freezing actions, or low
temperatures.
1. When average high and low temperature is expected to fall
below 40 deg F for three successive days, maintain
delivered concrete mixture temperature within the
temperature range required by ACI 301.
2. Do not use frozen materials or materials containing ice
or snow. Do not place concrete on frozen subgrade or on
subgrade containing frozen materials.
3. Do not use calcium chloride, salt, or other materials
containing antifreeze agents or chemical accelerators
unless otherwise specified and approved in mixture
designs.
B. Hot-Weather Placement: Comply with ACI 301 and as follows:
1. Maintain concrete temperature below 90 deg F at time of
placement. Chilled mixing water or chopped ice may be
used to control temperature, provided water equivalent of
ice is calculated to total amount of mixing water. Using
liquid nitrogen to cool concrete is Contractor's option.
2. Fog-spray forms, steel reinforcement, and subgrade just
before placing concrete. Keep subgrade uniformly moist
without standing water, soft spots, or dry areas.
PART 2 - PRODUCTS
2.1 FORM MATERIALS
A. Forms for Exposed Finish Concrete: Plywood, metal, metal-
framed plywood faced, or other acceptable panel-type
materials, to provide continuous, straight, smooth, exposed
surfaces.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 4
1. Use overlaid plywood complying with U.S. Product Standard
PS-1 “A-C or B-B High Density Overlaid Concrete Form”,
Class I.
2. Use plywood complying with U.S. Product Standard PS-1 “B-
B (Concrete Form) Plywood” Class I, Exterior Grade or
better, mill-oiled and edge-sealed, with each piece
bearing legible inspection trademark.
B. Forms for Unexposed Finish Concrete: Plywood, lumber, metal,
or another acceptable material. Provide lumber dressed on at
least two edges and one side for tight fit.
C. Form Release Agent: Provide commercial formulation form
release agent with a maximum of 350 g/L volatile organic
compounds (VOCS) that will not bond with, stain, or adversely
affect concrete surfaces and will not impair subsequent
treatments of concrete surfaces.
D. Form Ties: Factory-fabricated, adjustable-length, removable
or snap-off metal form ties designed to prevent form
deflection and to prevent spalling of concrete upon removal.
Provide units that will leave no metal closer than 1-1/2
inches to the plane of the exposed concrete surface.
1. Provide ties that, when removed, will leave holes not
larger than 1 inch in diameter in the concrete surface.
2.2 CONCRETE, GENERAL
A. ACI Publications: Comply with the following unless modified by
requirements in the Contract Documents:
1. ACI 301.
2. ACI 117.
2.3 CONCRETE MATERIALS
A. Portland Cement: ASTM C 150/C 150M, Type I or ASTM C1157, Type
LH or GU.
a. Use one brand of cement throughout the Project
unless otherwise specified.
b. Do not re-use cement which has partially set or
hardened.
B. Fly Ash:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 5
1. Permitted in drilled piers, footings, pier caps, pile
caps, columns, walls, grade beams only.
2. ASTM C 618, Class C or F, except maximum loss on
ignition: 6%. Maximum percent retained on #325 sieve:
28%. Maximum water requirement, stated as percentage of
control: 100%.
3. Testing: ASTM C311.
4. Percentage of fly ash in mix design shall be by weight,
not by volume. Water/cement ratio will be calculated as
water/cementitious (total cement and fly ash) ratio.
5. Prohibited: Fly ash in same mix with Type IP blended
cement.
6. If strength or air content varies from value specified by
more than specified tolerances, Engineer or designated
representative shall reject that concrete.
7. The total fly ash contained in concrete should not be
more than 20% of total cementitious materials by weight
8. Submit all fly ash concrete mix designs per ACI 301.
C. Ground Granulated Blast-Furnace Slag (GG BFS):
1. ASTM C 989, Grade 100 or higher.
2. Percentage of GGBF slag in mix design shall be by weight,
not by volume. Water-cement ratio shall be calculated as
water-cementitious (total Portland cement + GGBF slag)
ratio.
3. If strength or air content varies from value specified by
more than specified tolerances, Engineer or designated
representative shall reject that concrete.
4. Total fly ash and slag contained in concrete should not
be more than 30% of total cementitious materials by
weight.
5. Submit all GGBF slag concrete mix designs per ACI 301.
D. Aggregates:
1. Normal weight aggregates: Aggregates shall be crushed
stone or gravel complying with ASTM C 33, uniform
throughout the work, with fineness modulus not varying by
more than 0.15 either way from approved samples; maximum
size of coarse aggregate particles shall be ½ inch for
slabs on grade and 1” for other concrete. Use in all
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 6
foundations, slabs on grade, walls, steps, pits, mats,
etc.
2. Fine aggregates: Natural sand conforming to ASTM C33.
3. Combined aggregate gradation for slabs and other
designated concrete shall be 8% - 18% for large top size
aggregates (1½ in.) or 8% - 22% for smaller top size
aggregates (1 in. or ¾ in.) retained on each sieve below
the top size and above the No. 100.
E. Water: Potable.
2.4 CONCRETE MIXING
1. Ready-Mixed Concrete: Comply with requirements of ASTM C
94, and as specified.
2. When air temperature is between 85 deg F and 90 deg F,
reduce mixing and delivery time from 1-1/2 hours to 75
minutes, and when air temperature is above 90 deg F,
reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 FORMWORK INSTALLATION
A. Design, erect, shore, brace, and maintain formwork, according
to ACI 301, to support vertical, lateral, static, and dynamic
loads, and construction loads that might be applied, until
structure can support such loads.
B. Construct formwork so concrete members and structures are of
size, shape, alignment, elevation, and position indicated,
within tolerance limits of ACI 117.
C. Construct forms tight enough to prevent loss of concrete
mortar.
D. Construct forms for easy removal without hammering or prying
against concrete surfaces. Provide crush or wrecking plates
where stripping may damage cast-concrete surfaces. Provide top
forms for inclined surfaces steeper than 1.5 horizontal to 1
vertical.
1. Install keyways, reglets, recesses, and the like, for
easy removal.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 7
2. Do not use rust-stained steel form-facing material.
E. Set edge forms, bulkheads, and intermediate screed strips for
slabs to achieve required elevations and slopes in finished
concrete surfaces. Provide and secure units to support screed
strips; use strike-off templates or compacting-type screeds.
F. Provide temporary openings for cleanouts and inspection ports
where interior area of formwork is inaccessible. Close
openings with panels tightly fitted to forms and securely
braced to prevent loss of concrete mortar. Locate temporary
openings in forms at inconspicuous locations.
G. Do not chamfer exterior corners and edges of permanently
exposed concrete.
H. Form openings, chases, offsets, sinkages, keyways, reglets,
blocking, screeds, and bulkheads required in the Work.
Determine sizes and locations from trades providing such
items.
I. Clean forms and adjacent surfaces to receive concrete. Remove
chips, wood, sawdust, dirt, and other debris just before
placing concrete.
J. Retighten forms and bracing before placing concrete, as
required, to prevent mortar leaks and maintain proper
alignment.
K. Coat contact surfaces of forms with form-release agent,
according to manufacturer's written instructions, before
placing reinforcement.
3.2 EMBEDDED ITEM INSTALLATION
A. Place and secure anchorage devices and other embedded items
required for adjoining work that is attached to or supported
by cast-in-place concrete. Use setting drawings, templates,
diagrams, instructions, and directions furnished with items to
be embedded.
1. Install anchor rods, accurately located, to elevations
required and complying with tolerances in Section 7.5 of
AISC 303.
2. Install reglets to receive waterproofing and to receive
through-wall flashings in outer face of concrete frame at
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 8
exterior walls, where flashing is shown at lintels, shelf
angles, and other conditions.
3.3 STEEL REINFORCEMENT INSTALLATION
A. General: Comply with CRSI's "Manual of Standard Practice" for
fabricating, placing, and supporting reinforcement.
1. Do not cut or puncture vapor retarder. Repair damage and
reseal vapor retarder before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice,
and other foreign materials that reduce bond to concrete.
C. Accurately position, support, and secure reinforcement against
displacement. Locate and support reinforcement with bar
supports to maintain minimum concrete cover. Do not tack weld
crossing reinforcing bars.
D. Set wire ties with ends directed into concrete, not toward
exposed concrete surfaces.
3.4 JOINTS
A. General: Construct joints true to line with faces
perpendicular to surface plane of concrete.
B. Construction Joints: Install so strength and appearance of
concrete are not impaired, at locations indicated or as
approved by Architect.
1. Place joints perpendicular to main reinforcement.
Continue reinforcement across construction joints unless
otherwise indicated. Do not continue reinforcement
through sides of strip placements of floors and slabs.
2. Form keyed joints as indicated. Embed keys at least 1-1/2
inches into concrete.
3.5 WATERSTOP INSTALLATION
A. Flexible Waterstops: Install in construction joints and at
other joints indicated to form a continuous diaphragm. Install
in longest lengths practicable. Support and protect exposed
waterstops during progress of the Work. Field fabricate joints
in waterstops according to manufacturer's written
instructions.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
CAST-IN-PLACE CONCRETE 033000 - 9
3.6 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork,
reinforcement, and embedded items is complete and that
required inspections are completed.
B. Comply with ACI 304, “Guide for Measuring, Mixing,
Transporting, and Placing Concrete” and as specified.
3.7 FINISHING FORMED SURFACES
A. Rough-Formed Finish: As-cast concrete texture imparted by
form-facing material with tie holes and defects repaired and
patched. Remove fins and other projections that exceed
specified limits on formed-surface irregularities.
1. Apply to concrete surfaces not exposed to public view.
B. Smooth-Formed Finish: As-cast concrete texture imparted by
form-facing material, arranged in an orderly and symmetrical
manner with a minimum of seams. Repair and patch tie holes and
defects. Remove fins and other projections that exceed
specified limits on formed-surface irregularities.
1. Apply to concrete surfaces exposed to public view.
3.8 MISCELLANEOUS CONCRETE ITEM INSTALLATION
A. Equipment Bases: Provide machine and equipment bases and
foundations as shown on drawings. Set anchor bolts for
machines and equipment to template at correct elevations,
complying with diagrams or templates of manufacturer
furnishing machines and equipment.
3.9 CONCRETE PROTECTING AND CURING
A. General: Protect freshly placed concrete from premature drying
and excessive cold or hot temperatures. Comply with ACI 306.1
for cold-weather protection and ACI 301 for hot-weather
protection during curing.
END OF SECTION 033000
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 1
SECTION 051200 - STRUCTURAL STEEL FRAMING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes structural steel.
1.2 DEFINITIONS
A. Structural Steel: Elements of structural-steel frame, as
classified by AISC 303, "Code of Standard Practice for
Steel Buildings and Bridges."
1.3 PERFORMANCE REQUIREMENTS
A. Connections: Provide details of simple shear connections
required by the Contract Documents to be selected or
completed by structural-steel fabricator to withstand
loads indicated and comply with other information and
restrictions indicated.
1. Select and complete connections using schematic
details where indicated and AISC 360.
2. Use ASD; data are given at service-load level.
1.4 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: Show fabrication of structural-steel
components. Submit signed and sealed connection
calculations and Connection Standards along with shop
drawings. Connections not specifically detailed on the
Contract Drawings are to be designed under the direct
supervision of a Registered Professional Engineer,
licensed in the Project jurisdiction, specializing in
structural steel engineering
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 2
a. Indicate profiles, spacing and locations of
members, including:
1) Fabrication details.
2) Size and weight of members.
3) Location of shop and field connections.
4) Locations and details of anchors,
base/bearing plates and leveling plates.
5) Details of holes, cuts, camber and splices.
6) Layout and location of composite shear studs.
7) Identify high-strength bolted slip-critical,
direct-tension, or tensioned shear/bearing
connections.
b. Indicate welds by standard AWS A2.1 and A2.4
symbols distinguishing between shop and field
welds; and show size, length and type of each
weld.
c. Provide setting drawings, templates and
directions for installation of anchor bolts and
other anchorage to be installed as work by other
sections.
d. Obtain detailed drawings of the Work by other
trades including locations and sizes of openings
in roofs and the Work requiring holes in
structural steel, mounting brackets, and supports
attached to the structural steel.
C. Qualification Data: For qualified Installer, fabricator
and testing agency.
D. Welding certificates.
E. Mill test reports for structural steel, including chemical
and physical properties.
F. Source quality-control reports.
1.5 CONNECTION DESIGN AND MEMBER DETAILING
A. Member Detailing and Design of Connections: Details shown
are typical; similar details apply to similar conditions,
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 3
unless otherwise indicated. Verify dimensions at site
without causing delay in the work.
B. Design connections as “Framed Beam Connections: in accord-
ance with Part 4 of the AISC Manual, except as otherwise
indicated.
1. For noncomposite beams, reaction shall be end reaction on member, as defined in the AISC “Uniform Loaded Beam
Tables”, or reaction shown on the Drawings, whichever
is greater.
2. Single sided connections for spandrel beams are not
acceptable.
3. Bolts: A325 or A490. Connections may be designed
using Type N Bolts, except at hanger connections and
where slip-critical connections shall be used.
C. Shop and Field Connections:
1. Shop connections are to be welded unless indicated
otherwise on the Drawings.
2. Bolt field connections with high-strength bolts except where welded connections or other connections are
indicated.
3. Bolts: 3/4 inch diameter minimum. 4. Fillet welds: 1/4 inch minimum, unless otherwise
noted.
1.6 QUALITY ASSURANCE
A. Fabricator Qualifications: Company specializing in
structural steel fabrication having a minimum of 5 years
documented, successful experience with work comparable to
the Work of this Project.
B. Installer Qualifications: Minimum of 5 years documented,
successful experience with work comparable to the Work of
this Project.
C. Welding Qualifications: Qualify procedures and personnel
according to AWS D1.1-2015" Structural Welding Code -
Steel."
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 4
D. Comply with applicable provisions of the following
specifications and documents:
1. AISC 303.
2. AISC 360.
3. RCSC's "Specification for Structural Joints Using
ASTM A 325 or A 490 Bolts."
1.7 TEMPORARY BRACING
A. The steel erector/contractor is responsible for the de-
sign, strength, adequacy, safety and means and methods of
construction of shoring and temporary bracing of Structur-
al Steel Work at all stages of erection, until such time
that permanent members and construction are in place and
final connections are completed.
1.8 PROJECT CONDITIONS
A. Field verify all existing measurements and elevations pri-
or to beginning fabrication process. Engineer will not
review or take responsibility for any existing dimensions.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Metal Surfaces, General: For fabrication of work which
will be exposed to view, use only materials which are
smooth and free of surface blemishes including pitting,
rust and scale seam marks, roller marks, rolled trade
names and roughness in accordance with the AISC
“Specifications for Architecturally Exposed Structural
Steel”. Remove such blemishes by grinding, or by welding
and grinding, prior to cleaning, treating and application
of surface finishes.
B. Wide Flange Shapes: ASTM A 992 or ASTM A572
C. Structural Steel Shapes, Plates and Bars: ASTM A 36 or
ASTM A 572, Grade 50.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 5
D. Structural Steel Tubing:
1. Cold-Formed: ASTM A 500, Grade B. 2. Hot-Formed: ASTM A501.
E. Pipe: ASTM A53, Type E or S, Grade B.
F. Bolts, Nuts, and Washers:
1. Unheaded Rods: ASTM A 36 (ASTM A 36M). 2. Unheaded Rods: ASTM A 572, Grade 50 (ASTM A 572M,
Grade 345).
3. Anchor Rods: ASTM A307 or ASTM F 1554, Grade 36 or Grade 55, nonheaded type unless otherwise indicated.
4. Standard threaded fasteners:
a. Plain washers: ANSI B27.2, Type A.
b. Beveled washers: ANSI B27.4.
c. Nuts and bolts: ASTM A307, Grade A.
5. High-Strength Threaded Fasteners: Quenched and
tempered medium-carbon steel.
a. Bolts: Heavy hexagon ASTM A325.
b. Nuts: Heavy hexagon ASTM A563, Grade DH.
c. Washers: Hardened ASTM F436.
(1) beveled at channel flanges
6. Direct Tension Indicator Fasteners: Load indicator
washers to conform to ASTM F959, or tension control
bolts may be used.
G. Electrodes for Welding: Comply with AWS Code.
7. Welding Materials: AWS D1.1-1; type required for
materials being welded.
H. Structural Steel Primer Paint: Fabricator’s standard lead
and chromate-free, nanasphaltic, rust-inhibiting primer.
8. Where faying surfaces of slip-critical joints are
permitted by Architect to be painted, provide Class A
paint (providing a minimum slip coefficient of 0.33)
in accordance with Test Method to Determine Slip
Coefficient for Coatings used in Bolted Joints, in
Appendix A of the RCSC Specification for Structural
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 6
Joints. Manufacturer’s certification shall include a
certified copy of the test report.
I. Galvanizing Repair Paint: High zinc dust content paint
for regalvanizing welds and repair painting galvanized
steel, complying with Military Specifications DOD-P-21035
(Ships) or SSPC-Paint-20.
2.1 FABRICATION
A. Structural Steel: Fabricate and assemble in shop to
greatest extent possible. Fabricate according to AISC's
"Code of Standard Practice for Steel Buildings and
Bridges" and AISC 360.
B. Shear Connectors: Prepare steel surfaces as recommended
by manufacturer of shear connectors. Use automatic end
welding of headed-stud shear connectors according to
AWS D1.1-2015 and manufacturer's written instructions.
2.2 SHOP CONNECTIONS
A. High-Strength Bolts: Shop install high-strength bolts
according to RCSC's "Specification for Structural Joints
Using ASTM A 325 or A 490 Bolts" for type of bolt and type
of joint specified.
1. Joint Type: Snug tightened for all gravity only
members, slip critical for all braced bay and wind
girts members.
B. Weld Connections: Comply with AWS D1.1-15 for tolerances,
appearances, welding procedure specifications, weld
quality, and methods used in correcting welding work.
2.3 SHOP PRIMING
A. Shop prime steel surfaces except the following:
1. Surfaces embedded in concrete or mortar. Extend
priming of partially embedded members to a depth of 2
inches (50 mm).
2. Surfaces to be field welded.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 7
3. Surfaces to be high-strength bolted with slip-critical
connections.
4. Surfaces to receive sprayed fire-resistive materials
(applied fireproofing).
5. Beam flanges to receive shear studs.
6. Galvanized surfaces.
B. Surface Preparation: Clean surfaces to be painted.
Remove loose rust and mill scale and spatter, slag, or
flux deposits. Prepare surfaces according to the
following specifications and standards:
1. SSPC-SP 2, "Hand Tool Cleaning."
2. SSPC-SP 3, "Power Tool Cleaning."
C. Priming: Immediately after surface preparation, apply
primer according to manufacturer's written instructions
and at rate recommended by SSPC to provide a minimum dry
film thickness of 1.5 mils (0.038 mm). Use priming
methods that result in full coverage of joints, corners,
edges, and exposed surfaces.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify, with steel Erector present, elevations of braces
surfaces and locations for compliance with requirements.
B. Proceed with installation only after unsatisfactory
conditions have been corrected.
3.2 ERECTION
A. Set structural steel accurately in locations and to
elevations indicated and according to AISC 303 and
AISC 360.
B. Base Leveling Plates and Base Plates: Clean concrete- and
masonry-bearing surfaces of bond-reducing materials, and
roughen surfaces prior to setting plates. Clean bottom
surface of plates.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 8
1. Set plates for structural members on wedges, shims, or
setting nuts as required.
2. Weld plate washers to top of baseplate.
3. Snug-tighten anchor rods after supported members have
been positioned and plumbed. Do not remove wedges or
shims but, if protruding, cut off flush with edge of
plate before packing with grout.
4. Promptly pack grout solidly between bearing surfaces
and plates so no voids remain. Neatly finish exposed
surfaces; protect grout and allow to cure. Comply with
manufacturer's written installation instructions for
shrinkage-resistant grouts.
C. Maintain erection tolerances of structural steel within
AISC's "Code of Standard Practice for Steel Buildings and
Bridges."
3.3 FIELD CONNECTIONS
A. High-Strength Bolts: Install high-strength bolts
according to RCSC's "Specification for Structural Joints
Using ASTM A 325 or A 490 Bolts" for type of bolt and type
of joint specified.
1. Joint Type: Snug Tightened for gravity only members
and Slip critical for wind girts and braced bay
members or any members subject to tension.
B. Weld Connections: Comply with AWS D1.1-15 for tolerances,
appearances, welding procedure specifications, weld
quality, and methods used in correcting welding work.
1. Comply with AISC 303 and AISC 360 for bearing,
alignment, adequacy of temporary connections, and
removal of paint on surfaces adjacent to field welds.
3.4 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent
testing and inspecting agency to inspect field welds and
high-strength bolted connections].
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
STRUCTURAL STEEL FRAMING 051200 - 9
B. Bolted Connections: Bolted connections will be tested and
inspected according to RCSC's "Specification for
Structural Joints Using ASTM A 325 or A 490 Bolts."
C. Welded Connections: Field welds will be visually
inspected according to AWS D1.1-15.
D. Correct deficiencies in Work that test reports and
inspections indicate does not comply with the Contract
Documents.
END OF SECTION 051200
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTIONJanuary 15, 2018
MISCELLANEOUS ROUGH CARPENTRY 061053-1
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wood blocking, cants, and nailers.
2. Plywood backing panels
1.2 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-
fabricated product. Indicate component materials and
dimensions and include construction and application
details.
1.3 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: For the following, from ICC-ES:
1. Preservative-treated wood.
2. Power-driven fasteners.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading
agencies indicated. If no grading agency is indicated,
provide lumber that complies with the applicable rules
of any rules-writing agency certified by the ALSC Board
of Review. Provide lumber graded by an agency certified
by the ALSC Board of Review to inspect and grade lumber
under the rules indicated.
B. Maximum Moisture Content of Lumber: 19 percent unless
otherwise indicated.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTIONJanuary 15, 2018
MISCELLANEOUS ROUGH CARPENTRY 061053-2
2.2 WOOD-PRESERVATIVE-TREATED MATERIALS
A. Preservative Treatment by Pressure Process: AWPA U1;
Use Category UC2.
1. Preservative Chemicals: Acceptable to authorities
having jurisdiction and containing no arsenic or
chromium.
B. Kiln-dry lumber after treatment to a maximum moisture
content of 19 percent. Do not use material that is
warped or does not comply with requirements for
untreated material.
C. Mark lumber w ith treatment quality mark of an
inspection agency approved by the ALSC Board of Review.
D. Application: Treat all miscellaneous carpentry unless
otherwise indicated.
2.3 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and
lumber for support or attachment of other construction,
including the following:
1. Blocking.
2. Nailers.
3. Cants.
B. For concealed boards, provide lumber with 19 percent
maximum moisture content and any of the following
species and grades:
1. Mixed southern pine, No. 2 grade; SPIB.
2. Eastern softwoods, No. 2 Common grade; NELMA.
3. Northern species, No. 2 Common grade; NLGA.
4. Western woods, Construction or No. 2 Common grade;
WCLIB or WWPA.
2.4 PLYWOOD BACKING PANELS
A. Equipment Backing Panels: DOC PS 1, Exposure 1, C-D
Plugged, in thickness indicated or, if not indicated,
not less than 3/4-inch nominal thickness.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTIONJanuary 15, 2018
MISCELLANEOUS ROUGH CARPENTRY 061053-3
2.5 FASTENERS
A. General: Provide fasteners of size and type indicated
that comply with requirements specified in this article
for material and manufacture.
B. Power-Driven Fasteners: NES NER-272.
C. Screws for Fastening to Metal Framing: ASTM C 1002,
length as recommended by screw manufacturer for
material being fastened.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set carpentry to required levels and lines, with
members plumb, true to line, cut, and fitted. Fit
carpentry to other construction; scribe and cope as
needed for accurate fit.
B. Where wood-preservative-treated lumber is installed
adjacent to metal decking, install continuous flexible
flashing separator between wood and metal decking.
C. Framing Standard: Comply with AF&PA's WCD 1, "Details
for Conventional Wood Frame Construction," unless
otherwise indicated.
D. Install plywood backing panels by fastening to studs;
coordinate locations with utilities requiring backing
panels.
E. Do not splice structural members between supports
unless otherwise indicated.
F. Comply with AWPA M4 for applying field treatment to cut
surfaces of preservative-treated lumber.
G. Securely attach carpentry work to substrate by
anchoring and fastening as indicated, complying with
the following:
1. NES NER-272 for power-driven fasteners.
2. Table 2304.9.1, "Fastening Schedule," in ICC's
International Building Code.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTIONJanuary 15, 2018
MISCELLANEOUS ROUGH CARPENTRY 061053-4
3. Table R602.3(1), "Fastener Schedule for Structural
Members," and Table R602.3(2), "Alternate
Attachments," in ICC's International Residential
Code for One- and Two-Family Dwellings.
3.2 PROTECTION
A. Protect wood that has been treated with inorganic boron
(SBX) from weather. If, despite protection, inorganic
boron-treated wood becomes wet, apply EPA-registered
borate treatment. Apply borate solution by spraying to
comply with EPA-registered label.
END OF SECTION 061053
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PREPARATION FOR REROOFING 070150-1
SECTION 070150 - PREPARATION FOR REROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Full tear-off of entire roof.
2. Removal of base flashings.
1.2 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D 1079 and
glossary of NRCA's "The NRCA Roofing and Waterproofing
Manual" apply to work of this Section.
B. Roof Re-Cover Preparation: Existing roofing system is to
remain and be prepared for new roof installed over it.
C. Full Roof Tear-Off: Removal of existing roofing system
from deck.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Temporary Roofing Submittal: Product data and description
of temporary roofing system. If temporary roof remains in
place, include surface preparation requirements needed to
receive permanent roof, and submit a letter from roofing
manufacturer, stating acceptance of the temporary roof and
that its inclusion does not adversely affect the roofing
system's resistance to fire and wind.
1.4 INFORMATIONAL SUBMITTALS
A. Photographs or Videotape: Show existing conditions of
adjoining construction and site improvements, including
exterior and interior finish surfaces,that might be
misconstrued as having been damaged by reroofing
operations. Submit before Work begins.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PREPARATION FOR REROOFING 070150-2
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Approved by warrantor of
existing roofing system to work on existing roofing.
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately below
reroofing area. Conduct reroofing so Owner's operations
are not disrupted. Provide Owner with not less than 72
hours' notice of activities that may affect Owner's
operations.
1. Coordinate work activities daily with Owner so Owner
can place protective dust and water-leakage covers
over sensitive equipment and furnishings, shut down
HVAC and fire-alarm or -detection equipment if needed,
and evacuate occupants from below work area.
2. Before working over structurally impaired areas of
deck, notify Owner to evacuate occupants from below
affected area. Verify that occupants below work area
have been evacuated before proceeding with work over
impaired deck area.
B. Protect building to be reroofed, adjacent buildings,
walkways, site improvements, exterior plantings, and
landscaping from damage or soiling from reroofing
operations.
C. Maintain safe, unimpeded, and protected access to existing
walkways, corridors, and other adjacent occupied or used
facilities.
D. Weather Limitations: Proceed with reroofing preparation
only when existing and forecasted weather conditions
permit Work to proceed without water entering existing
roofing system or building.
PART 2 - PRODUCTS
2.1 INFILL AND REPLACEMENT MATERIALS
A. Use infill materials matching existing roofing system
materials unless otherwise indicated.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PREPARATION FOR REROOFING 070150-3
PART 3 - EXECUTION
3.1 PREPARATION
A. Shut off rooftop utilities and service piping before
beginning the Work.
B. Protect existing roofing system that is not to be
reroofed.
C. Coordinate with Owner to shut down air-intake equipment in
the vicinity of the Work. Cover air-intake louvers before
proceeding with reroofing work that could affect indoor
air quality or activate smoke detectors in the ductwork.
D. Maintain roof drains in functioning condition to ensure
roof drainage at end of each workday. Prevent debris from
entering or blocking roof drains and conductors. Use roof-
drain plugs specifically designed for this purpose. Remove
roof-drain plugs at end of each workday, when no work is
taking place, or when rain is forecast.
3.2 ROOF TEAR-OFF
A. General: Notify Owner each day of extent of roof tear-off
proposed for that day.
B. Remove pavers and accessories from roofing.
C. Full Roof Tear-Off: Where indicated, remove existing
roofing and other roofing system components down to the
deck.
1. Bitumen and felts that are firmly bonded to concrete
decks are permitted to remain if felts are dry. Remove
unadhered bitumen, unadhered felts, and wet felts.
2. Remove excess asphalt from steel deck. A maximum of 15
lb/100 sq. ft. of asphalt is permitted to remain on
steel decks.
3. Remove fasteners from deck or cut fasteners off
slightly above deck surface.
D. Partial Roof Tear-Off (Alternate No. 1): Where indicated
Appendix A of Project Manual, remove existing roofing and
immediately check for presence of moisture by visually
observing substrate that is to remain.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PREPARATION FOR REROOFING 070150-4
1. Bitumen and felts that are firmly bonded to concrete
decks are permitted to remain if felts are dry. Remove
unadhered bitumen, unadhered felts, and wet felts.
2. Remove excess asphalt from steel deck that is exposed
by removal of wet or damp materials. A maximum of 15
lb/100 sq. ft. of asphalt is permitted to remain on
steel decks.
3. Remove fasteners from deck.
3.3 DECK PREPARATION
A. Inspect deck after tear-off of roofing system.
B. If broken or loose fasteners that secure deck panels to
one another or to structure are observed, or if deck
appears or feels inadequately attached, immediately notify
Architect. Do not proceed with installation until directed
by Architect.
C. If deck surface is unsuitable for receiving new roofing or
if structural integrity of deck is suspect, immediately
notify Architect. Do not proceed with installation until
directed by Architect.
3.4 INFILL MATERIALS INSTALLATION
A. Immediately after roof tear-off, and inspection and
repair, if needed, of deck, fill in tear-off areas to
match existing roofing system construction.
B. Install new roofing patch over roof infill area. If new
roofing is installed the same day tear-off is made,
roofing patch is not required.
3.5 BASE FLASHING REMOVAL
A. Remove existing base flashings. Clean substrates of
contaminants, such as asphalt, sheet materials, dirt, and
debris.
B. Do not damage metal counterflashings that are to remain.
Replace metal counterflashings damaged during removal with
counterflashings of same metal, weight or thickness, and
finish.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
PREPARATION FOR REROOFING 070150-5
C. When directed by Architect, replace parapet framing, wood
blocking, curbs, and nailers to comply with Section 061053
Miscellaneous Rough Carpentry."
3.6 DISPOSAL
A. Collect demolished materials and place in containers.
Promptly dispose of demolished materials. Do not allow
demolished materials to accumulate on-site.
B. Transport and legally dispose of demolished materials off
Owner's property.
END OF SECTION 070150 PREPARATION FOR REROOFING
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
METAL WALL PANELS 074213-1
SECTION 074213 - METAL WALL PANELS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes metal composite material wall panels.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include fabrication and installation layouts
of metal composite material panels; details of edge
conditions, joints, panel profiles, corners, anchorages,
attachment assembly, trim, flashings, closures, and
accessories; and special details.
C. Samples: For each type of metal composite material panel
indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Warranties: Samples of special warranties.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers
and supervisors who are trained and approved by manufacturer.
1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which
manufacturer agrees to repair or replace components of metal
composite material panel systems that fail in materials or
workmanship within specified warranty period.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
METAL WALL PANELS 074213-2
1. Warranty Period: Two years from date of Substantial
Completion.
B. Special Warranty on Panel Finishes: Manufacturer's standard
form in which manufacturer agrees to repair finish or replace
metal composite material panels that show evidence of
deterioration of factory-applied finishes within specified
warranty period.
1. Finish Warranty Period: 10 years from date of
Substantial Completion.
PART 2 - PRODUCTS
2.1 METAL COMPOSITE MATERIAL WALL PANELS
A. Metal Composite Material Wall Panel Systems: Provide factory-
formed and -assembled, metal composite material wall panels
fabricated from two metal facings that are bonded to a solid,
extruded thermoplastic core; formed into profile for
installation method indicated. Include attachment assemblies
components, panel stiffeners, and accessories required for
weathertight system.
1. Basis-of-Design Product: Subject to compliance with
requirements, provide product indicated on Drawings or
comparable product approved equal by the Architect.
B. Aluminum-Faced Composite Wall Panels: Formed with 0.020-inch-
thick, anodized aluminum sheet facings.
1. Panel Thickness: 0.236 inch.
2. Core: Standard.
3. Exterior Finish: Three-coat fluoropolymer.
a. Color: As selected by Architect from manufacturer's
full range.
C. Attachment Assembly Components: Formed from extruded
aluminum.
D. Attachment Assembly: Manufacturer's standard.
2.2 MISCELLANEOUS MATERIALS
A. Miscellaneous Metal Subframing and Furring: ASTM C 645, cold-
formed, metallic-coated steel sheet ASTM A 653/A 653M, G90
coating designation or ASTM A 792/A 792M, Class AZ50
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
METAL WALL PANELS 074213-3
aluminum-zinc-alloy coating designation unless otherwise
indicated. Provide manufacturer's standard sections as
required for support and alignment of metal composite
material panel system.
B. Panel Accessories: Provide components required for a
complete, weathertight panel system including trim, copings,
fasciae, mullions, sills, corner units, clips, flashings,
sealants, gaskets, fillers, closure strips, and similar
items. Match material and finish of metal composite material
panels unless otherwise indicated.
C. Flashing and Trim: Provide flashing and trim formed from same
material as metal composite material panels as required to
seal against weather and to provide finished appearance.
Locations include, but are not limited to, bases, drips,
sills, jambs, corners, endwalls, framed openings, rakes,
fasciae, parapet caps, soffits, reveals, and fillers. Finish
flashing and trim with same finish system as adjacent metal
composite material panels.
D. Panel Fasteners: Self-tapping screws designed to withstand
design loads. Provide exposed fasteners with heads matching
color of metal composite material panels by means of plastic
caps or factory-applied coating. Provide EPDM or PVC sealing
washers for exposed fasteners.
E. Panel Sealants: ASTM C 920; as recommended in writing by
metal composite material panel manufacturer. Provide sealant
types recommended by manufacturer that are compatible with
panel materials, are nonstaining, and do not damage panel
finish.
2.3 FABRICATION
A. General: Fabricate and finish metal composite material panels
and accessories at the factory, by manufacturer's standard
procedures and processes, as necessary to fulfill indicated
performance requirements demonstrated by laboratory testing.
Comply with indicated profiles and with dimensional and
structural requirements.
B. Fabricate metal composite material panel joints with factory-
installed captive gaskets or separator strips that provide a
weathertight seal and prevent metal-to-metal contact, and
that minimize noise from movements.
C. Sheet Metal Flashing and Trim: Fabricate flashing and trim to
comply with manufacturer's recommendations and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
METAL WALL PANELS 074213-4
recommendations in SMACNA's "Architectural Sheet Metal
Manual" that apply to design, dimensions, metal, and other
characteristics of item indicated.
PART 3 - EXECUTION
3.1 PREPARATION
A. Miscellaneous Supports: Install subframing, furring, and
other miscellaneous panel support members and anchorages
according to ASTM C 754 and metal composite material panel
manufacturer's written recommendations.
3.2 METAL COMPOSITE MATERIAL PANEL INSTALLATION
A. Attachment Assembly, General: Install attachment assembly
required to support metal composite material wall panels and
to provide a complete weathertight wall system, including
subgirts, perimeter extrusions, tracks, drainage channels,
panel clips, and anchor channels.
1. Include attachment to supports, panel-to-panel joinery,
panel-to-dissimilar-material joinery, and panel-system
joint seals.
B. Installation: Attach metal composite material wall panels to
supports at locations, spacings, and with fasteners
recommended by manufacturer to achieve performance
requirements specified.
1. Wet Seal Systems: Seal horizontal and vertical joints
between adjacent metal composite material wall panels
with sealant backing and sealant. Install sealant backing
and sealant according to requirements specified in
Section 079200 "Joint Sealants."
2. Dry Seal Systems: Seal horizontal and vertical joints
between adjacent metal composite materialwall panels with
manufacturer's standard gasket system.
3. Rainscreen Systems: Do not apply sealants to joints
unless otherwise indicated.
C. Accessory Installation: Install accessories with positive
anchorage to building and weathertight mounting, and provide
for thermal expansion. Coordinate installation with flashings
and other components.
D. Flashing and Trim: Comply with performance requirements,
manufacturer's written installation instructions, and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
METAL WALL PANELS 074213-5
SMACNA's "Architectural Sheet Metal Manual." Provide
concealed fasteners where possible, and set units true to
line and level as indicated. Install work with laps, joints,
and seams that are permanently watertight.
3.3 CLEANING
A. Remove temporary protective coverings and strippable films,
if any, as metal composite material panels are installed,
unless otherwise indicated in manufacturer's written
installation instructions. On completion of metal composite
material panel installation, clean finished surfaces as
recommended by metal composite material panel manufacturer.
Maintain in a clean condition during construction.
END OF SECTION 074213
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-1
SECTION 075400 – THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
1.01 SUMMARY
A. Section Includes 1. Thermoplastic Polyolefin Single-Ply Roofing Membrane
2. Thermoplastic Polyolefin Flashings
3. Thermoplastic Polyolefin Accessories
4. Insulation
B. Related Sections 1.Section 061053: Miscellaneous Rough Carpentry
2.Section 076200: Sheet Metal Flashing and Trim
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) - Annual Book of ASTM Standards
1. ASTM D-751 – Standard Test Methods for Coated Fabrics 2. ASTM D-2137 - Standard Test Methods for Rubber Property—Brittleness Point of Flexible Polymers and Coated Fabrics
3. ASTM E-96 - Standard Test Methods for Water Vapor
Transmission of Materials
4. ASTM D1204 - Standard Test Method for Linear Dimensional Changes of Nonrigid Thermoplastic Sheeting or Film at
Elevated Temperature
5. ASTM D-471 - Standard Test Method for Rubber Property—Effect of Liquids
6. ASTM D-1149 - Standard Test Methods for Rubber
Deterioration—Cracking in an Ozone Controlled Environment
7. ASTM C-1549 - Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a
Portable Solar Reflectometer
8. ASTM C-1371 - Standard Test Method for Determination of Emittance of Materials Near Room Temperature Using
Portable Emissometers
9. ASTM G155 - Standard Practice For Operating Xenon Arc Light Apparatus For Exposure Of Non-Metallic Materials
10. ASTM D573 - Standard Test Method For Rubber -
Deterioration In An Air Oven
B. Sheet Metal and Air Conditioning Contractors National
Association, Inc. (SMACNA) - Architectural Sheet
Metal Manual
C. National Roofing Contractors Association (NRCA)
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-2
D. American Society of Civil Engineers (ASCE)
E. U.S. Green Building Council (USGBC) 1. Leadership in Energy and Environmental Design (LEED)
F. Factory Mutual (FM Global) - Approval Guide
G. Underwriters Laboratories (UL) - Roofing Systems and
Materials Guide (TGFU R1306)
H. California Title 24 Energy Efficient Standards
I. ENERGY STAR J. Cool Roofing Rating Council (CRRC)
K. Miami-Dade County
1.03 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D1079 and the glossary of the National Roofing Contractors Association (NRCA)
Roofing and Waterproofing Manual for definitions of roofing
terms related to this section.
1.04 LEED CERTICICATION
A. Provide a roofing system that will achieve or aid in the qualification of points satisfying
1. Sustainable Site credit 7.2 - Heat Island Effect - Roof. 2. Materials & Resource credit 4 - Recycled Content. 3. Materials & Resource credit 5 - Local and Regional
Materials.
4. Indoor Air Quality credit 4.1 - Low-Emitting Materials - Adhesives and Sealants.
1.05 SUBMITTALS
A. Product Data: Provide product data sheets for each type of product indicated in this section.
B. Shop Drawings: Provide manufacturers standard details and approved shop drawings for the roof system specified.
C. Samples: Provide samples of insulations, fasteners,
membrane materials and accessories for verification of
quality.
D. Certificates: Installer shall provide written
documentation from the manufacturer of their authorization
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-3
to install the roof system, and eligibility to obtain the
warranty specified in this section.
1.06 QUALITY ASSURANCE
A. Manufacturer’s Qualifications: Contractor shall provide a roofing system that meets or exceeds all criteria listed in
this section.
B. Source Limitations: All components listed in this section shall be provided by a single manufacturer or approved by
the primary roofing manufacturer.
C. Final Inspection
Manufacturer’s representative shall provide a comprehensive
final inspection after completion of the roof system. All
application errors must be addressed and final punch list
completed.
1.07 PRE-INSTALLATION CONFERENCE
A. Prior to scheduled commencement of the roofing installation and associated work, conduct a meeting at the project site
with the installer, architect, owner, Contractor
representative and any other persons directly involved with
the performance of the work. The installer shall record
conference discussions to include decisions and agreements
reached (or disagreements), and furnish copies of recorded
discussions to each attending party. The main purpose of
this meeting is to review foreseeable methods and
procedures related to roofing work.
1.08 PERFORMANCE REQUIREMENTS
A. Provide an installed roofing membrane and base flashing system that does not permit the passage of water, and will
withstand the design pressures calculated in accordance
with the most current revision of ASCE 7.
B. Contractor shall provide all primary roofing materials that are physically and chemically compatible when installed in
accordance with manufacturers current application
requirements.
C. Heat Aging
1. Test Method D573. Age sheet specimens for 150 days at 275°F. After exposure, the specimens shall be removed,
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-4
wrapped around a 3 inch mandrel, and inspected for cracks
and crazing. A specimen is rated “pass” if no cracks or
crazing is observed.
D. Weather Resistance: 1. Test Method G151 and G155, using conditions detailed in ASTM D6878 except that the radiant exposure should be
40,320 kJ/m2.nm at 340 nm (i.e. 4 times the D6878
standard). After exposure, the specimens shall be
removed, wrapped around a 3 inch mandrel, and inspected
for cracks and crazing. A specimen is rated “pass” if no
cracks or crazing is observed.
1.09 REGULATORY REQUIREMENTS
A. All work shall be performed in a safe, professional manner, conforming to all federal, state and local codes.
B. Provide a system that meets FM Class 1-195 in the field of the roof. FM RoofNav assembly # 334717-0-0.
1.10 DELIVERY, STORAGE AND HANDLING
A. Deliver all roofing materials to the site in original containers, with factory seals intact.
B. Store all pail goods in their original undamaged containers in a clean, dry location within their specified temperature
range.
C. Do not expose materials to moisture in any form before, during, or after delivery to the site. Reject delivery of
materials that show evidence of contact with moisture.
D. Remove manufacturer supplied plastic covers from materials provided with such. Use “breathable” type covers such as
canvas tarpaulins to allow venting and protection from
weather and moisture. Cover and protect materials at the
end of each work day. Do not remove any protective
tarpaulins until immediately before the material will be
installed.
E. Materials shall be stored above 55°F (12.6°C) a minimum of 24 hours prior to application.
1.11 PROJECT CONDITIONS
A. Weather
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-5
1.Proceed with roofing only when existing and forecasted
weather conditions permit.
2.Ambient temperatures must be above 45°F (7.2°C) when
applying hot asphalt or water based adhesives.
1.12 WARRANTY
A. Provide Manufacturers standard Guarantee with single source coverage and no monetary limitation where the manufacturer
agrees to repair or replace components in the roofing
system, which cause a leak due to a failure in materials or
workmanship.
1.Duration: Thirty (30) years from the date of completion.
*Materials and workmanship of listed products within this
section when installed in accordance with current.
PART 2 PRODUCTS
2.01 ACCEPTABLE MANUFACTURER
A. GAF® - 1 Campus Drive, Parsippany, NJ 07054. B. CARLISLE – 16430 N. SCOTTSDALE ROAD #400 SCOTTSSDALE, AZ.
85254
C. TROPICAL ROOFING PRODUCTS-1818 SW 31ST AVE HALLANDALE,FL 3309
2.02 INSULATION
A. Rigid polyisocyanurate board, with a strong white or black
fibrous glass facer conforming to or exceeding the
requirements of STM C 1289 / FS HH-I-1972 Polyiso
Insulation, with the following characteristics:
1. Board Thickness: 2.6”
2. Thermal Resistance (LTTR value) of: 15.0
B. Rigid polyisocyanurate board, with a strong white or black
fibrous glass facer conforming to or exceeding the
requirements of ASTM C 1289 / FS HH-I-1972. Tapered Polyiso
Insulation, with the following characteristics:
1. Board Thickness: ¼” tapered.
2. Thermal Resistance (LTTR value) of: varies.
C. Rigid polyisocyanurate cover board, with a coated polymer-
bonded glass fiber mat facers on both major surfaces of the
core foam conforming to or exceeding the requirements of
ASTM C 1289 / Class 4, Grade 1. HD Polyiso Insulation, with
the following characteristics:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-6
1. Board Thickness: ½” or 12.7mm
2. Minimum Compressive Strength: 80psi (551kPa)
3. Thermal Resistance (LTTR value) of: >2.5
2.03 MEMBRANE MATERIALS
A. A smooth type, polyester scrim reinforced thermoplastic polyolefin membrane with a nominal 0.060 inch (60 mil)
thickness, for use as a single ply roofing membrane.
Engineered to provide high solar reflectivity and extremely
high UV and thermal resistance. These combined
characteristics produce a single-ply membrane suitable for
the most demanding solar installations as well as any other
high heat or solar loading applications. Meets or exceeds
the minimum requirements of ASTM D-6878. UL Listed and FM
Approved. Each full roll contains approximately 1000
sq.ft. of roofing material, 10’ X 100’, weighing 322 lbs.
TPO 60 mil thermoplastic single-ply roofing membrane.
2.04 FLASHING MATERIALS
A. A smooth type, polyester scrim reinforced thermoplastic polyolefin membrane with a nominal 0.060 inch (60 mil)
thickness, for use as a single ply roofing membrane.
Engineered to provide high solar reflectivity and extremely
high UV and thermal resistance. These combined
characteristics produce a single-ply membrane suitable for
the most demanding solar installations as well as any other
high heat or solar loading applications. Meets or exceeds
the minimum requirements of ASTM D-6878. UL Listed and FM
Approved. Each full roll contains approximately 1000
sq.ft. Of roofing material, 10’ X 100’, weighing 322 lbs.
TPO 60 mil thermoplastic single-ply roofing membrane.
2.05 ADHESIVES, SEALANTS and PRIMERS
A. Low VOC solvent-based Bonding Adhesive: Solvent based
rubberized adhesive for use with TPO membranes, Low VOC
Bonding Adhesive.
B. Low VOC solvent based primer for preparing surfaces to receive butyl based adhesive tapes, TPO Low VOC Primer.
C. Low VOC TPO cleaner designed to clean exposed or
contaminated seams prior to heat welding to remove any
residual soap or revitalize aged membranes. Contains only
50 grams per liter of Volatile Organic Content and has been
formulated using a blend of primarily VOC-exempt
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-7
ingredients to be in compliance with air quality
regulations for single ply roofing products.
D. One part butyl based high viscosity sealant suitable for sealing between flashing membrane and substrate surface
behind exposed termination bars and for sealing between
roofing membrane and drain flange.
E. 100% solids epoxy based two-part sealant suitable for
filling sealant pans at irregularly-shaped penetrations.
Epoxy is part A. Polyamide is part B.
F. One-part, moisture-cure, self-leveling sealant designed for use in pitch pans on single ply roof systems. One-Part
Pourable Sealant.
G. Insulation Adhesive:
2.06 ACCESSORIES
A. FLASHING ACCESSORIES
1. A smooth type, unreinforced thermoplastic polyolefin
based membrane for use as an alternative
flashing/reinforcing material for penetrations and corners.
Required whenever preformed vent boots cannot be used,
0.055 inches (55 mils) nominal thickness and sheet size:
24in x 50ft.
2. An 8 inch (20 cm) wide smooth type, polyester scrim
reinforced thermoplastic polyolefin membrane strip for use
as a cover strip over coated metal and stripping-in coated
metal flanges and general repairs: 0.045 inches (45 mils)
nominal thickness with 100 foot length.
3. Extruded aluminum termination bar with angled lip caulk
receiver and lower leg bulb stiffener. Pre-punched slotted
holes at 6” on center or 8” on center. ¾” x 10’ with 0.090”
cross section.
4. A 6 inch (14 cm) wide, smooth type, heat-weldable
polyester scrim reinforced thermoplastic polyolefin
membrane strip. Designed for use as a cover strip over
non-coated metal edges and flanges. Each full roll
contains approximately 100 Lineal Ft. of material, 6” X
100’.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-8
5. .045” reinforced TPO membrane with pressure sensitive adhesive, to be installed on horizontal surfaces using
plates and fasteners as a base attachment in fully
adhered systems. Size 6” x 100’.
6. 24 gauge steel with 0.025” thick TPO based film as required for fabrication into metal gravel stop and drip
edge profiles, metal base and curb flashings, sealant
pans, and scupper sleeves. Standard sheet size 4’ x 10’,
sheet weight 47 lbs. Custom sizes available.
B. WALL & CURB ACCESSORIES
1. 55 mil TPO membrane and 24 gauge coated metal
prefabricated into standard and custom size thru wall
scuppers. Available in two sizes: 4" x 6" x 12" (l x w x
d) with a 5.75" x 3.75" opening and 8" x 10" x 12" (l x w
x d) with a 9.75" x 7.75" opening.
2. .045” thick reinforced TPO membrane fabricated corners. Available in four standard sizes to flash curbs. Four
corners are required to flash the curb.
3. 0.045” thick molded TPO membrane outside corners of base and curb flashing. Hot-air welds directly to TPO
membrane. Size 4” x 4” with 6” flange.
4. 0.055” molded TPO membrane inside corners of base and
curb flashing. Hot-air welds directly to TPO membrane.
Size 6” x 6” x 5.5”.
5. 8” diameter, nominal .050” vacuum formed unreinforced TPO membrane for use in flashing outside corners of base
and curb flashings.
6. 0.050” molded TPO membrane inside corners of base and curb flashing. Hot-air welds directly to TPO membrane.
Size 6” x 6” x 5.25” high.
C. PENETRATION ACCESSORIES
1. 0.065” thick molded TPO membrane sized to accommodate most common pipe and conduits, (1” to 6” diameter pipes),
including square tube. Hot-air welded directly to TPO
membrane, supplied with stainless steel clamping rings.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-9
2. 0.045” thick molded TPO membrane preformed boots are split to accommodate most common pipes and conduits and
available in three standard sizes.
3. 0.045” thick molded TPO membrane preformed square boots are split to accommodate most common square penetrations
and conduits and available in three standard sizes.
4. .070 thick molded penetration pocket to provide
structure and foundation for the application of a
pourable sealant for a variety of roof penetrations ,
weldable and 9" x 6" x 4" (l x w x h).
5. .055” thick smooth type, unreinforced thermoplastic
polyolefin membrane designed for use as a conforming
membrane seal over T-joints in 60 and 80 mil membrane
applications.
6. Aluminum drain unit coated with a weldable TPO compound. TPO membrane can be heat welded directly to the drain
body, resulting in a strong, secure installation. Each
drain is fitted with a BlueSeal® mechanical drain seal
for a secure, tight seal into the building drain system.
Available in two sizes ( 3” and 4”), and custom sizes
are available.
D. ROOF EDGE ACCESSORIES
1. Three piece fascia system with continuous galvanized steel spring cant, exterior decorative snap-on fascia and
available in 10 foot lengths in standard or custom
colors.
2. Two piece fascia system with rigid terminator base plate and exterior decorative fascia cover available in 10 foot
lengths in standard or custom colors for use with 45 mil
and 60 mil only.
3. Two piece fascia system with rigid extruded terminator base plate and exterior decorative snap-on fascia cover
available in 10 foot lengths in standard or custom
colors.
E. FIELD OF ROOF ACCESSORIES 1. Pre-manufactured expansion joint covers used to bridge expansion joint openings in a roof structure. Fabricated
to accommodate all roof to wall and roof to roof
applications, made of .060” reinforced TPO membrane,
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-10
available in 5 standard sizes for expansion joint
openings up to 8” wide.
2. .055” thick smooth type, unreinforced thermoplastic
polyolefin membrane designed for use as a conforming
membrane seal over T-joints in 60 and 80 mil membrane
applications.
3. 1/8” thick extruded and embossed TPO roll 34” x 50’, heat welds directly to roofing membrane. Unique
herringbone traction surface. Available in gray or
yellow.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that the surfaces and site conditions are ready to receive work.
B. Verify that the deck is supported and secured.
C. Verify that the deck is clean and smooth, free of
depressions, waves, or projections, and properly sloped to
drains, valleys, eaves, scuppers or gutters.
D. Verify that the deck surfaces are dry and free of ice or snow.
E. Verify that all roof openings or penetrations through the roof are solidly set, and that all flashings are tapered.
3.02 SUBSTRATE PREPARATION
A. Structural Concrete Deck 1.Minimum deck thickness for structural concrete is 4”
(10.2 cm).
2.Only poured in place concrete decks that provide bottom
side drying are acceptable. Decks that are installed over
non-vented metal decks or pans that remain in place may
trap moisture in the deck beneath the roof system and are
not acceptable.
3.The roof deck shall be properly cured prior to
application of the roofing system; twenty-eight (28) days
is normally required for proper curing. Curing agents
must be checked for compatibility with roofing materials.
Prior to the installation of the roof assemblies,
recommend the evaluation of the surface moisture and
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-11
deck’s dryness through the use of ASTM D-4263 or hot
bitumen test.
4.The deck must be smooth, level and cannot be wet or
frozen. If deck is determined to be wet, it must be
allowed to dry.
5.Treat cracks greater than 1/8” (3 mm) in width in
accordance with the deck manufacturer’s recommendations.
6.Sumps for the roof drains shall be provided in the
casting of the deck.
7.When insulation or roofing is to be adhered with hot
asphalt, prime the deck with asphalt/concrete primer,
ASTM D 41 at the rate of one gallon per 100 square feet
(0.4 L/m2). Allow the primer to dry prior to the
application of the roofing system.
8.In all retrofit roof applications, it is required that
deck be inspected for defects. Any defects are to be
corrected per the deck manufacturer’s recommendations
prior to the new roof application.
3.03 INSTALLATION - GENERAL
A. Install TPO roofing system according to all current
application requirements in addition to those listed in
this section.
B. TPO Specification #: TFATI60EX OR EQUAL
C. Start the application of membrane plies at the low point of the roof or at the drains, so that the flow of water is
over or parallel to, but never against the laps.
3.04 INSULATION - GENERAL
A. Do not apply roof insulation or roofing until all other work trades have completed jobs that require them to
traverse the deck on foot or with equipment. A vapor
retarder coated lightly with asphalt may be applied to
protect the inside of the structure prior to the insulation
and final roofing installation. Before the application of
the insulation, any damage or deterioration to the vapor
retarder must be repaired.
B. Do not install wet, damaged or warped insulation boards.
C. Install insulation boards with staggered board joints in one direction (unless taping joint).
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-12
D. Install insulation boards snug. Gaps between board joints must not exceed ¼” (6 mm). All gaps in excess of ¼” (6 mm)
must be filled with like insulation material.
E. Wood nailers must be 3-1/2” (8.9 cm) minimum width or 1” (25 mm) wider than metal flange. They shall be of equal
thickness as the insulation, and be treated for rot
resistance. All nailers must be securely fastened to the
deck.
F. Do not kick insulation boards into place.
G. Miter and fill the edges of the insulation boards at
ridges, valleys and other changes in plane to prevent open
joints or irregular surfaces. Avoid breaking or crushing of
the insulation at the corners.
H. Insulation should not be installed over new lightweight insulating concrete.
I. Roof tape, if required over insulation joints, must be laid evenly, smoothly and embedded in a uniform coating of hot
steep asphalt with 4” (10.2 cm) end laps. Care must be
taken to assure smooth application of tape, and full
embedment of the tape in the asphalt.
J. Do not install any more insulation than will be completely waterproofed each day.
3.05 INSULATION – BASE LAYER
A. The substrate must be free of and debris, dust, dirt, oil, grease, and standing water before applying the adhesive.
B. must be applied using the specially designed PaceCart
dispenser. Bond shall be applied using one of the
specially designed dual cartridge dispensers.
C. Install insulation layers applied with bands of Bond 500 spaced 12” O.C. – Field, 6” O.C. – Perimeter and 4” O.C. –
Corners. Approximate coverage rate is ½ to 1 gallon per
100 square feet, depending on the substrate. Allow the
foam to rise ¾” to 1”. Walk each board firmly into place.
Stagger the joints of additional layers in relation to the
insulation joints in the layer(s) below by a minimum of 6”
(15.2 cm) to eliminate continuous vertical gaps.
3.06 INSULATION – SUBSEQUENT LAYERS
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-13
A. The substrate must be free of and debris, dust, dirt, oil,
grease, and standing water before applying the adhesive.
B. Bond must be applied using the specially designed PaceCart
dispenser. Bond shall be applied using one of the
specially designed dual cartridge dispensers.
C. Install insulation layers applied with bands of Bond spaced
12” O.C. – Field, 6” O.C. – Perimeter and 4” O.C. –
Corners. Approximate coverage rate is ½ to 1 gallon per 100
square feet, depending on the substrate. Allow the foam to
rise ¾” to 1”. Walk each board firmly into place. Stagger
the joints of additional layers in relation to the
insulation joints in the layer(s) below by a minimum of 6”
(15.2 cm) to eliminate continuous vertical gaps.
3.07 MEMBRANE APPLICATION
A. Fully Adhered:
1. Place membrane so that wrinkles and buckles are not formed. Any wrinkles or buckles must be removed from the
sheet prior to permanent attachment. Roof membrane shall
be fully adhered immediately after it is rolled out,
followed by welding to adjacent sheets.
2. Overlap roof membrane a minimum of 3” (15 cm) for side laps and 3” (15 cm) for end laps.
3. Install membrane so that the side laps run across the roof slope lapped towards drainage points.
4. All exposed sheet corners shall be rounded a minimum of 1”.
5. Use full width rolls in the field and perimeter region of roof.
6. Use appropriate bonding adhesive for substrate surface, applied with a solvent-resistant roller, brush or
squeegee.
7. Apply bonding adhesive at 6 squares of finished, mated surface area per 5 gallons (Low VOC). A greater quantity
of bonding adhesive may be required based upon the
substrate surface condition.
8. Prevent seam contamination by keeping the adhesive
application a few inches back from the seam area.
9. Adhere approximately one half of the membrane sheet at a time. One half of the sheet’s length shall be folded
back in turn to allow for adhesive application. Lay
membrane into adhesive once the bonding adhesive is
tacky to the touch.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-14
10. Roll membrane with a weighted roller to ensure complete bonding between adhesive and membrane.
11. Membrane laps shall be heat-welded together. All welds shall be continuous, without voids or partial welds.
Welds shall be free of burns and scorch marks.
12. Weld shall be a minimum of 1-1/2” in width for
automatic machine welding and a minimum 2” in width for
hand welding.
13. All cut edges of reinforced membrane must be sealed with TPO Cut Edge Sealant.
14. Supplemental membrane attachment is required at the base of all walls and curbs, and where the angle of the
substrate changes by more than five (5) degrees (1” in
12”). Roofing membrane shall be secured to the
structural deck with appropriate screws and plates
spaced every 12” o.c. The screws and plates must be
installed no less than ½” from the membrane edge.
Alternatively, the roofing membrane may be turned up the
vertical plane a minimum of 3” and secured with screws
and termination bar Fastener spacing is the same as is
used for in-lap attachment. The termination bar must be
installed within 1-1/2” to 2” of the plane of the roof
membrane, with a minimum of 1” of membrane extending
above the termination bar.
15. Supplemental membrane attachment to the structural deck is required at all penetrations unless the insulation
substrate is fully adhered to the deck. Roofing membrane
shall be secured to the deck with appropriate screws and
plates.
16. Fasteners must be installed to achieve the proper
embedment depth. Install fasteners without lean or tilt.
17. Install fasteners so that the plate or termination bar is drawn down tightly to the membrane surface. Properly
installed fasteners will not allow the plate or
termination bar to move (underdriving), but will not
cause wrinkling of the membrane (overdriving).
3.08 FLASHINGS
A. General: 1. All penetrations must be at least 24” (61 cm) from
curbs, walls, and edges to provide adequate space for
proper flashing.
2. Flash all perimeter, curb, and penetration conditions
with coated metal, membrane flashing, and flashing
accessories as appropriate to the site condition.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-15
3. All coated metal and membrane flashing corners shall be
reinforced with preformed corners or non-reinforced
membrane.
4. Hot-air weld all flashing membranes, accessories, and
coated metal. A minimum 2” wide (hand welder) weld or
minimum 1 - 1/2" automatic machine weld is required.
5. All cut edges of reinforced membrane must be sealed with
TPO Cut Edge Sealant.
6. Consult the Application and Specifications Manual or
Contractor Services for more information on specific
construction details, or those not addressed in this
section.
B. Coated Metal Flashings: 1. Coated metal flashings shall be formed in accordance
with current construction details and SMACNA guidelines.
2. Coated metal sections used for roof edging, base
flashing and coping shall be butted together with a ¼”
gap to allow for expansion and contraction. Hot-air weld
a 6” wide reinforced membrane flashing strip to both
sides of the joint, with approximately 1” on either side
of the joint left un-welded to allow for expansion and
contraction. 2” wide aluminum tape can be installed over
the joint as a bond-breaker, to prevent welding in this
area.
3. Coated metal used for sealant pans, scupper inserts, corners of roof edging, base flashing and coping shall
be overlapped or provided with separate metal pieces to
create a continuous flange condition, and pop-riveted
securely. Hot-air weld a 6” wide reinforced membrane
flashing strip over all seams that will not be sealed
during subsequent flashing installation.
4. Provide a ½” hem for all exposed metal edges to provide corrosion protection and edge reinforcement for improved
durability.
5. Provide a ½” hem for all metal flange edges whenever possible to prevent wearing of the roofing and flashing
membranes at the flange edge.
6. Coated metal flashings shall be nailed to treated wood nailers or otherwise mechanically attached to the roof
deck, wall or curb substrates, in accordance with
construction detail requirements.
C. Reinforced Membrane Flashings: 1. The thickness of the flashing membrane shall be the same
as the thickness of the roofing membrane.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-16
2. Membrane flashing may either be installed loose or fully adhered to the substrate surface in accordance with
“Construction Detail Requirements”.
3. Where flashings are to be fully adhered, apply bonding adhesive at a rate resulting in 60 square feet/gallon of
finished roofing material for solvent-based bonding
adhesives, and at a rate of 125 square feet/gallon of
finished roofing material for water-borne bonding
adhesive. Apply bonding adhesive to both the underside
of the membrane and the substrate surface at 120 square
feet per gallon (Solvent Based) and 250 square feet per
gallon (Water Based). A greater quantity of bonding
adhesive may be required based upon the substrate
surface condition. The bonding adhesive must be allowed
to dry until tacky to the touch before flashing membrane
application.
4. Apply the adhesive only when outside temperature is above 40°F. Recommended minimum application temperature
is 50°F to allow for easier adhesive application.
5. The membrane flashing shall be carefully positioned
prior to application to avoid wrinkles and buckles.
D. Un-reinforced Membrane Flashings: 1. Un-reinforced membrane is used to field-fabricate
penetration or reinforcement flashings in locations
where preformed corners and pipe boots cannot be
properly installed.
2. Penetration flashings constructed of un-reinforced
membrane are typically installed in two sections, a
horizontal piece that extends onto the roofing membrane
and a vertical piece that extends up the penetration.
The two pieces are overlapped and hot-air welded
together.
3. The un-reinforced membrane flashing shall be adhered to the penetration surface. Apply bonding adhesive at a
rate resulting in 60 square feet/gallon of finished
roofing material for solvent-based bonding adhesives,
and at a rate of 125 square feet/gallon of finished
roofing material for water-borne bonding adhesive. Apply
bonding adhesive to both the underside of the membrane
and the substrate surface at 120 square feet per gallon
(Solvent Based) and 250 square feet per gallon (Water
Based). A greater quantity of bonding adhesive may be
required based upon the substrate surface condition.
The bonding adhesive must be allowed to dry until tacky
to the touch before flashing membrane application.
E. Roof Edges:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-17
1. Roof edge flashings are applicable for gravel stop and drip edge conditions as well as for exterior edges of
parapet walls.
2. Flash roof edges with metal flanges nailed 4” O.C. to pressure-treated wood nailers. Where required, hot-air
weld roof membrane to coated metal flanges.
3. When the fascia width exceeds 4”, coated metal roof edging must be attached with a continuous cleat to
secure the lower fascia edge. The cleat must be secured
to the building no less than 12” O.C.
4. Alternatively, roof edges may be flashed with a 2-piece snap on fascia system, adhering the roof membrane to a
metal cant and face nailing the membrane 8” on center
prior to installing a snap-on fascia.
5. Flash roof edge scuppers with a coated metal insert that is mechanically attached to the roof edge and integrated
as a part of the metal edging.
F. Parapet and Building Walls: 1. Flash walls with TPO membrane adhered to the substrate
with bonding adhesive, loose applied (Less than 24” in
height) or with coated metal flashing nailed 4” on
center to pressure-treated wood nailers.
2. Secure membrane flashing at the top edge with a
termination bar. Water Block shall be applied between
the wall surface and membrane flashing underneath all
exposed termination bars. Exposed termination bars shall
be mechanically fastened 8” on center; termination bars
that are counter flashed shall be fastened 12” on
center.
3. Roof membrane must be mechanically attached along the base of walls with screws and plates (deck securement)
or screws and inverted termination bar (wall securement)
at the following rate:
Fully / Self Adhered
Systems
12” on center
4. All coated metal wall flashings and loose applied
membrane flashings must be provided with separate metal
counterflashings, or metal copings.
5. Metal counterflashings may be optional with fully
adhered flashings depending on guarantee requirements.
Exposed termination bars must be sealed with roofing
cement or caulk grade.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-18
6. Flash wall scuppers with a coated metal insert that is mechanically attached to the wall and integrated as part
of the wall flashing.
G. Curbs and Ducts: 1. Flash curbs and ducts with TPO membrane adhered to the
curb substrate with bonding adhesive, loose applied
(Less than 18” in height) or with coated metal flashing
nailed 4” on center to pressure-treated wood nailers.
2. Secure membrane flashing at the top edge with a
termination bar. Water Block shall be applied between
the curb/duct surface and membrane flashing underneath
all termination bars. Exposed termination bars shall be
mechanically fastened every 8”o.c.; termination bars
that are counter flashed shall be fastened 12” on
center.
3. Roof membrane must be mechanically attached along the base of walls with screws and plates (deck securement)
or screws and inverted termination bar (wall securement)
at the following rate:
Fully / Self Adhered
Systems
12” on center
4. All coated metal curb flashings and loose applied
membrane flashings must be provided with separate metal
counterflashings, or metal copings.
5. Metal counterflashings may be optional with fully
adhered flashings depending on guarantee requirements.
Exposed termination bars must be sealed with roofing
cement or caulk grade.
H. Roof Drains: 1. Roof drains must be fitted with compression type
clamping rings and strainer baskets. Original-type cast
iron and aluminum drains, as well as retrofit-type cast
iron, aluminum or molded plastic drains are acceptable.
2. Roof drains must be provided with a minimum 36” x 36” sump. Slope of tapered insulation within the sump shall
not exceed 4” in 12”.
3. Extend the roofing membrane over the drain opening. Locate the drain and cut a hole in the roofing membrane
directly over the drain opening. Provide a ½” of
membrane flap extending past the drain flange into the
drain opening. Punch holes through the roofing membrane
at drain bolt locations.
4. For cast iron and aluminum drains, the roofing membrane must be set in a full bed of water block on the drain
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-19
flange prior to securement with the compression clamping
ring. Typical water block application is one 10.5 ounce
cartridge per drain.
5. Lap seams shall not be located within the sump area. Where lap seams will be located within the sump area, a
separate roof membrane drain flashing a minimum of 12”
larger than the sump area must be installed. The roof
membrane shall be mechanically attached 12” on center
around the drain with screws and plates. The separate
roof drain flashing shall be heat welded to the roof
membrane beyond the screws and plates, extended over the
drain flange, and secured as above.
6. Tighten the drain compression ring in place.
3.09 TRAFFIC PROTECTION
A. Install walkway rolls at all roof access locations and other designated locations including roof-mounted equipment
work locations and areas of repeated rooftop traffic.
B. Walkway pads must be spaced 2" apart to allow for drainage between the pads.
C. Heat-weld walkway rolls to the roof membrane surface
continuously around the perimeter of the roll.
D. Walkway rolls may be installed with TPO primer and 3” seam tape.
1. Roll or brush the TPO primer on the back of the TPO pad along the edges and down the middle length of the pad.
2. Clean and prime the roof membrane where the pad will be installed.
3. Install tape to the back of the cleaned area of the pad and roll in with a silicone hand roller.
4. Remove release paper and install the tapes pads directly onto the roof membrane. Roll pads to secure in place
3.10 ROOF PROTECTION
A. Protect all partially and fully completed roofing work from other trades until completion.
B. Whenever possible, stage materials in such a manner that foot traffic is minimized over completed roof areas.
C. When it is not possible to stage materials away from
locations where partial or complete installation has taken
place, temporary walkways and platforms shall be installed
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075400-20
in order to protect all completed roof areas from traffic
and point loading during the application process.
D. Temporary tie-ins shall be installed at the end of each workday and removed prior to commencement of work the
following day.
3.11 CLEAN-UP
A. All work areas are to be kept clean, clear and free of debris at all times.
B. Do not allow trash, waste, or debris to collect on the roof. These items shall be removed from the roof on a
daily basis.
C. All tools and unused materials must be collected at the end of each workday and stored properly off of the finished
roof surface and protected from exposure to the elements.
D. Dispose of or recycle all trash and excess material in a manner conforming to current EPA regulations and local
laws.
E. Properly clean the finished roof surface after completion, and make sure the drains and gutters are not clogged.
F. Clean and restore all damaged surfaces to their original condition.
END OF SECTION
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 1 of 6
* FM Approved roofs must also have corner and perimeter enhancements and FM Approved perimeter flashing. For details, see FM Global Property Loss Prevention Data Sheets 1-29 and 1-49. For Standing/Lap Seam roofs, see Property Loss Prevention Data Sheet 1-31.
CONTACT INFORMATION
Slope: Wind Borne Debris Risk:
Hail: Corner:
Height: Wind Speed: Exterior Fire: Perimeter:
Dimensions: Surface Roughness:
Internal Fire: Field:
Roof Area Properties Site Properties Fire / Hail Wind Uplift Ratings
ROOF AREA CLASSIFICATIONS
Type of Work: New Roof Min 3ft (1 m) Continuous Parapet:
Created In RoofNav: Jul 05, 2017 Assembly #: 334717-0-0
Roof Area: Index Number (Optional):
Building Name/Number: Area of Roof: Field
OVERVIEW OF WORK
No
For Use With Non-Combustible Walls:
NC/A 0.7500 in 12 (3.6°) SH 195 psf
Internal/Exterior Fire: Max Slope: Hail: *Wind Uplift Rating:
RATINGS FOR FM APPROVED ASSEMBLY#:
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 2 of 6
SIGNATURES
Signature of Installing Contractor:
Title: Date:
Signature of Designer/Observer:
Title: Date:
Signature of Client/Property Owner:
Title: Date:
ASSEMBLY DETAIL COMMENTS
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 3 of 6
Over Substrate Rate Wet: 0.4550 gal/square
Underside Rate Dry: 0.0000 lb/square
Underside Rate Wet: 0.4550 gal/square
Over Substrate Rate Dry: 0.0000 lb/square
Substrate Primer Rate Dry: 0.0000 lb/square
Type: liquid/semi-solid
Material: solvent-based
Substrate Primer Rate Wet: 0.0000 gal/square
Trade Name: EverGuard Low VOC TPO Bonding Adhesive
Company: GAF
Adhesive (Full Application)
Comments: Applied at a total rate of .91 gal/sq (0.37 l/m2). One half of the adhesive is applied to the back of the roof cover and one half of the adhesive is applied to the substrate.
2. Securement (Cover) from 1. Cover (Single-ply) to 3. Cover Board
Comments: none
Securement (Sheet Lap)
Comments: none
Outside/Full Width: 1.5000 in
Inside Width: 0.0000 in
Configuration: Single
Trade Name: weld, hot air
Company: Generic
Weld (Heat)
Comments: 3 in. (76 mm) lap sealed with minimum 1.5 in. (38 mm) wide heat weld.
1. Cover (Single-ply)
Comments: none
Min Thickness: 0.0600 in
Reinforcement: polyester
Max Thickness: 0.0800 in
Backing: (none)
Material: TPO (thermoplastic olefin)
Max Width: 0.0000 in
Trade Name: Everguard Extreme TPO
Company: GAF
Cover (Single-ply)
Comments: none
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 4 of 6
Board Profile: flat
Min Density: 0.0000 lb/ft3
Max Thickness: 12.0000 in
Min Thickness: 0.5000 in
Min Board Size: 48.00 x 96.00 in
Material: polyisocyanurate/polyurethane
Trade Name: EnergyGuard POLYISO INSULATION
Company: GAF
Insulation (Board Stock)
Comments: none
5. Insulation (Board Stock)
Comments: none
Type: foam
Application Method: Linear
Tape Width: 0.0000 in
Ribbon Width: 0.7500 in
Row Spacing: 12.0000 in
Material: polyurethane
Trade Name: OlyBond 500 Adhesive Fastener
Company: OMG
Adhesive (Ribbons)
Comments: Maximum ribbon width 1.0" (25 mm) wide
4. Securement (Board Stock) from 3. Cover Board to 5. Insulation (Board Stock)
Comments: none
Board Profile: flat
Min Density: 0.0000 lb/ft3
Max Thickness: 0.5000 in
Min Thickness: 0.5000 in
Min Board Size: 48.00 x 48.00 in
Material: polyisocyanurate/polyurethane
Trade Name: EnergyGuard HD Polyiso Insulation
Company: GAF
Cover Board
Comments: none
3. Cover Board
Comments: none
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 5 of 6
Type: foam
Application Method: Linear
Tape Width: 0.0000 in
Ribbon Width: 0.7500 in
Row Spacing: 12.0000 in
Material: polyurethane
Trade Name: OlyBond 500 Adhesive Fastener
Company: OMG
Adhesive (Ribbons)
Comments: Maximum ribbon width 1.0" (25 mm) wide
6. Securement (Board Stock) from 5. Insulation (Board Stock) to 7. (Deck) Structural Concrete
Comments: none
Min Strength: 0.0000 ksi
Min Thickness: 0.0000 in
Max Spacing: 0.0000 in
Structure Type: concrete
8. Structure
Comments: none
Note: Structural Concrete deck must have a minimum compressive strength of 2500 psi (17.24 Mpa) and a minimum thickness of 2 inches (50 mm).
7. (Deck) Structural Concrete
Comments: none
ROOFING SYSTEM CONTRACTOR PACKAGE
2006-2016 FM Approvals LLC. All rights reserved. Page 6 of 6
Fastener Placement
Now that the configuration is complete for the field of the roof, you must select the required fastener placement from the Fastener Placement Figures 3–6 in FM Global Property Loss Prevention Data Sheet 1-29.
Corner/Perimeter Enhancements
Now that you have selected a fastener placement, you must select enhancements for the corners and perimeters. Refer to FM Global Property Loss Prevention Data Sheet 1-29.
If you have sufficient detail about the roof assembly, you can select enhancements that have been approved for roofs with your specifications from Table 1A: Recommended Rating of Field, Perimeter and Corner Areas (Zones 1, 2 and 3) for Enclosed Buildings.
Also, the deck must be secured per the requirements in Data Sheet 1-29. For a steel deck, see section 2.2.1.5.6. For installation instructions, see section 2.2.13.2.
Otherwise, you can select the appropriate prescriptive enhancements from section 2.2.1.5.1.
Perimeter Flashing
Now that you have selected enhancements for the corners and perimeters, you must select an FM Approved perimeter flashing that meets a Class X rating, where X is the Wind Uplift rating for your roof. For more information, see FM Global Property Loss Prevention Data Sheet 1-49.
You can find FM Approved perimeter flashings in RoofNav. To do so, click Products. On the Product Search page, select Other for the Category and Perimeter Flashing for the Subcategory. Specify any other criteria as needed and then click Search.
CHECKLIST FOR ROOFING SYSTEM
X2688 ENGINEERING (Rev. Sept 2014)
CONTACT INFORMATION: INDEX NUMBER:
ROOFING CONTRACTOR (NAME & ADDRESS)
TELEPHONE NO.:
FAX:
E-MAIL ADDRESS:
CONTACT:
CLIENT (NAME & ADDRESS)
TELEPHONE NO.:
FAX:
E-MAIL ADDRESS:
CONTACT:
OVERVIEW OF WORK: (Submit 1 form per roof area)
Building Name & Number:
Building Dimensions: Length: ft/m; Width: ft/m.; Height ft/m.
Roof Slope:
Parapet Height ,max (in./m): Parapet Height ,min (in /m): Type of Work: New Construction Recover (New roof over existing Roofing System) Reroof (New cover/remove existing roofing system to deck) Other
FM Approved RoofNav Assembly Numbers:
ROOF SURFACING:
None
Coating (Trade Name/Application Rate)
Granules (Application Rate)
Gravel/Slag (Application Rate)
Ballast: Stone Size Pavers (Beveled or square edge); Other:
Ballast Weight (psf): Field: Perimeter: Corners:
ROOF COVER/MEMBRANE: (Please provide ALL applicable details including trade name, type, number of plies, thickness, reinforced, adhesive)
Panel: Through Fastened Metal
Standing Seam metal
Fiber Reinforced Plastic (FRP)
Other:
Single Ply: Adhered Fastened Ballasted
Built Up Roofing (BUR)
Modified Bitumen Lap Width in/mm Lap Adhesion Type
Spray Applied
Other:
BASE SHEET: (Please include Trade Name, Type, and Width)
None
Trade Name: Width: 36 In. 1 meter (39 In.)
Fastened Adhered
Secured per RoofNav OR Per FM Global Loss Prevention Data Sheet 1-29
Comments:
Lap Width in/mm Lap Adhesion Type
Air Retarder Vapor Retarder
INSULATION
Layer Trade Name Thickness (In.)
Fastened Adhered Tapered
1. Top
2. Next
3. Next
4. Next
Glass Fiber/Mineral Wool/Batt Facer Type/Vapor Barrier
Thermal Barrier
CHECKLIST FOR ROOFING SYSTEM
X2688 ENGINEERING (Rev. Sept 2014)
Other:
None
DECK: (Please include manufacturer, type, yield strength, thickness/gage, etc.)
Steel:
LWIC (Form Deck): Cementitious Wood Fiber:
Concrete: Pre-cast panels or Cast in Place
Wood
Fiber Reinforced Cement Fiber Reinforced Plastic
Gypsum: Plank Poured
Other:
Comments:
ROOF STRUCTURE (Include Size, Gage, Etc.):
Purlins “C” OR “Z”
Joists Wood OR Steel
Beams Wood OR Steel
Other:
Spacing: Field: Perimeter: Corners:
Comments:
FASTENERS USED IN ROOF ASSEMBLY:
Roof Cover Fasteners: Trade Name: Length: Diameter:
Stress Plate/Batten:
Spacing: Field: X Perimeter: X Corners: X
Insulation Fasteners: Trade Name: Type:
Size: Stress Plate:
Spacing: Field: Perimeter: Corners:
Deck Or Roof Panels Fasteners:
Trade Name:
Type:
Length: Size Washer:
If Weld: Size: Weld: Washer:
Deck Side Lap Fasteners: Field: X Perimeter: X Corners: X
Spacing: Field: X Perimeter: X Corners: X
Base Sheet Fasteners
Trade Name:
Type:
Head Diameter: Length:
Spacing: (Attached Sketches as necessary)
Spacing Along Laps: Field:
Perimeter:
Corners:
No. Intermediate Rows: Field: Perimeter: Corners:
Spacing Along Intermediate Rows: Field: Perimeter: Corners:
PERIMETER FLASHING: (Attach a detailed sketch of metal fascia, gravel stop, nailer, coping, etc.)
FM Approved Flashing Per FM Global Loss Prevention Data Sheet 1-49
Other: Comments:
DRAINAGE:
For new construction: Has roof drainage been designed by a Qualified Engineer per FM Global Loss Prevention Data Sheet 1-54 and the local building code? Yes No (Attach details)
For re-roofing and recovering: will the roof drainage be changed from the original design (for example: drain inserts, drains covered or removed, new expansion joints, blocked or reduced scupper size? Yes No If yes, were the changes reviewed by a Qualified Engineer? Yes No (Attach details)
Is secondary (emergency) roof drainage provided per FM Global Data Sheet 1-54? Yes No (Attach details)
CHECKLIST FOR ROOFING SYSTEM
X2688 ENGINEERING (Rev. Sept 2014)
FM Global OFFICE REVIEW (Please leave blank for FM Global Office Review) WIND:
Design Wind Speed: (mph) Ground Terrain: B C D
Uplift Pressure in field: (psf) Uplift Rating Required:
Adequate Uplift Rating Provided: Adequate? Yes No
FIRE:
Internal Assembly Rating: Class 1 Class 2 Non-Combustible
External Fire Rating: Class A Class B Class C None
Concealed Spaces? Yes No Sprinklers below Roof? Yes No
Adequate? Yes No
HAIL:
Hail Rating Needed? SH MH None Hail Rating Provided? SH MH None
Adequate? Yes No
COLLAPSE:
If standing seam, has collapse been reviewed? Yes No
COMMENTS:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 1
SECTION 076200 - SHEET METAL FLASHING AND TRIM
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Formed low-slope roof sheet metal fabrications.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For sheet metal flashing and trim.
1. Include plans, elevations, sections, and attachment
details.
2. Include identification of finish for each item.
3. Include pattern of seams and details of termination
points, expansion joints and expansion-joint covers,
direction of expansion, roof-penetration flashing, and
connections to adjoining work.
C. Samples: For each exposed product and for each color and
texture specified.
1.3 INFORMATIONAL SUBMITTALS
A. Product certificates.
B. Product test reports.
C. Sample warranty.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Employs skilled workers who
custom fabricate sheet metal flashing and trim similar to
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 2
that required for this Project and whose products have a
record of successful in-service performance.
1. For copings and roof edge flashings that are SPRI ES-1
tested, shop shall be listed as able to fabricate
required details as tested and approved.
1.6 WARRANTY
A. Special Warranty on Finishes: Manufacturer agrees to
repair finish or replace sheet metal flashing and trim
that shows evidence of deterioration of factory-applied
finishes within specified warranty period.
1. Finish Warranty Period: 20 years from date of
Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General: Sheet metal flashing and trim assemblies shall
withstand wind loads, structural movement, thermally
induced movement, and exposure to weather without failure
due to defective manufacture, fabrication, installation,
or other defects in construction. Completed sheet metal
flashing and trim shall not rattle, leak, or loosen, and
shall remain watertight.
B. Sheet Metal Standard for Flashing and Trim: Comply with
SMACNA's "Architectural Sheet Metal Manual" requirements
for dimensions and profiles shown unless more stringent
requirements are indicated.
C. SPRI Wind Design Standard: Manufacture and install copings
tested according to SPRI ES-1 and capable of resisting the
following design pressure:
1. Design Pressure: As indicated on Drawings.
D. Thermal Movements: Allow for thermal movements from
ambient and surface temperature changes.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 3
2.2 SHEET METALS
A. General: Protect mechanical and other finishes on exposed
surfaces from damage by applying strippable, temporary
protective film before shipping.
B. Stainless-Steel Sheet: ASTM A 240/A 240M, Type 304, dead
soft, fully annealed; 2B (bright, cold rolled) finish.
2.3 UNDERLAYMENT MATERIALS
A. Felt: ASTM D 226/D 226M, Type II (No. 30), asphalt-
saturated organic felt; nonperforated.
B. Synthetic Underlayment: Laminated or reinforced, woven
polyethylene or polypropylene, synthetic roofing
underlayment; bitumen free; slip resistant; suitable for
high temperatures over 220 deg F; and complying with
physical requirements of ASTM D 226/D 226M for Type I and
Type II felts.
1. Products: Subject to compliance with requirements,
available products that may be incorporated into the
Work include, but are not limited to, the following:
a. Atlas Roofing Corporation; Summit.
b. Engineered Coated Products; Nova-Seal II.
c. SDP Advanced Polymer Products Inc; Palisade.
C. Slip Sheet: Rosin-sized building paper, 3 lb/100 sq.
ft.minimum.
2.4 MISCELLANEOUS MATERIALS
A. General: Provide materials and types of fasteners, solder,
protective coatings, sealants, and other miscellaneous
items as required for complete sheet metal flashing and
trim installation and as recommended by manufacturer of
primary sheet metal or manufactured item unless otherwise
indicated.
B. Fasteners: Wood screws, annular threaded nails, self-
tapping screws, self-locking rivets and bolts, and other
suitable fasteners designed to withstand design loads and
recommended by manufacturer of primary sheet metal or
manufactured item.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 4
1. General: Blind fasteners or self-drilling screws,
gasketed, with hex-washer head.
a. Exposed Fasteners: Heads matching color of sheet
metal using plastic caps or factory-applied
coating. Provide metal-backed EPDM or PVC sealing
washers under heads of exposed fasteners bearing
on weather side of metal.
b. Blind Fasteners: High-strength aluminum or
stainless-steel rivets suitable for metal being
fastened.
2. Fasteners for Stainless-Steel Sheet: Series 300
stainless steel.
C. Elastomeric Sealant: ASTM C 920, elastomeric silicone
polymer sealant; of type, grade, class, and use
classifications required to seal joints in sheet metal
flashing and trim and remain watertight.
2.5 FABRICATION, GENERAL
A. General: Custom fabricate sheet metal flashing and trim to
comply with details shown and recommendations in cited
sheet metal standard that apply to design, dimensions,
geometry, metal thickness, and other characteristics of
item required. Fabricate sheet metal flashing and trim in
shop to greatest extent possible.
1. Obtain field measurements for accurate fit before shop
fabrication.
2. Form sheet metal flashing and trim to fit substrates
without excessive oil canning, buckling, and tool
marks; true to line, levels, and slopes; and with
exposed edges folded back to form hems.
3. Conceal fasteners and expansion provisions where
possible. Do not use exposed fasteners on faces
exposed to view.
B. Expansion Provisions: Form metal for thermal expansion of
exposed flashing and trim.
1. Use lapped expansion joints only where indicated on
Drawings.
C. Sealant Joints: Where movable, nonexpansion-type joints
are required, form metal to provide for proper
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 5
installation of elastomeric sealant according to cited
sheet metal standard.
D. Fabricate cleats and attachment devices of sizes as
recommended by cited sheet metal standard for application,
but not less than thickness of metal being secured.
E. Seams: Fabricate nonmoving seams with flat-lock seams.
Form seams and seal with elastomeric sealant unless
otherwise recommended by sealant manufacturer for intended
use.
2.6 LOW-SLOPE ROOF SHEET METAL FABRICATIONS
A. Copings: Fabricate in minimum 96-inch- long, but not
exceeding 12-foot- long, sections. Fabricate joint plates
of same thickness as copings. Furnish with continuous
cleats to support edge of external leg and interior leg.
Miter corners, fasten and seal watertight. Shop fabricate
interior and exterior corners.
1. Fabricate from the Following Materials:
a. Aluminum: 0.050 inch thick.
B. Base Flashing: Shop fabricate interior and exterior
corners. Fabricate from the following materials:
1. Stainless Steel: 0.019 inch thick.
C. Roof-Penetration Flashing: Fabricate from the following
materials:
1. Stainless Steel: 0.019 inch thick.
D. Roof-Drain Flashing: Fabricate from the following
materials:
1. Stainless Steel: 0.016 inch thick.
PART 3 - EXECUTION
3.1 UNDERLAYMENT INSTALLATION
A. Synthetic Underlayment: Install synthetic underlayment,
wrinkle free, according to manufacturers' written
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 6
instructions, and using adhesive where possible to
minimize use of mechanical fasteners under sheet metal.
3.2 INSTALLATION, GENERAL
A. General: Anchor sheet metal flashing and trim and other
components of the Work securely in place, with provisions
for thermal and structural movement. Use fasteners,
solder, protective coatings, separators, sealants, and
other miscellaneous items as required to complete sheet
metal flashing and trim system.
1. Install sheet metal flashing and trim true to line,
levels, and slopes. Provide uniform, neat seams with
minimum exposure of solder, welds, and sealant.
2. Install sheet metal flashing and trim to fit
substrates and to result in watertight performance.
Verify shapes and dimensions of surfaces to be covered
before fabricating sheet metal.
3. Space cleats not more than 12 inches apart. Attach
each cleat with at least two fasteners. Bend tabs over
fasteners.
4. Install exposed sheet metal flashing and trim with
limited oil canning, and free of buckling and tool
marks.
5. Torch cutting of sheet metal flashing and trim is not
permitted.
B. Metal Protection: Where dissimilar metals contact each
other, or where metal contacts pressure-treated wood or
other corrosive substrates, protect against galvanic
action or corrosion by painting contact surfaces with
bituminous coating or by other permanent separation as
recommended by sheet metal manufacturer or cited sheet
metal standard.
1. Coat concealed side of stainless-steel sheet metal
flashing and trim with bituminous coating where
flashing and trim contact wood, ferrous metal, or
cementitious construction.
2. Underlayment: Where installing sheet metal flashing
and trim directly on cementitious or wood substrates,
install underlayment and cover with slip sheet.
C. Expansion Provisions: Provide for thermal expansion of
exposed flashing and trim. Space movement joints at
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 7
maximum of 10 feet with no joints within 24 inches of
corner or intersection.
1. Form expansion joints of intermeshing hooked flanges,
not less than 1 inch deep, filled with sealant
concealed within joints.
2. Use lapped expansion joints only where indicated on
Drawings.
D. Fasteners: Use fastener sizes that penetrate substrate not
less than recommended by fastener manufacturer to achieve
maximum pull-out resistance.
E. Conceal fasteners and expansion provisions where possible
in exposed work and locate to minimize possibility of
leakage. Cover and seal fasteners and anchors as required
for a tight installation.
F. Seal joints as required for watertight construction.
Prepare joints and apply sealants to comply with
requirements in Section 079200 "Joint Sealants."
3.3 ROOF-DRAINAGE SYSTEM INSTALLATION
A. General: Coordinate with drawings.
3.4 ROOF FLASHING INSTALLATION
A. General: Install sheet metal flashing and trim to comply
with performance requirements and cited sheet metal
standard. Provide concealed fasteners where possible, and
set units true to line, levels, and slopes. Install work
with laps, joints, and seams that are permanently
watertight and weather resistant.
B. Copings: Anchor to resist uplift and outward forces
according to recommendations in cited sheet metal standard
unless otherwise indicated.
C. Roof-Penetration Flashing: Coordinate installation of
roof-penetration flashing with installation of roofing and
other items penetrating roof. Seal with elastomeric
sealant and clamp flashing to pipes that penetrate roof.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
SHEET METAL FLASHING AND TRIM 076200 - 8
3.5 CLEANING AND PROTECTION
A. Clean exposed metal surfaces of substances that interfere
with uniform oxidation and weathering.
B. Clean and neutralize flux materials. Clean off excess
solder.
C. Clean off excess sealants.
D. Remove temporary protective coverings and strippable films
as sheet metal flashing and trim are installed unless
otherwise indicated in manufacturer's written installation
instructions.
END OF SECTION 076200
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-1
SECTION 079200 - JOINT SEALERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Silicone joint sealants.
2. Mildew-resistant joint sealants.
3. Latex joint sealants.
1.2 ACTION SUBMITTALS
A. Product Data: For each joint-sealant product.
B. Samples: For each kind and color of joint sealant required.
C. Joint-Sealant Schedule: Include the following information:
1. Joint-sealant application, joint location, and
designation.
2. Joint-sealant manufacturer and product name.
3. Joint-sealant formulation.
4. Joint-sealant color.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
1.4 QUALITY ASSURANCE
A. Testing Agency Qualifications: Qualified according to
ASTM C 1021 to conduct the testing indicated.
1.5 WARRANTY
A. Special Installer's Warranty: Installer agrees to repair or
replace joint sealants that do not comply with performance
and other requirements specified in this Section within
specified warranty period.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-2
1. Warranty Period: Two years from date of Substantial
Completion.
B. Special Manufacturer's Warranty: Manufacturer agrees to
furnish joint sealants to repair or replace those joint
sealants that do not comply with performance and other
requirements specified in this Section within specified
warranty period.
1. Warranty Period: Five years from date of Substantial
Completion.
PART 2 - PRODUCTS
2.1 JOINT SEALANTS, GENERAL
A. Colors of Exposed Joint Sealants: As selected by Architect
from manufacturer's full range.
2.2 SILICONE JOINT SEALANTS
A. Silicone, S, NS, 50, NT: Single-component, nonsag, plus 50
percent and minus 50 percent movement capability, nontraffic-
use, neutral-curing silicone joint sealant; ASTM C 920,
Type S, Grade NS, Class 50, Use NT.
1. Products: Subject to compliance with requirements,
available products that may be incorporated into the Work
include, but are not limited to, the following:
a. Dow Corning Corporation; 791.
b. GE Construction Sealants; SCS2000 SilPruf.
c. May National Associates, Inc., a subsidiary of Sika
Corporation U.S.; Bondaflex Sil 265 LTS.
d. Pecora Corporation; PCS.
e. Sika Corporation U.S.; Sikasil WS-295 FPS.
B. Silicone, S, NS, 25, T, NT: Single-component, nonsag, plus 25
percent and minus 25 percent movement capability, traffic-
and nontraffic-use, neutral-curing silicone joint sealant;
ASTM C 920, Type S, Grade NS, Class 25, Uses T and NT.
1. Products: Subject to compliance with requirements,
available products that may be incorporated into the Work
include, but are not limited to, the following:
a. May National Associates, Inc., a subsidiary of Sika
Corporation U.S.; Bondaflex Sil 199 PG.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-3
b. Sika Corporation U.S.; Sikasil-N Plus US.
2.3 MILDEW-RESISTANT JOINT SEALANTS
A. Mildew-Resistant Joint Sealants: Formulated for prolonged
exposure to humidity with fungicide to prevent mold and
mildew growth.
B. Silicone, Mildew Resistant, Acid Curing, S, NS, 25, NT:
Mildew-resistant, single-component, nonsag, plus 25 percent
and minus 25 percent movement capability, nontraffic-use,
acid-curing silicone joint sealant; ASTM C 920, Type S,
Grade NS, Class 25, Use NT.
1. Products: Subject to compliance with requirements,
available products that may be incorporated into the Work
include, but are not limited to, the following:
a. Dow Corning Corporation; 786-M White.
b. GE Construction Sealants; SCS1700 Sanitary.
c. May National Associates, Inc., a subsidiary of Sika
Corporation U.S.; Bondaflex Sil 100 WF.
d. Soudal USA; RTV GP.
e. Tremco Incorporated; Tremsil 200.
2.4 LATEX JOINT SEALANTS
A. Acrylic Latex: Acrylic latex or siliconized acrylic latex,
ASTM C 834, Type OP, Grade NF.
1. Products: Subject to compliance with requirements,
available products that may be incorporated into the Work
include, but are not limited to, the following:
a. BASF Construction Chemicals, LLC, Building Systems;
Sonolac.
b. May National Associates, Inc., a subsidiary of Sika
Corporation U.S.; Bondaflex 600.
c. Pecora Corporation; AC-20.
d. Tremco Incorporated; Tremflex 834.
2.5 JOINT-SEALANT BACKING
A. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-
cell material with a surface skin) or any of the preceding
types, as approved in writing by joint-sealant manufacturer
for joint application indicated, and of size and density to
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-4
control sealant depth and otherwise contribute to producing
optimum sealant performance.
1. Manufacturers: Subject to compliance with requirements,
available manufacturers offering products that may be
incorporated into the Work include, but are not limited
to, the following:
a. BASF Construction Chemicals, LLC, Building Systems.
b. Construction Foam Products, a division of Nomaco,
Inc.
c. “Or Approved Equal”
B. Bond-Breaker Tape: Polyethylene tape or other plastic tape
recommended by sealant manufacturer.
2.6 MISCELLANEOUS MATERIALS
A. Primer: Material recommended by joint-sealant manufacturer
where required for adhesion of sealant to joint substrates
indicated, as determined from preconstruction joint-sealant-
substrate tests and field tests.
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable
to manufacturers of sealants and sealant backing materials.
C. Masking Tape: Nonstaining, nonabsorbent material compatible
with joint sealants and surfaces adjacent to joints.
PART 3 - EXECUTION
3.1 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately
before installing joint sealants to comply with joint-sealant
manufacturer's written instructions and the following
requirements:
1. Remove laitance and form-release agents from concrete.
2. Clean nonporous joint substrate surfaces with chemical
cleaners or other means that do not stain, harm
substrates, or leave residues capable of interfering with
adhesion.
B. Joint Priming: Prime joint substrates where recommended by
joint-sealant manufacturer or as indicated by preconstruction
joint-sealant-substrate tests or prior experience.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-5
C. Masking Tape: Use masking tape where required to prevent
contact of sealant or primer with adjoining surfaces.
3.2 INSTALLATION OF JOINT SEALANTS
A. General: Comply with ASTM C 1193 and joint-sealant
manufacturer's written installation instructions for products
and applications indicated, unless more stringent
requirements apply.
B. Install sealant backings of kind indicated to support
sealants during application and at position required to
produce cross-sectional shapes and depths of installed
sealants relative to joint widths that allow optimum sealant
movement capability.
C. Install bond-breaker tape behind sealants where sealant
backings are not used between sealants and backs of joints.
D. Install sealants using proven techniques that comply with the
following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet
joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths
relative to joint widths that allow optimum sealant
movement capability.
E. Tooling of Nonsag Sealants: Immediately after sealant
application and before skinning or curing begins, tool
sealants to form smooth, uniform beads of configuration
indicated. Use tooling agents that are approved in writing by
sealant manufacturer and that do not discolor sealants or
adjacent surfaces.
1. Provide concave joint profile per Figure 8A in
ASTM C 1193 unless otherwise indicated.
3.3 JOINT-SEALANT SCHEDULE
A. Joint-Sealant Application: Exterior joints in vertical
surfaces and horizontal nontraffic surfaces.
1. Joint Locations:
a. Joints between plant-precast architectural concrete
units.
b. Control and expansion joints in unit masonry.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-6
c. Joints in dimension stone cladding.
d. Other joints as indicated on Drawings.
2. Joint Sealant: Silicon sealant (Plus 50 percent or minus
50 percent movement).
3. Joint-Sealant Color: As selected by Architect from
manufacturer's full range of colors.
B. Joint-Sealant Application: Interior joints in horizontal
traffic surfaces.
1. Joint Locations:
a. Isolation joints in cast-in-place concrete slabs.
b. Other joints as indicated on Drawings.
2. Joint Sealant: Silicone sealant (Plus 25 percent or
minus 25 percent movement).
3. Joint-Sealant Color: As selected by Architect from
manufacturer's full range of colors.
C. Joint-Sealant Application: Interior joints in vertical
surfaces and horizontal nontraffic surfaces.
1. Joint Locations:
a. Tile control and expansion joints.
b. Perimeter joints between interior wall surfaces and
metal interior framing assemblies
c. Other joints as indicated on Drawings.
2. Joint Sealant: Acrylic latex.
3. Joint-Sealant Color: As selected by Architect from
manufacturer's full range of colors.
D. Joint-Sealant Application: Mildew-resistant interior joints
in vertical surfaces and horizontal nontraffic surfaces.
1. Joint Locations:
a. Joints between plumbing fixtures and adjoining walls,
floors, and counters.
b. Tile control and expansion joints where indicated.
c. Other joints as indicated on Drawings.
2. Joint Sealant: Silicone, mildew resistant, acid curing,
S, NS, 25, NT.
3. Joint-Sealant Color: As selected by Architect from
manufacturer's full range of colors.
E. Joint-Sealant Application: Concealed mastics.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
JOINT SEALERS 079200-7
1. Joint Locations:
a. Aluminum thresholds.
b. Other joints as indicated on Drawings.
2. Joint Sealant: Butyl-rubber based.
3. Joint-Sealant Color: As selected by Architect from
manufacturer's full range of colors.
END OF SECTION 079200
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 1
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes hollow-metal work.
1.2 DEFINITIONS
A. Minimum Thickness: Minimum thickness of base metal without
coatings according to NAAMM-HMMA 803 or SDI A250.8.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include elevations, door edge details,
frame profiles, metal thicknesses, preparations for
hardware, and other details.
C. Samples for Initial Selection: For units with factory-
applied color finishes.
D. Samples for Verification: For each type of exposed finish
required.
E. Schedule: Prepared by or under the supervision of
supplier, using same reference numbers for details and
openings as those on Drawings.
1.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements,
available manufacturers offering products that may be
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 2
incorporated into the Work include, but are not limited
to, the following:
1. Amweld International, LLC.
2. Apex Industries, Inc.
3. Ceco Door Products; an Assa Abloy Group company.
4. Commercial Door & Hardware Inc.
5. Concept Frames, Inc.
6. Curries Company; an Assa Abloy Group company.
7. Custom Metal Products.
8. Daybar.
9. Deansteel.
10. de La Fontaine Industries. 11. DKS Steel Door & Frame Sys. Inc. 12. Door Components, Inc. 13. Fleming-Baron Door Products. 14. Gensteel Doors Inc. 15. Greensteel Industries, Ltd. 16. HMF Express. 17. Hollow Metal Inc. 18. Hollow Metal Xpress. 19. J/R Metal Frames Manufacturing, Inc. 20. Karpen Steel Custom Doors & Frames. 21. L.I.F. Industries, Inc. 22. LaForce, Inc. 23. Megamet Industries, Inc. 24. Mesker Door Inc. 25. Michbi Doors Inc. 26. MPI Group, LLC (The). 27. National Custom Hollow Metal. 28. North American Door Corp. 29. Philipp Manufacturing Co (The). 30. Pioneer Industries, Inc. 31. Premier Products, Inc. 32. Republic Doors and Frames. 33. Rocky Mountain Metals, Inc. 34. Security Metal Products Corp. 35. Shanahans Manufacturing Ltd. 36. Steward Steel; Door Division. 37. Stiles Custom Metal, Inc. 38. Titan Metal Products, Inc. 39. Trillium Steel Doors Limited. 40. West Central Mfg. Inc.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 3
2.2 REGULATORY REQUIREMENTS
A. Fire-Rated Assemblies: Complying with NFPA 80 and listed
and labeled by a qualified testing agency acceptable to
authorities having jurisdiction for fire-protection
ratings indicated, based on testing at positive pressure
according to NFPA 252 or UL 10C.
B. Fire-Rated, Borrowed-Light Assemblies: Complying with
NFPA 80 and listed and labeled by a testing and inspecting
agency acceptable to authorities having jurisdiction for
fire-protection ratings indicated, based on testing
according to NFPA 257 or UL 9.
C. Extra-Heavy-Duty Doors and Frames: SDI A250.8, Level 3. At
locations indicated in the Door and Frame Schedule.
1. Physical Performance: Level A according to SDI A250.4.
2. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches.
c. Face: Metallic-coated steel sheet, minimum
thickness of 0.053 inch, with minimum A40 coating.
d. Edge Construction: Model 1, Full Flush.
e. Core: Manufacturer's standard insulation
material.
3. Thermal-Rated Doors: Provide doors fabricated with
thermal-resistance value (R-value) of not less than 13
when tested according to ASTM C 1363.
4. Frames:
a. Materials: Metallic-coated steel sheet, minimum
thickness 14 gauge, with minimum A40 coating.
b. Construction: Knockdown.
5. Exposed Finish: Factory.
2.3 FRAME ANCHORS
A. Jamb Anchors:
1. Masonry Type: Adjustable strap-and-stirrup or T-shaped
anchors to suit frame size, not less than 0.042 inch
thick, with corrugated or perforated straps not less
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 4
than 2 inches wide by 10 inches long; or wire anchors
not less than 0.177 inch thick.
2. Stud-Wall Type: Designed to engage stud, welded to
back of frames; not less than 0.042 inch thick.
3. Compression Type for Drywall Slip-on Frames:
Adjustable compression anchors.
4. Postinstalled Expansion Type for In-Place Concrete or
Masonry: Minimum 3/8-inch- diameter bolts with
expansion shields or inserts. Provide pipe spacer from
frame to wall, with throat reinforcement plate, welded
to frame at each anchor location.
B. Floor Anchors: Formed from same material as frames,
minimum thickness of 0.042 inch, and as follows:
1. Monolithic Concrete Slabs: Clip-type anchors, with two
holes to receive fasteners.
2. Separate Topping Concrete Slabs: Adjustable-type
anchors with extension clips, allowing not less than
2-inch height adjustment. Terminate bottom of frames
at finish floor surface.
2.4 MATERIALS
A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial
Steel (CS), Type B; suitable for exposed applications.
B. Frame Anchors: ASTM A 879/A 879M, Commercial Steel (CS),
04Z coating designation; mill phosphatized.
1. For anchors built into exterior walls, steel sheet
complying with ASTM A 1008/A 1008M or
ASTM A 1011/A 1011M, hot-dip galvanized according to
ASTM A 153/A 153M, Class B.
C. Inserts, Bolts, and Fasteners: Hot-dip galvanized
according to ASTM A 153/A 153M.
D. Power-Actuated Fasteners in Concrete: From corrosion-
resistant materials.
E. Grout: ASTM C 476, except with a maximum slump of 4
inches, as measured according to ASTM C 143/C 143M.
F. Mineral-Fiber Insulation: ASTM C 665, Type I (blankets
without membrane facing).
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 5
G. Glazing: Section 088000 "Glazing."
H. Bituminous Coating: Cold-applied asphalt mastic,
compounded for 15-mil dry film thickness per coat.
2.5 FABRICATION
A. Fabricate hollow-metal work to be rigid and free of
defects, warp, or buckle. Accurately form metal to
required sizes and profiles, with minimum radius for metal
thickness. Where practical, fit and assemble units in
manufacturer's plant. To ensure proper assembly at Project
site, clearly identify work that cannot be permanently
factory assembled before shipment.
B. Hollow-Metal Doors:
1. Exterior Doors: Provide weep-hole openings in bottoms
of exterior doors to permit moisture to escape. Seal
joints in top edges of doors against water
penetration.
2. Astragals: Provide overlapping astragal on one leaf of
pairs of doors where required by NFPA 80 for fire-
performance rating or where indicated.
C. Hollow-Metal Frames: Where frames are fabricated in
sections due to shipping or handling limitations, provide
alignment plates or angles at each joint, fabricated of
same thickness metal as frames.
D. Hardware Preparation: Factory prepare hollow-metal work to
receive templated mortised hardware; include cutouts,
reinforcement, mortising, drilling, and tapping according
to SDI A250.6, the Door Hardware Schedule, and templates.
1. Reinforce doors and frames to receive nontemplated,
mortised, and surface-mounted door hardware.
2. Comply with applicable requirements in SDI A250.6 and
BHMA A156.115 for preparation of hollow-metal work for
hardware.
E. Stops and Moldings: Provide stops and moldings around
glazed lites and louvers where indicated. Form corners of
stops and moldings with butted or mitered hairline joints.
1. Single Glazed Lites: Provide fixed stops and moldings
welded on secure side of hollow-metal work.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 6
2. Multiple Glazed Lites: Provide fixed and removable
stops and moldings so that each glazed lite is capable
of being removed independently.
3. Provide fixed frame moldings on outside of exterior
and on secure side of interior doors and frames.
4. Provide loose stops and moldings on inside of hollow-
metal work.
5. Coordinate rabbet width between fixed and removable
stops with glazing and installation types indicated.
2.6 STEEL FINISHES
A. Prime Finish: Clean, pretreat, and apply manufacturer's
standard primer.
1. Shop Primer: SDI A250.10.
B. Factory Finish: SDI A250.3.
1. Color and Gloss: As selected by Architect from
manufacturer's full range.
2.7 ACCESSORIES
A. Grout Guards: Formed from same material as frames, not
less than 0.016 inch thick.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Hollow-Metal Frames: Install hollow-metal frames of size
and profile indicated. Comply with SDI A250.11 or NAAMM-
HMMA 840 as required by standards specified.
1. Set frames accurately in position; plumbed, aligned,
and braced securely until permanent anchors are set.
After wall construction is complete, remove temporary
braces, leaving surfaces smooth and undamaged.
a. At fire-rated openings, install frames according
to NFPA 80.
b. Where frames are fabricated in sections because of
shipping or handling limitations, field splice at
approved locations by welding face joint
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 7
continuously; grind, fill, dress, and make splice
smooth, flush, and invisible on exposed faces.
c. Install frames with removable stops located on
secure side of opening.
d. Install door silencers in frames before grouting.
e. Remove temporary braces necessary for installation
only after frames have been properly set and
secured.
f. Check plumb, square, and twist of frames as walls
are constructed. Shim as necessary to comply with
installation tolerances.
g. Field apply bituminous coating to backs of frames
that will be filled with grout containing
antifreezing agents.
2. Floor Anchors: Provide floor anchors for each jamb and
mullion that extends to floor, and secure with
postinstalled expansion anchors.
a. Floor anchors may be set with power-actuated
fasteners instead of postinstalled expansion
anchors if so indicated and approved on Shop
Drawings.
3. Metal-Stud Partitions: Solidly pack mineral-fiber
insulation inside frames.
4. Masonry Walls: Coordinate installation of frames to
allow for solidly filling space between frames and
masonry with grout.
5. Installation Tolerances: Adjust hollow-metal door
frames for squareness, alignment, twist, and plumb to
the following tolerances:
a. Squareness: Plus or minus 1/16 inch, measured at
door rabbet on a line 90 degrees from jamb
perpendicular to frame head.
b. Alignment: Plus or minus 1/16 inch, measured at
jambs on a horizontal line parallel to plane of
wall.
c. Twist: Plus or minus 1/16 inch, measured at
opposite face corners of jambs on parallel lines,
and perpendicular to plane of wall.
d. Plumbness: Plus or minus 1/16 inch, measured at
jambs at floor.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
HOLLOW METAL DOORS AND FRAMES 081113 - 8
B. Hollow-Metal Doors: Fit hollow-metal doors accurately in
frames, within clearances specified below. Shim as
necessary.
1. Non-Fire-Rated Steel Doors:
a. Between Door and Frame Jambs and Head: 1/8 inch
plus or minus 1/32 inch.
b. Between Edges of Pairs of Doors: 1/8 inch to 1/4
inch plus or minus 1/32 inch.
c. At Bottom of Door: 5/8 inch plus or minus 1/32
inch unless otherwise noted.
d. Between Door Face and Stop: 1/16 inch to 1/8 inch
plus or minus 1/32 inch.
2. Fire-Rated Doors: Install doors with clearances
according to NFPA 80.
C. Glazing: Comply with installation requirements in
Section 088000 "Glazing" and with hollow-metal
manufacturer's written instructions.
1. Secure stops with countersunk flat- or oval-head
machine screws spaced uniformly not more than 9 inches
o.c. and not more than 2 inches o.c. from each corner.
3.2 ADJUSTING AND CLEANING
A. Final Adjustments: Check and readjust operating hardware
items immediately before final inspection. Leave work in
complete and proper operating condition. Remove and
replace defective work, including hollow-metal work that
is warped, bowed, or otherwise unacceptable.
B. Remove grout and other bonding material from hollow-metal
work immediately after installation.
C. Prime-Coat Touchup: Immediately after erection, sand
smooth rusted or damaged areas of prime coat and apply
touchup of compatible air-drying, rust-inhibitive primer.
D. Touchup Painting: Cleaning and touchup painting of abraded
areas of paint are specified in painting Sections.
END OF SECTION 081113
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ACOUSTICAL PANEL CEILINGS 095113-1
SECTION 095113 - ACOUSTICAL PANEL CEILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Acoustical mineral fiber lay-in panels in exposed
suspension systems.
2. Perimeter and column moldings, trim and accessories for
acoustical ceilings.
3. Adjust existing ceiling grids at new partition work.
4. Replace existing ceiling tiles in existing grid with new
tiles.
B. Related Sections:
1. Metal deck: Division 6.
PART 2 - PRODUCTS
2.1 ACOUSTICAL CEILING UNITS - GENERAL
A. Standard for Acoustical Ceiling Units: Provide units
conforming to applicable requirements of ASTM E 1264 for
Class A materials.
B. Surface Finish: Provide all ceiling units with factory-
applied white vinyl latex paint finish.
2.2 CEILING SUSPENSION SYSTEMS - GENERAL
A. Provide suspension systems conforming to specified
requirements and to requirements of ASTM C 635.
B. Finish for Exposed Suspension Elements and Accessories:
Manufacturer's standard baked-on enamel.
1. Hot-dip galvanized steel finishes shall meet the
requirements of ASTM C 635 for "Coating Classification
for Severe Environment Performance".
C. Attachment Devices for Suspension System:
1. Anchors and intermediate support members: Provide sizes
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ACOUSTICAL PANEL CEILINGS 095113-2
capable of sustaining 5 times the load-carrying
capabilities shown in ASTM C 635, Table 1, "Direct Hung"
column.
2. Hanger wire for acoustical ceilings: Zinc-coated
(galvanized) carbon steel wire, ASTM A 641, soft temper,
with Class 1 coating, minimum 10 gauge (0.135 inch
diameter).
D. Edge Moldings and Trim:
1. Extruded plastic or metal in profiles indicated; where
profiles are not indicated, provide moldings with
profiles suited to edge profiles of ceiling panels and
suspension members.
2. Circular ceiling penetrations: Provide edge moldings
which precisely fit penetrations.
2.3 LAY-IN ACOUSTICAL CEILING SYSTEMS
A. Ceiling Panels: Provide ceiling panels as manufactured by
Armstrong, USG Interiors Inc., Celotex, or approved equal;
refer to drawings for facial sizes, locations and other
pertinent information including specific products as basis
for project design.
B. Exposed Grid Suspension System: Formed steel with painted
finish; system as manufactured by Armstrong World
Industries, Inc., Chicago Metallic Corp., USG Interiors,
Inc., or approved equal.
1. Profile: Double-web tee, 15/16 inch wide.
2. Structural classification (ASTM C 635): Intermediate
duty system.
3. Color and texture: White color to match ceiling panels;
standard smooth texture.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions under which products of
this section are to be installed and correct any conditions
detrimental to the proper and timely completion of the
work.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ACOUSTICAL PANEL CEILINGS 095113-3
B. Do not proceed with the work until unsatisfactory
conditions have been corrected to permit proper
installation.
END OF SECTION 095113
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 1
SECTION 099100 EXTERIOR PAINTING
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Surface preparation, painting, and finishing of exposed
exterior and interior items and surfaces.
a. Surface preparation, priming, and finish coats
specified in this section are in addition to shop
priming and surface treatment specified under other
sections.
2. Paint all exposed surfaces whether or not colors are
designated in "schedules", except where a surface or
material is specifically indicated not to be painted or is
to remain natural. Where an item or surface is not
specifically mentioned, paint the same as similar adjacent
materials or surfaces. If color or finish is not
designated, the Architect will select color/finish.
a. Painting includes field painting of exposed bare and
covered pipes and ducts, hangers, exposed steel and
iron work, and primed metal surfaces of mechanical and
electrical equipment.
B. Section does not include:
1. Prefinished items.
2. Painting of concealed surfaces, unless specifically
indicated.
3. Prefinished metal surfaces.
4. Moving parts of equipment.
C. Related Sections:
1. Shop priming of ferrous metal: Division 5.
2. Shop finishing (transparent finish) for architectural
woodwork: Division 6.
3. Shop priming of hollow metal work: Division 8.
4. Shop finishing (transparent finish) for wood doors:
Division 8.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 2
1.2 DEFINITIONS
A. DFM (dry film mils): Thickness, measured in mils, of a coat of
paint in the cured state.
1.3 SUBMITTALS
A. Product Data: Submit manufacturer's technical data sheets for
each coating.
1. Submit material analysis including vehicle type and
percentage by weight and by volume of vehicle, resin, and
pigment.
2. Submit application instructions including mixing, surface
preparation, compatible primers and topcoats, recommended
wet and dry film thickness, recommended application
methods.
1.4 QUALITY ASSURANCE
A. Single Source Responsibility: All coating materials required
by this section shall be provided by a single manufacturer,
unless otherwise required or approved.
1. For each individual system, provide primer and other
undercoat paint produced by the same manufacturer as finish
coat.
B. Applicator: Firm with not less than 5 years of successful
experience in painting work similar in scope to work of this
project.
1. Maintain throughout duration of the work a crew of painters
who are fully qualified to satisfy requirements of the
specifications.
1.5 PRODUCT HANDLING
A. Delivery: Deliver materials in manufacturer's original
containers bearing coating name and color, material composition
data, date of manufacture, legal notices if applicable, and
mixing, thinning, and application instructions.
B. Storage:
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 3
1. Store materials in an orderly fashion and in clean, well
closed containers with labels intact.
2. Maintain above 40 degrees F. Do not allow materials to
freeze.
1.6 PROJECT CONDITIONS
A. Apply coatings only under the following environmental
conditions:
1. Air and surface temperatures are between 50 and 100 degrees
F, unless otherwise recommended by manufacturer.
2. Surface temperature is at least 5 degrees F above dew
point.
3. Relative humidity is less than 85 percent.
B. Do not apply coatings during inclement weather except within
enclosed, conditioned spaces.
1. Provide temporary lighting to achieve a well lit surface
with a level of at least 80 footcandles measured mid
height.
2. Provide continuous ventilation and heating to prevent
accumulation of hazardous fumes and to maintain surface and
ambient temperatures above 45 degrees F for 24 hours
before, during, and for 48 hours after application of
finishes, or longer if required to obtain fuel cure as
indicated by manufacturer's instructions.
1.7 COORDINATION
A. General: Perform work in proper sequence with work of other
trades to avoid damage to finished work.
B. Coordination: Where special coatings will be applied over shop
coatings specified in other sections, coordinate work of such
other sections to ensure that only approved, compatible primers
are applied.
1. Furnish the Architect with product data on both coatings
demonstrating coating compatibility.
1.8 MAINTENANCE STOCK
A. At completion of painting work, deliver stock of maintenance
material to the Owner. Furnish not less than five properly
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 4
labeled and sealed one gallon cans of each type of finish coat
of each color, taken from lots furnished for this project.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Provide paints complying with LEED Requirements. Names used in
the Schedules of Coatings for Interior and Exterior Surfaces at
the end of this section are those of Benjamin Moore, as basis
for project design.
1. Provide products of one of the following manufacturers, or
approved equal:
a. Benjamin Moore & Co.
b. PPG Industries, Inc./Pittsburgh Paints.
c. Sherwin Williams Company, Inc.
2.2 PRODUCTS
A. Material Quality: Provide the manufacturer's premium grade
product complying with compositional requirements and
recommended for anticipated exposures.
B. Colors: For multi-coat systems, apply each coat using a
successively darker tint or shade, unless approved otherwise.
1. Top coat colors: As indicated on drawings and in
schedules; where not indicated or scheduled, provide colors
as selected by the Architect.
C. Lead Content: Not more than 0.06 percent lead by weight
(calculated as lead metal) in the total nonvolatile content of
the paint or the equivalent measure of lead in the dried film.
1. Exception: Where permitted by applicable regulations.
D. VOC Content Limits: The VOC content of all site applied
interior paints and coatings under this section shall not
exceed the following VOC content limits in grams/liter (g/l):
1. Flat paint: 50.
2. Non-flats: 150.
3. Anti-corrosive/anti-rust: 250.
4. Varnishes: 350.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 5
5. Lacquers: 550.
6. Floor coatings: 100.
7. Sealers: Waterproofing - 250; sanding - 275; other - 200.
8. Stains: 250.
PART 3 - EXECUTION
3.1 INSPECTION
A. Verify that surfaces and conditions are ready for work in
accordance with coating manufacturer's recommendations.
B. Prior to commencement of work, examine surfaces scheduled to be
finished.
1. Report any unsatisfactory conditions in writing.
2. Do not apply coatings to unsatisfactory substrates.
3. Beginning painting work on an area will be deemed construed
acceptance of surfaces in that area.
3.2 SURFACE PREPARATION
A. Apply coatings to surfaces that are clean and properly prepared
in accordance with manufacturer's instructions and as herein
specified. Remove dirt, dust, grease, oils, and foreign
matter. Prepare surface for proper texture necessary to
optimum coating adhesion and intended finished appearance.
Plan cleaning, preparation, and coating operations to avoid
contamination of freshly coated surfaces.
1. Do not apply coatings to labels that identify equipment,
fire resistance ratings, etc.
2. Remove hardware, cover plates, and similar items before
applying coatings.
3. Provide protection for non removable items not scheduled
for coating. After application of coatings, install
removed items. Use only skilled workmen for removal and
replacement of such items.
4. Protect surfaces not scheduled for coating. Clean, repair,
or replace to the satisfaction of the Architect any
surfaces inadvertently spattered or coated.
B. Masonry and Concrete: Apply coatings to fully cured surfaces
that are at least 28 days old.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 6
1. Perform any required surface repairs before applying
coatings. Remove any fins or protrusions from surface.
Patch any holes and cracks in an approved manner. Verify
the joints are struck flush or concave unless otherwise
specifically required.
2. Clean surface of all dirt, oil, wax, grease, or other
contaminants. Use appropriate detergents and hot water.
Thoroughly flush cleaning agents from surface.
C. Ferrous Metal: Clean and prepare surface profile in accordance
with the applicable SSPC specifications for hand tool or power
tool cleaning.
1. Intricate fabricated shapes may be pickled in lieu of hand
or power tool cleaning.
2. Before hand or power tool cleaning, remove visible oil,
grease, soluble welding residue, and salts by solvent
cleaning. After hand or power tool cleaning, reclean
surfaces if necessary.
3. Before touching up coatings damaged by handling or welding,
repair damaged surfaces.
D. Galvanized Metal: Solvent clean in accordance with SSPC
specifications.
E. Gypsum Board: Latex-fill minor defects. Spot-prime defects
after repair.
F. Wood: Scrape and remove any sap or pitch deposits from surface
and clean with mineral spirits. Seal any knots and pitch
pockets with a suitable product recommended by the coating
manufacturer. Sand rough spots. Remove dust.
1. After first coat has dried, fill holes, cracks, or
depressions with a suitable wood filler recommended by the
coating manufacturer. Sand filler when dry.
2. Sand surfaces lightly between successive coats. Remove
dust.
G. Mildew: Remove mildew by scrubbing with solution of trisodium
phosphate and bleach. Rinse with clean water and allow surface
to dry.
H. Insulated Coverings: Remove dirt, grease, and oil from canvas,
cotton, and other insulated coverings to be painted.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 7
3.3 MIXING AND THINNING
A. Remove and discard any skin formed on surface of coatings in
containers. Discard any containers where skin comprises 2
percent or more of the remaining material. Do not add thinner
except as specifically recommended (not merely permitted) by
the coating manufacturer for proper coating application under
the circumstances prevailing at the project site when
application equipment recommended by the coating manufacturer
is employed. Use only the quantities and the types of thinner
recommended.
B. Mix materials using mechanical mixers in accordance with
coating manufacturer's instructions. Agitate mixed materials
during application if recommended by manufacturer.
C. Combine multi component paints in quantities needed for use
with in the manufacturer's recommended pot life at the
anticipated application temperatures. Discard remaining mixed
material after pot life has expired.
D. Strain pigmented coatings after mixing except where mechanical
application equipment is provided with effective strainers.
E. Tinting: Except where coating materials cannot be tinted, tint
each successive coat of paint a sufficiently contrasting color
to facilitate identification of complete coating coverage.
3.4 APPLICATION
A. General: Apply coatings in accordance with coating
manufacturer's instructions and using application method best
suited for obtaining full, uniform coverage of surfaces to be
coated.
1. Employ only application equipment that is clean, properly
adjusted, in good working order, and of the type
recommended by the coating manufacturer.
2. Apply successive coats after adequate cure of the preceding
coat and within the recommended recoating time.
3. Apply each coat to achieve the dry film thickness per coat
recommended by the coating manufacturer. Application rates
in excess of those recommended and fewer numbers of coats
than specified will not be accepted.
4. Completed coatings shall be free of defects such as runs,
sags, variations in color, lap or brush marks, holidays,
and skips.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 8
5. Apply coatings according to the schedule at the end of this
section and as otherwise indicated. Coat all similar
surfaces not specifically mentioned unless specifically
exempted.
a. Ensure that all surfaces receive a dry film thickness
equivalent to those of flat surfaces.
6. Coat front and back of miscellaneous items such as covers,
access panels, and grilles. Apply fully finish coats
behind movable items of furniture and equipment before
installation. Apply prime coat only behind non movable
items of furniture and equipment before installation.
7. Sand gloss coats before applying subsequent coatings.
B. Apply coatings to match approved mock ups.
C. Remove coatings not in compliance with this specification,
reclean and re prepare surfaces as specified, and apply
coatings to comply with the contract documents.
D. Scheduling: Apply first coat of material to properly prepared
surfaces without delay.
1. Apply successive coats within the time limits recommended
by the manufacturer.
E. Mechanical and Electrical Items: Paint mechanical and
electrical items exposed to view in finished spaces and in
equipment rooms.
1. Color code items in accordance with color schedules.
2. Color band and identify each component with flow arrows.
3. Paint exposed piping and supports, ducts and insulation,
conduit and fittings, panel enclosures, etc.
3.5 PRIME COATS
A. Field apply bottom coats scheduled except where the contract
documents require shop coating of ferrous metals.
B. Where first coat shows signs of suction spots or poorly sealed
areas, reapply first coat material to adequately seal surface
before proceeding with successive coats.
C. Apply block fillers using manufacturer's recommended
application techniques and achieving a pinhole free surface.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 9
D. Ferrous metals that have not been shop primed shall be field
primed promptly after arrival at the site or shall be stored
away from the effects of weather.
E. Reprepare and retouch damaged prime coats using approved,
compatible primer.
3.6 FINISH COATS
A. Apply not less than the number of coats indicated.
B. Apply each coat to achieve not less than the dry film
thicknesses indicated per coat.
C. Apply additional coats at no additional cost to the Owner when
necessary to achieve complete hiding, uniform texture, or
uniform sheen and appearance.
3.7 CLEANING AND PROTECTION
A. Cleaning: Clean work area on a daily basis; dispose of spent
materials and empty containers. If requested, turn over to the
Architect all empty coatings containers used during the course
of each day.
1. Remove all trace of coatings from adjacent surfaces not
scheduled to be coated. Remove by appropriate methods that
do not damage surfaces.
B. Protection: Protect work against damage until fully cured.
Provide signs identifying wet surfaces until surfaces are
adequately cured.
1. Shortly before final completion of the project, examine
surfaces for damage to coatings and restore coatings to
new, undamaged condition.
2. Touch up of minor damage will be acceptable where result is
not visibly different from surrounding surfaces. Where
result is different either in color, sheen, or texture,
recoat entire surface.
3.8 SCHEDULE OF COATINGS FOR INTERIOR SURFACES
A. Concrete Masonry Units (walls and partitions):
1. Latex, semi-gloss.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 10
a. Bottom coat: Super Spec Latex Block Filler #M160.
b. Intermediate coat: Ultra Spec 500 Interior Semi-Gloss
Finish N539.
c. Top coat: Ultra Spec 500 Interior Semi-Gloss Finish
N539.
2. Acrylic epoxy, low gloss.
a. Bottom coat: Super Spec Latex Block Filler #M160.
b. Intermediate coat: Super Spec HP Acrylic Epoxy Semi-
Gloss Coating #P43/P43-84.
c. Top coat: Super Spec HP Acrylic Epoxy Semi-Gloss
Coating #P43/P43-84.
B. Ferrous Metal (hollow metal work, railings/handrails,
miscellaneous metal items, etc.): Alkyd, semi-gloss.
1. Bottom coat: Super Spec HP Alkyd Metal Primer #P06.
2. Intermediate coat: Super Spec Alkyd Semi-Gloss Enamel
#C271.
3. Top coat: Super Spec Alkyd Semi-Gloss Enamel #C271.
C. Gypsum Board (walls, partitions and ceilings):
1. Latex, flat.
a. Bottom coat: Ultra Spec 500 Interior Latex Primer
#N534.
b. Intermediate coat: Aura Waterborne Interior Matte
Finish #522.
c. Top coat: Aura Waterborne Interior Matte Finish #522.
2. Latex, eggshell.
a. Bottom coat: Ultra Spec 500 Interior Latex Primer
#N534.
b. Intermediate coat: Aura Waterborne Interior Eggshell
Finish #524.
c. Top coat: Aura Waterborne Interior Eggshell Finish
#524.
3. Latex, semi-gloss.
a. Bottom coat: Ultra Spec 500 Interior Latex Primer
#N534.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
EXTERIOR PAINTING 099100- 11
b. Intermediate coat: Aura Waterborne Interior Satin
Finish #526.
c. Top coat: Aura Waterborne Interior Satin Finish #526.
4. Acrylic-epoxy, semi-gloss.
a. Bottom coat: Fresh Start All-Purpose 100% Acrylic
Primer #23.
b. Intermediate coat: Super Spec HP Acrylic Epoxy Semi-
Gloss Coating #P43/P43-84.
c. Top coat: Super Spec HP Acrylic Epoxy Semi-Gloss
oating #P43/P43-84.
D. Wood Surfaces (miscellaneous items): Latex, semi-gloss.
1. Bottom coat: Ultra Spec 500 Interior Latex Primer #N534.
2. Intermediate coat: Aura Waterborne Interior Satin Finish
#526.
3. Top coat: Aura Waterborne Interior Satin Finish #526.
E. Insulated Pipe and Ducts: Latex emulsion, flat.
1. Bottom coat: Ultra Spec 500 Interior Latex Primer #N534.
2. Top coat: Aura Waterborne Interior Matte Finish #522.
3.9 SCHEDULE OF COATINGS FOR EXTERIOR SURFACES
A. Ferrous Metal (hollow metal work, miscellaneous metals, etc.):
Alkyd, semi-gloss.
1. Bottom coat: Super Spec HP Alkyd Metal Primer #P06.
2. Intermediate coat: Super Spec Alkyd Semi-Gloss Enamel
#C271.
3. Top coat: Super Spec Alkyd Semi-Gloss Enamel #C271.
B. Galvanized Metal (railings/handrails, miscellaneous metals,
etc.): Alkyd, semi-gloss.
1. Bottom coat: Fresh Star All Purpose 100% Acrylic Primer
#023.
2. Intermediate coat: Super Spec Alkyd Semi-Gloss Enamel
#C271.
3. Top coat: Super Spec Alkyd Semi-Gloss Enamel #C271.
END OF SECTION 230100
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ROOF DRAINS 221426-1
SECTION 221426 - ROOF DRAINS
1. PART 1 - GENERAL
1.1.RELATED DOCUMENTS:
A. Documents affecting work of this Section include, but are not necessarily limited to, General Requirements, bidding
documents, Flexible Flashing and Sheet Metal and drawings.
1.2.GENERAL:
A. Existing drains will be re-worked, re-flashed, and deteriorated components replaced.
B. At start of each workday, drains within daily work area shall be plugged. Plugs to be removed at end of each
workday or before arrival of inclement weather
C. All drains will require new flashing lead.
D. New drains to be installed as directed by building owner's representative.
E. Roof Areas to be covered under this section: All roof areas.
2. PART 2 - PRODUCTS
2.1.DRAIN ACCESSORIES
A. Replacement parts should be from same manufacturer of original drain.
B. New drains, when required, should be appropriate for existing conditions. Drain manufacturers that may be used
but are not limited to the following subject to compliance
with requirements:
1 Zurn, Erie, PA
2 Smith, Montgomery, Alabama
3 Josam, Michigan City, Indiana
C. Metal flashing:
1 ASTM B29-79(1984), four lb. sheet lead or soft copper
drain flashing sheet.
D. Bitumen Stop: If bitumen stops are required (refer to detail drawing), see Flexible Flashing and Sheet Metal
Requirements.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ROOF DRAINS 221426-2
3. PART 3 - EXECUTION
3.1.DRAINS
A. Existing drains
1 Remove flashing collar. Clean. If broken, replace.
2 Install tapered edge strip around drain to create 48 x
48 inch sump. Miter corners. Seal top of tapered edge
to drain rim with fiberglass mesh embedded between
alternate courses of asphalt mastic.
3 Install multi-ply roofing or stripping plies into sump
and onto drain rim.
4 Apply 1/16 inch uniformly thick layer of asphalt mastic
to surface receiving lead flashing.
5 Set single piece lead flashing (30” square minimum) in
mastic centered over drain, extend lead six inches
beyond drain rim. Neatly dress lead with wood block.
6 Prime lead with asphalt primer and allow to dry.
7 Install two plies fiberglass roof ply embedded in
alternate courses of specified membrane adhesive over
primed lead. Stripping plies shall extend two and four
inches beyond edge of lead.
8 Reclamp flashing collar to drain in bed of mastic. If
bolts are broken, drill and retap. If ladder clamps are
installed, replace missing clamps.
9 Neatly cut lead within drain at rim, remove.
10 Install strainer. 11 Install bitumen stop where coal tar floodcoat is to be
used.
B. New Drains:
1 Locate and install drain body in locations specified by
owner's representative.
2 Install tapered edge strip around drain to create 48 x
48 inch sump. Miter corners. Seal top of tapered edge
to drain rim with fiberglass mesh embedded between
alternate courses of asphalt mastic.
3 Install multi-ply roofing or stripping plies into sump
and onto drain rim
4 Apply 1/16 inch uniformly thick layer of asphalt mastic
to surface receiving lead flashing.
5 Set single piece lead flashing (30” square minimum) in
mastic centered over drain, extend lead six inches
beyond drain rim. Neatly dress lead with wood block.
6 Prime lead with asphalt primer.
7 Install two plies fiberglass roof ply embedded in
alternate courses of adhesive over primed lead.
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018
ROOF DRAINS 221426-3
Stripping plies shall extend two and four inches beyond
edge of lead.
8 Reclamp flashing collar to drain in bed of mastic. If
bolts are broken, drill and retap. If ladder clamps are
installed, replace clamps.
9 Neatly cut lead within drain at rim, remove.
10 Seal/plug drain to prevent water entry until service connection is completed.
C. Service Connection:
1 Locate new piping to include as few bends as possible.
Do not overload any existing pipe and drain, ensure
balanced disposal of all rain water. Make adequate
provisions for thermal movement of all piping.
2 Provide cleanouts at elbows under each drain, and at
tops and bottoms of each vertical run, at connection to
storm sewer, as called for by Plumbing Code, and as
required to make sure that drainage system can be
cleaned anywhere, if needed. Provide and install access
panels if required for service cleanouts.
3 Where new work joins old, provide all necessary
materials, repairs, changes, and associated work as
needed for proper connections.
4 Make all connections watertight.
5 Remove seal/plug and install strainer.
6 Use insulation on all pipes and fittings from drains to
existing down- pipes. Ensure full continuity of
insulation over pipes, fitting, and connections.
Provide concealed saddles at all hangers.
END OF SECTION 221426.13
TCNJ FORCINA HALL - HVAC AND ROOF REPLACEMENT dlb # 47210
ISSUED FOR CONSTRUCTION January 15, 2018