PRE FEASIBILITY REPORT
For
PROPOSED SYNTHETIC ORGANIC CHEMICALS (SPECIALTY
CHEMICALS/PESTICIDE INTERMEDIATES) & INORGANIC
CHEMICALS MANUFACTURING UNIT
of
M/s. Din Chemicals
Plot No. 3030, Phase III, GIDC Industrial Estate, Panoli,
Tal: Ankleshwar, Dist: Bharuch-394116 (Guj.)
2
CONTENTS
Sr. No. Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 8
3. Project Description 9
4. Site Analysis 14
5. Planning Brief 16
6. Proposed Infrastructure 17
7. Rehabilitation and resettlement (R & R) Plan 18
8. Project Schedule & Cost Estimates 18
9. Analysis of Proposal (Final Recommendations) 19
3
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. Din Chemicals proposes manufacturing of Synthetic Organic Chemicals & Inorganic
Chemicals at Plot No. 3030, Phase-III, GIDC Industrial Estate, Panoli, Tal: Ankleshwar, Dist:
Bharuch , Gujarat.
Project Detail
1.2.1 Products along with Production Capacity
Sr.
No.
Product List
Proposed
Quantity
MT/Month
CAS No. LD50
Synthetic Organic Chemicals
1. Benzoic Acid
15
65-85-0 ---
2. Sodium Benzoate 532-32-1 --
3. Para Chloro Benzoic Acid 74-11-3 --
4. Ortho Chloro Benzoic Acid 118-91-2 --
5. Para Nitro Benzoic Acid 122-04-3 --
6. Ortho Nitro Benzoic Acid 552-16-9 --
7. Formaldehyde Bisulphite 870-72-4 --
Inorganic Chemicals
1. Sodium Sulfite
7757-83-7 --
2. Sodium bisulfite 7631-90-5 --
3. Sodium Thiosulphate 7772-98-7 --
4. Sodium Acetate (Crystal/Anhydrous) 127-09-3 --
5. Potassium Chloride 7447-40-7 --
6. Sodium Nitrate 7631-99-4 --
7. Sodium Bromide 7647-15-6 --
8. Potassium Bromide 7758-02-3 --
4
9. Potassium Nitrate 300 7757-79-1 --
10. Ammonium Sulphate 7783-20-2 --
11. Zinc chloride 7646-85-7 --
12. Potassium Sulphate 7778-80-5 --
13. Potassium Sulphite 10117-38-1 --
14. Potassium Acetate 127-08-2 --
15. Ammonium Acetate 631-61-8 --
16. Cobalt Sulphate 10124-43-3 --
17. Calcium Acetate 62-54-4 --
18. Potassium Acetate 127-08-2 --
19. Copper Acetate 142-71-2 --
20 Nickel Sulphate 10101-97-0 --
21 Tin Sulphate 7488-55-3 --
22 Distilled water --
Total 315
5
1.3 Raw Material Requirement
List of Raw Materials and Their Capacity:
Sr. No. Raw Material Quantity (MT/MT)
1 Benzoic Acid
Sodium Benzoate SOLUTION /OR CAKE 1.00
HCl 0.03
2 Sodium Benzoate
Benzoic Acid 0.850
Caustic flake/LYE 0.280
3 Para Chloro Benzoic Acid
Para Chloro Toluene (PCT) 1.00
Nitric Acid (HNO3) 60% 2.50
NaOH Lye 48% 0.350
4 Ortho Chloro Benzoic Acid
Ortho Chloro Toluene (OCT) 1.00
Nitric Acid (HNO3) 60% 2.50
NaOH Lye 48% 0.350
5 Para Nitro Benzoic Acid
Para Nitro Toluene (PNT) 1.00
Nitric Acid (HNO3) 60% 2.50
NaOH Lye 48% 0.350
6 Ortho Nitro Benzoic Acid
Ortho Nitro Toluene (PNT) 1.00
Nitric Acid (HNO3) 60% 2.50
NaOH Lye 48% 0.350
7 Formaldehyde Bisulfite
Formaldehyde 0.25
Sodium bisulfite 0.85
Inorganic Chemicals
8 Sodium Sulfite
Sodium Sulfite Solution 4.0
9 Sodium Bisulphite
Sodium Bisulfite Solution 2.0
10 Sodium Thio Sulphate
Sodium Thio sulphate crystal 2.0
11 Sodium Acetate
Soda ash/CAUSTIC LYE 0.732
Dil. Acetic acid 0.646
6
12 Potassium Chloride
Potassium Chloride cake or ML 2.0
13 Sodium Nitrate
Sodium Nitrate cake or ML 2.0
14 Sodium Bromide
Sodium Bromide cake or ML/HBR SOLUTION 2.0
15 Potassium Bromide
Potassium Bromide cake or ML/ HBR SOLUTION 2.0
16 Potassium Nitrate
Potassium Nitrate cake or ML 3.0
17 Ammonium Sulphate
Ammonium Sulphate cake or ML 3.0
18 Zinc Chloride
Zinc Chloride cake or ML 2.0
19 Potassium Sulphate
Potassium Sulphate cake or ML 4.0
20 Potassium Sulphite
Potassium Sulfite cake or ML 3.0
21. Ammonium Acetate
Ammonium Carbonate 0.850
Dil. Acetic acid 0.650
22. Cobalt Sulphate
Cobalt 0.125
Sulphuric Acid 0.40
23. CALCIUM ACETATE
Calcium Carbonate 0.60
Acetic Acid 1.28
24. POTASSIUM ACETATE
Potassium Hydroxide 0.43
Acetic Acid 1.01
25. COPPER ACETATE
Copper 0.25
Nitric Acid 1.60
Soda Ash /CAUSTIC LYE 0.45
Acetic Acid 1.14
26. NICKEL SULPHATE
Nickel Metal 0.15
Sulphuric Acid 0.47
27. Tin Sulphate
Tin Chloride 0.5
Soda Ash/ CAUSTIC LYE 0.375
Sulfuric Acid 0.5
7
1.4 Water Requirement, Waste Water Generation and Treatment
Source of water will be met through GIDC Water Supply. Total water requirement will be 14
m3/day. Total 4.0 m
3/day (2.0 m
3/day Industrial + 2.0 m
3/day domestic) of effluent shall be
generated, 1.67 m3/day = low COD and low TDS stream will be treated in ETP then sent it to
CETP, Panoli for further treatment and disposal. And 0.33 m3/day = High COD and High TDS
stream will be treated in ETP then sent it to Common Spray Dryer. Domestic Waste water will
be disposed by septic tank & soak pit.
1.5 Air Pollution Source and Control Management
There will be flue gas emission from Boiler, Thermic fluid heater and D.G. Set and process gas
emission from process vent only. Company will install Multicyclone Separator, bag filter,
scrubber to reduce air pollution.
1.6 Hazardous Waste
CAT.
NO. HAZARDOUS WASTE
PROPOSED
TOTAL
(MT/Month)
METHOD OF DISPOSAL
5.1 Used Oil 0.01 Collection, Storage, Transportation Re-use or Sent to
GPCB approved recycler
33.1 Discarded barrels/
containers/ liners
1 Collection, Storage, Transportation, decontamination
and Sent back to supplier / to GPCB approved recycler
35.3 ETP Sludge 5 Collection, Storage, Transportation and Sent to TSDF site
of M/s. PSWML, Panoli for secured land filling
20.3 Process Sludge 5 Collection, Storage, Transportation and Sent to TSDF site
of M/s. PSWML, Panoli for secured land filling
1.7 Green Belt
Total 1,000 sq. meter land area is available at site; out of this area about 250 sq. meter area will
be developed as greenbelt and other forms of greenery.
8
1.8 Power & Fuel Requirements
FUEL:
Bio-Coal = 150 MT/Month (Proposed)
HSD = 20 Liter/Hr
ENERGY:
250 KVA from DGVCL
100 KVA = D G Set in emergency only
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy of
mining lease/letter of intent should be given.
Identification of the project and project proponent
M/s. Din Chemicals proposes manufacturing of Synthetic Organic Chemicals & Inorganic
Chemicals at Plot No. 3030, Phase-III, GIDC Industrial Estate, Panoli, Tal: Ankleshwar, Dist:
Bharuch, Gujarat.
List of Proprietor:
Sr.
No.
Name of Proprietor
1. Mr. Bimal Salvi
2.2 Brief description of nature of the Project
Proposed project of Synthetic Organic Chemicals & Inorganic Chemicals manufacturing unit.
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the country by setting up
this unit, Company will be able to meet the demand of various products locally. The project will
save forex as certain products import will be reduced. This will also generate direct and indirect
employment opportunity for various levels of people.
2.4 Demands-Supply Gap
Based on our informal survey of the market with our current customers and various traders, we
have found that there is a big potential for the range of the products we are planning.
9
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials and the non availability of some
materials, we will have to import some of the key raw materials as they are not available
indigenously. This will make us very competitive against imported finished products and we will
export of our finished products in the international market.
2.6 Export possibility
We shall explore the possibility of export the products.
2.7 Domestic/Export Markets
Our products have good demand in domestic & international markets. We shall explore the
possibility of export the products.
2.8 Employment Generation (Direct and Indirect) due to project.
M/s. Din Chemicals will give direct employment to local people based on qualification and
requirement. In addition to direct employment, indirect employment shall generate ancillary
business to some extent for the local population.
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
• Location (map showing general location, specific location and project boundary & project
site layout) with coordinates.
10
Map showing general location.
PROJECT
SITE
11
Specific location and project boundary
• Project Site (Google Map)
10
•
11
Plant Layout
Office
Plant
Utilities Area
Finished Product – Storage Area
Entry Exit
40 Meter
ETP
25 Meter
12
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Looking to the domestic & international markets demand of the products it was decided by
M/s. Din Chemicals to set up new facility.
Major factors involved in the selection of site are listed below:
• Minor site clearance activities shall be carried out to clear shrubs and weed.
• The project site is located on level ground, which does not require any major land filling
for area grading work.
• Proximity to Raw Material suppliers.
• Site is very well connected by road and railway.
• Availability of Fuel, Power, CETP, TSDF, etc. within the estate.
Modern infrastructure support and amenities at par in other global markets, including:
� Efficient transport facilities.
� Environment-friendly zone.
� Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer Section-1.2.1, Page No. 3.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project, etc. should be given)
Please refer Please refer Form-I, Annexure-III.
13
3.6 Raw Material required along with estimated quantity, likely source, marketing area of
final product/s, mode of transport of raw material and Finished product.
For raw material required along with quantity; Please refer Section-1.3, Page No. 3. We shall
procure the raw material as much as possible from domestic market and if there is no
availability of any raw material we will import. We shall explore the possibility of export the
finished products.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
Company will explore the possibility of reuse & recycle.
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement shall meet through G.I.D.C Water Supply.
FUEL:
Bio-Coal = 150 MT/Month (Proposed)
HSD = 20 Liter/Hr
ENERGY:
250 KVA from DGVCL
100 KVA = D G Set in emergency only
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Please refer Please refer Form-I, Annexure-IV & VI.
14
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
4.1 Connectivity
• Site is very well connected by road
• Availability of fuel, power, CETP, TSDF, etc. within the estate.
4.2 Land Form, Land Use and Land Ownership
Land Use will be incorporated in the EIA Study.
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC
STATUS & BASIC AMENITIES. SITE VISITS BY AND
INTERVIEWS WITH LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT
PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE
MANAGEMENT, GREEN BELT DEVELOPMENT
MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
15
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from
HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette
notification should be given.
Existing land use pattern will be incorporated in the EIA report. CRZ Clearance is not
applicable.
4.5 Existing Infrastructure
This is proposed project.
4.6 Soil Classification
Soil Classification will be incorporated in the EIA report.
4.7 Climatic data from secondary sources.
Climatic data will be incorporated in the EIA report.
4.8 Social infrastructure available.
Various Programs/ Projects related to Social & Economic development of surrounded area
has been planned, which are as follows.
A) Natural Resource Management – The main focus of this program will be to maximize the
yield returns of the farmers through efficient management of existing resources &
extension of new agricultural practices.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture
sector and reduce the rural poverty by programs like Farmers Training, Nursery
Growing Trainings, Modern agriculture equipment distribution programs etc.
2) Animal Husbandry Projects – Various programs like health checkups & treatment,
vaccination program, Anti sterility camps, breed improvement etc. will be carried
out.
16
B) Income Generation Program -
1) Establishment of Self help groups.
2) Rural Entrepreneurship Development Program
3) Handcrafts Development Program
4) Vocational Training
5) Business process outsourcing
C) Health, Education & Infrastructure
1) Aids Awareness Program
2) General Health Camps
3) Innovative Teaching Methods
4) Adult Education
5) Sanitation
6) Infrastructure Development Projects
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed project of Synthetic Organic Chemicals & Inorganic Chemicals
unit.
5.2 Population Projection
Population Projection will be incorporated in the EIA report.
5.3 Land use planning (breakup along with green belt etc.)
Plot Area: 1,000 m2
17
Total Plant area: 200 m2
Total Utility Area: 100 m2
ETP Area: 100 m2
Raw Material and Product storage area: 150 m2
Green belt area: 250 m2
Open & Road Area: 200 m2
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed activity.
• Social Welfare
• Cordial relation with the villages shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.
5.5 Amenities/Facilities
Details of amenities available in study area
Population Projection will be incorporated in the EIA report.
6.0 Proposed Infrastructure
6.1 Industrial Area (Processing Area)
Processing Area (Plant facilities, ETP Area and Utility Services) = 400 m2
6.2 Residential Area (Non Processing Area)
Non Processing Area (Raw material storage area, finished storage area, Workshop and Engg.
Store, Canteen, security cabin, green belt and open area) = 600 m2
Green Belt: 250 m2
6.3 Green Belt
Total 1,000 sq. meter land area is available at site; out of this area about 250 sq. meter area
will be developed as greenbelt and other forms of greenery.
18
6.4 Social Infrastructure
• Water requirement will be met through G.I.D.C Water Supply.
• Power supply by DGVCL.
6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
• Site is very well connected by road
• Proximity to Raw Material suppliers
• Availability of sufficient land free from cultivation
• Availability of power facilities
• Availability of fuel
6.6 Drinking water Management (Source & Supply of water)
Total water requirement shall be met through G.I.D.C. Water Supply.
6.7 Sewerage System
Sewage pipes would be laid in entire company for the removal and disposal of mainly non-
harmful liquid wastes from the offices, canteen and domestic waste coming from different
section of industry. These liquid wastes would be sent to septic tank & soak pit.
6.8 Solid Waste Management
Please refer Form-I, Annexure-VI.
6.9 Power Requirement & Supply/Source
Please refer Section 1.8, Page No. 5 of this report.
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
19
There is no habitation on the proposed project activity area and it is open industrial land, so
R & R policy is not applicable to this project.
There shall not be displacement of any population in project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is
no permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We shall start construction of proposed project after getting EC and we shall start
production after applying for CCA.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total Project Cost for proposed project activity is Rs. 50 Lakhs.
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed project.
• Social Welfare shall be done.
• Cordial relation with the industry shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.