Forward Looking Statements

This presentation contains forward looking information, which is based on assumptions and judgments of management regarding future

events and results. Such forward looking information, including but not limited to information with respect to the potential expansion of

resources at Kipoi, production and expected recoveries from the Stage 1 mining, HMS and spiral system operation, and development of

a Stage 2 SX-EW plant at Kipoi, involves known and unknown risks, uncertainties, and other factors which may cause the actual results,

performance or achievements of the Company to be materially different from any anticipated future results, performance or

achievements expressed or implied by such forward looking information. Such factors include, among others, the actual market prices

of copper and cobalt, the actual results of current exploration, the availability of equity and debt financing, the volatility currently being

experienced in global financial markets, the actual results of future mining, processing and development activities, changes in project

parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's filings, is available under the

Company’s profile on SEDAR at www.sedar.com.

Competent Person Statement

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled

by Mr. Brad Marwood, who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Marwood is a Director and full-time

employee of the Company. Mr Marwood has sufficient experience which is relevant to the style of mineralisation and type of deposits

under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the

‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Marwood consents to the inclusion in

the report of the matters based on his information in the form and context in which it appears.

2

Disclaimer

For

per

sona

l use

onl

y

3

Corporate Snapshot

Corporate Snapshot

ASX / TSX Code TGS

Shares on Issue 673.5 million

Share Price A$0.36

Market Capitalisation A$239 million

Options / Performance Rights on Issue 43 million (Exp. Dec 12 – May 15)

Cash, Receivables & Conc. Inventory (30-Sep-12) US$36.7 million

Debt (Trafigura facility) US$9.0 million

Major Shareholders Undiluted Fully Diluted

Contango 6% 6%

Macquarie Bank 5% 5%

JP Morgan 4% 4%

Fidelity Group 3% 3%

Acorn Capital 3% 3%

Directors 1% 2%

ASX Share Price Performance

Board of Directors

Neil Fearis Non Executive Chairman

Brad Marwood Managing Director

Rhett Brans Non Executive Director

David Constable Non Executive Director

0

5,000

10,000

15,000

20,000

$0.00

$0.20

$0.40

$0.60

Sep

11

Oct

11

Nov

11

Dec 1

1

Jan

12

Mar

12

Apr 1

2

May

12

Jun

12

Jul 1

2

Aug

12

Sep

12

Volume('000)

Share Price

Major Projects Equity

Kipoi Copper / Cobalt, DRC (Mining Rights) 60%

Lupoto Copper, DRC (Prospecting Rights) 100%

For

per

sona

l use

onl

y

4

Democratic Republic of Congo (DRC)

First democratically elected Government in 2007

Joseph Kabila re-elected President in November 2011

Stable government following recent Presidential elections

Multilateral presence – UN, World Bank and IMF.

Mining reviews completed in 2009.

OHADA legal system.

For

per

sona

l use

onl

y

Source: CIBC Global Mining Group May 2011

5

Katanga Copper Belt – Key Deposits

M&A activity within last 4 years Kipoi Project location

1 Kamoa - Ivanplats

2 KOV Complex - Katanga

3 Kulu – MMG

4 Kolwezi Tailings – ENRC

5 Kalukundi – Africo

6 Tenke Fungurume – Freeport/Lundin

7 Mukondo – ENRC

8 Shituru – Shanghai Pengxin

9 Dikulushi & Kapulo – Mawson West

10 Kipoi – Tiger

11 Kinsevere – MMG

12 Kalumines – ARM/Vale

13 Ruashi & Etoile – Jinchuan

14 Sentinel – FQM

15 Lumwana – Barrick Gold

16 Kansanshi – FQM

17 Mutoshi & Kinsenda – Jinchuan

18 Konkola North – ARM/Vale

19 Nama – Caledonia

20 KCM – Vedanta

21 Nchanga – KCM

22 Chambishi – ENRC

23 Mufulira – Mopani

24 Nkana – Mopani

25 Frontier – ENRC

26 Chibuluma – Jinchuan

27 Baluba – Luanshya Copper Mines plc

28 Luanshya – CNMC

29 Lonshi – FQM

For

per

sona

l use

onl

y

6

Tiger Strategy

STRATEGY

1 Kipoi Stage 1 – low capital, high margin 35ktpa Cu HMS Plant – IN PRODUCTION

2 Kipoi Stage 2 – 50ktpa Cu SX-EW – DFS DUE Q4 2012

3 Phased Stage 2 development – funded through Stage 1 free cash flow

For

per

sona

l use

onl

y

Resources Estimate

7

Historic Timetable to Production

For

per

sona

l use

onl

y

8

Kipoi Stage 1 – HMS Ramp Up

HMS plant consistently exceeding nameplate production of 35,000tpa.

Record production of 3,853t in June, production in excess of 3,000t from March 2012 onwards

Concentrate grade exceeding target of 25% Cu.

Export sales commenced in June 2012

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

-

20,000

40,000

60,000

80,000

100,000

May

-11

Jun-

11

Jul-1

1

Aug-

11

Sep-

11

Oct

-11

Nov

-11

Dec-

11

Jan-

12

Feb-

12

Mar

-12

Apr-

12

May

-12

Jun-

12

Jul-1

2

Aug-

12

Sep-

12

Copper (t) Ore Processed (t)

Ore Processed Cu Produced Nameplate

For

per

sona

l use

onl

y

9

Self-funded Growth Profile

1. Stage 2 SX-EW operating and capital costs are based on management forecasts and subject to a DFS 2. Free cashflow excludes interest and tax payments 3. Forecast cash operating cost (US$/lb) includes mining, processing and G&A, and excludes royalties/copper cathode selling

costs

For

per

sona

l use

onl

y

10

Kipoi Stage 2 DFS

KIPOI STAGE 2 SX-EW DFS UPDATE

Development proposed to commence Q4 2012

Acid consumption confirmed bottom 25%, LOM average 12.9kt/t ore

Total copper recovery increased from 82.5% to 88%

Operating costs forecast less than $1.00/lb, start-up less than $0.70/lb (no mining)

SX-EW Phase 1 capital cost $154 million, LOM capital cost less than $400m

Mine life in excess of 9 years

For

per

sona

l use

onl

y

11

SX-EW Flowsheet

$154m

$70m

$93m

For

per

sona

l use

onl

y

12

Kipoi Capex Schedule

Stage Capex Status

HMS Plant – 35ktpa in concentrate $34m In production

SXEW Phase 1 – 25ktpa HL $154m Commence Q4 2012 In production Q2 2014

SXEW Phase 2 – 50ktpa HL $70m Commence Q3 2014 In production Q2 2015

SXEW Phase 3 – Tank leach $93m Commence Q4 2014 In production Q1 2016

Sustaining capex $49m LOM

For

per

sona

l use

onl

y

13

Kipoi Mining Licence (55km2)

12km main structure in Blue Flagship Kipoi Project extremely well positioned on the Katanga Copper Belt, DRC.

Stage 1 mining focused on the higher grade reserve at Kipoi Central producing 35ktpa Cu until 2014.

Stage 2 SX-EW operation to source ore from Kipoi Central, Kipoi North and Kileba to produce 50ktpa Cu, DFS due late 2012.

Resource of 49.0Mt at 1.7% Cu for 834kt contained Cu (mining depleted)

Reserve of 2.7Mt at 7.0% Cu for 188kt contained Cu.

For

per

sona

l use

onl

y

2012 Exploration Program

$13m exploration budget

4 diamond and 1 RC rigs on site

Priority 1 & 2 resource upgrade programmes completed at Kipoi Central, Kipoi North and Kileba

Kipoi Central and Kileba resource extension drill programmes completed in 3Q 2012

Judeira, Kaminafitwe and Sase South drilling programmes completed in 3Q 2012

Sase Central resource upgrade programme commenced in 3Q 2012

14

World Class Exploration Potential

For

per

sona

l use

onl

y

15

Kipoi Central Structural Understanding

TIL SLT DOL

SLT COZ DOL

SLT SLT DOL

BH For

per

sona

l use

onl

y

16

Judeira South

Judeira South Cross Section Judeira South Collar Plan

For

per

sona

l use

onl

y

Located 10km south of Kipoi and accessed via a direct road.

2012 drilling program focusing on Sase South and Sase Central with 3,000m of RC and 2,000m of DD

Mwana, Mwana East and Kapampala are primary ore targets.

Sase South oxide and primary ore target.

Resource of 14.7Mt at 1.4% Cu for 200kt contained Cu.

17

Lupoto Prospecting Licence (140km2)

For

per

sona

l use

onl

y

Tiger to acquire a 19.9% interest

1 representative on the board

Joint technical committee

First right to acquire assets, subject to maintaining 19.9% interest

Shikila and Kabwima projects strategically located in the Zambian Copperbelt

Within 200km radius of Tiger’s exploration base at Lubumbashi

Mwongo project is 5km from the recent Blackthorn Resources discovery at Kitumba (187Mt at 1.14% Cu)

18

Chrysalis Strategic Alliance (ASX: CYS)

For

per

sona

l use

onl

y

19

Ongoing news flow

Q4 2012 Exploration results for 83 DD and 30 RC holes for 14,248m

Q4 2012 Stage 2 DFS

Q4 2012 Board approval to proceed with Stage 2, Phase 1 25ktpa HL-SXEW

Ongoing Production reports from HMS operations

For

per

sona

l use

onl

y

20

Recent M&A featuring African focussed copper producers has highlighted the compelling valuation proposition of Tiger Resources: Current +A$800m bid for Botswana copper producer and ASX-listed

Discovery Metals by Cathay Fortune and CAD Fund.

Completed US$1.4b takeover of DRC copper producer and JSE-listed Metorex by Jinchuan in Dec ‘11.

Completed US$1.3b takeover of DRC copper producer and TSX/ASX-listed Anvil Mining by MMG in Feb ’12.

Completed C$7.3b takeover of Zambia copper producer and ASX-listed Equinox Minerals by Barrick Gold in April ‘11.

African Copper Transactions

For

per

sona

l use

onl

y

21

Peer Chart

Nb: 1. Size of bubbles represents contained copper resource 2. Stage 2b production dependent upon exploration success 3. Per Stage 1 HMS DFS payability will be 42% 4. Stage 1 HMS C1 cost is exclusive of payability factor Source: Foster Stockbroking

OZL – OZ Minerals TGS – Tiger Resources PNA – PanAust SFR – Sandfire Resources RXM – Rex Minerals

DML– Discovery Metals FND – Finders Resources AOH – Altona Mining HGO – Hillgrove Resources MMG – Minmetals, previously Anvil Mining SRQ – Straits Resources

-

20,000

40,000

60,000

80,000

100,000

120,000

$0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 $1.60 $1.80 $2.00

Fore

cast

Ann

ual P

rodu

ctio

n (k

tpa)

Forecast C1 Cash Costs (US$/lb)

OZL

PNARXM

MMG(Kinsevere)

DML

AOH

SFR

TGSSt 2 (HL)

TGSSt 1 (HMS)

SRQHGOFND

TGSSt 2 (SXEW)

For

per

sona

l use

onl

y

22

Corporate Responsibility

RIMHOP – Women & Children Health initiative, ECU programme

Hospital fit out assisted by NGO’s

Two Schools, power, internet, university supported programmes

Commercial farming lots 500Ha staples for 5,000 people

Co-ordinated focus with community, elders and leaders

For

per

sona

l use

onl

y

23

Further Information

Brad Marwood

Managing Director

Tel: (+61 8) 6188 2000

Email: [email protected]

Stephen Hills

Chief Financial Officer

Tel: (+61 8) 6188 2000

Email: [email protected]

Nathan Ryan

Investor Relations

Tel: (+61 0)420 582 887

Email: [email protected]

Company website: www.tigerresources.com.au

For

per

sona

l use

onl

y

Kipoi resources represent 847kt of contained Cu (depleted to 31 March 2012)

24

Appendix 1: Detailed Kipoi Resource

Kipoi Resource Type Mt Cu Grade Co Grade Cu (kt) Co (kt)

Kipoi Central Measured 5.4 3.9% 0.1% 211 7.6

Kipoi Central Indicated 20.5 1.6% 0.1% 327 14.5

Kileba Indicated 8.6 1.5% 0.05% 128 4.6

Total Measured and Indicated 34.5 1.9% 0.1% 666 27

Kipoi Central Inferred 7.9 1.0% 0.1% 82 9

Kipoi North Inferred 5.3 1.4% 0.05% 72 3

Kileba Inferred 2.2 1.2% 0.04% 27 1

Total Inferred 15.4 1.2% 0.04% 181 13

Kipoi High Grade Zone (included in Kipoi Central above) Type Mt Cu Grade Co Grade Cu (kt) Co (kt)

Kipoi Central Measured 1.84 7.3% 0.2% 134 3

Kipoi Central Indicated 0.47 5.1% 0.2% 24 1

TOTAL 2.31 6.8% 0.2% 158 4

Notes: 1. Mineral Resource depleted to 31 March 2012 2. Kipoi Central High Grade Zone (Mineral Reserve) depleted to 31 December 2011

For

per

sona

l use

onl

y

Classification Category Tonnes (mt) Copper (%) Cobalt (%) Copper (000't) Cobalt (000't)

Indicated Oxide 2.1 1.7 0.1 35 2

Transitional 0.6 1.5 0.0 9 0

Fresh 0.4 1.2 0.0 5 0

Total- Indicated 3.1 1.6 0.1 49 2

Inferred Oxide 1.7 1.4 0.1 23 1

Transitional 2.4 1.3 0.0 32 1

Fresh 7.5 1.3 0.0 96 3

Total- Inferred 11.6 1.3 0.0 151 5

25

Appendix 2: Detailed Sase Resource

25

For

per

sona

l use

onl

y