For personal use only - Australian Securities · PDF fileFeasibility Study – Vermiculite Production Expansion Resource Reserve Marketing (coarse products) ... o Perfume absorbents,

  • Upload
    dodieu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

General Meeting

19 April 2011 For

per

sona

l use

onl

y

Disclaimer This document is not a disclosure document nor does it constitute the provision of financial product advice. No

representation or warranty is made as to the accuracy, completeness or reliability of the information. The

information is provided expressly on the basis that recipients will carry out their own independent inquiries into

the matters contained herein and make their own independent decisions about the affairs, financial position or

prospects of the Company which reserves the right to update, amend or supplement any information at any time

in its absolute discretion.

COMPETENT PERSONS STATEMENT The information in this report that relates to Mineral Resources is based on information compiled by Hennie Theart, BSc (Hons), MSc, PhD, Pr. Sci. Nat (SACNASP 400069/88), FSEG, FGSSA, FAAG; Shaun Crisp, BSc (Hons), Pr.Sci.Nat. (SACNASP 400076/09); and Brent Barber, BSc (Hons), MPhil, AusIMM (222559), AAPG (59319-8). Hennie Theart and Shaun Crisp are registered with the South African Council for Natural Scientific Professions (SACNASP), a JORC Recognised Overseas Professional Organisation "ROPO" and Brent Barber is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). They are full-time employees of SRK Consulting and have experience which is relevant to the style of mineralisation, type of deposits under consideration and to the activity which they have undertaken, to qualify them as a Competent Persons, as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves'. Hennie Theart, Shaun Crisp and Brent Barber consent to the inclusion in the report of the matters based on their information in the form and context in which it appears. The information in this release that relates to the Exploration Process is based on information compiled by A Johnstone who is a member of the Australian Institute of Geoscientists (AIG). Andrew Johnstone provides exploration management consulting services to Gulf Industrials Ltd and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which Andrew Johnstone has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Andrew Johnstone consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

For

per

sona

l use

onl

y

Gulf Board

NE Chairman Sir Sam Jonah KBE OSG

CEO Vic Fitzmaurice

CFO Wayne Kernaghan

NE Directors Mike Brook African Lion 3

Jonathan Best

Chris Innis

Bobby Jurd

Corporate Advisor Mark Arnesen

3

For

per

sona

l use

onl

y

Corporate Snapshot

Share on Issue 429 M (ASX : GLF)

Options 25M (ASX : GLFO)

52M (ASX : GLFOB)

39.5 M unlisted options

Major Shareholders African Lion 3 Ltd 18.6%

Jonah Capital BVI Ltd 14%

Top 20 Shareholders 52%

4

For

per

sona

l use

onl

y

Why Industrial Minerals?

Essential raw materials for a wide range of industrial and domestic products

Building blocks for industrialization Demand is consistent and long term

Vermiculite / phosphate / limestone

Logistics must be manageable and cost effective

Price increases >30% - 50% (Vermiculite from 2010 - 2011). F

or p

erso

nal u

se o

nly

Gulf Projects

6

Uganda – Namekara Vermiculite Mine

55Mt JORC Inferred Resource (Example: >50y mine life at 280,000tpa possible, thus not resource constrained)

Largest vermiculite resource with coarse grades

Preparation for expansion to 30,000 tpa in progress for July 2011

Operational Staffing successful

Expanded mining lease

Expansion planning in progress (base case to 80ktpa, and 130ktpa)

Carbonatite under explored (old Phosphate mine, Cu, Fe, REE, Etc.)

Madagascar

Soalara Limestone project

Logistics study completed

BFS planned

Kenya

Mwingi project (greenfields) – Review Strategy

For

per

sona

l use

onl

y

Namekara Vermiculite

Namekara Mine

Namekara Mine

For

per

sona

l use

onl

y

Namekara Vermiculite Resource

• JORC Inferred Resource (Red Block):

54.9mt @ 26.7% V_180μm

and 18.8% @ V_425μm

• Rio Tinto (2008)

• SRK Consulting (2009)

• 15m x 15m x 10m block model (grade

estimation by inverse distance weighted

method)

Total Contained Vermiculite: 100%

Premium (+9.50 mm) 8 %

Large Grade (+5.60 mm) 21 %

Medium Grade (+2.00 mm) 30 %

Fine Grade (+1.18mm) 20 %

< S/ Fine, micron, super-micron (-1.18mm) 21 %

For

per

sona

l use

onl

y

Vermiculite – from mine to final product

9

Vermiculite is a product of weathered phlogopite (mica), i.e. A natural mineral that occurs in the ground, in veins and mixed with other minerals in the soil.

Vermiculite ore is mined by opencast means in a quarry

The ore is dried, screened, crushed and winnowed (air separated) and produces a concentrate graded by size, and sold to Exfoliators.

Vermiculite expands when heated in a kiln, thus producing lightweight particles called ‘exfoliated’ or ‘expanded’ vermiculite.

Exfoliators will apply the exfoliated product in industrial processes or onward sell it

Its many uses are derived from its unique physical and chemical properties, mostly after exfoliation:-

low weight,

its capacity to absorb and slowly release liquids,

Its excellent insulation values against heat and sound and

its ability to withstand chemical attack.

For

per

sona

l use

onl

y

Vermiculite Process Flowsheet

10

For

per

sona

l use

onl

y

Vermiculite Markets

11

Namekara is one the world’s largest vermiculite resource with coarse grades (>60% of product)

Coarse grades attract higher prices (>100% price differential between “FINE” and “Coarse” product)

World demand 700ktpa – 1,000ktpa (Dupre) (Roskill 650ktpa)

Shortfall of 200ktpa – 400ktpa (Actual demand not being met)

Vermiculite pricing for 2011 increased between 30% and 50%

Namekara resource can produce up to 280ktpa (logistics study currently underway)

Dupre has sales orders >120ktpa (in Europe only) from 2012 onwards

Other producers:-

South Africa produce about 190ktpa, declining, no coarse grades

USA – Shortfall and declining mine production

India, China, Japan, etc. Shortfall

Brazil new capacity (Fine products only)

For

per

sona

l use

onl

y

Vermiculite Marketing DUPRE MINERALS

12

Dupre Minerals, a wholly owned subsidiary of the Goodwin Group PLC UK.

Experienced in vermiculite processing and marketing

o Experienced Sales force

o Purchase product F.O.B. Mombasa

o Handle all product from port to final destination

o Technical assistance (laboratory, product improvement, R&D, etc.)

World wide distributor of Namekara product

In discussions to assist Gulf to advance capacity to 130ktpa

For

per

sona

l use

onl

y

Vermiculite – Namekara

13

Trenching in the Pit, Pit dug at site of old RioTinto drill hole

PWC, Palabora (Very dark)

Unweathered Namekara (Darker)

Weathered Namekara (Light colour)

For

per

sona

l use

onl

y

Namekara Vermiculite Concentrate (Crude)

Medium

Premium Large

For

per

sona

l use

onl

y

Namekara Vermiculite Exfoliated F

or p

erso

nal u

se o

nly

Vermiculite uses

Industrial

o Friction products (Brakes, clutch, etc.)

Construction

o Fire proofing products

o Insulation and insulating products

Horticultural

Agricultural

General

16

For

per

sona

l use

onl

y

Namekara Vermiculite Sales Projection (000 tons pa)

0

20

40

60

80

100

120

140

2011 2012 2013 2014

Plant 3

Plant 2

Plant 1

For

per

sona

l use

onl

y

Namekara Current Status

18

Social, Environmental, Safety & Health

Good community relationships

Equator principles

Land relocation plan to date successful

Nil fatalities, Nil lost time accidents, Nil community incidents

Production sold

1,125t Q1/2011

1,351t Q2/2011

1,800t Q3/2011

Forecast 2,500t pm from July 2011

For

per

sona

l use

onl

y

Namekara Future

19

Feasibility Study – Vermiculite Production Expansion

Resource Reserve

Marketing (coarse products)

Logistics (130,000tpa confirmed)

Mine Planning (confirmed up to 280,000tpa product)

Plant Expansions planned (50,000tpa modules)

Exploration

Mining Licence increased

Additional minerals (Cu, Fe, Phosphate, REE)

Technical Studies

Phosphate, etc

Vermiculite extraction improvements

For

per

sona

l use

onl

y

Namekara Exploration

Resource and sterilisation drilling: Increased in drilling pattern around the mine to move JORC resource to reserve (mine planning)

Consultant appointed to review and renew Independent Competent Person’s Report (Due End 2011)

Exploration drilling and activities on tenements surrounding the mine (retain licenses in good standing)

Exploration targets identified and project planning in progress based on 2010 drilling (6 x RC Holes) and exploration

Drilling expected to start in May 2011

Target minerals – Vermiculite, Phosphate, Copper, Iron Ore, REE

20

For

per

sona

l use

onl

y

Namekara Rio Tinto Drilling (2 campaigns)

21

For

per

sona

l use

onl

y

Namekara Future

22

For

per

sona

l use

onl

y

Namekara Future - Exploration

23

For

per

sona

l use

onl

y

Namekara Export Route / Logistics study Confirmed 130,000tpa / 280ktpa underway

24

Namekara Mine Port of

Mombasa

For

per

sona

l use

onl

y

Namekara Export Route / Logistics study Confirmed 130,000tpa

25

For

per

sona

l use

onl

y

Namekara Mine – Vermiculite veins

26

For

per

sona

l use

onl

y

Namekara Mine pit

27

For

per

sona

l use

onl

y

Namekara haulers

28

For

per

sona

l use

onl

y

Namekara Mine – New Drier

29

For

per

sona

l use

onl

y

Namekara Exploration (2010)

30

For

per

sona

l use

onl

y

Community Clinic

31

For

per

sona

l use

onl

y

Community – New house for relocation

32

For

per

sona

l use

onl

y

Community – Food garden trials

34

For

per

sona

l use

onl

y

Community – first ladies employed

35

For

per

sona

l use

onl

y

Madagascar

36

For

per

sona

l use

onl

y

Company Growth Strategy

Madagascar Soalara concept planning:-

o Develop Soalara Limestone: From zero 2Mtpa (BFS limestone) 5Mtpa (PFS on

other products)

o Drilling / Environmental / BFS

o Time table – TBC

o Funding - TBC

Harbour development (3rd party) delayed

Logistic study completed (Confirmed temporary harbour solution for 2Mtpa)

Strategic Alliance discussions (Underpinning off take, logistics, etc)

Off take(s) strategy and timing critical

37

For

per

sona

l use

onl

y

Madagascar Limestone – Soalara Project F

or p

erso

nal u

se o

nly

Conclusion

39

For

per

sona

l use

onl

y

Conclusion

Company moving from very small scale vermiculite producer to significant staged expansion, underpinned by strong market demand and robust feasibility studies

Unlocking the exploration potential of one of the world’s largest Carbonatites

Assets under-explored

Capital Requirement

o Uganda vermiculite mine expansions

o resource and sterilisation drilling

o working capital

o Feasibility studies (future expansion)

o Evaluate growth opportunities

40

For

per

sona

l use

onl

y

Thank You

41

For

per

sona

l use

onl

y

General Meeting

19 April 2011 For

per

sona

l use

onl

y

General Meeting Additional Slides

19 April 2011 For

per

sona

l use

onl

y

Vermiculite – Uses

Industrial

Construction

Horticultural

Agricultural

General

44

For

per

sona

l use

onl

y

Vermiculite – Uses

Industrial

o Friction products, clutches, brake pads / shoes

o Fire proofing (paints, boards, plaster, etc.)

o Insulation (furnaces, buildings, molten materials, etc.)

o refractories

o Fixation of hazardous materials

o Insulation blocks and shapes

o Low & High temperature insulation

o Molten metal insulation

o Moulded products

o Nuclear waste disposal

o Paints

o Perfume absorbents, etc.

45

For

per

sona

l use

onl

y

Vermiculite – Uses

Construction o Acoustic finishes

o Air setting binders

o Construction boards (fire proof and insulating)

o Floor & Roof screeds

o Combined with Gypsum plasterboard

o Loose fill loft and wall insulation

o Filtration

o Ceiling boards

o Roof profiles and tiles

o Wall and floor tiles

o Floor boards

o etc.

46

For

per

sona

l use

onl

y

Vermiculite – Uses

Horticultural

o Blocking mixes

o Hydroponics

o Micro – propagation

o Potting mixes

o Root cuttings

o Seed germination

o Sowing compost

o etc.

47

For

per

sona

l use

onl

y

Vermiculite – Uses

Agricultural o Animal feed

o Anti-caking agent

o Bulking agent

o Fertilizer carrier

o Pesticide carrier

o Seed encapsulement

o Soil conditioner, etc

General o Kitty litter

o Flower decorations (freshness)

o Odour absorption, etc.

48

For

per

sona

l use

onl

y