  • Forward Looking Statements

    This presentation contains forward looking information, which is based on assumptions and judgments of management regarding future

    events and results. Such forward looking information, including but not limited to information with respect to the potential expansion of

    resources at Kipoi, production and expected recoveries from the Stage 1 mining, HMS and spiral system operation, and development of

    a Stage 2 SX-EW plant at Kipoi, involves known and unknown risks, uncertainties, and other factors which may cause the actual results,

    performance or achievements of the Company to be materially different from any anticipated future results, performance or

    achievements expressed or implied by such forward looking information. Such factors include, among others, the actual market prices

    of copper and cobalt, the actual results of current exploration, the availability of equity and debt financing, the volatility currently being

    experienced in global financial markets, the actual results of future mining, processing and development activities, changes in project

    parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's filings, is available under the

    Company’s profile on SEDAR at www.sedar.com.

    Competent Person Statement

    The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled

    by Mr. Brad Marwood, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Marwood has sufficient experience

    which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to

    qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral

    Resources and Ore Reserves’. Mr Marwood consents to the inclusion in the report of the matters based on his information in the form

    and context in which it appears.

    2

    Disclaimer

    For

    per

    sona

    l use

    onl

    y

    http://www.sedar.com/

  • 3

    Corporate Snapshot

    Corporate Snapshot

    ASX / TSX Code TGS

    Shares on Issue 673.5 million

    Share Price A$0.35

    Market Capitalisation A$238 million

    Options / Performance Rights on Issue

    38 million (Exp. Between Dec 12 – July14)

    Cash (31 Mar-12) US$9.6 million

    Debt (Trafigura facility) US$10.5 million

    Major Projects Equity

    Kipoi Copper / Cobalt, DRC (Mining Rights) 60%

    Sase Copper, DRC (Prospecting Rights) 100%

    Major Shareholders Undiluted Fully Diluted

    Trafigura 26% 28%

    Fidelity 6% 6%

    Front Street 4% 3%

    Macquarie Bank 3% 3%

    Directors 1% 2%

    ASX Share Price Performance

    Shareholders by Region

    0.00

    20.00

    40.00

    60.00

    %

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    $-

    $0.10

    $0.20

    $0.30

    $0.40

    $0.50

    $0.60

    $0.70

    Jan

    -11

    Mar

    -11

    May

    -…

    Jul-

    11

    Sep

    -11

    No

    v-1

    1

    Jan

    -12

    Mar

    -12

    Volume ('000)

    Share Price

    For

    per

    sona

    l use

    onl

    y

  • 4

    Tiger Strategy

    STRATEGY

    1 Stage 1 – low capital, high margin 35ktpa Cu HMS Plant

    2 Stage 2 – 50ktpa Cu SX-EW

    3 Stage 2 capex – fully funded from Stage 1 HMS cashflow

    4 Growth – expand Kipoi SX-EW to 100ktpa Cu through exploration

    5 Acquire accretive assets For

    per

    sona

    l use

    onl

    y

  • 5

    Stage 1 – HMS Ramp Up

    HMS plant exceeded nameplate in March 2012 producing 3,508 t of copper in concentrate

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    4,000

    -

    20,000

    40,000

    60,000

    80,000

    100,000

    May

    -11

    Jun

    -11

    Jul-

    11

    Au

    g-1

    1

    Sep

    -11

    Oct

    -11

    No

    v-1

    1

    Dec

    -11

    Jan

    -12

    Feb

    -12

    Mar

    -12

    Ap

    r-1

    2

    Copper (t) Ore Processed (t)

    Ore Processed Forecast Ore Cu Produced Forecast Cu

    For

    per

    sona

    l use

    onl

    y

  • 6

    Tiger Growth Profile

    1. Stage 2 SX-EW based on a Scoping Study and is subject to a DFS. 2. Expansion of production above 50ktpa is conceptual in nature, there has been insufficient work done in determining

    additional mineral resources and evaluation of other factors for increasing production and it is uncertain that such an expansion will eventuate in the future.

    3. Free cashflow excludes interest and tax payments

    For

    per

    sona

    l use

    onl

    y

  • 7

    Exploration 2Q12

    Planned Drilling by Target June Quarter

    1 Kipoi Central 2,700 m DD

    2 Kileba 2,450m DD

    3 Kipoi North 1,700m DD

    4 Judeira 4,000m DD 1,000m RC: Simba 2,000m DD1,500mRC

    5 Sase Central, South Kapampala 5,500m DD 1,500mRC For

    per

    sona

    l use

    onl

    y

  • 8

    Kipoi Mining Licence (55km2)

    For

    per

    sona

    l use

    onl

    y

  • 9

    Kipoi Central High Grade Lenses

    Kipoi Central

    For

    per

    sona

    l use

    onl

    y

  • 10

    Judeira

    Judeira South Cross Section Judeira South Collar Plan

    For

    per

    sona

    l use

    onl

    y

  • Located 10kms south of Kipoi and accessed via a direct road.

    The licence is highly prospective with 200kt Cu initial resource at Sase Central.

    Mwana, Mwana East and Kapampala are primary ore targets

    Sase South oxide and primary ore target

    2012 drilling program will focus on Sase South with 5,500m drilling planned.

    11

    Lupoto Prospecting Licence (140km2)

    For

    per

    sona

    l use

    onl

    y

  • Contact:

    Brad Marwood - Managing Director Phone: +61 (0)8 6188 2001

    Email: [email protected]

    Stephen Hills – CFO Phone +61 (0)8 6188 2002 Email: [email protected]

    Nathan Ryan – Investor Relations

    Phone: +61 3 96222 159 Email: [email protected]

    12

    Further Information

    For

    per

    sona

    l use

    onl

    y